HomeMy WebLinkAboutResolution - 2023-R0038 - Contract 17005 with Lone Star Dirt and Paving 1.24.23Resolution No. 2023-R0038
Item No. 6.11
January 24, 2023
RESOLUTION
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK:
THAT the Mayor of the City of Lubbock is hereby authorized and directed to execute
for and on behalf of the City of Lubbock, Public Works Contract No. 17005 for asphalt
patching as per ITB 23-17005-KM, by and between the City of Lubbock and Lone Star Dirt
& Paving, Ltd of Lubbock, Texas, and related documents. Said Contract is attached hereto
and incorporated in this resolution as if fully set forth herein and shall be included in the
minutes of the City Council.
Passed by the City Council on January 24, 2023
ATTEST:
— hA "-i
Reb ca Garza, City Secretary
APPROVED AS TO CONTENT:
& -1,- �-
Erik Rejino, Assistant City Manager
APPROVED AS TO FORM:
lim r
elli Leisure, Assistant City Attorney
ccdocs/RES.Public Works Contract 17005 Asphalt Patching
01.04.22
BID SUBMITTAL FORM
UNIT PRICE BID CONTRACT
DATE: /
PROJECT NUMBER: ITB 23-17005-KM, Asphalt Patching
Bid of V1 n -!- _ (hereinafter called
Bidder)
To the Honorable Mayor and City Council City of Lubbock, Texas (hereinafter called Owner)
Ladies and Gentlemen:
The Bidder, in compliance with your Invitation to Bid for the construction of the referenced project, having
carefully examined the plans, specifications, instructions to bidders, notice to bidders and all other related
contract documents and the site of the intended work, and being familiar with all of the conditions surrounding
the construction of the intended project including the availability of materials and labor, hereby intends to
furnish all labor, materials, and supplies; and to construct the project in accordance with the plans, specifications
and contract documents, within the time set forth therein and at the price stated.
The bidder binds himself on acceptance of his bid to execute a contract and any required bonds, according to
the accompanying forms, for performing and completing the said work within the time stated and for the prices
stated.
Bidder hereby agrees to commence the work on the above project on a date to be specified in a written 'Notice
to Proceed" of the Owner and to substantially complete the project within 115 consecutive calendar days
with final completion of the project within 120 consecutive calendar days as stipulated in the specification
and other contract documents. Bidder hereby further agrees to pay to Owner as liquidated damages in the sum
of $1,204.29 for each consecutive calendar day after substantial completion and liquidated damages in the
sum of $1,204.28 for each consecutive calendar day after final completion set forth herein above for completion
of this project, all as more fully set forth in the General Conditions of the Agreement.
Bidder understands and agrees that this bid submittal shall be completed and submitted in accordance with
instruction number 29 of the General Instructions to Bidders.
Bidder understands that the Owner reserves the right to reject any or all bids and to waive any formality in the
bidding.
The Bidder agrees that this bid shall be good and may not be withdrawn for a period of 60 calendar days after
the scheduled closing time for receiving bids.
The undersigned Bidder hereby declares that he has visited the site of the work and has carefully examined the
plans, specifications and contract documents pertaining to the work covered by this bid, and he further agrees
to commence work on or before the date specified in the written notice to proceed, and to substantially complete
the work on which he has bid; as provided in the contract documents.
Bidders are required, whether or not a payment or performance bond is required, to submit a cashier's check or
certified check issued by a bank satisfactory to the City of Lubbock, or a bid bond from a reliable surety
company, payable without recourse to the order of the City of Lubbock in an amount not less than five percent
(5%) of the total amount of the bid submitted as a guarantee that bidder will enter into a contract, obtain all
required insurance policies, and execute all necessary bonds (if required) within 10 business days after notice
of award of the contract to him.
12/23/122 1:44 PM
City of Lubbock
ITB 23-17005-KM
Asphalt Patching
Bid Form
# Items
Location
Total Cost
Quantity Unit
of
(+/-) Measure
Patching with Black Base, 3" depth (milling to a depth of 5", with replacement 5000 SY
of 3" Black Base and 2" Type D Hot Mix), including labor, equipment, removal
and disposal of asphaltic surface, caliche base and sub -grade (if soft or unstable)
to a depth of 5" and replacing with 3" of Black Base and 2" Type D Hot Mix.
(All Millings will go to the City of Lubbock.)
#0-1
#0-2
#0-3
#0-4
#0-5
#0-6
Patching with Black Base, 6" depth (milling to a depth of 8", with replacement
of 6" Black Base and 2" Type C Hot Mix), including labor, equipment, removal
and disposal of asphaltic surface, caliche base and sub -grade (if soft or unstable)
to a depth of 8" and replacing with 6" of Black Base and 2" Type C Hot Mix.
Patching with Black Base, 9" depth (milling to a depth of 1 I", with replacement
of 9" Black Base and 2" Type C Hot Mix), including labor, equipment, removal
and disposal of asphaltic surface, caliche base and sub -grade (if soft or unstable)
to a depth of I I" and replacing with 9" of Black Base and 2" Type C Hot Mix
3000 SY
1500 SY
Patching with 2 sack flowable fill, 6"depth, (milling to a depth of 8 ",with 100
replacement of 6" 2 sack flowable fill and 2" Type D or C Hot Mix), including
labor, equipment, removal and disposal of asphaltic surface, caliche base and
sub -grad (if soft or unstable) to a depth of 8" and replacing with 6" of 2 sack
flowable fill and 2" Type D or C Hot Mix.
Patching with Hot Mix, 2" depth, (milling to a depth of 2" with Replacement of 11500
2" Type D or C Hot Mix), including labor, equipment, removal and disposal of
asphaltic surface, caliche base and sub -grade ( if soft or unstable) to a depth Of
2" and replacing with 2" of Type D or C Hot Mix. (All Millings will go to the
City of Lubbock.)
Mobilization. I
SY
SY
LS
Lone Star Dirt & Paving
Lubbock, TX
$1,452,300.00
Unit Extended
Cost Cost
$67.10
$335,500.00
$84.70
$254,100.00
$150.70
$226,050.00 1
$330.00 $33,000.001
$45.10 $518,650.00
$85,000.00 $85,000.00
Enclosed with this bid is a Cashier's Check or Certified Check for
Dollars ($ ) or a Bid Bond in the sum of
Dollars ($ >, which it is agreed shall be collected and
retained by the Owner as liquidated damages in the event the bid is accepted by the Owner and the
undersigned fails to execute the necessary contract documents, insurance certificates, and the required
bond (if any) with the Owner within 10 business days after the date of receipt of written notification of
acceptance of said bid; otherwise, said check or bond shall be returned to the undersigned upon
demand.
Bidder understands and agrees that the contract to be executed by Bidder shall be bound and include all contract
documents made available to him for his inspection in accordance with the Notice to Bidders.
Pursuant to Texas Local Government Code 252.W(g), a
competitive sealed bid that has been opened may not be
ebanged for the purpose of correcting an error in the bid price.
THEREFORE, ANY CORRECTIONS TO THE BID PRICE
MUST BE MADE ON THE BID SUBMITTAL FORM PRIOR
TO BID OPENING.
(Seal if Bidder is a Corporation)
ATTEST:
Secretary � -� -
Bidder acknowledges receipt of the following addenda:
Addenda No. Date
Addenda No. Date
Addenda No. Date
Addenda No. Date
M(WBE
Firm:
Date: ---?- -;k.--
s�
Auth ature _
(Printed or Typed Name)
i' 4V
Company
2J "
Address
City, County
State Zip Code
Telephone:-- 0x.— - _ _ TY f
Fax•
FEDERAL TAX ID or SOCIAL SECURITY No.
ga00 l3a_.!.1
EMAM:
oman-Black
American
Native American
Hispanic
American
ian aci c
American
Other peci
12/23/122 1:44 PM
CERTIFICATE OF INTERESTED PARTIES FORM 3295
loft
Complete Nos. i - 4 and 6d there are interested parties. 1OFFICE USE ONLY
Complete Nos.1, 2, 3, 5, and 6 Ifthere are no interested parties. CERTIFICATION OF FILING
1 Name of business entity filing form, and the city, state and country of the business entity's place Certificate Number.
of business. 2023-969600
LONE STAR DIRT & PAVING
Lubbock, TX United States Date Fib:
2 Name of govenvnental entity or state agency that is a party to the contact for which the forms 01/06/2023
being filed.
City of Lubbock Date aged:
3 Provide the Identification number used by the govemmental entity or state agency to track or identify the contract, and provide a
description of the services, goods, or other property to be provided under the contract
: ITB 23-170054KM
Asphalt Patching
4 Name Interested Party
of interest
Party City, State, Country (place of business) (dtedr api )
Control Interned'
Sanders, Wesley Lubbock, TX United States X
Turner, Steve Lubbock, TX United States X
5 Check only if there Is NO Interested party. ❑
6 UNSWORN DECLARATION
My name is� and my date of
of birth is
My address Is V ;% G, LLB-7qV o� c,:; A.
(mot) (City) (state) (zip code) (country)
I declare under penalty of perjury that the foregoing is true and correct.
Executed in County, State of t✓ cJ on the _day ofJI8—___, 2013
(nantb) (year)
Igoe orized agent of contracting business entity
(Declarant)
Forms provided by Texas Ethics Commission www.ethics.state.tx.us Version V3.5.1.3ac88bc0
116/123 1:59 PM
CERTIFICATE OF INTERESTED PARTIES
FORM 1295
1 0f 1
Complete Nos. 1- 4 and 6 if there are interested parties.
OFFICE USE ONLY
Complete Nos.1, 2, 3, 5, and 6 if there are no interested parties.
CERTIFICATION OF FILING
Certificate Number:
1 Name of business entity filing form, and the city, state and country of the business entity's place
of business.
2023-969600
LONE STAR DIRT & PAVING
Lubbock, TX United States
Date Filed:
01/06/2023
2 Name of governmental entity or state agency that is a party to the contract for which the form is
being filed.
City of Lubbock
Date Acknowledged:
01/11/2023
3 Provide the identification number used by the governmental entity or state agency to track or identify the contract, and provide a
description of the services, goods, or other property to be provided under the contract.
: ITB 23-17005-KM
Asphalt Patching
4
Name of Interested Party
City, State, Country (place of business)
Nature of interest
(check applicable)
Controlling
I Intermediary
Sanders, Wesley
Lubbock, TX United States
X
Turner, Steve
Lubbock, TX United States
X
5 Check only if there is NO Interested Party. ❑
6 UNSWORN DECLARATION
My name is and my date of birth is
My address is
(street) (city) (state) (zip code) (country)
declare under penalty of perjury that the foregoing is true and correct.
Executed in County, State of on the day of , 20
(month) (year)
Signature of authorized agent of contracting business entity
(Declarant)
Forms provided by Texas Ethics Commissinn www ethirc ctata tY iic \/crcinn %/Q R 1 gnrQQhrn
BOND CHECK
BEST RATING
LICENSED IN TEXAS
DATE BY:
CONTRACT AWARD DATE: January 24, 2023
CITY OF LUBBOCK
SPECIFICATIONS FOR
Asphalt Patching
ITB 23-17005-KM
CONTRACT 17005
PROJECT NUMBER: 92794.9240.30000
Plans & Specifications may be obtained from
https:Hci-lubbock-tx.bonfirehub.com/
City of 1 '
bb o cn
TEXAS
CITY OF LUBBOCK
Lubbock, Texas
Page Intentionally Left Blank
1. NOTICE TO BIDDERS
2. GENERAL INSTRUCTIONS TO BIDDERS
3. BID SUBMITTAL — (must be submitted by published due date & time)
3-1. UNIT PRICE BID SUBMITTAL FORM
3-2. CITY OF LUBBOCK REFERENCE FORM
3-3. CITY OF LUBBOCK INSURANCE REQUIREMENT AFFIDAVIT
3-4. SAFETY RECORD QUESTIONNAIRE
3-5. SUSPENSION AND DEBARMENT CERTIFICATION
3-6. PROHIBITION ON CONTRACTS WITH COMPANIES BOYCOTTING ISRAEL
VERIFICATION
4. LIST OF SUB -CONTRACTORS
5. PAYMENT BOND
6. PERFORMANCE BOND
7. CERTIFICATE OF INSURANCE
8. CONTRACT
9. CONFLICT OF INTEREST QUESTIONNAIRE CHAPTER 176
10. CHAPTER 46. DISCLOSURE OF INTERESTED PARTIES
11. GENERAL CONDITIONS OF THE AGREEMENT
12. DAVIS BACON WAGE DETERMINATIONS
13. SPECIAL CONDITIONS (IF APPLICABLE)
14. SPECIFICATIONS
2
Page Intentionally Left Blank
NOTICE TO BIDDERS
Page Intentionally Left Blank
City of
Lubbock
TEXAS
ITB 23-17005-KM
Asphalt Patching
1. NOTICE TO BIDDERS
1.1. Bidders may submit responses electronically by uploading required documents at the City of
Lubbock's partner website, Bonfire. This Invitation to Bid is for your convenience in submitting a
bid for the specified project. If submitting electronically, do not submit paper documents. If you
choose to submit in hard copy, submit one original paper copy of your submittal to the office of the
Director of Purchasing and Contract Management:
Physical: Marta Alvarez, Director of Purchasing and Contract Management
City of Lubbock
13 14 Avenue K, 9th Floor
Lubbock, Texas 79401
Mailing: Marta Alvarez, Director of Purchasing and Contract Management
City of Lubbock
P.O. Box 2000
Lubbock, Texas 79457
MARK ENVELOPE WITH THE SOLICITATION NUMBER, TITLE, AND DUE DATE/TIME
1.2. Bids will be opened in the office of the Director of Purchasing and Contract Management, Citizens
Tower, 1314 Avenue K, Floor 9, Lubbock, Texas, 79401, and via teleconference as shown below
at 2:00 PM on December 28, 2022, or as changed by the issuance of formal addenda to all
planholders, to furnish all labor and materials and perform all work for the construction of the above
referenced.
1.3. After the expiration of the time and date above first written, said sealed bids will be opened in the
office of the Director of Purchasing and Contract Management and publicly read aloud. Bids will
be opened via teleconference if date/time stamped on or before the deadline stated at the office
listed above. The Zoom meeting information is as follows:
Website: https:Hzoom.us/j/95419088916?pwd=dnZsdOhpTjEwRE5gY2Jnc2xEeUliUT09
Meeting ID: 954 1908 8916
Passcode: 1314
1.4. It is the sole responsibility of the bidder to ensure that his bid is actually received by the office of the
Director of Purchasing and Contract Management for the City of Lubbock, before the expiration of
the date above first written. Any bid received after the date and hour specified will be rejected and
returned unopened to the bidder.
1.5. Mailing of a bid does not ensure that the bid will be delivered on time or delivered at all. If bidder
does not hand deliver bid, we suggest that he/she use some sort of delivery service that provides a
receipt. The City of Lubbock assumes no responsibility for errant delivery of bids, including those
relegated to a courier agent who fails to deliver in accordance with the time and receiving point
specified.
1.6. Although bids may be submitted electronically, hard copy bids will be accepted in person, by United
States Mail, by United Parcel Service, or by private courier service. THE CITY WILL NOT ACCEPT
FAX BIDS.
1.7. Bids may be withdrawn prior to the above scheduled time set for closing. Alteration made before ITB
opening must be initialed by bidder guaranteeing authenticity.
1.8. Bids are due at 2:00 PM on December 28, 2022, and the City of Lubbock Council members will
consider the bids on January 24, 2021 at the Citizens Tower, 1314 Avenue K, Lubbock, Texas, or as
soon thereafter as may be reasonably convenient, subject to the right to reject any or all bids and waive
any formalities. The successful bidder will be required to furnish a performance bond in accordance
with Chapter 2253, Government Code, in the amount of 100% of the total contract price in the event
that said contract price exceeds $100,000 and the successful bidder will be required to furnish a
payment bond in accordance with Chapter 2253, Government Code, in the amount of 100% of the
total contract price in the event that said contract price exceeds $50,000. Said statutory bonds shall be
issued by a company carrying a current Best Rating of "A" or better. THE BONDS MUST BE IN
A FORM ACCEPTABLE TO THE CITY ATTORNEY. NO WORK ON THE CONTRACT
SHOULD COMMENCE BEFORE THE BONDS ARE PROVIDED AND APPROVED.
1.9 NOTICE TO PROCEED WILL BE ISSUED 30 DAYS FOLLOWING THE AWARD OF
THE CONTRACT BY THE LUBBOCK CITY COUNCIL.
1.10. Please allow time to upload required documentation. 24hrs in advance is recommended.
1.11. The estimated budget for this project is $1,500,000.
1.12. Bidders are required, whether or not a payment or performance bond is required, to submit a cashier's
or certified check issued by a bank satisfactory to the City of Lubbock, or a proposal bond from a
reliable surety company, payable without recourse to the order of the City of Lubbock in an amount
not less than 5% of the total amount of the proposal submitted as a guarantee that bidder will enter
into a contract and execute all necessary bonds within ten (10) business days after notice of award of
the contract to the bidder. FAILURE OF THE BIDDER TO INCLUDE BID SECURITY WITH
THE BID SUBMITTAL SHALL CONSTITUTE A NONRESPONSIVE BID AND RESULT IN
DISQUALIFICATION OF THE BID SUBMITTAL.
1.13. Copies of plans and specifications may be obtained at bidder's expense from the City of Lubbock
Purchasing and Contract Management office. Plans and specifications can be viewed online and
downloaded from https://ci-lbbock-tx.bonfirehub.com/portal/ at no cost. In the event of a large file
size, please be patient when downloading or viewing. BUSINESSES WITHOUT INTERNET
ACCESS may use computers available at most public libraries.
14. Bidders may view the plans and specifications without charge at The Reproduction Company, 2102
Avenue Q, Lubbock, Texas 79405 or at http://pr.thereproductioncompany.com/ . ONE SET OF
PLANS AND SPECIFICATIONS MAY BE OBTAINED, AT THE CITY'S EXPENSE, FROM
THE REPRODUCTION COMPANY WITH A $100 REFUNDABLE DEPOSIT, Phone: (806)
763-7770. Deposit Checks shall be made PAYABLE TO THE CITY OF LUBBOCK, and will be
refunded if documents are returned in good condition within Sixty (60) days of the opening of bids.
Additional sets of plans and specifications may be obtained at the Bidder's expense.
1.15. It shall be each bidder's sole responsibility to inspect the site of the work and to inform bidder
regarding all local conditions under which the work is to be done. It shall be understood and agreed
that all such factors have been thoroughly investigated and considered in the preparation of the bid
submitted.
2. PRE -BID MEETING
2.10. For the purpose of familiarizing bidders with the requirements, answering questions, and issuing
addenda as needed for the clarification of the Invitation to Bid (ITB) documents, a non -mandatory
pre -bid meeting will be held December 20, at 10:00 a.m., via teleconference. The Zoom meeting
information is as follows:
Website: https://zoom.us/j/97539733339?pwd=VVHNON11taORGKzR5SkILSktVWXFPQT09
Meeting ID: 975 3973 3339
Passcode: 1314
2.11. All persons attending the meeting will be asked to identify themselves and the prospective bidder they
represent.
2.12. It is the bidder's responsibility to attend the pre -bid meeting though the meeting is not mandatory. The
City will not be responsible for providing information discussed at the pre -bid meeting to bidders who
do not attend the pre -bid meeting.
3. Attention of each bidder is particularly called to the schedule of general prevailing rate of per diem wages
included in the contract documents on file in the office of the Purchasing and Contract Management Office
of the City of Lubbock, which document is specifically referred to in this notice to bidders. Each bidders
attention is further directed to Texas Government Code, Chapter 2258, Prevailing Wage Rates, and the
requirements contained therein concerning the above wage scale and payment by the contractor of the
prevailing rates of wages as heretofore established by owner in said wage scale.
4. The City of Lubbock hereby notifies all bidders that in regard to any contract entered into pursuant to this
advertisement, minority and women business enterprises will be afforded equal opportunities to submit bids
in response to this invitation and will not be discriminated against on the grounds of race, color, sex, disability,
or national origin in consideration for an award.
5. The City of Lubbock does not discriminate against persons with disabilities. City of Lubbock pre -proposal
meetings and proposal openings are available to all persons regardless of disability. If you require special
assistance, please contact the Purchasing and Contract Management Office at (806) 775-2572 write to Post
Office Box 2000, Lubbock, Texas 79457 at least 48 hours in advance of the meeting.
CITY OF LUBBOCK,
Marta Alvarez
DIRECTOR OF PURCHASING &
CONTRACT MANAGEMENT
Page Intentionally Left Blank
GENERAL INSTRUCTIONS TO BIDDERS
Page Intentionally Left Blank
GENERAL INSTRUCTIONS TO BIDDERS
1. BIDDER INQUIRIES AND CLARIFICATION OF REQUIREMENTS
1.1 It is the intent and purpose of the City of Lubbock that this request permit competitive bids. It shall be
the bidder's responsibility to advise the Purchasing and Contract Management Office if any language,
requirements, etc., or any combinations thereof, inadvertently restricts or limits the requirements stated
in this ITB to a single source. Such notification must be submitted in writing and must be received by
the City of Lubbock Purchasing and Contract Management Office no later than five (5) calendar days
before the bid closing date. A review of such notifications will be made.
1.2 NO BIDDER SHALL REQUEST ANY INFORMATION VERBALLY. ALL REQUESTS FOR
ADDITIONAL INFORMATION OR CLARIFICATION CONCERNING THIS INVITATION
TO BID (ITB) MUST BE SUBMITTED IN WRITING NO LATER THAN FIVE (5) CALENDAR
DAYS PRIOR TO THE BID CLOSING DATE AND ADDRESSED TO:
Kiara Morgan
City of Lubbock
Purchasing and Contract Management Office
1314 Avenue K, Floor 9
Lubbock, Texas 79401
Fax: 806-775-2164
Email: Kmorgan@mylubbock.us
2. TIME AND ORDER FOR COMPLETION
2.1 The construction covered by the contract documents shall be substantially completed within 115
Consecutive Calendar Days from the date specified in the Notice to Proceed issued by the City of
Lubbock to the successful bidder.
2.2 The Contractor will be permitted to prosecute the work in the order of his own choosing, provided,
however, the City reserves the right to require the Contractor to submit a progress schedule of the work
contemplated by the contract documents. In the event the City requires a progress schedule to be
submitted, and it is determined by the City that the progress of the work is not in accordance with the
progress schedule so submitted, the City may direct the Contractor to take such action as the City deems
necessary to ensure completion of the project within the time specified.
2.3 Upon receipt of notice to proceed, and upon commencement of the work, the Contractor shall ensure
daily prosecution of the work is conducted every business day until the work is completed, regardless if
the work will be substantially or finally complete ahead of specified deadlines in the agreement, unless
the City determines time off from said prosecution is necessary or reasonable and Contractor received
said determination in writing from the City. Additionally, inclement weather shall be the only other
reason consistent, daily prosecution of the work may not take place on those inclement weather days.
3. GUARANTEES
3.1 All equipment and materials incorporated in the project and all construction shall be guaranteed against
defective materials and workmanship. Prior to final acceptance, the Contractor shall furnish to the Owner,
a written general guarantee which shall provide that the Contractor shall remedy any defects in the work,
and pay for any and all damages of any nature whatsoever resulting in such defects, when such defects
appear within ONE (1) year from date of final acceptance of the work as a result of defective materials
or workmanship, at no cost to the Owner (City of Lubbock).
3.2 Notwithstanding any provisions contained in the contractual agreement, the Contractor represents and
warrants fault -free performance and fault -free result in the processing date and date -related data
(including, but not limited to calculating, comparing and sequencing) of all hardware, software and
firmware products delivered and services provided under this Contract, individually or in combination,
as the case may be from the effective date of this Contract. Also, the Contractor warrants calculations
will be recognized and accommodated and will not, in any way, result in hardware, software or firmware
failure. The City of Lubbock, at its sole option, may require the Contractor, at any time, to demonstrate
the procedures it intends to follow in order to comply with all the obligations contained herein.
3.3 The obligations contained herein apply to products and services provided by the Contractor, its sub-
contractor or any third party involved in the creation or development of the products and services to be
delivered to the City of Lubbock under this Contract. Failure to comply with any of the obligations
contained herein, may result in the City of Lubbock availing itself of any of its rights under the law and
under this Contract including, but not limited to, its right pertaining to termination or default.
3.4 The warranties contained herein are separate and discrete from any other warranties specified in this
Contract, and are not subject to any disclaimer of warranty, implied or expressed, or limitation to the
Contractor's liability which may be specified in this Contract, its appendices, its schedules, its annexes
or any document incorporated in this Contract by reference.
4. BID AWARD
4.1 The City of Lubbock reserves the right to reject any or all bids, reject any particular item on a bid, and
to waive immaterial formalities and to accept the offer most advantageous to the City of Lubbock in its
sole discretion. Unless otherwise specified herein, the City shall award the bid based on the total bid for
Bid Items 1 through 6 plus the sum of any Alternate Bids or Options the City may select.
4.2 All bids are evaluated for compliance with specifications before the bid price is considered. Response
to specifications is primary in determining the best low bid. Failure to comply with the specifications
may result in disqualification of the bid.
4.3 In case of tie bids, preference will be given to local bidders. Consistent and continued tie bidding may
be cause for rejection of bids by the City of Lubbock and/or investigation by the Attorney General to
determine possible Anti -Trust violations.
4.4 Before the City may award a bid to a nonresident bidder, the nonresident bidder's bid must be lower than
lowest bid submitted by a responsible Texas bidder by the same margin or amount that a Texas bidder
would be required to underbid the nonresident bidder in the nonresident bidders' home state.
4.5 Any contract made, or purchase order issued, as a result of this Invitation to Bid, shall be entered into the
State of Texas and under the laws of the State of Texas. In connection with the performance of work,
the Bidder agrees to comply with the Fair Labor Standard Act, Equal Opportunity Employment Act, and
all other applicable Federal, State, and Local laws, regulations, and executive orders to the extent that the
same may be applicable.
4.6 NO INDIVIDUAL OF ANY USING DEPARTMENT HAS THE AUTHORITY TO LEGALLY
AND/OR FINANCIALLY COMMIT THE CITY TO ANY CONTRACT, AGREEMENT OR
PURCHASE ORDER FOR GOODS OR SERVICES, UNLESS SPECIFICALLY SANCTIONED
BY THE REQUIREMENTS OF THIS INVITATION TO BID.
GENERAL INSTRUCTIONS TO BIDDERS
(Continued)
5. ADDENDA & MODIFICATIONS
5.1 Any changes, additions, or clarifications to the ITB are made by ADDENDA information available over
the Internet at https://ci-lubbock-tx.bonfirehub.com/portal/. We strongly suggest that you check for
any addenda a minimum of forty-eight hours in advance of the response deadline. BUSINESSES
WITHOUT INTERNET ACCESS may use computers available at most public libraries.
5.2 Any bidder in doubt as to the true meaning of any part of the specifications or other documents may
request an interpretation thereof from the Purchasing and Contract Management Office. At the request
of the bidder, or in the event the Purchasing and Contract Management Office deems the interpretation
to be substantive, the interpretation will be made by written addendum issued by the Purchasing and
Contract Management Office. Such addenda issued by the Purchasing and Contract Management Office
will be available over the Internet at hgps://ci-lubbock-tx.bonfirehub.com/portal/ and will become part
of the bid package having the same binding effect as provisions of the original ITB. NO VERBAL
EXPLANATIONS OR INTERPRETATIONS WILL BE BINDING. In order to have a request for
interpretation considered, the request must be submitted in writing and must be received by the City of
Lubbock Purchasing and Contract Management Office no later than five (5) calendar days before the bid
closing date.
5.3 All addenda, amendments, and interpretations of this solicitation shall be in writing. The City of Lubbock
shall not be legally bound by any amendment or interpretation that is not in writing. Only information
supplied by the City of Lubbock Purchasing and Contract Management Office in writing or in this ITB
should be used in preparing bid responses. All contacts that a bidder may have had before or after receipt
of this ITB with any individuals, employees, or representatives of the City and any information that may
have been read in any news media or seen or heard in any communication facility regarding this bid
should be disregarded in preparing responses.
5.4 The City does not assume responsibility for the receipt of any addendum sent to bidders.
6. EXAMINATION OF DOCUMENTS AND REQUIREMENTS
6.1 Each bidder shall carefully examine all ITB documents and thoroughly familiarize itself with all
requirements before submitting a bid to ensure that their bid meets the intent of these specifications.
6.2 Before submitting a bid, each bidder shall be responsible for making all investigations and examinations
that are necessary to ascertain conditions and requirements affecting the requirements of this Invitation
to Bid. Failure to make such investigations and examinations shall not relieve the bidder from obligation
to comply, in every detail, with all provisions and requirements of the Invitation to Bid.
6.3 Notices of any discrepancies or omissions in these plans, specifications, or contract documents, shall
be given to the Purchasing and Contract Management Office and a clarification obtained before
the bids are received, and if no such notice is received by the Purchasing and Contract Management
Office prior to the opening of bids, then it shall be deemed that the bidder fully understands the
work to be included and has provided sufficient sums in its bid to complete the work in accordance
with these plans and specifications. If bidder does not notify Purchasing and Contract
Management Office before bidding of any discrepancies or omissions, then it shall be deemed for
all purposes that the plans and specifications are sufficient and adequate for completion of the
project. It is further agreed that any request for clarification must be submitted no later than five
(5) calendar days prior to the bid closing date.
7. BID PREPARATION COSTS
7.1 Issuance of this ITB does not commit the City of Lubbock, in any way, to pay any costs incurred in the
preparation and submission of a bid.
7.2 The issuance of this ITB does not obligate the City of Lubbock to enter into contract for any services or
equipment.
7.3 All costs related to the preparation and submission of a bid shall be paid by the bidder.
8. TRADE SECRETS, CONFIDENTIAL INFORMATION AND THE TEXAS PUBLIC INFORMATION
ACT
8.1 If you consider any portion of your bid to be privileged or confidential by statute or judicial decision,
including trade secrets and commercial or financial information, clearly identify those portions.
8.2 The City of Lubbock will honor your notations of trade secrets and confidential information and decline
to release such information initially, but please note that the final determination of whether a particular
portion of your bid is in fact a trade secret or commercial or financial information that may be withheld
from public inspection will be made by the Texas Attorney General or a court of competent jurisdiction.
In the event a public information request is received for a portion of your bid that you have marked as
being confidential information, you will be notified of such request and you will be required to justify
your legal position in writing to the Texas Attorney General pursuant to Section 552.305 of the
Government Code. In the event that it is determined by opinion or order of the Texas Attorney General
or a court of competent jurisdiction that such information is in fact not privileged and confidential under
Section 552.110 of the Government Code and Section 252.049 of the Local Government Code, then such
information will be made available to the requester.
8.3 Marking your entire bid CONFIDENTIAL/PROPRIETARY is not in conformance with the Texas Open
Records Act.
8.4 Pursuant to Section 552.234(c) of the Texas Government Code, submit your open records request using
the link provided below.
https:Hlubbocktx.govqa.us/AVEBA-PP/ rs/(S(qui3drflbtihahjnycecs))/SLipportHome.aspx
8.5 For more information, please see the City of Lubbock Public Information Act website at:
https://ci.lubbock.tx.us/pages/public-information-act
9. LICENSES. PERMITS. TAXES
9.1 The price or prices for the work shall include full compensation for all taxes, permits, etc. that the bidder
is or may be required to pay.
10. UTILIZATION OF LOCAL BUSINESS RESOURCES
10.1 Prospective bidders are strongly encouraged to explore and implement methods for the utilization of local
resources, and to outline in their bid submittal how they would utilize local resources.
11. CONFLICT OF INTEREST
11.1 The bidder shall not offer or accept gifts or anything of value nor enter into any business arrangement
with any employee, official or agent of the City of Lubbock.
11.2 By signing and executing this bid, the bidder certifies and represents to the City the bidder has not offered,
conferred or agreed to confer any pecuniary benefit or other thing of value for the receipt of special
treatment, advantage, information, recipient's decision, opinion, recommendation, vote or any other
exercise of discretion concerning this bid.
11.3 It is not necessary to fill out the CIQ Form unless you have a business relationship that might cause
a conflict of interest with the City of Lubbock
11.4 Effective January 1, 2006, Chapter 176 of the Texas Local Government Code requires that any vendor
or person considering doing business with a local government entity disclose in the Questionnaire, Form
CIQ, the vendor or person's affiliation or business relationship that might cause a conflict of interest
with a local government entity. By law, the questionnaire must be filed with the records administrator
of the City of Lubbock not later than the Seventh business day after the date the person becomes aware
of the facts that require the statement to be filed. The questionnaire can be found at:
s://www.ethics.state.tx.us/forms/conflict/
For the City of Lubbock, these forms should be filed with the City Secretary's Office, P.O. Box 2000,
Lubbock, Texas, 79457
See Section 176.006, Local Government Code:
http://www.statutes.legis.state.tx.us/SOTWDocs/LG/htni/LG. 176.htm.
A person commits an offense if the person violates Section 176.006, Local Government Code.
An offense under this section is a Class C misdemeanor.
12. CONTRACT DOCUMENTS
12.1 All work covered by the contract shall be done in accordance with contract documents described in the
General Conditions.
12.2 All bidders shall be thoroughly familiar with all of the requirements set forth on the contract documents
for the construction of this project and shall be responsible for the satisfactory completion of all work
contemplated by said contract documents.
13. CERTIFICATE OF INTERESTED PARTIES
13.1 Effective January 1, 2016, Section 2252.908, as amended, of Chapter 2252 of the Texas Government
Code requires certain business entities to submit an electronic disclosure form to the Texas Ethics
Commission before entering into a contract with a local government entity when any of the following
apply:
1) Contract requires an action or vote by the City Council (governing body); OR
2) Contract value is $1 Million or greater; OR
3) Contract is for services that would require a person to register as a lobbyist under Chapter 305
of the Government Code.
This must be done before executing the contract. The disclosure form may be found at
https://www.ethics.state.tx.us/whatsnew/elf_ info_form1295.htm. You must log in and create an
account the first time you fill out the form. Tutorial videos on how to log in for the first time and how
to fill out the form can be found through the link above. After you electronically submit the
disclosure form, a screen will come up confirming the submission and assigning a certificate number.
Then, you must print the form, have an authorized agent complete the declaration and sign, and
provide it to the City (scanned email copy is acceptable).
14. PLANS FOR USE BY BIDDERS
14.1 It is the intent of the City of Lubbock that all parties with an interest in submitting a bid on the project
covered by the contract documents be given a reasonable opportunity to examine the documents and
prepare a bid without charge or forfeiture of deposit. The contract documents may be examined without
charge as noted in the Notice to Bidders.
15. PAYMENT
15.1 All payments due to Contractor shall be made in accordance with the provisions of the General
Conditions of the contract documents.
16. AFFIDAVITS OF BILLS PAID
16.1 The City of Lubbock reserves the right, prior to final acceptance of this project to require the Contractor
to execute an affidavit that all bills for labor, materials and incidentals incurred in the construction of the
improvements contemplated by the contract documents have been paid in full and that there are no claims
pending, of which the Contractor has been notified.
17. MATERIALS AND WORKMANSHIP
17.1 The intent of these contract documents is that only materials and workmanship of the best quality and
grade will be furnished. The fact that the specifications may fail to be sufficiently complete in some
detail will not relieve the Contractor of full responsibility for providing materials of high quality and for
protecting them adequately until incorporated into the project. The presence or absence of a
representative of the City on the site will not relieve the Contractor of full responsibility of complying
with this provision. The specifications for materials and methods set forth in the contract documents
provide minimum standards of quality, which the Owner believes necessary to procure a satisfactory
project.
18. PLANS FOR THE CONTRACTOR
18.1 The contractor will, upon written request, be furnished up to five sets of plans and specifications and
related contract documents for use during construction. Plans and specifications for use during
construction will only be furnished directly to the Contractor. The Contractor shall then distribute copies
of plans and specifications to suppliers, subcontractors or others, as required for proper prosecution of
the work contemplated by the Contractor.
19. PROTECTION OF THE WORK
19.1 The Contractor shall be responsible for the care, preservation, conservation, and protection of all
materials, supplies, machinery, equipment, tools, apparatus, accessories, facilities, and all means of
construction, and any and all parts of the work whether the Contractor has been paid, partially paid, or
not paid for such work, until the date the City issues its certificate of completion to Contractor. The City
reserves the right, after the bids have been opened and before the contract has been awarded, to require
of a bidder the following information:
19.1.1 The experience record of the bidder showing completed jobs of a similar nature to the one
covered by the intended contract and all work in progress with bond amounts and percentage
completed.
19.1.2 A sworn statement of the current financial condition of the bidder.
19.1.3 Equipment schedule.
20. TEXAS STATE SALES TAX
20.1 This contract is issued by an organization which qualifies for exemption provisions pursuant to provisions
of Article 20.04 of the Texas Limited Sales, Excise and Use Tax Act.
20.2 The Contractor must obtain a limited sales, excise and use tax permit which shall enable him to buy the
materials to be incorporated into the work without paying the tax at the time of purchase.
21. PROTECTION OF SUBSURFACE LINES AND STRUCTURES
21.1 It shall be the Contractor's responsibility to prosecute the work contemplated by the contract documents
in such a way as to exercise due care to locate and prevent damage to all underground pipelines, utility
lines, conduits or other underground structures which might or could be damaged by Contractor during
the construction of the project contemplated by these contract documents. The City of Lubbock agrees
that it will furnish Contractor the location of all such underground lines and utilities of which it has
knowledge. However, such fact shall not relieve the Contractor of his responsibilities aforementioned.
All such underground lines or structures cut or damaged by Contractor during the prosecution of the work
contemplated by this contract shall be repaired immediately by Contractor to the satisfaction of the City
of Lubbock, Texas, at Contractor's expense.
22. BARRICADES AND SAFETY MEASURES
22.1 The contractor shall, at his own expense, furnish and erect such barricades, fences, lights and danger
signals, and shall take such other precautionary measures for the protection of persons, property and the
work as may be necessary. The Contractor will be held responsible for all damage to the work due to
failure of barricades, signs, and lights to protect it, and when damage is incurred, the damaged portion
shall be immediately removed and replaced by Contractor at his own cost and expense. The Contractor's
responsibility for maintenance of barricades, signs, and lights shall not cease until the date of issuance to
Contractor of City's certificate of acceptance of the project.
23. EXPLOSIVES
23.1 The use of explosives will not be permitted unless written permission to do so is obtained by the
Contractor from the City. In all cases where written permission is obtained for the use of explosives, the
Contractor shall assume full responsibility for all damage, which may occur as a direct or indirect result
of the blasting. In addition, in all cases where explosives are authorized to be used, the Contractor shall
use utmost care so as not to endanger life or property and the Contractor shall further use only such
methods as are currently utilized by persons, firms, or corporations engaged in similar type of
construction activity.
23.2 Explosive materials shall not be stored or kept at the construction site by the Contractor.
23.3 In all cases where explosives are to be used during the construction of the project contemplated by this
contract, it shall be the duty of the Contractor to notify each utility company having structures (above or
below the ground) in proximity to the site of the work of Contractor's intention to use explosives, and
such notice shall be given sufficiently in advance to enable the companies to take such steps as they may
deem necessary to protect their property from injury. Such notice, however, shall not relieve the
Contractor of responsibility for any damage resulting from his blasting operations.
24. CONTRACTOR'S REPRESENTATIVE
24.1 The successful bidder shall be required to have a responsible local representative available at all times
while the work is in progress under this contract. The successful bidder shall be required to furnish the
name, address and telephone number where such local representative may be reached during the time
that the work contemplated by this contract is in progress.
25. INSURANCE
25.1 The Contractor shall not commence work under this contract until he has obtained all insurance as
required in the General Conditions of the contract documents, from an underwriter authorized to do
business in the State of Texas and satisfactory to the City. Proof of coverage shall be furnished to the
City and written notice of cancellation or any material change will be provided ten (10) days in advance
of cancellation or change. All policies shall contain an agreement on the part of the insurer waiving the
right to subrogation. The Contractor shall procure and carry at his sole cost and expense through the life
of this contract, insurance protection as hereinafter specified. Coverage in excess of that specified herein
also shall be acceptable. Such insurance shall be carried with an insurance company authorized to
transact business in the State of Texas and shall cover all operations in connection with this contract,
whether performed by the Contractor or a subcontractor, or separate policies shall be provided covering
the operation of each subcontractor. A certificate of insurance specifying each and all coverages shall be
submitted before contract execution.
25.2 PROOF OF COVERAGE SHALL BE FURNISHED TO THE CITY OF LUBBOCK IN THE FORM
OF A CERTIFICATE OF INSURANCE. THE INSURANCE CERTIFICATES FURNISHED SHALL
NAME THE CITY OF LUBBOCK AS ADDITIONAL INSURED ON AUTO/GENERAL LIABILITY
ON A PRIMARY AND NON-CONTRIBUTORY BASIS TO INCLUDE PRODUCTS OF COMPLETE
OPERATIONS. PROVIDE A WAIVER OF SUBROGATION IN FAVOR OF THE CITY OF
LUBBOCK. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO PROVIDE TO THE
OWNER ALL PROOF OF COVERAGE INSURANCE DOCUMENTS INCLUDING WORKERS
COMPENSATION COVERAGE FOR EACH SUBCONTRACTOR. COPIES OF THE
ENDORSEMENTS ARE REQUIRED.
26. LABOR AND WORKING HOURS
26.1 Attention of each bidder is particularly called to the schedule of general prevailing rate of per diem wages
included in these contract documents. The wage rate that must be paid on this project shall not be less
than specified in the schedule of general prevailing rates of per diem wages as above mentioned. The
bidders' attention is further directed to the requirements of Texas Government Code, Chapter 2258,
Prevailing Wage Rates providing for the payment of the wage schedules above mentioned and the
bidder's obligations thereunder. The inclusion of the schedule of general prevailing rate of per diem
wages in the contract documents does not release the Contractor from compliance with any wage law
that may be applicable. Construction work under the contract requiring an inspector shall not be
performed on weekends or holidays unless the following conditions exist:
26.1.1 The project being constructed is essential to the City of Lubbock's ability to provide the
necessary service to its citizens.
26.1.2 Delays in construction are due to factors outside the control of the Contractor. The
Contractor is approaching the penalty provisions of the contract and Contractor can show he
has made a diligent effort to complete the contract within the allotted time.
26.1.3 Before construction work requiring an inspector is to be performed on Sunday or holidays,
the Contractor must notify the Owner's Representative not less than three full working days
prior to the weekend or holiday he desires to do work and obtain written permission from the
Owner's Representative to do such work. The final decision on whether to allow construction
work requiring an inspector on Sunday or holidays will be made by the Owner's
Representative.
26.2In any event, if a condition should occur or arise at the site of this project or from the work being done
under this contract which is hazardous or dangerous to property or life, the Contractor shall immediately
commence work, regardless of the day of the week or the time of day, to correct or alleviate such
condition so that it is no longer dangerous to property or life.
27. PAYMENT OF EMPLOYEES AND FILING OF PAYROLLS
27.1 The contractor and each of his subcontractors shall pay each of his employees engaged in work on the
project under this contract in full (less mandatory legal deductions) in cash, or by check readily cashable
without discount, not less often than once each week. The Contractor and each of his subcontractors
shall keep a record showing the name and occupation of each worker employed by the Contractor or
subcontractor in the construction of the public work and the actual per diem wages paid to each worker.
This record shall be open at all reasonable hours to inspection by the officers and agents of the City. The
Contractor must classify employees according to one of the classifications set forth in the schedule of
general prevailing rate of per diem wages, which schedule is included in the contract documents. The
Contractor shall forfeit as a penalty to the City of Lubbock on whose behalf this contract is made, sixty
dollars ($60) for each laborer, workman, or mechanic employed for each calendar day, or portion thereof,
such laborer, workman or mechanic is paid less than the wages assigned to his particular classification
as set forth in the schedule of general prevailing rate of per diem wages included in these contract
documents.
28. PROVISIONS CONCERNING ESCALATION CLAUSES
28.1 Bids submitted containing any conditions which provide for changes in the stated bid price due to
increases or decreases in the cost of materials, labor or other items required for the project will be rejected
and returned to the bidder without being considered.
29. PREPARATION FOR BID
29.1 The bidder shall submit his bid on forms furnished by the City, and all blank spaces in the form shall be
correctly filled in, stating the price in numerals for which he intends to do the work contemplated or
furnish the materials required. Such prices shall be written in ink, distinctly and legibly, or typewritten.
In case of discrepancy between the unit price and the extended total for a bid item, the unit price will be
taken. A bid that has been opened may not be changed for the purpose of correcting an error in the bid
price.
29.2 If the bid is submitted by an individual, his name must be signed by him or his duly authorized agent. If
a bid is submitted by a firm, association, or partnership, the name and address of each member must be
given and the bid signed by a member of the firm, association or partnership, or person duly authorized.
If the bid is submitted by a company or corporation, the company or corporate name and business address
must be given, and the bid signed by an official or duly authorized agent. Powers of attorney authorizing
agents or others to sign bids must be properly certified and must be in writing and submitted with the
bid.
29.3 Pursuant to Texas Local Government Code 252.043(g), a competitive sealed bid that has been opened
may not be changed for the purpose of correcting an error in the bid price. THEREFORE, ANY
CORRECTIONS TO THE BID PRICE MUST BE MADE ON THE BID SUBMITTAL FORM PRIOR
TO BID OPENING.
29.4 Bid submittals may be withdrawn and resubmitted at any time before the time set for opening of the bids,
but no bid may be withdrawn or altered thereafter.
30. BOUND COPY OF CONTRACT DOCUMENTS
30.1 Bidder understands and agrees that the contract to be executed by bidder shall be bound and will include
the following:
(a) Notice to Bidders.
(b) General Instructions to Bidders.
(c) Bidder's Submittal.
(d) Statutory Bonds (if required).
(e) Contract Agreement.
(f) General Conditions.
(g) Special Conditions (if any).
(h) Specifications.
(i) Insurance Certificates for Contractor and all Sub -Contractors.
(j) All other documents made available to bidder for his inspection in accordance with the
Notice to Bidders.
29.2 If Plans and Specifications are too bulky or cumbersome to be physically bound, they are to be
considered incorporated by reference into the aforementioned contract documents.
31. QUALIFICATIONS OF BIDDERS
31.1 The bidder may be required before the award of any contract to show to the complete satisfaction of the
City of Lubbock that it has the necessary facilities, ability, and financial resources to provide the service
specified therein in a satisfactory manner. The bidder may also be required to give a past history and
references in order to satisfy the City of Lubbock about the bidder's qualifications. The City of Lubbock
may make reasonable investigations deemed necessary and proper to determine the ability of the bidder
to perform the work, and the bidder shall furnish to the City of Lubbock all information for this purpose
that may be requested. The bidder's bid may be deemed not to meet specifications or the bid may be
rejected if the evidence submitted by, or investigation of, the bidder fails to satisfy the City of Lubbock
that the bidder is properly qualified to carry out the obligations of the contract and to complete the work
described therein. Evaluation of the bidder's qualifications shall include:
(a) The ability, capacity, skill, and financial resources to perform the work or provide the
service required.
(b) The ability of the bidder to perform the work or provide the service promptly or within the
time specified, without delay or interference.
(c) The character, integrity, reputation, judgment, experience, and efficiency of the bidder.
(c) The quality of performance of previous contracts or services.
(d) The safety record of the Contractor and proposed Sub -Contractors
31.2 Before contract award, the recommended contractor for this project may be required to show that he has
experience with similar projects that require the Contractor to plan his work efforts and equipment needs
with City of Lubbock specifications in mind. Demonstration of experience shall include a complete list
of ALL similar municipal and similar non -municipal current and completed projects for the past three
(3) years for review. This list shall include the names of supervisors and type of equipment used to
perform work on these projects. In addition, the Contractor may be required to provide the name(s) of
supervisor(s) that will be used to perform work on this project in compliance with City of Lubbock
specifications herein.
32. PLANS FOR THE CONTRACTOR
32.1 The contractor will, upon written request, be furnished up to five sets of plans and specifications and
related contract documents for use during construction. Plans and specifications for use during
construction will only be furnished directly to the Contractor. The Contractor shall then distribute copies
of plans and specifications to suppliers, subcontractors or others, as required for proper prosecution of
the work contemplated by the Contractor.
33. ANTI -LOBBYING PROVISION
33.1 DURING THE PERIOD BETWEEN THE BID CLOSE DATE AND THE CONTRACT AWARD,
BIDDERS, INCLUDING THEIR AGENTS AND REPRESENTATIVES, SHALL NOT DIRECTLY
DISCUSS OR PROMOTE THEIR BID WITH ANY MEMBER OF THE LUBBOCK CITY COUNCIL
OR CITY STAFF EXCEPT IN THE COURSE OF CITY -SPONSORED INQUIRIES, BRIEFINGS,
INTERVIEWS, OR PRESENTATIONS, UNLESS REQUESTED BY THE CITY.
33.2 This provision is not meant to preclude bidders from discussing other matters with City Council members
or City staff. This policy is intended to create a level playing field for all potential bidders, assure that
contract decisions are made in public, and to protect the integrity of the bid process. Violation of this
provision may result in rejection of the bidder's bid.
34. PREVAILING WAGE RATES
34.1 Bidders are required to comply with Texas Government Code, Chapter 2258, Prevailing Wage Rates,
with respect to the payment of prevailing wage rates for the construction of a public work, including a
building, highway, road, excavation, and repair work or other project development or improvement, paid
for in whole or in part from public funds, without regard to whether the work is done under public
supervision or direction. A worker is employed on a public work if the worker is employed by the
contractor or any subcontractor in the execution of the contract for the project
34.2 A worker employed on a public work by or on behalf of the City of Lubbock shall be paid not less than
the general prevailing rate of per diem wages for the work of a similar character in the locality in which
the work is performed, and not less than the general prevailing rate of per diem wages for legal holiday
and overtime work.
34.3 A contractor or subcontractor who violates Texas Government Code Section 2258.023 shall pay to the
City of Lubbock sixty dollars ($60) for each worker employed for each calendar day or part of the day
that the worker is paid less than the wage rates stipulated in the contract.
35. PROTEST
35.1 All protests regarding the ITB process must be submitted in writing to the City Director of Purchasing
and Contract Management within 5 working days after the protesting party knows of the occurrence of
the action which is protested relating to advertising of notices deadlines, proposal opening and all other
related procedures under the Local Government Code, as well as any protest relating to alleged
improprieties with the ITB process. This limitation does not include protests relating to staff
recommendations as to award of contract. Protests relating to staff recommendations may be directed to
the City Manager. All staff recommendations will be made available for public review prior to
consideration by the City Council as allowed by law.
35.2 FAILURE TO PROTEST WITHIN THE TIME ALLOTTED SHALL CONSTITUTE A
WAIVER OF ANY PROTEST.
Page Intentionally Left Blank
BID SUBMITTAL FORM
Page Intentionally Left Blank
BID SUBMITTAL FORM
UNIT PRICE BID CONTRACT
DATE:
PROJECT NUMBER: ITB 23-17005-KM, Asphalt Patching
(hereinafter called
To the Honorable Mayor and City Council City of Lubbock, Texas (hereinafter called Owner)
Ladies and Gentlemen:
The Bidder, in compliance with your Invitation to Bid for the construction of the referenced project, having
carefully examined the plans, specifications, instructions to bidders, notice to bidders and all other related
contract documents and the site of the intended work, and being familiar with all of the conditions surrounding
the construction of the intended project including the availability of materials and labor, hereby intends to
furnish all labor, materials, and supplies; and to construct the project in accordance with the plans, specifications
and contract documents, within the time set forth therein and at the price stated.
The bidder binds himself on acceptance of his bid to execute a contract and any required bonds, according to
the accompanying forms, for performing and completing the said work within the time stated and for the prices
stated.
Bidder hereby agrees to commence the work on the above project on a date to be specified in a written "Notice
to Proceed" of the Owner and to substantially complete the project within 115 consecutive calendar days
with final completion of the project within 120 consecutive calendar days as stipulated in the specification
and other contract documents. Bidder hereby further agrees to pay to Owner as liquidated damages in the sum
of $1,204.28 for each consecutive calendar day after substantial completion and liquidated damages in the
sum of $1,204.28 for each consecutive calendar day after final completion set forth herein above for completion
of this project, all as more fully set forth in the General Conditions of the Agreement.
Bidder understands and agrees that this bid submittal shall be completed and submitted in accordance with
instruction number 29 of the General Instructions to Bidders.
Bidder understands that the Owner reserves the right to reject any or all bids and to waive any formality in the
bidding.
The Bidder agrees that this bid shall be good and may not be withdrawn for a period of 60 calendar days after
the scheduled closing time for receiving bids.
The undersigned Bidder hereby declares that he has visited the site of the work and has carefully examined the
plans, specifications and contract documents pertaining to the work covered by this bid, and he further agrees
to commence work on or before the date specified in the written notice to proceed, and to substantially complete
the work on which he has bid; as provided in the contract documents.
Bidders are required, whether or not a payment or performance bond is required, to submit a cashier's check or
certified check issued by a bank satisfactory to the City of Lubbock, or a bid bond from a reliable surety
company, payable without recourse to the order of the City of Lubbock in an amount not less than five percent
(5%) of the total amount of the bid submitted as a guarantee that bidder will enter into a contract, obtain all
required insurance policies, and execute all necessary bonds (if required) within 10 business days after notice
of award of the contract to him.
12123I'22 1:44 PM
City of Lubbock, TX
Public Works
ITB 23-17005-KM
Ashpalt Patching
Lone Star Dirt & Paving, Ltd Lubbock, TX
QTY Unit Extended
# Items +�_ U/M Price Cost
Base Bid
#1-1 Patching with Black Base, 3" depth (milling to a depth of 5", 5000 SY $67.10 335,500.00
with replacement of 3" Black Base and 2" Type D Hot Mix),
including labor, equipment, removal and disposal of asphaltic
surface, caliche base and sub -grade (if soft or unstable) to a
depth of 5" and replacing with 3" of Black Base and 2" Type
D Hot Mix. (All Millings will go to the City of Lubbock.)
#1-2 Patching with Black Base, 6" depth (milling to a depth of 8", 3000 SY 84.70 254,100.00
with replacement of 6" Black Base and 2" Type C Hot Mix),
including labor, equipment, removal and disposal of asphaltic
surface, caliche base and sub -grade (if soft or unstable) to a
depth of 8" and replacing with 6" of Black Base and 2" Type
C Hot Mix.
#1-3 Patching with Black Base, 9" depth (milling to a depth of 11", 1500 SY 150.70 226,050.00
with replacement of 9" Black Base and 2" Type C Hot Mix),
including labor, equipment, removal and disposal of asphaltic
surface, caliche base and sub -grade (if soft or unstable) to a
depth of 11" and replacing with 9" of Black Base and 2" Type
C Hot Mix.
#1-4 Patching with 2 sack flowable fill, 6"depth, (milling to a depth 100 SY 330.00 33,000.00
of 8 ",with replacement of 6" 2 sack flowable fill and 2" Type
D or C Hot Mix), including labor, equipment, removal and
disposal of asphaltic surface, caliche base and sub -grad (if soft
or unstable) to a depth of 8" and replacing with 6" of 2 sack
flowable fill and 2" Type D or C Hot Mix.
#1-5 Patching with Hot Mix, 2" depth, (milling to a depth of 2" 11500 SY 45.10 518,650.00
with Replacement of 2" Type D or C Hot Mix), including
labor, equipment, removal and disposal of asphaltic surface,
caliche base and sub -grade ( if soft or unstable) to a depth Of
2" and replacing with 2" of Type D or C Hot Mix. (All
Millings will go to the City of Lubbock.)
#1-6 Mobilization 1 LS 85,000.00 85,000.00
Total (Items 1-1 through 1-6): 11452,300.00
Enclosed with this bid is a Cashier's Check or Certified Check for
Dollars ($ } or a Bid Bond in the sum of
Dollars ($ }, which it is agreed shall be collected and
retained by the Owner as liquidated damages in the event the bid is accepted by the Owner and the
undersigned fails to execute the necessary contract documents, insurance certificates, and the required
bond (if any) with the Owner within 10 business days after the date of receipt of written notification of
acceptance of said bid; otherwise, said check or bond shall be returned to the undersigned upon
demand.
Bidder understands and agrees that the contract to be executed by Bidder shall be bound and include all contract
documents made available to him for his inspection in accordance with the Notice to Bidders.
Pursuant to Texas Local Government Code 252.043(g), a
competitive sealed bid that has been opened may not be
changed for the purpose of correcting an error in the bid price.
THEREFORE, ANY CORRECTIONS TO THE BID PRICE
MUST BE MADE ON THE BID SUBMITTAL FORM PRIOR
TO BID OPENING.
(Seal if Bidder is a Corporation)
ATTEST:
Secretary
Bidder acknowledges receipt of the following addenda:
Addenda No.
Date
Addenda No.
Date
Addenda No.
Date
Addenda No. !
_ _ Date_
M/WBE
Finn:
Date:-
Autho aw
(Printed or Typed Name)
k4V
Company
2 J 'v
Address /--4
City, County
State Zip Code
Telephone: 90 4.-
Fax: go 6 -
FEDERAL TAX ID or SOCIAL SECURITY No.
q,6o0 l3a
EMAIL: Ja v« S-f!5 r S�pw� 11 �- 5 - bnIull4 . ne
Woman
acR Amencan
Native American
ispamc
American
Asian Pacific
American
Offier (Specify)
1212311'22 1:44 PM
INSURANCE REQUIREMENTS
I, the undersigned Bidder certify that the insurance requirements contained in this bid document have been
reviewed by me and my Insurance Agent/Broker. If I am awarded this contract by the City of Lubbock, I will
be able to, within ten (10) business days after being notified of such award by the City of Lubbock, furnish a
valid insurance certificate to the City meeting all of the requirements defined in this bid.
If the time requirement specified above is not met, the City has the right to reject this proposal and award the
contract to another contractor. If you have any questions concerning these requirements, please contact the
Director of Purchasing & Contract Management for the City of Lubbock at (806) 775-2572.
SUSPENSION AND DEBARMENT CERTIFICATION
Federal Law (A-102 Common Rule and OMB Circular A-110) prohibits non -Federal entities from contracting
with or making sub -awards under covered transactions to parties that are suspended or debarred or whose
principals are suspended or debarred. Covered transactions include procurement contracts for goods or services
equal to or in excess of $25,000 and all non -procurement transactions (e.g., sub -awards to sub -recipients).
Contractors receiving individual awards of $25,000 or more and all sub -recipients must certify that their
organization and its principals are not suspended or debarred by a Federal agency.
Before an award of $25,000 or more can be made to your firm, you must certify that your organization and its
principals are not suspended or debarred by a Federal agency.
I, the undersigned agent for the firm named below, certify that neither this firm nor its principals are suspended
or debarred by a Federal agency.
TEXAS GOVERNMENT CODE SECTION 2252.152
The undersigned representative of the undersigned company or business, being an adult over the age of eighteen
(18) years of age, pursuant to Texas Government Code, Chapter 2252, Section 2252.152, certify that the
company named above is not listed on the website of the Comptroller of the State of Texas concerning the
listing of companies that are identified under Section 806.051, Section 807.051 or Section 2253.153. I further
certify that should the above -named company enter into a contract that is on said listing of companies on the
website of the Comptroller of the State of Texas, which do business with Iran, Sudan or any Foreign Terrorist
Organization, I will immediately notify the City of Lubbock Purchasing and Contract Department.
TEXAS GOVERNMENT CODE SECTION 2271.002
Company hereby certifies the following:
1. Company does not boycott Israel; and
2. Company will not boycott Israel during the term of the contract.
The following definitions apply to this state statute:
(1) "Boycott Israel" means refusing to deal with, terminating business activities with, or otherwise taking any
action that is intended to penalize, inflict economic harm on, or limit commercial relations specifically with
Israel, or with a person or entity doing business in Israel or in an Israeli -controlled territory, but does not include
an action made for ordinary business purposes; and
(2) "Company" means an organization, association, corporation, partnership, joint venture, limited partnership,
limited liability partnership, or limited liability company, including a wholly owned subsidiary, majority -owned
subsidiary, parent company, or affiliate of those entities or business associations that exists to make a profit.
12/23/122 1:51 PM
This Certification is required from a Company if the Company has 10 or more full-time employees and
the contract for goods or services (which includes contracts formed through purchase orders) has a
value of $100,000 or more that is to be paid wholly or partly from public funds of the governmental
entity.
TEXAS GOVERNMENT CODE 2274
By entering into this Agreement, Contractor verifies that: (1) it does not, and will not for the duration of the
contract, have a practice, policy, guidance, or directive that discriminates against a firearm entity or firearm
trade association or (2) the verification required by Section 2274.002 of the Texas Government Code does not
apply to the contract.
If Contractor is a company with 10 or more full-time employees and if this Agreement has a value of at least
$100,000 or more, Contractor verifies that, pursuant to Texas Government Code Chapter 2274, it does not have
a practice, policy, guidance, or directive that discriminates against a firearm entity or firearm trade association;
and will not discriminate during the term of the contract against a firearm entity or firearm trade association.
Contractor represents and warrants that: (1) it does not, and will not for the duration of the contract, boycott
energy companies or (2) the verification required by Section 2274.002 of the Texas Government Code does not
apply to the contract.
If Contractor is a company with 10 or more full-time employees and if this Agreement has a value of at least
$100,000 or more, Contractor verifies that, pursuant to Texas Government Code Chapter 2274, it does not
boycott energy companies; and will not boycott energy companies during the term of the Agreement. This
verification is not required for an agreement where a governmental entity determines that these requirements
are inconsistent with the governmental entity's constitutional or statutory duties related to the issuance,
incurrence, or management of debt obligations or the deposit, custody, management, borrowing, or investment
of funds.
,Agreement Example
Review
This sample Agreement has been reviewed and
( ) is acceptable
( ) is acceptable as noted
12/23I1122 1:51 PM
Contractor Acknowledgement
In compliance with this solicitation, the undersigned bidder, having examined the bid documents,
instructions to bidders, documents associated with the invitation to bid, and being familiar with the
conditions to be met has reviewed the above information regarding:
• Insurance Requirements
• Suspension and Debarment Certification
• Texas Government Code Section 2252.152
• Texas Government Code Section 2271.002
• Texas Government Code 2274
An individual authorized to bind the company must sign the following section. Failure to execute this portion
may result in bid rejection.
By signing below, the terms stated have been reviewed and approved.
Company Name: _ a/
Signed By: n
Print Name and Title:e,,.�{,, P ``,
Date: / -
121231'22 1.51 PM
Endurance
Endurance Assurance Corporation
Bid Bond
Know all men by these presents:
That we, the undersigned LONE STAR DIRT & PAVING, LTD
11820 UNIVERSITY AVENUE, LUBBOCK, TX 79423
and Endurance Assurance Corporation
Delaware corporation (hereinafter the
City of Lubbock
1314 Ave K Floor 9, Lubbock TX 79401
sum of
as Principal (hereinafter the "Principal"),
1221 Avenue of the Americas, 18th FI, New York, NY 10020 , a
"Surety"), are held and firmly bound unto
5% OF AMOUNT BID
(hereinafter the "Obligee") in the penal
$ , for the payment of which sum the Principal and Surety bind themselves, their heirs, executors,
administrators, successors and assigns, jointly and severally, as provided herein.
Whereas, the Principal has submitted a bid for
Patching ITB23-17005-KM
Now, therefore, if the Obligee shall accept the bid of the Principal and the Principal shall enter into a contract with
the Obligee in accordance with the terms of such bid, and give such bond or bonds as may be specified in the bidding or
contract documents with good and sufficient surety for the faithful performance of such contract and for the prompt
payment of labor and materials furnished in prosecution thereof, or in the event of the failure of the Principal to enter into
such contract and give such bond or bonds, if the Principal shall pay to the Obligee the difference, not to exceed the penalty
hereof between the amount specified in said bid and such larger amount for which the Obligee may reasonably contract
with another party to perform the work covered by said bid, then this obligation shall be null and void, otherwise to remain
in full force and effect. The liability of the Surety hereunder shall in no event exceed the lesser of: (a) the penalty hereof; or
(b) the difference between the amount specified in the Principal's bid and any larger amount for which the Obligee
reasonably contracts with another party to perform the work specified in the Principal's bid.
Signed and sealed this 28 day of December 2022
(SEAL)
Principal: LONE STAR DIRTAAAVING, LT
By:
Name & Title:
SureZDaTaylor,
urance Ass anc C poration
By:�'
NamATTORNIN IN FACT
(Attorney -in -Fact)
Endurance Assurance Corporation
Page 1 of 1
SUR 0205 0716
121231'22 1.43 PM
SOMPO INTERNATIONAL
POWER OF ATTORNEY
9395
KNOW ALL BY THESE PRESENTS, that Endurance Assurance Corporation, a Delaware corporation, Endurance American Insurance Company, a Delaware
corporation, Lexon Insurance Company, a Texas corporation, and/or Bond Safeguard Insurance Company, a South Dakota corporation, each, a "Company" and
collectively, "Sompo International," do hereby constitute and appoint: Kirk Killough, Alicia Grumbles, Tracy L. Miller, Mitchell Jennings, James R. Reid, Carey Brent
Aycock, Dawn Taylor, Aaron Endris, Mary Ellen Moore, Tricia Balolong as true and lawful Attomey(s)-In-Fact to make, execute, seal, and deliver for, and on its behalf as
surety or co -surety; bonds and undertakings given for any and all purposes, also to execute and deliver on its behalf as aforesaid renewals, extensions, agreements, waivers,
consents or stipulations relating to such bonds or undertakings provided, however, that no single bond or undertaking so made, executed and delivered shall obligate the
Company for any portion of the penal sum thereof in excess of the sum of ONE HUNDRED MILLION Dollars ($100,000,000.00).
Such bonds and undertakings for said purposes, when duly executed by said attomey(s)-in-fact, shall be binding upon the Company as fully and to the same extent as if
signed by the President of the Company under its corporate seal attested by its Corporate Secretary.
This appointment is made under and by authority of certain resolutions adopted by the sole shareholder of each Company by unanimous written consent effective the 15th
day of June, 2019, a copy of which appears below under the heading entitled "Certificate".
This Power of Attorney is signed and sealed by facsimile under and by authority of the following resolution adopted by the sole shareholder of each Company by
unanimous written consent effective the 15th day of June, 2019 and said resolution has not since been revoked, amended or repealed:
RESOLVED, that the signature of an individual named above and the seal of the Company may be affixed to any such power of attorney or any certificate relating thereto
by facsimile, and any such power of attorney or certificate bearing such facsimile signature or seal shall be valid and binding upon the Company in the future with respect
to any bond or undertaking to which it is attached.
June, 2019.
IN WITNESS WHEREOF, each Company has caused this instrument to be signed by the following officers, and its corporate seal to be affixed this 151h day of
EnciRrance Assurance Corporatio
By.
4XI �`
Richard Appel;,�904164,enior ounsel
,p�'SSUiaryoe �y�
ORp04T COys
,02
,nEtAwAriE;
a
iy k+nrkNtww`�rw'
Endurance American
InBuranc.p
By:.l 1 L,
Richard Appel;,.Eftlf�_ enior Counsel
Gan
a� Fs �o
s1gU 019
1996
{ A DEI AWARrE •�
Lexon Insurance Company
By°
Ric and Appel; �Senidr Cot
'U.0 ' ACKNOWLEDGEMENT
By:
Bond Safeguard
14' SOUTH
DAKOTA
q INSURANCE
1y _ COM11ANY
On this 15t^ day of June, 2019, before me, personally came the above signatories known to me, who being duly sworn, did depose and say that he/ttie �t9F' 4f�cer of each
of the Companies; and that he executed said instrument on behalf of each Company by authority of his oft under th by ws of each CompanK��......, av
sum % _
7E�fE
By:NOTW
Amy aylor, No ublic My Commissi$n Expire—,
CERTIFICATE 11"Aid•-•.. `
�Nlftannk
I, the undersigned Officer of each Company, DO HEREBY CERTIFY that:
1. That the original power of attorney of which the foregoing is a copy was duly executed on behalf of each Company and has not since been revoked, amended or modified;
that the undersigned has compared the foregoing copy thereof with the original power of attorney, and that the same is a true and correct copy of the original power of
attorney and of the whole thereof,
2. The following are resolutions which were adopted by the sole shareholder of each Company by unanimous written consent effective June 15, 2019 and said resolutions
have not since been revoked, amended or modified:
"RESOLVED, that each of the individuals named below is authorized to make, execute, seal and deliver for and on behalf of the Company any and all bonds,
undertakings or obligations in surety or co -surety with others: RICHARD M. APPEL, BRIAN J. BEGGS, CHRISTOPHER DONELAN, SHARON L. SIMS,
CHRISTOPHER L. SPARRO, MARIANNE L. WILBERT
; and be it further
RESOLVED, that each of the individuals named above is authorized to appoint attomeys-in-fact for the purpose of making, executing, sealing and delivering bonds,
undertakings or obligations in surety or co -surety for and on behalf of the Company."
3. The undersigned further certifies that the above resolutions are true and correct copies of the resolutions as so recorded and of the whole thereof.
IN WITNESS WHEREOF, I have hereunto set my hand and affixed the corporate seal this 28TH day of DECEMBER , 2022
By:
Dante S. rie, retary
NOTICE: U. S. TREASURY DEPARTMENT'S OFFICE OF FOREIGN ASSETS CONTROL IOFAr%
No coverage is provided by this Notice nor can it be construed to replace any provisions of any surety bond or other surety coverage provided. This Notice provides information concerning
possible impact on your surety coverage due to directives issued by OFAC. Please read this Notice carefully.
The Office of Foreign Assets Control (OFAC) administers and enforces sanctions policy, based on Presidential declarations of "national emergency'. OFAC has identified and listed
numerous foreign agents, front organizations, terrorists, terrorist organizations, and narcotics traffickers as "Specially Designated Nationals and Blocked Persons". This list can be located
on the United States Treasury's website — h s•//www.treasu ov/resource- nter/sanctions/SDN-List.
In accordance with OFAC regulations, if it is determined that you or any other person or entity claiming the benefits of any coverage has violated U.S. sanctions law or is a Specially
Designated National and Blocked Person, as identified by OFAC, any coverage will be considered a blocked orfrozen contract and all provisions of any coverage provided are immediately
subject to OFAC. When a surety bond or other form of surety coverage is considered to be such a blocked or frozen contract, no payments nor premium refunds may be made without
authorization from OFAC. Other limitations on the premiums and payments may also apply.
Any reproductions are void.
Surety Claims Submission: LexonClaimAdministration som o-intl.com
Telephone: 615-553-9600 Mailing Address: Sompo International; 12890 Lebanon Road; Mount Juliet, TN 37122-2870
12/23/122 1:43
Policyholder Notice
TEXAS - IMPORTANT NOTICE AVISO IMPORTANTE
To obtain information or make a complaint: Para obtener informacion o para someter una
You may call the company's telephone number for queja:
information or to make a complaint at: Usted puede Ilamar al numero de telefono de la
compania para informacion o para someter una
queja al:
1-877-676-7575
You may write the Company at:
Endurance Assurance Corporation
Attention: Surety
1221 Avenue of the Americas, 18th Floor
New York, NY 10020
You may contact the Texas Department of
Insurance to obtain information on companies,
coverages, rights or complaints at:
1-800-252-3439
You may write the
Texas Department of Insurance
PO Box 149104
Austin, TX 78714-9104
FAX# (512) 490-1007
Web: http://www.tdi. texas.eov
E-mail: ConsumerProtection tdi. texas. ov
1-877-676-7575
Usted tambien puede escribir a:
Endurance Assurance Corporation
Attention: Surety
1221 Avenue of the Americas, 18th Floor
New York, NY 10020
Puede communicarse con el Departamento de
Seguros de Texas para obtener informacion acerca
de companias, coberturas, derechos o quejas al:
1-800-252-3439
Puede escribir al
Departamento de Seguros de Texas
PO Box 149104
Austin, TX 78714-9104
FAX# (512) 475-1771
Web: http://www.tdi. texas.sov
E-mail: ConsumerProtectlonCOtdi. texas.eou
PREMIUM OR CLAIM DISPUTES: Should you have a DISPUTAS SOBRE PRIMAS O RECLAMOS: Si tiene
dispute concerning your premium or about a claim una disputa concerniente a su prima o a un
you should contact the company first. If the dispute reclamo, debe comunicarse con la compania
is not resolved, you may contact the Texas primero. Si no se resuelve la disputa, puede
Department of Insurance. entonces comunicarse con el departamento (TDI).
ATTACH THIS NOTICE TO YOUR POLICY: This notice
is for information only and does not become a part
or condition of the attached document.
UNA ESTE AVISO A SU POLIZA: Este aviso es solo
para proposito de informacion y no se convierte en
parte o condicion del documento adjunto.
12123/'22 1.43I'M
Page Intentionally Left Blank
Contractors Statement of Qualifications
Individual contractors and joint ventures submitting a bid must complete the following evaluation information for the
Project. Joint ventures shall be composed of not more than two firms and each firm must complete separate
evaluations. Evaluation information must be submitted at time of bid submittal. Failure to submit the following
Bidder Evaluation information may result in the OWNER considering the bid non -responsive and result in rejection of
the bid by the OWNER. Bidders are to provide any additional information requested by the OWNER.
In evaluating a firm's qualifications, the following major factors will be considered:
A. FINANCIAL CAPABILITY:
For this project, the CONTRACTOR'S financial capability to undertake the project will be determined by the
CONTRACTOR'S ability to secure bonding satisfactory to the OWNER.
B. EXPERIENCE:
Do the organization and key personnel have appropriate technical experience on similar projects?
C. SAFETY:
Does the organization stress and support safety as an important function of the work process?
D. QUALITY OF WORK:
(1) Does the organization have a commitment to quality in every facet of their work - the process as well
as the product?
(2) Does the organization have a written quality philosophy and/or principles that exemplifies their
work? If so, submit as Attachment "A".
(3) Has this organization ever received an award or been recognized for doing "quality" work on a
project? If so, give details under Attachment "A".
E. CONFORMANCE TO CONTRACT DOCUMENTS:
(1) Does the organization have a commitment and philosophy to construct projects as designed and as
defined in the Contract Documents?
The OWNER reserves the right to waive irregularities in determining the firm's qualifications and reserves the right to
require the submission of additional information.
The qualifications of a firm shall not deprive the OWNER of the right to accept a bid, which in its judgement is the
lowest and best bid, to reject any and all bids, to waive irregularities in the bids, or to reject nonconforming, non-
responsive, or conditional bids. In addition, the OWNER reserves the right to reject any bid where circumstances and
developments have in the opinion of the OWNER changed the qualifications or responsibility of the firm.
Material misstatements on the qualifications forms may be grounds for rejection of the firm's bid on this project. Any
such misstatement, if discovered after award of the contract to such firm, may be grounds for immediate termination of
the contract. Additionally, the firm will be liable to the OWNER for any additional costs or damages to the OWNER
resulting from such misstatements, including costs and attorney's fees for collecting such costs and damages.
Complete the following information for your organization:
Page Intentionally Left Blank
i
�i
41211'21 8_54 A M
8odoo�s Aii� Aim - — l
���I��u�11n�r I
Aftu
nii
M.N
7mR�r 7 4
�+�re�aiaibik
L" dW�rWja-
Y� m l�blipgwpu(dAMNMR
Aa a Oa�a1 C Aa axhiii �1a>lwaw
w��dbW
awl dQ isaipder smt. see lea - _ No
ar■ �
ar `
�P�d�de�laa�at�er�t:N�l+lad� —`
nr a aPINa p�poar arpgi�
I i'' aa�arffdaai!��� part N i
aY�1�+M�rddrlrrflaaaylwraiial� �rii■�ti�a —
. 1hf. ' ar illlt
my" paoride � dam io � �rwlrrMli■� it ati�r 1i� -No f
Od'r��� awr ra�iwror r anti'
NO —
I° cm�al�rl�w�d _
f gpov�.Yiliiiaa�ra��, �a�rrlMA i
i
• 1 I
I
41211'21 8_54 A M
- — — -- —. y aw■e>w ea we Cowen" etrlt 1>lnetreae s ith a 1 wet
Leahade the>f>te essd ry P—"C' �edede r3wt w 10 lids deAEWW llseaeOM
I+io.
Sanders—P
Y resident Jatnm Martell ----,Asphalt Forma
Steve Turner ---Vice President
Arbrey Stockman —General Superintendent
Jesse Palacous---Concrete Fortran
Carlos Yannis--- Dirt Forman ,
Pt"sk a bQ �rpelned et h
._
Arbrey Stockman Is the general manager on this project.
1lravide ibrr ae-8w�e Ibr e b otrsen &r mail of dose by; Aim
Butt pheq ad atteote eeaMft as a etlecma ra WMPVWW
i� ss *Aftft WA UMM"m kcbIjW sqwdWO, mamp1w area mod
04ME4 wd p=W hm"W ABdpdarl —giW Oboe the Id" N d mWaeido hr aai
aodWros b r$oald,mm" "Duda itieieeb" � rd� meioer edam 16e jslt
i
��atllie�r �Y ebm&(ft Ab wxo Qmffi *-
e
--_— y Sia�kn�ari
ltgjeatealb4►oleAeer — rbray SiQC6 a Stfte-Turner
Q oon6�l r rbMrey —S � ley
Steve L
jrhl Pmmmd am to dam aeane elan a Ottbe adr H" dbom piD9 a ■� aaoreI 1
time wW be demoted is +ds 4 dim 10 me"se PW=kp att & dme
6W wits be dewaW ea each n1k Irdw iedtvWW ie aat b be d mftd ed* lb >hde PNWOK bbm* bwr bode it to
bed[dded �h�,s�, title peat a� Wit a1� swibm�
41211'21 8_54 A hi
Prapoud Pnjaet M=qP rs
fiMEbf% Bud= As A Lone Star Dirt & Paving
l�meafiiyidr�al _ n:y an
YsamBapadmoeaaPlgjeoter tfyearns
Years
Yew ofBspeeieoca t ocean T
NumbarofdMfiffpPji ft=Prgedbtwer — nr MAre
— - --
NWAbwat pejects inotiaspodlww—
Giarant Ptrpoct Ar�enta — — -
Name of Aodpmmt ON of i Used & 8giarated p
ihia h6*od _ ldion Date
nler Business Park _ ds Time
'mnshi ISD 9th Grade Center for each piojerA
�aa Cadact dim [listia mtnea indicate ■„r zor�ii b ooabOtinngFJF7
as siefaenoej y
Kame T ,j��jjerbCm iT son �` Nrme ritia/Fositian _ TgwP
�—m U C oun - �-
.7�.5-� � wn --_ __r`Super9nbendantan�
Name ofhM"dod
Yearn ofExpw moc asPi*CdNMr
Yam ofEwedmoo with tbi■ aVwi"w — -
Numra of amilarprojega Upwiader -
Nombw ofAmilar pe*m in other po ditm
QUM Pftftd AUWMMM_�--
Name ofA -
mk/Paeadoo -
n
JL_L
Candidde role an
Pmiect
Doom of Time Used hr F mtcd �p
woproiarrt Q,;- IdianiDate
-- bw
SUIR
- � Proied
role
41211'21 8_54 A M
Rvpftw> t �s
Eton As
Lone Star Dirt & Paving-`�
zn&vidw
an
0 Years
o6
*NmdwHE�
Years�je�
ofsiasilupaojecb is a16er posN=
_
--
��� -
- 10azLmorp
eAof
7Z.Z-
Time Used fbr
Bus_ Iness Park _
a`x
Spen sFreime
ns hip 1 p 9th Grade Center
�an
-
Name
n+m m igwidoat: r a moe}
'i&Wpodtion r -- " - -
Iemne .i�.Um
u oun -
� °e [1� 77�1�
_a�am _ `
Superintendant
�Qa "w General Super
=Pmjw
Yams ofEpesinoe as pwjoel - -
Yews OfEqmdmo Wi&
Nmnberafs�7arprojeataaap�� -- - ---
Nmabw afaim pgsW in othw paeM= -
ii+aotect - -�
NameofA$dpnM 14eoaat efTS w Used fbr project
this PtiD'ootCompkdmDjft
99drlPbsitron
- ,•"••"
Tftie✓Pbl�oa
_
� Tclapbow
Carndidate role an
Prniea
-�--�-� - �
�dabe role
-OIIFio�iact �,
1
41211'21 8_54 A M
Peaposed Pmjeet�
eDadndft As
T L ne Star Dirt 8 Povina_
Numsofluffivi&W
Colin Coe
YestRaf>lkpedemceaspr�aotMarq�pr
_
20 Years
Years of stmtmce �vlm s� oadtio�
Y
N�beQofsisssapa�eobaBpdQjeath
rs
20 -
Number feborpmo*inotberpoeiHo=-
�
15 —
45meat Piojeet Assi�aa
-
Naae ofAnsko eent
Passel of TYme Und r Fsdmabod� piQject
la n Be ou us new
Spends time
of Lubbock Business Paris
on each ro ed
PAhroom Caemat amaeaa
ink�110n
names
Natm asarntis�e
T'hidPbaidan -
7�I1dPiadtiaa ---� '- -
--
wP Parkhill
IPi+oieot -
—
��w�Y �aaaon Owners Rep —
-
Civil Engineer
Name of7a,�vidnsl
Yams of�tpmriaooa as pmject -`
-
Yeas op'�deooe with dlis off. Y
— -
Nmaba of dmilarpeq�ee(a as Frajoct Maa�gpr
ofdmi7arpapjaelaiaotlrsposhiomi �� _
-
G1maat Pta;jeat Aeaisnmenti - - - - —
Name of Aasiga wm
ftow of Time Used Aw >Betlmaled lmjeat
its P�o'eat LbmpladcmDab
E-mail —
can"ote rcle ee l
Pnoiaat
iiadrotima -- --
B aoeul
IOR
C ie eTole - -
cm Pfnieat
1I
41211'21 8:54 AM
r+gowd P uimd WagOde
AftM in A
r
...... ,s it 0 ITZI r
1711
1 ..�,-
sir"•
4Q_nrA nQM_y-ear&
23 dears
Qvw 7QQ
at�mcdl
MKIC
edge u11e
Cbedi&b IBC
eai0d
I�
i
41211'21 8:54 AI
Mom Qmftcpmkd ok"Aw
r �p10�J1�
r
41211'21 8:54 AM
�-Ielesley D. Senders
11820 University Avenue
Lubbock, Texas 79423
PROFILE
• Managed million dollar projects
4 Involved in all phases concrete and asphalt work
• Utilized creative thinking, and superior problem solving skills t4 overcome
challenges.
Highly motivated to improve efficiency and profitability of proAU through
Corttmunication and analysis of Methods.
0 Strong leadership skills ensure all contributors remain focused on Critical Success
Factors to achieve all objectives
• Managed multiple simultaneous projects
• Good computer skills
EXPERIENCE:
Over 30 years in the corWructlon industry: 20 years experience as a partner/owner.
Presently a Partner in Lone Star Dirt & Paving Company, in addition to Seven Sanders a
rolkd company, as well as sole owner of a over the road trucking company Sanders
Transportation.
CORE COMPETENCIES:
#Scheduling - Engineering - Material Management - Budgeting - Contract Negotiations -
i
Hands on Supervisor - Staff Training/Motivating,
RECENT PROJECTS:
City of Idalou - road excavation, curb & gutter work, hot mix, and erosion control
City of Lubbock - remove existing asphalt surface, and replace with concrete
City of Lubbock - Seal coat streets throughout the city
Lake Alan Henry G1 - asphalt paving repair, milting, asphalt paving replacement, caliche
road replacement and concrete work.
Lubbock ISD parking kris - demolish and rebuild three (3) parking lots
Cooper Technology Building - new bLdiding, curb & gutter work, sidewalks, asphalt &
concrete paving.
Cooper ISD softball complex - demolish existing complex and rebuilt complex. I
3e Street Project - Indiana Avenue to Avenue 0 Reconstruction,
41211'21 8:54 A M
S1 EPREN D. TURNER
3202 WOODROW ROAD
LUBBOM TO AS 79423
(806) 548-3721
PROFILE
I have been in the construction business for over 4o years and have worked with local
individual contractors as well as with the City, County and State. Successfully
completing multi -million dollar projects on time, fashion while building a positive
rapport with architects, engineers, local officials, vendors and clients while maintaining
costs. Versed in contract negotiations, project estimating, document preparation,
codes and regulations, material purchasing, site management.
Areas of Expertise fie in:
• Team Building & Leadership * Ouality Control Management
Permitting and Building Code * Safety & Compliance Management
• Construction Planning and Scheduling * Organization & Time Management
Critical Path Project Management * Vendor & Materials Management
• Budget Analysis * Estimating & Job Costing
EMPLOYEMENT HISTORY
Lone Star Dirt & Paving 1995 - Present
Plan, organize, and manage the overall projects. Responsibilities include blueprint
review and analysis of projects, preparation of construction documents, bidding,
negotiations, material purchasing, scheduling, project budget, building code
compliance, project development quality control.
Caprock Highway Construction 1983 —1993
W.D. Turner Construction 1976.1g83
KEY PROJECTS AND SELECTED ACCOMPLISHMENTS
• Tx Dot Highway reconstruction
• New Airport construction and renovation of existing runways and taxiways at
Reese Air Force Base and Dallas Naval Air Station
• City of Muleshoe
• Heavy Highway concrete paving in Greenville, Tx
• Seal coat of numerous Texas major highways in Districts all over Texas
• 34th Street Project— Indiana Ave to Ave Q reconstruction
1
41211'21 8_54 A hi
�tlt►±,�t ::tl
D(CW8rRuG"rm®NCBlm
Seaecaaasd Atgi�lt S'�gie0alant vdJw T}as va+o�d in•Aeplb � aan anpeatd a�BiRhvray Oaa»ltnaodoa fitr admaat
iamPackme No as fisaw and edvembg to equ%mvmt cam, bbde opeasaey
sq malt bbl mag And llm moiad to laapba8 wimbloodmL Boa saw of pmod vak pLDOr1',
MMXFT, 8edmat lw4oc% pk2M say *as nd dW pa*ala of ell eiam atf ► to ,1-lw_ ,i,- 2 ,
momp and movie aamplavm to alaaate a =506 od vea uffis as W v a a =pbd am of ell lob
h ffm ampiogeesbtt wmbdmdor Wpr avirionftdwpaet M25yma.
GRANtl'>sCDZQS' CompANY,L96bocsic TX YA2-268
::;:1 Wea'tif semi, L"bod,r T$ Tessa Dmt Of 2word_e&t1 2003--2010
The Rant ! Went shmp) 9MWM ie a five lhRi e, i9 wile B4bwptvjaat is ` TS dalip to
mdm empolfito oltd► and peaeido 1lalded oay to anal fiatece hes>,potta8aaa taede. The
paai atiganoeaat touohar rewsal posbob:m aaf iba adW, inobdtarg Tam Teeb Udvuft. Joeee Stadiac4
tbo ocnW i A m l dbtdak eaamdool a mlem end aelne d bo4* is god MMUD l der. Okuaitn bm
gateomW Wodt es the 1twavi caeteuW fin• all 4 pbarre of to pedact swaaaa I by TxDCT on hr t vmn
1 hwk% d who&& maitigh lam is veins- tub moiad'uaiiuft koddag, m dt
p fiasi job 1aldea. , S.>d & O:t3F., AUpdore t>fis af BmddoM JotsBaal Coab ad wading end rod
!'brae i .. mw pa*WW is d ph= caddded otdo wtaerahag, Am Sm to dx ]rasa, of apleaod u* 5.1
milao of Wat Loop 289 and tlhlde Rd. 1v 30 tb, AIM iaallalad In 9M contact tarns mime g ,
axamb mdm ofmdmtiaes Loop 299 bade ovw US Q I R and bdk%g ad9m 50 St oveown ldamgd and
iLAt&d penieg 321t0 tons of 7*0 8 adz and pea W ail 'vadsoudom mdft fm beans FdIL
Goommated a 9Mb omntfag of37 nntrd'3 I* VAsoICEWMI
im 2 — This oogft pod m of flax 1 it 4.9 mile paedaa of US 82 iMb a POW aaxas
fieewaap, kdoft on eta of nosh Mabaltnos. This gbsas• I I Wad VWWamass atbatat
4hi 30 OuU 19dr St Qm w Ave, 4tb St and Avemle Q I db" and
1alpmrdeed the laying of 3860 to0e of Type 8 gait wbbb boobs a scupo raox d of amuml of mix laid laid
M toys of Type B mla os sevead &p is blab► Waft areas. K3arsrated s 929f, bom Oft of 3E out of 42
paving lots wi8m Tao removal.
Pbm 3A — Caeei W of 9.18 m gm admalti leas Y, ° loads sad tuna mbar flyover
baddper. Throe amtbbrmsd flyo m' firma. Loop 289 to US 82 EB#m y spans 39M 8 raid tataia b a m 74 8 high, .
wi tog it the l qpd and b&d madras in do l> olm of TmDM'a iarbbock District. Tire saoomd A'me4 an
omfflx uad, omm* r $balm US 82 BomV to Loop 289 eon ZM A end omb 41 L tall. GmmmW 100%
bane pr4l► fbr al udwe pound wig Dsw Rmff ffOW for OGPC and.WA VA as nmaval.
nM 3M — Cag1> WgW 1.5 MM atrdt & Boar CMeego to Salem Avg. end isobadea hdmdsmW M M Stead
Side Rd. vdib avm p m aoartt' xd ma rt the 06 hbamcdom. [ aumled 99% bum mntmg Wfi 20 am of xl
pmvlmg I * and naarmmWiL
41211'21 8_54 A M
I'
i
Ommon
OWam"Diers AM . — - -
r o. of ad arcammm crier or trove imm 0=OW .d wma an bw
AftdwadA
reewime
+rs 11Y16 �ilbl er mbdim Willu Lrrt wl io iOwmiriir '
sa3 ion °d 6c
r � �'�b:�A4�rprrrrWiwl ie'4ar.
bd.b do fAmdqpmw:
i N� and a ffUai
or
d
4 ��1d
L6.
Q
8 tio�ryry�eee
9. Meea�ne' iitMAg �;�
` a>rwr+i'r r tbrarsasii AM&AditMdhimrYonl�000euu► _
arc Lww
See affachad.
41211'21 8:54 A M I
rie mftrof somobadm md v ww"
v�earNae
MoafobopmMiY A' PMM I EUMN
dCmww Pim
dui
8 wr�ritIbiofd ilo�iiud � Md vu
hams an
r
4/21►121 9:54 AM
Lone Star
Did
& Paving, Ltd
Unit #
Supervisor
Year
Make
Model
Serial Number I
-Comments
P29
Dodrick
2007
Chev
Silverado
109690
4DR Flat Bed
P33
Jesse's Crew
2005
Chev
4500
509416
4500 Crew Cab Flat Bed
P35
Pete's Crew
2006
Chev
4500
420184
4500 Crew Cab Flat Bed
P37
2011
Ford
E350
A59295
Passenger Van
P38
Keith
2010
Chev
1500
257991
4DR 4 Wheel Drive
P39
Mario
2010
Chev
Silverado
248749
4DR 4 Wheel Drive
P40
Broken
2007
Ford
F550
28113
Mechanics Truck
P41
Rickey
2013
GIVIC
1500
34311
4DR 4 Wheel Drive
P42
Mary
2012
GIVIC
1500
157494
4DR 4 Wheel Drive
P43
Asphalt crew
2013
Chevrolet
3500 HD
141603
4x4 Work Truck
P44
Asphalt Crew
2013
Chevrolet
Silverado
164132
4DR 4 Wheel Drive
P45
Omero
2013
Chevrolet
Silverado
210422
4DR 4 Wheel Drive
P46
Asphalt crew
2013
Cheverolet
3500
139786
4DR Flat Bed
P47
Carlos
2018
Cheverolet
Silverado
150312
4DR 4Wheel Drive
P48
Roland
2013
Ford
E350 Ext
90473
Passenger Van
P49
Rick
2019
Ford
F550
55084
Mechanics Truck
P50
George
2019
Ford
F550
48284
Mechanics Truck
P51
Jason
2016
GIVIC
2500
328111
Mechanics Truck
P52
James
2020
Ford
F250
47726
Crew Cab
P53
Cruz
2020
Ford
F250
87515
Crew Cab
P54
Oscar
2020
Ford
F250
87517
Crew Cab
P55
Arbrey
2019
Ford
F150
25032
P56
Jesse
2021
Ford
F250
36426
Crew Cab
P57
Colin
2020
Ford
F150
54158
Super Crew
PT1
41 Pit
2002
Terex
TA30
A7991477
Articulated Dump Truck
PT2 1
41 Pit t2006
Terex
TA30
A8941056
Artculated Dump Truck
T1
1991
Ford
F8000
Al 3102
Water Truck
T7
1992
Ford
F8000
A07950
Water Truck
T27
1993
Ford
F8000
Al 1847
Water Truck
T28
1991
Ford
F8000
A37304
Bobtail Dump (Asphalt Plant Trk)
T29
2002
Ford
F450
A58078
1 Ton Flatbed
T36
T45
2000
1999
Pbt
Pbt
377
385
486009
502626
Water Truck
Bobtail Dump
Page 1 of 9 41211'21 8:54 AM
T50
1998
Ford
F800
A29809
Mechanics Trk
T52
Jose 2005
Pbt
330
857589
Fuel & Lube Truck
T53
1995
Ford
L900
A42667
Bobtail Dump (Asphalt Plant Trk)
T54
2008
Pbt
388 TWA
740319
Winch Truck (Red haul truck) *Logs
T55
2007
Pbt
Water Truck
676323
Water Truck
T56
2005
Pbt
Water Truck
872143
Water Truck
T57
2008
Pbt
388
752240
Tractor
T58
2008
Pbt
388
758854
Tractor
T59
2007
KW
T-800
183633
Tractor
T60
2007
KW
T-800
183631
Tractor
T61
2007
KW
T-800
183632
Tractor
T62
2007
KW
T-800
207407
Tractor
T63
2007
KW
T-800
185739
Tractor
T64
2008
KW
T-800
212990
Bobtail
T65
2008
KW
T-800
213389
Bobtail
T66
2008
KW
T-800
213387
Bobtail
T67
2008
KW
T-800
212981
Bobtail
T68
2008
KW
T-800
213386
Bobtail
T69
2006
Ptrblt
335
657385
Water Truck
T70
1993
Mack
CH613
27600
Water Truck
T71
2016
Freightliner
108SD
8810
Distributor Truck
T72
2007
Ptrblt
378
698593
Water Truck
T73
2007
Ptrblt
365
666586
Water Truck
T74
2008
Ptblt
367 T/A
770128
Tractor
T75
Chris 2010
Ptblt
340 T/A
105346
Fuel & lube Truck
T76
Bob 2007
Ford
F75O
411347
Mechanics Trk
T77
1999
Mack
RD688S
039735
Bobtail
T78
2000
Peterbilt
357
522718
Water Truck
T79
2012
Mack
CHU613
011338
Tractor
T80
2012
Mack
CHU613
011340
Tractor
T81
2007
International
4300
416708
Bobtail
T82
1992
Mack
RD695
11756
Bobtail
T83
1990
Mack
006322
Bobtail
TR1
1972
Vermeer
Flatbed
1906
16' Folding equip trailers
TR2
1988
Lee
Form
595388
18' equip trailers
TR3
1994
Gooseneck
Flatbed
31241
28' tandam axle w/loading ramp
Page 2 of 9
41211'21 8:54 A hi
TR5
1988
Kaly
Dump
5104
Hydraulic Dump Trailer
TR6
1982
Fruehauf
Tank
2806
Hot oil tanker
TR7
1981
Howl
Equip
S8111280
16' Equip Trlr
TR8
1966
Fruehauf
Tank
OMG353619
Hot oil tanker
TR20
2001
BIGTEX
Utility
E42782
18'
TR21
2002
Shopbuilt
Lube
124068
Lube Trailer
TR30
2006
Clem
End Dump
005313
End dump trailer
TR31
2008
Tiger
Utility
2253
18' utility
TR32
2001
Loadking
Haul Trailer
023906
Low Boy Haul Trailer
TR33
1999
Lee
Model T7
215286
14ft Utility Flatbed
TR34
2009
Tiger
Utility
227
Flat Bed Utility
TR35
2001
Etnyre
Haul Trailer
111211
Low Boy Haul Trailer
TR36
2009
Shopbuilt
Flatbed
Flat Bed Utility
TR37
2005
Load
Tilt Utility
005393
Flat Bed Tilt Utility
TR38
2012
AFF
Equipment
1A9BE1826CL790030
18' BP Equipment
TR39
2012
AFF
Equipment
1A9BE1824CL790031
18' BP Equipment
TR40
2006
Ranco
Dump
1 R9ESD5016L008143
Framless End Dump Trailer
TR41
2012
Bels
Equipment
16JF01622C1046491
Utility
TR42
2012
Bels
Equipment
16JF01629C1046486
Utility
TR43
2001
SEI
SEIPUP
1 S9PD33261 B638302
Pup End Dump
TR44
2001
SEI
SEIPUP
1S9PD33271B638308
Pup End Dump
TR45
1998
SEI
SEIPUP
1S9PD3322WB638109
Pup End Dump
TR46
2000
SEI
SEIPUP
1S9PD3421YB638215
Pup End Dump
TR47
2003
Warren
TIA
1 W9CA4B263T369001
Pup End Dump
TR48
1973
Heil
Tank
924979
Tank Trailer
TR49
2016
Armorite
Dump
56EA75C22GA000626
Framless End Dump Trailer
TR50
Shopbuilt
TR51
2020
Mana
Bellydump
5MC424012L3198398
Belly dump trailer
TR52
2020
Mana
Bellydump
5MC424010L3198397
Belly dump trailer
TR53
2020
Mana
Bellydump
5MC424014L3198399
Belly dump trailer
TR54
2020
Mana
Bellydump
5MC424019L3198396
Belly dump trailer
TR55
2020
Mana
Bellydump
5MC424019L3198401
Belly dump trailer
TR56
2020
Mana
Bellydump
5MC424017L3198395
Belly dump trailer
TR57
2020
Mana
Bellydump
5MC424017L3198400
Belly dump trailer
TR58
2016
Etnyre HFR50TD3
Equipment Trailer
1 E9319072GE111013
Haul Trailer
R59 T
1978
Delta
DD-46-96
2617
Drop Deck Equip Trailer
Page 3 of 9
41211'21 8:54 A hi
TR60
2020
Diamond C
Equipment
46UFU2O29L123O6O6
Utility Trailer
L6
1977
CAT
950
81J10964
Loader GP bucket w/ cab
L9
1989
CAT
980C
89P4756
Loader
L14
1983
CAT
980C
63X4723
Loader
L16
1983
CAT
930
41K11978
Backhoe
L17
2002
CAT
416D
BFP03226
Loader
L19
1989
CAT
988B
050W09849
Loader
L20
CAT
966F
01 SL03446
Compact Track Loader
L21
2004
CAT
252E
CAT0252BCSCP00510
Backhoe
L22
2002
CAT
420D
FDP12773
Loader
L23
2007
CAT
928G
DJD02717
Loader
L24
CAT
950 G
3JW01649
Compact Track Loader
L25
2009
CAT
289C
JMP00867
Compact Track Loader
L26
2012
CAT
289C
JMP2776
Compact Track Loader
L27
2012
CAT
289C
JMP2780
Loader
L28
2011
CAT
980G
2KR75009
Loader
L29
2008
CAT
966H
A6D1384
Landscape Tractor
L33
2006
CAT
416DIL
132D2395
Backhoe
L31
2007
CAT
420EIT
KMW1549
Loader
L32
2006
CAT
938G
RTB2312
Skip Loader
L30
2006
Case
570 MXT
JJG0302936
Loader
L34
2006
CAT
938G
TCR00266
Loader
L35
2010
CAT
850H
OK5K02879
Loader
L36
CAT
420F CE41-1
CATO42OFTSKRO3564
Backhoe
L37
2013
CAT
289C2
CAT0289CCRTD01156
Loader
L39
CAT
980C
Z63X09800
Backhoe
L40
2012
CAT
420E AM
ODAN02116
Compact Track Loader
L41
2013
CAT
289C2
CAT0289CCRTD01156
Backhoe
L42
2017
CAT
966M
OKJP02423
Loader
C3
Dynapac
CP271
23620353
3 Wheel Steel Wheel
C5
1978
Ingram
10-12 ton
726B095
Yellow Wacker Packer
C8
Wacker
Packer
583601396
Green Wacker Packer
C9
Wacker
Packer
654504847
Double Drum Vibratory Roller
C10
C11
C13
1977
r1968 r
Dynapac
Ingram
Ingram
CC421
539375
1125
Page 4
58010324
6419950D63
3A80281 FC
of 9
3 Wheel Steel Wheel
25 Ton Pneumatic
3 Wheel Steel Wheel (90100"
41211'21 8.54 AM
C17
2000
Dynapac
CS141
21720145
Pnuematic Roller
C18
2000
Dynapac
CP271
6996453
Double Drum Compactor
C22
1999
Dynapac
CC522
62910590
VIB
C20
1993
Wacker
Packer
LF70
Vibratory Padfoot
C23
2000
Dynapac
CA250PD
65320338
Vibratory Padfoot
C25
1999
Dynapac
CA152PD
64320602
3 Wheel Steel Wheel
C26
1991
Dynapac
CS12
175363
30 Ton Pneumatic
C27
1995
Dynapac
CP30
7018797
3 Wheel Steel Wheel
C28
1978
INGRAM
10-12ton
882750E9Q
25 Ton Pneumatic
C31
Dynapac
CP301
3 Wheel Steel Wheel
C32
1998
Dynapac
CS141
903R140055
Double Drum Compactor
C33
2008
Dynapac
CC142
60214052
Double Drum Compactor
C34
1998
Dynapac
CC522
62910617
Compactor
C35
1992
Caterpillar
815E
17ZOO487
Compactor
C36
2001
CMI
335C
HE-1506
Compactor
C37
1999
Rex
3-35C
HE1498
VHF Roller
C38
2006
Dynapac
CC522
51720557
Pnuematic Roller
C39
2002
Caterpillar
PS3608
9LS00221
3 Wheel Steel Wheel
C40
1992
Hamm
WH90
33906
7 Wheel Roller
C41
2001
Caterpillar
PS360B
9LS00229
3 Wheel Steel Wheel
C43
2011
Hamm
GRW280-30
H1950097
Compactor
C44
2001
CMI
3-35C
HE1508
Compactor
C45
2006
Dynapac
CP271
2362BR2284
Compactor
C46
1994
Caterpillar
815B
17ZO1695
Compactor
C47
1993
Caterpillar
815B
17ZO1524
Vibratory Double Drum Roller
C48
2013
Dynapac
CC524HF
10000322COA008893
Vibratory Double Drum Roller
C49
2006
Dynapac
CC522VHF
51720557
Compactor
C50
2000
Caterpillar
PS360B
9LS00115
Compactor
C51
2001
Caterpillar
PS360B
9LS00214
Three Wheel Steel Wheel
C52
Sakai
R21-1-2
RR4-40469
C53
2000
CMI
3-35C
HE1496
C54
1999
CMI
3-35C
HE1495
Compactor
CE1
1995
Gomaco
GT3600
902900-053
CE5
Gomaco
Commander III
900100562
Curb & gutter machine
CE6
Gomaco
9500
MC18682-55
4 Track Concrete Paver
CE7
2014
Gomaco
I GT3600 1
902900-957
Placer w/Trimmer Head
Page 5 of 9
41211' 21 8: 5 4 A hi
CE8
Gomaco
Slip Form Paver
CE9
Gomaco
GT-3600
902900-1008
Curb & gutter machine
D1
Gardner -Denver
GD45C
45001
Slab Drill
D3
2006 E-Z Drill
21OB-2SRA
U3349
Dozer
D4
2012 Komatsu
D155AX-7
90078
Slab Drill
I E1 I 11991 I John Deere I 790D-LC I 2ZKO0649 (8465)
Excavator
E3
2002
Cat
350L
3MLOO286
Excavator
E4
2009
Cat
307D
CAT0307DPDSGO0187
Excavator
E5
2007
Cat
330DL
MWPO1286
Excavator
LD4
2002
Leeboy
L500
309276
Pro-Pav
LD6
2000
Champion
1110-W
30277
Asphalt Paver
LD8
2009
Lee -Boy
8515T
8515T-54865
Asphalt Pick-up Machine
LD9
2002
Cedar -Rapids
MS2
45280
500 Gal Tack Wagon
LD11
2015
Lee -Boy
250T
1309357
Asphalt Paver
LD12
2011
CAT
AP-10001)
EAD00433
Asphalt Pick-up Machine
LD14
Cedar -Rapids
MS2
50224
Asphalt Paver
M4
1996
CAT
140H
2ZK006X9
equipped w/rear ripper
M6
1999
CAT
140H
2ZC04412
equipped w/rear ripper
M7
CAT
140 H
2ZKO5654
equipped w/rear ripper
M8
2008
CAT
140H
2ZKO7110
equipped wlrear ripper
M9
2008
CAT
140M
69DO0423
equipped wlrear ripper
M10
2004
CAT
140H
HVCCA00746
equipped w/rear ripper
M11
CAT
140H
CCA04056
equipped w/rear ripper
M12
1974
John Deere
670
002020
equipped w/rear ripper
M14
CAT
140H
CCA01089
equipped wlrear ripper
M15
2006
CAT
140HN
CCA02050
equipped w/rear ripper
M16
2019
CAT
140SW
ON9400238
equipped w/rear ripper
M17
2019
CAT
140SW
N9400164
equipped w/rear ripper
M18
2019
CAT
140SW
N9400162
equipped w/rear ripper
M19
2021
CAT
140
N9400439
equipped w/rear ripper
M20
2020
CAT
140
ON9400385
equipped w/rear ripper
S6
1999 CAT
623E
6YFOO166
Scraper
S7
CAT
623E
6CB00600
Scraper
S8
1996 CAT
623F
6BKO0215
Scraper
S9
2004 CAT
623G
CES00473
Scraper
Page 6 of 9
412I1'21 8.54 AM
S10
2003
CAT
623G
CES00312
Scraper
S11
CAT
623E
6CB00779
Scraper
CS 1
2002
0
Gff es
BM624
D7D H
986
jGhngeer-e
8649
1986
i z
9650
007414
TT4
1994
John Deere
8870
RW8870H002124
TT5
1993
John Deere
8870
RW8870H001398
TT6
1992
John Deere
8760
5755
Tractor 4X4
TT7
John Deere
8760
Tractor 4X4
WT1
2003
Interpipe
12000 Gals
12KT-0002
12000 Tank Tower
WT2
2006
MSE
12000 Gals
2006-31
12000 Tank Tower
WT3
2004
Superior
12000 Gals
00-12-73
12000 Tank Tower
WT4
Interpipe
12000 Gals
774524
12000 Tank Tower
MS2
1999
Broce
sweeper
88467
MS4
Morgan Bldg
I
10161CTBCUSA
Office building
MS5
2000
JD
OFF -SET
8' Mixing Disc
MS6
Star
fuel tanker
CTT1028
1000 gal trailer mounted fuel supply
MS8
2001
BROCE
RJ 350
401011
Broom
MS10
Shop made
3000 gal fuel storage /electric pump
MS11
Shop made
2000 gal fuel storage w/electric pump
MS12
Shop made
1000 gal fuel storage a/electric pump
MS13
Miller
Big 20
trailer mounted welding machine
MS15
Steel Forms
N/A
misc concrete paving forms
MS16
Storage
building
20' enclosed storage van
MS17
Storage
building
18 enclosed storage van
MS18
Shopmade
Trailer
Ramped Single Axle 5X8
MS19
John Deere
Plow
Flat Bottom Breaking Plow
MS20
John Deere
Shreader
Bat Wing
MS23
Leroi
Compressor
KG56-1303
Trailer MTD Air Compressor
MS24
Hotsy
S7055
C792330700
Pressure Washer
MS25
MKC
MK Concrete saw
Honda engine
MS26
Corecut Saw
Honda engine
MS30
Hotsy
5516
203243
Pressure Washer
MS31
1992
Cat
Forklift
7SC00883
60001b
MS37
2003
Bobcat
E
24"
Page 7 of 9
41211' 21 8. 5 4 A hi
MS39
2003
Bobcat
BIT
12"
MS41
1992
Onan
Generator
V2203-136528
Trailer Mtd Power Unite
MS42
1986
Lincoln
SA200
A802862
Welder
MS43
2004
Rome
G1-7-24
20GT-1021
Mixing disc plow
MS46
2004
S Pump
2" Centrifugal Selfpriming
MS47
Poulan
Chainsaw, (two)
MS48
1990
Lincoln
SA200
A-802862
Welder
MS50
1990
AMCO
WOG-2-3230-BG
1053
PLOW
MS51
2006
Allmand
0534AB06
AWB15-5573
Arrowboard
MS52
2006
Allmand
0549AB06
AWB15-5574
Arrowboard
MS53
2006
Red Lion
RLGF8
2906 CODE 616808
2" Pump Type A
MS54
2006
Red Lion
RLGF8
3705 CODE 616808
2" Pump Type A
MS55
Target
PRO6511ID30
228590001
Concrete Saw
MS56
2006
Allmand
0536AB05
Arrowboard
MS57
1996
Arrow Master
1350
6410
Self Propelled Hammer
MS58
2009
Norton
BBC547
8083028
Brick Saw
MS59
MI-T-M
75000 MHO
40033591
Generator
MS60
2005
Wirtgen
W2100
410145
Pavement Profiler
MS61
2004
Ingersall Rand
P185WJD
346433UE0221
Portable Air Compressor
MS62
2003
Ingersall Rand
P185WJD
356249UDPB34
Portable Air Compressor
MS63
2005
Bomag
MPH364R-2
9011323001607
Soil Stabilizer
MS64
2010
MI-T-M
60000MHO
40025106
Generator
MS65
1999
Allmand
402AB05
Portable Solar Arrowboard
MS66
2010
Terex
ODLSE25LA
EVD-10635
Arrowboard
MS67
2010
Terex/Amida
ODLSE25LA
GRD-21578
Arrowboard
MS68
2010
Terex/Amida
ODLSE25LA
GRD-21579
Arrowboard
MS69
2010
Terex/Amida
ODLSE25LA
FKD-13884
Arrowboard
MS70
2010
Terex
ODLSE25LA
FKD-13885
Arrowboard
MS71
2011
GNSS852-882
Trimble Kit
MS72
12'x48'
Mobile Office trailer
MS73
Trimble
GPS System Mounted on M6
MS74
Trimble
GCS900 31) Auto
Option Key
MS75
MS76 I
Remoo
MC WIZ
MCW07-762
Plow
MS77
I
2012
Maxe
5R8U61027CM022963
Pump
MS78
Husgvarne
FS40[
Concrete Flat Saw
Page 8 of 9 41211*21 8:54 Ahi
MS79
Stihl
TS420-14
179141323
Cutoff Saw
MS80
2008
Wirt en
W2100
09.21.0286
Cold Planer
MS81
Hus varna
FS400
Concrete Flat Saw
MS82
Briggs & Stratton
25T235001561
1405081600570
Generator
MS83
2010
Broce
KR-350
407027
Ride on Sweeper
MS84
Wishek
Y-2000-10
AGCWY2000EX036301
Offset Disc Plow
MS85
2010
Ditchwitch
RT45
CMWRT45XCB0000366
Trencher
MS86
2008
Genie
GTH842
GTH0808A12182
Telescopic Forklift
MS87
1998
Link -Belt
RTC-8065
D718-9945
MS88
Genie
S45
S4507-11814
45ft Boom Lift
MS89
Genie
S80
S8004-3616
80ft Boom Lift
MS90
2018
Bobcat
225
MJ161466R
WELDER
MS91
MS695
Jumping Jack
MS92
Stihl
TS-420
Chop Saw
MS93
Stihl
TS-420
Chop Saw
MS94
2011
Wishek
Y2000-10
2030610
Offset Disc Plow
MS95
In ersall-Rand
2 Lights
MS96
Yale
GDP070VXNYRE087
B875V09986K
Fork Lift
MS97
Sulliar
185
2.01205E+11
Portable Air Compressor
MS98
MS99
Plant 1
2001
Omega Impact Crusher Feeder
(Pit 41)
Crusher Plant
Plant 1-A
Conveyor Belt
Plant 2
1978
H & B Hatch Plant Control
(Asphalt Plant)
Hot Elev 10000ASP Tank Misc
Plant 3
2013
Powerscreen Cheifton 1400 Trax
PID00066JDGD16223
(Screen Plant) 5x16 ft deck portable
Plant 4
1998
Yard Crusher - Detriot Eng
OMTRO01
Impact crusher
Plant 5
1999
Nordberg 1213CC
2052-2781
Impact crusher
Plant 7
1998
1 Vince Hagen
981016
Concrete Batch Plant
Page 9 of 9
41211'21 8:54 Ahi
41211'21 8_54 A M
a-w h*-bA-fft mcmpmdtoI'll ®,chattoyopm
ARWhrmMA
PrdeaN�m
ILu1�Osk�,��1g,.8mtA71nCi _ x;AklieldAs�3r^dr8.,'h
,Lj
M-4tkt1
-�J�
wx
-.-� � �„r,,., Arbs� • 8toekseA x�ra 8toC7oasn
i#�+�i�lea olio Coe 'Care der
.,annlmvn 11m,Rla,�„ ti l�.i e,41 �. Ylr 7`''
i leR ,iKA
d
+vi to .frog.r Vila'9.W&k re ri id mower-os I�nditse-imm- , c�._a e
�b .� - •�.b,`iQa 8 _�000�111��. BtOCiA•Oi1R —CMto
ON, ..! F A Phan 2_ 22m=
d13 �°r{- - ,. rr. J.Tw:,�;.i,'�.:..lfi :..R�..�s � 'h4S s+�,�mx` .�;�,r �,,.:.:...r�:.;i.7�' f' "• `-
i _foil GOT. 'f
>� ! Aade� M�� Pn�ed � �61Bby 011irs 11mc*�s i
Aims `it MD*Mn-
Rn�e®eOoGYc1iu16�ee�aG�ingtiYh�e�ialro kftneYftdonon�
imaamsY�eldolk�ai
An,.
'An-_
7�dPmdim
Caodttx��aMtt+a_a �__ 1.�,.5 �,r�r.c* �8�6-_799,v83�i ,h;,xbGltel,�sfi6,cR:
41211'21 8:54 A M
AtlaolmmtA
�-' �!� wi Pr�ew OoopNtes�rW umi.e 14 Yrns
PAO
"L*r of h**WA i l i V.� f 'a`' T_ k :,
��� � ae,lee,r66•ap � '� O.bt'�ctecc + � _ � s,�,, _ �
AMC
- _ —°-�^V slaw xu:ne ubsvr smdaim ' Win Ca �esei�a stixae,r
1 --j=cc :aMm L
INN
- tl v6lrva �Rraast OMtpr - � �i `aa Spar oiue s m�viaa'` f�o41't. � � '-� J • t° of E�uzk,� tam. w 5C �►a3 Ater Pares pro ec
- - - - ..._., _ t
mar _ � s,a7s,oso.00 �
~'Blass ifoeno;
RoAteaee,,xUewgk�Oo�'ido�wwtsfaiio� _ w�;(ot�tirarrLi
tbrA4 $ CIt:- of Labboel[ ( Ta
cx
> Ra lhr onr3d�eri �
rt lm lD = 1"i f-v rnf Tot'nnnlr U trr
streets ali
�L?�--�� 8tevs �vrtur��� CNner
.r
��'��- �.. Saxe " •� ._..
rwjw FAURIM ww own k.
Acbmr etodma
�iaa�dixeaLep - - �`
__ _ ., 1�66t975-3app
of Iabbaek
sum Dire i Pavia* 1466)745-6032
st+k. l :,��1>alt Reif sr �G �r«,Tovs�r ri �t3oas
i+eIA
Y_ hR1a�,+ S011ioa'
_ ti95-aaoe
Fz°aR sus ure a myll,- 41"1745-son
41211'21 8:54 A M
L�a�1i� wi �y.e O*M+�s rrOrr •r lrt A1A�
rQFfl
4/30A
RRiM�lellrlrorn[ � 11��IiwAr 1r*s ��
„ Gain m;
�G1�rr�i�■� �ir� ���*nrrrr�Y�M��r��j
1nOr-i7 s-a000
v� _
1�r --
■M�■reL�o ar��
at
41tii•� Pa.naM[ � -
PW*mku"° }md-bpdmkto w0ID�
--VT tae ��C—ft-
� ��e Wd�ria��wq
aaa to
C
-- z
41211'21 8:54 A M
is opupbl".
Aem 4
cousl
[»Kll�l ilwitMi�plti�r!
Vwrrlir�y
MAT
.Ms O���i�� ilwe
� �=
lYirA�lllld fir. - -
�.1rai..��#�� ray : a•
11"li�lririlli �, T
liurt�sOMS.M4.90 I
41211'21 8:54 A M
'"'Aoor h amobw Waft ua lm 1s ymn
^�Clw
Ii=wd Da
PMJWCm
Re�Co"ace(���■■��ae� arm
Name �Fm
o of She r
st«L �
of Lubbock
d� poem®�dI.I�L a q
b" oAm
Core b Z T e C 140 Mix
Rdhum
11Gs!►l�ot�a�l
Silva Twt►er gbcia pan
appewl d anatae� � as r o n a j
I�
_ �`�e1Me�eyar
�riyaot G of onm
ytie"r DaQ� °i'F"y°°C G i '�1
Rdftm
0-
29
N
00
iil I
d A
a
BRA
a HMAC,
Sam ----i
Carreut Prejech and Ptuled Gbh wifhd the bd id Team
cowry o u oc PtwijectNawe .oncrete a in
cat of� Concrete atchin of C' S#rects =aloverProjed cad �92 .600.00 Data Pqw a 1112
Koy Project Pasemnal pfojcdmmuw
lea &www=&w Safety OMCw
Nm ®te Ortlt
Ram a CamIntbtamtizmVbftHawes indicates approval to Coaftft dw nuaw individuals as a zoom =)'
Owner Now r1tld position ° Lu Telepbona
Dodson City ° S 5-
fa0astzzmtiou Mazzeiper
OWM llitilitille: alt Patch'
°e10� man s a t a c i Streets
Pta�ad coat
Date Pmjla complded i
KwphqwtpK==l Project Mzma®er Pzzzjact Snpezeadeat Sai�ty O�Car
Nam �
Raibzemre Coutsct >afaRmation man
(lam z appzoval to azeting t5e zzwnes individmis as a refemmoe)
Name Titld Positina OrsoolzapM Telephone
°MatDodson of Lubbock
cnnawo�q„M DMitcl
>�e�rowaer Ci of .
GeandDevcr*p =ofPz*ftPNOUn
t Cast - Win Dato Pro)eet
Y Paedmei ,.! Prajeoe Mem�r Pz+c�ect sapamteadent Setbp Olr
Nam°° ruz R es rbre Stodcma A -re
Rafezonae Coataot Inon (IislioR indicates eppnovalnwow � a a miisrwea)
meow T ar d°n Telephone
°v°�'' C' of Lubbock D06-775- 000
w: pw
coastraetion Me
A_
� I
N �
Oe
A
Airchment A
us
us
.us
mahmm
dA
Cm"lie#eed rad lladretComwake*W ■��r w 7iXeNf
41211'21 9:54 AM
I'll P"40b #d. hvJeet Coate waft Ota be 10 Yaan
Atia &MM A
' pqjectoaailar I a vwatertName Reconstruction of Ave L
ofPagjeaE» �mo,,a
t.s, halt ana a.s �,,
rmwtGoat 29{. Dace al. Provide $ iostM 3 inches of black base 3 2 Inches of T D HMAC.
KryPro}ectpem�
Name t .�a em ° °dineadw Sebwomcw
Coated
r
� COMM b6omalin IPPMW 1D a6 � neaea iaritvl� as a eefaaaoej Colin Coe
Nana Titb/Paddon ���
°ww of Shallowater
i
832-4521
� �r �
rlhel�yshoo.com
an owner Q of Lubbock
t Daraiption of Projacb MIAIr+ toad th of 71 • withen rd venue Mill elay
PoiOdcost�OBRlent Of V Black Base 8 2
T e C Hot Mix
1470 738.25 mPlabd
KayPsajeatFatma�d 1 0 5
Name t P✓Od sqwbmwft I saw oii m
Qm* cm*d
Moran conw b xmadoa (HatinS mmmt iodiabes Stave Turner -A
a kman
b o ba mm�ealieffivih*as muss
Steve Turner
Owner Nana 7Yde/ p
Cm 0 mdoa bmbmom
r
Pm*"a Owaer Ci of Mon
t3eaeral erg al Cot I StreetsQ �Ibon 2015 Seal Coat
ect
Peojm cost
Key Pmjeat P=oaad >]ro B C=Piftd
Name - - - PhdOt t SefatY Ogh.,
coed i
Rebmm Contact hdbumt1m msftBa i✓o
ar
bbrey
Name i fie WE= mdiltdb as a t+eRaeaoe)
litldpaddon O
CRY Of O%Dn T°Ohm&mafl
A
N
r
Oa
!h
A
i
CprreatPrajects and Project Completed within the last ]0 Years Attachment A
Projec
Omer
Gcwr lDcwr . I o�rIC1V12W I projeceNeme ainview- a e oun USIneS3 ar hose
Cieiutal Descrlptidm of rgcct: ui ing 8 Road
Prda�ect Cost ( Project tots cost Daft Project Conde ted
Key Project Ponnel Q n going
ers
Pmjdxt Manager Project Superintendent Sa
i Name _ fir]' Officer Quality Control
ohn ae Steve Turner
lteidaence Contact Intbrmation (&ftg names indicates approval to contacting the names individuals as a rr:fereace) Steve Tumer
Title! Position Organhahan �
°ice Ci of Plainview T°le�h°°°l
J°°`ig°°` PsC - 806-296-1 00
lion Kamm 80fi473-2200
Projectoamer L of LuBtioCk pmjectivame Lub�ocl� usrness silt o � King venue
GanerelDcserdptldmofProjecttBuildIn a Road
Prajdrot Cast _ S271,074. prof ota cost Date Project Coin plated
Keyhojeotparsamel -- 3�n going
_ �OJ Ma°a8gr PROct Superintendent Safetyofficer h]► Control
Name COlin COe 0 In Oe M or
x�r°ncec«dactrnirormetioa(llstittg,un;�;e Steve Turner Steve Turner
Name epptoval to canteoting the names individuals as a reference)
LML—on
r y 0 u 0
gner PStr axi
Manager
Project owner UI y of uI)oC
of"ecrBuildin a Road
Project Cost 345,82 i
Key Project Penroanel
Nome
R°ferencc Contact Infos RWn (iistini names indicates
I Name
Owner
ragaer
Construction Manftr
Title✓ Position Organization TTelephone Email
PtoicaNam f purl Huffman soccer C;olrtplex
total cost I Date Prof ast Completed
Project Manager Project Superiirtendeat Tsafw Officer
►� d Ur uy OZocKman Arly
to dwataeting tlw names individuals as a
�1 -
City of Lubbock, TX
Purchasing and Contract Management
Similar Projects and Reference Form
Please list three references of current customers who can verify the quality of service your company
provides. The City prefers customers of similar size and scope of work. Please do not use the City of
Lubbock.
REFERENCE ONE
Company Name: �ct
Address:
Contact Person and Title:
Phone:
Similar Project:
Company Name:
Address:
Contact Person and Title:
Phone
Similar Project:
EPIC -
Email:
REFERENCE TWO
A
to
Email:
REFERENCE THREE
Company Name: LA
Address:
Contact Person and Title:
Phone: Email:
Similar Project:
Year eo 2 t — 2:x_
Year-jo .-.L t - ,I1
Yearc�0 ;Zi -XZ
5141'22 8:56AM
Page Intentionally Left Blank
City of Lubbock, TX
Purchasing and Contract Management
Safety Record Questionnaire
The City of Lubbock City Council desires to avail itself of the benefits of Section 252.0435 of the Local Government
Code, and consider the safety records of potential contractors prior to awarding proposals on City contracts. Pursuant
to Section 252.0435 of the Local Government Code, City of Lubbock has adopted the following written definition and
criteria for accurately determining the safety record of a proposer prior to awarding proposals on City contracts.
The definition and criteria for determining the safety record of a proposer for this consideration shall be:
The City of Lubbock shall consider the safety record of the offerors in determining the responsibility thereof. The City
may consider any incidence involving worker safety or safety of the citizens of the City of Lubbock, be it related or caused
by environmental, mechanical, operational, supervision or any other cause or factor. Specifically, the City may consider,
among other things:
a. Complaints to, or final orders entered by, the Occupational Safety and Health Review Commission (OSHRC),
against the proposer for violations of OSHA regulations within the past three (3) years.
b. Citations (as defined below) from an Environmental Protection Agency (as defined below) for violations
within the past five (5) years. Environmental Protection Agencies include, but are not necessarily limited to,
the U.S. Army Corps of Engineers (USACOE), the U.S. Fish and Wildlife Service (USFWS), the
Environmental Protection Agency (EPA), the Texas Commission on Environmental Quality (TCEQ), the
Texas Natural Resource Conservation Commission (TNRCC) (predecessor to the TCEQ), the Texas
Department of State Health Services (DSHS), the Texas Parks and Wildlife Department (TPWD), the
Structural Pest Control Board (SPCB), agencies of local governments responsible for enforcing environmental
protection or worker safety related laws or regulations, and similar regulatory agencies of other states of the
United States. Citations include notices of violation, notices of enforcement, suspension/revocations of state
or federal licenses or registrations, fines assessed, pending criminal complaints, indictments, or convictions,
administrative orders, draft orders, final orders, and judicial final judgments.
C. Convictions of a criminal offense within the past ten (10) years, which resulted in bodily harm or death.
d. Any other safety related matter deemed by the City Council to be material in determining the responsibility of
the offeror and his or her ability to perform the services or goods required by the proposal documents in a safe
environment, both for the workers and other employees of offeror and the citizens of the City of Lubbock.
In order to obtain proper information from offerors so that City of Lubbock may consider the safety records of potential
contractors prior to awarding proposals on City contracts, City of Lubbock requires that offerors answer the following
four (4) questions and submit them with their proposals:
QUESTION ONE
Has the offeror, or the firm, corporation, partnership, or institution represented by the offeror, or anyone acting for
such firm, corporation, partnership or institution, received citations for violations of OSHA within the past three (3)
years?
YES NO
If the offeror has indicated YES for question number one above, the offeror must provide to City of Lubbock, with its
proposal submission, the following information with respect to each such citation:
Date of offense, location of establishment inspected, category of offense, final disposition of offense, if any, and
penalty assessed.
12123I'22 1:45 PM
46 - Gallagher
Insurance I Risk Management I Comuitm9
October 18, 2022
Re: Lone Star Dirt & Paving, Ltd.
11820 Unversity Avenue
Lubbock, TX 79423
Experience Modifier Rating Letter
To Whom It May Concern:
This is to certify that Arthur J Gallagher insures the above referenced contractor and that NCCI has
promulgated their Experience Modification Rate (EMR) for the current period is as follows:
05/30/2022 to 05/30/2023 — .76
Should you have any questions please feel free to contact me.
Sincerely,
Scott Riddle
Area President
806-748-2017
Scott—riddle@ajg.com
121231'22 1.45 PM
UESTION TWO
Has the offeror, or the firm, corporation, partnership, or institution represented by the offeror, or anyone acting for
such firm, corporation, partnership or institution, received citations for violations of environmental protection laws or
regulations, of any kind or type, within the past five years? Citations include notice of violation, notice of enforcement,
suspension/revocations of state or federal licenses, or registrations, fines assessed, pending criminal complaints,
indictments, or convictions, administrative orders, draft orders, final orders, and judicial final judgments.
YES NO
If the offeror has indicated YES for question number two above, the offeror must provide to City of Lubbock, with its
proposal submission, the following information with respect to each such conviction:
Date of offense or occurrence, location where offense occurred, type of offense, final disposition of offense, if any,
and penalty assessed.
UESTION THREE
Has the offeror, or the firm, corporation, partnership, or institution represented by offeror, or anyone acting for such
firm, corporation, partnership, or institution, ever been convicted, within the past ten (10) years, of a criminal offense
which resulted in serious bodily injury or death?
YES NO
If the offeror has indicated YES for question number three above, the offeror must provide to City of Lubbock, with
its proposal submission, the following information with respect to each such conviction:
Date of offense, location where offense occurred, type of offense, final disposition of offense, in any, and penalty
assessed.
UESTION FOUR
Provide your company's Experience Modification Rate and supporting information:
-74 - -
ACKNOWLEDGEMENT
THE STATE OF TEXAS
COUNTY OF LUBBOCK
I certify that I have made no willful misrepresentations in this Questionnaire nor have I withheld information in my
statements and answers to questions. I am aware that the information given by me in this questionnaire will be
investigated, with my full permission, and that any misrepresentations or omissions may cause my proposal to be
rejected.
SigiiatuT4--
V/1
Title
12/231*22 1:45 PM
Page Intentionally Left Blank
NON -COLLUSION AFFIDAVIT
STATE OF TEXAS
LUBBOCK COUNTY
rr. _ being first duly sworn, on his/her oath, says that the
bid above submitted is a genuine and not a sham or collusive bid, or made in the interest or on behalf of any
person not therein named; and s/he further says that the said respondent has not directly induced or solicited any
firm on the above work or supplies to put in a sham , or any other person or corporation to refrain from a statement
of qualifications; and that said firm has not in any manner sought by collusion to secure to self an advantage over
any other firm or firms.
Lone '01rmt Lf-d
Firm
Name
V/0 e
Title
and sworn to
me this .2 3&
day of 02-k�
Nc ary Public o U - U
My Commission Expires: a
z -ors^ DEBBIE HERNANDEZ
YARBROUGH
Notary ID 86Y99703
+ �,+ M Commission Expires
�� y
June 27, 2026
NOTE: THIS FORM MUST BE COMPLETED i. [ _ �; s .:. SUBMISSION
121231'22 1.51 PM
Page Intentionally Left Blank
Company Name
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
PROPOSED LIST OF SUB -CONTRACTORS
Location Services Provided
Minority Owned
Yes No
❑ ❑
Cl ❑
❑ ❑
❑ ❑
❑ ❑
❑ ❑
❑ ❑
❑ ❑
❑ ❑
❑ ❑
❑ ❑
❑ ❑
❑ ❑
❑ ❑
❑ ❑
❑ ❑
THIS FORM SHALL BE COMPLETED AND RETURNED ALONG WITH YOUR
RESPONSE
IF NO SUB -CONTRACTORS WILL BE USED PLEASE INDICATE SO
SUBMITTED BY:
!� ane r r Ll,n
(PRINT NAME OF COMPAN
12/23I1122 1:51 PM
Page Intentionally Left Blank
POST -CLOSING DOCUMENT REQUIREMENTS
The below -listed document must be received in the Purchasing and Contract Management Office
Not Later Than SEVEN BUSINESS DAYS after the close date when responses are due.
FINAL LIST OF SUB -CONTRACTORS
Pate Intentionally Left Blank
FINAL LIST OF SUB -CONTRACTORS
Company Name Location
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
Services Provided
SUBMITTED BY:
LD r\ L�Lrl _f --Pav
(PRINT NAME OF COMPAN
Minority Owned
Yes No
❑ ❑
❑ ❑
❑ ❑
❑ ❑
❑ ❑
❑ ❑
❑ ❑
❑ ❑
❑ ❑
❑ ❑
❑ ❑
❑ ❑
THIS FORM SHALL BE COMPLETED AND RETURNED NOT LATER THAN SEVEN
BUSINESS DAYS AFTER THE CLOSE DATE WHEN RESPONSES ARE DUE
IF NO SUB -CONTRACTORS WILL BE USED PLEASE INDICATE SO
11181'23 12.141'M
Page Intentionally Left Blank
PAYMENT BOND
Page Intentionally Left Blank
STATUTORY PAYMENT BOND PURSUANT TO SECTION 2253.021(a)
OF THE TEXAS GOVERNMENT CODE
(CONTRACTS MORE THAN $50,000)
KNOW ALL MEN BY THESE PRESENTS, that Lone Star Dirt & Paving, Ltd. (hereinafter called the
Principal(s), as Principal(s), and
(hereinafter called the Surety(s), as Surety(s), are held and firmly bound unto the City of Lubbock (hereinafter
called the Obligee), in the amount of One Million Four Hundred Fifty -Two Thousand Three Hundred
Dollars ($1,452,300) lawful money of the United States for the payment whereof, the said Principal and Surety
bind themselves, and their heirs, administrators, executors, successors and assigns, jointly and severally, firmly
by these presents.
WHEREAS, the Principal has entered into a certain written contract with the Obligee, dated 24Lh day of
January, 2023, to ITB 23-17005-KM Asphalt Patching
and said Principal under the law is required before commencing the work provided for in said contract to execute
a bond in the amount of said contract which contract is hereby referred to and made a part hereof as fully and to
the same extent as if copied at length herein.
NOW, THEREFORE, THE CONDITION OF THIS OBLIGATION IS SUCH, that if the said Principal
shall pay all claimants supplying labor and material to him or a subcontractor in the prosecution of the work
provided for in said contract, then, this obligation shall be void; otherwise to remain in full force and effect;
PROVIDED, HOWEVER, that this bond is executed pursuant to the provisions of Section 2253.021(a) of
the Texas Government Code, and all liabilities on this bond shall be determined in accordance with the provisions
of said Article to the same extent as if it were copied at length herein.
IN WITNESS WHEREOF, the said Principal (s) and Surety (s) have signed and sealed this instrument
this day of 2023.
Surety
*By:
(Title)
(Company Name)
By:
(Printed Name)
(Signature)
(Title)
Page Intentionally Left Blank
The undersigned surety company represents that it is duly qualified to do business in Texas, and hereby
designates an agent resident in Lubbock County to whom any requisite notices may be
delivered and on whom service of process may be had in matters arising out of such suretyship.
Surety
* By:
Approved as to form:
City of Lubbock
By:
City Attorney
(Title)
* Note: If signed by an officer of the Surety Company there must be on file a certified extract from the by-laws
showing that this person has authority to sign such obligation. If signed by an Attorney in Fact, we must have
copy of power of attorney for our files.
Page Intentionally Left Blank
PERFORMANCE BOND
Pate Intentionally Left Blank
STATUTORY PERFORMANCE BOND PURSUANT TO SECTION 2253.021(a)
OF THE TEXAS GOVERNMENT CODE
(CONTRACTS MORE THAN $100,000)
KNOW ALL MEN BY THESE PRESENTS, that Lone Star Dirt & Paving, Ltd. (hereinafter called the
Principal(s), as Principal(s), and
(hereinafter called the Surety(s), as Surety(s), are held and firmly bound unto the City of Lubbock (hereinafter
called the Obligee), in the amount of One Million Four Hundred Fifty -Two Thousand Three Hundred
Dollars ($1,452,300) lawful money of the United States for the payment whereof, the said Principal and Surety
bind themselves, and their heirs, administrators, executors, successors and assigns, jointly and severally, firmly
by these presents.
WHEREAS, the Principal has entered into a certain written contract with the Obligee, dated 24± day of
January, 2023, to ITB 23-17005-KM Asphalt Patching
and said principal under the law is required before commencing the work provided for in said contract to execute
a bond in the amount of said contract which contract is hereby referred to and made a part hereof as fully and to
the same extent as if copied at length herein.
NOW, THEREFORE, THE CONDITION OF THIS OBLIGATION IS SUCH, that if the said Principal
shall faithfully perform the work in accordance with the plans, specifications and contract documents, then this
obligation shall be void; otherwise to remain in full force and effect.
PROVIDED, HOWEVER, that this bond is executed pursuant to the provisions of Section 2253.021(a) of
the Texas Government Code, and all liabilities on this bond shall be determined in accordance with the provisions
of said article to the same extent as if it were copied at length herein.
IN WITNESS WHEREOF, the said Principal (s) and Surety (s) have signed and sealed this instrument
this day of , 2023.
Surety
* By:
(Title)
(Company Name)
By:
(Printed Name)
(Signature)
(Title)
Page Intentionally Left Blank
The undersigned surety company represents that it is duly qualified to do business in Texas, and hereby
designates an agent resident in Lubbock County to whom any requisite
notices may be delivered and on whom service of process may be had in matters arising out of such suretyship.
Surety
*By:
(Title)
Approved as to Form
City of Lubbock
By:
City Attorney
* Note: If signed by an officer of the Surety Company, there must be on file a certified extract from the by-laws
showing that this person has authority to sign such obligation. If signed by an Attorney in Fact, we must have
copy of power of attorney for our files.
Page Intentionally Left Blank
CERTIFICATE OF INSURANCE
Pate Intentionally Left Blank
CERTIFICATE OF INSURANCE
TO: CITY OF LUBBOCK DATE:
P.O. BOX 2000, Room 204
LUBBOCK, TX 79457 TYPE OF PROJECT:
THIS IS TO CERTIFY THAT (Name and Address of Insured) is, at the date of this certificate,
insured by this Company with respect to the business operations hereinafter described, for the typed of insurance and in accordance with the provisions
f the standard policies used by this company, the further hereinafter
described. Exceptions to standard policy noted hereon.
TYPE OF INSURANCE
POLICY NUMBER
EFFECTIVE
EFFECTIVE
LIMITS
DATE
DATE
GENERAL LIABILITY
❑ Commercial General Liability
General Aggregate $
❑ Claims Made
Products-Comp/Op AGG $
❑ Occurrence
Personal & Adv. Injury $
❑ Owner's & Contractors Protective
Each Occurrence $
❑
Fire Damage (Any one Fire) $
Med Exp (Any one Person)
$
AUTOMOTIVE LIABILITY
❑ Any Auto
Combined Single Limit $
❑ All Owned Autos
Bodily Injury (Per Person) $
❑ Scheduled Autos
Bodily Injury (Per Accident) $
❑ Hired Autos
Property Damage $
❑ Non -Owned Autos
GARAGE LIABILITY
❑ Any Auto
Auto Only - Each Accident $
❑
Other than Auto Only:
Each Accident $
Aggregate $
❑ BUILDER'S RISK
❑ 100% of the Total Contract Price
$
❑ INSTALLATIONFLOATER
$
EXCESS LIABILITY
❑ Umbrella Form
Each Occurrence $
Aggregate $
❑ Other Than Umbrella Form
$
WORKERS COMPENSATION AND
EMPLOYERS' LIABILITY
The Proprietor/ ❑ Included
Statutory Limits
Partners/Executive ❑ Excluded
Each Accident $
Officers are:
Disease Policy Limit $
Disease -Each Employee $
OTHER
The above policies either in the body thereof or by appropriate endorsement provide that they may not be changed or canceled by the insurer in less
than the legal time required after the insured has received written notice of such change or cancellation, or in case there is no legal requirement, in less
than five days in advance of cancellation.
FIVE COPIES OF THE CERTIFICATE OF INSURANCE
MUST BE SENT TO THE CITY OF LUBBOCK
(Name of Insurer)
By:
Title:
The Insurance Certificates Furnished shall name the City of Lubbock as Additional Insured on Auto General
Liability and provide a Waiver of Subrogation in favor of the City of Lubbock. IT SHALL BE THE CONTRACTOR'S.
THE ADDITIONAL INSURED ENDORSEMENT SHALL INCLUDE PRODUCTS AND COMPLETE OPERATIONS.
CONTRACTORCHECKLIST
A CONTRACTOR SHALL:
(1) provide coverage for its employees providing services on a project, for the duration of the project based on
proper reporting of classification codes and payroll amounts and filling of any coverage agreements;
(2) provide a certificate of coverage showing workers' compensation coverage to the governmental entity prior
to beginning work on the project;
(3) provide the governmental entity, prior to the end of the coverage period, a new certificate of coverage
showing extension of coverage, if the coverage period shown on the contractor's current certificate of
coverage ends during the duration of the project;
(4) obtain from each person providing services on a project, and provide to the governmental entity:
(A) a certificate of coverage, prior to that person beginning work on the project, so the governmental
entity will have on file certificates of coverage showing coverage for all persons providing services
on the project; and
(B) no later than seven days after receipt by the contractor, a new certificate of coverage showing
extension of coverage, if the coverage period shown on the current certificate of coverage ends
during the duration of the project;
(5) retain all required certificates of coverage on file for the duration of the project and for one year thereafter;
(6) notify the governmental entity in writing by certified mail or personal delivery, within ten (10) days after
the contractor knew or should have known, of any change that materially affects the provision of coverage
of any person providing services on the project;
(7) post a notice on each project site informing all persons providing services on the project that they are
required to be covered, and stating how a person may verify current coverage and report failure to provide
coverage. This notice does not satisfy other posting requirements imposed by the Act or other commission
rules. This notice must be printed in at least 19-point normal type, and shall be in both English and Spanish
and any other language common to the worker population. The text for the notices shall be the following
text provided by the commission on the sample notice, without any additional words or changes:
PROOF OF COVERAGE SHALL BE FURNISHED TO THE CITY OF LUBBOCK IN THE FORM
OF A CERTIFICATE OF INSURANCE. THE INSURANCE CERTIFICATES FURNISHED
SHALL NAME THE CITY OF LUBBOCK AS ADDITIONAL INSURED ON AUTO/GENERAL
LIABILITY ON A PRIMARY AND NON-CONTRIBUTORY BASIS TO INCLUDE PRODUCTS
OF COMPLETE OPERATIONS. PROVIDE A WAIVER OF SUBROGATION IN FAVOR OF
THE CITY OF LUBBOCK. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO
PROVIDE TO THE OWNER ALL PROOF OF COVERAGE INSURANCE DOCUMENTS
INCLUDING WORKERS COMPENSATION COVERAGE FOR EACH SUBCONTRACTOR.
COPIES OF THE ENDORSEMENTS ARE REQUIRED.
REQUIRED WORKERS' COMPENSATION COVERAGE
"The law requires that each person working on this site or providing services related to this construction project must be
covered by workers' compensation insurance. This includes persons providing, hauling, or delivering equipment and
materials, or providing labor or transportation or other service related to the project, regardless of the identity of their
employer or status as an employee."
"Call the Texas Workers' Compensation Commission at 512-305-7238 to receive information on the legal requirement for
coverage, to verify whether your employer has provided the required coverage, or to report an employer's failure to provide
coverage." and contractually require each person with whom it contracts to provide services on a project, to:
(A) provide coverage based on proper reporting of classification codes and payroll amounts and filing
of any coverage agreements for all of its employees providing services on the project, for the
duration of the project;
(B) provide a certificate of coverage to the contractor prior to that person beginning work on the project;
(C) provide the contractor, prior to the end of the coverage period, a new certificate of coverage
showing extension of coverage, if the coverage period shown on the current certificate of coverage
ends during the duration of the project;
(D) obtain from each other person with whom it contracts, and provide to the contractor:
(i) a certificate of coverage, prior to the other person beginning work on the project; and
(ii) prior to the end of the coverage period, a new certificate of coverage showing extension of the
coverage period, if the coverage period shown on the current certificate of coverage ends during
the duration of the project;
(E) retain all required certificates of coverage on file for the duration of the project and for one year
thereafter;
(F) notify the governmental entity in writing by certified mail or personal delivery, within (ten) 10 days
after the person knew or should have known, of any change that materially affects the provision of
coverage of any person providing services on the project; and
(G) contractually require each other person with whom it contracts, to perform as required by
paragraphs (A) - (H), with the certificate of coverage to be provided to the person for whom they
are providing services.
The Contractor shall not commence work under this contract until he has obtained all insurance as required in the
General Conditions of the contract documents, from an underwriter authorized to do business in the State of Texas
and satisfactory to the City. Proof of coverage shall be furnished to the City and written notice of cancellation or
any material change will be provided ten (10) calendar days in advance of cancellation or change. All policies of
insurance, required herein, including policies of insurance required to be provided by Contractor and its
subcontractors, shall contain a waiver of any and all of the insurer's or payor's, in the event of self-insurance, rights
to subrogation that any such insurer or payor, in the event of self-insurance, may acquire by virtue of payment of
any loss under such insurance or self-insurance. All certificates of insurance submitted to the City in conformity
with the provisions hereof shall establish such waiver.
The Contractor shall procure and carry at its sole cost and expense through the life of this contract, insurance
protection as hereinafter specified. Coverage in excess of that specified herein also shall be acceptable. Such
insurance shall be carried with an insurance company authorized to transact business in the State of Texas and shall
cover all operations in connection with this contract, whether performed by the Contractor or a subcontractor, or
separate policies shall be provided covering the operation of each subcontractor. A certificate of insurance
specifying each and all coverages shall be submitted prior to contract execution.
Pate Intentionally Left Blank
CONTRACT
Page Intentionally Left Blank
Contract 17005
STATE OF TEXAS
COUNTY OF LUBBOCK
THIS AGREEMENT, made and entered into this 24" day of January, 2023 by and between the City of Lubbock,
County of Lubbock, State of Texas, acting by and through the Mayor, City of Lubbock, thereunto authorized to do so,
hereinafter referred to as OWNER, and Lone Star Dirt & Paving, Ltd. of the City of Lubbock, County of Lubbock and
the State of Texas hereinafter termed CONTRACTOR.
WITNESSETH: That for and in consideration of the payments and agreements hereinafter mentioned, to be made and
performed by the OWNER and under the conditions expressed in the bond bearing even date herewith (if any) the
CONTRACTOR hereby agrees with OWNER to commence and complete the construction of certain improvements
described as follows:
ITB 23-17005-KM Asphalt Patching
and all extra work in connection therewith, under the terms as stated in the contract documents and at his (or their) own
proper cost and expense to furnish all materials, supplies, machinery, equipment, tools, superintendence, labor, insurance
and other accessories and services necessary to complete the said construction in accordance with the contract documents
as defined in the General Condition of Agreement. Lone Star Dirt & Paving. Ltd.'s bid dated December 28, 20221 is
incorporated into and made a part of this agreement.
The CONTRACTOR hereby agrees to commence work within ten days after the date written notice to do so shall have
been given to him and to substantially complete same within the time specified in the contract documents.
The OWNER agrees to pay the CONTRACTOR in current funds for the performance of the contract in accordance with
the bid submitted therefore, subject to additions and deductions, as provided in the contract documents and to make payment
on account thereof as provided therein.
IN WITNESS WHEREOF, the parties to these presents have executed this agreement in Lubbock, Lubbock County,
Texas in the year and day first above written.
CONTRACTOR:
Lone Star PArt &
IN
TITLE:
COMPLETE ADDRESS:
CITY OF LU XAS (OWNER):
Ltd. By:
Tray Payne, or
AT S .
Reb ca Garza, City Secretary
Lone Star Dirt & Paving, Ltd.
11820 University Ave.
Lubbock, TX 79423
ATTEST:
ICorporate Secretary
D
APPROV�D AS TO CONT
Y1zi n Y--, r
Public Works Representative
k6JOAANd zA 3
Name (Printed) Date
APPROVED AS TO FORM:
PA
elli Leisure, Assistant City Attorney
I
Page Intentionally Left Blank
GENERAL CONDITIONS OF THE AGREEMENT
Page Intentionally Left Blank
GENERAL CONDITIONS OF THE AGREEMENT
1. OWNER
Whenever the word Owner, or First Party, are used in this contract, it shall be understood as referring
to the City of Lubbock, Texas.
2. CONTRACTOR
Whenever the word Contractor, or Second Party, is used, it shall be understood to mean the person,
persons, co -partnership or corporation, to wit Lone Star Dirt & Paving, Ltd., who has agreed to
perform the work embraced in this contract, or their legal representative.
3. OWNER'S REPRESENTATIVE
Whenever the word Owner's Representative or representative is used in this contract, it shall be
understood as referring to, City of Lubbock, or its representative Shane Childers, Sr Engineering
Inspector, so designated who will inspect constructions; or to such other representatives, supervisors,
architects, engineers, or inspectors as may be authorized by said Owner to act in any particular under
this agreement. Engineers, supervisors or inspectors will act for the Owner under the direction of
Owner's Representative, but shall not directly supervise the Contractor or persons acting on behalf
of the Contractor.
4. CONTRACT DOCUMENTS
The contract's documents shall consist of the Notice to Bidders, General Instructions to Bidders,
Response, Signed Agreement, Statutory Bonds (if required), General Conditions of the Agreement,
Special Conditions of the Agreement (if any), Specifications, Plans, Insurance Certificates, and all
other documents made available to Bidder for inspection in accordance with the Notice to Bidders.
The above described materials are sometimes referred to herein as the "contract" or "contract
documents".
5. INTERPRETATION OF PHRASES
Whenever the words "Directed," "Permitted," "Designated," "Required," "Considered Necessary,"
"Prescribed," or words of like import are used, it shall be understood that the direction, requirement,
permission, order, designation or prescription of the Owner's Representative is intended; and
similarly, the words "Approved," "Acceptable," "Satisfactory," or words of like import shall mean
approved by or acceptable or satisfactory to the Owner's Representative.
6. SUBCONTRACTOR
The term Subcontractor, as employed herein, includes only those having a direct contract with the
Contractor for performance of work on the project contemplated by these contract documents.
Owner shall have no responsibility to any Subcontractor employed by Contractor for performance
of work on the project contemplated by these contract documents, but said Subcontractors will
look exclusively to Contractor for any payments due Subcontractor. The City reserves the right to
approve or disapprove the selection of any subcontractor(s).
7. WRITTEN NOTICE
Written notice shall be deemed to have been duly served if delivered in person to the individual or
to a member of the firm or to an officer of the corporation for whom it is intended, or if delivered at
or sent certified mail to the last business address known to the party who gives the notice.
8. CONTRACTOR'S RESPONSIBILITIES
Unless otherwise stipulated, the Contractor shall provide and pay for all materials, supplies,
machinery, equipment, tools, superintendence, labor, insurance, and all water, light, power, fuel,
transportation and all other facilities necessary for the execution and completion of the work covered
by the contract documents. Unless otherwise specified, all materials shall be new and both
workmanship and materials shall be of a good quality. The Contractor shall, if required, furnish
satisfactory evidence as to the kind and quality of materials. Materials or work described in words
which so applied have well known, technical or trade meaning shall be held to refer such recognized
standards.
All work shall be done and all materials furnished in strict conformity with the contract documents.
9. SUBSTANTIALLY COMPLETED
The term "Substantially Completed" is meant that the structure or project contemplated by the
contract documents has been made suitable for use or occupancy or the facility is in a condition to
serve its intended purpose, but still may require minor miscellaneous work and adjustment.
10. LAYOUT
Except as specifically provided herein, the Contractor shall be responsible for laying out all work
and shall accomplish this work in a manner acceptable to the Owner's Representative. The Owner's
Representative will check the Contractor's layout of all major structures and any other layout work
done by the Contractor at Contractor's request, but this check does not relieve the Contractor of the
responsibility of correctly locating all work in accordance with the Plans and Specifications.
11. KEEPING OF PLANS AND SPECIFICATIONS ACCESSIBLE
The Contractor shall be furnished five copies of all Plans and Specifications without expense to
Contractor and Contractor shall keep one copy of same consistently accessible on the job site.
12. RIGHT OF ENTRY
The Owner's Representative may make periodic visits to the site to observe the progress or quality
of the executed work and to determine, in general, if the work is proceeding in accordance with the
contract documents. Owner's Representative will not be required to make exhaustive or continuous
onsite inspections to check the quality or quantity of the work, nor will Owner's Representative be
responsible for the construction means, methods, techniques, sequences or procedures, or the safety
precautions incident thereto. Notwithstanding the Owner's Representative's rights of entry
hereunder, the Owner's Representative will not be responsible for the Contractor's failure to perform
the work in accordance with the Contract Documents.
13. LINES AND GRADES
The Contractor is responsible for construction layout based on the control provided in the
construction documents. All lines and grades shall be furnished whenever Owner's Representative
(as distinguished from Resident Project Representative(s)) deems said lines and grades are necessary
for the commencement of the work contemplated by these contract documents or the completion of
the work contemplated by these contract documents. Whenever necessary, Contractor shall suspend
its work in order to permit Owner's Representative to comply with this requirement, but such
suspension will be as brief as practical and Contractor shall be allowed no extra compensation
therefore. The Contractor shall give the Owner's Representative ample notice of the time and place
where lines and grades will be needed. All stakes, marks, etc., shall be carefully preserved by the
Contractor, and in case of careless destruction or removal by Contractor, its Subcontractors, or its
employees, such stakes, marks, etc., shall be replaced by the Owner's Representative at Contractor's
expense.
14. OWNER'S REPRESENTATIVE'S AUTHORITY AND DUTY
Unless otherwise specified, it is mutually agreed between the parties to this Agreement that the
Owner's Representative (as distinguished from Resident Project Representative(s))has the authority
to review all work included herein. The Owner's Representative has the authority to stop the work
whenever such stoppage may be necessary to ensure the proper execution of the contract. The
Owner's Representative shall, in all cases, determine the amounts and quantities of the several kinds
of work which are to be paid for under the contract documents, and shall determine all questions in
relation to said work and the construction thereof, and shall, in all cases, decide every question which
may arise relative to the execution of this contract on the part of said Contractor. The decision of
the Owner's Representative shall be conclusive in the absence of written objection to same delivered
to Owner's Representative within fifteen (15) calendar days of any decision or direction by Owner's
Representative. In the absence of timely written objection by Contractor, as provided herein, any
and all objection or objections shall be deemed waived.
15. SUPERINTENDENCE AND INSPECTION
It is agreed by the Contractor that the Owner's Representative shall be and is hereby authorized to
appoint from time to time such subordinate engineers, supervisors, or inspectors, as distinguished
from Resident Project Representative, as the said Owner's Representative may deem proper to
inspect the materials furnished and the work done under this Agreement, and to see that said material
is furnished and said work is done in accordance with the specifications therefore. The Contractor
shall furnish all reasonable aid and assistance required by the subordinate engineers, supervisors or
inspectors for the proper inspection and examination of the work. The Contractor shall regard and
obey the directions and instructions of any subordinate engineers, supervisors or inspectors so
appointed, when such directions and instructions are consistent with the obligations of this
Agreement and accompanying plans and specifications provided, however, should the Contractor
object to any orders by any subordinate engineer, supervisor or inspector, the Contractor may within
fifteen (15) calendar days make written appeal to the Owner's Representative for its decision. In the
absence of timely written objection by Contractor, as provided herein, any and all objection or
objections shall be deemed waived.
16. CONTRACTOR'S DUTY AND SUPERINTENDENCE
The Contractor shall give personal attention to the faithful prosecution and completion of this
contract and shall keep on the work, during its progress, a competent superintendent and any
necessary assistants, all satisfactory to Owner's Representative. The superintendent shall represent
the Contractor in its absence and all directions given to superintendent shall be binding as if given
to the Contractor. It is expressly agreed that adequate supervision by competent and reasonable
representatives of the Contractor is essential to the proper performance of the work and lack of such
supervision shall be grounds for suspending operations of the Contractor.
The work, from its commencement to completion, shall be under the exclusive charge and control
of the Contractor and all risk in connection therewith shall be borne by the Contractor.
The Owner or Owner's Representatives shall not be responsible for the acts or omissions of the
Contractor, or any subcontractors, or any of Contractor's agents or employees, or any other persons
performing any of the work.
17. CONTRACTOR'S UNDERSTANDING
It is understood and agreed that the Contractor has, by careful examination, satisfied itself as to the
nature and location of the work, the confirmation of the ground, the character, quality and quantity
of materials to be encountered, the character of equipment and facilities needed preliminary to and
during the prosecution of the work, and the general and local conditions, and all other matters which
in any way affect the work under the contract documents. No oral agreement or conversation with
any officer, agent, or employee of the Owner, or Owner's Representative either before or after the
execution of this contract, shall affect or modify any of the terms or obligations herein contained.
Subject to the rights of Owner as set forth in Paragraph 23 hereof, all modifications and/or
amendments to the contract documents, shall be in writing, and executed by Owner's Representative
and Contractor.
Unless otherwise specified herein, all loss, expense or damage to Contractor arising out of the nature
of the work to be done, or from the action of the elements, or from any unforeseen circumstance and
the prosecution of the work, shall be sustained and borne by the Contractor at its own cost and
expense.
18. CHARACTER OF WORKERS
The Contractor agrees to employ only orderly and competent workers, skillful in the performance in
the type of work required under this contract, to do the work; and agrees that whenever the Owner's
Representative shall inform Contractor in writing that any person or persons on the work, are, in
Owner's Representative's sole opinion, incompetent, unfaithful, disorderly, or otherwise
unacceptable to Owner or Owner's Representative, such person or persons shall be discharged from
the work and shall not again be employed on the work without the Owner's Representative's written
consent.
19. CONSTRUCTION PLANT
The Contractor shall provide all labor, tools, equipment, machinery and materials necessary in the
prosecution and completion of this contract where it is not otherwise specifically provided that
Owner shall furnish same, and it is also understood that Owner shall not be held responsible for the
care, preservation, conservation, or protection of any materials, tools, equipment or machinery or
any part of the work until it is finally completed and accepted.
The building of structures for the housing of workers or equipment will be permitted only at such
places as the Owner's Representative shall consent or direct, and the sanitary conditions of the
grounds in or about such structure shall at all times be maintained in a manner satisfactory to the
Owner's Representative.
20. SANITATION
Necessary sanitary conveniences for the use of laborers on the work site, properly secluded from
public observation, shall be constructed and maintained by the Contractor in such manner and at
such points as shall be approved by the Owner's Representative and their use shall be strictly
enforced.
21. OBSERVATION AND TESTING
The Contractor is responsible for construction quality control testing, cost, and reporting of the type
and extent required by the contract documents. The Owner or Owner's Representative shall have
the right at all times to observe and test the work. Contractor shall make necessary arrangements
and provide proper facilities and access for such observation and testing at any location wherever
such work is in preparation or progress. Contractor shall ascertain the scope of any observation that
may be contemplated by Owner or Owner's Representative and shall give ample notice as to the time
each part of the work will be ready for such observation. Owner or Owner's Representative may
reject any such work found to be defective or not in accordance with the contract documents,
regardless of the stage of its completion or the time or place of discovery of such errors and
regardless of whether Owner's Representative has previously accepted the work. If any such work
should be covered without approval or consent of the Owner, it must, if requested by Owner or
Owner's Representative, be uncovered for examination at Contractor's expense. In the event that
any part of the work is being fabricated or manufactured at a location where it is not convenient for
Owner or Owner's Representative to make observations of such work or require testing of said work,
then in such event Owner or Owner's Representative may require Contractor to furnish Owner or
Owner's Representative certificates of inspection, testing or approval made by persons competent to
perform such tasks at the location where that part of the work is being manufactured or fabricated.
All such tests will be in accordance with the methods prescribed by the American Society for Testing
and Materials or such other applicable organization as may be required by law or the contract
documents.
If any such work which is required to be inspected, tested, or approved is covered up without written
approval or consent of the Owner or Owner's Representative, it must, if requested by the Owner or
Owner's Representative, be uncovered for observation and testing at the Contractor's expense. The
cost of all such inspections, tests and approvals shall be borne by the Contractor unless otherwise
provided herein. Any work which fails to meet the requirements of any such tests, inspections or
approvals, and any work which meets the requirements of any such tests or approvals but does not
meet the requirements of the contract documents shall be considered defective, and shall be corrected
at the Contractor's expense.
Neither observations by the Owner or Owner's Representative, nor inspections, tests, or approvals
made by Owner, Owner's Representative, or other persons authorized under the contract documents
22
23
to make such inspections, tests, or approvals shall relieve the Contractor from its obligation to
perform the work in accordance with the requirements of the contract documents.
DEFECTS AND THEIR REMEDIES
It is expressly agreed that if the work or any part thereof, or any material brought on the site of the
work for use in the work or selected for the same, shall be deemed by the Owner or Owner's
Representative as unsuitable or not in conformity with plans, specifications and/or contract
documents, the Contractor shall, after receipt of written notice thereof from the Owner's
Representative, forthwith remove such material and rebuild or otherwise remedy such work so that
it shall be in full accordance with the contract documents. It is further agreed that any remedial
action contemplated as hereinabove set forth shall be at Contractor's expense.
CHANGES AND ALTERATIONS
The Contractor further agrees that the Owner may make such changes and alterations as the Owner
may see fit, in the line, grade, form dimensions, plans or materials for the work herein contemplated,
or any part thereof, either before or after the beginning of the construction, without affecting the
validity of this contract and the accompanying bond.
If such changes or alterations diminish the quantity of the work to be done, they shall not constitute
the basis for a claim for damages, or anticipated profits on the work that may be dispensed with. If
they increase the amount of work, and the increased work can fairly be classified under the
specifications, such increase shall be paid according to the quantity actually done and at the unit
price established for such work under this contract; otherwise such additional work shall be paid for
as provided under Extra Work. In case the Owner shall make such changes or alterations as shall
make useless any work already done or material already furnished or used in said work, then the
Owner shall recompense the Contractor for any material or labor so used, and for actual expenses
incurred in preparation for the work as originally planned.
24. EXTRA WORK
The term "extra work" as used in this contract shall be understood to mean and include all work that
may be required by the Owner or Owner's Representative to be done by the Contractor to accomplish
any change, alteration or addition to the work as shown on the plans and specifications or contract
documents and not covered by Contractor's proposal, except as provided under Changes and
Alterations in Paragraph 23.
It is agreed that the Contractor shall perform all extra work under the observation of the Owner's
Representative when presented with a written work order signed by the Owner's Representative;
subject, however, to the right of the Contractor to require written confirmation of such extra work
order by the Owner. It is also agreed that the compensation to be paid to the Contractor for
performing said extra work shall be determined by the following methods:
Method (A) - By agreed unit prices; or
Method (B) - By agreed lump sum; or
Method (C) - If neither Method (A) or Method (B) be agreed upon before the extra work is
commenced, then the Contractor shall be paid the lesser of the following: (1)
actual field cost of the extra work, plus fifteen (15%) percent to the firm
actually performing the work, and additional higher -tier markups limited to
5% to cover additional overhead and insurance costs; or (2) the amount that
would have been charged by a reasonable and prudent Contractor as a
reasonable and necessary cost for performance of the extra work, as estimated
by the Engineer and approved by the Owner..
In the event said extra work be performed and paid for under Method (C)(1), then the provisions of
this paragraph shall apply and the "actual field cost" is hereby defined to include the cost of all
workers, such as foremen, timekeepers, mechanics and laborers, materials, supplies, teams, trucks,
rentals on machinery and equipment, for the time actually employed or used on such extra work,
plus actual transportation charges necessarily incurred, together with all expenses incurred directly
on account of such extra work, including Social Security, Old Age Benefits, Maintenance Bonds,
Public Liability and Property Damage and Workers' Compensation and all other insurances as may
be required by law or ordinances or directed by the Owner or Owner's Representative, or by them
agreed to. Owner's Representative may direct the form in which accounts of the actual field cost
shall be kept and records of these accounts shall be made available to the Owner's Representative.
The Owner's Representative may also specify in writing, before the work commences, the method
of doing the work and the type and kind of machinery and equipment to be used; otherwise, these
matters shall be determined by the Contractor. Unless otherwise agreed upon, the prices for the use
of machinery and equipment shall be determined by using 100%, unless otherwise specified, of the
latest Schedule of Equipment and Ownership Expenses adopted by the Associated General
Contractors of America. Where practical, the terms and prices for the use of machinery and
equipment shall be incorporated in the written extra work order. The fifteen percent (15%) of the
actual field cost to be paid to Contractor shall cover and compensate Contractor for its profit,
overhead, general superintendence and field office expense, and all other elements of cost and
expense not embraced within the actual field cost as herein defined, save that where the Contractor's
Camp or Field Office must be maintained primarily on account of such Extra Work, then the cost to
maintain and operate the same shall be included in the "actual field cost."
No claim for extra work of any kind will be allowed unless ordered in writing by Owner's
Representative. In case any orders or instructions appear to the Contractor to involve extra work for
which Contractor should receive compensation or an adjustment in the construction time, Contractor
shall prior to commencement of such extra work, make written request to the Owner's Representative
for a written order authorizing such extra work. Should a difference of opinion arise as to what does
or does not constitute extra work or as to the payment therefore, and the Owner's Representative
insists upon its performance, the Contractor shall proceed with the work after making written request
for written order and shall keep adequate and accurate account of the actual field cost thereof, as
provided under Method (C) (1). If Contractor does not notify Owner's Representative before the
commencement of any extra work, any claim for payment due to alleged extra work shall be deemed
waived.
25. DISCREPANCIES AND OMISSIONS
It is further agreed that it is the intent of the contract documents that all work described in the
proposal, the specifications, plans and other contract documents, is to be done for the prices quoted
by the Contractor and that such price shall include all appurtenances necessary to complete the work
in accordance with the intent of these contract documents as interpreted by Owner's Representative.
Notices of any discrepancies or omissions in these plans, specifications, or contract documents,
shall be given to the Owners' Representative and a clarification obtained before the proposals
are received, and if no such notice is received by the Owner's Representative prior to the
opening of proposals, then it shall be deemed that the Contractor fully understands the work
to be included and has provided sufficient sums in its proposal to complete the work in
accordance with these plans and specifications. If Contractor does not notify Owner's
Representative before offering of any discrepancies or omissions, then it shall be deemed for
all purposes that the plans and specifications are sufficient and adequate for completion of the
project. It is further agreed that any request for clarification must be submitted no later than
rive (5) calendar days prior to the opening of proposals. In the absence of a requested
clarification for a conflict in the documents prior to proposals being reviewed, it will be
assumed that the Contractor proposes the higher cost alternative on conflicts identified after
proposals are reviewed.
26. RIGHT OF OWNER TO MODIFY METHODS AND EQUIPMENT
If at any time the methods or equipment used by the Contractor are found to be inadequate to secure
the quality of work with the rate of progress required under this contract, the Owner or Owner's
Representative may order the Contractor in writing to increase their safety or improve their character
and efficiency and the Contractor shall comply with such order. If, at any time, the working force
of the Contractor is inadequate for securing the progress herein specified, the Contractor shall, if so
ordered in writing, increase its force or equipment, or both, to such an extent as to give reasonable
assurance of compliance with the schedule of progress.
27. PROTECTION AGAINST ACCIDENT TO EMPLOYEES AND THE PUBLIC AND GENERAL
INDEMNITY
The Contractor shall take out and procure a policy or policies of Workers' Compensation Insurance
with an insurance company licensed to transact business in the State of Texas, which policy shall
comply with the Workers' Compensation laws of the State of Texas. The Contractor shall at all
times exercise reasonable precaution for the safety of employees and others on or near the work and
shall comply with all applicable provisions of federal, state and municipal laws and building and
construction codes. All machinery and equipment and other physical hazards shall be guarded in
accordance with the "Manual of Accident Prevention in Construction" of Associated General
Contractors of America, except where incompatible with federal, state or municipal laws or
regulations. The Contractor, its sureties and insurance carriers shall defend, indemnify and hold
harmless the Owner and Engineer and all of its officers, agents and employees against any all losses,
costs, damages, expenses, liabilities, claims and/or causes of action, whether known or unknown,
fixed, actual, accrued or contingent, liquidated or unliquidated, including, but not limited to,
attorneys' fees and expenses, in connection with, incident to, related to, or arising out of, the
Contractor's or any subcontractor's, agent's or employee's, in any manner whatsoever, omission,
execution and/or supervision of this contract, and the project which is the subject matter of this
contract.
The safety precautions taken shall be the sole responsibility of the Contractor, in its sole discretion
as an Independent Contractor; inclusion of this paragraph in the Agreement, as well as any notice
which may be given by the Owners or the Owner's Representative concerning omissions under this
paragraph as the work progresses, are intended as reminders to the Contractor of its duty and shall
not be construed as any assumption of duty to supervise safety precautions by either the Contractor
or any of its subcontractors.
28. CONTRACTOR'S INSURANCE
The Contractor shall not commence work under this contract until he has obtained all insurance as
required in the General Conditions of the contract documents, from an underwriter authorized to do
business in the State of Texas and satisfactory to the City. Proof of coverage shall be furnished to
the City and written notice of cancellation or any material change will be provided ten (10) calendar
days in advance of cancellation or change. All policies of insurance, required herein, including
policies of insurance required to be provided by Contractor and its subcontractors, shall contain a
waiver of any and all of the insurer's or payor's, in the event of self-insurance, rights to subrogation
that any such insurer or payor, in the event of self-insurance, may acquire by virtue of payment of
any loss under such insurance or self-insurance. All certificates of insurance submitted to the City
in conformity with the provisions hereof shall establish such waiver.
The Contractor shall procure and carry at its sole cost and expense through the life of this contract,
insurance protection as hereinafter specified. Coverage in excess of that specified herein also shall
be acceptable. Such insurance shall be carried with an insurance company authorized to transact
business in the State of Texas and shall cover all operations in connection with this contract, whether
performed by the Contractor or a subcontractor, or separate policies shall be provided covering the
operation of each subcontractor. A certificate of insurance specifying each and all coverages shall
be submitted prior to contract execution.
PROOF OF COVERAGE SHALL BE FURNISHED TO THE CITY OF LUBBOCK IN THE
FORM OF A CERTIFICATE OF INSURANCE. THE INSURANCE CERTIFICATES
FURNISHED SHALL NAME THE CITY OF LUBBOCK AS ADDITIONAL INSURED ON
AUTO/GENERAL LIABILITY ON A PRIMARY AND NON-CONTRIBUTORY BASIS TO
INCLUDE PRODUCTS OF COMPLETE OPERATIONS. PROVIDE A WAIVER OF
SUBROGATION IN FAVOR OF THE CITY OF LUBBOCK. IT SHALL BE THE
CONTRACTOR'S RESPONSIBILITY TO PROVIDE TO THE OWNER ALL PROOF OF
COVERAGE INSURANCE DOCUMENTS INCLUDING WORKERS COMPENSATION
COVERAGE FOR EACH SUBCONTRACTOR. COPIES OF THE ENDORSEMENTS ARE
REQUIRED.
A. Commercial General Liability Insurance (Primary Additional Insured and Waiver of
Subrogation
required)
The contractor shall have Comprehensive General Liability Insurance with limits of
$1,000,000 Combined Single Limit in the aggregate and $1,000,000 per occurrence to
include:
Products & Completed Operations Hazard
Contractual Liability
Personal Injury & Advertising Injury
Fire Damage (any one fire)
Medical Expenses (any one person
B. Owner's and Contractor's Protective Liability Insurance — NOT REQUIRED
C. Comprehensive Automobile Liability Insurance (Waiver of Subrogation Required)
The Contractor shall have Comprehensive Automobile Liability Insurance with limits of not
less than; Bodily Injury/Property Damage, $1,000,000 Combined Single Limit per
occurrence, to include all owned and non -owned cars including: Employers Non -ownership
Liability Hired and Non -owned Vehicles.
D. Builder's Risk Insurance/Installation Floater Insurance — NOT REQUIRED
E. Umbrella Liability Insurance (Primary Additional Insured and Waiver of Subrogation
required)
The Contractor shall have Umbrella Liability Insurance in the amount of $4,000,000 per
occurrence on all contracts with coverage to correspond with Comprehensive General
Liability and Comprehensive Automobile Liability coverages.
F. Worker's Compensation and Employers Liability Insurance (Waiver of Subrogation
required)
Worker's Compensation Insurance covering all employees whether employed by the
Contractor or any Subcontractor on the job with Employers Liability of at least $1,000,000
1. Definitions:
Certificate of coverage ("certificate") - A copy of a certificate of insurance, a
certificate of authority to self -insure issued by the commission, or a coverage
agreement (TWCC-81, TWCC-82, TWCC-83, or TWCC-84), showing statutory
workers' compensation insurance coverage for the person's or entity's employees
providing services on a project, for the duration of the project.
Duration of the project - includes the time from the beginning of the work on the
project until the Contractor's/person's work on the project has been completed and
accepted by the governmental entity.
Persons providing services on the project ("subcontractor" in Section 406.096, Texas
Labor Code) - includes all persons or entities performing all or part of the services
the Contractor has undertaken to perform on the project, regardless of whether that
person contracted directly with the Contractor and regardless of whether that person
has employees. This includes, without limitation, independent contractors,
subcontractors, leasing companies, motor carriers, owner -operators, employees of
any such entity, or employees of any entity which furnishes persons to provide
services on the project. "Services" include, without limitation, providing, hauling, or
delivering equipment or materials, or providing labor, transportation, or other service
related to a project. "Services" does not include activities unrelated to the project,
such as food/beverage vendors, office supply deliveries, and delivery of portable
toilets.
2. The Contractor shall provide coverage, based on proper reporting of classification
codes and payroll amounts and filing of any coverage agreements, which meets the
statutory requirements of Texas Labor Code, Section 401.011(44) for all employees
of the contractor providing services on the project, for the duration of the project.
3. The Contractor must provide a certificate of coverage to the governmental entity prior
to being awarded the contract.
4. If the coverage period shown on the Contractor's current certificate of coverage ends
during the duration of the project, the Contractor must, prior to the end of the
coverage period, file a new certificate of coverage with the governmental entity
showing that coverage has been extended.
5. The Contractor shall obtain from each person providing services on the project, and
provide to the governmental entity:
(a) a certificate of coverage, prior to that person beginning work on the project,
so the governmental entity will have on file certificates of coverage showing
coverage for all persons providing services on the project; and
(b) no later than seven days after receipt by the Contractor, a new certificate of
coverage showing extension of coverage, if the coverage period shown on the
current certificate of coverage ends during the duration of the project.
6 The Contractor shall retain all required certificates of coverage for the duration of the
project and for one year thereafter.
7. The Contractor shall notify the governmental entity in writing by certified mail or
personal delivery, within 10 days after the Contractor knew or should have known,
of any change that materially affects the provision of coverage of any person
providing services on the project.
8. The Contractor shall post on each project site a notice, in the text, form and manner
prescribed by the Texas Workers' Compensation Commission, informing all persons
providing services on the project that they are required to be covered, and stating how
a person may verify coverage and report lack of coverage.
9. The Contractor shall contractually require each person with whom it contracts to
provide services on the project, to:
(a) provide coverage, based on proper reporting of classification codes and
payroll amounts and filing of any coverage agreements, which meets the
statutory requirements of Texas Labor Code, Section 401.011(44) for all of
its employees providing services on the project, for the duration of the project;
(b) provide to the Contractor, prior to that person beginning work on the project,
a certificate of coverage showing that coverage is being provided for all
employees of the person providing services on the project, for the duration of
the project;
(c) provide the Contractor, prior to the end of the coverage period, a new
certificate of coverage showing extension of coverage, if the coverage period
shown on the current certificate of coverage ends during the duration of the
project;
(d) obtain from each other person with whom it contracts, and provide to the
Contractor:
(1) a certificate of coverage, prior to the other person beginning work on
the project; and
(2) a new certificate of coverage showing extension of coverage, prior to
the end of the coverage period, if the coverage period shown on the
current certificate of coverage ends during the duration of the project;
(e) retain all required certificates of coverage on file for the duration of the
project and for one year thereafter;
(f) notify the governmental entity in writing by certified mail or personal
delivery, within 10 days after the person knew or should have known, of any
change that materially affects the provision of coverage of any person
providing services on the project; and
(g) contractually require each person with whom it contracts to perform as
required by paragraphs (a) - (g), with the certificates of coverage to be
provided to the person for whom they are providing services.
10. By signing this contract or providing or causing to be provided a certificate of
coverage, the Contractor is representing to the governmental entity that all employees
of the Contractor who will provide services on the project will be covered by worker's
compensation coverage for the duration of the project, that the coverage will be based
on proper reporting of classification codes and payroll amounts, and that all coverage
agreements will be filed with the appropriate insurance carrier or, in the case of a
self -insured, with the commission's Division of Self -Insurance Regulation. Providing
false or misleading information may subject the Contractor to administrative
penalties, criminal penalties, civil penalties, or other civil actions.
11. The Contractor's failure to comply with any of these provisions is a breach of contract
by the Contractor which entitles the governmental entity to declare the contract void
if the Contractor does not remedy the breach within ten days after receipt of notice of
breach from the governmental entity.
G. Proof of Coverage
Before work on this contract is commenced, each Contractor and subcontractor shall submit
to the Owner for approval five Certificates of Insurance covering each insurance policy
carried and offered as evidence of compliance with the above insurance requirements, signed
by an authorized representative of the insurance company setting forth:
(1) The name and address of the insured.
(2) The location of the operations to which the insurance applies.
(3) The name of the policy and type or types of insurance in force thereunder on the date
borne by such certificate.
(4) The expiration date of the policy and the limit or limits of liability thereunder on the
date borne by such certificate.
(5) A provision that the policy may be canceled only by mailing written notice to the
named insured at the address shown in the proposal specifications.
(6) A provision that written notice shall be given to the City ten days prior to any change
in or cancellation of the policies shown on the certificate.
(7) The certificate or certificates shall be on the form (or identical copies thereof)
contained in the job specifications. No substitute of nor amendment thereto will be
acceptable.
(8) If policy limits are paid, new policy must be secured for new coverage to complete
project.
(9) A Contractor shall:
(a) provide coverage for its employees providing services on a project, for the
duration of the project based on proper reporting of classification codes and
payroll amounts and filling of any coverage agreements;
(b) provide a certificate of coverage showing workers' compensation coverage to
the governmental entity prior to beginning work on the project;
(c) provide the governmental entity, prior to the end of the coverage period, a
new certificate of coverage showing extension of coverage, if the coverage
period shown on the Contractor's current certificate of coverage ends during
the duration of the project;
(d) obtain from each person providing services on a project, and provide to the
governmental entity:
(i) a certificate of coverage, prior to that person beginning work on the
project, so the governmental entity will have on file certificates of
coverage showing coverage for all persons providing services on the
project; and
(ii) no later than seven days after receipt by the Contractor, a new
certificate of coverage showing extension of coverage, if the coverage
period shown on the current certificate of coverage ends during the
duration of the project;
(e) retain all required certificates of coverage on file for the duration of the
project and for one year thereafter;
(f) notify the governmental entity in writing by certified mail or personal
delivery, within 10 days after the Contractor knew or should have known, of
any change that materially affects the provision of coverage of any person
providing services on the project;
(g) post a notice on each project site informing all persons providing services on
the project that they are required to be covered, and stating how a person may
verify current coverage and report failure to provide coverage. This notice
does not satisfy other posting requirements imposed by the Texas Worker's
Compensation Act or other commission rules. This notice must be printed
with a title in at least 30-point bold type and text in at least 19-point normal
type, and shall be in both English and Spanish and any other language
common to the worker population. The text for the notices shall be the
following text provided by the commission on the sample notice, without any
additional words or changes:
REQUIRED WORKERS' COMPENSATION COVERAGE
"The law requires that each person working on this site or providing
services related to this construction project must be covered by workers'
compensation insurance. This includes persons providing, hauling, or
delivering equipment or materials, or providing labor or transportation or
other service related to the project, regardless of the identity of their
employer or status as an employee. "
"Call the Texas Workers' Compensation Commission at 800-372-7713 or
512-804-4000 (www.tdLstate.tx.us) to receive information of the legal
requirements for coverage, to verify whether your employer has provided
the required coverage, or to report an employer's failure to provide
coverage; " and
(h) contractually require each person with whom it contracts to provide services
on a project, to:
(i) provide coverage based on proper reporting of classification codes and
payroll amounts and filing of any coverage agreements for all of its
employees providing services on the project, for the duration of the
project;
(ii) provide a certificate of coverage to the Contractor prior to that person
beginning work on the project;
(iii) include in all contracts to provide services on the project the following
language:
"By signing this contract or providing or causing to
be provided a certificate of coverage, the person
signing this contract is representing to the
governmental entity that all employees of the
person signing this contract who will provide
services on the project will be covered by workers'
compensation coverage for the duration of the
project, that the coverage will be based on proper
reprinting of classification codes and payroll
amounts, and that all coverage agreements will be
filed with the appropriate insurance carrier or, in
the case of a self -insured, with the commission's
Division of Self -Insurance Regulation. Providing
false or misleading information may subject the
Contractor to administrative penalties, criminal
penalties, civil penalties, or other civil actions.";
(iv) provide the Contractor, prior to the end of the coverage period, a new
certificate of coverage showing extension of coverage, if the coverage
period shown on the current certificate of coverage ends during the
duration of the project;
(v) obtain from each other person with whom it contracts, and provide to
the Contractor:
(1) a certificate of coverage, prior to the other person beginning
work on the project; and
(2) prior to the end of the coverage period, a new certificate of
coverage showing extension of the coverage period, if the
coverage period shown on the current certificate of coverage
ends during the duration of the project;
(vi) retain all required certificates of coverage on file for the duration of
the project and for one year thereafter;
(vii) notify the governmental entity in writing by certified mail or personal
delivery, within 10 days after the person knew or should have known,
of any change that materially affects the provision of coverage of any
person providing services on the project; and
(viii) contractually require each other person with whom it contracts, to
perform as required by paragraphs (i)-(viii), with the certificate of
coverage to be provided to the person for whom they are providing
services.
29. DISABLED EMPLOYEES
Contractors having more than fifteen (15) employees agree to comply with the Americans with
Disabilities Act of 1990, and agree not to discriminate against a qualified individual with a disability
because of the disability of such individual in regard to job application procedures, the hiring,
advancement, or discharge of employees, employee compensation, job training, and other terms,
conditions, and privileges of employment.
30. PROTECTION AGAINST CLAIMS OF SUBCONTRACTORS, LABORERS, MATERIALMEN,
AND FURNISHERS OF MACHINERY, EQUIPMENT AND SUPPLIES
Without limiting, in any way, manner or form, the indemnity provided by Contractor in paragraph
27 hereof, the Contractor agrees that it will indemnify and save the Owner and Engineer and all of
its officers, agents and employees, harmless against any and all claims, liabilities, losses, damages,
expenses and causes of action arising out of, in any way, manner or form, the demands of
subcontractors, laborers, workmen, mechanics, material men and furnishers of machinery and parts
thereof, equipment, power tools, and supplies, incurred in the performance of this contract and the
project which is the subject matter of this contract. When Owner so desires, the Contractor shall
furnish satisfactory evidence that all obligations of the nature hereinabove designated have been
paid, discharged or waived.
31. PROTECTION AGAINST ROYALTIES OR PATENT INVENTION
The Contractor shall pay all royalties and license fees, and shall provide for the use of any design,
device, material or process covered by letters patent or copyright by suitable legal agreement with
the Patentee or owner thereof. Without limiting, in any way, manner or form, the indemnity provided
by Contractor in paragraph 27 hereof, the Contractor shall defend all suits or claims for infringement
of any patent or copyrights and shall indemnify and save the Owner and Engineer, and all of its
officers, agents and employees harmless from any loss on account thereof, except that Owner shall
defend all such suits and claims and shall be responsible for all such loss when a particular design,
device, material or process or the product of a particular manufacturer or manufacturers is specified
or required in these contract documents by Owner; provided, however, if choice of alternate design,
device, material or process is allowed to the Contractor, then Contractor shall indemnify and save
Owner, and all of its officers, agents and employees harmless from any loss on account thereof.
Notwithstanding anything herein to the contrary, if the material or process specified or required by
Owner and/or this contract is an infringement, the Contractor shall be responsible for such loss unless
it gives written notice of such infringement to the Owner's Representative prior to offering.
32. LAWS AND ORDINANCES
The Contractor shall at all times observe and comply with all federal, state and local laws, ordinances
and regulations, which in any manner affect the contract or the work, and without limiting, in any
way, manner or form, the indemnity provided by Contractor in paragraph 27 hereof, Contractor shall
indemnify and save harmless the Owner and Engineer and all of its officers, agents, and employees
against any claims arising from the violation of any such laws, ordinances, and regulations, whether
by the Contractor, its employees, or subcontractors. If the Contractor observes that the plans and
specifications are at variance therewith, he shall notify the Owner's Representative in writing prior
to proposing and any necessary changes shall be adjusted as provided in the contract for changes in
the work. In the absence of timely written notification to Owner's Representative of such variance
or variances within said time, any objection and/or assertion that the plans and specifications are at
variance with any federal, state or local laws, ordinances or regulations shall be deemed waived. If
the Contractor, its employees or subcontractors perform any work contrary to such laws, ordinances,
rules and regulations, and without such notice to the Owner's Representative, Contractor shall bear
all costs arising there from.
The Owner is a municipal corporation of the State of Texas and the law from which it derives its
powers, insofar as the same regulates the objects for which, or the manner in which, or the conditions
under which the Owner may enter into contracts, shall be controlling, and shall be considered as part
of this contract to the same effect as though embodied herein.
33. SUBCONTRACTING
The Contractor agrees that it will retain personal control and will give its personal attention to the
fulfillment of this contract. The Contractor further agrees that subletting of any portion or feature
of the work, or materials required in the performance of this contract, shall not relieve the Contractor
from its full obligations to the Owner, as provided by the contract documents.
34. TIME FOR SUBSTANTIAL COMPLETION AND LIQUIDATED DAMAGES
It is hereby understood and mutually agreed by and between the Contractor and the Owner, that the
date of beginning and time for completion as specified in the Notice to Proceed and contract
documents, respectively, of work to be done hereunder are essential conditions of this contract; and
it is further mutually understood and agreed that the work embraced in this contract shall be
commenced as provided in the contract documents.
If the Contractor should neglect, fail, or refuse to substantially complete the work within the time
herein specified, then the Contractor does hereby agree as part of the consideration for the awarding
of this contract, the Owner may withhold permanently from Contractor's total compensation, the
sum of $1,204.28 PER CONSECUTIVE CALENDAR DAY, not as a penalty, but as liquidated
damages for the breach of the contract as herein set forth for each and every working day that the
Contractor shall be in default after the time stipulated for substantially completing the work.
If the Contractor should neglect, fail, or refuse to Finally complete the work within the time herein
specified, then the Contractor does hereby agree as part of the consideration for the awarding of this
contract, the Owner may withhold permanently from Contractor's total compensation, the sum of
$1,204.28 PER CONSECUTIVE CALENDAR DAY, not as a penalty, but as liquidated damages
for the breach of the contract as herein set forth for each and every working day that the Contractor
shall fail to meet the time requirements stipulated for substantially completing the work.
It is expressly understood and agreed, by and between Contractor and the Owner, that the time for
the substantial completion of the work described herein is reasonable time for the completion of the
same, taking into consideration the average climatic range and conditions and usual industrial
conditions prevailing in this locality. The amount is fixed and agreed upon by and between the
Contractor and the Owner because the actual damages the Owner would sustain in such event would
be difficult and/or impossible to estimate, however, the amount agreed upon herein is a reasonable
forecast of the amount necessary to render just compensation to Owner, and is expressly agreed to
be not disproportionate to actual damages as measured at time of breach.
IT IS FURTHER AGREED AND UNDERSTOOD BETWEEN THE CONTRACTOR AND
OWNER THAT TIME IS OF THE ESSENCE OF THIS CONTRACT.
35. TIME AND ORDER OF COMPLETION
It is the meaning and intent of this contract, unless otherwise herein specifically provided, that the
Contractor shall be allowed to prosecute its work in such order of precedence, and in such manner
as shall be most conductive to economy of construction. The Contractor shall ensure daily
prosecution of the work is conducted every business day until completed, regardless if the work will
be substantially or finally complete ahead of specified deadlines in the agreement, unless the City
determines time off from said prosecution is necessary or reasonable and Contractor received said
determination in writing from the City. Further, when the Owner is having other work done, either
by contract or by its own force, the Owner's Representative (as distinguished from the Resident
Project Representative) may direct the time and manner of constructing work done under this
contract so that conflicts will be avoided and the construction of the various works being done for
the Owner shall be harmonized. Additionally, inclement weather shall be the only other reason
consistent, daily prosecution of the work may not take place on those inclement weather days.
The Contractor shall submit, at such times as may reasonably be requested by the Owner's
Representative, schedules which shall show the order in which the Contractor intends to carry on
the work, with dates at which the Contractor will start the several parts of the work and estimated
dates of completion of the several parts.
36. TIME OF PERFORMANCE
The Contractor agrees that it has submitted its proposal in full recognition of the time required for
the completion of this project, taking into consideration the average climatic range and industrial
conditions prevailing in this locality, and has considered the liquidated damage provisions of
paragraph 34 hereinabove set forth and expressly agrees that it shall not be entitled to, nor will it
request, an extension of time on this contract, except when its work has been delayed by an act or
neglect of the Owner, Owner's Representative, employees of the Owner or other contractors
employed by the Owner, or by changes ordered in the work, or by strike, walkouts, acts of God or
the public enemy, fire or flood. Any request for extension shall be in writing with the written request
for same setting forth all justifications, in detail, for the request, and submitted to Owner's
Representative within twenty (20) calendar days of the occurrence of the event causing said delay.
A failure by Owner's Representative to affirmatively grant the extension no later than within twenty
(20) calendar days of written submission by Contractor shall be deemed a denial, and final. Further,
in the absence of timely written notification of such delay and request for extension, as provided
herein, any request for extension by Contractor shall be deemed waived.
37. HINDRANCE AND DELAYS
In executing the contract, the Contractor agrees that in undertaking to complete the work within the
time herein fixed, Contractor has taken into consideration and made allowances for all hindrances
and delays incident to such work, whether growing out of delays due to unusual and unanticipated
circumstances, difficulties or delays in securing material or workers, or any other cause or
occurrence. No charge shall be made by the Contractor for hindrance or delays from any cause
during the progress of any part of the work embraced in this contract except where the work is
stopped by order of the Owner or Owner's Representative for the Owner's convenience, in which
event, such expense as in the sole judgment of the Owner's Representative that is caused by such
stoppage shall be paid by Owner to Contractor.
38. QUANTITIES AND MEASUREMENTS
No extra or customary measurements of any kind will be allowed, but the actual measured or
computed length, area, solid contents, number and weight only shall be considered, unless otherwise
specifically provided. In the event this contract is let on a unit price basis, then Owner and
Contractor agree that this contract, including the specifications, plans and other contract documents
are intended to show clearly all work to be done and material to be furnished hereunder. Where the
estimated quantities are shown, and only when same are expressly stated to be estimates, for the
various classes of work to be done and material to be furnished under this contract, they are
approximate and are to be used only as a basis for estimating the probable cost of the work and for
comparing their proposals offered for the work. In the event the amount of work to be done and
materials to be furnished are expressly stated to be estimated, and only when same are expressly
stated to be estimated, it is understood and agreed that the actual amount of work to be done and the
materials to be furnished under this contract may differ somewhat from these estimates, and that
where the basis for payment under this contract is the unit price method, payment shall be for the
actual amount of work done and materials furnished on the project, provided that the over run or
under run of estimated quantities not exceed 15% of the estimated quantity.
39. PROTECTION OF ADJOINING PROPERTY
The Contractor shall take proper means to protect the adjacent or adjoining property or properties in
any way encountered, which may be injured or seriously affected by any process of construction to
be undertaken under this agreement, from any damage or injury by reason of said process of
construction; and Contractor shall be liable for any and all claims for such damage on account of his
failure to fully protect all adjacent property. Without limiting, in any way, manner and form, the
indemnity provided by Contractor in paragraph 27 hereof, the Contractor agrees to indemnify, save
and hold harmless the Owner and Engineer, and any of its officers, agents and employees, against
any and all claims or damages due to any injury to any adjacent or adjoining property, related to,
arising from or growing out of the performance of this contract.
40. PRICE FOR WORK
In consideration of the furnishing of all necessary labor, equipment and material and the completion
of all work by the Contractor, and on the delivery of all materials embraced in this contract in full
conformity with the specifications and stipulations herein contained, the Owner agrees to pay the
Contractor the price set forth in the proposal attached hereto, which has been made a part of this
contract, and the Contractor hereby agrees to receive such price in full for furnishing all materials
and all labor required for the aforesaid work, also, for all expenses incurred by Contractor and for
well and truly performing the same and the whole thereof in the manner and according to this
agreement, the attached specifications, plans, contract documents and requirements of Owner's
Representative.
41. PAYMENTS
No payments made or certificates given shall be considered as conclusive evidence of the
performance of the contract, either wholly or in part, nor shall any certificate or payment be
considered as acceptance of defective work. Contractor shall at any time requested during the
progress of the work furnish the Owner or Owner's Representative with a verifying certificate
showing the Contractor's total outstanding indebtedness in connection with the work. Before final
payment is made, Contractor shall satisfy Owner, by affidavit or otherwise, that there are no
outstanding liens against Owner's premises by reason of any work under the contract. Acceptance
by Contractor of final payment of the contract price shall constitute a waiver of all claims against
Owner, Owner's agents and employees, which have not theretofore been timely filed as provided in
this contract.
42. PARTIAL PAYMENTS
On or before the tenth day of each month, the Contractor shall submit to Owner's Representative an
application for partial payment or, if the Contractor does not submit such application, the Owner's
Representative shall determine the amount to be partially paid. Owner's Representative shall review
said application for partial payment if submitted, and the progress of the work made by the
Contractor and if found to be in order, shall prepare a certificate for partial payment showing as
completely as practical the total value of the work done by the Contractor up to and including the
last day of the preceding month. The determination of the partial payment by the Owner's
Representative shall be in accordance with Paragraph 14 hereof.
The Owner shall then pay the Contractor on or before the fifteenth day of the current month the total
amount of the Owner's Representative's Certificate of Partial Payment, less:
(i) in the event the total value of the contract is five million dollars or more, 5% of the amount thereof,
which 5% shall be retained until final payment, and further, less all previous payments and all further
sums that may be retained by Owner under the terms of the contract documents; or
(ii) in the event the total value of the contract is less than five million dollars, 10% or less, of the amount
thereof, which percentage shall be retained until final payment, and further, less all previous payments
and all further sums may be retained by Owner under the terms of the contract documents
("Retainage").
If Contractor engages a sub -contractor to perform all or part of Contractor's work under the contract,
the Contractor shall not withhold a greater percentage of Retainage than the percentage set out in in
this section pertaining to the Contractor. Contractor shall likewise require any subcontractor it
engages to comply with section 2252.032 of the Texas Government Code.
Any partial payment made hereunder shall not constitute a waiver by the Owner of any and all other
rights to enforce the express terms of the contract documents, and all remedies provided therein, as
to any and all work performed, to be performed and/or materials delivered hereunder, including, but
limited to, work to which said partial payment is attributable.
43. SUBSTANTIAL COMPLETION
Contractor shall give Owner's Representative written notice of substantial completion. Within
fifteen (15) calendar days after the Contractor has given the Owner's Representative written notice
that the work has been substantially completed, the Owner's Representative and/or the Owner shall
inspect the work and within said time, if the work be found to be substantially completed in
accordance with the contract documents, the Owner's Representative shall issue to the Owner and
Contractor a certificate of substantial completion. The work will be deemed substantially complete
when the work (or a specified portion thereof) has progressed to the point where, in the opinion of
the Owner or Owner's Representative, the work (or a specified portion thereof) is sufficiently
complete, in accordance with all the contract documents, including the Proposal and all applicable
technical specifications, so that the work (or a specified portion thereof) can be utilized for the
purposes for which it is intended without unscheduled disruption. Owner may, in its sole discretion,
release all or a portion of the Retainage upon Owner's receipt of the certificate of substantial
completion for all of the work or a specified portion thereof. Notwithstanding the issuance of a
certificate of substantial completion, Contractor shall proceed with diligence to finally complete the
work within the time provided in this contract.
44. FINAL COMPLETION AND PAYMENT
The Contractor shall give written notice to Owner's Representative of final completion. Upon
written notice of final completion, the Owner's Representative shall proceed to make final
measurement to determine whether final completion has occurred. If the Owner's Representative
determines final completion has occurred, Owner's Representative shall so certify to the Owner.
Upon certification by Owner's Representative of final completion, Owner shall pay to the Contractor
on or before the 31 st working day after the date of certification of final completion, the balance due
Contractor under the terms of this agreement. Neither the certification of final completion nor the
final payment, nor any provisions in the contract documents shall relieve the Contractor of the
obligation for fulfillment of any warranty which may be required in the contract documents and/or
any warranty or warranties implied by law or otherwise. Owner may, in its sole discretion, release
all or a portion of the Retainage for fully completed and accepted portions of the work.
Notwithstanding the foregoing, Owner may withhold the Retainage if there is a bona fide dispute
between Owner and Contractor according to section 2252.032(f) of the Texas Government Code.
45. CORRECTION OF WORK
Contractor shall promptly remove from Owner's premises all materials condemned by the Owner's
Representative on account of failure to conform to the contract documents, whether actually
incorporated in the work or not, and Contractor shall at its own expense promptly replace such
condemned materials with other materials conforming to the requirements of the contract
documents. Contractor shall also bear the expense of restoring all work of other contractors damaged
by any such removal or replacement. If Contractor does not remove and replace any such
condemned work within a reasonable time but not to exceed 30 days after a written notice by the
Owner or the Owner's Representative, Owner may remove and replace it at Contractor's expense.
The Contractor shall pay all claims, cost, losses, and damages (including but not limited to all fees
and charges of the engineers, architects, attorneys, and other professionals and all court or arbitration
or other dispute resolution cost) arising out of or relating to such correction or removal.
Neither the final payment, nor certification of final completion or substantial completion, nor any
provision in the contract documents shall relieve the Contractor of responsibility for faulty materials
or workmanship, and Contractor shall remedy any defects due thereto and pay for any damage to
other work resulting therefrom, which shall appear within a period of one (1) year from the date of
certification of final completion by Owner's Representative.
46. PAYMENT WITHHELD
The Owner or Owner's Representative may, on account of subsequently discovered evidence,
withhold or nullify the whole or part of any certification to such extent as may be necessary to protect
itself from loss on account of -
(a) Defective work not remedied and/or work not performed,
(b) Claims filed or reasonable evidence indicating possible filing of claims,
(c) Damage to another contractor,
(d) Notification to owner of failure to make payments to Subcontractors or Suppliers,
(e) Failure to submit up-to-date record documents as required,
(f) Failure to submit monthly progress schedule updates or revised scheduled as requested by
Owner,
(g) Failure to provide Project photographs required by Specifications.
When the above grounds are removed, or the Contractor provides a surety bond satisfactory
to the Owner, in the amount withheld, payment shall be made for amounts withheld because
of them.
47. CLAIM OR DISPUTE
It is further agreed by both parties hereto that all questions of dispute or adjustment presented by the
Contractor shall be in writing and filed with the Owner's Representative within fifteen (15) calendar
days after the Owner's Representative has given any direction, order or instruction to which the
Contractor desires to take exception. Timely written notice of dispute as provided in this contract
of any decision by Owner's Representative or Owner shall be a condition precedent to the bringing
and/or assertion of any action or claim by Contractor of any right under this Contract. If the matters
set forth in the notice of dispute are not granted or otherwise responded to by Owner's Representative
within fifteen (15) calendar days of receipt of notice of dispute by Owner's Representative, said
objections shall be deemed denied. Any decision by the Owner's Representative, or deemed denial
by the Owner's Representative, shall be final and conclusive in the absence of fraud. It is further
agreed that the acceptance by the Contractor of the final payment shall be a bar to any and all claims
of the Contractor, and constitute a waiver of the right to assert any claim against Owner, Owner's
agents and employees and Owner's Representative, by Contractor.
48. NON-COMPLIANCE AND/OR ABANDONMENT BY CONTRACTOR
In case the Contractor should (1) abandon and fail or refuse to resume work within fifteen (15)
calendar days after written notification from the Owner or the Owner's Representative, or (2) if the
Contractor fails to comply with the written orders of the Owner's Representative, when such orders
are consistent with this contract, then the Surety on the bond shall be notified in writing and directed
to complete the work and a copy of said notice shall be delivered to the Contractor. In the event a
bond is not required by law, or otherwise obtained by the Contractor, no further notice of such non-
compliance to Contractor shall be required.
After receiving said notice of abandonment or non-compliance , the Contractor shall not remove
from the work any machinery, equipment, tools, materials or supplies then on the job, but the same,
together with any materials and equipment under the contract for work, may be held for use on the
work by the Owner or the Surety of the Contractor, or another contractor, in completion of the work;
and the Contractor shall not receive any rental or credit therefore (except when used in connection
with Extra Work, where credit shall be allowed as provided for under paragraph 24 of this contract);
it being understood that the use of such equipment and materials will ultimately reduce the cost to
complete the work and be reflected in the final settlement.
In the event the Contractor, or Surety, whichever is applicable, should fail to commence compliance
with the notice hereinbefore provided within ten (10) calendar days after service of such notice,
and/or shall fail to proceed with diligence to complete the project as contemplated and in compliance
with all terms and provisions of the contract documents, then the Owner may exercise any and all
remedies available to it pursuant to law, contract, equity or otherwise, including, but not limited to,
providing for completion of the work in either of the following elective manners:
(a) The Owner may employ such force of persons and use of machinery, equipment, tools,
materials and supplies as said Owner may deem necessary to complete the work and charge
the expense of such labor, machinery, equipment, tools, materials and supplies to said
Contractor, and the expense so charged shall be deducted and paid by the Owner out of such
moneys as may be due, or that may thereafter at any time become due to the Contractor under
and by virtue of this Agreement. In case such expense is less than the sum which would have
been payable under this contract, if the same had been completed by the Contractor, then
said Contractor shall receive the difference. In case such expense is greater than the sum
which would have been payable under this contract, if the same had been completed by said
Contractor, then the Contractor and/or its Surety shall pay the amount of such excess to the
Owner; or
(b) The Owner, under sealed proposals, after notice published as required by law, at least twice
in a newspaper having a general circulation in the County of location of the work, may let
the contract for the completion of the work under substantially the same terms and conditions
which are provided in this contract. In case of any increase in cost to the Owner under the
new contract as compared to what would have been the cost under this contract, such increase
shall be charged to the Contractor and the Surety shall be and remain bound therefore.
Should the cost to complete any such new contract prove to be less than that which would
have been the cost to complete the work under this contract, the Contractor or his Surety
shall be credited therewith.
In the event the Owner's Representative elects to complete the work, as described above, when the
work shall have been finally completed, the Contractor and his Surety shall be so notified and
certification of completion as provided in paragraph 44 hereinabove set forth, shall be issued. A
complete itemized statement of the contract accounts, certified to by Owner's Representative as
being correct shall then be prepared and delivered to Contractor and his Surety, if applicable,
whereon the Contractor or his Surety, or the Owner as the case may be, shall pay the balance due as
reflected by said statement within 30 days after the date of certification of completion.
In the event the statement of accounts shows that the cost to complete the work is less than that
which would have been the cost to the Owner had the work been completed by the Contractor under
the terms of this contract, or when the Contractor and/or his Surety, if applicable, shall pay the
balance shown to be due by them to the Owner, then all machinery, equipment, tools, materials or
supplies left on the site of the work shall be turned over to the Contractor and/or his Surety, if
applicable. Should the cost to complete the work exceed the contract price, and the Contractor and/or
his Surety, if applicable, fail to pay the amount due the Owner within the time designated
hereinabove, and there remains any machinery, equipment, tools, materials or supplies on the site of
the work, notice thereof, together with an itemized list of such equipment and materials shall be
mailed to the Contractor and his Surety, if applicable, at the respective addresses designated in this
contract; provided, however, that actual written notice given in any manner will satisfy this
condition. After mailing, or other giving of such notice, such property shall be held at the risk of
the Contractor and his Surety, if applicable, subject only to the duty of the Owner to exercise ordinary
care to protect such property. After fifteen (15) calendar days from the date of said notice the Owner
may sell such machinery, equipment, tools, materials or supplies and apply the net sum derived from
such sale to the credit of the Contractor and his Surety, if applicable. Such sale may be made at
either public or private sale, with or without notice, as the Owner may elect. The Owner shall release
any machinery, equipment, tools, materials, or supplies that remain on the jobsite and belong to
persons other than the Contractor or his Surety, if applicable, to their proper owners.
The remedies provided to Owner by law, equity, contract, or otherwise, shall be cumulative, to the
extent permitted by law. It is expressly agreed and understood that the exercise by Owner of the
remedies provided in this paragraph shall not constitute an election of remedies on the part of Owner,
and Owner, irrespective of its exercise of remedies hereunder, shall be entitled to exercise
concurrently or otherwise, any and all other remedies available to it, by law, equity, contract or
otherwise, including but not limited to, liquidated damages, as provided in paragraph 34,
hereinabove set forth.
49. LIMITATION ON CONTRACTOR'S REMEDY
The remedies of Contractor hereunder shall be limited to, and Owner shall be liable only for, work
actually performed by Contractor and/or its subcontractors as set forth in the contract documents,
and Owner shall not be liable for any consequential, punitive or indirect loss or damage that
Contractor may suffer in connection with the project which is the subject matter of this contract.
50. BONDS
The Contractor is required to furnish a performance bond in accordance with Chapter 2253,
Government Code, in the amount of 100% of the total contract price in the event that said contract
price exceeds $100,000 and the Contractor is required to furnish a payment bond in accordance with
Chapter 2253, Government Code, in the amount of 100% of the total contract price in the event that
said contract price exceeds $50,000. All bonds shall be submitted on forms supplied by the Owner,
and executed by a Surety Company listed on the State Treasury's "Approved" list and authorized to
do business in the State of Texas. It is further agreed that this contract shall not be in effect until
such bonds are so furnished.
51. SPECIAL CONDITIONS
In the event special conditions are contained herein as part of the contract documents and said special
conditions conflict with any of the general conditions contained in this contract, then in such event
the special conditions shall control.
52. LOSS OR EXPENSE DUE TO UNUSUAL OR UNANTICIPATED CIRCUMSTANCES
Unless otherwise specified herein, all loss, expense or damage to the Contractor arising out of the
nature of the work to be done, or from the action of the elements, or from any unforeseen
circumstance or from unusual obstructions or difficulties, naturally occurring, man-made or
otherwise, which may be encountered in the prosecution of the work, shall be sustained and borne
by the Contractor at his own cost and expense.
53. INDEPENDENT CONTRACTOR
Contractor is, and shall remain, an independent contractor with full, complete and exclusive power
and authority to direct, supervise, and control its own employees and to determine the method of the
performance of the work covered hereby. The fact that the Owner or Owner's Representative shall
have the right to observe Contractor's work during Contractor's performance and to carry out the
other prerogatives which are expressly reserved to and vested in the Owner or Owner's
Representative hereunder, is not intended to and shall not at any time change or effect the status of
the Contractor as an independent contractor with respect to either the Owner or Owner's
Representative or to the Contractor's own employees or to any other person, firm, or corporation.
54. CLEANING UP
The Contractor shall at all times keep the premises flee from accumulation of debris caused by the
work, and at the completion of the work Contractor shall remove all such debris and also its tools,
scaffolding, and surplus materials and shall leave the work room clean or its equivalent. The work
shall be left in good order and condition. In case of dispute Owner may remove the debris and
charge the cost to the Contractor.
55. HAZARDOUS SUBSTANCES AND ASBESTOS
Hazardous Substances (herein so called), as defined in the Comprehensive Environmental Response,
Compensation, and Liability Act (42 U.S.C.S. §9601(14)) and the regulations promulgated
thereunder, as same may be amended from time to time, hydrocarbons or other petroleum products
or byproducts and/or asbestos, in any form, shall not (i) be utilized, in any way, manner or form, in
the construction of, or incorporation into, the Project; or (ii) be brought upon, placed, or located, by
any party, on the Project site, or any other property of the City, without the written consent of the
Owner's Representative. If Contractor believes that the utilization of a Hazardous Substance,
hydrocarbons or other petroleum products or byproducts and/or asbestos is necessary in the
construction of the Project, or that it is necessary to place and/or otherwise locate upon the site of
the Project or other property of the City, a Hazardous Substance, hydrocarbons or other petroleum
products or byproducts and/or asbestos, Contractor shall notify the Owner's Representative, and
request consent therefrom, at least twenty (20) days prior to such action. Owner's Representative
may grant or deny the request of Contractor and provide whatever requirements such consent, if
granted, is conditioned upon, in its sole and absolute discretion. If the request of Contractor is not
granted, or otherwise not responded to, by Owner's Representative within five (5) days of the receipt
of said request, said request shall be deemed to be denied.
In the event Owner's Representative shall consent to the request of Contractor, Contractor shall be
responsible for ensuring that all personnel involved in the Project are (i) trained for the level of
expertise required for proper performance of the actions contemplated by this Contract and, in
particular, in all aspects of handling, storage, disposal and exposure of Hazardous Substances,
hydrocarbons or other petroleum products or byproducts and/or asbestos; and (ii) are provided and
utilize all protective equipment, including without limitation, personal protective gear, necessary to
provide protection from exposure to Hazardous Substances, hydrocarbons or other petroleum
products or byproducts and/or asbestos.
56. NONAPPROPRIATION
All funds for payment by the City under this contract are subject to the availability of an annual
appropriation for this purpose by the City. In the event of non -appropriation of funds by the City
Council of the City of Lubbock for the goods or services provided under the contract, the City will
terminate the contract, without termination charge or other liability, on the last day of the then -
current fiscal year or when the appropriation made for the then -current year for the goods or services
covered by this contract is spent, whichever event occurs first. If at any time funds are not
appropriated for the continuance of this contract, cancellation shall be accepted by the Seller on
thirty (30) days prior written notice, but failure to give such notice shall be of no effect and the City
shall not be obligated under this contract beyond the date of termination.
57. THE CITY RIGHT TO AUDIT
At any time during the term of this Contract and for a period of four (4) years thereafter the City or
a duly authorized audit representative of the City, or the State of Texas, at its expense and at
reasonable times, reserves the right to audit Contractor's records and books relevant to all services
provided under this Contract. In the event such an audit by the City reveals any errors/overpayments
by the City, Contractor shall refund the City the full amount of such overpayments within thirty (30)
days of such audit findings, or the City, at its option, reserves the right to deduct such amounts owing
the City from any payments due Contractor.
58. NON -ARBITRATION
The City reserves the right to exercise any right or remedy available to it by law, contract, equity, or
otherwise, including without limitation, the right to seek any and all forms of relief in a court of
competent jurisdiction. Further, the City shall not be subject to any arbitration process prior to
exercising its unrestricted right to seek judicial remedy. The remedies set forth herein are cumulative
and not exclusive, and may be exercised concurrently. To the extent of any conflict between this
provision and another provision in, or related to, this document, this provision shall control.
59. CONTRACTOR ACKNOWLEDGES
Contractor Acknowledges by supplying any Goods or Services that the Contractor has read, fully
understands, and will be in full compliance with all terms and conditions and the descriptive material
contained herein and any additional associated documents and Amendments. The City disclaims any
terms and conditions provided by the Contractor unless agreed upon in writing by the parties. In the
event of conflict between these terms and conditions and any terms and conditions provided by the
Contractor, the terms and conditions provided herein shall prevail. The terms and conditions provided
herein are the final terms agreed upon by the parties, and any prior conflicting terms shall be of no
force or effect.
60. LABOR CODE CHAPTER 214
Sec. 214.008. MISCLASSIFICATION OF CERTAIN WORKERS; PENALTY. (a) A person who
contracts with a governmental entity to provide a service as defined by Section 2155.001,
Government Code, shall properly classify, as an employee or independent contractor in accordance
with Chapter 201, any individual the person directly retains and compensates for services performed
in connection with the contract. (b) In this subsection, "subcontractor" means a person directly
retained and compensated by a person who contracts with a governmental entity to provide a service
as defined by Section 2155.001, Government Code. A subcontractor shall properly classify, as an
employee or independent contractor in accordance with Chapter 201, any individual the subcontractor
directly retains and compensates for services performed in connection with the contract for which the
subcontractor is retained. (c) A person who fails to properly classify an individual as required by
Subsection (a) or (b) shall pay to the commission a penalty equal to $200 for each individual that the
person has not properly classified. (d) The commission may not take action to collect a penalty under
this section from a person after the third anniversary of the date on which the violation occurred.
61. CERTIFICATE OF INTERESTED PARTIES
House Bill 1295, adopted by the 84th Legislature, created §2252.908, Texas Government Code.
Section 2252.908 requires a business entity entering into certain contracts with a governmental entity
or state agency to file with the governmental entity or state agency a disclosure of interested parties
at the time the business entity submits the signed contract to the governmental entity or state agency.
Section 2252.908 requires the disclosure form to be signed by the authorized agent of the contracting
business entity, acknowledging that the disclosure is made under oath and under penalty of perjury.
Section 2252.908 applies only to a contract that requires an action or vote by the governing body of
the governmental entity or state agency before the contract may be signed or has a value of at least
$1 million. Instructions for completing Form 1295 are available at:
https:Hci.lubbock.tx.us/departments/purchasing/vendor-information
62. TEXAS GOVERNMENT CODE SECTION 2252.152
Contracts with Companies Engaged in Business with Iran, Sudan, or Foreign Terrorist Organization
Prohibited. Pursuant to Section 2252.152 of the Texas Government Code, prohibits the City from
entering into a contract with a vendor that is identified by The Comptroller as a company known to
have contracts with or provide supplies or service with Iran, Sudan or a foreign terrorist
organization.
63. TEXAS GOVERNMENT CODE SECTION 2271.002
Pursuant to Section 2271.002 of the Texas Government Code, a) This section applies only to a
contract that: (1) is between a governmental entity and a company with 10 or more full-time
employees; and (2) has a value of $100,000 or more that is to be paid wholly or partly from public
funds of the governmental entity. (b) A governmental entity may not enter into a contract with a
company for goods or services unless the contract contains a written verification from the company
that it: (1) does not boycott Israel; and (2) will not boycott Israel during the term of the contract.
64. CONTRACTOR ACKNOWLEDGES
Contractor Acknowledges by supplying any Goods or Services that the Contractor has read, fully
understands, and will be in full compliance with all terms and conditions and the descriptive material
contained herein and any additional associated documents and Amendments. The City disclaims any
terms and conditions provided by the Contractor unless agreed upon in writing by the parties. In the
event of conflict between these terms and conditions and any terms and conditions provided by the
Contractor, the terms and conditions provided herein shall prevail. The terms and conditions
provided herein are the final terms agreed upon by the parties, and any prior conflicting terms shall
be of no force or effect.
65. TEXAS PUBLIC INFORMATION ACT
The requirements of Subchapter J, Chapter 552, Government Code, may apply to this contract and
the contractor or vendor agrees that the contract can be terminated if the contractor or vendor
knowingly or intentionally fails to comply with a requirement of that subchapter. To the extent
Subchapter J, Chapter 552, Government Code applies to this agreement, Contractor agrees to: (1)
preserve all contracting information related to the contract as provided by the records retention
requirements applicable to the governmental body for the duration of the contract; (2) promptly
provide to the governmental body any contracting information related to the contract that is in the
custody or possession of the entity on request of the governmental body; and (3) on completion of
the contract, either: (A) provide at no cost to the governmental body all contracting information
related to the contract that is in the custody or possession of the entity; or (B) preserve the contracting
information related to the contract as provided by the records retention requirements applicable to
the governmental body.
66. CONFIDENTIALITY
The Contractor shall retain all information received from or concerning the City and the City's
business in strictest confidence and shall not reveal such information to third parties without prior
written consent of the City, unless otherwise required by law.
67. INDEMNITY
The Contractor shall indemnify and save harmless the city of Lubbock and its elected officials,
officers, agents, and employees from all suits, actions, losses, damages, claims, or liability of any
kind, character, type, or description, including without limiting the generality of the foregoing, all
expenses of litigation, court costs, and attorney's fees, for injury or death to any person, or injury to
any property, received or sustained by any person or persons or property, to the extent arising out
of, related to or occasioned by, the negligent acts of the Contractor, its agents, employees, and/or
subcontractors, related to the performance, operations or omissions under this agreement and/or the
use or occupation of city owned property. The indemnity obligation provided herein shall survive
the expiration or termination of this agreement.
68. PROFESSIONAL RESPONSIBILITY
All architectural or engineering services to be performed shall be done with the professional skill
and care ordinarily provided by competent architects or engineers practicing under the same or
similar circumstances and professional license.
69. TEXAS SENATE BILL 219 SUBCHAPTER B ITEMS B AND C
(b) A contractor must, within a reasonable time of learning of a defect, inaccuracy, inadequacy, or
insufficiency in the plans, specifications, or other design documents, disclose in writing to the person
with whom the contractor enters into a contract the existence of any known defect in the plans,
specifications, or other design documents that is discovered by the contractor, or that reasonably
should have been discovered by the contractor using diligence, before or during construction. In this
subsection, ordinary diligence means the observations of the plans, specifications, or other design
documents or the improvement to real property that a contractor would make in the reasonable
preparation of a bid or fulfillment of its scope of work under normal circumstances. Ordinary
diligence does not require that the contractor engage a person licensed or registered under Title 6,
Occupations Code, or any other person with specialized skills. A disclosure under this subsection is
made in the contractor's capacity as contractor and not as a licensed professional under Title 6,
Occupations Code.
(c) A contractor who fails to disclose a defect as required by Subsection (b) may be liable for the
consequences of defects that result from the failure to disclose.
DAVIS BACON WAGE DETERMINATIONS
Page Intentionally Left Blank
12/1/22, 3:00 PM
SAM.gov
"General Decision Number: TX2O22O28O 10/14/2022
Superseded General Decision Number: TX2O21O28O
State: Texas
Construction Type: Building
Counties: Crosby and Lubbock Counties in Texas.
BUILDING CONSTRUCTION PROJECTS (does not include single family
homes or apartments up to and including 4 stories).
Note: Contracts subject to the Davis -Bacon Act are generally
required to pay at least the applicable minimum wage rate
required under Executive Order 14026 or Executive Order 13658.
Please note that these Executive Orders apply to covered
contracts entered into by the federal government that are
subject to the Davis -Bacon Act itself, but do not apply to
contracts subject only to the Davis -Bacon Related Acts,
including those set forth at 29 CFR 5.1(a)(2)-(60).
JIf the contract is entered
into on or after January 30,
12022, or the contract is
renewed or extended (e.g., an
loption is exercised) on or
lafter January 30, 2022:
JIf the contract was awarded on
for between January 1, 2015 and
January 29, 2022, and the
contract is not renewed or
lextended on or after January
130, 2022:
Executive Order 14026
generally applies to the
contract.
The contractor must pay
all covered workers at
least $15.00 per hour (or
the applicable wage rate
listed on this wage
determination, if it is
higher) for all hours
spent performing on the
contract in 2022.
Executive Order 13658
generally applies to the
contract.
The contractor must pay alli
covered workers at least
$11.25 per hour (or the
applicable wage rate listedi
on this wage determination,
if it is higher) for all
hours spent performing on
that contract in 2022.
https://sam.gov/wage-determination/TX20220280/4
MI.]
12/1/22, 3:00 PM
SAM.gov
The applicable Executive Order minimum wage rate will be
adjusted annually. If this contract is covered by one of the
Executive Orders and a classification considered necessary for
performance of work on the contract does not appear on this
wage determination, the contractor must still submit a
conformance request.
Additional information on contractor requirements and worker
protections under the Executive Orders is available at
https://www.dol.gov/agencies/whd/government-contracts.
Modification Number
0
1
2
3
4
BOIL0074-003 01/01/2021
Publication Date
01/07/2022
02/25/2022
03/25/2022
08/05/2022
10/14/2022
Rates Fringes
BOILERMAKER ......................$ 29.47 24.10
----------------------------------------------------------------
CARP0665-001 01/01/2022
Rates Fringes
CARPENTER ........................$ 24.98 7.83
----------------------------------------------------------------
* ELEC0602-008 09/01/2022
Rates Fringes
ELECTRICIAN ......................$ 26.07 12.63
----------------------------------------------------------------
ENGIO178-005 06/01/2020
Rates Fringes
POWER EQUIPMENT OPERATOR
(1) Tower Crane .............$ 32.85 13.10
(2) Cranes with Pile
Driving or Caisson
Attachment and Hydraulic
Crane 60 tons and above ..... $ 28.75 10.60
(3) Hydraulic cranes 59
https://sam.gov/wage-determination/TX20220280/4
41-1
12/1/22, 3:00 PM
Tons and under ..............$ 32.35 13.10
----------------------------------------------------------------
IRONOO84-011 06/01/2022
Rates Fringes
IRONWORKER, ORNAMENTAL ........... $ 26.76 7.88
----------------------------------------------------------------
IRONO263-003 06/01/2022
Rates Fringes
IRONWORKER, STRUCTURAL ........... $ 27.14 7.68
----------------------------------------------------------------
PLUMO4O4-OO1 09/01/2020
Rates Fringes
PLUMBER ..........................$ 26.05 8.81
----------------------------------------------------------------
SHEEOO49-OO1 04/01/2019
Rates Fringes
SHEET METAL WORKER (HVAC Duct
Installation Only) ...............$ 21.73 14.94
----------------------------------------------------------------
* SUTX2O14-060 07/21/2014
Rates Fringes
BRICKLAYER .......................$ 20.04 0.00
CEMENT MASON/CONCRETE FINISHER ... $ 19.60 0.00
INSULATOR - MECHANICAL
(Duct, Pipe & Mechanical
System Insulation) ...............$
19.77
7.13
IRONWORKER, REINFORCING ..........
$ 12.27 **
0.00
LABORER: Common or General ......
$ 12.35 **
0.00
LABORER: Mason Tender - Brick ...
$ 11.36 **
0.00
LABORER: Mason Tender -
Cement/Concrete..................$ 10.58 ** 0.00
LABORER: Pipelayer..............$ 12.49 ** 2.13
https://sam.gov/wage-determination/TX20220280/4
SAM.gov
3/8
12/1/22, 3:00 PM
SAM.gov
LABORER: Roof Tearoff...........
$ 11.28
**
0.00
OPERATOR:
Backhoe/Excavator/Trackhoe.......
$ 14.25
**
0.00
OPERATOR: Bobcat/Skid
Steer/Skid Loader ................$
13.93
**
0.00
OPERATOR: Bulldozer .............$
18.29
1.31
OPERATOR: Drill .................$
16.22
0.34
OPERATOR: Forklift ..............$
14.83
**
0.00
OPERATOR: Grader/Blade ..........
$ 13.37
**
0.00
OPERATOR: Loader ................$
13.55
**
0.94
OPERATOR: Mechanic ..............$
17.52
3.33
OPERATOR: Paver (Asphalt,
Aggregate, and Concrete) .........
$ 16.03
0.00
OPERATOR: Roller ................$
12.70
**
0.00
PAINTER (Brush, Roller, and
Spray) ...........................$
14.27
**
0.00
ROOFER ...........................$
13.75
**
0.00
SHEET METAL WORKER, Excludes
HVAC Duct Installation ...........
$ 21.13
6.53
TILE FINISHER ....................$
11.22
**
0.00
TILE SETTER ......................$
14.00
**
2.01
TRUCK DRIVER: Dump Truck ........
$ 12.39
**
1.18
TRUCK DRIVER: Flatbed Truck .....
$ 19.65
8.57
TRUCK DRIVER: Semi -Trailer
Truck ............................$
12.50
**
0.00
TRUCK DRIVER: Water Truck .......
----------------------------------------------------------------
$ 12.00
**
4.11
WELDERS - Receive rate prescribed for craft performing
https://sam.gov/wage-determination/TX20220280/4 4/8
12/1/22, 3:00 PM
operation to which welding is incidental.
SAM.gov
** Workers in this classification may be entitled to a higher
minimum wage under Executive Order 14026 ($15.00) or 13658
($11.25). Please see the Note at the top of the wage
determination for more information.
Note: Executive Order (EO) 13706, Establishing Paid Sick Leave
for Federal Contractors applies to all contracts subject to the
Davis -Bacon Act for which the contract is awarded (and any
solicitation was issued) on or after January 1, 2017. If this
contract is covered by the EO, the contractor must provide
employees with 1 hour of paid sick leave for every 30 hours
they work, up to 56 hours of paid sick leave each year.
Employees must be permitted to use paid sick leave for their
own illness, injury or other health -related needs, including
preventive care; to assist a family member (or person who is
like family to the employee) who is ill, injured, or has other
health -related needs, including preventive care; or for reasons
resulting from, or to assist a family member (or person who is
like family to the employee) who is a victim of, domestic
violence, sexual assault, or stalking. Additional information
on contractor requirements and worker protections under the EO
is available at
https://www.dol.gov/agencies/whd/government-contracts.
Unlisted classifications needed for work not included within
the scope of the classifications listed may be added after
award only as provided in the labor standards contract clauses
(29CFR 5.5 (a) (1) (ii)).
The body of each wage determination lists the classification
and wage rates that have been found to be prevailing for the
cited type(s) of construction in the area covered by the wage
determination. The classifications are listed in alphabetical
order of ""identifiers"" that indicate whether the particular
rate is a union rate (current union negotiated rate for local),
a survey rate (weighted average rate) or a union average rate
(weighted union average rate).
Union Rate Identifiers
A four letter classification abbreviation identifier enclosed
https://sam.gov/wage-determination/TX20220280/4 5/8
12/1/22, 3:00 PM
SAM.gov
in dotted lines beginning with characters other than ""SU"" or
""UAVG"" denotes that the union classification and rate were
prevailing for that classification in the survey. Example:
PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of
the union which prevailed in the survey for this
classification, which in this example would be Plumbers. 0198
indicates the local union number or district council number
where applicable, i.e., Plumbers Local 0198. The next number,
005 in the example, is an internal number used in processing
the wage determination. 07/01/2014 is the effective date of the
most current negotiated rate, which in this example is July 1,
2014.
Union prevailing wage rates are updated to reflect all rate
changes in the collective bargaining agreement (CBA) governing
this classification and rate.
Survey Rate Identifiers
Classifications listed under the ""SU"" identifier indicate that
no one rate prevailed for this classification in the survey and
the published rate is derived by computing a weighted average
rate based on all the rates reported in the survey for that
classification. As this weighted average rate includes all
rates reported in the survey, it may include both union and
non -union rates. Example: SULA2012-007 5/13/2014. SU indicates
the rates are survey rates based on a weighted average
calculation of rates and are not majority rates. LA indicates
the State of Louisiana. 2012 is the year of survey on which
these classifications and rates are based. The next number, 007
in the example, is an internal number used in producing the
wage determination. 5/13/2014 indicates the survey completion
date for the classifications and rates under that identifier.
Survey wage rates are not updated and remain in effect until a
new survey is conducted.
Union Average Rate Identifiers
Classification(s) listed under the UAVG identifier indicate
that no single majority rate prevailed for those
classifications; however, 100% of the data reported for the
classifications was union data. EXAMPLE: UAVG-OH-0010
08/29/2014. UAVG indicates that the rate is a weighted union
average rate. OH indicates the state. The next number, 0010 in
the example, is an internal number used in producing the wage
determination. 08/29/2014 indicates the survey completion date
for the classifications and rates under that identifier.
https://sam.gov/wage-determination/TX20220280/4 6/8
12/1/22, 3:00 PM
SAM.gov
A UAVG rate will be updated once a year, usually in January of
each year, to reflect a weighted average of the current
negotiated/CBA rate of the union locals from which the rate is
based.
WAGE DETERMINATION APPEALS PROCESS
1.) Has there been an initial decision in the matter? This can
be:
* an existing published wage determination
* a survey underlying a wage determination
* a Wage and Hour Division letter setting forth a position on
a wage determination matter
* a conformance (additional classification and rate) ruling
On survey related matters, initial contact, including requests
for summaries of surveys, should be with the Wage and Hour
National Office because National Office has responsibility for
the Davis -Bacon survey program. If the response from this
initial contact is not satisfactory, then the process described
in 2.) and 3.) should be followed.
With regard to any other matter not yet ripe for the formal
process described here, initial contact should be with the
Branch of Construction Wage Determinations. Write to:
Branch of Construction Wage Determinations
Wage and Hour Division
U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210
2.) If the answer to the question in 1.) is yes, then an
interested party (those affected by the action) can request
review and reconsideration from the Wage and Hour Administrator
(See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:
Wage and Hour Administrator
U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210
The request should be accompanied by a full statement of the
interested party's position and by any information (wage
https://sam.gov/wage-determination/TX20220280/4 7/8
12/1/22, 3:00 PM
SAM.gov
payment data, project description, area practice material,
etc.) that the requestor considers relevant to the issue.
3.) If the decision of the Administrator is not favorable, an
interested party may appeal directly to the Administrative
Review Board (formerly the Wage Appeals Board). Write to:
Administrative Review Board
U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210
4.) All decisions by the Administrative Review Board are final.
END OF GENERAL DECISIO"
https://sam.gov/wage-determination/TX20220280/4 8/8
EXHIBIT B & C
City of Lubbock
Overtime
Legal Holiday
Prevailing Wage Rates
The rate for overtime (in excess of forty hours per week) shall be as required by the Fair Labor
Standards Act.
The rate for legal holidays shall be as required by the Fair Labor Standard
Page Intentionally Left Blank
SPECIAL CONDITIONS
Page Intentionally Left Blank
SPECIAL CONDITIONS
1. TIME AND ORDER FOR COMPLETION
The patching process covered by the contract documents shall be fully completed within 120 (ONE HUNDERED-
Twen consecutive calendar days from the date specified in the Notice to Proceed issued by the City of Lubbock to
the successful bidder.
A. The Asphalt patching, with locations and materials as designated by the City's representative, may begin as soon as
the Contractor receives the Notice to Proceed, and proceed until all designated locations are completed.
B. The repairs shall be completed in 120 (ONE HUNDRED- Twenty) consecutive calendar days. The Contractor shall
pay to the owner $1,204.28 per day for each calendar day after that until completion as liquidated damages. No credit
will be given for bad weather days or other delays. In the event it is determined by the City that the progress of the
work is not satisfactory, the City may direct the Contractor to take such action as the City deems necessary to ensure
completion of the project within the time specified.
2. CHANGES IN THE WORK
The Street Department may make changes in the scope of the work required to be performed by the Contractor under
the Contract or by making additions thereto, or by omitting work there from, without involving the Contract, and
without relieving or releasing the Contractor from any of his obligations under the contract or any guarantee given by
him pursuant to the Contract provisions, and without affecting the validity of the guaranty bonds, and without relieving
or releasing the surety or sureties of said bonds. All such work shall be executed under the terms of the original
Contract unless it is expressly provided otherwise
Except for the purpose of affording protection against any emergency endangering health, life, limb or property, the
Contractor shall make no change in the materials used or in the specified manner of constructing and/or installing the
improvements or supply additional labor, services or materials beyond that actually required for the execution of the
contract, unless in pursuance of a written order from the local Public Agency authorizing the Contractor to proceed
with the change. No claim for an adjustment of the contract price will be valid unless so ordered.
If applicable unit prices are contained in the agreement (established as a result of either a unit price bid or a
Supplement Schedule of Unit Prices) the Street Department may order the Contractor to proceed with desired changes
in the work, the value of such changes to be determined by the measured quantities involved and the applicable unit
prices specified in the contract; provided that in case of a unit price contract the net value of all changes does not
increase or decrease the original total amount shown in the Agreement by more than twenty-five (25%) percent.
3. SUPERINTENDENCE
The Contractor's Superintendent and/or his assistants will not be allowed to serve two functions simultaneously, such
as operating machinery and acting as Superintendent at the same time. The Contractor's Superintendent must be free
of individual responsibilities to enable him to give the entire project his constant attention to facilitate the progress
thereof. The Contractor's Superintendent will be responsible for establishing grade control on concrete removal and
replacement.
4. PROSECUTION OF WORK
The Contractor will, before starting any work on any street, erect barricades and signs, or provide sufficient flagmen,
as approved by the Street Superintendent, to give notice to vehicular traffic. During the construction the Contractor is
to close to traffic streets, as approved by the Street Superintendent.
At no time during the period of construction shall driveways and/or alleys be left impassable between the night hours
of 6 P.M. to 6 A.M., except during the construction of the curb and gutter for which the driveways and/or alleys shall
remain closed not more than 4 days including 72 hours for curing.
The Contractor will, during the progress of the work, erect and maintain for twenty-four hours a day such barricades
and warnings, as approved by the Street Superintendent, necessary to give notice to vehicular and pedestrian traffic of
any and all obstructions and insofar as possible keep the streets and/or alleys on which work is being done in a
passable condition. During the time the concrete is curing in the alleys and until it can be opened to traffic, the
Contractor shall maintain warning signs on barricades with lights at each end of the block until the alley can be opened
to traffic.
The flagmen will be required to wear vests and use the type of flag as shown on flagging detail sheet in specifications
All equipment working on the streets will at all times have at least two (2) red, orange or fluorescent red -orange flags
at least 16" x 16" in size. These flags shall be mounted high enough on the equipment so that they will be visible to all
traffic meeting or passing the equipment.
Before work is started on any street it, will be the responsibility of the Contractor to notify each property owner that
has a car or cars parked in their driveways or garages so that each owner might have the opportunity to move their
cars.
The Contractor shall schedule his work on major thoroughfares and collectors at least 5 days in advance, in order that
businesses may have time to adjust their plans. On all thoroughfares and collectors, the Contractor and the City's
Representatives will work with each of the businesses, hospitals, schools, etc., so that only part of the driveways into
their parking lots will be closed. At no time will any parking lot be completely closed, without prior approval from the
Owner's Representative, unless the work is being accomplished at night and the businesses are closed. The Contractor
shall be responsible for notifying affected businesses of the proposed work and the projected schedule for completion
of this work.
Immediately after each re -construction the Contractor shall clean, remove any paving materials from gutters, rubbish
and temporary structures from the street, restore in an acceptable manner all property, both public and private which
has been damaged during the prosecution of the work, and leave the site of the work in a neat and presentable
condition throughout. The cost of the "cleanup" shall be included as part of the cost of the various items of the work
involved, and no direct compensation will be made for this work.
The Contractor should familiarize himself with the Texas Manual on Uniform Traffic Control Devices for Streets and
Highways, Part VI.
5. BARRICADES AND DANGER, WARNING AND DETOUR SIGNS AND TRAFFIC HANDLING
The Contractor shall have the sole responsibility for providing, installing, moving, replacing, maintaining, cleaning
and removing upon completion of work, all barricades, warning signs, barriers, cones, lights, signals and other such
type devices for handling traffic control as indicated in the plans or as directed by the Street Superintendent. All
barricades, warning signs, barriers, cones, lights, signals and other such type devices shall conform to details shown on
the plans and as indicated in the Texas Manual on Uniform Traffic Control Devices.
The Contractor may provide special signs not covered by plans to protect the traveling public against special
conditions or hazards, provided however, that such signs are first approved by the Street Superintendent.
Upon completion of the work, all barricades, warning signs, barriers, cones, lights, signals and other such type devices
and evidence thereof shall be removed by the Contractor.
6. MAINTENANCE OF DETOURS
The Contractor shall do such work as may be necessary to maintain detours and facilities for safe public travel in
accordance with the Traffic Control Plan and these specifications. There shall be maintained in passable condition,
such temporary roads and structures as may be necessary to accommodate public travel. Temporary approaches and
crossings of intersecting highways shall be provided and maintained in a safe and passable condition by the Contractor
at his entire expense.
7. PUBLIC SAFETY AND CONVENIENCE
Ingress and egress to private property shall be provided as specified in the plans or as directed by the Street
Superintendent.
The Contractor shall plan and execute his operations in a manner that will cause the minimum interference with traffic.
The Contractor shall secure the Street Superintendent's approval of his proposed plan of operation, sequence of work,
and methods of providing for the safe passage of traffic before it is placed into operation. If at any time during
construction the approved plan does not accomplish the intended purpose, due to weather or other conditions affecting
the safe handling of traffic, the Contractor shall immediately make necessary changes therein to correct the
unsatisfactory conditions.
At night or otherwise, all equipment not in use shall be stored in such a manner and at such locations as not to interfere
with the safe passage of traffic. The Contractor shall provide and maintain flaggers at such points and for such periods
of time as may be required to provide for the safety and convenience of public travel and Contractor's personnel, and
as directed by the Street Superintendent. Flaggers shall be English speaking, courteous, well informed, physically and
mentally able to effectually perform their duties in safeguarding and directing traffic and protecting the work, and shall
be neatly attired and groomed at all times when on duty. When directing traffic, flaggers shall use standard attire, flags
and signals and follow the flagging procedures set forth in the Texas Manual on Uniform Traffic Control Devices for
Streets and Highways.
8. REMOVING OBSTRUCTIONS
The Contractor shall familiarize himself with the existing obstructions including sidewalks, trees, poles, etc., prior to
building. It shall be the Contractor's responsibility to remove these obstructions at the direction of the Street
Superintendent, except that the utility companies will move their equipment at no cost to the Contractor. The
Contractor will receive no compensation for delay caused by the Utility Companies in relocating or removing their
equipment.
9. TEST OF MATERIALS
The City of Lubbock Pavement Management laboratory test results shall be the sole consideration for approval of
materials, mix designs, adequacy of procedures, etc. The results of such testing shall be evaluated and final approval
given by the Street Superintendent.
A. CONCRETE MATERIALS
Before Concrete materials can be used on any street, a current mix design (not older than 30 days) with test reports
will be submitted to the Street Superintendent for approval. During the construction period, concrete tests that fail
will require the location to be cored at the contractor's expense. If the concrete cores fail, the concrete work will be
removed and replaced at no additional cost to the City of Lubbock.
B. HOT MIX
The Contractor, or supplier of such materials, shall submit a mix design to the City Pavement Management office,
at least thirty (30) days prior to the reconstruction, A mix design shall include, but is not limited to, crushed face
counts, Flakiness Index tests, and magnesium sulfate(soundness) tests. The gradation requirements shall be that as
necessary to meet the gradation requirements of Item 6.3 (HMAC Mix Design Requirements). The crushed face
count, Flakiness Index, and Magnesium Sulfate requirements shall meet those established in City of Lubbock
Standard Paving Specifications, Item number 6.4.
10. SUBCONTRACTOR
The Contractor shall not award any work to any subcontractor without prior written approval of the Owner, which
approval will not be given until the Contractor submits to the Owner a written statement concerning the proposed
award to the subcontractor, which statement shall contain such information as the Owner may require.
The Contractor shall be as fully responsible to the Owner for the acts and omissions of his subcontractors, and of
persons either directly or indirectly employed by them, as he is for the acts and omissions of persons directly employed
by him.
The Contractor shall cause appropriate provisions to be inserted in all subcontracts relative to the work to bind
subcontractors to the Contractor by the terms of the General Conditions and other contract documents insofar as
applicable to the work of subcontractors and to give the Contractor the same power as regard terminating any
subcontract that the Owner may exercise over the Contractor under any provision of the contract documents.
Nothing contained in this contract shall create any contractual relation between any subcontractor and the Owner and
said subcontractor will look exclusively to contractor for any payments due subcontractor.
11. UNDERGROUND UTILITIES
The Contractor's attention is directed to the fact that pipelines and other underground installations as may be shown on
the plans have been taken from the best available information. There may be other pipelines or installations. The
Contractor shall hold harmless the City from any and all suits or claims resulting from damage by his operations to any
pipeline or underground installation.
It is the Contractor's responsibility, during the period of street construction, to ensure that all utility cuts in the limits of
street construction have been properly backfilled, compacted, and the top 6" inches backfilled with 2-sack flow -able
fill. It is not the intent to require the Contractor to provide for the utility cut repair but for the individual utility
company making the cut to provide their own repairs.
In the case of a City underground installation, the Contractor may be required, at the Street Superintendent's option, to
repair the cut with 2-sack flow -able fill at the unit price bid.
12. PARTIAL PAYMENT
On or before the tenth day of each month, the Contractor shall submit to Owner's Representative an application for
partial payment. Owner's Representative shall review said application for partial payment and the progress of the work
made by the Contractor and if found to be in order shall prepare a certificate for partial payment showing as
completely as practical the total value of the work done by the Contractor up to and including the last day of the
preceding month.
13. CORRECTION OF WORK AFTER FINAL PAYMENT
Neither the final payment nor certificate nor any provision in this contract shall relieve the Contractor of responsibility
for faulty materials or workmanship, and he shall remedy any defects due thereto and pay for any damage to other
work resulting there from, which shall appear within a period of one (1) year from date of final acceptance of the
project. The Owner or the Owner's Representative shall give notice of observed defects with reasonable promptness.
14. LABOR
The Contractor must abide by the Wage and Hour Laws of the State of Texas, or the U.S. Department of Labor, and
must not pay less than the rate legally prescribed or as set forth herein, whichever is higher.
Payment for time worked over forty -hours per week shall be made at one and one-half (1-1/2) times the above
prevailing rates. Payment for time worked on legal holidays shall be paid at one and one-half (1-1/2) times the regular
governing per diem wage rates.
Any laborer, workman or mechanic required or permitted to work in excess of eight (8) hours per calendar day, under
the emergency exceptions to House Bill No. 115 of the 44th Legislature invoked by HCR No. 201 of the 47th
Legislature shall be paid on the basis of eight (8) hours constituting a day's work.
15. EQUIPMENT
All equipment shall be kept in good working conditions with no leaks. Any equipment that shows signs of leaks shall
be fixed immediately, and shall not be used until such leaks are fixed. The Milling Machine shall be capable of
complete pavement removal at a full depth of no less than 10 ''/2" in a single pass. The milling machine shall be
capable of maintaining grade control at full depth plus or minus I". The Milling machine shall be a self-propelled
milling machine. It shall have self -loading devices to promote continuous milling operation.
16. WORKING HOURS DEFINED
During this contract, the contractor shall make every effort to complete the work ahead of schedule. The working day
shall consist of but, is not limited to, the following hours 8 AM to 5 PM Monday through Friday. Working on Saturday
shall be subject to the approval of the Street Superintendent or his representative. At any time during the contract, the
street superintendent or his representative may adjust the working hours if adequate progress is not being made.
17. WORK SCHEDULE
The work schedule shall follow a predetermined route that will be laid out by the street superintendent or his
representative at the preconstruction meeting. At any time, the street superintendent or his representative shall have the
capability to adjust the predetermined route. The contractor or his representative may summit in writing no less than 10
working days to the street superintendent or his representative a request to change the predetermined route. This
request will be subject to approval by the street superintendent or his representative.
4
SPECIFICATIONS
Page Intentionally Left Blank
City of Lubbock Engineering
Minimum Design Standards and
Specifications
LubCity of
bock
Tf%Af
Department of Engineering
City of Lubbock, Texas
May 1, 2020
This document contains general standards and specifications for design work on public
infrastructure. At all times these regulations are subject to the direct supervision and
judgment of the City Engineer who may make modifications in their implementation as
may be necessary on a case -by -case basis, acting in the best interest of the public.
Approval of plans shall constitute general conformance with the City of Lubbock
Minimum Design Standards and Specifications Approval of plans shall not relieve the
Engineer of Record or the Developer from the responsibility to comply with local, State,
or Federal requirements, and/or any errors or omissions in plans and specifications
00 City of
ibbock
E X A S
May 4, 2020
Subject: City of Lubbock Public Works Engineering
Minimum Design Standards & Specifications
To whom it may concern:
This letter is to advise of the release of the 2020 annual update to the City of Lubbock Public
Works Engineering Minimum Design Standards and Specifications. Over the past two years
the City of Lubbock Engineering staff has been working with vendors, manufacturers,
engineering firms and the development community to update and improve the 2018 edition.
The Public Works Engineering Department will be reviewing plans and making comments
according to these standards for any proposed infrastructure beginning May 11, 2020.
Therefore, any plans received by this department dated on or after May 11, 2020 will be
reviewed under these newly adopted design and construction standards.
This manual is available in digital format on the City of Lubbock website.
Please feel free to contact me if you have any questions
Sincerely,
za"'ILd "n I LaQ-�
Michael G. Keenum, P.E.
Division Director of Engineering / City Engineer
City of Lubbock
1625 136 Street
Lubbock, Texas 79401
(806) 775-2393
C:\USERS\158869W'PDATA\LOCAL\MICROSOFI\WINDOWS\INETCACHE\CONTENT.OUIZOOKWVIQYOAF\STD SPECS ADOPTION LETTERDOCX
0 City of
ibbock
TEXAS
June l 1, 2020
Subject: City of Lubbock Engineering
Minimum Design Standards & Specifications
To whom it may concern:
This letter is to advise of the release of an amendment to the 2020 City of Lubbock
Engineering Minimum Design Standards and Specifications. This amendment adds American
AVK fire hydrants to the Approved Materials List. This change is effective immediately.
This manual is available in digital format on the City of Lubbock website.
Please feel free to contact me if you have any questions
Sincerely,
Michael G. Keenum, P.E.
Division Director of Engineering / City Engineer
City of Lubbock
1314 Avenue K
Lubbock, Texas 79401
(806) 775-2347
C: USEM127498 APPDATA LOCAL MCROSOF nWINDOWS JNETCACHECONfEM'.OUTLOOKOSO2SJ3DMSTD SPECS AMENDMENT L=P DOCX
No Text
2020 Design Standards and Specifications
Table of Contents
SECTION1......................................................................................................................................... 1
MINIMUM DESIGN STANDARDS FOR WATER DISTRIBUTION..........................................................1
1.01
General...................................................................................................................................1
1.02
Design Flow.............................................................................................................................1
1.03
Design Pressure.......................................................................................................................
2
1.04
Hydraulic Design......................................................................................................................
2
1.05
Typical Layout..........................................................................................................................2
1.06
Bedding and Cover...................................................................................................................3
1.07
Relation to Sanitary Sewer Mains and Appurtenances..................................................................3
1.08
Pipe Size and Spacing...............................................................................................................6
1.09
Pipe Materials..........................................................................................................................
6
1.10
Methods of Connection.............................................................................................................
6
1.11
Flanged Outlets........................................................................................................................7
1.12
Valve Spacing..........................................................................................................................
7
1.13
Fire Protection Requirements....................................................................................................7
1.14
Easements...............................................................................................................................8
1.15
Soil Analysis.............................................................................................................................9
1.16
Pipe Restraints and Reaction Blocking........................................................................................9
1.17
Tunneling, Jacking and Boring...................................................................................................9
1.18
Dead-end Mains.....................................................................................................................
10
1.19
Abandonment of Water Mains.................................................................................................
10
SECTION2.......................................................................................................................................11
CHECK LIST FOR WATER DISTRIBUTION CONSTRUCTION PLANS .................................................
11
2.01
Plan Submittal Requirements...................................................................................................
11
2.02
Plan Details...........................................................................................................................
13
SECTION3.......................................................................................................................................17
MINIMUM DESIGN STANDARDS FOR SANITARY SEWERS..............................................................
17
3.01
General.................................................................................................................................17
3.02
Design Flow...........................................................................................................................
17
3.03
Hydraulic Design....................................................................................................................
18
3.04
Design Details........................................................................................................................
18
3.05
Typical Layout........................................................................................................................
19
3.06
Bedding and Cover.................................................................................................................
20
3.07
Relation to Water Mains..........................................................................................................
20
3.08
Abandonment of Sewer Mains and Manholes............................................................................
22
3.09
Easements.............................................................................................................................22
3.10
Soil Analysis...........................................................................................................................
22
3.11
Tunneling, Jacking and Boring.................................................................................................
23
3.12
Lift Station.............................................................................................................................
23
SECTION4.......................................................................................................................................
25
CHECK LIST FOR SANITARY SEWER CONSTRUCTION PLANS.........................................................
25
4.01
Plan Submittal Requirements...................................................................................................
25
4.02
Plan Details...........................................................................................................................
27
SECTION5.......................................................................................................................................
29
STANDARD SPECIFICATIONS FOR WATER MAIN CONSTRUCTION ................................................
29
5.01
General.................................................................................................................................29
5.02
Plan Requirements.................................................................................................................
29
5.03
Plan Approval.........................................................................................................................
29
5.04
Inspection.............................................................................................................................
29
5.05
Specifications.........................................................................................................................29
5.06
Materials of Construction........................................................................................................
29
5.07
Methods of Construction.........................................................................................................
38
5.08
Pneumatic Testing for Tapping Sleeves....................................................................................
45
5.09
Hydrostatic Pressure Testing...................................................................................................
45
5.10
Sterilization and Bacteriological Testing....................................................................................
46
2020 Design Standards and Specifications
Table of Contents
5.11
Restoration and Clean Up........................................................................................................ 47
5.12
Warranty and Acceptance.......................................................................................................
48
SECTION6.......................................................................................................................................49
STANDARD SPECIFICATIONS FOR SANITARY SEWER MAIN CONSTRUCTION ............................... 49
6.01
General.................................................................................................................................49
6.02
Plan Requirements.................................................................................................................
49
6.03
Plan Approval.........................................................................................................................
49
6.04
Inspection.............................................................................................................................
49
6.05
Specifications.........................................................................................................................49
6.06
Materials of Construction........................................................................................................
50
6.07
Methods of Construction.........................................................................................................
54
6.08
Inspection, Testing, Approval and Acceptance of Gravity Flow Sanitary Sewer Pipe and Manholes. 63
6.09
Lift Station.............................................................................................................................
69
6.10
Restoration and Clean Up........................................................................................................
70
6.11
Warranty and Acceptance.......................................................................................................
71
SECTION7....................................................................................................................................... 73
APPROVED
MATERIALS AND MANUFACTURERS LIST..................................................................... 73
7.01
Introduction...........................................................................................................................
73
7.02
Product Submittal Procedures..................................................................................................
73
7.03
Evaluation Process.................................................................................................................
74
7.04
Approval Process....................................................................................................................
74
7.05
Water System........................................................................................................................
76
7.06
Sanitary Sewer System...........................................................................................................
83
7.07
Water and Sanitary Sewer Systems..........................................................................................
88
SECTION8.......................................................................................................................................91
Standard Specifications for streets and drainage construction...................................................... 91
8.01
General.................................................................................................................................91
8.02
Design Standards...................................................................................................................
92
8.03
Testing and Inspection...........................................................................................................
93
8.04
Notification of Property Owners...............................................................................................
93
8.05
Protection of Utilities and Irrigation Systems.............................................................................
93
8.06
Water for Construction............................................................................................................
94
8.07
Concrete...............................................................................................................................
95
8.08
Subgrade and Base..............................................................................................................
103
8.09
Hot Mix Asphalt Concrete Surface(HMAC)..............................................................................
109
8.10
Micro-Surfacing....................................................................................................................116
8.11
Storm Sewer........................................................................................................................
120
8.12
Fences................................................................................................................................
125
8.13
Salvage of Asphalt Paving.....................................................................................................
126
8.14
Traffic Control......................................................................................................................
126
8.15
Prosecution of the Work and Working Days............................................................................
127
8.16
Measurement and Payment...................................................................................................
128
8.17
Restoration and Clean Up......................................................................................................
131
8.18
Certificate of Completion and Warranty ..................................................................................
131
SECTION9.....................................................................................................................................132
CHECK LIST
FOR STREETS AND DRAINAGE CONSTRUCTION PLANS............................................133
9.01
Plan Submittal Requirements.................................................................................................
133
9.02
Plan Details.........................................................................................................................
136
SECTION10...................................................................................................................................139
TYPICAL DETAILS OF CONSTRUCTION..........................................................................................139
10.01
General Details........................................................................................................................A
10.02
Water Details...........................................................................................................................B
10.03
Sewer Details...........................................................................................................................0
10.04
Street and Drainage Details......................................................................................................
D
2020 Design Standards and Specifications
Water Standards
SECTION 1
MINIMUM DESIGN STANDARDS FOR WATER DISTRIBUTION
1.01 General
1.01.01 All water distribution system design shall be in accordance with the requirements of TCEQ
Chapter 290, AWWA Standards, City of Lubbock Water System Master Plan, current City
ordinances and the City of Lubbock Minimum Design Standards for Water Distribution.
1.02 Desian Flow
1.02.01 The design of the water distribution system shall be based on the following:
A. Design flow for residential use:
Design Criteria
Design Value
Units
Peak Hourly Demand
1,000
gpcd
Maximum Daily Demand
650
gpcd
Average Daily Demand
240
gpcd
Capita per Household (Single Family)
3.2
persons
Capita per Household(Multi-family)
2.5
persons
i. Domestic water service shall be provided from an alley or easement.
ii. Lines in alleys or easements shall be adequate to provide for a maximum size water
meter of 1-1/2 inches per lot for each 75 feet of frontage.
iii. Property owner may acquire a maximum domestic water tap and meter of 1-1/2 inches
or the equivalent in two meters per lot for each 75 feet of frontage.
iv. Minimum size water tap and meter shall be one inch.
B. Design flow for fire protection:
Proposed Use
Minimum Fire Flow (gpm)
1- and 2-Family Residential
1,000
Other Than 1- and 2-Family Residential
1,500-8,000
i. Fire protection service shall be provided from a street right-of-way or comparable
easement.
ii. Flow may be from more than one fire hydrant, provided the additional hydrants are
accessible to any possible fire location.
iii. Fire protection must comply with Fire Marshall's Office regulations, and in no case be
less than currently adopted International Fire Code requirements.
iv. Additional infrastructure may be required to provide fire protection service when
existing water distribution lines are inadequate.
Section 1 1
2020 Design Standards and Specifications
Water Standards
C. Design flow for development other than residential use shall be based on the following or as
directed by the City Engineer or designee:
Type of Development
Average Daily Demand
(gal/person/day)
Restaurant
18
Without cafeteria or showers
18
School
With cafeteria; no showers
24
With cafeteria and showers
30
Without cafeteria, restrooms or showers
6
Youth
With restrooms; no cafeteria or showers
24
camp
With restrooms and showers; no cafeteria
30
With restrooms, showers and cafeteria
42
Office building
18
Hospital(per bed
720
Institution other than hospital)
240
Factories exclusive of industrialprocesses)
24
Recreational Parks
6
Swimming pools
12
Country clubs
120
Airport(per passenger)
6
Self-service laundry
60
Service station/convenience store
12
i. Peak hourly demand for other than residential flows shall be 2.5 times the average
daily demand.
1.03 Design Pressure
1.03.01 Distribution system shall have a maximum operating pressure of 150 pounds per square
inch (psi) and a minimum operating pressure of 40 psi.
1.03.02 Distribution system shall maintain a 20 psi residual pressure during required fire flow and a
40 psi residual pressure during peak hourly demand.
1.04 Hydraulic Design
1.04.01 Distribution mains shall be designed to have a maximum velocity of 10 feet per second.
1.04.02 Distribution mains shall be designed using a Hazen -Williams friction coefficient "C" equal to
140.
1.05 Typical Layout
1.05.01 Unless approved otherwise by the City Engineer or designee, water distribution mains shall
be located:
A. In north -south alleys or streets, 5 feet west of centerline.
B. In east -west alleys or streets, 5 feet north of centerline.
1.05.02 Water mains to provide service connections shall be located within an alley or easement.
A. Service connections shall not be allowed within street right-of-way without written approval of
the City Engineer or designee.
2 Section 1
2020 Design Standards and Specifications
Water Standards
B. Service lines shall not cross property boundaries into adjacent private property without
coverage by a dedicated easement.
1.05.03 Where a water distribution main crosses a street, the crossing shall be made at as near to
perpendicular as possible.
1.05.04 Valves shall be installed at each junction such that no more than one connecting leg is
unvalved.
A. At street intersections, valves shall be located at right-of-way lines unless flanged fittings are
required.
B. At alley intersections with streets, valves shall be located 2 feet from the right of way line
towards the centerline of the street where possible.
C. Where possible, valves in streets should be designed to fall outside of wheel paths.
1.05.05 Water mains shall be designed as looped systems.
1.05.06 Minimum radius of curvature and maximum deflection angle of pipe joints shall be
restricted to 80% of manufacturer's recommendation, after which the use of horizontal or
vertical bends will be required.
1.05.07 In all instances water mains shall extend to the extremities of the platted property or the
subdivision served, and further when required to tie into existing mains adjacent to the
development.
1.06 Beddina and Cover
1.06.01 Water distribution mains shall ordinarily have a minimum of 4 feet of cover from top of
pipe to finished ground surface.
1.06.02 All water lines shall be laid as horizontal as possible, avoiding excessive numbers of high or
low points.
1.06.03 Pipe bedding and embedment shall be in accordance with the Standard Specifications for
Water Main Construction but in all cases shall be not less than manufacturer
recommendations.
1.07 Relation to Sanitary Sewer Mains and Appurtenances
1.07.01 No physical connection shall be made between a drinking water supply and a sewer line.
A. Appurtenances shall be designed and constructed so as to prevent any possibility of sewage
entering the drinking water system.
1.07.02 Water lines shall be located a minimum of 9 feet horizontally outside to outside from
existing or proposed sanitary sewer lines or appurtenances.
A. Where the 9 foot separation distance cannot be achieved, the following criteria shall apply:
i. New waterline installation —parallel lines:
a. Where a new potable waterline parallels an existing, non -pressure or pressure rated
sanitary sewer main and the Design Engineer is able to determine that the existing
sanitary sewer main is not leaking:
Section 1 3
2020 Design Standards and Specifications
Water Standards
(1) The new potable waterline shall be located a minimum of 2 feet above and a
minimum of 4 feet horizontally between outside diameters from the existing
sanitary sewer main.
(2) Every effort shall be exerted not to disturb the bedding and backfill of the
existing sanitary sewer main.
b. Where a new potable waterline parallels an existing, non -pressure or pressure rated
sanitary sewer main and it cannot be determined by the Design Engineer if the
existing line is leaking:
(1) The existing sanitary sewer main shall be replaced with at least 150 psi pressure
rated pipe.
(2) The new potable waterline shall be located a minimum of 2 feet above and a
minimum of 4 feet horizontally between outside diameters from the existing
sanitary sewer main.
c. Where a new potable waterline parallels a new sanitary sewer main:
(1) The sanitary sewer main shall be constructed of at least 150 psi pressure rated
pipe.
(2) The new potable waterline shall be located a minimum of 2 feet above and a
minimum of 4 feet horizontally between outside diameters from the existing
sanitary sewer main.
ii. New waterline installation —crossing lines:
a. Where a new potable waterline crosses over an existing, non -pressure rated sanitary
sewer main:
(1) A minimum 2 foot separation distance between outside diameters shall be
maintained.
(2) One segment of the waterline pipe shall be centered over the sanitary sewer
main such that the joints of the waterline pipe are equidistant and at least 9 feet
horizontally from the centerline of the sanitary sewer main.
(3) Whenever possible, the crossing shall be centered between the joints of the
sanitary sewer main.
(4) Every effort shall be exerted not to disturb the bedding and backfill of the
existing sanitary sewer main.
(5) If the existing sanitary sewer main is disturbed or shows signs of leaking, it shall
be replaced for at least 9 feet in both directions (18 feet total) with at least 150
psi pressure rated pipe.
b. Where a new potable waterline crosses over an existing, pressure rated sanitary
sewer main:
(1) An absolute minimum separation distance of 6 inches between outside diameters
shall be maintained.
(2) One segment of the waterline pipe shall be centered over the sanitary sewer
main such that the joints of the waterline pipe are equidistant and at least 9 feet
horizontally from the centerline of the sanitary sewer main.
(3) Whenever possible, the crossing shall be centered between the joints of the
sanitary sewer main.
(4) Every effort shall be exerted not to disturb the bedding and backfill of the
existing sanitary sewer main.
(5) If the existing sanitary sewer main is disturbed or shows signs of leaking, it shall
be replaced for at least 9 feet in both directions (18 feet total) with at least 150
psi pressure rated pipe.
4 Section 1
2020 Design Standards and Specifications
Water Standards
c. Where a new potable waterline crosses over a new, non -pressure rated sanitary
sewer main:
(1) A minimum 2 foot separation distance between outside diameters shall be
maintained.
(2) One segment of the waterline pipe shall be centered over the sanitary sewer
main such that the joints of the waterline pipe are equidistant and at least 9 feet
horizontally from the centerline of the sanitary sewer main.
(3) Whenever possible, the crossing shall be centered between the joints of the
sanitary sewer main.
(4) The sanitary sewer main shall be embedded in flowable fill from one quarter of
the diameter of the sanitary sewer main below the centerline of the pipe up to
12 inches above top of pipe for the total length of one pipe segment, minimum 9
feet in each direction from water line, plus 12 inches beyond the joint on each
end.
d. Where a new potable waterline crosses over a new, pressure rated sanitary sewer
main:
(1) An absolute minimum separation distance of 6 inches between outside diameters
shall be maintained.
(2) The sanitary sewer main shall be constructed of at least 150 psi pressure rated
pipe.
(3) One segment of the waterline pipe shall be centered over the sanitary sewer line
such that the joints of the waterline pipe are equidistant and at least 9 feet
horizontally from the center line of the sanitary sewer main.
(4) Whenever possible, the crossing shall be centered between the joints of the
sanitary sewer main.
(5) The sanitary sewer main shall be embedded in flowable fill from one quarter of
the diameter of the sanitary sewer main below the centerline of the pipe up to
12 inches above top of pipe for the total length of one pipe segment, minimum 9
feet in each direction from water line, plus 12 inches beyond the joint on each
end.
e. When a new potable waterline crosses under a sanitary sewer main:
(1) An absolute minimum separation distance of 1 foot between outside diameters
shall be maintained.
(2) The waterline shall be encased in an 18-foot or longer section of pipe or be
constructed of ductile iron or steel pipe with mechanical or welded joints as
appropriate.
(3) The encasing pipe shall be centered on the sewer line and shall be at least 2
nominal pipe diameters larger than the water line.
(4) The carrier pipe shall be supported at 5-foot or less intervals with spacers.
(5) Each end of the casing shall be sealed with watertight non -shrink cement grout
or a manufactured watertight seal.
(6) Both the waterline and sanitary sewer main must pass a pressure and leakage
test as specified in AWWA C600.
iii. The use of brown coloring in flowable fill for pressure rated sanitary sewer main
embedment is recommended for identification during future construction.
iv. In all cases, suitable backfill or other structural protection shall be provided to preclude
settling and/or failure of the higher pipe.
Section 1 5
2020 Design Standards and Specifications
Water Standards
B. Location of fire hydrants
i. Fire hydrants shall not be installed within 9 feet vertically or horizontally of any sanitary
sewer main, manhole or service line regardless of construction.
C. Location of potable or raw water supply or suction lines
i. Suction mains to pumping equipment shall not cross sanitary sewer mains or sanitary
sewer service lines.
ii. Raw water supply lines shall not be installed within 5 feet of any tile or concrete
sanitary sewer main or sanitary sewer service line.
D. Proximity of septic tank drain fields
i. Waterlines shall not be installed closer than 20 feet to septic tank drain fields.
1.07.03 Water and sewer lines shall be installed in separate trenches.
1.07.04 For other instances not covered in these design standards, consult current TCEQ
regulations.
1.08 Pine Size and
1.08.01 Distribution mains shall be located and sized in accordance with the current City of
Lubbock Water System Master Plan and current TCEQ rules:
Water Line Size
Spacing
16-inch or larger
Section Line mile
10- or 12-inch
Half -Section Line 1/2 mile
6- or 8-inch
Eighth -Section Line (660 feet)
1.08.02 The standard pipe sizes that shall be used are 4-, 6-, 8-, 10-, 12-, 16-, 20- and 24-inch.
Pipe sizes not listed here are considered non-standard and shall not be used in the City of
Lubbock water distribution system, unless approved by the City Engineer or designee.
1.09 Pipe Materials
1.09.01 All pipe used in the City of Lubbock water distribution system shall be Cement -lined Ductile
Iron, C900 PVC, C905 PVC, C301 Prestressed -Concrete Steel Cylinder Pressure or Concrete
Bar -wrapped Steel Cylinder Pressure Pipe.
1.09.02 See City of Lubbock Standard Specifications for Water Main Construction for details on
materials and methods of construction.
1.10 Methods of Connection
1.10.01 Tapping Sleeves
A. Tapping sleeves with tapping valves shall be used whenever possible for connections to
existing mains in order to avoid interruption of water service.
B. Maximum tap size shall be no larger than one standard size smaller than the main to be
tapped.
C. Size -on -size taps shall not be allowed without prior approval by the City Engineer or designee.
D. Using a tapping sleeve of one standard size smaller than the main to be tapped and
immediately increasing the pipe to a larger size shall not be allowed without prior approval by
the City Engineer or designee.
6 Section 1
2020 Design Standards and Specifications
Water Standards
1.10.02 Cut -in Tees
A. When it is necessary for a size -on -size connection and interruption of water service is not an
issue, a cut -in tee with valve shall be used.
B. Cut -in tees shall not be used without prior approval by the City Engineer or designee.
1.10.03 Service Connections
A. Taps shall be provided in water main lines for service connections at each lot or building site.
B. Service connections shall ordinarily be located 5.0 feet north or west of the centerline of the
lot.
C. Service lines shall not cross property boundaries into adjacent private property without
coverage by a dedicated easement.
D. Typical sizes of service connections are 1 inch, 1 1/2 inch, or 2 inch diameter for residential,
commercial, or industrial service. Service taps 3 inches or larger are available for commercial
and industrial only.
E. Maximum size service connection shall be no larger than one standard size smaller than the
main to be tapped.
F. Size -on -size service connections are not allowed.
1.11 Flanaed Outlets
1.11.01 All side outlets for valve attachments on lines 16-inches and larger shall be flanged.
1.12 Valve Spacing
1.12.01 Valves shall be provided in the distribution system so that no single accident, break or
repair will necessitate shutting down a length of pipe greater than 600 feet.
A. On distribution mains 12-inch diameter and smaller, valves shall be located at each tee, cross
or other junction.
B. Valves shall be installed at each junction such that no more than one connecting leg is
unvalved.
1.12.02 On 16-inch arterial mains, valves shall be spaced no greater than 800 feet as the arterial
feeder main traverses undeveloped land or is not intersected by other distribution mains.
1.12.03 Transmission mains 20-inch diameter and larger shall be equipped with valves at one-half
mile intervals unless intersected by arterial mains or other distribution mains, or it is
determined that more valves are required.
1.13 Fire Protection Requirements
1.13.01 Fire protection must comply with Fire Marshall's Office regulations, and in no case be less
than currently adopted International Fire Code requirements.
A. Each building in the city limits shall be within 500 feet of a fire hydrant, as measured by lay -
of -hose length.
IL. 13.02 In all cases, the following criteria shall be adhered to:
A. Fire hydrant leads shall be minimum 6-inch diameter, sole purpose and shall not exceed 150
feet in length. The entire length of the lead shall be mechanically restrained.
Section 1 7
2020 Design Standards and Specifications
Water Standards
B. Private fire protection lines and hydrant leads shall connect at the main with a gate valve or
tapping valve of at least equal size to the fire protection line.
C. A fire hydrant is required within 200 feet of a Fire Department Connection.
D. Fire lines from public mains to buildings shall be installed by a state certified fire sprinkler firm
and tested to Fire Marshall's Office requirements.
E. Fire hydrants shall be located at intersections wherever possible.
i. Consult Section C-104 of the International Fire Code for requirements on hydrants that
may obstruct access during fire fighting operations.
F. A hydrant shall be placed at the throat or beginning of each cul-de-sac at the intersecting
street.
i. Additional fire hydrants may be required based on length of cul-de-sac.
ii. Fire hydrants placed at the bulb end of cul-de-sacs should be avoided.
G. On divided highways hydrants shall be placed on each side of the highway wherever possible.
H. Fire hydrants shall be installed with the 4-inch nozzle facing the required access way or street.
I. Fire hydrants shall be installed and maintained so that the center of the lowest water outlet is
18 inches above the ground.
J. Fire hydrants shall be placed so that they are readily visible from the street and shall be no
closer than 2 feet nor further than 5 feet from back of curb.
K. A reflective, blue, raised pavement marker shall be placed at the center of the required access
way or street for any new fire hydrant installation, in line with the 4-inch nozzle.
L. No bushes, ground cover over 6 inches in height, or other obstructions shall be placed within
a 5 foot radius in all directions of a hydrant or fire department connection.
M. Where fire hydrants are vulnerable to vehicular damage, appropriate crash posts shall be
provided.
i. No obstructions shall exist within a 3-foot working area of each fire hydrant.
ii. Crash posts shall be 4-inch, cement -filled pipe with a minimum of 3 feet above finished
grade and 2 feet of pipe anchored in concrete below grade.
N. Fire hydrants shall be in operation before framing is started or combustibles are stored on any
construction site.
0. Streets and fire access roadways shall be able to support fire apparatus in wet weather before
framing is started or combustibles are stored on any construction site.
P. Fire hydrant shall be installed with flange 0.2 to 0.4 foot above finished grade so that the bury
line will be between finished grade and 0.2 foot above finished grade.
Q. No size -on -size taps for fire suppression shall be allowed.
1.14 Easements
1.14.01 When it is determined not to be feasible to construct a public water distribution main in a
street or alley, the installation may be made in a dedicated easement or right-of-way.
1.14.02 The minimum width of an easement or right-of-way for a public water distribution main is
10 feet exclusive, 20 feet if shared with a public sanitary sewer main or other utilities or if
depth of water distribution main is greater than 10 feet.
1.14.03 Easements will not be allowed between residential lots unless they are in combination with
a drainage easement or with prior approval from the City Engineer or designee.
8 Section 1
2020 Design Standards and Specifications
Water Standards
1.14.04 When a fire hydrant is to be installed on private property, an easement shall be dedicated
which provides a minimum of 5 feet clearance in all directions from the center of the fire
hydrant.
1.15 Soil Ana
1.15.01 The Contractor or Design Engineer may be required to submit a report showing the types
and characteristics of the soils to be encountered, water table elevations along the
proposed water distribution main, recommended methods of dewatering for water
distribution main construction, and the recommended methods of backfilling and
compacting to be used.
1.16 Pipe Restraints and Reaction Blocking
1.16.01 The size of required pipe restraints and reaction blocks shall be determined by the Design
Engineer for the project based on the allowable soil pressure and the anticipated working
pressure plus water hammer of the line.
1.16.02 For restrained joint lengths required, refer to Appendix A as derived from EBAA Iron, Inc.
1.17 Tunneling, Jacking and Bori
1.17.01 Tunneling, jacking and boring are methods used for water line placement under restrictive
conditions when open cut construction is not allowed.
A. Only straight pipe alignments for both horizontal and vertical alignment are allowed.
B. Casing shall extend full width of right-of-way or as directed by the City Engineer or designee.
C. Casing pipe shall be a minimum of two standard sizes larger than encased pipe.
D. Casing pipe thickness shall be:
Casing Diameter
Minimum Casing Thickness
<24 inches
3/8 inch
>_24 inches
1/2 inch
E. Manufactured centralizers or spacers shall be required at minimum 5-foot intervals or as
recommended by the manufacturer.
Only purpose-built centralizers may be used.
F. Coal tar coating for casing pipe shall conform to AWWA C203.
G. For bores in excess of 100 feet, purpose-built fused or restrained joint pipe shall be used.
H. All bores must comply with City Utility Excavation Manual.
1.17.02 Slick boring or directional drilling without encasement shall be considered on a case -by -
case basis by the City Engineer or designee. All slick bores shall be restrained or encased.
1.17.03 No annular space shall remain between casing, or uncased pipe, and bored hole.
1.17.04 Unbraced, uncased bore holes shall be left open no more than 24 hours.
Section 1 9
2020 Design Standards and Specifications
Water Standards
1.18 Dead-end Mains
1.18.01 A dead-end main is defined as a length of water line greater than 150 feet with no looped
connection.
1.18.02 Dead-end mains shall not be allowed unless approved by the City Engineer or designee.
1.18.03 Where dead-end mains are necessary as a stage in the growth of the system, they shall be
designed so that:
A. The system may be periodically flushed by use of a blow -off valve or fire hydrant, or
B. A temporary looped connection is installed.
1.19 Abandonment of Water Mains
1.19.01 When a water line is to be abandoned, allowances shall be made so that existing and new
water mains may be in service simultaneously, thereby providing a means for transferring
customer's service from the old main to the new main with minimal interruption.
1.19.02 If the construction of a proposed main necessitates the abandoning of the existing main
prior to the new main's placement into service, provisions for a temporary water main with
services must be addressed.
1.19.03 On mains to be abandoned, the designer shall note locations of cut and plug as close as
possible to the main that remains in service.
1.19.04 Fire hydrants, valves and other fittings located on mains to be abandoned shall be
removed and delivered to the City of Lubbock Water Utilities Department.
10 Section 1
2020 Design Standards and Specifications
Water Check List
SECTION 2
CHECK LIST FOR WATER DISTRIBUTION CONSTRUCTION PLANS
2.01 Plan Submittal Requirements
2.01.01 All water main construction plans shall be checked for conformance with City of Lubbock
Minimum Design Standards for Water Distribution prior to submittal to the Engineering
Department. Approval of plans is for general conformance with the City of Lubbock
Minimum Design Standards and Specifications. Approval of plans shall not relieve the
Engineer or Developer from any City, State or other governing requirements nor for errors
or omissions in plans and specifications.
2.01.02 Plan Review
A. The Design Engineer shall submit water main construction plans to the City Engineer or
designee for review and comment. The Design Engineer shall use the City of Lubbock
Customer Self Service (CSS) website to submit plans.
http://egovaccess.ci.lubbock.tx.us/EnerGov Prod/SelfService/#/home
B. Please call 806-775-2347 if you have any questions regarding the CCS submission process.
C. Upon completion of review and receipt of payment for appropriate Plan Review fees,
comments shall be returned to the Design Engineer on the CSS website.
i. Plans requiring resubmittal for substantial changes as determined by City Engineer or
Designee may require payment of an additional Plan Review fee.
D. After comments have been addressed and changes have been made the Design Engineer will
submit the revised plan using CSS website.
i. If comments have not been addressed on plans submitted for final approval for
construction the plans will be rejected.
ii. Plans will not be approved unless testing and inspection fees have been paid.
iii. If the design engineer does not submit plans for approval within 6 months of
comments being issued or if fees are not paid within 6 months then the review will be
terminated and the design engineer will have to start the plan review process over.
E. Upon approval, the city will return an electronic copy of the plan stamped "Approved for
Construction" through the CSS web site.
i. The design Engineer will be required to submit two half size copies of the approved for
construction stamped plans.
F. Final construction plans should not be submitted for Engineering Department approval for
work that will not be installed within 6 months of the approval date.
i. Delays between approval date and construction may require resubmittal of the plans
for review under current standards.
2.01.03 Pro Rata Estimate and Fees
A. The Pro Rata Cost Estimates shall be submitted for review at the time of plan review
submittal.
B. Plan Review Fees in the amount of 0.5% of the Pro Rata Cost Estimate (minimum $50) shall
be submitted at the time of plan review submittal.
Section 2 11
2020 Design Standards and Specifications
Water Check List
C. Inspection and Testing Fees in the amount of 1.5% of the Pro Rata Cost Estimate (minimum
$125) shall be submitted prior to construction.
D. In the event of significant changes in design, an updated Pro Rata Cost Estimate shall be
submitted and resulting differences in fee amounts settled.
2.01.04 Checklist
A. A copy of the completed "City of Lubbock Municipal Water and Sewer Submittal Checklist"
shall be submitted at the time of plan review submittal. The checklist can be found in the
Appendix.
2.01.05 Construction Plans
A. All plans to be used or kept on the job site shall be original or reproduced plan sets clearly
marked "Approved for Construction" with the signature of reviewer and date approved by the
Engineering Department.
B. Should circumstances during construction warrant changes from the approved plans or
specifications, a written approval must be obtained from the Engineering Department.
i. Copies of the written approval shall be attached to the construction plans and
maintained on the job site.
2.01.06 Record Drawings
A. The Design Engineer shall be responsible for recording constructed dimensions and
information on a set of Record Drawings during the progress of construction.
i. The City of Lubbock Engineering Department shall monitor this process to assure that
changes in construction are kept up to date on the Record Drawings.
B. Digital PDF "Record Drawings" certified by the Design Engineer shall be submitted to the
Engineering Department on the CSS website within 30 days of completion of the construction.
i. Record Drawings shall include locations of all valves, valve vaults, fire hydrants, bends
and tees or other changes in main pipe direction, material or size.
a. GPS Coordinates or property ties are acceptable.
C. Where the construction is phased and a lapse of more than 60 days occurs between phases,
then Record Drawings shall be submitted to the Engineering Department reflecting the
completed construction prior to issuance of the Certificate of Acceptance of Utility
Construction.
D. Items required to be submitted with Record Drawings:
i. Letter of Transmittal
ii. Record Drawing
iii. Updated Pro Rata Cost Estimate
iv. Certificate of Completion (Provided to Contractor from City Inspector)
v. Developer's Warranty Statement (See Appendix)
vi. Adjacent Mains Refund Contract (see Apendix)
2.01.07 Acceptance
A. Upon completion of construction, satisfactory system tests and submittal of Record Drawings,
the Design Engineer shall submit a request to the City Engineer or designee for a Certificate of
Acceptance of Utility Construction.
i. Water distribution system improvements shall not be put online or brought into service
without written approval by the Engineering Department.
12 Section 2
2020 Design Standards and Specifications
Water Check List
ii. A newly constructed system will not be accepted until the supplying, adjacent system
has been accepted.
iii. A Certificate of Acceptance of Utility Construction shall not be issued until Record
Drawings are provided to the Engineering Department.
iv. When all paperwork has been completed and provided to the City with a written
notification, utilities will be accepted within 30 days if there is no exception by the City.
B. Building Permits for residential developments and Certificates of Occupancy for commercial
facilities to be serviced by a newly constructed water system will not be released by the
Engineering Department until said system has been brought into service.
2.02 Plan Details
2.02.01 Plan Format
A. Standard drawing size shall be 22-inch by 34-inch.
2.02.02 The following information shall be shown on the plans:
A. General
i. Title Block (lower right hand corner preferred)
ii. Scale
iii. Original Date and Revision Dates
iv. Name of Professional Engineer
v. Professional Engineer's Seal
vi. Firm Name and Contact Information
vii. City of Lubbock Engineering Department Contact Information:
a. Development Services Engineering: (806) 775-2347
b. Senior Inspector: (806) 548-4152
viii. Drawings Number(s)
ix. Legal Description of Property Being Improved
x. Location Map or Plat (if available)
A. Statement:
"All work shall be performed in accordance with the current
version of the City of Lubbock Minimum Design Standards and
Specifications."
B. Plan
i. Bench Marks
ii. North Arrow
iii. Property Lines
iv. Street Names and Easements with Width Dimensions
v. Other Pertinent Details (Buildings, Curbs, Water Courses, Etc.)
vi. Proposed Water Mains (Bold)
a. Stationing
b. Size
c. Length
d. Material and Type of Joints
e. Location Dimensions
f. Fittings
Section 2 13
2020 Design Standards and Specifications
Water Check List
g. Tees
h. Crosses
i. Reducers
j. Bends
k. Plugs
I. Blow -offs
m. Thrust Blocks
n. Valves
o. Fire Hydrants
vii. Existing Utility Lines (Gray) with Location and Depth According to the Following
Standard:
WWw WATER LINE
s s
s
SANITARY SEWER LINE
G G
G
GAS LINE
FOc
FIBER OPTIC CABLE
FOc
CATV
CATV
CABLE TELEVISION
SWSw-
STORM WATER LINE
UGE
UGE
UNDER GROUND ELECTRIC
OHE
OHE
OVER HEAD ELECTRIC
UGT
UGT
UNDER GROUND TELEPHONE
OHT
OVER HEAD TELEPHONE
OHT
Ts
TS
TRAFFIC SIGNAL LINE
14 Section 2
2020 Design Standards and Specifications
Water Check List
C. Profile (required for water lines greater than 12-inch diameter)
i. Ground Surface - Existing (Dotted) and Proposed (Solid)
ii. Station Numbers
iii. Existing and Proposed Utilities Where Crossed
iv. Proposed Water Main Control Elevation and Grades
D. Plan, Profile and Complete Details for Off -Site Transmission Mains, Pump Stations, Special
Valves and Vaults, Tanks, Etc.
E. Detail Sheet - As Required
i. Standard Bedding Detail
ii. Thrust Block and Joint Restraint Tables
iii. Fire Hydrant Detail
iv. Tapping Details
v. Air Valve Detail
vi. Blow -off Detail
vii. Crossing Detail
F. Overall Layout Sheet - If Required
i. Scale 1 "=100'
ii. Lot Lines
iii. Streets and Street Names
iv. Water Line Sizes and Material
v. Valves
vi. Fire Hydrants
vii. Connections to Existing System
Section 2 15
2020 Design Standards and Specifications
Water Check List
16 Section 2
2020 Design Standards and Specifications
Sewer Standards
SECTION 3
MINIMUM DESIGN STANDARDS FOR SANITARY SEWERS
3.01 General
3.01.01 All sanitary sewer system design shall be in accordance with the requirements of TCEQ
Chapter 217, AWWA Standards, City of Lubbock Sewer System Master Plan, current City
ordinances and the City of Lubbock Minimum Design Standards for Sanitary Sewers.
3.02 Desian Flow
3.02.01 The design of the sanitary sewer system shall be based on the following:
A. For sewers in new developments sewer main lines and lift stations shall be designed for the
estimated future population to be served plus adequate allowance for future institutional and
commercial flows.
Minimum flow capacity for sizing of sewers for peak flow conditions shall not be less than the
following:
Design Criteria
Design Value
Units
Average Daily Flow
100
gpcd
Peak Factor, 2-hour flow <0.5 MGD
5
-
Peak Factor, 2-hour flow >0.5 MGD
4
Capita per Household (Single Family)
3.2
persons
Capita per Household(Multi-family)
2.5
persons
C. Minimum residential population density shall be figured on a basis of 6 houses per acre, and
70 percent of total land area developed as residential, unless detailed analysis of the area to
be served indicates differently.
D. Design flow for development other than residential use shall be based on the following or as
directed by the City Engineer or designee:
Type of Development
Design Criteria
Daily Flow - gpcd
Trailer Park — transient
2.5persons/trailer
50
Mobile Home Park
3persons/trailer
75
School with cafeteria
With showers
20
Without showers
15
Recreational Parks
Day Use
5
Overnight Use
30
Commercial/Industrial Building
20
Motel
50
Restaurant
Per meal served
5
Hospital
Per bed
200
Nursing Home
Per bed
100
Section 3 17
2020 Design Standards and Specifications
Sewer Standards
3.03 Hvdraulic Desian
3.03.01 The minimum velocity at the design flow rate shall be 2.0 feet per second.
3.03.02 Maximum allowable velocity shall be 10 feet per second.
3.03.03 Manning's coefficient for design purposes shall be n=0.013 for PVC pipe.
3.03.04 Manhole inverts shall be designed in such a manner that the energy gradient is
consistently falling in the direction of flow.
3.04 Desian Details
3.04.01 Sewer Pipe
A. The standard pipe sizes that shall be used are 6-, 8-, 10-, 12-, 15-, 18- and 21-inch. Pipe
sizes not listed here are considered non-standard and shall not be used in the City of Lubbock
sanitary sewer system, unless approved by the City Engineer or designee.
B. The following City slope standards shall apply to sanitary sewer mains: (refer to TCEQ
guidelines 30 TAC Section 217.53.1.2.A Table C. I.)
Pipe Diameter
Minimum Slope (%)
Maximum Slope (%)
6 inch
0.60 [0.50 TCEQ]
12.35
8 inch
0.40 [0.33 TCEQ]
8.40
10 inch
0.28 [0.25 TCEQ]
6.23
12 inch
0.22 [0.20 TCEQ]
4.88
15 inch
1 0.15 [0.15 TCEQ]
3.62
18 inch
1 0.12 [0.11 TCEQ]
2.83
C. Sewer main lines shall be straight between manholes both in line and grade.
D. All sewer main lines shall terminate in a manhole.
i. Cleanouts on sewer main lines shall not be permitted without written approval of the
City Engineer or designee.
3.04.02 Manholes
A. Manholes shall be a minimum of 48-inch diameter and shall be provided at every change in
direction, grade, or connection with other sewer main lines.
B. Manhole spacing and depth shall be as follows:
Pipe Diameter
Manhole
Depth
Manhole
Diameter
Max. Spacing
Between Manholes
15 inches or smaller
0-16 Ft.
48 in.
500 Ft.
15 inches or smaller
Over 16 Ft.
60 in.
500 Ft.
Over 15 inches
All depths
60 in.
800 Ft.
C. Manholes greater than 16 feet deep or serving pipes larger than 15 inches shall be 60-inch
diameter and include a protective coating system per the Approved Materials List.
D. Connections at manholes shall be designed such that the crowns of connecting pipes are
equal elevation if possible.
E. Force mains shall discharge directly into a manhole through a 900 downspout connection.
18 Section 3
2020 Design Standards and Specifications
Sewer Standards
F. Manholes receiving force main discharge shall include a protective coating system per the
Approved Materials List.
G. Minimum elevation difference across manhole inverts shall be as follows:
Deflection Angle Between
Inlet/Outlet
Min. Elevation Difference
Less than 3011
0.10 Ft.
Greater than 300
0.20 Ft.
H. Drop manholes shall be provided for sewer main lines entering a manhole at an elevation 24
inches or more above the manhole invert.
i. Drop connections on new manholes shall be constructed with an exterior or "outside"
drop system on all 48 inch manholes. All "outside" drops shall be flow filled against
undisturbed soil up to the depth of the main.
ii. Drop connections on existing manholes shall be constructed with an interior or "inside"
drop system. "Inside" drops shall be allowed for existing 60 inch manholes only.
I. Where the difference in elevation is less than 24 inches, the invert shall be filleted to prevent
solids deposition.
J. Manholes shall be stubbed out with suitable size pipe wherever future extension of the sewer
is anticipated.
i. Stub -outs shall extend beyond the edge of existing or proposed paving.
K. Inflow Prevention Devices (IPDs) shall be specified on all new manhole installations.
3.04.03 Service Connections
A. Tees or wyes shall be provided in sewer main lines for service connections at each lot or
building site.
B. Service connections shall ordinarily be located 5.0 feet south or east of the centerline of the
lot.
C. Service lines shall not cross property boundaries into adjacent private property without
coverage by a dedicated easement.
D. Minimum size service connections shall be 4 inch diameter.
E. Maximum size service connection shall be no larger than one standard size smaller than the
main to be tapped.
F. Size -on -size service connections are not allowed.
G. Gravity sewer taps shall connect to sewer main lines at or above the spring line.
H. No gravity service lines shall discharge directly into a manhole.
I. Service connections shall not be installed within 5 feet of the outside wall of a manhole.
3.05 Typical Layout
3.05.01 Unless approved otherwise by the City Engineer or designee, sanitary sewer mains shall be
located:
A. In north -south alleys or streets, 5 feet east of the centerline.
B. In east -west alleys or streets, 5 feet south of the centerline.
Section 3 19
2020 Design Standards and Specifications
Sewer Standards
3.05.02 Sanitary sewer mains to provide service connections shall be located within an alley or
easement.
A. Service connections shall not be allowed within street right-of-way without written approval of
the City Engineer or designee.
B. Service connections shall not be deeper than 12 foot without prior written approval from the
City Engineer or designee.
3.05.03 Where a sanitary sewer main crosses a street, the crossing shall be made at as near to
perpendicular as possible.
3.05.04 Manholes shall be located as to provide access for maintenance crews and equipment.
A. Where possible, manholes in streets should be designed to fall outside of wheel paths.
B. Where possible, manholes in alleys should be designed to fall at the projected intersection of
perpendicular lot lines.
3.05.05 In all instances sanitary sewer mains shall extend to the extremities of the platted property
or the subdivision served.
3.06 Beddina and Cover
3.06.01 Sewer mains shall have a minimum of 4 feet of cover from top of pipe to proposed finished
ground surface unless approved by City Engineer or designee.
A. Where less than 5 feet of elevation difference between the finished lot grade at building line
and the top of the sewer main is provided, the plans shall indicate that the lot is served by a
"shallow sewer" and appropriate elevation information shall be given.
B. Where a sewer main has less than 4 feet of cover, provisions shall be made to protect the
pipe from impact loading when located in a street or alley.
C. Maximum sanitary sewer depth in alleys shall be 12 feet unless approved by the Engineering
Department.
3.06.02 Pipe bedding and embedment shall be in accordance with the Standard Specifications for
Sanitary Sewer Main Construction but in all cases shall be not less than manufacturer
recommendations.
3.07 Relation to Water Mains
3.07.01 No physical connection shall be made between a drinking water supply and a sewer line.
A. Appurtenances shall be designed and constructed so as to prevent any possibility of sewage
entering the drinking water system.
3.07.02 Sewers shall be located a minimum of 9 feet horizontally outside to outside from existing
or proposed water mains.
A. Where the 9-foot separation distance cannot be achieved, the following guidelines shall apply:
i. New sanitary sewer installation — parallel lines:
a. Where a new sanitary sewer main parallels a water line:
(1) The sewer shall be constructed of ductile iron or PVC meeting ASTM
specifications with a pressure rating for both the pipe and joints of 150 psi.
(2) The vertical separation shall be a minimum of 2 feet and the horizontal
separation shall be a minimum of 4 feet between outside diameters.
20 Section 3
2020 Design Standards and Specifications
Sewer Standards
(3) The sewer shall be located below the water line.
ii. New sanitary sewer installation — crossing lines:
a. Where a sanitary sewer crosses under a water line and the sewer is constructed of
ductile iron or PVC with a minimum pressure rating of 150 psi:
(1) An absolute minimum separation distance of 6 inches between outside diameters
shall be maintained.
(2) One segment of the sewer pipe shall be centered on the water line such that the
joints of the sewer pipe are equidistant and at least 9 feet horizontally from the
centerline of the water line.
(3) Whenever possible, the crossing shall be centered between the joints of the
waterline.
(4) The sanitary sewer main shall be embedded in flowable fill from one quarter of
the diameter of the sanitary sewer main below the centerline of the pipe up to
12 inches above top of pipe for the total length of one pipe segment, minimum 9
feet in each direction from water line, plus 12 inches beyond the joint on each
end.
b. Where a sanitary sewer crosses under a water line and the sewer is constructed of
ABS truss pipe, similar semi -rigid plastic composite pipe, clay pipe or concrete pipe
with gasketed joints (Non -pressure rated pipe):
(1) A minimum 2 foot separation distance between outside diameters shall be
maintained.
(2) One segment of the sewer pipe shall be centered on the water line such that the
joints of the sewer pipe are equidistant and at least 9 feet horizontally from the
centerline of the water line.
(3) Whenever possible, the crossing shall be centered between the joints of the
waterline.
(4) The sanitary sewer main shall be embedded in flowable fill from one quarter of
the diameter of the sanitary sewer main below the centerline of the pipe up to
12 inches above top of pipe for the total length of one pipe segment, minimum 9
feet in each direction from water line, plus 12 inches beyond the joint on each
end.
c. Where a sanitary sewer crosses over a water line:
(1) An absolute minimum separation distance of 1 foot between outside diameters
shall be maintained.
(2) All portions of the sewer within 9 feet of the water line shall be encased in a joint
of 150 psi pressure class pipe at least 18 feet long and 2 nominal sizes larger
than the new conveyance.
(3) The carrier pipe shall be supported at 5-foot or less intervals with spacers.
(4) The encasement pipe should be centered on the crossing and each end sealed
with watertight non -shrink cement grout or a manufactured watertight seal.
(5) Both the waterline and sanitary sewer main must pass a pressure and leakage
test as specified in AWWA C600.
iii. The use of brown coloring in flowable fill for pressure rated sanitary sewer main
embedment is recommended for identification during future construction.
iv. In all cases, suitable backfill or other structural protection shall be provided to preclude
settling and/or failure of the higher pipe.
B. Sanitary sewer manhole and clean out separation from water
i. Manholes and clean outs must be installed so as to provide a minimum of 9 feet of
outside to outside clearance from an existing or proposed water line.
Section 3 21
2020 Design Standards and Specifications
Sewer Standards
ii. Where the 9-foot separation distance cannot be achieved, an encasement pipe as
described in subparagraph (c.) above may be used for the water line.
3.07.03 Water and sewer lines shall be installed in separate trenches.
3.07.04 For other instances not covered in these design standards, consult current TCEQ
regulations.
3.08 Abandonment of Sewer Mains and Manholes
3.08.01 When a sewer system is to be abandoned the Design Engineer shall ensure that all existing
mains and service connections are properly plugged or transferred to the new system prior
to decommissioning of the existing system.
3.08.02 Sewer Mains
A. If a line to be abandoned terminates in a manhole that will remain in service, the existing
main to be decommissioned shall be plugged from within the manhole and clearly marked on
the plans.
i. Cutting and plugging of existing lines directly outside of manholes should be avoided.
B. If a portion of a line is to be abandoned a manhole must be installed on the new terminus of
the portion of line to remain in service.
3.08.03 Sewer Manholes
A. Manholes may be decommissioned by either of the following methods or as approved by the
City Engineer or designee:
i. Complete removal of the manhole structure including ring, lid, cone, riser sections,
base and all appurtenances. The excavation shall be backfilled with compacted native
material or flowable fill.
ii. Remove cone, ring and lid sections and backfill to top of remaining structure with
flowable fill. Remaining excavation shall be backfilled with compacted native material
or flowable fill.
3.09 Easements
3.09.01 When it is determined not to be feasible to construct a public sanitary sewer line in a street
or alley, the installation may be made in a dedicated easement or right-of-way.
3.09.02 The minimum width of easement or right-of-way for a public sanitary sewer is 10 feet
exclusive, 20 feet if shared with a public water main or other utilities or if depth of sewer
main is greater than 10 feet.
3.10 Soil Analysis
3.10.01 The Contractor or Design Engineer may be required to submit a report showing the types
and characteristics of the soils to be encountered, water table elevations along the
proposed sewer, recommended methods of dewatering for sewer main construction, and
the recommended methods of backfilling and compacting to be used.
22 Section 3
2020 Design Standards and Specifications
Sewer Standards
3.11 Tunneling, Jacking and Bori
3.11.01 Tunneling, jacking and boring are methods used for sewer line placement under restrictive
conditions when open cut construction is not allowed.
A. Only straight pipe alignments for both horizontal and vertical alignment are allowed.
B. Casing shall extend full width of right-of-way or as directed by the City Engineer or designee.
C. Casing pipe shall be a minimum of two standard sizes larger than encased pipe and must
allow for the required casing spacers.
D. Casing pipe thickness shall be:
Casing Diameter
Minimum Casing Thickness
<24 inches
3/8 inch
>_24 inches
1/2 inch
E. Manufactured centralizers or spacers shall be required at minimum 5-foot intervals or as
recommended by the manufacturer.
i. Only purpose-built centralizers may be used.
F. Coal tar coating for casing pipe shall conform to AWWA C203.
G. For bores in excess of 100 feet, purpose-built fused or restrained joint pipe shall be used.
3.11.02 Slick boring or directional drilling without encasement shall be considered on a case -by -
case basis by the City Engineer or designee.
3.11.03 Annular space between casing or uncased pipe and bored hole shall be injection grouted.
3.11.04 All pipe longer than 50' installed by bore, jacking or tunneling must be video inspected by
the developer after running water through the pipe to identify low areas. Video inspection
shall conform to Section 6.08.07.
3.12 Lift Station
3.12.01 A thorough engineering analysis must be performed on physical and economic factors to
determine if a lift station is required.
A. A preliminary engineering report will be required to list all factors including TCEQ regulations
as outlined in the Standard Specifications for Sanitary Sewer Construction.
B. The City Engineer or designee will review the preliminary report and reserves the right to
determine if there is merit to require a lift station.
C. After approval of the preliminary report design shall follow the Standard Specifications for
Sanitary Sewer Main Construction.
D. Design of a lift station facility shall take into consideration the entire drainage basin, as well as
local runoff. The top slab of the lift station shall be higher than the adjacent ground and the
100 year flood event.
E. The review and approval process for lift station design could be subject to addition rules and
requirements more comprehensive than those listed in these specifications.
Section 3 23
2020 Design Standards and Specifications
Sewer Standards
24 Section 3
2020 Design Standards and Specifications
Sewer Check List
SECTION 4
CHECK LIST FOR SANITARY SEWER CONSTRUCTION PLANS
4.01 Plan Submittal Requirements
4.01.01 All sanitary sewer main construction plans shall be checked for conformance with City of
Lubbock Minimum Design Standards for Sanitary Sewer prior to submittal to the
Engineering Department for approval. Approval of plans is for general conformance with
the City of Lubbock Minimum Design Standards and Specifications. Approval of plans shall
not relieve the Engineer or Developer from any City, State or other governing requirements
nor for errors or omissions in plans and specifications.
4.01.02 Plan Review
A. The Design Engineer shall submit sanitary sewer main construction plans to the City Engineer
or designee for review and comment. The Design Engineer shall use the City of Lubbock
Customer Self Service (CSS) website to submit plans.
http://egovaccess.ci.lubbock.tx.us/EnerGov Prod/SelfService/#/home
B. Please call 806-775-2347 if you have any questions regarding the CCS submission process.
C. Upon completion of review and receipt of payment for appropriate Plan Review fees,
comments shall be returned to the Design Engineer on the CSS website.
i. Plans requiring resubmittal for substantial changes as determined by City Engineer or
Designee may require payment of an additional Plan Review fee.
D. After comments have been addressed and changes have been made the Design Engineer will
submit the revised plan using CSS website.
i. If comments have not been addressed on plans submitted for final approval for
construction the plans will be rejected.
ii. If testing and inspection fees have not been paid, plans will be rejected.
E. Upon approval, the city will return an electronic copy of the plan stamped "Approved for
Construction" through the CSS web site.
i. The design Engineer will be required to submit two half size copies of the approved for
construction stamped plans.
F. Final construction plans should not be submitted for Engineering Department approval for
work that will not be installed within 6 months of the approval date.
i. Delays between approval date and construction may require resubmittal of the plans
for review under current standards.
4.01.03 Pro Rata Estimate and Fees
A. Two (2) sets of Pro Rata Cost Estimates shall be submitted for review at the time of plan
review submittal.
B. Plan Review Fees in the amount of 0.5% of the Pro Rata Cost Estimate (minimum $50) shall
be submitted at the time of plan review submittal.
C. Inspection and Testing Fees in the amount of 1.5% of the Pro Rata Cost Estimate (minimum
$125) shall be submitted prior to construction.
D. In the event of significant changes in design, an updated Pro Rata Cost Estimate shall be
submitted and resulting differences in fee amounts settled.
Section 4 25
2020 Design Standards and Specifications
Sewer Check List
4.01.04 Checklist
A. A copy of the completed "City of Lubbock Municipal Water and Sewer Submittal Checklist"
shall be submitted at the time of plan review submittal. The checklist can be found in the
Appendix.
4.01.05 Construction Plans
A. All plans to be used or kept on the job site shall be original or reproduced plan sets clearly
marked "Approved for Construction" with the signature of reviewer and date approved by the
Engineering Department.
B. Should circumstances during construction warrant changes from the approved plans or
specifications, a written approval must be obtained from the Engineering Department.
i. Copies of the written approval shall be attached to the construction plans and
maintained on the job site.
4.01.06 Record Drawings
A. The Design Engineer shall be responsible for recording constructed dimensions and
information on a set of Record Drawings during the progress of construction.
i. The City of Lubbock Engineering Department shall monitor this process to assure that
changes in construction are kept up to date on the Record Drawings.
B. Digital PDF "Record Drawings", certified by the Design Engineer, shall be submitted to the
Engineering Department within 30 days of completion of the construction.
i. Record Drawings shall include locations of all lift stations, manholes or other changes
in main pipe direction, material or size.
a. GPS Coordinates or property ties are acceptable.
C. Where the construction is phased and a lapse of more than 60 days occurs between phases,
then Record Drawings shall be submitted to the Engineering Department reflecting the
completed construction prior to issuance of the Certificate of Acceptance of Utility
Construction.
D. Items required to be submitted with Record Drawings:
i. Letter of Transmittal
ii. Record Drawing
iii. Updated Pro Rata Cost Estimate
iv. Certificate of Completion (Provided to Contractor from City Inspector)
v. Developer's Warranty Statement (See Appendix)
vi. Adjacent Mains Refund Contract (see Apendix)
4.01.07 Acceptance
A. Upon completion of construction, satisfactory system tests and submittal of Record Drawings,
the Design Engineer shall submit a request to the City Engineer or designee for a Certificate of
Acceptance of Utility Construction.
i. Sanitary sewer system improvements shall not be put online or brought into service
without written approval by the Engineering Department.
ii. A newly constructed system will not be accepted until the receiving, downstream
system has been accepted.
iii. A Certificate of Acceptance of Utility Construction shall not be issued until Record
Drawings are provided to the Water Utilities Department.
26 Section 4
2020 Design Standards and Specifications
Sewer Check List
iv. When all paperwork has been completed and provided to the City with a written
notification, utilities will be accepted within 30 days if there is no exception by the City.
B. Building Permits for residential developments and Certificates of Occupancy for commercial
facilities to be serviced by a newly constructed system will not be released by the Engineering
Department until said system has been brought into service.
4.02 Plan Details
4.02.01 Plan Format
A. Standard drawing size shall be 22-inch by 34-inch.
4.02.02 The following details shall be shown on the plans:
A. General
i.
Title Block (lower right hand corner preferred)
ii.
Scale
iii.
Original Date and Revision Dates
iv.
Name of Professional Engineer
v.
Professional Engineer's Seal
vi.
Firm Name and Contact Information
vii.
City of Lubbock Engineering Department Contact Information:
a.
Development Engineering Services: (806) 775-2347
b.
Senior Inspector: (806) 548-4152
viii.
Drawings Number(s)
ix.
Legal Description of Property Being Improved
x.
Location Map or Plat (if available)
xi.
Statement:
"All work shall be performed in accordance with the current
version of the City of Lubbock Minimum Design Standards and
Specifications."
B. Plan
i.
Bench Marks
ii.
North Arrow
iii.
Property Lines
iv.
Street Names and Easements with Width Dimensions
v.
Other Pertinent Details (Buildings, Curbs, Water Courses, Etc.)
vi.
Proposed Sanitary Sewer Mains (Bold)
a.
Stationing
b.
Size
c.
Materials
d.
Gradients
e.
Length between Manholes
f.
Proposed Manholes
g.
Elevation of Inverts In And Out Of Manhole
h.
Elevation of Manhole Rim
i.
Location Control Dimensions
Section 4 27
2020 Design Standards and Specifications
Sewer Check List
j. Manhole Stub -Outs
k. Proposed Future Extensions
I. Proposed Service Connections or Stub -Ins
m. Standard Bedding Cross -Section
n. Proposed Concrete Encasement
o. Proposed Cut -Off Walls
vii. Existing Utility Lines (Gray) with Location and Depth According to the Following
Standard:
I I WATER LINE
5 5 5 SANITARY SEWER LINE
G G G GAS LINE
FOC FOC FIBER OPTIC CABLE
CATV CATV CABLE TELEVISION
SWSw STORM WATER LINE
UGE UGE UNDER GROUND ELECTRIC
OHE OHE OVER HEAD ELECTRIC
UGT UGT UNDERGROUND TELEPHONE
OHT OHT OVER HEAD TELEPHONE
TS TS TRAFFIC SIGNAL LINE
C. Profile
i. Ground Surface - Existing (Dotted) and Proposed (Solid)
ii. Station Numbers
iii. Existing and Proposed Utilities Where Crossed
iv. Existing Manhole Invert and Rim Elevations
D. Plan, Profile and Complete Details for Off -Site Force or Gravity Mains, Lift Stations, Special
Valves and Vaults, Tanks, Etc.
E. Detail Sheet - As Required
i. Standard Bedding Detail
ii. Standard Manhole Detail
iii. Drop Manhole Details
iv. Tapping Details
F. Overall Layout Sheet - If Required
i. Scale 1 "=100'
ii. Lot Lines
iii. Streets and Street Names
iv. Sewer Line Sizes and Material
v. Manholes
vi. Connections to Existing System
28 Section 4
2020 Design Standards and Specifications
Water Specifications
SECTION 5
STANDARD SPECIFICATIONS FOR WATER MAIN CONSTRUCTION
5.01 General
5.01.01 All water main construction within the City of Lubbock water system or for future
connections to the City of Lubbock water system shall be accomplished in accordance with
the requirements of these specifications.
5.02 Plan Reauirements
5.02.01 Water main construction shall be done in accordance with engineered construction plans
for the work, prepared under the direction of a Professional Engineer and approved by the
City of Lubbock Engineering Department.
5.02.02 Plans shall conform to the City of Lubbock's Minimum Design Standards for Water
Distribution and shall show all information called for on the City of Lubbock Check List for
Water Distribution Construction Plans.
5.03 Plan Approval
5.03.01 The Engineering Department shall review, approve and issue plans stamped "Approved for
Construction" to the Design Engineer.
5.04 Inspection
5.04.01 Engineer and/or Contractor shall notify the Engineering Department 48 hours prior to the
planned construction is to commence and also before starting up when construction is
interrupted for any reason.
5.04.02 All work shall be inspected by a representative of the Engineering Department who shall
have the authority to halt construction when, in their opinion, construction is being
performed contrary to these specifications or other approved plans.
5.04.03 Whenever any portion of these specifications is violated, the City Engineer or designee, by
written notice, may order that portion of construction in violation of these specifications or
other approved plans, specifications and material to cease until such violation is corrected.
5.05 Specifications
5.05.01 All standard specifications and quality standards; i.e., ASA, AWWA, ASTM, etc., which are
made a portion of these specifications by reference shall be the latest edition and revision
thereof.
5.06 Materials of Construction
5.06.01 Water Pipe
A. All pipe used in the City of Lubbock water distribution system shall be C900 PVC, C905 PVC,
C906 High Density Polyethylene (HDPE), Cement -lined Ductile Iron, C301 Prestressed -
Section 5 29
2020 Design Standards and Specifications
Water Specifications
Concrete Steel Cylinder Pressure Pipe or C303 Concrete Bar -wrapped Steel Cylinder Pressure
Pipe and shall conform to the Approved Materials List.
B. The following are approved materials for water main construction:
i. PVC Pipe
a. Polyvinyl chloride (PVC) pipe shall be manufactured in accordance with AWWA C900
or C905 specifications and shall be minimum DR-18, Pressure Class 235 PSI.
b. Pipe shall be furnished with bell and spigot joint with rubber gasket joint conforming
to the above specification.
c. Spigot ends shall be beveled and reference marked to facilitate joining and insure
proper seating depth.
d. Water pipe shall be blue.
ii. High Density Polyethylene (HDPE)
a. HDPE pipe shall be made of high density, high molecular weight polyethylene pipe
material meeting the requirements of the latest revision of AWWA C906, PE 4710,
Minimum DR11, Pressure Class 200 PSI.
b. Use of HDPE pipe must be preapproved by the City Engineer or designee in writing
prior to use within the City of Lubbock service area.
iii. Cement -lined Ductile Iron Pipe
a. Ductile iron pipe shall conform to AWWA C150 — ANSI A21.50 and AWWA C151 —
ANSI A21.51.
b. All ductile iron pipe shall be cement lined in accordance with AWWA C104 - ANSI
A21.4 specifications. The external surface shall be coated with an asphalt base paint.
c. All joints for ductile iron pipe shall be of the rubber gasket bell and spigot type,
except where connecting flanged fittings, and shall otherwise conform to the base
specifications to which the pipe is manufactured.
d. The joint shall be the latest approved type of rubber gasket joint for ductile iron pipe.
e. All joints of ductile iron pipe and fittings shall be sealed with a continuous ring rubber
gasket meeting standards specified by AWWA C111 - ANSI A21.11 or its latest
revision.
f. Flanged joints shall conform to AWWA C115 — ANSI A21.15
iv. Concrete Cylinder Pipe
a. Pre -stressed Concrete Steel Cylinder Pressure Pipe shall be manufactured in
accordance with the latest revision of AWWA C301.
b. Concrete Bar -wrapped Steel Cylinder Pressure Pipe shall be manufactured in
accordance with the latest revision of AWWA C303.
c. Concrete Cylinder Pipe shall withstand a minimum pressure of 150 psi longitudinally
and helically.
d. The joints of the pre -tensioned concrete cylinder pipe and fittings shall be sealed
with a continuous ring rubber gasket meeting standards specified in AWWA C303.
e. A Portland cement mortar shall be used to fill the annular space both inside and
outside of joints in the pre -tensioned concrete cylinder pipe.
(1) Portland cement used in the mortar shall conform to ASTM C150 and C77.
(2) Sand for the mortar shall conform to ASTM C33 for fine aggregate.
f. The exterior joints on pre -tensioned concrete cylinder pipe shall be poured with a
heavy duty diaper. The width of the diaper shall be 9 inches. The band shall be
provided with 3/8 inch x 0.20 steel straps on each side.
30 Section 5
2020 Design Standards and Specifications
Water Specifications
5.06.02 Service Saddles
A. 1-inch and 2-inch Service Connection
i. Service connections shall be made through an approved service saddle.
a. Service saddles shall be manufactured to conform to ASTM A240 Type 304 stainless
steel.
b. Service saddles shall be 4-bolt, double band type.
c. Service saddle shall be fusion bonded epoxy or nylon coated.
d. 1-inch service saddles shall have AWWA Tapered (CS/CC) threaded connection.
e. 2-inch service saddles shall have iron pipe sized (IPS) threaded connection.
5.06.03 Tapping Procedures
A. Tapping Sleeves
i. General
a. Clean, disinfect, and prepare the main line, valve, and tapping machine with NSF
approved disinfectant prior to operation.
b. Ensure shell cutter will clear valve walls.
ii. Tapping Machine
a. Use the appropriate pilot bit for the pipe material being tapped; follow pipe and bit
manufacturer's requirements.
b. Upon request, contractor shall provide specification for pilot bit and shell cutter.
c. If it is determined by the inspector that the bit or shell cutter is dull or damaged a
new bit or shell cutter must be provided for all taps.
d. If tapping machine is a solid body machine and the bit/shell cutter travels, the full
weight of the tapping machine must be supported with cribbing.
e. If the tapping machine is a two-piece body machine and moves with the bit/shell
cutter, the valve must be supported with cribbing or concrete.
iii. 4-inch through 12-inch Main Line Connection
a. Tapping sleeves shall be ductile iron or stainless steel, mechanical joint and conform
to the latest revision of ASTM Standard Designations. The tapping sleeve shall
withstand a working pressure of 200 psi.
b. Gaskets shall be compounded from new materials, and the shape of cross-section of
gasket shall provide adequate seal for the design pressure. Gaskets shall be shop
glued to the groove provided in the body section.
c. Bolts and hex nuts shall be stainless steel.
iv. 16-inch through 24-inch Main Line Connection
a. Tapping sleeves shall be ductile iron or stainless steel, mechanical joint and conform
to the latest revision of ASTM Standard Designations. Tapping sleeves shall be
capable of withstanding a working pressure of 200 psi.
b. Flanges shall be fabricated from steel plate conforming to ASTM Standard
Designation A36 or A285, Grade C.
c. Dimensions shall conform to AWWA Standard C207, "Steel Pipe Flanges," Class D.
(1) Flanges shall be machined to a flat face with finish of 250 micro -inches or
machined to a flat surface with a serrated finished in accordance with AWWA
Standard C-207, "Steel Pipe Flanges."
(2) Machined face shall be recessed for tapping valves in accordance with the MSS
Standard SP-60.
Section 5 31
2020 Design Standards and Specifications
Water Specifications
d. Gaskets shall be compounded from new materials, and the shape of cross-section of
gasket shall provide adequate seal for the design pressure. Gaskets shall be shop
glued to the groove provided in the body section.
e. Bolts and hex nuts shall be stainless steel.
B. Testing Outlet
i. A 3/4-inch NPT by welded coupling shall be attached to the outlet nozzle of each
tapping sleeve assembly complete with a 3/4-inch square head pipe plug.
C. Painting
i. All surfaces of the saddle shall be clean, dry, and free from grease and dirt before
painting.
ii. All surfaces of tapping sleeve except face of flange, bolts and nuts, shall be given a
shop coat of a two-part thermosetting epoxy. Face of flanges shall be shop coated with
a rust preventive compound.
iii. Bolts and nuts shall be shipped bare (no paint or protective coating).
5.06.04 Ductile Iron Fittings
A. Fittings shall be mechanical joint or rubber gasket AWWA Class D bell with transition gasket
for the type of pipe used.
B. All fittings shall be lined with cement or coal tar and coated with an asphaltic paint.
C. Fittings shall conform to AWWA C104, AWWA C110 and AWWA C111 latest revision.
5.06.05 Double Disc Gate Valves
A. Double disc gate valves 12-inch and smaller shall be parallel seat, ductile iron body and
bronze mounted throughout. In line valves shall be flanged or mechanical joint. Side outlets
shall be flanged.
i. Gate valves 12-inch and smaller shall be direct bury.
ii. Valves shall have non -rising stems, shall open by turning to the left (counter-
clockwise), and shall be furnished with a 2-inch square operating nut.
iii. Valves shall comply with the latest revision of AWWA C500 standards.
5.06.06 Resilient Seat Gate Valves
A. Resilient seat gate valves 12-inch and smaller shall be ductile iron. In line valves shall be
flanged or mechanical joint. Side outlets shall be flanged.
i. Gate valves 12-inch and smaller shall be direct bury.
ii. Valves shall have non -rising stems, shall open by turning to the left (counter-
clockwise), and shall be furnished with a 2-inch square operating nut.
iii. Valves shall comply with the latest revision of AWWA C509 or C515 standards.
5.06.07 Butterfly Valves
A. Butterfly valves 16-inch and larger shall be ductile iron and may be either short body or long
body lengths.
i. Butterfly valves shall be installed in a concrete valve vault and shall be equipped with a
hand wheel, a 2-inch square operating nut, a locking device and a position indicator.
ii. Valve shall open by turning to the left (counter -clockwise).
iii. Valves shall be designed for positive stop in the closed position.
32 Section 5
2020 Design Standards and Specifications
Water Specifications
iv. Valve shall be manually operated with enclosed worm gear or traveling nut operation
and shall be designed to operate at maximum torque with a maximum pull of 80
pounds.
v. The design water pressure differential shall be 150 psi upstream and 0 psi
downstream.
vi. Valves shall comply with the latest revision of AWWA C504 for Class 150B.
B. Valves installed in vaults shall be painted with heavy-duty machinery paint with color and type
to be approved by Engineering Department.
5.06.08 Pressure Regulating Valves
A. The function of a pressure regulating valve is to reduce an existing high pressure to a pre -
adjusted lower downstream pressure for varying rates of flow without causing shock or water
hammer on the system.
i. The pressure reducing valve shall be hydraulically operated with a free floating guided
piston having a seat diameter equal to the size of the valve.
ii. A pilot valve for controlling operation of the main valve shall be a single seated,
diaphragm operated and spring loaded type.
iii. Pilot valve shall be attached to the main valve with piping and isolation valves so
arranged for easy access in making adjustments and also for its removal from the main
valve while the main valve is under pressure.
iv. Needle valve shall be all bronze and included with the main valve to control the speed
of piston travel.
v. An indicator rod shall be furnished as an integral part of the valve to show the position
of the piston within the valve body.
vi. The valve shall be designed to provide an access opening in the valve body for
removing the piston and other internal parts without removing the main valve body
from the line.
B. The valve shall be fully bronze -mounted and all packing shall have either leather or rubber
seals to provide tight closure and prevent metal to metal friction.
i. Valves shall be ductile iron body.
ii. Bronze casting or parts for internal trim shall conform to ASTM B62.
C. All valves shall be furnished with flanged ends sized and drilled in accordance with ANSI
B16.1, Class 125.
i. Flanges and covers shall conform to ASTM A126, Class B.
ii. Flanges shall be machined to a flat face with a finish of 250 micro -inches or machined
to a flat surface with a serrated finish in accordance with AWWA C207.
D. Pressure regulating valves shall be capable of withstanding an operating pressure of 150 psi.
E. Body of the pressure reducing valve shall be given a hydrostatic test of 50% more than the
operating pressure specified herein. A second test of check seating of the cylinder shall be
made at the operating pressure.
F. All surfaces of the valve shall be clean, dry, and free from grease and dirt before painting.
i. Ductile iron surfaces, except the machined face of the flange, shall be evenly coated
with a suitable primer to inhibit rust, or a black asphalt varnish in accordance with
Federal Specification TT-V-51e.
ii. The face of flanges shall be shop coated with a rust preventive compound.
G. Pressure regulating valves shall be installed in an approved concrete valve vault.
Section 5 33
2020 Design Standards and Specifications
Water Specifications
5.06.09 2-inch Combination Air and Vacuum Release Valves
A. The function of a combination air and vacuum release valve is to allow air to escape during
pipeline filling and to enter during draining of the pipeline. Valve shall close water tight when
liquid enters the valve. The valve shall also be capable of releasing small pockets of trapped
air after the pipeline is filled and under pressure.
i. Combination air and vacuum release valves shall be shop assembled and shipped as a
complete unit ready for field installation.
ii. The combination air valve shall be the single body type.
iii. The valve body and cover shall be designed to operate under a maximum working
pressure of 250 psi.
iv. Material shall be one of the following:
a. Valve body
(1) Cast Iron - ASTM A48-CIass 35
(2) Cast Steel - ASTM A27 GR U60-30
(3) Ductile Iron - ASTM A536 GR 65-45-12
(4) Bosses for tapping pipe threads shall be cast integrally with each valve body and
cover.
v. The diameter of the large orifice of the combination air valve shall be 2 inches and the
small orifice diameter shall be 3/32 inch.
vi. Inlet shall be 2 inches in diameter with tapered iron pipe thread conforming to AWWA
C800.
vii. For valves not found in the approved materials and vendors list, all other components
shall conform to the following additional specifications:
a. Float shall be stainless steel.
b. All other internal parts shall be fabricated from bronze.
c. Valve seat shall be fabricated from oil resistant synthetic rubber.
B. Guard Valve and Connecting Pipe
i. Guard valve to be used with air valve shall be bronze ball valve with female iron pipe
thread ends.
ii. Connections between the air valve and the guard valve shall be made using brass
nipples with tapered iron pipe threads conforming to AWWA Standard C800.
C. All components shall be capable of withstanding an operating pressure of 250 psi.
D. Each shop assembled valve shall be given a hydrostatic test of 2 times the rated operating
pressure. During the test, air shall be injected into the body chamber of the valve to check its
ability to release entrained air to the atmosphere under operating pressure.
E. All surfaces of the valve shall be clean, dry and free from grease before painting. Exterior and
interior surfaces except the stainless steel trim and the seating surface of the flange face shall
be evenly coated with a suitable primer, or a black asphalt varnish in accordance with Federal
Specification TT-V51 C or Military Specification C-450-C, Type II.
5.06.10 Swing Check Valves
A. Swing check valves shall be manufactured in accordance with AWWA Standard C508, "Swing -
Check Valves for Ordinary Waterworks Service", with the following additional requirements or
exceptions.
B. All valves shall be iron body, fully bronze -mounted, metal to metal seating with a swing -type
disc.
34 Section 5
2020 Design Standards and Specifications
Water Specifications
i. Valves installed in vaults shall be in a horizontal position with exterior lever and
adjustable spring or weight operation.
ii. Valves which are buried shall be installed in a horizontal position and shall be gravity
operated with no external levers or weights.
C. Swing check valves shall be capable of withstanding an operating pressure of 150 psi.
D. Bolts and hex nuts used for attaching top cap to the body shall be the manufacturer's
standard, either fabricated from a low -alloy steel for corrosion resistance or electroplated with
zinc or cadmium.
i. The hot -dip process in accordance with ASTM A135 is not acceptable for the threaded
portions of the bolts and nuts.
E. Flat gasket, either ring type or full faced type, required at the body and cap connection, shall
be fabricated from compressed asbestos sheet with a rubber compound binder.
i. Use of a homogeneous rubber or vegetable fiber sheets is not acceptable.
F. All check valves shall be furnished with flanged ends. The size and drilling shall be in
accordance with ANSI B16.1 Class 125; flanges shall be machined to a flat face with a finish
of 250 micro -inches or machined to a flat surface with a serrated finish in accordance with
AWWA Standard C207.
G. All surfaces of the valve shall be clean, dry and free from grease before painting.
i. All ferrous surfaces, exterior and interior, except the seating surfaces of flange faces,
shall be evenly coated with a suitable primer to inhibit rust or black asphalt varnish in
accordance with Federal Specification TT-V-51f.
ii. Flange faces shall be shop coated with a rust preventive compound.
5.06.11 Blowoffs
A. Temporary or permanent blowoffs may be fabricated from 2-inch pipe with a 2-inch gate
valve.
B. Valve to be iron bodied bronze mounted with 2-inch square operating nut complete with valve
box.
C. Valve and valve box shall be as specified in the Approved Materials List.
5.06.12 Fire Hydrants
A. Fire hydrants shall be standard AWWA C502 hydrants, iron body, bronze mounted throughout
including drain seat ring, and shall be designed for a working pressure of 150 psi.
B. Fire hydrants shall be traffic model type and shall have a 5-1/4 inch valve opening, two 2-1/2
inch hose nozzles, one 4-inch steamer nozzle with 4 threads per inch and a crest to crest
dimension of 4.995 inches, and shall open by turning counter -clockwise.
C. Hydrants shall be for 6-inch mechanical joint connection and shall be 4-1/2 foot bury unless
otherwise shown on plans.
D. When required, a single fire hydrant extension section shall be used to bring the fire hydrant
to the appropriate elevation. No more than one extension will be allowed per installation.
E. Operating nuts shall be 1-1/2 inch pentagons measured to a point.
F. Hydrants shall be painted orange.
G. Fire hydrants that are not yet in service or have been taken out of service shall be covered
completely and securely with black plastic wrap or bags.
H. Hydrants shall meet the requirements as detailed in the Approved Materials List.
Section 5 35
2020 Design Standards and Specifications
Water Specifications
5.06.13 Valve Boxes, Vaults, Frames and Covers
A. Valve boxes for 12-inch or smaller valves shall be as specified in the Approved Materials List.
i. The boxes shall be designed to fit over a section of 6-inch C900 PVC pipe which will be
used as an extension from the top of the valve. Align riser pipe to ensure continuity
between box and pipe, using couplers if spliced.
ii. Top of valve box shall be set flush with surrounding finished grade.
iii. Valve boxes set in HMAC or brick pavement shall have a 2-foot square by 6-inch thick
reinforced concrete collar.
iv. Valve box shall be heavy cast iron.
v. Valve box shall have a heavy cast iron cover marked "Water Valve".
vi. Valve box shall have a flange type base approximately 2 inches larger in diameter than
the outside diameter of the barrel of the box.
B. Valve vaults for butterfly valves and gate valves 16-inches and larger shall be poured concrete
or pre -cast construction.
i. Valve vaults shall be constructed with the dimensions as called for on the plans or as
approved by the City Engineer or designee.
ii. Valve vault cover opening shall be centered over operating nut.
C. Manhole frames and covers shall be of good quality gray iron casting of a pattern similar to
that shown on the plans and with a clear opening of not less than 30 inches.
i. Frame and cover shall be designed with a full bearing ring so as to provide a
continuous seat between frame and cover.
ii. Cover shall be furnished with lifting ring cast into the cover in such manner as to
prevent leaking through.
iii. The cover shall be marked "City of Lubbock Water".
iv. Frame and cover shall be as specified in the Approved Materials List.
5.06.14 Boring Encasement Pipe
A. Encasement pipe shall be smooth steel pipe conforming to the following:
Casing Diameter
Minimum Casing Thickness
<24 inches
3/8 inch
>_24 inches
1/2 inch
B. Boring encasement steel pipe shall have welded joints.
5.06.15 Concrete
A. Proportioning of the constituents of the concrete shall produce a dense and workable mixture
and the designed mix shall be approved by the Engineer before any concrete is placed.
i. The concrete shall be of such consistency that it will flow without separation of the
aggregates.
B. Concrete mix shall be based on the water -cement ratio, and shall be as follows for the
different applications:
i. Concrete for manhole bases, valve vaults and other reinforced concrete structures shall
contain not more than 7.0 gallons of water per sack of cement and yield a 28-day
compressive strength of not less than 3,000 psi.
ii. Concrete for pipe cradling, thrust blocking or fittings and other non -reinforced concrete
shall contain not more than 9 gallons of water per sack of cement and yield a 28-day
compressive strength of not less than 2,500 psi.
36 Section 5
2020 Design Standards and Specifications
Water Specifications
C. Concrete shall be made with Portland cement which conforms to "Standard Specifications for
Portland Cement", ASTM C150.
D. Concrete aggregates shall consist of natural washed and screened sand, and washed and
screened gravel or clean crushed limestone conforming to "Standard Specifications for
Concrete Aggregate", ASTM C33.
Aggregates shall be well graded from coarse to fine and shall be free from injurious
amounts of clay, soft or flaky materials, loam or organic impurities.
ii. Aggregates shall be approved by the City Engineer or designee before use.
Water used in mixing concrete shall be clear, clean, free from oil, acid or organic matter and
free from injurious amounts of alkali, salts or other chemicals and shall conform to ASTM
C1602/C1602M "Standard Specification for Mixing Water Used in the production of Hydraulic
Cement Concrete."
Surface moisture or moisture carried by the aggregates shall be included as part of the mixing
water.
G. Reinforcing steel used in concrete shall be deformed bars conforming to ASTM A615
"Standard Specification for Deformed and Plain Carbon -Steel Bars for Concrete
Reinforcement" or ASTM A996 "Standard Specification for Rail -Steel and Axel -Steel Deformed
Bars for Concrete Reinforcement" grade 40 or grade 50.
i. All reinforcement shall be permanently marked with grade, identification marks or shall,
on delivery, be accompanied by a manufacturer's guarantee.
H. Forms shall be of wood or metal and shall be of sufficient strength to support the concrete
without bulging between supports and sufficiently water tight to hold the concrete mortar.
i. Forms shall be so constructed that the finished concrete shall be of the form and
dimensions shown on the plans.
ii. Form work for exposed surfaces shall be of such material and so constructed as to
produce a wall with a smooth, even surface when the concrete is poured.
iii. Wall forms shall be set plumb and true and rigidly braced to maintain them in correct
position and alignment.
iv. Walls for all reinforced concrete work shall be formed inside and outside.
v. Form ties shall be adjustable in length and of such type as to leave no metal closer
than 1-inch of the surface, and shall not be fitted with lugs, cones, washers, or other
devices acting as a spreader which will leave a hole larger than 7/8-inch in diameter or
depth back of the exposed surface of the concrete.
vi. Temporary openings for cleaning and inspection shall be provided at the base of
vertical forms or other places where necessary. Such openings shall be neatly and
securely closed before concrete is placed.
vii. Forms shall be oiled before use.
viii. No forms shall be removed without permission of the City Inspector. However, in
general, wall forms may be removed after the concrete has been in place for 24 hours
and on roof slabs after the concrete has been in place for 10 days.
ix. Immediately upon removal of the forms any honey -combed sections shall be repaired
as directed by the City Inspector.
Compounds used to form an air tight membrane over a fresh concrete surface shall be in
accordance with Texas Department of Transportation Item 360.2.0 (DMS-4650).
i. Curing compound shall be applied with a pressurized sprayer in an even coating or as
recommended by the manufacturer.
Section 5 37
2020 Design Standards and Specifications
Water Specifications
5.06.16 Bedding, Embedment and Backfill
A. Water Pipe 12-inch diameter and smaller
i. Bedding and embedment shall be native, sandy soil material free from rocks, clods,
roots or other debris larger than 1-inch diameter.
ii. Backfill material shall be native, sandy soil material free from rocks, clods, roots or
other debris larger than 2-inch diameter.
B. Water Pipe 16-inch diameter and larger
i. Bedding shall be select sand or aggregate free from rocks, clods, roots or other debris
larger than 3/8-inch.
a. Bedding material shall be free from injurious amounts of clay, dust, blow sand,
caliche or slag.
ii. Embedment material shall be crushed stone with irregular surfaces and comply with
the following gradation requirements:
Standard Crushed Rock Aggregate
Cumulative Percent Retained
(by weight)
Retained on 1" Sieve
0
Retained on 1/2" Sieve
0-20
Retained on 3/8" Sieve
15-40
Retained on No. 4 Sieve
60-90
Retained on No. 8 Sieve
95-100
a. Embedment shall extend to 12 inches above top of pipe.
iii. Backfill material shall be native, sandy soil material free from rocks, clods, roots or
other debris larger than 2-inch diameter.
C. Compaction
i. Bedding, embedment and backfill shall be compacted to 95% Modified Proctor Density
by approved mechanical means.
a. Compaction shall be in maximum 6-inch compacted lifts.
ii. Water jetting will not be allowed.
5.06.17 Flowable Fill
A. Flowable fill shall consist of a concrete mixture of pea gravel and sand with a cement content
of 1-1/2 sacks per cubic yard.
i. Utility ditches in Right of Way shall be backfilled in accordance with Details UEM-01
through UEM-07 in the appendix.
ii. Use of concrete in place of flowable fill is not acceptable, and if used in place of
flowable fill shall be removed by the Contractor at their expense.
5.07 Methods of Construction
5.07.01 Scope
A. The work covered by this section consists of constructing water distribution mains and other
appurtenances normally installed as a part of this system. Construction may include surface
preparation; trench excavation; shoring; dewatering; laying, aligning and joining pipe;
installation of pipe, valves, valve boxes, and fittings; cradling, blocking and anchorage;
bedding, embedment and backfilling; and other related work.
38 Section 5
2020 Design Standards and Specifications
Water Specifications
5.07.02 Quality Standards
Standard
Topic
Standard Test Methods for Laboratory Compaction
ASTM D698
Characteristics of Soil Using Standard Effort
AWWA C600 ANSI
Installation of Ductile Iron Mains and Their Appurtenances
Polyvinyl Chloride (PVC) Pressure Pipe and Fabricated
AWWA C900
Fittings, 4-inch through 12-inch for Water Transmission and
Distribution
Polyvinyl Chloride (PVC) Pressure Pipe and Fabricated
AWWA C905
Fittings, 14-inch through 48-inch for Water Transmission and
Distribution
AWWA M23
Polyvinyl Chloride PVC Pie Design and Installation
ACPA
Concrete Pipe Installation Manual (Published by American
Concrete Pipe Association
ASTM C891
Installation of Underground Pre -cast Utility Structures
5.07.03 Materials
A. The Contractor shall install water distribution pipe of the type, diameter, wall -thickness and
protective coating that is defined in the Approved Materials List or designated by the City
Engineer or designee.
B. One or more acceptable types of pipe may be used. As such, the Contractor shall have the
option of installing any of the acceptable types, provided only one type is used throughout
any single size designation or run of pipe.
5.07.04 Storm Water Pollution Prevention Plan (SWPPP)
A. Prior to disturbance of construction area, Contractor shall coordinate with the City of Lubbock
Engineering Department to develop a site -specific Storm Water Pollution Prevention Plan.
B. SWP3 measures shall conform to the integrated Stormwater Management (iSWM) criteria
developed by the North Central Texas Council of Governments.
C. SWP3 measures shall be installed prior to construction and shall be maintained throughout the
construction until final stabilization.
5.07.05 Surface Preparation
A. Within Easements, Cultivated or Agricultural Areas
i. All vegetation such as brush, sod, heavy growth, grass, weeds, decayed vegetable
matter, rubbish and other unsuitable material within the area of excavation and spoils
storage shall be stripped and properly disposed.
ii. Topsoil shall be removed to a depth of 8 inches or the full depth of topsoil, whichever
is less.
iii. Removed topsoil shall be stockpiled during construction in an approved location.
B. Within Unpaved Roadway Areas
i. Contractor shall strip the cover material from graveled roadways or other developed
but unpaved traffic surfaces to the full depth of the existing surfacing.
ii. Surfacing shall be stockpiled to the extent that it is acceptable for restoration purposes.
C. Within Paved Areas
i. All pavement cuts and repairs shall be in accordance with the current City of Lubbock
Street Ordinance.
Section 5 39
2020 Design Standards and Specifications
Water Specifications
ii. Wherever it is necessary to make cuts in existing pavements, sidewalks, driveways, or
curbs and gutters, the cuts shall be made in such a manner as to cause the least
possible damage to adjoining surfaces.
iii. Asphalt Paving
a. Asphalt surfaces shall be saw cut along each side of the trench ahead of the
trenching machine and the paving and base removed with the trenching machine as
the trench is excavated.
b. The width of surface removed by the Contractor is not to exceed the outside limits of
the trench plus 12 inches.
iv. Concrete Paving
a. Removal of any sidewalks, concrete pavement, concrete base, concrete curbs and
gutters shall be made by saw cutting the concrete to a straight line on each side of
the trench and removing the concrete ahead of the trenching.
b. Concrete shall be saw cut vertically in straight lines and avoiding acute angles.
c. Concrete pavement, sidewalks, driveways or curb and gutter shall be cut with a
power saw to a depth of not less than 2 inches prior to breaking.
d. Overbreak, separation or other damage to the existing bitumen or concrete outside
the designated cut lines shall be replaced at the Contractor's expense.
e. Tunneling may be required under curb and gutters.
f. The width of surface removed by the Contractor of concrete paving is not to exceed
the outside limits of the trench plus 12 inches.
v. All spoil piles must be 3' from travel lanes or have a traffic barrier that will prevent the
soil from encroaching on travel lanes.
vi. If roll off dumpsters are placed on street paving, then the paving must be protected
from damage.
5.07.06 Barricades and Safety Measures
A. Contractor shall, at their own expense, furnish and erect barricades and safety measures for
the protection of persons, property and the works as may be necessary.
B. All barricades and safety measures shall meet the rules and regulations of Federal, state and
local authorities, including but not limited to:
i. OSHA regulations for excavation, trenching and shoring
ii. Texas Manual on Uniform Traffic Control Devices
iii. City of Lubbock Barricade Ordinance
C. Contractor will be held responsible for all damage to the work due to failure of barricades and
safety measures.
i. If damage is incurred, the damaged portion shall be immediately removed and
replaced by Contractor at their own cost and expense.
D. Contractor's responsibility for maintenance of barricades and safety measures shall not cease
until the project is accepted by the City.
5.07.07 Water for Construction
A. The City will furnish water from fire hydrants for construction purposes.
i. To use City water for construction the contractor shall acquire a water meter for use on
a City fire hydrant, and will be charged the applicable rate for the quantity of water
used.
40 Section 5
2020 Design Standards and Specifications
Water Specifications
ii. The contractor shall contact Lubbock Power and Light Customer Service Department
and establish a utility account. The contractor must pay the current deposit for each
fire hydrant meter and will be responsible for all charges associated with that account.
iii. Once an account is established and the deposit is paid, the contractor may pick up a
meter from the City Water Department at 600 Municipal Drive.
iv. The contractor shall be responsible for reporting monthly water usage.
v. All water used shall be in accordance with City Ordinance, all water shall be used
within City Limits.
B. Fire hydrants shall be operated only by use of an approved fire hydrant wrench. No pipe
wrenches, or other unapproved devices, shall be used to open or close a fire hydrant.
C. For top loading trucks or containers the contractor shall provide a back flow prevention
assembly on the discharge side of the meter.
i. The backflow prevention assembly shall be in the form of two spring loaded ball check
valves.
ii. When filling the truck or container there shall be an air gap of at least two times the
opening diameter of the truck or container.
D. For bottom loading trucks the contractor shall provide a Reduced Pressure Zone (RPZ) type
backflow prevention assembly.
i. All RPZ type back flow prevention assemblies must be tested and the test results
approved by the City prior to use.
ii. The test results shall be sent to the City of Lubbock Public Works Department, Meter
and Customer Service Supervisor for approval.
E. In accordance with City of Lubbock Ordinance No. 10208 "Pertaining to Backflow Prevention",
City representatives are authorized to suspend water use from a fire hydrant by a contractor
until the proper and correct backflow prevention device is installed.
5.07.08 Protection of Existing Utilities
A. It shall be the Contractor's responsibility to properly mark (white line) the work area and
notify the Texas Excavation Safety System, 1-800-DIG-TESS (1-800-344-8377) a minimum of
48 hours prior to construction or excavation.
B. Contractor shall locate all utility lines, including customer service lines, far enough in advance
of the trenching to make proper provisions for protecting the lines and to allow for any
deviations that may be required from the established lines and grades.
C. If required, the Contractor shall "pothole" or physically locate existing underground utilities
ahead of trench excavation.
D. A contractor shall not be allowed to disrupt water service without permission from the
Engineering Department.
i. When a service disruption is planned, the Contractor shall notify the Engineering
Department a minimum of 48 hours in advance.
E. Contractor shall notify local utilities whenever working near gas mains or services or near
electrical or telephone cables or when the presence of these utilities is suspected in the area
of construction.
F. Contractor shall proceed with caution in the excavation and preparation of the trench so that
the exact location of underground structures, both known and unknown, may be determined.
G. Hand excavation shall be used where necessary.
H. All utility lines shall be properly supported to prevent settlement or damage to the line both
during and after construction.
Section 5 41
2020 Design Standards and Specifications
Water Specifications
I. Contractor shall be held responsible for the repair of any utilities when broken or otherwise
damaged because of carelessness on their part.
J. The Contractor shall immediately notify the proper utility company of any damage to utility
lines in order that service may be established with the least possible delay. Any damage to
existing lines and the repair of customer lines which are authorized to be cut shall be at the
Contractor's expense, and as directed by an official representative of the utility company
involved.
K. Any permanent relocation of existing utility lines shall be done by the proper utility company.
5.07.09 Excavation and Trenching
A. Minimum width of the trench shall be the outside diameter of the pipe plus 12 inches.
B. Maximum width of the trench shall be the outside diameter of the pipe plus 18 inches.
i. The City Engineer or designee shall review instances where trench widths are required
to be greater than the maximum allowable due to installation techniques or shoring.
C. Contractor shall take all necessary precautions for protecting paved streets and drives from
being damaged by the trenching and backfilling equipment.
D. Grade shall be such that the pipe will rest firmly on the bedding material throughout the
entire length of the pipe cylinder.
i. Bell holes of ample dimensions shall be dug at each joint to permit the proper jointing
of the pipe.
E. In order to obtain a true, even grade, the trench shall be fine -graded.
i. Material for fine grading shall be free of rocks, roots, grass or any other debris. The
depth of the fine grading material shall not exceed 3 inches.
ii. Where the trench is excavated in excess of 3 inches below grade, the bedding material
shall be compacted to 95% Modified Proctor Density.
iii. If the material being excavated is rock or other unyielding material, it shall be removed
to a depth of 3 inches below grade and replaced with approved bedding material to
grade.
F. All excavated material shall be placed in a manner that will not endanger the work or damage
existing structures.
5.07.10 Methods of Connection
A. Service and main line taps and connections shall comply with current City of Lubbock Utilities
Ordinance.
B. Service Taps
i. All service taps on existing mains shall be installed by City personnel or a City -
designated contractor.
C. Main Line Taps
i. All taps on existing mains in service shall comply with current TCEQ requirements.
ii. Persons installing main line taps shall hold a Class "C" or higher TCEQ Water Operator's
License.
iii. A person holding a Class "D" TCEQ Water Operator's License may install main line taps
only if they are in direct communication with a person holding a Class "C" or higher
TCEQ Water Operator's License.
iv. City Inspector must be present for any tap being installed on an existing main.
D. Valve Operating Procedures
42 Section 5
2020 Design Standards and Specifications
Water Specifications
i. Contractors shall not operate valves within the existing City of Lubbock
water distribution system.
ii. Operation of valves shall be done by authorized City of Lubbock personnel only.
iii. Contractors shall arrange opening or closing of valves by notifying the Engineering
Department at least 24-hours prior to needing a valve operated.
5.07.11 Pipe Installation
A. Pipe, fittings, valves and other accessories shall be inspected, handled, laid and joined in the
manner herein specified.
B. Pipe, fittings, valves, and accessories shall be inspected upon delivery and during the progress
of the work and any material found to be defective may be rejected.
i. If rejected, the Contractor shall remove and replace such defective material at their
own expense.
C. Pipe, fittings, valves, and other accessories shall be handled in accordance with
manufacturer's specifications.
i. Before lowering into the trench the pipe, fittings, valves and accessories shall be
inspected for defects.
a. Any defective, damaged, or unsound pipe or other incidental materials shall not be
incorporated into the work.
b. Contractor shall remove and replace such defective material at their own expense.
ii. All pipe, fittings, valves and accessories shall be carefully lowered into the trench piece
by piece using suitable tools or equipment in such a manner as to prevent damage to
the material.
iii. Under no circumstance shall pipe, valves, fittings, accessories or tools be dropped
directly into the trench.
D. All foreign matter shall be removed from the inside of the pipe, bells, spigots or parts of the
pipe used in forming the joint before the pipe is lowered into the trench;
i. Pipe shall be kept clean by approved means during and after laying.
ii. The open end of the pipe in the trench shall be plugged when pipe is not being laid.
E. Pipe shall be laid to the alignment as established on the approved plans.
i. Where grade is being maintained as shown on the plans, the use of batter boards or
laser beam will be required to fine grade the trench.
ii. Whenever it is necessary to deflect pipe from a straight line either in a vertical or
horizontal plane to avoid obstructions, to plumb valves, or where vertical or horizontal
curves are required, the allowable angle of curvature shall be 80% of the
manufacturer's maximum recommended curvature.
iii. Deflection at each joint shall not exceed 80% of the manufacturer's maximum
recommended deflection.
F. Pipe shall be laid so that the pipe label is facing up.
G. Pipe shall be jointed per manufacturer's requirements.
i. Pipe shall be laid with bells facing in the direction of laying.
a. For lines on appreciable slopes, the Engineer may specify the pipe to be installed
with the bell ends facing up grade.
ii. Bell, spigot and gasket of pipe to be laid shall be wiped clean prior to jointing.
iii. Cutting of pipe for inserting valves, fittings or closure pieces shall be done in a neat
workmanlike manner without damage to the pipe or lining.
iv. Jointing shall be completed for all pipe laid each day.
Section 5 43
2020 Design Standards and Specifications
Water Specifications
a. At the times when pipe laying is not in progress, the open ends of pipe shall be
properly plugged and sealed to prevent contamination.
b. No trench water shall be permitted to enter the pipe.
v. No pipe shall be laid in conditions unsuitable for such work as determined by the City
Inspector.
5.07.12 Trace wire for nonmetallic pipe installation
A. Conductive trace wire shall be installed in the same trench and inside bored holes and casing
with all nonmetallic pipe during pipe installation.
i. Trace wire shall be 12 gauge minimum solid copper with 30 mil HDPE insulation
recommended for direct bury.
ii. Trace wire shall be secured to the pipe as required to insure that the wire remains
directly on top of the pipe.
iii. Trace wire shall be securely bonded together at all wire joints with wire connectors
that are watertight and provide for electrical continuity.
iv. Trace wire shall be made accessible at water valve boxes and fire hydrants.
a. Trace wire shall not be placed inside valve box risers.
b. Trace wire shall be installed such that no less than 6 inches but no more than 12
inches of wire remain accessible.
5.07.13 Marking Tape
A. Marking tape shall be installed in the same trench with all pipe during pipe installation.
i. Marking tape for water mains shall be 3-inch, blue in color and clearly labeled "Caution:
Buried Water Line."
ii. Marking tape shall be installed directly above the centerline of the pipe a minimum of
24 inches above top of pipe.
iii. Depth of bury shall be 18 inches below top of trench.
5.07.14 Setting Valves, Valve Boxes and Fittings
A. Valves and fittings shall be set at the locations shown on the approved plans.
B. Valves and fittings shall be adequately blocked for thrust with concrete or mechanically
restrained.
i. Refer to thrust blocking details or Appendix A — Restrained Joint Lengths.
5.07.15 Cradling, Blocking and Anchorage
A. Contractor will be required to install concrete pipe cradle at all valve vaults and properly block
or mechanically restrain all fittings including tees, bends and valves.
B. Where concrete cradling or blocking is used, concrete shall conform to the concrete
specifications.
C. Before placing the concrete, all loose earth shall be removed from the trench.
D. Concrete shall be placed in the trench by the use of chutes extending to within 3 feet of the
bottom of the trench and shall be deposited uniformly on each side of the pipe in such a
manner as to not disturb the grade and alignment of the pipe.
E. Blocking shall be placed between solid ground and the fitting to be anchored. The area of
bearing on pipe and on the ground in each instance shall be that required by the Engineer.
F. Blocking shall be placed so that the joints of all pipe and fittings are accessible for repair.
44 Section 5
2020 Design Standards and Specifications
Water Specifications
G. Soil bearing value for thrust blocking shall be as recommended by the Engineer based on soil
analysis of the site. In the absence of such recommendation, the allowable soil bearing value
shall not exceed 2,500 pounds per square foot.
5.07.16 Backfilling
A. Backfilling of all trenches and excavations shall comply with the current City of Lubbock Street
Ordinance as well as the City of Lubbock Utility Excavation Manual.
B. After the trench has been backfilled, the disturbed area shall be cleared of all rocks larger
than 1-1/2 inches in diameter and leveled so that the surface will have the same slope and
appearance as it possessed before construction.
C. All surplus material shall be loaded and legally disposed of at the Contractor's expense at an
approved location.
D. Contractor shall compact backfill and clean up as close behind the pipe laying and backfilling
as possible.
E. Following completion of backfill and cleanup, the Contractor shall maintain the street and
trench surfaces in a satisfactory manner until final acceptance of the work.
i. Maintenance shall include blading, filling depressions caused by settlement, sprinkling
to settle dust, brooming and other work required to keep the streets and disturbed
areas in satisfactory condition as determined by the City Engineer or designee.
ii. The Contractor shall maintain and be responsible for all paving cuts until such time as
repairs can be completed.
5.08 Pneumatic Testina for Taooin4 Sleeves
5.08.01 Upon completion of tapping sleeve installation, the tapping sleeve shall be subjected to a
pneumatic pressure test according to the most recent City of Lubbock requirements.
5.08.02 Pneumatic Pressure Test
A. Contractor shall be responsible for performing a pneumatic pressure test witnessed by a City
Inspector.
i. Tapping sleeve shall be pressurized through 3/4-inch NPT port at a minimum
test pressure of 50 psi.
ii. Duration of the pressure test shall be a minimum of 10 minutes or as
directed by the City Inspector.
5.09 Hydrostatic Pressure Testing
5.09.01 Upon completion of pipe installation, the line shall be subjected to a hydrostatic pressure
test and leakage test according to the most recent AWWA standards, TCEQ rules and City
of Lubbock requirements.
5.09.02 Hydrostatic Pressure Test
A. Contractor shall be responsible for performing a hydrostatic pressure test witnessed by a City
Inspector.
i. Minimum test pressure shall be 100 psi or 150% of static operating
pressure, whichever is greater.
ii. Duration of each pressure test shall be a minimum of 2 hours or as directed
by the City Engineer or designee.
B. Hydrostatic Test Procedure
Section 5 45
2020 Design Standards and Specifications
Water Specifications
Each valved section of pipe shall be slowly filled with water.
ii. As the line is being filled, all air shall be expelled from the pipe.
a. Taps shall be made, if necessary, at points of highest elevation.
b. Taps shall be tightly plugged upon satisfactory completion of the test.
iii. Pressure shall be applied and maintained by means of a pump connected to the pipe in
a manner satisfactory to the City Inspector.
iv. The pump, pipe connection, and all necessary apparatus except meters shall be
furnished by the Contractor.
v. Contractor shall furnish all necessary labor for connecting the pump, meter, and gages.
vi. Water for filling and making tests may be obtained at a location designated by the
Engineering Department.
a. No charge will be made for the first 2 pipe volumes of water.
b. Contractor will be charged for water used in subsequent tests at the current rate of
bulk usage.
vii. The line shall be carefully checked at regular intervals for breaks or leaks.
viii. Any joints showing appreciable leaks shall be repaired and any cracked or defective
pipes or fittings shall be removed and replaced at the Contractor's own expense.
ix. The test shall be repeated until satisfactory results are obtained.
C. Leakage Test
i. For pipe of 12-inch diameter or smaller, no leakage or pressure drop shall be
allowed over a two hour period at the test pressure.
ii. For pipe 16-inch diameter or larger, the allowable leakage (gallons per hour)
shall not be greater than:
L _ NDJ
7400
L = Gallons per Hour
N = Number of Joints
D = Nominal Pipe Diameter (in.)
P = Test Pressure (PSI)
iii. The leakage shall be determined by measuring the quantity of water supplied to each
valved section of the lines, during the test period, when the various sections of the
lines are under pressure.
iv. If individual sections show leakage greater than the limits specified above, the
Contractor shall locate and repair the defective portions at their own expense.
5.10 Sterilization and Bacteriological Testing
5.10.01 Upon completion of pipe installation, the line shall be sterilized and tested according to the
most recent AWWA standards, TCEQ rules and City of Lubbock requirements including
AWWA C651.
A. Contractor shall notify City of Lubbock inspector a minimum of 24 hours in advance of
intended filling, chlorinating or flushing a new water main.
B. Contractor shall furnish all labor, equipment and material necessary for the chlorination and
testing of the new pipe lines which shall be sterilized before being placed into service.
C. Sterilization Procedure
i. Contractor shall advise City Inspector of filling and chlorinating plan.
46 Section 5
2020 Design Standards and Specifications
Water Specifications
ii. Contractor shall verify that all valves adjacent to test section are closed.
a. Valves shall be operated in accordance with the current City of Lubbock valve
operating procedures, and only when a City of Lubbock inspector is on site.
iii. Lines shall be sterilized by the application of an approved chlorinating agent.
iv. Chlorinating agent may be liquid chlorine, or a calcium hypochlorite solution, which
shall be fed into the lines through a suitable solution -feed device or other methods
approved by the City Engineer or designee.
v. All newly installed pipes and related products must conform to American National
Standards Institute / National Sanitation Foundation (ANSI/NSF) Standard 61 and must
be certified by an organization accredited by ANSI, including chlorine for disinfection.
vi. Chlorinating agent shall be applied at or near the point from which the line is being
filled, and through a corporation stop or other approved connection inserted in the
horizontal axis of the newly laid pipe.
vii. Water being used to fill the line shall be controlled to flow into the section to be
sterilized very slowly.
viii. Rate of application of the chlorinating agent shall be at least 50 parts per million.
ix. Chlorinated water shall be retained in the pipe lines for a period of not less than 24
hours.
D. Testing/Sampling Procedure
i. Sample ports shall be protected from contamination.
ii. Every sample port shall have a "NON -POTABLE WATER" tag and cap that require tools
to remove.
iii. The sampling riser shall be located at the farthest point possible from the chlorination
point.
a. The riser shall be above ground and equipped with a faucet for control of flow during
sampling.
iv. Samples shall be taken by City of Lubbock Inspectors from the line and will be tested
for bacteriologic growth at a City of Lubbock certified laboratory.
a. Samples will be taken twice in a 48 hour period not less than 24 hours apart.
b. Initial samples may only be taken on Monday, Tuesday or Wednesday prior to 2:00
p.m.
E. Chlorinated water used for sterilization shall be legally disposed of per current TCEQ or other
applicable regulations.
i. A temporary blow off may be required to achieve adequate flushing flow rates.
ii. Under no circumstances shall chlorinated water used for sterilization be released
directly into the storm drain system or a body of water.
iii. Contractor must dechlorinate water before it reaches a curb and gutter, storm drain or
body of water.
iv. All flushing must conform with the City of Lubbock Storm Water Permit and SWP3 Best
Practices.
5.11 Restoration and Clean Up
5.11.01 The Contractor shall restore or replace all removed or damaged paving, curbing, sidewalks,
gutters, sod, shrubbery, fences, irrigation systems, pipe, or other structures or surfaces to
a condition equal to that before the work began and to the satisfaction of the City Engineer
or designee.
Section 5 47
2020 Design Standards and Specifications
Water Specifications
5.11.02 All streets, alleys, driveways, sidewalks, curbs or other surfaces broken, cut or damaged by
the Contractor shall be reconstructed as required by the current City of Lubbock Street
Ordinance.
5.11.03 Topsoil material shall be replaced to pre -construction conditions or better.
5.11.04 All rubbish, unused materials and other non-native materials shall be removed from the
jobsite.
5.11.05 The right-of-way shall be left in a state of order and cleanliness as determined by the City
Engineer or designee.
5.12 Warrantv and Acceptance
5.12.01 Within 30 calendar days after the Developer or Developers Engineer has given written
notice that the improvements have been substantially completed, the City shall inspect the
completed improvements and provide a punch list if necessary.
A. If it is mutually determined that the improvements have been constructed in accordance with
the engineering plans and the City of Lubbock Engineering Minimum Design Standards and
Specifications, the Developers Engineer shall submit Record Drawings, Certificate of
Completion and Developers Warranty Statement (Copies of the Certificate of Completion and
the Developers Warranty Statement are included in the City of Lubbock Engineering Minimum
Design Standards and Specifications)
B. Upon receipt of the Developers Certificate of Completion, Record Drawings and the
Developers Warranty Statement, the City will accept improvements within 30 calendar days;
unless exception is given in writing.
C. Neither the Final Payment nor the Certificate of Completion shall relieve the Developer or
Contractor of responsibility related to warranty of materials or workmanship.
D. The Developer shall remedy any defects due to faulty materials or workmanship that appear
within 1 year from the date of acceptance by the City of Lubbock.
48 Section 5
2020 Design Standards and Specifications
Sewer Specifications
SECTION 6
STANDARD SPECIFICATIONS FOR SANITARY SEWER MAIN
CONSTRUCTION
6.01 General
6.01.01 All sanitary sewer main construction within the City of Lubbock sanitary sewerage system
or for future connections to the City of Lubbock sanitary sewerage system shall be
accomplished in accordance with the requirements of these specifications.
6.02 Plan Requirements
6.02.01 Sanitary sewer main construction shall be done in accordance with engineered construction
plans for the work, prepared under the direction of a Professional Engineer and approved
by the City of Lubbock Engineering Department.
6.02.02 Plans shall conform to the City of Lubbock's Minimum Design Standards for Sanitary Sewer
and shall show all information called for on the City of Lubbock Check List for Sanitary
Sewer Construction Plans.
6.03 Plan Approval
6.03.01 The Engineering Department shall review, approve and issue plans stamped "Approved for
Construction" to the Design Engineer.
6.04 Insuection
6.04.01 Engineer and/or Contractor shall notify the Engineering Department 48 hours before the
planned construction is to commence and also before starting up when construction is
interrupted for any reason.
6.04.02 All work shall be inspected by a representative of the Engineering Department who shall
have the authority to halt construction when, in their opinion, construction is being
performed contrary to these specifications or other approved plans.
6.04.03 Whenever any portion of these specifications is violated, the City Engineer or designee, by
written notice, may order that portion of construction which is in violation of these
specifications or other approved plans, specifications and material to cease until such
violation is corrected.
6.05 Specifications
6.05.01 All standard specifications and quality standards; i.e., ASA, AWWA, ASTM, etc., which are
made a portion of these specifications by reference shall be the latest edition and revision
thereof.
Section 6 49
2020 Design Standards and Specifications
Sewer Specifications
6.06 Materials of Construction
6.06.01 Sewer Pipe
A. All pipe used in the City of Lubbock sanitary sewer collection system shall be SDR 35 PVC,
SDR 26 PVC, PVC Corrugated Sewer Pipe with Smooth Interior, High Density Polyethylene
(HDPE), Ductile Iron, Steel Reinforced Polymer Concrete or Polypropylene Corrugated Single
Wall or Dual Wall Pipe and shall conform to the Approved Materials List.
B. PVC Pipe - Gravity Flow
i. Gravity flow PVC pipe and fittings shall conform to the requirements of ASTM F679 and
D3034 for SDR 35 sewer pipe.
ii. The pipe shall be jointed with an integral bell and spigot type rubber gasketed joint.
a. Each integral bell joint shall consist of a formed bell complete with a single rubber
gasket.
b. Gaskets shall conform to ASTM F477.
iii. Standard joint length shall be 14 or 20 feet f one inch.
iv. Gravity flow PVC pipe shall be installed in accordance with the manufacturer's
recommendations and shall not exceed 80% of the manufacturer's recommended
maximum deflection.
v. The minimum pipe stiffness factor shall be 46 psi.
vi. Gravity flow sewer pipe shall be green.
C. PVC Pipe - Pressure Rated
i. Pressure rated PVC sewer pipe and fittings shall conform to the requirements of ASTM
D2241 for SDR 26 sewer pipe.
ii. The pipe shall be joined with an integral bell and spigot type rubber gasketed joint.
a. Each integral bell joint shall consist of a formed bell complete with a single rubber
gasket.
b. Gaskets shall conform to ASTM F477.
iii. Pressure rated PVC pipe shall be installed in accordance with the manufacturer's
recommendations and shall not exceed 80% of the manufacturer's recommended
maximum deflection.
iv. Standard joint length shall be 14 or 20 feet t one inch.
v. Pressure rated sewer pipe shall be green.
D. PVC Pipe - Spiral Wound
i. Spiral wound PVC pipe and fittings shall conform to the requirements of the latest
revision of ASTM F794 for large diameter ribbed gravity sewer pipe.
ii. Spiral wound PVC pipe shall be installed in accordance with the manufacture's
recommendations and shall not exceed 80% of the manufacturer's recommended
maximum deflection.
iii. The minimum pipe stiffness factor shall be 46 psi.
E. High Density Polyethylene Pipe
i. The pipe shall be made of high density, high molecular weight polyethylene pipe
material meeting the requirements of ASTM F894.
ii. Rubber gaskets shall comply in all respects with the physical requirements specified in
the non -pressure requirements of ASTM Specifications C443.
iii. Polyethylene pipe shall be installed in accordance with the manufacturer's
recommendations.
50 Section 6
2020 Design Standards and Specifications
Sewer Specifications
F. Ductile Iron Pipe
i. Ductile iron pipe shall conform to ANSI/ASTM specifications A746 for Ductile Iron
Sewer Pipe.
a. Pipe and fittings shall have a 30-mil thickness epoxy lining on the interior.
b. Pipe and fittings shall have an exterior coating of coal tar pitch conforming to
requirements of Federal Specifications WW-P-421.
ii. Joints for Ductile Iron shall be of the rubber gasket bell and spigot, except when
otherwise shown on the plans and where connecting to flanged fittings, and shall
conform to the base specifications to which the pipe is manufactured.
iii. Fittings shall be AWWA Standard Class "Y bell and spigot type or an approved gasket
joint for the particular type of pipe used and designed for the pressures of the pipe
except as shown on the plans.
G. Steel Reinforced Polymer Concrete Pipe
i. Steel Reinforced Polymer Concrete Pipe and fittings shall conform to ASTM C76, D6783
and A615 and all other applicable standards.
ii. Steel Reinforced Polymer Concrete Pipe shall be installed in accordance with the
manufacturer's recommendations and shall not exceed 80% of the manufacturer's
recommended maximum deflection.
H. Polypropylene Corrugated Dual Wall and Triple Wall Pipe
i. Polypropylene Corrugated Dual Wall Pipe and fittings shall conform to ASTM F2736.
ii. Polypropylene Corrugated Triple Wall Pipe and fittings shall conform to ASTM F2764.
iii. Polypropylene Corrugated Dual Wall and Triple Wall Pipe shall be installed in
accordance with the manufacturer's recommendations and shall not exceed 80% of the
manufacturer's recommended maximum deflection.
6.06.02 Pre -cast Reinforced Concrete Manholes
A. Manhole barrel, cone, and extension sections shall be constructed of pre -cast concrete.
i. Manhole products shall be smooth, uniform in size and dimensions, consistent in
components throughout and free of voids or honeycombs.
ii. No grouting shall be applied to the edges or inside surfaces of manholes during the
manufacturing process.
iii. A plant inspection may be required for production facility inspection and to review
record -keeping for material certification.
iv. Steps are prohibited in a manhole.
B. Manufacturer must provide certification that all materials used for manufacturing meet with
the following ASTM Specifications:
Specification
Material
ASTM C-33
Aggregates
ASTM C-150
Cement
ASTM C-39
Sampling Specimens
ASTM A-615 or
A-996
Reinforcing
ASTM C-144
Sand and Mortar
C. Pre -cast Concrete Manhole Sections
i. Pre -cast concrete manhole sections shall conform to ASTM C478 specifications.
ii. Compressive strength test results must verify concrete strengths meet or exceed 4,000
psi.
Section 6 51
2020 Design Standards and Specifications
Sewer Specifications
iii. Coarse aggregate shall consist of 95% crushed limestone.
iv. Manholes shall be designed to withstand H-20 AASHTO loading.
v. Manholes shall have lifting holes that do not protrude through manhole wall; one full
inch of concrete thickness must remain between lift hole and outside or inside wall of
manhole.
D. Joints Other Than Grade Rings
i. Joints other than grade rings shall be tongue and groove or an equivalent male and
female type joint.
ii. Joints shall be effectively joined with water -tight sealant to prevent leakage and
infiltration. Sealant shall comply with the Approved Materials List.
E. Cones and Grade Rings
i. Cones and grade rings shall maintain a clear 30-inch opening.
ii. Grade rings shall be reinforced with the same percentage of steel as risers and tops
and shall also meet ASTM C478 specifications.
6.06.03 Inflow Prevention Device (IPD)
A. All new manholes shall be equipped with an approved IPD to prevent unwanted inflow into
the sanitary sewer system.
B. IPDs shall be constructed of corrosion proof material and load tested to withstand 800
pounds.
C. IPDs shall be equipped with a handle or lifting strap capable of supporting a minimum uniform
load of 500 pounds.
D. IPDs shall be equipped with ventilation valves or holes.
i. Release of water through vent valves or holes shall not exceed 5 gallons per 24 hour
period.
ii. Vent valves or holes shall vent sewer gas at one p.s.i. or less.
E. IPDs shall comply with the Approved Materials List.
6.06.04 Manhole Frames and Cover
A. Manhole frames and covers shall be of good quality gray iron casting and conform to ASTM
Designation A48, having a clear opening of not less than 30 inches.
B. Casting shall be designed with a full bearing ring so as to provide a continuous seat between
frame and cover.
C. Cover shall be furnished with lifting ring or pick bar cast into the cover in such a manner as to
prevent water leaking through.
D. Frame and cover shall have a weight of not less than 275 pounds, shall include lettering "City
of Lubbock, Texas Sanitary Sewer" and shall comply with the Approved Materials List.
6.06.05 Concrete
A. Proportioning of the constituents of the concrete shall be such as to produce a dense and
workable mixture, and the designed mix shall be approved by the Engineer before any
concrete is placed.
i. The concrete shall be of such consistency that it will flow without separation of the
aggregates.
B. Concrete mix shall be based on the water -cement ratio, and shall be as follows for the
different applications:
52 Section 6
2020 Design Standards and Specifications
Sewer Specifications
i. Concrete for manholes, valve vaults and other reinforced concrete structures shall have
a water -cement ratio of no more than ASTM C-478 max of 0.53 (by weight) and yield a
28-day compressive strength of not less than 3,000 psi.
ii. Concrete for pipe cradling, blocking of fittings, manhole inverts and other non -
reinforced concrete shall contain not more than 9.0 gallons of water per sack of
cement and yield a 28-day compressive strength of not less than 2,500 psi.
C. Concrete to be used in manhole bases, sections, cones, grade rings and inverts shall be made
with Portland cement which conforms to "Standard Specifications for Portland Cement", ASTM
C150.
D. Concrete coarse aggregates shall consist of natural washed and screened sand, and clean
crushed limestone conforming to "Standard Specifications for Concrete Aggregate", ASTM
C33.
i. Aggregates shall be well graded from coarse to fine and shall be free from injurious
amounts of clay, soft or flaky materials, loam or organic impurities.
ii. Aggregates shall be approved by the City Engineer or designee before use.
Sand to be used in cement mortar shall conform to ASTM C144 specifications.
F. Water used in mixing concrete or mortar shall be clear, clean, free from oil, acid or organic
matter and free from injurious amounts of alkali, salts or other chemicals.
G. Surface moisture or moisture carried by the aggregates shall be included as part of the mixing
water.
H. Reinforcing steel used in concrete shall be deformed bars conforming to ASTM A615
"Standard Specification for Deformed and Plain Carbon -Steel Bars for Concrete
Reinforcement" or ASTM A996 "Standard Specification for Rail -Steel and Axel -Steel Deformed
Bars for Concrete Reinforcement" grades 40, 50, or 60.
i. All reinforcement shall be permanently marked with grade, identification marks or shall,
on delivery, be accompanied by a manufacturer's guarantee.
I. Forms shall be of wood or metal and shall be of sufficient strength to support the concrete
without bulging between supports and sufficiently water tight to hold the concrete mortar.
i. Forms shall be so constructed that the finished concrete shall be of the form and
dimensions shown on the plans.
ii. Form work for exposed surfaces shall be of such material and so constructed as to
produce a wall with a smooth, even surface when the concrete is poured.
iii. Wall forms shall be set plumb and true and rigidly braced to maintain them in correct
position and alignment.
iv. Walls for all reinforced concrete work shall be formed inside and outside.
v. Form ties shall be adjustable in length and of such type as to leave no metal closer
than 1-inch of the surface, and shall not be fitted with lugs, cones, washers, or other
devices acting as a spreader which will leave a hole larger than 7/8-inch in diameter or
depth back of the exposed surface of the concrete.
a. Wire ties will not be permitted.
vi. Temporary openings for cleaning and inspection shall be provided at the base of
vertical forms or other places where necessary. Such openings shall be neatly and
securely closed before concrete is placed.
vii. Forms shall be oiled before use.
viii. No forms shall be removed without permission of the City Inspector. However, in
general, wall forms may be removed after the concrete has been in place for 24 hours
and on roof slabs after the concrete has been in place for 10 days.
Section 6 53
2020 Design Standards and Specifications
Sewer Specifications
ix. Immediately upon removal of the forms any honey -combed sections shall be repaired
as directed by the City Inspector.
1. Compounds used to form an air tight membrane over a fresh concrete surface shall be in
accordance with Texas Department of Transportation Item 360.2.0 (DMS-4650).
i. Curing compound shall be applied with a pressurized sprayer in an even coating or as
recommended by the manufacturer.
6.06.06 Bedding, Embedment and Backfill
A. Sewer Pipe, All Diameters
i. Bedding shall be select sand or aggregate free from rocks, clods, roots or other debris
larger than 1/2-inch.
a. Bedding material shall be free from injurious amounts of clay, dust, blow sand,
caliche or slag.
b. Bedding shall be 6 inches below pipe.
ii. Embedment material shall be crushed stone with irregular surfaces and comply with
the following gradation requirements:
Standard Crushed Rock Aggregate
Cumulative Percent Retained
(by weight)
Retained on 1" Sieve
0
Retained on 1/2" Sieve
0-20
Retained on 3/8" Sieve
15-30
Retained on No. 4 Sieve
60-90
Retained on No. 8 Sieve
90-100
a. Embedment shall extend to 12 inches above top of pipe.
iii. Backfill material shall be native, sandy soil material free from rocks, clods, roots or
other debris larger than 2-inch diameter.
6.06.07 Flowable Fill
A. Flowable fill shall consist of a mixture of Portland cement, pea gravel and sand with a cement
content of 1-1/2 sacks per cubic yard.
i. Utility ditches in Right of Way shall be backfilled in accordance with Details UEM-01
through UEM-07 in the appendix.
ii. Use of concrete in place of flowable fill is not acceptable, and if used in place of
flowable fill shall be removed by the Contractor at their own expense.
6.07 Methods of Construction
6.07.01 Scope
A. The work covered by this section consists of constructing gravity flow sanitary sewers,
manholes and other appurtenances normally installed as a part of this system. Construction
may include surface preparation; trench excavation; shoring; dewatering; laying, aligning and
jointing pipe; installation of appurtenances; construction of pre -cast, pre -assembled or field
assembled manholes; manhole bases; placement and assembly of manhole risers, cones, or
tops; installation of manhole rings, covers and grade rings; bedding, embedment and
backfilling; and other related work.
54 Section 6
2020 Design Standards and Specifications
Sewer Specifications
6.07.02 Quality Standards
Standard
Topic
Standard Test Methods for Laboratory Compaction
ASTM D698
Characteristics of Soil Using Standard Effort
ASTM A746 ANSI
Ductile Iron Gravity Sewer Pipe
Installation of Ductile Iron Mains and Their
AWWA C600 (ANSI)
A urtenances
AWWA M23
Polyvinyl Chloride PVC Pipe Design and Installation
Recommended Practice for Polyvinyl Chloride (PVC)
UNI B 5
Sewer Pipe
ASTM C891
Installation of Underground Pre -cast Utility Structures
6.07.03 Materials
A. The Contractor shall install sanitary sewer pipe of the type, diameter, wall -thickness and
protective coating that is defined in the Approved Materials List or designated by the City
Engineer or designee.
One or more acceptable types of pipe may be used. As such, the Contractor shall have the
option of installing any of the acceptable types, provided only one type is used throughout
any single size designation or run of pipe.
6.07.04 Storm Water Pollution Prevention Plan (SWP3)
A. Prior to disturbance of construction area, Contractor shall coordinate with the City of Lubbock
Engineering Department to develop a site -specific Storm Water Pollution Prevention Plan.
B. SWP3 measures shall conform to the integrated Stormwater Management (iSWM) criteria
developed by the North Central Texas Council of Governments.
C. SWP3 measures shall be installed prior to construction and shall be maintained throughout the
construction until final stabilization.
6.07.05 Surface Preparation
A. Within Easements, Cultivated or Agricultural Areas
i. All vegetation such as brush, sod, heavy growth, grass, weeds, decayed vegetable
matter, rubbish and other unsuitable material within the area of excavation and spoils
storage shall be stripped and properly disposed.
ii. Topsoil shall be removed to a depth of 8 inches or the full depth of topsoil, whichever
is less.
iii. Removed topsoil shall be stockpiled during construction in an approved location.
Within Unpaved Roadway Areas
i. Contractor shall strip the cover material from graveled roadways or other developed
but unpaved traffic surfaces to the full depth of the existing surfacing.
ii. Surfacing shall be stockpiled to the extent that it is acceptable for restoration purposes.
C. Within Paved Areas
i. All pavement cuts and repairs shall be in accordance with the current City of Lubbock
Street Ordinance and the City of Lubbock Engineering Minimum Design Standards and
Specifications.
ii. Wherever it is necessary to make cuts in existing pavements, sidewalks, driveways, or
curbs and gutters, the cuts shall be made in such a manner as to cause the least
possible damage to adjoining surfaces.
Section 6 55
2020 Design Standards and Specifications
Sewer Specifications
iii. Asphalt Paving
a. Asphalt surface shall be cut along each side of the trench ahead of the trenching
machine and the surfacing and base removed with the trenching machine as the
trench is excavated.
b. The width of surface removed by the Contractor is not to exceed the outside limits of
the trench plus 12 inches.
iv. Concrete Paving
a. Removal of any sidewalks, concrete pavement, concrete base, concrete curbs and
gutters shall be made by cutting the concrete to a straight line on each side of the
trench and removing the concrete ahead of the trenching.
b. Concrete shall be cut vertically in straight lines and avoiding acute angles.
c. Concrete pavement, sidewalks, driveways or curb and gutter shall be cut with a
power saw to a depth of 2 inches prior to breaking.
d. Overbreak, separation or other damage to the existing bitumen or concrete outside
the designated cut lines shall be replaced at the Contractor's expense.
e. Tunneling may be required under curb and gutters.
f. The width of surface removed by the Contractor of concrete paving is not to exceed
the outside limits of the trench plus 12 inches.
v. All spoil piles must be 3' from travel lanes or have a traffic barrier that will prevent the
soil from encroaching on travel lanes.
vi. If roll off dumpsters are placed on street paving, then the paving must be protected
from damage.
6.07.06 Barricades and Safety Measures
A. Contractor shall, at their own expense, furnish and erect barricades and safety measures for
the protection of persons, property and the works as may be necessary.
B. All barricades and safety measures shall meet the rules and regulations of Federal, state and
local authorities, including but not limited to:
i. OSHA regulations for excavation, trenching and shoring
ii. Texas Manual on Uniform Traffic Control Devices
iii. City of Lubbock Barricade Ordinance
C. Contractor will be held responsible for all damage to the work due to failure of barricades and
safety measures.
i. If damage is incurred, the damaged portion shall be immediately removed and
replaced by Contractor at their own cost and expense.
D. Contractor's responsibility for maintenance of barricades and safety measures shall not cease
until the project is accepted by the City.
6.07.07 Water for Construction
A. Water is available from fire hydrants for construction purposes.
i. To use City water for construction the contractor shall acquire a water meter for use on
a City fire hydrant, and will be charged the applicable rate for the quantity of water
used.
ii. The contractor shall contact Lubbock Power and Light Customer Service Department
and establish a utility account. The contractor must pay the current deposit for each
fire hydrant meter and will be responsible for all charges associated with that account.
iii. Once an account is established and the deposit is paid, the contractor may pick up a
meter from the City Water Department at 600 Municipal Drive.
56 Section 6
2020 Design Standards and Specifications
Sewer Specifications
iv. The contractor shall be responsible for reporting monthly water usage.
B. Fire hydrants shall be operated only by use of an approved fire hydrant wrench. No pipe
wrenches, or other unapproved devices, shall be used to open or close a fire hydrant.
C. For top loading trucks or containers the contractor shall provide a back flow prevention
assembly on the discharge side of the meter.
i. The backflow prevention assembly shall be in the form of two spring loaded ball check
valves.
ii. When filling the truck or container there shall be an air gap of at least two times the
opening diameter of the truck or container.
D. For bottom loading trucks the contractor shall provide a Reduced Pressure Zone (RPZ) type
backflow prevention assembly.
i. All RPZ type back flow prevention assemblies must be tested and the test results
approved by the City prior to use.
ii. The test results shall be sent to the City of Lubbock Public Works Department, Meter
and Customer Service Supervisor for approval.
E. In accordance with City of Lubbock Ordinance No. 10208 "Pertaining to Backflow Prevention",
City representatives are authorized to suspend water use from a fire hydrant by a contractor
until the proper and correct backflow prevention devices are installed.
6.07.08 Protection of Existing Utilities
A. It shall be the Contractor's responsibility to properly mark (white line) the work area and
notify the Texas Excavation Safety System, 1-800-DIG-TESS (1-800-344-8377) a minimum of
48 hours prior to construction or excavation.
B. Contractor shall locate all utility lines, including customer service lines, far enough in advance
of the trenching to make proper provisions for protecting the lines and to allow for any
deviations that may be required from the established lines and grades.
C. If required, the Contractor shall "pothole" or physically locate existing underground utilities
ahead of trench excavation.
D. Contractor will not be allowed to disrupt the service on any utility lines except customer
service lines, which may be taken out of service for short periods of time, provided the
Contractor obtains permission from the Engineering Department and from the owner of the
premises being served by the utility.
i. When a customer outage is planned, Contractor shall notify effected customer a
minimum of 24 hours in advance.
E. Contractor shall notify local utilities whenever working near gas mains or services or near
electrical or telephone cables or when the presence of these utilities is suspected in the area
of construction.
F. Contractor shall proceed with caution in the excavation and preparation of the trench so that
the exact location of underground structures, both known and unknown, may be determined.
G. Hand excavation shall be used where necessary.
H. All utility lines shall be properly supported to prevent settlement or damage to the line both
during and after construction.
I. Contractor shall be held responsible for the repair of such structures when broken or
otherwise damaged because of carelessness on their part.
J. The Contractor shall immediately notify the proper utility company of any damage to utility
lines in order that service may be established with the least possible delay. Any damage to
Section 6 57
2020 Design Standards and Specifications
Sewer Specifications
existing lines and the repair of customer lines which are authorized to be cut shall be at the
Contractor's expense, and as directed by an official representative of the utility company
involved.
K. Any permanent relocation of existing utility lines shall be done by the proper utility company.
6.07.09 Excavation and Trenching
A. The width of the trench shall provide adequate working room for installation, joining and
proper compaction along both sides of the pipe. Trenches shall conform to the following
dimensions, unless otherwise shown on the Plans:
Pipe Size
Min. Trench Width
Max. Trench Width
4" thru 12"
Pipe O.D. +12"
Pipe O.D. +18"
15" thru 21"
Pipe O.D. +18"
Pipe O.D. +24"
B. Contractor shall take all necessary precautions for protecting paved streets and drives from
being damaged by the trenching and backfilling equipment.
C. Grade shall be such that the pipe will rest firmly on the bedding material throughout the
entire length of the pipe cylinder.
i. Bell holes of ample dimensions shall be dug at each joint to permit the proper jointing
of the pipe.
D. In order to obtain a true, even grade, the trench shall be fine -graded.
i. Material for fine grading shall be free of rocks, roots, grass or any other debris. The
depth of the fine grading material shall not exceed 3 inches.
ii. Where the trench is excavated in excess of 3 inches below grade, the material shall be
compacted to 95% Modified Proctor Density or shall be replaced with approved
bedding material.
iii. If the material being excavated is rock or other unyielding material, it shall be removed
to a depth of 3 inches below grade and replaced with approved bedding material to
grade.
E. Excavation for manholes, structures and other appurtenances shall be sufficient to provide
clearances adequate for proper backfill and compacting on all sides.
F. All excavated material shall be placed in a manner that will not endanger the work or damage
existing structures.
6.07.10 Dewatering
A. All pipe trenches and excavation for structures and appurtenances shall be kept free of water
during pipe laying and other related work.
B. The method of dewatering shall provide for a dry foundation at the final grades of the
excavation.
C. Water shall be disposed of in accordance with current City of Lubbock Engineering
Department requirements and in a manner that does not inconvenience the public or result in
a menace to public health.
D. Pipe trenches shall contain enough backfill to prevent pipe flotation before dewatering is
discontinued.
E. Dewatering shall continue until such time as it is safe to allow the water to rise in the
excavation.
6.07.11 Methods of Connection
58 Section 6
2020 Design Standards and Specifications
Sewer Specifications
A. Service and main line taps and connections shall comply with current City of Lubbock Utilities
Ordinance.
B. Service Taps
i. Service taps on newly constructed mains shall be installed by the utility contractor at
the time of pipe installation.
ii. Service taps on existing, in-service mains shall be installed by City personnel or a City -
designated contractor.
C. Main Line Connections
i. Connections on existing mains shall comply with current TCEQ requirements.
ii. Connection to existing main shall be by a new manhole constructed on the existing
main or connection to an existing manhole.
iii. City Inspector must be present for any connection being installed on an existing main.
6.07.12 Pipe Installation
A. The Contractor shall be responsible for all materials intended for the Work including the safe
and proper storage of such materials until incorporated into the work.
B. Gravity sanitary sewer pipe and other accessories shall be inspected, handled, laid and joined
in the manner herein specified.
i. Force mains shall be installed according to water pipe installation specifications and
current TCEQ requirements.
C. Pipe and accessories shall be inspected upon delivery and periodically during the progress of
the work. Any material found to be defective may be rejected.
i. If rejected, the Contractor shall remove and replace such defective material at their
expense.
D. Pipe and accessories shall be handled in accordance with manufacturer's specifications.
i. Before lowering into the trench, the pipe and accessories shall be inspected for defects.
a. Any defective, damaged, or unsound pipe or other incidental materials shall not be
incorporated into the work.
ii. All pipe and accessories shall be carefully lowered into the trench piece by piece using
suitable tools or equipment in such a manner as to prevent damage to the material.
iii. Under no circumstance shall pipe, accessories or tools be dropped directly into the
trench.
E. Pipe shall be laid to the alignment as established on the approved plans.
i. Pipe shall be laid from lowest point to highest point.
ii. Pipe shall be laid with spigots facing in the direction of flow.
iii. Batter boards or laser beam will be required to fine grade the trench.
iv. Each time the instrument used to verify grades is moved, a shot off the hub is required
to verify setup.
v. All foreign matter shall be removed from the inside of the pipe, bells, spigots, or parts
of the pipe used in forming the joint before the pipe is lowered into the trench;
a. Pipe shall be kept clean by approved means during and after laying.
b. At the times when pipe laying is not in progress, the open ends of pipe shall be
closed by approved means.
vi. Bell holes shall be dug at each joint of sufficient depth to allow the entire length of the
barrel of the pipe to rest on the bottom of the trench and to allow ample space for
properly jointing the pipe.
Section 6 59
2020 Design Standards and Specifications
Sewer Specifications
F. Pipe shall be laid so that the pipe label is facing up.
G. Pipe shall be jointed per manufacturer's requirements.
i. Bell, spigot and gasket of pipe shall be wiped clean prior to joining.
ii. Cutting of pipe for inserting accessories or closure pieces shall be done in a neat
workmanlike manner without damage to the pipe or lining.
iii. If the pipe is disturbed from line and grade after being laid and jointed, the pipe shall
be removed from trench, the joints cleaned and the pipe re-laid.
iv. Jointing shall be completed for all pipe laid each day.
v. No pipe shall be laid in conditions unsuitable for such work as determined by the City
Inspector.
vi. No trench water shall be permitted to enter the pipe.
H. The Engineering Department shall be notified at least 24 hours in advance of when pipe is to
be laid in any trench.
i. No pipes shall be covered or authorized for cover until they have been inspected by the
City's Inspector.
6.07.13 Marking Tape
A. Marking tape shall be installed in the same trench with all pipe during pipe installation.
i. Marking tape for sewer mains shall be 3-inch, green in color and clearly labeled
"Caution: Buried Sewer Line" for gravity mains or "Caution: Buried Sewer Force Main"
for force mains.
ii. Marking tape shall be installed directly above the centerline of the pipe a minimum of
24 inches above top of pipe.
iii. Depth of bury shall be 18 inches below top of trench.
6.07.14 Backfill around Pipe
A. Bedding
i. Bedding material shall be fine graded select sand or aggregate material conforming to
the Materials of Construction section of these Specifications and shall be a minimum of
2 inches thick.
B. Embedment
i. Embedment, including haunching under pipe and to a point 12 inches above the top of
the pipe shall be carefully placed and shall be graded embedment material conforming
to the Materials of Construction section of these Specifications.
C. Compaction
i. Bedding and embedment shall be compacted to in accordance with pipe manufacturer's
specifications and approved mechanical means.
ii. Compaction shall be in maximum 6-inch compacted lifts.
D. Backfill
i. The remainder of the backfill shall conform to the current City of Lubbock Street
Ordinance and the City of Lubbock Utility Excavation Manual.
ii. In street or alley Right of Way or paved easements backfill shall be compacted to a
minimum of 95% modified Proctor Density.
iii. In unpaved easements the backfill shall be compacted to a minimum of 90% modified
Proctor Density. Top 12" of backfill shall be uncompacted. Top 2" of backfill shall be
top soil.
60 Section 6
2020 Design Standards and Specifications
Sewer Specifications
iv. A minimum of 12" flow fill cap under paving will be required with a minimum of 18"
under Arterial paving.
v. Flowable fill may be substituted for compacted backfill.
vi. Special situations such as state highway or railroad crossings may be subject to more
stringent requirements and shall be addressed on a case -by -case basis.
vii. Water jetting will not be allowed.
viii. See plates UEM-01 to UEM-05 for backfill details.
E. Following the completion of the backfilling, the Contractor shall maintain the trench surfaces
in a satisfactory manner until final completion and acceptance of the work.
i. The maintenance may include blading from time to time as necessary, filling
depressions caused by settlement, sprinkling to settle dust, brooming or flushing at the
request of the City Engineer or designee and other work required to keep the streets
and roads in satisfactory condition for traffic.
ii. The Contractor shall maintain and be responsible for all paving cuts until such time as
permanent repairs are made.
6.07.15 Manhole Construction
A. The Contractor shall be responsible for all materials intended for the Work including the safe
and proper storage of such materials until incorporated into the work.
B. Manholes and other accessories shall be inspected, handled, and installed in the manner
herein specified.
C. Fiberglass manholes shall be installed per detail SS-5b.
D. Manhole components and accessories shall be inspected upon delivery and periodically during
the progress of the work. Any material found to be defective may be rejected.
i. If rejected, the Contractor shall remove and replace such defective material at their
expense.
E. Manhole Base
i. Field poured concrete bases shall be at least 12 inches thick and not less than 12
inches greater diameter than the outside diameter of the manhole riser section.
ii. Concrete shall be minimum 3,000 psi.
iii. Concrete placement shall conform to ACI and good construction practices.
iv. Concrete shall be consolidated and struck -off to a horizontal surface within the forms
or pouring rings.
v. Field poured concrete bases shall be reinforced.
vi. Pre -cast reinforced concrete bases shall be of the size and shape detailed on the Plans.
F. Manhole Inverts
i. Invert channels shall be smooth and semi -circular in shape conforming to the inside of
the adjacent sewer section.
ii. Changes in direction of flow shall be made with a smooth curve of as large radius as
the size of the manhole will permit.
iii. Changes in size and grade of the channels shall be made gradually and evenly.
iv. The invert channels may be formed directly in the concrete of the manhole base or
may be half -pipe laid in concrete.
v. The floor of the manhole outside the channel shall be smooth and shall slope toward
the channel not less than one inch per foot or more than two inches per foot.
G. Manhole Barrels
Section 6 61
2020 Design Standards and Specifications
Sewer Specifications
i. Manhole barrels shall be assembled of pre -cast riser sections. Riser sections shall be
placed vertically with tongues and grooves properly keyed.
ii. Free drop inside the manhole shall not exceed 24 inches measured from the invert of
the inlet pipe to the invert of the outlet pipe.
a. Where the drop exceeds 24 inches, an approved drop manhole shall be required.
iii. All connections between the riser or base sections and the sewer pipe shall be joined in
such a manner as to make the manholes watertight.
a. Preformed rubber waterstop gaskets shall be cast into the riser or base section.
b. Approved preformed flexible plastic sealing compounds are also acceptable, provided
water tightness is achieved.
H. Top or Cone Sections
i. Cone shaped top sections shall be assembled on top of the manhole barrel with
tongues and grooves properly keyed.
ii. On shallow lines where standard cone sections will not conform to specified elevations,
flat top sections may be considered with prior approval of the City Engineer or
designee.
I. Grade Rings
i. Grade rings shall be used for adjusting the top elevation.
a. Grade rings shall be set to the elevations shown on the Plans or established by the
City's Inspector.
b. Each manhole shall have a minimum of 6 inches of grade adjustment.
c. Total height of the grade rings shall not exceed 18-inches at any manhole.
d. Non -shrink grout shall be placed around and under the rings to provide a seal and
properly seat the rings at the required elevation.
1. Manhole Frame and Cover
i. Manhole frame and cover shall be set to the elevation shown on the plans.
ii. Non -shrink grout shall be placed around and under the frame to provide a seal and
properly seat the frame at the required elevation.
K. Inflow Prevention Device (IPD)
i. All newly installed manholes shall be equipped with an approved IPD to prevent
unwanted inflow into the sanitary sewer system.
ii. IPDs shall be installed such that lifting strap is to the North.
iii. IPDs shall comply with the Approved Materials List.
L. Water Tightness
i. Finished manholes are expected to be as watertight as the pipe system they are
incorporated into. Infiltration or exfiltration shall not exceed the limits established in
these specifications.
ii. All connections between riser sections, bases and tops shall be sealed with an
approved preformed flexible plastic joint sealing compound.
iii. Application of primer and sealing compound shall be accomplished in conformance with
the manufacturer's recommendations.
iv. Grade of materials, quantity of materials and application temperatures shall conform to
the manufacturer's recommendations.
M. Protective Lining System
i. When required for rehabilitation of an existing manhole, construction of a new 60-inch
diameter manhole or construction of a manhole serving an 18-inch diameter or larger
62 Section 6
2020 Design Standards and Specifications
Sewer Specifications
pipe, an approved protective lining or coating system shall be installed per
manufacturer's instructions. Protective lining and coating systems shall conform to the
Approved Materials List.
N. Backfilling Around Manholes
i. Backfilling around manholes shall conform to the requirements as specified for
backfilling around pipe.
ii. Embedment material shall be placed up to a point equal to that required for the
adjacent pipe.
O. Following the completion of the backfilling, the Contractor shall maintain the excavated
surfaces in a satisfactory manner until final completion and acceptance of the work.
i. The maintenance may include blading from time to time as necessary, filling
depressions caused by settlement, sprinkling to settle dust, brooming or flushing at the
request of the City Engineer or designee and other work required to keep the streets
and roads in satisfactory condition for traffic.
ii. The Contractor shall maintain and be responsible for all paving cuts until such time as
permanent repairs are made.
6.07.16 Service Connections
A. Service connections on newly constructed mains shall be installed by the utility contractor at
the time of pipe installation.
B. Service connections on existing sewer mains shall be made by City of Lubbock Water Utility
forces.
C. Contractor shall place wyes and tees for service connections where required by the approved
construction plans on new sewer mains.
i. Wyes and tees shall be of like material as the sewer pipe.
ii. Service lateral lines shall be installed to 2 feet inside adjacent property line at a typical
depth of between 4 feet and 6 feet, or deeper when required.
iii. Watertight plugs shall be installed in each branch pipe or stub.
iv. Service locations shall be marked with a piece of two-inch by four -inch lumber
extended from the end of the pipe to above ground level with the above -ground
portion painted green.
6.08 Inspection, Testing, Approval and Acceptance of Gravity Flow Sanitary
Sewer Pipe and Manholes
6.08.01 Scope
A. The work covered by this section consists of the inspection, testing, approval and acceptance
of gravity flow sanitary sewers and manholes and other appurtenances normally installed as
part of this system. The work may include inspection, cleaning, leakage testing, deflection
testing and television inspection of the interior of the finished sewer system.
Section 6 63
2020 Design Standards and Specifications
Sewer Specifications
6.08.02 Quality Standards
A. The latest published revision of:
Standard
Topic
ASTM C969
Infiltration and Exfiltration Acceptance Testing of Installed
Sewer Lines
ASTM C828
Low Pressure Air Test of Sewer Lines
UNI B 6
Recommended Practice for Low Pressure Air Testing of
Installed Sewer Pipe
ASTM C1214
Standard Test Method for Concrete Pipe Sewer Lines by
Negative Air Pressure (Vacuum) Test Method
ASTM C1244
Standard Test Method for Concrete Sewer Manholes by the
Negative Air Pressure (Vacuum) Test Prior to Backfill
6.08.03 Materials
A. Water used for exfiltration tests shall be potable or as otherwise approved by the City
Inspector.
B. Equipment for tests shall be of the type, quality and capacity to perform the operations
required and shall be furnished by the Contractor.
C. All labor and materials, including water, shall be furnished at the Contractor's expense.
6.08.04 Inspection
A. City Inspector shall inspect and approve all work accomplished.
i. Testing shall be performed at the discretion of the City Inspector.
B. It shall be the responsibility of the Contractor to coordinate inspection and testing with the
Engineering Department.
6.08.05 Cleaning
A. Contractor shall remove all foreign matter from the interior of the system prior to testing any
section of sewer pipe.
i. Chunks of concrete, mortar or other debris including dirt, small gravel, and grit shall be
removed from the interior of the newly installed system.
ii. Flushing debris into the downstream system shall not be allowed.
B. Watertight plugs or other methods approved by the City Inspector shall be used to prevent
dirt or debris from entering the system.
C. After cleaning manholes, manhole cover shall be positioned to prevent dirt or debris from
entering the system. Other means of preventing intrusion of dirt or debris may be employed if
approved by the City Inspector.
6.08.06 Pipe Testing
A. Contractor shall have the option of conducting a hydrostatic exfiltration test or a low-pressure
air test. An infiltration test may also be required if the pipeline is continuously subjected to an
exterior hydrostatic head.
B. Contractor shall notify the City Inspector a minimum of 24 hours in advance of any testing.
C. Testing shall be conducted by the Contractor at their own expense.
64 Section 6
2020 Design Standards and Specifications
Sewer Specifications
D. Testing shall be accomplished in the presence of the City Inspector or his authorized
representative.
E. Testing shall not commence on any portion of the pipeline until all field placed concrete in
contact with the pipe, fittings or appurtenances is adequately cured.
F. Exfiltration Test
i. The sewer line being tested may be filled with water for a period long enough to allow
water absorption in the pipe wall. The saturation period shall be a minimum of 4 hours
and not more than 72 hours.
ii. Each section of the pipeline shall be tested between successive manholes or other
structures. The lower end of the section shall be closed with a watertight device. The
inlet end of the section to be tested shall be filled with water to a point 4 feet above
the pipe invert at the centerline of the upper manhole or structure.
a. If the ground water level is above the pipe invert, the water level in the upper
manhole shall be 4 feet above the adjacent ground water level. Ground water level
shall be determined by the Contractor, subject to approval by the City Inspector.
iii. Allowable exfiltration shall not exceed 10 gallons/inch diameter/mile of
pipe/24 hour period.
iv. For construction within the 25-year flood plain, the infiltration shall not
exceed 5 gallons/ inch diameter/mile of pipe/24 hour period at the same
minimum test head.
v. Leakage shall be measured by checking the drop in the water level in the upper
manhole or structure over a period of 4 hours.
vi. Contractor shall repair obvious or concentrated leaks and other repairs as necessary to
reduce exfiltration leakage to an acceptable rate.
vii. Contractor shall repeat the 4 hour exfiltration test after repairs are made until an
acceptable leakage rate is attained.
viii. Repairs required shall be at the Contractor's own expense.
G. Low -Pressure Air Test
i. Low-pressure air test shall be conducted in accordance to the provisions of UNI-13-6,
"Recommended Practice for Low -Pressure Air Testing of Installed Sewer Pipe,"
published by Uni-Bell Plastic Pipe Association.
ii. Low pressure air shall be slowly introduced into the sealed line until the
internal air pressure reaches 4.0 psig greater than the average backpressure
of the groundwater above the pipe.
iii. The air supply shall be throttled to maintain that internal pressure for at least 2
minutes to permit the temperature of the entering air to equalize with the temperature
of the pipe wall.
iv. When temperatures have been equalized and the pressure stabilized at 4.0 psig, the air
supply shall be shut off or disconnected.
v. Time shall be recorded for the pressure inside the pipe to drop 4.0 psig to
3.0 psig.
Section 6 65
2020 Design Standards and Specifications
Sewer Specifications
vi. Time shall not be less than that outlined in the following table:
Pipe Diameter
(inches)
Minimum Time
(seconds)
Max Length for
Min Time (feet)
Time for Longer
Length
seconds/foot
6
340
398
0.855
8
454
298
1.520
10
567
239
2.374
12
680
199
3.419
15
850
159
5.342
18
1020
133
7.693
21
1190
114
10.471
vii. City Inspector shall witness and verify results of the test.
viii. The City Inspector may stop a test if no pressure drop loss has occurred during the
thirst 25% of the calculated testing time.
ix. Contractor shall repair obvious or concentrated leaks and other repairs as necessary to
reduce leakage to an acceptable rate.
x. Contractor shall repeat the low-pressure air test after repairs are made until an
acceptable pressure drop for the test is attained.
xi. Repairs required shall be at the Contractor's expense.
H. Infiltration Test
i. Infiltration tests are acceptable only if the pipeline is continuously subjected to an
external hydrostatic head (ground water level) of at least 2 feet above the top of the
pipe at the upstream manhole or structure.
ii. Infiltration test shall be made by sealing the inlet and outlet ends of this pipeline and
measuring the volume of water that infiltrates into the section being tested.
a. Flow measurement may be measured by collecting the discharge into a volumetric
measuring container, weir or other approved method.
iii. The test shall be continued over a period of at least 4 hours. Time shall be allowed to
soak lines and manholes in advance of performing test.
iv. Allowable infiltration shall not exceed 10 gallons/inch diameter/mile of
pipe/24 hour period.
v. For construction within the 25-year flood plain, the infiltration shall not
exceed 5 gallons/ inch diameter/mile of pipe/24 hour period at the same
minimum test head.
vi. Contractor shall repair obvious or concentrated leaks and other repairs as necessary to
reduce the infiltration to an acceptable rate.
vii. Contractor shall repeat the 4 hour infiltration test after repairs are made until an
acceptable infiltration rate is attained.
viii. All repairs required shall be at the Contractor's own expense.
ix. Whenever the rate of infiltration is found to repeatedly exceed the prescribed amount,
the Contractor shall be notified in writing. The Contractor may then be required to
provide, at their own expense, video inspection of the interior of the conduit. The
Contractor shall make appropriate repairs by methods approved by the City Engineer or
designee and shall continue to test the conduit until it is proven satisfactory.
66 Section 6
2020 Design Standards and Specifications
Sewer Specifications
6.08.07 Video Inspection
A. Where determined to be necessary, the new sewer pipe shall be inspected by video camera
prior to final acceptance.
i. Initial video inspection shall be at the Contractor's own expense.
Video equipment expressly designed for pipeline inspection purposes and operated by
experienced and qualified personnel shall be pulled through the entire pipeline.
i. Video equipment operator shall maintain a log of all inspections and note location, type
and extent of any deficiencies.
ii. Video equipment operator shall also photograph all deficiencies and not less than one
"typical" location per each 500 feet of pipeline inspected.
C. Contractor shall bear all costs incurred in correcting deficiencies found during the video
inspection, including cost of additional video inspection required to verify correction of noted
deficiencies.
D. Video inspection conducted solely for the Contractor's benefit shall be at the Contractor's own
expense.
6.08.08 Deflection Test
A. Deflection tests shall be conducted in the presence of the City Inspector after the pipe has
been installed and backfilled.
i. The deflection test shall be conducted by pulling a mandrel (go no-go device) through
the pipe.
ii. The mandrel shall be designed and sized for each size and type of pipe and shall be at
least 1.5 pipe diameters in length.
iii. The mandrel shall be constructed with an odd number of runners placed parallel to the
pipe centerline and equally spaced around the perimeter of the mandrel.
iv. Test mandrel shall be furnished by the Contractor and approved by the City Inspector.
v. Test equipment, calibration data and procedures shall be subject to the approval of the
City Inspector.
vi. Deflection test cannot be performed until 30 days after final backfill per Title 30 Texas
Administrative Code Chapter 217.57(b)(4).
Ring or diametric deflection of the installed pipe shall not exceed 5% of the design internal
diameter of the pipe. Pipe sections that restrict free passage of the mandrel shall be removed
and replaced or excavated, re -bedded, backfilled and retested.
C. All repairs, replacement, remedial work and retesting shall be performed by the Contractor at
their own expense.
D. Deflection test may be conducted concurrently with the video inspection of the pipe interior,
subject to approval by the City Inspector.
6.08.09 Manhole Testing
A. Manholes shall be tested for leakage separately and independently of the sanitary sewer lines
by vacuum testing, hydrostatic exfiltration testing or other methods approved by the City
Inspector. An infiltration test may also be required if the manhole is continuously subjected
to an exterior hydrostatic head.
Contractor shall notify the City Inspector a minimum of 24 hours in advance of any testing.
C. Testing shall be conducted by the Contractor at their own expense.
Section 6 67
2020 Design Standards and Specifications
Sewer Specifications
D. Testing shall be accomplished in the presence of the City Inspector or his authorized
representative.
E. Testing shall not commence on any portion of the pipeline until all field placed concrete in
contact with the pipe, fittings or appurtenances is adequately cured.
F. Vacuum Test
i. All inlet and outlet pipes in the manhole shall be plugged with an airtight device.
ii. All lift holes and exterior joints shall be plugged with a non -shrink grout.
a. No grout shall be placed in horizontal joints prior to testing.
iii. The manhole opening shall be sealed by a method approved by the City Inspector.
iv. Vacuum test shall be in accordance with ASTM 1244-11.
v. The Contractor shall have the option to repeat the vacuum test one time after repairs
vi. If a vacuum test is failed twice, the manhole shall be repaired and an exfiltration test
shall be performed.
vii. All repairs required shall be at the Contractor's own expense.
G. Exfiltration Test
i. All inlet and outlet pipes in the manhole shall be plugged with a watertight device.
ii. The manhole being tested may be filled with water for a period long enough to allow
water absorption into the manhole. The saturation period shall be a minimum of 4
hours and not more than 72 hours.
iii. Test shall be conducted with the manhole filled with water to the top of the cone
section.
iv. Allowable leakage shall not exceed 0.025 gallon/foot diameter/foot of
manhole depth/hour over a 4 hour period.
v. The Contractor shall repeat the exfiltration test after repairs until an acceptable
leakage rate is attained.
vi. All repairs required shall be at the Contractor's own expense.
H. Infiltration Test
i. Infiltration tests are acceptable only if the connecting conduit is continuously subjected
to an external hydrostatic head (ground water level) at least 2 feet above the top of
the conduit. Ground water level shall be determined by the Contractor, subject to
approval by the City Inspector.
ii. All inlet and outlet pipes in the manhole shall be plugged with a watertight device. The
volume of water that infiltrates into the manhole during a 4 hour period shall be
measured in a manner determined by the City Inspector.
iii. The test shall be conducted after the manhole has been subjected to the maximum
ground water level for at least 4 hours to thoroughly saturate the manhole wall.
iv. The allowable infiltration shall not exceed 0.025 gallon/foot of
diameter/foot of manhole depth/hour during a 4 hour test.
v. The Contractor shall repeat the 4 hour infiltration test after repairs until an acceptable
leakage rate is attained.
vi. All repairs required shall be at the Contractor's own expense.
6.08.10 Approval
A. Final approval of sewer lines and manholes shall be based on an inspection covering all items
in this specification and other approved plans and material. The inspection shall be done in an
appropriate manner by representatives of the City Engineer or designee.
68 Section 6
2020 Design Standards and Specifications
Sewer Specifications
B. Contractor shall remedy any defects in workmanship or materials revealed by inspection at
their own expense.
C. Final approval will be based on re -inspection of the sewer after the appropriate repairs and
corrections are completed.
6.08.11 Acceptance
A. Flow of any kind into the existing sanitary sewer collection system shall not be allowed until
the new sewer lines and manholes has been satisfactorily completed and accepted for use by
the City Engineer or designee.
B. Portions of the work completed may be placed in operation after all cleaning, testing and
inspection requirements have been fulfilled. Such partial use or partial acceptance shall be
subject to approval of the City Engineer or designee.
6.09 Lift Station
6.09.01 Lift station design must conform to the most recent TCEQ design criteria.
6.09.02 Site Layout
A. Lift station site location shall be approved by the City Engineer or designee.
B. Site shall be chosen to provide the least negative impact to surrounding existing and future
development.
C. The station site shall be located so it may serve as much of the entire sewer drainage basin as
possible. This may require that the station be located off -site of the development.
D. The station site shall be protected from the 100-year flood plain and shall be accessible during
the 25-year storm event.
E. Lift station site and associated access road shall be located in a dedicated right-of-way or
permanent easement.
i. Access road shall be a minimum 12-foot wide all-weather surface.
ii. Additional staging and parking area shall be provided.
iii. Station grounds shall be minimum 5-inch thick, aggregate road base material.
F. Lift station site shall be fully enclosed by intruder -resistant fence and include a 14-foot vehicle
gate and 3-foot man gate. Vehicle gate shall be situated such that pumps and equipment are
accessible by service vehicles.
G. Lift station shall have bypass capability.
H. Lift station shall have lightning protection for all electronic components.
I. Lift station site shall be illuminated by a security light system.
J. Lift station shall be fitted with SCADA antennae.
6.09.03 Dry Well
A. Dry well shall have separate, dedicated entrance with ladder.
B. The dry well or valve vault shall have an approved, lockable, 26-inch x 36-inch pedestrian -
rated aluminum hatch.
C. Provisions shall be made for water removal from the dry well.
D. Dry well shall be adequately vented with a minimum of two 4-inch vent pipes with one having
an active ventilation blower.
Section 6 69
2020 Design Standards and Specifications
Sewer Specifications
6.09.04 Wet Well
A. Wet wells must be enclosed by water -tight and gas -tight walls.
B. Interior walls of wet wells shall be lined with a lining system per the Approved Materials List.
C. Wet well shall have a maintenance hatch for servicing pumps and a separate, dedicated
entrance.
i. Dedicated entrance shall have an approved, lockable, 26-inch x 36-inch pedestrian -
rated aluminum safety hatch.
ii. Maintenance hatch shall be an approved, double -door, lockable, 48-inch x 72-inch
pedestrian -rated aluminum hatch or as required to adequately maintain the wet well
pumps and components.
D. A gravity sewer pipe discharging to a wet well must be located so that the invert elevation is
above the level of the system's "on" setting.
E. All piping within wet well shall be PVC with flanged fittings.
F. All interior components shall be stainless steel including nuts, bolts, other fasteners and all
base plates.
G. Each pump shall be fitted with minimum 25 feet of stainless steel lifting chain.
H. Each pump shall be fitted with dual -rail stainless steel guide bar and upper guide bar
brackets.
I. Wet well shall have a sloped bottom toward the pump intake to avoid solids deposition.
J. Wet well shall be adequately vented with a minimum of two 4-inch vent pipes with one having
an active ventilation blower.
K. Piping associated with lift stations shall be approved gravity or pressure rated sewer pipe.
6.10 Restoration and Clean U
6.10.01 The Contractor shall restore or replace all removed or damaged paving, curbing, sidewalks,
gutters, sod, shrubbery, fences, irrigation systems, pipe, or other structures or surfaces to
a condition equal to that before the work began and to the satisfaction of the City Engineer
or designee.
6.10.02 All streets, alleys, driveways, sidewalks, curbs or other surfaces broken, cut or damaged by
the Contractor shall be reconstructed as required by the current City of Lubbock Street
Ordinance.
6.10.03 Irrigation systems affected by construction shall be properly repaired by a licensed
irrigator, with materials equal to the existing system and in compliance with current
applicable codes.
6.10.04 All rubbish, excess excavated materials, unused materials and other non-native materials
shall be removed from the jobsite and legally disposed.
6.10.05 The right-of-way shall be left in a state of order and cleanliness as determined by the City
Engineer or designee.
70 Section 6
2020 Design Standards and Specifications
Sewer Specifications
6.11 Warrantv and Acceptance
6.11.01 Within 30 calendar days after the Developer or Developers Engineer has given written
notice that the improvements have been substantially completed, the City shall inspect the
completed improvements and provide a punch list if necessary.
A. If it is mutually determined that the improvements have been constructed in accordance with
the engineering plans and the City of Lubbock Engineering Minimum Design Standards and
Specifications, the Developers Engineer shall submit Record Drawings, Certificate of
Completion and Developers Warranty Statement (Copies of the Certificate of Completion and
the Developers Warranty Statement are included in the City of Lubbock Engineering Minimum
Design Standards and Specifications)
B. Upon receipt of the Developers Certificate of Completion, Record Drawings and the
Developers Warranty Statement, the City will accept improvements within 30 calendar days;
unless exception is given in writing.
C. Neither the Final Payment nor the Certificate of Completion shall relieve the Developer or
Contractor of responsibility related to warranty of materials or workmanship.
D. The Developer shall remedy any defects due to faulty materials or workmanship that appear
within 1 year from the date of acceptance by the City of Lubbock.
Section 6 71
2020 Design Standards and Specifications
Sewer Specifications
72 Section 6
2020 Design Standards and Specifications
Approved Materials List
SECTION 7
APPROVED MATERIALS AND MANUFACTURERS LIST
7.01 Introduction
7.01.01 This section lists specific products and manufacturers that have been approved for use
within the City of Lubbock water and sanitary sewer system.
7.01.02 This listing is intended to be used as a reference source for Water Utilities employees,
design engineers, developers, contractors and vendors.
7.01.03 Materials produced by manufacturers not listed herein are not acceptable for use within the
City's system.
7.01.04 Manufacturers interested in submitting products for evaluation and possible approval
should submit a written request in accordance with the procedures listed below.
7.02 Product Submittal Procedures
7.02.01 Written requests should be sent to the attention of "City Engineer, City of Lubbock, PO Box
2000, Lubbock, Texas 79401".
7.02.02 Written requests shall include the following:
A. A complete Application for New Product(s) (See Appendix A-1)
B. Four (4) copies of the following documents:
i. A list of all applicable standards regarding the product and certification (AWWA, ANSI,
ASTM, etc.)
ii. Adequate shop drawings and design information (brochures and other product
information)
iii. Location of the manufacturer's plant
iv. Location of the nearest local distribution point and retail outlet
v. A list of any special tools, fittings or methods of construction required for installation
and/or maintenance
vi. Spare parts and service availability information
vii. A 5-year history of the product documenting its performance
viii. Warranties
ix. Product sample (where appropriate)
x. User references, with contact person and telephone numbers (Specifically in the State
of Texas)
A. Life cycle costs (where appropriate)
xii. A statement of why the approval of the product would be beneficial to City of Lubbock
C. Applicant shall send a formal review meeting request to the City Engineer or designee.
D. All submissions shall be made at least 30 days prior to the meeting at which review is
requested.
Section 7 73
2020 Design Standards and Specifications
Approved Materials List
7.03 Evaluation Process
7.03.01 Product evaluation will be conducted by the City Engineer or designee or their designee.
A. Review shall include:
i. Conformance with the City of Lubbock Minimum Design Standards and Specifications.
ii. Comments made by contractors, engineers, developers, suppliers, etc.
iii. Any other matters regarding the design, construction and implementation of the
proposed product into the City of Lubbock water and sanitary sewer system.
B. Applicant may be requested to make a brief presentation regarding the product.
Representatives shall be knowledgeable on product use, locations, design and reference
checks. The representative shall also have the authority to approve a trial run in City of
Lubbock.
7.04 Approval Process
7.04.01 The decision of the City Engineer or designee is final.
7.04.02 For each product that has been submitted, one of the following recommendations will be
made:
A. Approval for Use
i. This approves a product for use throughout the City's service area.
ii. The City Engineer or designee may withdraw the Approval for Use status for violation
of the City of Lubbock Minimum Design Standards and Specifications.
iii. All use of the product will be in conformance with the manufacturer's specifications and
good engineering practices.
B. Conditional Approval for Use
i. This approves a product for use throughout the City's service area; however, the
product will be reviewed periodically to ensure that no unforeseen installation or
maintenance problems have risen and that quality assurance/quality control meet City
Standards.
ii. After a suitable period of field observation, this approval may be upgraded to Approval
for Use status. The frequency of review and the length of field observation period will
be determined by the City Engineer or designee.
iii. If, during the field observation period, problems with installation, operation or
maintenance of the product are observed, the City Engineer or designee may
downgrade the status of the product to Disapproved for Use.
iv. The City Engineer or designee may withdraw the Conditional Approval for Use status
for violation of the City of Lubbock Minimum Design Standards and Specifications.
v. All use of the product will be in conformance with the manufacturer's specifications and
good engineering practices.
C. Limited Approval for Use
i. This approves a product for use only in certain sites or projects within the City's service
area. The City Engineer or designee will determine where the product can be used.
ii. The product will be reviewed periodically to ensure that no unforeseen installation,
operation or maintenance problems have arisen.
iii. After a suitable period of field observation, this approval may be upgraded to
Conditional Approval for Use or Approval for Use status. The frequency of review and
74 Section 7
2020 Design Standards and Specifications
Approved Materials List
the length of the field observation period will be determined by the City Engineer or
designee.
iv. If, during the field observation period, problems with the installation, operation or
maintenance of the product are observed, the City Engineer or designee may
downgrade the status of the product to Disapproved for Use.
v. The City Engineer or designee may withdraw the Limited Approval for Use status for
violation of the City of Lubbock Minimum Design Standards and Specifications.
vi. All use of the product will be in conformance with manufacturer's specifications and
good engineering practices.
D. Disapproved for Use
i. The product may not be used anywhere within the City's service area.
ii. If a product has been given a Disapproved for Use status by the City Engineer or
designee, the product may not be resubmitted for review unless significant changes
have been made to the product.
iii. The City Engineer or designee will not reconsider a product Disapproved for Use until
at least twelve (12) months have passed from the date of disapproval.
E. Insufficient Information
i. Not enough information was provided to evaluate the product.
ii. Upon receipt of requested additional information, the City Engineer or designee will
reevaluate the product.
iii. If, upon reevaluation, it is determined that not enough information was provided a
Disapproved for Use status will be given.
7.04.03 Design Changes of Approved Products
A. After the approval of a product, the manufacturer or their representative shall inform the City
Engineer or designee, in writing, of any modifications in design or material. Such changes
may require further evaluation and approval.
7.04.04 Withdrawal of Approval
A. The City Engineer or designee may withdraw any approval as a result of a design change,
field observation, testing, product failure, or other factors that, in the opinion City Engineer or
designee, warrant such withdrawal.
Section 7 75
2020 Design Standards and Specifications
Approved Materials List
7.05 Water
7.05.01 Water Pipe
A. Polyvinyl Chloride (PVC) 4-inch to 24-inch
i.
AWWA C900 or C905; Minimum DR-18
ii.
Manufacturers:
a.
CertainTeed
(1) Certa-Lok
b.
Diamond Plastics
c.
JM Eagle
(1) Blue Brute
(2) Big Blue
(3) Eagle Loc 900
d.
North American Pipe
e.
Northern Pipe Products
f.
Pipelife Jetstream
g.
VinylPlex, Inc.
h.
Royal Building Products
B. High Density Polyethylene (HDPE)
i.
AWWA C906, PE 4710, Minimum DR11, Pressure Class 200
ii.
Manufacturers
a.
Chevron
b.
JM Eagle
c.
Plexco
C. Cement -lined Ductile Iron (DIP) - Push -On or Mechanical Joint
i. AWWA C151 Minimum Thickness Class 50
ii. Manufacturers
a. American Cast Iron Pipe
b. Griffin Pipe Products
c. McWane Pipe
d. U.S. Pipe and Foundry
D. Concrete Cylinder Pipe
i. AWWA C301, Pre -stressed Concrete Steel Cylinder Pressure Pipe
ii. AWWA C303, Concrete Bar -wrapped Steel Cylinder Pressure Pipe
iii. Manufacturers:
a. Forterra
7.05.02 Fittings: (Bends, Crosses, Tees and Offset Glands)
A. Ductile Iron; Compact
B. AWWA C110 and C-153
C. Manufacturers:
i. American Cast Iron Pipe
ii. Griffin Pipe Products
76 Section 7
2020 Design Standards and Specifications
Approved Materials List
iii. McWane Pipe
iv. Sigma Corporation
v. Star Pipe Products, Inc.
vi. Tyler Pipe and Foundry Utilities
vii. U.S. Pipe and Foundry
7.05.03 Couplings (Transition or Straight), Non -Restrained
A. Low -alloy or stainless steel bolts and nuts; outside finish: heat fused nylon coating or fusion
bonded epoxy coating; standard length body.
B. Manufacturers
i. Dresser
ii. Ford
iii. JCM Industries
iv. Romac
v. Smith -Blair
7.05.04 Resilient Wedge Gate Valves, 4-inch through 12-inch
A. Ductile Iron Body; Outside finish: heat fused nylon coating or fusion bonded epoxy coating.
B. AWWA C509 and C515
C. Manufacturers
i. American AVK
ii. Clow
iii. Darling
iv. EJIW
v. Mueller
vi. M & H Model 4067
7.05.05 Butterfly Valves — 16-inch and Greater, with gearing if required by manufacturer
A. Ductile Iron Body; Outside finish: heat fused nylon coating or fusion bonded epoxy coating.
B. AWWA C504
C. Manufacturers
i. DeZurik
ii. Mueller
iii. M & H
7.05.06 Fire Hydrants
A. AWWA C502
B. 5-1/4-inch valve opening; 2-1/2-inch hose nozzles; 4-inch steamer nozzle
C. Factory painted orange
D. Manufacturers
i. American Darling Model B-84-B
ii. East Jordan Iron Works
Section 7 77
2020 Design Standards and Specifications
Approved Materials List
iii. Clow Medallion
iv. Mueller Centurion
v. M & H Style 129-09
vi. American AVK
7.05.07 Fire Hydrant Raised Pavement Marker
A. Manufacturer
i. Stimsonite Model 80
7.05.08 Service Saddles
A. Epoxy coated ductile iron body; Double band with SS bands and bolts
B. AWWA C800
C. 1-inch
i. Female AWWA Taper threads (CC or CS)
ii. Manufacturers
a. Ford
b. JCM Industries
c. Mueller
d. Romac Industries, Inc.
e. Smith -Blair
f. PowerSeal Pipeline Products
D. 2-inch
i. Female iron pipe threads
ii. Manufacturers
a. Ford
b. JCM Industries
c. Mueller
d. Romac Industries, Inc.
e. Smith -Blair
f. PowerSeal Pipeline Products
7.05.09 Corporation Stops
A. Full Port Ball Valve
B. AWWA C800
C. 1-inch
i. Male AWWA Taper threads (CC or CS) by flared copper or compression
ii. Manufacturers
a. A. Y. McDonald
b. Ford
c. Mueller
D. 2-inch
i. Male iron pipe threads by flared copper or compression
ii. Manufacturers
a. A. Y. McDonald
78 Section 7
2020 Design Standards and Specifications
Approved Materials List
b. Ford
c. Mueller
7.05.10 Service Tubing
A. Copper Tubing
i. ASTM B88
ii. Flared copper fittings
iii. 1-inch
a. Type K - Soft
iv. 2-inch
a. Type K - Hard
B. Polyethylene Tubing (PET and PEXa);
i. ASTM D2737 - Copper Tube Size (CTS), 200 PSI Minimum, Black or Blue
ii. Slip Fittings
a. Ford - Ultratite
b. Mueller - Instatite
iii. Manufacturers
a. Endot — Endopure PE 4710 — 1-inch only
b. NuMex PE 4710 — 1-inch only
c. Rehau — Municipex PEXa — 1-inch, 1.5-inch or 2-inch
d. Silverline — Sil-O-Flex PE 3408 or 4710 — 1-inch only
e. Ultraline — Driscoplex 5100 Series PE 4710 — 1-inch only
7.05.11 Curb Stops
A. Full Port Ball Valve
B. 360 degree rotation
C. AWWA C800
D. Curb stops shall include meter swivel nut (meter spud) connection on outlet side such that
meter nut can be replaced without removing valve from operation.
E. Reductions for smaller meter sizes shall be accomplished by use of appropriately sized iron
pipe threaded brass bushing on outlet side of curb stop.
F. 1-inch and 2-inch
i. Flared copper or compression by female iron pipe threads with meter swivel nut.
ii. Manufacturers
a. A. Y. McDonald
b. Ford
c. Mueller
7.05.12 Compression Fittings
A. Compression fittings shall be quick joint type.
B. Manufacturers
i. Mueller Insta-Tite Connection
ii. Ford Ultra-Tite Connection
Section 7 79
2020 Design Standards and Specifications
Approved Materials List
7.05.13 Tapping Sleeves
A. Stainless Steel Sleeves with Stainless Steel or Carbon Steel Flange
B. Epoxy coated with stainless steel bolts and nuts
C. Manufacturers
i. Ford FAST
ii. JCM Industries #469
iii. Smith Blair #662
iv. ROMAC #SST
v. PowerSeal Pipeline Products
7.05.14 Resilient Seat Wedge Tapping Valves
A. AWWA C509
B. Manufacturers:
i. American
ii. Clow
iii. EJIW
iv. Mueller
v. M & H
vi. U. S. Pipe
7.05.15 Water Meter Boxes and Vaults
A. Manufacturers
i. Boxes for 1" meters
a. DFW Plastics model DFW38FWP-18-AF1QF1 SMALL LID
ii. Boxes for 1.5" or 2" meters
a. DFW Plastics model DFW1324C-AFiQF SMALL LID
7.05.16 Double Check, Double Detector Check and Reduced Pressure Principle Devices
A. American Society of Sanitary Engineering Seal Approval
B. Call City of Lubbock backflow coordinator at (806) 775-2589 for specific applications.
C. Manufacturers
i. Ames
ii. Febco
iii. Watts
iv. Wilkins
7.05.17 Backflow Preventer Box
A. Polyester or Aluminum Enclosure, Heated and Insulated ASSE 1060
B. Manufacturers
i. EZ Box Model HEZ
ii. Hot Box
iii. Safe-T-Cover
80 Section 7
2020 Design Standards and Specifications
Approved Materials List
7.05.18 Air Release Valves
A. Manufacturers
i. APCO
ii. ARI
iii. Crespin
7.05.19 Flushing Hydrants
A. Manufacturers
i. Kupferle
7.05.20 Sampling Stations
A. Manufacturers
i. Kupferle
7.05.21 Valve boxes
A. Cast -Iron slip type
B. Manufacturers
i. EJIW
ii. Sigma
iii. Star Pipe
7.05.22 Pipe Restraints
A. ASTM F1674
B. Manufacturers
i. EBAA Iron, Inc.
ii. Ford
iii. Romac
iv. Sigma
v. Smith -Blair
vi. Star Pipe Products, Inc.
vii. Tyler Union
viii. AccuCast
7.05.23 Casing Spacers
A. Manufacturers
i. Advance Products
ii. BMW
iii. Cascade
iv. CCI Pipeline
V. Culpico
vi. PSI
7.05.24 Precast Concrete Vaults, HS-20 Rated
A. Manufacturers
i. Hanson Pipe and Products
Section 7 81
2020 Design Standards and Specifications
Approved Materials List
ii. Vaughn Concrete Products
7.05.25 Waterline Marker
Manufacturers
a. Blackburn
b. Carsonite International
82 Section 7
2020 Design Standards and Specifications
Approved Materials List
7.06 Sanitary Sewer
7.06.01 Gravity Sewer Pipe
A. Polyvinyl Chloride (PVC) Pipe
i.
6-inch thru 15-inch: ASTM D3034, Minimum Class SDR 35
ii.
18-inch thru 48-inch: ASTM F679, Minimum Class PS-46
iii.
Fittings ASTM D1784
iv.
Gaskets ASTM F477
v.
Manufacturers
a.
Certainteed Corporation
b.
Diamond Plastics
c.
GPK (Fittings Only)
d.
Harco (Fittings Only)
e.
JM Eagle
f.
Multi Fittings (Fittings Only)
g.
National Pipe and Plastics Ever -Green Sewer Pipe
h.
North American Pipe ASTM D3034
i.
Plastic Trend (Fittings Only)
j.
VINYL Plex (Fittings Only)
k.
Royal Building Products
B. PVC Corrugated Sewer Pipe with Smooth Interior
i.
ASTM F949, ASTM F794
ii.
Manufacturer
a.
Diamond Plastics
C. High Density Polyethylene (HDPE)
i. ASTM F714
ii. Manufacturers
a. Chevron
b. JM Eagle
c. Plexco
D. Ductile Iron (DIP)
i. AWWA C151 Minimum Thickness Class 50 with Sewer Gas Resistant Interior Lining
ii. Manufacturers
a. American Ductile Iron Pipe
b. Griffin Pipe Corporation
c. McWane
d. U.S. Pipe and Foundry Company
E. Steel Reinforced Polymer Concrete
i. ASTM D6783
ii. Manufacturers
a. U. S. Composite Pipe
F. Polypropylene Corrugated Dual Wall and Triple Wall
i. 12-inch thru 30-inch: ASTM F2736
Section 7 83
2020 Design Standards and Specifications
Approved Materials List
ii. 30-inch thru 60-inch: ASTM F2764
iii. Manufacturer
a. ADS Sanitite HP
7.06.02 Pressure Sewer Pipe
A. Polyvinyl Chloride (PVC)
i. AWWA C900 Minimum Class DR25
a. Manufacturers
(1) Diamond Plastics
(2) JM Eagle
(3) North American Pipe
ii. SDR26 Class 160
a. Manufacturers
(1) Diamond Plastics
(2) JM Eagle
(3) North American Pipe
B. Ductile Iron (DIP)
i. Minimum Thickness Class 50 with Sewer Gas Resistant Interior Lining
ii. Manufacturers
a. American Ductile Iron Pipe
b. Griffin Pipe Corporation
c. U. S. Pipe and Foundry Company
C. High Density Polyethylene (HDPE)
i. AWWA: C906, Minimum Pressure Class 160
ii. Manufacturers
a. Chevron
b. JM Eagle
c. Plexco
7.06.03 Manholes
A. Precast Concrete Manholes
i. ASTM C478
ii. Manufacturers
a. Hanson Building Products
b. South Plains Concrete Products
c. The Turner Company
d. Vaughn Concrete Products
B. Glass -Fiber -Reinforced Polyester Manholes, Wetwells and Manhole Liners
i. ASTM D3753
ii. Manufacturer
a. LF Manufacturing
b. Containment Solutions
C. Composite Manholes
i. Amarok
84 Section 7
2020 Design Standards and Specifications
Approved Materials List
ii. US Composite Pipe
7.06.04 Manhole Frames and Covers
A. ASTM A48, Class 3513, AASHTO M-306
B. Standard Solid Cover
i. Manufacturers
a. East Jordan Iron Works
C. Watertight Frame and Cover
i. Manufacturers
a. East Jordan Iron Works
b. Rexus
7.06.05 Manhole Coatings/Protective Lining System
A. Manufacturers
i. A-Lok - Dura Plate 100 PVC Liner
ii. Raven 405
iii. Tnemec — Series 436 PermaShield
7.06.06 Gaskets and Flexible Manhole Connections
A. Flexible cast -in -place seal or flexible boots installed with hydraulic pressure after manhole
manufacture. Manhole openings shall be made by hole -formers inserted during manufacture.
B. Manufacturers
i. Press -Seal Gasket Corp.
ii. A-Lok
iii. International Precast Supply
iv. NPC
7.06.07 Internal Chimney Seals
A. ASTM C923
B. Manufacturers
i. Cretex
ii. NPC
7.06.08 Manhole Joint Seals
A. Sealant per ASTM C990
B. 0-ring gaskets meeting ASTM C443 and ASTM C1628.
7.06.09 Manhole Joint Wrap (in addition to O-ring specified above)
A. Manufacturers
i. Ram Nek
ii. ConSeal CS 102
7.06.10 Manhole Joint Sealers
A. Butyl Mastic
Section 7 85
2020 Design Standards and Specifications
Approved Materials List
B. Manufacturers
i. Ram Nek
7.06.11 ConSeal CS 102Inflow Prevention Device
A. Non -Corrodible with self cleaning gas relief and vacuum relief valves
B. Manufacturers
i. L.F. Manufacturing Inc. - Rain Guard
ii. No Flow -In Flow
iii. The Man Pan
iv. Southwestern Packing and Seals, Inc. - Rainstopper
7.06.12 Polyethylene Slope Adjusting Ring
A. ASTM D1248
B. Manufacturers
i. Ladtech
7.06.13 Saddles
A. Manufacturer
i. NDS
7.06.14 Cleanout Cover
A. Manufacturer
i. East Jordan Iron Works
7.06.15 Valves — Must Be Approved for Use in Wastewater Application
A. Plug, Full Port
i. Manufacturers
a. DeZurik
B. Resilient Seat Gate
i. AWWA C509
ii. Manufacturers
a. American Flow Control
b. Clow
c. M & H
d. Mueller
e. U.S. Pipe
C. Swing Check
i. Manufacturer
a. Golden Anderson
b. M & H
c. Val-Matic
7.06.16 Backwater Valve for Manhole Vent
A. Manufacturer
86 Section 7
2020 Design Standards and Specifications
Approved Materials List
i. Josam
7.06.17 Lateral Backwater Valve
A. Diaphram Operated Stainless Steel Knife Valve ASME Al 12.14.1
B. Manufacturer
i. John Stephens
ii. Plastic Trends
iii. Smith Floodgate
7.06.18 Sewage Combination Air/Vacuum Valve
A. Manufacturers
i. APCO/Willamette
ii. ARI
iii. Golden Anderson Industries
7.06.19 Sanitary Sewer Marker
A. Manufacturers
i. Blackburn
ii. Carsonite International
7.06.20 Wastewater Pumps
A. Manufacturer
i. Flygt N-Pump
Section 7 87
2020 Design Standards and Specifications
Approved Materials List
7.07 Water and Sanitary Sewer Svstems
7.07.01 Modular Wall Seal
A. EPDM with stainless steel nuts and bolts
B. Manufacturer
i. Thunderline
ii. Pipe Seal
iii. Link Seal
7.07.02 Vault Doors
A. Type K heavy duty aluminum double leaf door, H-20 rated
B. Manufacturers
i. Bilco
ii. Halliday
iii. USF Fabrication, Inc.
7.07.03 Tracer Wire
A. 12-gauge
B. Manufacturers
i. Copperhead
ii. Southwire
7.07.04 Marking Tape
A. 3-inch width, Sewer — green, Water - blue
B. Manufacturers
i. Presco Prodcuts
ii. Terra Tape
88 Section 7
2020 Design Standards and Specifications
Approved Materials List
7.08 Street Construction
7.08.01 Detectable warning surface for handicap ramps
A. Manufacturers
StronGo Industries — Tek Way Dome Tiles
7.08.02 Fiber Reinforcement
A. Manufacturers
i. BASF macro fibers
Section 7 89
2020 Design Standards and Specifications
Approved Materials List
90 Section 7
2020 Design Standards and Specifications
Streets and Drainage Specifications
SECTION 8
STANDARD SPECIFICATIONS FOR STREETS AND DRAINAGE
CONSTRUCTION
8.01 General
8.01.01 The construction and materials for any City of Lubbock Engineering paving or drainage
improvements project shall conform to the following specifications and associated standard
details.
A. Any construction or materials failing to meet the requirements of these specifications or the
standard details shall be removed and replaced at the Contractor's own expense.
B. No consideration will be given to requests for reduced payments for construction or materials
not in conformance with these specifications and the plan sheets.
8.01.02 The term Engineer used in these specifications shall refer to the City of Lubbock City
Engineer or an individual designated by the City Engineer to administer these specifications
and associated plans.
8.01.03 The Engineer may require certificates from manufacturers certifying that materials or
equipment to be incorporated into the work meet these specifications.
A. Material Safety Data Sheets (MSDS) shall be required on all materials.
B. All materials or equipment shall be subject to approval by the Engineer before being
incorporated into any project.
C. After approval, the source and/or character of materials shall not be changed without written
authorization by the Engineer.
8.01.04 Streets to be constructed in a location where the traffic is expected to consist of an
unusual number of trucks or other heavy vehicles shall have an approved pavement
structure design specific to that loading condition.
8.01.05 All construction covered by these specifications shall be in compliance with the City of
Lubbock Code of Ordinances, Chapter 30 Lakes and Water Ways, Chapter 36 Streets,
Sidewalks, and Other Public Ways, Chapter 38 Subdivisions, and other chapters as
applicable.
8.01.06 Any references to these specifications, ASTM, AASHTO, TxDOT, or other designated tests,
procedures, quality standards, or requirements which are included in these specifications
or any associated plans shall be the latest edition and revision thereof.
A. When information indicated on the plan sheets is in conflict with these specifications, the
more stringent requirement shall govern, unless the City Engineer or designee gives written
approval for a specific variance.
8.01.07 Storm Water Pollution Prevention Plan (SWP3)
A. Prior to disturbance of construction area, Contractor shall coordinate with the City of Lubbock
Engineering Department to develop a site -specific Storm Water Pollution Prevention Plan.
B. SWP3 measures shall conform to the integrated Stormwater Management (iSWM) criteria
developed by the North Central Texas Council of Governments.
Section 8 91
2020 Design Standards and Specifications
Streets and Drainage Specifications
C. SWP3 measures shall be installed prior to construction and shall be maintained throughout the
construction until final stabilization.
8.02 Design Standards
8.02.01 The following design standards shall apply to all paving and drainage improvements
associated with construction of new subdivisions.
A. If unusual site conditions necessitate design criteria different from these requirements,
changes will be permitted only if specifically approved by the City Engineer.
8.02.02 Street Crown Elevations
A. All street paving shall incorporate a centerline crown at the following listed elevation unless
otherwise indicated on plans, or as directed by the Engineer:
Pavement Width
Face of Curb to Face of Curb
Finished Paving Surface
Above Gutter
32 feet
0.52 feet
36 feet
0.58 feet
42 feet
0.67 feet
46 feet
0.73 feet
66 feet
1.03 feet
88 feet
1.18 feet
i. The widths listed above refer to the total proposed future full width of street.
ii. Where there is a difference in elevation between top of opposite street curbs, the
crown elevation shall be adjusted such that the cross slopes are 2.0 percent minimum
and 4.0 percent maximum.
8.02.03 Minimum Grades
A. All street paving shall comply with the following minimum slopes unless otherwise approved
by the City Engineer:
Location
Finished Grade Sloe
Linear Curb and Gutter
0.20
Curb and Gutter in Cul-De-Sacs
0.30
Concrete Dips, Valley Gutters and Fillets
0.35
Concrete Alley Paving
0.20
Concrete Drainage Channel
0.20
Fall Around Curb Radii
0.80
B. Asphalt dips shall not be used in the place of concrete dips or valley gutters.
8.02.04 Vertical Alignment Requirements
A. Vertical curves are required if the change in grade is greater than the following maximums:
Street Classification
Maximum change in grade
Residential
2
Collector
1
Thoroughfare
0.5
92 Section 8
2020 Design Standards and Specifications
Streets and Drainage Specifications
B. Vertical curves are to be a minimum of 100' long and shall be designed for a speed of 5 MPH
greater than the posted speed limit.
C. The minimum gutter slope in a sag vertical curve shall be 0.2%, while a crest vertical curve
has no minimum.
8.03 Testina and Inspection
8.03.01 All work shall be inspected and tested by a representative designated by the City Engineer,
who shall have the authority to halt construction when, in their opinion, construction is
being performed contrary to these specifications or associated plans.
A. Whenever any portion of these specifications or associated plans is violated, the Engineer may
order the portion of construction that is in violation to cease until such violation is corrected.
8.03.02 Contractor shall cooperate with the Engineer in providing for sampling and testing
procedures.
A. The contractor shall provide at least a 2 hour notification to the City Inspection Staff prior to
requesting any inspection services.
B. In the event the City tests indicate out of specification materials, additional tests may be
provided by the contractor at their own expense.
C. Conflicting tests provided by the contractor will not automatically be considered as compliance
with City specifications, but will be considered only as additional information to be used by the
Engineer to determine the compliance of the material or construction in question.
8.03.03 The testing and inspection provided by the City is intended only to verify that materials and
construction comply with plans and specifications. The City's testing and inspection efforts
are not intended to replace the contractor's responsibility to comply with the specifications.
A. With respect to new material sources, or where the City lab has determined materials or
construction do not comply with these specifications, the City will not re -test until the
contractor has provided their own testing to demonstrate the materials and construction are
in compliance with the plans and specifications.
8.03.04 Upon completion of construction, the Contractor will apply sufficient water to all paving
improvements within the project to ensure all surfaces meet drainage requirements and
are in compliance with these specifications.
8.04 Notification of Property Owners
8.04.01 The contractor shall be responsible for maintaining positive communication with adjacent
property owners.
8.04.02 The contractor shall provide two days notice to all affected property owners with respect to
pending construction, and restriction of access or driveway locations.
8.05 Protection of Utilities and Irrigation Systems
8.05.01 The plans show only approximate locations of utilities as obtained from various utility
companies.
A. It is not implied that all utilities or their accurate locations are shown on the plans.
8.05.02 It is the contractor's responsibility to become familiar with all utilities and locations.
Section 8 93
2020 Design Standards and Specifications
Streets and Drainage Specifications
A. The contractor shall comply with all laws, ordinances, and regulations with respect to utility
notification and protection, including Underground Facility Damage Prevention Notification
Centers.
The contractor shall call DIG TESS (1-800-344-8377) and provide sufficient time for all utilities
to be identified prior to construction.
8.05.03 On all projects the contractor shall exercise care not to damage any sanitary sewer pipe,
manholes, storm sewers, water lines, valves and boxes, communication cables, power
cables, gas lines, nor any other pipe or utility. The contractor will be responsible during
the construction period for damages to any utilities.
8.05.04 Irrigation systems affected by construction shall be properly repaired by a licensed
irrigator, with materials equal to the existing system, and in compliance with current
applicable codes. The repairs shall be pressure tested to the satisfaction of the Engineer
prior to being covered.
8.05.05 If construction activities block the flow of water, then standing water shall be pumped off
existing paving daily.
8.06 Water for Construction
8.06.01 Water is available from fire hydrants for construction purposes.
A. To use City water for construction the contractor shall acquire a water meter for use on a City
fire hydrant and will be charged the applicable rate for the quantity of water used.
The contractor shall contact Lubbock Power and Light Customer Service Department to
establish a utility account. The contractor must pay a deposit for each fire hydrant meter and
will be responsible for all charges associated with that account.
C. Once an account is established and the deposit is paid, the contractor may pick up a meter
from the City Water Department at 600 Municipal Drive.
8.06.02 Fire hydrants shall be operated only by use of an approved fire hydrant wrench. No pipe
wrenches, or other unapproved devices, shall be used to open and close a fire hydrant.
8.06.03 For top loading trucks or containers the contractor shall provide a back flow prevention
assembly on the discharge side of the meter.
A. The backflow prevention assembly shall be in the form of two spring loaded ball check valves.
When filling the truck or container there shall be an air gap of at least two times the opening
diameter of the truck or container.
8.06.04 For bottom loading trucks the contractor shall provide a Reduced Pressure Zone (RPZ) type
backflow prevention assembly.
A. All RPZ type back flow prevention assemblies must be tested and the test results approved by
the City prior to use.
The test results shall be sent to the City of Lubbock Public Works Department, Meter and
Customer Service Supervisor for approval.
8.06.05 In accordance with City of Lubbock Ordinance No. 10208 "Pertaining to Backflow
Prevention", City representatives are authorized to suspend water use from a fire hydrant
by a contractor until the proper and correct backflow prevention devices are installed.
94 Section 8
2020 Design Standards and Specifications
Streets and Drainage Specifications
8.07 Concrete
8.07.01 These specifications shall govern Portland cement concrete used for curb and gutter, valley
gutters and fillets, alley paving, sidewalks, street paving, curb ramps, medians, and
drainage improvements.
A. The concrete shall be produced at a Ready -Mix Concrete Batch Plant conforming to ASTM
C94.
B. The concrete shall be transported to the project location in approved Revolving Drum Agitator
Trucks, and shall be placed within one hour of mixing time. The concrete shall be
continuously mixed during transit.
C. Concrete shall have a temperature of less than 90 degrees at time of placement. Concrete
above this temperature will be rejected and shall be removed from the job site.
D. No more than eight cubic yards of concrete shall be loaded in a Revolving Drum Agitator
Truck and transported to the job site. Loads in excess of eight cubic yards will be rejected and
shall be removed from the job site.
E. Admixture for increasing and or decreasing air shall be a temporary solution while the batch
plant makes adjustments. A maximum of three loads may be treated per plant per day.
F. No patching of any nature shall be allowed in repairing any damage to concrete
improvements. Where damage occurs, the section shall be removed to the nearest joints and
shall be replaced with new construction. Small cracks with no evidence of displacement may
be repaired with epoxy, only where approved by the Engineer.
G. All concrete shall have 5 percent, minus 1.5 percent to plus 1.5 percent, air content in
conformance with ASTM C231.
H. When delivered to the jobsite, each truck shall provide the load ticket indicating weights of all
concrete ingredients, including cement, aggregates, water, and admixtures.
I. Load tickets must be computer generated.
8.07.02 Classification
A. The following City of Lubbock classes of concrete shall be used:
Class
Typical Uses
A
Curb and gutter, sidewalks, curb ramps, drainage channels, medians,
inlet boxes, headwalls, junction boxes, driveways, and retaining walls.
B
Valley gutters and fillets, alley returns, and alley paving.
C
Concrete street pavement.
D
Utility encasements
E
Fast setting concrete pavement such as "Fast Track" Concrete
Pavement or, otherspecial design.
8.07.03 Thickness of Concrete Pavement
A. The following City of Lubbock minimum concrete pavement thickness shall be used:
Street Classification
Minimum Concrete
Pavement Thickness
Residential and Collector R-1/R-1A/R-2/C-1/Industrial
6"
Minor Arterial
7"
Principal Arterial
9"
Section 8 95
2020 Design Standards and Specifications
Streets and Drainage Specifications
B. Concrete alley paving shall have a minimum thickness of 7-1/2 inches at edge and 5 inches at
flow line.
i. No tolerance on minimum thickness will be allowed.
ii. No additional compensation will be made to the contractor for thickness greater than
specified.
C. All other proposed concrete pavement thickness and steel requirements not meeting the COL
minimum design standards and specifications shall be approved in writing by the City
Engineer.
8.07.04 Drainage Easements
A. All drainage easements shall have, at a minimum, a 10-foot wide concrete flow line to be
constructed with the street and alley paving improvements.
B. Drainage easements shall not be used as alleys or garbage collection.
8.07.05 Mix Design
A. Thirty (30) days prior to beginning any concrete construction the contractor shall submit an
engineer's recommended concrete mix design. The following shall be included in the
submittal:
i. Test certificates from an approved commercial testing laboratory on all proposed
aggregate.
(1) Certificates shall indicate material source, gradation, and loss from 5 cycle
Magnesium Sulfate test not to exceed 25 percent.
ii. Mix design based on water -cement ratio.
iii. Results of compressive strength tests in conformance with ASTM C 39 and/or flexural
strength tests in conformance with ASTM C78, made by an approved commercial
testing laboratory.
(1) Tests shall be made on 6 cylinders and/or 6 beams at curing times appropriate to
the class of concrete.
B. The Engineer will approve or reject the mix design and materials based on these submittals.
C. Mix design approval shall be subject to additional testing during construction.
D. Mix designs for various classes of concrete shall conform to the following:
Class
Min. Sacks Cement
er cubic yard
Water/Cement Ratio
Max. Slump
Inches
A
5.0
0.40 — 0.60
5
B
5.5
0.40 — 0.60
5
C
6.0
0.35-0.45
3
D
4.5
0.40 — 0.60
5
E
As required for specific cure time and strength.
i. New mix designs shall be submitted annually, or when material properties or sources
change.
ii. New mix design submittal will be required for any deviation from the mix design during
construction.
96 Section 8
2020 Design Standards and Specifications
Streets and Drainage Specifications
8.07.06 Strength Requirements
A. The various classes of concrete shall conform to the following minimum strengths in pounds
per square inch (psi) as determined by the average of two test cylinders or beams:
Class
Min. Com ressive Strength
3 Day
7 Day
28 Da
A
-
2100
3000
B
-
2500
3600
C
-
2500
3600
D
-
-
1 2500
E
3000 psi at 24 hours
B. ACI Testing will be followed.
C. When cores are subsequently used to prove compressive strength where test cylinders
indicate failures or the quality of installation is of concern, the cores shall be tested in
accordance with ACI C42. The cores shall meet the minimum 28 day compressive strength in
the table above and meet 85% of the mix design strength.
D. To place concrete in service the strength must meet 75% of the 28 day minimum compressive
strength in the table above.
8.07.07 Cement
A. Cement shall be Type I, Type II, or Type I -II cements, conforming to ASTM C150 "Standard
Specification for Portland Cement".
B. The contractor shall notify the Engineer prior to any changes of the cement supplier or source
during construction. The Engineer may require a new mix design if changes of supplier or
source occur.
C. Supplementary Cementitious Materials may replace up to 50% of the Cement with the
following limits.
i. Fly Ash conforming to ASTM C618, Class C or F no more than 30% by weight.
ii. Slag Cement conforming to ASTM C989, Class 100 or 120 no more than 50% by
weight.
iii. Silica Fume conforming to ASTM C1240 no more than 10% by weight.
iv. Metakaolin conforming to ASTM C618 no more than 10% by weight.
8.07.08 Aggregate
A. Concrete aggregate shall consist of natural, washed and screened sand, and washed and
screened gravel or clean crushed stone conforming to ASTM C33.
B. All aggregate shall be free of injurious amounts of clay, soft or flaky materials, loam, organic
impurities, or other deleterious materials.
C. Fine aggregate shall be graded from fine to coarse and shall conform to ASTM C136.
i. The gradation for fine aggregate shall meet the following requirements:
Fine Aggregate
Cumulative Percent Passing (by
weight)
3/8" Sieve
100
No. 4 Sieve
95-100
No. 8 Sieve
80-100
No. 16 Sieve
50-85
No. 30 Sieve
25-65
Section 8 97
2020 Design Standards and Specifications
Streets and Drainage Specifications
No. 50 Sieve
10-35
No. 100 Sieve
0-10
No. 200 Sieve
0-3
D. Coarse aggregates shall be well graded from coarse to fine with a maximum size of 1-1/2
inches, and shall conform to ASTM C136.
i. The gradation for coarse aggregate shall meet the following requirements:
Coarse Aggregate
Cumulative Percent Passing (by
weight
1-3/4" Sieve
100
1-1/2" Sieve
95-100
3/4" Sieve
60-90
1/2" Sieve
25-60
No. 4 Sieve
0-5
E. Coarse aggregate for Class C or E concrete shall be crushed limestone . Crushed gravel will
be allowed if on the TxDOT Quarterly Monitoring Program, or if specifically approved by the
engineer.
F. Aggregate shall comply with the following limits:
Material Property
Max. Allowable Limit
Deleterious Material
2.0%
Decantation
1.5%
Flakiness Index
17
Magnesium Sulfate Soundness
25%
G. Stockpiles shall be protected from dusty conditions by drift fences or other methods approved
by the Engineer.
i. Stockpiling methods used shall not allow aggregate to roll down the slope as it is
added to existing stockpiles.
ii. Stockpiles shall be built in layers of uniform thickness.
iii. Equipment shall not be permitted to operate over the same lift repeatedly.
8.07.09 Flowable Fill
A. Flowable fill shall consist of a concrete mixture of pea gravel and sand with a cement content
of 1-1/2 sacks (141 Ibs) per cubic yard.
B. Utility ditches in Right of Way shall be backfilled in accordance with Details UEM-01 through
UEM-07 in the appendix.
C. Use of concrete in place of flowable fill is not acceptable, and if used in place of flowable fill
shall be removed by the contractor at their expense.
8.07.10 Water
A. Water shall be clean, clear, free from oil, acid or organic matter and free from injurious
amounts of alkali, salts, or other chemicals and shall conform to AASHTO T26.
8.07.11 Admixtures
A. Admixtures may be included in the concrete mix when approved by the Engineer to achieve
any desired special properties. Chemical admixtures shall conform to ASTM C494 or ASTM
C260. Chemical admixtures shall not be used as a substitute for Cement.
98 Section 8
2020 Design Standards and Specifications
Streets and Drainage Specifications
B. Admixture for increasing and or decreasing air shall be a temporary solution while the batch
plant makes adjustments. A maximum of three loads may be treated per plant per day.
8.07.12 Reinforcing Material
A. All concrete shall incorporate reinforcement as follows:
i. Curb and gutter - horizontal paving steel shall extend to within 2" of back of curb.
When poured monolithically with adjacent concrete pavement.
ii. Residential (R-1/R-1A/R-2) and Collector (C-1/Industrial) Street Pavement — Refer to
Plate No. 38-7 through Plate No. 38-11 for more information.
iii. Valley Gutters and Fillets — A minimum of #4 deformed bars 12 inches on center both
ways.
iv. Drainage Channel — A minimum of #5 deformed steel bars 12 inches on center both
ways or design approved in writing by the City Engineer.
v. Alley Paving - No. 6 deformed steel bars on both edges as indicated on detail sheets
and fiber reinforcement as specified in section 8.07.12 (C).
vi. Alley Returns - #4 deformed steel bars 12 inch on centers both ways or 6-inch x 6-inch
- 6 gauge welded wire fabric.
vii. Sidewalk, Driveways (other than commercial), and Wheelchair Ramps - Fiber
reinforcement, or as required by the City of Lubbock Building Official, or design
approved in writing by the City Engineer.
viii. Commercial driveways, including pedestrian crossing area — #3 deformed steel bars
through the gutter section as indicated on the detail sheets and either #4 deformed
bards 12 inches on center both ways or 6 -inch x 6-inch — 6 gauge welded wire fabric.
B. Steel
i. All steel reinforcing materials shall be securely held in proper position with devices
appropriate to the type of reinforcement used, subject to approval by the Engineer.
ii. Welded wire reinforcement shall conform to ASTM A1064, and shall be 6-inch x 6-inch
- 6 gauge welded wire fabric as specified.
iii. Reinforcing bars shall be grade 60 (60 KSI), open-hearth, basic oxygen or electric
furnace new billet steel manufactured in accordance with ASTM A615.
a. Steel reinforcing materials shall be stored off the ground in a manner as to be
protected from accumulations of grease, mud, other foreign matter and rust
producing materials.
b. When incorporated into construction, steel reinforcement shall be free from rust,
scale, oil, mud, and structural defects.
iv. Dowels for slip joints shall be smooth plain round bars free from burrs, rough surfaces,
and deformations. Caps, sleeves, or wrapping shall be as indicated on plan sheets.
v. Chairs shall be used to support the reinforcing steel in the correct position while
concrete is being placed. Chairs shall be made of plastic (preferred) or steel, and shall
be of adequate size to positively hold the reinforcing materials in position.
C. Fiber
a. Fiber reinforcement shall be either 100 percent virgin polypropylene, collated,
fibrillated fibers specifically manufactured for use as concrete reinforcement,
containing no reprocessed olefin materials, or steel fibers.
b. The manufacturer shall provide calculations for equivalent amounts of fiber to
replace steel reinforcement, with a minimum of 1.5 pounds per cubic yard. The
amount of fiber used may be less than the equivalent steel for residential streets if
approved by the City Engineer or designee. When submitting less fiber than the
equivalent steel, the design must be stamped by a licensed engineer.
Section 8 99
2020 Design Standards and Specifications
Streets and Drainage Specifications
c. Fiber calculations must be done in accordance with ACI standards.
d. The physical characteristics on the fiber shall be as follows:
Physical Characteristic
Value
Sp ecific Gravity
0.91
Tensile Strength
70,000 psi to 110,000 psi
Minimum Length
3/4 inch
8.07.13 Joints
A. Curb and gutter (Class A concrete) shall be constructed with an expansion joint at the tangent
point of each return at intersections and at intervals not more than 40 feet between the
intersections.
i. Construction joints formed by removable metal templates accurately shaped to the
cross-section of the curb and gutter shall be located at the midpoint of each section
between expansion joints, or as directed by the Engineer.
ii. Tooled contraction joints cut at least one quarter the concrete depth shall be placed at
10 foot intervals.
iii. Expansion joint material shall be placed full depth of the concrete curb.
B. Alley paving (Class B concrete) shall be constructed with an expansion joint at each cold joint
and at a maximum spacing of 130 feet.
i. Alley returns shall be poured monolithically with curb radii and fillets with joints as
indicated in Standard Detail 36-7.
ii. Tooled contraction joints, cut 1/2 inch wide 2 inch deep, shall be placed as shown on
Standard Detail 36-11.
iii. Alley paving contraction joints shall be sealed with an elastomeric sealer.
iv. Expansion joints shall include bituminous pre -molded expansion joint board.
C. Street Paving (Class C or E concrete) shall be constructed with contraction and expansion
joints as indicated on plan and detail sheets.
i. Unless otherwise specified, the joints shall be sawed 1/2 inch wide and to depth equal
to 1/4 of the pavement thickness plus one half inch.
ii. Joints shall be saw cut within 12 hours of placement of the concrete paving.
iii. Joints shall be sealed with an elastomeric sealer.
iv. Joints shall be cleaned thoroughly with high pressure air prior to installation of any
sealing materials.
D. Valley gutters and fillets shall be constructed with tooled construction joints.
i. Joints shall be sealed with an elastomeric sealer.
ii. Joints shall be cleaned thoroughly with high pressure air prior to installation of any
sealing materials.
E. Joint Sealing Materials
i. Zip Strip or Bituminous pre -molded expansion joint board material shall conform to
ASTM D1751 and shall be placed as indicated on plan sheets or in these specifications.
a. Expansion joint material shall be placed full depth of the concrete slab.
ii. Elastomeric sealant for contraction joints shall be, or shall be equivalent to,
W.R.Meadows "SOF-SEAL", W.R. Meadows #158 cold applied, or "GARDOX" as
required by plan sheets.
a. Hot poured sealant for joints between Portland cement concrete and Bituminous
concrete shall conform to ASTM D3405.
100 Section 8
2020 Design Standards and Specifications
Streets and Drainage Specifications
b. Hot poured joint sealant for all other joints in Portland cement concrete pavement
shall conform to ASTM D3406.
c. Cold poured joint sealant shall conform to ASTM C920.
iii. Elastomeric joint sealant shall be mixed and applied in accordance with the
manufacturer's recommendations.
a. Prior to application, joints shall be cleaned by sandblasting and otherwise prepared
so that the sealant adheres to the surfaces to form an effective seal against moisture
and solid particles.
b. The sealant shall be a soft, highly flexible, rubber like material after curing which
shall not track, flow, crack, or break when exposed to hot and cold temperature
extremes typical of local conditions.
iv. Backer rod used with elastomeric sealant shall be 25 percent greater in diameter than
the joint width. It shall be made of polyethylene foam or other material as
recommended by the sealant manufacturer.
a. Compression of the backer rod material shall be approximately 25 percent shrinkage
at 8 psi applied stress.
b. The material shall not melt, shrink, evaporate, or absorb water, and shall be
compatible with the application of the sealant to be used.
8.07.14 Curing Compounds
A. All fresh concrete surfaces shall be completely sprayed with a liquid membrane forming curing
compound at a rate of one gallon per every 180 square feet. Its application shall conform to
DMS - 4650 and TxDOT Item "Concrete Structures - Curing Materials".
i. Fresh concrete is defined as less than 10 minutes after finishing
B. No other methods of moisture retention on fresh concrete shall be used unless specifically
approved by the Engineer.
8.07.1S Forms
A. Forms for curb and gutter, paving, and flatwork may be of wood or metal, of a section
satisfactory to the Engineer, straight, free of warp, and of a depth equal to the depth of the
concrete section formed.
B. Forms shall be constructed accurately to the line and grade as established in the field, shall be
adequately braced so that they will not move during the placing of the concrete, and shall
remain in place at least 12 hours after placing of the concrete.
C. Forms shall be treated with a light oil or release agent before each use, and forms which are
to be re -used shall be cleaned immediately after each use and maintained in good condition.
D. Curb forms shall be such that the face of the curb can be formed by use of a face form held in
place by steel templates.
E. Forms used for curb radii shall meet all of the above specifications, except that face forms on
curb radii may be omitted if a true section and an accurate flow line can be obtained by other
methods approved by the Engineer.
F. In no case will concrete placement be started without the approval of the Engineer.
G. No forms shall be placed until the subgrade is within one inch of its finished grade.
H. Forms for paving slabs may be used as a guide for screeding.
I. Where longitudinal construction joints are required, the form shall be so constructed as to
provide an approved load transfer mechanism in the face.
Section 8 101
2020 Design Standards and Specifications
Streets and Drainage Specifications
8.07.16 Placing and Finishing Concrete
A. Placing of concrete shall not start before sunrise, and shall stop one hour before sunset.
i. Concrete shall be placed as close to its proper location as practical.
ii. Sufficient concrete shall be placed to allow for shrinkage and extra material for
finishing.
iii. The concrete shall be floated and troweled to the approximate section.
iv. When water is needed for finishing purposes it must be dispensed by a pressurized
canister with a misting nozzle.
B. Removal of face forms and finishing of curb and gutter shall be started only after a partial set
occurs.
i. Only construction approved forms, templates, and tools shall be used to form the
cross -sections indicated on plan or detail sheets.
C. Concrete shall not be placed when the ambient temperature and the surface temperature is
below 40 degrees F or if sustained winds are 25 mph or higher as determined by field
measurements by city inspector, or if field measurement is not available then the Texas Tech
University Mesonet sites in Lubbock. If the sustained winds exceed the 25 miles per hour all
placement operations will cease immediately.
i. The contractor shall have available sufficient covering material, approved by the
Engineer, to immediately protect concrete should the air temperature fall below 33
degrees F. This protection and forms shall remain in place as long as the temperature
continues below 32 degrees, to a maximum of 5 days.
ii. No salt or other chemical admixtures shall be added to the concrete to prevent
freezing.
D. All concrete placed for pavement shall be consolidated by use of mechanical vibrators
approved by the Engineer and designed to vibrate the concrete internally.
i. Vibrators shall be operated in a manner not to interfere with joints, and shall not come
in contact with forms.
ii. Vibrators shall not be used to move concrete within the forms.
E. The surface of concrete street paving shall incorporate a tined finish perpendicular to the
travel direction.
F. All other concrete surfaces shall be completed with a light broom finish.
G. When forms are used for concrete paving the forms must stay in place for a minimum of 12
hours.
H. No equipment shall be placed on concrete until it has reached 75 percent of the specified 28
day compressive strength.
I. Finished concrete surfaces shall not have irregularities in excess of 1/8 inch when tested with
a 10 foot straightedge using the TxDOT Item 585 Surface Test Type A.
J. Prior to acceptance, the Contractor shall apply sufficient water to all gutters and paving to
determine locations of ponding.
i. Ponded areas deeper than 1/8 inch shall be removed and replaced, or rectified as
directed by the Engineer.
K. Where the surface of Major or Minor Arterial paving is noticeably uneven, the City may require
measurement of the ride quality using the TxDOT Surface Test Type B.
i. If the International Roughness Index (IRI) is determined to exceed 65 inches per mile
corrective action shall be performed by diamond grinding, or other methods acceptable
to the Engineer.
102 Section 8
2020 Design Standards and Specifications
Streets and Drainage Specifications
ii. If the IRI exceeds 95 inches per mile the pavement shall be removed and replaced.
L. Any concrete construction damaged by equipment, tools, vandals, or other influences shall be
replaced at the contractor's own expense.
8.07.17 Tolerance in Elevation and Grade
A. Curb and gutter or other concrete surfaces shall be constructed to the elevations and grades
as indicated on plan sheets. Deviation from elevations indicated on plans resulting in a
longitudinal slope of less than 0.15%, will be considered to be deficient, and shall be removed
and replaced at the correct elevations as indicated on the plans, unless curb and gutter
surfaces drain with flood testing and approved in writing by the City Engineer or designated
staff.
8.07.18 Concrete Alley Paving Cuts
A. Refer to Standard Detail UEM-06.
B. Transverse Cuts
i. Minimum width between transverse joints shall be 4 feet.
ii. No more than 2 transverse joints shall be added between existing 13 foot tooled joints.
iii. Transverse joints shall be doweled 6 inches into existing pavement with #5 dowel bars
at 3 foot spacing. When installed at expansion joints, slip dowels shall be used.
C. Longitudinal Cuts
i. Longitudinal cuts along the edge of existing alley pavement shall be a minimum width
of 3 feet.
ii. Maximum width of longitudinal cuts shall be 4 feet.
iii. Longitudinal cuts wider than 4 feet, regardless of location, shall replace the full width
of existing alley paving.
iv. Longitudinal joints shall be doweled 6 inches into existing pavement with #5 dowel
bars at 3 foot spacing.
D. Potholing for Locating Existing Utilities
i. Pavement cuts for potholing purposes shall be circular cored holes or clean square
cutouts.
a. Cored holes in asphalt pavement shall be filled with cold -mix asphalt to match the
depth of existing pavement.
b. Cored holes in concrete pavement shall be filled with concrete to match the depth of
existing pavement.
c. Cutouts shall be repaired as specified in Plate No. UEM-02
8.08 Subgrade and Base
8.08.01 Subgrade
A. Subgrade material for concrete or asphalt construction shall consist of suitable native soil or
off -site soil, free from vegetation or other objectionable matter.
B. All unstable or objectionable material shall be removed from the subgrade and replaced with
approved material.
Section 8 103
2020 Design Standards and Specifications
Streets and Drainage Specifications
C. Subgrade material shall be suitable for forming a stable embankment and shall meet the
following requirements:
Material Property
Wet
ASTM 4318 — 05.10.1
Dry
ASTM 4318 — 05.10.2
Liquid Limit
Max 45
Max 45
Plasticity Index
Min 5; Max 20
Min 10; Max 25
Linear Shrinkage
Min 2• Max 10
Min 2; Max 10
D. Subgrade Construction
i. All testing of subgrade will be completed prior to any placement of curb and gutter.
Subgrade will be processed the entire width of the roadway including under the curb
and gutter section.
ii. Subgrade shall be prepared in conformance with the lines and grades shown on the
plans, or as directed by the Engineer, by scarifying and compacting to a minimum of
95 percent of Modified Proctor Density at optimum moisture content, plus or minus 2
percent.
iii. Subgrade shall be constructed in maximum of 6 inch lifts, and each 6 inch lift tested for
moisture and density.
iv. Subgrade thickness shall be a minimum of 12 inches for all streets,
regardless of street width or classification.
v. The compaction method for subgrade shall provide for each lift to be compacted to the
specified density using appropriate equipment.
a. After each section of subgrade is complete, moisture/density testing will be
performed by the City of Lubbock inspection staff.
b. At any time the City Engineer may require proof rolling on streets or alleys with a 25
ton pneumatic roller, to test the uniformity of compaction.
c. Rollers will be completely loaded with water or wet sand to ensure they meet the
manufacturer's weight requirements.
vi. All utility ditches shall be determined to be stable prior to construction of subgrade
over such utility ditch.
vii. Any fill placed within existing or proposed street right-of-way in execution of an
approved cut and fill plan shall be in compliance with these specifications for materials
and construction.
a. Cut and fill operations shall comply with Chapter 38 of the City of Lubbock Code of
Ordinances.
viii. Subgrade which has become wet, or otherwise altered, after completion may be
subject to retesting and reprocessing as determined by the Engineer.
ix. Special care shall be exercised in grading street intersections where dips or valley
gutters are located so that the cross profiles present a smooth riding surface, and so
that the compacted subgrade thickness will not be less than specified above.
a. Crown section shall begin transition at a distance equal to one-half of the lip -to -lip
roadway width from concrete intersection or valley gutter, as indicated on Standard
Detail 36-11.
E. Rejected Subgrade Material
i. Rejected subgrade material, either from the construction area or delivered to the job
site, shall be dumped on the job site outside the area of construction, and remain there
until all construction is completed.
104 Section 8
2020 Design Standards and Specifications
Streets and Drainage Specifications
a. If it is determined that unapproved material has been incorporated into the
construction, all in place material shall be considered unapproved and shall be
removed.
b. No payment will be made for rejected material or construction.
8.08.02 Flexible Base (Caliche)
A. Material for flexible base shall consist of crushed caliche, limestone, and calcareous clay
particles produced from oversize quarried aggregate, sized by crushing and produced from a
naturally occurring single source.
i. All base material sources are subject to approval by the Engineer.
ii. If material characteristics within an approved source change, the material shall be
subject to retesting and re -approval prior to continued use.
iii. The Contractor shall not change material sources without approval by the Engineer.
B. Crushed concrete may be blended with quarried material only to the extent necessary to
produce material in compliance with these specifications, to a maximum of 20 percent
crushed concrete by weight.
i. Crushed concrete shall be produced from parent material consisting of structural
strength concrete, such as City of Lubbock Class A, B, and C.
ii. Lower strength materials, such as flowable fill, are not acceptable.
iii. Crushed concrete shall be free of reinforcing steel and any objectionable material, and
have a maximum of 1.5 percent deleterious material when tested in accordance with
Tex-413-A.
iv. When crushed concrete is used, the final product shall be entirely in compliance with
the specifications for single source material.
C. Recycled Asphalt Pavement (RAP) will not be approved for use in flexible base.
D. Prior to construction the contractor shall build stockpiles of sufficient quantity of base material
as required to complete the entire project or subdivision.
i. Each stockpile shall be dedicated, and identified as to the project or subdivision it is
for.
ii. Stockpiles may be on site or at the plant.
iii. After a stockpile is completed the contractor shall not add material to that stockpile.
iv. The contractor's methods, plant, and equipment are subject to approval by the
Engineer, and shall be appropriate and in suitable condition to produce stockpiles in
compliance with these specifications.
E. Material Tests
Flexible base material shall be tested yearly to confirm that the material conforms to
the following requirements:
a. Sieve Analysis
Standard Crushed Rock Aggregate
Cumulative Percent Passing(by
weight)
1-3/4" Sieve
100
7/8" Sieve
65-90
3/8" Sieve
50-70
No. 4 Sieve
45-55
No. 40 Sieve
15-30
Section 8 105
2020 Design Standards and Specifications
Streets and Drainage Specifications
b. Atterberg Limits
(1) Material passing the No. 40 Sieve shall be known as "Soil Binder" and shall meet
the following requirements:
Material Property
Value
Liquid Limit
Max 35
Plasticity Index
Min 3; Max 15
c. Wet Ball Mill
(1) When tested in accordance with Tex-116-E (Wet Ball Mill) the base material shall
have a value not to exceed 45.
(2) The percent of material passing the #40 sieve shall not increase by more than
20 during the test.
F. Flexible Base Construction
i. Areas behind curbs shall be backfilled and leveled with approved topsoil prior to placing
base material.
ii. Approved flexible base material shall be hauled in vehicles of uniform capacity and
dumped evenly along the project length for processing and compaction.
iii. Flexible base thickness shall be a minimum of 6 inches for Ria, R1 and R2
streets. Flexible base thickness shall be a minimum of 8" for collector
streets. Flexible base thickness shall be 10" for industrial Streets. Flexible
base thickness shall be 12" for arterial streets. Alternative designs may be
approved by the City Engineer.
iv. Processing shall be accomplished in lifts of 6 inches compacted thickness.
v. Each course shall be wetted and rolled with a pneumatic roller as required to produce a
uniform compaction to a minimum of 95 percent of Modified Proctor Density with a
moisture content of 2 percent above to 2 percent below optimum
a. Densities will be taken by City of Lubbock inspection staff
b. At any time the Engineer may require proof rolling with a 25 ton pneumatic roller to
ensure uniform compaction of base.
c. Processing for compaction of caliche base with a sheep's foot type roller will not be
permitted.
vi. The base shall be allowed to cure a minimum of 3 days, or until determined by the
Engineer to be adequately cured, before placing prime or surface course.
a. During the cure time the base shall be maintained by blading or other methods until
the wearing surface is placed.
b. Windrow caliche shall not be removed until the base has passed finish inspection.
c. Base which becomes wet, or otherwise altered, may be subject to retesting and
reprocessing as determined by the Engineer.
vii. The compacted flexible base shall be finished and shaped immediately preceding the
application of the surface treatment
a. All loose or unconsolidated material shall be removed and the surface moistened and
rolled with a steel wheel roller.
b. All irregularities, depressions, or weak spots which develop shall be corrected by
scarifying, adding or removing material as required, reshaping, and recompacting, or
other methods approved by the Engineer.
viii. Special care shall be exercised in grading street intersections where dips or valley
gutters are located so that the cross profiles present a smooth riding surface and so
that the compacted base thickness will not be less than 6 inches, or thickness
otherwise specified by the engineer.
106 Section 8
2020 Design Standards and Specifications
Streets and Drainage Specifications
a. Crown section shall begin transition at a distance equal to one-half of the lip -to -lip
roadway width from concrete intersection or valley gutter, as indicated on Standard
Detail 36-11.
ix. Any deviation in the surface of the finished base in excess of 3/8 inch from the
established grade or true cross-section, using a 10 foot long straight edge, shall be
corrected as provided above.
x. The compaction method for flexible base shall provide for each lift to be compacted to
the specified density using appropriate equipment.
A. After each section of flexbase is complete, moisture/density testing will be performed
by the City of Lubbock inspection staff.
a. All irregularities, depressions, weak or soft spots which develop shall be corrected
immediately by the contractor.
G. Rejected Flexible Base Material
i. Rejected material, either from the construction area or delivered to the job site, shall
be dumped on the job site outside the area of construction, and remain there until all
construction is completed.
ii. If it is determined that unapproved material has been incorporated into the
construction, all in place material shall be considered unapproved and shall be
removed.
iii. No payment will be made for rejected material or construction.
8.08.03 Asphalt Stabilized Base (ASB)
A. Asphalt stabilized base shall consist of a uniform mixture of mineral aggregate and asphalt
cement mixed hot in a mixing plant in accordance with these specifications.
i. Caliche is not an acceptable aggregate for ASB.
B. The contractor's plant and equipment are subject to approval by the Engineer, and shall be
appropriate and in suitable condition to produce the base material consistently in compliance
with these specifications.
C. In place compaction control is required for all ASB.
i. Locations of Cores, when required, will be determined by City of Lubbock personnel
and marked
ii. The ASB will be cored by the City inspection staff to determine composition,
compaction, thickness, and density.
iii. The contractor shall replace the pavement removed from core holes at no cost to the
City.
iv. ASB found to be deficient in composition, compaction, thickness, or density shall be
corrected at the contractor's expense as directed by the Engineer.
D. ASB Mix Design
i. The contractor shall submit an ASB mix design less than one year old, prepared by a
qualified lab, in compliance with these specifications using approved materials
indicating gradation and optimum asphalt content.
Section 8 107
2020 Design Standards and Specifications
Streets and Drainage Specifications
ii. The aggregate mixture shall conform to the following master gradation:
Standard Crushed Rock Aggregate
Cumulative Percent Passing
(by weight)
Passing
1" Sieve
98-100
Passing
3/4" Sieve
84-98
Passing
3/8" Sieve
60-80
Passing
No. 4 Sieve
40-60
Passing
No. 8 Sieve
29-34
Passing
No. 30 Sieve
13-28
Passing
No. 50 Sieve
6-20
Passing
No. 200 Sieve
2-7
a. Design produced Minimum VMA 13.0 percent
b. Plant produced Minimum VMA 12.0 percent
iii. Material passing the No. 40 sieve shall be known as "soil binder" and shall meet the
following requirements:
Material Property
Value
Liquid Limit
Max 45
Plasticity Index
Max 15
Linear Shrinkage
Max 5
iv. The mineral aggregate shall not contain more than 0.5 percent moisture prior to
entering the pug mill for mixing with asphalt.
v. The mix design shall have optimum asphalt content determined in accordance with
Tex-204-F, with a target lab molded density of 96.5 percent.
vi. Asphalt content of the Job Mix Formula shall not vary during construction from the
design by more than 0.3 percent.
vii. Asphalt for the mixture shall be a Performance Grade (PG) 64-28, or better.
viii. New mix designs must be submitted annually, or when material properties change.
ix. A maximum of 20 percent approved rap material can be added to ASB.
E. ASB Placement
i. The ASB material shall be placed on the approved prepared surface using an approved
lay down machine.
ii. ASB thickness shall be a minimum of 9 inches, or as required by the
Engineer.
iii. Asphalt Stabilized Base shall be placed and compacted in 4 inch lifts to form the
specified thickness of compacted base, unless otherwise directed by the Engineer.
a. Prior to placing ASB, the subgrade shall be prepared as previously specified.
iv. The cross-section shall be constructed to form the specified crown on the ASB surface
at the centerline of the street, or as indicated on the plans.
v. ASB shall not be placed when the air temperature, as measured by city inspector in
field or if field measurement is not avalible as reported by the Texas Tech University
Mesonet sites in Lubbock, less than 50 degrees F ambient or 60 degrees surface
temperature.
vi. ASB maximum temperature is 350 degrees. ASB minimum temperature in truck is 325
degrees. ASB minimum lay down temperature is 265 degrees.
vii. Any ASB material that is outside the specified temperature ranges, shall be rejected by
the Engineer.
108 Section 8
2020 Design Standards and Specifications
Streets and Drainage Specifications
viii. The material shall be placed in such a manner that when properly compacted the
finished course is smooth, of uniform density, and in conformance with the cross -
sections and grades shown on the associated plans.
ix. Special care shall be exercised in grading street intersections where dips or valley
gutters are located so that the cross profiles present a smooth riding surface and so
that the compacted base thickness is not less than 9 inches.
a. Crown section shall begin transition at a distance equal to one-half of the lip -to -lip
roadway width from concrete intersection or valley gutter, as indicated on Standard
Detail 36-11.
ASB Compaction
i. ASB shall be compacted thoroughly and uniformly with approved rollers to a density
between 93 percent and 98 percent of the maximum theoretical gravity, with a lab
molded target of 96.5 percent using the Texas Gyratory compaction method.
a. All results will be calculated using the maximum theoretical Rice gravity.
ii. Compaction less than 93 percent or greater than 98 percent will be considered
deficient. All deficient pavement shall be removed and replaced as determined by the
Engineer at the contractor's expense.
iii. ASB shall meet all compaction requirements at the time of inspection. Re -rolling is not
an approved method for achieving compaction requirements.
iv. Contractor shall set rolling patterns using a thin lift nuclear gauge in order to ensure
maximum compaction.
v. All roller marks shall be removed and compaction completed prior to the ASB mixture
cooling below 185 degrees F.
G. Rejected ASB Material
i. Rejected ASB material, either from the construction area or delivered to the job site,
shall be dumped on the job site outside the area of construction, and remain there
until all construction is completed.
ii. If it is determined that unapproved material has been incorporated into the
construction, all in place material shall be considered unapproved and shall be
removed.
iii. No payment will be made for rejected material or construction.
8.09 Hot Mix Asphalt Concrete Surface (HMAC)
8.09.01 Hot mix asphalt concrete surface shall consist of a uniform mixture of mineral aggregate
(coarse aggregate, fine aggregate, mineral filler) and asphalt cement mixed hot in a mixing
plant in accordance with these specifications.
8.09.02 The contractor's methods, plant, and equipment are subject to approval by the Engineer,
and shall be appropriate and in suitable condition to produce the HMAC surface material
consistently in compliance with these specifications.
8.09.03 Strip paving is a substandard, temporary improvement and does not satisfy the paving
requirements of the platting process. Strip paving may be used only in special
circumstances and must be approved by the City Council. If strip paving is used, the
developer is still responsible for providing for the required permanent curb and gutter and
paving.
A. Unless otherwise specified, the materials and construction shall conform to TxDOT Item 340 -
Dense -Graded -Hot -Mix Asphalt (Method).
Section 8 109
2020 Design Standards and Specifications
Streets and Drainage Specifications
B. Approval of the source and character of the materials shall be obtained from the Engineer
prior to use.
i. The combined mineral aggregate, after final processing by the mixing plant and prior
to addition of asphalt and mineral filler, shall have a sand equivalent value of not less
than 45 when tested in accordance with Test Method Tex-203-F.
ii. The percent of flat and elongated slivers of stone for any aggregate shall not exceed
25 percent when tested in accordance with Test Method Tex-224-F.
iii. Asphaltic mixtures with aggregates which exhibit stripping characteristics shall be
conditioned with either minimum 1 percent lime in accordance with DMS-6350, or
liquid anti -stripping agent approved by the Engineer.
a. Anti -stripping agents shall meet requirements of TXDOT Item 301 - Asphalt Anti -
stripping Agents, and shall be added at the manufacturer's recommended dosage
and temperature range.
8.09.04 A minimum of two sets of cores per day will be taken to determine thickness and density
of HMAC surfaces.
A. Core locations will be marked and cored at random locations by City of Lubbock inspection
staff.
B. Cores will be taken in pairs and averaged to determine the percent air voids based on the
theoretical maximum gravity.
C. HMAC surface found to be deficient shall be corrected at the contractor's own expense as
directed by the Engineer.
D. The contractor shall replace the pavement removed from core holes immediately after testing
at no cost to the City.
8.09.05 Thickness of HMAC Surfaces
A. HMAC thickness shall be a minimum of 2 inches for Residential and Collector, 2.5
inches for industrial, 3" for minor arterial and 5" for principal arterial, or as
indicated on the plans.
No tolerance on minimum thickness will be allowed.
B. If a core shows less than the specified minimum thickness, prior to being trimmed, the HMAC
surface shall be considered deficient with respect to thickness, and the deficiency shall be
rectified by removal and replacement at the specified thickness.
i. Additional cores will be taken at 25 foot spacing to define the limits of deficiency.
C. No additional compensation will be made to the contractor for thickness of HMAC surface
greater than specified.
8.09.06 HMAC Mix Design
A. The contractor shall provide a current HMAC mix design using the approved materials,
indicating gradation and optimum asphalt content as determined by Test Method Tex-204-F.
i. The mix design shall have a lab molded density of 96.5 percent using the Texas
Gyratory compaction method.
ii. New designs shall be submitted annually, or when material properties change.
110 Section 8
2020 Design Standards and Specifications
Streets and Drainage Specifications
iii. The aggregate mixture shall conform to the following master gradation:
a. Type "C" Coarse Graded Surface Course — Curb and gutter street widths
greater than 36 feet:
Standard Crushed Rock Aggregate
Cumulative Percent Passing
(by weight)
Passing
3/4" Sieve
95-100
Passing
3/8" Sieve
70-85
Passing
No. 4 Sieve
43-63
Passing
No. 8 Sieve
32-44
Passing
No. 30 Sieve
14-28
Passing
No. 50 Sieve
7-21
Passing
No. 200 Sieve
2-7
(1) Design Produced Minimum VMA 14 percent
(2) Plant Produced Minimum VMA 13 percent
b. Type "D" Fine Graded Surface Course — Curb and gutter street widths of 36
feet or less and strip paved streets of any width:
Standard Crushed Rock Aggregate
Cumulative Percent Passing
(by weight)
Passing 1/2" Sieve
98-100
Passing 3/8" Sieve
85-100
Passing No. 4 Sieve
50-70
Passing No. 8 Sieve
35-46
Passing No. 30 Sieve
15-29
Passing No. 50 Sieve
7-20
Passing No. 200 Sieve
2-7
(1) Design Produced Minimum VMA 15 percent
(2) Plant Produced Minimum VMA 14 percent
c. HMAC Type is in reference to the ultimate full width street, not half width.
iv. Material passing the No. 40 sieve shall be known as "soil binder" and shall maximum
linear shrinkage value of 5.
v. Mineral aggregate shall not contain more than 0.5 percent moisture prior to entering
the pugmill for mixing with asphalt.
vi. HMAC mixture shall consist of a uniform mixture of mineral aggregate and asphalt
material.
vii. The contractor's materials and mix design shall meet all the performance criteria
addressed in these specifications.
B. Coarse Aggregate
i. Coarse aggregate must be approved for use by the Engineer and must be on the
TXDOT source rating catalog or approved in writing by the City Engineer.
ii. Coarse aggregate shall be the material retained on a No. 4 sieve, and shall consist of
clean, washed, tough, durable fragments of crushed stone of uniform quality.
a. Mixing or combining of crushed gravel and crushed stone will not be permitted.
iii. Coarse aggregate shall be crushed to the extent that produces a minimum of 80
percent crushed faces for both Type "C" HMAC, and Type "D" HMAC, when tested in
accordance with Test Method Tex-460-A Part I "Determination of Crushed Face Count".
iv. Decantation shall be a maximum of 1.5 percent when tested in accordance with Tex-
217-F.
Section 8 111
2020 Design Standards and Specifications
Streets and Drainage Specifications
v. Deleterious materials shall be a maximum of 2.0 percent when tested in accordance
with Tex-217-F.
vi. Coarse aggregate shall have a maximum loss of 25 percent when subjected to 5 cycles
of the Magnesium Sulfate Soundness Test ASTM C-88.
vii. The amount of organic matter, clays, loams, or particles coated therewith, or other
undesirable materials shall not exceed 1.5 percent.
C. Fine Aggregate
i. Fine aggregate shall be that part of the aggregate passing the No. 10 sieve and shall
be of uniform quality throughout.
ii. A maximum of 15 percent of the total virgin aggregate may be field sand or other
crushed fine aggregate.
iii. Sand which exhibits no variation in particle size shall be limited to a maximum of 7
percent of the total virgin aggregate.
iv. Screenings shall be of the same or similar material as specified for coarse aggregate.
v. Linear shrinkage shall be a maximum of 3 percent.
vi. Mineral filler shall consist of thoroughly dry stone dust, slate dust, Portland cement or
other material dust approved by the Engineer.
a. The mineral filler shall be free of foreign and other injurious matter and shall meet
the following gradation:
Standard Crushed Rock Aggregate
Cumulative Percent Passing
(by weight)
Passing No. 8 Sieve
100
Passing No. 200 Sieve
55-100
D. Asphalt
i. Asphalt shall be a Performance Graded (PG) 64-28, or better, unless otherwise shown
on plans.
ii. The contractor shall notify the Engineer of the source of asphaltic material for approval
prior to production of the asphaltic mixture.
a. The contractor shall notify the Engineer prior to any changes of the asphalt supplier
or source.
b. The Engineer may require a new mix design if changes of supplier or source occur.
iii. Asphalt content shall not vary more than plus or minus 0.3 percent of design during
production
a. Asphalt content within that range is considered to be acceptable if no other defects
are noted, with the requirement that adjustments shall be made during production to
achieve the optimum asphalt content.
b. If the asphalt content falls outside these parameters immediate action is required.
c. If at any time the asphalt content varies to plus or minus 0.5 percent of optimum,
production shall immediately cease and all affected material shall be removed.
d. Production shall not be resumed until the contractor has provided sufficient evidence
of the problem being corrected.
e. A maximum of 10 percent approved RAP will be allowed within the surface course, as
included in the submitted design.
112 Section 8
2020 Design Standards and Specifications
Streets and Drainage Specifications
8.09.07 HMAC Placement
A. Prior to production beginning, contractor must submit in writing a job mix formula (JMF) for
the mix design proposed to be run on that project. The JMF will be held to tolerances as
outlined.
B. Prime and Tack Coats
i. Prior to placing HMAC on flexible base, the surface shall be primed and cured 48 hours
or until determined by the Engineer to be adequately cured, using an application of
0.20 gallons of asphalt per square yard of surface.
a. The contractor shall strap the asphalt distributor in the presence of the inspector to
verify the application rate.
ii. Before any asphaltic mixture is laid, the surfaces against which the pavement is to be
placed shall be cleaned, primed, and tacked to the satisfaction of the Engineer.
a. The surfaces shall be given a uniform application of tack coat using asphaltic
materials of this specification.
(1) Prime coat will not be used as a tack coat.
b. The tack coat shall be evenly and thoroughly applied with an approved sprayer as
directed by the Engineer.
(1) Mopping or brooming of tack coat is not allowed, unless prior approval by City
Inspection Staff.
(2) Minimum thickness shall be no less than 2 mil. thickness.
c. All contact surfaces of curb and gutter, structures, and joints shall be sprayed with a
thin uniform tack coat.
iii. The prime coat shall be MC 30, and shall be applied in accordance with TxDOT Item
310 Prime Coat.
iv. The tack coat shall be an asphalt material such as PG, AC-10.
a. Asphalt materials cut with kerosene, diesel, or other petroleum solvent
may not be used.
C. HMAC Installation Requirements
i. Pavement shall only be constructed on previously approved base.
ii. HMAC surface shall not be placed until at least 48 hours after the application of the
prime coat.
iii. Placing of HMAC shall not start until 30 minutes after sunrise, and must stop and all
equipment off the right of way 30 minutes prior to sunset.
iv. Air temperature requirements for placing HMAC shall be as follows:
a. HMAC shall not be placed when the air temperature is below 45 degrees F and
falling.
b. HMAC may be placed when the air temperature is above 45 degrees F and rising.
c. The forecasted high must be 50 degrees or above for the day by the National
Weather Service.
v. Surface of roadway must be 60 degrees or higher prior to placing HMAC pavement, as
determined in the field.
vi. Air temperature and wind speed shall be determined by City of Lubbock inspector field
measurement. If field measurement by inspector is not available the Texas Tech
University Mesonet sites in Lubbock shall be used.
vii. HMAC shall be placed at a temperature between 265 and 325 degrees F.
a. Any HMAC material that is above or below the specified temperature range,
measured at any point, shall be rejected by the Engineer.
Section 8 113
2020 Design Standards and Specifications
Streets and Drainage Specifications
viii. When high winds occur, contractor must provide a water truck in order to minimize
blowing dust.
a. If the sustained winds reach 25 mph, all concrete and HMAC operations will cease
production immediately.
ix. The asphaltic mixture shall be dumped and spread on the approved prepared surface
using an approved spreading and finishing machine.
a. The material shall be placed in such a manner that when properly compacted the
finished course is smooth, of uniform density, and in conformance with the cross -
sections and grades shown on the associated plans.
b. Wings of the laydown machine may not be dumped unless they are dumped after
every load.
c. The loose aggregate along the edge may not be raked back onto the mat.
x. A level up course 1/2 inch to 2 inch in thickness shall require the use of Type D HMAC.
xi. A level up course greater than 2 inch shall require the use of ASB.
xii. When the asphaltic mixture is placed in a small area where use of a finishing machine
is not practical, the contractor may use other methods approved by the Engineer
provided a satisfactory surface can be obtained.
xiii. Adjacent to curbs gutters or other flush structures, the surface shall be finished
uniformly high so that when compacted it will be 1/4 inch above the curb or other
concrete surface.
xiv. All concrete structures shall be complete before asphalt is placed.
xv. All joints shall present the same texture, density, and smoothness as other sections of
the course.
a. The joints between old and new pavements or between successive day's work shall
be made to insure a continuous bond between the old and new sections of the
course.
xvi. The transverse edges of old pavement and, if required by the Engineer, the successive
day's pavement shall be cut with an approved concrete saw to expose an even vertical
surface for the full thickness of the course.
xvii.All contact surfaces of previously constructed pavement shall be painted with a thin
uniform coat of approved tack coat before the fresh mixture is placed.
xviii. Special care shall be exercised in grading street intersections where dips or valley
gutters are located so that the cross profiles present a smooth riding surface and so
that the compacted asphalt thickness is not less than 2 inches.
a. Crown section shall begin transition at a distance equal to one-half of the lip -to -lip
roadway width from concrete intersection or valley gutter, as indicated on Standard
Detail 36-11.
xix. If the laydown machine is idling, the temperature of the asphalt shall remain between
230 and 345 degrees. If the temperature is outside this range the contractor must
create a clean joint in the asphalt.
xx. Any Utilities installed after placement of pavement but before certificate of completion
will require pavement to be removed to the next joint. All edges shall be sawcut.
D. HMAC Compaction
i. HMAC surfaces shall be constructed to the following compacted thickness stated in
8.09.05(A) with a maximum of 0.5 inches more thickness for Type D and a maximum
of 1.0 inches more thickness for Type C. No allowance will be made for less than
minimum thicknesses.
ii. Using appropriate rollers approved by the Engineer, the HMAC surface shall be
compacted thoroughly and uniformly to a density between 94 percent and 98 percent
114 Section 8
2020 Design Standards and Specifications
Streets and Drainage Specifications
of the theoretical maximum gravity, with a lab molded target of 96.5 percent using the
Texas Gyratory compaction method.
a. All results will be calculated using the maximum theoretical Rice gravity.
iii. Compaction less than 94 percent or greater than 98 percent will be considered
deficient.
iv. All deficient HMAC shall be removed and replaced as determined by the Engineer at the
contractor's expense.
v. HMAC shall meet all compaction requirements at the time of inspection. Re -rolling is
not an approved method for achieving compaction requirements.
vi. The contractor shall set rolling patterns using a thin lift nuclear gauge in order to
ensure correct compaction.
vii. Gasoline, oil, grease, solvents, or other foreign matter shall not be permitted to fall on
the pavement when rollers are in operation or standing.
viii. Places inaccessible to the rollers may be compacted using lightly oiled tamps.
ix. Trenches and other limited areas where required compaction cannot be obtained using
a three wheel roller shall be compacted with a trench type roller.
x. The surface of the pavement after compaction shall be smooth and true to the
established line, grade, and cross-section.
xi. Finished surfaces, including asphalt and concrete, shall not have irregularities in excess
of 1/8 inch when tested with a 10 foot straightedge.
xii. Prior to acceptance, the contractor shall apply sufficient water to all paving surfaces,
asphalt and concrete, to determine location of ponding.
a. Ponded areas deeper than 1/8 inch shall be removed and replaced, or rectified as
directed by the Engineer.
xiii. Where the surface of Major or Minor Arterial paving is noticeably uneven the City may
require measurement of the ride quality using the TxDOT Surface Test Type B.
a. If the International Roughness Index (IRI) is determined to exceed 65 inches per
mile corrective action shall be performed by diamond grinding, or other methods
approved by the Engineer.
b. If the IRI exceeds 95 inches per mile the pavement shall be removed and replaced.
E. Emulsified Asphalt Sealer
i. All HMAC surface courses shall be sprayed with an emulsified asphalt sealer consisting
of a 15/85 mixture of CSS-1H, or 20/80 SS-1, liquid anionic asphalt and distilled water.
ii. The emulsified asphalt sealer shall be applied after the HMAC surface has cooled to
below 70 degrees F, and shall be applied at a rate of 0.10 to 0.12 gallons per square
yard of surface.
F. Release Agents
i. Diesel shall not be used as a release agent.
ii. Only approved agents (such as Black Magic or equivalent) will be used.
iii. Diesel will not be permitted to be used on any tools or machinery that comes
into contact with the HMAC.
8.09.08 Sampling of HMAC
A. When sampling HMAC for testing purposes, the City of Lubbock representative will determine
when the sample is taken and will split the sample with the contractor (at the contractor's
request).
B. A "referee" sample will be taken at the same time and held at the city laboratory until all test
results are completed.
Section 8 115
2020 Design Standards and Specifications
Streets and Drainage Specifications
C. If the contractor's results differ from the City's results the referee will be utilized and it will be
run at an independent laboratory at the expense of the contractor, at which time all tests are
final.
D. If the contractor does not run quality control samples then no referee will be utilized and the
City of Lubbock test results will be final.
8.09.09 Rejected HMAC Material
A. Rejected HMAC material, either from the construction area or delivered to the job site shall be
dumped on the job site outside the area of construction, and remain there until all
construction is completed.
If it is determined that unapproved material has been incorporated into the construction, all in
place material shall be considered unapproved and shall be removed.
C. No payment will be made for rejected material or construction.
8.09.10 Islands In Streets
A. Islands in streets require City Council approval.
i. As a condition of approval, persons requesting approval of islands within a street shall
be required to submit to the City Engineer a street pavement structural design that
exceeds the minimum standard specifications for street paving.
ii. In general that shall mean an approved reinforced concrete pavement design.
iii. The paving design shall apply to all street paving adjacent to, and 50 feet beyond any
proposed island.
The submitted request shall include the proposed pavement design, surface treatment of the
island, types of plant materials, and methods and details of irrigation systems.
8.10 Micro-Surfad
8.10.01 Micro -surfacing materials and construction shall conform to TxDOT Specification Item #
350. There shall be no deviation from these specifications unless so directed by the Street
Superintendent.
8.10.02 It shall be the responsibility of the Contractor to produce, transport, and place the micro -
surfacing pavement and to ensure that the finished surface has a uniform texture and the
micro -surfacing mat is fully adhered to the existing roadway surface.
8.10.03 Materials of Construction
A. All materials that are to be stockpiled shall be protected from dust and other contamination.
Mineral filler shall be stored in a manner that will keep it dry and free from contamination.
C. All asphalt materials shall be kept free from contamination.
D. Cationic Polymer -Modified Asphalt Emulsion
i. Provide CSS-1P in accordance with TOOT Item # 300.2.D "Emulsified Asphalt".
Aggregate
i. Aggregate shall consist of clean, washed, tough, durable fragments of crushed stone of
uniform quality and from a single source.
ii. Aggregate shall meet TxDOT Class "A" surfacing classification.
iii. Contractor shall include the amount of mineral filler added to the mix determining the
total minus No. 200 sieve aggregate fraction.
116 Section 8
2020 Design Standards and Specifications
Streets and Drainage Specifications
iv. Aggregate shall meet the following gradation requirements:
Standard Crushed Rock Aggregate
Cumulative Percent Retained
(by weight)
Retained on 1/2" Sieve
0
Retained on 3/8" Sieve
0-1
Retained on No. 4 Sieve
6-14
Retained on No. 8 Sieve
35-55
Retained on No. 16 Sieve
54-75
Retained on No. 30 Sieve
65-85
Retained on No. 50 Sieve
75-90
Retained on No. 100 Sieve
82-93
Retained on No. 200 Sieve
85-95
v. Maximum Magnesium Sulfate Soundness shall be 30 percent (5 cycles) based upon
TxDOT Test Method Tex-411-A
vi. Minimum Sand Equivalent shall be 70 percent based upon TxDOT Test Method Tex-
203-F.
F. Mineral Filler shall be free of lumps and foreign matter consisting of Type S Lime.
G. Contractor shall adjust the mix design to attenuate the usage of Lime.
H. Water shall be potable and free of harmful soluble salts.
I. Use only approved additives as recommended by the emulsion manufacturer in the emulsion
mix or in any of the component materials when necessary to adjust mix time in field.
8.10.04 Methods of Construction
A. Equipment
i. Equipment shall be kept in good working conditions with no leaks.
ii. Any equipment that shows signs of leaks shall be fixed immediately and shall not be
used until such leaks are fixed.
iii. The mixing machine shall be a self-propelled micro -surfacing mixing machine with self -
loading devices to promote continuous laying operations.
iv. Mixing machine shall have sufficient storage capacity for mixture materials with
individual volume or weight controls that will proportion each material to be added to
the mixture.
v. Mixing machine shall have a water pressure system and nozzle -type spray bar
immediately ahead of spreader box capable of spraying the roadway for the width of
the spreader box.
vi. Scales used for weighing materials and emulsion must be calibrated and meet the
requirements of TxDOT Item # 520.
vii. Electronic Monitoring System
a. The micro -surfacing machine shall be equipped with an electronic monitoring system
that consists of pulse sensors measuring material delivery rates, a radar gun to
monitor distance traveled, and programmable micro -controller, and operators
display/input board and an on -board printer.
b. System shall be capable of monitoring and displaying application rates and use of
aggregate, emulsion, fines, water and additives.
c. System shall be capable of calculating and displaying ratios of emulsion to aggregate,
fines to aggregate, additive to aggregate, water to aggregate, and application rate in
pounds per square yard.
Section 8 117
2020 Design Standards and Specifications
Streets and Drainage Specifications
d. System shall be capable of printing a hard copy report on demand which displays the
date, weight of aggregate, emulsion, fines, number of gallons of additive and gallons
of water, and all of the above mentioned ratios since last reset.
e. A computer -generated report providing statistics for the full work day shall be
provided with each hand calculated daily run sheet.
f. This system shall be accurate to within 1/2 of a percent of actual weights and
measures for all parameters noted above. The system is not expected to calculate
quantities and ratios for materials used in handwork and cul-de-sac areas.
B. Air temperature requirements for placing micro -surfacing pavement shall be as follows:
i. November 1 to April 1
a. Micro -surfacing shall not be placed when the air temperature is below 60 degrees F
and falling.
b. Micro -surfacing may be placed when the air temperature is above 50 degrees F and
rising.
ii. April 1 to November 1
a. Micro -surfacing shall not be placed when the air temperature is below 50 degrees F
and falling.
b. Micro -surfacing may be placed when the air temperature is above 50 degrees and
rising.
iii. Surface of roadway must be 60 degrees or higher prior to placing micro -surfacing
pavement, as determined in the field.
iv. Air temperature shall be determined by the Texas Tech University Mesonet sites in
Lubbock, Texas.
C. Placement of Micro -Surfacing
i. The existing roadway surface shall be thoroughly clean and free of all vegetation, loose
aggregate, and soil.
ii. Existing raised pavement markers and thermoplastic markings shall be thoroughly
removed.
iii. When existing roadway surface conditions require, provide a water spray immediately
ahead of the spreader box.
a. Apply water at a rate that dampens the entire surface without any free -flowing water
ahead of the spreader box.
iv. Micro -surfacing shall be spread uniformly at a rate of not less than 25 pounds per
square yard and no more than 30 pounds per square yard, or as directed.
v. The spreader box shall be kept clean to minimize lumps.
vi. Set and maintain the skis on the spreader box as to prevent chatter in the finished
mat.
vii. Adjust the rear seal to provide the desired spread
viii. Adjust the secondary strike -off to provide the desired surface texture.
ix. The finished mat shall be protected from traffic until it has cured and traffic will not
harm it.
x. Adjustments shall be made to the mixture to allow rolling traffic back on the surface in
one hour.
xi. Locations with turning or stop -and -go traffic shall be protected for longer periods of
time.
xii. Special care shall be taken by the Contractor to ensure that all manholes, water
valves, and other surface structures are sufficiently protected from the micro -surfacing
process by the use of a plastic membrane covering or other approved method.
118 Section 8
2020 Design Standards and Specifications
Streets and Drainage Specifications
xiii. The Contractor shall be responsible for uncovering each manhole, water valve, and
other structure after the micro -surfacing pavement has been applied to the roadway
surface.
D. Rutting on Major Thoroughfares and Collector Streets
i. Shallow ruts that are less than 1/2 inch in depth may be covered by a full width scratch
box utilizing a steel primary strike -off plate.
ii. Ruts that are between 1/2 inch and 1 inch in depth shall be filled independently with a
fixed width spreader box no more than 6 feet wide. The rut filling box shall have a
steel primary strike -off plate that is the same width as the spreader box.
iii. Ruts that are in excess of 1 inch in depth shall be filled with a 5-foot wide rut filling
spreader box specifically designed to fill wheel path ruts. This operation will require
multiple placement passes to restore the pavement to its original cross section. Special
care shall be used by the Contractor to ensure that the material has proper time to dry
between applications to promote bonding between the original pavement and the
micro -surfacing pavement.
iv. Maximum micro -surfacing thickness applied as rut filling shall not exceed 1 inch for
each pass required to restore pavement to the original profile.
E. Asphalt Milling at Concrete Intersections
i. All thoroughfares and collector streets which have concrete intersections or where
concrete valley gutters intersect the street shall have the asphalt surface milled to such
a depth as to allow a smooth transition between concrete and the completed micro -
surfacing pavement.
F. Scratch Course
i. All "Scratch Course" applications shall be performed utilizing a steel primary strike -off
plate.
ii. This will allow the bottom, or "scratch course", to mitigate any irregularities and have a
more uniform profile for the micro -surfacing pavement to be applied to.
G. Finished Surface
i. Micro -surfacing pavement finished grade shall be uniform in texture and free from
excessive scratch marks, tears, and other surface irregularities.
a. All such irregularities shall be repaired by the Contractor at their own expense.
ii. Longitudinal joints shall be place on lane lines unless otherwise directed by the
Engineer.
iii. Joints shall be uniform in appearance when placed adjacent to existing joints.
iv. Joints and edges shall be uniform and neat in appearance.
v. All ruts, utility cuts, and depressions in the surface shall be filled in a separate pass
from the final pass.
8.10.05 Hours of Operation
A. Operating hours will be Monday through Saturday as outlined in Section 8.15 of these
Specifications, unless otherwise directed by the Engineer.
B. Hours of operation shall be:
i. Major Thoroughfare: 7:00pm to 7:00am (Night)
ii. Residential Areas: 7:00am to 7:00pm (Day)
C. On major thoroughfares the micro -surfacing pavement shall be traffic ready by 7:00am,
including all traffic control devices and barricades being removed from the roadway.
Section 8 119
2020 Design Standards and Specifications
Streets and Drainage Specifications
8.11 Storm Sewer
8.11.01 Storm sewer shall include installation of pipe, manholes, inlet structures, outlet structures,
and all appurtenances associated with these items.
8.11.02 Contractor shall use only materials, tools, methods, and equipment considered standard by
the pipeline construction industry, and approved by the Engineer.
8.11.03 Grade and horizontal alignment shall be maintained using a laser or batter boards.
8.11.04 Materials of Construction
A. Storm Sewer Pipe
i. As a standard, storm sewer shall be constructed using reinforced concrete pipe, either
precast or cast in place.
ii. Pipe shall conform to the requirements of AASHTO M170 or ASTM C76. Pipe shall be
Class III unless otherwise noted on plan sheets.
iii. Other pipe materials may be considered for approval by the Engineer based on
engineering and design criteria.
B. Mortar
i. Mortar shall be used for grouting and filling between pipe and drainage structures.
ii. Mortar shall be composed of 1 part, by volume, of Portland cement and 2 parts of
mortar sand.
a. Portland cement shall conform to the requirements of ASTM C150, Type I.
b. Sand shall conform to the requirements of ASTM C144.
iii. Hydrated lime may be added to the mixture of sand and cement in an amount equal to
15 percent of the weight of cement used.
a. Hydrated lime shall meet the requirements of ASTM C6.
iv. Mortar which has not been used after 45 minutes of having water added shall be
discarded.
a. Mortar may not be retempered by having water added.
C. Preformed Bituminous Gasket Joints
i. Preformed bituminous gaskets for concrete non -pressure pipe shall conform to the
requirements ASTM D994, and shall be Ram-Nek or approved equal.
ii. Gaskets shall be installed in accordance with manufacturer's recommendations and
shall form a water -tight joint.
D. Manholes, Frames, and Covers
i. Manhole barrel, cone and extension sections shall be constructed of precast concrete.
ii. A plant inspection may be required for production facility inspection and to review
record -keeping for material certification.
iii. The manufacturer must provide certification that all materials used for manufacturing
meet with the following ASTM Specifications:
ASTMSpecification
Material
ASTM C33
Aggregates
ASTM C150
Cement
ASTM C39
Sampling Specimens
ASTM A-615 or A-996
Reinforcing
ASTM C144
Sand and Mortar
120 Section 8
2020 Design Standards and Specifications
Streets and Drainage Specifications
iv. Precast concrete sections for manholes shall conform to ASTM C478 specifications.
a. Compressive strength test results must verify concrete strengths meet or exceed
4,000 psi.
v. Joints, excepting grade rings, shall be tongue and groove or an equivalent male and
female type joint as approved by the Engineer.
a. Joints shall be effectively jointed to prevent leakage and infiltration.
b. Connections between wall sections shall be joined with Conseal Joint Sealant or
approved equal to provide a watertight manhole.
(1) Sealant will be provided by supplier and will be considered an essential part of
each shipment.
vi. Cones and adjusting rings shall maintain a clear 30-inch opening.
a. Adjusting rings shall be reinforced with the same percentage of steel as risers and
tops and will also meet ASTM C478 specifications.
b. Adjusting rings, as well as all precast concrete manhole products, shall be smooth,
uniform in size and dimensions, consistent in components throughout and free of
voids or honeycombs.
vii. Manholes shall be designed to withstand H-20 AASHTO loading.
viii. Manholes shall also have lifting holes that do not protrude through manhole wall.
a. One full inch of concrete thickness must remain between lift hole and outside wall of
manhole.
ix. Manhole barrels shall be assembled of precast riser section.
a. Riser sections and top cone sections shall be placed vertically with tongues and
grooves properly keyed.
x. Invert channels shall be smooth and semi -circular in shape conforming to the inside of
the adjacent pipe section.
a. Changes in direction of flow shall be made with a smooth curve of as large a radius
as the size of the manhole will permit.
b. Changes in size and grade of the channels shall be made gradually and evenly.
c. Invert channels may be formed directly in the concrete of the manhole base or may
be half -pipe laid in concrete.
d. The floor of the manhole outside the channel shall be smooth and shall slope toward
the channel not less than one inch per foot, nor more than two inches per foot.
xi. Connections between the riser or base sections and the sewer pipe shall be joined in
such a manner as to make the manholes watertight.
a. Preformed rubber waterstop gaskets cast into the riser or base section are
acceptable.
b. Preformed flexible plastic sealing compounds equivalent to "Ram-nek" or "Kent Seal"
may be used provided a watertight seal is achieved.
xii. Adjusting rings may be used for adjusting the top elevation of manholes.
a. Each manhole shall have a minimum of 6 inches of grade adjustment.
b. Total height of the adjusting rings shall not exceed 12 inches at any manhole.
c. Concrete shall be placed around and under the rings to provide a seal and seat the
ring at the proper elevation.
xiii. Frames and Covers
a. Manhole frames and covers shall be of good quality gray iron casting and conform to
ASTM A48, having a clear opening of not less than 22 inches.
b. The casting shall be designed with a full bearing ring so as to provide a continuous
seat between frame and cover.
Section 8 121
2020 Design Standards and Specifications
Streets and Drainage Specifications
c. The cover shall be furnished with lifting ring cast into the cover in such manner as to
prevent water leaking through.
d. Frame and cover shall have a weight of not less than 275 pounds.
e. The manhole ring and cover shall conform with Plate SS-2.
8.11.05 Methods of Construction
A. All equipment necessary and required for the proper construction of storm sewers, manholes
and culverts shall be on the project, in first-class working condition, and approved by the
Engineer before construction is permitted to start.
B. If precast concrete pipe or manhole sections are used, the Contractor shall provide
appropriate hoisting equipment to handle the pipe or sections while unloading and placing it
in its final position without damage to the pipe.
C. The Contractor shall provide hand tampers and pneumatic tampers to obtain the required
compaction of the pipe bed, the manhole bed and the backfill, as specified.
D. Excavation and Trenching
i. The Contractor shall do all excavation to the depth shown on the plans.
ii. Where rock, or soil containing rocks or gravel, hard pan or other unyielding foundation
material is encountered in trench excavation, the pipe shall be bedded in accordance
with the requirements of one of the classes of bedding, and the hard unyielding
material shall be excavated below the elevation of the bottom of the pipe or pipe bell
to a depth of at least 8 inches or 1/2 inch for each foot of fill over the top of the pipe,
whichever is greater, but not more than three -fourths the nominal diameter of the
pipe.
a. The cushion shall consist of a fine compressive material, such as silty clay or loam,
lightly compacted, and shaped as required for the specified class of bedding.
b. The cost of furnishing and placing the cushion material shall be included in the bid
price per linear foot of pipe in place.
c. The bottom of the trench shall be excavated to a horizontal section as far as
practicable.
iii. Excavated material not required or acceptable for backfill shall be disposed of by the
Contractor as directed by the Engineer.
iv. Excavation shall not be carried below the required depth; but when it is, the trench
shall be backfilled at the Contractor's expense with material approved by the Engineer
and compacted to the density of the surrounding earth material as determined by
AASHTO T180.
v. When directed, unstable soil shall be removed for the full width of the trench and
replaced with sand or with approved granular material.
a. The Engineer shall determine the depth of removal of unstable soil and the amount
of backfill necessary.
vi. Backfill shall be compacted and shaped to a firm but slightly yielding condition to form
the bed for the pipe.
vii. Grades for pipe shall be as shown on the drawings. No changes in grade will be made
unless so directed by the Engineer.
viii. The minimum width of the trench at the top of the pipe, when placed, shall be a width
which will permit the proper construction of joints and compaction of backfill around
the pipe.
ix. The sides of the trench shall be vertical, unless otherwise approved by the Engineer.
x. The width of the trench shall provide adequate working room for installation, joining
and proper compaction along both sides of the pipe.
122 Section 8
2020 Design Standards and Specifications
Streets and Drainage Specifications
a. Trenches shall conform to the following dimensions, unless otherwise shown on the
Plans:
Pipe Size
Min. Trench Width
Max. Trench Width
Less than 18"
Pipe O.D. +12"
Pipe O.D. +18"
18" thru 36"
Pipe O.D. +18"
Pipe O.D. +24"
37" thru 60"
Pipe O.D. + 24"
Pipe O.D. + 30"
b. The width of the trench above the top of the pipe may be as wide as necessary for
shoring, bracing or proper installation of the pipe.
c. Excavation in paved areas shall be confined to a minimum practical width.
A. The bed for pipe shall be so shaped that at least the lower quarter of the pipe
circumference shall be in continuous contact with the bottom of the trench.
xii. Manholes
a. The excavation for manholes shall be essentially the same as that for the piping.
b. The sides of the excavation shall be vertical unless otherwise approved by the
Engineer.
c. The Contractor shall do such trench bracing, sheathing or shoring necessary to
perform and protect the excavation as required for safety and conformance to
applicable laws and regulations.
d. Bracing, sheathing, or shoring shall not be removed in one operation but shall be
done in successive stages to prevent overloading of the pipe during backfilling
operations.
e. The cost of the bracing, sheathing, or shoring and the removal of same, shall be
included in the unit price bid per foot for the pipe.
xiii. Surface water shall be prevented from entering the excavation.
xiv. Heavy equipment, except for excavating equipment, shall not be operated within 20
feet of the edge of the excavation.
xv. Excavated materials shall be stockpiled no closer than 3 feet from the edge of the
excavation.
E. Pipe Installation
i. Contractor shall provide the appropriate tools and methods to insure installation of the
pipe to line and grade, as shown on the drawings.
ii. Contractor's method for lowering pipe into the trench shall be such that neither the
pipe nor the trench will be damaged or disturbed.
iii. The Engineer shall inspect all pipe before it is placed in the trench.
iv. Any section that is damaged by handling or is defective to a degree which, in the
opinion of the Engineer, will materially affect the function and service of the pipe shall
be rejected and removed from the job site.
v. Installing pipe in the finished trench shall be started at the lowest point and laid
upgrade.
a. For tongue and groove pipe, the grooved end shall be laid upgrade.
vi. The pipe shall be firmly and accurately installed to line and grade so that the invert will
be smooth and uniform.
vii. The pipe shall be protected from water during placing and until the concrete, for cast -
in -place pipe, or the mortar, for joints of precast or cast in place pipe, has thoroughly
set.
a. The contractor shall provide temporary diversions as necessary to prevent surface
water flow into the excavation.
viii. Pipe shall not be laid or installed on frozen ground.
Section 8 123
2020 Design Standards and Specifications
Streets and Drainage Specifications
ix. Pipe which is not true in alignment, or which shows any change in grade after laying or
installing, shall be taken up and re-laid or re -installed without additional compensation.
x. Mortar shall be used for caulking and filling between the pipe and the drainage
structures.
xi. Mortar that is not used within 45 minutes after water has been added shall be
discarded.
a. Retempering of mortar shall not be permitted.
xii. Pipe joints for precast concrete pipe shall be of the tongue and groove type.
xiii. Joints shall be made water tight by means of a preformed bituminous gasket.
a. Gaskets shall be installed as recommended by the pipe manufacturer.
xiv. Field poured concrete bases shall be at least 12 inches thick and not less than 12
inches greater diameter than the outside diameter of the manhole riser section.
xv. Concrete shall be Class A at a minimum 3000 psi 28 day compressive strength.
xvi. Concrete placement shall conform to ACI and good construction practices.
xvii.Concrete shall be consolidated and struck -off to a horizontal surface within the forms
or pouring rings.
xviii. Field poured concrete bases shall be reinforced as detailed on the Plans or as shown
in the Standard Details.
xix. Manholes shall be constructed to ASTM C-891 standards.
xx. Precast reinforced concrete bases shall be of the size and shape detailed on the Plans
or as shown in the Standard Details.
F. Backfilling
i. All trenches and excavations shall be backfilled as the pipes and manholes are
installed, unless otherwise directed by the Engineer.
ii. Outside of street right of way the backfill material shall be selected granular material
from excavation or borrow; material which is placed at the sides of the pipe and
manhole and 1 foot over the top shall be material which can be readily compacted.
a. It shall not contain stones retained on a 2-inch sieve, frozen lumps, chunks of highly
plastic clay, or any other material which is objectionable to the Engineer.
b. The material shall be moistened or dried, if necessary, to be compacted by the
method in use.
c. Backfill material shall be approved by the Engineer.
iii. The backfill shall be placed in loose layers not to exceed 6 inches in depth along each
side of the pipe and manhole.
a. Special care shall be taken to secure thorough compaction under the haunches and
at the sides of the pipe and manhole.
b. This backfill shall be brought up evenly on each side of the structure to an elevation
of 1 foot over the top of the pipe, or such greater elevation as directed by the
Engineer.
c. Backfilling shall be done in a manner as to avoid injurious top or side pressures on
the pipe and manhole.
d. Backfill shall be compacted to minimum 95 percent Modified Proctor Density.
iv. Unless otherwise directed by the Engineer or plans, excavation within street right of
way shall be backfilled with flowable fill material (2-sacks of cement per cubic yard
concrete mix) to 2 inches below the asphalt surface.
a. The pipe shall be restrained so that during the pour the pipe shall not be displaced.
v. Movement of construction machinery over a culvert, pipeline, or manhole shall be at
the Contractor's risk.
124 Section 8
2020 Design Standards and Specifications
Streets and Drainage Specifications
a. Any damaged construction shall be removed and replaced at the Contractor's own
expense.
8.11.06 Trench Protection
A. Trench excavations not exceeding five feet in depth shall be protected in accordance with
applicable OSHA, state, and local requirements.
B. Trench excavations greater than five feet in depth shall be protected in accordance with the
following specifications.
i. All work performed under this section shall also comply with OSHA Part 1926, Subpart
P and all State and Local codes.
ii. The Contractor shall be responsible for complying with all trench safety requirements,
the requirements of the specifications, drawings and all applicable codes.
iii. Trench protection shall be performed by forces having at least two years experience
with similar types of trench safety systems.
iv. The manufacturer of prefabricated items used in trench safety systems shall have at
least two years of experience in fabricating the items.
v. The contractor shall provide detailed drawings for proposed trench safety systems.
a. The drawings shall identify where each system is proposed for use and type of
system to be used.
vi. Trench excavations shall not be started until trench safety systems have been
submitted and approved by the Engineer.
vii. If trench boxes are to be used, the contractor shall submit manufacturer's standard
data sheet and certificate of compliance stating the maximum allowable depth for the
given design pressure for each type of trench box proposed for use.
viii. If alternative systems composed of steel, aluminum, wood or a combination of
materials are proposed, the contractor shall submit design data demonstrating the
ability of the proposed materials to provide the necessary trench protection.
ix. Materials used for trench safety shall be capable of withstanding imposed loads without
excessive deflections.
x. Materials shall be clean, free of rust, holes, knots and other defects, and shall conform
to the following:
a. Steel — Steel shall be of type and thickness as required and shall have a minimum
yield stress of 36 ksi.
b. Aluminum — Type 6061-T6, thickness as required.
c. Wood in Contact with Earth — Pressure treated woods.
d. Wood not in Contact with Earth — Soft or hardwood as required.
8.12 Fences
8.12.01 Unless otherwise indicated on plans, existing fences which must be adjusted or relocated
shall be reconstructed using the same or equivalent materials, height, and construction in
the proper location.
8.12.02 The contractor shall remove existing fences and either store for reuse or legally dispose of
the fence materials, as directed by the Engineer.
8.12.03 New fence construction shall be in accordance with specifications and details included on
plan sheets.
Section 8 125
2020 Design Standards and Specifications
Streets and Drainage Specifications
8.13 Salvaae of Asphalt Pavi
8.13.01 All salvaged asphalt material shall be broken into pieces not more than 2 inch in size and
stockpiled at a location indicated in the plans.
8.13.02 Any non -asphaltic materials, such as flexible base and soil, shall be kept separated from
the salvaged asphalt.
8.14 Traffic Control
8.14.01 Prior to starting work on any project covered by these specifications, the contractor shall
submit a Traffic Control Plan for approval by the Engineer.
A. The contractor shall have the sole responsibility for providing, installing, moving, replacing,
maintaining, cleaning, and removing upon completion of work, all traffic control devices.
B. The Traffic Control Plan and devices shall be in compliance with the Texas Manual of Uniform
Traffic Control Devices (MUTCD).
8.14.02 The Traffic Control Plan approved by the Engineer shall be considered the minimum
requirement for the project.
A. The contractor shall provide additional devices as determined to be necessary during the
project.
B. If at any time during construction the approved plan does not accomplish the intended
purpose, due to weather or other conditions affecting the safe handling of traffic, the
contractor shall immediately make necessary changes to correct the unsatisfactory conditions.
8.14.03 The contractor shall provide and maintain at least one driveway to each property open
directly to the project corridor, at all times during construction.
A. Driveway width to remain open shall be appropriate for the character and volume of traffic
accessing the property, and shall require approval by the Engineer.
B. No driveways shall be closed along the project corridor without either a comprehensive access
management plan approved by the Engineer, or approval for individual closures from the
Engineer.
C. The contractor shall notify affected property owners a minimum of two (2) days in advance of
any driveway restriction or closure.
8.14.04 All signing and barricading shall be in place before construction operations are started and
during all times construction is in progress.
A. All hazards shall be clearly marked and adequately protected.
8.14.05 If pedestrian walkways are blocked, pedestrian control shall conform to "Typical Sidewalk
and Curb -Lane Closure for Pedestrian Control" as indicated in Texas MUTCD.
8.14.06 If traffic control is not specifically stated in the bid proposal, no separate payment will be
made for traffic control. The required plan and devices shall be considered to be subsidiary
to pay items.
8.14.07 During the period the Contractor is directing traffic over the base, the surface shall be
satisfactorily maintained by the use of sprinkling and blading as required, so that no hazard
will result.
A. The base course shall be maintained until the wearing surface is placed thereon.
126 Section 8
2020 Design Standards and Specifications
Streets and Drainage Specifications
B. At no time during the period of construction shall driveways and/or alleys be left impassable
between the night hours of 6:00 PM to 6:00 AM, except during the construction of curb and
gutter for which the driveways and/or alley's shall remain closed not more than 4 days.
C. Contractor shall give a minimum of one (1) day advance notice of the work schedule to
affected property owners, and shall conduct construction efforts so as not to create a
disturbance or nuisance.
8.14.08 All spoil piles must be 3' from travel lanes or have a traffic barrier that will prevent the soil
from encroaching on travel lanes.
8.14.09 If roll off dumpsters are placed on street paving, then the paving must be protected from
damage.
8.15 Prosecution of the Work and Working Days
8.15.01 As a standard, no work will be performed on weekends, nights, or holidays.
A. Requests by the contractor to work evenings, weekends, or holidays must be made and
processed in accordance with current City of Lubbock Administrative Policies and Procedures
"Construction on Weekends, Nights, or Holidays".
B. If the request is approved, the contractor shall be responsible for all City personnel costs
associated with the work.
C. If the Engineer determines that it is necessary and appropriate to work after dark or before
daylight, the contractor shall provide adequate lighting as required to allow prosecution of the
work equivalent to that in daylight hours.
8.15.02 Working Days Definition
A. City contracted paving projects will be based on working days allowed.
i. No requests for extensions of time will be considered.
B. A working day is defined as a calendar day, not including Saturdays, Sundays, or City of
Lubbock designated holidays, in which weather or other conditions beyond control of the
contractor will permit the performance of the principal unit of work for a continuous period of
not less than 7 hours between 7:00 am and 6:00 pm.
i. Work on Saturdays, Sundays, or City of Lubbock designated holidays must be
authorized by the Engineer.
ii. For each Saturday, Sunday, or City of Lubbock designated holiday on which the
Contractor chooses to work and has authorization from the Engineer to work, 1 day will
be charged against the contract working time.
iii. Work on Sunday will not be authorized except in cases of extreme emergency, as
determined by the Engineer.
C. Working days will be considered to begin on the effective date stated in the Notice to
Proceed, unless the contractor is unable to begin work on that date due to factors beyond
their control as determined by the Engineer.
i. In that event, time charged against the project will begin on the date the contractor
could first work a minimum of 7 hours as described above.
D. The Engineer will furnish the contractor a monthly statement showing the number of working
days used and the working days remaining.
i. The contractor shall be allowed 10 calendar days in which to protest the correctness of
each statement.
Section 8 127
2020 Design Standards and Specifications
Streets and Drainage Specifications
ii. The protest shall be in writing, addressed to the Engineer, and shall indicate basis of
the protest.
iii. The Engineer shall respond to the protest within 10 calendar days of receiving the
protest.
iv. Failure to file a protest within the allotted 10 days for any statement shall indicate the
contractor's approval of the time charges as shown on that period's time statement,
and future consideration of that time statement will not be permitted.
8.15.03 Work Between November 1 and January 2, and on Other City Holidays
A. If conditions are such that, in the opinion of the Engineer, construction will negatively affect
local businesses during holiday periods, the Engineer may suspend construction operations
from November 1 to January 2.
B. The City of Lubbock observes specific holidays, and City staff is not required to work those
days.
i. As standard procedure, construction operations that require testing/inspection may not
be performed on those holidays.
ii. If the contractor needs to perform construction operations that require City personnel
on holidays, the contractor shall make a written request for authorization to work from
the Engineer.
iii. The request shall state the reason the work is necessary, and shall state that the
contractor agrees to pay the City for the related personnel expenses including salary,
overtime, and benefits.
iv. If City personnel are available, the Engineer may approve the request.
8.16 Measurement and Pavment
8.16.01 The unit price bid for all bid items shall include furnishing and installing all materials,
excavation, filling, backfilling, reinforcement, forming, finishing, joint cutting, joint sealing,
and all incidentals necessary to complete the work, except as otherwise specified,
necessary or incidental to complete the various items of work in accordance with the plans
and specifications.
A. Cost of work or materials shown on the plans or called for in the specifications and for which
no bid item is indicated shall be considered subsidiary to the various bid items.
i. No separate payment shall be made for such subsidiary work or materials.
B. Payment will not be made for any item that is not complete, including all associated incidental
work.
C. All of the items covered by these standard specifications may not be included in a particular
project.
D. Only those items indicated on bid documents and plan sheets shall be included for
construction and payment.
8.16.02 Separate Curb and Gutter
A. Measurement will be made of the linear feet of separate curb and gutter actually constructed.
B. Separate curb and gutter will be paid for at the unit price bid per linear foot.
C. The 24-inch curb and gutter shall be considered standard; The 30-inch curb and gutter shall
be used only if specifically indicated on plans or bid documents.
128 Section 8
2020 Design Standards and Specifications
Streets and Drainage Specifications
D. Curb on a slab that is part of a sidewalk, driveway, alley return, alley paving, valley gutter and
fillets, drainage channel, or wheelchair ramp will be considered to be subsidiary to those
items, and no separate payment will be made for such curb.
8.16.03 Concrete Flat Slabs - Sidewalk, Driveway, Alley Return, Alley Paving, and Valley Gutters
and Fillets
A. Measurement will be made of the area, in square feet, of flat slab actually constructed.
B. Flat slabs will be paid for at the unit price bid per square foot for each specific type of slab.
C. Curb on sidewalks, driveways, alley returns, alley paving and valley gutters and fillets shall be
included in the area measured for the slab and will not be paid for as a separate item as curb
and gutter.
8.16.04 Curb Ramps (Handicap Ramps)
A. Measurement will be made of the area, in square feet, of curb ramp actually constructed,
including surface treatments and top surface area of any curb above the slab.
B. Landings, wings, and ramps will be paid for per square foot as 4 inch thick sidewalk.
C. Curb ramps will be paid for at the unit price bid per square foot. No separate payment will be
made for curb as part of a ramp.
8.16.05 Concrete Drainage Channel
A. Measurement will be made of the area, in square feet, of drainage channel actually
constructed, including top surface area of any curb above the slab.
B. Drainage channel will be paid for at the unit price bid per square foot.
8.16.06 Retaining Walls
A. Retaining wall will be considered as that portion of concrete construction which constitutes a
separate reinforced structural member for soil retention, extending above and below a surface
slab.
B. Measurement will be made of the linear feet of retaining wall actually constructed.
C. Retaining wall will be paid for at the unit price bid per linear foot.
8.16.07 Concrete Median
A. Measurement will be made of the area, in square feet, of median actually constructed.
B. Median will be paid for at the unit price bid per square foot.
8.16.08 Concrete Street Paving
A. Measurement will be made of the area, in square yards, of concrete street paving actually
constructed.
B. Concrete street paving will be paid for at the unit price bid per square yard.
8.16.09 Sawing and Sealing of Joints in Concrete Street Paving
A. Measurement will be made of the linear feet of sawed and sealed joints actually constructed.
B. Sawing and sealing of joints will be paid for at the unit price bid per linear foot.
8.16.10 Curb and Gutter Removal
A. Measurement will be made of the linear feet of curb and gutter actually removed.
Section 8 129
2020 Design Standards and Specifications
Streets and Drainage Specifications
B. Payment will be made at the unit price bid per linear foot of curb and gutter removed.
C. The contractor shall ensure that the Engineer has the opportunity to measure the linear feet
of curb and gutter prior to removal.
D. If curb and gutter is removed without measurement by the Engineer, no payment will be
made for that removal.
8.16.11 Concrete Slab Removal and Disposal
A. Measurement will be made of the area in square feet of concrete slab actually removed and
legally disposed of.
B. The contractor shall ensure that the Engineer has the opportunity to measure the area of
concrete slab prior to removal.
C. If concrete slab is removed without measurement by the Engineer, no payment will be made
for that removal and disposal.
D. Payment will be made at the unit price bid per square foot of concrete slab removed and
disposed of.
8.16.12 1-1/2 Sack (141 Ibs) Flowable Fill
A. Quantities of 1-1/2 sack (141 Ibs) flowable fill will be determined from tickets provided by the
drivers of the delivery trucks.
B. Payment will be made at the unit price bid per cubic yard of in place 1-1/2 sack (120 Ibs)
flowable fill.
8.16.13 Asphalt Paving
A. Measurement will be made of the area, in square yards, of asphalt paving actually
constructed.
B. The unit price bid shall include furnishing and installing all materials, subgrade preparation,
construction of caliche or asphalt stabilized base as specified, excavation, filling, tack and
prime coats, HMAC surface, emulsion seal, and all incidentals necessary to complete the work
C. Payment will be made at the unit price bid per square yard of asphalt paving.
8.16.14 Asphalt Paving Repair
A. Measurement will be made of the area, in square yards, of in place asphalt paving repair.
B. The unit price bid shall include removal of existing surface materials, furnishing and placing all
asphaltic materials, sawing of existing paving edges, smoothing and preparation of the
existing base, tack and prime coats, compaction, and all incidentals necessary to complete the
work.
C. Payment will be made at the unit price bid per square yard of paving repair.
8.16.15 Micro -Surfacing
A. Micro -surfacing will be measured by the ton of composite micro -surfacing mixture used,
defined as the asphalt emulsion, aggregate, and mineral filler.
B. The unit price bid shall include surface preparation, furnishing, hauling, preparing, and placing
materials, and all required equipment, labor, tools and incidentals necessary to complete the
work.
C. Payment will be made at the unit price per ton of composite micro -surfacing mixture used.
130 Section 8
2020 Design Standards and Specifications
Streets and Drainage Specifications
8.16.16 Excavation and Grading Outside Limits of Construction
A. Volume of excavation or fill, in cubic yards, will be determined by average end area method.
B. The unit price bid shall include all labor, equipment, and incidentals necessary to excavate or
fill the site to the grades established by the Engineer.
C. No separate payment will be made for disposing of excess material.
D. Payment will be made at the unit price bid per cubic yard of completed excavation or fill.
8.16.17 Ditch Grading and Unpaved Street Surface Grading
A. Measurement will be made of the linear feet of ditch or street grading.
B. No separate payment will be made for disposing of excess material.
C. Payment will be made at the unit price bid per linear foot of completed ditch or street grading.
8.16.18 Traffic Control
A. Set up and maintenance of traffic control plans indicated as a bid item in the contract will be
paid for on a per day basis for each day the control plan devices are required to be in place.
B. If no bid item for traffic control is included in the contract it shall be considered to be
subsidiary to bid items, and no separate payment shall be made for traffic control.
8.16.19 Mobilization
A. Contractor mobilization indicated as a bid item in the contract shall be paid for as a lump sum.
If no separate bid item for mobilization is included in the contract it shall be considered
subsidiary to contract bid items, and no separate payment shall be made for mobilization.
8.17 Restoration and Clean Up
8.17.01 After any construction covered by these specifications is completed, the Contractor shall
remove all equipment, surplus materials, and rubbish from the site.
8.17.02 The contractor shall restore all disturbed areas to their original condition satisfactory to the
Engineer, including sidewalks, driveways, curb or curb and gutter, sprinkler systems, and
turf or landscaping disturbed outside the defined construction area.
8.18 Certificate of Completion and Warranty
8.18.01 Within 30 calendar days after the Developer or Developers Engineer has given written
notice that the improvements have been substantially completed, the City shall inspect the
completed improvements and provide a punch list if necessary.
A. If it is mutually determined that the improvements have been constructed in accordance with
the engineering plans and the City of Lubbock Engineering Minimum Design Standards and
Specifications, the Developers Engineer shall submit Record Drawings, Certificate of
Completion and Developers Warranty Statement (Copies of the Certificate of Completion and
the Developers Warranty Statement are included in the City of Lubbock Engineering Minimum
Design Standards and Specifications).
Upon receipt of the Developers Certificate of Completion, Record Drawings and the
Developers Warranty Statement, the City will accept improvements within 30 calendar days;
unless exception is given in writing.
Section 8 131
2020 Design Standards and Specifications
Streets and Drainage Specifications
C. Neither the Final Payment nor the Certificate of Completion shall relieve the Developer or
Contractor of responsibility related to warranty of materials or workmanship.
D. The Developer shall remedy any defects due to faulty materials or workmanship that appear
within 2 years from the date of acceptance by the City of Lubbock.
132 Section 8
2020 Design Standards and Specifications
Streets and Drainage Check List
SECTION 9
CHECK LIST FOR STREETS AND DRAINAGE CONSTRUCTION PLANS
9.01 Plan Submittal Reauirements
9.01.01 All street and drainage improvements construction plans shall be checked for conformance
with City of Lubbock Standard Specifications for Street and Drainage Construction prior to
submittal to the Engineering Department. Approval of plans is for general conformance
with the City of Lubbock Minimum Design Standards and Specifications. Approval of plans
shall not relieve the Engineer or Developer from any City, State or other governing
requirements nor for errors or omissions in the plans and specifications.
9.01.02 Plan Review
A. The Design Engineer shall submit Paving and drainage construction plans to the City Engineer
or designee for review and comment. The Design Engineer shall use the City of Lubbock
Customer Self Service (CSS) website to submit plans.
http://egovaccess.ci.lubbock.tx.us/EnerGov Prod/SelfService/#/home
B. Please call 806-775-2347 if you have any questions regarding the CCS submission process.
C. Upon completion of review and receipt of payment for appropriate Plan Review fees,
comments shall be returned to the Design Engineer on the CSS website.
i. Plans requiring resubmittal for substantial changes as determined by City Engineer or
Designee may require payment of an additional Plan Review fee.
D. After comments have been addressed and changes have been made the Design Engineer will
submit the revised plan using CSS website.
i. If comments have not been addressed on plans submitted for final approval for
construction the plans will be rejected.
ii. If testing and inspection fees have not been paid, plans will be rejected.
E. Upon approval, the city will return an electronic copy of the plan stamped "Approved for
Construction" through the CSS web site.
i. The design Engineer will be required to submit two half size copies of the approved for
construction stamped plans.
F. Final construction plans should not be submitted for Engineering Department approval for
work that will not be installed within 6 months of the approval date.
i. Delays between approval date and construction may require resubmittal of the plans
for review under current standards.
9.01.03 Construction Cost Estimate and Fees
A. Two (2) sets of preliminary Cost Estimates shall be submitted for review at the time of plan
review submittal.
i. The preliminary Estimate shall be based upon reasonable estimates for the work as
established by the Design Engineer.
B. Two (2) sets of final Cost Estimates shall be submitted for review and reference at the time
that a contract is awarded for the work.
i. The final Cost Estimate shall be based upon actual contract values.
C. Plan Review Fees in the amount of 0.5 percent of the final Estimate amount (minimum $50)
shall be submitted prior to construction.
Section 9 133
2020 Design Standards and Specifications
Streets and Drainage Check List
D. Inspection and Testing Fees in the appropriate amount of the final Cost Estimate amount
(minimum $125) shall be submitted prior to construction.
E. Inspection and Testing Fees shall be based on the following requirements:
Cost Estimate Range
Testin
and Inspection Fee
Percent
Multiplication Factor
Up to $20,000
4.0
0.04
$20 001 - $25 000
3.75
0.0375
$25,001 - $30,000
3.5
0.035
$30,001 - $40,000
3.25
0.0325
$40 001 - $50 000
3.0
0.03
$50,001 - $75,000
2.5
0.025
$75,001 - $150,000
2.0
0.02
Greater than $150,000
1.5
0.015
9.01.04 Checklist
A. A copy of the completed "City of Lubbock Pavement Submittal Checklist" shall be submitted at
the time of plan review submittal. The checklist can be found in the Appendix.
9.01.05 Construction Plans
A. All plans to be used or kept on the job site shall be original or reproduced plan sets clearly
marked "Approved for Construction" with the signature of reviewer and date approved by the
Engineering Department.
B. Should circumstances during construction warrant changes from the approved plans or
specification, as determined by the City Inspector, a written approval must be obtained from
the City Engineer.
i. Copies of the written approval shall be attached to the construction plans and
maintained on the job site.
9.01.06 Record Drawings
A. The Design Engineer shall be responsible for recording constructed dimensions, grades,
elevations and additional information on a set of Record Drawings during the progress of
construction.
i. The City of Lubbock Engineering Department shall monitor this process to assure that
changes in construction are kept up to date on the Record Drawings.
B. Digital PDF "Record Drawings", certified by the Design Engineer and the City of Lubbock
Engineering Department, shall be submitted to the City within 30 days of completion of the
construction.
C. Where the construction is phased and a lapse of more than 60 days occurs between phases,
then Record Drawings shall be presented to the City of Lubbock Engineering Department
reflecting the completed construction prior to issuance of the Certificate of Acceptance of
Streets and Drainage Improvements.
D. Items required to be submitted with Record Drawings:
i. Letter of Transmittal
ii. Record Drawing
iii. Updated Construction Cost Estimate
iv. Certificate of Completion (Provided to Contractor from City Inspector)
v. Developer's Warranty Statement (See Appendix)
134 Section 9
2020 Design Standards and Specifications
Streets and Drainage Check List
9.01.07 Acceptance
A. Upon completion of construction, satisfactory tests, completion of punch list items, and
submittal of Record Drawings, the Design Engineer shall submit a request to the City Engineer
for a Certificate of Acceptance of Streets and Drainage Improvements.
Section 9 135
2020 Design Standards and Specifications
Streets and Drainage Check List
9.02 Plan Details
9.02.01 Plan Format
A. All drawings shall be no larger than 22-inch by 34-inch in size.
9.02.02 The following information shall be shown on the plans:
A. General
i. Title Block (lower right hand corner preferred)
ii. Scale
a. Horizontal 1"=20' or 1"=50'
b. Vertical 1"=1' (preferred) or 1"=2' (maximum)
iii. Original Date and Revision Dates
iv. Name of Professional Engineer
v. Professional Engineer's Seal
vi. Firm Name and Contact Information
vii. Legal Description of Property Being Improved
viii. Drawings Number (s)
ix. City of Lubbock Engineering Department Contact Information:
a. Streets Inspector: 775-3750
x. Statement:
"All work shall be performed in accordance with the current
version of the City of Lubbock Minimum Design Standards and
Specifications."
B. Plan
i. Bench Marks and USGS Datum
ii. North Arrow
iii. ROW Lines, Property Lines and Lot Numbers
iv. Street Names and Easements with Width Dimensions
v. Existing Curbs and Paving (Gray)
vi. Proposed Curbs and Paving (Bold)
vii. Spot Elevations on Radii, Dips, Grade Breaks, and Ditches
viii. Location and Direction of Dips
ix. Other Pertinent Details (Buildings, Utilities, Water Courses, Etc.)
C. Profile
i. Existing Ground Surface at Curb Lines (Gray)
ii. Existing Gutters or Flow Lines (Gray)
iii. Proposed Gutters or Flow Lines (Bold)
iv. Stationing with Profiles Indexed to Plan View
v. Intermediate Station Numbers and Elevations at Points of Grade Change and Radii
vi. Ditch Grades
vii. Existing and Proposed Utilities Where Crossed
D. Detail Sheet
i. Details are not required when engineers plans refer to City standards
ii. Include all non-standard details
136 Section 9
2020 Design Standards and Specifications
Streets and Drainage Check List
Overall Layout Sheet — As Required
i. Scale 1 "=100'
ii. Lot Lines
iii. Streets and Street Names
Section 9 137
2020 Design Standards and Specifications
Streets and Drainage Check List
138 Section 9
Design Standards and Specifications
Construction Details
SECTION 10 TYPICAL DETAILS OF CONSTRUCTION
Section 10 A
Design Standards and Specifications
Construction Details
A Section 10
Design Standards and Specifications
Construction Details
10.01 General Details
10.01.01 Construction shall be in accordance with the following standard details unless otherwise
indicated on plans or directed by the Engineer.
Section 10 A
2'
HOUSE
SERVICE
JI
TYPICAL LOT
5'
5'
WATER LINE WATER
GAS LINE
SEWER LINE
5 jI�
TYPICAL LOT
20'
10,
7' 6"
5'
10,
7' 5"
5'
3' 9"
2'
0
m
UTILITY
POLE
UTILITY
G
POLE
m
FINISHED
RADE
No
N z_ V
z
� BURIED
T.V. CABLE
URIED
AT&T CABLE
BURIED
GAS MAIN NTS CABLE
;T
z
CONCRETE PAD "v
OVER BURIED
ELECTRIC
CONDUIT
WATER
MAIN
HOUSE
SERVICE
Nor
L2'
BURIED
ELECTRICAL
BURIED
ELECTRICAL 9' MINIMUM SEWER
CABLE MIN
CABLE
2'
TYPICAL LOCATIONS
a(�
City of
REVISED
MAR. 2019
FOR UTILITIES IN ALLEYS
*Lubbock
DRAWING NUMBER
G-1
COMPROMISED SOIL
DUE TO MOISTURE
FROM A WATER LEAK
OR RAIN EVENT
PIPE SPRINGLINE
ZONE
NOTES:
ORIGINAL EXCAVATED TRENCH WIDTH
OVEREXCAVATED FOR COMPACTION
1. BEDDING, EMBEDMENT, AND BACKFILL SHALL BE CAREFULLY
PLACED MATERIAL AS SPECIFIED IN THESE SPECIFICATIONS.
3. BACKFILL REQUIREMENTS SHALL COMPLY WITH CURRENT CITY
OF LUBBOCK STREETS ORDINANCE.
FINISHED GRADE SURFACE
FINAL
BACKFILL
H
INITIAL w
BACKFILL m
0
w
m
w
w
a
a
HAUNCHING
BEDDING
FOUNDATION
(MAY NOT BE REQUIRED)
*1141
W REVISED
TRENCH CROSS-SECTION 11E o C;tv of
DEC. 2015
SHOWING TERMINOLOGY Lubb6ck DRAWING NUMBER
TEXAS G-2
Design Standards and Specifications
Construction Details
10.02 Water Details
Section 10
No Text
FINISHED GRADE SURFACE
NOTES:
1. BEDDING, EMBEDMENT, AND BACKFILL SHALL BE CAREFULLY
PLACED MATERIAL AS SPECIFIED IN THESE SPECIFICATIONS.
2. BACKFILL REQUIREMENTS SHALL COMPLY WITH CURRENT CITY
OF LUBBOCK STREETS ORDINANCE.
WATER LINE
TRENCH DETAIL
f#r ■
City of
ll�Lubbock
REVISED
DEC. 2012
DRAWING NUMBER
W-1
THRUST BLOCK
SIZING CHART
DIA.
INCHES
TEES CROSS & PLUGS
CF
4
3
6
6
8
15
10
27
12
37
16
53
18
64
20
77
24
104
30
149
ANCHORAGE FOR CROSS
N.T.S.
REMOVE PIPE SECTION,
TRIM AND REPLACE
FOLLOWING INSTALLATION
METAL OF PLUGS
PLATE
LINE TO BE - - - - LINE TO REMAIN
ABANDONED IN SERVICE
CONCRETE BLOCKING
TYPICAL 2,500 PSI
CONCRETE
CONCRETE
THRUST
BLOCK
I ='� TEE
I
ANCHORAGE FOR TEE
N.T.S.
PLUG W/EARS
THRUST BLOCK
SIZING CHART
DIA.
INCHES
TEES CROSS & PLUGS
CF
4
3
6
6
8
15
10
27
12
37
16
53
18
64
20
77
24
104
30
149
CAP OR PLUG
ON PRESSURE SIDE
CONCRETE -A.-
THRUST -
BLOCK - - -
ANCHORAGE FOR PLUG
N.T.S.
THRUST BLOCK
SIZING CHART
DIA.
INCHES
TEES CROSS & PLUGS
CF
4
3
6
6
8
15
10
27
12
37
16
53
18
64
20
77
24
104
30
149
NOTES:
THRUST BLOCK
SIZING CHART
DIA.
INCHES
TEES CROSS & PLUGS
CF
4
3
6
6
8
15
10
27
12
37
16
53
18
64
20
77
24
104
30
149
1. FOR BLIND TEE INSTALL ONE JOINT OF
PIPE WITH PLUG AND TREAT AS A DEAD
END LINE.
2. BEARING SURFACES SHALL BE
AGAINST UNDISTURBED GROUND.
3. CONCRETE BLOCKING SHALL BE TYPICAL
2,500 PSI CONCRETE.
4. DUCTILE IRON FITTINGS SHALL BE WRAPPED
WITH POLYETHYLENE ENCASEMENT PRIOR
TO PLACEMENT OF CONCRETE FOR THRUST
BLOCKING.
SIZE ACCORDING TO AWWA & PIPE
MANUFACTURER SPECIFICATIONS
REVISED
CONCRETE �', o City- of DEC. 2012
THRUST BLOCKING Lubb6ck DRAWING NUMBER
TEXAS W_2
THRUST BLOCK THRUST BLOCK
SIZING CHART SIZING CHART
DIA. 11.250 DIA. 22.50
INCHES CF INCHES CF
4 1 4 1
6 1 6 1
CONCRETE 0 2CONCRETE 0 3
THRUST 12 3 THRUST 12 8
BLOCK —— BLOCK
16 4 16 11
— 18 4 — — —= -- 18 13
20 5 20 16
11.25
p 24 7 22.5° BEND --� __ 24 21
BEND — 30 10 30 30
ANCHORAGE FOR A 11.25° BEND ANCHORAGE FOR A 22.5° BEND
N.T.S. N.T.S.
-= _-
_ — - CONCRETE
= THRUST
— — —__ BLOCK
45°BEND
ANCHORAGE FOR A 45° BEND
THRUST
SIZING
BLOCK
CHART
DIA.
INCHES
450
CF
4
1
6
2
8
4
10
7
12
15
16
21
18
25
20
30
24
40
30
58
N.T.S.
CONCRETE THRUST
BLOCK _ _ — -n- -r-
NO.3 BARS je
EACH WAY
VERTICAL BEND
N.T.S.
CONCRETE
THRUST BLOCKING
90° BEND
ANCHORAGE FOR A 90° BEND
N.T.S.
NOTES:
CONCRETE
THRUST
BLOCK
THRUST
SIZING
BLOCK
CHART
DIA.
INCHES
900
CF
4
2
6
4
8
9
10
17
12
27
16
38
18
46
20
55
24
30
74
1 106
1. BEARING SURFACES SHALL BE
AGAINST UNDISTURBED GROUND.
2. CONCRETE BLOCKING SHALL BE TYPICAL
2,500 PSI CONCRETE.
3. DUCTILE IRON FITTINGS SHALL BE WRAPPED
WITH POLYETHYLENE ENCASEMENT PRIOR
TO PLACEMENT OF CONCRETE FOR THRUST
BLOCKING.
SIZE ACCORDING TO AWWA & PIPE
MANUFACTURER SPECIFICATIONS
City of
Lubbock
TEXAS
REVISED
DEC. 2012
DRAWING NUMBER
W-3
3 1/2" X 3/8" DEEP RECESS METER
OFOR AMR PAD WITH
2' HOLE FOR ENDPOINT O D U p Q p p Q
17„ QopoQoQopoQ � 00 17,E
opopopopopopop
Q�Q�Q�Q2131b'MQ�Q�
F� 18" - 18"
2"
LID
N.T.S.
�21z"�
u"
28 16
NOTES:
1. LID MATERIAL: HDPE
2. BODY MATERIAL: LLDPE
3. WALL THICKNESS: 3/8" MINIMUM
TYPICAL 1" NON -TRAFFIC
RATED METER BOX
METER
0�0�0�0�0� �0
0.0�
�popopopopopop
2131bMQ�p�
i � 20Z
1. u
27 16"
Lubbity ock
TEXAS
REVISED
JAN. 2020
DRAWING NUMBER
W-4
TYPICAL 2,500 PSI
CONCRETE THRUST
BLOCK
EXISTING MAIN
RETAINER GLANDS
TAPPING VALVE
NOTES:
45° 45° TYPICAL TAPPING
SLEEVE
1. TAP SHALL BE HORIZONTAL TO MAIN.
2. TAPPING SLEEVE & VALVE SHALL BE AT LEAST ONE STANDARD
SIZE SMALLER THAN MAIN TO BE TAPPED.
3. SERVICE TAPS ON EXISTING MAINS SHALL BE EXECUTED BY CITY
FORCES.
4. MAIN LINE TAPS ON EXISTING MAINS SHALL BE EXECUTED IN
ACCORDANCE WITH THE METHODS OF CONNECTIONS SECTION OF
THESE SPECIFICATIONS.
TYPICAL TAPPING
SLEEVE AND VALVE
LIMIT OF WORK
FOR TAP -IN
War
City of
Lubbock
T E X A 5
REVISED
DEC. 2012
DRAWING NUMBER
W-5
900 BEND
METER
BYPASS
SERVICE
LINE
GATE
VALVE \
o I
TYPICAL
VALVE BOX
& COVER
MI X MI X THREAD
TEE
REDUCER
GATE
VALVE
O
p
WATER
METER
O
GATE
VALVE
REDUCER (IF REQUIRED)
900 BEND
MI X MI X THREAD
TEE
❑
TAPPING SLEEVE
AND VALVE
EXISTING MAIN
NOTE:
1. ALTERNATIVELY, METER BYPASS SERVICE LINE AND GATE VALVE CAN
BE LOCATED INSIDE METER VAULT.
REVISED
TYPICAL LARGE
C;tv of
DEC. 2012
DOMESTIC METER TAP
Lubb
6 C%
DRAWING NUMBER
TEXAS
W_6
TYPICAL FIRE -
HYDRANT
TYPICAL VALVE BOX
AND COVER WITH
CONCRETE COLLAR
PROPOSED FINISHED GRADE SURFACE
C-900
PVC RISER
4' MIN COVER
6" GATE
WATER'W VALVE
MAIN
W
TYPICAL 2,500 PSI
VALVE BLOCKING
VARIES BACK OF CURB OR
r
(SEE NOTE #1) EDGE OF PAVEMENT
0.2' MIN 18
0.4' MAX
CONC. CURB
SOLE -PURPOSE
FIRE HYDRANT
LINE L 2' X 2' SQ.
6" OUTLET M.J. X FLG.
OR ANCHOR TEE (OPTIONAL)
WITH M.J. X M.J. VALVE
NOTES:
1. IN SPACE BETWEEN CURB AND SIDEWALK, DIMENSION FROM
BACK OF CURB OR EDGE OF PAVEMENT SHALL BE 6" MINIMUM
AND 18" MAXIMUM. IN PUBLIC AREAS OR COMMERCIAL AREAS,
OR WHERE SIDEWALK ABUTS CURB, DIMENSION FROM BACK OF
CURB OR EDGE OF PAVEMENT SHALL BE 3' MINIMUM AND 6'
MAXIMUM. FIRE HYDRANTS SHALL NOT BE PLACED WITHIN
SIDEWALK AREAS. MAINTAIN T MINIMUM CLEARANCE TO ANY
OBSTRUCTION.
2. 4" STEAMER NOZZLE SHALL FACE FIRE LANE OR STREET ACCESS
3. FIRE LINE PIPING SHALL BE SAME MATERIAL AS MAIN OR MINIMUM
C900 PVC DR18 CLASS PIPE AND HAVE RESTRAINED JOINT FITTINGS
FROM WATER MAIN TO FIRE HYDRANT. LENGTH SHALL NOT EXCEED 1501.
4. FOR BURY DEPTHS GREATER THAN 5', ONE BARREL EXTENSION
NOT EXCEEDING 2' IN LENGTH SHALL BE INSTALLED DIRECTLY
BELOW THE FIRE HYDRANT.
5. TYPICAL 1/2" ROCK PIPE EMBEDMENT MATERIAL SHALL BE PLACED
AROUND THE BOTTOM OF THE HYDRANT FOR A RADIUS OF AT
LEAST V AND EXTEND AT LEAST V ABOVE THE OUTLET. DO NOT
BLOCK DRAIN HOLES.
I=iII, II
- DO NOT
BLOCK DRAIN
TYPICAL 2,500 PSI
CONCRETE THRUST
BLOCK
TYPICAL BLUE
RAISED PAVEMENT
MARKER PLACED
AT CENTERLINE
3' MIN OF ROADWAY
12" MIN
oxv War
TYPICAL FIRE HYDRANT � c'tv"f
Lubb o ck
T E X A 5
REVISED
MAY 2015
DRAWING NUMBER
W-7
MATCH PAVING THICKNESS TYPICAL VALVE BOX
MIN. 6" AND COVER
I
FINISHED GRADE SURFACE
H.M.A.C. PAVEMENT
III CONCRETE COLLAR
(NOT REQUIRED IN
—III—� CONCRETE PAVEMENT)
I-I I II I= FLOW FILL WHEN
CONCRETE COLLAR
_ I=1 11=1 I IS CUT IN AFTER
ASPHALT PAVING
6" PVC C900
=1 11-1 11-1 11-1 RISER PIPE
1-111-111— d �v
TYPICAL
TRACER WIRE
-- — - — - — - —
I
°p
1-1/
I °�e
TYPICAL PIPE
BEDDING &
EMBEDMENT
NOTES:
TYPICAL GATE VALVE
WATER MAIN
L 8" X 8" X 6" MIN. 2,500 PSI CONCRETE
BLOCK UNDER BODY OF BURIED VALVES
1=1 1 1-1 1
VALVE COVER SHALL
BE STAMPED
"WATER VALVE"
1. TREAT EACH SIDE OF VALVE AS A DEAD END OF EQUAL SIZE.
INSTALL THE CORRESPONDING LENGTH (FOR A DEAD END) OF FULLY
RESTRAINED PIPE THE FULL DISTANCE ON EACH SIDE OF VALVE
2. CONCRETE SUPPORT CRADLE AND SUPPORT PAD SHALL BE 3,600 P.S.I.
CONCRETE.
3. POLYWRAP BURIED GATE VALVES AND FITTINGS
4. TORQUE BOLTS PRIOR TO BACKFILL PER MANUFACTURERS RECOMENDATIONS
5. TOP OF VALVE NUT SHALL BE LESS THAN 6 FEET FROM FINISHED GRADE.
IF MORE THAN 6 FEET, INSTALL EXTENSION SO THAT TOP OF NUT IS LESS
THAN 6 FEET FROM FINISHED GRADE.
6. SET COVER OF VALVE BOX AND COLLAR 1/4" BELOW GRADE IN PAVEMENT OR
SHOULDER, AND 2" ABOVE GRADE ELSEWHERE.
BURIED VERTICAL GATE
VALVE DETAIL
2- SQUARE
City Of
Lubb o ck
TEXAS
VALVE BOX
AND COVER
CONCRETE COLLAR
(NOT REQUIRED IN
CONCRETE PAVEMENT)
N0. 4 BARS
EACH WAY
ORIENT SQUARE PARALLEL
OR PERPENDICULAR TO
SREET OR CURB
REVISED
APRIL 2019
DRAWING NUMBER
W-8
0
zo
HORIZANTAL GATE
VALVE IN VAULT
T\/!1T!`A1 I.A AI.I LIl11 G GI'1 AI.AL A�II'l !`/1\/LR
City of
Lubbock
T E X A 5
NO. 5 BARS
10" O.C. VERT.
NO. 5 BARS
8" O.C. HORZ.
REVISED
DEC. 2012
DRAWING NUMBER
W-9
4" D.I. PIPE
"GOOSENECK"
WITH WIRE
BUG SCREEN
LIP T-0"
ABOVEGROUND
VARIES
IIII�IIII '
12" BLIND FLANGE
I —I 1I—CCI I
4" BEDDING=IJ o•
FINISHED GRADE SURFACE
9" SLABIFE1 I I--
'
III -III-
I —I °
2„LIP
'-1 I I-
HANDWHEEL
— 3/4" CRUSHED
ROCK
—" I-11 III—III-
4' MIN.
=I I I- I— I 1-1 I I-
II1I1III1I1III11 1III
TYPICAL MANHOLE
FRAME & COVER
—III—III—I
I —III—i
#6 BARS 6"
I,
O.C. EA. WAY
=1 I I
II
e
COMB. AIR
I I I
°
RELEASE a
I- 2" FLANGED
& AIR INL e
GATE VALVE
111
°
0
1— #5 VERT. INNER
12" BLIND —
I FACE 10" O.C.
FLANGE
III
I #5 HORIZ. OUTER
e .
FACE 8" O.C.
°
---
---- �e
— ----�
0
8III
H_
6'IMIN.
^&rr REVISED
AIR & VACUUM A*A'aI City of DEC. 2012
RELIEF VALVES '■ Lubbock DRAWING NUMBER
W-10
CONCRETE ROCK
CONCRETE VALVE BOX
City of
Lubbock
TEXAS
REVISED
DEC. 2012
DRAWING NUMBER
W-11
CONCRET�+v� ,. O.C. EACH WAY
BUTTERFLY VALVE
IN VAULT
City of
Lubbock
TEXAS
REVISED
DEC. 2012
DRAWING NUMBER
W-12
A
�3pROAN IROry
1 " RAISED LETTERING
A T E R (RECESSED FLUSH)
CUSTOM LOGO
pF L I
B �-1 66
V B n
PI) EPIC CKB RSA
MADE IN 115p
A
32" DIA
21 3/4"
r �
v �
N 23
SECTION A -A
V-1430 A
PROD.NO. SECTION B-B
MO/DAY/YR
ASTM A48 CL35B
NOTES:
1. SANITARY SEWER MANHOLE FRAME
AND COVER I.D.: 4143009OA01
BOTTOM VIEW 2. STORM SEWER MANHOLE FRAME
AND COVER I.D.: 41430091AOI
REVISED
TYPICAL WATER � IV,, Cityof DEC 2015
VAULT COVER ll�Lubbock DRAWING NUMBER
W-13
•
m
A A
N
Q
0
O •
• B ��1y
M9�rN v 1a2o BB
�/Sq ® • 1 ��
1/2"
l
AA
32 3/16" 1 1/2"
4 1/2"
30"
40 3/4"
��r r REVISED
TYPICAL WATER �'aI City of DEC. 2012
ll�T .
VAULT FRAME ubb o Ck DRAWING NUMBER
W-14
2 T ,,-CARSONITE MARKER
GROUND SURFACE R
II -I I I -I I I -I I „III-u =I I i= _..
114" MI IIi li lI I 16" =-III SQUARE TRAFFIC RATED / OR NON
FOR HDPE OR PEX-A USE=I =
24" MIN -
TRAFFIC RATED METER BOX
APPROVED THREAD II -
X SLIP FITTING
4' TYP.
CORPORATION STOP
�_lillil�r'
CURB STOP
45' FOR HDPE OR PEX-A USE APPROVED
WATER MAIN + THREAD X SLIP FITTING
COPPER OR APPROVED HDPE PEX-A
TAPPING SADDLE
NOTES:
1. STANDARD 1" SERVICE TAP
2. 1" SERVICE SADDLES SHALL HAVE AWWA TAPERED THREADS.
3. METER BOX SHALL BE INSTALLED PLUMB & LEVEL WITH TOP OF LID 2" ABOVE FINISHED
GROUND SURFACE.
4. TOP OF METER SHALL BE 16" FROM BOTTOM OF METER BOX LID.
5. MATERIALS AND INSTALLATION OF SERVICE LINES SHALL COMPLY WITH THE CITY OF
LUBBOCK PUBLIC WORKS ENGINEERING MIN DESIGN STANDARDS AND SPECIFICATIONS.
TYPICAL 1" WATER SERVICE DETAIL
oxv War
City of
Lubbock
TEXAS
REVISED
DEC. 2015
DRAWING NUMBER
W-15
W
2 T ,-CARSONITE MARKER
GROUND SURFACE R
-IIi II- IT m m m
14 IvIliliil�iiliii 16 SQUARE TRAFFIC RATED / OR NON
24" MIN iii TRAFFIC RATED METER BOX
4' TYP.
CORPORATION STOP
CURB STOP
45' CORPORATION STOP
WATER MAIN
TAPPING SADDLE COPPER SERVICE TUBING
NOTES:
1. STANDARD 2" SERVICE TAP
2. 2" SERVICE SADDLES SHALL HAVE IPS THREADS.
3. METER BOX SHALL BE INSTALLED PLUMB & LEVEL WITH TOP OF LID 2" ABOVE FINISHED
GROUND SURFACE.
4. TOP OF METER SHALL BE 16" FROM BOTTOM OF METER BOX LID.
5. MATERIALS AND INSTALLATION OF SERVICE LINES SHALL COMPLY WITH THE CITY OF
LUBBOCK PUBLIC WORKS ENGINEERING MIN DESIGN STANDARDS AND SPECIFICATIONS.
REVISED
TYPICAL 1 1/2", OR 211olf �',# C;t�. o f DEC. 2015
WATER SERVICE DETAIL Lubb6ck DRAWING NUMBER
TEXAS W-16
TYPICAL TAPPING SLEEVE
NOTES:
1. THIS DETAIL SHALL APPLY TO ALL WATER LINES < 16" DIAM.
2. TAPPING DISTANCES FOR LARGER LINES SHALL BE CASE BY CASE.
TAPPING SLEEVE
MINIMUM DISTANCE
City of
Lubbock
TEXAS
REVISED
DEC. 2015
DRAWING NUMBER
W-17
Design Standards and Specifications
Construction Details
10.03 Sewer Details
Section 10 C
W
}Z
F
w I TYPICAL SANITARY SEWER
p I MARKER (2" X 4" PAINTED GREEN)
a
=III III III III III III III III III III III III III III I U a
B I I I I-1 I B I I -I I I -I I B I I -I I I -III I 11, I I I I -I I I -I I
' 1-I 11-11 ' 1=1 11=1 I EI I E111=1 I I 1 I I-111-
_' I i-
4" 450 BEND
H
4" RISER 4" PLUG
�
0
4" MIN. TEE MAX. NOT
TO EXCEED ONE STANDARD
SIZE SMALLER THAN MAIN
FLOW SEWER MAIN
4" 450 BEND
4" PLUG J
4" MIN. TEE MAX. NOT
\-
TO EXCEED ONE STANDARD
SIZE SMALLER THAN MAIN
FLOW SEWER MAIN
NOTES:
1. ALL TAPS MUST BE ABOVE SPRINGLINE OF SEWER MAIN.
2. NO SIZE -ON -SIZE TAPS.
3. SERVICE LATERALS SHALL BE BROUGHT TO THE PROPERTY
AND PLUGED AT A DEPTH OF NO GREATER THAN 6' FROM
FINISHED GRADE SURFACE, UNLESS REQUIRED TO BE
DEEPER BASED ON DEVELOPMENT REQUIREMENTS.
4. PLUG SHALL BE PRESENT AT OR NEAR PROPERTY
LINE OR EDGE OF PAVEMENT.
TYPICAL SEWER
SERVICE TAP
wi
zl
w I TYPICAL SANITARY SEWER
a.
p I MARKER (2" X 4" PAINTED GREEN)
a
A$ War
City of
Lubbock
T E X A 5
w
J
REVISED
DEC. 2015
DRAWING NUMBER
SS-1
A
�3pROAN IROry
SUBSTITUTE "STORM" 1 " RAISED LETTERING
FOR STORM SEWER (RECESSED FLUSH)
APPLICATION P NIT q
S R y CUSTOM LOGO
p F L (/
V BEPIC
n
PICKB RSA
S E W E R
MADE IN 115p
A
32" DIA
21 3/4"
r �
v �
N 23
SECTION A -A
V-1430 A
PROD.NO. SECTION B-B
MO/DAY/YR
ASTM A48 CL 35B
NOTES:
1. SANITARY SEWER MANHOLE FRAME
AND COVER I.D.: 4143009OA01
BOTTOM VIEW 2. STORM SEWER MANHOLE FRAME
AND COVER I.D.: 41430091AOI
REVISED
TYPICAL � � ,, City o f DEC. 2015
MANHOLE COVER iliLubbock DRAWING NUMBER
SS-2
•
m
A A
N
Q
0
O •
• B ��1y
M9�rN v 1a2o BB
�/Sq ® • 1 ��
1/2"
l
AA
32 3/16" 1 1/2"
4 1/2"
30"
40 3/4"
��r r REVISED
TYPICAL A*Asso City of DEC. 2012
MANHOLE FRAME ll�T .ubbock DRAWING NUMBER
SS-3
TYPICAL JOINT SEALANT
EACH JOINT OF RISER &
RING & COVER. MAXIMUM
GRADE ADJUSTMENT 18"
ELEVATION VIEW
NOTES:
1. CONCRETE SHALL BE MINIMUM 4000 P.S.I.
2. REINFORCING SHALL BE MINIMUM GRADE 60.
PRECAST CONCRETE
ECCENTRIC CONE
SECTIONAL VIEW
City of
Lubbock
TEXAS
REVISED
DEC. 2015
DRAWING NUMBER
SS-4
3600 PSI: CONC. MIN.
TYPICAL MANHOLE FRAME AND COVER
IF PAVED MATCH
PAVING THICKNESS NON -SHRINK GROUT
OR MIN MIN. 6"
it 1 1 r-i-111-'--
-�
30"'
GRADE RINGS FOR
GRADE ADJUSTMENT
(MAX 18")
ECCENTRIC CONE SECTION
T
SEAL ALL JOINTS
PER MANUFACTURER
REQUIREMENTS
H
0
ASTM 478 p -0 9� RISER SECTION
(TONGUE & GROOVE)
BOTTOM RISER SECTION
(BUTT & GROOVE)
1" TO 2" GROUT SPACE
CONCRETE BASE
FORMED SURFACES
} 6" OR 1/4 PIPE DIA.(P)
i WHICHEVER IS LARGER
#4 BARS-6" O.C. EA. WAY
ORIENT SQUARE PARALLEL
R PERPENDICULAR TO
2" BELOW BOTTOM OF PIPE
S
SREET OR CURB
5'SQUARE
STANDARD SANITARY
SEWER MANHOLE
H
P
D
T
4'TO 16'
6" TO 15"
MIN. 48"
MIN. 5"
18" & OVER
MIN. 60"
MIN. 6"
16'&DEEPER
ALL SIZES
MIN. 60"
MIN. 6"
(a
PLAN VIEW
FRAME & COVER
CONCRETE COLLAR
(NOT REQUIRED IN
CONCRETE PAVEME
NO. 4 BARS
EACH WAY
141I, REVISED
PRECAST REINFORCED '�� ;t�,{,f DEC. 2015
CONCRETE MANHOLE Lubb6ck DRAWING NUMBER
TEXAS SS_5
BACKFILL COMPACTED TO
95% MODIFIED PROCTOR
(ASTM D-1557)
H
MINIMUM WALL THICKNESS
OF .5 INCHES
112" MIP
4
CONCRETE BASE AS REQUIRED TO J
COUNTERACT FLOTATION, SEE NOTE
ANTI -FLOATATION
BTM. 54" DIA
AND 2" FLANGE
SEE MANHOLE COLLAR DETAIL
II FACTORY BONDED JOINT
41
NOTES:
_ CONTRACTOR TO PROVIDE SUFFICIENT
QUANTITY OF CONCRETE OVER
ANTI -FLOTATION RING TO COUNTERACT
FLOTATION AS SPECIFIED BY THE
ENGINEER
H
FIBERGLASS MANHOLE
3600 PSI CONCRETE
MATCH TOP OF ADJACENT 18" MIN
PAVNIG
o 12"
PAVEMENT AND FLOW
FILL PER UEM - 01
BACKFILL COMPACTED TO
95% MODIFIED PROCTOR
DENSITY
18" MIN
I
STD 30" MH FRAME & LID
FRP OR CONCRETE
MANHOLE RISER
SECTION
18" MIN
' 4
H
P
D
470 16'
6" TO 15"
MIN. 48"
18" & OVER
MIN. 60"
16'&DEEPER
ALL SIZES
MIN. 60"
INTEGRAL FIBERGLASS
BENCH W/ NON-SKID
COATING. MIN 1/4 INCH
THICKNESS
CONCRETE - 3000 PSI
@ 28 DAYS
PVC STUB
PROVIDE 4" - 6" OF
CRUSHED STONE
LEVELING COURSE
3/4" CHAMFER TYP.
FINAL GROUND
SURFACE
3600 PSI CONCRETE
BACKFILL COMPACTED TO
95% MODIFIED PROCTOR
DENSITY
1410 REVISED
War
� City- of APRIL 2019
FIBERGLASS MANHOLE LL1bb6Ck
DRAWING NUMBER
TEXAS SS-5b
OMING SEWER
450 BEND
PVC PIPE
900 BEND
NOTE:
1. FILL EXCAVATED SPACE OUTSIDE OF MANHOLE &
UNDER PIPE WITH FLOWABLE FILL.
OUTSIDE DROP REVISED
REVISED
� City of MAY 2014
MANHOLE (PVC) Lubbock
DRAWING NUMBER
(NEW MANHOLE INSTALL) TEXAS SS-6
NOTE:
1. FILL EXCAVATED SPACE OUTSIDE OF MANHOLE
& UNDER PIPE WITH FLOWABLE FILL.
INSIDE DROP ON
EXISTING MANHOLE
**Ivor
City of
Lubbock
TEXAS
TYPICAL
EPDXY
REVISED
DEC. 2012
DRAWING NUMBER
SS-7
STRAIGHT THROUGH MANHOLE
SLOPE
TYPICAL
MANHOLE FLOORS
BEND AT MANHOLE
JUNCTION AT MANHOLE
CUT OUT TOP OF PIPE
OR SHAPED CONCRETE INVERT
SHAPED CONCRETE INVERT
Mr1d41ZKi1110 741:811WA iA
oxv War
City of
*Lubb6ck
TEXAS
REVISED
DEC. 2015
DRAWING NUMBER
SS-8
5'- MAXIMUM CARRIER PIPE
BETWEEN SPACERS I' MAX
PIPE JOINT
CASING SPACERS SHALL BE FOUR CASING SPACERS ADDITIONAL SPACERS,
SPACED A MAXIMUM OF ONE PER PIPE JOINT AS REQUIRED TYPICAL EACH END
FOOT FROM EACH SIDE OF JOINT TO MEET MAXIMUM SPACING OF CASING PIPE
STEEL SPACER BODY STEEL CASING PIPE
45° 45
CADMIUM PLATED
45° 45 STUDS, NUTS, AND
PIPELINE WASHERS, TYP.
30° i " 30
45 4
FILL SPACE BETWEEN
EXCAVATED BORE AND
CASING PIPE WITH
CEMENT GROUT
L = D, WITH L MAX. = 16"
1. BEVEL END OF CASING PIPE TO REMOVE
ALL SHARP EDGES TO PREVENT DAMAGE
TO THE CARRIER PIPE.
2. THE END -SEAL SHALL BE ATTACHED TO
THE PIPE AND CASING SO AS TO PROVIDE
A WATER -TIGHT END SEAL.
3. FOR CASINGS OVER 12 INCHES IN DIAMETER,
PROVIDE TWO CLAMPS OR BANDS ON EACH
END OF EACH SEAL.
4. CASING PIPE SHALL HAVE END -SEALS
INSTALLED ON BOTH ENDS PRIOR TO
BACKFILLING ADJACENT PIPE TRENCHES.
L L
)/2
�r REVISED
PIPELINE ENCASEMENT m''+I77r�7 City of DEC. 2012
DETAIL L �1 bock DRAWING NUMBER
TEXAS SS-9
FINISHED GRADE SURFACE
1
IIEl I I-1 I I
=1II II1I1= III III1I1=�'
�-III-1 I I I -I I -I I �-
-III- I
-1 1 ElI-
IIIII IIIII 11�
� IIIIII IIIII 11
FINAL
( IIIII 11111 BACKFILL
PIPE WIDTH
12" COVER
EMBEDMENT w
MATERIAL z
o
m
PIPE SPRINGLINE w
ZONE a;
HAUNCHING
6" BEDDING
FOUNDATION
(MAY NOT BE REQUIRED)
-1 I-111-III-111-1 I 1-1 11-1 I El
NOTES:
1. BEDDING, EMBEDMENT, AND BACKFILL SHALL BE CAREFULLY
PLACED MATERIAL AS SPECIFIED IN THESE SPECIFICATIONS.
3. BACKFILL REQUIREMENTS SHALL COMPLY WITH CURRENT CITY
OF LUBBOCK STREETS ORDINANCE.
REVISED
TRENCH CROSS-SECTION City of APRIL 2019
SHOWING TERMINOLOGY Lubbock DRAWING NUMBER
TEXAS SS'10
Design Standards and Specifications
Construction Details
10.04Street and Drainage Details
Section 10 D
NOTE:
1. DRIVEWAYS MUST CONFORM TO ORDINACE SECTION 36.04.126
2. SPACING OF DRIVEWAYS "C" ALONG A ARTERIAL:
• WHEN INTERSECTING A RESIDENTIAL STREET - 50'
• WHEN INTERSECTING ANOTHER ARTERIAL, A COLLECTOR
OR AN INDUSTRIAL STREET- 150' ENTERING AND 100' EXITING
v
A
v
m
z
m
m
R
ISLAND, 50 SQ.FT. MIN.
AREA IF USED.
R
PROPERTY LINE 1 F
R
i
VISIBILITY
TRIANGLE
N
25'
C
LR ) ly
DIMENSION
REFERENCE
RESIDENTIAL
STREET
ARTERIAL
STREET
COLLECTOR
STREET
INDUSTRIAL
STREET
(ROADWAY CLASSIFICATION,
(R1A, 32')
MINOR, 66'
R2, 42'
N"
(I, 42 )
ROADWAY WIDTH
(RI, 36')
MAJOR, 88'�
46'�
ONE-WAY WIDTH
W
12'
15'
15'
20'
-------- --- - --
TWO-WAY -MINIMUM WIDTH
------
W
-------
12'
--------
30'
--------
30'
--------
40'
--------------
TWO-WAY -MAXIMUM WIDTH
--------------
------
W
------
-------
30'
-------
--------
40'
--------
--------
40'
--------
--------
S0'
--------
MINIMUM RADIUS
R
5'
15'
15'
20'
-------- ------
MINIMUM SPACING
------
-------
R
--------
R
--------
R+5'
--------
R+5'
FROM PROPERTY LINE
------------ --
MINIMUM SPACING
FROM STREET CORNER
- - - - --
C
- - - - - --
A+R
-- - - - - --
SEE NOTE 2
-- - - - - --
A+R
-- - - - - - -
A+R
-- - - - - - - - - - - --
MINIMUM SPACING BETWEEN
- - - - --
S
- - - - - --
3'
-- - - - - --
60'
-- - - - - --
60'
-- - - - - - -
30'
TWO WAY DRIVEWAYS
MINIMUM SPACING BETWEEN
S
N/A
0'
0'
0'
ONE WAY DRIVEWAYS
--------------
MINIMUM ANGLE
------
D
-------
45°
- -------
45°
--------
300
--------
300
"A" IS 25' FOR MOST STREET INTERSECTIONS. IF THE STREET INTERSECTION IS BETWEEN A ARTERIAL AND A COLLECTOR THEN "A" IS 401.
IF THE STREET INTERSECTION IS BETWEEN TWO ARTERIAL STREETS THEN "A" IS 40'. IF THE EXISTING STREET INTERSECTION RADIUS IS
LARGER THAN ANY OF THE SCENARIOS ABOVE THEN "A" WILL BE THE EXISTING STREET INTERSECTION RADIUS.
01RkyjATI%MA
STANDARDS
�A bbCity of
Luock
IIxAS
REVISED
APR. 2020
PLATE NO.
36-1
J
a
g
a
�g
fa
No
A A
PROP
"'L
PROPERTY LINE
. poD
paD.
pn
7oD
p D.
°
. voD
°
EXPANSION
4' SIDEWALK
a
Ln
EXPANSION JOINTS
SPACED 36' MAX. ALONG
D D.
JOINTS
p D'
W
SIDEWALK RUN.
g
FIRE HYDRANT, POWER
cn
POLE, ETC. MUST HAVE
EXPANSION
w
EXPANSION JOINT BLOCK -
JOINT
YY
OUT WHEN ENCLOSED
IN CONCRETE. EXTEND
6" PAST EDGE OF
AL
HYDRANT/POLE
CONTRACTION MARKINGS
1/2 WAY THROUGH
0
SLAB AT 4' INTERVALS.
SECTION A -A
w
z
J
VARIABLE
4SIDEWALK Wa
3' MIN. @ 2% MAX. SLOPE O
CURB
REMOVED.
NOTE:
SEE PLATE NO. 36-4 FOR
ASPHALT REPAIR ADJACENT
TO CURB AND GUTTER OR
DRIVEWAY.
FOR COMMERCIAL DRIVEWAY:
CURB AND GUTTER TO BE
COMPLETELY REMOVED AND
RECONSTRUCTED WITH #3
BARS RUNNING ENTIRE
LENGTH OF NEW GUTTER.
NOTES:
SECTIONS B-B
(RESIDENTIAL)
VARIABLE
— 4' SIDEWALK
3' MIN. @ 2% MAX. SLOPE
#4 DEFORMED STEEL BARS 12" O.C.
BOTH WAYS, CENTERED IN SLAB OR
W
6"X6" 6 GAUGE WELDED WIRE FABRIC.
?Y
w
ZY
i0�
�=
SECTIONS B-B
(COMMERCIAL)
TMR
1. MAINTAIN GUTTER FLOWINE THROUGH DRIVEWAY.
2. ALL EXPANSION JOINTS TO BE )4"" THICK.
3. 30' TO 45° FLARE MAY BE USED IN LIEU OF
RADII ON RESIDENTIAL DRIVEWAYS.
4. SEE PLATES 36-16 AND 36-16(A) FOR
CURB RAMP DETAILS.
4' SIDEWALK
CONSTRUCTION DETAILS
PROPERTY LINE
SECTION C-C
3'a.T'o,
*0" City of
Lubbock
INNER CURB
AS REQUIRED.
REVISED
MAR. 2019
PLATE NO.
36-2 (A)
a x
EXPANSION JOINTS <a
SPACED 36' MAX. �0 o O
ALONG SIDEWALK RUN. B ins N� PROPERTY LINE
------------ ---
D ..;°. --
LANDSCAPE
CONCFZ�E CONCRETE A A
v eD,
D
5' OR 6' EXPANSION : . °
SIDEWALK ° D °. JOINTS D; C ° C v'-
° °
° v ,000
FIRE HYDRANT, POWER
POLE, ETC. MUST HAVE
EXPANSION JOINT BLOCK -
OUT WHEN ENCLOSED
IN CONCRETE. EXTEND
6" PAST EDGE OF
EXPANSION HYDRANT/POLE
JOINT.
b,
° 4" MIN. THICKNESS OF SIDEWALK.
a .D
CONTRACTION MARKINGS
1/2 WAY THROUGH SLAB
AT 6' INTERVALS.
SECTION A -A
VARIES
3' MIN. @ 2% MAX. SLOPE w
aW
O
CURB T SIDEWALK d J
REMOVED.
v oD.
n D.
SECTIONS B-B 4" MIN.
NOTE: (RESIDENTIAL) THICKNESS.
I}
SEE PLATE NO. 36-4 w
FOR ASPHALT REPAIR VARIES a w
ADJACENT TO CURB 3' MIN. @ 2% MAX. SLOPE a z
AND GUTTER OR
DRIVEWAY. 6' SIDEWALK
6"
#4 DEFORMED STEEL BARS 12" O.C. z 4
z_ BOTH WAYS, CENTERED IN SLAB OR INNER CURB
FOR COMMERCIAL DRIVEWAY, 6"X6" 6 GAUGE WELDED WIRE FABRIC. io AS REQUIRED.
COMPLETELY REMOVE CURB AND iO SECTION B-B
GUTTER AND RECONSTRUCT WITH (COMMERCIAL)
#3 BARS RUNNING ENTIRE LENGTH
OF NEW GUTTER.
NOTES:
1. MAINTAIN GUTTER FLOWINE THROUGH DRI`
2. ALL EXPANSION JOINTS TO BE X4" THICK.
3. 300 TO 45° FLARE MAY BE USED IN LIEU OF
RADII ON RESIDENTIAL DRIVEWAYS.
4. SEE PLATES 36-16 AND 36-16(A) FOR
CURB RAMP DETAILS.
5. 5' CURB BACK ON RESIDENTIAL STREETS.
6' CURB BACK ON COLLECTOR AND
ARTERIAL STREETS.
5' OR 6' SIDEWALK
CONSTRUCTION DETAILS
PROPERTY LINE
SECTION C-C
*City Of
Lubbock
REVISED
APR. 2020
PLATE NO.
36-2 (B)
w
Z
i
iw
;Z
J
IJ
G/TC
G/TC
0
I0
I
G I
G/TP/TW
G/TP/TW
(OPTIONAL) - -
(OPTIONAL)
I
I
I
(OPTIONAL) - -
I
G/TP/TW
G I
(OPTIONAL) - -
I
G/TP/TW
G/TP/TW AT THE PROPERTY LINE I
G/TP/TW AT THE PROPERTY LINE
G/TC
SHALL BE 6" HIGHER THAN
G/TC
I
SHALL BE 6" HIGHER THAN
THE ADJACENT GUTTER
I
I
THE ADJACENT GUTTER
I
I
LEGEND
G GUTTER
TC TOP OF CURB
TP TOP OF PAVEMENT
TW TOP OF WALK
X SPOT GRADES REQUIRED
REVISED
City of
MARCH 2O18
DRIVEWAY
GRADES
Lubbock
PLATE NO.
TEXAS
36-3
6" 18" TYPICAL
NEW CONCRETE
DRIVEWAY
NOTES:
TOE FORM - TO BE REMOVED
PRIOR TO INSTALLATION OF
FLOWABLE FILL AND PAVING
SURFACE.
1. MAINTAIN VERTICAL AND HORIZONTAL
ALIGNMENT OF CURB, LIP, AND GUTTER
FLOW LINE.
2. REMOVE CURB TO LIP LINE AND
POUR NEW DRIVEWAY FLUSH AGAINST
TOE FORM.
ASPHALT REPAIR ADJACENT TO
CURB AND GUTTER OR DRIVEWAY
12"
SMOOTH H.M.A.C. SURFACE,
2" MIN. TYPE "C" Z SAWCUT `TO REMAIN
H.M.A.C. SURFACE. / IN PLACE.
BASE
D D
VERTICAL SURFACES)
TO RECEIVE TACK COAT
City Of
Lubb 0 ck
TEXAS
FLOWABLE FILL
REVISED
APRIL 2019
PLATE NO.
36-4(A)
6" 18" TYPICAL
NEW CONCRETE
DRIVEWAY
NOTES:
1. MAINTAIN VERTICAL AND HORIZONTAL
ALIGNMENT OF CURB, LIP, AND GUTTER
FLOW LINE.
2. REMOVE CURB TO LIP LINE AND
POUR NEW DRIVEWAY FLUSH AGAINST
TOE FORM.
CONCRETE PAVING REPAIR
ADJACENT TO CURB AND
GUTTER OR DRIVEWAY
SMOOTH
SAWCUT
-7
EXISTING
CONCRETE
PAVING
City of
Lubbock
TEXAS
REVISED
DEC. 2012
PLATE NO.
36-4(B)
R=VARIES
15'-40'
/ VARIES
4' PROPERTYlim
LINE SIDEWALK
L� �O/�C� 3' CLEARANCE
may LJ / tiP AROUND
OBSTRUCTIONS
r /QO ti
a LU-
LU
/
VARIES 8'-10'
I'' M
4' SIDEWALK ALONG
PROPERTY LINE
TMIN.
ALLEY RETURN
(TYPICAL)
City of
Lubbock
TEXAS
YMIN.
DRIVEWAY APPROACH
(TYPICAL)
REVISED
FEB. 2017
PLATE NO.
36-5
5' OR 6' SIDEWALK
ALONG CURB BACK
OBSTRUCTION
**Ivor
City of
Lubbock
TEXAS
DRIVEWAY APPROACH
(TYPICAL)
REVISED
FEB. 2017
PLATE NO.
36-6
CURB AND GUTTER,
FILLETS AND SLAB TO BE
POURED TOGETHER.
PAY LIMIT FOR
CURB AND GUTTER
SIDEWALK
2.5'
1'*
\ PROPERTY LINE
\ OR
\
\
\
\
\
6" CONCRETE SLAB WITH 6"X6" - 6 3/4" BITUMINOUS
GAUGE WELDED WIRE FABRIC OR #4 PREMOLDED EXP.
DEFORMED STEEL BARS 12" O.C. BOTH JOINT.
WAYS, CENTERED IN SLAB.
< °a° PAY LIMIT FOR
CURB AND GUTTER
CURB HEIGHT
TRANSITIONS TO
CONTRACTION 0" AT THIS POINT.
JOINTS. a.-,7�%lJ/�'/lam
IS POINT OF ALLEY RETURN
4.
TO BE NO MORE THAN 7"
HIGHER THAN GUTTER ON HIGH
_2.5'_ SIDE END OF RADIUS AT STREET.
1'*
Y2" BITUMINOUS
EXPANSION JOINT. S
PLAN VIEW
s .--I
N LU B
C).Z.
Z
0
°•D a
V
z 6"X6" - 6 GAUGE WELDED W
FABRIC OR #4 DEFORMED S
y BARS 12" O.C. BOTH WAYS,
w °> ° CENTERED IN SLAB.
J
o CONTRACTION
JOINT.
* TO BE USED WHEN
ALLEY R.O.W. WIDTH
IS 15'.
A
A
20'
w 5'
10, 5'
�
a Z
Lu
a
SECTION A -A NO. 6 REBAR SPACED 6" FROM EDGE OF SLAB
U
6"X6" - 6 GAUGE WELDED WIREJ
AND 132" FROM BOTTOM OF SLAB EACH SIDE.
FABRIC OR DEFORMED STEEL
LOCATE BY MEANS OF CHAIRS OR PLASTIC
BARS 12" O.C. BOTH WAYS,
STAKES (NOT METAL OR WOOD).
CENTERED IN SLAB.
CONSTRUCTION OF THIS TYPE IS ALLOWED ONLY
W.R. MEADOWS #158,
WHERE THE EXISTING ALLEY RETURN, ALLEY
SEALTIGHT SAFE -SEAL 3405,
PAVING OR STREET GUTTER IS IN GOOD CONDITION
SONNEBORN SL-1 OR
AND GRADE AND ALIGNMENT ARE SATISFACTORY.
APPROVED EQUIVALENT.
Y2" BITUMINOUS ALLEY SLAB.
-
EXPANSION JOINT. oEXISTING
ALLEY RETURN, ALLEPAVING
fCONCRETE
OR STREET GUTTER.TRANSVERSE
4 — 6"X6" - 6 GAUGE WELDED
WIRE FABRIC OR #4
CONTRACTION JOINT
6"�J DEFORMED STEEL BARS 12"
(REQUIRED AT COLD JOINTS AND
! 12"�' 1 O.C. BOTH WAYS,
EVERY 13 FEET OF PAVING.)
SFC'TTCIN R-R CENTERED IN SLAB.
ALL CONCRETE SHOWN TO BE 3,000
P.S.I. AT 7 DAYS. (CLASS B)
War REVISED
TYPICAL ALLEY �# c;tv of MAY 2014
RETURN Lubb 4 C% PLATE NO.
TEXAS 36-7
5'
10'
5'
'
w
p
J
�Ww
~Nz 0
a
10,
10'
N
°p
'
PROPERTY
p a
LINE
15' 51
SEE
20'
NOTE 2
13'
w
z
J N
a
CONTRACTION
a a 10'
zZJOINTSa
0 wwn
a
v•,
20'
5Eo
SE
aa .°
.1
NOTE 2 5'
PROPERTY LINE
oN
10'
a.
10
p,
d d Q •,
N
LLJ
NwL
Z
J
a v'
~vz
7
LOUa
0
a
5' 10,
5'
TRANSVERSE CONTRACTION JOINT
(REQUIRED AT COLD JOINTS AND
EVERY 13 FEET OF PAVING.)
NOTE:
1/2" —j
6"X6" - 6 GAUGE WELDED
1. TRANSVERSE CONTRACTION JOINT
_
WIRE FABRIC OR #4
(REQUIRED AT COLD JOINTS AND
— —
— — — DEFORMED STEEL BARS
EVERY 13 FEET OF PAVING.)
°
12' O.C. BOTH WAYS,
CENTERED IN SLAB.
2. NO OBSTRUCTIONS SUCH AS
METERS, POLES, PEDESTALS,
TREES, BOULDERS, ECT.
TYPICAL 1711 ALLEY
REVISED
�,�,
of'
APRIL 2020
INTERSECTION WITH
Lubbock
PLATE NO.
CONTRACTION JOINTS
TEXAS
36-8
6"
4"
�. 2"R
3"R00
J- ---
— -- o
N
(TDON URB SECTION. v . D
6
1248.337
TYPE "A"
9" R
a . a • ? NOTE:
9 R 1. THIS SECTION TO BE USED
FOR RESIDENTIAL APPLICATIONS
ONLY. APPROVAL WILL DEPEND
o v ON TRAFFIC AND DRAINAGE
a o v °• a: a o CONSIDERATIONS.
a :a .a. •v.p.a
v p a
F� 12" I 12"
ROLLOVER CURB TYPE "B"
9 11/16" :.
a a ,
00
°o —
a : a •.a •. i—
•v'D a
6"
3" � 9�� ,� 9�� M 3"
M
in
TYPE "C"
NOTE:
1. REINFORCED TYPE "C" GUTTER SECTION SHALL BE CONSTRUCTED WITH THREE
#3 BARS RUNNING THE ENTIRE LENGTH OF THE DRIVEWAY SECTION WITH CHAIRS
SPACED TO GIVE ACCURATE PLACEMENT. (TO BE USED AT DRIVEWAYS ONLY.)
REVISED
TYPICAL 24"CURB c;tv {,f MAY 2014
AND GUTTER SECTIONS Lubb6ck PLATE NO.
TEXAS 36-9
t
12" 18"
TYPE "A"
5 3/4"
4 1/4" �I
boa 2"R =
3"R ---
DOWN CURB SECTION. 6"
a . a .a •.
� D,a
�9 11/16" 20 5/16"
NOTE: CONTRACTOR MAY USE EITHER OF THE ABOVE SECTIONS.
TYPE "B"
a '
a .a
o.p a o'p
3
12" 611
� o a 3"
Ll
3"
�9 11/16" -� 20 5/16"
TYPE "C"
NOTES:
1. REINFORCED TYPCE "C" GUTTER SECTION SHALL BE CONSTRUCTED WITH THREE
#3 BARS RUNNING THE ENTIRE LENGTH OF THE DRIVEWAY SECTION WITH CHAIRS
SPACED TO GIVE ACCURATE PLACEMENT. (TO BE USED AT DRIVEWAYS ONLY.)
2. 30" CURB AND GUTTER IS NOT STANDARD AND SHALL ONLY BE USED WITH
PERMISSION OF CITY ENGINEER.
REVISED
TYPICAL 30" CURBS �'� C;tv of MAY 2014
AND GUTTER SECTIONS Lubb6ck PLATE NO.
TEXAS 36-10
FLOWABLE FILL SHALL BE USED
TO REPLACE BASE MATERIAL
CONTRACTION
REMOVED. SEE PLATE NO. 36-4
JOINT
#4 DEFORMED STEEL BARS
@ 12" O.C. BOTH WAYS.
A
—
—
\
FLOWLINE-10'
—
—
CONTRACTION
TRACTIONJOINT
Tq
rTRANSITIONS
z
36-16EGARDINGzIONS
F-
r
L
n
X=DISTANCE LIP TO LIP
z
DO
NOTES:
1. CLASS "B" CONCRETE 3,000 P.S.I. @ 7 DAYS
2. MAINTAIN LIP UP GUTTER SECTION WITH 1"
INVERT TO VALLEY GUTTER
3. TRANSITION FLOWLINE AND MAINTAIN 1"
PLAN VIEW
INVERT FOR POSITIVE DRAINAGE THROUGH
VALLEY GUTTER
DEPTH:
6"- RESIDENTIAL STREETS
8"- COLLECTORS & ARTERIALS
BASE
-----,
3"
5'___T____5�
SECTION A -A
2" MIN. TYPE "C"
H.M.A.C.SURFACE.
BASE _
FLOWABLE FILL
SEE PLATE NO. 36-4.
REVISED
CONCRETE VALLEY CityAPR. 2020
GUTTER & FILLET DETAIL kLubbo'c3'k PLATE NO.
5 36-11
CALICHE BASE
HMAC
SURFACE
6"
2"
RESIDENTIAL
8"
2"
COLLECTOR
10"
2.5"
INDUSTRIAL
12"
3"
MINOR ARTERIAL
12"
5"
PRINCIPAL ARTERIAL
H.M.A.C. SURFACE.
NOTE:
WIDTH AND CROWN VARY
SEE SECTION 8.2.02
7
CALICHE BASE
1. STREETS WITH ANTICIPATED ABNORMAL TRAFFIC LOADS,
SUCH AS TRUCKS AND BUSES, SHALL REQUIRE A SPECIFIC
DESIGN TO BE APPROVED BY THE CITY ENGINEER.
RESIDENTIAL/COLLECTOR/IN DUSTRIAL
I V V %-Mkl
ECTION
CONTINUOUSLY REINFORCED CONCRETE PAVEMENT
6" THICK RESIDENTIAL, COLLECTOR, AND INDUSTRIAL
7" THICK MINOR ARTERIAL
9"THICK PRINCIPAL ARTERIAL
TYPICAL STREET
CROSS -SECTIONS
City. of
Lubbock
TEXAS
6"
12 5/8"
REVISED
]AN. 2020
PLATE NO.
36-12
EXISTING
SIDEWALK
YELLOW CAST IN PLACE
REPLACEABLE TRUNCATED
DOME PANEL
VARIES
0" C.
C. OR
3& G.
SECTION A -A
ONLY APPLIES AT DEPRESSED ALLEY RETURNS
A A STREET
ALLEY
STREET
NOTES:
1. ALLEY RADII MAY VARY.
2. SEE OTHER PLATES FOR RAMP DETAILS
TYPICAL LOCATIONS
FOR CURB RAMP
EXISTING
SIDEWALK
1:12 SLOPE
TO BE CONSTRUCTED
YELLOW CAST IN PLACE
REPLACEABLE TRUNCATED
DOME PANEL
INSET
2B
I
YELLOW CAST IN PLACE
REPLACEABLE TRUNCATED
DOME PANEL
i
1:12 SLOPE
LENGTH VARIES,
DUE TO 1:12 MAX.
wd
SLOPE OF RAMP. ,
r r
oxv War
City of
Lubbock
TEXAS
REVISED
FEB. 2017
PLATE NO.
36-13
r� VARIES 4'VARIES
T.O.C. �1
1:12 SLOPE �1;12 SLOPE
FLOWLINE
SIDEWALK SLOPE REQUIREMENTS
LONGITUDINAL -- 1:20 MAX.
TRANSVERSE -- 1:50 MAX.
i
PROPERTY LINE
F-
< ? ss
CURB &.
GUTTER
4' MIN.
4" MIN. J
THICKNESS.
MINIMUM FINISHED
THICKNESS TO BE 4"
-VARIES-
(10' TYPICAL)
R=VARIES
9
YELLOW CAST IN PLACE
REPLACEABLE TRUNCATED
DOME PANEL.
VARIES
24" MIN.
1:1�EOP MAX
YELLOW CAST IN PLACE -
REPLACEABLE TRUNCATED
DOME PANEL.
4" MAX
SECTION A -A
SEE PLATE NO. 36-16(A) FOR
GENERAL NOTES ON A.D.A.
RAMPS CONSTRUCTION.
6 SLOPE 5%
MAX
BITUMINOUS Y4"
EXPANSION JOINT AS
REQUIRED BEHIND
CURB.
CORNER CURB RAMP �'� '� 11� REVISED
(WITH TYPICAL 4' SIDEWALK � C't` of FEB.2017
Lubbock PLATE NO.
ALONG PROPERTY LINE) TEXAS 36-14
T.O.C.
r--VARIES4'VARIES�1
1 i LOPE
FLOWLINE
FRONT VIEW
VARIES -
(10' TYPICAL)
I
I
SIDEWALK SLOPE REQUIREMENTS
LONGITUDINAL -- 1:20 MAX. ,{
TRANSVERSE -- 1:50 MAX.
i 1
i
i
PROPERTY LINE
CURB &
GUTTER
SEE PLATE NO. 36-16(B) FOR
GENERAL NOTES ON A.D.A.
RAMP CONSTRUCTION.
R=VARIES
RAMP = 50.8 SQ. FT. OF
CONCRETE FLATWORK
YELLOW CAST IN PLACE
REPLACEABLE TRUNCATED
DOME PANEL.
VARIES
24" MINN
1:12 SLOPE MAX.
z YELLOW CAST IN PLACE
REPLACEABLE TRUNCATED
v DOME PANEL.
4" MAX
r 6 SLOPE 5%
MAX
BITUMINOUS Y4"
EXPANSION JOINT AS
REQUIRED BEHIND
CURB.
CORNER CURB RAMP 10V REVISED
�'� '�
(WITHTYPICAL 5' OR 6' SIDEWALK �o City of FEB.2017
Lubbock PLATE NO.
ALONG CURB BACK) TEXAS 36-15
A
IN RADIUS
RAMPS SHALL BE CENTERED IN CURB &
GUTTER RADIUS TO THE MAXIMUM EXTENT
PRACTICABLE.
IN STRAIGHT C. & G.
GROOVE
JOINTS EACH
SIDE OF RAMP
o .
TOP OF CURB
BITUMINOUS -" EXPANSION
JOINT (FULL DEPTH)LOCATED
ALONG BACK OF CURB
NEW CONSTRUCTION.
_o0 0
A
YELLOW CAST IN PLACE REPLACEABLE TRUNCATED
DOME PANELS AFFIXED, FOLLOWING MANUFACTURER'S
INSTRUCTIONS, TO PROPERLY CONSTRUCTED,
CURED AND PREPARED 4" CONCRETE SLAB.
MAINTAIN GUTTER
FLOWLINE.
m
N
ZVARIES
g g
o 0 0 0 0 00 00goO O O O — VARIES
ev
v'D.a v'Daa v'D.a
RAMPS SHALL BE CENTERED IN CURB &
GUTTER RADIUS TO THE MAXIMUM EXTENT
PRACTICABLE.
SHEET 1 OF 2
0�� REVISED
TYPICAL ADA . ,# rL' C;t�. of FEB. 2017
RAMP PLAN L {.� I b 6 ck PLATE NO.
TEXAS 36-16(A)
�4' M. VARIES
24" MIN.
1:I2 SLOPE (MAX.) vpv
4" MIN.
THICKNESS. YELLOW CAST IN PLACE
REPLACEABLE TRUNCATED
DOME PANEL.
4" MAX
SECTION A -A
g SLOPE 5%
MAX
BITUMINOUS -"
EXPANSION JOINT AS
REQUIRED BEHIND
CURB.
CLASS "A" CONCRETE SHALL YELLOW CAST IN PLACE
CONFORM TO APPLICABLE REPLACEABLE TRUNCATED DOME.
SPECIFICATIONS.
�4" MIN.
THICKNESS
SECTION B-B
NOTES:
1. CAST IN PLACE REPLACEABLE TRUNCATED DOME, DETECTABLE WARNING SYSTEM PANELS, USED HEREIN, SHALL BE MANUFACTURED
BY ADA SOLUTIONS (WWW.ADATILE.COM), OR APPROVED EQUAL, AND SHALL BE LAID TO WHERE THE DOMES ARE UP
AND THE LONG AXIS OF THE PANEL SHALL BE PERPENDICULAR TO THE DIRECTION OF TRAVEL.
2. RAMP TEXTURES SHALL CONSIST OF TRUNCATED DOMES SURFACES. TRUNCATED DOME DIAMETER, HEIGHT AND
SPACING SHALL COMPLY WITH THE TEXAS ACCESSIBILITY STANDARDS (TAS), ADMINISTERED BY THE TEXAS
DEPARTMENT OF LICENSING AND REGULATION (TDLR). TEXTURES ARE REQUIRED TO BE DETECTABLE UNDERFOOT.
SURFACES THAT WOULD ALLOW WATER TO ACCUMULATE ARE PROHIBITED. THE PANELS SHALL BE AFFIXED AT
THE PRESCRIBED LOCATION, TO THE PROPERLY CURED AND PREPARED CONCRETE IN THE MANNER AND USING
THE MATERIALS SPECIFIED BY THE MANUFACTURER.
two F31(P991Cy3E9:/1No 3;wiO4)iPd111►Iq;Xy19l 29001 ya�ZleIIPI0 71
4. ALL SLOPES SHOWN ARE MAXIMUM ALLOWABLE. THE LEAST POSSIBLE SLOPE THAT WILL STILL DRAIN PROPERLY
SHOULD BE USED. RAMP LENGTH OR GRADE OF SIDEWALK APPROACH MAY BE ADJUSTED AS DIRECTED BY THE
ENGINEER. TAS REQUIRED DIMENSIONS AND SLOPES ARE PARAMOUNT. IF SITE CONDITIONS PREVENT A RAMP
FROM BEING CONSTRUCTED, AS -DRAWN, TO WORK AS INTENDED AND COMPLY WITH THE REQUIRED SLOPES, THEN
THE RAMP CONSTRUCTION MUST BE ADJUSTED TO COMPLY WITH THE REQUIRED SLOPES. ALL CONSTRUCTION
QUESTIONS SHALL BE DIRECTED TO THE ENGINEER.
5. MAXIMUM ALLOWABLE CROSS -SLOPE ON SIDEWALK AND RAMP SURFACES IS 2%. ALL CONCRETE SURFACES SHALL
RECEIVE A LIGHT BROOM FINISH UNLESS NOTED OTHERWISE ON THE PLANS. ADDITIONAL INFORMATION ON CURB
RAMP LOCATION, DESIGN, LIGHT REFLECTIVE VALUE AND TEXTURE MAY BE FOUND IN THE CURRENT EDITION
OF THE TAS.
SHEET 2 OF 2
�� REVISED
TYPICAL ADA rL' C;t�. of FEB. 2017
RAMP PLAN L' 7 Il.f b 6 ck PLATE NO.
TEXAS 36-16(B)
2
2'
i
SLOPE ALONG
GUTTER VARIES
SLOPE ALONG
GUTTER VARIES
SEE PLATE NO. 36-16
FOR DETAILS REGARDING
CURB TRANSITIONS
ADA RAMP AT FILLET
KEYED NOTES
(1 SLOPE ALONG BACK OF CURB AT RAMP OPENING
SHALL NOT EXCEED 2%.
2) SLOPE FROM BACK OF CURB AT RAMP OPENING TO LIP LINE SLOPE ALONG
SHALL NOT EXCEED 5%. GUTTER VARIES
2'
-4" MIN. -
THICKNESS.
TYPICAL ADA
RAMP DETAIL
SLOPE ALONG
GUTTER VARIES P
VARIES
24" N
1:12 SLOPE (MAX.)
YELLOW CAST IN PLACE
REPLACEABLE TRUNCATED
DOME PANEL.
4" MAX
SECTION A
SEE PLATE NO. 36-16
FOR DETAILS REGARDING
CURB TRANSITIONS
ADA RAMP AT CURB
r (' SLOPE 5%
MAX
'•<.°.I
BITUMINOUS Y4"
EXPANSION JOINT AS
REQUIRED BEHIND
CURB.
City of
Lubbock
TEXAS
REVISED
FEB. 2017
PLATE NO.
36-17
I
I
I
I
i
i
i
TOOLED i JOINT
�
�
I
I
I
I
I
I
I
I
�
�
�
�
I
I
I
I
i
i
i
F-
a
i
Z I
M
10'
Z I
0 I
I
i
I
p aLu
I
Z�
w I
w
u-
I
I
I
I
m I
o
TOOLED JOINT
I
I
o
�
I
I
�
I
I
I
�
�
I
I
I
I
I^
I
5'
i
i
�
I
I
I
I
I
I
�
�
EXPANSIONJOINT
I
I
I
I
i
I
I
A
A
20' ROW
20'
w
5'
10'
5'
LUZw
w
�
v.
Oz
6"X6" - 6 GAUGE WELDED WIRE
SECTION A -A
NO. 6 REBAR SPACED 6" FROM EDGE OF SLAB
FABRIC OR #4 DEFORMED STEEL
AND 1" FROM BOTTOM OF SLAB EACH SIDE.
BARS 12" O.C. BOTH WAYS,
LOCATE BY MEANS OF CHAIRS OR PLASTIC
CENTERED IN SLAB.
STAKES (NOT METAL OR WOOD).
REVISED
�
City- of
FEB. 2017Lubb4C%
TYPICAL ALLEY PAVING
PLATE NO.
TEXAS
37-1
R—IA RESIDENTIAL
52' ROW
32' FF
R-2 SCHOOL AND
R-1 RESIDENTIAL COMMERCIAL
56' ROW 60' ROW
�FF 42' FF
COLLECTOR INDUSTRIAL
�64'ROW� 60'ROW�
lt746' FF 42' FF
MINOR ARTERIAL MAJOR ARTERIAL
100' ROW 110' ROW
66' FF 88' FF
NOTE:
FF DIMENSIONS ARE FROM FACE OF CURB TO FACE OF CURB.
REVISED
CITY OF LUBBOCK *e City of APRIL 2020
STREET STANDARDS Lubbock PLATE NO.
TEXAS 38-1
COLLECTOR FLARE
AT INTERSECTION
WITH A ARTERIAL
MINOR OR MAJOR ARTERIAL -
*City Of
Lubbock
REVISED
APR. 2020
PLATE NO.
38-2
MINOR ARTERIAL
RIGHT TURN LANE (FLARE)
MINOR OR MAJOR ARTERIAL -
*City Of
Lubbock
REVISED
APR. 2020
PLATE NO.
38-3
MAJOR ARTERIAL
RIGHT TURN LANE (FLARE)
- MINOR OR MAJOR ARTERIAL
*City Of
Lubbock
REVISED
APR. 2020
PLATE NO.
38-4
R=40' (MIN.)
FACE OF CURB
R=50' (MIN.)
FPO OF Gv�g
PROVIDE A CONCRETE CURBED
CHANNEL AND ACCESSIBLE RAMPS
FOR DRAINAGE WHERE NECESSARY.
4' PEDESTRIAN ACCESS EASEMENT --< �I
(REQUIRED ONLY WHERE CUL-DE-SAC
LOTS ARE ADJACENT TO A STREET) I
IF NEEDED FOR DRAINAGE, A 20' MINIMUM I I I
DRAINAGE EASEMENT SHALL BE REQUIRED.
I I I I
I i I I
R=40'
ADJACENT ALLEY OR STREET
REVISED
50' R.O.W. RADIUS STANDARD �';# C;tv of FEB. 2017
CUL-DE-SAC LuI b 6 ck PLATE NO.
TEXAS 38-5
(52') OR (56')
RIGHT OF WAY
FACE TO OR
10'
R=40' (MIN.) R=40'
FRCE OF CURB 10'
50'(MIN.)
8'
PROVIDE A CONCRETE CURBED
CHANNEL AND ACCESSIBLE RAMPS
FOR DRAINAGE WHERE NECESSARY.
4' PEDESTRIAN ACCESS EASEMENT �I
(REQUIRED ONLY WHERE CUL-DE-SAC
LOTS ARE ADJACENT TO A STREET)
I I I I
IF NEEDED FOR DRAINAGE, A 20' MINIMUM I I I
DRAINAGE EASEMENT SHALL BE REQUIRED.
I I I I
I I I
I I I I
43' R.O.W. RADIUS R-1
& (R-IA) CUL-DE-SAC
ADJACENT ALLEY OR STREET
oxv War
City of
Lubbock
T E X A 5
REVISED
FEB. 2017
PLATE NO.
38-6
2% MIN
4% MAX
DEPTH OF CURB AND
GUTTER MATCHES
PAVING DEPTH
#4 BARS @ 36" O.C. TRANSVERSE
#4 @ 12" O.C. LONG
OR EQUIVALENT FIBER
6" PORTLAND CEMENT CONCRETE PAVEMENT
MIN. CEMENT CLASS C. COMPRESSIVE
STRENGTH OF 3,600 PSI @ 28 DAYS)
0:•11(»►IIf_1I&I1:14:11
CONCRETE PAVING
N.T.S.
2% MIN
4% MAX
12" COMPACTED SUBGRADE 12" -I F-
@ 95% MODIFIED DENSITY
TYPICAL SIDEWALK
oxv War
*Lubbi6 ckXAS
REVISED
FEB. 2017
PLATE NO.
38-7
20%lb MIN 2% MIN
4% MAX 4% MAX
i- 0
DEPTH OF CURB AND
GUTTER MATCHES
PAVING DEPTH
#4 BARS @ 24" O.C. TRANSVERSE
#5 @ 12" O.C. LONG
7"PORTLAND CEMENT CONCRETE PAVEMENT
MIN. CEMENT CLASS C. COMPRESSIVE
TRENGTH OF 3,600 PSI @ 28 DAYS)
MAJOR COLLECTOR (C-1) (I-1)
CONCRETE PAVING
N.T.S.
12" COMPACTED SUBGRADE 12" -I F-
@ 95% MODIFIED DENSITY
TYPICAL SIDEWALK
City of
Lubbock
T E X A 5
REVISED
FEB. 2017
PLATE NO.
38-8
TRAVEL LANE
Z
TRANSVERSE
CONSTRUCTION
JOINT
TRAVEL LANE
ADDITIONAL
STEEL BARS
Z Y
LONGITUDINAL
CONTRACTION JOINT
Fx
Y
LONGITUDINAL
CONSTRUCTION JOINT
c
X
LONGITUDINAL
STEEL
TRANSVERSE
STEEL
�
N
�
N
N
a
c
c
c
c
c
d TIE BARS
a
ISINGLE
—c/2 TIE
PIECE a
BARS
c/ 2
PAVEMENT OR
SHOULDER EDGE
GENERAL NOTES
—LUNCil I UUINAL
CONTRACTION JOINT LONGITUDINAL
CONSTRUCTION JOINT
TYPICAL PAVEMENT LAYOUT
PLAN VIEW (NOT TO SCALE)
PAVEMENT OR
SHOULDER EDGE
1. ALL THE REINFORCING STEEL AND TIE BARS SHALL BE DEFORMED
7. TRANSVERSE STEEL SHALL BE PLACED TO WITHIN 2" OF THE
STEEL BARS CONFORMING TO ASTM A 615 (GRADE 60) OR ASTM A 996
BACK OF CURB.
(GRADE 60) OR ABOVE. STEEL BAR SIZES AND SPACINGS SHALL CONFORM
TO TABLE NO.1 AND TABLE NO.2.
S. (b) = TRANSVERSE STEEL AND TIE BARS SPACING
(c) = LONGITUDINAL STEEL AND TIE BARS SPACING
2. STEEL BAR PLACEMENT TOLERANCE SHALL BE +/- 1 IN. HORIZONTALLY
AND +/- 0.5 IN. VERTICALLY. CALCULATED AVERAGE BAR SPACING
(SEE TABLE 1 AND 2 PLATE 38-10)
(CONCRETE PLACEMENT WIDTH / NUMBER OF LONGITUDINAL BARS) SHALL
CONFORM TO TABLE NO.1
3. PAVEMENT WIDTHS OF MORE THAN 25 FT. SHALL HAVE A LONGITUDINAL
JOINT (SECTION Z-Z OR SECTION Y-Y). THESE JOINTS SHALL BE
LOCATED WITHIN 6 IN. OF THE LANE LINE UNLESS THE JOINT
LOCATION IS SHOWN ELSEWHERE ON THE PLANS.
4. THE SAW CUT DEPTH FOR THE LONGITUDINAL CONTRACTION JOINT
(SECTION Z-Z) SHALL BE ONE THIRD OF THE SLAB THICKNESS (T/3).
5. OMIT TIE BARS LOCATED WITHIN 18 IN. OF THE TRANSVERSE
CONSTRUCTION JOINTS (SECTION X-X). USE HAND -OPERATED IMMERSION
VIBRATORS TO CONSOLIDATE THE CONCRETE ADJACENT TO ALL FORMED
JOINTS.
6. LONGITUDINAL REINFORCING STEEL SPLICES SHALL BE A MINIMUM
OF 25 IN. STAGGER THE LAP LOCATIONS SO THAT NO MORE THAN 1/3
OF THE LONGITUDINAL STEEL IS SPLICED IN ANY GIVEN 12-FT. WIDTH
AND 2-FT. LENGTH OF THE PAVEMENT.
RESIDENTIAL AND COLLECTOR STREET
City
REVISED
FEB. 2017
CONCRETE PAVING DETAILS
of
Lubbock
PLATE N0.
1 OF 3
TEXAS
38-9
L=50" ADDITIONAL
JOINT SEALING L/2 STEEL BARS
MATERIAL
dT
TZ2
TRANSVERSE BARS
LONGITUDINAL BARS
NO SPLICES ALLOWED WITHIN 10 FT OF THE JOINT.
TRANSVERSE CONSTRUCTION JOINT
SECTION X - X
50" FOR #5 BAR 42" FOR #4 BAR
25" FOR #5 BAR TIE BARS MAY BE
JOINT SEALING 21" FOR #4 BAR IN SAME PLANE AS
MATERIAL TRANSVERSE BARS
TIE BARS,SINGLE
OR MULTIPLE -PIECE
---- T
MIN.CLEAR-Z"� ----- ------------------ -- T/2
c ' c ' a' a, c Ic
LONGITUDINAL BARS TRANSVERSE BARS
LONGITUDINAL CONSTRUCTION JOINT
SECTION Y - Y
50" FOR #5 BAR, 42" FOR #4 BAR
LONGITUDINAL
JOINT SEALING 25" FOR #5 BAR BARS
MATERIAL
SAW CUT T/3
T
/2
I I I I I I I
f T T T T T l
c c c/2c/2 c c
TRANSVERSE BARS
SINGLE PIECE TIE BARS
SHOULD BE IN SAME PLANE AS TRANSVERSE BARS.
LONGITUDINAL CONTRACTION JOINT
SECTION Z - Z
TABLE NO.1 LONGITUDINAL STEEL
FIRST
ADDITIONAL STEEL
SLAB THICKNESS
REGULAR
SPACING
BARS AT TRANSVERSE
AND BAR SIZE
STEEL BARS
AT EDGE
CONSTRUCTION JOINT
OR JOINT
(SECTION X-X)
T
BAR
SPACING
SPACING
SPACING
LENGTH
(IN.)
SIZE
(c)
(a)
2 x c
L
(IN.)
(IN.)
(IN.)
(IN.)
6.0
#4
12
3
24
42
7.0
#5
12
3
24
50
TABLE NO.2 TRANSVERSE STEEL AND TIE BARS
TIE BARS
TIE BARS
SLAB
TRANSVERSE
AT LONGITUDINAL
AT LONGITUDINAL
THICKNESS
STEEL (b)
CONTRACTION JOINT
CONSTRUCTION JOINT
SECTION Z-Z
SECTION Y-Y
(IN.)
BAR
SPACING
BAR
SPACING
BAR
SPACING
SIZE
(IN.)
SIZE
(IN.)
SIZE
(IN.)
6.0
#4
36
#4
72
#4
36
7.0
#4
24
#4
48
#4
24
RESIDENTIAL AND COLLECTOR STREET J10lvt
� City- of
CONCRETE PAVING DETAILS *Lu b6ck
2 OF 3 T E X A 5
REVISED
MAY 2014
PLATE NO.
38-10
JOINT �„ XV
SEALING
COTINI4TIAL
M
~\
CUT
�1 F"
SAWED
LONGITUDINAL JOINT
XV
z JOINT SEALING
COMPOUND CLASS
4,5 OR 7
a' BACKER
ROD
INITIAL
SAW CUT
TRANSVERSE SAWED
CONTRACTION JOINT
GENERAL NOTES
JOINT Y„ XV
SEALING
COMPOUND
V p
' f
JOINT SEALING
COMPOUND
LONGITUDINAL OR TRANSVERSE
CONSTRUCTION JOINT
JOINT SEALING
COMPOUND CLASS 1 Y2"
4,5 OR 7
F
TRANSVERSE FORMED
EXPANSION JOINT
1. THE JOINT RESERVOIR FOR SEALANT SHALL BE SAWED UNLESS OTHER WISE
SHOWN ON THE PLANS FOR THE LONGITUDINAL AND TRANSVERSE
CONSTRUCTION AND THE TWO SAWED JOINTS.
2. THE JOINTS SHALL BE CLEANED IN ACCORDANCE WITH THE MANUFACTURES
REQUIREMENT AND PRIOR TO BEGINNING OPERATIONS, THE CONTRACTOR
SHALL SUBMIT A STATEMENT FROM THE SEALANT MANUFACTURER SHOWING
THE RECOMMENDED EQUIPMENT AND INSTALLATION PROCEDURES TO BE USED.
3. THE SAW CUT FOR THE LONGITUDINAL JOINT SHALL BE ONE FOURTH THE SLAB
THICKNESS.
4. TRANSVERSE EXPANSION JOINT SHALL BE PLACED AT THE RADII OF INTERSECTING
STREETS.
5. TRANSVERSE CONTRACTION JOINTS SHALL BE PLACED AT THE RADII OF INTERSECTING
ALLEYS.
RESIDENTIAL AND COLLECTOR STREET REVISED
CONCRETE PAVING DETAILS*Lubbock
City of APRIL 2019
PLATE NO.
3 OF 3 38_11
TYPE 'C' HMAC
MINIMUM OF THE UPPER
12" (18" MINIMUM ON
ARTERIAL STREETS)
OF TRENCH BACKFILL-
1 1/2 SACK CONTROLLED
LOW STRENGTH MATERIAL
(FLOWABLE FILL) WITH
PEA GRAVEL, IF USING
COMPACTED BACKFILL.
BACKFILL COMPACTED TO 95%t
MODIFIED PROCTOR(ASTM D 698)
2% OF OPTIMUMMOISTURE
CONTENT.(MAX. 6" LIFTS.)
ALTERNATIVE BACKFILL
FULL DEPTH OF TRENCH BACKFILL
1 1/2 SACK CONTROLLED LOW
STRENGTH MATERIAL(FLOWABLE
FILL) WITH PEA GRAVEL.
ASPHALT PAVEMENT
CUT REPAIRS
2' MIN.
[V
NO SCALE
6'
r/-- ASPHALT TACK COAT.
ALL JOINTS TO
BE SAWCUT.
ASPHALT TACK COAT.
COMPROMISED SOIL
DUE TO MOISTURE
FROM A WATER LEAK
OR RAIN EVENT
PIPE BEDDING (IN
ACCORDANCE WITH
THE ENGINEERS
AND MANUFACTURERS
RECOMMENDATIONS).
NOTE:
1. ALL MATERIALS AND CONSTRUCTION
PRACTICES SHALL BE IN CONFORMANCE
WITH CITY OF LUBBOCK PUBLIC WORKS
ENGINEERING DESIGN STANDARDS AND
SPECIFICATIONS.
2. GREATER THAN 5' WIDTH LONGITUDE
CUTS WILL REQUIRE PAVING
REPAIR APPROVAL BY THE CITY
ENGINEER.
'Alo lr� -
-% City of
Lubbock
rEYAS
REVISED
APR. 2020
PLATE NO.
UEM-01
i
L u
SPLICE LENGTH
4" SAW CUT
EXISTING CONCRETE
PAVING
COMPROMISED SOIL
DUE TO MOISTURE
FROM A WATER LEAK
OR RAIN EVENT
BACKFILL COMPACTED TO 95%t
MODIFIED PROCTOR (ASTM D 698)
2% OF OPTIMUM MOISTURE
CONTENT. (MAX. 6" LIFTS.)
FULL DEPTH CUTS
T MIN
CONCRETE PAVING
PREFERED METHOD
EXISTING CONCRETE
PAVING
MAKE FULL DEPTH CUTS THEN
REPAIR UTILITY. BACKFILL
OR COMPACT TRENCH.
SAW CUT 18" PERIMETER
AND JACK OUT CONCRETE
TIE STEEL TO MATCH EXISTING.
DRILL AND DRIVE DEFORMED TIE BARS 10"
CLASS 'B' CONCRETE 3000 PSI INTO EXISTING PAVING. EPDXY GROUT BAR
AT 7 DAYS. ARTERIAL INTO EXISTING PAVING MATCH EXISTING BAR
STREETS; CLASS "C" CONCRETE SIZE AND SPACING.
SPLICE
ALL CONCRETE JOINTS LENGTH 10"
TO BE SAW CUT.
EXISTING CONCRETE EXISTING CONCRETE
PAVING • • • • PAVING
T8"
MINIMUM
w °'
�O
ul y
LnJ
W J
Z
u�
COMPROMISED SOIL
DUE TO MOISTURE
FROM A WATER LEAK
OR RAIN EVENT
BACKFILL COMPACTED TO 95%t
MODIFIED PROCTOR (ASTM D 698)
2% OF OPTIMUM MOISTURE
CONTENT. (MAX. 6" LIFTS.)
ALTERNATIVE BACKFILL
NOTE:
BAR SIZE
MIN. SPLICE LENGTH
3
18"
4
18"
5
21"
6
25"
7
29"
8
33"
PIPE EMBEDMENT (IN
ACCORDANCE WITH
THE ENGINEERS
AND MANUFACTURERS
RECOMMENDATIONS).
FULL DEPTH OF TRENCH
1. MIN RESIDENTIAL CUT TX 4' SEE UEM-07 FOR COLLECTOR 3. FLOW FILL CAP OR STEEL PLATES REQUIRED
BACKFILL; 1 1/2 SACK
AND ARTERIAL IF PAVEMENT IS NOT REPAIRED IMMEDIATELY.
CONTROLLED LOW STRENGTH
2. ALL MATERIALS AND CONSTRUCTION PRACTICES SHALL BE IN
MATERIAL (FLOWABLE FILL)
CONFORMANCE WITH CITY OF LUBBOCK STANDARD PAVING
WITH PEA GRAVEL.
SPECIFICATIONS.
CONCRETE STREET REVISED
City of APR. 2020
AND ALLEY Lubbock PLATE NO.
CUT REPAIRS I x a s UEM-02
CONCRETE CAP
CLASS 'B' CONCRETE
3000 PSI AT 7 DAYS.
# 4 BARS, 12" O.C.
MAX. SPACING IN
BOTH DIRECTIONS.
BACKFILL COMPACTED TO 95%f
MODIFIED PROCTOR
(ASTM D 698) 2% OF
OPTIMUM MOISTURE CONTENT.
(MAX. 6" LIFTS.)
ALTERNATIVE BACKFILL
1 1/2 SACK CONTROLLED
LOW STRENGTH MATERIAL
(FLOWABLE FILL) WITH
PEA GRAVEL.
BRICK
PAVING
NOTE:
1. SEE CONCRETE CAP DETAIL. PLATE NO. 36.09.05
2. #5 DOWELS NEEDED IF TIED INTO EXISTING CONCRETE BASE.
3. ALL MATERIALS AND CONSTRUCTION PRACTICES SHALL BE IN
CONFORMANCE WITH CITY OF LUBBOCK STANDARD PAVING
SPECIFICATIONS.
4. FLOW FILL CAP OR STEEL PLATES REQUIRED IF PAVEMENT IS
NOT REPAIRED IMMEDIATELY.
BRICK STREET
CUT REPAIRS
BRICK JOINTS TO BE FILLED
WITH SAND/CEMENT AT A 50-50
BLEND, OR AS APPROVED BY THE
STREET SUPERINTENDENT.
DRILL AND DRIVE DEFORMED
TIE BARS 10" INTO EXISTING
PAVING. EPDXY GROUT BAR
INTO EXISTING PAVING MATCH
EXISTING BAR SIZE AND SPACING.
7
1" SAND CUSHION
MINIMUM.
8" MIN
COMPROMISED SOIL
DUE TO MOISTURE
FROM A WATER LEAK
OR RAIN EVENT
BAR SIZE
MIN. SPLICE LENGTH
3
18"
4
18"
5
21"
6
25"
7
29"
8
33"
PIPE BEDDING (IN
ACCORDANCE WITH
THE ENGINEERS
AND MANUFACTURERS
RECOMMENDATIONS).
City 0f
Lubb o ck
TEXAS
REVISED
MAR. 2019
PLATE NO.
UEM-03
Z
O
<z
w0.>
dQ
ad
w>-
a�
�J
Q
CONCRETE ALLEY PAVING. mw
`n z
o
o
0
0
0
0
o
e
— —
— —
— —
— —
— —
— —
—
BACKFILL COMPACTED TO 95%t
MODIFIED PROCTOR DENSITY
(ASTM D 698) 2% OF OPTIMUM
MOISTURE CONTENT.
(MAX. 6" LIFTS.)
ALTERNATIVE BACKFILL
FULL DEPTH OF TRENCH BACKFILL
1 1#2 SACK CONTROLLED LOW
STRENGTH MATERIAL (FLOWABLE
FILL) WITH PEA GRAVEL.
NOTE:
1. ALL MATERIALS AND CONSTRUCTION PRACTICES SHALL BE IN CONFORMANCE
WITH CITY OF LUBBOCK PUBLIC WORKS ENGINEERING DESIGN STANDARDS AND
SPECIFICATIONS.
2. THE ALLEY PAVING CONTRACTOR SHALL BE REQUIRED TO OBTAIN 95%f
MODIFIED PROCTOR DENSITY (ASTM D 698) 2% OF OPTIMUM
MOISTURE IN THE 6" DEPTH OF SUBGRADE IMMEDIATELY BELOW
THE ALLEY PAVING.
TRENCH BACKFILL REQUIREMENT
ON ALLEYS TO BE PAVED
WITHIN RIGHT-OF-WAY
THE ALLEY PAVING CONTRACTORS SHALL
BE REQUIRED TO OBTAIN 95%±
MODIFIED PROCTOR DENSITY
(ASTM D 698) 2% OF OPTIMUM
MOISTURE IN THE 6" DEPTH OF
SUBGRADE IMMEDIATELY BELOW
THE ALLEY PAVING.
PIPE EMBEDMENT (IN ACCORDANCE WITH
THE ENGINEERS AND MANUFACTURERS
RECOMMENDATIONS).
Alf War
�# *Lubb'o of
TEXAS
REVISED
DEC. 2012
PLATE NO.
UEM-04
BACKFILL COMPACTED TO 95%t
MODIFIED PROCTOR DENSITY
(ASTM D 698) 2% OF OPTIMUM
MOISTURE CONTENT.
(MAX. 6" LIFTS.)
ALTERNATIVE BACKFILL
FULL DEPTH OF TRENCH BACKFILL
116 SACK CONTROLLED LOW
STRENGTH MATERIAL (FLOWABLE
FILL) WITH PEA GRAVEL.
NOTE:
1. ALL MATERIALS AND CONSTRUCTION
PRACTICES SHALL BE IN CONFORMANCE
WITH CITY OF LUBBOCK PUBLIC WORKS
ENGINEERING DESIGN STANDARDS AND
SPECIFICATIONS.
TRENCH BACKFILL REQUIREMENTS
ON UNPAVED STREETS AND ALLEYS
WITHIN RIGHT-OF-WAY
EXISTING GROUND SURFACE.
12"
PIPE BEDDING (IN ACCORDANCE
WITH THE ENGINEERS AND
MANUFACTURERS RECOMMENDATIONS).
Alf. War
City of
Lubbock
TEXAS
REVISED
FEB. 2017
PLATE NO.
UEM-05
PLACE #4 BARS BOTH WAYS ALONG PAVING 6„
CUT AT 12" MAX. SPACING. AT LEAST 2
6" #4 BARS EACH WAY ARE REQUIRED.
LIE
#4 BARS, 12" O.C. MAX V NO SCALE DRILL AND DRIVE 12"
SPACING IN BOTH DEFORMED #5 DOWEL
DIRECTIONS, CENTERED BARS 6" INTO EXISTING
IN SLAB SLAB ON 3' SPACING
NOTE:
1. ALL MATERIALS AND CONSTRUCTION
2. ALL JOINTS SHALL BE
PRACTICES SHALL BE IN CONFORMANCE
DOWELED AS SPECIFIED
WITH CITY OF LUBBOCK PUBLIC WORKS
3. MAXIMUM OF TWO TRANSVERSE
ENGINEERING DESIGN STANDARDS AND
CUT JOINTS BETWEEN EXISTING
SPECIFICATIONS
13' TOOLED JOINTS (ONE SLAB).
.11410 Ivor
TYPICAL ALLEY PAVING CUT � city"f
*Lubb6ck
REVISED
FEB. 2017
PLATE NO.
UEM-06
LEGEND
® UTILITY/STREET CUT
.CITY STANDARD
RESTORATION REQUREMENTS
FOR CONCRETE PAVEMENT
BAR SIZE
MIN. SPLICE LENGTH
3
18"
4
18"
5
21"
6
25"
7
29"
8
33"
DOWEL MAY BE USED IN LIEU
OF SPLICING REBAR WITH APPROVAL.
SEE UEM-02 FOR DOWEL SIZE SPACING.
J = SPACING
BETWEEN
JOINTS
CONCRETE ARTERIAL 'Alwo'. REVISED
City of APR. 2020
AND COLLECTOR WLubbock
PLATE NO.
PAVEMENT REPAIR Ilxns UEM-07
No Text
No Text
No Text
G..bL(
No Text
A-1.3
Restrained Joint Table for Reducers
Minimum length to be restrained on larger pipe (Feet):
PVC Pipe
Small Pipe
Size (in.)
Large Pipe Size (in.)
4
6
8
10
12
16
20
24
4
-
22
40
54
69
95
119
142
6
-
-
23
41
57
86
112
137
8
-
-
-
23
42
75
103
129
10
-
-
-
-
23
61
92
120
12
-
-
-
-
-
44
78
109
16
-
-
-
-
-
-
44
80
20
-
-
-
-
-
-
-
44
24
-
-
-
-
-
-
-
-
D.I. Pipe
Branch Pipe
Size (in.)
Run Pipe Size (in.)
4
6
8
10
12
16
20
24
4
-
12
21
29
36
50
63
75
6
-
-
13
22
30
46
59
72
8
-
-
-
12
22
40
54
68
10
-
-
-
-
13
32
49
63
12
-
-
-
-
-
23
42
57
16
-
-
-
-
-
-
23
42
20
-
-
-
-
-
-
-
24
24 1
-
-
-
-
-
-
-
-
Table is based on Soil Type SC, Safety Factor 2, Trench Type 3, Depth of Bury 3 feet, Test
Pressure 100 psi, and minimum restrained length of small size pipe to be 1/2 that listed
here. Values derived from the EBAA Iron, Inc. Restrained Length Calculation Program.
Revised 3/11
City of Lubbock Water Utilities Engineering Department
Minimum Design Standards and Specifications for Water and Sewer
No Text
A
� -2�r
c6"�'k
Iubb
TEXAS
Approved Materials and Manufacturers List
Application For New Product(s)
Note: Incomplete applications will be returned unprocessed.
Date of Application:
Company Name
Address
Contact Person
Position
Phone Number
Email
Fax Number
Manufacturer
(If not applicant)
Supplier
(If not applicant)
Product Nomenclature
Model No. Series
Description/Use of Product
Have you included a sample?
Would you like this sample returned?
List Testing
Certifications
(Required)
1.
List Attached
Items
(Provide five
copies of each)
1.
2.
2.
3.
3.
4.
4.
5.
5.
6.
6.
7.
7.
Application No.
Comments:
****Do not write below this line - - For City use only****
(Ex. 2014-01) Approved By:
Title:
Accepted Rejected
No Text
CERTIFICATE OF COMPLETION
DATE:
PROJECT DATA
SUBDIVISION NAME:
PLAT DESCRIPTION:
TYPE OF MUNICIPAL IMPROVEMENT
❑ WATER ❑ SEWER ❑ PAVING ❑ DRAINAGE
❑ OTHER
CONTRACTOR'S AFFIDAVIT TO DEVELOPER
I certify that the work under the above named project, including all amendments thereto, has been
satisfactorily completed in accordance with the engineering plans and specifications and in accordance with
the City of Lubbock Public Works Engineering Minimum Design Standards and Specifications; that no liens
have been or will be attached against the property and improvements of the owner; that no suits are pending
by reason on the project under the contract; and no public liability claims are pending.
CONTRACTOR/DEVELOPER
ADDRESS:
PHONE:
SIGNED:
PRINTED:
TITLE:
RECOGNITION BY CITY OF LUBBOCK
An inspection of the work on the above referenced Project was conducted on
Those participating in the inspection (final walk-through) were
and The
inspection revealed that the infrastructure inspected has been completed substantially in accordance with
the plans and specifications and is recommended for acceptance on
City of Lubbock
By
Printed Name
Title
Rev. 05-01-2014
No Text
DEVELOPER WARRANTY STATEMENT
DATE:
PROJECT DATA
SUBDIVISION NAME:
PLAT DESCRIPTION:
TYPE OF MUNICIPAL IMPROVEMENT
❑ WATER ❑ SEWER ❑ PAVING ❑ DRAINAGE
❑ OTHER
WARRANTY STATEMENT
TO THE CITY OF LUBBOCK
As the developer of the above referenced development, I guarantee the improvements installed by my
Contractor and inspected, tested, and accepted by the City of Lubbock to be free from defects for a period of
one year for water and/or sewer improvements and two years for paving and or drainage improvements from
the date the infrastructure is accepted by the City of Lubbock. Upon receipt of the Developers Certificate of
Completion, Record Drawings and the Developers Warranty Statement, the City will accept improvements
within 30 calendar days; unless exception is given in writing. The Contractor, Engineer/Surveyor, Record
Drawing submittal date, and the Substantial Completion Date are listed below.
CONTRACTOR
ENGINEER/SURVEYOR:
RECORD DRAWING SUBMITTAL DATE:
SUBSTANTIAL COMPLETION DATE:
DEVELOPER CONTACT INFORMATION
DEVELOPER
ADDRESS:
PHONE:
EMAIL:
SIGNED:
PRINTED:
LIMITATIONS
This warranty does not include damage to underground utilities caused by others due to excavation or boring activities
after the date of the infrastructure is accepted by the City of Lubbock. This warranty does not include any cosmetic
damages or the results of any cosmetic damages to either above ground utility infrastructure or paving/drainage
improvements occurring after the date of substantial completion. These cosmetic damages may include but are not limited
to gouges in asphalt from vehicular traffic excluding all construction equipment related to the development, the failure of
asphalt due to water ponding beyond the control of the Developer, any natural disaster, or utility work within dedicated
Public Right of Way.
Rev. 05-01-2014
No Text
Ar,�City of
Lubb o ck
SO
T E X A 5
LEGAL DESCRIPTION:
ENGINEERING FIRM:
E-MAIL:
PHONE NUMBER:
PAVEMENT
MUNICIPAL IMPROVEMENTS
SUBMITTAL CHECKLIST
ADDRESS:
CONTACT:
DATE:
�
w
a
w
o
Q
CRITERIA
ua
a
NOTES
w
F
W
�
z
z
General Requirements
Provide 2 sets of plan for review
Provide review fee calculations
Provide payment for review fee
Drawings shall be no larger than
24"x36".
Include a Location map
Include a Title Block (lower right
corner preferred)
Drawing Scale shall be
Horizontal 1"=50' or 1"=20'
Vertical 1"=1' or 1"=2'
Include original date and revision
dates
Include Name of Professional
Engineer
Include Firm Name and Contact
Information
Include Legal Description of Property
Being Improved
Include Drawings Numbers
Include City of Lubbock Inspector
Contact Information 806-775-3751.
Include Note on Plans "All work shall
be in accordance with the City of
Lubbock Minimum Design Standards
and Specifications."
Plan
Include Benchmark and Datum
Include North Arrow
V/
o
w
rl
w
z
a
CRITERIA
�ww
a
NOTES
�
Q
A
z
w
w
z
Include ROW lines, property lines and
lot numbers
Include Street Names and Easements
with Width Dimensions
Include Existing Curbs and Paving
(Gray)
Include Proposed Curbs and Paving
(Bold)
Include Spot Elevations on Radii, Dips,
Grade Breaks, and Ditches
Include Location and Direction of Dips
Include Other Pertinent Details
(Buildings, Utilities, Water Courses,
Etc.)
Profile
Include Existing Ground Surface at
Curb Lines (Gray)
Include Existing Gutters or Flow Lines
(Gray)
Include Proposed Gutters or Flow
Lines (Bold)
Include Stationing with Profiles
Indexed to Plan View
Include Intermediate Station
Numbers and Elevations at Points of
Grade Change and Radii
Include Ditch Grades
Include Existing and Proposed Utilities
Where Crossed
Detail Sheet
Details are not required when
engineers plans refer to City
standards
Include all non-standard details
Overall Layout Sheet — As Required
Drawing Scale shall be 1 "=100'
Include Lot Lines
Include Streets and Street Names
City of
Lubbock
TEXAS
LEGAL DESCRIPTION:
ENGINEERING FIRM:
E-MAIL:
PHONE NUMBER:
WATER AND SEWER
MUNICIPAL INFRASTRUCTURE
SUBMITTAL CHECKLIST
ADDRESS:
CONTACT:
DATE:
0
w
y F
.a
�
Q
CRITERIA
w
z
NOTES
U
.a
C1.
W
y
�
W
W
General Requirements
Provide 2 plan sets for review
Provide fee calculations (Pro Rata)
Provide payment of review fee
Include a Location map
All drawings shall be approximately 24-inch by
36-inch in size
Include the legal description of property being
improved
Include a title block (Lower right hand corner
preferred)
Make the drawings to standard engineering
scale (with graphic scale representation shown
on plans)
Include original date and revision dates
Include the name of the Professional Engineer
Include Professional Engineer's seal
Include the Firm name and contact information
Include City of Lubbock Engineering
Department Contact Information:
Development Engineering Services: (806)
775-2347 Senior Inspector:
(806) 548-4152
Include Drawing number(s)
Includes statement: "All work shall be
performed in accordance with the City of
Lubbock Design Standards and Specifications."
Plans
Include Bench Marks
H
O
'a
W
CRITERIA
w
z .a
NOTES
Include Location control dimensions
Include North Arrows
Include Property Lines
Include Street Names and Easements with
Width Dimensions
Include Existing Buried Utility Lines Location
and Depth (Gray -Dashed)
• Water
• Gas
• Communications
• Storm drains
• Sanitary sewers
• Electric
Include Other Pertinent Details (Structures,
Curbs, Water Courses, Etc.)
Include Proposed water/sewer mains (Bold —
Solid)
Label proposed diameters
Label proposed materials
Include proposed manholes
Label water line elements (fittings, tees,
crosses, reducers, bends, plugs, blow -offs,
thrust blocks, valves and fire hydrants)
Include stationing and other number
designations
Include elevation of inverts in and out of
manhole
Include elevation of manhole rim
Label manhole stub -outs
Include proposed future extensions
Include proposed service connections or stub -
ins
Include proposed concrete encasement
Include proposed cut-off walls
Include easement description for offsite
easements.
Make utility easements have correct
orientation and offsets (water north & west,
sewer 10ft from water lines)
Profiles
Include ground surface — existing (dotted) and
proposed (Solid)
Include station numbers
Include length between manholes and depth of
cut
Include existing and proposed utilities where
crossed
H
O
'a
W
CRITERIA
w
z .a
NOTES
Include existing manhole invert and rim
elevations
Include Plan, Profile, and Complete Details for
off -site transmission mains, lift stations, special
valves and vaults, tanks, etc.
Water Design
Include water line summary
Include overall layout (scale 1" = 100')
Include Profiles at large utility crossings
including sewer mains >10", fiber or electric
duct banks, storm sewers, etc.
Include profiles for 12" or larger water lines.
Verify existing lines for tie-in
Abandoned line procedure followed
Boring and casing standards followed
Include shutoff valves (12" or < dist. mains
<600ft, larger mains <800ft)
Include a fire hydrant within 500ft of each
structure
Make a looped system
Water lines shall be 2 ft. above existing sewer
lines (and force mains)
Make joint spacing and clearances of 9ft at
sewer crossing
No stub outs under paving
No dead end mains > 150ft
No developed lines that cut off adjacent plots
from future water
No service taps off streets
No size on size municipal taps without approval
Sewer Design
Include overall layout (scale 1" = 100')
Include profiles
Verify existing line for tie-in
Abandoned line procedure followed
Gradients follow:
• 6 in diam 0.60-12.35%
• 8 in diam 0.40-8.40%
• 10 in diam 0.28-6.23%
• 12 in diam 0.22-4.88%
• 15 in diam 0.15-3.62%
• 18 in diam 0.12-2.83%
All shallow manholes (<16ft) on small sewer
lines (<15in diam) have 48in diam manholes
spaced at <500ft
All deep manholes (>16ft) on small sewer lines
(<15in diam) have 60in diam manholes spaced
at <500ft
H
O
'a
W
CRITERIA
w
z .a
NOTES
All manholes on large sewer lines (>15in diam)
have 60in diam manholes spaced at <800ft
Protective coatings specified on all large and
drop manholes and manholes receiving force
main discharge
Max sewer service tap depth of 12ft (or
Engineering Department approval)
Water lines shall be 2 ft. above existing sewer
lines (and force mains)
Joint spacing and clearance of 9ft at sewer
crossing
Inlet drops in manholes follow:
• Inlet angle <30 degree drop 0.10ft min
• Inlet angle >30 degree drop 0.20ft min
Inlet with <24 in drop must be filleted
Drop manhole (>24in drop) follow:
• Existing manholes drop inside
• New manholes drop outside
No stub outs under paving
REFUND CONTRACT NO.
City of
*Lubbock
TEXAS
REFUND CONTRACT DECLARATION
DEVELOPMENT LEGAL DESCRIPTION OF PROPERTY:
DEVELOPER/OWNER:
ADDRESS:
NUMBER STREET
CITY
CERTIFIED REFUND INTENT
STATE
ZIP
❑ I accept the terms of this Refund Contract (the "Contract') and request the adjacent mains fees
collected by the City of Lubbock (the "City"), for the infrastructure improvements ("Improvements")
on the developed property listed above (the "Property"), be released to me as a refund within 6
(six) months of receipt.
❑ I hereby knowingly, and willingly waive the right to a refund for adjacent mains fees for
Improvements accepted by the City on behalf of the Property (including all lines not shown in
"Exhibit A") due to separate agreements made with adjacent property owners or for any other
reason.
The City and the undersigned developer, Property owner, and/or authorized representative of the
developer or Property owner, pursuant to Section 22.05.015 of the City of Lubbock Code of Ordinances,
does hereby enter into this Contract for Water and/or Sewer Infrastructure. The execution of which is
upon acceptance of infrastructure by the City, which requires infrastructure development that is performed
in accordance with Section 22.05.010, including, but not limited to receipt of as-builts of the water and
sewer improvements as outlined in the City of Lubbock Public Works Engineering Minimum Design
Standards and Specifications.
The parties hereto, by execution of this Contract, acknowledge and agree that the amount of the refund, if
any, shall ultimately be determined, in part, on the number of adjacent property owners electing to
connect to the infrastructure during the term of the Contract, and further paying the appropriate adjacent
main fee. During the term of this Contract, the City shall hold, in trust, adjacent main fees collected in
connection with the Property, and periodically release funds therefrom, to eligible applicants, for any
associated extensions. The City makes no representation as to, nor does it warrant, the amount of refund
eligible under the Contract, and the City is under no obligation to pay, from its own funds, any portion of
the refund. The lines subject to this Contract are attached as "Exhibit A" (which shall include record
p. 1of2 Refund Contract
drawings including the water and sewer refund calculation spreadsheet for
each line the developer is requesting the refund of fees collected), attached REFUND CONTRACT NO.
and incorporated herein.
The term of this refund contract shall be fifteen (15) years from the date
of execution, and in no case shall the City be liable to issue refunds after
such term. No interest shall accrue or be paid on any funds held by the City.
PRINTED NAME OF DEVELOPER/ PROPERTY OWNER OR AUTHORIZED
REPRESENTATIVE
SIGNATURE
BELOW TO BE COMPLETED BY THE CITY
Lines Accepted On:
Authorized By the City:
LUBBOCK ASSISTANT CITY MANAGER
DATE
DATE
p. 2of2 Refund Contract
MR
e
rCity of
Lub Dock
TEXAS
Proposed Projects for 2023
Street Maintenance Projects
Asphalt Patching
Asphalt Patching