Loading...
HomeMy WebLinkAboutResolution - 041372A - Agreement - Lubbock Labs - Foundation Investigation, Memorial Civic Center - 04/13/197244�/372A RESOLUTION M IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK: THAT the Mayor of #fie City of Lubbock be and is hereby authorized and {directed to emote for and as behalf of the City of Lubbock as Agreement to ftrar of Lubbock tabs, attached herewith Which shall be egad Wn the minutes 4t the Conactl and as spread upon the minutes of this Council shell constitute and be a part of this Resolution as g fully copied herein in detail. Passed by the City Council this ,...�1 day of �PRI6? 1972. J � S �xy WA i UR •iTTESTr JJ /! I Lavinia Lowe, City Secretary -Treasurer APPROVED AS TO FORM: m4 d. Sentet', jr., City Attorney ... «e ttrcbitecis t;rega-�� 1611 BROADWAY / Sqzy / LUBBOCK, TEXAS 19401 / PHONE (806)163.4109 pet lM1CiniHLL � +' IA1Yi.X7 hltCil I ' tF I - 4LL XI lIt1�IXI1 / UA�p�ril 5, ]972 . Mr. Al Couch Director of Public Services P. 0. Box 2000 Lubbock, Texas 79408 RE: Memorial Civic Center -Foundation Investigation> Dear Mr. Couch: - In accordance with paragraphs 2.4 and 2.7 of Article 2 of our Agreement with the City of Lubbock for the above referenced project, we request that we be furnished twenty-nine (29) test borings, to a depth of thirty feet (30'-0"). The required locations for the test borings are indicated on the enclosed Partial Site Plan, dated April 5, 1972. We request samples be taken by standard split spoon sampler with penetration values at five (5) foot .intervals.and/or at change of strata. We require the following information be included in the report: 1. Bearing capacity for spot footings at 5'-011, ' 151-011, 20'-0", and 25' -QU° 1 ev0 s . , 2. Water levels, if any. , 3. Design recommendations for bearing capacity of continuous footing and for point loads or drilled spot footings. Should the requested sub -surface investigations indicate any unusual conditions, we may require that further investigations be conducted. We would appreciate your prompt attention to this request as the information is needed as soon as possible. Very truly yours, THE ARCHITECTS GROUP _ E. Paul King EPK:dsb ' Enclosure as noted cc: Cason & Associates ITEM 2 Y McMurtry & Craig