Loading...
HomeMy WebLinkAboutResolution - 199 - Contract-Clen Clyatt-Safety Climbing Equipment, Sandhills Well Field - 06/28/1979l;�F:mw RESO #199 - 6/38t79 RESOLUTION BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK: THAT the Mayor of the City of Lubbock is hereby authorized and directed to execute a Contract with Glenn Clyatt as contractor to do the following: FURNISHING AND INSTALLING ALL NECESSARY MATERIALS, MACHIMM, EQUIPMENT, SUPERINTENDITCE AND LABOR FOR INSTALLATION OF SAFETY CLIMBING EQUIPMENT ON THE FOLLOWING: I. ELEVATED TANK 50TH & JOLIET A 2. ELEVATED TANK 35TH & AVENUE W 3. ELEVATED TANK 19TH & AVENm V 4. ELEVATED TANK - AIRPORT 5. ELEVATED TANK - WATER TRE uojT pLANT 6. MICRaiAVE TO411;R - SANDHILLS �Ej y n Bid No. 5333, amaunt is $7,532.00, copy of said contract is attached herewith and shall be spread upon the minutes of the Council and as spread upon the minutes of this Council shall constitute and be a part of this Resolution as if fully copied herein in detail. Passed by the City Council this 28th ATItST 4etl*ga," ity - Treasurer APPROVED, AS TO a CONTENT: c Eng ening Departftent APPROVED AS TO FORM: J. lVh Fullinguamn—, city#ttorney day of June, 1979. h CONTRACT STATE OF TEXAS. COUNTY OF•LUBBOCK THIS AGREEMENT, made and entered into the 28th day of June A.D., 1979, by and between the City of Lubbock, or the County of Lubbock and State of Texas, acting through Dirk West, Mayor, thereunto duly authorized so to do, Party of the First Part, hereinafter termed OWNER, and Glen Clyatt, Route 2 Eastland, Texas of the City of Eastland , County•of Eastland and State of Texas , Party of the Second Part, hereinafter termed CONTRACTOR. WITNESSETH: That for and in consideration of the payments and agree- ments hereinafter mentioned, to be made and performed by the party of the First Part (OWNER), and under conditions expressed in the bond bearing even date* herewith, the Party of the Second Pard (CONTRACTOR), hereby agrees with the said Party of the First Part (OWNER) to commence and complete the construction of certain improvements described as follows: Safety Climbing Equipment W.W.O. 11522 and all extra work in connection therewith, under the terms its stated in the General Conditions of the agreement; and at his (or their) own proper cost and expense to furnish all the materials, supplies, machinery, equipment, tools, superintendence, labor, insurance and other accessories and services necessary to complete the said construction, in accordance with the conditions and prices stated in the proposal attached hereto and in accordance with the General Conditions of the Agreement, and in accordance with the Plans, which includes all maps, plats, blue prints and other drawings andprinted written explanatory matter thereof, and the Specifications therefore, as prepared by the CITY ENGINEER, each of which has been identified by the endorsement of the CONTRACTOR and the ENGINEER thereon, together -with the CONTRACTOR'S written proposal, the General Conditions of the Agreement, and the Construction Bond hereto attached, all of which are made a part hereof and collectively evidence and constitute the entire contract. The CONTRACTOR hereby agrees to commence work within thirty days after the clearance of all Utilities in the Right of'Way, and to substantially complete' same by. The OWNER agrees to pay the CONTRACTOR in current funds for the per- formance of the contract in accordance with the proposal submitted therefore, subject to addition and deductions, as provided in the specifications, and to addition thereof as provided therein. The OWNER agrees to pay the CONTRACTOR in current funds for the performance of the contract in accordance with the proposal submitted therefore, subject to addition and deductions, as provided in the speci— fications, and to addition thereof as provided therein. IN WITNESS WHEREOF, the parties to these presents have executed this agreement in quadruplicate in the year and day first above written. ecity of Lubbock, Texas's Party of the First Part (OWNER), • r BY i ATTEST: a West, Mayor r • • ' Evelyn Ga fga, City ec e y (SEAL) Contractor, Corporation, Partnership Party.of the Second Part ATTEST' Secretary BY 4 �P TITLE GLEN CLYATT - OWNER Complete Address: Glen Clyatt Route 2 Eastland, Texas Z 762-6411 P. O, Box 2000 Certificate of Completion Honorable Mayor and City Council City of Lubbock, Texas Gentlemen: r� LUBBOCK, TEXAS 79457 On September 10, 1979 the contract, Safety Climbing Equipment, W.W.O. 11522, constructed by Glen Clyatt under contract dated June 28, 1979, was inspected and found said improvements to have been completed in accordance with the plans and specifications. Therefore, I recommend that you accept said improvements and authorize final payment to the Contractor. Very truly yours, Wil o d D. Watson Chi Water Utilities Engineer 762-6411 P. O. Box 2000 Certificate of Acceptance Gentlemen: LUBBOCK, TEXAS 79457 In accordance with paragraph 49, Section II, of the Specifications for Safety Climbing Equipment, W.W.O. 11522, you are hereby notified of the acceptance of this project by the City Council of the City of Lubbock on September 27, 1979. Final payment was authorized at the same meeting and will be forthcoming. Yours very truly, Li Wilf d D. Watson ti Water Utilities Engineer il09 � 762-6411 P. O. Box 2000 Certificate of Acceptance Gentlemen: LUBBOCK, TEXAS 79457 In accordance with paragraph 49, Section II, of the Specifications for Safety Climbing Equipment, W.W.O. 11522, you are hereby notified of the acceptance of this project by the City Council of the City of Lubbock on September 27, 1979. Final payment was authorized at the same meeting and will be forthcoming. Yours very truly, Li Wilf d D. Watson ti Water Utilities Engineer CONTRACTOR'S AFFIDAVIT ON CLOSING JOB STATE OF TEXAS X COUNTY OF LUBBOCK X Before me, a Notary Public in and for Lubbock County, Texas, on this day personally appeared Glen Clyatt , who being by me duly sworn, upon oath says: I, Glen Clyatt do represent to the City of Lubbock and solemnly swear that I executed a Contract with the City of Lubbock, said Contract being dated June 28. 1979 , for safety climbing„ Eauiument under WWO 11522 , and that the work and contract has been completed according to the plans and specifications pertaining to the project and that all labor, material, supplies and other cost including equipment, rental and hire, and all expense items incurred in connection with said project have been paid in full; that all liens and rights to fix liens against any part of said project or the moneys, bonds, or warrants due the Contractor, have been satisfied by payment to the claimant, his authorized agent or attorney, and full release of all recorded liens or claims have been secured by settlement and duly filed of.record with the County Clerk of Lubbock County. I further represent and affirm that all Federal, State and Municipal laws were substantially complied with by me in doing and carrying out the job and project herein referred to and that I paid applicable scale of wages, and this affidavit is made to secure payment from the City of Lubbock to me of the full and final moneys due me under this contract. Witness my hand this day of S 0—�-P T';E7 M Q F—t-- Attest: t bsvibed and sworn to before me this theL L*day of TT Notary Public and for Lubbock County, Texas a-,, Pfes' /Q 0 U £y s MONTHLY ESTIMATE CITY OF LUBBOCK Type of Work Raf Pry C1 JTnhtng Equipment Project 22-0001-14800-011522 Location: Elevated Tanks within City and Microwave Tower Estimate No 2nd and Final in Sandhills Well Field Contract $ 7532.00 Estimate Period From GPptpTnT+p*- 1 1972 to September 27, , 19 79 On First estimate and final estimate use actual work dates For Glen ciyn t—!'---Rn•t +p #7 EaRt1 a� Tpxa a 76448 Name and Address of Contractor ITEM UNIT OF MEASURE PROJECT TOTAL WORK DONE ESTIMATE QUANTITIES ON CONTRACT CONTRACT PRICE AMOUNT 1. Cable e: Safety Climbing EQuip-ment installed on dome of elevated tank at 50th street and Joliet Avenue. labor, c;maete in place, per linear foot: L.F. 49 49 1 $13.00 637.00 2. Cable Type: Safet Climbin Equipment 4n.st-21-lerl- — a" elevated tank at 35tb St. _ Avenue "W", including _and materials and labor, complete in place, per linear foot: L.F. 141 154 1 $10.00 $1,540.00 3. Cable Typpe:_ Equipment installed on stand- pipe at 19th St. and Ave. "V" _ including materials and labor complete in Rlace, Rer linear foot-- 2 65.00 4. Cable type: Safety Climbing gouipment installed on ele- vated tank at Municipal Air - ort including materials suel '-bar,, compl etn ir+ nl 0 120 $10.00 $1,200.00 per—Liuear-foot-- .�_ MONTHLY ESTIMATE ' CITY OF LUBBOCK Type of Wor Safety Climbing Equipment Location: Elevated tanks within City and Microwave Tower in Sandhills Well Field Estimate Period From :._SP.�1tPm�'t'r I. , 1972 toqeptember 27, _19 79 On first estimate and final estimate use actual work dates For Glen Clyatt Route #2 Eastland, Texas 76448 Project 22-0001-14800-011522 Estimate No 2nd and Final Contract .$ $7532.00 rvame Ono nuv.c+. •••• !TEM �•-• UNIT Of MEASURE PROJECT ESTIMATE QUANTITIES TOTAL WORK DONE ON CONTRACT CONTRACT AMOUNT PRICE 5. Cable Type: Safety Climbing Equipment installed on eleva- ted tank at the Water Treat- ment Plant, including mater- •alq laceper linear foot: L.F. 135 135 $10.00 $1,350.00 6. Cable T e: Safety Climbin _ EQuivmen>: installed on Micro- wave Tower at Sandhills Well _Field. includin materials and labor, complete In place, per linear feet: L.F. 167 167 $10.00 $1,670.00 — i APPR VED: For R*s. Engr's Office Total Amount of Work Dome . $ 7 662.00 Less 10% Retained . . . . . . . S✓_ Difference $ Less Special Deduction . . . ' . $ Less Liquidated Damage . . . . . . $ Less Previous Payments . . . . . . . $ 6778.80 883.20 Amount Due this Estimate . . . $ , %-%e Calculations verifi.d ty% SupportOing Papas . K R id En ee Date jr Proof Read By. ity neer _ a City Manager to For City E is os%`o Calculatlens S vorifl.d t Supporting Pa "o' K. Proof R.ad t� C,ty Commission Dateil �� 1