HomeMy WebLinkAboutResolution - 042662F - Water/Sewer Improvements - Hemphill Contracting Co - Mackenzie Manor Addition - 04/26/1962RESOLtT.CION C42L*UjA -7F
Resolution accepting water and sewer system improvements for Lots 165
thru 183, Mackenzie Manor Addition,
WHEREAS, the developers of Lots 165 thru 183, Mackenzie Manor
Addition have complied with the provisions of the City of Lubbock Code,
Chapter 34, Article 2, by providing the water and sewer improvements for said
addition in accordance with paragraph 61 of said Chapter 34, and,
WHEREAS, the total utility cost to the developer is $5,311.55 with
the improvements constructed by Hemphill Contracting Company having a value of
$4,029.10 as determined by the unit prices established by said Chapter 34, and
$1,282.45 cash (engineering, wet tie-ins, paving repair, difference -in Pro Rat
and actual cost) paid to the City with the developer to receive a refund of
$534.05 in accordance with Chapter 34 of the Code of the City of Lubbock, and,
WHEREAS, the construction of the said water and sewer improvements
was performed under the supervision of the City Engineer and said improvements
have been completed in accordance with the City of Lubbock's plans and
specifications,
NOW THEREFORE BE IT RESOLVED BY THE CITY COMISSION OF THE CITY
OF LTJBBOCK:
1. That the improvements be and the same are hereby accepted as
an integral part of the water and sewage system of the City
of Lubbock.
2. That refund of the refundable cost in the amount of $534.05
be made in accordance with said Chapter 34.
3. This resolution shall take effect and be in force from and
after its passage.
PASSED AND APPROVED THIS 26th DAY OF April 1962.
Atte
enia Lowe, ity Secretary
Approved:
n T. Hickerson, City Engineer
r
d O. Senter, Jr.,