HomeMy WebLinkAboutResolution - 099 - CO#1 To Contract - Water Industries, Inc. - Water Wells, Sandhills Well Field - 03/22/1979JGR:cl
REM. #99 (3/22/79
V QnT TTTTnNT
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK:
THAT the Mayor of the City of Lubbock BE and is hereby authorized and
directed to execute for and on behalf of the City of Lubbock a Change Order
No. 1, to that certain contract executed between the City of Lubbock and Water
Industries, Inc., on September, 1978, for the Drilling and Developing of Water
Wells in the Sandhills Well Field, attached herewith which shall be spread upon
the minutes of the Council and as spread upon the minutes of this Council shall
constitute and be a part of this Resolution as if fully copied herein in detail.
Passed by the City Council this 22nd day of March
�' II
DIRK WEST, MAYOR
ATTEST:
E el yn Gaf ga, City Se a Treasurer
APPROVED AS TO CONTENT:
1
Wilf or7 D. Watson, City Engineer
APPROVED AS TO FORM:
J C. Ross, Jr., Cit torney
1979.
2� ,
JGR:cl
RESOLUTION
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK:
REM. #99 (3/22/79
THAT the Mayor of the City of Lubbock BE and is hereby authorized and
directed to execute for and on behalf of the City of Lubbock a Change Order
No. 1, to that certain contract executed between the City of Lubbock and .Water
Industries, Inc., on September, 1978, for the Drilling and Developing of Water
Wells in the Sandhills Well Field, attached herewith which shall be spread upon
the minutes of the Council and as spread upon the minutes of this Council shall
constitute and be a part of this Resolution as if fully copied herein in detail.
Passed by the City Council this. 22nd day of March
ATTEST:
4el Gaf ga, City Se a Treasurer
APPROVED AS TO CONTENT:
VW&atson,
Wil or City
AS TO FORM:
torney
l�' r
DIRK WEST, MAYOR
1979.
Change Order No. 1
Drilling & Developing Seven Wells
In Sondhills Well Field
WWO 11520
T0: Water Industries, Inc.
Box 871
Hereford, Texas 79045
Original amount of contract $118,242.00
Net amount previous change orders _0_
Net amount this change order 11,420.00
Amended amount of contract 129,662.00
Time of 'completion 210 days
WHEREAS, it is desirable to make .changes in the plans and specifications .
for this project;
THIS AGREEMENT WITNESSETH: In consideration of the mutual advantages
gained, the Owner and the Contractor agree to the change shown herein and in the
attached exhibits and data, the Owner and the Contractor agree that the original
contract between them shall be modified to the extent herein indicated.
IN WITNESS WHEREOF, the Owner and the Contractor have hereto set their
hands this the 22nd day of March, 1978.
CITY OF LUBBOCK
OWNER
W � rcj� L.�.�b acs—,erg-cam
By By
Contractor Dirk West, Mayor
ATTEST:
CA -y Secretafy
RECONME
NDED F0.APPROVAV—
Cit ineer
40
City r
Well 117
1.1 Clean out 12 hrs. @ $60.00/hr. - $ 720.00
2.1 Set 220 feet of 10" liner @ $3.75/foot - 825.00
3. Gravel pack and bail 12 hrs. @ $60.00/h4. - 720.00
$ 2,265.00
TOTAL $11,420.00
Attachment
to Change Order No. 1
Water Industries, Inc.
WO 11520
BREAKDOWN OF
CHANGE
I. Additions
Well 192
1.
Drill: 19" hole, 240 feet @
$12.50/foot -
$.31-000.00
2.
Furnish, set and cement 80
feet of 16
=inch casing @ $24.50/foot
-
1,960.00
3.,
Install 10 inch casing, 240 feet @
$3.75/foot -
900.00
4.
Furnish and install 35 yards gravel @
$65/yard -
2,275.00
5.
Furnish and install gravel
chute -
300.00
6.!
Develop by bailing, 12 hrs.
@ $60.0.0/hr. -
720.00
$ 9,155.00
Well 117
1.1 Clean out 12 hrs. @ $60.00/hr. - $ 720.00
2.1 Set 220 feet of 10" liner @ $3.75/foot - 825.00
3. Gravel pack and bail 12 hrs. @ $60.00/h4. - 720.00
$ 2,265.00
TOTAL $11,420.00
m►4'/''�ry
762-6411
P. O. Box 2000
LUBBOCK, TEXAS 79457
June 20, 1979
Certificate of Completion
Honorable Mayor and City Council
City of Lubbock, Texas
Gentlemen:
On 18 June 1979, the drilling and developing of seven wells in
the Sandhills Well Field constructed by Water Industries under
contract dated October 12, 1978 was inspected and found to have
been completed in accordance with the plans and specifications.
Therefore, I recommend that you accept said improvements and
authorize final payment to the contractor.
Ver truly youV,
Wilford D..Watson
City Engineer
�UN'G 6 1979
r MONTHLY ESTIMATE
CITY OF LUBBOCK
Type of'hork Drilling and Developing Seven Wells
Location. In Sandhil.ls Well Field
Estimate ;Period
From June 1. 19 _Z9 to June-18. 7 g
On First estimate and final estimate use actual work dotes v? --
-For Water Industries Box 871V Hereford, Texas 79045
-----------------
Name and Address of Contractor
1 of 2
Project 22-0001-14800-.,011520
Estimate No 6 & F; n 1
Contract $ 118,242.00 •
i ITEM UNIT Of • PROJECT
MEASURE ESTIMATE QUANTITIES
1• Drill 24-inch hole in de ths'
to240 feet V.F. 1,630
2. Furnish and install 20-inch
surface casing V.F. 560
3. Furnish and install 16 inch
well casing V.F. .1,120
�aU 16 -inch
TOTAL WORK DONE CONTRACT
ON CONTRACT PRICE •
1,678 $ ?3.00
551 23.00
1,13) 14.25
AMOUNT
21,814;00
$ 12 673.00
$ 16,102,50
screen V.E. 280
-
5. Furnish and install 16-inch
280
45.00
$ 12 600.00
5,534.80
$ .42, 402.00
mill slot casing V.F. 210 274 20.20
6. Fnrtsi e1, and 24 573 74.00
7. Furnish and install concrete C.Y. - 28
8. Furnish and install gravel ..
.31
-80.00
Z,480,00
_
chutes7
Ea.
7
300.00-
—�--
$ 2;100.00
9. v ` lO seven wells with �44- '
surie block and bailer..• Hr. 85
Furnish and install seven
131
60.00
$_.:-.7,;860.:00
well houses-with concrete
$ 16,800.00
$ 7,000:.00
floor and pump base. Ea' 7 7 2,400.00
Ll. Move set u '.-test pump 7 -'.,,-71,000.00
MONTHLY ESTIMATE
Page 2 of 2
CITY OF LUBBOCK
Type of Worm Drilling and Developing Seven Wells in Project ?2-0001-14800-011520
Location: Sandhills Well Field 6 & Final
Estimate No
Estimate Period
Contract $ 118, 24 2. 00
From June 1 19 79 to June 18 7 9
,19_
On First estimate and final estimate use actual work dates
For. Water Industries Box 871 Elerefordy Texas 79045
Name and Address of Contractor
ITEM UNIT OF' PROJECT TOTAL WORK CONE CONTRACT
MEASURE ESTIMATE QUANTITIES ON CONTRACT PRICE AMOUNT
C. 0. #1
7�
Colcvlaltans
Verified
$
Well #192
��
suppwlt n0
Less 10% Retained
_ —
r
/4"
Papers O. K.
Difference
1• Drill 19t1 hole.
V.F. 240
240
12.50
3,000.00
2. Furnish set and cement4V.FZ.
ty ngi eer.
less Special Deduction
inch casing.
80
80.
$ 24.50
$ 1,960.00
3. Install 10 inch casin240
240
3.7 5
Less Liquidated Damage . . .
00.00
—
±. Furnish and install gravel
1 Lam..—_1 .L _._ 1 • �� _
Y
�.
246
.00
1 560.00
155,398.80
�..u� ch I 1 3 300.00300.00
6. Develop -by--b-a 60.00
0.00
Fxtra Work:
Furnish and install 10 3/4
inch casing V.F. - 10 $ 9.50 $ 95.00
I. Clean out by bailing. Hrs. 12 5.5 60.00
APP ED: For Res. Ener' ; Office
Total Amount of Work Done 156,291.30
7�
Colcvlaltans
Verified
$
Re 'd t E ;neer
��
suppwlt n0
Less 10% Retained
_ —
r
/4"
Papers O. K.
Difference
15b, 291.30
Read
��_.
ItDate
Proof
r
ty ngi eer.
less Special Deduction
$
—
Fer City Enw's Ofrwe
w 6 28
Calcutarlens
Less Liquidated Damage . . .
. . , $
—
City per
Date
Verified Cyt
Less Previous Payments
$
155,398.80
Supporting
Papers O. K.
Amount Due this Estimate .
$___19
2. 50
Read
Gy Commission
Date
. .
. .
026