Loading...
HomeMy WebLinkAboutResolution - 031264C - Paving Improvements - Kerr Construction Co. - GWO 2848, A-366 - 03/12/1964RESOLUTION 03iZ641G RESOLUTION ACCEPTING IMPROVEMENTS ON A PORTION OF AN ALIEY AS LISTED BELOW: WHEREAS, the City of Lubbock passed a resolution on December 19, 1963 authorizing the construction of street improvements by Kerr Construction Co, on a portion of the following alley: The East-West alley between 26th Street and 27th Street from its intersection with a line 14 feet West of the East Property Line of College Avenue to its intersection with a line 163 feet East of the East Property Line of College known and designated as Unit A -366a AND WHEREAS, the improvements upon the said portion of the above- mentioned alley has been inspected and found to have been constructed according to the approved plans and specifications. THEREFORE, BE IT RESOLVED BY THE CITY OF LUBBOCK$ TEXAS I. That the improvements on said portion of the abovementioned alley be, and the same are hereby accepted and the City Engineer be and he is hereby authorized to direct the payment of the Cityrs share„ II. This resolution shall take effect and be in force after its passa PASSED AND APPROVED THIS 12TH(DAV OF MARCH, V,964a ATTEST`: Laven -Lower �C,ity Secretary , 7-Z-� T. 'Hickerson, City Engineer APPROVED: Fred 0. Senter, Jr., y Attorney F. Strong, Mayor Honorable Mayor and City Council Lubbock, Texas Gentlemen: City of Lubbock Porter 3-3491 916 Texas Avenue Lubbock, Texas March 12, 1964 I have examined the paving improvements constructed by Kerr Construction Company, paving contractor, as authorized by a resolution. passed on December 19, 1963 and find the improvements on'the East-West alley between 26th Street and 27th Street from College Avenue East 1601 as listed on the final estimate sheet to have been completed in accordance with the plans and specifications and recommend that you accept the improvements on said alley, authorizing payment to the contractor the amount shown on the attached consolidated final estimate sheet as due them by the City of Lubbock. ours very truly, John .,Hickerson City Engineer ..` CONSOLIDATED FINAL ESTIMATE GWO 2848 Accepted March 12, 1964 DANT 1T IES S .Y. Unit & Conc. L.F. Sub -Unit Location Paving C & G A-366 The E -W alley between 26th 199.47 37.3 St. and 27th St. from 14* W. of the EPL of College Ave. to 163.2* E, of the EPL of College Ave. COST ESTIMATE 199.47 S.Y. Paving 37.3 L.F. Curb & Gutter @ $5.75 1,146.95 @ $1.40 _ 52.22 CONTRACT COST $ 1,199.17 COST DISTRIBUTION Property Unit & Contract Owner Sub -Unit Cost Cost A-366 $ 1,199.17 $ 1,199.17