HomeMy WebLinkAboutResolution - 2011-R0309 - Contract - Talon LPE - Fountain Demolition - 07/14/2011Resolution No. 2011-80309
July 14, 2011
Item No. 5.37
RESOLUTION
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK:
THAT the Mayor of the City of Lubbock is hereby authorized and directed to
execute for and on behalf of the City of Lubbock, Contract No. 10254 for Civic Center
fountain demolition, by and between the City of Lubbock and Talon/LPE of Amarillo,
Texas, and related documents. Said Contract is attached hereto and incorporated in this
resolution as if fully set forth herein and shall be included in the minutes of the City
Council.
Passed by the City Council on July 14, 2011
k J�j
TOM MARTIN, MAYOR
ATTEST:
Reb ca Garza, City Secretar
APPROVED AS TO CO ENT:
Ak
_.—
*6
Scott Snider, Assistant City Manager
Community Services
APPROVED AS TO FORM:
Chad Weaver, Assistant City Attorney
vw:ccdocs/RES.Contract-Talon LPE
June 20, 2011
Job Order Contract: 11-10254
Resolution No. 2011—RO309
Work Order Signature Document
BUYBOARD EZdQC Contract No.: Area i-1- TAL
Fx� New Work Order F]Modify an Existing Work Order
Work Order Number: 010743.00 Work Order Date:
Work Order Title: City of Lubbock - Civic Center Fountain Demo
Owner Name: City of Lubbock Contractor Name: Talon&PE
Contact: John Castillo Contact: Bridger Howard
Phone: No Data Input Phone: (806) 676-3815
Wont to be Performed
Work to be performed as per the Final Detailed Scope of Work Attached and as per the terms and conditions of
BuyBoard FZIQC Contract No Area 1-1- TAL.
Brief Work Order Descriotion:
Civic Center Fountain Demolition
Time of Performance See Schedule Section of the Detailed Scope of Work
Liquidated Damages Will apply: 0 Will not apply: a
Work Order Firm Fixed Price: $148,813.35
Owner Purchase Order Number:
Approvals
CITY OF LUBBOCK
Tom Martin, Mayor
Attest:
Reb&Sa Garza, City Secretary
TALON/LPE
BrihfJ1144ard, 1froject Manager
(&b (-'VccA
Wesley Everett, Director of Facilities
APP AS FORM:
Chad Weaver, Msistant City Attorney
Work Order Signature Document Page 4 of 1
EZ1QC - Buy Board 4/17/2011
Board"
eoop...rl..
Detailed5copeof Work
To: Bridger Howard
From:
John Castillo
TalcrvLPF:
Gty ofLubbodc
921 N Slums Street
1625 13th St
Amarillo, TX 79107
Lubbock TX 79401
(806) 676-3815
No Bata Input
Date Printed:
June 23, 2011
Work Order Numnber.
010743.00
Work Order Title:
City of Lubbock -Civic Center Fountain Derno
Brief Sc":
Civic Center Fountain DernoMon
1-1 Preliminary E]Revised Q Final
The following items detail the scope ofwork asdiscussed atthe site. All requirements necessary to accomplish the itefm
set forth below shall be considered part of this scope ofwerk.
SOW: DemclEtlon of Fountain Inside Civic Center Courtyard
City to Remove and Reinstall Ligt Posts per the Job Watk Thru.
Baddill sand will be compacted utIWrq ongth equipment only.
Scope of Wolk Page 1 of 1
EZ1Qfr . Buy Board 812512£111
Contractor's Price Proposal CSI -Summary
Date: June 23, 2011
Re: IOC Master Contract #
Area 1-1- TAL
Work Order It.
010743.00
Owner PO It
Title:
Cityol Lubbock -Civic Center Fountain Demo
Contractor:
TalonlLPE
Proposal Value:
$148,813.35
01 . General Requirements $79,560.09
02 - SRe Work
$69.253.26
Proposal Total $148,813.35
Contractor's Pros Proposal -Summary Page 1 of 1
E7fQC - SW Board 6/2312011
Contractor's Price Proposal CSI -Detail
Date: Jure 23, 2011
Re. 10C Master Contract t#
Area 1-1- TAL
Work Order #.
010743.00
Owner PO #.
Title:
City of Lubbock -Civic Center Fountain Demo
Contractor,
TalonlLPE
Proposal Value:
$148,813.35
Sect. Item Modrer
UDM Description
Lina Total
Labor Equip. Material (Excluded If marked with an X
01- General Requirements
1 01560 0019
LF Temporary 8' High Chain Link Fence And Posts, Up To 6 Months
$768.00
Quantity UnitPno° Factor
Total
Installation 24000 x 256 x 12500 e
766-00
2 01590 0232
VVK 1,500 LB Capacity, 60' Wide, SlddSteer Loader (Bobcat) Nth Full -Time
$12,378.68
Operator
Quantity UnitPrice Factor
Total
Installation 600 x 1,650.49 x 1.2500 a
12,378.68
3 01590 0241
VW Hydraulic dammer Attachment For Skid -Steer Loaders
$3,156.15
Quantity UrvtPdoe Factor
Total
Installation 6.00 x 420.82 x 1.2500
3,156.15
4 01590 0324
VW 1,000 Ft -Lb Hydraulic Hammer Attachment For Hydraulic Excavators
$7.066.35
Quantity UnitPnce Factor
Total
InstallationB.oB x 942.18 x 1.2500 -
7,066.35
5 01590 0346
VW 35001E Mini -Excavator Wth Full -Time Operator, Bobcat 3220r323
$14,021.93
Quantity Url}Prloa factor
Total
Instaliabon 6,00 x.. 1,869.59 x 12500
14,021.93
8 01590 0368
VX 1-1f2 CY, 24' BuckK 16-66" Deep, 90 HP, Loader -Backhoe With Full -Time
$16,275.60
Operator
Quantity UnitPdea Factor
Total
Installation 6.00 x 2,170.08 x 1.2500
16.275.60
Batldloe with concrete breaker needed to break concrete at bottom of fountain trenches
7 01590 0381
VW 3-112 CY, 198 HP, Heavy Duty Construction Loader Wth Full-T]mepperator
$25,893.38
Quantity Unit Pdce Factor
Total
Installation 6.00 x 3,452.45 x 1.2500 -
25,893-38
Subtotal for 01 - General Regtirements
$79,560.09
02 - Site Work
8 02112 0091
CF Demo Reinforced Concrete Budding Foundation
$44,460.00
Quantity UnllPdbe Factor
Total
installation 9.120-00 x 3.90 x 1.2500 -
44,460.00
9 02112 0131
CF Elevated Concrete BeamlSlablStepsRemoval, Reinforced
$1,628.78
Quantity UnitPncrf Factor
Total
Installation 38100 x 3.42 x 1.2500
1,628.78
10 02119 0012
GYM Hauling >l0 To 15 Miles
$3,356.89
Quantity UnitPnce Factor
Total
Installation 5,067.00 x 0.53 x 1.2500 -
3,356.89
Contractor's Price Proposal - Detail Page 1 of 2
EMC - BW Board 612312011
Contractol'sPrice Proposal- DetailContinues-
WorkOrder Number. 010743.00
Work Order Title:
City of Lubbock - Civic Center Fountain Demo
Sect. Item
Modifier UOM Description
Line Total
Labor Equip. Material
(Excluded If marked with an X
02 - Site work
11 02205 0007
GY Spreading, Shaping. and Rough Grading Imported or Stockpiled Material for
$1.400-65
Bulk Excaratlon by Machine
Quantity UnitPdce
Factor
Total
Installation 514.00 x 2.18 x
1.2500 -
1,400.65
To Include haddill ing fountain trenches and building(2) di it. ramps i n order to transport matedal out of
courtyard area
12 02205 01120
CY Loading Excess Material For Removal From Bulk Excavation
$1,051.31
Quantity United®
Factor
Total
Installation 315.00 x 2.67 x
1.2500 -
1,051.31
13 02210 0013
CY Relocating On Site Excavated Material From Excavation For Building
$2,283.75
Foundations and Other Structures Over 309 to 500'
Quantity Un1lPnoa
Factor
Total
Installation 630.00 x 2,90 x
1.2500
2,283.75
14 92MOD 0013
0093 For Quantities> 250 To 500 (> 192 To 382 M3� Add
$173.25
Quantity UnitPdoe
Factor
Total
Installation 315.00 x 0.44 x
1.2500
173.25
15 02210 0018
CY BacldillinglAmund Building Foundations And Other Structures By Hydrauikc
$1,229.10
Euxoator, Badihoe, loader
Quantity UnI1Pnca
Factor
Total
Installation 408.00 x 2.41 x
1,2500 -
1,229.10
16 02MOD 0018
0093 For CuanhUes r 250 To 500 (> 192 To 382 M3 ), Add
$183.60
Quantity UnitPdce
Factor
Total
Installa8an 408.01] x 0.36 x
1.2500 -
183.60
17 02213 0003
CY Sand. Washed
$12,997.78
Quantity UnitPrice
Factor
Total
Installation 514A0 x 20.23 x
1.2500 -
12,997.18
18 02820 0050
MSF Bemludas Sod, Under 1,000 SF, On Laval Ground
$488.15
Quantity UnilPdce
Factor
Total
Installation 0.64 x 610.19 x
1.2500 -
488.15
Gress will be disturbed at material tanfer location
Subtotal for 02 - Site Work
$69,253.26
Proposal Total
$148.813.35
This total represents Ne correct total for Bre proposal. Any discrepancy between Il no totair,
sub -totals and the proposal total is due to rounding.
Contractor's Price Proposal - Detail Page 2 of 2
FZJQC -Buy Board 612312011