HomeMy WebLinkAboutResolution - 2011-R0048 - Contract - Talon/LPE - Roof Repair At Buddy Holly Center - 01/27/2011Resolution No. 2011—R0048
January 27, 2011
Item No. 5.23
RESOLUTION
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK:
THAT the Mayor of the City of Lubbock is hereby authorized and directed to
execute for and on behalf of the City of Lubbock, Contract No. 9927 for roof repair at
Buddy Holly Center, by and between the City of Lubbock and Talon/LPE, and related
documents. Said Contract is attached hereto and incorporated in this resolution as if fully
set forth herein and shall be included in the minutes of the City Council.
Passed by the City Council on January 27, 2011
TOM MARTIN, MAYOR
ATTEST:
Reb cca Garza, City Secret
APPROVED AS TO CONTENT:
City Manager
Chief Information Officer
APPROVED AS TO FORM:
7
Chad Weaver, Assistant City Attorney
vwxcdocs/RES.Contract-Talon LPE
January 12, 2011
City of Lubbock Job Order
This Joh Order is go%erned bN "di terms and conditions of the Contract referenced below which is hereby
is}corporatecl by refers rice.
0%� ner: Wesley [;verett. Director of Facilities Management fear -- Roof Repairs at Buddy Holly Center
NJPA Contract Number: TX,04-061980-TAL, National Joint Powers alliance (NJ1'A), Indefinite Quality
Construction Contract.
Contract Joh Order Number: 11-9927-JOC
('omractor: TalonILPE
Date of Contract: September 25, 2008
Joh Order Date - January r 4, 2011
Strmmaary and Description of Staatemew of Work attached hereto: Roof Repairs at the Buddy Dolly Center
J aloas Joh U1 -der NutZahcr: 009500.30 hereto attached. and Insurance Rccluirements perExhibit A, attached.
V,aluc of Prc-1'ricud Work: S 74,993.67
Value of Non-I're-Priccd work: S 00.01)
Total Fixed PriCC stipulated SUM tear this Job Order (Joh Order Sum): $76,916.58
-Notice to Proceed Date for this Job Order: To be issued after City Council approval
Expected Completion Date for this Job Order: to be determined after City Council approval.
LiyuidartCl Damages (i f di fferent than M fOrth in Agreement): S25 per clay
Ct Nftt.AC]()R:
Faliill ,1_PI,
13": 4 ?�o�__
PkI" l t l 1ME: l;MIXil.R f.It:)WLItC)
I il I_l�' I'RC)Jlal \I,A�,'.ltiL=1Z
t (?'':11'1.1- 1 k AI)DRESS:
untivooti i_.al�tt_L1'f.
cjh Cva
CffY OF LUBBOCK,TEXAS (OWNL R)
wsr
Tom Martin, [Mayor
ATTEST:
TZehtc'a (Jtuta. (_'its Sc cr�rsary
M,,,K ,m od, l�hironnationOfficer
Work Order Signature Document
NJPA EZIQC Contract No.: TX04-061908-TAL
New Work Order Fx I Modify an Existing Work Order
Work Order Number.: 009566.30 Work Order Date:
Work Order Title: Lubbock- Buddy Holly Renovations- Roof Repai
Owner Name: City of Lubbock Contractor Name: TalonILPE
Contact: George Usenbe Contact: Bridger Howard
Phone: (806) 775-2200 Phone: (806) 676-3815
Work to be Performed
Work to be performed as per the Final Detailed Scope of Work Attached and as per the terms and conditions of
NJPA EZIOC Contract No TX04-061908-TAL.
Brief Work Order Description:
Buddy Holly Roof Repair (West Wing)
Time of Performance Estimated Start Date:
Estimated Completetion Date:
Liquidated Damages Will apply: El Will not apply: L_^ 1
Work Order Firm Fixed Price: $76,916.58
Owner Purchase Order Number:
Approvals
Owner
Date Contractor
Date
Work Order Signature Document Page 1 of 1
EZ1QC - Southwest 1{412411
�tQC
Detailed Scope of Work
To: Bridger Howard From:
George Lisenbe
Talon/LPE
City of Lubbock
921 N Bivins Street
1625 13th Street, Room 204
Amarillo, TX 79107
Lubbock„ TX 79457
(806) 676-3815
(806) 775-2200
Date Printed: January 04, 2011
Work Order Number: 009566.30
Work Order Title: Lubbock- Buddy Holly Renovations- Roof Repai
Brief Scope: Buddy Holly Roof Repair (West Wing)
❑
Preliminary
1-1
Revised
FX I
Final
The following items detail the scope of work as discussed at the site. All requirements necessary to accomplish the
items set forth below shall be considered part of this scope of work.
SOW. Buddy Holly Roof Repair (West Wing)
1. Remove 3 rows of tile at the built in gutter assembly, roof to wall, chimney and penetration conditions and dormer
within the West side of the courtyard.
2. Replace Deteriorated wood runners and nailers as required (per unit prices).
3. Remove the underlayment at these areas only, not throughout the entire roof area.
4. Install new underlayment as specified (in repair areas).
5. Install new built in gutter "Hyioad CTEM" liner. Adhere and heat weld as specified.
6. Install new 16 oz. copper J -gutter trim mold at all roof to wall locations.
7. Install new ice and water barrier at roof to wall conditions, built in gutter, chimney flashing and penetration locations.
8. Cut a new reglet and install a new 2 piece 16 oz, copper counter flashing assembly.
9. Reinstall tile members as required.
10. Provide and install approximately 4 S.Q. of new tile members.
11. Replace all broken and missing tiles.
12. Provide 2 year contractor warranty covering materials and workmanship.
13. All tile to reamin on the roof.
Scope of Work Page 1 of 2
EZ1QC - Southwest 1/412011
Detailed Scope of Work Continues..
Work Order Number: 009666.30
Work Order Title: Lubbock- Buddy Holly Renovations- Roof Repai
Contractor
Owner
Date
D ate
Scope of Work Page 2 of 2
EZIQC - Southwest 1r4/201 1
Contractor's Price Proposal - Summary
Date: January 04, 2011
Re: IQC Master Contract #:
TX04-061908-TAL
Worts Order #:
oos56e.3o
Owner PO #:
Title:
Lubbock- Buddy Holly Renovations- Hoof Repai
Contractor:
Talon/LPE
Proposal Value:
$76,916.58
Section - 01
$41,445.05
Section - 02
$698.03
Section - 07
$34,773.50
Proposal Total
$76,916.58
Thisl total represents the correct total for the proposal. Any discrepancy between line totals,
sub -totals and the proposal total is due to rounding.
Contractor's Price Proposal - Summary Page 1 of 1
EZIQC - Southwest 1/4/2011
Contractor's Price Proposal - Detail
Date: January 04, 2011
Re: IQC Master Contract #
TX04-061908-TAL
Work Order #:
009566.30
Owner PO #:
Title:
Lubbock- Buddy Holly Renovations- Roof Repai
Contractor:
Talon/LPE
Proposal Value:
$76,916.58
Sect. Item Mod.
UOM Description
Line Total
Labor Equip. Material (Excludes)
Section - 01
1 01320 0003
EA 3-112" x 5" Color Print Photograph
$88.57
Quantity Unit Price
Factor
Total
Installation 50.00 X 1.37 x
1,2930
88.57
2 01352 0027
HR Roofer, Tile/SlateNote: Line items in the CTC include appropriate costs to cover
$36,831.11
labor. These items will be requested specifically by the owner for miscellaneous
work not covered in the CTC.
Quantity Unit Price
Factor
Total
Installation 1,500,00 X 18.99 x
1.2930
36,831.11
Remove three rows of tole at the built in gutter assembly around the entire perimeter of the building, roof to
wall,
chimney and penetration conditions, valley locations, dormer within the courtyard, install special eave closure and
eave closure per details.
3 01590 0035
MO 60' Telescopic Boom Lift
$4,202.12
Quantity Unit Price
Factor
Total
Installation 1.00 X 3,249.90 X
1.2930
4,202.12
4 01590 0804
EA Less Than 20 Ton Move On/Off Cost, Truck Mounted Crane
$323.25
Quantity Unit Price
Factor
Total
Installation=
1.00 X 250.00 X
1.2930
323.25
Subtotal for Section - 01
$41,445.05
Section - 02
5 02845 0035
LF 2" x 4" Pressure Treated Pine
$698,03
Quantity Unit Price
Factor
Total
Installation 295 00 X 1.83 X
1.2930
698.03
Wood Nailer per A2.02
Subtotal for Section - 02
$698.03
Section - 07
6 07320 0009
SQ Two Piece Mission Tile Roofing, 192 Piece Per 50
$10,457.53
Quantity Unit Price
Factor
Total
Installation 4.00 x 1,768.60 x
1.2930
9,147.20
Demolition 15.00 x 67.56 x
1.2930 =
1,310.33
New tiles to replace broken and missing tiles in these areas
7 07533 0044
SQ 90 Mil Ballasted SBS Modified Bitumen Membrane RoofingNofe Excludes ballast.
$1,900.13
Quantity Unit Price
Factor
Total
Installation 15.00 X 86.80 X
1.2930
1,683.49
Demolition 15.00 X 11.17 x
1.2930 =
216.64
8 07590 0004
LF Heat Weld Roofing Seams For Repair
$451.00
Quantity Unit Price
Factor
Total
Installation 320.00 X 1.09 x
1.2930 =
451.60
Contractor's Price Proposal - Detail
Page 1 of 2
EZIQC - Southwest
1/4/2011
Contractor's Price Proposal - Detail Continues..
Work Order Number: 009566.30
Work Order Title: Lubbock- Buddy Holly Renovations- Roof Repai
Section - 07
9 07620 0010 SF Copper Flashing, 16 Ounce, Up To 500 SF $21,964.84
Quantity Unit Price Factor Total
Installation 1,250.00 x 12,26 x 1.2930 19,815,23
Demolition 1,250.00 x 1_33 x 1.2930 = 2,149.61
copper Flashing and drip edge, continuous copper dip
Subtotal for Section - 07 $34,773.50
Proposal Total $76,916.58
This total represents the correct total for the proposal. Any discrepancy between line totals,
sub -totals and the proposal total is due to rounding.
Contractor's Price Proposal - Detail Page 2 of 2
EZIQC - Southwest 114!2011
Subcontractor Listing
Date: January 04. 2011
Re: IQC Master Contract #:
TX04-061908-T4L
Work Order #:
009566.30
Owner PO #:
Title:
Lubbock- Buddy Holly Renovations- Roof Repai.
Contractor:
Talon/LPE
Proposal Value,
$76,916 58
Name of Contractor
Duties
Amount
No Subcontractors have been
selected for this Work Order
S'-' CIO
0 OD
Subcontractor Listing Page 1 of 1
EZIQC - Southwest 1!4!2011