HomeMy WebLinkAboutResolution - 665 - Amendment #1 To Agreement - F&N/PSC Inc - Improvements, WTP - 11/20/1980GV:bs RESOLUTION #665 11/20/80
(See Reso, #440 , 3/13/80)
RESOLUTION
E IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK:
That the Mayor of the City of Lubbock BE and is hereby authorized and
irected to execute for and on behalf of the City of Lubbock Amendment No. 1
o the March 13, 1980, Agreement between the City of Lubbock, Texas, and
reese & Nichols/Parkhill, Smith & Cooper, Inc., pertaining to the construction
f improvements at the City of Lubbock Water Treatment Plant, which Amendment
o. 1 is attached hereto and which shall be spread upon the minutes of this
ouncil and as spread upon the minutes of this Council shall constitute and be
part of this Resolution as if fully copied herein in detail.
Passed by the City Council this 20th day of November
- � � * J -k
BILL MCALISTER, MAYOR
kITEST-
Ebelyn .Gai`iga; CityAr0tary-Treasurer
APPROVED AS TO CONTENT:
Wil D. Watson, Chief Engineer,
Water ITtilities
ROVED AS TO FORM:
G. Vandiver, Asst. City
0
1980.
RESOLUTION #665 t, 11/20/80
(See Reso, 4440 - 3/13/80)
AMENDMENT NO. 1
TO AGREEMENT
CITY OF LUBBOCK, TEXAS
AND
FREESE & NICHOLS/PARKHILL, SMITH & COOPER, INC., A JOINT VENTURE
FOR ENGINEERING SERVICES
THIS IS AN AMENDMENT to the Agreement dated March 33, 1980 between the CITY
OF LUBBOCK, TEXAS hereinafter called the 'Owner" and FREESE & NICHOLS/PARKHILL,
SMITH & COOPER, INC., A JOINT VENTURE, hereinfater called the "Engineer".
WHEREAS the Engineer has completed the Preliminary Phase for the construc-
tion of a 1200 acre-foot regulating reservoir, for the construction of six new
filters at the Lubbock Water Treatment Plant and for the construction of a new
water distribution main from the Water Treatment Plant to connect to the distri-
bution system new Pump Station No. 4:
WHEREAS the Owner desires to accomplish the Design Phase, the Bidding Phase
and Construction Phase of the new water distribution main "in-house":
WHEREAS the Owner desires the Engineer to furnish Preliminary Phase, Design
Phase, Bidding Phase and Construction Phase engineering services required for
(1) a new 25 MGD high service pump station (to be known as Pump Station No. 9)
at the Low Head Pump Station B site at Quaker Avenue and Clovis Road and (2) cer-
tain.repair and rehabilitation of the building which houses Low Head B pumping
equipment.
The Agreement is hereby amended as follows:
1. Under RECITAL, ADD the following:
"l. Construct a new 25 MGD high service pump station at
the Low Head Pump Station B site at Quaker Avenue
and Clovis Road; also make certain repairs to and
rehabilitate the Low Head Pump Station B building."
AMENDMENT NO. 1
Page 1 of 3
2. Section VI A, PRELIMINARY PHASE, page VI-lA, ADD the following
paragraph to provide for payment of the Preliminary Phase for Pump Station
No. 9:
AMENDMENT NO. 1
Page 2 of 3
"For the Pump Station No. 9 and repair and rehabilita-
tion of the Low Head Pump Station B building the lump
sum amount of $9,390.00. In addition for property and
site survey, to be conducted by Wilson Surveying Com-
pany, in accordance with applicable portions of Sec-
tion VII, however the total amount shall not exceed
$4,000.00 without written authorization of the Owner.
In addition for special investigation of the sub-
surface conditions for Pump Station No. 9, to be con-
ducted by Terra Testing Laboratories, in accordance
with applicable portions of Section VII, however, the
total amount shall not exceed $2,500.00 without written
authorization of the Owner."
3.
Section VI B, DESIGN PHASE, pave VI -2, DELETE the subparagraph:
"For -the new pipeline of 15 MGD capacity from the Lub-
bock Water Treatment Plant to the ten million gallon
reservoir at Pump Station No. 4, the lump sum amount
of $52,966.00"
and ADD the
following subparagraph: -
"For Pump Station No. 9 and the repair and rehabilita-
tion of the Low Head Pump Station B building, the lump
sum amount of $34,237.00."
4.
Section VI C, BIDDING PHASE, Page VI -3, DELETE the subparagraph:
"For the new pipeline of 15 MGD capacity from the Lub-
bock Water Treatment Plant to the ten million gallon
reservoir at Pump Station No. 4, the lump sum amount
of $2,371.00"
and ADD the
following subparagraph:
AMENDMENT NO. 1
Page 2 of 3
"For Pump Station No. 9 and the repair and rehabilita-
tion of the Low Head Pump Station B building, the lump
sum amount of $1,074.00."
5. Section VI B, CONSTRUCTION PHASE, page VI -4, DELETE the following
subparagraph:
"For the new pipeline of 15 MGD capacity from the Lub-
bock Water Treatment Plant to the ten million gallon
reservoir at Pump Station No. 4 the lump sum amount
of $18,504.00"
and ADD the following subparagraph:
"For Pump Station No. 9 and the repair and rehabilita-
tion of the Low Head Pump Station B building, the lump
sum amount of $9,959.00."
THIS AMENDMENT NO. 1 is hereby approved and executed in 4 counterparts
(each of which is an original) on behalf of the Engineer by the President of
Freese & Nichols, Inc. and the President of Parkhill, Smith & Cooper, Inc.
shown below, and on behalf of the Owner by its Mayor (thereunto duly authorized)
this ckOa day of November, 1980.
OWNER:
CITY OF LUBBOCK, TEXAS
r
By
Mayor
ATTEST: -
_ City SCKcr y
APPROVED AS TO FORM:
74\j;,GSffCXjkt City Attorney
ENGINEER:
FREESE & NICHOLS, INC.
BY.
6/S
President
PARKHILL, TH & COOPER, INC.
By
kIA4,U
President
AMENDMENT NO. 1
Page 3 of 3