HomeMy WebLinkAboutResolution - 5980 - Change Order To Contract - West Texas Paving - Express Exit Lane At LPSIA - 08_27_1998Resolution No. 5980 Item No. 21 August 27, 1998 BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK: THAT the Mayor of the City of Lubbock BE and is hereby authorized and directed to execute Change Order No. 1 with associated documents for and on behalf of the City of Lubbock for West Texas Paving for an express exit lane at the Lubbock International Airport parking lot. Said agreements are attached hereto and incorporated in this Resolution as if fully set forth herein and shall be included in the minutes of the Council. Passed by the City Council this 27th day of August , 19 . WAY O , MAYOR ATTEST: 1.�ayt!4-jarnell, City Secretary APPROVED AS TO CONTENT: Mark . le, Aviation Manager AS TO FORM: L. Wade, Assistant City Attorney Xs/oodocs/Ch Order Went Tom Paving Compauy.m Agast 19, 1998 Resolution Item No. 21 MANGE ORDER August 27, No. 5980 1998 s PROJECT: Parking Lot Reconfiguration and Reconstruction of Itibbock International Airport OWNER: City of Lubbock CONTRACTOR: West Texas Paving CONTRACT FOR: Reconfiguration of LIA Parking Lot No. 1 DATE OF ISSUANCE: 9113/98 OWNER'S PROJECT NO. Bid 197280 ENGINEER: Parkhill, Smith & Cooper, Inc., Lubbock ENGINEER'S PROJECT NO. 01-2713-99 You are directed to stake the following changes in the Contract Documents. Description: Construction of an additional automated exit lane from the terminal building parking lot. Purpose of Change Order: An increase in the contract time and amount is needed to construct the additional exit lane under this contract. Attachments: (List documents supporting change): Engineer's Opinion of Probable Cost dated 9/14198 CHANGE IN CONTRACT PRICE Original Contract Price $ 362,945.00 CHANGE IN CONTRACT TIME: Original Contract Time 30 days days or date Previous Change Orders No. to No. + s Net change from previous Change Orders days or date Contract Price prior to this Change Order $ 362,945.00 Contract Time prior to this Change Order 150 days days or date Net Increase (decrease) of this Change Order $ 38,050.00 Net Increase (decrease) of this Change Order 30 days days or date Contract Price with all approved Change Orders $ 400,995.00 Contract Time with all approved Change Orders 180 days days or date RECONIlVIENDED: erg =—NZA10'584 Date: C��/ �l' S (1983 Edition) Prepared by the Engineers' Joint Contract Documents Comauttee and endorsed by The Associated General Contractors of America. Rqwbnw Sw APrPROWn! City of Lubbock, Texas Lubbock International Airport PARKING LOT RECONFIGURATION AND RECO14STRUCTION CONSTRUCTION OF ADDITIONAL EXIT LANE Engineers Opinion of Probable Costs 08/14/98 Item Description Unit I Quantity Unit Price Amount .: 1 Remove and Dispose of Existing Curb &. Gutter LF 155 $10.00 $1,550 2 Remove and Dispose of Exist Asphalt Paving and Base SY 35 $3.00 $105 3 New Loop Detector Gate, incl. all wiring and control circ. Each 1 $7,050.00 $7,050 4 30-inch Concrete Curb and Gutter LF 650 $8.00 $5,200 5 6-inch Concrete Slabs SY 45 $42.00 $1,890 6 Bituminous Surface Course, 3 inch thickness, including bituminous prime and tack coats SY 320 $8.00 $2,560 7 Flexible Base Course, 104nch SY 515 $7.00 $3,605 8 Excavation, Grading and Subgrade Preparation SY 515 $4.00 $2,060 9 Traffic Marking, 44nch wide lane lines LF 9,029 $0.35 $3,160 10 Parking Control Equipment Guard Post, Type B Each 2 $700.00 $1,400 SUBTOTAL ( current contract items) 1$28,580.25 A (1) Remove and relocate existing debit card reader, including all wiring and control circuitry, (2) Remove and relocate existing Type 16.1 Sign, including any required touch-up painting, (3) Furnish and Install New Type 10.3 sign LS 1 1 $9,469.75 $9,469.75 SUBTOTAL ( additional contract items) $9,469.75 ATTEST: KayQID e Dar5el1;Lity Secretes APPR AS TO FORM; William D. de Haas Competition and Contracts Manager