Loading...
HomeMy WebLinkAboutResolution - 080973D - Pavement Improvements- HA Padgett Building Contractor- Planter's Industrial Add - 08/09/1973d �tO175n RESOLUTION RESOLUTION ACCEPTING IMPROVEMENTS ON A PORTION OF A STREET AS LISTED BELOW: WHEREAS, in conformance with the paving requirement provisions of City Ordinance 1331, the subdivider of Planter's Industrial Park Addition Tracts5, made arrangements with H. A. Padgett, Jr., Building Contractor, for the con- struction of paving improvements on certain street dedicated in said subdi- vision under the provisions of said Ordinance prior to the recording of the subdivision plat of Planter's Industrial Park Addition Tract 5 including the following street: North half of East 12th Street from the East lip line of the Loop 289 access road to 540.15 §eet East of the East lip line of the Loop 289 access road, known and designated as New Subdivision Unit Number 2017-10. AND WHEREAS, the construction of the above improvements on the above- mentioned street was performed under the supervision of the City Engineer, and said improvements have been completed and have been inspected and found to have been constructed in accordance with City specifications and in ac- cordance with the provisions of City Ordinance 1331. THEREFORE, BE IT RESOLVED BY THE CITY OF LUBBOCK, TEXAS. That the improvements on said portions of the abovementioned street be and the same are hereby accepted and the City Engineer be and he is here- by authorized to direct the payment of the City's portion of the cost. This resolution shall take effect and be in force from and after its passage. PASSED AND APPROVED THIS 9th DAY OF AUGUST, 1973. `ATTEST: Lavenia Lowe,° Cit Secretary APP VED: Wi d D. Watson, City -Engineer Morris W. Turner, Mayor AP�OVEDc r Fred 0. Senter, Jr, C' y Corney U S N CONSOLIDATED FINAL ESTIMATE PLANTER'S INDUSTRIAL PARK ADDITION, TRACT 5 Accepted August 9, 1973 ITIES S.Y. 6.Y. It Paving L.F. Valley b -Unit Location 6" Base C & G Gutter 5 2017-10 N1/2 East 12th St. from the ELI.Q. of Loop 289 access road to 540.15' East of the E1L', of Loop 289 ac- cess road. COST ESTIMATE 1493.36 S.Y. Paving 6" Base 552.92 L.F. Curb & Gutter 24.44 S.Y. Valley Gutter COST DISTRIBUTION nit & Contract ub-Unit Cost S 2017-10 $5,709.00 1493.36 552.92 24.44 @ $2.75 $4,106.74 @ 2.50 1,382.30 @ 9.00 219.96 CONTRACT COST $5,709.00 Property Owner Cost $5,709.00