HomeMy WebLinkAboutResolution - 032571B - Change Order 1 To Contract - Pharr Construction Co - Airport - 03/25/1971p8257/ i°�
RESOLUTION
IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK:
THAT the Mayor of the City of Lubbock BE and is hereby authorized and
,ected to execute for and on behalf of the City of Lubbock CHANGE ORDER NO. 1
the Contract between the City of Lubbock and Pharr Construction Company,
vering additions to the Flight Service Station, Lubbock Regional Airport, attache
rewith which shall be spread upon the minutes of the Council and as spread upon
minutes of this Council shall constitute and be a part of this Resolution as if
ly copied herein in detail.
ssed by the City Council this 25th day of Ma/h? 1971.
TTEST:
r
"sem
,aveni :Lowe, City Se
.PPROVED:
. Seater, Jr ,
ary-Treasurer
ATCHE"DNi ATKIN50N AND ['+RTWRIGHT
;.,
ARCHITECTS AND ENGINEERS - MEMBERS OF THE A.I.A.
1214 FOURTEEIJTH STREET BUTTE 1D6 AC ®06 PO Z-0174 M 21-n K TEXA
� • 8 79401
Architect's Job No. 091-69 CHANGE ORDER NO. 1
Amount: Plus/ke X $ + 1,054.00 Issued. February 22, 19 71
TO: Pharr Construction CompaiIy, Lubbock, Texas, General Contractor.
You are hereby authorized to make the following changes in your contract for the construction of
Addition to Existing Terminal Building for Flight Service Station Lubbock Regional Airport.
for Owner,_ The City of Lubbock, Texas.
Any new work covered under this Change Order, shall comply with the applicable provisions of the
original plans and specifications with no change in warranties.
ADD DEDUCT
1. Construct expansion joint and other revisions at Nortll Entpm=e
as shown on Supplementary Drawing No. ,2, dated 2,/4/71.
All work to be done incompliance with specifications for
similar materials in the original specifications. 994.00
2. Extend electrical service from point now shown to be 1310"
from north wall and ft" from the east wally to a point 15'8"
from the north wall and 9�6" from the east wall (F.S.S. OPS). 60.00
Total addition to contracts $1,054.00
The amount of the contract will be increased/AXXXXf, & in the sum of One Thousand
Fifty-four and•no/100---------------------------- Dol lays ($ 1(054.00
with a uweom» xhsxra3=e/no change in the contract timer
t of Original Contract Total Additions- Total Deductions Contract to Date
Amoun.
_ $129,988.00 $1,054.00
ACCEPTED: —�---- -- — APPROVED:-~—
PHARR CONSTRUCTION COMPANY i:: THE CIN OF LUBBOCKs TEXAS
Contractor Owner
BY,)B
Date Date
ITEM 36