HomeMy WebLinkAboutResolution - 041273E - Water/Sewer Improvements - Adobe Co - Lots 1-54 Keystone Addition - 04/12/19730
0!%//Z?3 E
RESOLUTION
Resolution accepting water and sewer system improvements for Lots 1 thru
54, Keystone Addition.
WHEREAS, the developer of Lots 1 thru 54, Keystone Addition has complied
with the provisions of the City of Lubbock Code, Chapter 34, Article 2, by
providing the water and sewer improvements for said addition in accordance wi
paragraph 61 of said Chapter 34, and,
WHEREAS, the total utility cost to the developer is $17,088.33 with the
improvements constructed by Adobe Construction Company having a value of
$12,432.04 as determined by the unit prices established by said Chapter 34, an
$4,676.29 cash (engineering, wet tie-ins, paving repair, difference in Pre
Rata and actual cost) paid to the City, with Flagg Realtors, Incorporated, the
developer, to receive a refund of $1,603.61 in accordance with Chapter 34 of
the Code of the City of Lubbock and a refund of deposit in the amount of
$20.00 and,
Y
WHEREAS, the construction of the said water and sewer improvements was
performed under the supervision of the City Engineer and said improvements hav
been completed in accordance with the City of Lubbock's plans and specificatio s;
NOW THEREFORE BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK:
1. That the improvements be and the same are hereby accepted as
an integral part of the water and sewage system of the City
of Lubbock.
2. That refund of the refundable cost in the amount of $1,603.61
be made in accordance with said Chapter 34.
3. That a refund of deposit be made in the amount of $20.00.
4. This resolution shall take effect and be in force from and
after its passage.
PASSED AND APPROVED THIS 12TH DAY OF APRIL, 1973.
ATTESTED .
Lavenia L we, City Se retary
0
Wilfokd/15. Watson, City Engineer
F&0"4 ► w. per..
Morris W. Turner, Mayor
APPROVED:
Fred O.— Senter, City