HomeMy WebLinkAboutResolution - 2023-R0235 - Change Order 1 Contract 16447 with Tommy Klein Construction - AirportResolution No. 2023-RO235
Item No. 6.15
May 9, 2023
RESOLUTION
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK:
THAT the Mayor of the City of Lubbock is hereby authorized and directed to execute
for and on behalf of the City of Lubbock, a Change Order No. 1 per ITB 22-16447-TF, by and
between the City of Lubbock and Tommy Klein Construction, Inc. for Gypsum Furring Wall
Addition, Relocation and Exhaust Air Venting Design Revision, and IT & Security Revisions
at the Lubbock Preston Smith International Airport, a copy of which Change Order is attached
hereto and incorporated herein, and related documents.
Passed by the City Council on
APPROVED AS TO CONTENT:
CV&UUUV cp�__ -
Kelly Campbel , Director of Aviation
APPROVPB.AS TO FORM:
May 9, 2023
TRAY PAYNC MAYOR
it',' 5WAssistant City Attorney
ccdocs/RES.Bid Award -Tommy Klein Construction, Inc.
April 21, 2023
Office of Purchasing and'Contract Management
Change Order
Contract No: 16647 Contractor: Tommy Klein Construction, Inc.
Change Order No: 01 Contract Title: Construct Federal Inspection Service
Bid/RFP No: ITB 22-16447-TF Project No: 92619
"Change Order" means a written order to a Contractor, executed by the Owner, in accordance with the Contract authorizing an addition to, deletion
from, or adjustment or revision of the requirements of the Contract documents, or an adjustment to the compensation payable to the Contractor, or to
the time for performance of the Contract and completion of the project, or a combination thereof, which does not alter the nature of project and is an
integral part of the project objective. Adjustments to "Estimated Quantities" to a line time in a Unit Price Contract do not require a Change Order. All
work that alters the nature of the construction or that is not an integral part of the project objective must be let out for public bid.
Description of Change (alteration, deviation, addition, or deletion) caused by conditions encountered during construction not covered by the
is
Chance Order Items:
Item #1: Gypsum Furring Wall Addition
Contractor Proposal Document: LBB CBP — CCR 2 - Furring Wall (TK Construction)
Cost: $5,671.68
Description:
Gypsum Furring Wall to be constructed on the West and South walls of the CBP Waiting Room Lobby. The purpose of this
additional construction item is to conceal the interior side of existing CMU and Brick Masonry walls which have an uneven surface
and are not aesthetically pleasing. This condition was unknown prior to construction.
Item #2: Roof Top Unit (RTU) Relocation and Exhaust Air Venting Design Revision
Contractor Proposal Document: LBB CBP _ CCR 3 - RTU & Exhaust Changes (TK Construction)
Cost: $29,263.32
Description:
The RTU placement issue was due to inaccurate field information. The existing RTU was off by about 3 feet from where plans
indicated. Thus, it interfered with the clearance requirements with the designated location of the new unit.
The Exhaust ventilation re -work was an oversight during design. It was anticipated that independent duct connections for the
general return air to the RTU and the exhaust air that would be routed through the energy wheel. The BOD unit utilizes a single
duct connection that intermingles the exhaust airflow with the general return air and then routes it through the energy wheel. This
was missed during design and thus needed to change the routing of the exhaust air from the toilets and the Janitor Closet so as not
to comingle that exhaust air with the general return air and likely introduce exhaust air back into the occupied spaces.
Item #3: 60 Construction Contract Extension — IT & Security Revisions
Contractor Proposal Document: LBB CBP — CCR 4 - 60 Day Contract Extension (TK Construction)
Cost: $19,199.71
Description:
Revisions to the IT and Security System Design have resulted in an estimated need to extend the construction contract period by 60
days. Cost for this item is for additional project supervision by the Contractor.
Where the Change Order is negotiated, the Change Order must be fully documented and itemized as to costs, including material quantities, material
costs, taxes, insurance, employee benefits, other related costs, profit and overhead Where certain unit prices are contained in the initial Contract, no
deviations are allowed in computing negotiated change order costs.
ITEMIZED COSTS MUST BE FULLY DOCUMENTED AND ATTACHED TO THIS FORM.
ITEM
DESCRIPTION
AMOUNT
A.
ORIGINAL CONTRACT VALUE:
$2 728 000.00
B.
AMOUNT OF THIS CHANGE ORDER: Note: Council approval required if (+ -) $50,000
$54134.71
COST CENTERA61 I I ACCOUNT.92619.8302.10000
C.
PERCENT OF CONTRACT VALUE THIS CHANGE ORDER B/A
19.8%
D.
AMOUNT OF PREVIOUS CHANGE ORDERS:
$0.00
E.
TOTAL AMOUNT OF ALL CHANGE ORDERS B+D
$54 134.71
F.
PERCENT OF CONTRACT OF ALL CHANGE ORDERS (E/A): 25% maximum)
19.8%
PUR-45 (Rev 08,2018)
T NEW CON?RACr AmOtWii-ii: . - T A7AD4.71
it is muuWly agreed tha the above dolls antmrat and the trmc extcrmm, er applicable. as sat Path ar ibis Changc Orderaonstautes full oompt aauion
to the Cowwrftr for to costa. expenses sad damages to the Cabtracm. whether dues, consequcmial or otherwise. in anyway atcideat W or no"
ow of. orfnalypF rndirmly; from the work performed or modified by the Contractor ceder this Change Order.
Date
54r
tMq r Kelly CaheWt
presentative Due
(S) Capital Project Manager _ Date
Connal DltW May 9, 2023
Pad FWVAM
(2) PnWo AmbiteevEn$inew
May 9, 2023
Due (a) City
Agenda Item 6.15
0421123
Dati
Ye�-xgl,
Date
Resohmm it 2023-RO235
PUR45 (Rev OE 2019)
lk
Tommy Klein Construction, Inc.
March 15, 2023
Attention: Paul Ferguson
Reference: Lubbock CRP GAF Relocation
CCR #2
Paul.
Tonum Klein Construction is providing this pricing for the additional %%ork as described bolo.%.
• Additional taming %wrk as per attached Architect Directive.
Santana (FrinnlnC Dr\ "all) -S 3.414.00
Pesina Painting CDD%%all Finishing) -S i.250.00
I omm% Klein (Glass Block Work)- S 400.00
Subtotal- S 5.0640)
(;C 12°0 S 607.68
Price S 5,671.68
Respect la 11%.
Shad I lartman
Tomnt. Klein Construction
806-252-1305
Attachtnents-
I. Architect Supplemental In,,tructions
Tommy Klein Construction Lubbock, Texas 806-438.8777 Fax 806-797-2959
Clarification/
Su lementallnstruction
To: Contractor - TK
From: A/E — RSBH
Project: LBB CBP GAF
Reference: Contract Drawing:
Specification:
Shop Drawing
Other
A100, A102, A401
CSl Subjectrritle CMU Furring Wall Directive
Contract Document Clarification/Supplement Description
A/E's Directive By: Ryan Johnson RSBH
Item 1
CMU Furring wall at LBB CBP
Scope Overview:
SI - 002
Date: 2.1.23
ME File No: 2231874.002
Construct Furring Wall along the interior side of the West Exterior Wall within the new CBP Waiting
Area. The existing Glass Block - Transom Window is to be maintained.
1) Furring Wall Construction: 5/8 Gyp. on 7/8" Furring Hat Channel.
a. 16 GA.
b. Placed 16" O.C.
2) Furring Wall should terminate V' Above the Finished Ceiling.
3) Painted Gyp. Edge Finish should be provided on all sides of the Transom Window opening.
4) Any exposed Gypsum Wall Board edges shall receive Corner Bead.
5) Clean Glass Block - Transom Window:
a. Joint Seal with Silicone Caulking (White) if necessary.
b. Paint any Trim to match the project -specified PT-01 paint finish.
6) Paint the Wall to match the project -specified PT-01 paint finish.
7) Recess all Convenience Receptacles within Furring Wall.
8) Install Wall Base to match the specification provided for Waiting Area.
Contractor's Response — Optional:
if no response is provided within 15 days, the CS/ is a binding contract requirement with no change to the
Contract Sum or Contract Time as required by Section01035 Par. 1.2 A
Type response here
Contractor's Response By-
Typed/Printed Name:
Date of Response:
lk
Tommy Klein Construction, Inc.
March 21, 2023
Attention: Paul Ferguson
Reference: Lubbock CBP GAF Relocation
CCR #3
Paul,
Tommy Klein Construction is providing this pricing for the additional work as described below.
• Additional Mechanical and Electrical work as per attached Architect Directive.
WSC (Mechanical) -$ 21,354.00
1PS (Electrical) -$ 4,773.96
Subtotal: $ 26,127.96
GC 12°o $ 3,135.36
Price $ 29,263.32
Respectfully,
Shad Hartman
Tommy Klein Construction
806-252-1305
Attachments-
1. Architect Supplemental Instructions
Tommy Klein consbuctlon Lubbock, Texas 806.438-8777 Fax 806-797.2959
RSaiff
I" 3co
ij It.
` •G
it i•L �II—)
rO�ols
I ~
•—O—O
O) t rst y
I I
i
GENT RAL NOTES POW8t KEYED NOTES: 0
�.�.�.�m.�. enai.`i.im«.isaso[uu.n.wn .►`.ion...wu..ursw..csawao
.ar rlru
PARTIAL FIRST FLOOR
ELECTRICAL POWER
PLAN
In P Murs .00 u. W r...y.w
�. `w�woew.rnmu"�� oaaw.a ru/+w.e.ror. w
FIRST FLOOR ELECTRICAL POWER PLAN
. l'rsnwrn.�ww`�r �i �M°�nK�`.°. wu naw.MO`0e • �o/wwwarwr..enns..amrr.
rrm ralrww n.�. u.r r.[.o w+.e.
m .a.a.w/../n►..en,..r.r...
.r/ v...
.cm
m4roIImMIRC„P.
No Text
RSGH
f
Umboa
Ic-J I I
1� _� wean mu
Inl „nn Iswwwla
t nr I I I .0
•_-i ! - Iln�el mau
Sq I � i N711I.9rrsl
rr IrY nlrm
OI—c I 1 II,,_ Cyr
1 iti
I i ' I
I}1 0U.��41 I iE TT-`•1-C- - �-j11
/•� I 1; I�1•�1 Ir� 1 1 v'r i
4
Li ; 1''
11 1 y j G
td
o
Quiw
OIL
'1-'------
pr77a'p�� � 1 1 .Ol�Jll ii L-y0fI9Sf i; ���f^ � �
41,
-�11 , Irulrru wer / _
i
II /
----'L___ - yrmiu o f—I I—
I A` 1 TM._____ ' 1
l I 1 1
YQI 104
1 i OVERALL FRST
I FLOOR NVAC
1 j I DEMOUTION PLAN
1ST FLOOR MECHANICAL DEMOLRION PLAN
um r
MD101
p i a/rl
6 �.IwttV/�A Z
ULII v/w.n' 1 -I
I
1 ST FLOOR MECHANICAL PLAN
"'I, W� � t
tl
RSaH
))7fD W M.ti M.%O
y.4w /4K91
a w 4aoc.lo/
11gIGt 400Nf.
m7n.A i//Y d
IW W /4114!
OVERALL FIRST
FLOOR NVAC FLAN
KGVNM10
vwQ
M101
.. "V.14
KRT
nMDIMMI4PWRu0/
a
an�
rru,aw.sna„w.
QDI*'-=111-12.
• � u�nll�.y •. MV
MECHANICAL ROOF PLAN
RS&H
P-DAM Mt
tr Wlft I
I m Wa I
OVERALL ROOF WAC I
PLAN
M111
woaeSrom
If rc
�ro.metrucna
GAS PIPING CONNECTION DETAIL
3 DUCT CONNECTION TO LOUVER DETAIL
w
a.u..nn. aawna
ourt••au,� ru w•w.•• aaw..s
•� .[nw•µnw ns.•. l.-. Yw• M...f.,KW w�wM Rrn.,
yR.•�iiW,nw�oM�«iaw~�..o�w«iwu.r YN bn�ilM•wM
MrH.rr nY,.I.M.
EXHAUST FAN EF-1 CONTROL SCHEMATIC
2
SZ
4 INLINE FAN DETAIL
Rs",
nosttmt
if OM WOCIJIOn
woiict.00�pa
onnw� rfw
Wrs•f41.07
HVAC DETAILS AND
CONTROLS
wro
M504 ''
K�
ru.0 NOaw
lnnwYrr,wmmrY.rmnai .
WWIuwmYP.rwwr.
dYrurw.srww'wnnmrr,
all.
..w.wrrYran r
53VIU3X�S r,,,�r, 4 r,Ym.o.r
rW�
..Irs.,r.nne+re ono Aar
YnlrwnrrP
Y.vrwwY.
r+asaP wumr'a�
acre w r
MNr Idr "�I..�wP.
W�
1Ia r��
MI =, 3framIm wrosloiiBm
u Yap1
4 ww1 Mrl
,��� lyPPrl,rw.A\r
rw\.,\wr,mwY�.MOOY rY\,q P\„r
mr a�uw
e.w�.rn \Y\mP.. Awrr..Ir
r,iwn W YY\ YOr � M.a., rw,AYOOr [YO��.r,dY,\IAnw Wlr�Ysr r
Oa.1w.M Irrtlr O, plYpmrr.m..�wfl0/\wtflnY 1 YMP�V VY.sYMIrr Y.�
rrw A • aIr rwn r, rr w. v.o w„I tl O � W Im w r.wo wr ,
•..Wr• Aw.YYr.�Irpr.Irlrrw,n Y,.,tl IrF,IY,Arwo.Yonw sr,
�.YDYYWwaWAPOPr+Y Yr.IIOPYr,4�,.Iw., p,.m � WAPYrYYr r
r.P YisMSYMw.P,IYrr, WwM Psr wrr �,rw.r.�I rao.�wP1
AP tWL\I W �YYr.WOIM ��.waTwM+m.
,iwr1M� rar�rrrNM�%,.1wuY.Y YAInIa.rlrtlw.�
nM,Mlu\r,
PnY Apnwo\ro.inq
W rtlal AAPrh,•
OM �tlw YY,Yw rwroniw WrlrMn'w\w
y p. O.rMArYi,ra n r.IMTMFM�Fi,
AfY, W\arMA �f Yut,W A..
fm 'r•t I�OCn ryior uevrlMrbP
rrK2X9rwM1MP, YAIUP.IYn Ar.
i@4.IYYOYYYOPrMwre.rYrAwrl W, W,pnlwA•mn
w,rlpw• rrIYOM�\rn ww�
O Yrtr • OOMr
OOwn ri lrrw'I.rWmwlvrs. Ylsr•
Ia w'" 4YnIia
��� YwrbwwOrti\IY�Ywlwow,PAYYOwaY AfmrIpYYMYwnnYPsmoe. wrl �
.dA1r
Yr1wIw.,IIlMrior,Y10W,I11rOwYMr AO„w.tam dor 1
O{AD4Y AOItl
TYI Wa.l w.Innw mMrY tlA'uov!
rnlup�.r�Yw
'r' �lr\rLY W Yar.)btl
M4wwW rr�pY „yy} 4.O P\nrrmwm
T rrirlOMrP WCnl4.,
'.I..r plrO
W YYYrPwI
wlMrYr\nlnP WC
T M.1
w.PI.I�, WI w b an. Yr,Y1\
�r.t4�Y ✓Y �
p wrH MOIYI 3Y1Gl1041M'Ma09131rY1011VMWA 3Y1®f�i11i1 JIN0U1Q�i1J iN G3Ui1011 EOM
H?Sd
Tommy Klein Construction, Inc.
April 10, 2023
Attention: Paul Ferguson
Reference: Lubbock CBP GAF Relocation
CCR #4
Paul,
Tommy Klein Construction is providing this pricing for the additional work as described below.
• Additional Supervision due to Contract Extension.
• Average of $ 2,016.78 a week (8.5 weeks). Covers Super Payroll, Vehicle, Insurances
Tommy Klein (Supervision)- $ 17,142.60
Subtotal: $ 17,142.60
GC 12% $ 2,057.11
Price $ 19,199.71
Additional Days- 60 Days
Respectfully,
Shad Hartman
Tommy Klein Construction
806-252-1305
Attachments-
1. None