RESOLUTION
RESOLUTION ACCEPTING IMPROVEMENTS ON PORTIONS OF STREETS AND/OR AVENUES AS
LISTED BELOW:
WHEREAS, in conformance with the paving requirement provisions of City
Ordinance 1331, the subdivider of Horizon West Addition, Lots 114-274 and Tract "A"
made arrangements with W.D. Turner Construction Company for the construction of
paving improvements on certain streets dedicated in said subdivision under the
provisions of said Ordinance prior to the recording of the subdivision plat of
Horizon West Addition, Lots 114-274 and Tract "A" including the following streets:
Duke Street from its intersection with the East Paving Line of Frankford
Avenue to its intersection with the Northwest Lip Line of North Evanston
Drive known and designated as New Subdivision Sub -Unit Number 28 of Unit
Number 2023.
Dartmouth Drive from its intersection with the cul-de-sac 50.00 feet
East of the East Property Line of Frankford Avenue to its intersection
with the Northwest Lip Line on North Evanston Drive known and designated
as New Subdivision Sub -Unit Number 29 of Unit Number 2023.
Cornell Street from its intersection with the East Paving Line of
Frankford Avenue to its intersection with the Southwest Property Line
of Dartmouth Drive known and designated as New Subdivision Sub -Unit
Number 30 of Unit Number 2023.
Essex Drive from its intersection with the North Lip Line of Colgate
Street to its intersection with a line 16.00 feet Southwest of the
Southwest Property Line of North Englewood Avenue.known and designated
as New Subdivision Sub -Unit Number 31 of Unit Number 2023.
North 1/2 of Colgate Street from its intersection with the West Lip
Line of North Dover Avenue to its intersection with a line 9.00 feet
East of the West Property Line of Essex Drive known and designated as
New Subdivision Sub -Unit Number 32 of Unit Number 2023.
North Englewood Avenue from its intersection with the North Lip Line
of Colgate Street to its intersection with the Southeast Lip Line of
Dartmouth Street known and designated as New Subdivision Sub -Unit
Number 33 of Unit Number 2023.
North Englewood Avenue from its intersection with the Southeast Lip
Line of North Evanston Drive to its intersection with the Northwest
Lip Line of North Essex Drive known and designated as New Subdivision
Sub -Unit Number 34 of Unit Number 2023.
North Englewood Avenue from its intersection with the Northwest Lip
Line of North Evanston Drive to its intersection with a line 7.00
feet South of the South Property Line of the alley South of Emory Street
known and designated as New Subdivision Sub -Unit Number 35 of Unit Number
2023.
West 1/2 of North Dover Avenue from its intersection with a line 2.00
feet South of the centerline of Colgate Street to its intersection with
a line 7.00 feet South of the South Property Line of the alley North of
Duke Street known and designated as New Subdivision Sub -Unit Number 36
of Unit Number 2023.
Ji
North Elkhart Avenue from its intersection with the cul-de-sac 50.00
feet North of Colgate Street to its intersection with the South Lip
Line of Dartmouth Street known and designated as New Subdivision
Sub -Unit Number 38 of Unit Number 2023.
Cornell Street and North Durham Avenue from its intersection with the
cul-de-sac North of Colgate Street to its intersection with the West
Lip Line of North Dover Avenue known and designated as New Subdivision
Sub -Unit Number 39 of Unit Number 2023.
North Evanston Drive from its intersection with the Southwest Property
Line of Dartmouth Drive to its intersection with a line 16.00 feet
Northeast of the Northeast Property Line of Englewood Avenue known
and designated as New Subdivision Sub -Unit Number 40 of Unit Number 2023.
Duke Street from its intersection with the Northeast Property Line of
North Englewood Avenue to its intersection with the West Lip Line of
North Dover Avenue known and designated as New Subdivision Sub -Unit
Number 41 of Unit Number 2023.
Dartmouth Street from its intersection with a line 16.00 feet Southwest
of the Southwest Property Line of North Englewood Avenue to its intersection
with the West Lip Line of North Dover Avenue known and designated as
New Subdivision Sub -Unit Number 43 of Unit Number 2023.
Drainage Slabs on Cornell Street (N.S. 2023-30), North Evanston Drive
(N.S. 2023-40) and North Englewood Avenue (N.S. 2023-34) known and
designated as New Subdivision Sub -Unit Number 43-(A) of Unit Number 2023.
AND WHEREAS, the construction of the above improvements on the abovementioned
streets was performed under the supervision of the City Engineer, and said
improvements have been completed and have been inspected and found to have been
constructed in accordance with City specifications and in accordance with the
provisions of City Ordinance 1331.
THEREFORE, BE IT RESOLVED BY THE CITY OF LUBBOCK, TEXAS.
I.
That the improvements on said portions of the abovementioned streets be
and the same are hereby accepted and the City Engineer be and he is hereby
authorized to direct the payment of the City's portion of the cost and to release
escrow money.
II.
This resolution shall take effect and be in force from and after its passage.
PASSED AND APPROVED THIS 24TH DAY OF MAY, 1979.
ATTEST:
Evelyn Ga ga, City c t y
APPROVED:
WD.` Watson, City Engineer
A:PYRVED AS TO FORM:
C ?��j�ty Shn C.Ross, JCttorney
TIED TO RESO #166 - 5/24/79
CONSOLIDATED FINAL ESTIMATE
HORIZON WEST ADDITION, LOTS 114-274 & TRACT "A"
Accepted May 24, 1979
QUANTITIES
S.Y.
Alley
Return
S.Y.
and S.Y.
Unit &
Paving
L.F. Drainage Valley
Sub -Unit
Location
6" Base
C & G Channels Gutter
NS 2023-28
Duke Street from E. paving line of
Frankford Avenue to N.W.L.L. of N.
Evanston Drive.
3,395.95
1,654.52 40.40
NS 2023-29 Dartmouth Street from cul-de-sac
50' E. of E.P.L. of Frankford Ave.
to N.W.L.L. of N. Evanston Drive.
NS 2023-30 Cornell Street from E. paving line
of Frankford Avenue to S.W.P.L. of
Dartmouth Drive.
NS 2023-31 Essex Drive from N.L.L. of Colgate
Street to 16' S.W. of S.W.P.L. of
N. Englewood Avenue.
NS 2023-32 N. 1/2 of Colgate Street from W.L.L.
of N. Dover Avenue to 9.00' E. of
W.P.L. of Essex Drive.
NS 2023-33 N. Englewood Avenue from N.L.L.
of Colgate Street to S.E.L.L. of
Dartmouth Street.
NS 2023-34 N. Englewood Avenue from S.E.L.L.
of N. Evanston Drive to N.W.L.L.
of N. Essex Drive.
NS 2023-35 N. Englewood Avenue from N.W.L.L. of
N. Evanston Drive to 7.00' S. of
S.P.L. of alley S. of Emory Street.
2,149.09 111P139.83 40.40 34.76
2,698.11 1,052.32
3,152.04 1,351.75 17.38
3,315.32 1,254.21 95.44 29.05
2,035.66 1,148.61 65.19 52.54
776.52 402.72 46.57
820.52 496.09 52.54
QUANTITIES
S.Y.
Alley
Return
S.Y. and S.Y.
Unit & Paving L.F. Drainage Valley
Sub -Unit Location 6" Base C & G Channels Gutter
NS 2023-36 W. 1/2 of N. Dover Avenue from 2.00'
S. of centerline of Colgate Street
to 7.00' S. of S.P.L. of alley W. of
Duke Street. 2,378.33 693.77 40.40
NS 2023-38 N. Elkhart Avenue from cul-de-sac
50.00' N. of Colgate Street to
S.L.L. of Dartmouth Street.
NS 2023-39 Cornell Street and N. Durham
Avenue from cul-de-sac N. of
Colgate Street to W.L.L. of N.
Dover Avenue.
NS 2023-40 N. Evanston Drive from S.W.P.L.
of Dartmouth Drive to 16.00' N.E.
of N.E.P.L. of Englewood Avenue.
NS 2023-41 Duke Street from 16' N.E. of N.E.P.L.
of N. Englewood Avenue to W.L.L. of
N. Dover Avenue.
1,943.80 1,039.52 52.54
1,837.77 977.30 20.20 52.54
2,579.78 885.00
4,129.67 2,354.91 20.20 52.54
NS 2023-43 Dartmouth Street from 16' S.W. of
S.W.P.L. of N. Englewood to W.L.L.
of N. Dover Avenue. 3,654.22 1,852.26 52.54
2023-43A Various Drainage Channels. 1,141.70 486.21
TOTAL QUANTITIES
34,866.78 17,444.51 808.44 443.00
COST ESTIMATE
34,866.78 S.Y.
Paving 6" Base
@
$ 4.35
17,444.51 L.F.
Curb & Gutter
@
$ 4.23
808.44 S.Y.
Alley Return and
Drainage Channel @
$20.00
443.00 S.Y.
Valley Gutter .
@
$20.00
CONTRACT COST
$151,670.49
$ 73,790.27
$ 16,168.80
$ 8,860.00
$250,489.56
COST DISTRIBUTUION
Unit &
Contract
Developer
Sub -Unit
Cost
Cost
NS
2023-28
$ 22,579.00
$ 22,579.00
NS
2023-29
15,673.22
15,673.22
NS
2023-30
16,188.09
16,188.09
NS
2023-31
19,776.87
19,776.87
NS
2023-32
22,216.75
22,216.75
NS
2023-33
16,068.34
16,068.34
NS
2023-34
6,012.77
6,012.77
NS
2023-35
6,718.52
6,718.52
NS
2023-36
14,088.39
14,088.39
NS
2023-38
13,903.50
13,903.50
NS
2023-39
13,583.08
13,583.08
NS
2023-40
14,965.59
14,965.59
NS
2023-41
29,380.13
29,380.13
NS
2023-43
24,781.72
24,781.72
NS
2023-43 A
14,553.59
14,553.59
TOTAL
$250,489.56
$250,489.56