HomeMy WebLinkAboutResolution - 1908 - Contract - WTM Inc - I27 Project Utility Adjustments, Spur 326 & Broadway Ave - 12/20/1984JCR:cl
RFgni 1ITTnKi
RESOLUTION #1908
December 20, 1984
Agenda Item #35
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK.-
THAT the Mayor of the City of Lubbock BE and is hereby authorized and
directed to execute for and on behalf of the City of Lubbock a Contract
between the City of Lubbock and West Texas Mechanical, Inc., for utility
adjustments at Spur 326 and Broadway in accordance with I-27 Highway
project, attached herewith, which shall be spread upon the minutes of the
Council and as spread upon the minutes of this Council shall constitute and
be a part of this Resolution as if fully copied herein in detail.
Passed by the City Council this 20th day of December 3,19 84
ATTEST:
Ranet a Boyd, City Secretary
APPROVED AS TO CONTENT:
Gene E ddb, Purchbsing Manager
APPROVED AS TO FORM:
C.
hn C. Ross, Jr., City Attorney
ALAN/� i I'
���r 1tcAl:'1
STATE OF TEXAS
cou= OF LUBBOCK )
THIS AGREEMENT, made and entered into thisAd %, of
A.D. 19 074 by and between the City of Lubbock
of the County of Lubbor-k and State of Texas, acting through
its mayor, Alan Henry thereunto duly authorized so to do,
party of the First Part, hereinafter tensed Owner, and
West Texas Mechanical, Inc.
of the City of Lubbock Countyof
Lubbock
and State of Texas , Party of the Second Part,
hereinafter te=ed Contractor.
WITNESSETH: That for and in consideration of the payments and
agreements hereinafter mentioned, to be made and perfo cmed by the Party of
the First Part (Owner) , and under _the conditions expressed in the bond
bearing even date herewith, the said Party of the Second Part (Contractor)
hereby agrees with said Party of the First Part (Owner) to commence and
complete the construction of certain improvements described as follows :
Furnish all labor and materials and --perform all work for the construction
for the City of Lubbock I-27 Utility Adjustments - Spur 326 and Broadway
W all extra work in connection therewith, under the texas as stated in
the General Conditions of the Agreement; and at his (or their) own proper
C08t and expense to furnish all the materials, supplies, machinery,
4k4uipment, tools, superintendence, labor, insurance and other accessories
D - 1
/w__
services necessary to complete the said construction, is accordance
d s ices stated in the Proposal attached hereto, and in
an the conditions and pr eeaent, and in accordance
with
accordance with all the General Conditions Of the
prints and other drawings
with the Plans, which includes all maps, plats, Specifications
inted or written explanatory matter thereof, and the SP Engineers,
and eared by Parkhill, Smith & Cooper, Inc., Consulting n8
therefor, as prepared each of which has been identified
Lubbock, Texas, herein entitled the Engineer, tor and the Engineer thereon, together with
by the endorsement of the Contrac
ns
the
Contractor's
written proposals the General which tarmadetaepart e�reof and
the Construction Bond hereto attached, al o
collectively evidence and constitute the entire contract.
ees to commence work within tea (10
daysThe Contractor hereby agrand to
after the date written thin tice to doso aco eeeutivehacave alendar gdaYs tthereafter as
complete the project
stipulated in the specifications
The Contractor agrees that time is of the essence of thiscontract
for the
and that for each day of delay bey upon and the time herein agreed _
(after due
completion letion of the work herein specified ancontracted
provided foreunderr Extension of
allowance for such extension of tw�ithhold permanently from the Contractor's
Time hereinabove), the Owner may as
total compensation, the sumfor such delay•
stipulated liquidated damages
The owner agrees to pay the Contractor in current fundi _'ar the pentted
submif
ormance of the contract in accorda'aions, as the
dPoin Proposal
General
therefor,, subject to additions and t� make payments on account thereof as
Conditions of the Agreement,
provided therein.
IN WITNESS WHEREOF, the parties to these
pg1effient in the year and day first above written.
Party of the First Part (Owner)
CITY OF CK, TE S
BY
Party of the Second Part (Contractor)
presents have executed this
ATTEST: __.
By -
ATTEST: 1
By
D - 2
WEST TEXAS t4ECHANi'CA INC
Resolution #1908
CHANGE ORDER NO. 1
City of Lubbock, Texas
I-27 Utility Adjustments
Spur 326 and Broadway
April 29, 1985
TO: West Texas Mechanical, Inc.
5847 50th Street
Lubbock, Texas 79414
Original Contract Amount . . . . . . . . . .. .
. . $
259,848.10
Change Order No. 1 . . . . . . . I .. . . . . .
$
2,510.13
Adjusted Contract Amount . . .
. . . . $
262,358.23
Adjustment to Contract Time . .
. . . (ADD) 27 days
WHEREAS, it is desirable to make certain chan-es in
the work in this
project:
THIS AGREEMENT WITNESSETH: In consideration of the mutual advantage.
gained, the Owner and the Contractor agree to the changes
indic4ted
below.
Add the following items at the quantities and unit prices
shown:
1. 6 -inch Class 1509' 20 L.F. 0 $9.34
$
186.80
Approved Type Pipe.
7. 6" X 6" Tapping Sleeve 1 Each @ $656.00
$
656.00'
and 6" Gate Valve and
Box.
14. Relocate Existing Fire ' 1 Each @ $322.00
$
322.00
Hydrant
55. Cut and plug existing 1 Each @ $200.00
$
200.00
8" Sanitary Sewer.
56. 6 -inch Fire Service Line 1 Each @ $1,145.33
$
1,145.33
Connection.
TOTAL CHANGE ORDER NO.
1 $
2,510.13
The adjustment to Contract Time includes the following:
a. Weather days for Larch 19th and 20th . . . . . .
. . . . .
. 2
b. Time required for obtaining necessary . . . . .
. . . . ..
. 7
permits on Avenue A (U.S. 87)
c. Time for additional work perscribed . . . . . .
. . . . .
. 18
by this change order.
With the adjustment to Contract Time, the completion date is now
June 1, 1985.
CHANGE ORDER NO. 1
Page 1 of 2
IN WITNESS WHEREOF, the Owner and the Contractor have hereto set
their hands this the f/j day of April, 1985.
RECOMMEND: PARKHILL, SMITH & COOPER, INC. Consulting Engineers
Proj.
By ' , Engineer, , -� �/ 198
APPROVED: WEST TEXAS MECHANICAL, INC., Contractor
By fy /� Presi,dmt 5/1 198
Calvin Worley
APPROVED: CITY 0 LUBBOCK TEXAS, Owner
By 19E
11