HomeMy WebLinkAboutResolution - 359 - Accept Paving Improvements - Kerr Co - GWO 10,976 - 12/12/1979q)
RESOLUTION359 - 12/12/79
RESOLUTION
RESOLUTION ACCEPTING IMPROVEMENTS ON PORTIONS OF ALLEYS, STREETS,
AND/OR AVENUES AS LISTED BELOW.
WHEREAS, the City of Lubbock heretofore passed various street improvement
ordinances and resolutions and entered into contract with Kerr Construction
Company, (G.W.O. 10,976) for the making and construction of street and/or
alley improvements on portions of numerous alleys, streets and/or avenues in
said City including among others the fo•llbwiing,r:' ..
East-West alley between 74th Street and 75th Street from its intersection with
the existing paving 64.30 feet East of the East Property Line of Indiana Avenue
to its intersection with a line 25.49 feet West of the East Property Line of Lot
25, Melonie Gardens Addition, known and designated as Sub -Unit Number 70 of
Unit Number A-460;
East-West alley between 39th Street and 40th Street and parking lot paving from
its intersection with a line 5.00 feet East of the West Property Line of the
North-South alley West of Elgin Avenue to its intersection with the West
Lip Line of Elgin Avenue known and designated as Sub -Unit Number 74 of Unit
Number A-460;
40th Street from its intersection with the East Lip Line of Flint Avenue to its
intersection with the West Lip Line of Elgin Avenue known and designated as
Sub -Unit Number 15 of Unit Number 2235.
AND WHEREAS, the improvements upon the said portions of the abovementioned
alleys, streets, and/or avenues, have been inspected and found to have been
constructed in accordance with terms of said contract G.W.O. 10,976.
THEREFORE, BE IT RESOLVED BY THE CITY OF LUBBOCK, TEXAS:
I.
That the improvements on said portions of the abovementioned alleys,
streets, and/or avenues be and the same are hereby accepted, and the City
Engineer be and he is hereby authorized to direct payment of the City's por-
tion of the cost.
II.
This resolution shall take effect and be in force from and after its passage.
PASSED AND APPROVED THIS 12TH DAY
ATTEST:
Evelyn Gatfga; Cit3K/,0e&yetary
APPROVED,.A TO CONTEN
Don Jeng,91ings, C y Engineer
OF DECEMBER, 1979
est, Mayor
APPROVED AS TO17'r __ FORM:
�- rte" /
4
0. Ross, Jr., ity Attorney
4 -
co
N
N
In
Ch 0
r
O
n
to
rt
w
0
� rn
C ►-� FC
0 `C
00
:r -
O
N
a
0% Ptrn
w
z
En
O
C
wr
U'i
�
O
a
0
rtm
rr
w ri
r -"j to i
rt
rOn rOi, o
►d o rt Z
w C0
r3 b o rL E
90r
y
� r En
-
°N'
r
H
L-'
ao oo 03
rr f�D LA �
H
rtw
O rt
w r t p r
0 0 0 t1 m
m O rt H+
O tzj O' m
H
r P'hm
Fh s %4
>"N
L
o
� rt
rt w cJ"
C z L,
LA P -h
a r-4 . M O
O1h w rfi
rt Cit Pi m
rt
w O 1- r rt
,-r rt�O
H.
tzj rt O
0
M P) - 0J.
O N O 0% N
oa 9
rH 0 oq �
0 v+ � rh
�:
* rt
. 0
rm�0
o0`=.,
C m
C
t-' :r w rr
`F , �'' H. rt
rr
m w a
O rt W ]
m O
w w
i
to
m
d°
~
W
;n
rn
�
to
o
�
�
V
N
N
W
co
V
O
4-
N
V
� N
O
r
N
N
N
O
N
N
O
V
N
�
;o
V
N
N
CD
o,
i.n
w
jr
V
Co
�D
V
V
VI
�
W
W
0
0
w
w
rn
O�
4 -
co
N
N
In
Ch 0
r
O
n
to
rt
w
0
� rn
C ►-� FC
0 `C
00
(per 0 t -r
O
C 47
t-�
w M cn
w rA
0 0
co rt
N rn
r
O
O
0% Ptrn
z
En
wr
�
W
co OQ
0
rtm
m
ty
O
Cl
�r
o
z
fir
+n
m
ON
11i
rt
U]
N
v
H
C m
v
(per 0 t -r
O
C 47
t-�
w M cn
w rA
0 0
co rt
N rn
r
COST ESTIMATE.
815.94
S.Y.
Alley Paving
@
$22,75
942.40
S.Y.
Paving 6" Base
@
$ 5.45
1,263.85
L.F.
Curb and Gutter
@
$ 5.65
102.32
S.Y.
Alley Return -@
$21.50
174.99
L.F.
C & G Removal
@
$ 6.50
106.57
S.Y.
Resurface
@
$ 4.25
17.53
S.Y.
Concrete Slab Removal
@
$ 4.75
40.36
S.Y.
Sidewalk
@
$19,75
482.25
S.Y.
Asphalt Surface
@
2.25
Removal
CONTRACT COST
COST DISTRIBUTION
Unit &
Sub -Unit
A-460-70
A-460-74
2235-15
Contract
Cost
$8,336.51
$15,195.92
$13,062.72
$18,562.64
$ 5,136.08
$ 7,140.75
$ 2,199.88
$ 1,137.44
$ 452.92
$ 83.27
$ 797.11
$ 1,085.06
$36,595.15
City to
$8,336.51
$15,195.92
$13,062.72