HomeMy WebLinkAboutResolution - 2023-R0320 - PW Contract 17342, Lone Star Dirt & Paving, Ltd. - 06/27/2023Resolution No. 2023-R0320 Item No. 6.9 June 27, 2023 RESOLUTTON BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK: THAT the Mayor of the City of Lubbock is hereby authorized and directed to execute for and on behalf of the City of Lubbock, Public Works Contract No. 17342 for unpaved roads improvements C.O. Phase 3 as per RFP 23-17342-KM, by and between the City of Lubbock and Lone Star Dirt & Paving, Ltd of Lubbock, Texas, and related documents. Said Contract is attached hereto and incorporated in this resolution as if fully set forth herein and shall be included in the minutes of the City Council. Passed by the City Council on June 27, 2023 AT' 'EST: Courtney Paz, City Sec tary I:T��:Z�]�/��Z:I.YIIC�ZK�������� `� � • Erik Rejino, Assistant City Manager TRAY PA , MAYOR APPROVED AS TO FORM: elli Leisure, Senior Assistant City Attorney ccdocslRES.Public Works Cantract 17342 unpaved roads phasc 3 6.123 Resolution 2023-R0320 PROPOSAL SUBMITTAL FORM UNIT PRICE PROPOSAL CONTRACT DATE: �-�� �'� - - - PROJECT NUMBER: RFP 23-1'7342-KM Unpaved Roads Improvements C.O. Phase 3 Proposal of �,�o r1 e S � �� � called Offeror) --� �� �-��- (hereina$er To the Honorable Mayor and City Council City of Lubbock, Texas (hereinafter called Owner) Ladies and Gentlemen: The Offeror, in compliance with your Request for Proposals for construction of the referenced project, having carefully examined the plans, specifications, instructions to offerors, notice to offerors and all other related contract documents and the site of the intended work, and being familiar with all of the conditions surrounding the construction of the intended project including the availability of materials and labor, hereby intends to fumish all labor, materials, and supplies; and to construct the project in accordance with the plans, specificarions and contract documents, within the time set forth therein and at the price stated. The price to cover all expenses incurred in performing the work required under the contract documents. PROPOSED CONSTRUCTION TIME: 1. Contractors proposed CONSTRUCTION TIME for completion: TOTAL CONSECI7'TIVE CALENDAR DAYS: � 3� (to Substantial Completion) TOTAL CONSECUTIVE CALENDAR DAYS: .3 �� (to Final Completion) (not to exceed 335 consecutive calendar days to SubstanNal Comnletion / 365 consecutive calendar days to Final Comaledon). Of%ror hereby agrees to commence the work on the above project on a date to be specified in a written "Notice to Proceed" of the Owner and to substantially complete the project within 335 Consecutive Calendar Days with final completion within 365 Consecutive Calendar Days as stipulated in the specificarion and other contract documents. Offeror hereby fiuther agrees to pay to Owner as liquidated damages in the sum of $500 for each consecutive calendar day after substantial completion and liquidated damages in the sum of $300 for each consecutive calendar day after final completion set forth herein above for completion of this project, all as more fully set forth in the General Conditions of the Agreement. Offeror understands and agrees that this proposal submittal shall be completed and submitted in accordance with instruction number 28 of the General Instructions to Of�'erors. Offeror understands that the Owner reserves the right to reject any or all proposals and to waive any formality in the proposing. T'he Offeror agrees that this proposal shall be good for a period of six 60 calendar days after the scheduled closing time for receiving proposals. The undersigned Offeror hereby declares that he has visited the site of the work and has carefully examined the plans, specifications and contract documents pertaining to the work covered by this proposal, and he further agrees to commence work on the date specified in the written notice to proceed, and to substanrially complete the work on which he has proposed; as provided in the contract documents. S/30/'23 5:0'i PM City of Lubbock, TX Public Works RFP 23-17342-KM Unpaved Roads Improvements C.O. Phase 3 Lone Star Dirt & Paving, Ltd. of Lubbock, TX QTY Unit Extended # Items +/- U�M Price Cost � � . ' ���� - #1-1 MOBILIZATION 1 LS 9,000.00 9,000.00 #1-2 SWPPP 1 LS 4,000.00 4,000.00 #1-3 PREPARFNG OF RIGHT-OF-WAY 6 STA 3,500.00 21,000.00 #1-4 ASPHALT REMOVAL 57 SY 25.00 1,425.00 #1-5 CONCRETE REMOVAL 400 SY 50.00 20,000.00 #1-6 24" COL TYPE A OR B CURB AND GUTTER CURI3 1401 LF 32.00 44,832.00 # 1-7 1' X 1 RIBBON CURS 0 LF 40.00 - #1-8 2" HMAC COL TYPE C 1950 SY 42.00 81,900.00 #1-9 6" CONCRETE VALLEY GUTTER AND FILLET 105 SY 80.00 8,400.00 #1-10 6" CONCRETE ALLEY RETURNS AND DRIVEWAYS 0 SY 80.00 - #1-11 ADA RAMP 4 EA 1,800.00 7,200.00 #1-12 MANHOLE 1 VALVE ADJUSTMENTS 1 EA 2,500.00 2,500.00 # 1-13 TRAFFIC CONTROL 1 EA 500.00 500.00 � • • • � � ---- - . . - #2-1 MOBILIZATION 1 LS 35,000.00 35,000.00 #2-2 SWPPP 1 LS 4,000.00 4,000.00 #2-3 PREPARING OF RIGHT-OF-WAY 38 STA 3,500.00 133,000.00 #2-4 ASPHALT REMOVAL 1027 SY 25.00 25,675.00 #2-5 CONCRETE REMOVAL 52 SY 50.00 2,600.00 #2-6 24" COL TYPE A OR B CURB AND GUTTER CURB 3665 LF 32.00 117,280.00 #2-7 1' X1 RIBBON CURB 0 LF 40.00 - #2-8 2" HMAC COL TYPE C 9355 SY 42.00 392,910.00 #2-9 6" CONCRETE VALLEY GUTTER AND FILLET 329 SY 80.00 26,320.00 #2-10 6" CONCRETE ALLEY RETURNS AND DRIVEWAYS 286 SY 80.00 22,880.00 #2-11 ADA RAMP 0 EA 1,800.00 - #2-12 MANHOLE 1 VALVE ADJUSTMENTS 2 EA 2,500.00 5,000.00 #2-13 TRAFFIC CONTROL 1 EA 500.00 500.00 Tsy���� i�',� �� �4;'.?4:l '�:Sj�xl • � #3-1 MOBILIZATION 1 LS 35,000.00 35,000.00 #3-2 SWPPP 1 LS 4,000.00 4,000.00 #3-3 PR�PARING OF RIGHT-OF-WAY 26 STA 3,500.00 91,000.00 #3-4 ASPHALT R�:MOVAL 6 SY 25.00 150.00 #3-5 CONCRETE REMOVAL 0 SY 50.00 - #3-6 24" COL TYPE A OR B CURB AND GUTTER CURB 0 LF 32.00 - #3-7 1' X1 RIBBON CURB 4734 LF 40.00 189,360.00 #3-8 2" HMAC COL TYPE C 9591 SY 42.00 402,822.00 #3-9 6" CONCRETE VALLEY GUTTER AND FILLET 85 SY 80.00 6,800.00 #3-10 6" CONCk�ETE ALLEY RETURNS AND DRIVEWAYS 275 SY 80.00 22,000.00 #3-11 ADA R�1MP 0 EA 1,800.00 - City of Lubbock, TX Public Works RFP 23-17342-KM Unpaved Roads Improvements C.O. Phase 3 QTY # Items +�_ U/M #3-12 MANHOLE 1 VALVE ADJUSTMENTS 0 EA #3-13 TRAFFIC CONTROL 1 EA #4-1 MOBILIZATION 1 LS #4-2 SWPPP 1 LS #4-3 PR�PARING OF RIGHT-OF-WAY 12 STA #4-4 ASPHALT REMOVAL 466 SY #4-5 CONCRETE REMOVAL 193 SY #4-6 24" COL TYPE A OR B CURB AND GUTTER CURB 1508 LF #4-7 1' X1 RIBBON CURB 0 LF #4-8 2" HMAC COL TYPE C 4446 SY #4-9 6" CONCR�:TE VALLEY GUTTER AND FILLET 169 SY #4-10 6" CONCRETE ALLEY RETURNS AND DRIVEWAYS 456 SY #4-11 ADA RAMP 0 EA #4-12 MANHOLE / VALVE ADJUSTMENTS 11 EA #4-13 TRAFFIC CONTROL 1 EA _7 _ _ . �¢ . �' j � • �'•� � . #5-1 MOBILIZATION 1 LS #5-2 SWPPP 1 LS #5-3 PREPARING OF RIGHT-OF-WAY 13 STA #5-4 ASPHALT RGMOVAL 6 SY #5-5 CONCRETE REMOVAL 0 SY #5-6 24" COL TYPE A OR B CURB AND GUTTER CURB 0 LF #5-7 1' X1 RIBBON CURB 2318 LF #5-8 2" HMAC COL TYPE C 3467 SY #5-9 6" CONCRETE VALLEY GUTTER AND FILLET 327 SY #5-10 6" CONCRETE ALLEY RETURNS AND DRIVEWAYS 0 SY Unit Extended Price Cost 2,500.00 - 500.00 500.00 19,000.00 19,000.00 4,000.00 4,000.00 3,500.00 42,000.00 25.00 11,650.00 50.00 9,650.00 32.00 48,256.00 40.00 - 42.00 186,732.00 80.00 13,520.00 80.00 36,480.00 1,800.00 - 2,500.00 27,500.00 500.00 500.00 �.__ _ ..�.� iyr I 16,000.00 16,000.00 4,000.00 4,000.00 3,500.00 45,500.00 25.00 150.00 50.00 - 32.00 - 40.00 92,720.00 42.00 145,614.00 80.00 26,160.00 80.00 - #5-11 ADA RAMP 0 EA 1,800.00 - #5-12 MANHOLE 1 VALVE ADJUSTMENTS 0 EA 2,500.00 - #5-13 TRAFFIC CONTROL 1 EA 500.00 500.00 • : � � � • -� . . #6-1 MOBILIZATION 1 LS 8,000.00 8,000.00 #6-2 SWPPP 1 LS 4,000.00 4,000.00 #6-3 PREPARING OF RIGHT-OF-WAY 7 STA 3,500.00 24,500.00 #6-4 ASPHALT REMOVAL 19 SY 25.00 475.00 #6-5 CONCKi�:TE REMOVAL 46 SY 50.00 2,300.00 #6-6 24" COL TYPE A OR B CURB AND GUTTER CURB 1154 LF 32.00 36,928.00 #6-7 1' X1 RIBBON CURB 0 LF 40.00 - #6-8 2" HMAC COL TYPE C 1978 SY 42.00 83,076.00 #6-9 6" CONCRETE VALLEY GUTTER AND FILLET 0 SY 80.00 - City of Lubbock, TX Public Works RFP 23-17342-KM Unpaved Roads Improvements C.O. Phase 3 QTY U/M # Items +/- #6-10 6" CONCK�TE ALLEY RETURNS AND DItIVEWAYS 51 SY #6-11 ADA RAMP #6-12 MANHOLE 1 VALVE ADJUSTMENTS #6-13 TRAFFIC CONTROL ; :.i � .• � •�- . � � . . #7-1 MOBILIZATION #7-2 SWPPP #7-3 PREPARING OF RIGHT-OF-WAY #7-4 ASPHALT REMOVAL #7-5 CONCRETE REMOVAL #7-6 24" COL TYPE A OR B CURB AND GUTTER CURS #7-7 1' X1 RIBBON CURB #7-8 2" HMAC COL TYPE C #7-9 6" CONCRETE VALLEY GUTTER AND FILLET #7-10 6" CONCRETE ALLEY RETURNS AND DRIVEWAYS #7-11 ADA RAMP #7-12 MANHOLE 1 VALVE ADJUSTMENTS #7-13 TRAFFIC CONTROL .� 1 1 1 7 274 92 912 0 1951 0 29 0 0 1 EA EA EA LS LS STA SY SY LF LF SY SY SY EA EA EA #8-1 MOBILIZATION #8-2 TEMPORARY STORMWATER POLLUTION PREVENTION AND EROSION CONTROL MEASUR�:S #8-3 TRAFFIC CONTROL #8-4 TREE REMOVAL #8-5 ASPHALT REMOVAL #8-6 CONCR�TE REMOVAL #8-7 EXCAVATION FOR ROADWAYS #8-8 ROADWAY EMBANKMENT (PLACEMENT OF ON-SITE EXCAVATED MATERIAL) #8-9 PAVEMENT SECTION (2.5" HMAC, 10" FLEXIBLE BASE COURSE, 12" COMPACTED SUBGRADE) #8-10 24" CONCRETE CURS AND GUTTER #8-11 6" CONCRETE DRIVEWAYS #8-12 8" CONCRETE PAVING #8-13 8" CONCRETE FILLETS AND VALLEY GUTTERS #8-14 5" CURBED CONCRETE DRAINAGE FLUME #8-15 WATER VALVE BOX ADJUSTMENT #8-16 WATER VALVE VAULT MANHOLE RIM ADJUSTMENT 1 1 1 1 2157 95 1310 1118 LS LS LS LS SY SY CY CY 9366 SY 3442 131 142 731 29 4 1 LF SY SY SY SY EA EA Unit Extended Price Cost 80.00 4,080.00 1,800.00 - 2,500.00 - 500.00 500.00 ' ��:':___ . 1 7,500.00 7,500.00 4,000.00 4,000.00 3,500.00 24,500.00 25.00 6,850.00 50.00 4,600.00 32.00 29,184.00 40.00 - 42.00 81,942.00 80.00 - 80.00 2,320.00 1,800.00 - 2,500.00 - 500.00 500.00 50,000.00 50,000.00 4,500.00 4,500.00 12,000.00 12,000.00 25,000.00 25,000.00 25.00 53,925.00 50.00 4,750.00 12.00 15,720.00 12.00 13,416.00 68.00 636,888.00 32.00 110,144.00 80.00 10,480.00 87.00 12,354.00 90.00 65,790.00 80.00 2,320.00 1,800.00 7,200.00 2,500.00 2,500.00 City of Lubbock, TX Public Works RFP 23-17342-KM Unpaved �.oads Improvements C.O. Phase 3 QTY Unit Extended # Items +/- U� Price Cost „ i � , � #9-1 MOBILIZATION 1 LS 60,000.00 60,000.00 #9-2 SWPPP 1 LS 4,500.00 4,500.00 #9-3 TRAFFIC CONTROL 1 LS 12,000.00 12,000.00 #9-4 TREE REMOVAL 1 LS 20,000.00 20,000.00 #9-5 ASPHALT RFMOVAL 32 SY 25.00 800.00 #9-6 EXCAVATION FOR ROADWAYS 6035 CY 12.00 72,420.00 #9-7 ROADWAY EMBANKMENT 822 CY 12.00 9,864.00 #9-8 PAVEMENT SECTION (2.5" HMAC, 8" FLEXIBLE BASE 12250 SY 68.00 833,000.00 COURSE, 12" COMPACTED SUBGRADE) #9-9 24" CONCRETE CURB AND GUTTER #9-10 8"CONCRETE DRIVEWAYS AND ALLEY RETURN #9-11 8" CONCRETE FILLETS AND VALLEY GUTTER #9-12 4" CONCRETE SIDEWALK AND DRAINAGE FLA��; FLATWORKS #9-13 6' X 3' BOX CULVERT WITH SAFETY END TREATMENTS #9-14 ADA RAMP 4850 LF 32.00 155,200.00 192 SY 87.00 16,704.00 120 SY 87.00 10,440.00 230 SY 56.00 12,880.00 130 LF 1,350.00 175,500.00 2 LF 1,800.00 3,600.00 Total (Items 1-1 through 1-13): $200,757.00 Total (Items 2-2 through 2-13): $765,165.00 Total (Items 3-1 through 3-13): $751,632.00 Total (Items 4-1 through 4-13): $399,288.00 Total (Items 5-1 through 5-13): $330,644.00 Total (Items 6-1 through 6-13): $163,859.00 Total (Items 7-1 through 7-13): $161,396.00 Total (Items 8-1 through 8-16): $1,026,987.00 Total (Items 9-1 through 9-14): $1,386,908.00 Total (Items 1-1 through 9-14): $5,186,636.00 Offerors are required, whether or not a payment or performance bond is required, to submit a cashier's check or certified check issued by a bank satisfactory to the City of Lubbock, or a proposal bond from a reliable surety company, payable without recourse to the order of the City of Lubbock in an amount not less than five percent (5%) of the total amount of the proposal submitted as a guazantee that offeror will enter into a contract, obtain all required insurance policies, and execute all necessary bonds (if required) within ten (10) days after notice of awazd of the contract to him. 5/3�/•23 5:09 PM Enclosed with this proposat is a Cashier's Check or CertiBed CLeck Enclosed wit6 this proposal is a Cashier's Check or Certified Check for Dollars ($ ) or a Proposal Bond in the sum of Dollars ($ ), which it is agreed shall be collected and retained by the Owner as liquidated damages fn the event the proposai is accepted by the Owner and the undersigned fails to execute the necessary contract documents, insurance certificates, and the required bond (if any) with the Owner within ten (10) business days after the date of receipt of written notification of acceptance of said proposal; otherwlse, said check or bond shall be returned to the undersigned upon demand. Of%ror understands and agrees that the contract to be executed by Offeror shall be bound and include all contract documents made available to him for his inspection in accordance with the Notice to Offerors. Pursuant to Texas Local Government Code 252.043(�, a competitive sealed proposal that has been opened may not be changed for the purpose of correcting an error in the proposal price. THEREFORE, ANY CORRECTIONS TO THE PROPOSAL PRICE MUST BE MADE ON THE PROPOS i. SUBNIITTAL FORM PRIOR TO PROPOSAL OPENING. (Seal if Offeror is a Corporation) ATTEST: Secretary Offeror acknowledges receipt of the following addenda: Addenda No. _ / Date 5— � "� Addenda No. �_ Date S;� g Addenda No. 3 Date�� Addenda No. Date M/WBE Firm: Date: � 3 " A ih ri7 d Signature �� (Printed or Typed Name) � O AQ �.>C�i r,-� �____�,e �►� � Company �l�Q - -�t- �1 ✓ Address�� I �4� 4 , City,'_.. County � State Zip Code Telephone: $p(p - _ 7y 5 � n ► � Fax: _ DL - 7`� ��1 o T�„ - Email: ' ��` FEDERAL TAX ID or SOCIAL SECURITY No. --� floo � 3 0. `'�� 5/30/'23 5:0� PM CERTIFICATE OF INTERESTED PARTIES FORnn 1295 lofi Complete Nos. i- 4 and s ii there are interested parties. OFFICE USE ONLY Complete Nos. i, 2, 3, 5, and 6 if there aze no interested parties. CERTIFICATION OF FILING 1 Name of business entily filing form, and ttie city, state and country of the business entity's place Cerdflcate Number: of business. 2023-1032660 LONE STAR DIRT & PAVING Lubbock, TX United States �ate Fi1ed: 2 Name of govemmental entlty or state agency that is a party to e contract r w c t e nri s 06l09l2023 being flled. City of Lubbock Date Acknowledged: 3 P►ovide the identification number used by the governmental entity or state agency to track or idenUty the cantract, and provide a descriptlon of the services, goods, or other property to be provided under the contract. RFP 23-17342-KM Unpaved Roads Improvement C.O. Phase 3 4 Nature of interest Name of Interested Party City, State, Country (piace of business) (check appllcable) Controlling Intermediary Turner, Steve Lubbock, TX United States X Sanders, Wesley Lubbock, TX United States X b Check on�y H there is NO Interested Party. ❑ 6 UNSWORN DECLARATION My name is �� G 1 , and my date ot birth is �✓ � My address is /� rJC ,1����� 3 (streeq (cRY) (etate) (zip code) (country) 1 declare under penalty ot per�ury that the toregoing is true and correct. Executed in ������ Counry, State of , o the �day of�[.,,�., 20� (monlh) (year) i.._ - - - � Signature of authorized agent of contracting business entlry (Declarant) Forms provided by Texas Ethics Commission www.ethics.state.bc.us Version V3.5.i.a18ea2ca 6/9/'23 3:16 PM CERTIFICATE OF INTERESTED PARTIES FORnn 1295 1of1 Complete Nos. 1- 4 and 6 if there are interested parties. OFFICE USE ONLY Complete Nos. �, 2, 3, 5, and s if there are no interested parties. CERTIFICATION OF FILING 1 Name of business entity filing form, and the city, state and country of the business entity's place Certificate Number: of business. 2023-1032660 LONE STAR DIRT & PAVING Lubbock, TX United States Date Filed: 2 Name of governmental entity or state agency that is a party to the contract for which the form is 06/09/2023 being filed. Ciry of Lubbock Date Acknowledged: 06/12/2023 3 Provide the identification number used by the governmental entity or state agency to track or identify the contract, and provide a description of the services, goods, or other property to be provided under the contract. RFP 23-17342-KM Unpaved Roads Improvement C.O. Phase 3 4 Nature of interest Name of Interested Party City, State, Country (place of business) (check applicable) Controlling Intermediary Turner, Steve Lubbock, TX United States X Sanders, Wesley Lubbock, TX United States X 5 Check only if there is NO Interested Parry. ❑ 6 UNSWORN DECLARATION My name is , and my date of birth is My address is (street) (ciry) (state) (zip code) (country) I declare under penalty of perjury that the foregoing is true and correct. Executed in County, State of , on the day of , 20 (month) (year) Signature of authorized agent of contracting business entiry (Declarant) Forms provided by Texas Ethics Commission www.ethics.state.tx.us Version V3.5.1.a18ea2ca BOND CHECK BEST RATING _________ LICENSED IN TEXAS DATE______ BY: _______ CONTRACT AWARD DATE: June 27, 2023 CITY OF LUBBOCK SPECIFICATIONS FOR Unpaved Roads Improvements C.O. Phase 3 RFP 23-17342-KM CONTRACT 17342 PROJECT NUMBER: 92712/92739.9240.30000 Plans & Specifications may be obtained from https://ci-lubbock-tx.bonfirehub.com/ CITY OF LUBBOCK Lubbock, Texas ADDENDUM 1 Revised Bid Table ITB 23-17342-KM Unpaved Roads Improvements C.O. Phase 3 DATE ISSUED: May 11, 2023 CLOSING DATE: May 31, 2023 at 3:00 p.m. The following items take precedence over specifications for the above named Invitation to Bid (ITB). Where any item called for in the ITB documents is supplemented here, the original requirements, not affected by this addendum, shall remain in effect. Revised Bid Table 1. Line Item #9-13 6' X 3' BOX CULVERT WITH SAFETY END TREATMENTS in the bid table has been updated. Please ensure you are submitting the current version of Bid Table BT-14VX revised May 11, 2023. If you have already submitted a bid, you will need to withdraw your submission and download the bid table again before re-submitting. All requests for additional information or clarification must be submitted in writing and directed to: Kiara Morgan City of Lubbock Purchasing and Contracts Management Office 1314 Ave K, Floor 9 Lubbock, Texas 79401 Questions may be emailed to kmorgan@mylubbock.us Questions are preferred to be posted on https://ci-lubbock-tx.bonfirehub.com/ THANK YOU, Kiara Morgan #)49 /& ,5""/#+ +¨ ±  -®±¦ ­ "´¸¤± ))) City of Lubbock Purchasing and Contracts Management Office It is the intent and purpose of the City of Lubbock that this request permits competitive proposals.It shall be the proposeManagement if any language, requirements, etc., or any combinations thereof, inadvertently restricts or limits the requirements stated in this RFP to a single source. Such notification must be submitted in writing and must be received by the Director of Purchasing and Contract Management no later than five (5) business days prior to the close date. A review of such notifications will be made. ADDENDUM RevisedBidTableandSpecifications RFP 23-17342-KM Unpaved Roads Improvements C.O. Phase 3 DATE ISSUED: May 23, 2023 CLOSE DATE: May 31, 2023at3:00 P.M. CST The following items take precedence over the proposal dates for the above named Request for Proposal (RFP). Where any item called for in the RFP documents is supplemented here, the original requirements, not affected by this addendum, shall remain in effect. The following date in the Request for Proposals has been revised. Revised Bid Table 1.The Bid Table has been updated to remove concrete patching. Please ensure you are submitting the current version of Bid Table BT-14VXrevised May23, 2023. RevisedSpecifications 1.Please add TrafficControlrequirements toSheet 0.1020-1 of Spec Section 01020Measurement and Payment. Revised specification attached. All requests for additional information or clarification must be submitted in writing and directed to: Kiara Morgan, Buyer III City of Lubbock Purchasing and Contracts Management Office 1314 Ave K, Floor Lubbock, Texas 79401 Questions may be emailedtoKMorgan@mylubbock.us Questions are preferred to be posted onBonfire:https://ci-lubbock- tx.bonfirehub.com/portal/?tab=openOpportunities THANK YOU, Kiara Morgan #)49 /& ,5""/#+ +¨ ±  -®±¦ ­ "´¸¤± ))) City of Lubbock Purchasing and Contracts Management Office It is the intent and purpose of the City of Lubbock that this request permits competitive bids.It shall be the bidder responsibility to advise the Director of Purchasing and Contract Management ifany language, requirements, etc., or any combinations thereof, inadvertently restricts or limits the requirements stated in this ITBto a single source. Such notification must be submitted in writing and must be received by the Director of Purchasing and Contract Management no later than five (5) business days prior to theclose date. A review of such notifications will be made. UNPAVED ROADS IMPROVEMENTS C.O. PHASE 3 SECTION 01020 MEASUREMENT AND PAYMENT PART 1 -GENERAL 1.1SCOPE A.The following sections shall be used to define measurements and payments for this project. The unit price bid on each item as stated in the bid proposal shall include furnishing all labor, superintendence, machinery, equipment, and materials except as otherwise specified, necessary or incidental to complete the various items of work in accordance with the plans and specifications. Cost of work or materials shown on the plans or called for in the specifications and on which no separate payment is made shall be included in the bid prices on the various pay items. Payment will not be made for any item that is not complete, including all associated incidental work. Only those items indicated on bid documents and plan sheets will be included for construction andpayment. 1.2MOBILIZATION A.The cost for mobilization shall be limited to no more than 5% of the Contract amount for construction items (materials and labor) bid for thisproject. B.Mobilization shall include costs associated with move-in related equipment and labor, bid bond, performance and construction bonds and insurance related for this project. This would include the establishment and removal of offices, plants and facilities, movement of personnel, equipment, and supplies to and from the project or the vicinity of the project site to begin work or complete work on Contract Items. This Item will be measured by the lump sum as the work progresses. C.Payment. Partial payments of the lump sum bid for mobilization will be as follows. The adjusted Contract amount for construction Items as used below is defined as the total Contract amount less the lump sum formobilization. 1.3TRAFFIC CONTROL A.A traffic control plan must bemaintained for the duration of the project. This includes supplying and designing a traffic control plan as well as any coordination with adjacent property tenants regarding any changes that may impact operations, parking, etc... The unit price bid shall include furnishing and placing all materials and signage necessary to implementthe traffic control plan provided. 1.4STORM WATER POLLUTION PREVENTIONPLAN Payment will be made ona lump sum basis for the Storm Water Pollution Prevention Plan. Partial payment will be made on a pro-rata basis as a percentage of the construction contract duration. The sum of the partial payments made for storm water pollution prevention shall not exceed 90% of the lump sum price bid for storm water pollution prevention prior to the termination of the construction contract. No partial payment will be made for partial storm water pollution prevention measures. Payment shall not be made for this item where the Owner determines a lack of evidence that storm water pollution prevention measures were used, or that the measures installed do not meet the requirements of the plan. No additional payments will be allowed where storm water pollution prevention is required because of work being remedied due to not meeting the requirements of the plans and specifications. The unit price bid shall include furnishing and installing all materials, filing Notice of Intent/Termination forms, inspections, maintenance, siltfences, hay bales, sand bags, diversion swales and any other measure and/or incidentals required for compliance with NPDESPermit. MEASUREMENT AND PAYMENT01020 -1 April2023 ADDENDUM3 RFP 23-17342-KM Unpaved Roads Improvements C.O. Phase 3 DATE ISSUED: May 26, 2023 CLOSE DATE: May 31, 2023at3:00 P.M. CST The following items take precedence over the proposal dates for the above named Request for Proposal (RFP). Where any item called for in the RFP documents is supplemented here, the original requirements, not affected by this addendum, shall remain in effect. The following date in the Request for Proposals has been revised. Addition of Section3Clause 1.Please see attached. All requests for additional information or clarification must be submitted in writing and directed to: Kiara Morgan, Buyer III Cityof Lubbock Purchasing and Contracts Management Office 1314 Ave K, Floor Lubbock, Texas 79401 Questions may be emailedtoKMorgan@mylubbock.us Questions are preferred to be posted onBonfire:https://ci-lubbock- tx.bonfirehub.com/portal/?tab=openOpportunities THANK YOU, Kiara Morgan #)49 /& ,5""/#+ +¨ ±  -®±¦ ­ "´¸¤± ))) City of Lubbock Purchasing and ContractsManagement Office It is the intent and purpose of the City of Lubbock that this request permits competitive bids.It shall be the bidder responsibility to advise the Director of Purchasing and Contract Management ifany language, requirements, etc., or any combinations thereof, inadvertently restricts or limits the requirements stated in this ITBto a single source. Such notification must be submitted in writing and must be received by the Director of Purchasing and Contract Management no later than five (5) business days prior to theclose date. A review of such notifications will be made. \[ǒĬĬƚĭƉΏЌʹ {ĻĭƷźƚƓ Ќ /ƌğǒƭĻ The below Section 3 Clause must be included in every contract and subcontract awarded for the construction of the project (contracts for professional services are exempt from this requirement) {ĻĭƷźƚƓ Ќ /ƌğǒƭĻʹ A. The work to be performed under this contract is subject to the requirements of section 3 of the Housing and Urban Development Act of 1968, as amended, 12 U.S.C. 170lu (section 3), contributes to the establishment of stronger, more sustainable communities by ensuring that employment and other economic opportunities generated by HUD financial assistance for housing and community development programs are, to the greatest extent feasible, directed toward low- and very low-income persons, particularly those who receive HUD financial assistance for housing and those residing in communities where the financial assistance is expended. B. which implement section 3. As evidenced by their execution of this contract, the parties to this contract certify that they are under no contractual or other impediment that would prevent them from complying with the part 75 regulations. C. The contractor agrees to include this Section 3 Clause in every subcontract subject to compliance with regulations in 24 CFR Part 75, and agrees to take appropriate action, as provided in an applicable provision of the subcontract or in this Section 3 Clause, upon finding that the subcontractor is in violation of the regulations in 24 CFR Part 75. The contractor will not subcontract with any subcontractor where the contractor has notice or knowledge that the subcontractor has been found in violation of the regulations in 24 CFR Part 75. D. 24 CFR Part 75 may result in sanctions, termination of this contract for default, and debarment or suspension from future HUD assisted contracts. NOTICE TO OFFERORS Page Intentionally Left Blank RFP 23-17342-KM Unpaved Roads Improvements C.O. Phase 3 1. NOTICE TO OFFERORS 1.1. Offerors may submit proposals electronically by uploading required documents at the City of Request for Proposals is for your convenience in submitting an offer for the specified services. If submitting electronically, do not submit paper documents. If you choose to submit in hard copy, submit one original paper copy of your submittal to the office of the Director of Purchasing and Contract Management: Physical: Marta Alvarez, Director of Purchasing and Contract Management City of Lubbock 13 14 Avenue K, 9th Floor Lubbock, Texas 79401 Mailing: Marta Alvarez, Director of Purchasing and Contract Management City of Lubbock P.O. Box 2000 Lubbock, Texas 79457 MARK ENVELOPE WITH THE SOLICITATION NUMBER, TITLE, AND DUE DATE/TIME 1.2. Proposals will be opened in the office of the Director of Purchasing and Contract Management, Citizens Tower, 1314 Avenue K, Floor 9, Lubbock, Texas, 79401, and via teleconference as shown below at 3:00 PM May 31, 2023, or as changed by the issuance of formal addenda to all planholders, to furnish all labor and materials and perform all work for the construction of the above referenced. 1.3. After the expiration of the time and date above first written, said sealed proposals will be opened in the office of the Director of Purchasing and Contract Management and publicly read aloud. Bids will be opened via teleconference if date/time stamped on or before the deadline stated at the office listed above. The Zoom meeting information is as follows: Website: §³³¯²Ȁȝȝ¹®®¬ȁ´²ȝ©ȝΘΖΔΏΑΓΗΕΏΕΔȈ¯¶£ώ¢(¯§£ªª±3%£Δ65®¸37&­£Α5Β+Α¯)£¹ΏΘ Meeting ID: 975 0248 6065 Passcode: 1314 1.4. It is the sole responsibility of the offeror to ensure that his proposal is actually in the office of the Director of Purchasing and Contract Management for the City of Lubbock, before the expiration of the date above first written. Any proposal received after the date and hour specified will be rejected and returned unopened to the offeror. 1.5. Mailing of a proposal does not ensure that the proposal will be delivered on time or delivered at all. If offeror does not hand deliver proposal, we suggest that he/she use some sort of delivery service that provides a receipt. The City of Lubbock assumes no responsibility for errant delivery of proposals, including those relegated to a courier agent who fails to deliver in accordance with the time and receiving point specified. 1.6. Although offers may be submitted electronically, hard copy proposals will be accepted in person, by United States Mail, by United Parcel Service, or by private courier service. THE CITY WILL NOT ACCEPT FAX PROPOSALS. 1.7. Proposals may be withdrawn prior to the above scheduled time set for closing. Alteration made before RFP closing must be initialed by offeror guaranteeing authenticity. 1.8. Proposals are due at 3:00 PM on May 31, 2023 and should be addressed to Marta Alvarez, Director of Purchasing and Contract Management, City of Lubbock, Texas, Citizens Tower, 1314 Avenue K, Floor 9, Lubbock, Texas, 79401. The City of Lubbock Council members will consider the proposals on June 27, 2023, at the Citizens Tower, 1314 Avenue K, Lubbock, Texas, or as soon thereafter as may be reasonably convenient, subject to the right to reject any or all proposals and waive any formalities. The successful offeror will be required to furnish a performance bond in accordance with Chapter 2253, Government Code, in the amount of 100% of the total contract price in the event that said contract price exceeds $100,000 and the successful offeror will be required to furnish a payment bond in accordance with Chapter 2253, Government Code, in the amount of 100% of the total contract price in the event that said contract price exceeds $50,000. Said statutory bonds shall be issued by a company carrying a current . THE BONDS MUST BE IN A FORM ACCEPTABLE TO THE CITY ATTORNEY. NO WORK ON THE CONTRACT SHOULD COMMENCE BEFORE THE BONDS ARE PROVIDED AND APPROVED. 1.9NOTICE TO PROCEED WILL BE ISSUED 30 DAYS FOLLOWING THE AWARD OF THE CONTRACT BY THE LUBBOCK CITY COUNCIL. 1.10. Please allow time to upload required documentation. 24hrs in advance is recommended. 1.11. Offerors are required, whether or not a payment or performance bond is required, to submit a cashier's or certified check issued by a bank satisfactory to the City of Lubbock, or a proposal bond from a reliable surety company, payable without recourse to the order of the City of Lubbock in an amount not less than 5% of the total amount of the proposal submitted as a guarantee that offeror will enter into a contract and execute all necessary bonds within ten (10) business days after notice of award of the contract to the Offeror. FAILURE OF THE OFFEROR TO INCLUDE PROPOSAL SECURITY WITH THE PROPOSAL SUBMITTAL SHALL CONSTITUTE A NON- RESPONSIVE PROPOSAL AND RESULT IN DISQUALIFICATION OF THE PROPOSAL SUBMITTAL. 1.12. Copies of plans and specifications may be obtained Purchasing and Contract Management office. Plans and specifications can be viewed online and downloaded from https://ci-lubbock-tx.bonfirehub.com/portal/ at no cost. In the event of a large file size, please be patient when downloading or viewing. BUSINESSES WITHOUT INTERNET ACCESS may use computers available at most public libraries. 1.13. Offerors may view the plans and specifications without charge at The Reproduction Company, 2102 Avenue Q, Lubbock, Texas 79405 or at http://pr.thereproductioncompany.com/ . ONE SET OF THE REPRODUCTION COMPANY WITH A $100 REFUNDABLE DEPOSIT, Phone: (806) 763-7770. Deposit Checks shall be made PAYABLE TO THE CITY OF LUBBOCK, and will be refunded if documents are returned in good condition within Sixty (60) days of the opening of Proposals. Additional sets of plans and specifications may be obtained at the offeror 1.14. It shall be each offeror regarding all local conditions under which the work is to be done. It shall be understood and agreed that all such factors have been thoroughly investigated and considered in the preparation of the proposal submitted. 2. PRE-PROPOSAL MEETING 2.10.For the purpose of familiarizing offerors with the requirements, answering questions, and issuing addenda as needed for the clarification of the Request for Proposals (RFP) documents, a non- mandatory pre-proposal conference will be held at 10:00AM, May 17, 2023, via teleconference. The Zoom meeting information is as follows: Website: §³³¯²Ȁȝȝ¹®®¬ȁ´²ȝ©ȝΘΖΓΏΓΓΓΏΑΓΘȈ¯¶£ώ£Β*ΐ65Ώ¶4Ώ.¯£$1Δ56-¸¡'.7:ª¢·:¹ΏΘ Meeting ID: 974 0444 0249 Passcode: 1314 2.11. All persons attending the meeting will be asked to identify themselves and the prospective offeror they represent. 2.12. It is the offeror-proposal meeting though the meeting is not mandatory. The City will not be responsible for providing information discussed at the pre-proposal meeting to offerors who do not attend the pre-proposal meeting. Attention of each offeror is particularly called to the schedule of general prevailing rate of per diem wages included in the contract documents on file in the office of the Purchasing and Contract Management Office of the City of Lubbock, which document is specifically referred to in this notice to offerors. Each offerors attention is further directed to Texas Government Code, Chapter 2258, Prevailing Wage Rates, and the requirements contained therein concerning the above wage scale and payment by the contractor of the prevailing rates of wages as heretofore established by owner in said wage scale. 3. The City of Lubbock hereby notifies all offerors that in regard to any contract entered into pursuant to this advertisement, minority and women business enterprises will be afforded equal opportunities to submit proposals in response to this invitation and will not be discriminated against on the grounds of race, color, sex, disability, or national origin in consideration for an award. 4. The City of Lubbock does not discriminate against persons with disabilities. City of Lubbock pre-proposal meetings and proposal openings are available to all persons regardless of disability. If you require special assistance, please contact the Purchasing and Contract Management Office at (806) 775-2572 write to Post Office Box 2000, Lubbock, Texas 79457 at least 48 hours in advance of the meeting. CITY OF LUBBOCK, Marta Alvarez DIRECTOR OF PURCHASING & CONTRACT MANAGEMENT GENERAL INSTRUCTIONS TO OFFERORS Page Intentionally Left Blank GENERAL INSTRUCTIONS TO OFFERORS 1. OFFEROR INQUIRIES AND CLARIFICATION OF REQUIREMENTS 1.1 It is the intent and purpose of the City of Lubbock that this request permits competitive proposals. It shall be the offerors responsibility to advise the Director of Purchasing and Contract Management if any language, requirements, etc., or any combinations thereof, inadvertently restricts or limits the requirements stated in this RFP to a single source. Such notification must be submitted in writing and must be received by the City Purchasing and Contract Management Office no later than five (5) calendar days before the proposal closing date. A review of such notifications will be made. 1.2 NO OFFEROR SHALL REQUEST ANY INFORMATION VERBALLY. ALL REQUESTS FOR ADDITIONAL INFORMATION OR CLARIFICATION CONCERNING THIS REQUEST FOR PROPOSALS (RFP) MUST BE SUBMITTED IN WRITING NO LATER THAN FIVE (5) CALENDAR DAYS PRIOR TO THE PROPOSAL CLOSING DATE AND ADDRESSED TO: Kiara Morgan, Buyer III City of Lubbock Purchasing and Contract Management Office 1314 Avenue K, Floor 9, Lubbock, Texas, 79401 Fax: 806-775-2164 Email: KMorgan@mylubbock.us Website: https://ci-lubbock-tx.bonfirehub.com/portal/ 2. TIME AND ORDER FOR COMPLETION 2.1 The construction covered by the contract documents shall be substantially completed within 335 Consecutive Calendar Days from the date specified in the Notice to Proceed issued by the City of Lubbock to the successful offeror. 2.2 The Contractor will be permitted to prosecute the work in the order of his own choosing, provided, however, the City reserves the right to require the Contractor to submit a progress schedule of the work contemplated by the contract documents. In the event the City requires a progress schedule to be submitted, and it is determined by the City that the progress of the work is not in accordance with the progress schedule so submitted, the City may direct the Contractor to take such action as the City deems necessary to ensure completion of the project within the time specified. 2.3 Upon receipt of notice to proceed, and upon commencement of the work, the Contractor shall ensure daily prosecution of the work is conducted every business day until the work is completed, regardless if the work will be substantially or finally complete ahead of specified deadlines in the agreement, unless the City determines time off from said prosecution is necessary or reasonable and Contractor received said determination in writing from the City. Additionally, inclement weather shall be the only other reason consistent, daily prosecution of the work may not take place on those inclement weather days. 3. GUARANTEES 3.1 All equipment and materials incorporated in the project and all construction shall be guaranteed against defective materials and workmanship. Prior to final acceptance, the Contractor shall furnish to the Owner, a written general guarantee which shall provide that the Contractor shall remedy any defects in the work, and pay for any and all damages of any nature whatsoever resulting in such defects, when such defects appear within One year from date of final acceptance of the work as a result of defective materials or workmanship, at no cost to the Owner (City of Lubbock). 3.2 Notwithstanding any provisions contained in the contractual agreement, the Contractor represents and warrants fault-free performance and fault-free result in the processing date and date-related data (including, but not limited to calculating, comparing and sequencing) of all hardware, software and firmware products delivered and services provided under this Contract, individually or in combination, as the case may be from the effective date of this Contract. Also, the Contractor warrants calculations will be recognized and accommodated and will not, in any way, result in hardware, software or firmware failure. The City of Lubbock, at its sole option, may require the Contractor, at any time, to demonstrate the procedures it intends to follow in order to comply with all the obligations contained herein. 3.3 The obligations contained herein apply to products and services provided by the Contractor, its sub- contractor or any third party involved in the creation or development of the products and services to be delivered to the City of Lubbock under this Contract. Failure to comply with any of the obligations contained herein, may result in the City of Lubbock availing itself of any of its rights under the law and under this Contract including, but not limited to, its right pertaining to termination or default. 3.4 The warranties contained herein are separate and discrete from any other warranties specified in this Contract, and are not subject to any disclaimer of warranty, implied or expressed, or limitation to the y be specified in this Contract, its appendices, its schedules, its annexes or any document incorporated in this Contract by reference. 4. BASIS OF PROPOSALS AND SELECTION CRITERIA 4.1 The City uses the Competitive Sealed Proposals procurement method as authorized by the Texas Legislature and further defined by Texas Government Code Section 2269. The Maximum Point value is equal to 100 points. The weight factor is 60 points for Price, 30 points for Contractor Qualifications, and 10 points for Construction Time. The selection criteria used to evaluate each proposal includes the following: 4.1.1 60 POINTS - PRICE: The quality of Offerors is not judged solely by a low initial cost proposal or, conversely, eliminated solely because of a high initial cost proposal. The following is the formula used when determining price as a factor for construction contract proposals. The lowest proposal price of all the proposals becomes the standard by which all price proposals are evaluated. One at a time, each proposal is evaluated by taking the lowest proposal price and dividing it by the price of the proposal being evaluated. That fraction is then multiplied by the maximum point value of the price factor for the price score. For Example: (Lowest Price/Current Proposal Price) x Maximum Point Value = Price Score. 4.1.2 30 POINTS - CONTRACTOR QUALIFICATIONS: Experience Modification Ratio (EMR). The City may also interview the job superintendent at a time to be named after receipt of proposals. 4.1.3 Five (5) points of the overall points for this criteria are based on the Experience Modification Ration (EMR) and supporting documentation submitted by the contractor. 4.1.3.1 The lowest EMR of all the proposals becomes the standard by which all the EMRs are evaluated. One at a time, each proposal is evaluated by taking the lowest EMR and dividing it by the EMR of the proposal being evaluated. That fraction is then multiplied by 5 for the EMR score. For example: (Lowest EMR/Current EMR) x 5 = EMR Score portion of this criteria) 4.1.3.2 Contractors with an EMR greater than 1.0, as well as those Contractors not submitting EMRs, will receive zero points for this portion of the selection criteria. 4.1.4 For the remaining portion of this criteria, each evaluator assigns points based upon the responses with the contractor, and on safety record information submitted. The City may consider any incidence involving worker safety or safety of Lubbock residents, be it related or caused by environmental, mechanical, operational, supervision or any other cause or factor under the offenses with the date of the offense, location where the offense occurred, type of offense, final disposition of the offense, and any penalty assessed 4.1.5 4.1.5.1 You may provide additional pertinent information relevant to the project for which you are submitting this proposal in an appendix. 4.1.6 10 POINTS - CONSTRUCTION TIME: This criterion is, as with price, objective and evaluators use the following formula when determining construction time as a factor for construction contract proposals. The lowest construction time proposal of all the proposals becomes the standard by which all the construction time proposals are evaluated. One at a time, each proposal is evaluated by taking the lowest construction time and dividing it by the construction time of the proposal being evaluated. That fraction is then multiplied by the maximum point value of the construction time factor for the construction time score. For example: (Lowest construction time/Current Proposal construction time) x Maximum Point Value = Construction Time Score) 4.1.7 EVALUATION PROCESS: Evaluators independently review and score each proposal. The Committee meets, to discuss the individual scores of each evaluator. If the individual scores are similar, the Chairperson may average the scores then rank offerors accordingly. If the scores are significantly diverse, the Chairperson initiates and moderates discussion to determine the reasons for the differences and ensures that all evaluators are fully knowledgeable of all aspects of the proposals. Scores may then be adjusted by the committee based on committee discussion. 4.1.8 Please note that offerors with higher qualifications scores could be ranked higher than offerors with slightly better price scores. 4.2 The estimated budget for the construction phase of this project is $5,000,000.00. 4.3 Proposals shall be made using the forms provided. GENERAL INSTRUCTIONS TO OFFERORS (Continued) 5. ADDENDA & MODIFICATIONS 5.1 Any changes, additions, or clarifications to the RFP are made by ADDENDA information available over the Internet at https://ci-lubbock-tx.bonfirehub.com/portal/. We strongly suggest that you check for any addenda a minimum of forty-eight hours in advance of the response deadline. BUSINESSES WITHOUT INTERNET ACCESS may use computers available at most public libraries. 5.2 Any offeror in doubt as to the true meaning of any part of the specifications or other documents may request an interpretation thereof from the Director of Purchasing and Contract Management. At the request of the offeror, or in the event the Director of Purchasing and Contract Management deems the interpretation to be substantive, the interpretation will be made by written addendum issued by the Purchasing and Contract Management. Such addenda issued by the Purchasing and Contract Management Office will be available over the Internet at https://ci-lubbock-tx.bonfirehub.com/portal/ and will become part of the proposal package having the same binding effect as provisions of the original RFP. NO VERBAL EXPLANATIONS OR INTERPRETATIONS WILL BE BINDING. In order to have a request for interpretation considered, the request must be submitted in writing and must be received by the City of Lubbock Purchasing and Contract Management Office no later than five (5) calendar days before the proposal closing date. 5.3 All addenda, amendments, and interpretations of this solicitation shall be in writing. The City of Lubbock shall not be legally bound by any explanation or interpretation that is not in writing. Only information supplied by the City of Lubbock Purchasing and Contract Management Office in writing or in this RFP should be used in preparing proposal responses. All contacts that an offeror may have had before or after receipt of this RFP with any individuals, employees, or representatives of the City and any information that may have been read in any news media or seen or heard in any communication facility regarding this proposal should be disregarded in preparing responses. 5.4 The City does not assume responsibility for the receipt of any addendum sent to offerors. 6. EXAMINATION OF DOCUMENTS AND REQUIREMENTS 6.1 Each offeror shall carefully examine all RFP documents and thoroughly familiarize itself with all requirements before submitting a proposal to ensure that their proposal meets the intent of these specifications. 6.2 Before submitting a proposal, each offeror shall be responsible for making all investigations and examinations that are necessary to ascertain conditions and requirements affecting the requirements of this Request for Proposals. Failure to make such investigations and examinations shall not relieve the offeror from obligation to comply, in every detail, with all provisions and requirements of the Request for Proposals. 6.3 Notices of any discrepancies or omissions in these plans, specifications, or contract documents, shall be given to the Director of Purchasing and Contract Management and a clarification obtained before the proposals are received, and if no such notice is received by the Director of Purchasing and Contract Management prior to the opening of proposals, then it shall be deemed that the offeror fully understands the work to be included and has provided sufficient sums in its proposal to complete the work in accordance with these plans and specifications. If offeror does not notify the Director of Purchasing and Contract Management before offering of any discrepancies or omissions, then it shall be deemed for all purposes that the plans and specifications are sufficient and adequate for completion of the project. It is further agreed that any request for clarification must be submitted no later than five (5) calendar days prior to the opening of proposals. 7. PROPOSAL PREPARATION COSTS 7.1 Issuance of this RFP does not commit the City of Lubbock, in any way, to pay any costs incurred in the preparation and submission of a proposal. 7.2 The issuance of this RFP does not obligate the City of Lubbock to enter into contract for any services or equipment. 7.3 All costs related to the preparation and submission of a proposal shall be paid by the offeror. 8. TRADE SECRETS, CONFIDENTIAL INFORMATION AND THE TEXAS PUBLIC INFORMATION ACT 8.1 If you consider any portion of your proposal to be privileged or confidential by statute or judicial decision, including trade secrets and commercial or financial information, clearly identify those portions. 8.2 Proposals will be opened in a manner that avoids disclosure of the contents to competing offerors and keeps the proposals secret during negotiations. All proposals are open for public inspection after the contract is awarded, but trade secrets and confidential information in the proposals are not open for inspection. Tex. Loc. Govt. Code 252.049(a) 8.3 Marking your entire proposal CONFIDENTIAL/PROPRIETARY is not in conformance with the Texas Public Information Act. 8.4 Pursuant to Section 552.234(c) of the Texas Government Code, submit your open records request using the link provided below. https://lubbocktx.govqa.us/WEBAPP/_rs/(S(quiyirflbtihahjnycegwpcs))/SupportHome.aspx 8.5 For more information, please see the City of Lubbock Public Information Act website at: https://ci.lubbock.tx.us/pages/public-information-act 9. LICENSES, PERMITS, Taxes 9.1 The price or prices for the work shall include full compensation for all taxes, permits, etc. that the offeror is or may be required to pay. 10. UTILIZATION OF LOCAL BUSINESS RESOURCES 10.1 Prospective offerors are strongly encouraged to explore and implement methods for the utilization of local resources, and to outline in their proposal submittal how they would utilize local resources. 11. CONFLICT OF INTEREST 11.1 The offeror shall not offer or accept gifts or anything of value nor enter into any business arrangement with any employee, official or agent of the City of Lubbock. 11.2 By signing and executing this proposal, the offeror certifies and represents to the City the offeror has not offered, conferred or agreed to confer any pecuniary benefit or other thing of value for the receipt of special treatment, advantage, information, recipient's decision, opinion, recommendation, vote or any other exercise of discretion concerning this proposal. 11.3 It is not necessary to fill out the CIQ Form unless you have a business relationship that might cause a conflict of interest with the City of Lubbock 11.4 Effective January 1, 2006, Chapter 176 of the Texas Local Government Code requires that any vendor or person considering doing business with a local government entity disclose in the Questionnaire, Form CIQ, the vendor or perso affiliation or business relationship that might cause a conflict of interest witha local government entity. By law, the questionnaire must be filed with the records administrator of the City of Lubbock not later than the Seventhbusiness day after the date the person becomes aware of the facts that require the statement to be filed. The questionnaire can be found at: https://www.ethics.state.tx.us/forms/conflict/ Lubbock, Texas, 79457 See Section 176.006, Local Government Code: http://www.statutes.legis.state.tx.us/SOTWDocs/LG/htm/LG.176.htm. A person commits an offense if the person violates Section 176.006, Local Government Code. An offense under this section is a Class C misdemeanor. 12. CONTRACT DOCUMENTS 12.1 All work covered by the contract shall be done in accordance with contract documents described in the General Conditions. 12.2 All offerors shall be thoroughly familiar with all of the requirements set forth on the contract documents for the construction of this project and shall be responsible for the satisfactory completion of all work contemplated by said contract documents. 13. CERTIFICATE OF INTERESTED PARTIES 13.1 Effective January 1, 2016, Section 2252.908, as amended, of Chapter 2252 of the Texas Government Code requires certain business entities to submit an electronic disclosure form to the Texas Ethics Commission before entering into a contract with a local government entity when any of the following apply: 1) Contract requires an action or vote by the City Council (governing body); OR 2) Contract value is $1 Million or greater; OR 3) Contract is for services that would require a person to register as a lobbyist under Chapter 305 of the Government Code. This must be done before executing the contract. The disclosure form may be found at https://www.ethics.state.tx.us/whatsnew/elf_info_form1295.htm. You must log in and create an account the first time you fill out the form. Tutorial videos on how to log in for the first time and how to fill out the form can be found through the link above. After you electronically submit the disclosure form, a screen will come up confirming the submission and assigning a certificate number. Then, you must print the form, have an authorized agent complete the declaration and sign, and provide it to the City (scanned email copy is acceptable). 14. PLANS FOR USE BY OFFERORS 14.1 It is the intent of the City of Lubbock that all parties with an interest in submitting a proposal on the project covered by the contract documents be given a reasonable opportunity to examine the documents and prepare a proposal without charge. The contract documents may be examined without charge as noted in the Notice to Offerors. 15. PAYMENT 15.1 All payments due to Contractor shall be made in accordance with the provisions of the General Conditions of the contract documents. 16. AFFIDAVITS OF BILLS PAID 16.1 The City of Lubbock reserves the right, prior to final acceptance of this project to require the Contractor to execute an affidavit that all bills for labor, materials and incidentals incurred in the construction of the improvements contemplated by the contract documents have been paid in full and that there are no claims pending, of which the Contractor has been notified. 17. MATERIALS AND WORKMANSHIP 17.1 The intent of these contract documents is that only materials and workmanship of the best quality and grade will be furnished. The fact that the specifications may fail to be sufficiently complete in some detail will not relieve the Contractor of full responsibility for providing materials of high quality and for protecting them adequately until incorporated into the project. The presence or absence of a representative of the City on the site will not relieve the Contractor of full responsibility of complying with this provision. The specifications for materials and methods set forth in the contract documents provide minimum standards of quality, which the Owner believes necessary to procure a satisfactory project. 18. PLANS FOR THE CONTRACTOR 18.1 The contractor will, upon written request, be furnished up to a maximum of five sets of plans and specifications and related contract documents for use during construction. Plans and specifications for use during construction will only be furnished directly to the Contractor. The Contractor shall then distribute copies of plans and specifications to suppliers, subcontractors or others, as required for proper prosecution of the work contemplated by the Contractor. 19. PROTECTION OF THE WORK 19.1 The Contractor shall be responsible for the care, preservation, conservation, and protection of all materials, supplies, machinery, equipment, tools, apparatus, accessories, facilities, and all means of construction, and any and all parts of the work whether the Contractor has been paid, partially paid, or not paid for such work, until the date the City issues its certificate of completion to Contractor. The City reserves the right, after the proposals have been opened and before the contract has been awarded, to require of an offeror the following information: (a) The experience record of the offeror showing completed jobs of a similar nature to the one covered by the intended contract and all work in progress with bond amounts and percentage completed. (b) A sworn statement of the current financial condition of the offeror. (c) Equipment schedule. 20. TEXAS STATE SALES TAX 20.1 This contract is issued by an organization which qualifies for exemption provisions pursuant to provisions of Article 20.04 of the Texas Limited Sales, Excise and Use Tax Act. 20.2 The Contractor must obtain a limited sales, excise and use tax permit which shall enable him to buy the materials to be incorporated into the work without paying the tax at the time of purchase. 21. PROTECTION OF SUBSURFACE LINES AND STRUCTURES 21.1 It shall be the Contractor's responsibility to prosecute the work contemplated by the contract documents in such a way as to exercise due care to locate and prevent damage to all underground pipelines, utility lines, conduits or other underground structures which might or could be damaged by Contractor during the construction of the project contemplated by these contract documents. The City of Lubbock agrees that it will furnish Contractor the location of all such underground lines and utilities of which it has knowledge. However, such fact shall not relieve the Contractor of his responsibilities aforementioned. All such underground lines or structures, both known and unknown, cut or damaged by Contractor during the prosecution of the work contemplated by this contract shall be repaired immediately by Contractor to the satisfaction of the City of Lubbock, Texas, and/or the owning utility at the Contractor's expense. 22. BARRICADES AND SAFETY MEASURES 22.1 The contractor shall, at his own expense, furnish and erect such barricades, fences, lights and danger signals, and shall take such other precautionary measures for the protection of persons, property and the work as may be necessary. The Contractor will be held responsible for all damage to the work due to failure of barricades, signs, and lights to protect it, and when damage is incurred, the damaged portion shall be immediately removed and replaced by Contractor at his own cost and expense. The Contractor's responsibility for maintenance of barricades, signs, and lights shall not cease until the date of issuance to Contractor of City's certificate of acceptance of the project. 23. EXPLOSIVES 23.1 The use of explosives will not be permitted 23.2 Explosive materials shall not be stored or kept at the construction site by the Contractor. 24. CONTRACTOR'S REPRESENTATIVE 24.1 The successful offeror shall be required to have a responsible local representative available at all times while the work is in progress under this contract. The successful offeror shall be required to furnish the name, address and telephone number where such local representative may be reached during the time that the work contemplated by this contract is in progress. 25. INSURANCE 25.1 The Contractor shall not commence work under this contract until he has obtained all insurance as required in the General Conditions of the contract documents, from an underwriter authorized to do business in the State of Texas and satisfactory to the City. Proof of coverage shall be furnished to the City and written notice of cancellation or any material change will be provided ten (10) days in advance of cancellation or change. All policies shall contain an agreement on the part of the insurer waiving the right to subrogation. The Contractor shall procure and carry at his sole cost and expense through the life of this contract, insurance protection as hereinafter specified. Coverage in excess of that specified herein also shall be acceptable. Such insurance shall be carried with an insurance company authorized to transact business in the State of Texas and shall cover all operations in connection with this contract, whether performed by the Contractor or a subcontractor, or separate policies shall be provided covering the operation of each subcontractor. A certificate of insurance specifying each and all coverages shall be submitted before contract execution. 26. LABOR AND WORKING HOURS 26.1 Attention of each offeror is particularly called to the schedule of general prevailing rate of per diem wages included in these contract documents. The wage rate that must be paid on this project shall not be less than specified in the schedule of general prevailing rates of per diem wages as above mentioned. The offeror's attention is further directed to the requirements of Texas Government Code, Chapter 2258, Prevailing Wage Rates, providing for the payment of the wage schedules above mentioned and the offeror's obligations thereunder. The inclusion of the schedule of general prevailing rate of per diem wages in the contract documents does not release the Contractor from compliance with any wage law that may be applicable. Construction work under this contract requiring an inspector will not be performed on Sundays or holidays unless the following conditions exist: 26.1.1The project being constructed is essential to the City of Lubbock's ability to provide the necessary service to its citizens. 26.1.2Delays in construction are due to factors outside the control of the Contractor. The Contractor is approaching the penalty provisions of the contract and Contractor can show he has made a diligent effort to complete the contract within the allotted time. 26.2 Before construction work requiring an inspector is to be performed on Sundays or holidays, the Contractor must notify the Owner's Representative not less than three full working days prior to the weekend or holiday he desires to do work and obtain written permission from the Owner's Representative to do such work. The final decision on whether to allow construction work requiring an inspector on Sundays or holidays will be made by the Owner's Representative. 26.3 In any event, if a condition should occur or arise at the site of this project or from the work being done under this contract which is hazardous or dangerous to property or life, the Contractor shall immediately commence work, regardless of the day of the week or the time of day, to correct or alleviate such condition so that it is no longer dangerous to property or life. 27. PAYMENT OF EMPLOYEES AND FILING OF PAYROLLS 27.1 The contractor and each of his subcontractors shall pay each of his employees engaged in work on the project under this contract in full (less mandatory legal deductions) in cash, or by check readily cashable without discount, not less often than once each week. The Contractor and each of his subcontractors shall keep a record showing the name and occupation of each worker employed by the Contractor or subcontractor in the construction of the public work and the actual per diem wages paid to each worker. This record shall be open at all reasonable hours to inspection by the officers and agents of the City. The Contractor must classify employees according to one of the classifications set forth in the schedule of general prevailing rate of per diem wages, which schedule is included in the contract documents. The Contractor shall forfeit as a penalty to the City of Lubbock on whose behalf this contract is made, sixty dollars for each laborer, workman, or mechanic employed for each calendar day, or portion thereof, such laborer, workman or mechanic is paid less than the wages assigned to his particular classification as set forth in the schedule of general prevailing rate of per diem wages included in these contract documents. 28. PROVISIONS CONCERNING ESCALATION CLAUSES 28.1 Proposals submitted containing any conditions which provide for changes in the stated proposal price due to increases or decreases in the cost of materials, labor or other items required for the project will be rejected and returned to the offeror without being considered. 29. PREPARATION FOR PROPOSAL 29.1 The bidder shall submit his bid on forms furnished by the City, and all blank spaces in the form shall be correctly filled in, stating the price in numerals for which he intends to do the work contemplated or furnish the materials required. Such prices shall be written in ink, distinctly and legibly, or typewritten. In case of discrepancy between the unit price and the extended total for a bid item, the unit price will be taken. A bid that has been opened may not be changed for the purpose of correcting an error in the bid price. 29.2 If the proposal is submitted by an individual, his name must be signed by him or his duly authorized agent. If a proposal is submitted by a firm, association, or partnership, the name and address of each member must be given and the proposal signed by a member of the firm, association or partnership, or person duly authorized. If the proposal is submitted by a company or corporation, the company or corporate name and business address must be given, and the proposal signed by an official or duly authorized agent. Powers of attorney authorizing agents or others to sign proposals must be properly certified and must be in writing and submitted with the proposal. The proposal shall be executed in ink. 29.3 Pursuant to Texas Local Government Code 252.043(g), a competitive sealed proposal that has been opened may not be changed for the purpose of correcting an error in the proposal price. THEREFORE, ANY CORRECTIONS TO THE PROPOSAL PRICE MUST BE MADE ON THE PROPOSAL SUBMITTAL FORM PRIOR TO PROPOSAL OPENING. 29.4 Proposal submittals may be withdrawn and resubmitted at any time before the time set for opening of the proposals, but no proposal may be withdrawn or altered thereafter. 30. BOUND COPY OF CONTRACT DOCUMENTS 30.1 Offeror understands and agrees that the contract to be executed by offeror shall be bound and include the following: (a) Notice to Offerors. (b) General Instructions to Offerors. (c) Offeror's Submittal. (d) Statutory Bonds (if required). (e) Contract Agreement. (f) General Conditions. (g) Special Conditions (if any). (h) Specifications. (i) Insurance Certificates for Contractor and all Sub-Contractors. (j) All other documents made available to offeror for his inspection in accordance with the Notice to Offerors. 30.2 If Plans and Specifications are too bulky or cumbersome to be physically bound, they are to be considered incorporated by reference into the aforementioned contract documents. 31. QUALIFICATIONS OF OFFERORS 31.1 The offeror may be required before the award of any contract to show to the complete satisfaction of the City of Lubbock that it has the necessary facilities, ability, and financial resources to provide the service specified therein in a satisfactory manner. The offeror may also be required to give a past history and may make reasonable investigations deemed necessary and proper to determine the ability of the offeror to perform the work, and the offeror shall furnish to the City of Lubbock all information for this purpose deemed not to meet specifications or the proposal may be rejected if the evidence submitted by, or investigation of, the offeror fails to satisfy the City of Lubbock that the offeror is properly qualified to carry out the obligations of the contract and to complete (a) The ability, capacity, skill, and financial resources to perform the work or provide the service required. (b) The ability of the offeror to perform the work or provide the service promptly or within the time specified, without delay or interference. (c) The character, integrity, reputation, judgment, experience, and efficiency of the offeror. (d) The quality of performance of previous contracts or services. (e) The safety record of the Contractor and proposed Sub-Contractors (f) The experience and qualifications of key project personnel (g) Past experience with the Owner 31.2 Complete and submit the PROPOSED List of Sub-Contractors. Seven (7) business days after closing, complete and submit the FINAL List of Sub-contractors. (a) If no sub-contractors will be used please indicate so. 31.3 Before contract award, the recommended contractor for this project may be required to show that he has experience with similar projects that require the Contractor to plan his work efforts and equipment needs with City of Lubbock specifications in mind. Demonstration of experience shall include a complete list of ALL similar municipal and similar non-municipal current and completed projects for the past five (5) years for review. This list shall include the names of supervisors and type of equipment used to perform work on these projects. In addition, the Contractor may be required to provide the name(s) of supervisor(s) that will be used to perform work on this project in compliance with City of Lubbock specifications herein. 32. SELECTION 32.1 Selection shall be based on the responsible offeror whose proposal is determined to be the most advantageous to the City of Lubbock considering the relative importance of evaluation factors included in this RFP. 32.2 NO INDIVIDUAL OF ANY USING DEPARTMENT (CITY OF LUBBOCK WATER UTILITIES OR OTHER) HAS THE AUTHORITY TO LEGALLY AND/OR FINANCIALLY COMMIT THE CITY TO ANY CONTRACT, AGREEMENT OR PURCHASE ORDER FOR GOODS OR SERVICES, UNLESS SPECIFICALLY SANCTIONED BY THE REQUIREMENTS OF THIS REQUEST FOR PROPOSAL. 32.3 The City shall select the offeror that offers the best value for the City based on the published selection criteria and on its ranking evaluation. The City shall first attempt to negotiate a contract with the selected offeror. The City and its engineer or architect may discuss with the selected offeror options for a scope or time modification and any price change associated with the modification. If the City is unable to negotiate a contract with the selected offeror, the City shall, formally and in writing, end negotiations with that offeror and proceed to the next offeror in the order of the selection ranking until a contract is reached or all proposals are rejected. 32.4 In determining best value for the City, the City is not restricted to considering price alone, but may consider any other factor stated in the selection criteria. 32.5 A proposal will be subject to being considered irregular and may be rejected if it shows omissions, alterations of form, conditional alternate proposals, additions or alternates in lieu of the items specified, if the unit prices are obviously unbalanced (either in excess of or below reasonably expected values), or irregularities of any kind. 33. ANTI-LOBBYING PROVISION 33.1 DURING THE PERIOD BETWEEN PROPOSAL SUBMISSION DATE AND THE CONTRACT AWARD, OFFERORS, INCLUDING THEIR AGENTS AND REPRESENTATIVES, SHALL NOT DISCUSS OR PROMOTE THEIR PROPOSAL WITH ANY MEMBER OF THE LUBBOCK CITY COUNCIL OR CITY STAFF EXCEPT UPON THE REQUEST OF THE CITY OF LUBBOCK PURCHASING DEPARTMENT IN THE COURSE OF CITY-SPONSORED INQUIRIES, BRIEFINGS, INTERVIEWS, OR PRESENTATIONS. 33.2 This provision is not meant to preclude bidders from discussing other matters with City Council members or City staff. This policy is intended to create a level playing field for all potential bidders, assure that contract decisions are made in public, and to protect the integrity of the bid process. Violation of this provision may result in rejection of the bidder's bid. 34. PROTEST 34.1 All protests regarding the RFP process must be submitted in writing to the City Director of Purchasing and Contract Management within 5 working days after the protesting party knows of the occurrence of the action which is protested relating to advertising of notices deadlines, proposal opening and all other related procedures under the Local Government Code, as well as any protest relating to alleged improprieties with the RFP process. This limitation does not include protests relating to staff recommendations as to award of contract. Protests relating to staff recommendations may be directed to the City Manager. All staff recommendations will be made available for public review prior to consideration by the City Council as allowed by law. FAILURE TO PROTEST WITHIN THE TIME ALLOTTED SHALL CONSTITUTE A WAIVER OF ANY PROTEST. 35. PREVAILING WAGE RATES 35.1 Offerors are required to comply with Texas Government Code, Chapter 2258, Prevailing Wage Rates, with respect to the payment of prevailing wage rates for the construction of a public work, including a building, highway, road, excavation, and repair work or other project development or improvement, paid for in whole or in part from public funds, without regard to whether the work is done under public supervision or direction. A worker is employed on a public work if the worker is employed by the contractor or any subcontractor in the execution of the contract for the project. 35.2 A worker employed on a public work by or on behalf of the City of Lubbock shall be paid not less than the general prevailing rate of per diem wages for the work of a similar character in the locality in which the work is performed, and not less than the general prevailing rate of per diem wages for legal holiday and overtime work. 35.3 A contractor or subcontractor who violates Texas Government Code Section 2258.023 shall pay to the City of Lubbock $60 for each worker employed for each calendar day or part of the day that the worker is paid less than the wage rates stipulated in the contract. City of Lubbock, TX Public Works RFP 23-17342-KM Unpaved Roads Improvements C.O. Phase 3 Lone Star Dirt & Paving of Lubbock, TX QTY UnitExtended U/M #Items+/- PriceCost 1N. Waco Ave from 1st Street to Auburn Street #1-1MOBILIZATION1LS 9,000.00 9,000.00 #1-2SWPPP1LS 4,000.00 4,000.00 #1-3PREPARING OF RIGHT-OF-WAY6STA 3,500.00 21,000.00 #1-4ASPHALT REMOVAL57SY 25.00 1,425.00 #1-5CONCRETE REMOVAL400SY 50.00 20,000.00 #1-624" COL TYPE A OR B CURB AND GUTTER CURB1401LF 32.00 44,832.00 #1-71' X1 RIBBON CURB0LF 40.00 - #1-82" HMAC COL TYPE C1950SY 42.00 81,900.00 #1-96" CONCRETE VALLEY GUTTER AND FILLET105SY 80.00 8,400.00 #1-106" CONCRETE ALLEY RETURNS AND DRIVEWAYS0SY 80.00 - #1-11ADA RAMP4EA 1,800.00 7,200.00 #1-12MANHOLE / VALVE ADJUSTMENTS1EA 2,500.00 2,500.00 #1-13TRAFFIC CONTROL1EA 500.00 500.00 226th Street from Yuma Ave to Upland Ave, FNI #2-1MOBILIZATION1LS 35,000.00 35,000.00 #2-2SWPPP1LS 4,000.00 4,000.00 #2-3PREPARING OF RIGHT-OF-WAY38STA 3,500.00 133,000.00 #2-4ASPHALT REMOVAL1027SY 25.00 25,675.00 #2-5CONCRETE REMOVAL52SY 50.00 2,600.00 #2-624" COL TYPE A OR B CURB AND GUTTER CURB3665LF 32.00 117,280.00 #2-71' X1 RIBBON CURB0LF 40.00 - #2-82" HMAC COL TYPE C9355SY 42.00 392,910.00 #2-96" CONCRETE VALLEY GUTTER AND FILLET329SY 80.00 26,320.00 #2-106" CONCRETE ALLEY RETURNS AND DRIVEWAYS286SY 80.00 22,880.00 #2-11ADA RAMP0EA 1,800.00 - #2-12MANHOLE / VALVE ADJUSTMENTS2EA 2,500.00 5,000.00 #2-13TRAFFIC CONTROL1EA 500.00 500.00 3Wausau Ave from 19th St to 26th St, FNI #3-1MOBILIZATION1LS 35,000.00 35,000.00 #3-2SWPPP1LS 4,000.00 4,000.00 #3-3PREPARING OF RIGHT-OF-WAY26STA 3,500.00 91,000.00 #3-4ASPHALT REMOVAL6SY 25.00 150.00 #3-5CONCRETE REMOVAL0SY 50.00 - #3-624" COL TYPE A OR B CURB AND GUTTER CURB0LF 32.00 - #3-71' X1 RIBBON CURB4734LF 40.00 189,360.00 #3-82" HMAC COL TYPE C9591SY 42.00 402,822.00 #3-96" CONCRETE VALLEY GUTTER AND FILLET85SY 80.00 6,800.00 #3-106" CONCRETE ALLEY RETURNS AND DRIVEWAYS275SY 80.00 22,000.00 #3-11ADA RAMP0EA 1,800.00 - City of Lubbock, TX Public Works RFP 23-17342-KM Unpaved Roads Improvements C.O. Phase 3 QTY UnitExtended U/M #Items+/- PriceCost #3-12MANHOLE / VALVE ADJUSTMENTS0EA 2,500.00 - #3-13TRAFFIC CONTROL1EA 500.00 500.00 422nd Street from west of Urbana Place to Upland Ave, FNI #4-1MOBILIZATION1LS 19,000.00 19,000.00 #4-2SWPPP1LS 4,000.00 4,000.00 #4-3PREPARING OF RIGHT-OF-WAY12STA 3,500.00 42,000.00 #4-4ASPHALT REMOVAL466SY 25.00 11,650.00 #4-5CONCRETE REMOVAL193SY 50.00 9,650.00 #4-624" COL TYPE A OR B CURB AND GUTTER CURB1508LF 32.00 48,256.00 #4-71' X1 RIBBON CURB0LF 40.00 - #4-82" HMAC COL TYPE C4446SY 42.00 186,732.00 #4-96" CONCRETE VALLEY GUTTER AND FILLET169SY 80.00 13,520.00 #4-106" CONCRETE ALLEY RETURNS AND DRIVEWAYS456SY 80.00 36,480.00 #4-11ADA RAMP0EA 1,800.00 - #4-12MANHOLE / VALVE ADJUSTMENTS11EA 2,500.00 27,500.00 #4-13TRAFFIC CONTROL1EA 500.00 500.00 521st Street from Research Blvd to East Dead End, FNI #5-1MOBILIZATION1LS 16,000.00 16,000.00 #5-2SWPPP1LS 4,000.00 4,000.00 #5-3PREPARING OF RIGHT-OF-WAY13STA 3,500.00 45,500.00 #5-4ASPHALT REMOVAL6SY 25.00 150.00 #5-5CONCRETE REMOVAL0SY 50.00 - #5-624" COL TYPE A OR B CURB AND GUTTER CURB0LF 32.00 - #5-71' X1 RIBBON CURB2318LF 40.00 92,720.00 #5-82" HMAC COL TYPE C3467SY 42.00 145,614.00 #5-96" CONCRETE VALLEY GUTTER AND FILLET327SY 80.00 26,160.00 #5-106" CONCRETE ALLEY RETURNS AND DRIVEWAYS0SY 80.00 - #5-11ADA RAMP0EA 1,800.00 - #5-12MANHOLE / VALVE ADJUSTMENTS0EA 2,500.00 - #5-13TRAFFIC CONTROL1EA 500.00 500.00 6E. 81st from Ash Ave to Cedar Ave, KHA #6-1MOBILIZATION1LS 8,000.00 8,000.00 #6-2SWPPP1LS 4,000.00 4,000.00 #6-3PREPARING OF RIGHT-OF-WAY7STA 3,500.00 24,500.00 #6-4ASPHALT REMOVAL19SY 25.00 475.00 #6-5CONCRETE REMOVAL46SY 50.00 2,300.00 #6-624" COL TYPE A OR B CURB AND GUTTER CURB1154LF 32.00 36,928.00 #6-71' X1 RIBBON CURB0LF 40.00 - #6-82" HMAC COL TYPE C1978SY 42.00 83,076.00 #6-96" CONCRETE VALLEY GUTTER AND FILLET0SY 80.00 - City of Lubbock, TX Public Works RFP 23-17342-KM Unpaved Roads Improvements C.O. Phase 3 QTY UnitExtended U/M #Items+/- PriceCost #6-106" CONCRETE ALLEY RETURNS AND DRIVEWAYS51SY 80.00 4,080.00 #6-11ADA RAMP0EA 1,800.00 - #6-12MANHOLE / VALVE ADJUSTMENTS0EA 2,500.00 - #6-13TRAFFIC CONTROL1EA 500.00 500.00 7E. 49th St from Globe Ave to Ivory Ave, KHA #7-1MOBILIZATION1LS 7,500.00 7,500.00 #7-2SWPPP1LS 4,000.00 4,000.00 #7-3PREPARING OF RIGHT-OF-WAY7STA 3,500.00 24,500.00 #7-4ASPHALT REMOVAL274SY 25.00 6,850.00 #7-5CONCRETE REMOVAL92SY 50.00 4,600.00 #7-624" COL TYPE A OR B CURB AND GUTTER CURB912LF 32.00 29,184.00 #7-71' X1 RIBBON CURB0LF 40.00 - #7-82" HMAC COL TYPE C1951SY 42.00 81,942.00 #7-96" CONCRETE VALLEY GUTTER AND FILLET0SY 80.00 - #7-106" CONCRETE ALLEY RETURNS AND DRIVEWAYS29SY 80.00 2,320.00 #7-11ADA RAMP0EA 1,800.00 - #7-12MANHOLE / VALVE ADJUSTMENTS0EA 2,500.00 - #7-13TRAFFIC CONTROL1EA 500.00 500.00 8Ash Ave #8-1MOBILIZATION1LS 50,000.00 50,000.00 #8-2TEMPORARY STORMWATER POLLUTION 1LS 4,500.00 4,500.00 PREVENTION AND EROSION CONTROL MEASURES #8-3TRAFFIC CONTROL1LS 12,000.00 12,000.00 #8-4TREE REMOVAL1LS 25,000.00 25,000.00 #8-5ASPHALT REMOVAL2157SY 25.00 53,925.00 #8-6CONCRETE REMOVAL95SY 50.00 4,750.00 #8-7EXCAVATION FOR ROADWAYS1310CY 12.00 15,720.00 #8-8ROADWAY EMBANKMENT (PLACEMENT OF ON-SITE 1118CY 12.00 13,416.00 EXCAVATED MATERIAL) #8-99366SY 68.00 636,888.00 #8-103442LF 32.00 110,144.00 #8-11131SY 80.00 10,480.00 #8-12142SY 87.00 12,354.00 #8-13731SY 90.00 65,790.00 #8-1429SY 80.00 2,320.00 #8-15WATER VALVE BOX ADJUSTMENT4EA 1,800.00 7,200.00 #8-16WATER VALVE VAULT MANHOLE RIM ADJUSTMENT1EA 2,500.00 2,500.00 City of Lubbock, TX Public Works RFP 23-17342-KM Unpaved Roads Improvements C.O. Phase 3 QTY UnitExtended U/M #Items+/- PriceCost 9Iola Ave #9-1MOBILIZATION1LS 60,000.00 60,000.00 #9-2SWPPP1LS 4,500.00 4,500.00 #9-3TRAFFIC CONTROL1LS 12,000.00 12,000.00 #9-4TREE REMOVAL1LS 20,000.00 20,000.00 #9-5ASPHALT REMOVAL32SY 25.00 800.00 #9-6EXCAVATION FOR ROADWAYS6035CY 12.00 72,420.00 #9-7ROADWAY EMBANKMENT822CY 12.00 9,864.00 #9-8PAVEMENT SECTION (2.5" HMAC, 8" FLEXIBLE BASE 12250SY 68.00 833,000.00 COURSE, 12" COMPACTED SUBGRADE) #9-924" CONCRETE CURB AND GUTTER4850LF 32.00 155,200.00 #9-108"CONCRETE DRIVEWAYS AND ALLEY RETURN192SY 87.00 16,704.00 #9-118" CONCRETE FILLETS AND VALLEY GUTTER120SY 87.00 10,440.00 #9-124" CONCRETE SIDEWALK AND DRAINAGE FLARE 230SY 56.00 12,880.00 FLATWORKS #9-136' X 3' BOX CULVERT WITH SAFETY END 130LF 1,350.00 175,500.00 TREATMENTS #9-14ADA RAMP2LF 1,800.00 3,600.00 Total (Items 1-1 through 1-13): $200,757.00 Total (Items 2-2 through 2-13): $765,165.00 Total (Items 3-1 through 3-13): $751,632.00 Total (Items 4-1 through 4-13): $399,288.00 Total (Items 5-1 through 5-13): $330,644.00 Total (Items 6-1 through 6-13): $163,859.00 Total (Items 7-1 through 7-13): $161,396.00 Total (Items 8-1 through 8-16): $1,026,987.00 Total (Items 9-1 through 9-14): $1,386,908.00 Total (Items 1-1 through 9-14): $5,186,636.00 Contractors Statement of Qualifications Individual contractors and joint ventures submitting a bid must complete the following evaluation information for the Project. Joint ventures shall be composed of not more than two firms and each firm must complete separate evaluations. Evaluation information must be submitted at time of bid submittal. Failure to submit the following Bidder Evaluation information may result in the OWNER considering the bid non-responsive and result in rejection of the bid by the OWNER. Bidders are to provide any additional information requested by the OWNER. In evaluating a firm's qualifications, the following major factors will be considered: A. FINANCIAL CAPABILITY: For this project, the CONTRACTOR'S financial capability to undertake the project will be determined by the CONTRACTOR'S ability to secure bonding satisfactory to the OWNER. B. EXPERIENCE: Do the organization and key personnel have appropriate technical experience on similar projects? C. SAFETY: Does the organization stress and support safety as an important function of the work process? D. QUALITY OF WORK: (1) Does the organization have a commitment to quality in every facet of their work - the process as well as the product? (2) Does the organization have a written quality philosophy and/or principles that exemplifies their work? If so, submit as Attachment "A". (3) Has this organization ever received an award or been recognized for doing "quality" work on a project? If so, give details under Attachment "A". E. CONFORMANCE TO CONTRACT DOCUMENTS: (1) Does the organization have a commitment and philosophy to construct projects as designed and as defined in the Contract Documents? The OWNER reserves the right to waive irregularities in determining the firm's qualifications and reserves the right to require the submission of additional information. The qualifications of a firm shall not deprive the OWNER of the right to accept a bid, which in its judgement is the lowest and best bid, to reject any and all bids, to waive irregularities in the bids, or to reject nonconforming, non- responsive, or conditional bids. In addition, the OWNER reserves the right to reject any bid where circumstances and developments have in the opinion of the OWNER changed the qualifications or responsibility of the firm. Material misstatements on the qualifications forms may be grounds for rejection of the firm's bid on this project. Any such misstatement, if discovered after award of the contract to such firm, may be grounds for immediate termination of the contract. Additionally, the firm will be liable to the OWNER for any additional costs or damages to the OWNER resulting from such misstatements, including costs and attorney's fees for collecting such costs and damages. Complete the following information for your organization: 1 /87 POST-CLOSING DOCUMENT REQUIREMENTS The below-listed document must be received in the Purchasing and Contract Management Office Not Later Than SEVEN BUSINESS DAYS after the close date when responses are due. FINAL LIST OF SUB-CONTRACTORS Page Intentionally Left Blank PAYMENT BOND STATUTORY PAYMENT BOND PURSUANT TO SECTION 2253.021(a) OF THE TEXAS GOVERNMENT CODE (CONTRACTS MORE THAN $50,000) KNOW ALL MEN BY THESE PRESENTS, that Lone Star Dirt & Paving, Ltd. (hereinafter called the Principal(s), as Principal(s), and _______________________________________________________ (hereinafter called the Surety(s), as Surety(s), are held and firmly bound unto the City of Lubbock (hereinafter called the Obligee), in the amount of Five Million One Hundred Eighty-Six Thousand Six Hundred Thirty- Six Dollars ($5,186,636.00) lawful money of the United States for the payment whereof, the said Principal and Surety bind themselves, and their heirs, administrators, executors, successors and assigns, jointly and severally, firmly by these presents. th WHEREAS, the Principal has entered into a certain written contract with the Obligee, dated 27 day of June, 2023, to RFP 23-17342-KM Unpaved Roads Improvements C.O. Phase 3 __________________ __________________________________________________________________________________________ and said Principal under the law is required before commencing the work provided for in said contract to execute a bond in the amount of said contract which contract is hereby referred to and made a part hereof as fully and to the same extent as if copied at length herein. NOW, THEREFORE, THE CONDITION OF THIS OBLIGATION IS SUCH, that if the said Principal shall pay all claimants supplying labor and material to him or a subcontractor in the prosecution of the work provided for in said contract, then, this obligation shall be void; otherwise to remain in full force and effect; PROVIDED, HOWEVER, that this bond is executed pursuant to the provisions of Section 2253.021(a) of the Texas Government Code, and all liabilities on this bond shall be determined in accordance with the provisions of said Article to the same extent as if it were copied at length herein. IN WITNESS WHEREOF, the said Principal (s) and Surety (s) have signed and sealed this instrument this ________ day of __________________ 2023. ________________________________ _____________________________ Surety (Company Name) *By:_____________________________ By:__________________________ (Title) (Printed Name) _____________________________ (Signature) _____________________________ (Title) 1 The undersigned surety company represents that it is duly qualified to do business in Texas, and hereby designates ____________________ an agent resident in Lubbock County to whom any requisite notices may be delivered and on whom service of process may be had in matters arising out of such suretyship. _____________________________ Surety * By: _________________________ (Title) Approved as to form: City of Lubbock By: ____________________________ City Attorney * Note: If signed by an officer of the Surety Company there must be on file a certified extract from the by-laws showing that this person has authority to sign such obligation. If signed by an Attorney in Fact, we must have copy of power of attorney for our files. 2 PERFORMANCE BOND Page Intentionally Left Blank STATUTORY PERFORMANCE BOND PURSUANT TO SECTION 2253.021(a) OF THE TEXAS GOVERNMENT CODE (CONTRACTS MORE THAN $100,000) KNOW ALL MEN BY THESE PRESENTS, that Lone Star Dirt & Paving, Ltd. (hereinafter called the Principal(s), as Principal(s), and _______________________________________________________ (hereinafter called the Surety(s), as Surety(s), are held and firmly bound unto the City of Lubbock (hereinafter called the Obligee), in the amount of Five Million One Hundred Eighty-Six Thousand Six Hundred Thirty- Six Dollars ($5,186,636.00) lawful money of the United States for the payment whereof, the said Principal and Surety bind themselves, and their heirs, administrators, executors, successors and assigns, jointly and severally, firmly by these presents. th WHEREAS, the Principal has entered into a certain written contract with the Obligee, dated 27 day of June, 2023, to RFP 23-17342-KM Unpaved Roads Improvements C.O. Phase 3__________________ __________________________________________________________________________________________ and said principal under the law is required before commencing the work provided for in said contract to execute a bond in the amount of said contract which contract is hereby referred to and made a part hereof as fully and to the same extent as if copied at length herein. NOW, THEREFORE, THE CONDITION OF THIS OBLIGATION IS SUCH, that if the said Principal shall faithfully perform the work in accordance with the plans, specifications and contract documents, then this obligation shall be void; otherwise to remain in full force and effect. PROVIDED, HOWEVER, that this bond is executed pursuant to the provisions of Section 2253.021(a) of the Texas Government Code, and all liabilities on this bond shall be determined in accordance with the provisions of said article to the same extent as if it were copied at length herein. IN WITNESS WHEREOF, the said Principal (s) and Surety (s) have signed and sealed this instrument this ___ day of ____________________, 2023. ____________________________ _____________________________ Surety (Company Name) * By: _______________________ By:__________________________ (Title) (Printed Name) _____________________________ (Signature) _____________________________ (Title) 1 Page Intentionally Left Blank The undersigned surety company represents that it is duly qualified to do business in Texas, and hereby designates ______________________________ an agent resident in Lubbock County to whom any requisite notices may be delivered and on whom service of process may be had in matters arising out of such suretyship. _______________________ Surety *By:____________________ (Title) Approved as to Form City of Lubbock By: ____________________ City Attorney * Note: If signed by an officer of the Surety Company, there must be on file a certified extract from the by-laws showing that this person has authority to sign such obligation. If signed by an Attorney in Fact, we must have copy of power of attorney for our files. 2 Page Intentionally Left Blank GENERAL LIABILITY AUTOMOTIVE LIABILITY GARAGE LIABILITY BUILDER’S RISK INSTALLATION FLOATER EXCESS LIABILITY WORKERS COMPENSATION AND EMPLOYERS’ LIABILITY OTHER � � Contract 17342 STATE OF TEXAS COUNTY OF LUBBOCK THIS AGREEMENT, made and entered into this 27'h day of June, 2023 by and between the City of Lubbock, County of Lubbock, State of Texas, acting by and through the Mayor, City of Lubbock, thereunto authorized to do so, hereinafter referred to as OWNER, and Lone Star Dirt & Paving, Ltd. of the City of Lubbock, Counry of Lubbock and the State of Texas hereinafter termed CONTRACTOR. WITNESSETH: That for and in consideration of the payments and agreements hereinafrer mentioned, to be made and performed by the OWNER and under the conditions expressed in the bond bearing even date herewith (if any) the CONTRACTOR hereby agrees with OWNER to commence and complete the construction of certain improvements described as follows: RFP 23-17342-KM Unpaved Roads Improvements C.O. Phase 3 and all extra work in connection therewith, under the terms as stated in the contract documents and at his (or their) own proper cost and expense to furnish all materials, supplies, machinery, equipment, tools, superintendence, labor, insurance and other accessories and services necessary to complete the said construction in accordance with the contract documents as defined in the General Condition of Agreement. Lone Star Dirt & Pavin�, Ltd.'s proposal dated May 31, 2023, is incorporated into and made a part ofthis agreement. The CONTRACTOR hereby agrees to commence work within ten days after the date written notice to do so shall have been given to him and to substantially complete same within the time specified in the contract documents. The OWNER agrees to pay the CONTRACTOR in current funds for the performance of the contract in accordance with the proposal submitted therefore, subject to additions and deductions, as provided in the contract documents and to make payment on account thereof as provided therein. IN WITNESS WHEREOF, the parties to these presents have executed this agreement in Lubbock, Lubbock County, Texas in the year and day first above written. CONTRACTOR: Lone Star rt & Paving, Ltd. By:_ l.�.,,�.-- PRfNTE . ME: �t v�e. _�,� TITLE: �IP Co �..�r Gf_. CITY OF LUBBO� By:� Tray Payne, h�! A TES : — Courtney Paz, City COMPLETE ADDRESS: Lone Star Dirt & Paving, Ltd. 11820 University Lubbock, TX 79423 TTEST: �rporate Secretary APPROVED AS TO C NTENT: Public 'orks epresentative � Y��rr���-- Oti �� Zo�3 Name� (Printed) Dat �P� •D A O FORM: T;Plli Leisure, Senior Assistant City Attorney GENERAL CONDITIONS OF THE AGREEMENT 1.OWNER Whenever the word Owner, or First Party, are used in this contract, it shall be understood as referring to the City of Lubbock, Texas. 2.CONTRACTOR Whenever the word Contractor, or Second Party, is used, it shall be understood to mean the person, persons, co- partnership or corporation, to wit who has agreed to perform the work embraced in this contract, or their legal representative. 3.OWNER'S REPRESENTATIVE Whenever the word Owner's Representative or representative is used in this contract, it shall be understood as referring to, City of Lubbock, or its representativeZoltan Fekete.,Senior Civil Engineering,sodesignated who will inspectconstructions; or to such other representatives, supervisors, architects, engineers, or inspectors as may be authorized by said Owner to actin any particular under this agreement. Engineers, supervisors or inspectors will actfor the Owner under the direction of Owner's Representative, but shall not directly supervise the Contractor or persons acting on behalf of the Contractor. 4.CONTRACT DOCUMENTS The contract's documents shall consist of the Notice to Offerors, General Instructions to Offerors, Proposal, Signed Agreement, Statutory Bonds (if required), General Conditions of the Agreement, Special Conditions of the Agreement (if any), Specifications, Plans, Insurance Certificates, and all other documents made available to Offeror for inspection in accordance with the Notice to Offerors. The above described materials are sometimes referred to 5.INTERPRETATION OF PHRASES Whenever the words "Directed," "Permitted," "Designated," "Required," "Considered Necessary," "Prescribed," or words of like import are used, it shall be understood that the direction, requirement, permission, order, designation or prescription of the Owner's Representative is intended; and similarly, the words "Approved," "Acceptable," "Satisfactory," or words of like import shall mean approved by or acceptable or satisfactory to the Owner's Representative. 6.SUBCONTRACTOR The term Subcontractor, as employed herein, includes only those having a direct contract with the Contractor for performance of work on the project contemplated by these contract documents. Owner shall have no responsibility to any Subcontractor employed by Contractor for performance of work on the project contemplated by these contract documents, but said Subcontractors will look exclusively to Contractor for any payments due Subcontractor. The City reserves the right to approve or disapprovethe selection of any subcontractor(s). 7.WRITTEN NOTICE Written notice shall be deemed to have been duly served if delivered in person to the individual or to a member of the firm or to an officer of the corporation for whom it is intended, or if delivered at or sent certified mail to the last business address known to the party who gives the notice. 8. Unless otherwise stipulated, the Contractor shall provide and pay for all materials, supplies, machinery, equipment, tools, superintendence, labor, insurance, and all water, light, power, fuel, transportation and all other facilities necessary for the execution and completion of the work covered by the contract documents. Unless otherwise specified, all materials shall be new and both workmanship and materials shall be of a good quality. The Contractor shall, if required, furnish satisfactory evidence as to the kind and quality of materials. Materials or work described in words which so applied have well known, technical or trade meaning shall be held to refer such recognized standards. All work shall be done and all materials furnished in strict conformity with the contract documents. 9. SUBSTANTIALLY COMPLETED The term "Substantially Completed" is meant that the structure or project contemplated by the contract documents has been made suitable for use or occupancy or the facility is in a condition to serve its intended purpose, but still may require minor miscellaneous work and adjustment. 10. LAYOUT Except as specifically provided herein, the Contractor shall be responsible for laying out all work and shall accomplish this work in a manner acceptable to the Owner's Representative. The Owner's Representative will check the Contractor's layout of all major structures and any other layout work done by the Contractor at Contractor's request, but this check does not relieve the Contractor of the responsibility of correctly locating all work in accordance with the Plans and Specifications. 11. KEEPING OF PLANS AND SPECIFICATIONS ACCESSIBLE The Contractor shall be furnished ten copies of all Plans and Specifications without expense to Contractor and Contractor shall keep one copy of same consistently accessible on the job site. 12. RIGHT OF ENTRY The Owner's Representative may make periodic visits to the site to observe the progress or quality of the executed Representative will not be required to make exhaustive or continuous onsite inspections to check the quality or failure to perform the work in accordance with the Contract Documents. 13. LINES AND GRADES The Contractor is responsible for construction layout based on the control provided in the construction documents. Representative(s)) deems said lines and grades are necessary for the commencement of the work contemplated by these contract documents or the completion of the work contemplated by these contract documents. Whenever necessary, Contractor shall suspend its work in order to permit Owner's Representative to comply with this requirement, but such suspension will be as brief as practical and Contractor shall be allowed no extra compensation therefore. The Contractor shall give the Owner's Representative ample notice of the time and place where lines and grades will be needed. All stakes, marks, etc., shall be carefully preserved by the Contractor, and in case of careless destruction or removal by Contractor, its Subcontractors, or its employees, such stakes, marks, etc., shall be replaced by the Owner's Representative at Contractor's expense. 14. OWNER'S REPRESENTATIVE'S AUTHORITY AND DUTY Unless otherwise specified, it is mutually agreed between the parties to this Agreement that the Owner's Representative (as distinguished from Resident Project Representative(s))has the authority to review all work necessary to ensure the proper execution of the contract. The Owner's Representative shall, in all cases, determine the amounts and quantities of the several kinds of work which are to be paid for under the contract documents, and shall determine all questions in relation to said work and the construction thereof, and shall, in all cases, decide every question which may arise relative to the execution of this contract on the part of said Contractor. The decision Representative within fifteen (15) calend absence of timely written objection by Contractor, as provided herein, any and all objection or objections shall be deemed waived. 15. SUPERINTENDENCE AND INSPECTION It is agreed by the Contractor that the Owner's Representative shall be and is hereby authorized to appoint from time to time such subordinate engineers, supervisors, or inspectors, as distinguished from Resident Project Representative, as the said Owner's Representative may deem proper to inspect the materials furnished and the work done under this Agreement, and to see that said material is furnished and said work is done in accordance with the specifications therefore. The Contractor shall furnish all reasonable aid and assistance required by the subordinate engineers, supervisors or inspectors for the proper inspection and examination of the work. The Contractor shall regard and obey the directions and instructions of any subordinate engineers, supervisors or inspectors so appointed, when such directions and instructions are consistent with the obligations of this Agreement and accompanying plans and specifications provided, however, should the Contractor object to any orders by any subordinate engineer, supervisor or inspector, the Contractor may within fifteen (15) calendar days make written appeal to the Owner's Representative for its decision. In the absence of timely written objection by Contractor, as provided herein, any and all objection or objections shall be deemed waived. 16. CONTRACTOR'S DUTY AND SUPERINTENDENCE The Contractor shall give personal attention to the faithful prosecution and completion of this contract and shall keep on the work, during its progress, a competent superintendent and any necessary assistants, all satisfactory to Owner's Representative. The superintendent shall represent the Contractor in its absence and all directions given to superintendent shall be binding as if given to the Contractor. It is expressly agreed that adequate supervision by competent and reasonable representatives of the Contractor is essential to the proper performance of the work and lack of such supervision shall be grounds for suspending operations of the Contractor. The work, from its commencement to completion, shall be under the exclusive charge and control of the Contractor and all risk in connection therewith shall be borne by the Contractor. The Owner or Owner's Representatives shall not be responsible for the acts or omissions of the Contractor, or any subc 17. CONTRACTOR'S UNDERSTANDING It is understood and agreed that the Contractor has, by careful examination, satisfied itself as to the nature and location of the work, the confirmation of the ground, the character, quality and quantity of materials to be encountered, the character of equipment and facilities needed preliminary to and during the prosecution of the work, and the general and local conditions, and all other matters which in any way affect the work under the contract Representative either before or after the execution of this contract, shall affect or modify any of the terms or obligations herein contained. Subject to the rights of Owner as set forth in Paragraph 23 hereof, all modifications tative and Contractor. Unless otherwise specified herein, all loss, expense or damage to Contractor arising out of the nature of the work to be done, or from the action of the elements, or from any unforeseen circumstance and the prosecution of the work, shall be sustained and borne by the Contractor at its own cost and expense. 18. CHARACTER OF WORKERS The Contractor agrees to employ only orderly and competent workers, skillful in the performance in the type of work required under this contract, to do the work; and agrees that whenever the Owner's Representative shall inform incompetent, unfaithful, disorderly, or otherwise unacceptable to Owner or persons shall be discharged from the work and shall not again be employed on the work without the Owner's Representative's written consent. 19. CONSTRUCTION PLANT The Contractor shall provide all labor, tools, equipment, machinery and materials necessary in the prosecution and completion of this contract where it is not otherwise specifically provided that Owner shall furnish same, and it is also understood that Owner shall not be held responsible for the care, preservation, conservation, or protection of any materials, tools, equipment or machinery or any part of the work until it is finally completed and accepted. The building of structures for the housing of workers or equipment will be permitted only at such places as the Owner's Representative shall consent or direct, and the sanitary conditions of the grounds in or about such structure shall at all times be maintained in a manner satisfactory to the Owner's Representative. 20. SANITATION Necessary sanitary conveniences for the use of laborers on the work site, properly secluded from public observation, shall be constructed and maintained by the Contractor in such manner and at such points as shall be approved by the Owner's Representative and their use shall be strictly enforced. 21. OBSERVATION AND TESTING The Contractor is responsible for construction quality control testing, cost, and reporting of the type and extent required by the contract documents. The Owner or Owner's Representative shall have the right at all times to observe and test the work. Contractor shall make necessary arrangements and provide proper facilities and access for such observation and testing at any location wherever such work is in preparation or progress. Contractor shall ascertain the scope of any observation that may be contemplated by Owner or Owner's Representative and shall give ample notice as to the time each part of the work will be ready for such observation. Owner or Owner's Representative may reject any such work found to be defective or not in accordance with the contract documents, regardless of the stage of its completion or the time or place of discovery of such errors and regardless of whether Owner's Representative has previously accepted the work. If any such work should be covered without approval or consent of the Owner, it must, if requested by Owner or Owner's Representative, be uncovered for examination at Contractor's expense. In the event that any part of the work is being fabricated or manufactured at a location where it is not convenient for Owner or Owner's Representative to make observations of such work or require testing of said work, then in such event Owner or Owner's Representative may require Contractor to furnish Owner or Owner's Representative certificates of inspection, testing or approval made by persons competent to perform such tasks at the location where that part of the work is being manufactured or fabricated. All such tests will be in accordance with the methods prescribed by the American Society for Testing and Materials or such other applicable organization as may be required by law or the contract documents. If any such work which is required to be inspected, tested, or approved is covered up without written approval or consent of the Owner or Owner's Representative, it must, if requested by the Owner or Owner's Representative, be uncovered for observation and testing at the Contractor's expense. The cost of all such inspections, tests and approvals shall be borne by the Contractor unless otherwise provided herein. Any work which fails to meet the requirements of any such tests, inspections or approvals, and any work which meets the requirements of any such tests or approvals but does not meet the requirements of the contract documents shall be considered defective, and shall be corrected at the Contractor's expense. Neither observations by the Owner or Owner's Representative, nor inspections, tests, or approvals made by Owner, Owner's Representative, or other persons authorized under the contract documents to make such inspections, tests, or approvals shall relieve the Contractor from its obligation to perform the work in accordance with the requirements of the contract documents. 22. DEFECTS AND THEIR REMEDIES It is expressly agreed that if the work or any part thereof, or any material brought on the site of the work for use in the work or selected for the same, shall be deemed by the Owner or Owner's Representative as unsuitable or not in conformity with plans, specifications and/or contract documents, the Contractor shall, after receipt of written notice thereof from the Owner's Representative, forthwith remove such material and rebuild or otherwise remedy such work so that it shall be in full accordance with the contract documents. It is further agreed that any remedial action contemplated as hereinabove set forth shall be at Contractor's expense. 23. CHANGES AND ALTERATIONS The Contractor further agrees that the Owner may make such changes and alterations as the Owner may see fit, in theline, grade, form dimensions, plans or materials for the work herein contemplated, or any part thereof, either before or after the beginning of the construction, without affecting the validity of this contract and the accompanying bond. If such changes or alterations diminish the quantity of the work to be done, they shall not constitute the basis for a claim for damages, or anticipated profits on the work that may be dispensed with. If they increase the amount of work, and the increased work can fairly be classified under the specifications, such increase shall be paid according to the quantity actually done and at the unit price established for such work under this contract; otherwise such additional work shall be paid for as provided under Extra Work. In case the Owner shall make such changes or alterations as shall make useless any work already done or material already furnished or used in said work, then the Owner shall recompense the Contractor for any material or labor so used, and for actual expenses incurred in preparation for the work as originally planned. 24. EXTRA WORK The term "extra work" as used in this contract shall be understood to mean and include all work that may be required by the Owner or Owner's Representative to be done by the Contractor to accomplish any change, alteration or addition to the work as shown on the plans and specifications or contract documents and not covered by Contractor's proposal, except as provided under Changes and Alterations in Paragraph 23. It is agreed that the Contractor shall perform all extra work under the observation of the Owner's Representative when presented with a written work order signed by the Owner's Representative; subject, however, to the right of the Contractor to require written confirmation of such extra work order by the Owner. It is also agreed that the compensation to be paid to the Contractor for performing said extra work shall be determined by the following methods: Method (A) - By agreed unit prices; or Method (B) - By agreed lump sum; or Method (C) - If neither Method (A) or Method (B) be agreed upon before the extra work is commenced, then the Contractor shall be paid the lesser of the following: (1) actual field cost of the extra work, plus fifteen (15%) percent to the firm actually performing the work, and additional higher-tier markups limited to 5% to cover additional overhead and insurance costs; or (2) the amount that would have been charged by a reasonable and prudent Contractor as a reasonable and necessary cost for performance of the extra work, as estimated by the Engineer and approved by the Owner.. In the event said extra work be performed and paid for under Method (C)(1), then the provisions of this paragraph shall apply and the "actual field cost" is hereby defined to include the cost of all workers, such as foremen, timekeepers, mechanics and laborers, materials, supplies, teams, trucks, rentals on machinery and equipment, for the time actually employed or used on such extra work, plus actual transportation charges necessarily incurred, together with all expenses incurred directly on account of such extra work, including Social Security, Old Age insurances as may be required by law or ordinances or directed by the Owner or Owner's Representative, or by them agreed to. Owner's Representative may direct the form in which accounts of the actual field cost shall be kept and records of these accounts shall be made available to the Owner's Representative. The Owner's Representative may also specify in writing, before the work commences, the method of doing the work and the type and kind of machinery and equipment to be used; otherwise, these matters shall be determined by the Contractor. Unless otherwise agreed upon, the prices for the use of machinery and equipment shall be determined by using 100%, unless otherwise specified, of the latest Schedule of Equipment and Ownership Expenses adopted by the Associated General Contractors of America. Where practical, the terms and prices for the use of machinery and equipment shall be incorporated in the written extra work order. The fifteen percent (15%) of the actual field cost to be paid to Contractor shall cover and compensate Contractor for its profit, overhead, general superintendence and field office expense, and all other elements of cost and expense not embraced within the actual field cost as herein defined, save that where the Contractor's Camp or Field Office must be maintained primarily on account of such Extra Work, then the cost to maintain and operate the same shall be included in the "actual field cost." No claim for extra work of any kind will be allowed unless ordered in writing by Owner's Representative. In case any orders or instructions appear to the Contractor to involve extra work for which Contractor should receive compensation or an adjustment in the construction time, Contractor shall prior to commencement of such extra work, make written request to the Owner's Representative for a written order authorizing such extra work. Should a difference of opinion arise as to what does or does not constitute extra work or as to the payment therefore, and the Owner's Representative insists upon its performance, the Contractor shall proceed with the work after making written request for written order and shall keep adequate and accurate account of the actual field cost thereof, as of any extra work, any claim for payment due to alleged extra work shall be deemed waived. 25. DISCREPANCIES AND OMISSIONS It is further agreed that it is the intent of the contract documents that all work described in the proposal, the specifications, plans and other contract documents, is to be done for the prices quoted by the Contractor and that such price shall include all appurtenances necessary to complete the work in accordance with the intent of these contract documents as interpreted by Owner's Representative. Notices of any discrepancies or omissions in these plans, specifications, or contract documents, shall be given to the Owners' Representative and a clarification obtained before the proposals are received, and if no such notice is received by the Owner's Representative prior to the opening of proposals, then it shall be deemed that the Contractor fully understands the work to be included and has provided sufficient sums in its proposal to complete the work in accordance with these epresentative before offering of any discrepancies or omissions, then it shall be deemed for all purposes that the plans and specifications are sufficient and adequate for completion of the project. It is further agreed that any request for clarification must be submitted no later than five (5) calendar days prior to the opening of proposals. In the absence of a requested clarification for a conflict in the documents prior to proposals being reviewed, it will be assumed that the Contractor proposes the higher cost alternative on conflicts identified after proposals are reviewed. 26. RIGHT OF OWNER TO MODIFY METHODS AND EQUIPMENT If at any time the methods or equipment used by the Contractor are found to be inadequate to secure the quality of work with the rate of progress required under this contract, the Owner or Owner's Representative may order the Contractor in writing to increase their safety or improve their character and efficiency and the Contractor shall comply with such order. If, at any time, the working force of the Contractor is inadequate for securing the progress herein specified, the Contractor shall, if so ordered in writing, increase its force or equipment, or both, to such an extent as to give reasonable assurance of compliance with the schedule of progress. 27. PROTECTION AGAINST ACCIDENT TO EMPLOYEES AND THE PUBLIC AND GENERAL INDEMNITY insurance company licensed to transact business Compensation laws of the State of Texas. The Contractor shall at all times exercise reasonable precaution for the safety of employees and others on or near the work and shall comply with all applicable provisions of federal, state and municipal laws and building and construction codes. All machinery and equipment and other physical hazards shall be guarded in accordance with the "Manual of Accident Prevention in Construction" of Associated General Contractors of America, except where incompatible with federal, state or municipal laws or regulations. The Contractor, its sureties and insurance carriers shall defend, indemnify and hold harmless the Owner and Engineer and all of its officers, agents and employees against any all losses, costs, damages, expenses, liabilities, claims and/or causes of action, whether known or unknown, fixed, actual, accrued or contingent, liquidated or unliquidated, and expenses, in connection with, incident to, related to, or arising out and/or supervision of this contract, and the project which is the subject matter of this contract. The safety precautions taken shall be the sole responsibility of the Contractor, in its sole discretion as an Independent Contractor; inclusion of this paragraph in the Agreement, as well as any notice which may be given by the Owners or the Owner's Representative concerning omissions under this paragraph as the work progresses, are intended as reminders to the Contractor of its duty and shall not be construed as any assumption of duty to supervise safety precautions by either the Contractor or any of its subcontractors. 28. CONTRACTOR'S INSURANCE The Contractor shall not commence work under this contract until he has obtained all insurance as required in the General Conditions of the contract documents, from an underwriter authorized to do business in the State of Texas and satisfactory to the City. Proof of coverage shall be furnished to the City and written notice of cancellation or any material change will be provided ten (10) calendar days in advance of cancellation or change. All policies of insurance, required herein, including policies of insurance required to be provided by Contractor and its subcontractors, shall contain a waiver o-insurance, rights to subrogation that any such insurer or payor, in the event of self-insurance, may acquire by virtue of payment of any loss under such insurance or self-insurance. All certificates of insurance submitted to the City in conformity with the provisions hereof shall establish such waiver. The Contractor shall procure and carry at its sole cost and expense through the life of this contract, insurance protection as hereinafter specified. Coverage in excess of that specified herein also shall be acceptable. Such insurance shall be carried with an insurance company authorized to transact business in the State of Texas and shall cover all operations in connection with this contract, whether performed by the Contractor or a subcontractor, or separate policies shall be provided covering the operation of each subcontractor. A certificate of insurance specifying each and all coverages shall be submitted prior to contract execution. PROOF OF COVERAGE SHALL BE FURNISHED TO THE CITY OF LUBBOCK IN THE FORM OF A CERTIFICATE OF INSURANCE. THE INSURANCE CERTIFICATES FURNISHED SHALL NAME THE CITY OF LUBBOCK AS ADDITIONAL INSURED ON AUTO/GENERAL LIABILITY ON A PRIMARY AND NON-CONTRIBUTORY BASIS TO INCLUDE PRODUCTS OF COMPLETE OPERATIONS. PROVIDE A WAIVER OF SUBROGATION IN FAVOR OF THE CITY OF LUBBOCK. IT SHALL BE THE COVERAGE INSURANCE DOCUMENTS INCLUDING WORKERS COMPENSATION COVERAGE FOR EACH SUBCONTRACTOR. COPIES OF THE ENDORSEMENTS ARE REQUIRED. Commercial General Liability Requirements: $1,000,000 occurrence / $2,000,000 aggregate (can be combined with an Excess Liability to meet requirements). CGL is required in ALL contracts. It is perhaps the most important of all insurance policies in a contractual relationship. It insures the Contractor has broad liability coverage for contractual activities and for completed operations. Commercial General Liability to include Products Completion/OP, Personal and Advertising Injury, Contractual Liability, Fire Damage (any one fire), and Medical Expenses (any one person). Commercial General Liability Heavy Equipment Endorsement: Heavy equipment endorsement is required Automobile Liability Requirements: $1,000,000/occurrence is needed Professional Liability Requirements: $1,000,000 occurrence / $2,000,000 aggregate Workers Compensation Requirements: Statutory. If the vendor is an independent contractor with no employees and are exempt from providing Workers' Compensation coverage, they must sign a waiver (obtained from COL Purchasing) and include a copy of their driver's license Employer Liability ($1,000,000 min) is required with Workers Compensation. The City of Lubbock (including its officials, employees and volunteers) shall be afforded additional insured status on a primary and non-contributory basis on all liability policies except professional liabilities and workers' comp. Waivers of Subrogation are required for CGL, AL, and WC. To Include Products of Completed Operations endorsement. Carrier will provide a 30-day written notice of cancellation, 10-day written notice for non- payment. Carriers must meet a A.M. Best rating of A- or better. Subcontractors must carry same limits as listed above. 1. Definitions: Certificate of coverage ("certificate") - A copy of a certificate of insurance, a certificate of authority to self-insure issued by the commission, or a coverage agreement (TWCC-81, TWCC-82, TWCC- 83, or TWCC-84), showing statutory workers' compensation insurance coverage for the person's or entity's employees providing services on a project, for the duration of the project. Duration of the project - includes the time from the beginning of the work on the project until the Contractor's/person's work on the project has been completed and accepted by the governmental entity. Persons providing services on the project ("subcontractor" in Section 406.096, Texas Labor Code) - includes all persons or entities performing all or part of the services the Contractor has undertaken to perform on the project, regardless of whether that person contracted directly with the Contractor and regardless of whether that person has employees. This includes, without limitation, independent contractors, subcontractors, leasing companies, motor carriers, owner-operators, employees of any such entity, or employees of any entity which furnishes persons to provide services on the project. "Services" include, without limitation, providing, hauling, or delivering equipment or materials, or providing labor, transportation, or other service related to a project. "Services" does not include activities unrelated to the project, such as food/beverage vendors, office supply deliveries, and delivery of portable toilets. 2. The Contractor shall provide coverage, based on proper reporting of classification codes and payroll amounts and filing of any coverage agreements, which meets the statutory requirements of Texas Labor Code, Section 401.011(44) for all employees of the contractor providing services on the project, for the duration of the project. 3. The Contractor must provide a certificate of coverage to the governmental entity prior to being awarded the contract. 4. If the coverage period shown on the Contractor's current certificate of coverage ends during the duration of the project, the Contractor must, prior to the end of the coverage period, file a new certificate of coverage with the governmental entity showing that coverage has been extended. 5. The Contractor shall obtain from each person providing services on the project, and provide to the governmental entity: (a) a certificate of coverage, prior to that person beginning work on the project, so the governmental entity will have on file certificates of coverage showing coverage for all persons providing services on the project; and (b) no later than seven days after receipt by the Contractor, a new certificate of coverage showing extension of coverage, if the coverage period shown on the current certificate of coverage ends during the duration of the project. 6 The Contractor shall retain all required certificates of coverage for the duration of the project and for one year thereafter. 7. The Contractor shall notify the governmental entity in writing by certified mail or personal delivery, within 10 days after the Contractor knew or should have known, of any change that materially affects the provision of coverage of any person providing services on the project. 8. The Contractor shall post on each project site a notice, in the text, form and manner prescribed by the Texas Workers' Compensation Commission, informing all persons providing services on the project that they are required to be covered, and stating how a person may verify coverage and report lack of coverage. 9. The Contractor shall contractually require each person with whom it contracts to provide services on the project, to: (a) provide coverage, based on proper reporting of classification codes and payroll amounts and filing of any coverage agreements, which meets the statutory requirements of Texas Labor Code, Section 401.011(44) for all of its employees providing services on the project, for the duration of the project; (b) provide to the Contractor, prior to that person beginning work on the project, a certificate of coverage showing that coverage is being provided for all employees of the person providing services on the project, for the duration of the project; (c) provide the Contractor, prior to the end of the coverage period, a new certificate of coverage showing extension of coverage, if the coverage period shown on the current certificate of coverage ends during the duration of the project; (d) obtain from each other person with whom it contracts, and provide to the Contractor: (1) a certificate of coverage, prior to the other person beginning work on the project; and (2) a new certificate of coverage showing extension of coverage, prior to the end of the coverage period, if the coverage period shown on the current certificate of coverage ends during the duration of the project; (e) retain all required certificates of coverage on file for the duration of the project and for one year thereafter; (f) notify the governmental entity in writing by certified mail or personal delivery, within 10 days after the person knew or should have known, of any change that materially affects the provision of coverage of any person providing services on the project; and (g) contractually require each person with whom it contracts to perform as required by paragraphs (a) - (g), with the certificates of coverage to be provided to the person for whom they are providing services. 10. By signing this contract or providing or causing to be provided a certificate of coverage, the Contractor is representing to the governmental entity that all employees of the Contractor who will provide services on the project will be covered by worker's compensation coverage for the duration of the project, that the coverage will be based on proper reporting of classification codes and payroll amounts, and that all coverage agreements will be filed with the appropriate insurance carrier or, in the case of a self-insured, with the commission's Division of Self-Insurance Regulation. Providing false or misleading information may subject the Contractor to administrative penalties, criminal penalties, civil penalties, or other civil actions. 11. The Contractor's failure to comply with any of these provisions is a breach of contract by the Contractor which entitles the governmental entity to declare the contract void if the Contractor does not remedy the breach within ten days after receipt of notice of breach from the governmental entity. G. Proof of Coverage Before work on this contract is commenced, each Contractor and subcontractor shall submit to the Owner for approval five Certificates of Insurance covering each insurance policy carried and offered as evidence of compliance with the above insurance requirements, signed by an authorized representative of the insurance company setting forth: (1) The name and address of the insured. (2) The location of the operations to which the insurance applies. (3) The name of the policy and type or types of insurance in force thereunder on the date borne by such certificate. (4) The expiration date of the policy and the limit or limits of liability thereunder on the date borne by such certificate. (5) A provision that the policy may be canceled only by mailing written notice to the named insured at the address shown in the proposal specifications. (6) A provision that written notice shall be given to the City ten days prior to any change in or cancellation of the policies shown on the certificate. (7) The certificate or certificates shall be on the form (or identical copies thereof) contained in the job specifications. No substitute of nor amendment thereto will be acceptable. (8) If policy limits are paid, new policy must be secured for new coverage to complete project. (9) A Contractor shall: (a) provide coverage for its employees providing services on a project, for the duration of the project based on proper reporting of classification codes and payroll amounts and filling of any coverage agreements; (b) provide a certificate of coverage showing workers' compensation coverage to the governmental entity prior to beginning work on the project; (c) provide the governmental entity, prior to the end of the coverage period, a new certificate of coverage showing extension of coverage, if the coverage period shown on the Contractor's current certificate of coverage ends during the duration of the project; (d) obtain from each person providing services on a project, and provide to the governmental entity: (i) a certificate of coverage, prior to that person beginning work on the project, so the governmental entity will have on file certificates of coverage showing coverage for all persons providing services on the project; and (ii) no later than seven days after receipt by the Contractor, a new certificate of coverage showing extension of coverage, if the coverage period shown on the current certificate of coverage ends during the duration of the project; (e) retain all required certificates of coverage on file for the duration of the project and for one year thereafter; (f) notify the governmental entity in writing by certified mail or personal delivery, within 10 days after the Contractor knew or should have known, of any change that materially affects the provision of coverage of any person providing services on the project; (g) post a notice on each project site informing all persons providing services on the project that they are required to be covered, and stating how a person may verify current coverage and report failure to provide coverage. This notice does not satisfy other posting tion Act or other commission rules. This notice must be printed with a title in at least 30-point bold type and text in at least 19-point normal type, and shall be in both English and Spanish and any other language common to the worker population. The text for the notices shall be the following text provided by the commission on the sample notice, without any additional words or changes: REQUIRED WORKERS' COMPENSATION COVERAGE "The law requires that each person working on this site or providing services related to this construction project must be covered by workers' compensation insurance. This includes persons providing, hauling, or delivering equipment or materials, or providing labor or transportation or other service related to the project, regardless of the identity of their employer or status as an employee." "Call the Texas Workers' Compensation Commission at 800-372-7713 or 512-804-4000 (www.tdi.state.tx.us) to receive information of the legal requirements for coverage, to verify whether your employer has provided the required coverage, or to report an employer's failure to provide coverage;" and (h) contractually require each person with whom it contracts to provide services on a project, to: (i) provide coverage based on proper reporting of classification codes and payroll amounts and filing of any coverage agreements for all of its employees providing services on the project, for the duration of the project; (ii) provide a certificate of coverage to the Contractor prior to that person beginning work on the project; (iii) include in all contracts to provide services on the project the following language: By signing this contract or providing or causing to be provided a certificate of coverage, the person signing this contract is representing to the governmental entity that all employees of the person signing this contract who will provide compensation coverage for the duration of the project, that the coverage will be based on proper reprinting of classification codes and payroll amounts, and that all coverage agreements will be filed with the appropriate insurance carrier or, in the case of a self-insured, with th Division of Self-Insurance Regulation. Providing false or misleading information may subject the Contractor to administrative penalties, criminal penalties, civil penalties, or ; (iv) provide the Contractor, prior to the end of the coverage period, a new certificate of coverage showing extension of coverage, if the coverage period shown on the current certificate of coverage ends during the duration of the project; (v) obtain from each other person with whom it contracts, and provide to the Contractor: (1) a certificate of coverage, prior to the other person beginning work on the project; and (2) prior to the end of the coverage period, a new certificate of coverage showing extension of the coverage period, if the coverage period shown on the current certificate of coverage ends during the duration of the project; (vi) retain all required certificates of coverage on file for the duration of the project and for one year thereafter; (vii) notify the governmental entity in writing by certified mail or personal delivery, within 10 days after the person knew or should have known, of any change that materially affects the provision of coverage of any person providing services on the project; and (viii) contractually require each other person with whom it contracts, to perform as required by paragraphs (i)-(viii), with the certificate of coverage to be provided to the person for whom they are providing services. 29. DISABLED EMPLOYEES Contractors having more than fifteen (15) employees agree to comply with the Americans with Disabilities Act of 1990, and agree not to discriminate against a qualified individual with a disability because of the disability of such individual in regard to job application procedures, the hiring, advancement, or discharge of employees, employee compensation, job training, and other terms, conditions, and privileges of employment. 30. PROTECTION AGAINST CLAIMS OF SUBCONTRACTORS, LABORERS, MATERIALMEN, AND FURNISHERS OF MACHINERY, EQUIPMENT AND SUPPLIES Without limiting, in any way, manner or form, the indemnity provided by Contractor in paragraph 27 hereof, the Contractor agrees that it will indemnify and save the Owner and Engineer and all of its officers, agents and employees, harmless against any and all claims, liabilities, losses, damages, expenses and causes of action arising out of, in any way, manner or form, the demands of subcontractors, laborers, workmen, mechanics, material men and furnishers of machinery and parts thereof, equipment, power tools, and supplies, incurred in the performance of this contract and the project which is the subject matter of this contract. When Owner so desires, the Contractor shall furnish satisfactory evidence that all obligations of the nature hereinabove designated have been paid, discharged or waived. 31. PROTECTION AGAINST ROYALTIES OR PATENT INVENTION The Contractor shall pay all royalties and license fees, and shall provide for the use of any design, device, material or process covered by letters patent or copyright by suitable legal agreement with the Patentee or owner thereof. Without limiting, in any way, manner or form, the indemnity provided by Contractor in paragraph 27 hereof, the Contractor shall defend all suits or claims for infringement of any patent or copyrights and shall indemnify and save the Owner and Engineer, and all of its officers, agents and employees harmless from any loss on account thereof, except that Owner shall defend all such suits and claims and shall be responsible for all such loss when a particular design, device, material or process or the product of a particular manufacturer or manufacturers is specified or required in these contract documents by Owner; provided, however, if choice of alternate design, device, material or process is allowed to the Contractor, then Contractor shall indemnify and save Owner, and all of its officers, agents and employees harmless from any loss on account thereof. Notwithstanding anything herein to the contrary, if the material or process specified or required by Owner and/or this contract is an infringement, the Contractor prior to offering. 32. LAWS AND ORDINANCES The Contractor shall at all times observe and comply with all federal, state and local laws, ordinances and regulations, which in any manner affect the contract or the work, and without limiting, in any way, manner or form, the indemnity provided by Contractor in paragraph 27 hereof, Contractor shall indemnify and save harmless the Owner and Engineer and all of its officers, agents, and employees against any claims arising from the violation of any such laws, ordinances, and regulations, whether by the Contractor, its employees, or subcontractors. If the Contractor observes that the plans and specifications are at variance therewith, he shall notify the Owner's Representative in writing prior to proposing and any necessary changes shall be adjusted as provided in the contract or variances within said time, any objection and/or assertion that the plans and specifications are at variance with any federal, state or local laws, ordinances or regulations shall be deemed waived. If the Contractor, its employees or subcontractors perform any work contrary to such laws, ordinances, rules and regulations, and without such notice to the Owner's Representative, Contractor shall bear all costs arising there from. The Owner is a municipal corporation of the State of Texas and the law from which it derives its powers, insofar as the same regulates the objects for which, or the manner in which, or the conditions under which the Owner may enter into contracts, shall be controlling, and shall be considered as part of this contract to the same effect as though embodied herein. 33. SUBCONTRACTING The Contractor agrees that it will retain personal control and will give its personal attention to the fulfillment of this contract. The Contractor further agrees that subletting of any portion or feature of the work, or materials required in the performance of this contract, shall not relieve the Contractor from its full obligations to the Owner, as provided by the contract documents. 34. TIME FOR SUBSTANTIAL COMPLETION AND LIQUIDATED DAMAGES It is hereby understood and mutually agreed by and between the Contractor and the Owner, that the date of beginning and time for completion as specified in the Notice to Proceed and contract documents, respectively, of work to be done hereunder are essential conditions of this contract; and it is further mutually understood and agreed that the work embraced in this contract shall be commenced as provided in the contract documents. If the Contractor should neglect, fail, or refuse to substantially complete the work within the time herein specified, then the Contractor does hereby agree as part of the consideration for the awarding of this contract, the Owner may withhold permanently from Contractor's total compensation, the sum of $500 PER CONSECUTIVE CALENDAR DAY, not as a penalty, but as liquidated damages for the breach of the contract as herein set forth for each and every working day that the Contractor shall be in default after the time stipulated for substantially completing the work. If the Contractor should neglect, fail, or refuse to Finally complete the work within the time herein specified, then the Contractor does hereby agree as part of the consideration for the awarding of this contract, the Owner may withhold permanently from Contractor's total compensation, the sum of $300 PER CONSECUTIVE CALENDAR DAY, not as a penalty, but as liquidated damages for the breach of the contract as herein set forth for each and every working day that the Contractor shall fail to meet the time requirements stipulated for substantially completing the work. It is expressly understood and agreed, by and between Contractor and the Owner, that the time for the substantial completion of the work described herein is reasonable time for the completion of the same, taking into consideration the average climatic range and conditions and usual industrial conditions prevailing in this locality. The amount is fixed and agreed upon by and between the Contractor and the Owner because the actual damages the Owner would sustain in such event would be difficult and/or impossible to estimate, however, the amount agreed upon herein is a reasonable forecast of the amount necessary to render just compensation to Owner, and is expressly agreed to be not disproportionate to actual damages as measured at time of breach. IT IS FURTHER AGREED AND UNDERSTOOD BETWEEN THE CONTRACTOR AND OWNER THAT TIME IS OF THE ESSENCE OF THIS CONTRACT. 35. TIME AND ORDER OF COMPLETION It is the meaning and intent of this contract, unless otherwise herein specifically provided, that the Contractor shall be allowed to prosecute its work in such order of precedence, and in such manner as shall be most conductive to economy of construction. The Contractor shall ensure daily prosecution of the work is conducted every business day until completed, regardless if the work will be substantially or finally complete ahead of specified deadlines in the agreement, unless the City determines time off from said prosecution is necessary or reasonable and Contractor received said determination in writing from the City. Further, when the Owner is having other work done, either by contract or by its own force, the Owner's Representative (as distinguished from the Resident Project Representative) may direct the time and manner of constructing work done under this contract so that conflicts will be avoided and the construction of the various works being done for the Owner shall be harmonized. Additionally, inclement weather shall be the only other reason consistent, daily prosecution of the work may not take place on those inclement weather days. The Contractor shall submit, at such times as may reasonably be requested by the Owner's Representative, schedules which shall show the order in which the Contractor intends to carry on the work, with dates at which the Contractor will start the several parts of the work and estimated dates of completion of the several parts. 36. TIME OF PERFORMANCE The Contractor agrees that it has submitted its proposal in full recognition of the time required for the completion of this project, taking into consideration the average climatic range and industrial conditions prevailing in this locality, and has considered the liquidated damage provisions of paragraph 34 hereinabove set forth and expressly agrees that it shall not be entitled to, nor will it request, an extension of time on this contract, except when its work has been delayed by an act or neglect of the Owner, Owner's Representative, employees of the Owner or other contractors employed by the Owner, or by changes ordered in the work, or by strike, walkouts, acts of God or the public enemy, fire or flood. Any request for extension shall be in writing with the written request for same setting affirmatively grant the extension no later than within twenty (20) calendar days of written submission by Contractor shall be deemed a denial, and final. Further, in the absence of timely written notification of such delay and request for extension, as provided herein, any request for extension by Contractor shall be deemed waived. 37. HINDRANCE AND DELAYS In executing the contract, the Contractor agrees that in undertaking to complete the work within the time herein fixed, Contractor has taken into consideration and made allowances for all hindrances and delays incident to such work, whether growing out of delays due to unusual and unanticipated circumstances, difficulties or delays in securing material or workers, or any other cause or occurrence. No charge shall be made by the Contractor for hindrance or delays from any cause during the progress of any part of the work embraced in this contract except where the work is stopped by order of the Owner or Owner's Representative for the Owner's convenience, in which event, such expense as in the sole judgment of the Owner's Representative that is caused by such stoppage shall be paid by Owner to Contractor. 38. QUANTITIES AND MEASUREMENTS No extra or customary measurements of any kind will be allowed, but the actual measured or computed length, area, solid contents, number and weight only shall be considered, unless otherwise specifically provided. In the event this contract is let on a unit price basis, then Owner and Contractor agree that this contract, including the specifications, plans and other contract documents are intended to show clearly all work to be done and material to be furnished hereunder. Where the estimated quantities are shown, and only when same are expressly stated to be estimates, for the various classes of work to be done and material to be furnished under this contract, they are approximate and are to be used only as a basis for estimating the probable cost of the work and for comparing their proposals offered for the work. In the event the amount of work to be done and materials to be furnished are expressly stated to be estimated, and only when same are expressly stated to be estimated, it is understood and agreed that the actual amount of work to be done and the materials to be furnished under this contract may differ somewhat from these estimates, and that where the basis for payment under this contract is the unit price method, payment shall be for the actual amount of work done and materials furnished on the project, provided that the over run or under run of estimated quantities not exceed 15% of the estimated quantity. 39. PROTECTION OF ADJOINING PROPERTY The Contractor shall take proper means to protect the adjacent or adjoining property or properties in any way encountered, which may be injured or seriously affected by any process of construction to be undertaken under this agreement, from any damage or injury by reason of said process of construction; and Contractor shall be liable for any and all claims for such damage on account of his failure to fully protect all adjacent property. Without limiting, in any way, manner and form, the indemnity provided by Contractor in paragraph 27 hereof, the Contractor agrees to indemnify, save and hold harmless the Owner and Engineer, and any of its officers, agents and employees, against any and all claims or damages due to any injury to any adjacent or adjoining property, related to, arising from or growing out of the performance of this contract. 40. PRICE FOR WORK In consideration of the furnishing of all necessary labor, equipment and material and the completion of all work by the Contractor, and on the delivery of all materials embraced in this contract in full conformity with the specifications and stipulations herein contained, the Owner agrees to pay the Contractor the price set forth in the proposal attached hereto, which has been made a part of this contract, and the Contractor hereby agrees to receive such price in full for furnishing all materials and all labor required for the aforesaid work, also, for all expenses incurred by Contractor and for well and truly performing the same and the whole thereof in the manner and according to this agreement, the attached specifications, plans, contract documents and requirements of Owner's Representative. 41. PAYMENTS No payments made or certificates given shall be considered as conclusive evidence of the performance of the contract, either wholly or in part, nor shall any certificate or payment be considered as acceptance of defective work. Contractor shall at any time requested during the progress of the work furnish the Owner or Owner's Representative with a verifying certificate showing the Contractor's total outstanding indebtedness in connection with the work. Before final payment is made, Contractor shall satisfy Owner, by affidavit or otherwise, that there are no outstanding liens against Owner's premises by reason of any work under the contract. Acceptance by Contractor of final payment of the contract price shall constitute a waiver of all claim which have not theretofore been timely filed as provided in this contract. 42. PARTIAL PAYMENTS On or before the tenth day of each month, the Contractor shall submit to Owner's Representative an application fo Representative shall determine the amount to be partially paid. Owner's Representative shall review said application for partial payment if submitted, and the progress of the work made by the Contractor and if found to be in order, shall prepare a certificate for partial payment showing as completely as practical the total value of the work done by the Contractor up to and including the last day of the preceding month. T Paragraph 14 hereof. The Owner shall then pay the Contractor on or before the fifteenth day of the current month the total amount of the Owner's Representative's Certificate of Partial Payment, less: (i) in the event the total value of the contract is five million dollars or more, 5% of the amount thereof, which 5% shall be retained until final payment, and further, less all previous payments and all further sums that may be retained by Owner under the terms of the contract documents; or (ii) in the event the total value of the contract is less than five million dollars, 10% or less, of the amount thereof, which percentage shall be retained until final payment, and further, less all previous payments and all further sums may be retained by Owner under the terms of the contract documents If Contractor engages a sub- Contractor shall not withhold a greater percentage of Retainage than the percentage set out in in this section pertaining to the Contractor. Contractor shall likewise require any subcontractor it engages to comply with section 2252.032 of the Texas Government Code. Any partial payment made hereunder shall not constitute a waiver by the Owner of any and all other rights to enforce the express terms of the contract documents, and all remedies provided therein, as to any and all work performed, to be performed and/or materials delivered hereunder, including, but limited to, work to which said partial payment is attributable. 43. SUBSTANTIAL COMPLETION (15) calendar days after the Contractor has given the Owner's Representative written notice that the work has been substantially completed, the Owner's Representative and/or the Owner shall inspect the work and within said time, if the work be found to be substantially completed in accordance with the contract documents, the Owner's Representative shall issue to the Owner and Contractor a certificate of substantial completion. The work will be deemed substantially complete when the work (or a specified portion thereof) ha work (or a specified portion thereof) is sufficiently complete, in accordance with all the contract documents, including the Proposal and all applicable technical specifications, so that the work (or a specified portion thereof) can be utilized for the purposes for which it is intended without unscheduled receipt of the certificate of substantial completion for all of the work or a specified portion thereof. Notwithstanding the issuance of a certificate of substantial completion, Contractor shall proceed with diligence to finally complete the work within the time provided in this contract. 44. FINAL COMPLETION AND PAYMENT notice of final completion, the Owner's Representative shall proceed to make final measurement to pay to the Contractor on or before the 31st working day after the date of certification of final completion, the balance due Contractor under the terms of this agreement. Neither the certification of final completion nor the final payment, nor any provisions in the contract documents shall relieve the Contractor of the obligation for fulfillment of any warranty which may be required in the contract documents and/or any warranty or warranties implied by law or otherwise. Owner may, in its sole discretion, release all or a portion of the Retainage for fully completed and accepted portions of the work. Notwithstanding the foregoing, Owner may withhold the Retainage if there is a bona fide dispute between Owner and Contractor according to section 2252.032(f) of the Texas Government Code. 45. CORRECTION OF WORK Contractor shall promptly remove from Owner's premises all materials condemned by the Owner's Representative on account of failure to conform to the contract documents, whether actually incorporated in the work or not, and Contractor shall at its own expense promptly replace such condemned materials with other materials conforming to the requirements of the contract documents. Contractor shall also bear the expense of restoring all work of other contractors damaged by any such removal or replacement. If Contractor does not remove and replace any such condemned work within a reasonable time but not to exceed 30 days after a written notice by the Owner or the Owner's Representative, Owner may remove and replace it at Contractor's expense. The Contractor shall pay all claims, cost, losses, and damages (including but not limited to all fees and charges of the engineers, architects, attorneys, and other professionals and all court or arbitration or other dispute resolution cost) arising out of or relating to such correction or removal. Neither the final payment, nor certification of final completion or substantial completion, nor any provision in the contract documents shall relieve the Contractor of responsibility for faulty materials or workmanship, and Contractor shall remedy any defects due thereto and pay for any damage to other work resulting therefrom, which shall appear within a period of one year from the date of certification of final completion by Ow 46. PAYMENT WITHHELD the whole or part of any certification to such extent as may be necessary to protect itself from loss on account of: (a) Defective work not remedied and/or work not performed, (b) Claims filed or reasonable evidence indicating possible filing of claims, (c) Damage to another contractor, (d) Notification to owner of failure to make payments to Subcontractors or Suppliers, (e) Failure to submit up-to-date record documents as required, (f) Failure to submit monthly progress schedule updates or revised scheduled as requested by Owner, (g) Failure to provide Project photographs required by Specifications. When the above grounds are removed, or the Contractor provides a surety bond satisfactory to the Owner, in the amount withheld, payment shall be made for amounts withheld because of them. 47. CLAIM OR DISPUTE It is further agreed by both parties hereto that all questions of dispute or adjustment presented by the Contractor shall be in writing and filed with the Owner's Representative within fifteen (15) calendar days after the Owner's Representative has given any direction, order or instruction to which the Contractor desires to take exception. shall be a condition precedent to the bringing and/or assertion of any action or claim by Contractor of any right under this Contract. If the matters set forth in the notice of dispute are not granted or otherwise responded to by said objections by the Contractor of the final payment shall be a bar to any and all claims of the Contractor, and constitute a waiver Contractor. 48. NON-COMPLIANCE AND/OR ABANDONMENT BY CONTRACTOR In case the Contractor should (1) abandon and fail or refuse to resume work within fifteen (15) calendar days after written notification from the Owner or the Owner's Representative, or (2) if the Contractor fails to comply with the written orders of the Owner's Representative, when such orders are consistent with this contract, then the Surety on the bond shall be notified in writing and directed to complete the work and a copy of said notice shall be delivered to the Contractor. In the event a bond is not required by law, or otherwise obtained by the Contractor, no further notice of such non-compliance to Contractor shall be required. After receiving said notice of abandonment or non-compliance , the Contractor shall not remove from the work any machinery, equipment, tools, materials or supplies then on the job, but the same, together with any materials and equipment under the contract for work, may be held for use on the work by the Owner or the Surety of the Contractor, or another contractor, in completion of the work; and the Contractor shall not receive any rental or credit therefore (except when used in connection with Extra Work, where credit shall be allowed as provided for under paragraph 24 of this contract); it being understood that the use of such equipment and materials will ultimately reduce the cost to complete the work and be reflected in the final settlement. In the event the Contractor, or Surety, whichever is applicable, should fail to commence compliance with the notice hereinbefore provided within ten (10) calendar days after service of such notice, and/or shall fail to proceed with diligence to complete the project as contemplated and in compliance with all terms and provisions of the contract documents, then the Owner may exercise any and all remedies available to it pursuant to law, contract, equity or otherwise, including, but not limited to, providing for completion of the work in either of the following elective manners: (a) The Owner may employ such force of persons and use of machinery, equipment, tools, materials and supplies as said Owner may deem necessary to complete the work and charge the expense of such labor, machinery, equipment, tools, materials and supplies to said Contractor, and the expense so charged shall be deducted and paid by the Owner out of such moneys as may be due, or that may thereafter at any time become due to the Contractor under and by virtue of this Agreement. In case such expense is less than the sum which would have been payable under this contract, if the same had been completed by the Contractor, then said Contractor shall receive the difference. In case such expense is greater than the sum which would have been payable under this contract, if the same had been completed by said Contractor, then the Contractor and/or its Surety shall pay the amount of such excess to the Owner; or (b) The Owner, under sealed proposals, after notice published as required by law, at least twice in a newspaper having a general circulation in the County of location of the work, may let the contract for the completion of the work under substantially the same terms and conditions which are provided in this contract. In case of any increase in cost to the Owner under the new contract as compared to what would have been the cost under this contract, such increase shall be charged to the Contractor and the Surety shall be and remain bound therefore. Should the cost to complete any such new contract prove to be less than that which would have been the cost to complete the work under this contract, the Contractor or his Surety shall be credited therewith. been finally completed, the Contractor and his Surety shall be so notified and certification of completion as provided in paragraph 44 hereinabove set forth, shall be issued. A complete itemized statement of the contract accounts, certified to by Owner's Representative as being correct shall then be prepared and delivered to Contractor and his Surety, if applicable, whereon the Contractor or his Surety, or the Owner as the case may be, shall pay the balance due as reflected by said statement within 30 days after the date of certification of completion. In the event the statement of accounts shows that the cost to complete the work is less than that which would have been the cost to the Owner had the work been completed by the Contractor under the terms of this contract, or when the Contractor and/or his Surety, if applicable, shall pay the balance shown to be due by them to the Owner, then all machinery, equipment, tools, materials or supplies left on the site of the work shall be turned over to the Contractor and/or his Surety, if applicable. Should the cost to complete the work exceed the contract price, and the Contractor and/or his Surety, if applicable, fail to pay the amount due the Owner within the time designated hereinabove, and there remains any machinery, equipment, tools, materials or supplies on the site of the work, notice thereof, together with an itemized list of such equipment and materials shall be mailed to the Contractor and his Surety, if applicable, at the respective addresses designated in this contract; provided, however, that actual written notice given in any manner will satisfy this condition. After mailing, or other giving of such notice, such property shall be held at the risk of the Contractor and his Surety, if applicable, subject only to the duty of the Owner to exercise ordinary care to protect such property. After fifteen (15) calendar days from the date of said notice the Owner may sell such machinery, equipment, tools, materials or supplies and apply the net sum derived from such sale to the credit of the Contractor and his Surety, if applicable. Such sale may be made at either public or private sale, with or without notice, as the Owner may elect. The Owner shall release any machinery, equipment, tools, materials, or supplies that remain on the jobsite and belong to persons other than the Contractor or his Surety, if applicable, to their proper owners. The remedies provided to Owner by law, equity, contract, or otherwise, shall be cumulative, to the extent permitted by law. It is expressly agreed and understood that the exercise by Owner of the remedies provided in this paragraph shall not constitute an election of remedies on the part of Owner, and Owner, irrespective of its exercise of remedies hereunder, shall be entitled to exercise concurrently or otherwise, any and all other remedies available to it, by law, equity, contract or otherwise, including but not limited to, liquidated damages, as provided in paragraph 34, hereinabove set forth. 49. The remedies of Contractor hereunder shall be limited to, and Owner shall be liable only for, work actually performed by Contractor and/or its subcontractors as set forth in the contract documents, and Owner shall not be liable for any consequential, punitive or indirect loss or damage that Contractor may suffer in connection with the project which is the subject matter of this contract. 50. BONDS The Contractor is required to furnish a performance bond in accordance with Chapter 2253, Government Code, in the amount of 100% of the total contract price in the event that said contract price exceeds $100,000 and the Contractor is required to furnish a payment bond in accordance with Chapter 2253, Government Code, in the amount of 100% of the total contract price in the event that said contract price exceeds $50,000. All bonds shall be submitted and authorized to do business in the State of Texas. It is further agreed that this contract shall not be in effect until such bonds are so furnished. 51. SPECIAL CONDITIONS In the event special conditions are contained herein as part of the contract documents and said special conditions conflict with any of the general conditions contained in this contract, then in such event the special conditions shall control. 52. LOSS OR EXPENSE DUE TO UNUSUAL OR UNANTICIPATED CIRCUMSTANCES Unless otherwise specified herein, all loss, expense or damage to the Contractor arising out of the nature of the work to be done, or from the action of the elements, or from any unforeseen circumstance or from unusual obstructions or difficulties, naturally occurring, man made or otherwise, which may be encountered in the prosecution of the work, shall be sustained and borne by the Contractor at his own cost and expense. 53. INDEPENDENT CONTRACTOR Contractor is, and shall remain, an independent contractor with full, complete and exclusive power and authority to direct, supervise, and control its own employees and to determine the method of the performance of the work covered hereby. The fact that the Owner or Owner's Representative shall have the right to observe Contractor's vested in the Owner or Owner's Representative hereunder, is not intended to and shall not at any time change or effect the status of the Contractor as an independent contractor with respect to either the Owner or Owner's Representative or to the Contractor's own employees or to any other person, firm, or corporation. 54. CLEANING UP The Contractor shall at all times keep the premises free from accumulation of debris caused by the work, and at the completion of the work Contractor shall remove all such debris and also its tools, scaffolding, and surplus materials and shall leave the work room clean or its equivalent. The work shall be left in good order and condition. In case of dispute Owner may remove the debris and charge the cost to the Contractor. 55. HAZARDOUS SUBSTANCES AND ASBESTOS Hazardous Substances (herein so called), as defined in the Comprehensive Environmental Response, Compensation, and Liability Act (42 U.S.C.S. §9601(14)) and the regulations promulgated thereunder, as same may be amended from time to time, hydrocarbons or other petroleum products or byproducts and/or asbestos, in any form, shall not (i) be utilized, in any way, manner or form, in the construction of, or incorporation into, the Project; or (ii) be brought upon, placed, or located, by any party, on the Project site, or any other property of the City, without resentative. If Contractor believes that the utilization of a Hazardous Substance, hydrocarbons or other petroleum products or byproducts and/or asbestos is necessary in the construction of the Project, or that it is necessary to place and/or otherwise locate upon the site of the Project or other property of the City, a Hazardous Substance, hydrocarbons or other petroleum products or byproducts and/or asbestos, ty (20) days prior requirements such consent, if granted, is conditioned upon, in its sole and absolute discretion. If the request of Contractor is no receipt of said request, said request shall be deemed to be denied. hall be responsible for ensuring that all personnel involved in the Project are (i) trained for the level of expertise required for proper performance of the actions contemplated by this Contract and, in particular, in all aspects of handling, storage, disposal and exposure of Hazardous Substances, hydrocarbons or other petroleum products or byproducts and/or asbestos; and (ii) are provided and utilize all protective equipment, including without limitation, personal protective gear, necessary to provide protection from exposure to Hazardous Substances, hydrocarbons or other petroleum products or byproducts and/or asbestos. 56. NONAPPROPRIATION All funds for payment by the City under this contract are subject to the availability of an annual appropriation for this purpose by the City. In the event of non-appropriation of funds by the City Council of the City of Lubbock for the goods or services provided under the contract, the City will terminate the contract, without termination charge or other liability, on the last day of the then-current fiscal year or when the appropriation made for the then-current year for the goods or services covered by this contract is spent, whichever event occurs first. If at any time funds are not appropriated for the continuance of this contract, cancellation shall be accepted by the Seller on thirty (30) days prior written notice, but failure to give such notice shall be of no effect and the City shall not be obligated under this contract beyond the date of termination. 57. THE CITY RIGHT TO AUDIT At any time during the term of this Contract and for a period of four (4) years thereafter the City or a duly authorized audit representative of the City, or the State of Texas, at its expense and at reasonable times, reserves the right to audit Contractor's records and books relevant to all services provided under this Contract. In the event such an audit by the City reveals any errors/overpayments by the City, Contractor shall refund the City the full amount of such overpayments within thirty (30) days of such audit findings, or the City, at its option, reserves the right to deduct such amounts owing the City from any payments due Contractor. 58. NON-ARBITRATION The City reserves the right to exercise any right or remedy available to it by law, contract, equity, or otherwise, including without limitation, the right to seek any and all forms of relief in a court of competent jurisdiction. Further, the City shall not be subject to any arbitration process prior to exercising its unrestricted right to seek judicial remedy. The remedies set forth herein are cumulative and not exclusive, and may be exercised concurrently. To the extent of any conflict between this provision and another provision in, or related to, this document, this provision shall control. 59. CONTRACTOR ACKNOWLEDGES Contractor acknowledges by supplying any Goods or Services that the Contractor has read, fully understands, and will be in full compliance with all terms and conditions and the descriptive material contained herein and any additional associated documents and Amendments. The City disclaims any terms and conditions provided by the Contractor unless agreed upon in writing by the parties. In the event of conflict between these terms and conditions and any terms and conditions provided by the Contractor, the terms and conditions provided herein shall prevail. The terms and conditions provided herein are the final terms agreed upon by the parties, and any prior conflicting terms shall be of no force or effect. 60. LABOR CODE CHAPTER 214 Sec. 214.008. MISCLASSIFICATION OF CERTAIN WORKERS; PENALTY. (a) A person who contracts with a governmental entity to provide a service as defined by Section 2155.001, Government Code, shall properly classify, as an employee or independent contractor in accordance with Chapter 201, any individual the person directly retains and compensates for services performed in connection with the contract. (b) In this subsection, "subcontractor" means a person directly retained and compensated by a person who contracts with a governmental entity to provide a service as defined by Section 2155.001, Government Code. A subcontractor shall properly classify, as an employee or independent contractor in accordance with Chapter 201, any individual the subcontractor directly retains and compensates for services performed in connection with the contract for which the subcontractor is retained. (c) A person who fails to properly classify an individual as required by Subsection (a) or (b) shall pay to the commission a penalty equal to $200 for each individual that the person has not properly classified. (d) The commission may not take action to collect a penalty under this section from a person after the third anniversary of the date on which the violation occurred. 61. CERTIFICATE OF INTERESTED PARTIES House Bill 1295, adopted by the 84th Legislature, created §2252.908, Texas Government Code. Section 2252.908 requires a business entity entering into certain contracts with a governmental entity or state agency to file with the governmental entity or state agency a disclosure of interested parties at the time the business entity submits the signed contract to the governmental entity or state agency. Section 2252.908 requires the disclosure form to be signed by the authorized agent of the contracting business entity, acknowledging that the disclosure is made under oath and under penalty of perjury. Section 2252.908 applies only to a contract that requires an action or vote by the governing body of the governmental entity or state agency before the contract may be signed or has a value of at least $1 million. Instructions for completing Form 1295 are available at: https://ci.lubbock.tx.us/departments/purchasing/vendor-information 62. TEXAS GOVERNMENT CODE SECTION 2252.152 Contracts with Companies Engaged in Business with Iran, Sudan, or Foreign Terrorist Organization Prohibited. Pursuant to Section 2252.152 of the Texas Government Code, prohibits the City from entering into a contract with a vendor that is identified by The Comptroller as a company known to have contracts with or provide supplies or service with Iran, Sudan or a foreign terrorist organization. 63. TEXAS GOVERNMENT CODE SECTION 2271.002 Pursuant to Section 2271.002 of the Texas Government Code, a) This section applies only to a contract that: (1) is between a governmental entity and a company with 10 or more full-time employees; and (2) has a value of $100,000 or more that is to be paid wholly or partly from public funds of the governmental entity. (b) A governmental entity may not enter into a contract with a company for goods or services unless the contract contains a written verification from the company that it: (1) does not boycott Israel; and (2) will not boycott Israel during the term of the contract. 64. CONTRACTOR ACKNOWLEDGES Contractor Acknowledges by supplying any Goods or Services that the Contractor has read, fully understands, and will be in full compliance with all terms and conditions and the descriptive material contained herein and any additional associated documents and Amendments. The City disclaims any terms and conditions provided by the Contractor unless agreed upon in writing by the parties. In the event of conflict between these terms and conditions and any terms and conditions provided by the Contractor, the terms and conditions provided herein shall prevail. The terms and conditions provided herein are the final terms agreed upon by the parties, and any prior conflicting terms shall be of no force or effect. 65. TEXAS PUBLIC INFORMATION ACT The requirements of Subchapter J, Chapter 552, Government Code, may apply to this contract and the contractor or vendor agrees that the contract can be terminated if the contractor or vendor knowingly or intentionally fails to comply with a requirement of that subchapter. To the extent Subchapter J, Chapter 552, Government Code applies to this agreement, Contractor agrees to: (1) preserve all contracting information related to the contract as provided by the records retention requirements applicable to the governmental body for the duration of the contract; (2) promptly provide to the governmental body any contracting information related to the contract that is in the custody or possession of the entity on request of the governmental body; and (3) on completion of the contract, either: (A) provide at no cost to the governmental body all contracting information related to the contract that is in the custody or possession of the entity; or (B) preserve the contracting information related to the contract as provided by the records retention requirements applicable to the governmental body. 66. CONFIDENTIALITY The Contractor shall retain all information received from or concerning the City and the City's business in strictest confidence and shall not reveal such information to third parties without prior written consent of the City, unless otherwise required by law. 67. INDEMNITY The Contractor shall indemnify and save harmless the city of Lubbock and its elected officials, officers, agents, and employees from all suits, actions, losses, damages, claims, or liability of any kind, character, type, or description, including without limiting the generality of the foregoing, all expenses of litigation, court costs, and attorney's fees, for injury or death to any person, or injury to any property, received or sustained by any person or persons or property, to the extent arising out of, related to or occasioned by, the negligent acts of the Contractor, its agents, employees, and/or subcontractors, related to the performance, operations or omissions under this agreement and/or the use or occupation of city owned property. The indemnity obligation provided herein shall survive the expiration or termination of this agreement. 68. PROFESSIONAL RESPONSIBILITY All architectural or engineering services to be performed shall be done with the professional skill and care ordinarily provided by competent architects or engineers practicing under the same or similar circumstances and professional license. 69. TEXAS SENATE BILL 219 SUBCHAPTER B ITEMS B AND C (b) A contractor must, within a reasonable time of learning of a defect, inaccuracy, inadequacy, or insufficiency in the plans, specifications, or other design documents, disclose in writing to the person with whom the contractor enters into a contract the existence of any known defect in the plans, specifications, or other design documents that is discovered by the contractor, or that reasonably should have been discovered by the contractor using diligence, before or during construction. In this subsection, ordinary diligence means the observations of the plans, specifications, or other design documents or the improvement to real property that a contractor would make in the reasonable preparation of a bid or fulfillment of its scope of work under normal circumstances. Ordinary diligence does not require that the contractor engage a person licensed or registered under Title 6, Occupations Code, or any other person with specialized skills. A disclosure under this subsection is made in the contractor's capacity as contractor and not as a licensed professional under Title 6, Occupations Code. (c) A contractor who fails to disclose a defect as required by Subsection (b) may be liable for the consequences of defects that result from the failure to disclose. DAVIS BACON WAGE DETERMINATIONS EXHIBIT A "General Decision Number: TX20230002 01/06/2023 Superseded General Decision Number: TX20220002 State: Texas Construction Types: Heavy and Highway Counties: Armstrong, Carson, Crosby, Ector, Irion, Lubbock, Midland, Potter, Randall, Taylor and Tom Green Counties in Texas. HEAVY & HIGHWAY CONSTRUCTION PROJECTS Note: Contracts subject to the Davis-Bacon Act are generally required to pay at least the applicable minimum wage rate required under Executive Order 14026 or Executive Order 13658. Please note that these Executive Orders apply to covered contracts entered into by the federal government that are subject to the Davis-Bacon Act itself, but do not apply to contracts subject only to the Davis-Bacon Related Acts, including those set forth at 29 CFR 5.1(a)(2)-(60). ______________________________________________________________ |If the contract is entered |. Executive Order 14026 | |into on or after January 30, | generally applies to the | |2022, or the contract is | contract. | |renewed or extended (e.g., an |. The contractor must pay | |option is exercised) on or | all covered workers at | |after January 30, 2022: | least $16.20 per hour (or | | | the applicable wage rate | | | listed on this wage | | | determination, if it is | | | higher) for all hours | | | spent performing on the | | | contract in 2023. | |______________________________|_____________________________| |If the contract was awarded on|. Executive Order 13658 | |or between January 1, 2015 and| generally applies to the | |January 29, 2022, and the | contract. | |contract is not renewed or |. The contractor must pay all| |extended on or after January | covered workers at least | |30, 2022: | $12.15 per hour (or the | | | applicable wage rate listed| | | on this wage determination,| | | if it is higher) for all | | | hours spent performing on | | | that contract in 2023. | |______________________________|_____________________________| The applicable Executive Order minimum wage rate will be adjusted annually. If this contract is covered by one of the Executive Orders and a classification considered necessary for performance of work on the contract does not appear on this wage determination, the contractor must still submit a conformance request. Additional information on contractor requirements and worker protections under the Executive Orders is available at http://www.dol.gov/whd/govcontracts. Modification Number Publication Date 0 01/06/2023 SUTX2011-002 08/02/2011 Rates Fringes CEMENT MASON/CONCRETE FINISHER (Paving & Structures)...$ 13.55 ** ELECTRICIAN......................$ 20.96 FORM BUILDER/FORM SETTER Paving & Curb...............$ 12.36 ** Structures..................$ 13.52 ** LABORER Asphalt Raker...............$ 12.28 ** Flagger.....................$ 9.30 ** Laborer, Common.............$ 10.30 ** Laborer, Utility............$ 11.80 ** Work Zone Barricade Servicer....................$ 10.30 ** POWER EQUIPMENT OPERATOR: Asphalt Distributer.........$ 14.87 ** Asphalt Paving Machine......$ 13.40 ** Broom and Sweeper...........$ 11.21 ** Crane, Lattice Boom 80 Tons or Less................$ 16.82 Crawler Tractor Operator....$ 13.96 ** Excavator, 50,000 lbs or less........................$ 13.46 ** Front End Loader Operator, Over 3 CY...................$ 12.77 ** Front End Loader, 3CY or less........................$ 12.28 ** Loader/Backhoe..............$ 14.18 ** Mechanic....................$ 20.14 Milling Machine.............$ 15.54 ** Motor Grader, Rough........$ 16.15 ** Motor Grader, Fine..........$ 17.49 Pavement Marking Machine....$ 16.42 Reclaimer/Pulverizer........$ 12.85 ** Roller, Asphalt.............$ 10.95 ** Roller, Other...............$ 10.36 ** Scraper.....................$ 10.61 ** Spreader Box................$ 12.60 ** Servicer.........................$ 13.98 ** Steel Worker (Reinforcing).......$ 13.50 ** TRUCK DRIVER Lowboy-Float................$ 14.46 ** Single Axle.................$ 12.74 ** Single or Tandem Axle Dump..$ 11.33 ** Tandem Axle Tractor with Semi........................$ 12.49 ** ---------------------------------------------------------------- WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental. ================================================================ ** Workers in this classification may be entitled to a higher minimum wage under Executive Order 14026 ($16.20) or 13658 ($12.15). Please see the Note at the top of the wage determination for more information. Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year. Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at https://www.dol.gov/agencies/whd/government-contracts. Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)). ---------------------------------------------------------------- The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of ""identifiers"" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate (weighted union average rate). Union Rate Identifiers A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than ""SU"" or ""UAVG"" denotes that the union classification and rate were prevailing for that classification in the survey. Example: PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014. Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate. Survey Rate Identifiers Classifications listed under the ""SU"" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier. Survey wage rates are not updated and remain in effect until a new survey is conducted. Union Average Rate Identifiers Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010 08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier. A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based. ---------------------------------------------------------------- WAGE DETERMINATION APPEALS PROCESS 1.) Has there been an initial decision in the matter? This can be: * an existing published wage determination * a survey underlying a wage determination * a Wage and Hour Division letter setting forth a position on a wage determination matter * a conformance (additional classification and rate) ruling On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour National Office because National Office has responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.) and 3.) should be followed. With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to: Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W. Washington, DC 20210 2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to: Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W. Washington, DC 20210 The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue. 3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to: Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W. Washington, DC 20210 4.) All decisions by the Administrative Review Board are final. ================================================================ END OF GENERAL DECISIO" EXHIBITS B & C City of Lubbock Overtime Legal Holiday Prevailing Wage Rates The rate for overtime (in excess of forty hours per week) shall be as required by the Fair Labor Standards Act. The rate for legal holidays shall be as required by the Fair Labor Standards Act. Page Intentionally Left Blank Page Intentionally Left Blank 1503903134 Page is too large to OCR. Page is too large to OCR. Page is too large to OCR. Page is too large to OCR. Page is too large to OCR. Page is too large to OCR. Page is too large to OCR. Page is too large to OCR. Page is too large to OCR. Page is too large to OCR. Page is too large to OCR. Page is too large to OCR. Page is too large to OCR. Page is too large to OCR. Page is too large to OCR. Page is too large to OCR. Page is too large to OCR. Page is too large to OCR. Page is too large to OCR. Page is too large to OCR. Page is too large to OCR. Page is too large to OCR. Page is too large to OCR. Page is too large to OCR. Page is too large to OCR. Page is too large to OCR. Page is too large to OCR. Page is too large to OCR. Page is too large to OCR. Page is too large to OCR. Page is too large to OCR. Page is too large to OCR. D.617 Page is too large to OCR. Page is too large to OCR. Page is too large to OCR. Page is too large to OCR. Page is too large to OCR. Page is too large to OCR. Page is too large to OCR.