HomeMy WebLinkAboutResolution - 2025-R0258 - Change Order No. 5 To Contract 17341, ACME Electric Company, LPSIA - 06/10/2025Resolution No. 2025-R0258 Item No. 5.16 June 10, 2025 RESOLUTION BE IT RESOLVED BY THE CITY CO[JNCIL OF THE CITY OF LUBBOCK: THAT the Mayor of the City of Lubbock is hereby authorized and directed to execute for and on behalf of the City of Lubbock, Change Order No. 5 to that certain Contract No. 17341, by and between the City of Lubbock and ACME Electric Company, and related documents. Said Change Order No 5 is attached hereto and incorporated in this resolution as if fully set forth herein and shall be included in the minutes of the City Council. Passed by the City Council on __ June 10, 2025 ^ � � a �� C ISTY MA INEZ-GAR A, MAYOR PRO TEM ATTEST: C rtney Paz, City e etary APPROVED AS TO CONZ'L;NT: Kelly Cam ell, Executive Director of Aviation . .. itchell(,,Sa�ferwhi�, Firs1 Assistant City Attorney ccdocs IIIRES.ChgOrd-ACME Electric Company May 21, 2025 Office of Purchasing and Contract Management Change Order Contract No: 17341 Contractor: ACME Electric Company Change Order No: 005 Contract Title: LBB Electrical Grounding and Generator Upgrade Bid/RFP No: ITB 23-17341-TF Project No: 253.92770 "Change Order" means a HTitten order to a Contractor, executed by the Owner, in accordance with the Contract authorizing an addition to, deletion from, or adjustment or revision of the requirements of the Contract documents, or an adjustment to the compensation payable to the Contractor, or to the time for perforrr►ance of the Contract and completion of the project, or a combination thereof, which does not alter the nature of project and is an integral part of the project objective. Adjustments to "Estimated Quantities" to a line time in a Unit Price Contract do not require a Change Order. All work that alters the nature of the construction or that is not an integral part of the project objective must be let out for public bid. Description of Change (alteration, deviation, addition, or deletion) caused by conditions encountered during construction not covered by the ana a Chanee Order Items: ot cne oroiec[ �a[[acnea aaa�nona� naaes �s necessa 1. PCO # 008 - An existing panel serving the Southwest Airlines gate services was unknown and not identified to be refed in the bid documents. This item refed the existing panel from the new main switchboard to maintain power to the area. 2. PCO #009 - Additional panels were requested by the airport to be included as part of the project scope to replace existing agedloutdated panels and motor control centers that were at the end of their useful service life. This item provides new panels to be able to extend the life of the existing systems. This item will also add 276 calendar days to the construction duration to procure and install new panel equipment. New Substantial completion date will be March 16, 2026. 3. PCO #O10 - An existing panel RU-3 was unknown and needed to be reconnected to the new switchgear panel USA-1 to maintain power to the systems fed from RU-3. Where the Change Order is negotiated, the Change Order must be fully documented and itemized as to costs, including material quantities, material costs, taxes, insurance, employee benefits, other related costs, profit and overhead. Where certain unit prices are contained in the initial Contract, no deviations are allowed in computing negotiated change order costs. ITEMIZED COSTS MUST BE FULLY DOCUMENTED AND ATTACHED TO THIS FORM. ITEM DESCRIPTION AMOUNT A. ORIGINAL CONTRACT VALUE: $ 6,405,600.00 B. AMOiJNT OF THIS CHANGE ORDER: Note: Council a roval re uired if (+/_� $50,000 $352,873.63 COST CENTER: 253.92770 ACCOUNT: 9251.30000 C. PERCENT OF CONTRACT VALUE THIS CHANGE ORDER B/A 5.50% D. AMOUNT OF PREVIOUS CHANGE ORDERS: $122,229.85 E. TOTAL AMOUNT OF ALL CHANGE ORDERS B+D $475,103.48 F. PERCENT OF CONTRACT OF ALL CHANGE ORDERS E/A : 25% maximum) 7.42 % G. NEW CONTRACT AMOLINT A+E : $6,880,703.48 It is mutually agreed that the above dollar amount and the time extension, as applicable, as set forth in this Change Order constitutes full compensation to the Contractor for all costs, expenses and damages to the Contractor, whether direct, consequential or otherwise, in anyway incident to, or arising out of, or resulting directly or indirectly; from the work performed or modified by the Contractor under this Change Order. � ZB -Z/Z'r Date �a--� � �� � w (5) Capital Project Manager Date S r atc PUR-45 (Rev 082018) - 6�� aS J `� (3) Ow r's Represe tative Date (4) D� to hasing & Contract Date Orders over ��� Mayor Pro Council Date: 0,000.00 require a Con � -' `� � June 10. 2025 10/2025 Agenda Item #: 5.16 Resolution #: Date 2025-R0258 PUR-45 (Rev 0812018) _ � ACME ELECTRIC Company Proposed Change Order TITLE: PROJ ECT: TO: ATTN: PCO - 0008 - SWA 400A Panel - New conduit and wiring - PCO DATE: IPSIA - Terminal Renovations RS&H Keith Nix PCO - 0008 - SWA 400A Panel - New conduit and wiring - PCO JOB: 0008 2/7/2025 1540 Project Manager 8.65 $ 65.69 $ 568.10 Superintendent 17.30 $ 30.00 $ 518.89 Superintendent OT 0.00 $ 45.00 $ - Foreman/Journeyman 172.96 $ 30.00 $ 5,188.89 Foreman/Journeyman OT 0.00 $ 45.00 $ - Labor Burden $ 6,275.88 35% $ 2,196.56 Total Labor $ 8,472.43 Materials $ 11,915.56 Equipment $ - Cat 2 MW Gen $ - Cat (2) 1.1 MW Gen $ - Teinert $ - $ - Schedule Discount $ - Lighting $ - Deduct Seismic Testing $ - Subtotal $ 20,387.99 OH/Profit 10.00% $ 2,038.80 Bond 2.00% $ 448.54 Total $ 22,875.33 Robby Brown Date: Date: _ � Attributes 2-1/2" 2-1/2" 2-1/2" 2-1/2" 2-1/2" 12"Hx12"Wx6"D #3 Green #3/0 Brown #3/0 Gray #3/0 Orange #3/0 Yellow 2-1/2" ACME ELECTRIC Company Item Description Conduit - EMT 10' Lengths Elbow 90 Degree - EMT Coupling - EMT Set Screw Steel Connector - EMT Set Screw Steel Bushing - Plastic 105 Degree Junction Box Screw-On Cover NEMA 1- Painted Steel Wire THHN / T90 - Copper Wire THHN / T90 - Copper Wire THHN / T90 - Copper Wire THHN / T90 - Copper Wire THHN / T90 - Copper 2-Piece Strut Clamp - Universal Steel Zinc Plated Break-Apart Qty Total Mat. $ Total Labor 300 2,467.98 62.28 8 270.72 10 37 1,159.43 10.175 8 305.28 4.8 8 24.22 1.4 2 85.14 4.5 330 564.81 9.818 330 1,742.20 15.51 330 1,742.20 15.51 330 1,742.20 15.51 330 1,742.20 15.51 30 69.18 7.95 11,915.56 172.96 Request for Information / Suaplemental Instruction To: RS&H, Inc. RFI - 0014.1 From: Acme Electric Date: 2/7/2025 Project: LBB Elec Grounding/Gen Upgrades CA/RPR A/E File No: 20231874013 Reference: Contract Drawing: See attached Specification: Shop Drawing: Other: RFI Subject/Title: SWA 400A Panel - New conduit and wiring - PCO Contractor's Re4uestforlr�formation: Engineer's Response The SWA 400A panel should be integrated into the new main switchboard MSB-1. See sketch below. The existing 400A panelboard shall be fed from the spare 400A circuit breaker, and new 400A feeders. Existing feeders may be reused provided they do not need to be spliced and extended. Existing Feeders could not be reused. Attached PCO reflects the new feeder required for the panel. Architect / Enqineer's Response: New feeders proposed cost will be incorporated into next change order, Change Order #5. A/E's ResponseBy: Keith Nix Date ofResponse: 5/13/2025 _ � ACME ELECTRIC Company Proposed Change Order 009 TITLE: PCO #009 - RFP #2 - Additional Panels and MCCs DATE: 4/25/2025 PROJECT: LPSIA - Terminal Renovations JOB: 1540 TO: RS&H ATTN: Keith Nix PCO #009 - RFP #2 - Additional Panels and MCCs Project Manager 44.83 $ 65.69 $ 2,944.75 Superintendent 89.66 $ 30.00 $ 2,689.65 Superintendent OT 0.00 $ 45.00 $ - Foreman/Journeyman 800.55 $ 30.00 $ 24,016.50 Foreman/lourneyman OT 0.00 $ 45.00 $ - Labor Burden $ 29,650.90 35% $ 10,377.82 Total Labor $ 40,028.72 Materials $ 35,073.34 Equipment $ - Cat 2 MW Gen $ - Cat (2) 1.1 MW Gen $ - Teinert $ - Sq D $ 199,300.00 Schedule Discount $ - Lighting $ - Deduct Seismic Testing $ - Subtotal $ 274,402.06 OH/Profit 10.00% $ 27,440.21 Bond 2.00� $ 6,036.85 Total $ 307,879.11 Robby Brown Date: Date: _ � ACME ELECTRIC Company Material Breakout Attributes Item Descri MA1 MA2 MA3 MA4 DA2 EDA LA4 RA9 Transformer 24" H x 12" W x 6" D Junction Box Screw-On Cover No Knockouts NEMA 1- Paint 3P - Size 1 Motor Starter Factory Mounted in MCC - Single Speed Non-I 3P - Size 2 Motor Starter Factory Mounted in MCC - Single Speed Non-I 3P - Size 3 Motor Starter Factory Mounted in MCC - Single Speed Non-I MCC up to 600 Volt Power Shut Down MCC up to 600 Volt Put Into Place MCC up to 600 Volt Relocation MCC up to 600 Volt Testing 100A 30-Circuit 4-Wire Panelboard Lighting & Appliance Main Breaker Surface Mou Power Distribution Panelboard Power Shut Down Power Distribution Panelboard Put Into Place Power Distribution Panelboard Receiving and Unload Power Distribution Panelboard Testing Lighting & Appliance Panelboard Power Shut Down Lighting & Appliance Panelboard Receiving and Unload Transformer Concrete Pad Transformer Put Into Place Startup Services Coordination Study CCSI Controls Termination Allowances Extra Wire Allowace 1 1 1 1 1 1 1 1 1 11 11 9 4 4 4 4 4 2 2 2 2 2 2 2 1 1 1 1 4 7 7 Total Mat. $ Total Labor 31.5 31.5 31.5 21 10.8 8.7 8 8 19.05 1,033.34 1,500.00 7,000.00 66 45 16.00 128 32 32 32 7.5 64 8 16 8 48 16 8 4 8 8 56 28 800.55 _ � ACME ELECTRIC Company Princing Breakout + Narrative Include Temporary Generator Cost to eliminate after hours work. Adder for After Hours Adder for Temp C�en II Base Bid I I MCC (N)MA1 I I MCC (N)MA2 I I MCC (N)MA3 I I MCC (N)MA4 I I Dist. PNL (N)DA2 I I SWBD (N)EDA � � Panel (N)LA4 - Transformer - Panel (N)RA9 $ S $ $ � 17,014.50 58,984.24 $ 64,273.93 $ 70,728.22 $ 48,465.22 $ 17,818.86 $ 14,076.94 $ 16,517.20 $ 307.879.11 9� .28 .28 .28 .28 .28 $ 16,500.00 *Base Bid can not be broken out. It Includes studies, site visits for testing, and indirect labor (PM&Super). *Pricing in red can be broken out if Panel/MCCs are not needed. *The pricing above is based on 8 hour long shutdowns during working hours (8am - 5pm) *If panels need to be replaced after hours, see adder in Blue. *Acme's Superintendant indicated there may be some panels affected by the shutdowns that cannot be shut down for extended periods. The $16,500.00 included tempoaray generator to limit the power interuption to an hour or so ,vs8. *See Contractor Request for Time Extension #2 E ELE TRI� A 1�It C � Con�pany Contractor Request for Time Extension #2 April 25, 2025 To: RS&H Architects Attn: Keith Nix From: Robby Brown General Information Admin NTP Date: Construction NTP Date: Estimated Completion: Proposed Completion (original time request) Proposed Completion (new time request): Substantial Completion: Contract Days: Contract Days Used: 10/12/2023 01/08/2024 OS/02/2025 06/13/2025 03/16/2026 TBD 482 Calendar Days 475 Calendar Days Days Left until SC: 7 Calendar Days 276 days to be added to June 13, 2025 completion date. Acme Electric would like to request an additio al 276 d s to be added to the contract time. Shut Down Delay: 21 days 1. 4/10/2025 — Key player for airport could not be on hand. Shutdown had to be pushed to the next week. Acme's Superintendent indicated that even though the shutdown was only pushed for a week, the impact was really 3 weeks. This was due to the prep work going into a major shutdown being a week's worth of work and losing a week working on other non-shutdown related tasks. Pricing Request #2 — Additional MCCs and Panels: 1. Approval — 21 days? This can go along with the shutdown time extension 2. Submittals — 30 days Equipment Lead Times. 26 weeks was indicated by supplier, but I've seen orders being pushed back weeks, even months. I would like to cover ourselves and request 30 weeks. — 210 days 4. Complete shutdowns — 45 days REQUEST FOR PROPOSAL To: From: ACME Electrical Contractors RS&H. Inc. Project: LBB Electrical Grounding & Generator Upgrades Reference: Subject/Title: Contract Drawing: Specification: Shop Drawing: Other: . �-T . RFP - 002 Date: 4/15/2025 A/E File No: 2231874.012 ED101-B thru ED101-G, EP101-B thru EP101-G, EP601, EP602, EP704 Additional Electrical Panel and Motor Control Center Replacement Contract Document Clarification/Suqplement Description: As shown in the attached drawings, provide proposal to replace eight existing panel boards and motor control centers. Provide individual pricing for each panel board replacement as well as combined price to replace all eight panel boards as one lump sum amount.