HomeMy WebLinkAboutResolution - 637 - Grant Application - EPA - Step 3 Funds, Wastwater Reclamation Plant Improvements - 10/23/1980JWF:bs RESOLUTION 4637 - 10/23%80 RESOLUTION w r BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK: THAT the Mayor of the City of Lubbock is hereby authorized and directed to sign and submit a Step III Grant Application for Water Reclamation Improve- ments under Federal Grant C-48-1252-13, a copy of which is attached herewith and made a part hereof. Passed by the City Council the 23rd day of October 1980. B LL McALISTER, MAYOR � _ATTEST.: j Evelyn-G'aftga, City SefrerL`a }-Treasurer ik APPROVED AS TO CONTENT: U �of / 1 '6��j 74w_,� Guy Wipon, Sr. Utilities Engineer APPROVED AS TO FORM: c J. W h Fullingim, Asst. City 4_6iorney ` RESOLUTION #637 10/23/80 f APPLICATION FOR AN ENVIRONMENTAL PROTECTION AGENCY STEP 3 GRANT FOR WASTEWATER RECLAMATION PLANT IMPROVEMENTS CITY OF LUBBOCK, TEXAS EPA PROJECT NO, C-48-1252-13 NOVEMBER 1980 PREPARED BY: PARKHILL, SMITH & COOPER, INC. Engineers - Architects - Planners Lubbock Midland El Paso Texas TABLE OF CONTENTS ITEM PAGE 1. Form CG -122C 1 2. Form 5700-32 Part I - Standard Form 424 7 Part II - Project Approval Information 8 Part III - Budget Information 10 Part IV - Narrative Statement 12 3. Coordination With Regional Planning Agency 14 4. Resolution Designating Signatory Agent 15 5. Site Certificate 16 6. Certificate of Availability of Local Share of Funds 17 7. Certified Construction Cost Estimate 18 CG -122C TEXAS (Rev. 3-7-80) STEP 3 CHECKLIST Name of Applicant; City of Lubbock Project Number: C-48-1252-13 This is your guide to preparing a complete application package. All documents listed here must be submitted in triplicate to the Texas Department of Water Resources. Check off each item as you complete it. If you leave anything out, the application may not be processed. Submit this checklist with your grant application. Check When Application Completed EPA Form 5700.32 PAGE 1 Do not include; instructions only. PAGE 2, SECTION ( X) 1. Check "application." ( x) 2. Fill in with number assigned by Applicant and date of application, or leave blank. ( x) 3. Number assigned by clearinghouse and date assigned. ( X) 4. a. Enter legal name of applicant. c. -g. Enter mailing address of applicant. h. Name of person to be contacted for additional information. ( X) 5. Not applicable. f. -x) 6. a. Enter "66.418" b. Enter "Construction Grants for Wastewater Treatment Works." I YJ 7. Enter "Step 3 project for building and erecting a treatment works;" and describe the works planned or being built. ( x) 8. Enter E or G as appropriate. (� 9. Enter "N/A" in box. ( Xl 10. Complete ONLY if project will serve communities other than community doing construction; otherwise, show "N/A." ( X) 11. Use current population figures. - ( Xl 12. Enter ..D., in box. ( yJ 13. Show source of all funds. 1 CG -122C TEXAS (Rev. 3-7-80) Check When Application Completed EPA Form 5700-32 (x ) 14. Self-explanatory. (x 1 15. Enter "N/A." (x 1 16. Estimate 60 days after date of submittal to TDWR. 1x1 17. Self-explanatory- (x1 18. Estimate 30 days after date of submittal to TDWR- (x1 19. To be filled out by TDWR. ( x1 20. Enter "Environmental Protection Agency Dallas, Texas 75270" (x 1 21. Check appropriate box; include any remarks in Narrative Statement. PAGE 2, SECTION 11 (x1 22. b. Enter name of A-95 Clearinghouse (COG); comments should have been submitted with final Facilir. Plan. ( x 1 23. a., b., c., Self-explanatory. PAGE 2, SECTION II To be completed by EPA. PAGE 3, SECTION IV Omit this page; include any remarks in Narrative Statement. PAGES 4 and 5 Do not include; instructions only. PAGE 6, PART 11, SECTION A , ( x) Complete Items 1 through 7, 10 and 11; mark other items "N/A." PAGE 7 Do not include; instructions only. PAGE 8 (x1 Complete item 20; you will complete item 15 by executing.CG-16A (Site Certificate). Other items are not applicable. PAGE 9, PART 111, SECTION A ( x1 1. Enter "66.418." 2. Not applicable. PAGE 9, PART 111, SECTIONS ( x) On line 1, you may show Administrative Expense of 1% of the Step 3 A/E costs, up to a maximum of $2,500. -2- 2 CG -122C TEXAS (Rev. 3-7-80) Check When Application Completed EPA Form 5700-32 (X) Complete in 'Total Amount Required" column items 4, 5, 6, 11, and any other items that are applicable. Add separate line items for: • Final Plan of Operation • O & M Manual 0 Start -Up Services (if applicable) A Any other applicable items, such as: — Force Account Work — Patents/Royalties (see PRM 79-2) — Land Aquisition for land treatment o Compute amount for line item 18 according to Contingency Authorization Graph. (x) Complete items 14, and 17 through 25. PAGE 10 Do not include; instructions only. PAGE 11, SECTION C (X) 26. Show all costs excluded from Grants funding. Total dollar amount in this Section should equal amount shown on line 17, page 9. PAGE 11, SECTION D (X ) 27. Show source of local funds. (X) 28. a. Not applicable. b. Show as applicable amount of contributions by Federal Agencies other than EPA; e.g. FHA, DHUD, Reg. Comm., or EDA. (X) 29. Self-explanatory. PAGE 11, SECTION E Show the following as applicable: ( x) a Date or proposed date of bond election. NOTE: A Step 3 grant will not be awarded until bond election has been held if bond monies are needed for Step 3 financing. (X) O Federal Agency (other than EPA) grant of $ or Federal Loan of $ PAGE 12 Do not include; instructions only. PAGE 13, PART IV — NARRATIVE STATEMENT ( XI Following are the instructions for preparing an adequate Narrative Statement. Answer every point; if an item does not apply to your project, explain that it does not apply. 1. State that, as a grantee, you will maintain compliance with other applicable Federal, statutory and regulatory requirements as set forth in 40 CFR Part 30, Subpart C. .3. _ 3 CG -122C TEXAS ( Rev. 3-7-80) Check When Application Complete EPA Form 5700-32 2. Give the name, address and telephone number of your prime consultant. 3. Explain how you intend to award any subcontracts. 4. Is this project located in an identified Flood Hazard Area? If so, have you taken necessary steps to secure DHUD Flood Insurance coverage before applying for Step 3 grant assistance? 5. Will a Federal facility discharge to this wastewater treatment plant? (Refer to 40 CFR 35.925-16) 6. Does your waste discharge permit require treatment more stringent than secondary? 7. a. Is a pretreatment program required to be developed for this facility under 40 CFR 403.8(a)? b. If a pretreatment program must be developed then the items required by 40 CFR 35.907(d)(1)-(9) must be submitted at this time, for grantees who will receive Step 3 grants after December 31, 1980. 8. Grant Payments State that you will request grant payments monthly. Remember, however, a request for payment should be no greater than the Federal share of costs incurred at the time the request is submitted. See Form CG -58 for specific information concernign payments. PAGE 14 ( x) Complete all items according to the instructions on page 15. PAGES 15 and 16 Do not include; instructions only. PAGES 18 and 19, PART V, ASSURANCES Read Carefully and attach to grant application. Subagreements ( X) Include copies of all proposed subagreements including the A/E contract and any sub- contracts. Contracts must be negotiated in accordance with 40 CFR 35.936 and 35.937, and must include Appendix C-1 as a part of each contract. (See Federal Register dated September 27, 1978, for references.) If contract includes fees for any A/E work associated with ineligible construction it should differentiate between eligible and ineligible A/E costs. 4 CG -1226 TEXAS (Rev. 3.7-60) Check When Application Completed EPA Form 5700-32 Where. Start-up Services are included in the scope of services, A Start-up Services Proposal defining the scope of Start-up Services must be included with the A/E contract. When proposed contract has been approved you will be notified and requested to forward copies of the executed contract to Texas Department of Waier Resources. (X) If A/E cost equals or exceeds $10,000, attach documentation to show the positive steps taken to procure MBE participation; or attach the proposed MBE contract. Supplements to Application (x) 1. Complete and execute EPA Form 5700-41 and include with each proposed subagreement. (x) 2. Complete Form CG -15, Sample Resolution which designates the authorized representative. ( x) 3. Complete CG -16A, Site Certificate. �X) 4. Complete request for approval of force account work, if applicable. Include negotiated indirect cost agreement, if applicable. ( x) 5. Complete TDWR Financial Information Sheet. (Step 3) ( x) 6. Complete Certified Construction Cost Estimate. Final Application Review (X) 1. Make sure all applicable documents are included. ( X) 2. Check all totals for accuracy. 3. Check for matching dollar accounts. In 5700-32, page 9, check that: ( X) • the sum of lines 4, 5, 6, and lines for Plan of Operation, 0 & M Manual, and Start-up Services equals the dollar amount in the AN contract. ( X) • line 17 (if applicable) equals 5700-32, page 11, Section C, item 26.g. ( x) • line 22 equals 5700-32, page 2, item 13.a. ( X) O line 23 equals 5700-32, page 2, item 13.b. and equals 5700-32, page 11, line 29. ( X) Q line 25 equals 5700-32, page 2; item 13.f. ( x) 4. Check that the engineering contract speaks specifically to the cost for the Plan of Operation, 0 & M Manual, Inspection, and (if applicable) Start-up Services. -5- 0 CG -122C TEXAS (Rev. 3-7-80) Subagreements (x) 5. Make sure all documents are dated and signed by the appropriate people. (x) 6. Make three copies of all the application documents and send to: Texas Department of Water Resources Construction Grants and Water Quality Planning Division P.O. Box 13087, Capitol Station Austin, Texas 78711 PART 1 CONSTRUCTION GRANTS OR COOPE-RATIVIF AGREFMENTS OUB App "I No "0190 FEDERAL ASSISTANCE 2• u a. NJhWR 3. STATE se. NUMBER - APPLI- CATION CATIU- IDENTI. FIERACTION b. DAT! ASSIGNED Year month day 1' TYPE ❑ PREAPPLICATION A IS. DATE Year month day 0 APPUCATION 19 80 11 5 „ (Mark ep. ❑ NOTIFICATION OF INTENT (Opt) Leon, tau ❑ REPORT OF FEDERAL ACTION dlaek 4. LEGAL APPLICANT/RECIPIENT 3. FEDERAL EMPLOYER IDENTIFICATION NO. a.ApPBraasNo" I City of Lubbock, Texas b.Org"W06 eLINN , City 4. S"M/P.O. II" r P.O. Box 2000 nIo. a. NUMBER 1610-141 A 8� A as r Lubbock e. c«r.w r Lubbock GRAM Is. TITLE f. ie.la .r Texas 5. zw cado 79457 (From Construction Grants for t F n Cooled Pe *as (Name Mr. Samuel W. Wahl 806-762-6411 Federal Grab Wastewater Treatment Wor Atelephone Ne) 7. TITLE AND I?ESCRIPTION OF A P{T'S E(T Step ji project or bbui�c�ing and erecting treat- i. TYPE OF APPLICANT/RECIPIENT ,�,,.,r ment works, including two 400,000 cubic feet ,4-C-omitfA.,;r, Agency Ec_- ; .won 1&._%_W, ""'""" digesters and related equipment, piping, pump- Dirwid K- co- aprC6). D. -c. -,y ing equipment, and structures. F- 11d.01 06"140 r__ 0- Soo" P 0 . Eerrr appropriate knrr LE. 9. TYPE OF ASSISTANCE - A- Bohr Grant D- Imuremt B- Supplensenhd Grant E- 00w Enter &A TA C- Leen prii to k9,00)EN 11 AREA Of PROJECT IMPACT (Names of cities eanann 11. ESTIMATED NUM. 12. TYPE OF APPLICATION Statim eta) N/A SER OF PERSONS BENEFITING A- New C- Revision E- Aepm,entotlon S- Unewel D- C.nrinamiee Enter opprvpriau krter 13. PROPOSED FUNDING 14. CONGRESSIONAL DISTRICTS OFs IS. TYPE OF CHANGE (For 12 a or 12 e) • FEDERAL $2-8.3-3. 00 a. APPLICANT ►. PROJECT A- Is - se no" F- OMer (Sprc*).• 19th Texas 19th Texas c bnatew Dwre`se °"„ IS. APPLICANT50 , 0 Do D- Docre"N D"r"wn E- G"O°SO}1t" c STATE DO 10. PROJECT START 17. PROJECT OAT' Yeff, m th ay f DURATIO Enterappry d LOLL 00 19 81 1 J LSF Monrkr prion Irttrr o a. OTHER ,00 ii. ESTIMATED DATE TO Year month day 19. EXISTING FEDERAL IDENTIFICATION NUMBER Of SUBMITD TO FED RAL AG NCY 80 11 15 1. TOTAL B 00 20. FEDERAL AGENCY TO RECEIVE REQUEST (Nana City, Stare. ZIP eade) 21. REMARKS ADDED Environmental Protection ARency, Dallas Texas 75270 ❑rim. 0 N 22. a. To Mt best of my knt-Leige ani belief, IS. N required by OMB Oreulw A-15 Mir application was wbuinad, pw.wM N No rr• Response THE ata In Ml. trreoppl w/ien/eppliratian Imkucriem Martin, to swepiere deerinDAwses and all ""Pena" are at. sponer enached APFUCAW are bw and-Nrtes, Ma deevawnt bas teehed, CERTIFIES ~an «+b evikerisei by As "vernin+ (1) South Plains Association of Government❑ G3 THAT B► ►a+7 of Ma epoir»M ani the Swieent 12i ❑ ❑ wiN -amply 1 Nee ahadrai asswarsan N MN anhtenct is apprevad. _ (3) ❑ ❑ 23. a. TYPED NAME AND TITLE b. SIGNATURE e. DATE SIGNED CERTIFYING REPREmE Bill McAlister' MayorSENTA Year nwnth day /_�/ 19 24. AGENCY NAME 23. APPUCA- Year month day TION RECEIVED H 26. ORGANIZATIONAL UNIT 27. ADMINISTRATIVE OFFICE 28. FEDERAL APPLICATION IDENTIFICATION 29• ADDRESS 30. FEDERAL GRANT IDENTIFICATION 31. ACTION TAKEN 32. FUNDING Year month day 34. Year month day O �. AWARDED 33. ACTION DATE B- 1• STARTING OATS 19 IL FEDERAL S ^ Do O k REJECTED 36. Year month day b. APPUCAM 00 33. CONTACT FOR ADDITIONAL INFORMA- O t RETURNED FOR TION (Name and telephone asrmbrr) ENDING STAT[ a DATE 19 d. LOCAL AD AMENDMENT 37. REMARKS ADDED O d. DEFERRED a OTHER DD O e. WITHDRAWN O Yes O Ne f. TOTAL S .00 3B. a. le salting abeva acute, " eewweoh rtai.ed frew cloonaBhwses ware Is. FEDERAL AGENCY A-93 OFFICIAL esmidered. N agency response IS, An snrdar Vresis:em of Fart 1, OMB (Name and tekphow nal FEDERAL AGENCY t7.cular A-93, N her been or is being ooie. A-43 ACTION 424-102 {TANDARD FORM 424 PAGE 1(Rev 4-77) Prvveone ty OMe CGae4r A -1W * See Attached letter from South Plains Association of Governaments. 6-32 (Ilay. 10-79) PAGE 2 OF 19 7 PART 11 PROJECT APPROVAL INFORMATION Form Approved SECTION A 0618 No. 158•R0134 Item 1. Does this assistance request require State, local, regional, or other priority rating? --!L—Yes No Item 2. . Does this assistance request require State, or local advisory, educational or health clearances? Name of Governing BodyTexas Department of. Water Priority Rating 26_ Resource, Name of Agency or Board Yes x No (Attach Documentation) Item 3. Does this assistance request require clearinghouse review (Attach Comments) in accordance with OMB Circular A-95? - Comments of South Plains Association _x Yes No of Governments are attached. Item 4. Does thii assistance request require State, local, Name of Approving Agency regional or other planning approval? Date Yes 1L_No Item 5. Is the proposed project covered by an approved Check one: State ❑ comprehensive plan? Local » Office of Director of Regional ❑ Water Utilities N/A X Yes No Location of plan City HA 11 Item 6. Will the assistance requested serve a Federal Name of Federal Installation installation? Federal Population benefiting from,Project Yes w No Item 7. Will the assistance requested be on Federal land Name of Federal Installation or installation? Location of Federal Land Percent of Project Yes x No Item 8. Will the assistance requested have an impact or effect See instruction for additional information to be on the environment? provided. N/A Yes No Item 9. Number of: Has the project for which assistance is requested caused, Individuals since January 1, 1971, or will it cause, the displacement Families of any individual, family, business, or farm? Businesses Farms N/A Yes No Item 10. Is there other related Federal assistance on this See instructions for additional information to be project previous, pending, or anticipated? provided. Yes x No Item 11. Is project in a designated flood hazard area? - Yes x_No EPA Form $700-32 (Rev. 10_79) PAGE 6 of 19 u N/A Form Approved OMB No. 158-R0134 PART 11 — SECTION B 11. SITES AND IMPROVEMENTS: Not required, Attached as exhibits Applicant intends to acquire the site through: N/A Eminent domain, Negotiated purchase, Other means (specify) 12. TITLE OR OTHER INTEREST IN THE SITE IS OR WILL BE VESTED IN: N/A Applicant, Agency or institution operating the facility, Other (specify. 13. INDICATE WHETHER APPLICANT/QPERATOR HAS: N/A Fee simple title, Leasehold interest, Other (specify) 14. IF APPLICANT/OPERATOR HAS LEASEHOLD INTEREST, GIVE THE FOLLOWING INFORMATION: /A a. length of lease or other estate interest , and number of years to run b. Is lease renewables Yes No c. Current appraised value of land $ d. Annual rental rate $ 15. ATTACH AN OPINION FROM ACCEPTABLE TITLE COUNSEL DESCRIBING THE INTEREST APPLICANT OPERATOR HAS IN THE SITE AND CERTIFYING THAT THE ESTATE OR INTEREST IS LEGAL & VALID 16. WHERE APPLICABLE, ATTACH SITE SURVEY, SOIL INVESTIGATION REPORTS AND COPIES OF LAND APPRAISALS. 17. WHERE APPLICABLE, ATTACH CERTIFICATION FROM ARCHITECT ON THE FEASIBILITY OF /A IMPROVING EXISTING SITE TOPOGRAPHY. 18. ATTACH PLOT PLAN. A 19. CONSTRUCTION SCHEDULE ESTIMATES: Not required, Being prepared, —Attached as exhibits /A Percentage of completion of drawings and specifications at application date: Schematics % Preliminary % Final % 20. TARGET DATES FOR: Bid Advertisement March 15, 1981 Contract Award June 1, 1981 Construction Completion December 1982 Occupancy January 1983 21. DESCRIPTION OF FACILITY: Not Required Attached as exhibits /A Drawings — Attach any drawings which will assist in describing the project. Specifications — Attach copies of completed outline specifications. (1f drawings and specifications have not been fully completed, please attach copies or working drawings that have been completed.) NOTE: ITEMS ON THIS SHEET ARE SELF-EXPLANATORY; THEREFORE, NO INSTRUCTIONS ARE PROVIDED. EPA Form 570032 (Rev. 10-79)1 PAGES OF 09 9 Form approved OMB No. 158•R 0134 EPA Form 570032 (Rev. 10-79) PAGES OF 19 10 PART III — BUDGET INFORMATION — CONSTRUCTION f5CTION A — GENERAL 1. Federal Domestic Assistance Catalog No ..................... 66.418 2. Functional or Other Breakout ............................ N/A SECTION B — CALCULATION OF FEDERAL GRANT Cost Classification Use only for revisions/augmentation Total Amount Required Latest Approved Amount Adjustment +orI—) 1. Administration expense $ $ S 2,500 2. Preliminary expense lis hogizon al & -1,012 3. Land structures, right -of -way 4. Architectural engineering basic fees V). 94n 5. Other architectural engineering fees CUT15LLUCLIUL 9,997 6. Project inspection fees 70,969 pp 7. �2ekmwomolp an sp2csducti 2,389 8. 3:Z>€Rfil6w&xwcxrxaf final Plan of Opera— Ton. 2,596 Ucal L 9. 21,644 10. atbfttxandxeconwtAs—Built Drawings 1,7.-1-8 11. Construction and project improvement 2.9 550 12. h*hex Startup Services 5,931 13. Miscellaneous 14. Total (Lines 1 through 13) 3,126, 206 15. Estimated Income 00'applicable) 16. Net Project Amount (Line 14 minus 15)3. 126 206 17. Less: Ineligible Exclusions 0.00 18. Add: Contingencies 207,127 19. Total Project Amt. (Excluding Rehabilitation Grants) 3,333,333 20. Federal Share requested of Line 19 2,833,333 21. Add Rehabilitation Grants Requested (100 Percent) 22. Total Federal grant requested (Liner 20 & 211 2,833,333 23. Grantee share 500,000 24. Other shares 25. Total project (Lines 22, 23 & 241 S $ $ 3,333,333 EPA Form 570032 (Rev. 10-79) PAGES OF 19 10 r Form Approved OMB No. 158-R 0134 EPA Form 5700-32 (Rev. 10-79) PART IV PROGRAM NARRATIVE (Attach—See Instructions) PAGE 11 OF 19 SECTION C — EXCLUSIONS Classification 26 Ineligible for Participation (11 Excluded from Contingency Provision (21 a. $ $ 0 b. C. d. e. f. 9• Totals Z $ 0 SECTION D - PROPOSED METHOD OF FINANCING NON-FEDERAL SHARE 27. Grantee Share $ a. Securities b. Mortgages c. Appropriations (ey Applicant) d. Bond: 500,000 e. Tax Levies f. Non Cash g. Other (Explain) h. TOTAL — Grantee share 28. Other Shares a. State N/A .b: Other NZA c. Total Other Shares 23. TOTAL $500,000 SECTION E — REMARKS Bond funds are currently available EPA Form 5700-32 (Rev. 10-79) PART IV PROGRAM NARRATIVE (Attach—See Instructions) PAGE 11 OF 19 PART IV NARRATIVE STATEMENT EPA FORM 5700-32 CITY OF LUBBOCK, TEXAS PROJECT NO. 48-1252-13 1. All applicable federal, statuatory and regulatory requirements as set forth in 40 CFR Part 30, Subpart C will be complied with. 2. The name, address and telephone number of the prime consultant is listed below. PARKHILL, SMITH & COOPER, INC. 4010 Avenue R Lubbock, Texas 79412 Phone: (806) 747-0161 3. The City of Lubbock intends to utilize the consulting engineer- ing firm of Parkhill, Smith & Cooper, Inc., as prime consultant for the Step 3 phase of the project. This firm provided Step 2 engineering services on the project and updated a Facility Plan prepared by the City of Lubbock, and retaining the same firm for Step 3 work is in accordance with 40 CFR 35.937-2(b) (2). A contract between the City of Lubbock and Parkhill, Smith & Cooper, Inc., will be negotiated in accordance with applicable portions of 40 CFR Part 35, including appendices; the contract will be negotiated and submitted to the Texas Department of Water Resources. EPA Form 5700-41, Cost or Price Summary Format for Subagreements under U.S. EPA Grants will be submitted along with the engineering contract. Parkhill intends to subcontract construction testing to Terra Testing, Inc., and preparation of an Operation and Maintenance Manual and startup services to Water and Environmental Technology. Terra Testing, Inc., and Water and Environmental Technology are minority business enterprises. Construction Contract will be awarded through competitive bidding in accordance with applicable requirements of 40 CFR Part 35, including appendicies. 4. The project is not located within an identified Flood Hazard Area. 5. No Federal facilities as defined in 40 CFR 35.925-16 will discharge to this wastewater treatment plant. 6. The waste discharge permit for this facility does not require more stringent treatment than secondary. 7. a. Yes, a pretreatment program ,is required under the provisions of 40 CFR 403.8(a). b. The City of Lubbock is in the process of developing pretreatment regulations. 8. Grant payments will be requested monthly. 12 Form Approved PART IV — NARRATIVE STATEMENT Section D OMBNo. 158-RO134 SUMMARY OF COSTS OF PLANNED TREATMENT WORKS MUNICIPALITY (Applicant): APPLICANT'S SCHEDULED BY PROJECT AND CATEGORY APPLICATION NO. (Read instructions on reverse before completing form) City of Lubbock �,1�8-1220 'a. b. C. d. e. 1 PROJECT PROJECT PROJECT PROJECT TOTAL ALL SEQUENCE SEQUENCE SEQUENCE' SEQUENCE PROJECTS 2. PROJECT STEP STEP 2 STEP 3 STEP STEP \. , ESTIMATED CALENDAR QUARTER/ 3. YEAR APPLICATION WILL BE SUBMIT- NSA 4I8O TED TO EPA FOR FUNDING &N ;; s $ $ a. a. CATEGORY I Secondary Treatment and BPWTT 3,333,333 b. CATEGORY II More Stringent Treatment c. CATEGORY IIIA Infiltration/Inflow Correction d. CATEGORY IIIB Sewer System Replacement Rehabilitation c. CATEGORY IVA New Collectors and Appurtenances 4. f. CATEGORY IVB New fnterceptors end Appurtenances g. CATEGORY V Correction of Combined Sewer Overflows h. CATEGORY VI Treatment and/or Control of Stormwaters TOTAL COST OF STEP 2 a. PREVIOUSLY FUNDED$ 102, 600 s s $ $102 600 s S. AND STEP 3 PROJECTS b. PLANNED 0 $ $3,333,3331STOTAL FSTTMWI ED COST OF ALL 6. PLANNED BUT UNFUNDED PROJECTS TO BEINCLUDED IN THE ENTIRE3.333.333 o GRANT STEP 1 PROJECT COST 44 7' PROJECT NO. C 48-1252 —0 1 4,851 :«.. ........ COST ESTIMATES OF PLANNED PROJECTS WERE COMPUTED AS OF qqRR.:> OctoberAND REFLECT THE LATEST 11 (MONTH Y1280 CONSTRUCTION COST INDEX OF 3344 AS REPORTED BY THE ENGINEERING NEWS RECORD. 9a. ESTIMATES PREPARED/VERIFIED BY 9b. REVIEW AND APPROVAL BY STATE AGENCY NAME (Please print) DATE NAME (Please print/ DATE James R. Glaser R I ATION ORGANIZATION Parkhill, Smith & Cooper, Inc. TELEPHONE 1 AREA CODE I NUMBER SIGNATURE NUMBER t 806 it 747-0161 SIGNATURE 9c. REVIEW AND APPROVAL BY EPA REGIONAL OFFICE 9�&�6 NAME (Please print) DATE SIGNATURE • The Step 1 project, if any, will be reported on line 7. •' If no Step 1 project was funded by EPA, insert N/A. EPA Form 5700-32 (Rev -.-110-79) PAGE i6'CF tti' . - :13 PRESIDENT GLENN W. THOMPSON County Judge Cochran County IST VICE PRESIDENT MEDLIN CARPENTER Councilman City of Plainview IND VICE PRESIDENT ALAN HENRY Councilman - City of Lubbock 3RD VICE PRESIDENT HENRY HECK County Judge Hale County 4TH VICE PRESIDENT H.L. "BILL" YOUNG CcuntyJudge Dickens County SECRETARY PAUL CARM ICKLE Mayor Pro Tem City of Littlef laid TREASURER JAMES E. "JIM" LANCASTEF County Commissioner Lubbock County EX -OFFICIO MEMBER CAROLYNJORDAN City Councilwoman City of Lubbock EXECUTIVE DIRECTOR TRUETT MAYES 1611 Ave. M Lubbock, Texas 79401 B06.762-8721 GA 78-83 South Plains Association of Governments August 9, 1978 Mr. Guy W. Wilson Utilities Engineer Public Works Department P.O. Box 2000 Lubbock, Texas 79457 SUBJECT: SAI TX 80602011 - Digester Construction at Southeast Reclamation Plant Dear Mr. Wilson: On Tuesday, August 8, 1978, the South Plains Association of Governments' Board of Directors reviewed and COMMENTED FAVORABLY on the above -referenced application. This project is consistent with the regional and local plans and there are no adverse environmental problems. You are to be commended on your application endeavors and a job well-done. If we may be of further assistance, do not hesitate to contact this office. Si erely, James V. Crider Community Development Planner JVC:jh sc: Administrator Environmental Protection Agency, Region VI An Equal Opportunity Employer Through Affirmative Action 14 CG -15 TEXAS (Rev. B-16-79) RESOLUTION WHEREAS, the City of Lubbock, Texas deems it necessary (Legal name of Applicant and proper to apply for Federal grant assistance under the Federal Water Pollution Control Act Amendments of 1972, Public Law 92-500, and the rules and regulations pursuant thereto. NOW, THEREFORE, BE IT RESOLVED by the above-named Applicant that Bill McAlister, Mayor as the Signatory Agent of Name and Title of Signatory gent the Applicant, or the successor of said Agent, is hereby authorized and directed to make application for grant assistance under Public Law 92=500 and the rules and regulations pursuant thereto, specifically 40 CFR 30.315-1 (1975); and to sign the acceptance of the grant assistance, when made, and any other documents required to complete the project, on behalf of the above-named Applicant . PASSED, APPROVED, AND ADOPTED this2 r3 d day of October 1980 S1 nature nd it a of Governing Body Official) (SEAL) ATTEST: SZgnature cff Secreta y C ty Clerk, etc. 15 CG -16A (Rev. 8-24-79) SITE CERTIFICATE This is to certify that the City of Lubbock, Texas (Legal Name of Applicant, i.e., City, District, Ietc. has now acquired all property (sites, easements, rights-of-way, or specific use permits) necessary for construction, operation and maintenance of waste- water facilities described asdescribed in sten 3 project for new digesters at Fastewater reclamation plant. Proposed Contract No. and Description in accordance with approved plans and specifications and designated as Project No. C-48-1252-0 by the Environmental Protection Agency. Any deeds or ocuments required to be recorded to protect the title(s) held by City of Lubbock, Texas Legal Name of Applicant have been recorded or filed for record wherever necessary. In the event of conflicts with existing underground utilities or to preserve unknown cultural or historic resources, the City of Lubbock, Texas Name of Applicant) has the right of eminent domain and will take condemnation action, if necessary, to acquire any sites, easements or rights-of-way which may be required to change the location of any of the facilities described above; and upon acquisition of the rights-of-way and recording of documents, will submit another site certificate to that effect. EXECUTED this day of 19 r Jig n a 1. ur N�ayor (Title) NOTE: This certificate MUST BE EXECUTED BY AN ATTORNEY OR AN ABSTRACTOR qualified to evaluate the Applicant's interest in the site and make such a determination. 16 I certify that CERTIFICATE OF AVAILABILITY OF LOCAL SHARE FUNDS FOR STEP 3 GRANT City of Lubbock, Texas has its share (name of entity) of project funds available to support the construction costs esti- mated in the application. The specific status is as follows: Estimated Total Project Cost $ 3,333,333 Estimated Grant Amount $ 2,833,333 Estimated Local Share $ son, non Local share will be financed by Cash on hand designated for this project, Q Bonds DOther (explain under remarks below) If bonds are the source of local share funding: What type of bonds were authorized? General Obligation When was voter approval obtained? May 5 & 21, 1977 To what dollar limit? $500,000 Have the bonds been sold? Yes No If not yet sold, to whom and when will they be sold? Commercially .Federal Agency Texas Dept, of Water Resources Date of Sales August 1979 Remarks: Certified by: E ity Authorized Representative Mayor Title 1DWR 0?a1 17 STEP 3 APPLICATION CERTIFIED CONSTRUCTION COST ESTIMATE The attached estimate, prepared by Parkhill, Smith, & Cooper, Inc. Name of Firm on November 10, 1980 was made using the most current informa Date tion available, and in our opinion represents the closest estimate to the actual construction costs. In order that an inflation factor can be applied to the above estimate, the project number of calendar days from the date of grant award by EPA to the beginning of construction is (calendar days) 135 Certified by: Grantee /l 18 8 o Da e (Seal) "own 0780 'age 2 of 2 ESTIMATED CONSTRUCTION COST WASTEWATER RECLAMATION PLANT IMPROVEMENTS CITY OF LUBBOCK, TEXAS PROJECT NO. C-48-1252-03 ITEMUQ ANTITY UNIT COST ESTIMATED COST 1. Excavation 15,000 C.Y. $ 10.00 $ 150,000 2. Concrete for Digesters 2,500 C.Y. 400.00 1,000,000 3. Covers 2 375,000.00 ea 750,000 4. Mixing Equipment 1 job 400,000.00 L.S. 400,000 5. Heaters 1 job 200,000.00 L.S. 200,000 6. Sludge Pumps 1 job 100,000.00 L.S. 100,000 7. Control Building 1 job 150,000.00 L.S. 150,000 8. Control Bldg. Piping 1 job 100,000.00 L.S. 100,000 9. Yard Piping 1 job 100,000.00 L.S. 100,000 10. Paving 700 S.Y. 10.00 7,000 11. Fencing 970 L.F. 15.00 14,550 TOTAL ESTIMATED CONSTRUCTION COST $2,971,550