HomeMy WebLinkAboutResolution - 628 - Accept Paving Improvements - LAP Inc - Storm Drainage, Lots 5-6 Rip Addition - 10/09/1980RESOLUTION #628 - 10/ 9/ 80
RESOLUTION
RESOLUTION ACCEPTING IMPROVEMENTS AS LISTED BELOW:
WHEREAS, in conformance with the paving requirement provisions of City
Ordinance 1331, the subdivider of Rip Addition, Lots 5 and 6, made arrangements
with Lubbock Asphalt Products, Inc., for the construction of drainage improvements
dedicated in said subdivision under the provisions of said Ordinance prior to
the recording of the subdivision plat of Rip Addition, Lots 5 and 6, including
the following improvements:
Storm water drainage improvements Unit NS 2027-27
AND WHEREAS, the construction of the above improvements was performed under
the supervision of the City Engineer, and said improvements have been completed
and have been inspected and found to have been constructed in accordance with
City specifications and in accordance with the provisions of City Ordinance 1331.
THEREFORE, BE IT RESOLVED BY THE CITY OF LUBBOCK, TEXAS.
I.
That the improvements be and the same are hereby accepted and the City
Engineer be and he is hereby authorized to direct the payment of the City's
portion of the cost (and to release escrow money).
II.
The resolution shall take effect and be in force from and after its passage.
PASSED AND APPROVED THIS 9TH
-ATTEST
r
Evelyn-Gaffga, C t cretary
APPRO ED TO CONTENT:
Don Jerrngs, C y Engineer
APPROVED AS TO FORM:
'-
Ross, Jr., C ty Attorney
DAY OF OCTOBER 80.
- 0 d&
B 1 McAlister, Mayor
CONSOLIDATED FINAL ESTIMATE
RIP ADDITION, LOTS 5 AND 6
ACCEPTED OCT. 9TH, 1980
QUANTITIES -
Unit &
Sub -Unit Location
NS 2027-27 N -S Drainage Channel
along East Side of Lots
5and 6
COST ESTIMATE
893.33
126.40
273.39
37.00
COST DISTRIBUTION
Unit &
Sub -Unit
NS 2027-27
S.Y. Paving 6" Base
L.F. Curb & Gutter
S.Y. Drainage Channel
L.F. Curb & Gutter
Removal & Repair
Contract
Cost
$11,894.74
S.Y. S.Y. L.F.
Paving L.F. Drainage C & G
6" Base C & G Channel Removal&
!.< Repair
893.33 126.40 273.39 37.00
@ $ 5.75
@ $ 5.50
@ $21.50
@ $ 5.00
CONTRACT COST
Property
Owner Cost
$11,894.74
$ 5,136.65
$ 5,877.89
$ 11,894.74
City to
Contractor
0.00
QUANTITIES
Unit &
CONSOLIDATED�FINAL ESTIMATE
RIP ADDITION, LOTS 5 AND 6
ACCEPTED' OCT. 9TH, 1980
Sub -Unit Location
NS 2027.-27 N -S Drainage Channel
along East Side of Lots
5and 6
COST ESTIMATE
893.33
126.40
273.39
37.00
COST DISTRIBUTION
Unit &
Sub -Unit
NS 2027-27
S.Y. Paving 6" Base
L.F. Curb & Gutter
S.Y. Drainage Channel
L.F. Curb & Gutter
Removal & Repair
Contract
Cost
$11,894.74
S.Y. S.Y.
Paving L.F. Drainage
6" Base C & G Channel
893.33 126.40 273.39
@ $ 5.75
@ $ 5.50
@ $21.50
@ $ 5.00
CONTRACT COST
Property
Owner Cost
$11,894.74
L.F.
C & G
Removal&
Repair
37.00
$ 5,136.65
$ 5,877.89
$ 185.00
$ 11,894.74
City to
Contractor
0.00