HomeMy WebLinkAboutResolution - 062 - Agreement - TDHPT - Widening/Improving Slide Rd,1.2 Miles South From S Loop 289 - 02/08/1979KJ: hw
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK:
RESO #62 2/8/79
THAT the Mayor and City Council of the City of Lubbock BE and are hereby
authorized and directed to execute for and on behalf of the City of Lubbock an
Agreement between the City of Lubbock and the State of Texas, acting through
the State Department of Highways and Public Transportation, covering the widening
and improving of FM 1730, Slide Road, from South Loop 289, south 1.2 miles,
attached herewith which.shall be spread upon the minutes of the Council and as
spread upon the minutes of this Council shall constitute and be a part of this
Resolution as if fully copied herein in detail.
Passed by the City Council this 8th day o 1979.
ATTEST:
;:E lyn Gaf a,,,.,ity Se r reasurer
.APEROV ;D AS TO CONT
F �
Sdm.Wahlt Director of Public Works
Z
AS TO FORM:
Kenneth ;Jones, S or Asst. City Attorney
r
i S
M D014 (1)
1344-2-9
Lubbock Co.
STATE OF TEXAS X
- X
COUNTY OF TRAVIS'- X
THIS AGREEMENT, made this 8th day of February, 1979,
by and between the City of Lubbock, Texas, hereinafter called
the "City", Party of the First Part, acting by and through its
City Council and the State of Texas, hereinafter called the
"State", Party of the Second Part, acting by and through its
State Highway and Public Transportation Commission.
WHEREAS, the City desires the construction of continuous
curb and gutter, driveways and incidental items within the limits
from Loop 289, South 1.2 Miles on Farm to Market Road No. 1730,
which is solely the City's responsibility and the City has re-
quested the State to construct or have constructed this work.
The State will construct or have constructed this work for and on
behalf of the City and at the City's sole expense, excluding pre-
liminary engineering. The estimated construction cost of this
work is Eighty Five Thousand Four Hundred and No/100 ($85,400.00),
including contingencies and construction engineering, and
WHEREAS, the City by the execution of this agreement agrees to
the terms and conditions of Commission Minute No. 72154, as it
applies to the City, a copy of which is attached hereto and marked
"Exhibit A" and made a part',of this agreement.
1.
NOW THEREFORE, it is understood that this proposed work will
be constructed by the State and the City will transmit to the State
with the return of this agreement, executed by the City, a warrant
or check made payable to the State Treasurer, Account of Trust Fund
No. 927 in the amount of Eighty Five Thousand Four Hundred and
No/100 Dollars ($85,400.00), to be used in paying for the proposed
work required by the City in the City of Lubbock. It is further
understood that the State will construct only those items for the
City as requested and required by the City and the entire cost of
such items, excluding preliminary engineering, will be borne by
the City. If the State elects to receive bids and if upon re-
ceipt of bids by the State and/or the actual construction and/or
approved changes in the contemplated improvements it is found that
this amount is insufficient to pay the City's portion, then the
City upon request of the State will forthwith supplement this
amount by an amount equal to the City's full estimated or actual
share of the cost of this work less the amount previously paid
into Trust Fund No. 927. In the event the amount as paid is more
than the actual cost, then the excess amount will be returned to
the City. It is further understood that the work to be done on
behalf of the City, as herein provided, will include the cost of
contingencies and construction engineering. It is further under-
stood that the City by the execution of this agreement agrees to
the terms and conditions of Commission Minute No. 72154, as it
2.
0
applies to the City, a copy of
which is attached hereto and marked
"Exhibit A" and made a part allf
this agreement.
IN TESTIMONY WHEREOF, the
parties hereto have caused these presents
to be executed in duplicate 'on
the day above stated.
CITY OF LUBBOCK
STATE OF TEXAS
art f the First Part
STATE HIGHWAY AND PUBLIC
TRANSPORTATION COMMISSION
By:
Party of the Second Part
Certified as being executed for the
By:
purpose and effect of activating and/
Memb C ty Co it
or carrying out the orders, established
policies, or work programs heretofore
By:
approved and authorized by the State
Member ity Cou
Highway and Public Transportation
Commission:
By:
ember of City Council
By:
A t. En sneer -Director under
By:
authority of Commission Minute
Member of City Council
70104
i
Recommended for execution:
4Asst.City
or
(State) Director, Finance
0
O HEREAS, in LUBBOCK COUNTY, the City of Lubbock has requested
assistance in reconstruction on Farm to Market Road 1730 from Loop 289,
south a distance of approximately 1.1 miles; and
WHEREAS, Farm to Market Road 1730 is included in the Urban
System; !and
WHEREAS, it is the desire of the State Department of Highways and
Public Transportation to assist the City of Lubbock in such work;
:NOW, THEREFORE, the Engineer -Director is directed to tender the
following proposal to the City of Lubbock:
Provided the City will:
1. Furnish all requi.red right of way clear of obstructions with
acquisition procedures to be in accordance with applicable
Federal and State laws governing the acquisition policies for
acquiring real property.
12. Provide for the adjustment of utilities, the construction of
continuous curb and gutter, storm sewers, driveways and side-
walks, all as may be required and all in accordance with
governing policies and regulations of the Department.
3. Maintain that portion of the work which is its responsibility
in accordance with present maintenance agreement and agree to
regulate traffic, prohibit parking and prevent encroachment
on the right of way, all in accordance with governing policies
and regulations of the Department.
Subject to the availability of Federal -aid Urban System funds and
the eligibility of the proposed work for financing with said funds, the
State Department of Highways and Public Transportation will:
I. Prepare construction plans and specifications.
2. Provide relocation assistance as may be required and deter-
mined to be eligible under the Relocation Assistance Program
at an estimated cost of $500.00.
i
Provide for reconstruction of grading, structures and sur-
facing at an estimated cost of $641,500.00 as authorized in
the 1977-1978 Urban System Program.
4. Maintain that portion of the work which is its responsibility
in accordance with present maintenance agreement.
Minute No. 72154 - Continued
Upon acceptance of the provisions of this Order by the appropri-
ate officials of the City of Lubbock, the Engineer -Director is directed
to;,proceed with the Relocation Assistance Program, to enter into any
necessary agreements with the City covering the details of the proposed
improvements, to proceed with the engineering development of the project
and after the City has fulfilled its responsibilities, to proceed with
construction in the most feasible and economical manner.
It is understood that the City may discharge its construction
obligations as outlined herein in any manner as it may elect. In the
event the City desires the State to include its portion of the work in
the State's construction contract, the Engineer -Director is hereby autho-
rized to''enter into agreement with the City for such work and its cost as
may be agreed upon.
This Order shall become operative upon acceptance by the City of
Lubbock and if not accepted within 90 days of the date hereof, the action
herein contained shall be automatically cancelled.
Minute No. 72154
January',,20, 1977
COPY "EXHIBIT A"
a
COMMISSION
REAGAN HOUSTON. CHAIRMAN
DEWITT C. GREER
CHARLES E. SIMONS
STATE DEPARTMENT OF HIGHWAYS
AND PUBLIC TRANSPORTATION
P. 0. Box 771
Lubbock,.Texas 79408
January22, 1,97.9
ENGINEER -DIRECTOR
B. L. DEBERRY
� 1I 111 pf' {Y REFER TO
Lubbock County ��FIL�
F. M. 1730 �N a
Control 1344-2-9 C/p L . �9J 1
M D014(1) Q �'/QQ 9 �I
In Lubbock from Loop: 2 89 , south 1.2 miles we o��/�F��'a
l
Mr. Larry J. Cunningham D6,
City Manager, City:'of Lubbock
P. 0. Box 2000
Lubbock, Texas 79457
Dear Sir:
We are transmitting two .copies: of a proposed agreement in
connection with the construction of the above captioned project.
Will you please have these agreements properly executed and
return both copies to us for our.further processing.
A warrant in the amount ;of'$85,400 00 made payable to.the
State Treasurer, Account of Trust .Fund No. 927 must accompany
the agreement when it is returned to- us.
After both copies of this ag-r.eement have been executed by the
State, the.duplicate original will be furnished you for.your
files.
Sincerely yours,
George Wall.5r.
Di,strict.Engineer
District Five
DTJ.:mbk.
enclosures`
cc: Mr. V. G. Chetty
I
�
'
a
a
COMMISSION
REAGAN HOUSTON. CHAIRMAN
DEWITT C. GREER
CHARLES E. SIMONS
STATE DEPARTMENT OF HIGHWAYS
AND PUBLIC TRANSPORTATION
P. 0. Box 771
Lubbock,.Texas 79408
January22, 1,97.9
ENGINEER -DIRECTOR
B. L. DEBERRY
� 1I 111 pf' {Y REFER TO
Lubbock County ��FIL�
F. M. 1730 �N a
Control 1344-2-9 C/p L . �9J 1
M D014(1) Q �'/QQ 9 �I
In Lubbock from Loop: 2 89 , south 1.2 miles we o��/�F��'a
l
Mr. Larry J. Cunningham D6,
City Manager, City:'of Lubbock
P. 0. Box 2000
Lubbock, Texas 79457
Dear Sir:
We are transmitting two .copies: of a proposed agreement in
connection with the construction of the above captioned project.
Will you please have these agreements properly executed and
return both copies to us for our.further processing.
A warrant in the amount ;of'$85,400 00 made payable to.the
State Treasurer, Account of Trust .Fund No. 927 must accompany
the agreement when it is returned to- us.
After both copies of this ag-r.eement have been executed by the
State, the.duplicate original will be furnished you for.your
files.
Sincerely yours,
George Wall.5r.
Di,strict.Engineer
District Five
DTJ.:mbk.
enclosures`
cc: Mr. V. G. Chetty
E
0 oa-
CC
L
COMMISSION
REAGAN HOUSTON. CHAIRMAN
DEWITT C. GREER
CHARLES E. SIMONS
STATE DEPARTMENT OF HIGHWAYS
AND PUBLIC TRANSPORTATION
P. 0. Box 771
Lubbock, Texas 79408
March 9, 1979
Lubbock County
F. M. 1730
Control 1344-2-9
M D014(l)
In Lubbock from Loop 289, south 1.2 miles
Mr. Larry J. Cunningham
City Manager, City of Lubbock
P. 0. Box 2000
Lubbock, Texas 79457
Dear Sir:
We are transmitting for your files a duplicate original
of the agreement in connection with the construction of
the captioned project.
DTJ:mbk
enclosure
cc: Mr. Jack Moore
Sincerely yours,
George C. Wall, Jr.
District Engineer
District Five
ENGINEER -DIRECTOR
B. L. DEBERRY
IN REPLY REFER TO
FILE NO.
MAR 121919
I;I1 V SECRETARY
R,.
M D014 (1)
1344-2-9
Lubbock'Co.
STATE OF TEXAS
LUBBOCK
COUNTY OF
THIS AGREEMENT, made this 8th day of February , 1979,
by and between the City of Lubbock, Texas, hereinafter called
the "City", Party of the First Part, acting by and through its.
City Council and the State of Texas, hereinafter called the
"State", Party of the Second Part, acting by and through its
State Highway and Public Transportation Commission.
WHEREAS, the City desires the construction of continuous
t curb and gutter, driveways and incidental items within the limits
from Loop 289, South 1.2 Miles on Farm to Market Road No. 1730,
which is solely the City's responsibility and the City has re-
quested the State to construct or have constructed this work.
The State will construct or have constructed this work for and on
behalf of the City and at the City's sole expense, excluding pre-
liminary engineering. The estimated construction cost of this
work is Eighty Five Thousand Four Hundred and No/100 ($85,400.00),
including contingencies and construction engineering, and
WHEREAS, the City by the execution of this agreement agrees to
the terms and conditions of Commission Minute No. 72154, as it
applies to the City, a copy of which is attached hereto and marked
"Exhibit A" and made a part of this agreement.
NOW THEREFORE, it is understood that this proposed work will
be constructed,by the State and the City will transmit to the State
with the return of this agreement, executed by the City, a warrant
or check made payable to the State Treasurer, Account of Trust Fund
No. 927 in the amount of Eighty Five Thousand Four Hundred and
No/100 Dollars ($85,400.00), to be used in paying for the proposed
work required by the City in the City of Lubbock. Itis further
understood that the State will construct only those items for the
City as requested and required by the City and the entire cost of
such items, excluding preliminary engineering, will be borne by
the City. If the State elects to receive bids and if upon re-
ceipt of bids by the State and/or the actual construction and/or
t approved changes in the contemplated improvements it is found that
this amount is insufficient to pay the City's portion, then the
City upon request of the State will forthwith supplement this
amount by an amount equal.to the City's full estimated or actual _
share of the cost of this work less the amount previously paid
into Trust Fund No. 927. -In the event the amount as paid is more
than the actual cost, then the excess amount will be returned to
the City. It is further understood that the work to be done on
behalf of the City, as herein provided, will include the cost of
contingencies and construction engineering. It is further under-
stood that the City by the execution of this agreement agrees to
the terms and conditions of Commission Minute No. 72154, as it
2.
applies to the City, a copy of which is attached hereto and marked
"Exhibit A" and made a part of this agreement.
IN TESTIMONY WHEREOF, the parties hereto have caused these presents
to be executed in duplicate on the day above stated.
CITY OF LUBBOCK STATE OF TEXAS
Party of the First Part STATE HIGHWAY AND PUBLIC
TRANSPORTATION COMMISSION
By: Party of the Second Part
Certified as being executed for the
By: purpose and effect of activating and/
M erf C ty uncil or carrying out the orders, established
policies, or work programs heretofore
By: approved and authorized by the State
ASPOM
ember ofit Cou 1 Highway and Public Transportation
Commission:
By:
M f City u i1 By:
r Asst. Engineer-Director under
By: authority of Commission Minute
Member of City Coun it 70104
Recommended for execution:
(State) Director, Finance
WHEREAS, in LUBBOCK COUNTY, the City of Lubbock has requested
assistance in reconstruction on Farm to Market Road 1730 from Loop.289,
south a distance of approximately 1.1 miles; and
WHEREAS, Farm to Market Road 1730 is included in the.U.rban
System; and
WHEREAS, it is the desire of the State Department of Highways and
Public Transportation to assist the City of Lubbock in such work;
NOW, THEREFORE, the Engineer-Director is directed to tender the
following proposal to the City of Lubbock:
Provided the City will:
1. Furnish all required right of way clear of obstructions with
acquisition procedures to be in accordance with applicable
Federal and State laws governing the acquisition policies for
acquiring real property.
2. Provide for the adjustment of utilities, the construction of
continuous curb and gutter, storm sewers, driveways.and side-
walks, all as may be required and all in accordance with
governing policies and regulations of the Department.
3. Maintain that portion of the work which is its responsibility
in accordance with present maintenance agreement and agree to
regulate traffic, prohibit parking and prevent encroachment
on the right of way, all in accordance with governing policies
and regulations of the Department.
Subject to the availability of Federal-aid Urban System funds and
the eligibility of the proposed work for financing with said funds, the
State Department of Highways and Public Transportation will:
1. Prepare construction plans and specifications.
2. Provide relocation assistance as may be required and deter-
mined to be eligible under the Relocation Assistance Program
at an estimated cost of $500.00.
3. Provide for reconstruction of grading, structures and'sur
facing at an estimated cost of $641,500.00 as authorized in
the 1977-1978 Urban System Program.
4. Maintain that portion of the work which is its responsibility
in accordance with present maintenance agreement.
Minute No. 72154 - Continued
Upon acceptance of the provisions of this Order by the appropri-
ate officials of the City of Lubbock, the Engineer -Director is directed
to proceed with the Relocation Assistance Program, to enter into any
necessary agreements with the City covering the details of the proposed
improvements, to proceed with the engineering development of the project
and after the City has fulfilled its responsibilities, to proceed with
construction in the most feasible and economical manner.
It is understood that the City may discharge its construction
obligations as outlined herein in any manner as it may elect. In the
event the City desires the State to include its portion of the work in
the State's construction contract, the Engineer -Director is hereby autho-
rized to enter into agreement with.the City for such work and its cost as
may be agreed upon.
This Order shall become operative upon acceptance by the City of
Lubbock and if not accepted.within 90 days of the date hereof, the action
herein contained shall be automatically cancelled.
Minute No. 72154
1 January 20, 1977
COPY "EXHIBIT A"
38-95-160
(31)
--------�• �_•� ___�� :.v_ -Yu -"CLL SLeY In Lne annual assessment program.
Motion was made by Councilman McAlister, seconded by Councilman Aderton to
pass said resolution. Motion carried: Mayor West, Mayor Pro Tem Henry,
Councilmen Aderton andMcAlister voting Yea; none voting Nay; Councilwoman
Jordan absent.
Resolution No. 62
A resolution authorizing the Mayor to sign an agreement with the State
Department of Highways and Public Transportation (Slide Road Loop
289, South 1.2 miles).
KJ:hw
RESOLUTION
BE IT RESOLVED BY THE -CITY COUNCIL OF THE CITY OF LUBBOCK:
THAT the Mayor and City Council of the City of Lubbock BE and are hereby
authorized and directed to execute for and on behalf of the City of Lubbock
an Agreement between the City of Lubbock and the State of Texas, acting thr4
the State Department of Highways and Public Transportation, covering the
widening and improving of FM. 1730, Slide Road, from South Loop 289, south
1.2 miles, attached herewith which shall be spread upon the minutes of the
Council and as spread upon the minutes of this Council shall constitute and
be a part of this Resolution as if fully copied herein in detail.
Passed by the City Council this 8th day of February
,1975
/s/ Dirk West
DIRK WEST, MAYOR
ATTEST:
/s/ Evelyn Gaffga
Evelyn Gaffga, City Secretary -Treasurer
APPROVED AS TO CONTENT:
/s/ Sam Wahl
Sam Wahl, Director of Public Works
APPROVED AS TO FORM:
/s/ Kenneth Jones
Kenneth Jones, Senior Asst. City Attorney
This agreement between the City and the State Highway Department is a require
for the Slide Road project. The agreement reaffirms what has been agreed
to in a previous minuted order and reflects the estimated City cost of $85,40
The City will assess the property owners along Slide Road for the majority
of the curb and gutter. The assessment hearing will be held February 22,
1979.
Motion was made by Mayor Pro Tem Henry, seconded by Councilman Aderton to
pass said resolution. Motion carried: Mayor West, Mayor Pro Tem Henry,
Councilmen Aderton and McAlister voting Yea; none voting Nay; Councilwoman
Jordan absent.
Ordinance No. 7806
Appropriatlon ordinance from Street Ca ital Improvement Funds for the
Cit 's share of avin Slide Road (S. Loo 289, South 1.2 miles)
AN APPROPRIATION ORDINANCE
WHEREAS, the City Council of the City of Lubbock finds it is necessary to
appropriate certain specific ruids for an approved project: y
NOW THEREFORE,
BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK:
There is hereby appropriated out of the following described fund, to -wit"
Street Capital Improvement
Thom Q,,, c r_n ' ,.,..