HomeMy WebLinkAboutResolution - 112663A - Pavement Improvements - City Engineer - Main St. & Broadway - 11/26/1963RES GLUT ION
WHEREAS, the City Commission has heretofore determined that the City
would contribute the customary city portion of the cost of alley paving im-
provements, as determined by City of Lubbock paving policy, to be constructed
in accordance with the standard City of Lubbock alley plans and specifications
as approved by the City Engineer, and the owners of property abutting the
east -west alley between Main Street and Broadway from Avenue T to Avenue U
have requested permission to have pavement improvements constructed on the
aforementioned alley and the paving of said alley is needed to provide access
to the area during its construction period, and the City Engineer has approved
the plans and specifications for such improvements, and,
WHEREAS, the owners of the property abutting on the herein described alle,
will contract separately with a competent contractor for the above alley
improvements, and said improvements will be constructed in accordance with the
abovementioned plans and specifications under the supervision of the City
Engineer, and the said owners desire that the City contribute its customary
share towards such paving, and,
.WHEREAS, the contract cost of the paving improvements will not exceed
$3,253.00, the total cost not over $3,415,65, and the City's share in connec-
tion therewith would not exceed $627.02, leaving the property owners portion
not to exceed $2,788.63, such costs being well within the current prices for
paving obtained by competitive bidding, and that such payment to be made by
the City is reasonable, fair, and just to the abutting property owners, the
City and all other persons affected thereby, and that the'sum of $627.02 will
be duly budgeted, THEREFORE,
BE IT RESOLVED BY THE CITY COMMISSION OF THE CITY OF LUBBOCK:
Section 1. THAT, the City Engineer be and he is hereby authorized to
approve plans and specifications for paving on the alley herein described,
provided that such plans and specifications meet the usual requirements for
paving on alleys within the corporate limits of the City of Lubbock; said
alley being as follows, to -wit:
The east -west alley between Main Street and Broadway from its intersection
with a line 12 feet east of the west property line of Avenue T to its
intersection with a line 12 feet west of the east property line of Avenue U,
known and designated as Unit .A,-363.
The City Engineer is further authorized and directed to duly inspect said
paving construction on said alleys and to require strict compliance with the
approved plans and specifications, and upon completion of said paving, and upoti
final approval by the City Engineer and acceptance of such improvements by the
City Commission, the City Engineer is authorized to pay the contractor in full
and final payment of the City's share of the cost of the abovementioned
improvements a sum not to exceed $464.37 which is the Cityls share ($627.02)
less $162.65 engineering, leaving.the amount due the contractor from the
property owners not to exceed $2788.63.
Section 2. This authority is conditioned that the owners of abutting
property and the contractor will pay for all material and labor and costs
incidental to such construction, indemnify the City of Lubbock against any
costs, claims or damages of every nature pertaining thereto, and that the
Contractor furnish the City Engineer with acceptable evidence that the
contractor and his sub -contractors, if any, are adequately covered by public
liability and property damage insurance policies, that the said owners of
Abutting property will cause such paving to continue to be done according
to the approved plans and specifications, and that upon completion thereof and
final approval of the City Engineer, all improvements designated herein shall
be a permanent part of said alley and the property of the City of Lubbock,
without any liability whatsoever, except for the payment of a sum of $464.37
to the contractor.
On motion of Commissioner O'Mara ,
seconded by Commissioner '91 lderson , the foregoing
resolution was unanimously passed by the City Commission this 26th day of
N e .@X-, 1963.
4
4-
licle F. Strong, Maydr
ATTEST:
al �4;,O Form Approved
Lavertia Lowe, C y Secretary
Gtr Airur_w
The owners of abutting property on the abovementioned alley, and Kenneth W.
Wright, Contractor, do hereby accept and agree to fully abide by the foregoing
provisions for the considerations therein stated.
KENNETH W. WRIGHT
CONTRACTOR
By ,
Lot 1 and the east 51 of 2 $ 78.25
c -
The west 451 of Lot 2 $ 64.03 IWUlct��� 7�
Lot 3 $128.05 "
A92\ J
Lot 4 and the E 1/2 of 5 $192.07 K
Lot 6 and the West 1/2 of 5 $192.07
Lot 7 and the East 1/2 of 8 $192.07
Lot 9 and the West 1/2 of 8 $106.71
Lot 10 and the East 1/2 of 11 $192.07
Lot 12 and the West 1/2 of 11 $106.71
Lot 13 $128.05 �.
Lot 14 $128.05
Lots 15, 16 and 17
Lots 18 and 19
Lot 20
Lots 210 22, 23 and 24
,approved;
tK
o T. Hickerson, City Engineer
41p oved * n /�
$ 384.15
$ 256.10
$ 128.07,
$ 512.20
Fred 0. Senter, Jr., ZiXy ,attorney