HomeMy WebLinkAboutResolution - 2021-R0095 - Downtown Facade Grant to 12K PropertiesResolution No. 2021-R0095
Item No. 6.11
March 23, 2021
RESOLUTION
WHEREAS, pursuant to Article IV, Section 5 of the Amended and Restated Bylaws of the
Market Lubbock Economic Development Corporation (the "Corporation"), the City Council
of the City of Lubbock (the "City Council"), as the Corporation's authorizing unit, has the
authority to approve all programs and expenditures of the Corporation; and
WHEREAS, the City Council finds that it is in the best interest of the public to approve the
program or expenditure, as proposed to the City Council by the Corporation, as set forth in
Exhibit "A" attached hereto and incorporated herein by reference; NOW THEREFORE:
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK:
THAT the Downtown Fagade Grant program or expenditure of the Corporation, in the
amount set forth in Exhibit "A" attached hereto and incorporated herein by reference, to be
provided to 12K Properties, LLC, is hereby approved pursuant to Section 5 of the Amended
and Restated Bylaws of the Corporation.
Passed by the City Council on March 23, 2021
DANIEL M. POPE, MAYOR
ATTEST:
Reb cca Garza, City Sec etary
APPROVED AS TO C N ENT:
Brianna Gerardi, Busi ss evelopment Director
APPROVED AS TO FORM:
K lli Leisure, Assistant City Attorney
ccdocs/RES. Market Lubbock DT Facade Expenditure - 12K Properties
02.25.21
Resolution No. 2021-R0095
RE 21-11
RESOLUTION APPROVING 12K PROPERTIES, LLC
1212 Avenue K
DOWNTOWN FACADE & PERMITTABLE GRANT
THE STATE OF TEXAS
COUNTY OF LUBBOCK
At a regular meeting of the Board of Directors of MARKET LUBBOCK ECONOMIC DEVELOPMENT
CORPORATION, INC., a Texas nonprofit corporation (MLI), on Wednesday, February 24, 2021, held in conformity with the
bylaws, after due notice as therein provided, a quorum being present and acting, the following resolution was unanimously
adopted:
WHEREAS, MLI staff presented to members of the Board the proposal of a possible Economic Development Grant
and Contract to 12K Properties, LLC for renovations to the property at 1212 Avenue K, located within the downtown TIF.
The scope of facade work will include new glass, painting, new sidewalk and framing totaling $33,900 in facade
expenses and scope of permittable work includes demolition, electrical, plumbing, framing, bathrooms, flooring and new roof
totaling $159,779 in permittable expenses for a grant total of $193,679 in expenses for this project. The terms and conditions
of such Economic Development Grant and Contract, other than the normal terms and conditions applicable to all such
Economic Development Grant and Contracts by the Corporation, are described generally as follows, to wit:
Grant 12K Properties, LLC, a Downtown Fagade Grant totaling $16,950 and a Downtown Permittable Grant totaling
$15,978 for the project at 1212 Avenue K, which is located within the Downtown TIF, once proof of payment has been
submitted.
WHEREAS, The Board of Directors of MLI finds that an Economic Development Grant and Contract offering the
incentive for providing assistance to renovations to their property, meet and comply with the qualifications and purposes of the
Corporation for the granting of such Economic Development Grants and Contracts.
Upon Motion by Director, Dr. John Opperman and Seconded by Director, Mr. Brett,
IT WAS RESOLVED that MLI offer and, if accepted by Recipient, enter into an Economic Grant and Contract with
12K Properties, LLC, for the improvements to the building at 1212 Avenue K, Lubbock, Texas. This Economic Development
Grant and Contract will be on the normal terms and conditions of such Downtown Grant Program and Contract offered by MLI
to existing businesses and business prospects and authorize the CEO to enter into and execute all documents related to the
Economic Grant and Contract.
i
John Osborne, President & CEO
Linda Davis, Secretary
MARKET LUBBOCK, INC. - DOWNTOWN GRANT PROGRAM
1212 Avenue K
(12K Properties, LLC)
TOTAL SCOPE OF WORK = $193,679
TOTAL GRANTS = $32,928
TOTAL FACADE SCOPE OF WORK = $33,900
FACADE GRANT = $16,950
TOTAL PERMITTABLE SCOPE OF WORK = $159,779
PERMITTABLE GRANT = $15,978
M A R K E T
Downtown Grant Program
Presented to MLI Board
February 24, 2021
Project 1212 Ave K (FaVade and Permittable)
12K Properties, LLC, managed by George Hardberger, is renovating their building at 1212 Ave K, located
within the Downtown TIF. Mr. Hardberger also owns multiple properties throughout the downtown
area, including his office/residence at 1602 Texas Ave.
The scope of facade work will include new glass, painting, new sidewalk and framing totaling $33,900 in
fagade expenses and the scope of permittable work will include demolition, electrical, plumbing, framing,
bathrooms, flooring and a new roof totaling $159,779 in permittable expenses for a grand total of
$193,679 in expense.
The MLI Board is being asked to consider a Downtown Facade Grant for 12K Properties, LLC totaling
$16,950 and a Downtown Permittable Grant totaling $15,978 at 1212 Ave K.
LUBB(*CK.
Downtown Grant - Application
The information requested on this form will be used by Market Lubbock, Inc. for analysis of your project.
MLI CONTACT INFORMATION
Jorge Quirino - Special Projects
Market Lubbock, Inc.
1600 Broadway, Sixth Floor, Lubbock, TX 79401
Phone: 806.749.4500
Email: 4orcieamarketlubbock.org
Date Initial Application Submitted (Due prior to start of construction or permits assigned) 09/11/20
Projected Project Start Date Immediate
Project Property Address
Property LCAD R#
1212 Ave. K, Lubbock, TX 79401
R109945
GENERAL INFORMATION ABOUT THE COMPANY
Company Name 12K Properties, LLC
Street Address P.O. Box 1219
City, State, Zip Lubbock, TX 79408
GENERAL INFORMATION ABOUT THE COMPANY CONTACT
Name
Title
Phone Number
Email
George Hardber er
Manager
806-548-1451
ghardbergerOgmail.com
INFORMATION ABOUT THE PROJECT
Property Ownership:
Own 0
Grant Type (May choose both if applicable): Permittable R
Lease ❑
Owner Approved ❑
Fagade ❑
uetwea Nroject Summary (incivaing projectea start aate) ana uescrnption of worK:
Interior: Remove asbestos in floor, drywall, build two ADA bathrooms, ceiling, lighting, paint, flooring,electrical,
plumbing. Exterior: New storefront, new exterior surface, paint, lighting, replace concrete in front of building and
new roof.
Summary of Expenses (detailed bids attached)
Projected
MLI Approved Reimbursement
Fagade
$33,900
$16,950
Permittable
$159,779
$15,978
TOTALI
$193,679
1 $32,928
Final bids will be used to ca►cu►ate the project cost and grant amount.
1 MLI 5.26.20
COMPANY BACKGROUND
List any person or entity that has at least 5% ownership in the Applicant Company:
Name Percent Name Percent
George Hardber er 50%
James Hardber er 50%
Is the firm registered with the Secretary of State's Office to do business in Texas? Yes
Are you in good standing with the State of Texas? Yes
If you answered "No" to either of the above two questions, please explain
Is the firm and/or principals delinquent on any federal, state or local tax obligations? No
Has the company or principals of the company had prior bankruptcies or lawsuits? No
If you answered "Yes" to either of the above two questions, please explain
APPLICANT'S RESPONSIBILITIES (PROPERTY OWNER OR LEASEE)
City of Lubbock requirements:
City of Lubbock - Planning Department 806-775-2108
Contact the City of Lubbock to determine the following:
❑ Does the scope of work meet downtown standards and guidelines?
❑ Are permits required for any aspect of the scope of work?
❑ Are public improvements required?
❑ Is there a current Certificate of Occupancy on file for this property?
Market Lubbock, Inc. (MLI) requirements:
Manager of Downtown & Special Projects (Jorge Quirino) 806-749-4500
Application Packet:
❑ Initial application (page one of this document) must be received by MLI prior to
the start of construction and/or before permits are assigned
All remaining documents must be received and an application packet
presented to the MLI Board no more than three months after the
initial application is received by MLI.
Date Final Documents Received:
❑ Copies of City permits or City approval
❑ Copy of Current Certificate of Occupancy
❑ Detailed Construction Bids or Schedule of Values
❑ Before Picture (prior to construction beginning)
❑ Architectural Plans (if applicable)
❑ Architectural Renderings (if applicable)
After completion of construction:
❑ Certificate of Occupancy or Similar City Document Approving Completion
(Applicant responsible for final scope of work matching approved scope)
Proof of Payment:
❑ PAID Invoices (must reference the approved project)
❑ Processed Checks, Bank or Credit Card Statements matching PAID
invoices (legible copies)
2 MLI 5.26.20
Overview
• An Applicant must be a valid Owner or Tenant (Lessee) of the property needing improvements
• Properties must fall within the Lubbock Downtown TIF boundaries (Central Business District TIF)
• Single -Family residences and duplexes are excluded.
• An Applicant is eligible to receive a permittable grant and/or fagade grant per property (LCAD R#
or Development Lot), per enterprise, per year. Must wait one year from approval to apply again for
the same property. (Expenses used in one application cannot be used in another application.)
• Applicant is not eligible for grant program funding if delinquent in property taxes according to
LCAD records - includes all LCAD properties listed in the applicant's name
• MLI disbursements are characterized as "reimbursable grants" - Applicant pays expenses first
• Expenses eligible for reimbursement must relate to reasonable costs or expenses.
• Receipt of an application is not a guarantee of grant approval.
Grant Types
Permittable Projects
• Improvements require a City of Lubbock permit
• Improvements may be made to the exterior and/or interior of the property
• Improvements must total a minimum of $10,000
• The permittable grant reimburses 10% of approved expenses up to a $100,000 grant
• Permittable scope of work that may be considered:
• HVAC
• Plumbing
• Electrical
• Structural
• Any other work requring a City of Lubbock permit
Fagade Projects
• Improvements may or may not require a City of Lubbock permit
• Improvements must be made to the exterior of the property facing the most prominent street
• Improvements must total a minimum of $1,000
• The fagade grant reimburses 50% of approved expenses up to a $25,000 grant
• Fagade scope of work that may be considered:
• Painting
• New windows and doors
• Signage
• Landscaping
• Parking lots
• Awnings
• Any other work that improves the appearnce of the fagade
Signature (not required for electronic submittals):
Date:
3 MLI 5.26.20
-IN
I E';i� ,r,i�
"rl
Q 806-543-2385 WWW.SHERWOODCONSTRUCTION.CO 4801 6TH LUBBOCK TX, 79416
ESTIMATE 1212 AVE K
1212 AVE K RENOVATION
FRONT FACADE RENOVATION $28,700
REMOVE CINDER BLOCK SECTION IN FRONT TO MAKE ROUGH OPENING FOR STORE FRONT GLASS
FRAME IN OPENING AND INSTALL CORRECT STRUCTUAL BEAM TO CARRY LOAD
INSTALL NEW COMMERCIAL GLASS STORE FRONT WITH DOUBLE DOORS
ADD SCRATCH COAT TO EXTERIOR TO PREP SURFACE TO SMOOTHE ROUGH SPOTS
PAINT EXTERIOR SURFACE OF FRONT AND SIDE OF BUILDING
BUILD AWNING TO COVER NEW STORE FRONT GLASS
ADD CEDAR WOOD OR METAL TO FUR OUT ABOVE NEW GLASS STORE FRONT
STAIN CEDAR TO PROTECT THE EXTERIOR
ADD WOODEN POSTS ON ANGLE TO SUPPORT AWNING
WRAP AWNING WITH METAL TO WEATHER PROOF THE WOOD FRAME
ADD NEW METAL EADGE ON ROOF TO MATCH NEW METAL AWNING
ADD EXTERIOR LIGHTING
EXTERIOR CONCRETE $5,200
REMOVE OLD CURB AND SIDE WALK
INSTALL NEW CURB AND SIDE WALK TO MATCH THE NEIGHBORING PROPERTY
TOTAL EXTERIOR RENOVATIONS $33,900
INTERIOR DEMO $4,350
REMOVE BACK ROOM SECOND STORY FLOOR AND CEILING
REMOVE OLD TIN CEILING EDGING AROUND PERIMETER
REMOVE COMERCIAL HOOD VENT
REMOVE WIRES AND AND PIPES IN CEILING
ELECTRICAL $6,560
REMOVE OLD ELECTRICAL CONDUIT AND WIRE
CLEAN UP BREAKER PANELS AND DEMO UNUSED ELCTRICAL WIRES
ADD NEW ELECTRICAL SUB PANEL
ADD NEW RACK LIGHTING THROUGH OUT BUILDING
ADD SPECIFIC DESIGNATED CIRCUTS FOR THE BUILDING
PLUMBING $7,875
REMOVE OLD PLUMBING LINES
CUT CONCRETE AND TRENCH A NEW LINE TO INSTALL NEW 3" SEWER DRAIN
INSTALL NEW PLUMBING DRAIN LINES FOR TWO NEW BATHROOMS
INSTALL NEW WATER LINES TO SUPPLY TWO NEW BATHROOMS
INSTALL NEW WATER HEATER
INSTALL NEW UNRINALS ANS SINKS FOR TWO NEW BATHROOMS
ADD FLOOR DRAINS TO BOTH BATHROOMS
FRAMING $8,580
FRAME 2X6 WALL AT THE BACK OF THE BUILDING TO COVER OLD BROKEN CLAY BLOCKS
SHEET ROCK NEW FRAMEING WALLS, TAPE AND BED READY FOR PAINT
BATHROOMS $7,460
FRAME NEW BATHROOM WALLS
SHEET ROCK BATHROOMS
INSTALL MIRRORS AND PROPER FIXTURES
INSTALL 3.0 DOOR IN BOTH BATHROOMS
BUILD HOT WATER HEATER CLOSET
PAINT BOTH BATHROOMS
INSTALL HAND RAILS WHERE NEEDED
AC SPIREL DUCT $2,300
REMOVE OLD FIBER BOARD PLENTUM
ADD NEW 16" SPIRAL DUCT WITH VENTS DOWN THE CENTER OF THE BUILDING
REPAIR PLASTER WALLS $2,500
PAINT INTERIOR $4,500
PAINT CEILING ALL ONE NUETRAL COLOR
PREP WALLS AND PAINT INTERIOR WALLS
POLISH CONCRETE FLOOR $3800
TOTAL INTERIOR RENOVATIONS $47,925
SHERWOODCONSTRUCTION
12-14-20
BATHROOM LAYOUT
9A, A •
ubC'ock
Of
APN:
6670000013100050000
'E ISSUED:
02-Feb-2021
PERMIT;
C OMM-112833-2021
SCOPE:
Commercial BuildingAlwratioas
ADI)RESS:
1212 Ave K
IDIVISION:
ORIGIN Al. TOWN LUBBC
CITY:
Lubbock
t
CITY OF LUBBOCK
PERMTRECEIPT
S1IBRWOQD 91IL, RWOOD DE, SIGN AND CCINSTRUC
Fee.Maim Fee
I Comm - Alteration/Relrusdeling
t Building Permst Plan l2ev�aw Fee 25% Of Permit F=;
Page I of I
PARCEL OWNER: 12 K PROPERTIES LLC
ADDRESS: PO BOX 1219
Cl'1VSTATF 17,,1P: LUBBOCK, TX 79408
BRAI
Contractor
Billing Contact
Yss
Paid To )[late Balance Iiue
$90.00 $0.00
S50.00 SO.00
Total SO.00
t Num Payment Gate Puymt nt 'Noe Eavtnent Note TransacllQn Tm R111inQ Contact Payment Amon
0731-02-02-2021 0210212021 Visa (We116 Fee Paymerst CASEY SHER* $140,00
Varga)
Pee Name CRItllll' DEBIT AMQlJ1YT
ACY:i uvr A(:COUNT PAID
Building meant Plan Ror+aw Fee 100.6222 100 150 $50.00
Comm •AlterahorditmodtUvg 100 W22 100-1548 $90,00
4CITY OF LiJBBOCK
L,"Ib o c
'W4 ALTERATIONS COMMERCIAL SUILI]ILVG
TEXAS
71—cfay. Feb--Oy 2, 2021 1i:24A,4fi Pugc 1 of2
Date lFntered X>MW tL:Z r lserntit "Rrr►a /Numbe,P t N
�Ll� umhc-r
02-Feb-2021 02-Aug-2021 COMM-112833-2021
I'a reel
PiTI: 41321
Addross: 1212 ,kv K
Zep: 794 0 !
Un its-
Subclivision, ORIGINAL TOw]V LU13130CK
K. Etnl Detail: 131-K 131 L 15
Zaano c of Constructiun Occalpwncy+
v-la
Proposed Development
437 - COMM*3MCtAL A""T-1r1 C)NS ts\1,t' 1:�1tAT10145
1%41N. I-IWIS13ED FI .00R 1cI.B1/, Not l3etc7rnined PER 'IAl31.,F 403 1. 7.3. 2009 MCC AJK4r- IT>MeW-r:s
FLOOD Pl_AIW?
ORIG "I' 1-U[3L30CK l3LK 131 1,15 2.4 �L4_00 :
DESCRIPTION'
COMMENT6-
• COMl6AENTS:
t�ESCF2IPTION:
CORRECTIVEACTION:
COMMENTS:
iif=COMM ENOATCON .
tea R6QUEFS r' ItiGiGGTiON9 CALL (pp6J773-31» ote IeaOo)f is-�174 rOK ISUJL .DING INSPECIZON ANL?
{806)775-2569 FOR VI/ATER UTILI-r1ES.
13xtertar facade work only. lncltadrs new curb to match neiahbor's and inat-11ation of Iiahting fixt� to
etxisting clectricnl
MMIUALiml Ss3S1� fsSi3} u �stC_O iic ui
$40,000.00 2.439.00
T City of CITY OF LUBl30CK
�Lub�OL►� ALTERATIONS C01v1<1vll✓RCIAL BUILDING
TEXAS
7'"e-VJ"y, Fab>•uo y 2. 2021 I/:24A1N Pugc 2 d%1 '2
Belt_ l_.nte-rad Data Expires P®rtnit 'Tvoe/[utnbcr
02-Feb -202 1 02-Aug-2021 4DOM M-1 12833 -2021
1'rofesssonal
st-MRL /OCD�f1 pES1C3N LTC C.
S1.1I;iiwOC313, CASIiY
6216 23Rp S-r-P EE"r
F-U13130CK, TX -79407
State License: ACT'IYr
Professiorual LicCnsa�
Required Inspections
r'ramina
Slab Muildrng
Footing
Building Final
Zaaring Final
Fire, Final
Notiee/Signa tore
Project Alumbor
806-543-2395
1 hereby certify that the above statements — true Pas--ts ecmc=rn[ng the oonmtructLon of the buLidiug i r other work for
which this application is made_ 1 also underscand that the issuance of'this permit dues not rctie%re the permit holder frcarta
the rosponslbility of complying with all applicuble City of Lubbock regulations, code's and ordinances and that faitura to
comply may subject the p•errnit holder to crimiraal atad/ar civil liability.
Issuance trethis city permit done not insane: eotnplinrsoa with state or redaral regulations, rules ar laws. t tandcrstaiaaJ that it
i9 tlsC msPo--Iii lJlity of r}ra p•orrralt ttaJdor or his o,gont9 to enat:t appiicabte state and Federal requiren ents. Phase
rcyui—ttcists essay Jzwlud:o, but are not lirtatted to, those trrepo®ad try tho ^211CriCnnA with I7isabilitier Act, the tJ. S.
GnvironrnCntal Protection Agency, the 'Texas ArebRec-tural Barriers Act, the T'oxos 17).opAL tmanit of Licetasing and
Iiagutation, the Texas 1Dapartmerrt of Health and the Texas Commisoin.s t'r F'.,..ri,.,A,.��new1 Quality. T7sic liat is not
all-inclusive and other fncleral ,rr irate rc clutra-mersty mny ba appliooblo.
Costomor slulasaturet - VarI ff lIt ionized I3y: 170303
Case Number: COMMA 12833-2021 Case Module: Permit Management
Inspection Date: 02/09/2021 Inspection Status: Passed
Inspector: Chad Price 1-2369 Inspection Type: Framing
Job Address: 1212 Ave K
Lubbock, TX 79401
Contact Type Company Name
Contractor SHERWOOD DESIGN AND CONSTRI
Checklist Item Passed
General Comments True
Parcel Number: 41321
Name
CASEY SHERWOOD
Comments
February 09, 2021
Page 1 of 1
$I:ALLCOFSPIV WITH ADO'TIf DnIE�:
AND 4111' OF LVtX30CV ELEFA MCA.
OfiDINAN :¢F> aULIjeUf T'O
FL7G- C_V7rvrl4 s'I-ige^mc
FOR ALL INSPECTIONS CALL
775-3159 OR 775-3174
CITY OF LUBBOCK JOB SET
ACCEPTED FOR CONSTRUCTION
SUSIECTTO THE BUILDING CODE
AND/OR FILED INSPECTIONS
,DRE��SS/S1rraZ��/a A k-w !t
TE.�, BY
GREEN & CphfiFlpt[OUS SPECIES (W
CARE PROFfISi[ ED IN ;H$ PARKWAY. I IoWS.tFR'1Ct 3WWLAID LpCALWNSTHAT MAY
WAY fRRIGATIOMSY.4PFe4c en�.n twv►
THESE PLANS SHALL REMAIN
ON THE JOB SITE DURING
CONSTRUCTION FOR ALL
INSPECTIONS UNTIL THE
BLDG :
p<<
ELEC. • SaL tejx- fr/iti
PLBG/MECH. -e
ZONING:
WATER:
_dK
TYPE OF CONST.: - !�
94. FT.: cET q�p
OCCUPANCY:
ZO.NU40 A"ROVW
DATE:, ola ...._
G G
I -') I -.;? Te>,-,,a s AP-e .
"qL i C— L X +er i or <'Q G Rep—*7 title l
ESTIMATE
SHERWOOD CONSTRUCTION
1212 AVE K
]� 1212 AVE K INTERIOR FINISH OUT RENOVATIONS
1
BUILD MECHANICLE ROOM $4,350
FRAME NEW WALLS FOR MECHANICLE ROOM
SHEET ROCK WALLS, TAPE MUD AND TEXTURE
INSTALL NEW 3-0 SOLID METAL DOOR
PLUMBING $9,050
ADD NEW PLUMBING FOR COMMERCIAL KITCHEN SINKS AND SERVICE BAR
ADD NEW WATER LINES FOR KITCHEN SINKS AND SERVICE BAR
ADD FLOOR DRAIN FOR KITCHEN AREA
INSTALL NEW HOT WATER HEATER TO SUPPLY BUILDINGS NEEDS
ELECTRICAL $ 1 4,450
ADD NEW ZOO AMP SERVICE PANEL AND ZOO AMP METER BASE
ADD NEW ELECTRICAL CIRCUITS FOR COMMERCIAL KITCHEN REQUIREMENTS
ADD NEW CIRCUITS FOR INTERIOR LIGHTING AND PROPER WALL PLUGS
INSTALL NEW TRACK LIGHTING IN CIELING FOR PROPER LIGHTING
INSTALL EXIT SIGNS AND REQUIRED SMOKE DETECTORS
INSTALL NEW ELCTRICAL IN BAR TOP AND SERVICE AREA
FRAMING $13,580
FRAME NEW KITCHEN PARTICIAN WALLS AND OTHER REQUIRED FRAMING NEEDED FOR CLOSET STORAGE OR OFFICE SPACE
SHEET ROCK NEW FRAMING WITH 5/8 SHEET ROCK, TAPE MUD AND TEXTURE
AC DUCT AND RETURN $8,200
INSTALL NEW SPIRAL DUCT TO HEAT AND COOL BUILDING
INSTALL TO CODE THE PROPER SIZE OF VENTING AND RETURNS FOR BUILDING
DOORS AND TRIM $9,550
INSTALL NEW DOORS NEEDED FOR KITCHEN AND STORAGE AND OFFICE SPACFS
INSTALL NEW COMMERCIAL BASE BOARD IN KITCHEN AND BUILDING
INTERIOR PAINT $8,450
PAINT ALL NEW PARTICIAN WALLS AND DOORS AND TRIM
PAINT AND SEAL NEW BAR TOP CABINETS
HOOD VENT $7,800
INSTALL COMMERCIAL HOOD VENT WITH PROPER CODE REQUIREMENTS (OWNER WILL SUPPLY HOODVENT)
SERVICE BAR TOP $8,560
DESIGN AND BUILD NEW BAR TOP TO SERVE CUSTOMERS
BUILD CUSTOM CABINETRY TO ACCOMIDATE NEEDS OF THE SERVICE AREA
INSTALL NEW SOLID SURFACE COUNTER TOPS ($1800 ALLOWANCE)
FIRE SAFETY $1,560
INSTALL PROPER FIRE EXTINGUISHERS NEEDS
INSTALL PROPER SIGNAGE NEEDED TO PASS FIRE INSPECTION
OBTAIN FIRE SAFETY INSPECTION PERMIT FEES
2-10-21
TOTAL $85,550 In addition to permittable scope of
work in previous (attached) bid.
Permits pending and due prior to
reimbursement.
wl*31"L`EIL' relt":7=FerIII 111re1:7=1, rHVerIII Ik' re
AMERICAN
ROOFING
& STORM RESTORATION
OFFICE Serving Lubbock Since 1982 Fax
806-866-2642 806-866-2645
P.O. Box 65122
Lubbock, Texas 79464-5122
PROPOSAL SUBMITTED TO
PHONE
DATE
GEORGEHARDBERGER
February 11,2021
STREET
JOB PHONE
JOB NAME
CITY, STATE, ZIP CODE
JOB LOCATION
1212 AVE K LUBBOCK, TX
We
estimates for:
INSTALL 60MIL TPO OVER EXISTING ROOF
INSTALL TPO PIPE BOOTS & PITCH POCKETS AS NEEDED
INSTALL COPING CAP OR TERMINATION BAR AS NEEDED
INSTALL EDGE METAL & COVER TAPE
REQUIRES A PERMIT
PRICE: $24, 300.00
COMMERCIAL TAX.- $2,004.00
WE PROPOSE HEREBY TO FURNISH MATERIAL AND LABOR --- COMPLETE IN ACCORDANCE WITH ABOVE SPECIFICATIONS, FOR THE SUM OF:
TWENTY SIX THOUSAND THREE HUNDRED FOUR AND NO/100 DOLLARS (S _ _ _ _ _ 26 304.00 _ )
n �]�-yi-- .-00 ----
All material is guaranteed to be as specified. All work to be completed in a workmanlike Authorized At.�(/7cJ�manner according to standard practices. Any alteration or deviation from above specifications
involving extra costs will be executed and will become an extra charge over and above the Signature------ ------ - - ------------------
estimate. All agreements contingent upon strikes, accidents or delays beyond our control.
Owner to carry fire, tomado and other necessary insurance.
PAYMENT DUE UPON COMPLETION OF JOB
ACCEPTANCE OF PROPOSAL --- The above prices, specifications and conditions are
satisfactory and are hereby accepted. You are authorized to do the work as specified. Payment
will be made as outlined above.
SIGNATURE
Note: This proposal may be withdrawn
by us ifnot accepted by: - - -- Thursday _Feb , 25,2021
Date of Acceptance:
PLEASE SIGN & RETURN
ADDITIONAL PROVISIONS
The Contract on the face hereof and any "Texas law requires a person insured under a
agreement made pursuant thereto between property insurance policy to pay any deductible
Parsley Roofing Inc. dba• American Roofing applicable to a claim made under the policy. It is a
(the "Company") and the customer(s) (the violation of Texas law for a person or business
"Customer") will be subject to all appropriate paid wholly or partly from proceeds of a property
laws, regulations, and ordinances, and to the insurance claim to knowingly allow the policyholder
following special terms and conditions: to fail to pay, or assist the policyholders failure to
pay, the applicable insurance deductible. "
1. Payment shall be made upon the following terms: Net cash upon completion of work. if work is of such nature that it will exceed one calendar month, partial payment shall be made on the
tenth (10) of each calendar month, based on the work completed and material on the job as of the last day of the preceding month as evidenced by our statement.
2. Should default be made in payment of the contract, charges shall be added from date thereof at a rate of one and one-half (1-1/2%) per month (18%) PER ANNUM) or maximum allowed by
law with minimum charge of $2.00 per month, and if placed for collection, customer agrees to pay all cost of such actions as attorney fees and legal and filing fees by accepting said contract.
3. By signing of this agreement, the parties to such agree that the Company reserves the right to file a materialman's and mechanic's lien should any payment which shall arise as a result of the
contract be disputed by and between the parties to this contract.
4. The Company shall have no responsibility for damage from fire, windstorm, or other hazard, as is normally contemplated to be covered by Builder Risk or Homeowners insurance, unless a
specific written agreement be made thereof prior to commencement of the work.
5. Any new electrical accessories will be installed by a licensed electrician at Customer's cost.
6. Replacement of deteriorated decking, fascia boards, roof jacks, ventilators, flashing or other materials, unless otherwise stated in the contract, are not included and will be charged as an extra
on a time and material basis.
7.Our company reserves the right to file for supplemental claim due to material or labor increases caused by supply and demand of storm catastrophe or if insurance measurements are proven to
be incorrect and additional payment is required for completion of work.
8. Due to vibration while a new roof is being installed, it is the home owners' responsibility to secure wall hangings and interior and exterior light fixtures that have loose fitting parts. These have
been known to fall during construction and the Company will not be responsible for these occurrences.
9. We are considerate of the customer's gardening, flowerbeds and landscaping. Due to the nature of the roof system installation, some damage may occur and we will not be responsible for any
damage.
10. Contractors and material suppliers will require driveway access. We will not be held responsible for any damage to your driveway as they are at times undermined and we cannot
predetermine this condition.
11. We, our crews, either ship or bring an additional small quantity of material to insure adequate supplies for the work to be completed. Leftover materials remain the property of the Company.
12. We will not be responsible for any pre-existing structure problems. Please note that some roofs have pre-existing defects (sunken and/or broken rafters, etc.). The
installation of a new roof system may enhance this appearance. The Company will not assume any responsibility if this should occur.
13. During winter installations, fiberglass shingles may not lay completely flat until they have had time to relax.
14. The company warrants that the Contract Work will be performed in a workmanlike manner for its intended purpose. Subject to all other provisions of this contract, the Company warrants our
roof system to be free from leaks for the period stated on front of contract. All liability of the Company is limited to the repair of any workmanship and/or defects causing leaking. The Company
makes no other warranties, whether expressed or implied, with regard to this project and expressly disclaims all other warranties not listed. The Company makes no other warranties, whether
expressed or implied, with regard to any deficiencies, or defects in the materials supplied. The Owner agrees to look only to the manufacturer of the materials provided for any warranties
regarding any deficiencies or defects in the material supplied.
15. The Company is not responsible for any damage below the roof, due to leaks by excessive wind, ice, snow or hail during the period of the warranty.
16. If the material has to be reordered or restocked because of a cancellation by the Customer, there will be a restocking fee equal to fifteen percent (150'u) of the contract price.
17. The Company will not be held responsible for the cost of the realignment of satellite dishes or any other electronic devices on site.
18. Unless otherwise stated, the Company is not responsible for any realignment, reinstalling or replacement costs associated with damage from roofing to the air conditioning system, including,
but not limited to, a nail in the freon line located under decking, recharging compressors, condensers, blowers, and any part of the complete air conditioning and heating systems.
19. If this contract is cancelled by the Customer later than three (3) days from execution, customer shall pay to the Company fifteen percent (15%) of the contract price as liquidated damages, not
as penalty and the Company agrees to accept such as a reasonable and just compensation for said completion.
20. This contract cannot be cancelled once work is commenced except by mutual written agreement of the parties.
21. This agreement constitutes the entire agreement between the parties. It may be changed only by written instrument signed by both parties.
22. If any provision of this statement should be held to be invalid or unenforceable, the validity and enforceability of the remaining provisions of this agreement shall not be affected thereby.
23. Any representations, statements, or other communications not written in this Contract are agreed to be inmmaterial, and not relied on by either party, and do not survive the execution of this
Contract.
24. These conditions shall be considered a part of any contract entered into or authorized to proceed, 0me same as if they were included therein.
25.Our Company will not be held responsible or liable for any mold issues. Mold and the prevention of mold is a maintenance issue, and is the responsibility of the Customer for the prevention
thereof.
The parties irrevocably agree to submit to arbitration any controversy hereafter arising between them, including any claims of tort, breach of contract or violation of statute or common law in an) wt9y related to this
contract or the goods and services provided hereunder. The arbitration will be conducted under the odes of the Better Business Bureau. The arbitration will be held in Lubbock Counts not less than days' notice to the
parties, but otherwise as soon as the arbitrator is able to conduct the arbitration. The arbitration wilt include a one hourfiled examination of the work done and will be concluded by 5: 00 pun on the day it begins. The
arbitrator's award will be binding and final as to all matters that could have been brought at doe time of orbitration.
Responsibility of Maintenance of Roof
The following conditions are unrelated to defects in the roofand therefore are not covered by the warranty. The maintenance tips provided below will help you get the best service from your new roof. 1. If damage is caused
by fire, lightning, windstorm, hailstorm, etc., or interior damage from moisture, notify your insurance company immediately and call us. 2. Accumulation of leaves or pine needles in gutters and roof valleys produces what Is
known as a "water dam'. A water dam can force water under the shingles and produces leaks throughout the roof substructure. These leaks can travel along roof joints, etc. and produce interior damage at points far distant
from the leak. Therefore, provisions should be made for the removal of debris or ice. 3. Adequate ventilation will keep attic temperatures close to those outside, helping to prevent the deck delamnathon of the roof and the
formation of ice dams in gutters and valleys. Adequate ventilation is essential to the fife ofasphalt shingles. 4. Installation or relocation of antennae or other equipment on the roof may cause leaks unless proper sealants are
used at any point where screws or other anchoring devices enter the roof. Avoid unnecessary roof traffic, since it can greatly durunish the life of the roof. 5. Leaking can occur in or around the chimney unless it is periodically
tuck -pointed. Normal settling of your house through the years will cause leaking conditions. In addition, the flashing compound around the chimney and vent pipe areas requires normal maintenance on a year to year basis.
These areas should be inspected periodically for cracking or indications of weathering and should be re -flashed accordingly. It is agreed that it is the responsibility of the owner to follow these maintenance tips to extend the
Gr ..r,..,...eW —r—A ,,. ,.r., .,,,, ,,,,.I,1 t.-.— ,I,.......,,.,.,....