HomeMy WebLinkAboutResolution - 041262C - Street Improvements - City Engineer - York Avenue - 04/12/1962RESOLUTION (?\u4 17. 11, L
WHEREAS, the City Commission has heretofore determined that the City
would contribute the customary city portion of the cost of street paving im-
provements, as determined by City of Lubbock paving policy, to be constructed
in accordance with the standard City of Lubbock street plans and specifications
as approved by the City Engineer, and the owners of property abutting York
Avenue have requested permission to have pavement improvements constructed on
the aforementioned street and ,the paving of said street is needed to provide
access to the area during its construction period, and the City Engineer has
approved the plans and specifications for such improvements, and,
WHEREAS, the owners of the property abutting on the herein described
street will contract separately with a competent contractor for the above stree
improvements, and said improvements will be constructed in accordance with the
abovementioned plans and specifications under the supervision of the City Engil
eer, and the siad owners desire that.the City contribute its customary share
towards such paving, and,
WHEREAS, the contract cost of the paving improvements will not excee
$6840.133, the total cost not over $71b2.87, and the Cityts share in connection
therewith would not exceed $342.04, leaving the property owne0 s portion not t
exceed $6840.83, such costs being well within the current prices for paving
obtained by competitive bidding, and that such payment to be made by the City
reasonable, fair, and j ust to the abutting property owners, the City and all
other persons affected thereby, and that the sum of $342.04 will be duly bud-
geted, THEREFORE,
BE IT RESOLVED BY THE CITY C011MISSION OF THE CITY OF LUBBOCK:
Section 1. THAT, the City Engineer be and he is hereby authorized
approve plans and specifications for apving on the street herein described,
provided that such plans and specifications meet the usual requirements for
paving on street within the corporate limits of the City of Lubbock; said st
being as follows, to -wit:
York Avenue from its intersection with a line 160.92 feet North of the North
line of the drainage easement North of 29th Street to its intersection with a
line 18 feet South of the North line of 29th Street known and designated as
Unit Number 2084.
The City Engineer is further authorized and directed to duly inspect
said paving construction on said street and to require strictc;compliance with
the approved plans and specifications, and upon completion of said paving, and
upon final approval by the City Engineer and acceptance of such improvements b;
the City Commission, the City Engineer is authorized to pay the contractor in
full and final payment of the Cityts share of the cost of the abovementioned ij
provements a sum not to exceed $0.00 which is the City's share ($342.04) less
$342.04 engineering, leaving the amount due the contractor from the property
owners not to exceed $6840.83.
Section 2. This authority is conditioned that the owners of abuttin
property and the contractor will pay for all material and labor and costs incl
dental to such construction, indemnify the City of Lubbock against any costs,
is
claims or damages of every nature pertaining theretop and that the Contractor
furnish the City Engineer with acceptable evidence that the contractor and his
sub -contractors, if any,,are adequately covered by public liability and prop-
erty damage insurance policies, that the said owners of abutting property will
cause such paving to continue to be done according to the approved plans and
specifications, and that upon completion thereof and final approval of the
City Engineer, all improvements designated herein shall be a permanent part
of said street and the property of the City of Lubbock, without any liability
whatsoever, except for the payment of a sum cf$0.00 to the contractor.
On motion of Commissioner OT#axa , seconded b
Cozissioner Aldetson the foregoing resolution was unan-
imously passed by the City Commission this 12th day of April , 19 62
ATTEST:
�
Lavenua Lowe, City Secretary
the owners of abutting property on the abovementioned street, and
Bill Hood, Contractor, do hereby
accept and 'agree to fully abide by the foregoing provisions for the consider-
ations therein stated.
Golden Age Addition $811.78
Daniel Construction Company
Orville Davidson $20423.60
J. W. Baugh $769.46
$2,835.99
By l.i
Bill Hood, Contractor ,
By
Approved/
ohn T. Hickerson, City Engineer
Approved:
red a. Senter, Jr.� Ci ttorney