HomeMy WebLinkAboutResolution - 2024-R0332 - Change Order No. 2 To Contract 16162, With Landmark Structures, LP - 07/23/2024Resolution No. 2024-R0332
Item No. 6.16
July 23, 2024
RESOLUTION
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK:
THAT the Mayor of the City of Lubbock is hen: L,� �i.ihorircd and directed to execute fo
and on behalf of the City of Lubbock, Change Order No. 02 to ::.za certain Contract No. 16167 b,
and between the City of Lubbock and Landmark Structures, LP I'Or the 3`d and 87th Street 2.0 Mc
Elevated Storage Tanks as per RFP 22-16162-TF, and related documents. Said Change Order No
02 is attached hereto and incorporated in this resolution as if fully set forth herein and shall bE
included in the minutes of the City Council.
Passed by the City Council on July 23, 2024
MARK W. MCBRAYAKMAYOR
ATTEST:
Courtney Paz, City Secretary
APPROVED AS TO CONTENT:
-4", C
Erik Xino, Assist y Manager
APPROVED AS TO FORM:
K 11i eisure, Senior Assistant City Attorney
ccdocs/RES.Chg0rd#2 -- Elevatcc
6.10.24
DocuSign Envelope ID: E4C959C9-913F-4A66-91E9-9CDB2F35143B
Office of Purchasing and Contract Management
Change Order
Contract No: 16162 Contractor": Landmark Structures, LP
Change Order No: 002 Cor.rac. Title: amd 8711' Street _'.0 tilG 1, Ln at,d Storage Tanks
Bid/RFP No: PUR-2021-16162 No 0' 1)_`41,30000
"Change Order" means a written order to a Contractor, executed by the O«.:er, t,,, deletion
from, or adjustment or revision of the requirements of the Contract documents. ..n ; justment t(, the (compensation payable to the CorlC2Ctor, or to
the time for perforniance of the Contract and completion of the project, or a .:t,nthir.aalon thereof, wl.: lr does not alter the nature of pro ::ct and is an
integral part of the project objective. Adjustments to "Estimated Quantili::,' tc::i :ine time in a Unit Pri,:,: ( 11n�r;ct do not require a Chan e Order. All
work that alters the nature of the construction or that is not an integral part of tl,e project objective mint ). '.,:t gut for public bid.
Description of Change (alteration, deviation, addition, or deletion) caused by conditions encountered during construction not covered by the
tpecifrcations and drawings of the project (attached additional pages is necessary:
Change Order 002 to Contract 16162 with Landmark Structures, LP includes Change Proposals 005 through 010, RCP-007.2, RCP-
009, and RCP-010 as documented in the attached forms.
Where thc• ('l:ange Order is negotiated, the Change Order must be fully documented and itemized as to costs, including material quantities, material
cc»'s. taz-:,. insurance, employee benefits, other related costs, profit and overhead. Where certain unit prices are contained in the initial Contract, no
deviations are allowed in computing negotiated change order costs.
ITEMIZED COSTS MUST BE FULLY DOCUMENTED AND ATTACHED TO THIS FORM.
ITEM
DESCRIPTION
AMOUNT
A.
ORIGINAL CONTRACT VALUE:
$16,428,784.24
B.
AMOUNT OF THIS CHANGE ORDER: Note: Council approval required if (+/-) $50,000
$64,053.00
COST CENTER:4545 I ACCOUNT: 92753.9241.30000
C.
PERCENT OF CONTRACT VALUE THIS CHANGE ORDER B/A
0.39%
D.
AMOUNT OF PREVIOUS CHANGE ORDERS:
$42,265.00
E.
TOTAL AMOUNT OF ALL CHANGE ORDERS (B+D)
$106,318.00
F.
PERCENT OF CONTRACT OF ALL CHANGE ORDERS (E/A): (25% maximum)
.647%
G.
NEW CONTRACT AMOUNT A+E):
$16,535,102.24
It is mutually agreed that the above dollar amount and the tirne extension, as applicable, as set forth in this Change Order constitutes full compensation
to the Contractor for all costs, expenses and damages to the Contractor, whether direct, consequential or otherwise, in anyway incident to, or arising
out of, or resulting directly or indirectly; from the work performed or modified by the Contractor under this Change Order.
This Change Order is not valid without the followine sienatures (Please sign in order and return 3 orisinals with the Contract Cover Sheet to
Purchasnap and Contract Management department):
�• Docuftned by: 5/21/2024
� Ewe �l _ 5-21-2024
ontractor � Date (_) Project Architect/Engineer Date
OF16087C Dr4C6...
3v zy S/3c /.Va�
(3) Owner's Representative Date (4) Dkctor of Purchasing & Contract Date
age <en
�f3o b-l®
(5) Capital Project anager Y Date (6) City Atto ey Date
7/23/2024 vI a 6 7/2:
Date (S City Secretary Date
Council Date: July 23, 2024 Agenda Item #: 6.16 Resolution #: 2024-R0332
PUR-45 (Rev 08/2018)
DocuSign Envelope ID: E4C959C9-913F-4A66-91E9-9CDB2F35143B
Project: 87th Street and 3rd Street 2.0 MG EST
Owner: City of Lubbock
Contractor: Landmark Structures
Project Number:
92753.9241.30000
1740/1741
Engineer: Freese and Nichols, Inc. LUB18410-B
Change Order No.: 002 Date: 5/17/2024
Make the following additions, modifications, or deletions to the Work described in the Contract Documents:
Change Order #2
Item No.
Description of Item
Days Added
Credit
Addition
Access Tube Plugs &
CP-005
Temp Transmitter
5
$12,362.00
87th and 3rd Flume
CP-006
revision
$12,300.00
3rd St Apply City
CP-007
Logos in Air
$8,400.00
87th St Business
Concrete Approach
CP-008
and Partial Driveway
$26,200.00
3rd St CMU Wall
CP-009
Modification
$6,637,00
3rd St CMU Wall
RCP-007.2
Photocell Modification
$20,545.00
87th and 3rd Pedestal
RCP-009
Blast Credit
($24,000.00)
Anti -graffiti Coating at
50th and Milwaukee
RCP-010
EST's
30
$16,609.00
Site Restoration
CP-10
Moidifications
30
($15,000.00)
($39,000.00)
$103,053.00
NET Addition
$64,053.00
The compensation in this Change Proposal is the full, complete, and final compensation for all costs the Contractor
may incur as a result of or relating to this change whether said costs are known, unknown, foreseen, or unforeseen
at this time, including without limitation, any cost for delay, extended overhead, ripple or impact cost, or any other
effect on changed or unchanged Work as a result of this Contract Amendment. The changes in Contract Times are
the complete and final adjustments for direct impacts to the ability of the Contractor to complete the Work within
the Contract Times and are the only adjustments to which the Contractor is entitled.
a Original Contract Price
b Previously Approved Change Order Amounts
c Adjusted Contract Price ( a + b )
d Change Order Amount
e Revised Contract Price ( c + d )
$16,428,784.24
$42,265.00
$16,471,049.24
$64,053.00
$16,535,102.24
DocuSign Envelope ID: E4C959C9-913F-4A66-91 E9-9CDB2F35143B
Project: 87th Street and 3rd Street 2.0 MG EST
Owner: City of Lubbock
Contractor: Landmark Structures
Engineer: Freese and Nichols, Inc.
f Percent Change to Date: 0.65%
Completion Dates: Original
Substantial h 03/02/2024
Final k 05/01/2024
Recommended by: FREESE AND NICHOLS, INC.
CkWJO 5-17-24
Name Date
Approved by: Landmark Structures
DocuSianed by:
5/20/2024
N e Date
Ds DS
Project Number:
92753.9241.30000
1740/1741
LU B 18410-B
g Change in Days this Change Order: 65
Previous Current
i 03/02/2024 j 03/21/2024
1 05/01/2024 m 07/05/2024
Approved by: CITY OF LUBBOCK
Name Date
CERTIFICATE OF INTERESTED PARTIES
FORM 1295
1of1
Complete Nos. 1 - 4 and 6 if there are interested parties.
OFFICE USE ONLY
Complete Nos. 1, 2, 3, 5, and 6 if there are no interested parties.
CERTIFICATION OF FILING
Certificate Number:
1 Name of business entity filing form, and the city, state and country of the business entity's place
of business.
2024-1176206
Landmark Structures I, LP
Fort Worth, TX United States
Date Filed:
06/17/2024
2 Name of governmental entity or state agency that is a party to the contract for which the form is
being filed.
City of Lubbock
Date Acknowledged:
3 Provide the identification number used by the governmental entity or state agency to track or identify the contract, and provide a
description of the services, goods, or other property to be provided under the contract.
RFP 22-16162-TF
87th Street and 3rd Street 2.0 MG Elevated Storage Tanks
Nature of interest
4
Name of Interested Party
City, State, Country (place of business)
(check applicable)
Controlling
I Intermediary
Icon Borrower LP
Fort Worth, TX United States
X
Lamon, Christopher
Ft. Worth, TX United States
X
Allan, Bret
Fort Worth, TX United States
X
Talley, Benjie
Fort Worth, TX United States
X
5 Check only if there is NO Interested Party. ❑
6 LINSWORN DECLARATION
My name is Chris Lamon and my date of birth is 11/29/60
1665 Harmon Road Fort Worth
Texas 76177 Tarrant
My address is
(street) (city)
(state) (zip code) (country)
I declare under penalty of perjury that the foregoing is true and correct.
Executed in Tarrant County, State of Texas on the
17 day of June , 20 24
Chris Lamon, President of Landmark r)
Structures Management Inc., General
-
Partner
Signature of authorized agent of contracting business entity
(Declarant)
Forms provided by Texas Ethics Commission www.ethics.state.tx.us Version V4.1.0.d378aba0
CERTIFICATE OF INTERESTED PARTIES
FORM 1295
1of1
Complete Nos. 1 - 4 and 6 if there are interested parties.
OFFICE USE ONLY
Complete Nos.1, 2, 3, 5, and 6 if there are no interested parties.
CERTIFICATION OF FILING
Certificate Number:
1 Name of business entity filing form, and the city, state and country of the business entity's place
of business.
2024-1176206
Landmark Structures I, LP
Fort Worth, TX United States
Date Filed:
06/17/2024
2 Name of governmental entity or state agency that is a parry to the contract for which the form is
being filed.
City of Lubbock
Date Acknowledged:
06/24/2024
3 Provide the identification number used by the governmental entity or state agency to track or identify the contract, and provide a
description of the services, goods, or other property to be provided under the contract.
RFP 22-16162-TF
87th Street and 3rd Street 2.0 MG Elevated Storage Tanks
4
Name of Interested Party
City, State, Country (place of business)
Nature of interest
(check applicable)
Controlling
Intermediary
Icon Borrower LP
Fort Worth, TX United States
X
Lannon, Christopher
Ft. Worth, TX United States
X
Allan, Bret
Fort Worth, TX United States
X
Talley, Benjie
Fort Worth, TX United States
X
5 Check only it there is NO interested Party. ❑
6 UNSWORN DECLARATION
My name is and my date of birth is
My address is
(street) (city) (state) (zip code) (country)
I declare under penalty of perjury that the foregoing is true and correct.
Executed in County, State of on the day of , 20
(month) (year)
Signature of authorized agent of contracting business entity
(Declarant)
Farms provided by Texas Ethics Commission www.ethics.state.tx.Lts Version V4.1.0.d378aba0