HomeMy WebLinkAboutResolution - 2011-R0491 - Contract - Minnix Commercial - IT Building Demolition - 11/03/2011Resolution No. 2011--RO491
November 3, 2011
Item No. 5.32
RESOLUTION
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK-
THAT the Mayor of the City of Lubbock is hereby authorized and directe
execute for and on behalf of the City of Lubbock, Contract No. 10463 for Information
Technology building demolition, by and between the City of Lubbock and Minnix
Commercial, and related documents. Said Contract is attached hereto and incorporated in
this resolution as if fully set forth herein and shall be included in the minutes of the City
Council.
Passed by the City Council on
November 3, 2011
TOM MARTIN, MAYOR
ATTEST:
Rebe a Garza, City Secretary
APPROVED AS TO CONTENT:
Mark -&"oodAssi;t-aNt City Manager
Chief Information Officer
APPROVED AS TO FORM:
Chad Weaver, Assistant City Attorney
vw:ccdocs/RES.Contract-Minnix Commercial
October 11, 2011
Contract No. 10463
Resolution No. 2011-80491
Work Order Signature Document
BUYBOARD EQIQC Contract No.: Area I -1 MCP - Option 1
New Work Order 1-1 Modify and Existing Work Order
Work Order Number: 011206.00 Work Order Date:10/11/2011
Work Order Title: City of Lubbock– Information Technology Building. Demolition
Owner Name: City of Lubbock Contractor Name: Minnix Commercial Partners, LTD.
Contact: John Castillo Contact: Keenan Davis
Phone: (806) 775-3078 Phone: (806) 798-7335
Work to be Performed
Work to be performed as per the Final Detailed Scope of Work Attached and as per the terms and conditions of
BuyBoard EZIQC Contract No Area I –1 MCP – Option 1.
Brief Work Order Description_
Information Technology Building Demolition.
Time of Performance See Schedule Section of the Detailed Scope of Work
Work Order Number
011206.00
CITY OF LUBBOCK
Tom Martin, Mayor
Attest: P–ab–e,—
Rebecca
Gakza, City Secretary
Location
Information Technology
APPROVED AS CONTENT:
Mark Y6rwootq Assistant City Manager
Amount of Contract
49,478.60
nenan bavis, Project Manager
Minnix Commercial Partners, LTD
Owner's Representative
W ma=y �✓.
Wesley Everett, Director of Facilities
APPRO
/ 7%lLY/�1+"�
Assistant City Attorney
wBoard®
oDprMei's purah"Mu
lim
Detailed Scope of Work
To: Keenan Davis
Wnnix Commercial Partners, LTD
PO Box 64895
Lubbock, TX 79464
(806) 798-7335
Date Printed: October 19, 2011
From: John Castillo
City of Lubbock
1625 13th St
Lubbock, TX 79401
No Data Input
Work Order Number: 011206.00
Work Order Title: City of Lubbock - Information Technology Demolition
Brief Scope: Information Technology Demolition.
F7Preliminary E] Revised El Final
The following items detail the scope of work as discussed at the site. All requirements necessary to accomplish the
items set forth below shall be considered part of this scope of work.
Shut down and capping of existing services including plumbing and electrical.
Demo and haul off of existing building. Cut away building from existing breezeway.
Demo and haul off of existing slab and footings including saw cutting around perimeter of building.
Temporary fencing around entire jobsite for security and safety.
Scope cf Work Page 1 of 1
EZ1QC - Buy Board 10/19/2011
Contractor's Price Proposal CSI - Summary
Date: October 19, 2011
Re: IQC Master Contract #:
Work Omer #:
Owner PO #:
Title:
Contractor:
Area I - 1 MCP - Option 1
011206.00
011206.00
City of Lubbock - Information Technology Demolition
Minnix Commercial Partners, LTD
Proposal Value: $49.478.60
01 - General Requirements $1,535.12
02 - Site Work $47,759.64
15 - Mechanical
$183.84
Proposal Total $49,478.60
Contractor's Price Proposal - Summary Page 1 of 1
EZIQC - Buy Board 1 0/1 91201 1
Contractor's Price Proposal GSI - Detail
Date: October 19, 2011
Re: IQC Master Contract #: Area I - 1 MCP - Option 1
Work Order #: 011206.00
Owner PO #: 011206.00
Title: City of Lubbock - Information Technology Demolition
Contractor: Minnix Commercial Partners, LTD
Proposal Value: $49,478.60
Sect. Item Modifer UOM Description
CY Cut Shape, and Rough Grading for Roadways, Parking Areas, Landscaping
Line Total
Labor Equip. Material IExcluded if marked with an X)
and Embankments by Machine in Loose Rock
01 - General Requirements
02111
0015
1 01560 0156 LF Temporary 6' High Chain Link Pence Panels (Portable), Up To 6 Months
Total
$1,131.34
Quantity Unit Price Factor
Total
581.30
Installation 500.00 x 1.81 x 1.2501
1,131.34
Factor
2 01560 0183 SF 518" Gypsum Board On Both Sides,Temporary Stud WallNote: Wood studs at
$47,759.64
$403.78
16" O.C., taped and finished, one coat of fiat paint. Remove after use.
Installation 86614 x 16.21 x
Quantity Unit Price Factor
Total
Installation 100.00 x 3.23 x 1.2501
403.78
0015 0010
Subtotal for 01 - General Requirements
$1,535.12
02 - Site Work
CY Cut Shape, and Rough Grading for Roadways, Parking Areas, Landscaping
$581.30
and Embankments by Machine in Loose Rock
3
02111
0015
CCF Demo Masonry Building By Machine Remove Building
Total
$17,592.09
Installation 155.00 x 3.00 x 1.2501
581.30
Quantity Unit Price
Factor
Total
$47,759.64
15 - Mechanical
Installation 86614 x 16.21 x
1.2501
17,592.09
4
02MOD
0015 0010
For Work On The Volume Of Area Within 1 S' To An Adjacent Building, Add
$5,806.15
Quantity Unit Price Factor
Total
Quantity Unit Price
Factor
Total
Subtotal for 15 - Mechanical
Installation 868.14 x 5.35 x
1.2501
5,806.15
5
02112
0091
CF Demo Reinforced Concrete Building Foundation
$18,063.32
Quantity Unit Price
Factor
Total
Installation 3,705.00 x 3.90 x
1.2501
18,063.32
6
02112
0136
LF Saw Cut Concrete Slab Or Paving Up To 4" (10 cm) Depth
$556.37
Quantity Unit Price
Factor
Total
Installation 374 00 x 1.19 x
1.2501 -
556.37
7
02119
0011
CYM Hauling >5 To 10 Miles
$5,160.41
Quantity Unit Price
Factor
Total
Installation 8,450.00 x 0.64 x
1,2501
5,160.41
a 02212 0004
CY Cut Shape, and Rough Grading for Roadways, Parking Areas, Landscaping
$581.30
and Embankments by Machine in Loose Rock
Quantity Unit Price Factor
Total
Installation 155.00 x 3.00 x 1.2501
581.30
Subtotal for 02 - Site Work
$47,759.64
15 - Mechanical
9 15048 0101
EA Shut Down Existing Interior Piping SystemNote: Includes lock outltag out and
$183.84
average line tracing. Use when valves are greater than 25' from work.
Quantity Unit Price Factor
Total
Installation 2.00 x 73.53 x 1.2501
183.84
Subtotal for 15 - Mechanical
$183.84
Contractor's Price Proposal - Detail Page 1 of 2
EZIQC - Buy Board 1 011 912 01 1
Contractor's Price Proposal - Detail Continues..
Work Order Number: 011206.00
Work Order Title: City of Lubbock - Information Technology Demolition
Proposal Total
This total represents the correct total for the proposal. Any discrepancy between line totals,
sub -totals and the proposal total is clue to rounding.
$49,478.60
P-41-0. Oriro PMn ftAl _ detail page 2 of 2
EZfQC - Buy Board 10/19/2011