HomeMy WebLinkAboutResolution - 050963E - Water/Sewer Improvements - Hemphill Contracting Co - Willowick Addition - 05/09/1963HSOUITION
os�i63E
Resolution accepting water and sewer system improvements for Lots 73
thru 118, Willowick addition
WEEREAS, the developers of Lots 73 thru 118, Willowick Addition have
complied with the provisions of the City of Lubbock Code, Chapter 34, Article 2
by providing the water and sewer improvements for said addition in accordance
with paragraph 61 of said Chapter 34, and,
SBA$, the total utility cost to the developer is $12,366.65 with
the improvements constructed by Hemphill Contracting Company having a value
of $11,71542l�as determined by the unit prices established by said Chapter 34,
and:$1,219.82 cash (engineering,''et tie-ins, paving repair, difference to
)'p. y developer a
Pro Bata and'actual�cost aid to the cit with the develo er to receive.
refund of $1,556.33 in accordance with Chapter 34 of the Code of the City of
Lubbock.
WHEREAS, the construction of the said water and sewer improvements
was performed under the supervision of the City Engineer and said improvements
have been completed in accordance with the City of Lubbock's plans and
specifications,
NOW THEREFORE BE IT RESOLVED BY THE CITY COMMISSION (F THE CITY OF
LUBBOCK:
1. That the improvements be and the same are hereby accepted as
an integral part of the water and sewage system of the City
o€Lubbock.
2. That refund of the refundable cost in the amount of $1,556.63
be made in accordance with said Chapter 34.
3. This resolution shall take effect and be in force from and after
its passage.
PASSED AND APPROVED THIS 9TH DAY 1963.
ack F. Stiong, Itayor
Attes
1
dnia Lowe,
approved:
hn T. Hickerson, City Engineer
Approved:
Fred' 0. Sleenter, Jr.,
orney