Loading...
HomeMy WebLinkAboutResolution - 2024-R0143 - Contract 17769, Matthews Backhoe, Inc, Coronado Apartments, 1714 East Broadway - 03/26/2024Resolution No. 2024-RO143 Item No. 5.44 March 26, 2024 RESOLUTION BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK: THAT the Mayor of the City of Lubbock is hereby authorized and directed to execute for and on behalf of the City of Lubbock, Contract No. 17769 for 1714 E. Broadway Demolition, by and between the City of Lubbock and Matthews Backhoe, Inc., of Lubbock, Texas, and related documents. Said Contract is attached hereto and incorporated in this resolution as if fully set forth herein and shall be included in the minutes of the City Council. Passed by the City Council on A TEST: Courtney Paz, City Secretary APPROVED AST 0 CONTENT: Erik Rejino, Assistant City Manager In-ufIg '11•9, 1 1 1032• •:u Amy ems, D RES.Contract-Matthews Backhoe 17769 March 26. 2024 PROPOSAL SUBMITTAL FORM LUMP SUM PROPOSAL CONTRACT DATE: I � 1(D �t .2Z4 PROJECT NUMBER: RFP 24-17769-YB 1714 E. Broadway Demo Proposal of _ called Offeror) W To the Honorable Mayor and City Council City of Lubbock, Texas (hereinafter called Owner) Ladies and Gentlemen: (hereinafter The Offeror, in compliance with your Request for Proposals for construction of the referenced project, having carefully examined the plans, specifications, instructions to offerors, notice to offerors and all other related contract documents and the site of the intended work, and being familiar with all of the conditions surrounding the construction of the intended project including the availability of materials and labor, hereby intends to furnish all labor, materials, and supplies; and to construct the project in accordance with the plans, specifications and contract documents, within the time set forth therein and at the price stated. The price to cover all expenses incurred in performing the work required under the contract documents. PROPOSED CONSTRUCTION TIME: 1. Contractors proposed CONSTRUCTION TIME for completion: TOTAL CONSECUTIVE CALENDAR DAYS: 130 (to Substantial Completion) TOTAL CONSECUTIVE CALENDAR DAYS: (to Final Completion) (not to exceed 90 consecutive calendar days to Substantial Completion / 95 consecutive Calendar days to Final Completion). Offeror hereby agrees to commence the work on the above project on a date to be specified in a written "Notice to Proceed" of the Owner and to substantially complete the project within 90 Consecutive Calendar Days with final completion within 95 Consecutive Calendar Days as stipulated in the specification and other contract documents. Offeror- hereby further agrees to pay to Owner as liquidated damages in the sum of $25.00 for each consecutive calendar day after substantial completion and liquidated damages in the sum of$25.00 for each consecutive calendar day after final completion set forth herein above for completion of this project, all as more fully set forth in the General Conditions of the Agreement. Offeror understands and agrees that this proposal submittal shall be completed and submitted in accordance with instruction number 28 of the General Instructions to Offerors. Offeror understands that the Owner reserves the right to reject any or all proposals and to waive any formality in the proposing. The Offeror agrees that this proposal shall be good for a period of sixty 60 calendar days after the scheduled closing time for receiving proposals. The undersigned Offeror hereby declares that he has visited the site of the work and has carefully examined the plans, specifications and contract documents pertaining to the work covered by this proposal, and lie further agrees to commence work on the date specified in the written notice to proceed, and to substantially complete the work on which he has proposed; as provided in the contract documents. City of Lubbock Publice Works RFP 24-17769-YB 1714 E. Broadway Demo Matthews Backhoe, Inc., Lubbock, TX Item Description Demolition of a secondary structures on a lot located at 1714 E. Broadway Ave., Lubbock, Texas. Base bid consists of the materials and labor for the demolition for the above referenced project, as specified herein. Quantity Required Unit Total (+l-) UOM Price Cost 1 EA $78,000.00 $78,000.00 Offerors are required, whether or not a payment or performance bond is required, to submit a cashier's check or certified check issued by a bank satisfactory to the City of Lubbock, or a proposal bond from a reliable surety company, payable without recourse to the order of the City of Lubbock in an amount not less than five percent (5%) of the total amount of the proposal submitted as a guarantee that offeror will enter into a contract, obtain all required insurance policies, and execute all necessary bonds (if required) within ten (10) days after notice of award of the contract to him. Enclosed with this proposal is a Cashier's Check or Certified Check Enclosed with this proposal is a Cashier's Check or Certified Chec r '� 1 � Dollars (S ) or a Proposal Bond in the sum 0f%ej3QU M jkAjj1 M ollars {$ �' 06 ), which it is agreed shall be collected and tetained by the Owner as liquidated damages in the event the proposal is accepted by the Owner and the undersigned fails to execute the necessary contract documents, insurance certificates, and the required bond (if any) with the Owner within ten (10) business days after the date of receipt of written notification of acceptance of said proposal; otherwise, said check or bond shall be returned to the undersigned upon demand. Offeror understands and agrees that the contract to be executes] by Offeror shall be bound and include all contract documents made available to him for his inspection in accordance with the Notice to Offerors. Pursuant to Texas Local Gm'ernment Code 252.013(g), a competitive sealed proposal that has been opened may not he changed for the purpose of correcting an error in the proposal price. THEREFORE, ANY CORRECTIONS TO THE PROPOSAL PRICE MUST BE MADE ON THE PROPOSAL SUBMITTAL FORM PRIOR TO PROPOSAL OPENING. (Sea] if �fferra/Clrpordtikaln)ATAS Se Offeror acknowledges receipt of the following addenda Addenda No. Date 11411.144 Addenda No. ,42 Date 1 �� 2 Addenda No. Date_ Addenda No. Date Date: i 4AUtorize Signature s r ukrhe (Printed or Typed Name) 1 Q &,c oeIn� Company ;� Address L n�CC. Lu1 boc city, County State Zip Code Telephone:( Fax: - Email: FEDERAL TAX ID or SOCIAL SECURITI No. NUNN'BE FiiYn: Woman Black American Native I-Iiti panic American Asian Pacific American Other American Contractor Acknowledgement In compliance with this solicitation, the undersigned, having examined the solicitation documents, instructions to offerors, documents associated with the request for proposals, and being familiar with the conditions to be met has reviewed the above information regarding: • Insurance Requirements • Suspension and Debarment Certification • Texas Government Code Section 2252.152 • Texas Government Code Section 2271.002 • Texas Government Code 2274 An individual authorized to bind the company must sign the following section. Failure to execute this portion may result in proposal rejection. By signing below, the terms stated have been reviewed and approved. Company Nam Signed By: Print Name and Title: 'An�,C—:CDate:— =- V(SN of ibbo k TEXAS Purchasing and Contract Management Project Summary RFP 24-17769-YB 1714 E. Broadway Demo Notice was published in the Lubbock Avalanche Journal on December 24 & December 31, 2023. Notice was published on the Purchasing Web Site under Bid Opportunities. Notice was published on the State of Texas Electronic State Business Daily. Notice was published on Bonfire.com from December 21 to January 16, 2024. 4 individuals attended the pre -proposal meeting. 52 vendors downloaded the documents using Bonfire.com. 5 vendors were notified separately. 2 vendors submitted proposals. BOND CHECK BEST RATING LICENSED IN TEXAS DATE BY: CONTRACT AWARD DATE: CITY OF LUBBOCK SPECIFICATIONS FOR 1714 E. Broadway Demo RFP 24-17769-YB CONTRACT 17769 PROJECT NUMBER: 4211.8801 Plans & Specifications may be obtained from httDs://ci-lubbock-tx.bonfirehub.com/ City of 1 ' bb o cn TEXAS CITY OF LUBBOCK Lubbock, Texas Page Intentionally Left Blank Addenda Pate Intentionally Left Blank r-&XI Lu City T E X A S ADDENDUM 1 New Safety Record Questionnaire RFP 24-17769-YB 11714 E. Broadway Demo DATE ISSUED: January 4, 2024 CLOSING: January 16, 2024 3:00 PM The following items take precedence over specifications for the above named Request for Proposal (RFP). Where any item called for in the RFP documents is supplemented here, the original requirements, not affected by this addendum, shall remain in effect. New Safety Record Questionnaire 1. New Safety Record Questionnaire All requests for additional information or clarification must be submitted in writing and directed to: Yolanda Busby City of Lubbock Purchasing and Contracts Management Office 1314 Ave K, 9th Floor Lubbock, Texas 79401 Questions may be emailed to Ybusbygmylubbock.us Questions are preferred to be posted on Bonfire: https://ci-lbbock-tx.bonfirehub.com/ THANK YOU, *d",& SW4 CITY OF LUBBOCK Yolanda Busby City of Lubbock Purchasing and Contracts Management Office It is the intent and purpose of the City of Lubbock that this request permits competitive proposals. It shall be the offeror's responsibility to advise the Director of Purchasing and Contract Management if any language_ requirements, etc., or any combinations thereof, inadvertently restricts or limits the requirements stated in this RFP to a single source. Such notification must be submitted in writing and must be received by the Director of Purchasing and Contract Management no later than five (5) business days prior to the close date. A review of such notifications will be made. Page Intentionally Left Blank City of oirLubbock ADDENDUM 2 Scope of Work, Asbestos Analysis Report & Q&A RFP 24-17769-YB 1714 E. Broadway Demo DATE ISSUED: January 9, 2024 CLOSING: January 16, 2024 3:00 PM The following items take precedence over specifications for the above named Request for Proposal (RFP). Where any item called for in the RFP documents is supplemented here, the original requirements, not affected by this addendum, shall remain in effect. Scope of Work, Asbestos Analysis Report & Q&A 1. The documents referenced in the title are attached to the addendum. All requests for additional information or clarification must be submitted in writing and directed to: Yolanda Busby City of Lubbock Purchasing and Contracts Management Office 1314 Ave K, 9th Floor Lubbock, Texas 79401 Questions may be emailed to Ybusbygmylubbock.us Questions are preferred to be posted on Bonfire: https://ci-lbbock-tx.bonfirehub.com/ THANK YOU, *d",& SW4 CITY OF LUBBOCK Yolanda Busby City of Lubbock Purchasing and Contracts Management Office It is the intent and purpose of the City of Lubbock that this request permits competitive proposals. It shall be the offeror's responsibility to advise the Director of Purchasing and Contract Management if any language requirements, etc., or any combinations thereof, inadvertently restricts or limits the requirements stated in this RFP to a single source. Such notification must be submitted in writing and must be received by the Director of Purchasing and Contract Management no later than five (5) business days prior to the close date. A review of such notifications will be made. Pate Intentionally Left Blank Scope of Work For 1714 E. Broadway Demo Remove: DEMOLITION OF ALL STRUCTURES ON LOT. THESE ARE METAL AND WOOD FRAME COMMERCIAL STRUCTURES WITH CONFIRMED ASBESTOS PRESENT. STORM CELLAR. JOB SCOPE: DEMOLISH ALL STRUCTURES, REMOVE ALL RUBBISH AND DEBRIS AND TIRES. REMOVE PAVING MATERIALS, CURBS, AND FOUNDATIONS. REMOVE ALL DEAD TREES, AND ANY TREESNEGETATION THAT HINDER DEMOLITION. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO CAP AND REMOVE ALL UTILITIES. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO CLEAR AND LEVEL GROUNDS TO PROPER DRAINAGE GRADE. IT IS THE RESPONSIBILTY OF THE CONTRACTOR TO OBTAIN DEMOLITION PERMIT AND NOTIFIY ANY REQUIRED AGENCIES PRIOR TO DEMOLITION. Leave: CLEAN AND LEVEL LOT. Page Intentionally Left Blank L A B O R AT D R I E S 2033 HERITAGE PARK ❑R, OKLAHOMA CITY, OK 73 120 1. 8 0 0. 8 2 2. 1 6 5 0 Polarized Light Microscopy Asbestos Analysis Report QuanTEM Lab No. 358988 Client: City of Lubbock -Facility Maint. Account Number: B370 Rodney Unrein 1314 Avenue K 4th Fl Date Received: 06/01/2023 Lubbock, TX 79457 Received By: Baylie Longstreth Date Analyzed: 06/06/2023 Project: Codes Department Demo Analyzed By: Cassie Sanborn Project Location: 1714 E. Broadway, Lubbock, TX Methodology: EPA/600/R-93/116 Project Number: 05312023 QuanTEM Client Color / Non -Asbestos Non Fibrous Sample ID Sample ID Composition Description Asbestos (%) Fiber (%) 001 CS-1 Homogeneous Brown Asbestos Not Present Glass Fiber 25 Tar Shingle Sand 002 CS-2 Homogeneous Brown Asbestos Not Present Glass Fiber 25 Tar Shingle Sand 003 CS-3 Homogeneous Brown Asbestos Not Present Glass Fiber 25 Tar Shingle Sand 004 CR-1 Homogeneous Brown Asbestos Not Present Glass Fiber 25 Tar Roofing Sand 005 CR-2 Homogeneous Brown Asbestos Not Present Glass Fiber 25 Tar Roofing Sand 006 CR-3 Homogeneous Brown Asbestos Not Present Glass Fiber 25 Tar Roofing Sand 007 RF-1 Homogeneous Black Asbestos Present NA Tar Roofing Chrysotile 10 Binder Unless otherwise noted, upon receipt the condition of the sample was acceptable for analysis. QuanTEM is a NVLAP accredited Testing PLM laboratory (Lab Code: 101959-0). This report relates only to the specific items tested. NVLAP accreditation applies only to analysis performed utilizing EPA-40 CFR Appendix E to Subpart E of Part 763 and EPA/600/R-93/116 methods. This report may not be used to claim product endorsement by NVLAP or any agency of the US Government. This report may not be reproduced except in full, without the written approval of the laboratory. Page 1 of 11 L A B O R AT D R I E S 2033 HERITAGE PARK ❑R, OKLAHOMA CITY, OK 73 120 1. 8 0 0. 8 2 2. 1 6 5 0 Polarized Light Microscopy Asbestos Analysis Report QuanTEM Lab No. 358988 Client: City of Lubbock -Facility Maint. Account Number: B370 Rodney Unrein 1314 Avenue K 4th Fl Date Received: 06/01/2023 Lubbock, TX 79457 Received By: Baylie Longstreth Date Analyzed: 06/06/2023 Project: Codes Department Demo Analyzed By: Cassie Sanborn Project Location: 1714 E. Broadway, Lubbock, TX Methodology: EPA/600/R-93/116 Project Number: 05312023 QuanTEM Client Color / Non -Asbestos Non Fibrous Sample ID Sample ID Composition Description Asbestos (%) Fiber (%) 008 RF-2 Homogeneous ** ** Not Analyzed Roofing Positive Stop 009 RF-3 Homogeneous ** ** Not Analyzed Roofing Positive Stop 010 SR-1 Layered Gray Asbestos Not Present Talc 3 CaCO3 Texture Paint 010a Layered White Asbestos Not Present Cellulose 10 Gypsum Sheetrock Oil SR-2 Layered Gray Asbestos Not Present Talc 3 CaCO3 Texture Paint Ol la Layered White Asbestos Not Present Cellulose 10 Gypsum Sheetrock Unless otherwise noted, upon receipt the condition of the sample was acceptable for analysis. QuanTEM is a NVLAP accredited Testing PLM laboratory (Lab Code: 101959-0). This report relates only to the specific items tested. NVLAP accreditation applies only to analysis performed utilizing EPA-40 CFR Appendix E to Subpart E of Part 763 and EPA/600/R-93/116 methods. This report may not be used to claim product endorsement by NVLAP or any agency of the US Government. This report may not be reproduced except in full, without the written approval of the laboratory. Page 2 of 11 L A B O R AT D R I E S 2033 HERITAGE PARK ❑R, OKLAHOMA CITY, OK 73 120 1. 8 0 0. 8 2 2. 1 6 5 0 Polarized Light Microscopy Asbestos Analysis Report QuanTEM Lab No. 358988 Client: City of Lubbock -Facility Maint. Account Number: B370 Rodney Unrein 1314 Avenue K 4th Fl Date Received: 06/01/2023 Lubbock, TX 79457 Received By: Baylie Longstreth Date Analyzed: 06/06/2023 Project: Codes Department Demo Analyzed By: Cassie Sanborn Project Location: 1714 E. Broadway, Lubbock, TX Methodology: EPA/600/R-93/116 Project Number: 05312023 QuanTEM Client Color / Non -Asbestos Non Fibrous Sample ID Sample ID Composition Description Asbestos (%) Fiber (%) 012 SR-3 Layered Gray Asbestos Not Present Talc 3 CaCO3 Texture Paint 012a Layered White Asbestos Not Present Cellulose 10 Gypsum Sheetrock 013 SR-4 Layered Tan Asbestos Not Present NA CaCO3 Texture Paint 013a Layered White Asbestos Not Present Cellulose 10 Gypsum Sheetrock 014 SR-5 Layered Tan Asbestos Not Present NA CaCO3 Texture Paint 014a Layered White Asbestos Not Present Cellulose 10 Gypsum Sheetrock 015 SR-6 Layered Tan Asbestos Not Present NA CaCO3 Texture Paint Unless otherwise noted, upon receipt the condition of the sample was acceptable for analysis. QuanTEM is a NVLAP accredited Testing PLM laboratory (Lab Code: 101959-0). This report relates only to the specific items tested. NVLAP accreditation applies only to analysis performed utilizing EPA-40 CFR Appendix E to Subpart E of Part 763 and EPA/600/R-93/116 methods. This report may not be used to claim product endorsement by NVLAP or any agency of the US Government. This report may not be reproduced except in full, without the written approval of the laboratory. Page 3 of 11 L A B O R AT D R I E S 2033 HERITAGE PARK ❑R, OKLAHOMA CITY, OK 73 120 1. 8 0 0. 8 2 2. 1 6 5 0 Polarized Light Microscopy Asbestos Analysis Report QuanTEM Lab No. 358988 Client: City of Lubbock -Facility Maint. Account Number: B370 Rodney Unrein 1314 Avenue K 4th Fl Date Received: 06/01/2023 Lubbock, TX 79457 Received By: Baylie Longstreth Date Analyzed: 06/06/2023 Project: Codes Department Demo Analyzed By: Cassie Sanborn Project Location: 1714 E. Broadway, Lubbock, TX Methodology: EPA/600/R-93/116 Project Number: 05312023 QuanTEM Client Color / Non -Asbestos Non Fibrous Sample ID Sample ID Composition Description Asbestos (%) Fiber (%) 015a Layered White Asbestos Not Present Cellulose 10 Gypsum Sheetrock 016 SR-7 Homogeneous Blue Asbestos Not Present Cellulose 15 Gypsum Sheetrock Paint 017 SR-8 Homogeneous Blue Asbestos Not Present Cellulose 15 Gypsum Sheetrock Paint 018 SR-9 Homogeneous Blue Asbestos Not Present Cellulose 15 Gypsum Sheetrock Paint 019 SR-10 Homogeneous Gray Asbestos Not Present Cellulose 15 Gypsum Sheetrock 020 SR-11 Homogeneous Gray Asbestos Not Present Cellulose 15 Gypsum Sheetrock Unless otherwise noted, upon receipt the condition of the sample was acceptable for analysis. QuanTEM is a NVLAP accredited Testing PLM laboratory (Lab Code: 101959-0). This report relates only to the specific items tested. NVLAP accreditation applies only to analysis performed utilizing EPA-40 CFR Appendix E to Subpart E of Part 763 and EPA/600/R-93/116 methods. This report may not be used to claim product endorsement by NVLAP or any agency of the US Government. This report may not be reproduced except in full, without the written approval of the laboratory. Page 4 of 11 L A B O R AT D R I E S 2033 HERITAGE PARK ❑R, OKLAHOMA CITY, OK 73 120 1. 8 0 0. 8 2 2. 1 6 5 0 Polarized Light Microscopy Asbestos Analysis Report QuanTEM Lab No. 358988 Client: City of Lubbock -Facility Maint. Account Number: B370 Rodney Unrein 1314 Avenue K 4th Fl Date Received: 06/01/2023 Lubbock, TX 79457 Received By: Baylie Longstreth Date Analyzed: 06/06/2023 Project: Codes Department Demo Analyzed By: Cassie Sanborn Project Location: 1714 E. Broadway, Lubbock, TX Methodology: EPA/600/R-93/116 Project Number: 05312023 QuanTEM Client Color / Non -Asbestos Non Fibrous Sample ID Sample ID Composition Description Asbestos (%) Fiber (%) 021 SR-12 Homogeneous Gray Asbestos Not Present Cellulose 15 Gypsum Sheetrock 022 FI-1 Homogeneous Tan Asbestos Not Present NA Foam Insulation Binder 023 F-2 Homogeneous Tan Asbestos Not Present NA Foam Insulation Binder 024 FI-3 Homogeneous Tan Asbestos Not Present NA Foam Insulation Binder 025 FT-1 Layered Green Asbestos Not Present NA CaCO3 Floor Tile Vinyl 025a Layered Yellow Asbestos Not Present NA Glue Mastic CaCO3 026 FT-2 Layered Green Asbestos Not Present NA CaCO3 Floor Tile Vinyl Unless otherwise noted, upon receipt the condition of the sample was acceptable for analysis. QuanTEM is a NVLAP accredited Testing PLM laboratory (Lab Code: 101959-0). This report relates only to the specific items tested. NVLAP accreditation applies only to analysis performed utilizing EPA-40 CFR Appendix E to Subpart E of Part 763 and EPA/600/R-93/116 methods. This report may not be used to claim product endorsement by NVLAP or any agency of the US Government. This report may not be reproduced except in full, without the written approval of the laboratory. Page 5 of 11 L A B O R AT D R I E S 2033 HERITAGE PARK ❑R, OKLAHOMA CITY, OK 73 120 1. 8 0 0. 8 2 2. 1 6 5 0 Polarized Light Microscopy Asbestos Analysis Report QuanTEM Lab No. 358988 Client: City of Lubbock -Facility Maint. Account Number: B370 Rodney Unrein 1314 Avenue K 4th Fl Date Received: 06/01/2023 Lubbock, TX 79457 Received By: Baylie Longstreth Date Analyzed: 06/06/2023 Project: Codes Department Demo Analyzed By: Cassie Sanborn Project Location: 1714 E. Broadway, Lubbock, TX Methodology: EPA/600/R-93/116 Project Number: 05312023 QuanTEM Client Color / Non -Asbestos Non Fibrous Sample ID Sample ID Composition Description Asbestos (%) Fiber (%) 026a Layered Yellow Asbestos Not Present NA Glue Mastic CaCO3 027 FT-3 Layered Green Asbestos Not Present NA CaCO3 Floor Tile Vinyl 027a Layered Yellow Asbestos Not Present NA Glue Mastic CaCO3 028 VF-1 Layered Tan Asbestos Not Present Cellulose 15 CaCO3 Sheet Vinyl Glass Fiber 5 Vinyl 028a Layered Brown Asbestos Not Present NA Glue Mastic 029 VF-2 Layered Tan Asbestos Not Present Cellulose 15 CaCO3 Sheet Vinyl Glass Fiber 5 Vinyl Unless otherwise noted, upon receipt the condition of the sample was acceptable for analysis. QuanTEM is a NVLAP accredited Testing PLM laboratory (Lab Code: 101959-0). This report relates only to the specific items tested. NVLAP accreditation applies only to analysis performed utilizing EPA-40 CFR Appendix E to Subpart E of Part 763 and EPA/600/R-93/116 methods. This report may not be used to claim product endorsement by NVLAP or any agency of the US Government. This report may not be reproduced except in full, without the written approval of the laboratory. Page 6 of 11 L A B O R AT D R I E S 2033 HERITAGE PARK ❑R, OKLAHOMA CITY, OK 73 120 1. 8 0 0. 8 2 2. 1 6 5 0 Polarized Light Microscopy Asbestos Analysis Report QuanTEM Lab No. 358988 Client: City of Lubbock -Facility Maint. Account Number: B370 Rodney Unrein 1314 Avenue K 4th Fl Date Received: 06/01/2023 Lubbock, TX 79457 Received By: Baylie Longstreth Date Analyzed: 06/06/2023 Project: Codes Department Demo Analyzed By: Cassie Sanborn Project Location: 1714 E. Broadway, Lubbock, TX Methodology: EPA/600/R-93/116 Project Number: 05312023 QuanTEM Client Color / Non -Asbestos Non Fibrous Sample ID Sample ID Composition Description Asbestos (%) Fiber (%) 029a Layered Brown Asbestos Not Present NA Glue Mastic 030 VF-3 Homogeneous Tan Asbestos Not Present Cellulose 15 CaCO3 Sheet Vinyl Glass Fiber 5 Vinyl 031 VF-4 Layered Green Asbestos Not Present NA CaCO3 Floor Tile Vinyl 031a Layered Tan Asbestos Not Present NA Glue Mastic 032 VF-5 Layered Green Asbestos Not Present NA CaCO3 Floor Tile Vinyl 032a Layered Tan Asbestos Not Present NA Glue Mastic 033 VF-6 Layered Green Asbestos Not Present NA CaCO3 Floor Tile Vinyl Unless otherwise noted, upon receipt the condition of the sample was acceptable for analysis. QuanTEM is a NVLAP accredited Testing PLM laboratory (Lab Code: 101959-0). This report relates only to the specific items tested. NVLAP accreditation applies only to analysis performed utilizing EPA-40 CFR Appendix E to Subpart E of Part 763 and EPA/600/R-93/116 methods. This report may not be used to claim product endorsement by NVLAP or any agency of the US Government. This report may not be reproduced except in full, without the written approval of the laboratory. Page 7 of 11 L A B O R AT D R I E S 2033 HERITAGE PARK ❑R, OKLAHOMA CITY, OK 73 120 1. 8 0 0. 8 2 2. 1 6 5 0 Polarized Light Microscopy Asbestos Analysis Report QuanTEM Lab No. 358988 Client: City of Lubbock -Facility Maint. Account Number: B370 Rodney Unrein 1314 Avenue K 4th Fl Date Received: 06/01/2023 Lubbock, TX 79457 Received By: Baylie Longstreth Date Analyzed: 06/06/2023 Project: Codes Department Demo Analyzed By: Cassie Sanborn Project Location: 1714 E. Broadway, Lubbock, TX Methodology: EPA/600/R-93/116 Project Number: 05312023 QuanTEM Client Color / Non -Asbestos Non Fibrous Sample ID Sample ID Composition Description Asbestos (%) Fiber (%) 033a Layered Tan Asbestos Not Present NA Glue Mastic 034 WT-1 Layered White Asbestos Present NA CaCO3 Wall Texture Chrysotile 2 Paint 034a Layered Tan Asbestos Not Present NA CaCO3 Wall Texture Sand Paint 035 WT-2 Layered ** ** Not Analyzed Wall Texture Positive Stop 035a Layered Tan Asbestos Not Present NA CaCO3 Wall Texture Sand Paint 036 WT-3 Layered ** ** Not Analyzed Wall Texture Positive Stop Unless otherwise noted, upon receipt the condition of the sample was acceptable for analysis. QuanTEM is a NVLAP accredited Testing PLM laboratory (Lab Code: 101959-0). This report relates only to the specific items tested. NVLAP accreditation applies only to analysis performed utilizing EPA-40 CFR Appendix E to Subpart E of Part 763 and EPA/600/R-93/116 methods. This report may not be used to claim product endorsement by NVLAP or any agency of the US Government. This report may not be reproduced except in full, without the written approval of the laboratory. Page 8 of 11 L A B O R AT D R I E S 2033 HERITAGE PARK ❑R, OKLAHOMA CITY, OK 73 120 1. 8 0 0. 8 2 2. 1 6 5 0 Polarized Light Microscopy Asbestos Analysis Report QuanTEM Lab No. 358988 Client: City of Lubbock -Facility Maint. Account Number: B370 Rodney Unrein 1314 Avenue K 4th Fl Date Received: 06/01/2023 Lubbock, TX 79457 Received By: Baylie Longstreth Date Analyzed: 06/06/2023 Project: Codes Department Demo Analyzed By: Cassie Sanborn Project Location: 1714 E. Broadway, Lubbock, TX Methodology: EPA/600/R-93/116 Project Number: 05312023 QuanTEM Client Color / Non -Asbestos Non Fibrous Sample ID Sample ID Composition Description Asbestos (%) Fiber (%) 036a Layered Tan Asbestos Not Present NA CaCO3 Wall Texture Sand Paint 037 CT-1 Layered White Asbestos Present NA CaCO3 Ceiling Texture Chrysotile 3 Paint 037a Layered Tan Asbestos Present NA CaCO3 Ceiling Texture Chrysotile 3 Gypsum Paint 038 CT-2 Layered ** ** Not Analyzed Ceiling Texture Positive Stop 038a Layered ** ** Not Analyzed Ceiling Texture Positive Stop 039 CT-3 Layered ** ** Not Analyzed Ceiling Texture Positive Stop 039a Layered ** ** Not Analyzed Ceiling Texture Unless otherwise noted, upon receipt the condition of the sample was acceptable for analysis. QuanTEM is a NVLAP accredited Testing PLM laboratory (Lab Code: 101959-0). This report relates only to the specific items tested. NVLAP accreditation applies only to analysis performed utilizing EPA-40 CFR Appendix E to Subpart E of Part 763 and EPA/600/R-93/116 methods. This report may not be used to claim product endorsement by NVLAP or any agency of the US Government. This report may not be reproduced except in full, without the written approval of the laboratory. Page 9 of 11 L A B O R AT D R I E S 2033 HERITAGE PARK ❑R, OKLAHOMA CITY, OK 73 120 1. 8 0 0. 8 2 2. 1 6 5 0 Polarized Light Microscopy Asbestos Analysis Report QuanTEM Lab No. 358988 Client: City of Lubbock -Facility Maint. Account Number: B370 Rodney Unrein 1314 Avenue K 4th Fl Date Received: 06/01/2023 Lubbock, TX 79457 Received By: Baylie Longstreth Date Analyzed: 06/06/2023 Project: Codes Department Demo Analyzed By: Cassie Sanborn Project Location: 1714 E. Broadway, Lubbock, TX Methodology: EPA/600/R-93/116 Project Number: 05312023 QuanTEM Client Color / Non -Asbestos Non Fibrous Sample ID Sample ID Composition Description Asbestos (%) Fiber (%) Positive Stop 040 WM-1 Layered 040a 041 041a Positive Stop 041b 042 Layered WM-2 Layered Layered Layered WM-3 Layered Brown Asbestos Not Present Mastic Black Asbestos Present Mastic Chrysotile 5 Brown Asbestos Not Present Mastic Mastic White Asbestos Not Present Sheetrock Brown Asbestos Not Present Mastic NA Glue CaCO3 NA Tar Glue NA Glue CaCO3 Not Analyzed Cellulose 10 Gypsum NA Glue CaCO3 Unless otherwise noted, upon receipt the condition of the sample was acceptable for analysis. QuanTEM is a NVLAP accredited Testing PLM laboratory (Lab Code: 101959-0). This report relates only to the specific items tested. NVLAP accreditation applies only to analysis performed utilizing EPA-40 CFR Appendix E to Subpart E of Part 763 and EPA/600/R-93/116 methods. This report may not be used to claim product endorsement by NVLAP or any agency of the US Government. This report may not be reproduced except in full, without the written approval of the laboratory. Page 10 of 11 L A B O R AT D R I E S 2033 HERITAGE PARK ❑R, OKLAHOMA CITY, OK 73 120 1. 8 0 0. 8 2 2. 1 6 5 0 Polarized Light Microscopy Asbestos Analysis Report QuanTEM Lab No. 358988 Client: City of Lubbock -Facility Maint. Account Number: B370 Rodney Unrein 1314 Avenue K 4th Fl Date Received: 06/01/2023 Lubbock, TX 79457 Received By: Baylie Longstreth Date Analyzed: 06/06/2023 Project: Codes Department Demo Analyzed By: Cassie Sanborn Project Location: 1714 E. Broadway, Lubbock, TX Methodology: EPA/600/R-93/116 Project Number: 05312023 QuanTEM Client Color / Non -Asbestos Non Fibrous Sample ID Sample ID Composition Description Asbestos (%) Fiber (%) 042a Layered ** ** Not Analyzed Mastic Positive Stop 042b Layered White Asbestos Not Present Cellulose 10 Gypsum Sheetrock 6/7/2023 Cassie Sanborn, Laboratory Analyst Date of Report Unless otherwise noted, upon receipt the condition of the sample was acceptable for analysis. QuanTEM is a NVLAP accredited Testing PLM laboratory (Lab Code: 101959-0). This report relates only to the specific items tested. NVLAP accreditation applies only to analysis performed utilizing EPA-40 CFR Appendix E to Subpart E of Part 763 and EPA/600/R-93/116 methods. This report may not be used to claim product endorsement by NVLAP or any agency of the US Government. This report may not be reproduced except in full, without the written approval of the laboratory. Page 11 of 11 M , f LABORATORIES www,QuanTEM.com Contact Information company- City Of Lubbock contact: Rodney Unrein Accounts: B370 SAMPtEo BY: I name: Rodney Unrein RELINQUISHED BY ASBESTOS CHAIN OF CUSTODY 2033 Heritage Park Drive, Oklahoma City, OK 73120-1502 (800) 822-1650 • (405) 755-7272 • fax: (405) 755-2059 LEGAL DOCUMENT - PLEASE PRINT LEGIBLY Project In Phone. (806) 470-4125 Pro;enName: Codes Department Demo cenphone: (806) 470-4125 Prnjecrt-a1i n 1714 E. Broadway, Lubbock, TX. e-maa: runrein(a]myLubbock.us P,njectJD: 05312023 Date 5/31/2023 P.O. Number DATE & TIME VIA -v'.23 ri�i RECEIVED BY Page 1 of 1 For b U e I Lab No. � Accept Reject Report Res ❑ QUanTEM Website Other email DATE & T( REQUESTED SERVICES (Please ❑O the Appropriate Boxes) PLM PLM TEM TEM ITURNAROU-NDTIME 8ulkAnalysis(EPA 600111-9311161 ❑ Vermiculite Attic Insulation ❑ Air-AHERA ❑ Bulk- Presence ,/AbsenceEPA600/R-93/116 ❑ Rush ❑ (EPA 600IR-04/004) ""-- 400 Pointiount ❑ Air- NIOSH 7402 ❑ Bulk -quantitative [weigh[4S]- Chatfield ❑ Same Day Other - ❑ 1000 Point Count ❑ Air-15010312 ❑ Dust- Presence / Absence ❑ 24 - Hour ❑ Gravimetric Preparation P'CM Ell Rrinking Waler-EPA 100.2 Dust -quantitative Ifiberslsq cm]-ASTM D5755 El 3 - Day SATURDAY SAMPLE DELIVERY -CALL TO SCHEDULE 0 Use this address for Saturday Wiveryonly- 4220N. Santa FeAve.,Oklahoma City, OK73105-8517 0 Mark Package 'Hold for Saturday Pickup G" LABORATORIES www.QttanTEM.com Project Information comp—y: City Of Lubbock ASBESTOS CHAIN OF CUSTODY 2033 Heritage Park Drive, Oklahoma City, OK 73120-7502 (800) 822-1650 • (405) 755-7272 . Fax: (405) 755-2058 LEGAL DOCUMENT - PLEASE PRINT LEGIBLY Page 2 of 1 �Fo, n Lab Reject Project Name: Codes Department Demo I Protect Location: 1714 E. Broadway, Lubbock, TX. No. Sample ID (10 characters Max) 1 f To Be Color Analyzed Description Volume/ Area (asapplicable) Comments / Notes 11 12 SR-2 SR-3 ❑ ❑ 1 _ 13 SR-4 ❑✓ Tan Sheetrock + stop 14 SR-5 ❑ is SR-13 ❑ N 16 SR-7 ❑✓ Blue Sheetrock + stop SR-8 SR-9 ❑ r18 SR-10 d❑ Grey Sheetrock + stop SR-11 ❑ 21 SR-12 ❑ 1 22 FI-1 0 Tan Foam Insulation + stop 23 FI-2 ❑ _ 24 FI-3 ❑ 25 FT-1 Q Green VCT Floor Tile + stop 26 FT-2 ❑ 27 FT-3 ❑ z8 VF-1 ❑ Tan Vinyl Flooring + stop z9 VF-2 El3o VF-3 ❑ SATURDAYSAMPLEDELIVERY- CALLTIDSCHEDULE * Usethisaddressfor Saturday Deliveryonly: 4220 M Sanla Fe Ave., Oklahoma City, OK 73105-8517 • Mark Package' Hold for Saturday Pickup" GLOLABORATORIES www.QuanTEM.com Information camPny: City Of Lubbock ASBESTOS CHAIN OF CUSTODY 2033 Heritage Park Drive, Oklahoma City, OK 73120-7502 (800) 822-1650 . (405) 755-7272 . Fax: (405) 755-2058 LEGAL DOCUMENT - PLEASE PRINT LEGIBLY Pra ect Hama: Codes Department Demo Page 3 of 1 Lab No. Accept Reject P1.,:_1tncarfo 1714 E. Broadway, Lubbock, TX. No. Sample ID 00 Characters Max) b To Be Analyzed Color Description Volume/ Area tasappl(cable) Comments / Notes 31 VF-4 ❑✓ Green _ Vinyl Flooring + stop 32 VF-5 ❑ 33 VF-6 ❑ 34 WT-1 ❑d Light Tan Wall Texture + stop 35 WT-2 ❑ 36 WT-3 ❑ 37 CT-1 ❑✓ Light Green Ceiling Texture + stop 38 39 CT-2 CT-3 ❑ ❑ 1 r fV 40 WM-1 ❑✓ Brown Wallboard Mastic + stop 41 WM-2 ❑ 42 WM-3 ❑ < 43 ❑ - _ + stop 44 ❑ 45 ❑ + stop r47 El - ❑ + stop 50 ❑ SAT URDAY SAMPLE DEL IVERY-CALL TO SC HEDULE 0 Use this address for Saturday Delivery only: 4220N. Santa FeAve.,Oklahoma City, DK73105-8517 • Mark PackageHold for Saturday Pickup` INDEX 1. NOTICE TO OFFERORS 2. GENERAL INSTRUCTIONS TO OFFERORS 3. TEXAS GOVERNMENT CODE § 2269 4. PROPOSAL SUBMITTAL FORM — (must be submitted by published due date & time) 4-1. PROPOSAL SUBMITTAL FORM 4-2. SUBMITTAL OF DOCUMENTS 4-3. CONTRACTOR'S STATEMENT OF QUALIFICATIONS 5. POST -CLOSING DOCUMENT REQUIREMENTS — (to be submitted no later than seven business days after the close date when proposals are due) 5-1. FINAL LIST OF SUB -CONTRACTORS 6. PAYMENT BOND 7. CERTIFICATE OF INSURANCE 8. CONTRACT 9. GENERAL CONDITIONS OF THE AGREEMENT 10. WAGE DETERMINATIONS 11. SPECIAL CONDITIONS (IF APPLICABLE) 12. SPECIFICATIONS Page Intentionally Left Blank NOTICE TO OFFERORS Pate Intentionally Left Blank of ,rLubblock TEXAS RFP 24-17769-YB 1714 E. Broadway Demo 1. NOTICE TO OFFERORS 1.1. Offerors may submit proposals electronically by uploading required documents at the City of Lubbock's partner's website, Bonfire. This Request for Proposals is for your convenience in submitting an offer for the specified services. If submitting electronically, do not submit paper documents. If you choose to submit in hard copy, submit one original paper copy of your submittal to the office of the Director of Purchasing and Contract Management: Physical: Marta Alvarez, Director of Purchasing and Contract Management City of Lubbock 13 14 Avenue K, 9th Floor Lubbock, Texas 79401 Mailing: Marta Alvarez, Director of Purchasing and Contract Management City of Lubbock P.O. Box 2000 Lubbock, Texas 79457 MARK ENVELOPE WITH THE SOLICITATION NUMBER, TITLE, AND DUE DATE/TIME 1.2. Proposals will be opened in the office of the Director of Purchasing and Contract Management, Citizens Tower, 1314 Avenue K, Floor 9, Lubbock, Texas, 79401, and via teleconference as shown below at 3:00 PM on January 16, 2024, or as changed by the issuance of formal addenda to all planholders, to furnish all labor and materials and perform all work for the construction of the above referenced. 1.3. After the expiration of the time and date above first written, said sealed proposals will be opened in the office of the Director of Purchasing and Contract Management and publicly read aloud. Bids will be opened via teleconference if date/time stamped on or before the deadline stated at the office listed above. The Zoom meeting information is as follows: Website: https://zoom.us/j/99912268830?pwd=dE5nWERidEPJVnVtZDN6Y2RtZIRZUT09 Meeting ID: 999 1226 8830 Passcode: 1314 1.4. It is the sole responsibility of the offeror to ensure that his proposal is actually in the office of the Director of Purchasing and Contract Management for the City of Lubbock, before the expiration of the date above first written. Any proposal received after the date and hour specified will be rejected and returned unopened to the offeror. 1.5. Mailing of a proposal does not ensure that the proposal will be delivered on time or delivered at all. If offeror does not hand deliver proposal, we suggest that he/she use some sort of delivery service that provides a receipt. The City of Lubbock assumes no responsibility for errant delivery of proposals, including those relegated to a courier agent who fails to deliver in accordance with the time and receiving point specified 1.6. Although offers may be submitted electronically, hard copy proposals will be accepted in person, by United States Mail, by United Parcel Service, or by private courier service. THE CITY WILL NOT ACCEPT FAX PROPOSALS. 1.7. Proposals may be withdrawn prior to the above scheduled time set for closing. Alteration made before RFP closing must be initialed by offeror guaranteeing authenticity. 1.8. Proposals are due at 3:00 PM on January 16, 2024 and should be addressed to Marta Alvarez, Director of Purchasing and Contract Management, City of Lubbock, Texas, Citizens Tower, 1314 Avenue K, Floor 9, Lubbock, Texas, 79401. The City of Lubbock Council members will consider the proposals on TBD, at the Citizens Tower, 1314 Avenue K, Lubbock, Texas, or as soon thereafter as may be reasonably convenient, subject to the right to reject any or all proposals and waive any formalities. The successful offeror will be required to furnish a performance bond in accordance with Chapter 2253, Government Code, in the amount of 100% of the total contract price in the event that said contract price exceeds $100,000 and the successful offeror will be required to furnish a payment bond in accordance with Chapter 2253, Government Code, in the amount of 100% of the total contract price in the event that said contract price exceeds $50,000. Said statutory bonds shall be issued by a company carrying a current Best Rating of "A" or better. THE BONDS MUST BE IN A FORM ACCEPTABLE TO THE CITY ATTORNEY. NO WORK ON THE CONTRACT SHOULD COMMENCE BEFORE THE BONDS ARE PROVIDED AND APPROVED. 1.9 NOTICE TO PROCEED WILL BE ISSUED 30 DAYS FOLLOWING THE AWARD OF THE CONTRACT BY THE LUBBOCK CITY COUNCIL. 1.10. Please allow time to upload required documentation. 24hrs in advance is recommended. 1.11. Offerors are required, whether or not a payment or performance bond is required, to submit a cashier's or certified check issued by a bank satisfactory to the City of Lubbock, or a proposal bond from a reliable surety company, payable without recourse to the order of the City of Lubbock in an amount not less than 5% of the total amount of the proposal submitted as a guarantee that offeror will enter into a contract and execute all necessary bonds within ten (10) business days after notice of award of the contract to the Offeror. FAILURE OF THE OFFEROR TO INCLUDE PROPOSAL SECURITY WITH THE PROPOSAL SUBMITTAL SHALL CONSTITUTE A NON- RESPONSIVE PROPOSAL AND RESULT IN DISQUALIFICATION OF THE PROPOSAL SUBMITTAL. 1.12. Copies of plans and specifications may be obtained at bidder's expense from the City of Lubbock Purchasing and Contract Management office. Plans and specifications can be viewed online and downloaded from https://ci-lbbock-tx.bonfirehub.com/portal/ at no cost. In the event of a large file size, please be patient when downloading or viewing. BUSINESSES WITHOUT INTERNET ACCESS may use computers available at most public libraries. 1.13. It shall be each offeror's sole responsibility to inspect the site of the work and to inform Offeror regarding all local conditions under which the work is to be done. It shall be understood and agreed that all such factors have been thoroughly investigated and considered in the preparation of the proposal submitted. 2. PRE -PROPOSAL MEETING 2.10. For the purpose of familiarizing offerors with the requirements, answering questions, and issuing addenda as needed for the clarification of the Request for Proposals (RFP) documents, a non - mandatory pre -proposal conference will be held at 10:00AM, January 4, 2024, via teleconference. The Zoom meeting information is as follows: Website: hgps://zoom.us/j/91215573974?pwd=STZgTVNuSXIuMOJCK05XallUSXJCdz09 Meeting ID: 912 1557 3974 Passcode: 1314 2.11. All persons attending the meeting will be asked to identify themselves and the prospective offeror they represent. 2.12. It is the offeror's responsibility to attend the pre -proposal meeting though the meeting is not mandatory. The City will not be responsible for providing information discussed at the pre -proposal meeting to offerors who do not attend the pre -proposal meeting. Attention of each offeror is particularly called to the schedule of general prevailing rate of per diem wages included in the contract documents on file in the office of the Purchasing and Contract Management Office of the City of Lubbock, which document is specifically referred to in this notice to offerors. Each offerors attention is further directed to Texas Government Code, Chapter 2258, Prevailing Wage Rates, and the requirements contained therein concerning the above wage scale and payment by the contractor of the prevailing rates of wages as heretofore established by owner in said wage scale. 3. The City of Lubbock hereby notifies all offerors that in regard to any contract entered into pursuant to this advertisement, minority and women business enterprises will be afforded equal opportunities to submit proposals in response to this invitation and will not be discriminated against on the grounds of race, color, sex, disability, or national origin in consideration for an award. 4. The City of Lubbock does not discriminate against persons with disabilities. City of Lubbock pre -proposal meetings and proposal openings are available to all persons regardless of disability. If you require special assistance, please contact the Purchasing and Contract Management Office at (806) 775-2572 write to Post Office Box 2000, Lubbock, Texas 79457 at least 48 hours in advance of the meeting. CITY OF LUBBOCK, Marta Alvarez DIRECTOR OF PURCHASING & CONTRACT MANAGEMENT Page Intentionally Left Blank GENERAL INSTRUCTIONS TO OFFERORS 1. OFFEROR INQUIRIES AND CLARIFICATION OF REQUIREMENTS 1.1 It is the intent and purpose of the City of Lubbock that this request permits competitive proposals. It shall be the offerors responsibility to advise the Director of Purchasing and Contract Management if any language, requirements, etc., or any combinations thereof, inadvertently restricts or limits the requirements stated in this RFP to a single source. Such notification must be submitted in writing and must be received by the City Purchasing and Contract Management Office no later than five (5) calendar days before the proposal closing date. A review of such notifications will be made. 1.2 NO OFFEROR SHALL REQUEST ANY INFORMATION VERBALLY. ALL REQUESTS FOR ADDITIONAL INFORMATION OR CLARIFICATION CONCERNING THIS REQUEST FOR PROPOSALS (RFP) MUST BE SUBMITTED IN WRITING NO LATER THAN FIVE (5) CALENDAR DAYS PRIOR TO THE PROPOSAL CLOSING DATE AND ADDRESSED TO: Yolanda Busby, Buyer 11 City of Lubbock Purchasing and Contract Management Office 1314 Avenue K, Floor 9, Lubbock, Texas, 79401 Fax: 806-775-2164 Email: YBusby2mylubbock.us Website: https:%/ci/ci-lubbock-tx.bonfirehub.com/portal/ 2. TIME AND ORDER FOR COMPLETION 2.1 The construction covered by the contract documents shall be substantially completed within 90 Consecutive Calendar Days from the date specified in the Notice to Proceed issued by the City of Lubbock to the successful offeror. 2.2 The Contractor will be permitted to prosecute the work in the order of his own choosing, provided, however, the City reserves the right to require the Contractor to submit a progress schedule of the work contemplated by the contract documents. In the event the City requires a progress schedule to be submitted, and it is determined by the City that the progress of the work is not in accordance with the progress schedule so submitted, the City may direct the Contractor to take such action as the City deems necessary to ensure completion of the project within the time specified. 2.3 Upon receipt of notice to proceed, and upon commencement of the work, the Contractor shall ensure daily prosecution of the work is conducted every business day until the work is completed, regardless if the work will be substantially or finally complete ahead of specified deadlines in the agreement, unless the City determines time off from said prosecution is necessary or reasonable and Contractor received said determination in writing from the City. Additionally, inclement weather shall be the only other reason consistent, daily prosecution of the work may not take place on those inclement weather days. 3. GUARANTEES 3.1 All equipment and materials incorporated in the project and all construction shall be guaranteed against defective materials and workmanship. Prior to final acceptance, the Contractor shall furnish to the Owner, a written general guarantee which shall provide that the Contractor shall remedy any defects in the work, and pay for any and all damages of any nature whatsoever resulting in such defects, when such defects appear within One year from date of final acceptance of the work as a result of defective materials or workmanship, at no cost to the Owner (City of Lubbock). 3.2 Notwithstanding any provisions contained in the contractual agreement, the Contractor represents and warrants fault -free performance and fault -free result in the processing date and date -related data (including, but not limited to calculating, comparing and sequencing) of all hardware, software and firmware products delivered and services provided under this Contract, individually or in combination, as the case may be from the effective date of this Contract. Also, the Contractor warrants calculations will be recognized and accommodated and will not, in any way, result in hardware, software or firmware failure. The City of Lubbock, at its sole option, may require the Contractor, at any time, to demonstrate the procedures it intends to follow in order to comply with all the obligations contained herein. 3.3 The obligations contained herein apply to products and services provided by the Contractor, its sub- contractor or any third party involved in the creation or development of the products and services to be delivered to the City of Lubbock under this Contract. Failure to comply with any of the obligations contained herein, may result in the City of Lubbock availing itself of any of its rights under the law and under this Contract including, but not limited to, its right pertaining to termination or default. 3.4 The warranties contained herein are separate and discrete from any other warranties specified in this Contract, and are not subject to any disclaimer of warranty, implied or expressed, or limitation to the Contractor's liability which may be specified in this Contract, its appendices, its schedules, its annexes or any document incorporated in this Contract by reference. 4. BASIS OF PROPOSALS AND SELECTION CRITERIA 4.1 The City uses the Competitive Sealed Proposals procurement method as authorized by the Texas Legislature and further defined by Texas Government Code Section 2269. The Maximum Point value is equal to 100 points. The weight factor is 60 points for Price, 30 points for Contractor Qualifications, and 10 points for Construction Time. The selection criteria used to evaluate each proposal includes the following: 4.1.1 60 POINTS - PRICE: The quality of Offerors is not judged solely by a low initial cost proposal or, conversely, eliminated solely because of a high initial cost proposal. The following is the formula used when determining price as a factor for construction contract proposals. The lowest proposal price of all the proposals becomes the standard by which all price proposals are evaluated. One at a time, each proposal is evaluated by taking the lowest proposal price and dividing it by the price of the proposal being evaluated. That fraction is then multiplied by the maximum point value of the price factor for the price score. For Example: (Lowest Price/Current Proposal Price) x Maximum Point Value = Price Score. 4.1.2 30 POINTS - CONTRACTOR QUALIFICATIONS: When evaluating a contractor's qualifications, the City uses the "Contractor's Statement of Qualifications" attached within, past experience with the contractor and the "Safety Record Questionnaire. The City may also interview the job superintendent at a time to be named after receipt of proposals. 4.1.3 Each evaluator assigns points based upon the responses the contractor provides in the "Contractor's Statement of Qualifications", any past experience with the contractor, and on safety record information submitted. The City may consider any incidence involving worker safety or safety of Lubbock residents, be it related or caused by environmental, mechanical, operational, supervision or any other cause or factor under the contractor's control. Evaluators base their rating primarily upon how well you document previous offenses with the date of the offense, location where the offense occurred, type of offense, final disposition of the offense, and any penalty assessed 4.1.4 The "Contractor's Statement of Qualifications" is a minimum. 4.1.4.1 You may provide additional pertinent information relevant to the project for which you are submitting this proposal in an appendix. 4.1.5 10 POINTS - CONSTRUCTION TIME: This criterion is, as with price, objective and evaluators use the following formula when determining construction time as a factor for construction contract proposals. The lowest construction time proposal of all the proposals becomes the standard by which all the construction time proposals are evaluated. One at a time, each proposal is evaluated by taking the lowest construction time and dividing it by the construction time of the proposal being evaluated. That fraction is then multiplied by the maximum point value of the construction time factor for the construction time score. For example: (Lowest construction time/Current Proposal construction time) x Maximum Point Value = Construction Time Score) 4.1.6 EVALUATION PROCESS: Evaluators independently review and score each proposal. The Committee meets, to discuss the individual scores of each evaluator. If the individual scores are similar, the Chairperson may average the scores then rank offerors accordingly. If the scores are significantly diverse, the Chairperson initiates and moderates discussion to determine the reasons for the differences and ensures that all evaluators are fully knowledgeable of all aspects of the proposals. Scores may then be adjusted by the committee based on committee discussion. 4.1.7 Please note that offerors with higher qualifications scores could be ranked higher than offerors with slightly better price scores. 4.2 The estimated budget for the construction phase of this project is $150,000.00, 4.3 Proposals shall be made using the forms provided. GENERAL INSTRUCTIONS TO OFFERORS (Continued) 5. ADDENDA & MODIFICATIONS 5.1 Any changes, additions, or clarifications to the RFP are made by ADDENDA information available over the Internet at hiips://ci-lubbock-tx.bonfirehub.com/portal/. We strongly suggest that you check for any addenda a minimum of forty-eight hours in advance of the response deadline. BUSINESSES WITHOUT INTERNET ACCESS may use computers available at most public libraries. 5.2 Any offeror in doubt as to the true meaning of any part of the specifications or other documents may request an interpretation thereof from the Director of Purchasing and Contract Management. At the request of the offeror, or in the event the Director of Purchasing and Contract Management deems the interpretation to be substantive, the interpretation will be made by written addendum issued by the Purchasing and Contract Management. Such addenda issued by the Purchasing and Contract Management Office will be available over the Internet at https://ci-lubbock-tx.bonfirehub.com/portal/ and will become part of the proposal package having the same binding effect as provisions of the original RFP. NO VERBAL EXPLANATIONS OR INTERPRETATIONS WILL BE BINDING. In order to have a request for interpretation considered, the request must be submitted in writing and must be received by the City of Lubbock Purchasing and Contract Management Office no later than five (5) calendar days before the proposal closing date. 5.3 All addenda, amendments, and interpretations of this solicitation shall be in writing. The City of Lubbock shall not be legally bound by any explanation or interpretation that is not in writing. Only information supplied by the City of Lubbock Purchasing and Contract Management Office in writing or in this RFP should be used in preparing proposal responses. All contacts that an offeror may have had before or after receipt of this RFP with any individuals, employees, or representatives of the City and any information that may have been read in any news media or seen or heard in any communication facility regarding this proposal should be disregarded in preparing responses. 5.4 The City does not assume responsibility for the receipt of any addendum sent to offerors 6. EXAMINATION OF DOCUMENTS AND REQUIREMENTS 6.1 Each offeror shall carefully examine all RFP documents and thoroughly familiarize itself with all requirements before submitting a proposal to ensure that their proposal meets the intent of these specifications. 6.2 Before submitting a proposal, each offeror shall be responsible for making all investigations and examinations that are necessary to ascertain conditions and requirements affecting the requirements of this Request for Proposals. Failure to make such investigations and examinations shall not relieve the offeror from obligation to comply, in every detail, with all provisions and requirements of the Request for Proposals. 6.3 Notices of any discrepancies or omissions in these plans, specifications, or contract documents, shall be given to the Director of Purchasing and Contract Management and a clarification obtained before the proposals are received, and if no such notice is received by the Director of Purchasing and Contract Management prior to the opening of proposals, then it shall be deemed that the offeror fully understands the work to be included and has provided sufficient sums in its proposal to complete the work in accordance with these plans and specifications. If offeror does not notify the Director of Purchasing and Contract Management before offering of any discrepancies or omissions, then it shall be deemed for all purposes that the plans and specifications are sufficient and adequate for completion of the project. It is further agreed that any request for clarification must be submitted no later than five (5) calendar days prior to the opening of proposals. 7. PROPOSAL PREPARATION COSTS 7.1 Issuance of this RFP does not commit the City of Lubbock, in any way, to pay any costs incurred in the preparation and submission of a proposal. 7.2 The issuance of this RFP does not obligate the City of Lubbock to enter into contract for any services or equipment. 7.3 All costs related to the preparation and submission of a proposal shall be paid by the offeror. 8. TRADE SECRETS, CONFIDENTIAL INFORMATION AND THE TEXAS PUBLIC INFORMATION ACT 8.1 If you consider any portion of your proposal to be privileged or confidential by statute or judicial decision, including trade secrets and commercial or financial information, clearly identify those portions. 8.2 Proposals will be opened in a manner that avoids disclosure of the contents to competing offerors and keeps the proposals secret during negotiations. All proposals are open for public inspection after the contract is awarded, but trade secrets and confidential information in the proposals are not open for inspection. Tex. Loc. Govt. Code 252.049(a) 8.3 Marking your entire proposal CONFIDENTIAL/PROPRIETARY is not in conformance with the Texas Public Information Act. 8.4 Pursuant to Section 552.234(c) of the Texas Government Code, submit your open records request using the link provided below. https:///Iubbocktx.govga.us/WEBAPP/_rs/(S(guiyirflbtihahjny^ cegwpcs))/SLipportHome.aspx 8.5 For more information, please see the City of Lubbock Public Information Act website at: https://ci.lubbock.tx.us/pa�es/public-information-act 9. LICENSES, PERMITS, Taxes 9.1 The price or prices for the work shall include full compensation for all taxes, permits, etc. that the offeror is or may be required to pay. 10. UTILIZATION OF LOCAL BUSINESS RESOURCES 10.1 Prospective offerors are strongly encouraged to explore and implement methods for the utilization of local resources, and to outline in their proposal submittal how they would utilize local resources. 11. CONFLICT OF INTEREST 11.1 The offeror shall not offer or accept gifts or anything of value nor enter into any business arrangement with any employee, official or agent of the City of Lubbock. 11.2 By signing and executing this proposal, the offeror certifies and represents to the City the offeror has not offered, conferred or agreed to confer any pecuniary benefit or other thing of value for the receipt of special treatment, advantage, information, recipient's decision, opinion, recommendation, vote or any other exercise of discretion concerning this proposal. 11.3It is not necessary to fill out the CIQ Form unless you have a business relationship that might cause a conflict of interest with the City of Lubbock 11.4 Effective January 1, 2006, Chapter 176 of the Texas Local Government Code requires that any vendor or person considering doing business with a local government entity disclose in the Questionnaire, Form CIQ, the vendor or person's affiliation or business relationship that might cause a conflict of interest with a local government entity. By law, the questionnaire must be filed with the records administrator of the City of Lubbock not later than the Seventh business day after the date the person becomes aware of the facts that require the statement to be filed. The questionnaire can be found at: hLtps://www.ethics.state.tx.us/fonns/conflict/ For the City of Lubbock, these forms should be filed with the City Secretary's Office, P.O. Box 2000, Lubbock, Texas, 79457 See Section 176.006, Local Government Code: http://www.statutes.Iegis.state.tx.us/SOTWDocs/LG/htm/LG.176.htm. A person commits an offense if the person violates Section 176.006, Local Government Code. An offense under this section is a Class C misdemeanor. 12. CONTRACT DOCUMENTS 12.1 All work covered by the contract shall be done in accordance with contract documents described in the General Conditions. 12.2 All offerors shall be thoroughly familiar with all of the requirements set forth on the contract documents for the construction of this project and shall be responsible for the satisfactory completion of all work contemplated by said contract documents. 13. CERTIFICATE OF INTERESTED PARTIES 13.1 Effective January 1, 2016, Section 2252.908, as amended, of Chapter 2252 of the Texas Government Code requires certain business entities to submit an electronic disclosure form to the Texas Ethics Commission before entering into a contract with a local government entity when any of the following apply: 1) Contract requires an action or vote by the City Council (governing body); OR 2) Contract value is $1 Million or greater; OR 3) Contract is for services that would require a person to register as a lobbyist under Chapter 305 of the Government Code. This must be done before executing the contract. The disclosure form may be found at https://www.ethics.state.tx.us/whatsnew/elf_ info_forml295.htm. You must log in and create an account the first time you fill out the form. Tutorial videos on how to log in for the first time and how to fill out the form can be found through the link above. After you electronically submit the disclosure form, a screen will come up confirming the submission and assigning a certificate number. Then, you must print the form, have an authorized agent complete the declaration and sign, and provide it to the City (scanned email copy is acceptable). 13.2 A contract described by Subsection (b) of Government Code Section 2252.908 entered into by a governmental entity or state agency is voidable for failure to provide the disclosure of interested parties required by this section only if: (1) the governmental entity or state agency submits to the business entity written notice of the business entity 's failure to provide the required disclosure; and (2) the business entity fails to submit to the governmental entity or state agency the required disclosure on or before the loth business day after the date the business entity receives the written notice under Subdivision (1). 14. PLANS FOR USE BY OFFERORS 14.1 It is the intent of the City of Lubbock that all parties with an interest in submitting a proposal on the project covered by the contract documents be given a reasonable opportunity to examine the documents and prepare a proposal without charge. The contract documents may be examined without charge as noted in the Notice to Offerors. 15. PAYMENT 15.1 All payments due to Contractor shall be made in accordance with the provisions of the General Conditions of the contract documents. 16. AFFIDAVITS OF BILLS PAID 16.1 The City of Lubbock reserves the right, prior to final acceptance of this project to require the Contractor to execute an affidavit that all bills for labor, materials and incidentals incurred in the construction of the improvements contemplated by the contract documents have been paid in full and that there are no claims pending, of which the Contractor has been notified. 17. MATERIALS AND WORKMANSHIP 17.1 The intent of these contract documents is that only materials and workmanship of the best quality and grade will be furnished. The fact that the specifications may fail to be sufficiently complete in some detail will not relieve the Contractor of full responsibility for providing materials of high quality and for protecting them adequately until incorporated into the project. The presence or absence of a representative of the City on the site will not relieve the Contractor of full responsibility of complying with this provision. The specifications for materials and methods set forth in the contract documents provide minimum standards of quality, which the Owner believes necessary to procure a satisfactory proj ect. 18. PLANS FOR THE CONTRACTOR 18.1 The contractor will, upon written request, be furnished up to a maximum of five sets of plans and specifications and related contract documents for use during construction. Plans and specifications for use during construction will only be furnished directly to the Contractor. The Contractor shall then distribute copies of plans and specifications to suppliers, subcontractors or others, as required for proper prosecution of the work contemplated by the Contractor. 19. PROTECTION OF THE WORK 19.1 The Contractor shall be responsible for the care, preservation, conservation, and protection of all materials, supplies, machinery, equipment, tools, apparatus, accessories, facilities, and all means of construction, and any and all parts of the work whether the Contractor has been paid, partially paid, or not paid for such work, until the date the City issues its certificate of completion to Contractor. The City reserves the right, after the proposals have been opened and before the contract has been awarded, to require of an offeror the following information: (a) The experience record of the offeror showing completed jobs of a similar nature to the one covered by the intended contract and all work in progress with bond amounts and percentage completed. (b) A sworn statement of the current financial condition of the offeror (c) Equipment schedule. 20. TEXAS STATE SALES TAX 20.1 This contract is issued by an organization which qualifies for exemption provisions pursuant to provisions of Article 20.04 of the Texas Limited Sales, Excise and Use Tax Act. 20.2 The Contractor must obtain a limited sales, excise and use tax permit which shall enable him to buy the materials to be incorporated into the work without paying the tax at the time of purchase. 21. PROTECTION OF SUBSURFACE LINES AND STRUCTURES 21.1 It shall be the Contractor's responsibility to prosecute the work contemplated by the contract documents in such a way as to exercise due care to locate and prevent damage to all underground pipelines, utility lines, conduits or other underground structures which might or could be damaged by Contractor during the construction of the project contemplated by these contract documents. The City of Lubbock agrees that it will furnish Contractor the location of all such underground lines and utilities of which it has knowledge. However, such fact shall not relieve the Contractor of his responsibilities aforementioned. All such underground lines or structures, both known and unknown, cut or damaged by Contractor during the prosecution of the work contemplated by this contract shall be repaired immediately by Contractor to the satisfaction of the City of Lubbock, Texas, and/or the owning utility at the Contractor's expense. 22. BARRICADES AND SAFETY MEASURES 22.1 The contractor shall, at his own expense, furnish and erect such barricades, fences, lights and danger signals, and shall take such other precautionary measures for the protection of persons, property and the work as may be necessary. The Contractor will be held responsible for all damage to the work due to failure of barricades, signs, and lights to protect it, and when damage is incurred, the damaged portion shall be immediately removed and replaced by Contractor at his own cost and expense. The Contractor's responsibility for maintenance of barricades, signs, and lights shall not cease until the date of issuance to Contractor of City's certificate of acceptance of the project. 23. EXPLOSIVES 23.1 The use of explosives will not be permitted 23.2 Explosive materials shall not be stored or kept at the construction site by the Contractor. 24. CONTRACTOR'S REPRESENTATIVE 24.1 The successful offeror shall be required to have a responsible local representative available at all times while the work is in progress under this contract. The successful offeror shall be required to furnish the name, address and telephone number where such local representative may be reached during the time that the work contemplated by this contract is in progress. 25. INSURANCE 25.1 The Contractor shall not commence work under this contract until he has obtained all insurance as required in the General Conditions of the contract documents, from an underwriter authorized to do business in the State of Texas and satisfactory to the City. Proof of coverage shall be furnished to the City and written notice of cancellation or any material change will be provided ten (10) days in advance of cancellation or change. All policies shall contain an agreement on the part of the insurer waiving the right to subrogation. The Contractor shall procure and carry at his sole cost and expense through the life of this contract, insurance protection as hereinafter specified. Coverage in excess of that specified herein also shall be acceptable. Such insurance shall be carried with an insurance company authorized to transact business in the State of Texas and shall cover all operations in connection with this contract, whether performed by the Contractor or a subcontractor, or separate policies shall be provided covering the operation of each subcontractor. A certificate of insurance specifying each and all coverages shall be submitted before contract execution. 26. LABOR AND WORKING HOURS 26.1 Attention of each offeror is particularly called to the schedule of general prevailing rate of per diem wages included in these contract documents. The wage rate that must be paid on this project shall not be less than specified in the schedule of general prevailing rates of per diem wages as above mentioned. The offeror's attention is further directed to the requirements of Texas Government Code, Chapter 2258, Prevailing Wage Rates, providing for the payment of the wage schedules above mentioned and the offeror's obligations thereunder. The inclusion of the schedule of general prevailing rate of per diem wages in the contract documents does not release the Contractor from compliance with any wage law that may be applicable. Construction work under this contract requiring an inspector will not be performed on Sundays or holidays unless the following conditions exist: 26.1.1 The project being constructed is essential to the City of Lubbock's ability to provide the necessary service to its citizens. 26.1.2 Delays in construction are due to factors outside the control of the Contractor. The Contractor is approaching the penalty provisions of the contract and Contractor can show he has made a diligent effort to complete the contract within the allotted time. 26.2 Before construction work requiring an inspector is to be performed on Sundays or holidays, the Contractor must notify the Owner's Representative not less than three full working days prior to the weekend or holiday he desires to do work and obtain written permission from the Owner's Representative to do such work. The final decision on whether to allow construction work requiring an inspector on Sundays or holidays will be made by the Owner's Representative. 26.3In any event, if a condition should occur or arise at the site of this project or from the work being done under this contract which is hazardous or dangerous to property or life, the Contractor shall immediately commence work, regardless of the day of the week or the time of day, to correct or alleviate such condition so that it is no longer dangerous to property or life. 27. PAYMENT OF EMPLOYEES AND FILING OF PAYROLLS 27.1 The contractor and each of his subcontractors shall pay each of his employees engaged in work on the project under this contract in full (less mandatory legal deductions) in cash, or by check readily cashable without discount, not less often than once each week. The Contractor and each of his subcontractors shall keep a record showing the name and occupation of each worker employed by the Contractor or subcontractor in the construction of the public work and the actual per diem wages paid to each worker. This record shall be open at all reasonable hours to inspection by the officers and agents of the City. The Contractor must classify employees according to one of the classifications set forth in the schedule of general prevailing rate of per diem wages, which schedule is included in the contract documents. The Contractor shall forfeit as a penalty to the City of Lubbock on whose behalf this contract is made, sixty dollars for each laborer, workman, or mechanic employed for each calendar day, or portion thereof, such laborer, workman or mechanic is paid less than the wages assigned to his particular classification as set forth in the schedule of general prevailing rate of per diem wages included in these contract documents. 28. PROVISIONS CONCERNING ESCALATION CLAUSES 28.1 Proposals submitted containing any conditions which provide for changes in the stated proposal price due to increases or decreases in the cost of materials, labor or other items required for the project will be rejected and returned to the offeror without being considered. 29. PREPARATION FOR PROPOSAL 29.1 The bidder shall submit his bid on forms furnished by the City, and all blank spaces in the form shall be correctly filled in, stating the price in numerals for which he intends to do the work contemplated or furnish the materials required. Such prices shall be written in ink, distinctly and legibly, or typewritten. In case of discrepancy between the unit price and the extended total for a bid item, the unit price will be taken. A bid that has been opened may not be chanted for the purpose of correcting an error in the bid price. 29.2If the proposal is submitted by an individual, his name must be signed by him or his duly authorized agent. If a proposal is submitted by a firm, association, or partnership, the name and address of each member must be given and the proposal signed by a member of the firm, association or partnership, or person duly authorized. If the proposal is submitted by a company or corporation, the company or corporate name and business address must be given, and the proposal signed by an official or duly authorized agent. Powers of attorney authorizing agents or others to sign proposals must be properly certified and must be in writing and submitted with the proposal. The proposal shall be executed in ink. 29.3 Pursuant to Texas Local Government Code 252.043(2), a competitive sealed proposal that has been opened may not be chanted for the purpose of correcting an error in the proposal price. THEREFORE, ANY CORRECTIONS TO THE PROPOSAL PRICE MUST BE MADE ON THE PROPOSAL SUBMITTAL FORM PRIOR TO PROPOSAL OPENING. 29.4 Proposal submittals may be withdrawn and resubmitted at any time before the time set for opening of the proposals, but no proposal may be withdrawn or altered thereafter. 30. BOUND COPY OF CONTRACT DOCUMENTS 30.1 Offeror understands and agrees that the contract to be executed by offeror shall be bound and include the following: (a) Notice to Offerors. (b) General Instructions to Offerors. (c) Offeror's Submittal. (d) Statutory Bonds (if required). (e) Contract Agreement. (f) General Conditions. (g) Special Conditions (if any). (h) Specifications. (i) Insurance Certificates for Contractor and all Sub -Contractors. (j) All other documents made available to offeror for his inspection in accordance with the Notice to Offerors. 30.2If Plans and Specifications are too bulky or cumbersome to be physically bound, they are to be considered incorporated by reference into the aforementioned contract documents. 31. QUALIFICATIONS OF OFFERORS 31.1 The offeror may be required before the award of any contract to show to the complete satisfaction of the City of Lubbock that it has the necessary facilities, ability, and financial resources to provide the service specified therein in a satisfactory manner. The offeror may also be required to give a past history and references in order to satisfy the City of Lubbock about the offeror's qualifications. The City of Lubbock may make reasonable investigations deemed necessary and proper to determine the ability of the offeror to perform the work, and the offeror shall furnish to the City of Lubbock all information for this purpose that may be requested. The offeror's proposal may be deemed not to meet specifications or the proposal may be rejected if the evidence submitted by, or investigation of, the offeror fails to satisfy the City of Lubbock that the offeror is properly qualified to carry out the obligations of the contract and to complete the work described therein. Evaluation of the offeror's qualifications shall include but not be limited to: (a) The ability, capacity, skill, and financial resources to perform the work or provide the service required. (b) The ability of the offeror to perform the work or provide the service promptly or within the time specified, without delay or interference. (c) The character, integrity, reputation, judgment, experience, and efficiency of the offeror (d) The quality of performance of previous contracts or services. (e) The safety record of the Contractor and proposed Sub -Contractors (f) The experience and qualifications of key project personnel (g) Past experience with the Owner 31.2 Complete and submit the PROPOSED List of Sub -Contractors. Seven (7) business days after closing, complete and submit the FINAL List of Sub -contractors. (a) If no sub -contractors will be used please indicate so. 31.3 Before contract award, the recommended contractor for this project may be required to show that he has experience with similar projects that require the Contractor to plan his work efforts and equipment needs with City of Lubbock specifications in mind. Demonstration of experience shall include a complete list of ALL similar municipal and similar non -municipal current and completed projects for the past five (5) years for review. This list shall include the names of supervisors and type of equipment used to perform work on these projects. In addition, the Contractor may be required to provide the name(s) of supervisor(s) that will be used to perform work on this project in compliance with City of Lubbock specifications herein. 32. SELECTION 32.1 Selection shall be based on the responsible offeror whose proposal is determined to be the most advantageous to the City of Lubbock considering the relative importance of evaluation factors included in this RFP. 32.2 NO INDIVIDUAL OF ANY USING DEPARTMENT (CITY OF LUBBOCK WATER UTILITIES OR OTHER) HAS THE AUTHORITY TO LEGALLY AND/OR FINANCIALLY COMMIT THE CITY TO ANY CONTRACT, AGREEMENT OR PURCHASE ORDER FOR GOODS OR SERVICES, UNLESS SPECIFICALLY SANCTIONED BY THE REQUIREMENTS OF THIS REQUEST FOR PROPOSAL. 32.3 The City shall select the offeror that offers the best value for the City based on the published selection criteria and on its ranking evaluation. The City shall first attempt to negotiate a contract with the selected offeror. The City and its engineer or architect may discuss with the selected offeror options for a scope or time modification and any price change associated with the modification. If the City is unable to negotiate a contract with the selected offeror, the City shall, formally and in writing, end negotiations with that offeror and proceed to the next offeror in the order of the selection ranking until a contract is reached or all proposals are rejected. 32.4In determining best value for the City, the City is not restricted to considering price alone, but may consider any other factor stated in the selection criteria. 32.5A proposal will be subject to being considered irregular and may be rejected if it shows omissions, alterations of form, conditional alternate proposals, additions or alternates in lieu of the items specified, if the unit prices are obviously unbalanced (either in excess of or below reasonably expected values), or irregularities of any kind. 33. ANTI -LOBBYING PROVISION 33.1 DURING THE PERIOD BETWEEN PROPOSAL SUBMISSION DATE AND THE CONTRACT AWARD, OFFERORS, INCLUDING THEIR AGENTS AND REPRESENTATIVES, SHALL NOT DISCUSS OR PROMOTE THEIR PROPOSAL WITH ANY MEMBER OF THE LUBBOCK CITY COUNCIL OR CITY STAFF EXCEPT UPON THE REQUEST OF THE CITY OF LUBBOCK PURCHASING DEPARTMENT IN THE COURSE OF CITY -SPONSORED INQUIRIES, BRIEFINGS, INTERVIEWS, OR PRESENTATIONS. 33.2 This provision is not meant to preclude bidders from discussing other matters with City Council members or City staff. This policy is intended to create a level playing field for all potential bidders, assure that contract decisions are made in public, and to protect the integrity of the bid process. Violation of this provision may result in rejection of the bidder's bid. 34. PROTEST 34.1 All protests regarding the RFP process must be submitted in writing to the City Director of Purchasing and Contract Management within 5 working days after the protesting party knows of the occurrence of the action which is protested relating to advertising of notices deadlines, proposal opening and all other related procedures under the Local Government Code, as well as any protest relating to alleged improprieties with the RFP process. This limitation does not include protests relating to staff recommendations as to award of contract. Protests relating to staff recommendations may be directed to the City Manager. All staff recommendations will be made available for public review prior to consideration by the City Council as allowed by law. FAILURE TO PROTEST WITHIN THE TIME ALLOTTED SHALL CONSTITUTE A WAIVER OF ANY PROTEST. 35. PREVAILING WAGE RATES 35.1 Offerors are required to comply with Texas Government Code, Chapter 2258, Prevailing Wage Rates, with respect to the payment of prevailing wage rates for the construction of a public work, including a building, highway, road, excavation, and repair work or other project development or improvement, paid for in whole or in part from public funds, without regard to whether the work is done under public supervision or direction. A worker is employed on a public work if the worker is employed by the contractor or any subcontractor in the execution of the contract for the project. 35.2 A worker employed on a public work by or on behalf of the City of Lubbock shall be paid not less than the general prevailing rate of per diem wages for the work of a similar character in the locality in which the work is performed, and not less than the general prevailing rate of per diem wages for legal holiday and overtime work. 35.3 A contractor or subcontractor who violates Texas Government Code Section 2258.023 shall pay to the City of Lubbock $60 for each worker employed for each calendar day or part of the day that the worker is paid less than the wage rates stipulated in the contract. TEXAS GOVERNMENT CODE § 2269 SUBCHAPTER D. SELECTING CONTRACTOR FOR CONSTRUCTION SERVICES THROUGH COMPETITIVE SEALED PROPOSALS Sec. 2269.151. CONTRACTS FOR FACILITIES: COMPETITIVE SEALED PROPOSALS. (a) In this chapter, "competitive sealed proposals" is a procurement method by which a governmental entity requests proposals, ranks the offerors, negotiates as prescribed, and then contracts with a general contractor for the construction, rehabilitation, alteration, or repair of a facility. (b) In selecting a contractor through competitive sealed proposals, a governmental entity shall follow the procedures provided by this subchapter. Sec. 2269.152. USE OF ARCHITECT OR ENGINEER. The governmental entity shall select or designate an architect or engineer to prepare construction documents for the project. The selected or designated engineer or architect has full responsibility for complying with Chapter 1001 or 1051, Occupations Code, as applicable. If the engineer or architect is not a full-time employee of the governmental entity, the governmental entity shall select the engineer or architect on the basis of demonstrated competence and qualifications as provided by Section 2254.004, Government Code. Sec. 2269.153. PREPARATION OF REQUEST. The governmental entity shall prepare a request for competitive sealed proposals that includes construction documents, selection criteria and the weighted value for each criterion, estimated budget, project scope, estimated project completion date, and other information that a contractor may require to respond to the request. The governmental entity shall state in the request for proposals the selection criteria that will be used in selecting the successful offeror. Sec. 2269.154. EVALUATION OF OFFERORS. (a) The governmental entity shall receive, publicly open, and read aloud the names of the offerors and any monetary proposals made by the offerors. (b) Not later than the 45th day after the date on which the proposals are opened, the governmental entity shall evaluate and rank each proposal submitted in relation to the published selection criteria. Sec. 2269.155. SELECTION OF OFFEROR. (a) The governmental entity shall select the offeror that submits the proposal that offers the best value for the governmental entity based on: (1) The selection criteria in the request for proposal and the weighted value for those criteria in the request for proposal; and (2) its ranking evaluation. (b) The governmental entity shall first attempt to negotiate a contract with the selected offeror. The governmental entity and its architect or engineer may discuss with the selected offeror options for a scope or time modification and any price change associated with the modification. (c) If the governmental entity is unable to negotiate a satisfactory contract with the selected offeror, the governmental entity shall, formally and in writing, end negotiations with that offeror and proceed to the next offeror in the order of the selection ranking until a contract is reached or all proposals are rejected. In determining best value for the governmental entity, the governmental entity is not restricted to considering price alone, but may consider any other factor stated in the selection criteria. Page Intentionally Left Blank PROPOSAL SUBMITTAL FORM Pate Intentionally Left Blank PROPOSAL SUBMITTAL FORM LUMP SUM PROPOSAL CONTRACT DATE: PROJECT NUMBER: RFP 24-17769-YB 1714 E. Broadway Demo Proposal of called Offeror) To the Honorable Mayor and City Council City of Lubbock, Texas (hereinafter called Owner) Ladies and Gentlemen: (hereinafter The Offeror, in compliance with your Request for Proposals for construction of the referenced project, having carefully examined the plans, specifications, instructions to offerors, notice to offerors and all other related contract documents and the site of the intended work, and being familiar with all of the conditions surrounding the construction of the intended project including the availability of materials and labor, hereby intends to furnish all labor, materials, and supplies; and to construct the project in accordance with the plans, specifications and contract documents, within the time set forth therein and at the price stated. The price to cover all expenses incurred in performing the work required under the contract documents. PROPOSED CONSTRUCTION TIME: 1. Contractors proposed CONSTRUCTION TIME for completion: TOTAL CONSECUTIVE CALENDAR DAYS: 90 TOTAL CONSECUTIVE CALENDAR DAYS: 95 (to Substantial Completion) (to Final Completion) (not to exceed 90 consecutive calendar days to Substantial Completion / 95 consecutive calendar days to Final Completion). Offeror hereby agrees to commence the work on the above project on a date to be specified in a written "Notice to Proceed" of the Owner and to substantially complete the project within 90 Consecutive Calendar Days with final completion within 95 Consecutive Calendar Days as stipulated in the specification and other contract documents. Offeror hereby further agrees to pay to Owner as liquidated damages in the sum of $25.00 for each consecutive calendar day after substantial completion and liquidated damages in the sum of $25.00 for each consecutive calendar day after final completion set forth herein above for completion of this project, all as more fully set forth in the General Conditions of the Agreement. Offeror understands and agrees that this proposal submittal shall be completed and submitted in accordance with instruction number 28 of the General Instructions to Offerors. Offeror understands that the Owner reserves the right to reject any or all proposals and to waive any formality in the proposing. The Offeror agrees that this proposal shall be good for a period of six 60 calendar days after the scheduled closing time for receiving proposals. The undersigned Offeror hereby declares that he has visited the site of the work and has carefully examined the plans, specifications and contract documents pertaining to the work covered by this proposal, and he further agrees to commence work on the date specified in the written notice to proceed, and to substantially complete the work on which he has proposed; as provided in the contract documents. Page Intentionally Left Blank Offerors are required, whether or not a payment or performance bond is required, to submit a cashier's check or certified check issued by a bank satisfactory to the City of Lubbock, or a proposal bond from a reliable surety company, payable without recourse to the order of the City of Lubbock in an amount not less than five percent (5%) of the total amount of the proposal submitted as a guarantee that offeror will enter into a contract, obtain all required insurance policies, and execute all necessary bonds (if required) within ten (10) days after notice of award of the contract to him. Page Intentionally Left Blank Enclosed with this proposal is a Cashier's Check or Certified Check Enclosed with this proposal is a Cashier's Check or Certified Check for Dollars ($ ) or a Proposal Bond in the sum of Dollars ($ ), which it is agreed shall be collected and retained by the Owner as liquidated damages in the event the proposal is accepted by the Owner and the undersigned fails to execute the necessary contract documents, insurance certificates, and the required bond (if any) with the Owner within ten (10) business days after the date of receipt of written notification of acceptance of said proposal; otherwise, said check or bond shall be returned to the undersigned upon demand. Offeror understands and agrees that the contract to be executed by Offeror shall be bound and include all contract documents made available to him for his inspection in accordance with the Notice to Offerors. Pursuant to Texas Local Government Code 252.043(g), a competitive sealed proposal that has been opened may not be changed for the purpose of correcting an error in the proposal price. THEREFORE, ANY CORRECTIONS TO THE PROPOSAL PRICE MUST BE MADE ON THE PROPOSAL SUBMITTAL FORM PRIOR TO PROPOSAL OPENING. (Seal if Offeror is a Corporation) ATTEST: Secretary Offeror acknowledges receipt of the following addenda: Addenda No. Date Addenda No. Date Addenda No. Date Addenda No. Date Date: Authorized Signature (Printed or Typed Name) Company Address City, State Telephone: Fax: Email: FEDERAL No. County Zip Code TAX ID or SOCIAL SECURITY M/WBE Firm: Woman Black American Native American Hispanic American Asian Pacific American Other (Specify) INSURANCE REQUIREMENTS I, the undersigned Bidder certify that the insurance requirements contained in this bid document have been reviewed by me and my Insurance Agent/Broker. If I am awarded this contract by the City of Lubbock, I will be able to, within ten (10) business days after being notified of such award by the City of Lubbock, furnish a valid insurance certificate to the City meeting all of the requirements defined in this bid. If the time requirement specified above is not met, the City has the right to reject this proposal and award the contract to another contractor. If you have any questions concerning these requirements, please contact the Director of Purchasing & Contract Management for the City of Lubbock at (806) 775-2572. SUSPENSION AND DEBARMENT CERTIFICATION Federal Law (A-102 Common Rule and OMB Circular A-110) prohibits non -Federal entities from contracting with or making sub -awards under covered transactions to parties that are suspended or debarred or whose principals are suspended or debarred. Covered transactions include procurement contracts for goods or services equal to or in excess of $25,000 and all non -procurement transactions (e.g., sub -awards to sub -recipients). Contractors receiving individual awards of $25,000 or more and all sub -recipients must certify that their organization and its principals are not suspended or debarred by a Federal agency. Before an award of $25,000 or more can be made to your firm, you must certify that your organization and its principals are not suspended or debarred by a Federal agency. I, the undersigned agent for the firm named below, certify that neither this firm nor its principals are suspended or debarred by a Federal agency. TEXAS GOVERNMENT CODE SECTION 2252.152 The undersigned representative of the undersigned company or business, being an adult over the age of eighteen (18) years of age, pursuant to Texas Government Code, Chapter 2252, Section 2252.152, certify that the company named above is not listed on the website of the Comptroller of the State of Texas concerning the listing of companies that are identified under Section 806.051, Section 807.051 or Section 2253.153. I further certify that should the above -named company enter into a contract that is on said listing of companies on the website of the Comptroller of the State of Texas, which do business with Iran, Sudan or any Foreign Terrorist Organization, I will immediately notify the City of Lubbock Purchasing and Contract Department. TEXAS GOVERNMENT CODE SECTION 2271.002 Company hereby certifies the following: 1. Company does not boycott Israel; and 2. Company will not boycott Israel during the term of the contract. The following definitions apply to this state statute: (1) 'Boycott Israel" means refusing to deal with, terminating business activities with, or otherwise taking any action that is intended to penalize, inflict economic harm on, or limit commercial relations specifically with Israel, or with a person or entity doing business in Israel or in an Israeli -controlled territory, but does not include an action made for ordinary business purposes; and (2) "Company" means an organization, association, corporation, partnership, joint venture, limited partnership, limited liability partnership, or limited liability company, including a wholly owned subsidiary, majority -owned subsidiary, parent company, or affiliate of those entities or business associations that exists to make a profit. This Certification is required from a Company if the Company has 10 or more full-time employees and the contract for goods or services (which includes contracts formed through purchase orders) has a value of $100,000 or more that is to be paid wholly or partly from public funds of the governmental entity. TEXAS GOVERNMENT CODE 2274 By entering into this Agreement, Contractor verifies that: (1) it does not, and will not for the duration of the contract, have a practice, policy, guidance, or directive that discriminates against a firearm entity or firearm trade association or (2) the verification required by Section 2274.002 of the Texas Government Code does not apply to the contract. If Contractor is a company with 10 or more full-time employees and if this Agreement has a value of at least $100,000 or more, Contractor verifies that, pursuant to Texas Government Code Chapter 2274, it does not have a practice, policy, guidance, or directive that discriminates against a firearm entity or firearm trade association; and will not discriminate during the term of the contract against a firearm entity or firearm trade association. Contractor represents and warrants that: (1) it does not, and will not for the duration of the contract, boycott energy companies or (2) the verification required by Section 2274.002 of the Texas Government Code does not apply to the contract. If Contractor is a company with 10 or more full-time employees and if this Agreement has a value of at least $100,000 or more, Contractor verifies that, pursuant to Texas Government Code Chapter 2274, it does not boycott energy companies; and will not boycott energy companies during the term of the Agreement. This verification is not required for an agreement where a governmental entity determines that these requirements are inconsistent with the governmental entity's constitutional or statutory duties related to the issuance, incurrence, or management of debt obligations or the deposit, custody, management, borrowing, or investment of funds. Agreement Example Review This sample Agreement has been reviewed and ( ) is acceptable ( ) is acceptable as noted Contractor Acknowledgement In compliance with this solicitation, the undersigned, having examined the solicitation documents, instructions to offerors, documents associated with the request for proposals, and being familiar with the conditions to be met has reviewed the above information regarding: • Insurance Requirements • Suspension and Debarment Certification • Texas Government Code Section 2252.152 • Texas Government Code Section 2271.002 • Texas Government Code 2274 An individual authorized to bind the company must sign the following section. Failure to execute this portion may result in proposal jection. By signing below, the terms stated have been reviewed and approved. Company r Signed By: Print Nam( Date: _�� Contractors Statement of Qualifications Individual contractors and joint ventures submitting a bid must complete the following evaluation information for the Project. Joint ventures shall be composed of not more than two firms and each firm must complete separate evaluations. Evaluation information must be submitted at time of bid submittal. Failure to submit the following Bidder Evaluation information may result in the OWNER considering the bid non -responsive and result in rejection of the bid by the OWNER. Bidders are to provide any additional information requested by the OWNER. In evaluating a firm's qualifications, the following major factors will be considered: A. FINANCIAL CAPABILITY: For this project, the CONTRACTOR'S financial capability to undertake the project will be determined by the CONTRACTOR'S ability to secure bonding satisfactory to the OWNER. B. EXPERIENCE: Do the organization and key personnel have appropriate technical experience on similar projects? y es C. SAFETY: Does the organization stress and support safety as an important function of the work process? � e4s D. (QUALITY OF WORK: (1) Does the organization nave a commitment to quality in every facet of their work - the process as well as the product? "f e-4 (2) Does the organization have a written quality philosophy and/or principles that exemplifies their work? If so, submit as Attachment "A". (3) Has this organization ever received an award or been recognized for doing "quality" work on a project? If so, give details under Attachment "A". 140 E. CONFORMANCE TO CONTRACT DOCUMENTS: (1) Does the organization have a commitment and philosophy to construct projects as designed and as defined in the Contract Documents? %I es The OWNER reserves the right to waive irregularities in determining the firm's qualifications and reserves the right to require the submission of additional information. The qualifications of a frin shall not deprive the OWNER of the right to accept a bid, which in its judgement is the lowest and best bid, to reject any and all bids, to waive irregularities in the bids, or to reject nonconforming, non- responsive, or conditional bids. hi addition, the OWNER reserves the right to reject any bid where circumstances and developments have in the opinion of the OWNER changed the qualifications or responsibility of the firm. Material misstatements on the qualifications forms may be grounds for rejection of the firm's bid on this project. Any such misstatement, if discovered after award of the contract to such firm, may be grounds for immediate termination of the contract. Additionally, the firm will be liable to the OWNER for any additional costs or damages to the OWNER resulting from such misstatements, including costs and attorney's fees for collecting such costs and damages. Complete the following information for your organization Contractor's General Information Organization Doing Business As C Business Address of Principle Office Telephone Numbers Main Number Fax Number Web Site Address Form of Business (Check One) A Corporation A Partnership An Individual Date of Incorporation 5 State of Incorporation Chief Executive Officer's Name President's Name �� C r Vice President's Name(s) E. Secretary's Name d Treasurer's Name rDateof Organizationwhether partnership is general or linuted If an Individual Name Business Address IdentaN all indiNiduals not preNiousIN named which exert a significant amount ot'business control o-ter the organization Indicators of Oi-�,anization Size Average Number of Current Full Time Employees Average Estimate of Revenue for the ,� Current Year Contractor's Organizational Experience Organization Doing Business As AO C • Business Address of Regional Office 0 n '1 Name of Regional Office Manager Telephone Numbers Main Number Fax Number Web Site Address List of names that this organization currently, has or anticipates operating under over the history of the organization, including the names of related companies presently doin business: Names of Organization From Date To Date List of companies, firms or organizations that own any part of the organization. Name of companies, firms or organization Percent Ownership Construction Experience Years experience in projects similar to the proposed project: As a General Contractor As a Joint Venture Partner Has this or a predecessor organization ever defalilted on a project or failed to complete any work awarded to it? 110 If yes provide full details in a separate attachment. See attachment No. Has this or a predecessor organization been released from a bid or proposal in the past ten years'? If yes provide full details in a separate attachment. See attachment No. Has this or a predecessor organization ever been disqualification as a bidder or proposer by any local, state, or federal agency within the last five ears'? If yes provide full details in a separate attachment. See attachment No. �^V Is this organization or your proposed surety currently in any litigation or contemplating litigation? Y10 If yes provide full details in a separate attachment. See attachment No. Has this or a predecessor organization ever refused to construct or refused to provide materials defined in the contract documents'? AQ If yes provide full details in a separate attachment. See attachinnent No. Contractor's Proposed Key Personnel Organization Doing Business As Provide a brief description of the managerial structure of the organization and illustrate with an organizational cart. Include the title and names of key personnel. Include this chart at an attaclnnent to this description. See attachment No. s ee. ao ach nne Provide a brief description of the managerial structure proposed for this project and illustrate with an organizational cart. Include the title and names of proposed key personnel and alternates. Include this chart at an attachment to this description. See attachment No. 2 -/ sSRM a4aCV1fA 1+ c;2. Provide information on the key personnel proposed for this project that will provide the following key functions. Provide information for candidates for each of these positions on the pages for each of these key personnel. Also provide biographical informatio for each primary and alternate candidate as an attachment. The biographical information must include the following as a minimum: technical experience, managerial experience, education and formal training, work history which describes project experience, including the roles and responsibilities for each assignment, and primary language. Additional information highlighting experience which makes them the best candidate for the assignment should also be included. Role Primary Candidate Alternate Candidate Project Manager 13ce CobbC Project Superintendent f t Cy- Vuldho, Project Safety Officer E.W%eopl Quality Control Manager (� If key personnel are to fulfill more than one of the roles listed above, provide a written narrative describing how much time will be devoted to each function, their qualifications to fulfill each role and the percentage of their time that will be devoted to each role. If the individual is not to be devoted solely to this project, indicate how time it to be divided between this project and their other assignments. Patrick Fulcher President Safety officer/Qualitiy control Manager Dee Cobbs Project Manager Roy Matthews Vice President Superintendent Tyler Matthews' Alternate Project Manager Holly Matthews Secertary Clerical/Office Manager Patrick Fulcher President Safety Officer/ Qualitiy Control Manager ALTERNATE: SUPERINTENDENT Roy Matthews Vice President Superintendent ALTERNATE: SAFTEY OFFFICER/ QUALITY CONTROL MANAGER Dee Cobbs Project Manager Tyler Matthews ALTERNATE: PROJECT MANAGER Proposed Project Managers I Organization Doing Business As tri": ^R�'.'`, - 0.' --� Name of Individual Years of Experience as Project Manager Years of Experience with this organization Number of similar projects as Project Manager Number of similar projects in other positions Current Project Assignments Name of Assignment Reference Contact Information (listin names indicates Name i' t Title/ Position Organization Al Telephone E-mail Proiect Candidate role on QvcilaN Percent of Time Used for Estimated Project this Project I Completion Date oval to contacting the names individuals as a reference Name (3 Titlei Position 'V i ` Organization Telephone E-mail tip' Proiect Candidates role 14Vi�2l on Proiect Name of Individual • Years of Experience as Project Manager Evar Years of Experience with this organization Q Number of similar projects as Project Manager Number of similar projects in other positions Current Project Assignments Percent of Time Used for Estimated Project Name of Assignment this Project I Completion Date Name I Name` C Title/ Position tyo a r� o y 1-1 I Title/ Position I 1 (kC 0.~ ay-yj l ele hone ( ` 7 �, i eic uuuc E-mail E-mail Project Project Candidate role on `�%� 6Fh(�Y`(ZUu'L{ Candidate role on 5 Proposed Project Superintendent Organization Doing Business As Primary Candidate Name of Individual Years of Experience as Project Superintendent o-+ Years of Experience with this organization ell Number of similar projects as Superintendent Number of similar projects in other positions Current Project Assignments Name of Assignment Percent of Time Used for this Project Estimated Project Completion Date Reference Contact Information (listing names indicates ap roval to contacting the names individuals as a reference) Name 1A Mur0. Name Ar Title/ Position owner Title/ Position wd12 Organization Organization i Telephone Telephone — — E-mail E-mail Project 1 r Project O f Candidate role on UrxerV % o Project Candidate role on Project SU peril %%.5 O r Name of Individual Years of Experience as Project Superintendent it _j T Years of Experience with this organization Number of similar prrjects as Superintendent Number of similar projects in other positions Current Project Assignments Name of Assignment Percent of Time Used for this Project Estimated Project Completion Date Name TIPT, Name ^WWAAL Title/ Position Title/ Position fii Organization Or anization U-M Tele hone d Tele hone - C E-mail E-mail Project I Project Candidate role on Project �L� q 1� r l Candidate role on Project A �E -Ix- Proposed Project Safety Officer Organization Doing Business As 1VA&A+r1P1k)5y--A Y.I.Y10f. W Name of Individual cyier Years of Experience as Project Safety Officer Years of Experience with this organization Number of similar projects as Safety Officer Number of similar projects in other positions CPLU Current Project Assignments Name of Assignment Percent of Time Used for this Project Estimated Project Completion Date Reference Contact Information listin names indicates a royal to contacting the names individuals as a reference Name Name 1 Title/ Position Title, -Position Or anization Telephone `1 Or anization Telephone ` - �' E-mail E-mail Project Candidate role on (' D`:"1N0j Pro ect Project Candidate role on Project 4;e� (v �,� G�%V`t lC.o"wot Name of Individual Years of Experience as Project Safety Officer Years of Experience with this organization Number of sunilar projects as Safety Officer Number of similar projects in other positions Current Project Assignments Name of Assignment Percent of Time Used for this Project Estimated Project Completion Date Name Y Name Title/ Position Title/ Position L Y Organization Telephone \1 E-mail Pne Project Candidate role on C of �l c � n Z�V V� 'Project Proposed Project Quality Control Manager Organization Doing Business As Name of Individual Years of Experience as Quality Control b Years of Experience with this organizatio Number of similar projects as Quality Mz Number of similar projects in other positi Current Project Assignments Name of Assignment Percent of Time Used for I Estimated Project this Project Completion Date Reference Contact Information (listin names indicates a roval to contactinE the names individuals as a reference Name Av n Name Title/ Position Title/ Position Organization Or anization Telephone. _ Tele hone E-mail E-mail Project Project Candidate role on ,� E� �c kr 0,V C�V, �`t Candidate role on , � � ,� (ji(� Cu r� PrniPrt /MNAIYGl Project Name of Individual Years of Experience as Quality Control Me Years of Experience with this organization Number of similar projects as Quality Man Number of similar projects in other positio Current Project Assignments Name of Assignment Percent of Time Used for Estimated Project this Project Completion Date wr o I i A Ar-'. ,A ', 4 V1, f\ \ Am to iName Title/ Position Title/ Position ' Organization Or anization Telephone Tele hone E-mail E-mail Project Project Candidate role on SU CYV lcS�( Candidate role on Project Project 8 Contractor's Project Experience and Resources Organization Doing Business As :Inc. Provide a list of ajor projects that are currently underway, or have been completed within the last ten years on Attachment A Provide a description of your organizations approach to completing this project to provide best value for the Owner. Including a description of your approach in the following areas: 1. Contract administration 2. Management of subcontractor and suppliers 3. Time management 4. Cost control 5. Quality management 6. Project site safety 7. Managing changes to the project 8. Managing equipment p 9. Meeting HUB / MWBE Participation Goal -- Provide a list of major equipment ro osed for use on this prcject. Attach Additional Information if necessary Equipment Item Primary Use on Project Own Will Lease r toe Pc �u ✓ What work will the organization complete using its own resources'? What work does the organization propose to subcontract on thisproject? nO fle MATTHEWS BACKHOE, INC. P.O. BOX 3187 LUBBOCK, TX 79452 806-863-2509 1. CONTRACT ADMINISTRATION: Holly Matthews, Secretary -Will make sure all paperwork is signed and turned in. She will take care of the State notification and all the manifest for the dumping. 2. Management of Subcontractors and supplies: We will not be using any subcontractors. 3. Tim Management: Patrick Fulcher and Holly Matthews will be handling time management. 4. Cost control: Patrick Fulcher, Roy Matthews, and Holly Matthews will handle the cost control. 5. Quality management: Patrick Fulcher will be handling quality control. 6. Project site safety: Patrick Fulcher will be having daily safety meetings at the job site. 7. Managing changes in the project: Patrick Fulcher, Roy Matthews, and Holly Matthews will be Managing any changes that come up during the project. 8. Managing equipment: Dee cobbs will check the equipment every day when on the project. ATTACHMENT 3 Contractor's Subcontractors and Vendors Organization Doing Business As Provide a list of subcontractors that will provide more than 10 percent of the work (based on contract amounts Name Work to be Provided Est. Percent HUB/MWBE of Contract Firm Provide information on the proposed key personnel, project experience and a description of past relationship and work experience for each subcontractor listed above using the Project Information Forms. Provide a list of major equipment ro osed for use on this prctiect. Attach Additional Information if necessary Furnish Furnish HUBlM Vendor Name Equipment / Material Provided Only and WBE Install Finn 10 Attachment A Current Projects and Project Completed within the last 10 Years Project Owner Project Narne G General Description of Project: ckewio Poo j It Project Cost Q �yQ Date Project Completed Key Project Personnel Project Manager Project Superintendent Safety Officer Quality Control Manager Name Dee C.6 s c e Reference Contact Information (listing names indicates approval to contacting the names individuals as a reference) Name Title/ Position Organization Telephone E-mail Owner Designer Construction Manager eG ` Project Owner Project Name General Description of Project: perno buildma,poot, Project Cost I Date Project Completed Key Project Personnel Project Manager Project Superintendent Safety Officer Quality Control Manager Name r►C i1 �' k C e Reference Contact Information (listing names indicates approval to contacting the names individuals as a reference) Name Title/ Position Organization Telephone E-mail Owner Designer Construction Manager 0re it e r � �• � �� Project Owner r Project Name \I-P— •}+ General Description of Project: C.1e r wt ana Project Cost 3a�OW .00 Date Project Completed Key Project Personnel Project Manager Project Superintendent Safety Officer Quality Control Manager Name Reference Contact Information (listing names indicates approval to contacting the names individuals as a reference) Name Title/ Position Organization Telephone E-mail Owner •�1"tO Designer Construction Manager GRANITERE, INC. KNOW ALL MEN BY THESE PRESENTS, that we Matthews Backhoe, Inc. 12311 Hwy 87, Lubbock, TX 79423 as principal, hereinafter called the Principal, and Granite Re, Inc., 14001 Quailbrook Drive, Oklahoma City, OK 73134, a corporation duly organized under the laws of the State of Minnesota as Surety, hereinafter called the Surety, are held and firmly bound unto City of Lubbock, TX , P. O. Box 2000, Lubbock, TX 79457 as Obligee, hereinafter called the Obligee, in the sum of **** Five Percent of Bid Amount (5%) **** for payment of which sum well and truly to be made, the said Principal and the said Surety, bind ourselves, our heirs, executors, administrators, successors and assigns, jointly and severally, firmly by these presents. WHEREAS, the Principal has submitted a bid for Project: Demolition of 1714 E. Broadway Demo / RFP 24-17769-YB Bid Date: 01/16/2024 The conditions of this Bond are such that if the Obligee accepts the bid of the Principal within the time specified in the bid documents or within such time period as may be agreed to by the Obligee and Principal, and the Principal either (1) enters into a contract with the Obligee in accordance with the terms of such bid, and gives such bond or bonds as may be specified in the bidding or Contract Documents, with a surety admitted in the jurisdiction of the Project and otherwise acceptable to the Obligee, for the faithful performance of such Contract and for the prompt payment of labor and material furnished in the prosecution thereof; or (2) pays to the Obligee the difference, not to exceed the amount of this Bond, between the amount specified in said bid and such larger amount for which the Obligee may in good faith contract with another party to perform the work covered by said bid, then this obligation shall be null and void, otherwise to remain in full force and effect. The Surety hereby waives any notice of an agreement between the Obligee and Principal to extend the time in which the Obligee may accept the bid. Waiver of notice by the Surety shall not apply to any extension exceeding sixty (60) days in the aggregate beyond the time for acceptance of bids, and the Obligee and Principal shall obtain the Surety's consent for an extension beyond sixty (60) days. When this Bond has been furnished to comply with a statutory or other legal requirement in the location of the Project, any provision in this Bond conflicting with said statutory or legal requirement shall be deemed deleted herefrom and provisions conforming to such statutory or other legal requirement shall be deemed incorporated herein. When so furnished, the intent is that this bond shall be construed as a statutory bond and not as a common law bond. Signed and sealed this 01/16/2024 Witness Matt s Backh Inc. Title (SEAL) Granite Re, Inc. Kenneth D. Whittington, Attorney -in -Fact (SEAL) GR0614-2 Page Intentionally Left Blank GRANITE RE, INC. GENERAL POWER OF ATTORNEY Know all Men by these Presents: That GRANITE RE, INC., a corporation organized and existing under the laws of the State of MINNESOTA and having its principal office at the City of OKLAHOMA CITY in the State of OKLAHOMA does hereby constitute and appoint: KENNETH D. WHITTINGTON; KYLE MCDONALD its true and lawful Attorney-in-Fact(s) for the following purposes, to wit: To sign its name as surety to, and to execute, seal and acknowledge any and all bonds, and to respectively do and perform any and all acts and things set forth in the resolution of the Board of Directors of the said GRANITE RE, INC. a certified copy of which is hereto annexed and made a part of this Power of Attorney; and the said GRANITE RE, INC. through us, its Board of Directors, hereby ratifies and confirms all and whatsoever the said: KENNETH D. WHITTINGTON; KYLE MCDONALD may lawfully do in the premises by virtue of these presents. In Witness Whereof, the said GRANITE RE, INC. has caused this instrument to be sealed with its corporate seal, duly attested by the signatures of its President and Assistant Secretary, this 315L day of July, 2023. s F L STATE OF OKLAHOMA ) — Kenneth D. Whittin on, President ) SS: 4 COUNTY OF OKLAHOMA ) Kyle . McDonald, Assistant Secretary On this 31 st day of July, 2023, before me personally came Kenneth D. Whittington, President of the GRANITE RE, INC. Company and Kyle P. McDonald, Assistant Secretary of said Company, with both of whom I am personally acquainted, who being by me severally duly sworn, said, that they, the said Kenneth D. Whittington and Kyle P. McDonald were respectively the President and the Assistant Secretary of GRANITE RE, INC., the corporation described in and which executed the foregoing Power of Attorney; that they each knew the seal of said corporation; that the seal affixed to said Power of Attorney was such corporate seal, that it was so fixed by order of the Board of Directors of said corporation, and that they signed their name thereto by like order as President and Assistant Secretary, respectively, of the Company. My Commission Expires: 7ii�✓°��' April 21 , 2027 Commission #: 11003620iairr ',mnur Notary Public GRANITE RE, INC. Certificate THE UNDERSIGNED, being the duly elected and acting Assistant Secretary of Granite Re, Inc., a Minnesota Corporation, HEREBY CERTIFIES that the following resolution is a true and correct excerpt from the July 15, 1987, minutes of the meeting of the Board of Directors of Granite Re, Inc. and that said Power of Attorney has not been revoked and is now in full force and effect. "RESOLVED, that the President, any Vice President, the Assistant Secretary, and any Assistant Vice President shall each have authority to appoint individuals as attorneys -in -fact or under other appropriate titles with authority to execute on behalf of the company fidelity and surety bonds and other documents of similar character issued by the Company in the course of its business. On any instrument making or evidencing such appointment, the signatures may be affixed by facsimile. On any instrument conferring such authority or on any bond or undertaking of the Company, the seal, or a facsimile thereof, may be impressed or affixed or in any other manner reproduced; provided, however, that the seal shall not be necessary to the validity of any such instrument or undertaking." IN WITNESS WHEREOF, the undersigned has subscribed ttis Certificate and affixed the corporate seal of the Corporation this 16th day of January , 20 24_ bPPN,TE q e %�c S r A L Kyle P. McDonald, Assistant Secretary GR0800-1 Page Intentionally Left Blank City of Lubbock, TX Purchasing and Contract Management Safety Record Questionnaire The City of Lubbock City Council desires to avail itself of the benefits of Section 252.0435 of the Local Government Code, and consider the safety records of potential contractors prior to awarding proposals on City contracts. Pursuant to Section 252.0435 of the Local Government Code, City of Lubbock has adopted the following written definition and criteria for accurately determining the safety record of a proposer prior to awarding proposals on City contracts. The definition and criteria for determining the safety record of a proposer for this consideration shall be: The City of Lubbock shall consider the safety record of the offerors in determining the responsibility thereof. The City may consider any incidence involving worker safety or safety of the citizens of the City of Lubbock, be it related or caused by environmental, mechanical, operational, supervision or any other cause or factor. Specifically, the City may consider, among other things: a. Complaints to, or final orders entered by, the Occupational Safety and Health Review Commission (OSHRC), against the proposer for violations of OSHA regulations within the past three (3) years. b. Citations (as defined below) from an Environmental Protection Agency (as defined below) for violations within the past five (5) years. Environmental Protection Agencies include, but are not necessarily limited to, the U.S. Army Corps of Engineers (USACOE), the U.S. Fish and Wildlife Service (USFWS), the Environmental Protection Agency (EPA), the Texas Commission on Environmental Quality (TCEQ), the Texas Natural Resource Conservation Commission (TNRCC) (predecessor to the TCEQ), the Texas Department of State Health Services (DSHS), the Texas Parks and Wildlife Department (TPWD), the Structural Pest Control Board (SPCB), agencies of local governments responsible for enforcing environmental protection or worker safety related laws or regulations, and similar regulatory agencies of other states of the United States. Citations include notices of violation, notices of enforcement, suspension/revocations of state or federal licenses or registrations, fines assessed, pending criminal complaints, indictments, or convictions, administrative orders, draft orders, final orders, and judicial final judgments. C. Convictions of a criminal offense within the past ten (10) years, which resulted in bodily harm or death. d. Any other safety related matter deemed by the City Council to be material in determining the responsibility of the offeror and his or her ability to perform the services or goods required by the proposal documents in a safe environment, both for the workers and other employees of offeror and the citizens of the City of Lubbock. In order to obtain proper information from offerors so that City of Lubbock may consider the safety records of potential contractors prior to awarding proposals on City contracts, City of Lubbock requires that offerors answer the following four (4) questions and submit them with their proposals: QUESTION ONE Has the offeror, or the firm, corporation, partnership, or institution represented by the offeror, or anyone acting for such firm, corporation, partnership or institution, received citations for violations of OSHA within the past three (3) years? YES NO V If the offeror has indicated YES for question number one above, the offeror must provide to City of Lubbock, with its proposal submission, the following information with respect to each such citation: Date of offense, location of establishment inspected, category of offense, final disposition of offense, if any, and penalty assessed. QUESTION TWO Has the offeror, or the firm, corporation, partnership, or institution represented by the offeror, or anyone acting for such firn, corporation, partnership or institution, received citations for violations of environmental protection laws or regulations, of any kind or type, within the past five years? Citations include notice of violation, notice of enforcement, suspension/revocations of state or federal licenses, or registrations, fines assessed, pending criminal complaints, indictments, or convictions, administrative orders, draft orders, final orders, and judicial final judgments. YES NO If the offeror has indicated YES for question number two above, the offeror must provide to City of Lubbock, with its proposal submission, the following information with respect to each such conviction: Date of offense or occurrence, location where offense occurred, type of offense, final disposition of offense, if any, and penalty assessed. UESTION THREE Has the offeror, or the firm, corporation, partnership, or institution represented by offeror, or anyone acting for such firm, corporation, partnership, or institution, ever been convicted, within the past ten (10) years, of a criminal offense which resulted in serious bodily injury or death? % YES NO If the offeror has indicated YES for question number three above, the offeror must provide to City of Lubbock, with its proposal submission, the following information with respect to each such conviction: Date of offense, location where offense occurred, type of offense, final disposition of offense, in any, and penalty assessed. QUESTION FOUR Provide your company I s Experience Modification Rate and supporting information: ACKNOWLEDGEMENT THE STATE OF TEXAS COUNTY OF LUBBOCK I certify that I have made no willful misrepresentations in this Questionnaire nor have I withheld information in my statements and answers to questions. I am aware that the information given by me in this questionnaire will be investigated, with my full permission, and that any misrepresentations or omiss. s may cause my proposal to be rejected. ,/) Signature ?r-0--5tdrCVA+ Title NON -COLLUSION AFFIDAVIT STATE OF TEXAS LUBBOCK COUNTY being first duly sworn, on his/her oath, says that the bid above submitted is a genuine and not a sham or collusive bid, or made in the interest or on behalf of any person not therein named; and s/he further says that the said respondent has not directly induced or solicited any firm on the above work or supplies to put in a sham , or any other person or corporation to refrain from a statement of qualifications; and that said firm has not in any manner sought by collusion to secure to self an advantage over any other firm or firms. M Signature Title Subscribed and sworn to before this 1 d' day of 10 V1 _ 202.4 Notary Public i My Commission Expires: � • JAIME GREER ': •: *: My Notary ID # 130384564 Expires September 25, 2027 NOTE: THIS FORM MUST BE COMPLETED AND INCLUDED IN WITH THE SUBMISSION Page Intentionally Left Blank PROPOSED LIST OF SUB -CONTRACTORS Company Name Location 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. 13. 14. 15. 16. Services Provided Minority Owned Yes No ❑ ❑ THIS FORM SHALL BE COMPLETED AND RETURNED ALONG WITH YOUR RESPONSE IF NO SUB -CONTRACTORS WILL BE USED PLEASE INDICATE SO SUBMITTED BY: Motftews $acKhoe ,I:nc. (PRINT NAME OF COMPANY) Page Intentionally Left Blank POST -CLOSING DOCUMENT REQUIREMENTS The below -listed document must be received in the Purchasing and Contract Management Office Not Later Than SEVEN BUSINESS DAYS after the close date when responses are due. FINAL LIST OF SUB -CONTRACTORS Page Intentionally Left Blank FINAL LIST OF SUB -CONTRACTORS Company Name Location Services Provided Minority Owned Yes No 1. ❑ ❑ 2. ❑ ❑ 3. ❑ ❑ 4. ❑ ❑ 5. ❑ ❑ 6. ❑ ❑ 7. ❑ ❑ S. ❑ ❑ 9. ❑ ❑ 10. ❑ ❑ 11. ❑ ❑ 12. ❑ ❑ 13. ❑ ❑ 14. ❑ ❑ 15. --- ❑ ❑ 16. ❑ ❑ SUB�M+ITTTTEED BVV: iJ .LJUIC [�.�Vy � �� l C• (PRINT NAME OF COMPANY ) THIS FORM SHALL BE COMPLETED AND RETURNED NOT LATER THAN SEVEN BUSINESS DAYS AFTER THE CLOSE DATE WHEN RESPONSES ARE DUE IF NO SUB -CONTRACTORS WILL BE USED PLEASE INDICATE SO Page Intentionally Left Blank PAYMENT BOND Page Intentionally Left Blank STATUTORY PAYMENT BOND PURSUANT TO SECTION 2253.021(a) OF THE TEXAS GOVERNMENT CODE (CONTRACTS MORE THAN $50,000) KNOW ALL MEN BY THESE PRESENTS, that Matthews Backhoe, Inc. (hereinafter called the Principal(s), as Principal(s), and (hereinafter called the Surety(s), as Surety(s), are held and firmly bound unto the City of Lubbock (hereinafter called the Obligee), in the amount of Seventy -Eight Thousand Dollars ($78,000.00) lawful money of the United States for the payment whereof, the said Principal and Surety bind themselves, and their heirs, administrators, executors, successors and assigns, jointly and severally, firmly by these presents. WHEREAS, the Principal has entered into a certain written contract with the Obligee, dated day of , 2024, to RFP 24-17769-YB 1714 E. Broadway Demo and said Principal under the law is required before commencing the work provided for in said contract to execute a bond in the amount of said contract which contract is hereby referred to and made a part hereof as fully and to the same extent as if copied at length herein. NOW, THEREFORE, THE CONDITION OF THIS OBLIGATION IS SUCH, that if the said Principal shall pay all claimants supplying labor and material to him or a subcontractor in the prosecution of the work provided for in said contract, then, this obligation shall be void; otherwise to remain in full force and effect; PROVIDED, HOWEVER, that this bond is executed pursuant to the provisions of Section 2253.021(a) of the Texas Government Code, and all liabilities on this bond shall be determined in accordance with the provisions of said Article to the same extent as if it were copied at length herein. IN WITNESS WHEREOF, the said Principal (s) and Surety (s) have signed and sealed this instrument this day of Surety By: (Title) 2024. (Company Name) By: (Printed Name) (Signature) (Title) Page Intentionally Left Blank The undersigned surety company represents that it is duly qualified to do business in Texas, and hereby designates an agent resident in Lubbock County to whom any requisite notices may be delivered and on whom service of process may be had in matters arising out of such suretyship. Surety By: Approved as to form: City of Lubbock By: City Attorney (Title) * Note: If signed by an officer of the Surety Company there must be on file a certified extract from the by-laws showing that this person has authority to sign such obligation. If signed by an Attorney in Fact, we must have copy of power of attorney for our files. Page Intentionally Left Blank CERTIFICATE OF INSURANCE TO: CITY OF LUBBOCK DATE: P.O. BOX 2000, Room 204 LUBBOCK, TX 79457 TYPE OF PROJECT: THIS IS TO CERTIFY THAT (Name and Address of Insured) is, at the date of this certificate, insured by this Company with respect to the business operations hereinafter described, for the typed of insurance and in accordance with the provisions of the standard policies used by this company, the further hereinafter described. Exceptions to standard policy noted hereon. TYPE OF INSURANCE POLICY NUMBER EFFECTIVE EFFECTIVE LIMITS DATE DATE GENERAL LIABILITY LJ Commercial General Liability General Aggregate $ LJ Claims Made Products-Comp/Op AGG $ LJ Occurrence Personal & Adv. Injury $ LJ Owner's & Contractors Protective Each Occurrence $ ❑ Fire Damage (Any one Fire) $ $ Med Exp (Any one Person) AUTOMOTIVE LIABILITY LJ Any Auto Combined Single Limit $ LJ All Owned Autos Bodily Injury (Per Person) $ LJ Scheduled Autos Bodily Injury (Per Accident) $ LJ Hired Autos Property Damage $ LJ Non -Owned Autos LJ GARAGE LIABILITY LJ Any Auto Auto Only - Each Accident $ LJ Other than Auto Only: Each Accident $ Aggregate $ LJ BUILDER'S RISK LJ 100% of the Total Contract Price $ LJ INSTALLATIONELOATER $ EXCESS LIABILITY LJ Umbrella Form Each Occurrence $ Aggregate $ LJ Other Than Umbrella Form $ WORKERS COMPENSATIONAND EMPLOYERS' LIABILITY The Proprietor/ LJ Included Statutory Limits Partners/Executive LJ Excluded Each Accident $ Officers are: Disease Policy Limit $ Disease -Each Employee $ OTHER The above policies either in the body thereof or by appropriate endorsement provide that they may not be changed or canceled by the insurer in less than the legal time required after the insured has received written notice of such change or cancellation, or in case there is no legal requirement, in less than five days in advance of cancellation. FIVE COPIES OF THE CERTIFICATE OF INSURANCE MUST BE SENT TO THE CITY OF LUBBOCK (Name of Insurer) ma Title: The Insurance Certificates Furnished shall name the City of Lubbock as Additional Insured on Auto General Liability and provide a Waiver of Subrogation in favor of the City of Lubbock. IT SHALL BE THE CONTRACTOR'S. THE ADDITIONAL INSURED ENDORSEMENT SHALL INCLUDE PRODUCTS AND COMPLETE OPERATIONS. CONTRACTORCHECKLIST A CONTRACTOR SHALL: (1) provide coverage for its employees providing services on a project, for the duration of the project based on proper reporting of classification codes and payroll amounts and filling of any coverage agreements; (2) provide a certificate of coverage showing workers' compensation coverage to the governmental entity prior to beginning work on the project; (3) provide the governmental entity, prior to the end of the coverage period, a new certificate of coverage showing extension of coverage, if the coverage period shown on the contractor's current certificate of coverage ends during the duration of the project; (4) obtain from each person providing services on a project, and provide to the governmental entity: (A) a certificate of coverage, prior to that person beginning work on the project, so the governmental entity will have on file certificates of coverage showing coverage for all persons providing services on the project; and (B) no later than seven days after receipt by the contractor, a new certificate of coverage showing extension of coverage, if the coverage period shown on the current certificate of coverage ends during the duration of the project; (5) retain all required certificates of coverage on file for the duration of the project and for one year thereafter; (6) notify the governmental entity in writing by certified mail or personal delivery, within ten (10) days after the contractor knew or should have known, of any change that materially affects the provision of coverage of any person providing services on the project; (7) post a notice on each project site informing all persons providing services on the project that they are required to be covered, and stating how a person may verify current coverage and report failure to provide coverage. This notice does not satisfy other posting requirements imposed by the Act or other commission rules. This notice must be printed in at least 19-point normal type, and shall be in both English and Spanish and any other language common to the worker population. The text for the notices shall be the following text provided by the commission on the sample notice, without any additional words or changes: PROOF OF COVERAGE SHALL BE FURNISHED TO THE CITY OF LUBBOCK IN THE FORM OF A CERTIFICATE OF INSURANCE. THE INSURANCE CERTIFICATES FURNISHED SHALL NAME THE CITY OF LUBBOCK AS ADDITIONAL INSURED ON AUTO/GENERAL LIABILITY ON A PRIMARY AND NON-CONTRIBUTORY BASIS TO INCLUDE PRODUCTS OF COMPLETE OPERATIONS. PROVIDE A WAIVER OF SUBROGATION IN FAVOR OF THE CITY OF LUBBOCK. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO PROVIDE TO THE OWNER ALL PROOF OF COVERAGE INSURANCE DOCUMENTS INCLUDING WORKERS COMPENSATION COVERAGE FOR EACH SUBCONTRACTOR. COPIES OF THE ENDORSEMENTS ARE REQUIRED. REQUIRED WORKERS' COMPENSATION COVERAGE "The law requires that each person working on this site or providing services related to this construction project must be covered by workers' compensation insurance. This includes persons providing, hauling, or delivering equipment and materials, or providing labor or transportation or other service related to the project, regardless of the identity of their employer or status as an employee." "Call the Texas Workers' Compensation Commission at 512-305-7238 to receive information on the legal requirement for coverage, to verify whether your employer has provided the required coverage, or to report an employer's failure to provide coverage." and contractually require each person with whom it contracts to provide services on a project, to: (A) provide coverage based on proper reporting of classification codes and payroll amounts and filing of any coverage agreements for all of its employees providing services on the project, for the duration of the project; (B) provide a certificate of coverage to the contractor prior to that person beginning work on the project; (C) provide the contractor, prior to the end of the coverage period, a new certificate of coverage showing extension of coverage, if the coverage period shown on the current certificate of coverage ends during the duration of the project; (D) obtain from each other person with whom it contracts, and provide to the contractor: (i) a certificate of coverage, prior to the other person beginning work on the project; and (n) prior to the end of the coverage period, a new certificate of coverage showing extension of the coverage period, if the coverage period shown on the current certificate of coverage ends during the duration of the project; (E) retain all required certificates of coverage on file for the duration of the project and for one year thereafter; (F) notify the governmental entity in writing by certified mail or personal delivery, within (ten) 10 days after the person knew or should have known, of any change that materially affects the provision of coverage of any person providing services on the project; and (G) contractually require each other person with whom it contracts, to perform as required by paragraphs (A) - (H), with the certificate of coverage to be provided to the person for whom they are providing services. The Contractor shall not commence work under this contract until he has obtained all insurance as required in the General Conditions of the contract documents, from an underwriter authorized to do business in the State of Texas and satisfactory to the City. Proof of coverage shall be furnished to the City and written notice of cancellation or any material change will be provided ten (10) calendar days in advance of cancellation or change. All policies of insurance, required herein, including policies of insurance required to be provided by Contractor and its subcontractors, shall contain a waiver of any and all of the insurer's or payor's, in the event of self-insurance, rights to subrogation that any such insurer or payor, in the event of self-insurance, may acquire by virtue of payment of any loss under such insurance or self-insurance. All certificates of insurance submitted to the City in conformity with the provisions hereof shall establish such waiver. The Contractor shall procure and carry at its sole cost and expense through the life of this contract, insurance protection as hereinafter specified. Coverage in excess of that specified herein also shall be acceptable. Such insurance shall be carried with an insurance company authorized to transact business in the State of Texas and shall cover all operations in connection with this contract, whether performed by the Contractor or a subcontractor, or separate policies shall be provided covering the operation of each subcontractor. A certificate of insurance specifying each and all coverages shall be submitted prior to contract execution. Page Intentionally Left Blank CONTRACT Page Intentionally Left Blank Contract 17769 � STATE OF TEXAS COUNTY OF LUBBOCK THIS AGREEMENT, made and entered into this 26th day of March , 2024 by and between the City of Lubbock, County of Lubbock, State of Texas, acting by and through the Mayor, City of Lubbock, thereunto authorized to do so, hereinafter referred to as OWNER, and Matthews Backhoe. Inc. of the City of Lubbock, County of Lubbock and the State of Texas hereinafter termed CONTRACTOR. WITNESSETH: That for and in consideration of the payments and agreements hereinafter mentioned, to be made and performed by the OWNER and under the conditions expressed in the bond bearing even date herewith (if any) the CONTRACTOR hereby agrees with OWNER to commence and complete the construction of certain improvements described as follows: RFP 24-17769-YB 1714 E. Broadway Demo and all extra work in connection therewith, under the terms as stated in the contract documents and at his (or their) own proper cost and expense to furnish all materials, supplies, machinery, equipment, tools, superintendence, labor, insurance and other accessories and services necessary to complete the said construction in accordance with the contract documents as defined in the General Condition of Agreement. Matthews Backhoe, Inc.'s proposal dated January 16, 2024 , is incorporated into and made a part of this agreement. The CONTRACTOR hereby agrees to commence work within ten days after the date written notice to do so shall have been given to him and to substantially complete same within the time specified in the contract documents. The OWNER agrees to pay the CONTRACTOR in current funds for the performance of the contract in accordance with the proposal submitted therefore, subject to additions and deductions, as provided in the contract documents and to make payment on account thereof as provided therein. IN WITNESS WHEREOF, the parties to these presents have executed this agreement in Lubbock, Lubbock County, Texas in the year and day first above written. CONTRACTOR: Matthews ckh , Inc. By: P NTED NAME: — � TITLE: �pre ry, q h CITY OF LUB , EXAS (OWNER): By: Tray Payne, yor ATTEST. Courtney az, City Secretary COMPLETE ADDRESS: Matthews Backhoe, Inc. P. O. Box 3187 Lubbock, TX 79452 ATTEST: APPRO S TO CONTENT: Stu er, Director of Code Enforcement Name (Printed) Date Corporate Secretary APPROVED AS TO FORM: Am s, Depu C' Attorney � Page Intentionally Left Blank GENERAL CONDITIONS OF THE AGREEMENT Page Intentionally Left Blank GENERAL CONDITIONS OF THE AGREEMENT 1. OWNER Whenever the word Owner, or First Party, are used in this contract, it shall be understood as referring to the City of Lubbock, Texas. 2. CONTRACTOR Whenever the word Contractor, or Second Party, is used, it shall be understood to mean the person, persons, co -partnership or corporation, to wit Matthews Backhoe, Inc. who has agreed to perform the work embraced in this contract, or their legal representative. 3. OWNER'S REPRESENTATIVE Whenever the word Owner's Representative or representative is used in this contract, it shall be understood as referring to, City of Lubbock, or its representative Department Representative , so designated who will inspect constructions; or to such other representatives, supervisors, architects, engineers, or inspectors as may be authorized by said Owner to act in any particular under this agreement. Engineers, supervisors or inspectors will act for the Owner under the direction of Owner's Representative, but shall not directly supervise the Contractor or persons acting on behalf of the Contractor. 4. CONTRACT DOCUMENTS The contract's documents shall consist of the Notice to Bidders, General Instructions to Bidders, Response, Signed Agreement, Statutory Bonds (if required), General Conditions of the Agreement, Special Conditions of the Agreement (if any), Specifications, Plans, Insurance Certificates, and all other documents made available to Bidder for inspection in accordance with the Notice to Bidders. The above described materials are sometimes referred to herein as the "contract" or "contract documents". 5. INTERPRETATION OF PHRASES Whenever the words "Directed," "Permitted," "Designated," "Required," "Considered Necessary," "Prescribed," or words of like import are used, it shall be understood that the direction, requirement, permission, order, designation or prescription of the Owner's Representative is intended; and similarly, the words "Approved," "Acceptable," "Satisfactory," or words of like import shall mean approved by or acceptable or satisfactory to the Owner's Representative. 6. SUBCONTRACTOR The term Subcontractor, as employed herein, includes only those having a direct contract with the Contractor for performance of work on the project contemplated by these contract documents. Owner shall have no responsibility to any Subcontractor employed by Contractor for performance of work on the project contemplated by these contract documents, but said Subcontractors will look exclusively to Contractor for any payments due Subcontractor. The City reserves the right to approve or disapprove the selection of any subcontractor(s). 7. WRITTEN NOTICE Written notice shall be deemed to have been duly served if delivered in person to the individual or to a member of the firm or to an officer of the corporation for whom it is intended, or if delivered at or sent certified mail to the last business address known to the party who gives the notice. 8. CONTRACTOR'S RESPONSIBILITIES Unless otherwise stipulated, the Contractor shall provide and pay for all materials, supplies, machinery, equipment, tools, superintendence, labor, insurance, and all water, light, power, fuel, transportation and all other facilities necessary for the execution and completion of the work covered by the contract documents. Unless otherwise specified, all materials shall be new and both workmanship and materials shall be of a good quality. The Contractor shall, if required, furnish satisfactory evidence as to the kind and quality of materials. Materials or work described in words which so applied have well known, technical or trade meaning shall be held to refer such recognized standards. All work shall be done and all materials furnished in strict conformity with the contract documents. 9. SUBSTANTIALLY COMPLETED The term "Substantially Completed" is meant that the structure or project contemplated by the contract documents has been made suitable for use or occupancy or the facility is in a condition to serve its intended purpose, but still may require minor miscellaneous work and adjustment. 10. LAYOUT Except as specifically provided herein, the Contractor shall be responsible for laying out all work and shall accomplish this work in a manner acceptable to the Owner's Representative. The Owner's Representative will check the Contractor's layout of all major structures and any other layout work done by the Contractor at Contractor's request, but this check does not relieve the Contractor of the responsibility of correctly locating all work in accordance with the Plans and Specifications. 11. KEEPING OF PLANS AND SPECIFICATIONS ACCESSIBLE The Contractor shall be furnished five copies of all Plans and Specifications without expense to Contractor and Contractor shall keep one copy of same consistently accessible on the job site. 12. RIGHT OF ENTRY The Owner's Representative may make periodic visits to the site to observe the progress or quality of the executed work and to determine, in general, if the work is proceeding in accordance with the contract documents. Owner's Representative will not be required to make exhaustive or continuous onsite inspections to check the quality or quantity of the work, nor will Owner's Representative be responsible for the construction means, methods, techniques, sequences or procedures, or the safety precautions incident thereto. Notwithstanding the Owner's Representative's rights of entry hereunder, the Owner's Representative will not be responsible for the Contractor's failure to perform the work in accordance with the Contract Documents. 13. LINES AND GRADES The Contractor is responsible for construction layout based on the control provided in the construction documents. All lines and grades shall be furnished whenever Owner's Representative (as distinguished from Resident Project Representative(s)) deems said lines and grades are necessary for the commencement of the work contemplated by these contract documents or the completion of the work contemplated by these contract documents. Whenever necessary, Contractor shall suspend its work in order to permit Owner's Representative to comply with this requirement, but such suspension will be as brief as practical and Contractor shall be allowed no extra compensation therefore. The Contractor shall give the Owner's Representative ample notice of the time and place where lines and grades will be needed. All stakes, marks, etc., shall be carefully preserved by the Contractor, and in case of careless destruction or removal by Contractor, its Subcontractors, or its employees, such stakes, marks, etc., shall be replaced by the Owner's Representative at Contractor's expense. 14. OWNER'S REPRESENTATIVE'S AUTHORITY AND DUTY Unless otherwise specified, it is mutually agreed between the parties to this Agreement that the Owner's Representative (as distinguished from Resident Project Representative(s))has the authority to review all work included herein. The Owner's Representative has the authority to stop the work whenever such stoppage may be necessary to ensure the proper execution of the contract. The Owner's Representative shall, in all cases, determine the amounts and quantities of the several kinds of work which are to be paid for under the contract documents, and shall determine all questions in relation to said work and the construction thereof, and shall, in all cases, decide every question which may arise relative to the execution of this contract on the part of said Contractor. The decision of the Owner's Representative shall be conclusive in the absence of written objection to same delivered to Owner's Representative within fifteen (15) calendar days of any decision or direction by Owner's Representative. In the absence of timely written objection by Contractor, as provided herein, any and all objection or objections shall be deemed waived. 15. SUPERINTENDENCE AND INSPECTION It is agreed by the Contractor that the Owner's Representative shall be and is hereby authorized to appoint from time to time such subordinate engineers, supervisors, or inspectors, as distinguished from Resident Project Representative, as the said Owner's Representative may deem proper to inspect the materials furnished and the work done under this Agreement, and to see that said material is furnished and said work is done in accordance with the specifications therefore. The Contractor shall furnish all reasonable aid and assistance required by the subordinate engineers, supervisors or inspectors for the proper inspection and examination of the work. The Contractor shall regard and obey the directions and instructions of any subordinate engineers, supervisors or inspectors so appointed, when such directions and instructions are consistent with the obligations of this Agreement and accompanying plans and specifications provided, however, should the Contractor object to any orders by any subordinate engineer, supervisor or inspector, the Contractor may within fifteen (15) calendar days make written appeal to the Owner's Representative for its decision. In the absence of timely written objection by Contractor, as provided herein, any and all objection or objections shall be deemed waived. 16. CONTRACTOR'S DUTY AND SUPERINTENDENCE The Contractor shall give personal attention to the faithful prosecution and completion of this contract and shall keep on the work, during its progress, a competent superintendent and any necessary assistants, all satisfactory to Owner's Representative. The superintendent shall represent the Contractor in its absence and all directions given to superintendent shall be binding as if given to the Contractor. It is expressly agreed that adequate supervision by competent and reasonable representatives of the Contractor is essential to the proper performance of the work and lack of such supervision shall be grounds for suspending operations of the Contractor. The work, from its commencement to completion, shall be under the exclusive charge and control of the Contractor and all risk in connection therewith shall be borne by the Contractor. The Owner or Owner's Representatives shall not be responsible for the acts or omissions of the Contractor, or any subcontractors, or any of Contractor's agents or employees, or any other persons performing any of the work. 17. CONTRACTOR'S UNDERSTANDING It is understood and agreed that the Contractor has, by careful examination, satisfied itself as to the nature and location of the work, the confirmation of the ground, the character, quality and quantity of materials to be encountered, the character of equipment and facilities needed preliminary to and during the prosecution of the work, and the general and local conditions, and all other matters which in any way affect the work under the contract documents. No oral agreement or conversation with any officer, agent, or employee of the Owner, or Owner's Representative either before or after the execution of this contract, shall affect or modify any of the terms or obligations herein contained. Subject to the rights of Owner as set forth in Paragraph 23 hereof, all modifications and/or amendments to the contract documents, shall be in writing, and executed by Owner's Representative and Contractor. Unless otherwise specified herein, all loss, expense or damage to Contractor arising out of the nature of the work to be done, or from the action of the elements, or from any unforeseen circumstance and the prosecution of the work, shall be sustained and borne by the Contractor at its own cost and expense. 18. CHARACTER OF WORKERS The Contractor agrees to employ only orderly and competent workers, skillful in the performance in the type of work required under this contract, to do the work; and agrees that whenever the Owner's Representative shall inform Contractor in writing that any person or persons on the work, are, in Owner's Representative's sole opinion, incompetent, unfaithful, disorderly, or otherwise unacceptable to Owner or Owner's Representative, such person or persons shall be discharged from the work and shall not again be employed on the work without the Owner's Representative's written consent. 19. CONSTRUCTION PLANT The Contractor shall provide all labor, tools, equipment, machinery and materials necessary in the prosecution and completion of this contract where it is not otherwise specifically provided that Owner shall furnish same, and it is also understood that Owner shall not be held responsible for the care, preservation, conservation, or protection of any materials, tools, equipment or machinery or any part of the work until it is finally completed and accepted. The building of structures for the housing of workers or equipment will be permitted only at such places as the Owner's Representative shall consent or direct, and the sanitary conditions of the grounds in or about such structure shall at all times be maintained in a manner satisfactory to the Owner's Representative. 20. SANITATION Necessary sanitary conveniences for the use of laborers on the work site, properly secluded from public observation, shall be constructed and maintained by the Contractor in such manner and at such points as shall be approved by the Owner's Representative and their use shall be strictly enforced. 21. OBSERVATION AND TESTING The Contractor is responsible for construction quality control testing, cost, and reporting of the type and extent required by the contract documents. The Owner or Owner's Representative shall have the right at all times to observe and test the work. Contractor shall make necessary arrangements and provide proper facilities and access for such observation and testing at any location wherever such work is in preparation or progress. Contractor shall ascertain the scope of any observation that may be contemplated by Owner or Owner's Representative and shall give ample notice as to the time each part of the work will be ready for such observation. Owner or Owner's Representative may reject any such work found to be defective or not in accordance with the contract documents, regardless of the stage of its completion or the time or place of discovery of such errors and regardless of whether Owner's Representative has previously accepted the work. If any such work should be covered without approval or consent of the Owner, it must, if requested by Owner or Owner's Representative, be uncovered for examination at Contractor's expense. In the event that any part of the work is being fabricated or manufactured at a location where it is not convenient for Owner or Owner's Representative to make observations of such work or require testing of said work, then in such event Owner or Owner's Representative may require Contractor to furnish Owner or Owner's Representative certificates of inspection, testing or approval made by persons competent to perform such tasks at the location where that part of the work is being manufactured or fabricated. All such tests will be in accordance with the methods prescribed by the American Society for Testing and Materials or such other applicable organization as may be required by law or the contract documents. If any such work which is required to be inspected, tested, or approved is covered up without written approval or consent of the Owner or Owner's Representative, it must, if requested by the Owner or Owner's Representative, be uncovered for observation and testing at the Contractor's expense. The cost of all such inspections, tests and approvals shall be borne by the Contractor unless otherwise provided herein. Any work which fails to meet the requirements of any such tests, inspections or approvals, and any work which meets the requirements of any such tests or approvals but does not meet the requirements of the contract documents shall be considered defective, and shall be corrected at the Contractor's expense. Neither observations by the Owner or Owner's Representative, nor inspections, tests, or approvals made by Owner, Owner's Representative, or other persons authorized under the contract documents 22 23 to make such inspections, tests, or approvals shall relieve the Contractor from its obligation to perform the work in accordance with the requirements of the contract documents. DEFECTS AND THEIR REMEDIES It is expressly agreed that if the work or any part thereof, or any material brought on the site of the work for use in the work or selected for the same, shall be deemed by the Owner or Owner's Representative as unsuitable or not in conformity with plans, specifications and/or contract documents, the Contractor shall, after receipt of written notice thereof from the Owner's Representative, forthwith remove such material and rebuild or otherwise remedy such work so that it shall be in full accordance with the contract documents. It is further agreed that any remedial action contemplated as hereinabove set forth shall be at Contractor's expense. CHANGES AND ALTERATIONS The Contractor further agrees that the Owner may make such changes and alterations as the Owner may see fit, in the line, grade, form dimensions, plans or materials for the work herein contemplated, or any part thereof, either before or after the beginning of the construction, without affecting the validity of this contract and the accompanying bond. If such changes or alterations diminish the quantity of the work to be done, they shall not constitute the basis for a claim for damages, or anticipated profits on the work that may be dispensed with. If they increase the amount of work, and the increased work can fairly be classified under the specifications, such increase shall be paid according to the quantity actually done and at the unit price established for such work under this contract; otherwise such additional work shall be paid for as provided under Extra Work. hi case the Owner shall make such changes or alterations as shall make useless any work already done or material already furnished or used in said work, then the Owner shall recompense the Contractor for any material or labor so used, and for actual expenses incurred in preparation for the work as originally planned. 24. EXTRA WORK The term "extra work" as used in this contract shall be understood to mean and include all work that may be required by the Owner or Owner's Representative to be done by the Contractor to accomplish any change, alteration or addition to the work as shown on the plans and specifications or contract documents and not covered by Contractor's proposal, except as provided under Changes and Alterations in Paragraph 23. It is agreed that the Contractor shall perform all extra work under the observation of the Owner's Representative when presented with a written work order signed by the Owner's Representative; subject, however, to the right of the Contractor to require written confirmation of such extra work order by the Owner. It is also agreed that the compensation to be paid to the Contractor for performing said extra work shall be determined by the following methods: Method (A) - By agreed unit prices; or Method (B) - By agreed lump sum; or Method (C) - If neither Method (A) or Method (B) be agreed upon before the extra work is commenced, then the Contractor shall be paid the lesser of the following: (1) actual field cost of the extra work, plus fifteen (15%) percent to the firm actually performing the work, and additional higher -tier markups limited to 5% to cover additional overhead and insurance costs; or (2) the amount that would have been charged by a reasonable and prudent Contractor as a reasonable and necessary cost for performance of the extra work, as estimated by the Engineer and approved by the Owner.. In the event said extra work be performed and paid for under Method (C)(1), then the provisions of this paragraph shall apply and the "actual field cost" is hereby defined to include the cost of all workers, such as foremen, timekeepers, mechanics and laborers, materials, supplies, teams, trucks, rentals on machinery and equipment, for the time actually employed or used on such extra work, plus actual transportation charges necessarily incurred, together with all expenses incurred directly on account of such extra work, including Social Security, Old Age Benefits, Maintenance Bonds, Public Liability and Property Damage and Workers' Compensation and all other insurances as may be required by law or ordinances or directed by the Owner or Owner's Representative, or by them agreed to. Owner's Representative may direct the form in which accounts of the actual field cost shall be kept and records of these accounts shall be made available to the Owner's Representative. The Owner's Representative may also specify in writing, before the work commences, the method of doing the work and the type and kind of machinery and equipment to be used; otherwise, these matters shall be determined by the Contractor. Unless otherwise agreed upon, the prices for the use of machinery and equipment shall be determined by using 100%, unless otherwise specified, of the latest Schedule of Equipment and Ownership Expenses adopted by the Associated General Contractors of America. Where practical, the terms and prices for the use of machinery and equipment shall be incorporated in the written extra work order. The fifteen percent (15%) of the actual field cost to be paid to Contractor shall cover and compensate Contractor for its profit, overhead, general superintendence and field office expense, and all other elements of cost and expense not embraced within the actual field cost as herein defined, save that where the Contractor's Camp or Field Office must be maintained primarily on account of such Extra Work, then the cost to maintain and operate the same shall be included in the "actual field cost." No claim for extra work of any kind will be allowed unless ordered in writing by Owner's Representative. In case any orders or instructions appear to the Contractor to involve extra work for which Contractor should receive compensation or an adjustment in the construction time, Contractor shall prior to commencement of such extra work, make written request to the Owner's Representative for a written order authorizing such extra work. Should a difference of opinion arise as to what does or does not constitute extra work or as to the payment therefore, and the Owner's Representative insists upon its performance, the Contractor shall proceed with the work after making written request for written order and shall keep adequate and accurate account of the actual field cost thereof, as provided under Method (C) (1). If Contractor does not notify Owner's Representative before the commencement of any extra work, any claim for payment due to alleged extra work shall be deemed waived. 25. DISCREPANCIES AND OMISSIONS It is further agreed that it is the intent of the contract documents that all work described in the proposal, the specifications, plans and other contract documents, is to be done for the prices quoted by the Contractor and that such price shall include all appurtenances necessary to complete the work in accordance with the intent of these contract documents as interpreted by Owner's Representative. Notices of any discrepancies or omissions in these plans, specifications, or contract documents, shall be given to the Owners' Representative and a clarification obtained before the proposals are received, and if no such notice is received by the Owner's Representative prior to the opening of proposals, then it shall be deemed that the Contractor fully understands the work to be included and has provided sufficient sums in its proposal to complete the work in accordance with these plans and specifications. If Contractor does not notify Owner's Representative before offering of any discrepancies or omissions, then it shall be deemed for all purposes that the plans and specifications are sufficient and adequate for completion of the project. It is further agreed that any request for clarification must be submitted no later than five (5) calendar days prior to the opening of proposals. In the absence of a requested clarification for a conflict in the documents prior to proposals being reviewed, it will be assumed that the Contractor proposes the higher cost alternative on conflicts identified after proposals are reviewed. 26. RIGHT OF OWNER TO MODIFY METHODS AND EOUIPMENT If at any time the methods or equipment used by the Contractor are found to be inadequate to secure the quality of work with the rate of progress required under this contract, the Owner or Owner's Representative may order the Contractor in writing to increase their safety or improve their character and efficiency and the Contractor shall comply with such order. If, at any time, the working force of the Contractor is inadequate for securing the progress herein specified, the Contractor shall, if so ordered in writing, increase its force or equipment, or both, to such an extent as to give reasonable assurance of compliance with the schedule of progress. 27. PROTECTION AGAINST ACCIDENT TO EMPLOYEES AND THE PUBLIC AND GENERAL INDEMNITY The Contractor shall take out and procure a policy or policies of Workers' Compensation Insurance with an insurance company licensed to transact business in the State of Texas, which policy shall comply with the Workers' Compensation laws of the State of Texas. The Contractor shall at all times exercise reasonable precaution for the safety of employees and others on or near the work and shall comply with all applicable provisions of federal, state and municipal laws and building and construction codes. All machinery and equipment and other physical hazards shall be guarded in accordance with the "Manual of Accident Prevention in Construction" of Associated General Contractors of America, except where incompatible with federal, state or municipal laws or regulations. The Contractor, its sureties and insurance carriers shall defend, indemnify and hold harmless the Owner and Engineer and all of its officers, agents and employees against any all losses, costs, damages, expenses, liabilities, claims and/or causes of action, whether known or unknown, fixed, actual, accrued or contingent, liquidated or unliquidated, including, but not limited to, attorneys' fees and expenses, in connection with, incident to, related to, or arising out of, the Contractor's or any subcontractor's, agent's or employee's, in any manner whatsoever, omission, execution and/or supervision of this contract, and the project which is the subject matter of this contract. The safety precautions taken shall be the sole responsibility of the Contractor, in its sole discretion as an Independent Contractor; inclusion of this paragraph in the Agreement, as well as any notice which may be given by the Owners or the Owner's Representative concerning omissions under this paragraph as the work progresses, are intended as reminders to the Contractor of its duty and shall not be construed as any assumption of duty to supervise safety precautions by either the Contractor or any of its subcontractors. 28. CONTRACTOR'S INSURANCE The Contractor shall not commence work under this contract until he has obtained all insurance as required in the General Conditions of the contract documents, from an underwriter authorized to do business in the State of Texas and satisfactory to the City. Proof of coverage shall be furnished to the City and written notice of cancellation or any material change will be provided ten (10) calendar days in advance of cancellation or change. All policies of insurance, required herein, including policies of insurance required to be provided by Contractor and its subcontractors, shall contain a waiver of any and all of the insurer's or payor's, in the event of self-insurance, rights to subrogation that any such insurer or payor, in the event of self-insurance, may acquire by virtue of payment of any loss under such insurance or self-insurance. All certificates of insurance submitted to the City in conformity with the provisions hereof shall establish such waiver. The Contractor shall procure and carry at its sole cost and expense through the life of this contract, insurance protection as hereinafter specified. Coverage in excess of that specified herein also shall be acceptable. Such insurance shall be carried with an insurance company authorized to transact business in the State of Texas and shall cover all operations in connection with this contract, whether performed by the Contractor or a subcontractor, or separate policies shall be provided covering the operation of each subcontractor. A certificate of insurance specifying each and all coverages shall be submitted prior to contract execution. PROOF OF COVERAGE SHALL BE FURNISHED TO THE CITY OF LUBBOCK IN THE FORM OF A CERTIFICATE OF INSURANCE. THE INSURANCE CERTIFICATES FURNISHED SHALL NAME THE CITY OF LUBBOCK AS ADDITIONAL INSURED ON AUTO/GENERAL LIABILITY ON A PRIMARY AND NON-CONTRIBUTORY BASIS TO INCLUDE PRODUCTS OF COMPLETE OPERATIONS. PROVIDE A WAIVER OF SUBROGATION IN FAVOR OF THE CITY OF LUBBOCK. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO PROVIDE TO THE OWNER ALL PROOF OF COVERAGE INSURANCE DOCUMENTS INCLUDING WORKERS COMPENSATION COVERAGE FOR EACH SUBCONTRACTOR. COPIES OF THE ENDORSEMENTS ARE REQUIRED. Commercial General Liability Requirements: $1M occurrence / $2M aggregate (can be combined with an Excess Liability to meet requirements). CGL is required in ALL contracts. It is perhaps the most important of all insurance policies in a contractual relationship. It insures the Contractor has broad liability coverage for contractual activities and for completed operations. Commercial General Liability to include Products — Completion/OP, Personal and Advertising Injury, Contractual Liability, Fire Damage (any one fire), and Medical Expenses (any one person). Commercial General Liability Heavy Equipment Endorsement: Heavy equipment endorsement is required. Commercial General Liability Digging Endorsement: XCU endorsement is required. Automobile Liability Requirements: $1M/occurrence is needed. Professional Liability Requirements: $1M occurrence / $2M aggregate Pollution Liability Requirements: $1M occurrence / $2M aggregate. * The City of Lubbock (including its officials, employees and volunteers) shall be afforded additional insured status on a primary and non-contributory basis on all liability policies except professional liabilities and workers' comp. * Waivers of Subrogation are required for CGL, AL, and WC. * To Include Products of Completed Operations endorsement. * Carrier will provide a 30-day written notice of cancellation, 10-day written notice for non- payment. * Carriers must meet a A.M. Best rating of A- or better. * Subcontractors must carry same limits as listed above. 1. Definitions: Certificate of coverage ("certificate") - A copy of a certificate of insurance, a certificate of authority to self -insure issued by the commission, or a coverage agreement (TWCC-81, TWCC-82, TWCC-83, or TWCC-84), showing statutory workers' compensation insurance coverage for the person's or entity's employees providing services on a project, for the duration of the project. Duration of the project - includes the time from the beginning of the work on the project until the Contractor's/person's work on the project has been completed and accepted by the governmental entity. Persons providing services on the project ("subcontractor" in Section 406.096, Texas Labor Code) - includes all persons or entities performing all or part of the services the Contractor has undertaken to perform on the project, regardless of whether that person contracted directly with the Contractor and regardless of whether that person has employees. This includes, without limitation, independent contractors, subcontractors, leasing companies, motor carriers, owner -operators, employees of any such entity, or employees of any entity which furnishes persons to provide services on the project. "Services" include, without limitation, providing, hauling, or delivering equipment or materials, or providing labor, transportation, or other service related to a project. "Services" does not include activities unrelated to the project, such as food/beverage vendors, office supply deliveries, and delivery of portable toilets. 2. The Contractor shall provide coverage, based on proper reporting of classification codes and payroll amounts and filing of any coverage agreements, which meets the statutory requirements of Texas Labor Code, Section 401.011(44) for all employees of the contractor providing services on the project, for the duration of the project. 3. The Contractor must provide a certificate of coverage to the governmental entity prior to being awarded the contract. 4. If the coverage period shown on the Contractor's current certificate of coverage ends during the duration of the project, the Contractor must, prior to the end of the coverage period, file a new certificate of coverage with the governmental entity showing that coverage has been extended. 5. The Contractor shall obtain from each person providing services on the project, and provide to the governmental entity: (a) a certificate of coverage, prior to that person beginning work on the project, so the governmental entity will have on file certificates of coverage showing coverage for all persons providing services on the project; and (b) no later than seven days after receipt by the Contractor, a new certificate of coverage showing extension of coverage, if the coverage period shown on the current certificate of coverage ends during the duration of the project. 6 The Contractor shall retain all required certificates of coverage for the duration of the project and for one year thereafter. 7. The Contractor shall notify the governmental entity in writing by certified mail or personal delivery, within 10 days after the Contractor knew or should have known, of any change that materially affects the provision of coverage of any person providing services on the project. 8. The Contractor shall post on each project site a notice, in the text, form and manner prescribed by the Texas Workers' Compensation Commission, informing all persons providing services on the project that they are required to be covered, and stating how a person may verify coverage and report lack of coverage. 9. The Contractor shall contractually require each person with whom it contracts to provide services on the project, to: (a) provide coverage, based on proper reporting of classification codes and payroll amounts and filing of any coverage agreements, which meets the statutory requirements of Texas Labor Code, Section 401.011(44) for all of its employees providing services on the project, for the duration of the project; (b) provide to the Contractor, prior to that person beginning work on the project, a certificate of coverage showing that coverage is being provided for all employees of the person providing services on the project, for the duration of the project; (c) provide the Contractor, prior to the end of the coverage period, a new certificate of coverage showing extension of coverage, if the coverage period shown on the current certificate of coverage ends during the duration of the proj ect; (d) obtain from each other person with whom it contracts, and provide to the Contractor: (1) a certificate of coverage, prior to the other person beginning work on the project; and (2) a new certificate of coverage showing extension of coverage, prior to the end of the coverage period, if the coverage period shown on the current certificate of coverage ends during the duration of the project; (e) retain all required certificates of coverage on file for the duration of the project and for one year thereafter; (f) notify the governmental entity in writing by certified mail or personal delivery, within 10 days after the person knew or should have known, of any change that materially affects the provision of coverage of any person providing services on the project; and (g) contractually require each person with whom it contracts to perform as required by paragraphs (a) - (g), with the certificates of coverage to be provided to the person for whom they are providing services. 10. By signing this contract or providing or causing to be provided a certificate of coverage, the Contractor is representing to the governmental entity that all employees of the Contractor who will provide services on the project will be covered by worker's compensation coverage for the duration of the project, that the coverage will be based on proper reporting of classification codes and payroll amounts, and that all coverage agreements will be filed with the appropriate insurance carrier or, in the case of a self -insured, with the commission's Division of Self -Insurance Regulation. Providing false or misleading information may subject the Contractor to administrative penalties, criminal penalties, civil penalties, or other civil actions. 11. The Contractor's failure to comply with any of these provisions is a breach of contract by the Contractor which entitles the governmental entity to declare the contract void if the Contractor does not remedy the breach within ten days after receipt of notice of breach from the governmental entity. G. Proof of Coverage Before work on this contract is commenced, each Contractor and subcontractor shall submit to the Owner for approval five Certificates of Insurance covering each insurance policy carried and offered as evidence of compliance with the above insurance requirements, signed by an authorized representative of the insurance company setting forth: (1) The name and address of the insured. (2) The location of the operations to which the insurance applies. (3) The name of the policy and type or types of insurance in force thereunder on the date borne by such certificate. (4) The expiration date of the policy and the limit or limits of liability thereunder on the date borne by such certificate. (5) A provision that the policy may be canceled only by mailing written notice to the named insured at the address shown in the proposal specifications. (6) A provision that written notice shall be given to the City ten days prior to any change in or cancellation of the policies shown on the certificate. (7) The certificate or certificates shall be on the form (or identical copies thereof) contained in the job specifications. No substitute of nor amendment thereto will be acceptable. (8) If policy limits are paid, new policy must be secured for new coverage to complete proj ect. (9) A Contractor shall: (a) provide coverage for its employees providing services on a project, for the duration of the project based on proper reporting of classification codes and payroll amounts and filling of any coverage agreements; (b) provide a certificate of coverage showing workers' compensation coverage to the governmental entity prior to beginning work on the project; (c) provide the governmental entity, prior to the end of the coverage period, a new certificate of coverage showing extension of coverage, if the coverage period shown on the Contractor's current certificate of coverage ends during the duration of the project; (d) obtain from each person providing services on a project, and provide to the governmental entity: (i) a certificate of coverage, prior to that person beginning work on the project, so the governmental entity will have on file certificates of coverage showing coverage for all persons providing services on the proj ect; and (ii) no later than seven days after receipt by the Contractor, a new certificate of coverage showing extension of coverage, if the coverage period shown on the current certificate of coverage ends during the duration of the project; (e) retain all required certificates of coverage on file for the duration of the project and for one year thereafter; (f) notify the governmental entity in writing by certified mail or personal delivery, within 10 days after the Contractor knew or should have known, of any change that materially affects the provision of coverage of any person providing services on the project; (g) post a notice on each project site informing all persons providing services on the project that they are required to be covered, and stating how a person may verify current coverage and report failure to provide coverage. This notice does not satisfy other posting requirements imposed by the Texas Worker's Compensation Act or other commission rules. This notice must be printed with a title in at least 30-point bold type and text in at least 19-point normal type, and shall be in both English and Spanish and any other language common to the worker population. The text for the notices shall be the following text provided by the commission on the sample notice, without any additional words or changes: REQUIRED WORKERS' COMPENSATION COVERAGE "The law requires that each person working on this site or providing services related to this construction project must be covered by workers' compensation insurance. This includes persons providing, hauling, or delivering equipment or materials, or providing labor or transportation or other service related to the project, regardless of the identity of their employer or status as an employee. " "Call the Texas Workers' Compensation Commission at 800-372-7713 or 512-804-4000 (www.tastate.tx.us) to receive information of the legal requirements for coverage, to verify whether your employer has provided the required coverage, or to report an employer's failure to provide coverage; " and (h) contractually require each person with whom it contracts to provide services on aproject, to: (i) provide coverage based on proper reporting of classification codes and payroll amounts and filing of any coverage agreements for all of its employees providing services on the project, for the duration of the proj ect; (ii) provide a certificate of coverage to the Contractor prior to that person beginning work on the project; (iii) include in all contracts to provide services on the project the following language: "By signing this contract or providing or causing to be provided a certificate of coverage, the person signing this contract is representing to the governmental entity that all employees of the person signing this contract who will provide services on the project will be covered by workers' compensation coverage for the duration of the project, that the coverage will be based on proper reprinting of classification codes and payroll amounts, and that all coverage agreements will be filed with the appropriate insurance carrier or, in the case of a self -insured, with the commission's Division of Self -Insurance Regulation. Providing false or misleading information may subject the Contractor to administrative penalties, criminal penalties, civil penalties, or other civil actions."; (iv) provide the Contractor, prior to the end of the coverage period, a new certificate of coverage showing extension of coverage, if the coverage period shown on the current certificate of coverage ends during the duration of the project; (v) obtain from each other person with whom it contracts, and provide to the Contractor: (1) a certificate of coverage, prior to the other person beginning work on the project; and (2) prior to the end of the coverage period, a new certificate of coverage showing extension of the coverage period, if the coverage period shown on the current certificate of coverage ends during the duration of the project; (vi) retain all required certificates of coverage on file for the duration of the project and for one year thereafter; (vii) notify the governmental entity in writing by certified mail or personal delivery, within 10 days after the person knew or should have known, of any change that materially affects the provision of coverage of any person providing services on the project; and (viii) contractually require each other person with whom it contracts, to perform as required by paragraphs (i)-(viii), with the certificate of coverage to be provided to the person for whom they are providing services. 29. DISABLED EMPLOYEES Contractors having more than fifteen (15) employees agree to comply with the Americans with Disabilities Act of 1990, and agree not to discriminate against a qualified individual with a disability because of the disability of such individual in regard to job application procedures, the hiring, advancement, or discharge of employees, employee compensation, job training, and other terms, conditions, and privileges of employment. 30. PROTECTION AGAINST CLAIMS OF SUBCONTRACTORS, LABORERS, MATERIALMEN, AND FURNISHERS OF MACHINERY, EQUIPMENT AND SUPPLIES Without limiting, in any way, manner or form, the indemnity provided by Contractor in paragraph 27 hereof, the Contractor agrees that it will indemnify and save the Owner and Engineer and all of its officers, agents and employees, harmless against any and all claims, liabilities, losses, damages, expenses and causes of action arising out of, in any way, manner or form, the demands of subcontractors, laborers, workmen, mechanics, material men and furnishers of machinery and parts thereof, equipment, power tools, and supplies, incurred in the performance of this contract and the project which is the subject matter of this contract. When Owner so desires, the Contractor shall furnish satisfactory evidence that all obligations of the nature hereinabove designated have been paid, discharged or waived. 31. PROTECTION AGAINST ROYALTIES OR PATENT INVENTION The Contractor shall pay all royalties and license fees, and shall provide for the use of any design, device, material or process covered by letters patent or copyright by suitable legal agreement with the Patentee or owner thereof. Without limiting, in any way, manner or form, the indemnity provided by Contractor in paragraph 27 hereof, the Contractor shall defend all suits or claims for infringement of any patent or copyrights and shall indemnify and save the Owner and Engineer, and all of its officers, agents and employees harmless from any loss on account thereof, except that Owner shall defend all such suits and claims and shall be responsible for all such loss when a particular design, device, material or process or the product of a particular manufacturer or manufacturers is specified or required in these contract documents by Owner; provided, however, if choice of alternate design, device, material or process is allowed to the Contractor, then Contractor shall indemnify and save Owner, and all of its officers, agents and employees harmless from any loss on account thereof. Notwithstanding anything herein to the contrary, if the material or process specified or required by Owner and/or this contract is an infringement, the Contractor shall be responsible for such loss unless it gives written notice of such infringement to the Owner's Representative prior to offering. 32. LAWS AND ORDINANCES The Contractor shall at all times observe and comply with all federal, state and local laws, ordinances and regulations, which in any manner affect the contract or the work, and without limiting, in any way, manner or form, the indemnity provided by Contractor in paragraph 27 hereof, Contractor shall indemnify and save harmless the Owner and Engineer and all of its officers, agents, and employees against any claims arising from the violation of any such laws, ordinances, and regulations, whether by the Contractor, its employees, or subcontractors. If the Contractor observes that the plans and specifications are at variance therewith, he shall notify the Owner's Representative in writing prior to proposing and any necessary changes shall be adjusted as provided in the contract for changes in the work. In the absence of timely written notification to Owner's Representative of such variance or variances within said time, any objection and/or assertion that the plans and specifications are at variance with any federal, state or local laws, ordinances or regulations shall be deemed waived. If the Contractor, its employees or subcontractors perform any work contrary to such laws, ordinances, rules and regulations, and without such notice to the Owner's Representative, Contractor shall bear all costs arising there from. The Owner is a municipal corporation of the State of Texas and the law from which it derives its powers, insofar as the same regulates the obj ects for which, or the manner in which, or the conditions under which the Owner may enter into contracts, shall be controlling, and shall be considered as part of this contract to the same effect as though embodied herein. 33. SUBCONTRACTING The Contractor agrees that it will retain personal control and will give its personal attention to the fulfillment of this contract. The Contractor further agrees that subletting of any portion or feature of the work, or materials required in the performance of this contract, shall not relieve the Contractor from its full obligations to the Owner, as provided by the contract documents. 34. TIME FOR SUBSTANTIAL COMPLETION AND LIQUIDATED DAMAGES It is hereby understood and mutually agreed by and between the Contractor and the Owner, that the date of beginning and time for completion as specified in the Notice to Proceed and contract documents, respectively, of work to be done hereunder are essential conditions of this contract; and it is further mutually understood and agreed that the work embraced in this contract shall be commenced as provided in the contract documents. If the Contractor should neglect, fail, or refuse to substantially complete the work within the time herein specified, then the Contractor does hereby agree as part of the consideration for the awarding of this contract, the Owner may withhold permanently from Contractor's total compensation, the sum of $25.00 PER CONSECUTIVE CALENDAR DAY, not as a penalty, but as liquidated damages for the breach of the contract as herein set forth for each and every working day that the Contractor shall be in default after the time stipulated for substantially completing the work. If the Contractor should neglect, fail, or refuse to Finally complete the work within the time herein specified, then the Contractor does hereby agree as part of the consideration for the awarding of this contract, the Owner may withhold permanently from Contractor's total compensation, the sum of $25.00 PER CONSECUTIVE CALENDAR DAY, not as a penalty, but as liquidated damages for the breach of the contract as herein set forth for each and every working day that the Contractor shall fail to meet the time requirements stipulated for substantially completing the work. It is expressly understood and agreed, by and between Contractor and the Owner, that the time for the substantial completion of the work described herein is reasonable time for the completion of the same, taking into consideration the average climatic range and conditions and usual industrial conditions prevailing in this locality. The amount is fixed and agreed upon by and between the Contractor and the Owner because the actual damages the Owner would sustain in such event would be difficult and/or impossible to estimate, however, the amount agreed upon herein is a reasonable forecast of the amount necessary to render just compensation to Owner, and is expressly agreed to be not disproportionate to actual damages as measured at time of breach. IT IS FURTHER AGREED AND UNDERSTOOD BETWEEN THE CONTRACTOR AND OWNER THAT TIME IS OF THE ESSENCE OF THIS CONTRACT. 35. TIME AND ORDER OF COMPLETION It is the meaning and intent of this contract, unless otherwise herein specifically provided, that the Contractor shall be allowed to prosecute its work in such order of precedence, and in such manner as shall be most conductive to economy of construction. The Contractor shall ensure daily prosecution of the work is conducted every business day until completed, regardless if the work will be substantially or finally complete ahead of specified deadlines in the agreement, unless the City determines time off from said prosecution is necessary or reasonable and Contractor received said determination in writing from the City. Further, when the Owner is having other work done, either by contract or by its own force, the Owner's Representative (as distinguished from the Resident Project Representative) may direct the time and manner of constructing work done under this contract so that conflicts will be avoided and the construction of the various works being done for the Owner shall be harmonized. Additionally, inclement weather shall be the only other reason consistent, daily prosecution of the work may not take place on those inclement weather days. The Contractor shall submit, at such times as may reasonably be requested by the Owner's Representative, schedules which shall show the order in which the Contractor intends to carry on the work, with dates at which the Contractor will start the several parts of the work and estimated dates of completion of the several parts. 36. TIME OF PERFORMANCE The Contractor agrees that it has submitted its proposal in full recognition of the time required for the completion of this project, taking into consideration the average climatic range and industrial conditions prevailing in this locality, and has considered the liquidated damage provisions of paragraph 34 hereinabove set forth and expressly agrees that it shall not be entitled to, nor will it request, an extension of time on this contract, except when its work has been delayed by an act or neglect of the Owner, Owner's Representative, employees of the Owner or other contractors employed by the Owner, or by changes ordered in the work, or by strike, walkouts, acts of God or the public enemy, fire or flood. Any request for extension shall be in writing with the written request for same setting forth all justifications, in detail, for the request, and submitted to Owner's Representative within twenty (20) calendar days of the occurrence of the event causing said delay. A failure by Owner's Representative to affirmatively grant the extension no later than within twenty (20) calendar days of written submission by Contractor shall be deemed a denial, and final. Further, in the absence of timely written notification of such delay and request for extension, as provided herein, any request for extension by Contractor shall be deemed waived. 37. HINDRANCE AND DELAYS In executing the contract, the Contractor agrees that in undertaking to complete the work within the time herein fixed, Contractor has taken into consideration and made allowances for all hindrances and delays incident to such work, whether growing out of delays due to unusual and unanticipated circumstances, difficulties or delays in securing material or workers, or any other cause or occurrence. No charge shall be made by the Contractor for hindrance or delays from any cause during the progress of any part of the work embraced in this contract except where the work is stopped by order of the Owner or Owner's Representative for the Owner's convenience, in which event, such expense as in the sole judgment of the Owner's Representative that is caused by such stoppage shall be paid by Owner to Contractor. 38. QUANTITIES AND MEASUREMENTS No extra or customary measurements of any kind will be allowed, but the actual measured or computed length, area, solid contents, number and weight only shall be considered, unless otherwise specifically provided. In the event this contract is let on a unit price basis, then Owner and Contractor agree that this contract, including the specifications, plans and other contract documents are intended to show clearly all work to be done and material to be furnished hereunder. Where the estimated quantities are shown, and only when same are expressly stated to be estimates, for the various classes of work to be done and material to be furnished under this contract, they are approximate and are to be used only as a basis for estimating the probable cost of the work and for comparing their proposals offered for the work. In the event the amount of work to be done and materials to be furnished are expressly stated to be estimated, and only when same are expressly stated to be estimated, it is understood and agreed that the actual amount of work to be done and the materials to be furnished under this contract may differ somewhat from these estimates, and that where the basis for payment under this contract is the unit price method, payment shall be for the actual amount of work done and materials furnished on the project, provided that the over run or under run of estimated quantities not exceed 15% of the estimated quantity. 39. PROTECTION OF ADJOINING PROPERTY The Contractor shall take proper means to protect the adjacent or adjoining property or properties in any way encountered, which may be injured or seriously affected by any process of construction to be undertaken under this agreement, from any damage or injury by reason of said process of construction; and Contractor shall be liable for any and all claims for such damage on account of his failure to fully protect all adjacent property. Without limiting, in any way, manner and form, the indemnity provided by Contractor in paragraph 27 hereof, the Contractor agrees to indemnify, save and hold harmless the Owner and Engineer, and any of its officers, agents and employees, against any and all claims or damages due to any injury to any adjacent or adjoining property, related to, arising from or growing out of the performance of this contract. 40. PRICE FOR WORK In consideration of the furnishing of all necessary labor, equipment and material and the completion of all work by the Contractor, and on the delivery of all materials embraced in this contract in full conformity with the specifications and stipulations herein contained, the Owner agrees to pay the Contractor the price set forth in the proposal attached hereto, which has been made a part of this contract, and the Contractor hereby agrees to receive such price in full for furnishing all materials and all labor required for the aforesaid work, also, for all expenses incurred by Contractor and for well and truly performing the same and the whole thereof in the manner and according to this agreement, the attached specifications, plans, contract documents and requirements of Owner's Representative. 41. PAYMENTS No payments made or certificates given shall be considered as conclusive evidence of the performance of the contract, either wholly or in part, nor shall any certificate or payment be considered as acceptance of defective work. Contractor shall at any time requested during the progress of the work furnish the Owner or Owner's Representative with a verifying certificate showing the Contractor's total outstanding indebtedness in connection with the work. Before final payment is made, Contractor shall satisfy Owner, by affidavit or otherwise, that there are no outstanding liens against Owner's premises by reason of any work under the contract. Acceptance by Contractor of final payment of the contract price shall constitute a waiver of all claims against Owner, Owner's agents and employees, which have not theretofore been timely filed as provided in this contract. 42. PARTIAL PAYMENTS On or before the tenth day of each month, the Contractor shall submit to Owner's Representative an application for partial payment or, if the Contractor does not submit such application, the Owner's Representative shall determine the amount to be partially paid. Owner's Representative shall review said application for partial payment if submitted, and the progress of the work made by the Contractor and if found to be in order, shall prepare a certificate for partial payment showing as completely as practical the total value of the work done by the Contractor up to and including the last day of the preceding month. The determination of the partial payment by the Owner's Representative shall be in accordance with Paragraph 14 hereof. The Owner shall then pay the Contractor on or before the fifteenth day of the current month the total amount of the Owner's Representative's Certificate of Partial Payment, less: (i) in the event the total value of the contract is five million dollars or more, 5% of the amount thereof, which 5% shall be retained until final payment, and further, less all previous payments and all further sums that may be retained by Owner under the terms of the contract documents; or (ii) in the event the total value of the contract is less than five million dollars, 10% or less, of the amount thereof, which percentage shall be retained until final payment, and further, less all previous payments and all further sums may be retained by Owner under the terms of the contract documents ("Retainage"). If Contractor engages a sub -contractor to perform all or part of Contractor's work under the contract, the Contractor shall not withhold a greater percentage of Retainage than the percentage set out in in this section pertaining to the Contractor. Contractor shall likewise require any subcontractor it engages to comply with section 2252.032 of the Texas Government Code. Any partial payment made hereunder shall not constitute a waiver by the Owner of any and all other rights to enforce the express terms of the contract documents, and all remedies provided therein, as to any and all work performed, to be performed and/or materials delivered hereunder, including, but limited to, work to which said partial payment is attributable. 43. SUBSTANTIAL COMPLETION Contractor shall give Owner's Representative written notice of substantial completion. Within fifteen (15) calendar days after the Contractor has given the Owner's Representative written notice that the work has been substantially completed, the Owner's Representative and/or the Owner shall inspect the work and within said time, if the work be found to be substantially completed in accordance with the contract documents, the Owner's Representative shall issue to the Owner and Contractor a certificate of substantial completion. The work will be deemed substantially complete when the work (or a specified portion thereof) has progressed to the point where, in the opinion of the Owner or Owner's Representative, the work (or a specified portion thereof) is sufficiently complete, in accordance with all the contract documents, including the Proposal and all applicable technical specifications, so that the work (or a specified portion thereof) can be utilized for the purposes for which it is intended without unscheduled disruption. Owner may, in its sole discretion, release all or a portion of the Retainage upon Owner's receipt of the certificate of substantial completion for all of the work or a specified portion thereof. Notwithstanding the issuance of a certificate of substantial completion, Contractor shall proceed with diligence to finally complete the work within the time provided in this contract. 44. FINAL COMPLETION AND PAYMENT The Contractor shall give written notice to Owner's Representative of final completion. Upon written notice of final completion, the Owner's Representative shall proceed to make final measurement to determine whether final completion has occurred. If the Owner's Representative determines final completion has occurred, Owner's Representative shall so certify to the Owner. Upon certification by Owner's Representative of final completion, Owner shall pay to the Contractor on or before the 31st working day after the date of certification of final completion, the balance due Contractor under the terms of this agreement. Neither the certification of final completion nor the final payment, nor any provisions in the contract documents shall relieve the Contractor of the obligation for fulfillment of any warranty which may be required in the contract documents and/or any warranty or warranties implied by law or otherwise. Owner may, in its sole discretion, release all or a portion of the Retainage for fully completed and accepted portions of the work. Notwithstanding the foregoing, Owner may withhold the Retainage if there is a bona fide dispute between Owner and Contractor according to section 2252.032(f) of the Texas Government Code. 45. CORRECTION OF WORK Contractor shall promptly remove from Owner's premises all materials condemned by the Owner's Representative on account of failure to conform to the contract documents, whether actually incorporated in the work or not, and Contractor shall at its own expense promptly replace such M condemned materials with other materials conforming to the requirements of the contract documents. Contractor shall also bear the expense of restoring all work of other contractors damaged by any such removal or replacement. If Contractor does not remove and replace any such condemned work within a reasonable time but not to exceed 30 days after a written notice by the Owner or the Owner's Representative, Owner may remove and replace it at Contractor's expense. The Contractor shall pay all claims, cost, losses, and damages (including but not limited to all fees and charges of the engineers, architects, attorneys, and other professionals and all court or arbitration or other dispute resolution cost) arising out of or relating to such correction or removal. Neither the final payment, nor certification of final completion or substantial completion, nor any provision in the contract documents shall relieve the Contractor of responsibility for faulty materials or workmanship, and Contractor shall remedy any defects due thereto and pay for any damage to other work resulting therefrom, which shall appear within a period of one (1) year from the date of certification of final completion by Owner's Representative. PAYMENT WITHHELD The Owner or Owner's Representative may, on account of subsequently discovered evidence, withhold or nullify the whole or part of any certification to such extent as may be necessary to protect itself from loss on account of: (a) Defective work not remedied and/or work not performed, (b) Claims filed or reasonable evidence indicating possible filing of claims, (c) Damage to another contractor, (d) Notification to owner of failure to make payments to Subcontractors or Suppliers, (e) Failure to submit up-to-date record documents as required, (f) Failure to submit monthly progress schedule updates or revised scheduled as requested by Owner, (g) Failure to provide Project photographs required by Specifications. When the above grounds are removed, or the Contractor provides a surety bond satisfactory to the Owner, in the amount withheld, payment shall be made for amounts withheld because of them. 47. CLAIM OR DISPUTE It is further agreed by both parties hereto that all questions of dispute or adjustment presented by the Contractor shall be in writing and filed with the Owner's Representative within fifteen (15) calendar days after the Owner's Representative has given any direction, order or instruction to which the Contractor desires to take exception. Timely written notice of dispute as provided in this contract of any decision by Owner's Representative or Owner shall be a condition precedent to the bringing and/or assertion of any action or claim by Contractor of any right under this Contract. If the matters set forth in the notice of dispute are not granted or otherwise responded to by Owner's Representative within fifteen (15) calendar days of receipt of notice of dispute by Owner's Representative, said objections shall be deemed denied. Any decision by the Owner's Representative, or deemed denial by the Owner's Representative, shall be final and conclusive in the absence of fraud. It is further agreed that the acceptance by the Contractor of the final payment shall be a bar to any and all claims of the Contractor, and constitute a waiver of the right to assert any claim against Owner, Owner's agents and employees and Owner's Representative, by Contractor. 48. NON-COMPLIANCE AND/OR ABANDONMENT BY CONTRACTOR In case the Contractor should (1) abandon and fail or refuse to resume work within fifteen (15) calendar days after written notification from the Owner or the Owner's Representative, or (2) if the Contractor fails to comply with the written orders of the Owner's Representative, when such orders are consistent with this contract, then the Surety on the bond shall be notified in writing and directed to complete the work and a copy of said notice shall be delivered to the Contractor. In the event a bond is not required by law, or otherwise obtained by the Contractor, no further notice of such non- compliance to Contractor shall be required. After receiving said notice of abandonment or non-compliance , the Contractor shall not remove from the work any machinery, equipment, tools, materials or supplies then on the job, but the same, together with any materials and equipment under the contract for work, may be held for use on the work by the Owner or the Surety of the Contractor, or another contractor, in completion of the work; and the Contractor shall not receive any rental or credit therefore (except when used in connection with Extra Work, where credit shall be allowed as provided for under paragraph 24 of this contract); it being understood that the use of such equipment and materials will ultimately reduce the cost to complete the work and be reflected in the final settlement. In the event the Contractor, or Surety, whichever is applicable, should fail to commence compliance with the notice hereinbefore provided within ten (10) calendar days after service of such notice, and/or shall fail to proceed with diligence to complete the project as contemplated and in compliance with all terms and provisions of the contract documents, then the Owner may exercise any and all remedies available to it pursuant to law, contract, equity or otherwise, including, but not limited to, providing for completion of the work in either of the following elective manners: (a) The Owner may employ such force of persons and use of machinery, equipment, tools, materials and supplies as said Owner may deem necessary to complete the work and charge the expense of such labor, machinery, equipment, tools, materials and supplies to said Contractor, and the expense so charged shall be deducted and paid by the Owner out of such moneys as may be due, or that may thereafter at any time become due to the Contractor under and by virtue of this Agreement. In case such expense is less than the sum which would have been payable under this contract, if the same had been completed by the Contractor, then said Contractor shall receive the difference. In case such expense is greater than the sum which would have been payable under this contract, if the same had been completed by said Contractor, then the Contractor and/or its Surety shall pay the amount of such excess to the Owner; or (b) The Owner, under sealed proposals, after notice published as required by law, at least twice in a newspaper having a general circulation in the County of location of the work, may let the contract for the completion of the work under substantially the same terms and conditions which are provided in this contract. In case of any increase in cost to the Owner under the new contract as compared to what would have been the cost under this contract, such increase shall be charged to the Contractor and the Surety shall be and remain bound therefore. Should the cost to complete any such new contract prove to be less than that which would have been the cost to complete the work under this contract, the Contractor or his Surety shall be credited therewith. In the event the Owner's Representative elects to complete the work, as described above, when the work shall have been finally completed, the Contractor and his Surety shall be so notified and certification of completion as provided in paragraph 44 hereinabove set forth, shall be issued. A complete itemized statement of the contract accounts, certified to by Owner's Representative as being correct shall then be prepared and delivered to Contractor and his Surety, if applicable, whereon the Contractor or his Surety, or the Owner as the case may be, shall pay the balance due as reflected by said statement within 30 days after the date of certification of completion. In the event the statement of accounts shows that the cost to complete the work is less than that which would have been the cost to the Owner had the work been completed by the Contractor under the terms of this contract, or when the Contractor and/or his Surety, if applicable, shall pay the balance shown to be due by them to the Owner, then all machinery, equipment, tools, materials or supplies left on the site of the work shall be turned over to the Contractor and/or his Surety, if applicable. Should the cost to complete the work exceed the contract price, and the Contractor and/or his Surety, if applicable, fail to pay the amount due the Owner within the time designated hereinabove, and there remains any machinery, equipment, tools, materials or supplies on the site of the work, notice thereof, together with an itemized list of such equipment and materials shall be mailed to the Contractor and his Surety, if applicable, at the respective addresses designated in this contract; provided, however, that actual written notice given in any manner will satisfy this condition. After mailing, or other giving of such notice, such property shall be held at the risk of the Contractor and his Surety, if applicable, subject only to the duty of the Owner to exercise ordinary care to protect such property. After fifteen (15) calendar days from the date of said notice the Owner may sell such machinery, equipment, tools, materials or supplies and apply the net sum derived from such sale to the credit of the Contractor and his Surety, if applicable. Such sale may be made at either public or private sale, with or without notice, as the Owner may elect. The Owner shall release any machinery, equipment, tools, materials, or supplies that remain on the jobsite and belong to persons other than the Contractor or his Surety, if applicable, to their proper owners. The remedies provided to Owner by law, equity, contract, or otherwise, shall be cumulative, to the extent permitted by law. It is expressly agreed and understood that the exercise by Owner of the remedies provided in this paragraph shall not constitute an election of remedies on the part of Owner, and Owner, irrespective of its exercise of remedies hereunder, shall be entitled to exercise concurrently or otherwise, any and all other remedies available to it, by law, equity, contract or otherwise, including but not limited to, liquidated damages, as provided in paragraph 34, hereinabove set forth. 49. LIMITATION ON CONTRACTOR'S REMEDY The remedies of Contractor hereunder shall be limited to, and Owner shall be liable only for, work actually performed by Contractor and/or its subcontractors as set forth in the contract documents, and Owner shall not be liable for any consequential, punitive or indirect loss or damage that Contractor may suffer in connection with the project which is the subject matter of this contract. 50. BONDS The Contractor is required to furnish a performance bond in accordance with Chapter 2253, Government Code, in the amount of 100% of the total contract price in the event that said contract price exceeds $100,000 and the Contractor is required to furnish a payment bond in accordance with Chapter 2253, Government Code, in the amount of 100% of the total contract price in the event that said contract price exceeds $50,000. All bonds shall be submitted on forms supplied by the Owner, and executed by a Surety Company listed on the State Treasury's "Approved" list and authorized to do business in the State of Texas. It is further agreed that this contract shall not be in effect until such bonds are so furnished. 51. SPECIAL CONDITIONS In the event special conditions are contained herein as part of the contract documents and said special conditions conflict with any of the general conditions contained in this contract, then in such event the special conditions shall control. 52. LOSS OR EXPENSE DUE TO UNUSUAL OR UNANTICIPATED CIRCUMSTANCES Unless otherwise specified herein, all loss, expense or damage to the Contractor arising out of the nature of the work to be done, or from the action of the elements, or from any unforeseen circumstance or from unusual obstructions or difficulties, naturally occurring, man-made or otherwise, which may be encountered in the prosecution of the work, shall be sustained and borne by the Contractor at his own cost and expense. 53. INDEPENDENT CONTRACTOR Contractor is, and shall remain, an independent contractor with full, complete and exclusive power and authority to direct, supervise, and control its own employees and to determine the method of the performance of the work covered hereby. The fact that the Owner or Owner's Representative shall have the right to observe Contractor's work during Contractor's performance and to carry out the other prerogatives which are expressly reserved to and vested in the Owner or Owner's Representative hereunder, is not intended to and shall not at any time change or effect the status of the Contractor as an independent contractor with respect to either the Owner or Owner's Representative or to the Contractor's own employees or to any other person, firm, or corporation. 54. CLEANING UP The Contractor shall at all times keep the premises free from accumulation of debris caused by the work, and at the completion of the work Contractor shall remove all such debris and also its tools, scaffolding, and surplus materials and shall leave the work room clean or its equivalent. The work shall be left in good order and condition. In case of dispute Owner may remove the debris and charge the cost to the Contractor. 55. HAZARDOUS SUBSTANCES AND ASBESTOS Hazardous Substances (herein so called), as defined in the Comprehensive Environmental Response, Compensation, and Liability Act (42 U.S.C.S. §9601(14)) and the regulations promulgated thereunder, as same may be amended from time to time, hydrocarbons or other petroleum products or byproducts and/or asbestos, in any form, shall not (i) be utilized, in any way, manner or form, in the construction of, or incorporation into, the Project; or (ii) be brought upon, placed, or located, by any party, on the Project site, or any other property of the City, without the written consent of the Owner's Representative. If Contractor believes that the utilization of a Hazardous Substance, hydrocarbons or other petroleum products or byproducts and/or asbestos is necessary in the construction of the Project, or that it is necessary to place and/or otherwise locate upon the site of the Project or other property of the City, a Hazardous Substance, hydrocarbons or other petroleum products or byproducts and/or asbestos, Contractor shall notify the Owner's Representative, and request consent therefrom, at least twenty (20) days prior to such action. Owner's Representative may grant or deny the request of Contractor and provide whatever requirements such consent, if granted, is conditioned upon, in its sole and absolute discretion. If the request of Contractor is not granted, or otherwise not responded to, by Owner's Representative within five (5) days of the receipt of said request, said request shall be deemed to be denied. In the event Owner's Representative shall consent to the request of Contractor, Contractor shall be responsible for ensuring that all personnel involved in the Project are (i) trained for the level of expertise required for proper performance of the actions contemplated by this Contract and, in particular, in all aspects of handling, storage, disposal and exposure of Hazardous Substances, hydrocarbons or other petroleum products or byproducts and/or asbestos; and (ii) are provided and utilize all protective equipment, including without limitation, personal protective gear, necessary to provide protection from exposure to Hazardous Substances, hydrocarbons or other petroleum products or byproducts and/or asbestos. 56. NONAPPROPRIATION All funds for payment by the City under this contract are subject to the availability of an annual appropriation for this purpose by the City. In the event of non -appropriation of funds by the City Council of the City of Lubbock for the goods or services provided under the contract, the City will terminate the contract, without termination charge or other liability, on the last day of the then - current fiscal year or when the appropriation made for the then -current year for the goods or services covered by this contract is spent, whichever event occurs first. If at any time funds are not appropriated for the continuance of this contract, cancellation shall be accepted by the Seller on thirty (30) days prior written notice, but failure to give such notice shall be of no effect and the City shall not be obligated under this contract beyond the date of termination. 57. THE CITY RIGHT TO AUDIT At any time during the term of this Contract and for a period of four (4) years thereafter the City or a duly authorized audit representative of the City, or the State of Texas, at its expense and at reasonable times, reserves the right to audit Contractor's records and books relevant to all services provided under this Contract. In the event such an audit by the City reveals any errors/overpayments by the City, Contractor shall refund the City the full amount of such overpayments within thirty (30) days of such audit findings, or the City, at its option, reserves the right to deduct such amounts owing the City from any payments due Contractor. 58. NON -ARBITRATION The City reserves the right to exercise any right or remedy available to it by law, contract, equity, or otherwise, including without limitation, the right to seek any and all forms of relief in a court of competent jurisdiction. Further, the City shall not be subject to any arbitration process prior to exercising its unrestricted right to seek judicial remedy. The remedies set forth herein are cumulative and not exclusive, and may be exercised concurrently. To the extent of any conflict between this provision and another provision in, or related to, this document, this provision shall control. 59. CONTRACTOR ACKNOWLEDGES Contractor Acknowledges by supplying any Goods or Services that the Contractor has read, fully understands, and will be in full compliance with all terms and conditions and the descriptive material contained herein and any additional associated documents and Amendments. The City disclaims any terms and conditions provided by the Contractor unless agreed upon in writing by the parties. In the event of conflict between these terms and conditions and any terms and conditions provided by the Contractor, the terms and conditions provided herein shall prevail. The terms and conditions provided herein are the final terms agreed upon by the parties, and any prior conflicting terms shall be of no force or effect. 60. LABOR CODE CHAPTER 214 Sec. 214.008. MISCLASSIFICATION OF CERTAIN WORKERS; PENALTY. (a) A person who contracts with a governmental entity to provide a service as defined by Section 2155.001, Government Code, shall properly classify, as an employee or independent contractor in accordance with Chapter 201, any individual the person directly retains and compensates for services performed in connection with the contract. (b) In this subsection, "subcontractor" means a person directly retained and compensated by a person who contracts with a governmental entity to provide a service as defined by Section 2155.001, Government Code. A subcontractor shall properly classify, as an employee or independent contractor in accordance with Chapter 201, any individual the subcontractor directly retains and compensates for services performed in connection with the contract for which the subcontractor is retained. (c) A person who fails to properly classify an individual as required by Subsection (a) or (b) shall pay to the commission a penalty equal to $200 for each individual that the person has not properly classified. (d) The commission may not take action to collect a penalty under this section from a person after the third anniversary of the date on which the violation occurred. 61. CERTIFICATE OF INTERESTED PARTIES House Bill 1295, adopted by the 84th Legislature, created §2252.908, Texas Government Code. Section 2252.908 requires a business entity entering into certain contracts with a governmental entity or state agency to file with the governmental entity or state agency a disclosure of interested parties at the time the business entity submits the signed contract to the governmental entity or state agency. Section 2252.908 requires the disclosure form to be signed by the authorized agent of the contracting business entity, acknowledging that the disclosure is made under oath and under penalty of perjury. Section 2252.908 applies only to a contract that requires an action or vote by the governing body of the governmental entity or state agency before the contract may be signed or has a value of at least $1 million. Instructions for completing Form 1295 are available at: https://ci.lubbock.tx.us/departments/purchasing/vendor-information 62. TEXAS GOVERNMENT CODE SECTION 2252.152 Contracts with Companies Engaged in Business with Iran, Sudan, or Foreign Terrorist Organization Prohibited. Pursuant to Section 2252.152 of the Texas Government Code, prohibits the City from entering into a contract with a vendor that is identified by The Comptroller as a company known to have contracts with or provide supplies or service with Iran, Sudan or a foreign terrorist organization. 63. TEXAS GOVERNMENT CODE SECTION 2271.002 Pursuant to Section 2271.002 of the Texas Government Code, a) This section applies only to a contract that: (1) is between a governmental entity and a company with 10 or more full-time employees; and (2) has a value of $100,000 or more that is to be paid wholly or partly from public funds of the governmental entity. (b) A governmental entity may not enter into a contract with a company for goods or services unless the contract contains a written verification from the company that it: (1) does not boycott Israel; and (2) will not boycott Israel during the term of the contract. 64. CONTRACTOR ACKNOWLEDGES Contractor Acknowledges by supplying any Goods or Services that the Contractor has read, fully understands, and will be in full compliance with all terms and conditions and the descriptive material contained herein and any additional associated documents and Amendments. The City disclaims any terms and conditions provided by the Contractor unless agreed upon in writing by the parties. In the event of conflict between these terms and conditions and any terms and conditions provided by the Contractor, the terms and conditions provided herein shall prevail. The terms and conditions provided herein are the final terms agreed upon by the parties, and any prior conflicting terms shall be of no force or effect. 65. TEXAS PUBLIC INFORMATION ACT The requirements of Subchapter J, Chapter 552, Government Code, may apply to this contract and the contractor or vendor agrees that the contract can be terminated if the contractor or vendor knowingly or intentionally fails to comply with a requirement of that subchapter. To the extent Subchapter J, Chapter 552, Government Code applies to this agreement, Contractor agrees to: (1) preserve all contracting information related to the contract as provided by the records retention requirements applicable to the governmental body for the duration of the contract; (2) promptly provide to the governmental body any contracting information related to the contract that is in the custody or possession of the entity on request of the governmental body; and (3) on completion of the contract, either: (A) provide at no cost to the governmental body all contracting information related to the contract that is in the custody or possession of the entity; or (B) preserve the contracting information related to the contract as provided by the records retention requirements applicable to the governmental body. 66. CONFIDENTIALITY The Contractor shall retain all information received from or concerning the City and the City's business in strictest confidence and shall not reveal such information to third parties without prior written consent of the City, unless otherwise required by law. 67. INDEMNITY The Contractor shall indemnify and save harmless the city of Lubbock and its elected officials, officers, agents, and employees from all suits, actions, losses, damages, claims, or liability of any kind, character, type, or description, including without limiting the generality of the foregoing, all expenses of litigation, court costs, and attorney's fees, for injury or death to any person, or injury to any property, received or sustained by any person or persons or property, to the extent arising out of, related to or occasioned by, the negligent acts of the Contractor, its agents, employees, and/or subcontractors, related to the performance, operations or omissions under this agreement and/or the use or occupation of city owned property. The indemnity obligation provided herein shall survive the expiration or termination of this agreement. 68. PROFESSIONAL RESPONSIBILITY All architectural or engineering services to be performed shall be done with the professional skill and care ordinarily provided by competent architects or engineers practicing under the same or similar circumstances and professional license. 69. TEXAS SENATE BILL 219 SUBCHAPTER B ITEMS B AND C (b) A contractor must, within a reasonable time of learning of a defect, inaccuracy, inadequacy, or insufficiency in the plans, specifications, or other design documents, disclose in writing to the person with whom the contractor enters into a contract the existence of any known defect in the plans, specifications, or other design documents that is discovered by the contractor, or that reasonably should have been discovered by the contractor using diligence, before or during construction. In this subsection, ordinary diligence means the observations of the plans, specifications, or other design documents or the improvement to real property that a contractor would make in the reasonable preparation of a bid or fulfillment of its scope of work under normal circumstances. Ordinary diligence does not require that the contractor engage a person licensed or registered under Title 6, Occupations Code, or any other person with specialized skills. A disclosure under this subsection is made in the contractor's capacity as contractor and not as a licensed professional under Title 6, Occupations Code. (c) A contractor who fails to disclose a defect as required by Subsection (b) may be liable for the consequences of defects that result from the failure to disclose. 70. GOVERNMENT CODE 2251.0521 UNSIGNED CHANGE ORDER (a) A contractor or subcontractor may elect not to proceed with additional work directed by a governmental entity if: (1) the contractor or subcontractor has not received a written, fully executed change order for the governmental entity -directed additional work; and (2) the aggregate actual or anticipated value of the additional work plus any previous governmental entity -directed additional work for which the contractor or subcontractor has not received a written, fully executed change order exceeds 10 percent of the contractor 's or subcontractor 's original contract amount. (b) contractor or subcontractor who elects not to proceed with additional work as provided by this section is not responsible for damages associated with the election not to proceed. DAVIS BACON WAGE DETERMINATIONS Page Intentionally Left Blank EXHIBIT A "General Decision Number: TX20230280 10/13/2023 Superseded General Decision Number: TX20220280 State: Texas Construction Type: Building Counties: Crosby and Lubbock Counties in Texas. BUILDING CONSTRUCTION PROJECTS (does not include single family homes or apartments up to and including 4 stories). Note: Contracts subject to the Davis -Bacon Act are generally required to pay at least the applicable minimum wage rate required under Executive Order 14026 or Executive Order 13658. Please note that these Executive Orders apply to covered contracts entered into by the federal government that are subject to the Davis -Bacon Act itself, but do not apply to contracts subject only to the Davis -Bacon Related Acts, including those set forth at 29 CFR 5.1(a)(2)-(60). If the contract is entered �. into on or after January 30, 2022, or the contract is renewed or extended (e.g., an �. option is exercised) on or after January 30, 2022: JIf the contract was awarded on for between January 1, 2015 and January 29, 2022, and the contract is not renewed or lextended on or after January 130, 2022: 1 1 1 1 1 1_ Executive Order 14026 generally applies to the contract. The contractor must pay all covered workers at least $16.20 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in 2023. Executive Order 13658 generally applies to the contract. The contractor must pay all covered workers at least $12.15 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on that contract in 2023. The applicable Executive Order minimum wage rate will be adjusted annually. If this contract is covered by one of the Executive Orders and a classification considered necessary for performance of work on the contract does not appear on this wage determination, the contractor must still submit a conformance request. Additional information on contractor requirements and worker protections under the Executive Orders is available at http://www.dol.gov/whd/govcontracts. Modification Number 0 1 2 3 4 5 Publication Date 01/06/2023 02/03/2023 03/17/2023 04/14/2023 09/01/2023 10/13/2023 * BOIL0074-003 07/01/2023 Rates Fringes BOILERMAKER ......................$ 37.00 24.64 ---------------------------------------------------------------- CARP0665-001 01/01/2022 Rates Fringes CARPENTER ........................$ 24.98 7.83 ---------------------------------------------------------------- ELEC0602-008 09/01/2022 Rates Fringes ELECTRICIAN ......................$ 26.07 12.63 ---------------------------------------------------------------- ENGIO178-005 06/01/2020 Rates Fringes POWER EQUIPMENT OPERATOR (1) Tower Crane .............$ 32.85 13.10 (2) Cranes with Pile Driving or Caisson Attachment and Hydraulic Crane 60 tons and above.....$ 28.75 10.60 (3) Hydraulic cranes 59 Tons and under ..............$ 32.35 13.10 ---------------------------------------------------------------- IRON0084-011 06/01/2023 Rates Fringes IRONWORKER, ORNAMENTAL ........... $ 27.51 8.13 ---------------------------------------------------------------- * IRON0263-003 06/01/2023 Rates Fringes IRONWORKER, STRUCTURAL ........... $ 27.89 7.93 ---------------------------------------------------------------- PLUM0404-001 09/01/2022 Rates Fringes PLUMBER ..........................$ 28.64 10.65 ---------------------------------------------------------------- SHEE0049-001 06/01/2022 Rates Fringes SHEET METAL WORKER (HVAC Duct Installation Only) ...............$ 26.72 12.13 ---------------------------------------------------------------- * SUTX2014-060 07/21/2014 Rates Fringes BRICKLAYER .......................$ 20.04 0.00 CEMENT MASON/CONCRETE FINISHER ... $ 19.60 0.00 INSULATOR - MECHANICAL (Duct, Pipe & Mechanical System Insulation) ...............$ 19.77 7.13 IRONWORKER, REINFORCING..........$ 12.27 ** 0.00 LABORER: Common or General......$ 12.35 ** 0.00 LABORER: Mason Tender - Brick...$ 11.36 ** 0.00 LABORER: Mason Tender - Cement/Concrete..................$ 10.58 ** 0.00 LABORER: Pipelayer..............$ 12.49 ** 2.13 LABORER: Roof Tearoff...........$ 11.28 ** 0.00 OPERATOR: Backhoe/Excavator/Trackhoe.......$ 14.25 ** 0.00 OPERATOR: Bobcat/Skid Steer/Skid Loader ................$ 13.93 ** 0.00 OPERATOR: Bulldozer .............$ 18.29 1.31 OPERATOR: Drill .................$ 16.22 0.34 OPERATOR: Forklift ..............$ 14.83 ** 0.00 OPERATOR: Grader/Blade..........$ 13.37 ** 0.00 OPERATOR: Loader ................$ 13.55 ** 0.94 OPERATOR: Mechanic ..............$ 17.52 3.33 OPERATOR: Paver (Asphalt, Aggregate, and Concrete).........$ 16.03 ** 0.00 OPERATOR: Roller ................$ 12.70 ** 0.00 PAINTER (Brush, Roller, and Spray) ...........................$ 14.27 ** 0.00 ROOFER ...........................$ 13.75 ** 0.00 SHEET METAL WORKER, Excludes HVAC Duct Installation...........$ 21.13 6.53 TILE FINISHER ....................$ 11.22 ** 0.00 TILE SETTER ......................$ 14.00 ** 2.01 TRUCK DRIVER: Dump Truck........$ 12.39 ** 1.18 TRUCK DRIVER: Flatbed Truck.....$ 19.65 8.57 TRUCK DRIVER: Semi -Trailer Truck ............................$ 12.50 ** 0.00 TRUCK DRIVER: Water Truck.......$ ---------------------------------------------------------------- 12.00 ** 4.11 WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental. ** Workers in this classification may be entitled to a higher minimum wage under Executive Order 14026 ($16.20) or 13658 ($12.15). Please see the Note at the top of the wage determination for more information. Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the Davis -Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year. Employees must be permitted to use paid sick leave for their own illness, injury or other health -related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health -related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at https://www.dol.gov/agencies/whd/government-contracts. Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)). The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of ""identifiers"" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate (weighted union average rate). Union Rate Identifiers A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than ""SU"" or ""UAVG"" denotes that the union classification and rate were prevailing for that classification in the survey. Example: PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014. Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate. Survey Rate Identifiers Classifications listed under the ""SU"" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non -union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier. Survey wage rates are not updated and remain in effect until a new survey is conducted. Union Average Rate Identifiers Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010 08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier. A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based. WAGE DETERMINATION APPEALS PROCESS 1.) Has there been an initial decision in the matter? This can be: * an existing published wage determination * a survey underlying a wage determination * a Wage and Hour Division letter setting forth a position on a wage determination matter * a conformance (additional classification and rate) ruling On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour National Office because National Office has responsibility for the Davis -Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.) and 3.) should be followed. With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to: Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W. Washington, DC 20210 2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to: Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W. Washington, DC 20210 The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue. 3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to: Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W. Washington, DC 20210 4.) All decisions by the Administrative Review Board are final. END OF GENERAL DECISION EXHIBIT C City of Lubbock Overtime Legal Holiday Prevailing Wage Rates The rate for overtime (in excess of forty hours per week) shall be as required by the Fair Labor Standards Act. The rate for legal holidays shall be as required by the Fair Labor Standard Pate Intentionally Left Blank SPECIFICATIONS Page Intentionally Left Blank Scope of Work For 1714 E. Broadway Demo Remove: DEMOLITION OF ALL STRUCTURES ON LOT. THESE ARE METAL AND WOOD FRAME COMMERCIAL STRUCTURES WITH CONFIRMED ASBESTOS PRESENT. STORM CELLAR. JOB SCOPE: DEMOLISH ALL STRUCTURES, REMOVE ALL RUBBISH AND DEBRIS AND TIRES. REMOVE PAVING MATERIALS, CURBS, AND FOUNDATIONS. REMOVE ALL DEAD TREES, AND ANY TREESNEGETATION THAT HINDER DEMOLITION. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO CAP AND REMOVE ALL UTILITIES. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO CLEAR AND LEVEL GROUNDS TO PROPER DRAINAGE GRADE. IT IS THE RESPONSIBILTY OF THE CONTRACTOR TO OBTAIN DEMOLITION PERMIT AND NOTIFIY ANY REQUIRED AGENCIES PRIOR TO DEMOLITION. Leave: CLEAN AND LEVEL LOT. Pate Intentionally Left Blank