RESOLUTION
RESOLUTION ACCEPTING IMPROVEMENTS ON A PORTION OF A STREET AS
LISTED BELOW:
WHEREAS, in conformance with the paving requirement provisions of
City Ordinance 1331, the subdivider of Whisperwood Addition, Lots 7A
through 11 B made arrangements with Kerr Construction Company for the
construction of paving improvements on a street dedicated in said
subdivision under the provisions of said Ordinance prior to the recor-
ding of the subdivision plat of Whisperwood Addition, Lots 7A through
11B including the following street:
The cul-de-sac on the south side of Third Boulevard that is West of
Utica Avenue and East of Vicksburg Avenue, known and designated as New
Subdivision Sub -Unit Number 24 of Unit Number 2026.
AND WHEREAS, the construction of the above improvements on the
abovementioned street was performed under the supervision of the
City Engineer, and -said improvements have been completed and have been
inspected and found to have been constructed in accordance with City
specifications and in accordance with the provisions of City Ordinance
1331.
THEREFORE, BE IT RESOLVED BY THE CITY OF LUBBOCK, TEXAS.
I.
That the improvements on said portions of the abovementioned street
be and the same are hereby accepted and the City Engineer be and he
is hereby authorized to directtiie-payment of the City's portion of the
cost and to release escrow money.
II.
This resolution shall take effect and be in force from and after
its passage.
PASSED AND APPROVED THIS 25th DAY OF OCIMER,51979.
TD West, Mayor
AT T:
_1tvelyn Ga fga, City S c tary
APPRO ED ASS T7ONTENT:
Wil or D. Watson, City Engineer
APPRO D AS TO FORM:
t_ t
o n Ross; r., -C ity ttor ey._...
TIED TO RESOLUTION #302 10-25-79
CONSOLIDATED FINAL ESTIMATE
Whisperwood Addition, Lots 7A -11B
Accepted October 25, 1979
QUANTITIES
S. Y. Paving 6" Base
S.Y.
S.Y.
484.93
Paving
L.F. Alley
Unit &
6" Base
C & G Return
Sub -Unit
Location
129.00
N.S.
Repair @
$ 6.50
2026-24
The cul-de-sac on S. ':_
1015.38
484.93 40.40
Side of 3rd Blvd.
West of Utica Ave. and
East of Vicksburg Ave.
COST ESTIMATE
1015.38
S. Y. Paving 6" Base
@
$ 4.68
484.93
L. F. Curb & Gutter
@
$ 4.80
40.40
S. Y. Alley Return
@
$21.50
129.00
L.F. C & G Removal &
Repair @
$ 6.50
CONTRACT COST
COST DISTRIBUTION
Unit & Sub -Unit
N.S. 2026-24
Contract Cost
$8,786.74
L.F., C & G
Removal &
Repair
129.00
$ 4,751.98
$ 2,327.66
$ 868.60
$ 838.50
$ 8,786.74
Property Owner Cost
$8,786.74