RESOLUTION
RESOLUTION ACCEPTING IMPROVEMENTS ON A PORTION OF A STREET AS LISTED
BELOW:
WHEREAS, in conformance with the paving requirement provisions of City
Ordinance 1331, the subdivider of Planter's Industrial Park Addition Tracts5,
made arrangements with H. A. Padgett, Jr., Building Contractor, for the con-
struction of paving improvements on certain street dedicated in said subdi-
vision under the provisions of said Ordinance prior to the recording of the
subdivision plat of Planter's Industrial Park Addition Tract 5 including the
following street:
North half of East 12th Street from the East lip line of the Loop 289 access
road to 540.15 §eet East of the East lip line of the Loop 289 access road,
known and designated as New Subdivision Unit Number 2017-10.
AND WHEREAS, the construction of the above improvements on the above-
mentioned street was performed under the supervision of the City Engineer,
and said improvements have been completed and have been inspected and found
to have been constructed in accordance with City specifications and in ac-
cordance with the provisions of City Ordinance 1331.
THEREFORE, BE IT RESOLVED BY THE CITY OF LUBBOCK, TEXAS.
That the improvements on said portions of the abovementioned street
be and the same are hereby accepted and the City Engineer be and he is here-
by authorized to direct the payment of the City's portion of the cost.
This resolution shall take effect and be in force from and after its
passage.
PASSED AND APPROVED THIS 9th DAY OF AUGUST, 1973.
`ATTEST:
Lavenia Lowe,° Cit Secretary
APP VED:
Wi d D. Watson, City -Engineer
Morris W. Turner, Mayor
AP�OVEDc
r
Fred 0. Senter, Jr, C' y Corney
U
S
N
CONSOLIDATED FINAL ESTIMATE
PLANTER'S INDUSTRIAL PARK ADDITION, TRACT 5
Accepted August 9, 1973
ITIES
S.Y. 6.Y.
It Paving L.F. Valley
b -Unit Location 6" Base C & G Gutter
5 2017-10 N1/2 East 12th St.
from the ELI.Q. of Loop
289 access road to
540.15' East of the
E1L', of Loop 289 ac-
cess road.
COST ESTIMATE
1493.36 S.Y. Paving 6" Base
552.92 L.F. Curb & Gutter
24.44 S.Y. Valley Gutter
COST DISTRIBUTION
nit & Contract
ub-Unit Cost
S 2017-10
$5,709.00
1493.36 552.92 24.44
@ $2.75
$4,106.74
@ 2.50
1,382.30
@ 9.00
219.96
CONTRACT COST
$5,709.00
Property
Owner
Cost
$5,709.00