Loading...
HomeMy WebLinkAboutResolution - 080973G - Pavement Improvements - Roehr Construction Inc - Newman Addition - 08/09/1973a RESOLUTION RESOLUTION ACCEPTING IMPROVEMENTS ON PORTIONS OF STREETS AND/OR AVENUES AS LISTED BELOW: WHEREAS= in conformance with the paving requirement provisions of City Ordinance 1331, the subdivider of Newman Addition Tract A, made arrangements with Roehr Construction, Inc. for the construction of paving improvements on certain streets dedicated in said subdivision under the provisions of said Ordinance prior to the recording of the subdivision plat of Newman Addition including the following streets: 53rd Street from its intersection with the East lip line of Chicago Avenue to its intersection with the West lip line of Bangor Avenue known and designated as New Subdivision Unit Number 2014-43. Part of curb and gutter on North side plus stub at Bangor. Bangor Avenue from its intersection with the South lip line of 50th Street to its intersection with a line 16.00 feet South of the South property line of 53rd Street known and designated as New Subdivision Unit Number 2014-45. AND WHEREAS, the construction of the above improvements on the above- mentioned streets was performed under the supervision of the City Engineer, and said improvements have been completed and have been inspected and found to have been constructed in accordance with City specifications and in accordance with the provisions of City Ordinance 1331. THEREFORE$ BE IT RESOLVED BY THE CITY OF LUBBOCK$ TEXAS. That the improvements on said portions of the above-mentioned streets be and the same are hereby accepted and the City Engineer be and he is hereby authorized to direct the payment of the City's portion of the cost. This resolution shall take effect and be in force from and after its passage, PASSED'AND APPROVED THIS 9TH DAY OF AUGUST, 1973 ATTEST: _ -- - orris W. Turner, Mayor Lave 'a Lowe, City' Secretary APPROVED APPROVED: CONSOLIDATED FINAL ESTIMATE NEWMAN ADDITION - TRACT A Accepted August 9, 1973 _ QUANTITIES S.Y. L.F. S.Y. L.F. Unit & Paving Curb & Alley Curb':& -Gutter L.F. Sub -Unit Location 6" Base Gutter Return Removal Re -surfacing NS 2014-43 53rd Street from 148.76 568.54 the ELL of Chicago Avenue to the WLL of Bangor Avenue. Part of curb and gutter on North side plus stub at Bangor Avenue. NS 2014-46 Bangor Avenue from 3,628.86 1,559.08 12.22 92.00 92.00 the SLL of 50th St. to 16.00 feet South of the SPL of 53rd Street. :- TOTAL QUANTITITES 3,77:'x.62 2,127.62 12.22 92.00 92.00 COST ESTIMATE 3,777.62 S.Y. Paving 6" Base 2,127.62 L.F. Curb & Gutter 12.22 S.Y. Alley Return 92.00 L.F. Re -surface 92.00 L.F. Curb & Gutter Removal COST DISTRIBUTION Lump Sum Contract Cost $12,000.00 Property Unit & Contract Owner Xub-Unit Cost Cost NS 2014-43 Lump Sum NS 2014-45 Lump Sum Total Lump Sum Contract 12,000.00<:•.: