RESOLUTION 4610 - 9/2$/80
DWRlel
RESOLUTION
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK:
THAT the Mayor of the City of Lubbock BE and is hereby authorized and
directed to execute for and on behalf of the City of Lubbock an Agreement
Modifying Engineering Service Contract for Power Supply Study between the City,
of Lubbock, Texas, and Tippett and Gee, Inc., Abilene, Texas, attached herewith
which shall be spread upon the minutes of the Council and as spread upon the
minutes of this Council shall constitute and be a part of this Resolution as if
fully copied herein in detail.
Passed. by the City Council this. 25th day of September
ATTEST:
EvelynGa Aga, City c t -Treasurer
APPROVED AS TO CONTENT:
Carroll McDonald, Director
Electric Sales and Service
APPROVED AS TO FORM:
r
David W. Reagan, As tant City Attorney
oe
B,4 9cISTTER,. MAYOR
,1980.
s
ti
RESOLUTION ,1610 - 9/25/80
AGREEMENT MODIFYING ENGINEERING SERVICE CONTRACT
FOR
POWER SUPPLY STUDY
BETWEEN
THE CITY OF LUBBOCK, TEXAS
AND
TIPPETT & GEE, INC.
ABILENE, TEXAS
AGREEMENT MODIFYING ENGINEERING SERVICE CONTRACT
FOR
POWER SUPPLY STUDY
BETWEEN
THE CITY OF LUBBOCK, TEXAS
AND
TIPPETT & GEE, INC.
ABILENE, TEXAS
This Agreement is between the City of Lubbock, Texas, a Texas Municipality
of Lubbock County, Texas, (hereinafter called the "Owner") and Tippett and
Gee, Inc., a Texas Corporation, having its principal office in Abilene, Taylor
County, Texas, (hereinafter called the "Engineer").
WHEREAS, the parties hereto entered into an Agreement for Engineer to
conduct and provide a Power Supply Study to Owner, on July 12, 1979. A copy of
that Agreement is attached hereto, marked Exhibit "A" and insofar as it is not
inconsistent with the terms hereof, made a part of this Agreement; and
WHEREAS, the time for performance of such Agreement marked Exhibit "A" has
passed and the Owner has made no payments for services to be performed under
such Agreement; and
WHEREAS, the Engineer desires to perform such Agreement at the same fee
stated in Exhibit "A" and Owner desires to obtain such performance at the same
fee.
NOW, THEREFORE, the parties hereto desire to, and do hereby modify the
Agreement, Exhibit "A" attached hereto, in the following respects:
I.
The first paragraph of Article II of that Agreement, which read as follows:
"The Engineer agrees to perform the services required by this Contract as
expeditiously as practical and to schedule the completion of all phases of
the study and its submittal in final form not later than May 1, 1980."
is hereby deleted, and the following is substituted so that the paragraph now
reads as follows:
"The Engineer agrees to perform the services required by this Contract as
expeditiously as practical and to schedule the completion of all phases of
the study and its submittal in final form not later than July 31, 1981."
II.
Section B of Article VI of that Agreement which read as follows:
"B. PAYMENTS
Payments to the Engineer shall be made in Abilene, Taylor County, Texas,
as follows:
1. 50% of the fee in 10 equal monthly payments beginning one month after
authorization to proceed with the Study.
t�
2. 40% of the fee upon submittal of the final draft of the completed
Study.
3. 10% of the fee upon acceptance by the City of Lubbock, but not later
90 days after submittal of the completed Study.
4. Reimbursement for out-of-pocket expenses upon submittal of itemized
invoices for such expenses."
is hereby deleted, and the following is substituted so that the section now
reads as follows:
"B. PAYMENTS
Payment to the Engineer shall be made in Abilene, Taylor County, Texas, as
follows:
1. 40% of the fee upon submittal of an interim report not later than
November 15, 1980.
2. 50% of the fee upon submittal of the final draft of the completed
Study not later than July 31, 1981.
3. 10% of the fee upon acceptance by the City of Lubbock, but not later
than 90 days after submittal of the completed Study.
4. Reimbursement for out-of-pocket expenses upon submittal of itemized
invoices for such expenses."
This modifying Agreement is supplemental to the Contract between the
parties dated July 12, 1979, and marked Exhibit "A" and attached hereto, and
such Contract is by reference made a part hereof. All the terms, conditions,
and provisions thereof (unless specifically modified herein) are to apply
hereto.
IN WITNESS WHEREOF, the parties hereto have entered into this Agreement
this 25th day of September , 1980.
THE CITY UBBOCK TEXAS
OWNER
B McALISTER, MAYOR
TIPPETT AND GEE, INC.
ENGI ER c
J _
PRESIDENT
AT ATTEST:
Evelyn Ga ga, City e e y -Treasurer SECRETARY
APPROVED AS TO CONTENT:
Carroll McDonald, irector
Electric Sales and Service
.m
Aastartt CIry /Ittwrwq
9
ENGINEERING SERVICE CONTRACT
FOR
POWER SUPPLY STUDY
BETWEEN
THE CITY OF LUBBOCK, TEXAS
AND -
TIPPETT S GEE, INC.
ABILENE, TEXAS
EXHIBIT "A"
ENGINEERING SERVICE CONTRACT
FOR
POWER SUPPLY STUDY
BETWEEN
THE CITY OF LUBBOCK, TEXAS
AND
TIPPETT & GEE, INC.
ABILENE, TEXAS
AGREEMENT made /Z /�
t between the City of Lubbock,
Texas, a Texas Municipal y, 49f Lubbock County, Texas, (hereinafter called
D the "Owner") and Tippett & Gee, Inc., a Texas Corporation, having its prin-
cipal office in Abilene, Taylor County, Texas, (hereinafter called the
"Engineer").
WHEREAS, the Owner directs that the future growth of the demands upon
its electric utility System and the means for meeting these demands be studied
in detail; and
WHEREAS, the Engineer represents that he has sufficient experienced
personnel and equipment to perform, and the Owner desires the Engineer to
perform the engineering services herein described in respect of the System.
NOW, THEREFORE, in consideration of the mutual covenants herein con-
tained, the parties hereto agree as follows:
ARTICLE 1
EMPLOYMENT OF ENGINEER
The Owner agrees to employ the Engineer and the Engineer agrees to
perform professional engineering services in connection with the Work as stated
in the sections to follow, and for having rendered such services, the Owner agrees
to pay to the Engineer compensation as stated in the sections to follow.
The Engineer hereby agrees to assign the personnel to this Project
which may be necessary for satisfactory completion of said engineering services.
ARTICLE II
CHARACTER AND EXTENT OF SERVICES
The Engineer agrees to perform the services required by this Contract
as expeditiously as practical and to schedule the completion of all phases of
the study and its submittal in final form not later than May 1, 1980.
The Engineer shall render services on the project including but not
limited to the following:
A. Study the feasibility of possible sources of future additional electric
power supply to ensure continued economic and reliable electric service for
the citizens of Lubbock including:
1. Types and sizes of generating prime movers including combined cycles
utilizing existing or future gas turbines.
2. Fuel types and sources available for power generation, including Western
coal and solid waste as a supplemental or alternate fuel.
3. Use of sewage effluent as a source of cooling water.
4. Requirements for compliance with all state and federal regulations for
additional power production sources.
5. Siting considerations and their impact on the environment.
6. Disposal of wastes incidental to electric power production utilizing solid
fuels.
B. Study general feasibility of interconnection and/or joint generation installa-
tion with other electric utility systems, and the specific feasibility of a
100 MW interconnection to be in operation by the summer of 1983.
ARTICLE III
FURNISHED BY OWNER
Lubbock Power & Light shall furnish the Engineer all relevant maps, load
data including future load projections, descriptions of property, records, cost
data, existing fuel contracts and generating plant performance,data in regard to
quantity and quality of solid waste, fresh water availability, sewage effluent
quantity and quality, and any other pertinent data which it may possess relating
to the services to be performed by the Engineers.
ARTICLE IV
REVIEW MEETINGS & DOCUMENTATION
. The Engineer shall meet with the Owner at agreed -upon -intervals and shall
submit preliminary drafts of parts of the study to the Owner for review and dis-
cussion.
The Engineer shall submit 20 bound final copies of the study to the Owner.
ARTICLE V
ENGINEER, INDEPENDENT CONTRACTOR
It is understood and agreed that in all work covered in this Agreement
that the Engineer shall act as an independent contractor administrating complete
control over its employees.
ARTICLE VI
COMPENSATION
A. For and in consideration of the services to be rendered by the Engineer, the
Owner shall pay, and the Engineer shall receive the compensation hereinafter
set forth for the Study.
-2-
r .
' The compensation payable by the Owner to the Engineers shall be as
follows:
I. A fee for the performance of the Study in the amount of ONE HUNDRED
TWENTY FIVE THOUSAND DOLLARS ($125,000); and
2. Reimbursement for out-of-pocket expense at actual cost for all normal
travel expenses for inspection of solid -waste generating facilities
as may be directed or authorized by the Owner.
B. PAYMENTS
Payments to the Engineer shall be made in Abilene, Taylor County, Texas,
as follows:
1. 50% of the fee in 10 equal monthly payments beginning one month after
authorization to proceed with the Study.
2. 40% of the fee upon submittal of the final draft of the completed Study.
3. 10% of the fee upon acceptance by the City of Lubbock, but not later than
90 days after submittal of the completed study.
4. Reimbursement for out-of-pocket expense upon submittal of itemized invoices
for such expenses.
IN WITNESS WHEREOF, the parties hereto have entered into this Contract
as of the day and year first hereinabove written.
ATTEST:
City Secreliiry 7 lzr'l
Approved as to form:
G
hn C. Ross, Jr., City Attorney
C
ATTEST:
Secretary
CITY nF InRRnrK TFYac
TIPPETT.& GEE, INC.
Engineer
By
President
Title
-3-
Y e
Aippett
e e
L.Ionsulting Engineers �.
502 NORTH
WILLIS STREET
ABILENE, TEXAS 79603 PHONE 673-8291 AREA CODE 915
TELEX: 739457 nP8GEE ABI
Mr. Larry Cunningham
City Manager
City of Lubbock
P. 0. Box 2000
Lubbock, Texas 79457
September 8, 1980
Re: Agreement Modifying Engineering
Service Contract for Power Supply
Study for the City of Lubbock
Dear Mr. Cunningham:
Attached hereto is a fully executed copy of the modifying agreement transmitted
with your letter of August 26, 1980.
We would appreciate your returning to us two copies of this agreement upon execu-
tion by the City of Lubbock.
We appreciate the opportunity to go forward on this study. It is most complicated
as the present condition of the energy situation is very complex.
Yours truly,
TIPPETT S GEE, INC.
Louis
LSG:nfs
Attach.