Loading...
HomeMy WebLinkAboutResolution - 081364D - Pavement Improvements - J.R. Fanning - Yellow House Canyon Addition - 08/13/1964o I -41L RESOLUTION RESOLUTION ACCEPTING IMPROVEMENTS ON PORTIONS OF STREETS AND/OR AVENUES AS LISTED BELOW: WHEREAS, in conformance with the paving requirement provisions of Cit, Ordinance 1331, the subdivider of Yellow House Canyon Addition, made arrange- ments with J. R. Fanning for the construction of paving improvements on certain streets dedicated in said subdivision under the provisions of said Ordinance prior to the recording of the subdivision plat of Yellow House CanyoY Addition including the following streets: The South 1/2 of East 60th Street from its intersection with the East Lip Line of Olive Avenue to its intersection with the West Lip Line of Peach Avenue, known and designated as New Subdivision Unit Number 1303, East 61st Street from its intersection with the East Lip Line of Olive Avenue to its intersection with the West Lip Line of Peach Avenue, known and designated as New Subdivision Unit Number 1304. The East 1/2 of Olive Avenue from its intersection -with a line 37.5 feet North of the South Property Line of East 60th Street to its intersection with a line 320 feet South of the South Property Line of East 61st Street, known and designated as New Subdivision Unit Number 1307-A. The Nest 1/2 of Peach Avenue from its intersection with a line 37.5 feet North of the South Property Line of East 60th Street to its intersection with a line 320 feet South of the South Property Line of East 61st Street, known and designated as New Subdivision Unit Number 1308-A. The East 1/2 of Olive Avenue from its intersection with a line 3 feet South of the South Property bine of the alley North of East 60th Street to its intersection with the center line of East 60th Street, known and designated as part of New Subdivision Unit Number 1387. The North 1/2 of East 60th Street from its intersection with a line 13.5 feet East of the East Property Line of Olive Avenue to its intersection with the East Property Line of Lot 300, Yellow House Canyon Addition, known and designated as New Subdivision Unit Number 1388. AND.WHERE&S, the construction of the above improvements on the above- mentioned streets was performed under the supervision of the City Engineer, and said improvements have been completed and have been inspected and found to have been constructed in accordance with City specifications and in accordance with the provisions of City Ordinance 1331. THEREFORE, BE IT RESOLVED BY THE CITY OF LUBBOCK, TEXAS. I. That the improvements on said portions of the abovementioned streets be and the same are hereby accepted and the City Engineer be and he is hereby authorized to direct the payment of the City's portion of the cost. II. This resolution shall take effect and be in force from and after its passage. PASSED AND APPROVED THIS 13TH DAY OF AUGUST, 1964. -ATTZS:T Lav' is bowe,__C4t -Secretary APPROVED s T. Hickerson, City Engineer APPILOVED -2 Fred 0. Senter, Jr., Cit torney r Max Tidmore# Mayor PORTER 2. d 4 Of P.O. B o X 2 0 0 0 LUBBOCK. TEXAS 79408 August 130 1964 Honorable Mayor and City Council Lubbock, Texas Gentlemen: I have examined the paving improvements constructed by J. R. Fanning, paving contractor, under his contract with the subdividers.of Yellow House Canyon Addition and find the improvements on the West 1/2 of Peach Avenue from East 60th Street to 3201 South of East 61st Street, the East 1/2 of Olive Avenue from the alley North of East 60th Street to 3201 South of East 61st Street, East 60th Street from Olive Avenue to Peach Avenue and East 61st Street from Olive,Avenue to Peach Avenue as listed on the final estimate sheet to have been completed in accordance with the plans and specifications and recommend that you accept the improvements on said streets and/or avenues, authorizing payment to the contractor the amount shown on the attached consolidated final estimate sheet as due,him by the City of Lubbock. Yours very truly, JohnT. Hickerson City Engineer CONSOLIDATED FINAL ESTDWE YELLOW HOUSE CANYON ADDITION LOTS 257-261. 283-295 & 300-303 Accepted August 13, 1964 Unit & $1.49 S.Y. @ S.Y. S.Y. Sub -Unit Location Paving 6" Base L.F. C & G Alley Return Valley Gutter N.S. 1303 The S 1/2 of E. 60th St, from the E. 730,29 284,03 1307-A 39679.32 30679.32 lip line of Olive Avenue to the W. 1308-A 3,664.08 3,664.08 N,S. 1387 lip line of Peach Avenue 988.60 N.S. 1388 1,455.98 N,S. 1304 E. 61st Street from the E. lip line 19558.40 666,48 14,56 122,86 of Olive Ave, to the W, lip line of Peach Ave, N.S. 1307-A The E 1/2 of Olive Ave, from 37,51 10836.08 544.70 13,89 N. of the SPL of E. 60th St, to 320= S. of the SPL of E. 61st St. N.S. 1308-A The W 1/2 of Peach Ave, from 37.51 18821,33 543,10 14,85 N. of the SPL of E. 60th St, to 320; S, of the SPL of E. 61st St. Part of N.S. 1387 The E 1/2 of Olive Ave. from 3t S. 517,72 145.77 of the SPL of the alley N. of E. 60th St, to the center line of E. 60th St, N.S. 1388 The N 1/2 of E. 60th St, from 13.5t 710,67 266,5 E. of the EPL of Olive Ave. to the E. line of Lot 300 Yellow House Canyon Add, COST ESTIMATE 79174.49 S.Y. Paving 2,450.58 L.F. Curb & Gutter 43.30 S.Y. Alley Return 122.86 S.Y. Valley Gutter COST DISTRIBUTION TOTALS 7,174.49 @ $1.49 $ 109689.99 @ 1.49 3,651.37 @ 9.50 411.35 @ 1,49 183.06 CONTRACT COST $ 14,935.77 Unit & Contract Property Sub -Unit Cost Owner Cost N.S. 1303 $ 1,511.34 $ 1,511.34 N.S. 1304 39636,45 39636.45 N.S. 1307-A 39679.32 30679.32 N,S. 1308-A 3,664.08 3,664.08 N,S. 1387 988.60 988.60 N.S. 1388 1,455.98 1455.98 TOTAL $ 149935.77 $ 14,935.77 2,450.58 43,30 122.86