Resolution accepting water and sewer system improvements for Lots
307 thru 400, Tarrytown Addition
WHEREAS, the developers of Lots 307 thru 400, Tarrytown Addition
have complied with the provisions of.the City of Lubbock Code, Chapter 34,
Article 2, by providing the water and sewer improvements for said addition in
accordance with paragraph 61 of said Chapter 34, and,
WHEREAS, the total utility cost to the developer is $23,628.69 with
the improvements constructed by Panhandle Construction Company having a value
of $18,574.59 as determined by the unit prices established by said Chapter 34,
and.$946.72 cash (engineering, wet tie-ins, paving repair, difference in Pro
Rata.and actual cost) paid to the city with the developer to receive a refund
of $214,89 in accordance with Chapter 34 of the Code of the City of Lubbock
and,a refund of deposit in the amount of $538.00 and,
WHEREAS, the construction of the said water and sewer improvements
was performed under the supervision of the City Engineer and said improvements
have been completed in accordance with the City of Lubbock's plans and
specifications,
NOW THEREFORE BE IT RESOLVED BY THE CITY COMKISSION OF THE CITY
OF LUBBOCK:
1. That the improvements be and the same are hereby accepted as
an integral part of the water and sewage system of the City
of Lubbock.
2. That refund of the refundable cost in the amount of $214.89
be made in accordance with said Chapter 34.
3. That a refund of deposit be made in the amount of $538.00.
4. This resolution shall take effect and be in force from and
after its passage.
PASSED AND APPROVED THIS 11TH
Attes /
La nia Lowe, C y Secreta y
Ap roved:
r
J n T. Hickerson, City Engineer
Approved:
01" 'i .
44 4 44z
e�cr -z
O. Senter, Jr., Ci ttorney
OF JULY, 1963
tack F. trong, Mayor