HomeMy WebLinkAboutResolution - 2011-R0433 - Contract - Minnix Commercial Partners Ltd - Installation Of HVAC Systems - 10/13/2011Resolution No. 2011-RO433
October 13, 2011
Item No. 5.11
RESOLUTION
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK:
THAT the Mayor of the City of Lubbock is hereby authorized and directed to
execute for and on behalf of the City of Lubbock, Contract No. 10432 for installation of 3
HVAC systems at Water Reclamation Plant, by and between the City of Lubbock and
Minnix Commercial Partners, Ltd., and related documents. Said Contract is attached
hereto and incorporated in this resolution as if fully set forth herein and shall be included
in the minutes of the City Council.
Passed by the City Council on
October 13, 2011
TOM MARTIN, MAYOR
ATTEST:
Reb cca Garza, City Secret
APPROVED AS TO CONTENT:
Marsha Reed, P.E., Chief Operating Officer
APPROVED AS TO FORM:
Chad Weaver, Assistant City Attorney
vw:ccdocs/RES.Contract-Minnix Commercial Partners, Ltd.
September 26, 2011
Contract No. 10432
Resolution No. 2011—RO433
Work Order Signature Document
BUYBOARD EQIQC Contract No.: Area I — 1 MCP — Option 1
lJ New Work Order Q Modify and Existing Work Order
Work Order Number: 011279 Work Order Date:9/08/2011
Work Order Title: City of Lubbock — Replace 3 HVAC systems at the Water Reclamation Plant
Owner Name: City of Lubbock Contractor Name: Minnix Commercial Partners, LTD.
Contact: Brad Reed Contact: Keenan Davis
Phone: (806)790-7301 Phone: (806)798-7335
Work to be Performed
Work to be performed as per the Final Detailed Scope of Work Attached and as per the terms and conditions of
BuyBoard EZIQC Contract No Area I —1 MCF — Option 1.
Brief Work Order Description:
Replace three (3) 1-1/2 ton electric split HVAC systems and replace one(1) 5 ton electric split HVAC system.
Time of Performance See Schedule Section of the Detailed Scope of Work
Work Order Number
011279
CITY OF LUBBOCK
C --Zls+��
Tom Martin, Mayor
Attest:
Rebecca C;a a, City Secretary
APPROVED AS -ONTEN :
IV arsha ee , Chief Operating Of jcer
Location
Water Reclamation Plant
Amount of Contract
57,088.30
eenan Davis, Project Manager
Nlinnix Commercial Partners, LTD
Owner's Representative
A -b C
Wesley Everett, Director of Facilities
AP€tOr DOI,FORM:
Assistant City Attorney
Voard-
eapffrafirff Psrchasis.
Detailed Scope of Work
To: Keenan Davis From: Brad Reed
Minnix Commercial Partners, LTD City of Lubbock
PO Box 64895 1625 13th St
Lubbock, TX 79464 Lubbock, TX 79401
(806)798-7335 806 790-7301
Date Printed: September 08, 2011
Work Order Number: 011279.00
Work Order Title: Lubbock -Water Reclamation HVAC
1 IM
Brief Scope: Replace three (3) 7 112 ton electric split HVAC systems and repalce One (1) 5 ton
electric split HVAC system.
7 Preliminary
7 Revised
Final
The following items detail the scope of work as discussed at the site. All requirements necessary to accomplish the
items set forth below shall be considered part of this scope of work.
We propose to furnish, install, and provide equipment necessary to complete the following work:
Install (3) - 7.5 ton Carrier Systems that have Novation condenser coils with twinned air handlers so that we can get the
tin plated evaporator coils to prevent corrosion due to H2S gas. The tin plating is not available in the larger air handlers.
Install (1) - 6 ton system with Novation condenser coils with (2) twinned 3 ton air handlers.
Both Systems will include using soft copper, painting all copper piping, and insulating both lines for extra preventafive
measures due to H2S gas.
Furniture in working areas will be relocated by Minnix and stored onsite. Furniture will also be put back in areas upon
completion.
Ceilings will be demoed and patched back in order to remove old above ceiling systems.
Scope of Work Page 1 of 1
EZ1QC - Buy Board 91812011
Contractor's Price Proposal CSI - Detail
Date: September 08, 2011
Re: IQC Master Contract #: Area I - 1 MCP - Option 1
Work Order #: 011279.00
Owner PO #:
Title: Lubbock -Water Reclamation HVAC
Contractor: Minnix Commercial Partners, LTD
Proposal Value: $57,088.30
Sect Item Modifer UOM Description Line Total
Labor Equip, Material (Excluded If marked with an X)
01 -General Requirements
1 01352 0015 HR LaborerNote: Tasks in the CTC include appropriate costs to cover labor. These $104.01
tasks will be requested specifically by the owner for miscellaneous work not
covered in the CTC,
Quantity Unit Price Factor Total
Installation 4.00 x 20.80 x 12501 = 104.01
Furniture Relocation and Put Back
Remove=2 hours
Put Back=2 hours
Subtotal for 01 - General Requirements $104.01
09 - Finishes
2 09511 0021 SF 2'x 2'x 314" Mineral Fiber Acoustical Ceiling Panels $492,04
Quantity Unit Price Factor Total
Installation 240.00 x 1.44 x 1,2501 = 432.03
Demolition 240.00 x 0.20 x 1.2501 = 60.00
3 09540 0003
SF T Bar Ceilings Suspension System 2'x 2`, Standard 15/16"
$513.04
Quantity Unit Price Factor
Total
Factor
Total
Installation 240.00 x 1.54 x 1.2501
462.04
installation x ac
3.00 13,094,80
-
1.0040
Demolition 240.00 x 0.17 x 1.2501 =
51.00
4 09925 0041
CSF Epoxy Coating, First Coat With Glove/Mift, Conduit Or Pipe
3,093.99
$143,49
1:...50000012
Quantity Unit Price Factor
Total
$12,626,01 ,
Installation 3.00 x 36.26 x 1.2501
143,49
Total
Subtotal for 09 - Finishes
NPP
Installation 1,00 x 11,594.68 x
$1,148.57
15 - Mechanical
i
Demolition 1.00 x 1,031.33 x
5 15000 0011
R._
E4 7.5 Ton Carrier System with Novation Tin Plated Cndensor Coils with
$42,378.39
Twinned Air Handlers
'
Quantity Unit Price '
Factor
Total
installation x ac
3.00 13,094,80
-
1.0040
39,284.40
Demolition 3.00 z 1,031,33 x
1.0000 =
3,093.99
1:...50000012
Fes. 6 Tan Unit with Novation Condensing Coil Twinned with two 3 ton Air Handlers
$12,626,01 ,
Quantity Unit Price
Factor
Total
NPP
Installation 1,00 x 11,594.68 x
1,0004
11,594,58
i
Demolition 1.00 x 1,031.33 x
1.0000 =
1,031.33
7 15182 0003
LF 1/2" Diameter Pipe, 112" Thick Fiberglass Insulation
$377.53
Quantity Unit Price
Factor
Total
Installation 100.00 x 3.02 x
1.2501
377.53
8 15182 0007
LF 1-1 F2" Diameter Pipe, 112" Thick Fiberglass Insulation
$453.79
Quantity Unit Price
Factor
Total
Installation 100.00 x 3.63 x
12501 =
453.79
Contractor's Price Proposal - Detail
Page 1 of 2
EZ1QC - Buy Board
91812011
Contractor's Price Proposal - Detail Continues..
Work Order Number: 011279.00
Work Order Title: Lubbock -Water Reclamation HVAC
Sect. Item Modifer UOM Description Line Total
Labor Equip. Material (Excluded if marked with an X)
Subtotal for 15 - Mechanical
Proposal Total
This total represents the correct total for the proposal. Any discrepancy between line totals,
sub -totals and the proposal total is due to rounding.
The Percentage of NPP on this Proposal: 96.35%
$55,835.72
$57,088.30
Contractor's Price Proposaf - Detail Page 2 of 2
EZ1QC - Buy Board 9/812011
'Contractor's Price Proposal CSI - Summary
Date: September 08, 2011
Re: IQC Master Contract #:
Area I - 1 MCP - Option 1
Work Order #:
011279.00
Owner PO #:
Title:
Lubbock -Water Reclamation HVAC
Contractor:
Virl Commercial Partners, 'LTD
Proposal Value:
$57,088.30
01 - General Requirements
$104.01
09 - Finishes
$1,148.57
15 - Mechanical
$55,835.72
Proposal Total
$57,088.30
The Percentage of NPP on this Proposal: 96.35%
Contractor's Price Proposal - Summary Page 1 of 1
EZ1QC - Buy Board 918/2011