WHEREAS, the City of Lubbock and Lubbock County have heretofore established
a Steering Committee of the Lubbock Urban Transportation Study known as the
Metropolitan Planning Organization, and;
WHEREAS, one of the responsibilities of such organization is the annual
preparation of a Transportation Improvement Program with an annual element and
the preparation of a Transportation Management Element with an annual element,
and;
WHEREAS, such annual elements are presented to the �ity Council for its
consideration and approval, NOW THEREFORE:
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK:
THAT the City Council of the City of Lubbock does/hereby approve the
annual elements of the Transportation Improvement Progxain and the Transportation
Management Element.
Passed by the City Council this 23rd day of August 1979.
DIRK WEST, MAYOR
ATTEST:
Evelyn Gaffga, City Secretay easurer
APPROVED AS TO CONTENT:
.H. cDan el, Traffic Engineering Dir.
APPROVED AS TO FORM:
414�
Leon G. Bean, Assistant City Attorney
COMMISSION
A. SAM WALDROP, CHAIRMAN
DEWITT C. GREER
RAY A. BARNHART
STATE DEPARTMENT OF HIGHWAYS
AND PUBLIC TRANSPORTATION
Mr. Larry J. Cunningham
City Manager
City of Lubbock
P. 0. Box 2000
Lubbock, Texas 79457
P. 0. Box 771
Lubbock, Texas 79408
August 10, 1979
Attention: Mr. Jim Bertram
Dear Sir:
/P�p11-12�13�Qsc
�lC. l..�9V D N
ci C.
l LUBgOCK, TX .
ENGINEER -DIRECTOR
B. L. DEBERRY
IN REPLY REFER TO
FILE NO.
As you know, the Steering Committee of the Lubbock Urban
Transportation Study presently serves, at the joint request
of the City of Lubbock and Lubbock County, as the Metropoli-
tan Planning Organization (MPO) for the Lubbock Urbanized
Area. One of the responsibilities of the MPO is the annual
preparation of a Transportation Improvement Program with.
annual element (TIP/AE) and a Transportation Management -Element
with annual element (TSME/AE). Preparation of these programs•
has been a cooperative effort by members of our department,.
Mr. Edgar Chance and Mr. Coy Biggs of Lubbock County, and
Messrs. Jim Bertram, Willie Watson, Bill McDaniel, and John
Wilson.
The TIP/AE is an annual listing of priority projects for a
five year period. The annual element of this program shows
the -projects considered likely to be implemented during the
period of September 1, 1979, to August 31, 1980. Any project
expected to be implemented within the time period must be a
part of the annual element in order to be eligible for Federal
funds. Funding amounts shown for transit items does not
express a commitment for expenditure of funds, but establishes
fund eligibility for transit projects.
The TSME/AE attemts to use present facilities more efficiently
through management or minor modification. TSME projects would
• 4
Mr. Larry J. Cunningham
2
August 10, 1979
include improvement in intersection alignment, improve or
install traffic signals, aid transit management or operations
and other traffic engineering improvements which would aid
the movement of people.
Copies of the TIP/AE and the TSME/AE are enclosed. We would
appreciate Council review, suggestions for any,necessary re-
visions, and approval of these programs.
If there are any questions, please let us know.
GYJ:kas
enclosures
Very truly yours,
i, . ��
Ae C. Wall, r.
DistrictEngineer
District Five
!August 27, 1979
Mr- George C. Mall, Jr.
District Engineer .. District Five
State Department of gighways and
Public Transportation
P. Q. Dox 771
Lubbock, Texas 79408
Dear Mr. Wall:
Pursuant to Mr. Bertram$0 Instructions, enclosed herewith to you
are the following documents:
A copy of Resolution No. 242 and a duplicate original of
the, contract between the City and the Steering Cowdttee
of the Lubbock 'Urban Transportation Study (14P4) with
appropriate attachments, and
d copy of Res�lutioa No. 243 reflecting the council's
aPproval of the annual elements of the TZP and TSME,
as submitted by your office..
If you are needing farther certification of the above matters,
please let me know.
Sincerely,
SPELYN GAFFM
City Steretaary-Treasurer
Enclosures
cc: Mr. Larry Cunningham, City Manager
Mr. Jim Bertram, Director of Plaaaing
x,25-fry
TIED TO RESOLUTION #243 - 8/23/79
TRANSPORTATION SYSTEM MANAGEMENT ELEMENT
FOR LUBBOCK URBANIZED AREA
FY 1980
(September 1, 1979 - August 31, 1979)
t '
TABLE OF CONTENTS
June, 1979
Page
Method
1
Product
2
TSME Actions
3
Project development
9
Five-year transit program
11
Annual element - Transit TSM
projects to
be included in FY 1979 TIP/AE
13
Annual element - Streets and
highways TSM
projects to be included
in FY 1979
TIP/AE`
14
Monitoring
15
Items discussed in Attachment
A
lg
k June, 1979,
TRANSPORTATION SYSTEM MANAGEMENT ELEMENT
LUBBOCK URBANIZED AREA
FY 1980 (September 1, 1979 - August 31, 1980)
METHOD
The FY 1978 Transportation System Management Element was developed by
a technical committee made up of representatives from the following
agencies: City of Lubbock, Lubbock County, Lubbock Transit Company,
Yellow Cab Company, Citizens for Improved Transportation (CFIT), South
Plains Association of Governments, Texas Tech University, and the
State Department of Highways and Public Transportation. The committee
considered each of the categories set forth in the Federal -Aid Highway
Program Manual, Volume 4, Chapter 4, Section 2, Subsection 1. From the
very broad area of actions available, those considered applicable to the
Lubbock Urbanized Area were selected.
For FY 1979 the committee elected to revise and update the previous
year's TSM to avoid duplicating work already done. The revision was
accomplished by addressing those areas where minor capital expenditure
provided needed increased vehicle capacities in street segments and
intersections. One important task from the FY 1979 TSM was a.consultant
study of the three traffic signal systems in the city with recommenda-
tions for more efficient use of the equipment now in place. The transit
system was also surveyed and revised to perform more efficiently.
Based upon the past two year's experience, it was decided to change the
approach to the TSM development this year. The item by item approach
1
�
June, 1979
.has produced essentially a project oriented document based primarily
upon Ancreasing the use of road space through revising existing or
installing new traffic signals and by revising intersection alignment
or geometric configuration. Studies conducted..to monitor existing
conditions or provide needed information for improvements have.aided
the efficiency of both the transit system and the highway and street
network. The experience of the past two years has been valuable in
providing insight into low capital improvements in existing.systems,
and producing several valuable projects.
This year's approach has been to reaffirm the four goals previously
established for the city and to develop both attitudes and projects as
objectives toward those goals. Input into the FY 1980 TSM has come
from several technical committee meetings, from the Transit Advisory
Board, from Public Meetings, and from official City Council actions
relating to the transit system. This input has provided projects for
implementation,.but in addition, it has provided possibilities for some
movement away from the traditional one car -one person traffic movement
in the City of Lubbock.
PRODUCT
The continuing goals for the TSM are as follows:
1. Insure the efficient use of existing road space
2. Reduce the vehicle use in congested areas
3. Improve transit service
4. Increased internal transit management efficiency
This year's TSM will discuss each of these goals, address perceived
problems and possibilities, and produce projects where applicable.
2.
TSME ACTIONS
Insure the -efficient' -use of existing road space
June, 1979
This area emphasizes the importance of allowing traffic to move
more efficiently especially through intersections. The past two
years have presented several projects for improving or installing
new traffic signal equipment or improving intersection alignment.
or geometric configuration. In most instances, the need for the
improvement was evident and needed little planning.
It has become evident that several intersections in the city are
reaching their capacity and will need improvement. Since funds
are limited, it has become imperative that alternate improvement
methods be compared for cost and effectiveness. It is also
desirable that choices be available between phased improvement
for an intersection and the massive cost of a grade separation.
Various studies, some underway presently and others to begin soon,
will provide data showing present conditions, i.e. present volumes
and capacities of intersections and street segments, and provide
projections for future operations. The.Traffic Engineering Study
that is now underway will survey each of the three integrated
traffic signal systems and make recommendations for their most
efficient use. The same study will survey selected intersections
to determine the present capacity, the future need, and provide
recommendations for alternatives to meet that need. The FY 1980
Unified Work Program also contains a work task to study other se-
lected intersections for present and projected capacity needs.
3.
June, 1979
Three selected street segments are also proposed for study in the
ts presently carries a high volume
FY 1980 UWP. Each of the segmen
of traffic and will need additional capacity soon. This study will
ide recommendations for alternate
analyze present conditions, Prov
methods of improvement, and provide costs estimates for these
alternatives.
The intersection at East 34th Street and Quirt Avenue will be the
subject of a special study. This intersection presents special
problems because of alignment and conflict with tracks owned by
two railroad companies. Energy conservation is another factor in-
volved in this intersection. Quirt Avenue is a major access route
into east Lubbock and railroad traffic crossing the street.blocks
automobile traffic. This study will provide alternatives between
an overpass and underpass with right-of-way and construction
estimates.
The efficient use of the existing road space is an essential part
of future transportation in Lubbock. Through the knowledge of
local conditions plus the data obtained from the studies mentioned,
us alternatives for system -improve:-
choices can be made from vario
ment. These choices may include channelization, traffic signal
installation or revision, intersection realignment or geometric '
changes or possibly new construction.
The review of other items involved with the use of the existing
road space found that no new one-way streets were proposed,
` June, 1979
preferential treatment for transit vehicles was not recommended,
and parking did not constitute a problem at the present time,
but would be the subject of a study during FY 1980. The projects
developed from this section will be a part of the Streets and
Highways portion of the FY 1980 TSME.
5.
June_, 1979
2. Reduce vehicle use in congested areas
On June 8., 1979, a meeting was held at the District Headquarters
of the State Department of Highways and Public Transportation to
discuss ride -sharing. Approximately 35 people were present for the
meeting and represented the Public School System, Texas Tech
University, Reese Air Force Base, City Government, and manu-
facturing and business interests. The interest shown by those
attending the meeting resulted in'a task in the UWP providing for
the Metropolitan Planning Organization to provide information and
act as liaison between interested persons and expertise to be
found in agencies such as the Department of Transportation and
the 'Governor's Office of Energy Resources.
The intent of the meeting was to provide information and encour-
agement for the development of van pools and car pools. So far
there has not been.any developments from the meeting. However,
by providing advise and further encouragement to any interested
parties through the UWP task,:'interest may grow in one or both
of these programs.
6.
June, 1979
3. Improve transit service
The City Transit Department is making determined efforts to
improve the transit service. Routes and schedules have been
changed to provide better service. Experimental routes have
been tried to provide wider access to transit services. A
capital grant will provide radio communication for the buses.
Route maps and promotional material are updated frequently and
every effort is made to make the material both understandable
and attractive.
Earlier this'year, subscription bus service to Reese Air Force
Base was offered. At the present time, there is not enough
positive response to warrant service. In the future there may
be enough interest to change present plans.
The Lubbock City Council has requested that the Transit Advisory
.Board develop goals.and objectives for the Lubbock Transit System.
-The Board has not yet had time to develop a formal program for
transit. Some of the areas being investigated include:
Survey of present system
Capacity of the system at peak hour
Transit ridership expected if fuel crisis develops
Method of maintenance costs control
Short term development (2 to 5 years)
Replace present 21—passenger buses -with larger buses
Providing greater peak hour capacity
Very little increase in maintenance or operating
costs.
7.
June, 1979
Transit ridership projections
Provide flexibility for adding additional routes
The transportation needs of the elderly and handicapped are being
.met by the city through Citizens for Improved Transportation (CFIT).
The organization is using one 28 passenger bus, one lift -equipped
passenger bus, two 12 passenger vans, and one van equipped to
accommodate three wheelchair bound passengers and two other passengers.
A capital grant will provide for two more lift -equipped vans for
providing transportation for the elderly and.handicapped.
8.
4, Increased internal transit management efficiency been an mans since the
aging Citibu
The American Transit Comp Y has of Lubbock is
g
beginning of Phase I in December, 1976. The City
nt contract with ATE Management
presently negotiating a manageme
Inc. It is felt that the change in companies
and Service Company, general management.
will improve efficiency, record keeping, and g
been approv
has rant ed by the Urban Mass Transportation
Ag
Administration which will aid in renovating a building as an
office and service area. This increase in service area and im-
nt in facilitie s.is expected to improve the efficiency of
proveme b Pro-
-the bus system. The grant will also increase eficiency Y
vidinfunds for radios in all transit buses and demand -response
g
vehicles.
ement efficiency is a`constant endeavor of the
Service. and mana g
't Transit Department. Presently,'the transit situation in
City ort and the
Lubbock appears to be pointing up because of city Supp
recent grant approval.
Ll
June, 1979
PROJECT DEVELOPMENT
The Transportation System Management Element projects for FY 1980 have
been designated to satisfy four goals. Most of the projects fall under
Goal 1 - "Insure the efficient use of existing road space." The
largest group of projects under Goal 1 deals with the installation or
revision of traffic signals at individual locations. There are seven
proposed projects for this year. Two projects involving modification
of existing signals and five proposing the installation of new signals.
One project involves the modernization of the traffic signal system
along University Avenue. The five signals between 6th Street and
16th Street are proposed to be interconnected for progressive traffic
movement
Two street revisions are proposed under Goal 1. Guava Avenue creates
a safety hazard and impedes traffic flow by intersecting US 62 at its
intersection with FM 40 (4th St.). Guava Avenue is to be realigned
to intersect US 62 at 5th Street rather than 4th Street. This project
was proposed for FY 1979, but has been carried over to FY 1980. The
other street revision involves the widening of Quirt Avenue from 50th
Street to 52nd Street. This widening will be in conjunction with a
traffic signal installation at the intersection.of Quirt Avenue and
50th Street.
Three Traffic Engineering Studies are also included in Goal 1. The
Intersection Capacity study will survey selected intersections and
10.
June, 1979
provide information for increasing capacity as needed. The study
of the intersection at E. 34th Street and Quirt Avenue is expected
to provide the information necessary to address several problems
involved at this location. The results'of the study are expected
to lead to a TSM type construction project. The study involving
Street Segment Capacity is related to the University Avenue signal
System. The results of this study will provide information for the
most efficient signal installation along this street.
Although numerous projects are included in Goal 1, this year one
project is related to Goal 2 - "Reduce vehicle use in congested
areas." A new task described in the Unified Work Program -is "Energy
Conservation" and the objective described in that task directly re-
lates to the TSM concept. The task was set up to encourage and aid
individuals or companies interested in some sort of ridesharing.
If interest develops, the task will be continued and expanded in
future years, if there is no interest it will be allowed to drop.
All transit or social service transportation is considered to fall
within the TSM project category. Therefore, all projects intended
for implementation in FY 1980 are to be included in the Annual Element
of the TIP as TSM projects. This includes both Operating Grants and
Capital Improvement Grants for transit operations. All of these
projects are considered to fall under both Goal 3 "Improve transit
service" and Goal 4 - "Increased internal transit management
efficiency."
11.
June, ,1979
TRANSPORTATION SYSTEM MANAGEMENT ELEMENT
FOR LUBBOCK
URBANIZED AREA
FY 1980
(September 1, 1979 - August 31, 1980)
Transit Element
The transit element
the following projects
of -the Transportation Improvement Pro ,
recommended for gram consists
These projects are supported b Y the
advancement during
9
Transportation System
the period 1979-84.
79
Management Element.
Pro'ects
Cost
Fund
Federal State
Operating Assistance
Local Share
(FY 1979)
8600,000
430,000
Operating Assistance
430,000
.Amendment
-
(FY 1979)
TX -05-4050-o1
30,000
15,000
Capital Improvement
15,000
(FY 1979)
Grant TX -05-0039
Phase I
2,041,007
1,632,806 265
142,870
Capital Improvement
.Amendment
(FY 1979)
TX -05-0039-01
869,600
695,680
Capital Improvement
113 048
60,872
(FY 1980)
Phase J1
1,318,900 1,055,120 171,457
Operating Assistance
92.323
(FY )980)
1,061,6�5
530,812
Capital Improvement
'
530,813
(FY 1980)
1,083,500
866,800 140,855
Operating Assistance
75,845
(FY 1981)
1,152,328`
576,164
Capital Improvement
576,164
(FY 1981)
1,191.,850
953,480 154,941 ,9 1
83,428
12.
•
June, 1979
Operating Assistance
(FY 1982)
1,382,792
691096
691,396
Capital Improvement
'
,(FY 1982)
1,311.,035
1,048,828
'170,435 91,772
Operating Assistance
(FY 1983)
1,548.728•
774,364
774,364
Operating Assistance
(FY 1984)
1,734,576
867,288
867,288
15,585,941
10,137,738
1,016,067 4,432,136
13.
June, 1979
TRANSPORTATION SYSTEM MANAGEMENT ELEMENT
FOR LUBBOCK URBANIZED AREA
ANNUAL ELEMENT - TRANSIT
FY 1980 (September 1., 1979 - August 31, 1980)
Classifi-
Funding*
cation
Projects
Cost
Federal
State
Local Share
Section
5
Operating Assistance
(FY 1979)
Grant TX -05-4050
8609000
430,000
430,000
Section.
5
Operating Assistance
(FY 1979 Amendment)
TX -05-4050-01
30,000
15,000
15,000
Section,
5
Capital Improvement
(FY 1979)
TX -05-0039 Phase 1
2,041,007.
1,632,806
265031
.142,870
Section
5
Capital Improvement
(FY 1979 Amendment)
869,600
695,680
113,048
60,872
TX -05-0039-01
Section'
5
Capital Improvement
(FY 1980)
Phase 11
1,318,900
1,055,120
171,457
92,323
Section
5
Operating Assistance
(FY 1980)
19061,625
5309812
530,813
Capital Improvement
(FY 1980)
1,083,500
866,800
140,855
75,845
TOTALS
7,264,632
5,226,218
690,691
1,347,723
i
14.
F
Projects
ANNUAL ELEMENT - STREETS AND HIGHWAYS
TRANSPORTATION SYSTEM MANAGEMENT ELEMENT
September 1, 1979 - August 31, 1980
Cost Fe
June, 1979
Funding
tate Local Share
US 87 (Avenue A) at US 62
(19th Street)
Traffic Signal Imp.
40,000.
36,000.
45000.
US 87 (Avenue A) at 17th St.
Traffic Signal Imp.
25,000.
225500.
29500.
82nd Street at Slide Road
Traffic Signal
352000.
31,500.
35500.
S. Quirt Avenue at Loop 289
Traffic Signal
50,000:
451,000.
53,000.
University Avenue, 6th St.
to 16th St:.
Traffic Signal Imp.
114,300,
102,870.
111,430.
Guava Avenue at 4th St.
Street realignment
101,000.
10,000.
19th St. at Frankford Avenue
Traffic Signal _
--30,000.
309000.
E. 50th St. at Quirt Avenue
Traffic Signal
30,000.
30,000.
50th Street to 52nd Street
Street Revision
35,000.
35,000.
13th Street at Slide Road
Traffic Signal
30,000.
.301000.
,Traffic Engineering Study
Street Segment Capacity
20,000.
20,000.
Study of Construction -
Alternatives - 34th Street
at E. Quirt
-10,000.
10,000.
;Traffic Engineering Study
Intersection Capacity
242000.
205000.
2,000.
2,000.
Energy Conservation
2,000.
1,000.
1,000.
TOTALS
455,300.
278,870.
18,000.
158,430.
15.
June, 1979
MONITORING
Monitoring to check the effectiveness of the transportation plan and
TSME projects is a continuing process . Some of the monitoring is
done by a special task, some is a by-product of studies underway, and
some monitoring is done as a part of the routine study office duties.
The Traffic Engineering Study from the FY 1979 UWP provides monitor-
ing both as a special task and as a by-product. The study calls for
a survey of.the present coordinated signal systems, a discussion of
its present efficiency and recommendations for improvements. The
study also provides for a study of the traffic capacity of several
intersections. The by-products of the study provide information on
traffic counts, turning movements, time delay studies, and other
information essential to providing smooth and efficient traffic
movement. The study office has conducted one special study on inter-
section capacity. Traffic counts were conducted during the afternoon
peak hour traffic on three heavily traveled intersections. Actual
volumes, turning movements, and directional flow were observed and
then compared to calculated capacities..
Routine office procedure provides a continual review of proposed
new land use through a monthly review of plats for proposed additions
to the city. Day to day routine provides observation of general
traffic flow and points out developing problems on the traffic system.
16.
June, 1979
The annual update of the Accident Study warns of intersections or
roadways that may be developing high accident rates. The Street
Inventory Task, now underway, will provide information on city
streets concerning right-of-way width, paved street width, type of
base and surface, and a sidewalk notation. The Parking Study, to be
done next fiscal year, will show the following information for the
Central Business District:
1. Available parking spaces
2. Usage and turnover
3. Survey on reasons for being in the CBD
A Capacity Study of selected intersections and a Traffic Engineering
Study on three roadway segments are proposed in the FY 1980 Unified_
Work Program. These studies are primarily to provide information for
future facility expansion, but a great deal of information will be
provided for monitoring the presentconditionof the roadway or
intersection.
A Population and Economics Study, to be used for the update of the
Transportation Plan in 1980, will provide valuable information con-
cerning the number of people in the city, their location, and their
economic status. This will aid in correlating past projections with
present conditions.
The transit coordinator's office continually monitors the operation
of the transit system. Section 15 accounting procedures are used,
monthly reports are presented to the Transit Advisory Board
17.
June, 1979
. T
concerning ridership, revenue, expenditures, miles of travel, and
type.of fares. On -board surveys are periodically conducted to
determine rider characteristics and desires.
June, 1979
The following -subjects are discussed in Attachment A:
Actions taken on TSME projects in the FY 1979 TIPME
Street & Highway Projects
Transit Projects
Transportation for the Elderly.& Handicapped
Section 1 -- Planning
Section 2 -- Programming
Project budgets for grant applications
Section 5 - Capital Improvement FY 1978-79 (Phase I)
Section 5 - Capital Improvement FY 1980 (Phase II)
Section 5 - Operating Assistance FY 1979
Section 5 - Operating Assistance amendment to FY 1979
Section 5 - Operating Assistance FY 1980
t,
ATTACHMENT A
To avoid duplication.and repetition, this packet
will be used as an attachment to both the Trans-
portation Improvement Program and the Transpor-
tation System Management Element.
TABLE OF CONTENTS
Page
Actions taken on
TSM projects in the
FY 1979 TIPME
Street 8 Highway
Projects
1
Transit Projects
3
Transportation
for the.elderly and handicapped
Section 1 --
Planning
5
Section 2 --
Programming
7
Project budgets
for grant applications
Section 5 --
FY 1979 Capital Improvement
(TX -05-0039)
10
Section 5 --
FY 1980 Capital Improvement
(Amendment to TX -05-0039)
11
Section '5 --
FY 1980 Capital Improvement
(Phase II)
12
Section 5 --
FY 1980 Capital Improvement
13
Section 5 --
FY 1979 Operating Assistance
(TX -05-4050)
14
Section 5 --
FY 1979 Operating Assistance
-
(Amendment to TX -05-4050)
16
Section 5 --
FY 1980 Operating Assistance
18
June, 1979
Actions taken on TSM Projects in the
Annual Element of the FY 1979 TIP
Streets and Highways Projects
Twelve
TSM
projects were set up
in the annual element of the FY 1979
TIP.
Four
of the projects were
for installation of new traffic
signals. Five of the projects were for the improvement and moderni-
zation of existing traffic signals. One project was for improvement
and modernization of five signals along University Avenue to provide
an interconnected system. Another project provides for the realign-
ment of Guava Avenue to more efficiently and safely serve traffic.
The last, project was for an Engineering Study consisting of three
parts. The first part was a study of three interconnected signal
systems to provide data on present operation and obtain recommenda-
tions for the most efficient use of the present signal equipment.
The second area was a capacity study of 12 selected intersections and
the third area was a study of a one-way pair along 15th and 16th
Streets.
Installation
of traffic signals
Projects
Status
Loop 289 at South Quaker
Expected to be complete
by 9-1-79''
Parkway Drive at Zenith Avenue
Complete
_ Indiana Avenue at 82nd Street
Expected to be complete
by 9-1-79
Loop 289 at West 4th Street
To be carried over to FY
1980 TIP
Improvement of existing traffic signals
US 87 (Avenue A) at 17th Street
To be carried over to FY
1980 TIP
US 87 (Avenue A) at US 62
(19th Street)
To be carried over to FY
1980 TIP
US 62 (19th Street) at Quirt
Complete
US 62 (19th Street) at Guava
To be carried over to FY
1980 TIP
Broadway at Quirt
Complete
June, 1979
Improvement of a signal system
University Avenue, 6th Street to 16th.Street
The City of Lubbock is attempting to secure additional right-
of-way along University Avenue'to provide turn lanes. Place-
ment of the signal pedestals is impractical until this action
is finalized. If right-of-way for the turn lanes is not secured,
the City and University must reach an agreement concerning place-
ment of pedestals on University owned land along the west side
of the street. This project will be carried over to the FY 1980
TIP.
Revised street alignment
Guava Avenue at 4th Street To be carried over to FY 1980 TIP
Traffic Engineering Study Expected to be complete -by 9-1-79
Six of the TSM projects in the annual element of the FY 1979 TIP
are expected to be complete by September 1, 1979. The other six
projects will be carried over as TSM projects in the annual element
of the FY 1980 TIP.
2.
June, 1979
Actions taken on TSM Projects
in the FY 1979 TIP ME
Transit Section
'Section 5 Operating Assistance Grant (Amendment FY 1975)
The Lubbock Transit Department received $81,254 (Grant TX -05-
4009) in Operating Assistance September 2, 1975. An amendment
to this grant requested an additional $47,848. The funds were
received 12-4-78.
Section 5 Operating Assistance Grant (Amendment FY 1976)
The.Lubbock.Transit Department received $162,057 (Grant TX -
05 -4021) in Operating Assistance July 20, 1977. An amendment
to this grant requested an additional $525570. These funds
were received 12-4-78.
Section 5 Operating Assistance Grant (FY 1977)
An amount of $387,816 was received November 7, 1978 (Grant
TX -05-4039).
Section 5 Operating Assistance Grant (FY 1978)
Two payments have been received on this grant (TX -05-4048).
The first payment, in the amount of $368,694, was received
November 3:, 1978. The second payment, in the amount of
$12,790, was received April 16, 1979. The final payment will
be requested when audit is complete.
3.
July, 1979
Section 5 Operating Assistance Grant (FY 1979)
.Payment in the amount of $323,279 has been received on this
grant (TX -05-4050). Payment for the last quarter of the fiscal
year has not yet been requested.
Section 5 Capital Improvement Grant (FY 1979)
This grant has been approved and contracts are being executed.
No funds have yet been requested.
4.
June, 1979
ATTACHMENT A
TRANSPORTATION FOR THE ELDERLY E HANDICAPPED
SECTION I -- PLANNING
The.transportatfon needs of the elderly and handicapped, especially
the wheelchair user and the person with semi -ambulatory capabilities, is
receiving steadily increasing consideration from transportation planners
within the Lubbock area. The -need is being addressed by planning projects
directed to benefit this group and then through programming these projects.
Section 2 will deal with projects as.they are set up in the annual element
of the TIP and then implemented.
The primary responsibility for planning transportation which can be
used by the elderly and handicapped lies with the City of Lubbock Transit
Department. These duties are carried out through the Department Staff, the
use of consultants, and in close cooporation with Citizen's for Improved
Transit (CFIT). CFIT presently provides administrative personnel, dispatchers,
acid drivers, and oversees the operation of seven vehicles in both demand-
response/lift-vehicle
emand-
response/lift vehicle service and a route deviation type service for elderly
persons. The City of Lubbock. works closely with CFIT in the special efforts
program. CFIT has been approved by the City as .a project to be included
in the Section 5 Operating Assistance Grant Program. Efforts toward a
coordinated system between CFIT and the City have: focused upon locating
and identifying the elderly and handicapped. Previous studies have indicated
a need for more vehicles and the establishment of a coordinated transportation
system for individuals with special requirements.
Planning work directed toward.meeting the required special effort for
the elderly and handicapped was intensified during FY 1978 and FY 1979.
Approximately 45% of the area's Section 9 funds were spent on this task.
Progress was made in locating groups of elderly.and providing service through
regular Citibus routes, as well as a special route service through CFIT.
Wheelchair users and persons with semi -ambulatory capabilities were located
and provided with service through the lift -equipped demand -response bus.
Response to surveys. and the service has shown that additional special
- ( equipment is required. In March of 1979, CFIT began operations of a second
Lift -equipped vehicle. ,Two additional lift -equipped q pped vehicles to be used in
the special efforts.program have been Included in a capital grant• application
June, 1979
submitted to UMTA in September 1978. The Transit Department is preparing
a report which will be published as an element of the current Technical
Study at the end of FY 1979, setting forth the full activities of Transit,
Including a full report on aid to the elderly and handicapped. Included
in the special efforts program were the following planning tasks:
1. Planning of a survey to update current needs and
evaluate unmet needs.
2. Planning of an ongoing self -identification process.
3. Planning of a CFIT evaluation study E report.
4. Planning of the evaluation of alternative
transportation methodologys.
5. Planning the evaluation of current services.
6. Planning the implementation impact of additional
vehicles.
Proposed planning for the elderly and handicapped needs in FY 1980 is
described.in detail in the FY 1979 Unified Work, Program. The implementation
of this program should further identify both.personal and group needs
allowing the City and CFIT to betterserve these needs.
We believe that the Lubbock area is making -a determined effort toward
meeting the special efforts required for planning and programming projects
for the elderly and handicapped generally and a.speciai effort toward the
needs of the wheelchair user and the person with semi -ambulatory capabilities.
The City of Lubbock Transit Department,.in coordination with CFIT will
continue their effort to locate, identify,'and determine needs of this
group, and will provide programs to meet.those needs.
6.
June, 1979
SECTION 2 -- DISCUSSION OF PROJECTS IN ANNUAL ELEMENT OF TIP DESIGNED TO
AID WHEELCHAIR USERS AND THOSE WITH SEMIAMBULATORY CAPABILITIES.
The rules and regulations pertaining to'"Transportation for Elderly
and Handicapped Persons" as set forth in the Federal Register of April 30,
1976, provide that the annual element of the TIP program submitted after
September 30, 1976 contain projects or project elements designed to benefit
elderly and handicapped persons, specifically including wheelchair users and
those with semiambulatory capabilities. It also provides that after September.
30, 1977 reasonable progress has been demonstrated in implementing previously
programmed projects.
The City of Lubbock is attempting to meet the needs of the wheelchair
user and the semiambulatory person by providing and maintaining a special
bus equipped with a wheelchair lift and having a maximum capacity of 13 seated
passengers and three restrained wheelchairs. The City is actively supporting
and aiding a non-profit organization known as Citizen for Improved Transportation,
( Inc. (CFIT). The goal of CFIT is to provide a coordinated, adequate transportation
service for the elderly and handicapped. CFIT is presently directing the
activities of five vehicles used primarily in a route deviation service in addition
to the two lift equipped vehicles which are dispached on a demand -response
basis. The routed service provides for the needs of the elderly and
handicapped generally, while the demand -response system services the special
needs of wheelchair users and semiambulatory persons. In addition to the
lift -equipped bus currently provided by CFIT, the City proposes to buy two
other 1•ift-equipped vehicles to be maintained by the City, which will increase
the.demand response service operated by CFIT-to.four, vehircles: All transit
vehicles, - purchased for regular route -service -described in the current capital
grant will be lift -equipped.
The rules and regulation mentioned above provide that the special effort
requirement may bi met by providing a program that will involve the expenda'.ure
of an average dollar amount equivalent to a minimum "of 'five percent of the
Section 5 apportionment to the urbanized area..`Expendatures or estimated
expendatures for Fiscal Year 1977, 1978, 1979, and 1980 are itemized below. -
7. _ „
June, 1979
The actual cost of the elderly and handicapped operation paid for by the
City of Lubbock for F.Y. 1977 'is as follows:
Capital Cost for Lift Bus
$ 24,381
Capital Cost for Farebox
2,353
Drivers Wages
4,640
Dispatchers Wages
7,000
In -Kind Services
492
Fuel
1,580
Maintenance
1,930
oil
9
Insurance
1,574
Total Expenditures
43.959
Total Revenue
289
Total Cost of Operation
43,670
In its second year of operation (FY 1978) the City
of Lubbock's specially
equipped bus was placed under the management of
CFIT. This allowed a more
efficient and coordinated operation. The bus was
originally operated from
8am to 5 pm on weekdays only. The hours were expanded to provide weekday
service from 7 am to 7 pm with some weekend service as necessary. CFIT
coordinated the scheduling of the lift bus along
with a small fleet of vans
designated for the exclusive use of elderly and
handicapped Individuals.
The following figures indicate the source and total
cost of the local
elderly and handicapped transportation effort.
City of Lubbock Transit Department
$ 5,363
City of Lubbock Community Services
11,242
Citizens for Improved Transit
43,481
South Plains Association of Governments- 25,096
85,182
The estimated cost of operations for FY 1979 is
based upon the purchase of
two lift equipped vehicles and placa:ag them in service
sometime late in the
year. The estimated cost of operation is shown
below:
Capital cost for lift -equipped vehicles
$ 35,000
Dispatcher & Drivers Wages
25,800
In -Kind Services
1,200
Fuel & Oil.
3,000
Maintenance
3,500
Insurance
2,150
Total Estimated Cost of Operation
.70 ,650
The estimated cost of operations for FY'1980is
itemized below:
Fuel: 7,866 gal @ .75�
$ 5,900
Oil: 175 qts @ .60t
105
Tires: 1.6t per mile
698
$ 6,703
8.
June, 1979
t ,
Driver wages: 2,540 hrs @ $4.69 (4) $47,650
304 hrs @ 7.04 (4) 8.560
$56,210
Maint. Expense: 11,070
Taxes FICA @ 6.15% 3,457
Administration: 158
Dispatcher: 8,100 '
*Paging Service: $378 x 4 1,512
Taxes: other 533
Fringe Benefits: (ins., Soc. Sec., etc.) 11,576
$36,406
Total $99,319
* - Charge would be deleted when radio equipped.
9.
June, 1979
CAPITAL GRANT APPLICATION
SECTION 5 PROJECT DESCRIPTION
'
FY 1978-79
. 14 new 39-45 passenger diesel powered
advanced design buses l4 X 98,600
$
1,380,400
2 wheelchair life•equipped vans 2 X 17,500
35,000--
5,000:new
newsupport vehicles 4 X 5,000
209000•
1 new maintenance vehicle
7,960•
Purchase and install two-way radio
cornmun 1 cat i ons
80, 000 •
Professional Appraisal Services
1,500•
Real Estate Acquisition
244,000
Professional Engineering S Architectural
Services
55;000:'
Purchase and installation of 50 bus stop
benches 50 X 400
20,000•
Purchase and installation bus stop information
signs 100 x 40
4,000
Purchase and installation of 6 bus stop shelters 6 X
5,000
30,000-
Estimated Project Cost..'
$
1,877,860
,Contingencies
163,147.
Total Project Cost
$
2,041,007
F I EANC I NG BREAKDOWN .
City of Lubbock (7$)
$
142,870
State of Texas Share 03%)
265,331
Federal Share (80%)
1,632,806
TOTAL PROJECT -COST
$
2,041,007
City of Lubbock
Transit Department
10.
a
j
diesel powered advanced design buses
@ 120,000 equipped w/ wheelchair lifts
1
AMENDMENT TO TX -05-0039
Purchase of 4 additional new 39 -passenger
diesel powered advanced design buses
@ 120,000 equipped w/ wheelchair lifts
$480,000
Additional funds needed to cover wheelchair
lifts and inflation for 14 advanced
design buses
299,600
Purchase of 2 complete power plant assemblies
50,000 ,
Administration
40,000
TOTAL PROJECT COST
$869,600
Financing Breakdown
City of Lubbock (7X)
60,872
State of Texas Share (13%)
113,048
Federal Share (80%)
695,680
TOTAL PROJECT COST
$869,660
City of Lubbock
•Transit Department
August, 1979
11.
June, 1979
SECTION 5 FY 1980
• PROPOSED CAPITAL GRANT APPLICATION
- PHASE 11
Purchase 20 fareboxes and related equipment
$ 50,000
Renovation of facilities
850,000
Purchase of office equipment
10,000
Purchase of office furniture
30,000,
Purchase and installation of washing/
cleaning equipment
50,000
Purchase and installation of shop tools
and equipment
84,000
Purchase and installation of Management
Information System
125,000
Estimated Project Cost
$1,199,000
Contingencies (10%)
119,900
TOTAL PROJECT COST
$1,318,900
Financing Breakdown
City of Lubbock (7%) (Land)
92,323
State of Texas Share (13%)
171,457
Federal Share (80%)
$1,055,120
TOTAL PROJECT COST
$1,318,900
City of Lubbock
Transit Department
August, 1979
12.
i
June, 1979
SECTION -5 FY 1980
PROPOSED -CAPITAL GRANT APPLICATION
Purchase of 8 new 39 -passenger diesel
powered advanced design buses
@ 120,000 equipped with wheelchair
y
lifts for replacement of 8 21 -pas-
senger gasoline powered buses $ 960,000
Purchase of 1 complete power plant assembly 25,000
Estimated Project Cost $ 985,000
Contingencies (10%) 98,500
TOTAL PROJECT COST $1,083,500
Financing Breakdown
City of Lubbock (7%) 75,845
State of Texas Share (13%) 140,855
Federal Share (80%) 866,800
TOTAL PROJECT COST $1,083,500
City of Lubbock
Transit Department
August,.1979
13.
_� •
June, 1979
PROJECT BUDGET
ESTIMATED TRANSIT REVENUE AND
EXPENSES
FY 1979
(1) a. Operating Expenses
Salaries -Permanent Employees
$ 39,409
Salaries Part-time Employees
8,674
Stability Pay
6h6
Retirement
2,355
Social Security
21P09
Group insurance
1,040
Workmen's Compensation
87 '
Motor Vehicle Supplies
350
Minor Tools
50
Office Supplies
1,300
Educational Supplies
75
. Photographic Supplies
100
' Postage .
200
_
( Other Office Supplies1,500
Maintenance -Motor Vehicles_
300 -
Rent -Land Lease
1,000
Maintenance -Other Equipment
250
' Utilities -Electric
858
Utilities -Telephone
935
Professional Services
10,000
Board & Commission
900
• Advertising and Promotion
25,000
' Liability Insurance
.207.
Surety Bond
10
Other Insurance
87,920
Travel, Dues, L Training —"' ' " ' ' ' l , l 00
SUB -TOTAL OPERATING EXPENSES
$,075
' b. Contract Costs
_
Maintenance -Vehicles
185,000
Transportation
540,000•
Traffic Promotion'
+4,500
Insurance & Safet�
23,900
- General & Administrative
57,100
Depreciation
5,260
Taxes and Licenses
511,000
Operating Rents
h8,200
Management Fee
23;40
• Cost of Viurk 2D Capital
4,200
SUB -TOTAL CONTRACT COSTS
$ 9b5,E00
14.
. •'
June, 1979 ,
c, Capital Outlay
Office FgrniLure & Equipment
$ 125
SUBTOTAL CAPITAL OUTLAY
S
1125
Total Operating, Contract Costs, and
Capital Outlay
1,133,300 (1)
(2)
Less Eliminations:
•
a. Non-14ass Transportation Expenses`
Charter Operations
$53,300
_
,•
•
b. Other Exclusions
UMTA Section 9-Technical
Study
25,000
TOTAL ELIMINATIONS.
$78,300
$ 78,300(2)
(3)
Eligible Operating Expenses
•$1,055,000
(3)
(4)
Less Farebox- Revenue.
$195,000.
$
195,000 {�)
(5)
Net Project Cost
$
860,006 (5)
(6).
Local -Share
s
City of Lubbock
$285,000
University Student Funds
145,000
.
LOCAL SHARE
••$430,000
S
4301000 (6)
(7)
Net Expenses Advanced on.Operat ions Before
Applying 1 in3 UMTA Funds
$
430,000 (7)
`. (8)
UMTA Funds Reuested
q
i
$
1130,000 ($)
15.
i June, 1979
PROJECT BUDGET
AMENDMENT TX -05-4050-01
4
ESTIMATED TRANSIT REVENUE AND EXPENSES
• FY 1979
(1) a. Operating Expenses
Salaries -Permanent Employees
41,630
Salaries -Part-time Employees
8,674
Stability Pay
645
Retirement
2,380
Social Security
2,985
Group Insurance
1,040
Workmen's Compensation
115
Motor Vehicle Supplies
320
Minor Tools
52
Office Supplies
1;400
Educational Supplies
0
Photographic Supplies
13
Postage
200
Other Office Supplies
1,500
Maintenance -Office Furniture
140
Maintenance -Motor Vehicles
140
Rent Land Lease
1,000
Maintenance -Other Equipment
300
Utilities -Electric
300
Utilities -Telephone
935
Professional Services
18,000
Board E Commission
800
Advertising & Promotion
25,000
Liability Insurance
282
Surety Bond
9
Other Insurance
87,920
Travel, Dues, & Training
1,430
SUB -TOTAL OPERATING EXPENSES
197,210
b. Contract Costs
Maintenance -Vehicles
183,200
Transportation
552,890
Traffic Promotion
4,960
Insurance & Safety
24,780
General & Administrative
55,304
Depreciation
5,245
Taxes and Licenses
50,305
Operating Rents
47,252
Management Fee
4,200
Cost of Working Capital
23,596
SUB -TOTAL CONTRACT COSTS
951,732
16.
.
June, 1979
c. Capital Outlay
Office Furniture & Equipment
$ 7,428
SUB-TOTAL CAPITAL OUTLAY
$ 7,428
Total Operating, Contract Costs, and
Capital Outlay
1,156.,370(1)
(2)
Less Eliminations:
a. Non-Mass Transportation Expenses
Charter Operations
52,870
b. Other Exclusions
UMTA Section 9 Technical
Study
25,000
TOTAL ELIMINATIONS
$77,870
'—' 77,870
(2)
(3)
Eligible Operating Expenses
1,078,500
(3)
(4)
.Less Farebox Revenue
188,500
188,500
(4)
(5)
Net Project Cost
$ 890,000
(5)
(6)
Local Share
City of Lubbock
294,500
University Student Funds
150,500
LOCAL SHARE
$445,000
445,000
(6)
(7)
Net Expenses Advanced on Operations
Before Applying UMTA Funds
$ 445,000
(7)
(8)
UMTA Funds Previously Requested
430,000
(8)
(9)
Remainder UMTA Funds Due
15,000
(9)
17.
SECTION 111
PROJECT BUDGET
For the Period: September 1, 1979 to October 31, 19$0
Transit Operator: Lubbock Transit Cor oration
Designated Recipient: City of Lubbock, Texas
Operath, E
9 xpenses
Salaries -Permanent Employees
Salaries -Part -Time Employees
Stability Pay
Retirement
Social Security
Group Insurance
Workman's Compensation
Motor Vehicle Supplies
Minor Tools
Office Supplies
Educational Supplies
Photographic Supplies
Postage
Other Office Supplies
Maintenance Motor Vehicles
Maintenance Office Furniture
Maintenance Other Equipment
Maintenance Building
Utilities Electrics
Utilities Telephone
Services
Board & Commissions
Advertising;& Promotion
Rent•Land
.Liability insurance
Surety -'Bonds
Other. -insurance
Travel,`•Dues_ and Tralnin
SUB -TOTAL OPERATINGEXPENSES
$. :Contract Costs
Maintenance Vehicles
Transportation
Traffitl-Promotion '
Ins. &.Safety
General and Administrative
Taxes & Licenses
Operating Rents
Cost of Working Capital
Management•Fee
SUB TOTAL CONTRACT COSTS
18.
June, 1979
$ 45,501
8,674
800
3,028'
3,370
1,268
170
350
50
1,800
-O-
-0-
200
1,750
300
10o
400
-0-
36o
960
10,000
900
27,5oo
1,000
282
11
112,900
1,400 -
223,0]
$ 225,325
659,620 .
4,040
29,200
36,320
48,950
48,JJ6
8,000
68,800
*
'r
June, 1979
c. Capital Outlay
Offl-ce Furniture S Equip.
0
. SUB -TOTAL CAPITAL OUTLAY
0
0
Total
Operating, Contract Costs, and
Capital Outlay
$1,551,445
(2)--
Less Eliminations:
a. Non -Mass Transportation
Expenses
47,750
b. Other Exclusions
UMTA Section 9 - Technical
Study
25,000
72,750
$ 72,750
(2)
(3)
Eligible Operating Expenses
$1,278,695
(3)
(4)
Less Farebox Revenue
217,070
$ 217,070
(4)
(5)
Net Project Cost
$1,061,625
(6)
Local Share:
Charter Revenue
$ 8,500
City of Lubbock
360,163
University Student.Funds.
162,154
Auxiliary Transportation Revenue
O
.Miscellaneous"Income
0
LOCAL SHARE._
$ 530,813
(6)
(7)
Net Expenses Advanced on Operations
Before.Applyfng-_UMTA Funds
$ 530,813
(8).
UMTA Funds Requested...
$ 530,812
19.