Resolution - 2011-R0235 - Change Order To Contract - Lee Lewis Construction Inc.- Replace Asphalt - 05/31/2011
Resolution No. 2011-RO235 May 31, 2011 Item No. 5.14 RESOLUTION BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK: THAT the Mayor of the City of Lubbock is hereby authorized and directed to execute for and on behalf of the City of Lubbock, Change Order No. 1 to that certain Contract No. 9770 by and between the City of Lubbock and Lee Lewis Construction, Inc., for replacement of asphalt paving with six inch concrete, and related documents. Said Change Order No. 1 is attached hereto and incorporated in this resolution as if fully set forth herein and shall be included in the minutes of the City Council. Passed by the City Council on May 31, 2011 TOM MARTIN, MAYOR ATTEST: Rebe a Garza, City Secreta APPROVED AS TO CONTENT: 0 CU�� Wes Everett, Director of Facilities APPROVE AS TO FORM: Chad Weaver, Assistant City Attorney vw:ccdocs/RES.ChgOrd#1 Contract -Lee Lewis Construction, Inc. May 16, 201 1 r CITY OF LUBBOCK CHANGE ORDER Change Order #: p I Contractor: , Lee Lewis Construction, Inc, ,Date: 05/10/11 RFI'# 117-14 l -MA Contract #: 9770 Project Name: Fire Station #16 "Change Order" means a written order to a Contractor executed by the Owner in accordance with the contract authorizing an addition to, deletion form, or adjustment or revision of the requirements of the contract documents, or an adjustment to the compensation payable to Contractor, or to the time for performance of the contract and completion of the Project, or a combination thereof, which does not alter the nature of the (hing.to he constructed and is an integral pant of the project objective. Adjustments to "Estimated Quantities" to a line item in a Unit Price contract do not require a Change Order. All work that alters the nature of the thing to be constructed or that is not an integral part of the proiect objective must be let out for public bid. Description of change (alteration, deviation, addition, or deletion) caused by conditions encountered during construction not covered by the specifications and drawings of the project fartath additional pages if necessary): t. CCR#2 Replace approximately 18,000 sq -ft of 2" ILD asphalt paving with 6" $50„578.00 concrete. 2 Total extra days Requested: 0 n1a TOTAL $50,578.00 Where the Change Order is negotiated, the Change Order must be fully documented and itemized as to costs, including material quantities, material costs. taxes, insurance, employee benefits, other related costs, profit and overhead. Where certain unit prices are contained in the initial contract, no deviations are allowed in computing negotiated change order costs. ITEMIZED COSTS MUST BE FULLY DOCUMENTED AND ATTACHED TO THIS FORM.. ITEM DESCRIPTION AMOUNT A. ORIGINAL CONTRACT VALUE: $1,725,000.00 B. AMOUNT OF THIS CHANGE ORDER: cu mn approval required haver SZS,EX10 , a. C. PERCENT OF CONTRACT VALUE THIS CHANGE ORDER (B/A): D. AMOUNT OF PREVIOUS CHANGE ORDERS: $0.00 E. TOTAL AMOUNT OF ALL CHANGE ORDERS (B+D): $_50,578.00 F. PERCENT OF CONTRACT OF ALL CHANGE ORDERS (E/A).25% MaAiinum ` a G. NEW CONTRACT AMOUNT (A+E): $1,775,578.00 It is mutually agreed that the above dollar amount and the time extension, as applicable, as set forth in this Change Order constitutes full compensation to the Contractor for all costs, expenses and damages to the Contractor, whether direct, consequential or otherwise, in anyway incident to, or arising out of or resulting directly or indirectly; from the work performed or modified by the Contractor under this Ch. age Order. a e r is not vali without the followin si atures lease sin in order nd ret ra 3 ori 'nals t Part r ant fanet erareret L)e ✓amen✓ s f i) CON cwr&wDate; (2) PR Vf CH fI E IENGRiEER Date Approved j s t C t App ai OF q OWNER'SREPRESENTATIVE Dale () rN Y �Ir 5 f7�ao�r (5) cAprrAll PROIEcTs MANAGER Dam (6) P RCHAS G AND NTRACT MANAGER Date Change Orders over $2500 require a Contract Cover 5heel and rhe following signatures: crt�r tFlti +f'�iss 5 / 31 / 11 A 5/31/11 (7) MAYOR i7atc (B) S ' -lil i ARY hate Council Date: MaY 31 s 2011 Agenda Item It: 5.14 R -solution lt:_ . 11—R0235 PWC -045 (Rev 01108) OWNER: City of Lubbock PO Box 2000 Lubbock, TX 79457 TO: Lee Lewis Construction 7810 Orlando Ave Lubbock, TX1 79423 DATE: May 3, 2011 ARCHITECT'S PROJECT NO.: 03.8788.10 OWNER'S PROJECT NO.:9770 Please submit an itemized quotation for changes in the Contract Sum and/or Time incidental to proposed modification to the Contract Documents described herein. THIS IS NOT A CHANGE ORDER NOR A DIRECTION TO PROCEED WITH THE WORK DESCRIBED HEREIN. Description: (Written description of the work) Submitted By: Gary Dawson This change will remove all asphalt pavement from the Fire Station #16 project and replace it with an equal amount and area of concrete pavement. There will be a different paving cross section to accommodate the concrete thickness as compared to the asphalt thickness. The original section consisted of 2" of HMAC pavement over 8" of flexible base over 6" of compacted subgrade. The new concrete section will be 6" of concrete pavement over 6" of flexible base over 6" of compacted subgrade. ® Attachments: C-102 Response by Contractor: ❑ Add to Contract Sum by Change Order $ �] Deduct from Contingency $ El Attachments: Additional days requested for this CCR: clays (if no days are requested, type "0" in the blank. Initial Approval Owner's Approval Date Amarillo p 3 El Paso Las Cruces Lubbock Midland 4222 85th Street Lubbock, Texas 79423 806,4712200 Fax 806.473.3500 PARKHILLSMITH&COOPER in Resolution No. 2011—R©235 COPIES r FAX No. CONSTRUCTION ® Wes Everett, City of Lubbock 0 Stephen Schneider, Lee Lewis ® Bill Noonan CHANGE 0 Electronic File 13 Other: REQUEST PROJECT: Fire Station 16 CHANGE REQUEST NO.: 002 OWNER: City of Lubbock PO Box 2000 Lubbock, TX 79457 TO: Lee Lewis Construction 7810 Orlando Ave Lubbock, TX1 79423 DATE: May 3, 2011 ARCHITECT'S PROJECT NO.: 03.8788.10 OWNER'S PROJECT NO.:9770 Please submit an itemized quotation for changes in the Contract Sum and/or Time incidental to proposed modification to the Contract Documents described herein. THIS IS NOT A CHANGE ORDER NOR A DIRECTION TO PROCEED WITH THE WORK DESCRIBED HEREIN. Description: (Written description of the work) Submitted By: Gary Dawson This change will remove all asphalt pavement from the Fire Station #16 project and replace it with an equal amount and area of concrete pavement. There will be a different paving cross section to accommodate the concrete thickness as compared to the asphalt thickness. The original section consisted of 2" of HMAC pavement over 8" of flexible base over 6" of compacted subgrade. The new concrete section will be 6" of concrete pavement over 6" of flexible base over 6" of compacted subgrade. ® Attachments: C-102 Response by Contractor: ❑ Add to Contract Sum by Change Order $ �] Deduct from Contingency $ El Attachments: Additional days requested for this CCR: clays (if no days are requested, type "0" in the blank. Initial Approval Owner's Approval Date Amarillo p 3 El Paso Las Cruces Lubbock Midland 4222 85th Street Lubbock, Texas 79423 806,4712200 Fax 806.473.3500 Lee Lewis Construction Inc. CONST CHANGE REQUEST No. OOOOX IL TITLE: Concrete Paving DATE: 5/5/2011 PROJECT: Fire Station # 16 JOB: 01060 TO: Attn: Wes Everett CONTRACT NO: 1060-1 City of Lubbock RE: To: From: DESCRIPTION OF PROPOSAL,. To delete heavy duty asphalt and replace with concrete paving. Item Description Stack# Quantity Units 00001 Concrete Paving 1.000 Number: Unit Price Tax Rate Tax Amount Net Amount $50,578.00 0.00% $0.00 $50,578.00 Unit Cost: $50,578.00 Unit Tax: $0.00 Total: $50,578.00 APPROVAL: By: By: Wes Everett Josh Weems Date: Date: Expedition 0