Loading...
HomeMy WebLinkAboutResolution - 2011-R0309 - Contract - Talon LPE - Fountain Demolition - 07/14/2011Resolution No. 2011-80309 July 14, 2011 Item No. 5.37 RESOLUTION BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK: THAT the Mayor of the City of Lubbock is hereby authorized and directed to execute for and on behalf of the City of Lubbock, Contract No. 10254 for Civic Center fountain demolition, by and between the City of Lubbock and Talon/LPE of Amarillo, Texas, and related documents. Said Contract is attached hereto and incorporated in this resolution as if fully set forth herein and shall be included in the minutes of the City Council. Passed by the City Council on July 14, 2011 k J�j TOM MARTIN, MAYOR ATTEST: Reb ca Garza, City Secretar APPROVED AS TO CO ENT: Ak _.— *6 Scott Snider, Assistant City Manager Community Services APPROVED AS TO FORM: Chad Weaver, Assistant City Attorney vw:ccdocs/RES.Contract-Talon LPE June 20, 2011 Job Order Contract: 11-10254 Resolution No. 2011—RO309 Work Order Signature Document BUYBOARD EZdQC Contract No.: Area i-1- TAL Fx� New Work Order F]Modify an Existing Work Order Work Order Number: 010743.00 Work Order Date: Work Order Title: City of Lubbock - Civic Center Fountain Demo Owner Name: City of Lubbock Contractor Name: Talon&PE Contact: John Castillo Contact: Bridger Howard Phone: No Data Input Phone: (806) 676-3815 Wont to be Performed Work to be performed as per the Final Detailed Scope of Work Attached and as per the terms and conditions of BuyBoard FZIQC Contract No Area 1-1- TAL. Brief Work Order Descriotion: Civic Center Fountain Demolition Time of Performance See Schedule Section of the Detailed Scope of Work Liquidated Damages Will apply: 0 Will not apply: a Work Order Firm Fixed Price: $148,813.35 Owner Purchase Order Number: Approvals CITY OF LUBBOCK Tom Martin, Mayor Attest: Reb&Sa Garza, City Secretary TALON/LPE BrihfJ1144ard, 1froject Manager (&b (-'VccA Wesley Everett, Director of Facilities APP AS FORM: Chad Weaver, Msistant City Attorney Work Order Signature Document Page 4 of 1 EZ1QC - Buy Board 4/17/2011 Board" eoop...rl.. Detailed5copeof Work To: Bridger Howard From: John Castillo TalcrvLPF: Gty ofLubbodc 921 N Slums Street 1625 13th St Amarillo, TX 79107 Lubbock TX 79401 (806) 676-3815 No Bata Input Date Printed: June 23, 2011 Work Order Numnber. 010743.00 Work Order Title: City of Lubbock -Civic Center Fountain Derno Brief Sc": Civic Center Fountain DernoMon 1-1 Preliminary E]Revised Q Final The following items detail the scope ofwork asdiscussed atthe site. All requirements necessary to accomplish the itefm set forth below shall be considered part of this scope ofwerk. SOW: DemclEtlon of Fountain Inside Civic Center Courtyard City to Remove and Reinstall Ligt Posts per the Job Watk Thru. Baddill sand will be compacted utIWrq ongth equipment only. Scope of Wolk Page 1 of 1 EZ1Qfr . Buy Board 812512£111 Contractor's Price Proposal CSI -Summary Date: June 23, 2011 Re: IOC Master Contract # Area 1-1- TAL Work Order It. 010743.00 Owner PO It Title: Cityol Lubbock -Civic Center Fountain Demo Contractor: TalonlLPE Proposal Value: $148,813.35 01 . General Requirements $79,560.09 02 - SRe Work $69.253.26 Proposal Total $148,813.35 Contractor's Pros Proposal -Summary Page 1 of 1 E7fQC - SW Board 6/2312011 Contractor's Price Proposal CSI -Detail Date: Jure 23, 2011 Re. 10C Master Contract t# Area 1-1- TAL Work Order #. 010743.00 Owner PO #. Title: City of Lubbock -Civic Center Fountain Demo Contractor, TalonlLPE Proposal Value: $148,813.35 Sect. Item Modrer UDM Description Lina Total Labor Equip. Material (Excluded If marked with an X 01- General Requirements 1 01560 0019 LF Temporary 8' High Chain Link Fence And Posts, Up To 6 Months $768.00 Quantity UnitPno° Factor Total Installation 24000 x 256 x 12500 e 766-00 2 01590 0232 VVK 1,500 LB Capacity, 60' Wide, SlddSteer Loader (Bobcat) Nth Full -Time $12,378.68 Operator Quantity UnitPrice Factor Total Installation 600 x 1,650.49 x 1.2500 a 12,378.68 3 01590 0241 VW Hydraulic dammer Attachment For Skid -Steer Loaders $3,156.15 Quantity UrvtPdoe Factor Total Installation 6.00 x 420.82 x 1.2500 3,156.15 4 01590 0324 VW 1,000 Ft -Lb Hydraulic Hammer Attachment For Hydraulic Excavators $7.066.35 Quantity UnitPnce Factor Total InstallationB.oB x 942.18 x 1.2500 - 7,066.35 5 01590 0346 VW 35001E Mini -Excavator Wth Full -Time Operator, Bobcat 3220r323 $14,021.93 Quantity Url}Prloa factor Total Instaliabon 6,00 x.. 1,869.59 x 12500 14,021.93 8 01590 0368 VX 1-1f2 CY, 24' BuckK 16-66" Deep, 90 HP, Loader -Backhoe With Full -Time $16,275.60 Operator Quantity UnitPdea Factor Total Installation 6.00 x 2,170.08 x 1.2500 16.275.60 Batldloe with concrete breaker needed to break concrete at bottom of fountain trenches 7 01590 0381 VW 3-112 CY, 198 HP, Heavy Duty Construction Loader Wth Full-T]mepperator $25,893.38 Quantity Unit Pdce Factor Total Installation 6.00 x 3,452.45 x 1.2500 - 25,893-38 Subtotal for 01 - General Regtirements $79,560.09 02 - Site Work 8 02112 0091 CF Demo Reinforced Concrete Budding Foundation $44,460.00 Quantity UnllPdbe Factor Total installation 9.120-00 x 3.90 x 1.2500 - 44,460.00 9 02112 0131 CF Elevated Concrete BeamlSlablStepsRemoval, Reinforced $1,628.78 Quantity UnitPncrf Factor Total Installation 38100 x 3.42 x 1.2500 1,628.78 10 02119 0012 GYM Hauling >l0 To 15 Miles $3,356.89 Quantity UnitPnce Factor Total Installation 5,067.00 x 0.53 x 1.2500 - 3,356.89 Contractor's Price Proposal - Detail Page 1 of 2 EMC - BW Board 612312011 Contractol'sPrice Proposal- DetailContinues- WorkOrder Number. 010743.00 Work Order Title: City of Lubbock - Civic Center Fountain Demo Sect. Item Modifier UOM Description Line Total Labor Equip. Material (Excluded If marked with an X 02 - Site work 11 02205 0007 GY Spreading, Shaping. and Rough Grading Imported or Stockpiled Material for $1.400-65 Bulk Excaratlon by Machine Quantity UnitPdce Factor Total Installation 514.00 x 2.18 x 1.2500 - 1,400.65 To Include haddill ing fountain trenches and building(2) di it. ramps i n order to transport matedal out of courtyard area 12 02205 01120 CY Loading Excess Material For Removal From Bulk Excavation $1,051.31 Quantity United® Factor Total Installation 315.00 x 2.67 x 1.2500 - 1,051.31 13 02210 0013 CY Relocating On Site Excavated Material From Excavation For Building $2,283.75 Foundations and Other Structures Over 309 to 500' Quantity Un1lPnoa Factor Total Installation 630.00 x 2,90 x 1.2500 2,283.75 14 92MOD 0013 0093 For Quantities> 250 To 500 (> 192 To 382 M3� Add $173.25 Quantity UnitPdoe Factor Total Installation 315.00 x 0.44 x 1.2500 173.25 15 02210 0018 CY BacldillinglAmund Building Foundations And Other Structures By Hydrauikc $1,229.10 Euxoator, Badihoe, loader Quantity UnI1Pnca Factor Total Installation 408.00 x 2.41 x 1,2500 - 1,229.10 16 02MOD 0018 0093 For CuanhUes r 250 To 500 (> 192 To 382 M3 ), Add $183.60 Quantity UnitPdce Factor Total Installa8an 408.01] x 0.36 x 1.2500 - 183.60 17 02213 0003 CY Sand. Washed $12,997.78 Quantity UnitPrice Factor Total Installation 514A0 x 20.23 x 1.2500 - 12,997.18 18 02820 0050 MSF Bemludas Sod, Under 1,000 SF, On Laval Ground $488.15 Quantity UnilPdce Factor Total Installation 0.64 x 610.19 x 1.2500 - 488.15 Gress will be disturbed at material tanfer location Subtotal for 02 - Site Work $69,253.26 Proposal Total $148.813.35 This total represents Ne correct total for Bre proposal. Any discrepancy between Il no totair, sub -totals and the proposal total is due to rounding. Contractor's Price Proposal - Detail Page 2 of 2 FZJQC -Buy Board 612312011