Loading...
HomeMy WebLinkAboutResolution - 627 - CO#3 To Contract - Kerr Co - 1979 Assessment Paving Program, GWO 10,976 - 10/09/1980JWF:bs RESOLUTION BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK: RESOLUTION #621 - (Reso. #86, 3/8/79 THAT the Mayor of the City of Lubbock BE and is hereby authorized and directed to execute for and on behalf of the City of Lubbock a Change Order No. 3 to the 1979 Assessment Paving Program (G.W.O. 10,976), with Kerr Construction Company, a copy of which is attached herewith which shall be spread upon the minutes of the Council and as spread upon the minutes of th Council shall constitute and be a part of this Resolution as if fully copie herein in detail. by the City Council this 9th d Evelyn°GaFffia, Ci y tary-Treasurer APPROVED AS TO CONTENT: I A,$ 7 a, - Don JeriVings, C y Engineer APPROVED AS TO FORM: ) 1 1019) j u i f i Resolution #627 - 10/9/80 Change Order Number 3 to GWO 10,976 TO: Kerr Construction Company Box 888 Lubbock, Texas 79408 Gentlemen: WHEREAS, it is desirable to make changes in the plans and specifications for G.W.O. 10,976, being namely the following changes in the specifications: 1. The completion date of Unit -Numbers 2237-1 and 2237-2 be extended from October 15, 1980 to December 15, 1980. 2. Statement 1 of the Deadline for Hot Mix Surfacing located in the proposal and in Section I, paragraph 20, be revised to read as follows: 1. 1 1/2" surfacing with T.H.D. Type "C" A.C. will be permitted after October 15 and before December 15 provided the Contrac- tor abides by the following restrictions: A. The surfacing shall be guaranteed by a letter from the Con- tractor for a period of one (1) year after acceptance of the unit. B. A dilute emulsion treatment of:a-_xate._.dete.rmi.ned_by the Engineer will be applied to the surface within ten (10) days of the placement of the surface. C. The A.C. surface will have a minimum temperature of 300' F immediately after placement by the lay -down machine. D. The A.C. surface will not be placed when the air temperature is below 50° F. E. Standby rollers shall be located at the job site for immediate use if needed. Original Amount of Contract G.W.O. 10,976 $1,694,618.04 Increased by Change Order No. 1 38,261.44 Increased by Change Order No. 2 204,081.32 Increased by Change Order No. 3 0.00 Total Amount of Contract $1,936,960.80 THIS AGREEMENT WITNESSETH: In consideration of the mutual advantages gained, the Owner and the Contractor agree to the changes shown herein and in the revised plans. The Contractor agrees to proceed with construction and to adhere to applicable specifications, under the direction of the Engineer. Furthermore, the parties agree that the original contract between the Owner and the Contractor shall be modified to.the extent herein indicated. IN WITNESS WHEREOF, the Owner and the Contractor have hereto set their hands this 9th day of October, 1980. Kerr Construction Company (Contractor) By 10,Title: CITY OF LUBBOCK (Owner) By Bill McAlister, Mayor RECOMMENDED Don J nin , City Engineer APPROVED AS TO FORM: &O'n C. Ross, Jr., City Attorney Attest: elyn G fga, Ci retary FOR APPROV Lar y ingham, i Manager