HomeMy WebLinkAboutResolution - 2023-R0235 - Change Order 1 Contract 16447 with Tommy Klein Construction - AirportResolution No. 2023-RO235 Item No. 6.15 May 9, 2023 RESOLUTION BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK: THAT the Mayor of the City of Lubbock is hereby authorized and directed to execute for and on behalf of the City of Lubbock, a Change Order No. 1 per ITB 22-16447-TF, by and between the City of Lubbock and Tommy Klein Construction, Inc. for Gypsum Furring Wall Addition, Relocation and Exhaust Air Venting Design Revision, and IT & Security Revisions at the Lubbock Preston Smith International Airport, a copy of which Change Order is attached hereto and incorporated herein, and related documents. Passed by the City Council on APPROVED AS TO CONTENT: CV&UUUV cp�__ - Kelly Campbel , Director of Aviation APPROVPB.AS TO FORM: May 9, 2023 TRAY PAYNC MAYOR it',' 5WAssistant City Attorney ccdocs/RES.Bid Award -Tommy Klein Construction, Inc. April 21, 2023 Office of Purchasing and'Contract Management Change Order Contract No: 16647 Contractor: Tommy Klein Construction, Inc. Change Order No: 01 Contract Title: Construct Federal Inspection Service Bid/RFP No: ITB 22-16447-TF Project No: 92619 "Change Order" means a written order to a Contractor, executed by the Owner, in accordance with the Contract authorizing an addition to, deletion from, or adjustment or revision of the requirements of the Contract documents, or an adjustment to the compensation payable to the Contractor, or to the time for performance of the Contract and completion of the project, or a combination thereof, which does not alter the nature of project and is an integral part of the project objective. Adjustments to "Estimated Quantities" to a line time in a Unit Price Contract do not require a Change Order. All work that alters the nature of the construction or that is not an integral part of the project objective must be let out for public bid. Description of Change (alteration, deviation, addition, or deletion) caused by conditions encountered during construction not covered by the is Chance Order Items: Item #1: Gypsum Furring Wall Addition Contractor Proposal Document: LBB CBP — CCR 2 - Furring Wall (TK Construction) Cost: $5,671.68 Description: Gypsum Furring Wall to be constructed on the West and South walls of the CBP Waiting Room Lobby. The purpose of this additional construction item is to conceal the interior side of existing CMU and Brick Masonry walls which have an uneven surface and are not aesthetically pleasing. This condition was unknown prior to construction. Item #2: Roof Top Unit (RTU) Relocation and Exhaust Air Venting Design Revision Contractor Proposal Document: LBB CBP _ CCR 3 - RTU & Exhaust Changes (TK Construction) Cost: $29,263.32 Description: The RTU placement issue was due to inaccurate field information. The existing RTU was off by about 3 feet from where plans indicated. Thus, it interfered with the clearance requirements with the designated location of the new unit. The Exhaust ventilation re -work was an oversight during design. It was anticipated that independent duct connections for the general return air to the RTU and the exhaust air that would be routed through the energy wheel. The BOD unit utilizes a single duct connection that intermingles the exhaust airflow with the general return air and then routes it through the energy wheel. This was missed during design and thus needed to change the routing of the exhaust air from the toilets and the Janitor Closet so as not to comingle that exhaust air with the general return air and likely introduce exhaust air back into the occupied spaces. Item #3: 60 Construction Contract Extension — IT & Security Revisions Contractor Proposal Document: LBB CBP — CCR 4 - 60 Day Contract Extension (TK Construction) Cost: $19,199.71 Description: Revisions to the IT and Security System Design have resulted in an estimated need to extend the construction contract period by 60 days. Cost for this item is for additional project supervision by the Contractor. Where the Change Order is negotiated, the Change Order must be fully documented and itemized as to costs, including material quantities, material costs, taxes, insurance, employee benefits, other related costs, profit and overhead Where certain unit prices are contained in the initial Contract, no deviations are allowed in computing negotiated change order costs. ITEMIZED COSTS MUST BE FULLY DOCUMENTED AND ATTACHED TO THIS FORM. ITEM DESCRIPTION AMOUNT A. ORIGINAL CONTRACT VALUE: $2 728 000.00 B. AMOUNT OF THIS CHANGE ORDER: Note: Council approval required if (+ -) $50,000 $54134.71 COST CENTERA61 I I ACCOUNT.92619.8302.10000 C. PERCENT OF CONTRACT VALUE THIS CHANGE ORDER B/A 19.8% D. AMOUNT OF PREVIOUS CHANGE ORDERS: $0.00 E. TOTAL AMOUNT OF ALL CHANGE ORDERS B+D $54 134.71 F. PERCENT OF CONTRACT OF ALL CHANGE ORDERS (E/A): 25% maximum) 19.8% PUR-45 (Rev 08,2018) T NEW CON?RACr AmOtWii-ii: . - T A7AD4.71 it is muuWly agreed tha the above dolls antmrat and the trmc extcrmm, er applicable. as sat Path ar ibis Changc Orderaonstautes full oompt aauion to the Cowwrftr for to costa. expenses sad damages to the Cabtracm. whether dues, consequcmial or otherwise. in anyway atcideat W or no" ow of. orfnalypF rndirmly; from the work performed or modified by the Contractor ceder this Change Order. Date 54r tMq r Kelly CaheWt presentative Due (S) Capital Project Manager _ Date Connal DltW May 9, 2023 Pad FWVAM (2) PnWo AmbiteevEn$inew May 9, 2023 Due (a) City Agenda Item 6.15 0421123 Dati Ye�-xgl, Date Resohmm it 2023-RO235 PUR45 (Rev OE 2019) lk Tommy Klein Construction, Inc. March 15, 2023 Attention: Paul Ferguson Reference: Lubbock CRP GAF Relocation CCR #2 Paul. Tonum Klein Construction is providing this pricing for the additional %%ork as described bolo.%. • Additional taming %wrk as per attached Architect Directive. Santana (FrinnlnC Dr\ "all) -S 3.414.00 Pesina Painting CDD%%all Finishing) -S i.250.00 I omm% Klein (Glass Block Work)- S 400.00 Subtotal- S 5.0640) (;C 12°0 S 607.68 Price S 5,671.68 Respect la 11%. Shad I lartman Tomnt. Klein Construction 806-252-1305 Attachtnents- I. Architect Supplemental In,,tructions Tommy Klein Construction Lubbock, Texas 806-438.8777 Fax 806-797-2959 Clarification/ Su lementallnstruction To: Contractor - TK From: A/E — RSBH Project: LBB CBP GAF Reference: Contract Drawing: Specification: Shop Drawing Other A100, A102, A401 CSl Subjectrritle CMU Furring Wall Directive Contract Document Clarification/Supplement Description A/E's Directive By: Ryan Johnson RSBH Item 1 CMU Furring wall at LBB CBP Scope Overview: SI - 002 Date: 2.1.23 ME File No: 2231874.002 Construct Furring Wall along the interior side of the West Exterior Wall within the new CBP Waiting Area. The existing Glass Block - Transom Window is to be maintained. 1) Furring Wall Construction: 5/8 Gyp. on 7/8" Furring Hat Channel. a. 16 GA. b. Placed 16" O.C. 2) Furring Wall should terminate V' Above the Finished Ceiling. 3) Painted Gyp. Edge Finish should be provided on all sides of the Transom Window opening. 4) Any exposed Gypsum Wall Board edges shall receive Corner Bead. 5) Clean Glass Block - Transom Window: a. Joint Seal with Silicone Caulking (White) if necessary. b. Paint any Trim to match the project -specified PT-01 paint finish. 6) Paint the Wall to match the project -specified PT-01 paint finish. 7) Recess all Convenience Receptacles within Furring Wall. 8) Install Wall Base to match the specification provided for Waiting Area. Contractor's Response — Optional: if no response is provided within 15 days, the CS/ is a binding contract requirement with no change to the Contract Sum or Contract Time as required by Section01035 Par. 1.2 A Type response here Contractor's Response By- Typed/Printed Name: Date of Response: lk Tommy Klein Construction, Inc. March 21, 2023 Attention: Paul Ferguson Reference: Lubbock CBP GAF Relocation CCR #3 Paul, Tommy Klein Construction is providing this pricing for the additional work as described below. • Additional Mechanical and Electrical work as per attached Architect Directive. WSC (Mechanical) -$ 21,354.00 1PS (Electrical) -$ 4,773.96 Subtotal: $ 26,127.96 GC 12°o $ 3,135.36 Price $ 29,263.32 Respectfully, Shad Hartman Tommy Klein Construction 806-252-1305 Attachments- 1. Architect Supplemental Instructions Tommy Klein consbuctlon Lubbock, Texas 806.438-8777 Fax 806-797.2959 RSaiff I" 3co ij It. ` •G it i•L �II—) rO�ols I ~ •—O—O O) t rst y I I i GENT RAL NOTES POW8t KEYED NOTES: 0 �.�.�.�m.�. enai.`i.im«.isaso[uu.n.wn .►`.ion...wu..ursw..csawao .ar rlru PARTIAL FIRST FLOOR ELECTRICAL POWER PLAN In P Murs .00 u. W r...y.w �. `w�woew.rnmu"�� oaaw.a ru/+w.e.ror. w FIRST FLOOR ELECTRICAL POWER PLAN . l'rsnwrn.�ww`�r �i �M°�nK�`.°. wu naw.MO`0e • �o/wwwarwr..enns..amrr. rrm ralrww n.�. u.r r.[.o w+.e. m .a.a.w/../n►..en,..r.r... .r/ v... .cm m4roIImMIRC„P. No Text RSGH f Umboa Ic-J I I 1� _� wean mu Inl „nn Iswwwla t nr I I I .0 •_-i ! - Iln�el mau Sq I � i N711I.9rrsl rr IrY nlrm OI—c I 1 II,,_ Cyr 1 iti I i ' I I}1 0U.��41 I iE TT-`•1-C- - �-j11 /•� I 1; I�1•�1 Ir� 1 1 v'r i 4 Li ; 1'' 11 1 y j G td o Quiw OIL '1-'------ pr77a'p�� � 1 1 .Ol�Jll ii L-y0fI9Sf i; ���f^ � � 41, -�11 , Irulrru wer / _ i II / ----'L___ - yrmiu o f—I I— I A` 1 TM._____ ' 1 l I 1 1 YQI 104 1 i OVERALL FRST I FLOOR NVAC 1 j I DEMOUTION PLAN 1ST FLOOR MECHANICAL DEMOLRION PLAN um r MD101 p i a/rl 6 �.IwttV/�A Z ULII v/w.n' 1 -I I 1 ST FLOOR MECHANICAL PLAN "'I, W� � t tl RSaH ))7fD W M.ti M.%O y.4w /4K91 a w 4aoc.lo/ 11gIGt 400Nf. m7n.A i//Y d IW W /4114! OVERALL FIRST FLOOR NVAC FLAN KGVNM10 vwQ M101 .. "V.14 KRT nMDIMMI4PWRu0/ a an� rru,aw.sna„w. QDI*'-=111-12. • � u�nll�.y •. MV MECHANICAL ROOF PLAN RS&H P-DAM Mt tr Wlft I I m Wa I OVERALL ROOF WAC I PLAN M111 woaeSrom If rc �ro.metrucna GAS PIPING CONNECTION DETAIL 3 DUCT CONNECTION TO LOUVER DETAIL w a.u..nn. aawna ourt••au,� ru w•w.•• aaw..s •� .[nw•µnw ns.•. l.-. Yw• M...f.,KW w�wM Rrn., yR.•�iiW,nw�oM�«iaw~�..o�w«iwu.r YN bn�ilM•wM MrH.rr nY,.I.M. EXHAUST FAN EF-1 CONTROL SCHEMATIC 2 SZ 4 INLINE FAN DETAIL Rs", nosttmt if OM WOCIJIOn woiict.00�pa onnw� rfw Wrs•f41.07 HVAC DETAILS AND CONTROLS wro M504 '' K� ru.0 NOaw lnnwYrr,wmmrY.rmnai . WWIuwmYP.rwwr. dYrurw.srww'wnnmrr, all. ..w.wrrYran r 53VIU3X�S r,,,�r, 4 r,Ym.o.r rW� ..Irs.,r.nne+re ono Aar YnlrwnrrP Y.vrwwY. r+asaP wumr'a� acre w r MNr Idr "�I..�wP. W� 1Ia r�� MI =, 3framIm wrosloiiBm u Yap1 4 ww1 Mrl ,��� lyPPrl,rw.A\r rw\.,\wr,mwY�.MOOY rY\,q P\„r mr a�uw e.w�.rn \Y\mP.. Awrr..Ir r,iwn W YY\ YOr � M.a., rw,AYOOr [YO��.r,dY,\IAnw Wlr�Ysr r Oa.1w.M Irrtlr O, plYpmrr.m..�wfl0/\wtflnY 1 YMP�V VY.sYMIrr Y.� rrw A • aIr rwn r, rr w. v.o w„I tl O � W Im w r.wo wr , •..Wr• Aw.YYr.�Irpr.Irlrrw,n Y,.,tl IrF,IY,Arwo.Yonw sr, �.YDYYWwaWAPOPr+Y Yr.IIOPYr,4�,.Iw., p,.m � WAPYrYYr r r.P YisMSYMw.P,IYrr, WwM Psr wrr �,rw.r.�I rao.�wP1 AP tWL\I W �YYr.WOIM ��.waTwM+m. ,iwr1M� rar�rrrNM�%,.1wuY.Y YAInIa.rlrtlw.� nM,Mlu\r, PnY Apnwo\ro.inq W rtlal AAPrh,• OM �tlw YY,Yw rwroniw WrlrMn'w\w y p. O.rMArYi,ra n r.IMTMFM�Fi, AfY, W\arMA �f Yut,W A.. fm 'r•t I�OCn ryior uevrlMrbP rrK2X9rwM1MP, YAIUP.IYn Ar. i@4.IYYOYYYOPrMwre.rYrAwrl W, W,pnlwA•mn w,rlpw• rrIYOM�\rn ww� O Yrtr • OOMr OOwn ri lrrw'I.rWmwlvrs. Ylsr• Ia w'" 4YnIia ��� YwrbwwOrti\IY�Ywlwow,PAYYOwaY AfmrIpYYMYwnnYPsmoe. wrl � .dA1r Yr1wIw.,IIlMrior,Y10W,I11rOwYMr AO„w.tam dor 1 O{AD4Y AOItl TYI Wa.l w.Innw mMrY tlA'uov! rnlup�.r�Yw 'r' �lr\rLY W Yar.)btl M4wwW rr�pY „yy} 4.O P\nrrmwm T rrirlOMrP WCnl4., '.I..r plrO W YYYrPwI wlMrYr\nlnP WC T M.1 w.PI.I�, WI w b an. Yr,Y1\ �r.t4�Y ✓Y � p wrH MOIYI 3Y1Gl1041M'Ma09131rY1011VMWA 3Y1®f�i11i1 JIN0U1Q�i1J iN G3Ui1011 EOM H?Sd Tommy Klein Construction, Inc. April 10, 2023 Attention: Paul Ferguson Reference: Lubbock CBP GAF Relocation CCR #4 Paul, Tommy Klein Construction is providing this pricing for the additional work as described below. • Additional Supervision due to Contract Extension. • Average of $ 2,016.78 a week (8.5 weeks). Covers Super Payroll, Vehicle, Insurances Tommy Klein (Supervision)- $ 17,142.60 Subtotal: $ 17,142.60 GC 12% $ 2,057.11 Price $ 19,199.71 Additional Days- 60 Days Respectfully, Shad Hartman Tommy Klein Construction 806-252-1305 Attachments- 1. None Tommy Klein Consbuctlon Lubbock Texas 806-438.8777 Fax 806-797-2959