HomeMy WebLinkAboutResolution - 004 - Contractual Rights Assignment-GPNC Inc & BGR Architects Engineers-405 N Quirt - 01/11/1979RESO-4
1/11/79
f
.RESOLUTION
�ry
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK:
THAT the Mayor of the City of Lubbock BE and is hereby authorized and
directed to execute for and on behalf of the City of Lubbock an Assignment of
Contractual Rights between the City of Lubbock, the Guadalupe -Parkway Neighbor-
hood Center, Inc., and BGR Architects -Engineers of Lubbock, Texas, attached
herewith which shall be spread upon the minutes of the Council and as spread
upon the minutes of this Council shall constitute and be a part of this Resolution
as if fully copied herein in detail.
Passed by the City Council this 11th day of January 1-1979.
Iffinimanyclum
ATTEST
Eveklyn Gaffg , Cit gecret�rasurer
APPROVED AS TO FORM:
Leon G. Bean, Asst., City Attorney
APPRO D:
VICKI FOW ER
Community Development Coordinator
l� STATE OF TEXAS §
ASSIGNMENT OF CONTRACTUAL RIGHTS
COUNTY OF LUBBOCK S
This assignment, made and entered into, this 11th day of
January, 1979, by and among the City of Lubbock, Texas, a Home
Rule Municipality, hereinafter referred to as "City of Lubbock",
the Guadalupe -Parkway Neighborhood Center,._Inc., a not-for-profit
Texas corporation, hereinafter referred to as "Guadalupe -Parkway,
Inc." and BGR Architects -Engineers of Lubbock, Texas, hereinafter
referred to as "BGR".
WITNESSETH:
That on the 29th day of December, 1978, Guadalupe -Parkway,
Inc., and BGR entered into a Standard Form Agreement. Between
Owner and Architect, AIA Document B141, 1977 Edition, the
original of which is attached hereto and is made a part hereof
by reference, said agreement hereinafter referred to as "Agreement"
to provide for architectural and engineering services for ad-
ditions and alterations to the Parkway Neighborhood Center Build-
ing, located at 405 North Quirt Avenue, Lubbock, Lubbock County,
Texas, said building also being known as the Guadalupe -Parkway
Neighborhood Center Building;
That the City of Lubbock is the owner of said building and
premises, that Guadalupe -Parkway, Inc. is tenant thereof, and
that the Agreement is being financed by the City of Lubbock
through its Community Development Block Grant Program, wherefor
it is mutually agreed to be in the best interest of all parties
for Guadalupe -Parkway, Inc. to assign its rights in the Agreement
to the City of Lubbock;
Now therefore, by this instrument Guadalupe -Parkway, Inc.,
as Assignor, hereby assigns to the City of Lubbock, as assignee,
all rights, duties and remedies, including unpaid debts for work
partially completed, arising from the Agreement executed with BGR.
That whenever reference is made in the Agreement to Guadalupe -
Parkway Neighborhood Center, Inc. or "Owner" it shall henceforth
refer to the City of Lubbock. The City of Lubbock expressly
receives and accepts said assignment and agrees to perform thereby
in the same manner in which Guadalupe -Parkway, Inc. agreed to
perform prior to this assignment.
Guadalupe -Parkway, Inc. expressly acknowledges that it has
received good and valuable consideration for this assignment
and in total satisfaction thereof. Guadalupe -Parkway, Inc.
expressly understands that by its assignment it will no longer
be a party to the Agreement.
BGR expressly accepts the City of Lubbock as assignee in
place of Guadalupe -Parkway, Inc. and totally releases Guadalupe -
Parkway, Inc. from the Agreement. BGR also expressly agrees to
perform the Agreement in .the same manner for the City of Lubbock,
as assignee, as it was obligated to do for Guadalupe -Parkway, Inc.
It is mutually understood by all parties, that save and
except this assignment, no changes in the terms or conditions of
the Agreement will result from this instrument.
Executed to become effective the 11th day of January, 1979.
GUADALUPE-PARKWAY NEIGHBORHOOD
CENTER, INC..
BY:'
404
Y4_!.�g
!
BGR ARCHITECTS -ENGINEERS
.ice �i' _.tG►��1�'r
THECITY OF LUBBOCK
BY:
RK WEST, MAYOR
ATTEST:
BY:
Evelyn a ga
City Secretary -
Treasurer
APPROVED AS TO FORM:
BY:
Leon G. Bean
Asst. City Attorney
APPROVED:
BY: A&A--,
VICKI FOSTER
COMMUNITY DEVELOPMENT
COORDINATOR
THE AMERICAN INSTITUTE OF ARCHITECTS
AIA Document 8141
- Standard Form- of Agreement Between
Owner and Architect
1977 EDITION
THIS DOCUMENT HAS IMPORTANT LEGAL CONSEQUENCES, CONSULTATION WITH
AN ATTORNEY IS ENCOURAGED WITH RESPECT TO ITS COMPLETION OR MODIFICATION
AGREEMENT
made as of the 29th day of December in the year of Nineteen
Hundred and Seventy -Eight
BETWEEN the Owner: Guadalupe -Parkway Neighborhood Center, Inc.
Lubbock, Texas -
and the Architect: BGR Architects -Engineers
Lubbock, Texas
For the following Project:
(Include detailed description oI Project location and scope.)
Additions and Alterations to Parkway Neighborhood Center Building
405 North Quirt Avenue
Lubbock, Texas
The Owner and the Architect agree as set forth below.
Copyright 1917, 1926, 1948, 1951, 1953, 1958, 1961, 1%3, 1966, 1%7, 1970, 1974, p 1977 by The American Institute
of Atichitects, 1735 New York Avenue, N.W., Washington, D.C. 20006. Reproduction of the material herein or
substantial quotation of its provisions without permission of the AIA violates the copyright laws o
States and will be subject to legal prosecution. f the United
AIA DOCUMENT 9141 - OWNER -ARCHITECT AGREEMENT - THIRTEENTH EDITION - JULY 1977 • AIA0
1977
THE AMERICAN INSTITUTE Of ARCHITECTS, 1735 NEW YORK AVENUE, N.W., WASHINGTON, D.C.®20006
6141-1977 1
TERMS AND CONDITIONS OF AGREEMENT BETWEEN OWNER AND ARCHITECT
- ARTICLE 1
ARCHITECT'S SERVICES AND RESPONSIBILITIES
BASIC SERVICES
The Architect's Basic Services consist of the five
phases described in Paragraphs 1.1 through 1.5 and
include normal structural, mechanical and electrical
engineering services and any other services included
in Article 15 as part of Basic Services.
1.1 SCHEMATIC DESIGN PHASE
1.1.1 The Architect shall review the program furnished
by the Owner to ascertain the requirements of the Project
and shall review the understanding of such requirements
with the Owner.
1.1.2 The Architect shall provide a preliminary evalua-
tion of the program and the Project budget requirements,
each in terms of the other, subject to the limitations set
forth in Subparagraph 3.2.1.
1.1.3 The Architect shall review with the Owner alterna-
tive approaches to design and construction of the Project.
1.1.4 Based on the mutually agreed upon program and
Project budget requirements, the Architect shall prepare,
for approval by the Owner, Schematic Design Documents
consisting of drawings and other documents illustrating
the scale and relationship of Project components.
1.15 The Architect shall submit to the Owner a State-
ment of Probable Construction Cost based on current
area, volume or other unit costs.
1.2 DESIGN DEVELOPMENT PHASE
1.2.1 Based on the approved Schematic Design Docu-
ments and any adjustments authorized by the Owner in
the program or Project budget, the Architect shall pre-
pare, for approval by the Owner, Design Development
Documents consisting of drawings and other documents
to fix and describe the size and character of the entire
Project as to architectural, structural, mechanical and elec-
trical systems, materials and such other elements as may
be appropriate.
1.2.2 The Architect shall submit to the Owner a further
Statement of Probable Construction Cost.
1.3 CONSTRUCTION DOCUMENTS PHASE
1.3.1 Based on the approved Design Development Doc-
uments and any further adjustments in the scope or qual-
ity of the Project or in the Project budget authorized by
the Owner, the Architect shall prepare, for approval by
the Owner, Construction Documents consisting of Draw-
ings and Specifications setting forth in detail the require-
ments for the construction of the Project.
1.3.2 The Architect shall assist the Owner in the prepara-
tion of the necessary bidding information, bidding forms,
the Conditions of the Contract, and the form of Agree-
ment between the Owner and the Contractor.
13.3 The Architect shall advise the Owner of any adjust-
ments to previous Statements of Probable Construction
Cost indicated by changes in' requirements or general
market conditions.
1.3.4 The Architect shall assist the Owner in connection
with the Owner's responsibility for filing documents re-
quired for the approval of governmental authorities hav-
ing jurisdiction over the Project:
1.4 BIDDING OR NEGOTIATION PHASE
1.4.1 The Architect, following the Owner's approval of
the Construction Documents and of the latest Statement
of Probable Construction Cost, shall assist the Owner in
obtaining bids or negotiated proposals, and assist in
awarding and preparing contracts for construction.
1.5 CONSTRUCTION PHASE—ADMINISTRATION
OF THE CONSTRUCTION CONTRACT
15.1 The Construction Phase will commence with the
award of the Contract for Construction and, together with
the Architect's obligation to provide Basic Services under
this Agreement, will terminate when final payment to the
Contractor is due, or in the absence of a final Certificate
for Payment or of such due date, sixty days after the Date
of Substantial Completion of the Work, whichever occurs
first.
1.5.2 Unless otherwise provided in this Agreement and
incorporated in the Contract Documents, the Architect
shall provide administration of the Contract for Construc-
tion as set forth below and in the edition of AIA Docu-
ment A201, General Conditions of the Contract for Con-
struction, current as of the date of this Agreement.
1.5.3 The Architect shall be a representative of the
Owner during the Construction Phase, and shall advise
and consult with the Owner. Instructions to the Contrac-
tor shall be forwarded through the Architect. The Archi-
tect shall have authority to act on behalf of the Owner
only to the extent provided in the Contract Documents
unless otherwise modified by written instrument in ac-
cordance with Subparagraph 1.5.16.
1.5.4 The Architect shall visit the site at intervals ap-
propriate to the stage of construction or as otherwise
agreed by the Architect in writing to become generally
familiar with the progress and quality of the Work and to
determine in general if the Work is proceeding in accord-
ance with the Contract Documents. However, the Archi-
tect shall not be required to make exhaustive or con-
tinuous on-site inspections to check the quality or quan-
tity of the Work. On the basis of such on-site observa-
tions as an architect, the Architect shall keep the Owner
informed of the progress and quality of the Work, and
shall endeavor to guard the Owner against defects and
deficiencies in the Work of the Contractor.
15.5 The Architect shall not have control or charge of
and shall not be responsible for construction means,
methods, techniques, sequences or procedures, or for
safety precautions and programs in connection with the
Work, for the acts or
omisslons of the Contractor, Sub -
ASA DOCUMENT 9141 • OWNER -ARCHITECT AGREEMENT • THIRTEENTH EDITION • JULY 1977 AIA® •
1977
THE AMERICAN INSTITUTE OF ARCHITECTS, 1735 NEW YORK AVENUE, N.W., WASHINGTON, D.C.®20006
B141
-1s» 4
contractors or any other persons performing any of the
Work, or for the failure of any of them to carry out the
Work in accordance with the Contract Documents.
1.S.6 The Architect shall at all times have access to the
Work wherever it is in preparation or progress.
1.5.7 The Architect shall determine the amounts owing
to the Contractor based on observations at the site and on
evaluations of the Contractor's Applications for Payment,
and shall issue Certificates for Payment in such amounts,
as provided in the Contract Documents.
1.5.8 The issuance of a Certificate for Payment shall
constitutea representation by the Architect to the Owner,
based on the Architect's observations at the site as pro-
vided in Subparagraph 1.5.4 and on the data comprising
the Contractor's Application for Payment; that the Work
has progressed to the point indicated; that,.to the best of
the Architect's knowledge, information and belief, the qual-
ity of the Work is in accordance with the Contract Docu-
ments' (subject to an evaluation of the Work for con-
formance with the Contract Documents upon Substantial
Completion, to the results of any subsequent tests re-
quired by or performed under the Contract Documents,
to minor deviations from the Contract Documents cor-
rectable prior to completion, and to any specific qualifica-
tions stated in the Certificate for Payment); and that the
Contractor is entitled to payment in the amount certified.
However, the issuance of a Certificate for Payment shall
not be a representation that the Architect has made any
examination to ascertain how and for what purpose the
Contractor has used the moneys paid on account of the
Contract Sum.
1.5.9 The Architect shall be the interpreter of the re-
quirements of the Contract Documents and the judge of
the performance thereunder by both the Owner and
Contractor. The Architect shall render interpretations nec-
essary for the proper execution or progress of the Work
with reasonable promptness on written request of either
the Owner or the Contractor, and shall render written de-
cisions, within a reasonable time, on all claims, disputes
and other matters in question between the Ownerand the
Contractor relating to the execution or progress of the
Work or the interpretation of the Contract Documents.
1.5.10 Interpretations and decisions of the Architect shall
be consistent with the intent of and reasonably inferable
from the Contract Documents and shall be in written or
graphic form. In the capacity of interpreter and judge,
the Architect shall endeavor to secure faithful perform-
ance by both the Owner and the Contractor, shall not
show partiality to either, and shall not be liable for the
result of any interpretation or decision rendered in goad
faith in such capacity.
1S.11 The Architect's decisions in matters relating to
artistic effect shall be final if consistent with the intent of
the Contract Documents. The Architect's decisions on
any other claims, disputes or other matters, including
those in question between the Owner and the Contractor,
shall be subject to arbitration as provided in this Agree-
ment and in the Contract Documents.
1.5.12 The Architect shall have authority to reject Work
which does not conform to the Contract Documents.
Whenever, in the Architect's reasonable opinion, it is
4 8141-1977
necessary or advisably for the implementation of the intent
of the Contract Documents, the Architect will have author-
ity to require special inspection or testing of the Work in
accordance with the provisions of the Contract Docu-
ments, whether or not such Work be then fabricated, in-
stalled or completed.
1.5.13 The Architect shall review and approve or take
other appropriate action upon the Contractor's submittals
such as Shop Drawings, Product Data and Samples, but
only for conformance with the design concept of the
Work and with the information given in the Contract
Documents. Such action shall be taken with reasonable
Promptness so as to cause no delay. The Architect's ap-
proval of a specific item shall not indicate approval of an
assembly of which the item is a component.
1.5.14 The Architect shall prepare Change Orders for
the Owner's approval and execution in accordance with
the Contract Documents, and shall have authority to order
minor changes in the Work not involving an adjustment
in the Contract Sum or an extension of the Contract Time
which are not inconsistent with the intent of the Contract
Documents.
1.S.15 The Architect shall conduct inspections to deter-
mine the Dates of Substantial Completion and final com-
pletion, shall receive and forward to the Owner for the
Owner's review written warranties and related documents
required by the Contract Documents and assembled by
the Contractor, and shall issue a final Certificate for Pay-
ment.
1.5.16 The extent of the duties, responsibilities and lim-
itations of authority of the Architect as the Owner's rep-
resentative during construction shall not be modified or
extended without written consent of the Owner, the Con-
tractor and the Architect.
1.6 PROJECT REPRESENTATION BEYOND BASIC SERVICES
1.6.1 If the Owner and Architect agree that more ex-
tensive representation at the site than is described in
Paragraph 1.5 shall be provided, the Architect shall pro-
vide one or more Project Representatives to assist the
Architect in carrying out such responsibilities at the site.
1.6.2 Such Project Representatives shall be selected, em-
ployed and directed by the Architect, and the Architect
shall be compensated therefor as mutually agreed be-
tween the Owner and the Architect as set forth in an ex-
hibit appended to this Agreement, which shall describe
the duties, responsibilities and limitations of authority of
such Project Representatives.
1.6.3 Through the observations by such Project Repre-
sentatives, the Architect shall endeavor to provide further
protection for the Owner against defects and deficiencies
in the Work, but the furnishing of such project representa-
tion shall not modify the rights, responsibilities or obliga-
tions of the Architect as described in Paragraph 1.5.
1.7 ADDITIONAL SERVICES
The following Services are not included in Basic
Services unless so identified in Article 15. They shall
be provided if authorized or confirmed in writing by
the Owner, and they shall be paid for by the Owner
as provided in this Agreement, in addition to the
compensation for Basic Services.
THE AMERICAN INSTITUTE OWNER -ARCHITECT AGREEMENT •THIRTEENTH EDITION •
OF ARCHITECTS, 7735 NEW YORK AVENUE, N,yy,� My 1977 . AIAS . 1977
WASHINGTON, D.C.®
1.7.1 Providing analyses of the Owner's needs, and pro-
gramming the requirements of the Project.
1.7.2 Providing financial feasibility or other special
studies.
1.7.3 Providing planning surveys, site evaluations, envi-
ronmental studies or comparative studies of prospective
sites, and preparing special surveys, studies and submis-
sions required for approvals of governmental authorities
or others having jurisdiction over the Project.
1.7.4 Providing services relative to future facilities, sys-
tems and equipment which are not intended to be con-
structed during the Construction Phase. _.
1.7.5 Providing services to investigate existing conditions
or facilities or to make measured drawings thereof, or to
verify the accuracy of drawings or other information fur-
nished by the Owner.
1.7.6 Preparing documents of alternate, separate or
sequential bids or providing extra services in connection
with bidding, negotiation or construction prior to the
completion of the Construction Documents Phase, when
requested by the Owner.
1.7.7 Providing coordination of Work performed by
separate contractors or by the Owner's own forces.
1.7.8 Providing services in connection with the work of
a construction manager or separate consultants retained
by the Owner.
1.7.9 Providing Detailed Estimates of Construction Cost,
analyses of owning and operating costs, or detailed quan-
tity surveys or inventories of material, equipment and
labor.
1.7.10 Providing interior design and other similar ser-
vices required for or in connection with the selection,
procurement or installation of furniture, furnishings and
related equipment.
1.7.11 Providing services for planning tenant or rental
spaces.
1.7.12 Making revisions in Drawings, Specifications or
other documents when such revisions are inconsistent
with written approvals or instructions previouslygiven,
are required by the enactment or revision of codes, laws
or regulations subsequent to the preparation of such doc-
uments or are due to other causes not solely within the
control of the Architect.
1.7.13 Preparing Drawings, Specifications and supporting
data and providing other services in connection with
Change Orders to the extent that the adjustment in the
Basic Compensation resulting from the adjusted Con-
struction Cost is not commensurate with the services re-
quired of the Architect, provided such Change Orders are
required by causes not solely within the control of the
Architect.
1.7.14 Making investigations, surveys, valuations, inven-
tories or detailed appraisals of existing facilities, and serv-
ices required in connection with construction performed
by the Owner.
1.7.15 Providing consultation concerning replacement of
any Work damaged by fire or other cause during con-
struction, and furnishing services as may be required in
connection with the replacement of such Work.
1.7.16 •Providing services made necessary by the default
of the Contracjbr, or by major defects or deficiencies in
the Work of the Contractor, or by failure of performance
of either the Owner or Contractor under the Contract for
Construction.
1.7.17 Preparing a set of reproducible record drawings
showing significant changes in the Work madC during
construction based on marked -up prints, drawings and
other data furnished by the Contractor to the Architect.
1.7.18 Providing extensive assistance in the utilization of
any equipment or system such as initial start-up or testing,
adjusting and balancing, preparation of operation and
maintenance manuals, training personnel for, operation
and maintenance, and consultation during operation.
1.7.19 Providing services after issuance to the Owner of
the final Certificate for Payment, or in the absence of a
final Certificate for Payment, more than sixty days after
the Date of Substantial Completion of the Work.
1.7.20 Preparing to serve or serving as an expert witness
in connection with any public hearing, arbitration pro-
ceeding or legal proceeding.
1.7.21 Providing services of consultants for other than
the normal architectural, structural, mechanical and elec-
trical engineering services for the Project.
1.7.22 Providing any other services not otherwise in-
cluded in this Agreement or not customarily furnished in
accordance with generally accepted architectural practice.
1.8 TIME
1.8.1 The Architect shall perform Basic and Additional
Services as expeditiously as is consistent with professional
skill and care and the orderly progress of the Work. Upon
request of the Owner, the Architect shall submit for the
Owner's approval, a schedule for the performance of the
Architect's services which shall be adjusted as required as
the Project proceeds, and shalt .include allowances for peri-
ods of time required for the Owner's review and approval
of submissions and for approvals of authorities having
jurisdiction over the Project. This schedule, when approved
by the Owner, shall not, except for reasonable cause, be
exceeded by the Architect.
ARTICLE 2
THE OWNER'S RESPONSIBILITIES
2.1 The Owner shall provide full information regarding
requirements for tti)e Project including a program, which
shall set forth the Owner's design objectives, constraints
and criteria, including space requirements and relation-
ships, flexibility and expandability, special equipment and
systems and site requirements.
2.2 If the Owner provides a budget for the Project it
shall include contingencies for bidding, changes in the
Work during construction, and other costs which are the
responsibility of the Owner, including those described in
this Article 2 and in Subparagraph 3.1.2. The Owner shall,
at the request of the Architect, provide a statement of
funds available for the -Project a d h .
n t e source.
AIA DOCUMENT 8141 • OWNER -ARCHITECT AGREEMENT • THIRTEENTH EDITION •
THE AMERICAN INSTITUTE OF ARCHITECTS, 1735 NEW YORK AVENUE, N.W., WASH ON! D.C.®21977
00o6
B141 19
77 3
-2.3 The Owner shall designate when necessa
rep-
resentative authorized to act in the Owner's behalf with
respect to the Project. The Owner or suchauthorized
representative shall examine the documents submitted by
the Architect and shall render decisions pertaining thereto
Promptly, to avoid unreasonable delay in the progress of
the Architect's services.
2.4 The Owner shall furnish a legal description and a
certified land survey of the site,-,o�giving, as applicable,
grades and lines of streets, alleys, pavements and adjoin-
ing property; rights-of-way, restrictions, easements, en-
croachments, zoning, deed restrictions, boundaries and
contours of the site; locations, dimensions and complete
data pertaining to existing buildings, other improvements
and trees; and full information concerning available serv-
ice and utility lines both public and private, above and
below grade, including inverts and depths.
2.5 The Owner shall furnish the services of soil engi-
neers or other consultants when such services are deemed
necessary by the Architect. Such services shall include test
borings, test pits, soil bearing values, percolation tests, air
and water pollution tests, ground corrosion and resistivity
tests, including necessary operations for determining sub-
soil, air and water conditions, with reports and appropri-
ate professional recommendations.
2.6 The Owner shall furnish structural, mechanical,
chemical and other laboratory tests, inspections and re-
ports as required by law or the Contract Documents.
2.7 The Owner shall furnish all legal, accounting and in-
surance counseling services as may be necessary at any
time for the Project, including such auditing services as
the Owner may require to verify the Contractor's Applica-
tions for Payment or to ascertain how or for what pur-
poses the Contractor uses the moneys paid by or on be-
half of the Owner.
2.8 The services, information, surveys and reports re-
quired by Paragraphs 2.4 through, 2.7 inclusive shall be
furnished at the Owner's expense, and the Architect shall
be entitled to rely upon the accuracy and completeness
thereof.
2.9 If the Owner observes or otherwise becomes aware
of any fault or defect in the Project or nonconformance
with the Contract Documents, prompt written notice
thereof shall be given by the Owner to the Architect.
2.10 The Owner shall furnish required information and
services and shall render approvals and decisions as ex-
peditiously as necessary for the orderly progress of the
Architect's services and of the Work.
ARTICLE 3
CONSTRUCTION COST
3.1 DEFINITION
3.1.1 The Construction Cost shall be the total cost or
estimated cost to the Owner of all elements of the Project
designed or specified by the Architect.
3.1.2 The Construction Cost shall include at current
market rates, including a reasonable allowance for over-
head and profit, the cost of labor and materials furnished
by the Owner and any equipment which has been de -
6 8141-1977
signed, specified, selected or specially provided for by
the Architect.
3.1.3 Construction Cost does not include the compen-
sation of the Architect and the Architect's consultants,
the cost of the land, rights-of-way, or other costs which
are the responsibility of the Owner as provided in Arti-
cle 2.
3.2 "RESPONSIBILITY FOR CONSTRUCTION COST
3.2.1 -Evaluations of the Owner's Project budget, State-
ments of Probable Construction Cost and Detailed
Estimates of Construction Cost, if any, prepared by the
Architect, represent the Architect's best judgment as a
design professional familiar with the construction indus-
try. It is recognized, however, thatneitherthe Architect
nor the Owner has control over the cost of labor, mate-
rials or equipment, over the Contractor's methods of de-
termining bid prices, or over competitive bidding, market
or negotiating conditions. Accordingly,
rchitect
cannot and does not warrant or represent that or
negotiated prices will not vary from the Project budget
proposed, established or approved by the Owner, if any,
or from any Statement of Probable Construction Cost or
other cost estimate or evaluation prepared by the Archi-
tect.
3.2.2 No fixed limit of Construction Cost shall be estab-
lished as a condition of this Agreement by the furnishing,
proposal or establishment of a Project budget under Sub-
paragraph 1.1.2 or Paragraph 2.2 or otherwise, unless such
fixed limit has been agreed upon in writing and signed by
the parties hereto. If such a fixed limit has beenestab-
lished, the Architect shall be permitted to include con-
tingencies for design, bidding and price escalation, to de-
termine what materials, equipment, component systems
and types of construction are to be included in the Con-
tract Documents, to make reasonable adjustments in the
scope of the Project and to include in the Contract Docu-
ments alternate bids to adjust the Construction Cost to the
fixed limit. Any such fixed limit shall be increased in the
amount of any increase in the Contract Sum occurring
after execution of the Contract for Construction.
3.2.3 If the Bidding or Negotiation Phase has not com-
menced within three months after the Architect submits
the Construction Documents to the Owner, any Project
budget or fixed limit of Construction Cost shall be ad-
justed to reflect any change in the general level of prices
in the construction industry between the date of submis-
sion of the Construction Documents to the Owner and
the date on which proposals are sought.
3.2.4 If a Project budget or fixed limit of Construction
Cost (adjusted as provided in Subparagraph 3.2.3) is ex-
ceeded by the lowest bona fide bid or negotiated pro-
posal, the Owner shall (1) give written approval of an
increase in such fixed limit, (2) authorize rebidding or re-
negotiating of the Project within a reasonable time, (3) if
the Project is abandoned, terminate in accordance with
Paragraph 10.2, or (4) cooperate in revising the Project
scope and quality as required to reduce the Construction
Cost. In the case of (4), provided a fixed limit of Construc-
tion Cost has been established as a condition of this Agree-
ment, the Architect, without additional charge, shall mod-
ify the Drawings and Specifications as necessary to comply
• a aimcrv� I147 • OWNER -ARCHITECT AGREEMENT •THIRTEENTH EDAIA®• p 1877
ITION •
THE AMERICAN INSTITUTE OF ARCHITECTS, 1735 NEW YORK AVENUE, N.W., WASHINGTON, D.C. 20006
1 --
with the fixed limit. The providing of such service shall be
the limit of the Architect's responsibility arising from the
establishment Of such fixed limit, and having done so, the
Architect shall be entitled to compensation for all services
performed, in accordance with this Agreement, whether•
or not the Construction Phase is commenced.
• ARTICLE 4
DIRECT PERSONNEL EXPENSE
' 4.1 Direct Personnel Expense is defined as the direct sal-
aries of all the Architect's personnel engaged on the Proj-
ect, and the portion of the cost of their mandatory and
customary contributions and benefits related thereto, such
as employment taxes and other statutory employee bene-
fits, insurance, sick leave, holidays, vacations, pensions
and similar contributions and benefits.
ARTICLE 5
REIMBURSABLE EXPENSES
5.1 Reimbursable Expenses are in addition to the Com-
pensation for Basic and Additional Services and include
actual expenditures made by the Architect and the Archi-
tect's employees and consultants in the interest of the
Project for the expenses listed in the following Sub-
paragraphs:
5.1.1 Expense of transportation in connection with the
Project; living expenses in connection with out-of-town
travel; long distance communications, and fees paid for
securing approval of authorities having jurisdiction over
the Project.
5.1.2 Expense of reproductions, postage and handling of
Drawings, Specifications and other documents, excluding
reproductions for the office use of the Architect and the
Architect's consultants.
5.1.3 Expense of data processing and photographic.pro-
duction techniques when used in connection with Addi-
tional Services.
S.1.4 If authorized in advance by the Owner, expense of
overtime work requiring higher than regular rates.
5.1.S Expense of renderings, models and mock-ups re-
quested by the Owner.
5.1.6 Expense of any additional insurance coverage or
limits, including professional liability insurance, requested
by the Owner in excess of that normally carried by the
Architect and the Architect's consultants.
ARTICLE 6
PAYMENTS TO THE ARCHITECT
6.1 PAYMENTS ON ACCOUNT OF BASIC SERVICES
6.1.1 An initial payment as set forth in Paragraph 14.1 is
the minimum payment under this Agreement.
6.1.2 Subsequent payments for Basic Services shall be
made monthly and shall be in proportion to services per-
formed within each Phase of services, on the basis set
forth in Article 14.
6.1.3 If and to the extent that the Contract Time initially
established in the Contract for Construction is exceeded
Ark DOCUMENT X147 • OWNER—ARCHITECT
or extended through no fault of the Architect, compens
tion for any Basic Services .required for such extend
period of Administration of the Construction Contra
shall be computed es'set forth in Paragraph 14.4 for Adc
tional Services.
6.1.4 When compensation is based on a percentage
Construction Cost, and any portions of the Project ai
deleted or otherwise not constructed, compensation fc
such portions of the Project shall be payable to the exter
services are performed on such portions, in accordanc
with the schedule set forth in Subparagraph 14.2.2; base
on (1) the lowest bona fide bid or negotiated proposal of
(2) if no such bid or proposal is received, the most recen
Statement of Probable Construction Cost or Detailed Esti
mate of Construction Cost for such portions of the Project
6.2 PAYMENTS ON ACCOUNT OF
ADDITIONAL SERVICES
6.2.1 Payments on account of the Architect's Additional
Services as defined in Paragraph 1.7 and for Reimbursable
Expenses .as defined in Article 5 shall be made monthly
upon presentation of the Architect's statement of services
rendered or expenses incurred.
6.3 PAYMENTS WITHHELD
6.3.1 No deductions shall be made from the Architect's
compensation on account of penalty, liquidated damages
or other sums withheld from payments to contractors, or
on account of the cost of changes in the Work other than
those for which the Architect is held legally liable.
6.4 PROJECT SUSPENSION OR TERMINATION
6.4.1 If the Project is suspended or abandoned in whole
or in part for more than three months, the Architect shall
be compensated for all services performed prior to receipt
of written notice from the Owner of such suspension or
abandonment, together with Reimbursable Expenses then
due and all Termination Expenses as defined in Paragraph
10.4. If the Project is resumed after being suspended for
more than three months, the Architect's compensation
shall be equitably adjusted.
ARTICLE 7
ARCHITECT'S ACCOUNTING RECORDS
7.1 Records of Reimbursable Expenses and expenses per-
taining to Additional Services and services performed on
the basis of a Multiple of Direct Personnel Expense shall
be kept on the basis of generally accepted accounting
Principles and shall be available to the Owner or the
Owner's authorized representative at mutually convenient
times.
ARTICLE 8
OWNERSHIP AND USE OF DOCUMENTS
8.1 Drawings and Specifications as instruments of serv-
ice are and shall remain the property of the Architect
whether the Project for which they are made is executed
or not. The Owner shall be permitted to retain copies, in-
cluding reproducible copies, of Drawings and Specifica-
tions for information and reference in connection with the
Owner's use and occupancy of the Project. The Drawings
and Specifications shall not be used by the Owner on
THE AMERICAN INSTITUTE OF ARCHITECTS,G17iIc35MNEW YORK AVENUE, N.W., lIIl I 111 11 F!•WASH NGTON,I D.C.®20006
6141-1977 7
other projects, for additions to this Project, or for comple-
tion of this Project by others provided the Architect is not
in Wault under this Agreement, except by agreement n
writing and with appropriate compensation to the Arc .in
J
tect.
8.2 Submission or distribution to meet official regulatory
requirements or for other purposes in connection with the
Project is not to be construed as, publication in derdgation
of the Architect's rights:
ARTICLE 9
ARBITRATION
9.1 All claims, disputes and other matters in question
between the parties to this Agreement, arising out"of or
relating to this Agreement or the breach thereof, shall be
decided by arbitration in accordance with the Construc-
tion Industry Arbitration Rules of the American Arbitra-
tion Association then obtaining unless the parties mutu-
ally agree otherwise: No arbitration, arising out of or re-
lating to this Agreement, shall include, by consolidation,
joinder or in any other manner, any additional person not
a party to this Agreement except by written consent con-
taining a specific reference to this Agreement and signed
by the Architect, the Owner, and any other person sought
to be joined. Any consent to arbitration involving an ad-
ditional person or persons shall not constitute consent to
arbitration of any dispute not described therein or with
any person not named or described therein. This Agree-
ment to arbitrate and any agreement to arbitrate with an
additional person or persons duly consented to by the
parties to this Agreement shall be specifically enforceable
under the prevailing arbitration law.
9.2 Notice of the demand for arbitration shall be filed in
writing with the other party to this Agreement and with
the American Arbitration Association. The demand shall
be made within a reasonable time after the claim, dispute
or other matter in question has arisen. In no event shall
the demand for arbitration be made after the date when
institution of legal or equitable proceedings based on
such claim, dispute or other matter in question would be
barred by the applicable statute of limitations.
9.3 The award rendered by the arbitrators shall be final,
and judgment may be entered upon it in accordance with
applicable law in any court having jurisdiction thereof.
ARTICLE 10
TERMINATION OF AGREEMENT
10.1 This Agreement may be terminated by either party
upon seven days' written notice should the other party
fail substantially to perform in accordance with its term
through no fault of the party initiating the terminations.
10.2 This Agreement may be terminated by the Owner
upon at least seven days' written notice to the Architect
in the event that the Project is permanently abandoned.
10.3 In the event of termination not the fault of the Ar-
chitect, the Architect shall be compensated for all services
Performed to termination date, together with Reimburs-
able Expenses then due and all Termination Expenses as
defined in Paragraph 10.4.
8
10.4 Termination Expenses include expenses directly at-
tributable to termination for which the Architect is not
otherwise compensated, plus an amount computed as a
percentage of the total Basic and Additional Compensa-
tion earned to the time of termination, as follows:
A 20 percent if termination occurs during the Sche-
matic Design Phase; or
.2 10 percent if termination occurs during the Design
Development Phase; or
.3 5 percent if termination occurs during any subse-
quent phase.
ARTICLE 11
MISCELLANEOUS PROVISIONS
11.1 Unless otherwise specified, this Agreement shall be
governed by the law of the principal. place of business of
the Architect.
11.2 Terms in this Agreement shall have the same mean-
ing as those in AIA Document A201, General Conditions
of the Contract for Construction, current as of the date
of this Agreement.
11.3 As between the parties to this Agreement: as to all
acts or failures to act by either party to this Agreement,
any applicable statute of limitations shall commence to
run and any alleged cause of action shall be deemed to
have accrued in any and all events not later than the rele-
vant Date of Substantial Completion of the Work, and as
to any acts or failures to act occurring after the relevant
Date of Substantial Completion, not later than the date of
issuance of the final Certificate for Payment.
11.4 The Owner and the Architect waive all rights
against each other and against the contractors, consult-
ants, agents and employees of the other for damages cov-
ered by any property insurance during construction as set
forth in the edition of AIA Document A201, General Con-
ditions, current as of the date of this Agreement. The
Owner and the Architect each shall require appropriate
similar waivers from their contractors, consultants and
agents.
ARTICLE 12
SUCCESSORS AND ASSIGNS
12.1 The Owner and the Architect, respectively, bind
themselves, their partners, successors, assigns and legal
representatives to the other party to this Agreement and
to the partners, successors, assigns and legal representa-
tives of such other party with respect to all covenants of
this Agreement. Neither the Owner nor the Architect shall
assign, sublet or transfer any interest in this Agreement
without the written consent of the other.
ARTICLE 13
EXTENT OF AGREEMENT
13.1 This Agreement represents the entire and integrated
agreement between the Owner and the Architect and
supersedes all prior negotiations, representations or agree-
amendedeither
only bytenor wrttenrinstrumentAgreement
bymay
both
Owner and Architect.
8141-1977 AIA DOCUMENT III I • OWNER -ARCHITECT •
THE AMERICAN INSTITUTE OF ARCHITECTS, 1735 AGREEMENT NEW YORKAVENUE, N
ION • IULY 1977 •
w•, WASHINGTON,D.C.
I ®20006
i
ARTICLE 14
BASIS OF COMPENSATION
The Owner shall compensate the Architect for the Scope of Services provided, in accordance with Article 6, Payments
to the Architect, and the other Terms and Conditions of this Agreement, as follows:
14.1 AN INITIAL PAYMENT of _ 0 _ dollars ($ )
shall be made upon execution of this Agreement and credited to the Owner's account as follows:
14.2 BASIC COMPENSATION 8% of Construction Cost
14.2.1 FOR BASIC SERVICES, as described in Paragraphs 1.1 through 1.5, and any other services included in Article 15
as part of Basic Services, Basic Compensation shall be computed as follows:
(Here insert basis of compensation, including fixed amounts, multiples or percentages, and identify Phases to which particular methods of compensa-
tion apply, if necessary.)
14.2.2 Where compensation is based on a Stipulated Sum or Percentage of Construction Cost, payments for Basic
Services shall be made as provided in Subparagraph 6.1.2, so that Basic Compensation for each Phase shall
equal the following percentages of the total Basic Compensation payable:
(include any additional Phases as appropriate.)
Schematic Design Phase:
Design Development Phase:
Construction Documents Phase:
Bidding or Negotiation Phase:
Construction Phase:
percent (15 %)
percent( 30 %)
percent( 75 %)
percent ( 80 %)
percent (100%)
14.3 FOR PROJECT REPRESENTATION BEYOND BASIC SERVICES, as described in Paragraph 1.6, Compensation shall
be computed separately in accordance with Subparagraph 1.6.2.
AIA DOCUMENT 8141 • OWNER -ARCHITECT AGREEMENT • THIRTEENTH EDITION • JULY 1977 • AIA® • ®1977
THE AMERICAN INSTITUTE OF ARCHITECTS, 1735 NEW YORK AVENUE, N.W., WASHINGTON, D.C. 20006 8141-1977 9
' , f
14A COMPENSATION FOR ADDITIONAL SERVICES
14.4.1 FOR ADDITIONAL SERVICES OF THE ARCHITECT, as described in Paragraph 1.7, and any other services in-
cluded in Article 15 as part of Additional Services, but excluding Additional Services of consultants, Compen-
sation shall be computed as follows:
bas's Of
andrelassifyinsert employees,
f required. Identify spec lc srates ervicflor stlottvhfch ples of �lfr��la�emeftir>dsfo! compensation apply, d employe .
xpense for Principals and necessary.) employees, and identity Principal,
2.5 x direct personnel expense
14.4.2 FOR ADDITIONAL SERVICES OF CONSULTANTS, including additional structural, mechanical and electrical
engineering services and those provided under Subparagraph 1.7.21 or identified in Article 15 as part of Addi-
tional Services, a multiple of _ _
to the Architect for such services. ) times the amounts billed
(Identify specific types of consultants in Article 15, if required.)
14.5 ' FOR REIMBURSABLE EXPENSES, as described in Article 5, and any other items included in Article 15 as Reim-
bursable Expenses, a multiple of 1
pended by the Architect, the Architect's employees and consultants in he interest ofsthe Project. ex -
14.6 Payments due the Architect and unpaid under this Agreement shall bear interest from the date payment is
due at the rate entered below, or in the absence thereof, at the legal rate prevailing at the principal place of
business of the Architect.
(Here insert any rate of interest agreed upon.)
(Usury laws and requirements under theFederal Truth in Lending Act, similar state and local consumer credit laws and other regulations at the
Owner's and Architect's principal places of business, the location of the Project and elsewhere may aNect the validity of this provision. specific legal
advice should be obtained with respect to deletion, modification, or other requirements such as written disclosures or waivers.)
14.7 The Owner and the Architect agree in accordance with the Terms and Conditions of this Agreement that:
14.7.1 IF THE SCOPE of the Project or of the Architect's Services is changed materially, the amounts Of compensation
shall be equitably adjusted.
14.7.2 IF THE SERVICES covered by this Agreement have not been completed within
(19 months of the date hereof, through no fault of the Architect, the amounts of compensation, rates and
multiples set forth herein shall be equitably adjusted.
IO 6141-1977 AtA DOCUMENT 6141 • OWNER- ARCHITECT AGREEMENT •THIRTEENTH EDITION • ULY 1977 • AIA® •
THE AMERICAN INSTITUTE OF ARCHITECTS, 1735 NEW YORK AVENUE, N.W., WASHINGTON, O.C. 20006
® 1977
ikTICLE 15
OTHER CONDITIONS OR SERVICES
AIA DOCUMENT 5141 - OWNER -ARCHITECT AGREEMENT - THIRTEENTH EDITION - JULY 1977 -
THE AMERICAN INSTITUTE OF ARCHITECTS, 1735 NEW YORK AVENUE, N.W., WASHINGTON'AD.C.® 120006
B141-1977 11
This Agreement entered into as of the day and year first written above.
OWNER Guadalupe -Parkway
Neighborhood Center, Inc.
-----------------
405 N. Quirt, Lubbock, Texas
BY
12 B141-1977
ARCHITECT BGR Architects -Engineers
2118 - 34th Street
L bock, as 79411
BY to e
AIA DOCUMENT B141• OWNER ARCHITECT AGREEMENT • THIRTEENTH EDITION •
THE AMERICAN INST OF ARCHITECTS, 1735 NEW YORK AVENUE, N.W., WASHINGTON! D.C.® 1977