RESOLUTION ACCEPTING li'IPROVEMNTS ON PORTIONS OF STREETS AND/OR
AVENUES AS LISTED BELOW:
WHEREAS, the City of Lubbock passed a resolution on December 6,1962
authorizing the construction of street improvements by Pete Zahn, Contractor,
on portions of the following streets:
East 8th Street from its intersection with a line 7 feet east of the west
property line of Beech Avenue to its intersection with a line 20 feet east of
the east property.line of lot 1, Maner Addition, known and designated as New
Subdivision Unit Number 2094.
Beech Avenue from its intersection with a line 8 feet south of the south
property line of east 8th Street (west leg) to its intersection with a line
3 feet north of the north property line of the alley south of east 8th Street
(east leg), known and designated as New Subdivision Unit Number 2095.
AND WHEREAS, the improvements upon the said portions of the above-
mentioned streets have been inspected and found to have been constructed
according to the approved plans and specifications.
THEREFORE, BE IT RESOLVED BY THE CITY OF LUBBOCK, TEXAS
I.
That the improvements on said portions of the abovementioned streets
be, and the same are hereby accepted and the City Engineer be and he is hereby
authorized to direct the payment of the city's share.
II.
This resolution shall take effect and be in force after its passage.
PASSED AND APPROVED THIS 25TH DAY OF JULY, 1963.
Jack F. Strong, May
ATTE :
I8 enia Lowe, C y Secretary
ohn T. Hickerson, City Engineer
APP�ROV-E�D : Z (�
Fred 0. Senter, Jr., C;4 Attorney
City of Lubbock
POrter 3-3491
916 Texas Avenue
Lubbock, Texas
July 25, 1963
Honorable Mayor and City Commission
Lubbock, Texas
Gentlemens
I have examined the paving improvements constructed by
Pete Zahn, paving contractor, as'authorized by a resolution passed on
December 6, 1962 and find the improvements on East 8th Street and
Beech Avenue as listed on the final estimate sheet to have been
completed in accordance with the plans and specifications and recommend
that you accept the improvements on said streets and/or avenues, authorizing
payment to the contractor the amount shown on the attached consolidated
final estimate sheet as due him by the City of Lubbock.
Yours very truly,
John T. Hickerson
City Engineer
CONSOLIDATED FINAL ESTIMATE
GWO 2817
Accepted July 25, 1963
ULNTITIES
COST ESTIMATE
2,510.36 S.Y. Paving
1,376:44 L:F. Curb -& butter
24.00 S,Y. Alley_.Return
OST DISTRIBUTION
@ $1:60 4,016:58
@ $1:43 1,968:31
@ $5.40 129.60
CONTRACT COST $ 6,114.49
Unit &
Contract
Property
City to
S.Y.
Unit &
Owner Cost
S.Y.
L.F.
Alley
Sub -Unit
Location
Paving
C & G
Ret.
249.78
N.S. 2095
422.74
386.90
35.84
N.S. 2094
E. 8th St. from 71 east of the
WPL of Beech Ave. to 20' east
of the EPL of_Lot,-1, Mauer Add.
2,334.54
1,277.54
24.00
N.S. 2095
Beech Ave. from 8' south of -the
SPL of E. `8th St: (W*TA9) to
31 -north of tfte alley south of
E. 8th St. (E. Leg)
175.82
98!90
TOWS
2,510.36
1,376.44
24.00
COST ESTIMATE
2,510.36 S.Y. Paving
1,376:44 L:F. Curb -& butter
24.00 S,Y. Alley_.Return
OST DISTRIBUTION
@ $1:60 4,016:58
@ $1:43 1,968:31
@ $5.40 129.60
CONTRACT COST $ 6,114.49
Unit &
Contract
Property
City to
Sub -Unit
Cost
Owner Cost
Contractor
N:S: 2094
$ 5,691.75
5,441.97
249.78
N.S. 2095
422.74
386.90
35.84
TOUIS $ 6,114.49 5,828.87 285.62