Loading...
HomeMy WebLinkAboutResolution - 099 - CO#1 To Contract - Water Industries, Inc. - Water Wells, Sandhills Well Field - 03/22/1979JGR:cl REM. #99 (3/22/79 V QnT TTTTnNT BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK: THAT the Mayor of the City of Lubbock BE and is hereby authorized and directed to execute for and on behalf of the City of Lubbock a Change Order No. 1, to that certain contract executed between the City of Lubbock and Water Industries, Inc., on September, 1978, for the Drilling and Developing of Water Wells in the Sandhills Well Field, attached herewith which shall be spread upon the minutes of the Council and as spread upon the minutes of this Council shall constitute and be a part of this Resolution as if fully copied herein in detail. Passed by the City Council this 22nd day of March �' II DIRK WEST, MAYOR ATTEST: E el yn Gaf ga, City Se a Treasurer APPROVED AS TO CONTENT: 1 Wilf or7 D. Watson, City Engineer APPROVED AS TO FORM: J C. Ross, Jr., Cit torney 1979. 2� , JGR:cl RESOLUTION BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK: REM. #99 (3/22/79 THAT the Mayor of the City of Lubbock BE and is hereby authorized and directed to execute for and on behalf of the City of Lubbock a Change Order No. 1, to that certain contract executed between the City of Lubbock and .Water Industries, Inc., on September, 1978, for the Drilling and Developing of Water Wells in the Sandhills Well Field, attached herewith which shall be spread upon the minutes of the Council and as spread upon the minutes of this Council shall constitute and be a part of this Resolution as if fully copied herein in detail. Passed by the City Council this. 22nd day of March ATTEST: 4el Gaf ga, City Se a Treasurer APPROVED AS TO CONTENT: VW&atson, Wil or City AS TO FORM: torney l�' r DIRK WEST, MAYOR 1979. Change Order No. 1 Drilling & Developing Seven Wells In Sondhills Well Field WWO 11520 T0: Water Industries, Inc. Box 871 Hereford, Texas 79045 Original amount of contract $118,242.00 Net amount previous change orders _0_ Net amount this change order 11,420.00 Amended amount of contract 129,662.00 Time of 'completion 210 days WHEREAS, it is desirable to make .changes in the plans and specifications . for this project; THIS AGREEMENT WITNESSETH: In consideration of the mutual advantages gained, the Owner and the Contractor agree to the change shown herein and in the attached exhibits and data, the Owner and the Contractor agree that the original contract between them shall be modified to the extent herein indicated. IN WITNESS WHEREOF, the Owner and the Contractor have hereto set their hands this the 22nd day of March, 1978. CITY OF LUBBOCK OWNER W � rcj� L.�.�b acs—,erg-cam By By Contractor Dirk West, Mayor ATTEST: CA -y Secretafy RECONME NDED F0.APPROVAV— Cit ineer 40 City r Well 117 1.1 Clean out 12 hrs. @ $60.00/hr. - $ 720.00 2.1 Set 220 feet of 10" liner @ $3.75/foot - 825.00 3. Gravel pack and bail 12 hrs. @ $60.00/h4. - 720.00 $ 2,265.00 TOTAL $11,420.00 Attachment to Change Order No. 1 Water Industries, Inc. WO 11520 BREAKDOWN OF CHANGE I. Additions Well 192 1. Drill: 19" hole, 240 feet @ $12.50/foot - $.31-000.00 2. Furnish, set and cement 80 feet of 16 =inch casing @ $24.50/foot - 1,960.00 3., Install 10 inch casing, 240 feet @ $3.75/foot - 900.00 4. Furnish and install 35 yards gravel @ $65/yard - 2,275.00 5. Furnish and install gravel chute - 300.00 6.! Develop by bailing, 12 hrs. @ $60.0.0/hr. - 720.00 $ 9,155.00 Well 117 1.1 Clean out 12 hrs. @ $60.00/hr. - $ 720.00 2.1 Set 220 feet of 10" liner @ $3.75/foot - 825.00 3. Gravel pack and bail 12 hrs. @ $60.00/h4. - 720.00 $ 2,265.00 TOTAL $11,420.00 m►4'/''�ry 762-6411 P. O. Box 2000 LUBBOCK, TEXAS 79457 June 20, 1979 Certificate of Completion Honorable Mayor and City Council City of Lubbock, Texas Gentlemen: On 18 June 1979, the drilling and developing of seven wells in the Sandhills Well Field constructed by Water Industries under contract dated October 12, 1978 was inspected and found to have been completed in accordance with the plans and specifications. Therefore, I recommend that you accept said improvements and authorize final payment to the contractor. Ver truly youV, Wilford D..Watson City Engineer �UN'G 6 1979 r MONTHLY ESTIMATE CITY OF LUBBOCK Type of'hork Drilling and Developing Seven Wells Location. In Sandhil.ls Well Field Estimate ;Period From June 1. 19 _Z9 to June-18. 7 g On First estimate and final estimate use actual work dotes v? -- -For Water Industries Box 871V Hereford, Texas 79045 ----------------- Name and Address of Contractor 1 of 2 Project 22-0001-14800-.,011520 Estimate No 6 & F; n 1 Contract $ 118,242.00 • i ITEM UNIT Of • PROJECT MEASURE ESTIMATE QUANTITIES 1• Drill 24-inch hole in de ths' to240 feet V.F. 1,630 2. Furnish and install 20-inch surface casing V.F. 560 3. Furnish and install 16 inch well casing V.F. .1,120 �aU 16 -inch TOTAL WORK DONE CONTRACT ON CONTRACT PRICE • 1,678 $ ?3.00 551 23.00 1,13) 14.25 AMOUNT 21,814;00 $ 12 673.00 $ 16,102,50 screen V.E. 280 - 5. Furnish and install 16-inch 280 45.00 $ 12 600.00 5,534.80 $ .42, 402.00 mill slot casing V.F. 210 274 20.20 6. Fnrtsi e1, and 24 573 74.00 7. Furnish and install concrete C.Y. - 28 8. Furnish and install gravel .. .31 -80.00 Z,480,00 _ chutes7 Ea. 7 300.00- —�-- $ 2;100.00 9. v ` lO seven wells with �44- ' surie block and bailer..• Hr. 85 Furnish and install seven 131 60.00 $_.:-.7,;860.:00 well houses-with concrete $ 16,800.00 $ 7,000:.00 floor and pump base. Ea' 7 7 2,400.00 Ll. Move set u '.-test pump 7 -'.,,-71,000.00 MONTHLY ESTIMATE Page 2 of 2 CITY OF LUBBOCK Type of Worm Drilling and Developing Seven Wells in Project ?2-0001-14800-011520 Location: Sandhills Well Field 6 & Final Estimate No Estimate Period Contract $ 118, 24 2. 00 From June 1 19 79 to June 18 7 9 ,19_ On First estimate and final estimate use actual work dates For. Water Industries Box 871 Elerefordy Texas 79045 Name and Address of Contractor ITEM UNIT OF' PROJECT TOTAL WORK CONE CONTRACT MEASURE ESTIMATE QUANTITIES ON CONTRACT PRICE AMOUNT C. 0. #1 7� Colcvlaltans Verified $ Well #192 �� suppwlt n0 Less 10% Retained _ — r /4" Papers O. K. Difference 1• Drill 19t1 hole. V.F. 240 240 12.50 3,000.00 2. Furnish set and cement4V.FZ. ty ngi eer. less Special Deduction inch casing. 80 80. $ 24.50 $ 1,960.00 3. Install 10 inch casin240 240 3.7 5 Less Liquidated Damage . . . 00.00 — ±. Furnish and install gravel 1 Lam..—_1 .L _._ 1 • �� _ Y �. 246 .00 1 560.00 155,398.80 �..u� ch I 1 3 300.00300.00 6. Develop -by--b-a 60.00 0.00 Fxtra Work: Furnish and install 10 3/4 inch casing V.F. - 10 $ 9.50 $ 95.00 I. Clean out by bailing. Hrs. 12 5.5 60.00 APP ED: For Res. Ener' ; Office Total Amount of Work Done 156,291.30 7� Colcvlaltans Verified $ Re 'd t E ;neer �� suppwlt n0 Less 10% Retained _ — r /4" Papers O. K. Difference 15b, 291.30 Read ��_. ItDate Proof r ty ngi eer. less Special Deduction $ — Fer City Enw's Ofrwe w 6 28 Calcutarlens Less Liquidated Damage . . . . . , $ — City per Date Verified Cyt Less Previous Payments $ 155,398.80 Supporting Papers O. K. Amount Due this Estimate . $___19 2. 50 Read Gy Commission Date . . . . 026