Loading...
HomeMy WebLinkAboutResolution - 2012-R0042 - Contract - Minnix Commercial Partners Ltd.- Replace Overhead Door, Airfield - 01/26/2012Resolution No. 2012-R0042 January 26, 2012 Item No. 5.15 RESOLUTION BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK: THAT the acts of the Mayor of the City of Lubbock and the City Manager in executing, on behalf of the City of Lubbock, Contract No. 12-1 0476-JOC to replace steel overhead door at airfield maintenance building, by and between the City of Lubbock and Minnix Commercial Partners, Ltd., and related documents are hereby ratified in full. Said Contract is attached hereto and incorporated in this resolution as if fully set forth herein and shall be included in the minutes of the City Council. Passed by the City Council on January 26, 2012 ,/ TOM MARTIN, MAYOR ATTEST: Reba Garza, City Secretar ery (APPROVED AS TO CONTENT: Mark earw od, Assistant City Manager Chief Information Officer APPROVED AS TO FORM: Chad Weaver, Assistant City Attorney vw:ccdocs/RES.Minnix Commercial -Contract Ratification January 17, 2012 Contract No. 10476 Resolution No. 2012-80042 Work Order Signature Document BUYBOARD EQIQC Contract No.: Area 1- 1 MCP - Option 1 New Work Order F -I Modify and Existing Work Order Work Order Number: 011603.00 Work Order Date:11/04/2011 Work Order Title: City of Lubbock — Replace Steel Overhead Door at LPSIA Maintenance Building Owner Name: City of Lubbock Contractor Name: Minnix Commercial Partners, LTD. Contact: Steve Nicholson Contact: Keenan Davis Phone: (806) 775-2036 Phone: (806) 798-7335 Work to be Performed Work to be performed as per the Final Detailed Scope of Work Attached and as per the terms and conditions of BuyBoard EZIQC Contract No Area I —1 MCP — Option 1. Brief Work Order Description: Replace Steel Overhead Door at Airfield Maintenance Building Time of Performance See Schedule Section of the Detailed Scope of Work Work Order Number 011603.00 CITY OF LUBBOCK Toni Martin, Mayor Attest: Rebecca Garz City Secretary Location LPSIA Maintenance Building APPROVED AS CONTENT: d Mark earwod , Assistant City Manager Amount of Contract 79,544.48 Ke an Davis, Project Manager Minnix Commercial Partners, LTD Owner's Representative l Weslev Everett, Director of Facilities APP 'ED r S TO FOR;yI: Assistant Cite Attorney Board coaPer�rr.e v���traar�y Detailed Scope of Work To: Keenan Davis Minnix Commercial Partners, LTD PO Box 64895 Lubbock, TX 79464 (806)798-7335 Date Printed: Work Order Number: Work Order Title: Brief Scope: cc:QC From: Steve Nicholson City of Lubbock - Preston Smith International Airport 5401 N Martin Luther King Blvd; Unit 389 Lubbock, TX 79403 (806) 775-2036 November 44, 2011 011603.00 City of Lubbock - Replace Steel Overhead Door Airfield Maintenance Building Replace Steel Overhead Door Airfield Maintenance Building. Preliminary ❑ Revised ❑X Final The following items detail the scope of work as discussed at the site. All requirements necessary to accomplish the items set forth below shail be considered part of this scope of work. Replace four 24'X 18' Rolling Steel Overhead 24 PSI Insulated doors with new 24'X 18' Ro9ling Steel Overhead 30 PSI Insulated doors. New 2.0 HP Gear Head Operators to handle heavier doors. Relocate one of the interior overhead doors temporarily until new doors arrive. Scope of Work Page 1 of 1 EZ1QC - Buy Board 1114/2011 Contractor's Price Proposal CSI - Summary Date: November 04, 2011 Re: iQC Master Contract #: Area l - 1 MCP - Option 1 Work Order #: 011603.00 Owner PO #: Title: City of Lubbock - Replace Steel Overhead Door Airfield Maintenance Building Contractor: Minnix Commercial Partners, LTD Proposal Value: $79,544.48 08 -Openings $79,544.48 Proposal Total $79,544.48 The Percentage of NPP on this Proposal: 94.98° Contractors Price Proposal - Summary Page 1 of 1 E7JQc - Buy Board 11/412011 Contractor's Price Proposal GSI - Detail Date: November 04, 2011 Re: IQC Master Contract #: Area I - 1 MCP - Option 1 Work Order #. 011603 00 Owner PO #: Title'. City of Lubbock - Replace Steel Overhead Door Airfield Maintenance Building Contractor: Mlnnix Commercial Partners, LTD Proposal Vatue: $79,54448 Sect. Item Modlfer UOM Description Line Total Labor Equip. Material (Excluded if marked with an X) 08 - Openings 1 08000 0002 EA 24' x 18' Insulated Rolling Steel 30 PSI Coiling Overhead Door with 2 HP Gear $75,553.513 Head Operator Quantity Unit Price Factor Total NPP Installation 4.00 x 18,257.52 x 1,0000 73.030.08 X Demolition 4.00 x 630.87 x 1.0000 2,523.48 2 08330 0212 SF Remove And Reinstall Metal Roil -up Door And Supports $399092 Quantity Unit Price Factor Total Installation 432.00 x 7.39 x 1 2501 399092 Subtotal for 08 - Openings $79,544.48 Proposal Total $79,544.48 This total represents the correct total for the proposal. Any discrepancy between line totals, sub -totals and the proposal total is due to rounding. The Percentage of NPP on this Proposal: 94.98% Contractor's Price Proposal - Detaii Page 1 of 1 EZiQC - Buy Board 11!412011