Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Resolution - 3800 - Contract - Lydick-Hooks Roofing Company - Re-Roofing West Terminal, LIA - 01_23_1992
Resolution No. 3800 Janaury 23, 1992 Item #32 :jS RESOLUTION E IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK: THAT the Mayor of the City of Lubbock BE and is hereby authorized and iirected to execute for and on behalf of the City of Lubbock a Contract by and )etween the City of Lubbock and Lydick -Hooks Roofing Company for re -roofing of :he Lubbock International Airport West Terminal, attached herewith, which ;hall be spread upon the minutes of the Council and as spread upon the minutes )f this Council shall constitute and be a part of this Resolution as if fully :opied herein in detail. Passed by the City Council this 23rd day of January , 1992. c • . C.�Mc A Y OR ATTEST: ndtte Boyd, City Secretary PPROVED AS TO CONTENT: "Purchasing Manager APPROVED AS TO FORM: Harrold i I 1ard_,_A_ss_is_tant_ City Attorney LYDICAKS.RES/D1-Agenda D23$oQ, CITY OF LUBBOCK SPECIFICATIONS FOR RE -ROOF WEST AIRPORT TERMINAL PHASE I BID # 11756 i CITY OF LUBBOCK Lubbock, Texas as/�� Office of Purchasing City of Lubbock P.O. Box 2000 Lubbock. Texas 79457 606-767-2167 MAILED TO VENDOR: December 20, 1991 CLOSE: 01/09/92 @ 2:00 P.M. BID # 11756 ADDENDUM # 1 Please modify of amend Contract Documents as follows: 1. Base bid shall include the cost for the 3/4" perlite insulation. 2. ALTERNATE #1 shall be a DEDUCT for the 3/4" perlite insulation. PLEASE RETURN ONE COPY WITH YOUR BID I g YOU huffi , CITY OF LUBBOCK PURCHASING OFFICE MAILED TO VENDOR: JANUARY 8, 1992 OLD CLOSE: 01/09/92 @ 2:00 P.M. NEW CLOSE: 01/10/92 @ 2:00 P.M. l BID # 11755 ADDENDUM # 2 Please modify or amend Contract Documents as follows: 1. The closing date for this bid has been changed. The new closing date and time is Friday, January 10, 1992 at 2:00 P.M. Please note the following specification changes: 1. SECTION 7510-3, PARAGRAPH 2.05, "EMERGENCY SUPPLIES": DELETE ITEM C.-TARPS, ITEM D.-WATER PUMPS, ITEM E.-HOSES. 2. SECTION 7510-5, PARAGRAPH 3.03, "TEMPORARY WATER STOPS", r' ITEM A: SHOULD READ THREE (3)-PLIES OF FIBERGLASS MEMBRANE ( 9", 18", 27°. ALSO DELETE ITEM B._, C., AND F. 3. SECTION 7510-6, PARAGRAPH 3.04, "BITUMEN HEATING", ITEM E: r DELETE REFERENCE TO THREE (3) FIRE EXTINGUISHERS. SHOULD READ TWO (2) FIRE EXTINGUISHERS, ONE TO BE LOCATED AT KETTLE r- AND ONE TO BE ON ROOF SURFACE DURING ALL PHASES OF WORK. 4. WARRANTY: ALL MATERIAL USED SHALL CONFORM TO MANUFACTURE'S U.D.L. WARRANTY. 5. ALL PAINTING SHALL BE BY OTHERS AND NOT INCLUDED IN THIS CONTRACT. THAW,80U, k r. n Shu fiel , CITY OF LUBBOCK PURCHASING OFFICE PLEASE RETURN ONE COPY WITH YOUR BID CITY OF LUBBOCK SPECIFICATIONS for TITLE: RE -ROOF NEST AIRPORT TERMINAL - PHASE I ADDRESS: 6100 N. CUIRT BID NUMBER: 11756 PROJECT NUMBER: 2154-552101-9661 CONTRACT PREPARED BY: Purchasing Department (THIS PAGE LEFT BLANK INTENTIONALLY) 6, INDEX PAGE ;Ohl' 1. NOTICE TO BIDDERS..........................................................................................3 i 2. GENERAL INSTRUCTIONS TO BIDDERS ........................ .....5 ............................................... 3. BID PROPOSAL - BID FOR LUMP SUM CONTRACTS.................................................................10 4. PAYMENT BOND.............................................................................................14 r, 1 i 5. PERFORMANCE BOND..........................................................................................17 6. CERTIFICATE OF INSURANCE..................................................................................20 t 7. CONTRACT..................................................................................................22 8. GENERAL CONDITIONS OF THE AGREEMENT.......................................................................24 9. CURRENT WAGE DETERMINATIONS............................................................... ..............42 r 10. SPECIFICATIONS............................................................................................43 11. SPECIAL CONDITIONS........................................................................................44 P-4 4 12. NOTICE OF ACCEPTANCE......................................................................................45 r r -2- No Text r A NOTICE TO BIDDERS t -3- (THIS PAGE LEFT BLANK INTENTIONALLY) NOTICE TO BIDDERS BID 0 11756 Sealed proposals addressed to Gene Eads, C.P.M., Purchasing Manager, City of Lubbock, Texas, will be received at the office of the Purchasing Manager, 1625 13th St., Roam L-04, Lubbock, Texas, 79401, until 2:00 o'clock p.m. on the 9th day of January, 1992, or as changed by the issuance of formal addenda to all planholders, to furnish all labor and materials and perform all work for the construction of the following described project: RE -ROOF NEST AIRPORT TERMINAL - PHASE I After the expiration of the time and date above first written, said sealed proposals will be opened by the Purchasing Manager at his office and publicly read aloud. It is the sole responsibility of the bidder to insure that his bid is actually in the office of Gene Eads, Purchasing Manager for the City of Lubbock, prior to the expiration of the date above first written. The City of Lubbock will consider the bids on the 23rd day of January. 1992, at Municipal Bldg., Lubbock, Texas, or as soon thereafter as may be reasonably convenient, subject to the right to reject any or r all bids and waive any formalities. The successful bidder will be required to furnish a performance bond and payment bond in accordance with Article 5160, Vernon's Am. Civil St., in the amount of 100% of the �• total contract price in the event that said contract price exceeds $25,000.00. Said statutory bonds should be issued by a company carrying a current ft1t Rating of @ or, or, as the rating of the bond company is a factor that will be considered in determination of the lowest responsible bidder. If the contract price does not exceed S25,000.00 the said statutory bonds will not be required. Bidders are required, whether or not a payment or performance bond is required, to submit a cashier's or certified check issued by a bank satisfactory to the City of Lubbock, or a proposal bond from a reliable surety company, payable without recourse to the order of the City of Lubbock in an amount not less than 5% of the total amount of the bid submitted as a guarantee that bidder will enter into a contract and execute all necessary bonds (if required) within 10 days after notice of award of the contract to him. It shall be each bidders sole responsibility to inspect the site of the work and to inform himself regarding all local conditions under which the work is to be done. It shall be understood and agreed that all such factors have been thoroughly investigated and considered in the preparation of the bid submitted. The plans, specifications, proposal forms and contract documents may be examined at the office of the Purchasing Manager for the City of Lubbock, Texas. Attention of each bidder is particularly called to the schedule of general prevailing rate of per diem wages included in the contract documents on file in the office of the Purchasing Manager of the City of Lubbock, which document is specifically referred to in this notice to bidders. Each bidder's attention is further directed to provision of Article 5159a, Vernon's Ann. Civil St., and the requirements contained therein concerning the above wage scale and payment by the contractor of the prevailing rates of wages as heretofore established by owner in said wage scale. The City of Lubbock hereby notifies all bidders that in regard to any contract entered into pursuant to this advertisement, minority and women business enterprises Witt be afforded equat opportunities to submit bids in response to this invitation and wilt not be discriminated against on the grounds of race, color, sex, or national origin in consideration for an award. There wilt be a pre -bid conference on 20th day of December, 1991, at 10:00 olctock a.m., Personnet Conference Room 0108, Municipat Building, 1625 13th Street. CITY OF LUBBOCK V BY: Gene Eads, C.P.M.1 Purchasing Manager ADVERTISEMENT FOR BIDS BID 0 11756 Sealed proposals addressed to Gene Eads, C.P.M., Purchasing Manager, City of Lubbock, Texas, will be received at the office of the Purchasing Manager, Municipal Building, 1625 13th Street, Roam L-04, Lubbock, Texas, 79401 until 2:00 o'clock o.m. on the 9th day of January. 1992, or as changed by the issuance of formal addenda to all planholders, to furnish all labor and materials and perform all work for the construction of the following described project: RE -ROOF WEST AIRPORT TERMINAL - PHASE I After the expiration of the time and date above first written, said sealed proposals will be opened by the Purchasing Manager at his office and publicly read aloud. The plans, specifications, proposal forms and contract documents may be examined at the office of the Purchasing Manager for the City of Lubbock, Texas. Attention of each bidder is particularly called to the Schedule of General Prevailing Rate of Per Diem Wages included in the contract documents on file in the office of the Purchasing Manager of the City of Lubbock, Texas. Each bidder's attention is further directed to the provisions of Article 5159a, Vernon's Ann. Civil St., and the requirements contained therein concerning such wage scales and payment by the contractor of the prevailing rates of wages as heretofore established by the City of Lubbock. The City of Lubbock hereby notifies all bidders that in regard to any contract entered into pursuant to this advertisement, minority and wanen business enterprises will be afforded equal opportunities to submit bids in response to this invitation and will not be discriminated against on the grounds of race, color, sex, or national origin in consideration for an award. There will be a prebid conference an 20th day of December. 1991, at 10:00 o'clock a.m., Personnel Conference Room 108, Municipal Building, 1625 13th Street. BY: Gene Eads, C.P.M.( PURCHASING MANAGER (THIS PAGE LEFT BLANK INTENTIONALLY) GENERAL INSTRUCTIONS TO BIDDERS •4- (THIS PAGE LEFT BLANK INTENTIONALLY) lz30'�Q GENERAL INSTRUCTIONS TO BIDDERS 1. SCOPE OF WORK The work to be done under the contract documents shall consist of the following: Re -roofing of the west wing terminal at Lubbock International Airport, 6100 N. Quirt, Lubbock, Texas. The contractor shall furnish all labor, superintendence, machinery, equipment and all materials necessary to complete this project in accordance with contract documents. 2. CONTRACT DOCUMENTS All work covered by this contract shall be done in accordance with contract documents described in the Gen- eral Conditions. All bidders shall be thoroughly familiar with all of the requirements set forth on the contract documents for the construction of this project and shall be responsible for the satisfactory completion of all work contemplated by said contract documents. 3. PLANS FOR USE BY BIDDERS It is the intent of the City of Lubbock that all parties with an interest in submitting a bid on the project covered by the contract documents be given a reasonable opportunity to examine the documents and prepare a bid without charge of forfeiture of deposit. The contract documents, may be examined without charge as noted in the Notice to Bidders. 4. TIME AND ORDER FOR COMPLETIDN The construction covered by the contract documents shall be fully completed within 90 (NINETY) calendar days from the date specified in the Notice to Proceed issued by the City of Lubbock to the successful bidder. The Contractor will be permitted to prosecute the work in the order of his own choosing, provided, however, the City reserves the right to require the Contractor to submit a progress schedule of the work contemplated by the contract documents. in the event the City requires a progress schedule to be submitted, and it is determined by the City that the progress of the work is not in accordance with the progress schedule so sub- mitted, the City may direct the Contractor to take such action as the City deems necessary to insure comple- tion of the project within the time specified. 5. PAYMENT All payments due to Contractor shall be made in accordance with the provisions of the General Conditions of the contract documents. 6. AFFIDAVITS OF BILLS PAID The City of Lubbock reserves the right, prior to final acceptance of this project to require the Contractor to execute an affidavit that all bills for labor, materials and incidentals incurred in the construction of the improvements contemplated by the contract documents have been paid in full and that there are no claims pending, of which the Contractor has been notified. -5- 1 7. MATERIALS AND WORKMANSHIP The intent of these contract documents is that only materials and workmanship of the best quality and grade will be furnished. The fact that the specifications may fail to be sufficiently complete in some detail will not relieve the Contractor of full responsibility for providing materials of high quality and for pro- tecting them adequately until incorporated into the project. The presence or absence of a representative of the City on the site will not relieve the Contractor of full responsibility of complying with this provi- sion. The specifications for materials and methods set forth in the contract documents provide minimum standards of quality which the owner believes necessary to procure a satisfactory project. a. GUARANTEES All equipment and materials incorporated in the project and all construction shall be guaranteed against de- fective materials and workmanship. 'Prior to final acceptance, the Contractor shall furnish to the Owner, a written general guarantee which shall provide that the Contractor shall remedy any defects in the work, and pay for any and all damages of any nature whatsoever resulting in such defects, when such defects appear within ONE year from date of final acceptance of the work as a result of defective materials or workmanship, at no cost to the Owner (City of Lubbock). 9. PLANS FOR THE CONTRACTOR The contractor will be furnished one set of plans and specifications, and related contract documents for his use during construction. Plans and specifications for use during construction will only be furnished di- rectly to the Contractor. The Contractor shall then distribute copies of plans and specifications to sup- pliers, subcontractors or others, as required for proper prosecution of the work contemplated by the Con- tractor. 10. PROTEgTION OF THE WORK The Contractor shall be responsible for the care, preservation, conservation, and protection of all materi- als, supplies, machinery, equipment, tools, apparatus, accessories, facilities, and all means of construc- tion, and any and all parts of the work whether the Contractor has been paid, partially paid, or not paid for such work, until the date the City issues its certificate of completion to Contractor. The City re- serves the right, after the bids have been opened and before the contract has been awarded, to require of a bidder the following information: (a) The experience record of the bidder showing completed jobs of a similar nature to the one covered by the proposed contract and all work in progress with bend amounts and percentage completed. (b) A sworn statement of the current financial condition of the bidder. (c) Equipment schedule. 11. TEXAS STATE SALES TAX This contract is issued by an organization which qualifies for exemption provisions pursuant to provisions of Article 20.04 of the Texas Limited Sales, Excise and Use Tax Act. The Contractor must obtain a limited sales, excise and use tax permit which shall enable him to buy the ma- terials to be incorporated into the work without paying the tax at the time of purchase. -6 F 12. PROTECTION OF SUBSURFACE LINES AND STRUCTURES It shall be the Contractor's responsibility to prosecute the work contemplated by the contract documents in such a way as to exercise due care to locate and prevent damage to all underground pipelines, utility lines, conduits or other underground structures which might or could be damaged by Contractor during the construc- tion of the project contemplated by these contract documents. The City of Lubbock agrees that it will fur- nish Contractor the location of all such underground lines and utilities of which it has knowledge. How- ever, such fact shall not relieve the Contractor of his responsibilities aforementioned. All such under- ground lines or structures cut or damaged by Contractor during the prosecution of the work contemplated by this contract shall be repaired immediately by Contractor to the satisfaction of the City of Lubbock, Texas, at Contractor's expense. 13. BARRICADES AND SAFETY MEASURES The contractor shall, at his own expense, furnish and erect such barricades, fences, lights and danger sig- nals, and shall take such other precautionary measures for the protection of persons, property and the work as may be necessary. The Contractor will be held responsible for all damage to the work due to failure of barricades, signs, and lights to protect it, and when damage is incurred, the damaged portion shall be immediately removed and re- placed by Contractor at his own cost and expense. The Contractor's responsibility for maintenance of barri- cades, signs, and lights shall not cease until the date of issuance to Contractor of City's certificate of acceptance of the project. 14. EXPLOSIVES The use of explosives will not be permitted unless written permission to do so is obtained by the Contractor from the City. In all cases where written permission is obtained for the use of explosives, the Contractor shall assume full responsibility for all damage which may occur as a direct or indirect result of the blast- ing. In addition, in all cases where explosives are authorized to be used, the Contractor shall use utmost care so as not to endanger life or property and the Contractor shall further use only such methods as are currently utilized by persons, firms, or corporations engaged in similar type of construction activity. Explosive materials shall not be stored or kept at the construction site by the Contractor. In all cases where explosives are to be used during the construction of the project contemplated by this contract, it shall be the duty of the Contractor to notify each utility company having structures (above or below the ground) in proximity to the site of the work of Contractor's intention to use explosives, and such notice shall be given sufficiently in advance to enable the companies to take such steps as they may deem necessary to protect their property from injury. Such notice, however, shall not relieve the Contractor of responsibility for any damage resulting from his blasting operations. 15. CONTRACTOR'S REPRESENTATIVE The successful bidder shall be required to have a responsible local representative available at all times while the work is in progress under this contract. The successful bidder shall be required to furnish the name, address and telephone rnmber where such local representative may be reached during the time that the work contemplated by this contract is in progress. 16. INSURANCE The Contractor shall not commence work under this contract until he has obtained all insurance as required in the General Conditions of the contract documents, from an underwriter authorized to do business in the State of Texas and satisfactory to the City. Proof of coverage shall be furnished to the City and written notice of cancellation or any material change will be provided ten (10) days in advance of cancellation or change. All policies shall contain an agreement on the part of the insurer waiving the right to subroga- tion. The insurance certificates furnished shall name the City as an additional insured and shall further state that all subcontractors are named as additional insureds, or in the alternative, shall be accompanied by a statement from the Contractor to the effect that no work on this particular project shall be subcontracted. 17. LABOR AND VORKiNG HOURS. Attention of each bidder is particularly called to the schedule of general prevailing rate of per diem wages included in these contract documents. The wage rate which must be paid on this project shall not be less than specified in the schedule of general prevailing rates of per diem wages as above mentioned. The bidders' attention is further directed to the requirements of Article 5159a, Vernon's Annotated Civil Statutes providing for the payment of the wage schedules above mentioned and the bidder's obligations there- under. The inclusion of the schedule'of general prevailing rate of per diem wages in these contract docu- ments does not release the Contractor from compliance with any wage law that may be applicable. Construc- tion work under this contract requiring an inspector will not be performed on weekends or holidays unless the following conditions exist: (1) The project being constructed is essential to the City of Lubbock's ability to provide the necessary service to its citizens. (2) Delays in construction are due to factors outside the control of the Contractor. The Contractor is approaching the penalty provisions of the contract and Contractor can show he has made a diligent effort to complete the contract within the allotted time. Before construction work requiring an inspector is to be performed on weekends or holidays, the Contractor must notify the Owner's Representative not less than three full working days prior to the weekend or holiday _ he desires to do work and obtain written permission from the Owner's Representative to do such work. The final decision on whether to allow construction work requiring an inspector on weekends or holidays will be made by the Owner's Representative. In any event, if a condition should occur or arise at the site of this project or from the work being done under this contract which is hazardous or dangerous to property or life, the Contractor shall immediately commence work, regardless of the day of the week or the time of day, to correct or alleviate such condition so that it is no longer dangerous to property or life. 18. PAYMENT OF EMPLOYEES AND FILING OF PAYROLLS The contractor and each of his subcontractors shall pay each of his employees engaged in work on the project under this contract in full (less mandatory Legat deductions) in cash, or by check readily cashable without discount, not Less often than once each week. The Contractor and each of his subcontractors engaged at the site of the work shall not later than the seventh day following the payment of wages, file with the Owner's Representative, or Engineer, a certified, sworn, legible copy of such payroll. This shall contain the name of each employee, his classification, the number of hours worked on each day, rate of pay, and net pay. The affidavit shall state that the copy is a true and correct copy of such 'payroll, that no rebates or deduc- tions (except as shown) have been made, or will in the future be made from the wages paid as shown thereon. The Contractor must classify employees according to one of the classifications set forth in the schedule of general prevailing rate of per diem wages, which schedule is included in the contract documents. -8- The Contractor shall forfeit as a penalty to the City of Lubbock on whose behalf this contract is made, ten a dollars for each laborer, workman, or mechanic employed for each calendar day, or portion thereof, such laborer, workman or mechanic is paid less than the wages assigned to his particular classification as set forth in the schedule of general prevailing rate of per diem wages included in these contract documents. 19. PROVISIONS CONCERNING ESCALATOR CLAUSES Proposals submitted containing any conditions which provide for changes in the stated bid price due to in- creases or decreases in the cost of materials, labor or other items required for the project will be re- jected and returned to the bidder without being considered. 20. PREPARATION FOR PROPOSAL The bidder shall submit his proposal on forms furnished by the City. All blank spaces in the form shall be correctly filled in and the bidder shall state the price both in words and numerals, for which he proposes to do the work contemplated or furnish the materials required. Such prices shall be written in ink, dis- tinctly and legibly, or typewritten. In case of discrepancy between the price written in words and the price written in figures, the price written in words shall govern. If the proposal is submitted by an indi-vidual, his name must be signed by him or his duly authorized agent. If a proposal is submitted by a firm, association, or partnership, the name and address of each member must be given and the proposal signed by a member of the firm, association or partnership, or person duly authorized. If the proposal is submitted by t" a company or corporation, the company or corporate name and business address must be given, and the proposal signed by an official or duly authorized agent. Powers of attorney authorizing agents or others to sign proposals must be properly certified and must be in writing and submitted with the proposal. The proposal shall be executed in ink. Each proposal shall be enclosed in a sealed envelope, addressed as specified in the Notice to Bidders, and endorsed an the outside of the envelope in the following manner: (a) Bidder's name (b) Proposal for (description of the project). Bid proposals may be withdrawn and resubmitted at any time prior to the time set for opening of the bids, but no proposal may be withdrawn or altered thereafter. r 21. BOUND COPY OF CONTRACT DOCUMENTS k Bidder understands and agrees that the contract to be executed by bidder shell be bound and include the fol- lowing: (a) Notice to Bidders. (b) General Instructions to Bidders. (c) Bidder's Proposal. (d) Statutory Bond (if required). - (a) Contract Agreement. (f) General Conditions. (g) Special Conditions (if any). (h) Specifications. (i) Insurance Certificates. M All other documents made available to bidder for his inspection in accordance with the Notice to Bidders. If Plans and Specifications are too bulky or cumbersome to be physically bound, they are to be considered incorporated by reference into the aforementioned contract documents. '9 -9- i No Text f I pr` BIO PROPOSAL taw 6 P' 4 ' f� A`Pp� S �1 F i R . t , (THIS PAGE LEFT BLANK INTENTIONALLY) BID PROPOSAL BID FOR Lu"P SUN CONTRACTS PLACE RM L-04 DATE 1/10/92 PROJECT NO. 11756 Proposat of Lydick -Hooks Roofing Co. of Lubbock, Inc. (hereinafter called Bidder) To the Honorable Mayor and'City Council City of Lubbock, Texas (hereinafter tatted owner) Gentlemen: The Bidder, In compliance with your invitation for bids for the construction of a Re —Roof West s� Airport Terminal - Phase I having carefully examined the plans, specifications, instructions to bidders, notice to bidders and atL other re- lated contract documents and the site of the proposed work, and being famitiar with all of the conditions surround- ing the construction of the proposed project including the availabitity of materials and tabor, hereby proposes to furnish all labor, materials, and supplies; and to construct the project in accordance with the plans, specifica- tions and contract documents, within the time set forth therein and at the price stated below. The price to cover all expenses incurred in performing the work required under the contract documents, of which this proposal is to be a part, is as follows: MATERIALS:Thirty—one thousand c}n4i-mrs------------------------ (t 31P000.00 ) SERVICES: Seventy-four thousand, and fifty-seven dollars --- (f 74,057.00 ) PHASE I BASE BID: One hundred, five thousand, & fifty-seven dol}irsi 05.057.00 ) MATERIALS: Twenty-two thousand, one hundred dollars -- (= zl�� • �� '', l�? t SERVICES: Sixty-six thousand, five hundred &Seventy-four D ATTERNATE: ol: Ei ht -eight thousand, six hundred and (INSULATION) seventy—four dollars -------------- DECK REPAIR UNIT PRICE: ' (S S_00 /sq. ft.) (Lightweight Concrete/per Square foot) I (s 2.50 /sq. ft.) y (Wood Deck/per Square Foot) Amount shatt be shown in both words and figures. In case of discrepancy, the amount shown in words shall govern.) -11- Bidder hereby agrees to commence the work on the above project on or before a date to be specified in a , written "Notice to Proceed" of the Owner and to fully complete the project within 90(MIMETY) consecutive calendar days thereafter as stipulated in the specifications and other contract documents. Bidder hereby further agrees to pay to Owner as liquidated damages the sum of $50.00 (fifty dollars) for each consecutive calendar day in excess of the time set forth hereinabove for completion of this project, all as more fully set forth in the general conditions of the contract documents. Bidder understands and agrees that this bid proposal shall be completed and submitted in accordance with in- struction number 20 of the General Instructions to Bidders. Bidder understands that the Owner reserves the right to reject any or all bids and to waive any formality in (` the bidding. The Bidder agrees that this bid shall be good and may not be withdrawn for a period of thirty (30) calendar days after the scheduled closing time for receiving bids. The undersigned Bidder hereby declares that he has visited the site of the work and has carefully examined the plans, specifications and contract documents pertaining to the work covered by this bid, and he further agrees to commence work on or before the date specified in the written notice to proceed, and to substantially complete the work on which he has bid; as provided in the contract documents. Enclosed with this proposal is a Cashier's Check or Certified Check for N/A Dollars (S ) or a Proposal Said in the sum of 5 % of Total Dollars (S ), which it is agreed shall be collected and retained by the Owner as liquidated damages in the event the proposal is accepted by the Owner and the undersigned fails to execute the necessary contract documents and the required bond (if any) with the Owner within ten (10) days after the date of receipt of written notification of acceptance of said proposal; otherwise, said check or bond shall be returned to the undersigned upon demand. r— Bidder understands and agrees that the contract to be executed by Bidder shall be bound and include all con- tract documents made available to him for his inspection in accordance with the Notice to Bidders. r Lydick -Hooks Roofing Co. of Lubboc: Contractor Inc Bidder'ia,►t,Cgrporation) t'AITEST k im chill an Fst- i maf•nr 4 -12- t LIST OF SUBCONTRACTORS This form shall be eamleted and submitted with the Bidderls Proposal. 1.� Dent Electric 2. Bruce Thorton Mechanical 3. 4. ---- - 5. 6. 7. 8. 4. 10. R 1. . Minority Owned Yes No X X r No Text t r } i ♦ w �won"IMONIM No coo --- — BID BOND Know a I I men by these presents: That LYDICK-HOOKS ROOFING COMPANY OF LUBBOCK, INC. (hereinafter called the Principal) as Principal, and the MERCHANTS BONDING COMPANY (Mutual) a corporation of the State of Iowa, with its Home Office in the City of Deb Moines, Iowa, (hereinafter called Surety), as Surety, are held and firmly bound to CITY OF LUBBOCK, TEXAS, (hereinafter called the Obligee) in the full and just sum of ($ - - - - - - - - - - 57 - - - - - - - - - - - ) FIVE PER CENT OF THE GREATEST AMOUNT BID ---------------------- nellars good and lawful money of the United States of America, to the payments of which sum of money well and truly to be made, the said Principal and Surety bind themselves, their and each of their heirs, executors, administrators, successors and assigns, jointly and severally, firmly by these presents. Signed, sealed and dated this loth day of JANUARY 19 92. THE CONDITION OF THIS OBLIGATION IS SUCH, that, if the Obligee shall make any award to the Principal for REROOFING OF WEST AIRPORT TERMINAL, PHASE I, BID NO. 11756, FOR THE CITY OF LUBBOCK, TEXAS, according to the terms of the proposal or bid made by the Principal therefor, and the Principal shall duly make and enter into a contract with the Obligee in accordance with the terms of said proposal or bid and award, and shall give bond for the faithful performance thereof with the MERCHANTS BONDING COMPANY (Mutual) and Surety, or with other Surety or Sureties approved by the Obligee; or if the Principal shall, in case of failure to do so, pay to the Obligee the damages which the Obligee m,ay'suffer.;,�(, by reason of such failure, not exceeding the penalty of this bond, then this obligation shall.be',,n�)l and ', �. void; otherwise it shall be and remain in full force and effect. ` "V IN TESTIMONY WHEREOF, the Principal and Surety have caused these presents to be, duly signed and sealed. LY -HOOKS ROOFING COMPANY OF o11 Witness: � ! � Pri �ips� �.►,- ByA` I RA�Plt N. HOOKS, JR., RESIDENT M G COMPANY ATTORNEY-IN- No Text i M MERCHANTS BONDING COMPANY Mutual + ! DES MOINE$, IQWA POWER OF ATTORNEY' op { { �b �7 SP /,.. :.y + ,�,,.;.• All �y .%� ,. ., .�+' i.- _..j Q�,i++� • w �. � q AltafiAert By These Presents, that the MERCHANTS BONDING COfViPANY (Mutual), a corporafion duty ganiYed under`the �aws `'`�'` tate of ,kwua, and having ;its principal .office in; the City of Des Moines County of Polk. State of lows. hath made. a constituted and = anted. and does by these P resents make, constitute and appoint:lo i« + Wm. E 'blurt k ee, Sr . Wm E. Murfee, Jr., Lance Murfee or Joan Carnes 14 r St+ Lubbock and State of Texas '.its true and lawful Attomey-in-Fact wfth full power .taffy hereoy conferred in its name place and Stead, to sign• execute, acknowledge and deliver in its behalf as surety e t'Fj v� i-�`��tie '.. 1t1 a - i. h-, ,;-:;: �'}v, ;:. ,• - -- ^.�,,.:,,. :;_; i a -,^t 1 �k.;.. ix d . -Any.and all bonds or undertakings;`provided that no bond or undertakin executed under this authority shall exceed in amount the sum of 6 {{'' `,,++ �.�"'"' --•5, }, �d+ FIVE HUNDRED THOUSAND S500 1 000 00) DOLLARS " 44" �+E'!-; :" , ; 4 � $ ' '.niTl. •r'' c 5{�, ` ' y�}�ii;�, ah vt Min the MERCHANTS BONDI,ND G+OMPANy (Mutual) thereby as fully and to the same extent as if such bond �undertakirtwas 5V.1hp ty.authorized officers of the: MERCHANTS BONDING COMPAN, (Mutual); and all the ads of said Attomey 0ftu*0p the , 1 � �R �� iorlty"fierein given are hereby ratified and confirmed. r ;r=kA+ i 'a tiff a t .. • -i ky 1�.:-f f• ' �Y�f'. i µ�i1 his Power of -Attorney is made and executed pursuant to and by authority of the following By -Laws adopted by the Board of Directors of 4 (Mutual). , ce President or Sec MERCHANTS BONDING COMPANY . A�TICLE 2• SECTION 6A. '' The Chairman of the Board or President or any Vice Secretary shall have power and i + .authority to appoint. Attorneys -in -Fact.- and to authorize them to execute on behalf of the Company, and attach the seal of. 'the1 ' bompany thereto, bonds and undertakings, recognizances, contracts of indemnity and other writings obligatory in the nature thereof. AfiTICLE 2, SECTION 66. --The signature o1 any authorized officer and the Seal of the Company may be affixedby facsimlfe to ,an r Power of Attorney .or Certification thereof authorizing the execution and delivery of any bond, undertaking,. recognizance. or other suretyship obligations of the Company, and such signature and seal when so used shall have the same force and effect as • Elk : 5 " , >$ - '' ^"'� L! I i'�Ahtness Whereof. MERCHANTS BONDING COMPANY (Mutual) has caused these presents to be signed by its Vice President and ;.•. •�.;;?!i.; cutive Vice, President, and its corporate seal to be hereto affixed, this , tst day of January arc t 9i s' 1 : " MERCHANTS BONDING COMPANY (Mutual) 4..i,►i., i' i . •• • ill"' By 4 Jri _� tltl ii ' •t � . ��Q • E �i4 � �A'' • 1/ce President • y�acec•dive ace P�esid {r • TE OF )OWA JNTY OF POLK as " • -H �'\ rh n • b, • x in this 1st day of January ;' 1990 before me appeared M.J. Long and Iney,Bliss Ill, to me personally known, who being by me duly sworn did say that they are Vice President and Executive Vice Presidents iectively of the MERCHANTS BONDING COMPANY (Mutual), the corporation described in the foregoing instrument. and that the Seat ,ed to the said instrument is the Corporate Seal of the said Corporation and that the said instrument was signed and sealed in behalf of I t Toration by authority of its Board of Directors. TJ ?'1 l I "Y „i 1 ri w. _ -y'�".- t r.. d : t ,F ,+ h• : { M P10 i Testimony Whereof I have hereunto set my hand and affixed my Official Seal at the City of Des Moines Iowa the day and year first y NO �i 'I " 9 • .—f NWXY PUW. Pdk Couirai+bwa��j o�iiiA • m . a A4Y CQmnnptsaari Ertpres �Q STATE OF 1bWA I AL COUNTY OF POLK ••'6 ••• i M,J. Long Vice President of the MERCHANTS BONOING COMPANY (Mutual) do hereby ceetffy that the above and t a . foregoing is a true and correct copy of the POWER OF ATTORNEY, executed by said MERCHANTS BONDING t: COMPANY (Mutual), which is still in force and effect\NG C • ••\" ") i 1Nitne s Wh rent 1 have here�unto set my hand and affixed the seat of the Company, at \1Q ��%!,o •• z`,a's'+#��±. .fit day of January19 }2 ' ,� �4 p(iPO�t' {� 1.. .,4au •r avefa 'f �"{.zl�_ #.r atf. .. r.� (> 'fl�,yl• y,yF Z • { 33 st power of attorney expires . b� .fj� • ° + ii la r'd a F 1`s 1 Y Fr.', J !. • • w l" �' December 31, ,1993 a• �Y ';'�• ' r� ni5., g a Y'iY' �••••�••• s f.J No Text a�+ !: (THIS PAGE LEFT BLANK INTENTIONALLYY BOND CHECK BEST RATING LICEN770 IJ-2'By TAS DATE V�� %ONa/ys �r o �,4 ]BONINNG 000 a. _ %%jam — 6000 N. LAMAR • SUITE 200 • AUSTIN, TEXAS 78752-4497 PAYMENT BOND STATUTORY PAYMENT BOND PURSUANT TO ARTICLE 5160 OF THE REVISED CIVIL STATUTES OF TEXAS AS AMENDED BY ACTS OF THE 56TH LEGISLATURE, 1959 (McGregor Act — Public Works) (Penalty of this bond must be 10091c of Contract amount) KNOW ALL MEN BY THESE PRESENTS: Lydick -Hooke Roofing Co an� of Lubbock., Inc. That, (hereinafter called, the Principal), as Principal, and MERCHANTS BONDING COMPANY (Mutual), a I corporation organized and existing under the laws of the State of Iowa, with its principal office in the City of Des Moines, (hereinaftercalled the Surety), as Surety, are held and firmly bound unto. fifty, of LubbockE Texas # �j/��71��A,�. -$���d �aa ti{/.�{ia nd f •©� art � XPAII A1ml W eG3V 5��� 111 Gli1 Vl !Y♦ i wM !!!! !lM l�►�+l �wrr li�llll�l�r!!r! •! Dollars ($ J_), for the payment whereof, the said Principal and Surety bind themselves, and their heirs, administrators,- executors, successors and assigns, jointly and severally, firmly by these presents. 27th WHER " Principal h gZnter i 8,fegjjevr t �aj$ Oblig iglel«he day. of 19 , to bld No. 11756 for the City of Lubbock, Texas, which contract is hereby referred to and made a part hereof as fully and to the same extent as if copied at length herein. NOW THEREFORE, THE CONDITION OF THIS OBLIGATION IS SUCH, that if the said Principal shall pay all claimants supplying labor and material ,to him or a subcontractor in the prosecution of the work provided for in said contract, then, this obligation shall be void; otherwise to remain in full force and effect. PROVIDED, HOWEVER, that this bond is executed pursuant to the provisions of Article 5160 of the Revised Civil Statutes of Texas as amended by Acts of the 56th Legislature, 1959, and all '�abffil ei-oli,-this bond to all such claimants shall be determined in accordance with the provisions of said_.=Article to tl er4ame extent as if 'it were copied at length herein. - I hIN WITNESS WHJjF",,Jhe said P cipal and Surety have signed and sealed cis i 6txuhient this day of , 19 L7 ►I .•" Kb' t 041? ItTG CIMPAM O JGUBB0Gr4,1N Witness • (deal) Attest: r F �r (If Individual or Firm) (Seal) MERCHANTS BONDING COMPANY (Mutual) Surety By fc�® No Text ' MERCHANTS BONDING COMPANY (Mutual) ' DES MOINES, IOWA r POWER OF ATTORNEY Know All Men By These Presents. that the MERCHANTS BONDING COMPANY (Mutual), a corporation duly organized under the laws: of the State of Iowa, and having its principal office in the City of Des Moines, County of Polk. State of lov✓a. hath made, constituted and appointed, and does by these presents make. constitute and appoint Wm. E, Murfee, Sr., Wm. E. Murfee, Jr., Lance Murfee or Joan Carnes Lubbock Texas of and State of its true and lawful 4,ttgrney-in-Fact, with lull power and authority hereoy conferred in its name, place and stead, to sign, execute, acknowledge and deliver in its behalf as surety: r Any and all bonds or undertakings, provided that no bond or undertaking executed under this authority shall exceed in amount the sum of ttt FIVE HUNDRED THOUSAND ($500,000.00) DOLLARS and to bind the MERCHANTS BONDING COMPANY (Mutual) thereby as fully and to the same extent as if such bond or undertaking was signed by the duly authorized officers of the MERCHANTS BONDING COMPANY (Mutual), and all the acts of said Attorney, pursuant to the • authority herein given, are hereby ratified and confirmed. This Power -of -Attorney is made and executed pursuant to and by authority of the following By -Laws adapted by the Board of Directors of the MERCHANTS BONDING COMPANY (Mutual). ARTICLE 2. SECTION 6A. — The Chairman of the Board or President or any Vice President or Secretary shall have power and authority to appoint Attorneys -in -Fact, and to authorize them to execute on behalf of the Company, and attach the seal of the Company thereto, bonds and undertakings, recognizances, contracts of indemnity and other writings obligatory in the nature thereof. ARTICLE 2. SECTION 6B. -- The signature of any authorized officer and the Seal of the Company may be affixed by facsimile to any Power of Attorney or Certification thereof authorizing the execution and delivery of any bond, undertaking. recognizance, .or other suretyship obligations of the Company, and such signature and seal when so used shall have, the same, force and ejlcct as though manually fixed. In Witness Whereof, MERCHANTS BONDING COMPANY (Mutual) has causal these presents to be signed by its Vice Pmsidont and Executive Vice President, and its corporate seal to be hereto affixed. this 1st day of January A.D., 1990 Attest: MERCHANTS BONDING COMPANY (Mutunli �.... C By �— ------------_-� _.T.--_...—. • R 1 U 3 Vice Pia"+,doot • SFrecutive occ, Presi&,n STATE OF IOWA PM COUNTY OF POLK ss. ••;'��Z' \1a••• On this 1st day of January 1990 before me appeared M.J. Long and Rodney Bliss III, to me personally known, who being by me duly sworn did say that they are Vice President and Executive Vice President respectively.of the MERCHANTS BONDING COMPANY (Mutual), the corporation described in the foregoing instrument. and that the, Seal affixed to the said instrument is the Corporate Seal of the said Corporation and that the said instrument was signed and sealed in behalf of t said Corporation by authority of its Board of Directors. In Testimony Whereof, I have hereunto set my hand and affixed my Official Seal, at the City of Des Moines, Iowa the day and your first above written. G. .. B AI I C y 3 IOWA m rry Go,..,.),r.,, EKn y .• . V 8-4-92 O P STATE OF IOWA •'. T4,9 I A%- COUNTY OF POLK 5 1. M.J. Long, Vice President of the MERCHANTS BONDING COMPANY (Mutual), do he•eby certify that the above and foregoing is a true and correct copy of the POWER OF ATTORNEY, executed by said MERCHANIS BONDING r" COMPANY (Mutual), which is still in force and effect. . •"•' • . .• i . • Q\KG ; CO In Witr27 ereof. I have hereury� ;C d and affixed t eal of the Company, at �• !%fp •• this f. f day of �i� >r 19, �0 . �� P 0,q CO qM3A 1 This power of attorney expires _ =- :`�6 •*+ December 31, 1993 r PERFORMANCE BOND (THIS PAGE LEFT BLANK INTENTIONALLY) 7 77 BDND CHECK —— BEST RATING 6000 N. LAMAR • SUITE 200 • AUSTIN, TEXAS 78752-4497 LICENSED N TEXAS DATE Y PERFORMANCE BOND STATUTORY PERFORMANCE BOND PURSUANT TO ARTICLE 5160 OF THE REVISED CIVIL STATUTES OF TEXAS AS AMENDED BY ACTS OF THE 56TH LEGISLATURE, 1959 (McGregor Act —Public Works) (Penalty of this bond must be 1007o of Contract amount) KNOW ALL MEN BY THESE PRESENTS: That, Lydick -Hooks Rooting CorgenY of Lubbock, TAc. (hereinafter, called the Principal), as Principal, and MERCHANTS BONDING COMPANY (Mutual), a corporation organized and existing under the laws of the State of Iowa, with its principal office in the City of Des Moines, (hereinafter called the Surety), as Surety, are held and firmly bound unto City of Lubbock# Texas l ei #j �the.+c3bii ea�.i�.tbe.amount.o�-,� '� ort f jye �ha'usand„ ift�R!gyen� Dollars ($105■ 05'7 a a_4, for the payment whereof, the said Principal and Surety bind themselves, and their heirs, administrators, executors, successors and assigns, jointly and severally, firmly by these presents. WHER S the Princi al entered ' to a ce a w t ontra t th t O i e dated t o 27 a'tuary p e•1 oc�' e� . WE ®t ii►e�; 'Use , day of Bid No, 11756 for the City of Lubbocks Texans which contract is hereby referred to and made a part hereof as fully and to the same extent as if copied at length herein. NOW, THEREFORE, THE CONDITION OF THIS OBLIGATION IS SUCH, that if the, said Principal shall faithfully perform the work in accordance with the plans, specifications and contract documents, then this obligation shall be void; otherwise to remain in full force and effect. PROVIDED, HOWEVER, that this bond is executed pursuant to the provisions of Article"5150-of the Revised Civil Statutes of Texas as amended by Acts of the 56th Legislature, 1959, and a11,,habil1fies 6n-fhis bond shall be determined in accordance with the provisions of said Article. to the same eiter'it--as if it "weDQ copied at length herein. _ 11 19 WITNESS WHEREOF � the said P cipal and Surety have signed and sealed ilu_s :instrument this 2' A day of 19 Witness: LYDICK-HOOKS ROOFING �°U?AUY--- S ' `t A) Seal) , If Individual�or Firm) Attest: (Seal) �. (Seal) (If orporati A), Prin ip 1 ME CHANTS BONDING COMPANY (Mutual) 01 surety Byt to8n F No Text CERTIFICATE OF INSURANCE .20- (THIS PAGE LEFT BLANK INTENTIONALLY) y1 e 7 i vKf r + t y a. sMC y ti DS ur_ V 49 d Idd rCC" C.T .l! VI w&'c I o7n on ( y aYhV Confers no r i 3h1 Jpon the certificate holder. This certificate does not amend, extend or'alter the coverage afforded by the policies Iisted below. ')RODU CER ' C Letter A Highlands Insurance Co./Dalla 0 McQueary & Henry, Inc. M Letter B Northbrook Insurance Company 4006 lieft Line Road, Suite 115 P Dallas TX TBZ44 A Letter C CFCI :HS'JREA N LYDICK-HOOKS/LUBBOCK I Letter D 1924 Clovis Rd E P 0 Box '2605 S Letter E 77 r Lubbock. TX T9408 Phis is to certify that, policies of insurance listed below have been issued.to :he insured named above for the policy period indicated. Notwithstanding any -equirement, term or condition of any contract or'other document with respect .o which this certificate may be issued or may pertain, the insurance afforded )y the policies described -herein is subject to all the terms, exclusions and', w"- :onditions of such poiicles. Limits shown may have been reduced by paid claims -COVERAGES- - --- -- ------- Co Type of Policy. PaI I Cy Policy Limits Ltr Insurance Effective Expiration ---- GENERAL LIABILITY -------------------------------------------------------- A (X) Commercial GL ' R60106ITS- 01/01/92' 01/0I/93 Gen A3gr-e3 $29000,00, ( ) ( )Claims I'Sade Prd-C/Op"Agf2,000y001 r' A (X)Occurrence Pers/Adv In$19000,001 ( ) Owners ?A Contr Each Occur 51,000,001 ( ) Fire Damag '$50,000 1 Medical Ex $5,000 ---- AUTOMOBILE LIABILITY--------------------------------------------------•---- F (X) Any Auto CA0320345 0110119Z 01/01/93 CEL S11000100( All Owned- b.I./Pers $ ( ) Scheduled B.I./Acrid $ E (X) Hired P.D. $ (X) Non -Owned .( ) Garase Liab ---- EXCESS LIABILITY -------------------------------------------------------- C (X) Umbrella Form 5236292718 01/01/92 01/01/93 Each Occur Ag3regat4 O.T. Umbr-c I I a 2,000,000 $ 2,000,000 ---- WORKERS COMPENSATION -- A WIC. RWCti1340-- --- 01101/92 01/01/93-STATUTORY Employers Liab. Each Acrid $500,000 Dis/Policy $500,000 D i s/Employ$500, - OTHER-- -------------------------------------------------------. ram` k b s l -------------------------------.---------------------- .----------------------- r )ESCRIPTION OF Operati_ons/Locations/Vehicies/Special Iteyms CANCELLATION: Should any of the above described policies be cancelled before the expiration data thereof, the issu'ng company will endeavor to mail 10 days written notice to the certificate holder named below but failure to mail such notice shall impose no obligation or liability of any kind upon the company, its agents or representatives. NAME and ADDRESS of CERTIFICATE HOLDER r CITY OF LUBBOCK ' P 0 Box 2000 Lubbock, TX 79400 Author i zed Represen at ive--_ 7nni7nnM zxnrau V zvvqnMIN 86T0 RQ1 q-T7.c7. rYn:rr-aiall�rn No Text CONTRACT (THIS PAGE LEFT BLANK INTENTIONALLY) F CONTRACT STATE OF TEXAS COUNTY OF LUBBOCK THIS AGREEMENT, made and entered into this January 23. 1992 , by and between the City of Lubbock, County of Lubbock, State of Texas, acting by and through B.C. McMinn, Mayor, thereunto authorized to do so, hereinafter referred to as OWNER, and LYDICK-HOOKS ROOFING CO. OF LUBBOCK, INC. of the City of LUBBOCK, County of LUBBOCK and the State of TEXAS, hereinafter termed CONTRACTOR. WITNESSETH: That for and in consideration of the payments and agreements hereinafter mentioned, to be made and performed by the OWNER and under the conditions expressed in the bond bearing even date herewith (if any) the CON- TRACTOR hereby agrees with OWNER to commence and complete the construction of certain improvements described as fol- lows: BID # 11756-RE-ROOF WEST AIRPORT TERMINAL - PHASE I IN THE AMOUNT OF $105,057.00 r and all extra work in connection therewith, under the terms as stated in the contract documents and at his (or their) own proper cost and expense to furnish all materials, supplies, machinery, equipment, tools, superintendence, r. labor, insurance and other accessories and services necessary to complete the said construction in accordance with the contract documents as defined in the General Condition of Agreement. The CONTRACTOR hereby agrees to commence work within ten days after the date written notice to do so shall have been given to him and to substantially complete same within the time specified in the contract documents. The OWNER agrees to pay the CONTRACTOR in current funds for the performance of the contract in accordance with I� the proposal submitted therefore, subject to additions and deductions, as provided in the contract documents and to make payment on account thereof as provided therein. IN WITNESS WHEREOF, the parties to these presents have executed this agreement in Lubbock, Lubbock County, -'- Texas in the year and day first above written. 4 ATTEST: CITY OF LUBBOCK, TEXAS (OWNER) retery 4. MAYOR r. AP VED AS TO CONTE : 1 A ROVED AS TO F M: , r ATTES Corporate S retary r LYDICK-HOOKS ROOFING CO. OF LUBBOCK. INC. B NTRAC R � �� ` �, y +-- TITLE PRESIDENT COMPLETE ADDRESS: Z7 PO BOX 2605 LUBBOCK, TX 79408 -23- No Text GENERAL CONDITIONS OF THE AGREEMENT -24. (THIS PAGE LEFT BLANK INTENTIONALLY) GENERAL CONDITIONS OF THE AGREEMENT F i. OWNER Whenever the word Owner, or the expression Party of the First Part, or First Party, are used in this con- tract, it shall be understood as referring to the City of Lubbock, Texas. 2. CONTRACTOR Whenever the word Contractor, or the expression Party of the Second Part, or Second Party, is used, it shall be understood to mean the person, persons, co -partnership or corporation, to -wit: LYDICK-HOOKS ROOFING COMPANY, who has agreed to perform the work embraced in this contract, or to his or their legal representative. 3. OWNER'S REPRESENTATIVE Whenever the word Owner's Representative or representative is used in this contract, it shall be understood as referring to JERRY SMITH, DIRECTOR OF BUILDING SERIVC£S, City of Lubbock, under whose supervision these contract documents, including the plans and specifications, were prepared, and who will inspect construc- tions; or to such other representative, supervisor, or inspector as may be authorized by said owner to act in any particular under this agreement. Engineers, supervisor or inspectors will act for the owner under the direction of Owner's Representative, but shall not directly supervise the Contractor or men acting in behalf of the Contractor. 4. CONTRACT DOCUMENTS The contract documents shall consist of the Notice to Bidders, General Instructions to Bidders, Proposal, Signed Agreement, Statutory Bonds (if required), General Conditions of the Agreement, Special Conditions of the Agreement (if any), Specifications, Plans, Insurance Certificate, and all other documents made available to Bidder for his inspection in accordance with the Notice to Bidders. 5. INTERPRETATION OF PHRASES Whenever the words "Directed," "Permitted," "Designated," "Required," "Considered Necessary," "Prescribed," or words of like import are used, it shall be understood that the direction, requirement, permission, order, r.. designation or prescription of the Owner's Representative is intended; and similarly, the words "Approved," f "Acceptable," "Satisfactory," or words of like import shall mean approved by or acceptable or satisfactory to the Owner's Representative. Whenever in the Specifications or drawings accompanying this agreement, the terms of description of various qualities relative to finish, workmanship, or other qualities of similar kind which cannot, from their na- ture, be specifically and clearly described and specified, but are necessarily described in general terms, the fulfillment of which must depend on individual judgment, then, in all such cases, any question of the fulfillment of said Specifications shall be decided by the Owner's Representative, and said work shall be done in accordance with his interpretations of the meaning of the words, terms, or clauses defining the character of the work. 6. SUBCONTRACTOR The term Subcontractor, as employed herein, includes only those having a direct contract with the Contractor for performance of work on the project contemplated by these contract documents. Owner shall have no re- sponsibility to any Subcontractor employed by Contractor for performance of work on the project contemplated r 4 F -25. 9.. 10. 12. by these contract documents, but said Subcontractors will look exclusively to Contractor for any payments due Subcontractor. WRITTEN NOTICE Written notice shall be deemed to have been duly served if delivered in person to the individual or to a member of the firm or to an officer of the corporation for whom it is intended, or if delivered at or sent certified mail to the last business address known to him who gives the notice. WORK Unless otherwise stipulated, the Contractor shall provide and pay for all materials, supplies, machinery, equipment, tools, superintendence, labor, insurance, and all water, light, power, fuel, transportation and all other facilities necessary for the execution and completion of the work covered by the contract docu- ments. Unless otherwise specified, all materials shall be new and both workmanship and materials shall be of a good quality. The Contractor shall, if required, furnish satisfactory evidence as to the kind and quality of materials. Materials or work described in words which so applied have well known, technical or trade meaning shall be held to refer such recognized standards. All work shall be done and all materials furnished in strict conformity with the contract documents. SUBSTANTIALLY COMPLETED The term "Substantially Completed" is meant that the structure or project contemplated by the contract docu- ments has been made suitable for use or occupancy or the facility is in a condition to serve its intended purpose, but still may require minor miscellaneous work and adjustment. LAYOUT Except as specifically provided herein, the Contractor shall be responsible for laying out all work and _ shall accomplish this work in a manner acceptable to the Owner's Representative. The Owner's Representative will check the Contractor's layout of all major structures and any other layout work done by the Contractor at Contractor's request, but this check does not relieve the Contractor of the responsibility of correctly locating all work in accordance with the Plans and Specifications. KEEPING OF PLANS AND SPECIFICATIONS ACCESSIBLE The Contractor shall be furnished with one copies of all Plans, Profiles and Specifications without expense to him and he shall keep one copy of same consistently accessible on the job site. RIGHT OF ENTRY The Owner's Representative may make periodic visits to the site to observe the progress of quality of the executed work and to determine, in general, if the work is proceeding in accordance with the contract docu- ments. He will not be required to make exhaustive or continuous on -site inspections to check the quality or quantity of the work, nor will he be responsible for the construction means, methods, techniques, sequences or procedures, or the safety precautions incident thereto. His efforts will be directed towards providing assurances for the Owner that the completed project will conform to the requirements of the contract docu- ments, but he will not be responsible for the Contractor's failure to perform the work in accordance with the Contract Documents. On the basis of his on -site observations, he will keep the Owner informed of the progress of the work and will endeavor to guard the Owner against defects and deficiencies in the work of the Contractor. -26- 4 f 13. LINES AND GRADES All lines and grades shall be furnished by the Owner's Representative whenever necessary for the commence- ment of the work contemplated by these contract documents or the completion of the work contemplated by r these contract documents. Whenever necessary, Contractor shall suspend his work in order to permit Owner's Representative to comply with this requirement, but such suspension will be as brief as practical and Con- tractor shalt be allowed no extra compensation therefore. The Contractor shall give the owner's Repre- sentative ample notice of the time and place where lines and grades will be needed. All stakes, marks, etc., shall be carefully preserved by the Contractor, and in case of careless destruction or removal by him, his Subcontractors, or his employees, such stakes, marks, etc., shall be replaced by the Owner's Representa- tive at Contractor's expense. 14. WER'S REPRESENTATI�'S AUTHORITY AND DUTY REPRESENTATI�'S AUTHORITY AND DUTY Unless otherwise specified, it is mutually agreed between the parties to this Agreement that the Owner's r Representative shall review all work included herein. He has the authority to stop the work whenever such stoppage may be necessary to insure the proper execution of the contract. In order to permit delays and disputes and to discourage litigation, it is further agreed that the Owner's Representative shall, in all cases, determine the amounts and quantities of the several kinds of work which are to be paid for under this contract. He shall determine all questions in relation to said work and the construction thereof, and shall, in all cases, decide every question which may arise relative to the execution of this contract on the part of said Contractor. The owner's Representative's estimates and findings shall be conditions precedent to the right of the parties hereto to arbitration or to any action on the contract, and to any rights of the f Contractor to receive any money under this contract; provided, however, that should Owner's Representative render any decision or give any direction, which in the opinion of either party hereto, is not in accordance with the meaning and intent of this contract, either party may file with said owner's Representative within 30 days his written objection to the decision or direction so rendered, and by such action may reserve the right to submit the questions so raised to arbitration as hereinafter provided. It is the intent of this Agreement that there shall be no delay in the execution of the work, therefore, written decisions or direc- 7 tion of the Owner's Representative as rendered shall be promptly carried out, and any claim arising there- from shall be thereafter adjusted to arbitration as hereinafter provided. The Owner's Representative shall, within a reasonable time, render and deliver to both the Owner and the I' Contractor a written decision on all claims of the parties hereto and on all questions which may arise rela- tive to the execution of the work or the interpretation of the contract, specifications and plans. Should the Owner's Representative fail to make such decision within a reasonable time, an appeal to arbitration may +^ be taken as if his decision had been rendered against the party appealing. 15. SUPERINTENDENCE AND INSPECTION INSPECTION It is agreed by the Contractor that the Owner's Representative shall be and is hereby authorized to appoint from time to time such subordinate engineers, supervisors, or inspectors as the said owner's Representative slay deem proper to inspect the materials furnished and the work done under this Agreement, and to see that said material is furnished and said work is done in accordance with the specifications therefore. The Con- tractor shall furnish all reasonable aid and assistance required by the subordinate engineers, supervisors or inspectors for the proper inspection and examination of the work. The Contractor shall regard and obey the directions and instructions of any subordinate engineers, supervisors or inspectors so appointed, when such directions and instructions are consistent with the obligations of this Agreement and accompanying plans and specifications provided, however, should the Contractor object to any orders by any subordinate engineer, supervisor or inspector, the Contractor may within six (6) days Brake written appeal to the Owner's Representative for his decision. 16. CONTRACTOR'S DUTY AND SUPERINTENDENCE The Contractor shall,give personal attention to the faithful prosecution and completion of this contract and shall keep on the work, during its progress, a competent superintendent and any necessary assistants, all satisfactory to Owner's Representative. The superintendent shall represent the Contractor in his absence and all directions given to him shall be binding as if given to the Contractor. Adequate supervision by competent and reasonable representatives of the Contractor is essential to the proper performance of the work and lack of such supervision shall be grounds for suspending operations of the Contractor. The work, from its commencement to completion, shall be under the exclusive charge and control of the Con- tractor and all risk in connection therewith shall be borne by the Contractor. The Owner or Owner's Representatives will not be responsible for the acts or omissions of the Contractor, or any subcontractors, or any of his agents or employees, or any other persons performing any of the work. 17. CONTRACTOR'S UNDERSTANDING It is understood and agreed that the Contractor has, by careful examination, satisfied himself as to the na- ture and location of the work, the confirmation of the ground, the character, quality and quantity of mate- rials to be encountered, the character of equipment and facilities needed preliminary to and during the prosecution of the work, and the general and local conditions, and all other matters which in any way effect the work under this contract. No verbal agreement or conversation with any officer, agent, or employee of the Owner, either before or after the execution of this contract, shall effect or modify any of the terms or obligations herein contained. 18. CHARACTER OF WORKMEN The Contractor agrees to employ only orderly and competent men, skillful in the performance in the type of work required under this contract, to do the work; and agrees that whenever the Owner's Representative shall Inform him in writing that any man or men on the work, are, in his opinion, incompetent, unfaithful, or dis- orderly, such man or men shall be discharged from the work and shall not again be employed on the work with- out the Owner's Representative's written consent. 19. CONSTRUCTION PLANT The Contractor shall provide all labor, tools, equipment, machinery and materials necessary in the prosecu- tion and completion of this contract where it is not otherwise specifically provided that Owner shall fur- nish same, and it is also understood that Owner shall not be held responsible for the care, preservation, conservation, or protection of any materials, tools, equipment or machinery or any part of the work until it is finally completed and accepted. The building of structures for the housing of men or equipment will be permitted only at such places as the Owner's Representative shall direct, and the sanitary conditions of the grounds in or about such structure shall at all times be maintained in a manner satisfactory to the Owner's Representative. 20. SANITATION Necessary sanitary conveniences for the use of laborers on the work site, properly secluded from public ob- servation, shall be constructed and maintained by the Contractor in such manner and at such points as shall be approved by the Owner's Representative and their use shall be strictly enforced. -28- r 21. OBSERVATION AND TESTING The Owner or Owner's Representative shall have the right at all reasonable times to observe and test the work. Contractor shall make necessary arrangements and provide proper facilities and access for such obser- vation and testing at any location wherever work is in preparation or progress. Contractor shall ascertain the scope of any observation which may be contemplated by Owner or Owner's Representative and shall give am- ple notice as to the time each part of the work will be ready for such observation. owner or Owner's Rep- resentative may reject any work found to be defective or not in accordance with the contract documents, re- gardless of,the stage of its completion or the time or place of discovery of such errors and regardless of whether Owner's Observer has previously accepted the work through oversight or otherwise. If any work should be covered without approval or consent of the Owner, it must, if requested by Owner or Owner's Repre- sentative, be uncovered for examination at Contractor's expense. In the event that any part of the work is being fabricated or manufactured at a location where it is not convenient for Owner or Owner's Representa- tive to make observations of such work or require testing of said work, then in such event Owner or Owner's Representative may require Contractor to furnish owner or Owner's Representative certificates of inspection, testing or approval made by persons competent to perform such tasks at the location where that part of the work is being manufactured or fabricated. All such tests will be in accordance with the methods prescribed by the American Society for Testing and Materials or such other applicable organization as may be required by law or the contract documents. If any work which is required to be inspected, tested, or approved is covered up without written approval or consent of the Owner or Owner's Representative, it must, if requested by the Owner or owner's Representa- tive, be uncovered for observation and testing at the Contractor's expense. The cost of all such inspec- tions, tests and approvals shall be borne by the Contractor unless otherwise provided herein. Any work which fails to meet the requirements of any such tests, inspections or approval, and any work which meets the requirements of any such tests or approval but does not meet the requirements of the contract documents shall be considered defective. Such defective work shall be corrected at the Contractor's expense. Neither observations by the Owner or Owner's Representative, nor inspections, tests, or approvals made by I^ Owner, Owner's Representative, or other persons authorized under this agreement to make such inspections, tests, or approvals shall relieve the Contractor from his obligation to perform the work in accordance with the requirements of the contract documents. 22. DEFECTS AND THEIR REMEDIES It is further agreed that if the work or any part thereof, or any material brought on the site of the work for use in the work or selected for the same, shall be deemed by the Owner or Owners' Representative as un- suitable or not in conformity with plans, specification and contract documents, the Contractor shall, after receipt of written notice thereof from the Owner's Representative, forthwith remove such material and re- build or otherwise remedy such work so that it shall be in full accordance with this contract. It is fur- ther agreed that any remedial action contemplated as hereinabove set forth shall be at Contractor's expense. 23. CHANGES AND ALTERATIONS The Contractor further agrees that the Owner may make such changes and alterations as the Owner may see fit, in the line, grade, form dimensions, plans or or materials for the work herein contemplated, or any part thereof, either before or after the beginning of the construction, without affecting the validity of this contract and the accompanying bond. If such changes or alterations diminish the quantity of the work to be done, they shall not constitute the r basis for a claim for damages, or anticipated profits on the work that may be dispensed with. if they in- crease the amount of work, and the increased work can fairly be classified under the specifications, such increase shall be paid according to the quantity actually done and at the unit price established for such r work under this contract; otherwise such additional work shall be paid for as provided under Extra Work. In i r .29- case the Owner shall make such changes or alterations as shall make useless any work already done or mate- rial already furnished or used in said work, then the Owner shall recompense the Contractor for any material or labor so used, and for any actual loss occasioned by such change, due to actual expenses incurred in preparation for the work as originally planned. 24. EXTRA WORK The term ■extra work" as used in this contract shall be understood to mean and include all work that may be required by the Owner or Owner's Representative to be done by the Contractor to accomplish any change, al- teration or addition to the work as shown on the plans and specifications or contract documents and not cov- ered by Contractor's proposal, except as provided under Changes and Alterations herein. It is agreed that the Contractor shall perform all extra work under the direction of the Owner's Representa- tive when presented with a written work order signed by the Owner's Representative; subject, however, to the right of the Contractor to require written confirmation of such extra work order by the Owner. It is also agreed that the compensation to be paid to the Contractor for performing said extra work shall be determined by the following methods: Method (A) - By agreed unit prices; or Method (B) - By agreed lump sum; or Method (C) - If neither Method (A) or Method (8) be agreed upon before the extra work is com- menced, then the Contractor shall be paid the actual field cost of the work, plus fifteen (15%) per cent. in the event said extra work be performed and paid for under Method (C), then the provisions of this para- graph shall apply and the "actual field cost" is hereby defined to include the cost of all workmen, such as foremen, timekeepers, mechanics and laborers, materials, supplies, teams, trucks, rentals on machinery and equipment, for the time actually employed or used on such extra work, plus actual transportation charges necessarily incurred, together with all expenses incurred directly on account of such extra work, including Social Security, Old Age Benefits, Maintenance Bonds, Public Liability and Property Damage and Workmen's Compensation and all other insurances as may be required by law or ordinances or directed by the Owner or Owner's Representative, or by them agreed to. Owner's Representative may direct the form in which accounts of the actual field cost shall be kept and records of these accounts shall be made available to the Owner's Representative. The Owner's Representative may also specify in writing, before the work commences, the method of doing the work and the type and kind of machinery and equipment to be used; otherwise, these mat- ters shall be determined by the Contractor. Unless otherwise agreed upon, the prices for the use of machin- ery and equipment shall be determined by using 100%, unless otherwise specified, of the latest Schedule of Equipment and Ownership Expenses adopted by the Associated General Contractors of America. Where practical, the terms and prices for the use of machinery and equipment shall be incorporated in the written extra work order. The fifteen percent (15%) of the actual field cost to be paid to Contractor shall cover and com- pensate him for his profit, overhead, general superintendence and field office expense, and all other ele- ments of cost and expense not embraced within the actual field cost as herein defined, save that where the Contractor's Camp or Field Office must be maintained primarily on account of such Extra Work, then the cost to maintain and operate the same shall be included in the "actual field cost." No claim for extra work of any kind will be allowed unless ordered in writing by Owner's Representative. In case any orders or instructions appear to the Contractor to involve extra work for which he should receive compensation or an adjustment in the construction time, he shall make written request to the Owner's Repre- sentative for a written order authorizing such extra work. Should a difference of opinion arise as to what does or does not constitute extra work or as to the payment therefore, and the Owner's Representative in- sists upon its performance, the Contractor shall proceed with the work after making written request for written order and shall keep adequate and accurate account of the actual field cost thereof, as provided under Method (C). The Contractor will thereby preserve the right to submit the matter of payment to arbi- tration as herein below provided. -30- 25. DISCREPANCIES AND OMISSIONS It is further agreed that it is the intent of this contract that all work described in the proposal, the specifications, plans and other contract documents, is to be done for the prices quoted by the Contractor and that such price shall include all appurtenances necessary to complete the work in accordance with the intent of these contract documents as interpreted by owner's Representative. If the Contractor finds any discrepancies or omissions in these plans, specifications, or contract documents, he should notify the Owners' Representative and obtain a clarification before the bids are received, and if no such request is received by the Owner's Representative prior to the opening of bids, then it shall be considered that the Contractor fully understands the work to be included and has provided sufficient sums in his proposal to complete the work in accordance with these plans and specifications. It is further understood that any re- quest for clarification oust be submitted no later than five days prior to the opening of bids. 26. RIGHT OF OWNER TO MODIFY METHODS AND EQUIPMENT If at any time the methods or equipment used by the Contractor are found to be inadequate to secure the quality of work with the rate of progress required under this contract, the Owner or Owner's Representative may order the Contractor in writing to increase their safety or improve their character and efficiency and the Contractor shall comply with such order. If, at any time, the working force of the Contractor is inadequate for securing the progress herein speci- fied, the Contractor shall, if so ordered in writing, increase his force or equipment, or both, to such an extent as to give reasonable assurance of compliance with the schedule of progress. 27. PROTECTION AGAINST ACCIDENT TO EMPLOYEES AND THE PUBLIC The Contractor shall take out and procure a policy or policies of Workmen's Compensation Insurance with an insurance company licensed to transact business in the State of Texas, which policy shall comply with the Workmen's Compensation laws of the State of Texas. The Contractor shall at all times exercise reasonable precaution for the safety of employees and others on or near the work and shall comply with all applicable provisions of federal, state and municipal laws and building and construction codes. All machinery and equipment and other physical hazards shall be guarded in accordance with the "Manual of Accident Prevention in Construction" of Associated General Contractors of America, except where incompatible with federal, state or municipal laws.or regulations. The Contractor, his sureties and insurance carriers shall defend, indem- nify and save harmless the Owner and all of its officers, agents and employees from all suits, actions, or claims of any character whatsoever, brought for or on account of any injuries or damages received or sus- tained by any person or persons or property, on account of any negligent act or fault of the Contractor or any subcontractor, their agents or employees, in the execution and supervision of said contract, and the project which is the subject matter of this contract, on account of the failure of Contractor or any subcon- tractor to provide necessary barricades, warning lights, or signs and will be required to pay any judgment with costs which may be obtained against the Owner or any of its officers, agents, or employees including attorney's fees. The safety precautions taken shall be the sole responsibility of the Contractor, in his sole discretion as an Independent Contractor; inclusion of this paragraph in the Agreement, as well as any notice which may be given by the Owners or the Owner's Representative concerning omissions under this paragraph as the work pro- gresses, are intended as reminders to the Contractor of his duty and shall not be construed as any assump- tion of duty to supervise safety precautions by either the Contractor or any of his subcontractprs. -31- 28. CONTRACTOR'S INSURANCE The Contractor shall procure and carry at his sole cost and expense through the life of this contract, in- surance protection as hereinafter specified. Such insurance shall be carried with an insurance company au- thorized to transact business in the State of Texas and shall cover all operations in connection with this contract, whether performed by the Contractor or a subcontractor, or separate policies shall be provided covering the operation of each subcontractor. A.' Comprehensive General Liability Insurance The contractor shall have Comprehensive General Liability Insurance with limits of $300,000 Bodily Injury and $300,000 Property Damage per occurrence to include: Premises and Operations Explosion 8 Collapse Hazard Underground Damage Hazard Products 8 Completed Operations Hazard Contractual Liability Independent Contractors Coverage Personal Injury (with exclusion "c" waived) The City is to be named as an additional insured on this policy for this specific job, and copy of the endorsement doing so is to be attached to the Certificate of Insurance. B. Owner's Protective or Contingent Public Liability Insurance and Property Damage Liability Insurance. The Contractor shall obtain an Owner's Protective or Contingent Public Liability Insurance policy naming the City of Lubbock as insured and the amount of such policy shall be as follows For bodily injuries, including accidental death, $500,000 per occurrence, and $100,000 for Property Damage. C. Comprehensive Automobile Liability Insurance The Contractor shall have Comprehensive Automobile Liability Insurance with limits of not less than; Bodily Injury $250/500,000 Property Damage $100,000 to include all owned and non -owned cars including: Employers Non -ownership liability Hired and Non - owned Vehicles. The City is to be named as an additional insured on this policy for this specific job and copy of the endorsement doing so is to be attached to the Certificate of Insurance. D. Builder's Risk Insurance The Contractor shall obtain a Builder's Risk policy in the amount of (100% of poten- tial loss) naming the City of Lubbock as insured. -32- r E. Excess or Umbrella Liability Insurance The Contractor shall have Excess or Umbrella Liability Insurance in the amount of (E1,000,000 minimum) with coverage to correspond with Comprehensive General Liability and Comprehen- sive Automobile Liability coverages. The City is to be named as an additional insured on this policy for this specific job and copy of the endorsement doing so is to be attached to the Certificate of Insurance. F. Worker's Compensation and Employers Liability Insurance As required by State statute covering all employees whether employed by the Contractor or any Sub- contractor on the job with Employers Liability of at least $100,000 limit. G. Proof of Coverage Before work on this contract is commenced, each Contractor and subcontractor shall submit to the kk Owner for approval five Certificates of Insurance covering each insurance policy carried and offered as evidence of compliance with the above insurance requirements, signed by an authorized r representative of the insurance company setting forth: (1) The name and address of the insured. (2) The location of the operations to which the insurance applies. (3) The name of the policy and type or types of insurance in force thereunder on the date borne by such certificate. (4) The expiration date of the policy and the limit or limits of liability thereunder on the date borne by such certificate. (5) A provision that the policy may be canceled only by mailing written notice to the named in- sured at the address shown in the bid specifications. (6) A provision that written notice shall be given to the City ten days prior to any change in or cancellation of the policies shown on the certificate. (7) The certificate or certificates shall be on the form (or identical copies thereof) con- tained in the job specifications. No substitute of nor amendment thereto will be accept- able. 29. PROTECTION AGAINST CLAIMS OF SUBCONTRACTORS, LABORERS, MATERIALMEN, AND FURNISHERS OF MACHINERY, EQUIPMENT AND SUPPLIES The Contractor agrees that he will indemnify and save the Owner harmless from all claims growing out of any demands of subcontractors, laborers, workmen, mechanics, materialmen and furnishers of machinery and parts thereof, equipment, power tools, all suppliers, including commissary, incurred in the furtherance of the performance of this contract. When Owner so desires, the Contractor shall furnish satisfactory evidence that all obligations of the nature hereinabove designated have been paid, discharged or waived. If during the progress of the work, Contractor shall allow any indebtedness to accrue for work furnished by any of those designated in the preceding paragraph and shall fail to pay and discharge any such indebtedness within five (5) days after demand is made, then Owner may, during the period for which such indebtedness .� -33— shall remain unpaid, withhold from the unpaid portion of this contract, a sum equal to the amount of such unpaid indebtedness or may apply the sum so withheld to discharge any such indebtedness. Any and all communications between any party under this paragraph must be in writing. 30. PROTECTION AGAINST ROYALTIES OR PATENT INVENTION The contractor shall pay all royalties and License fees, and shall provide for the use of any design, de- vice, material or process covered by letters patent or copyright by suitable Legal agreement with the Paten- tee or Owner thereof. The Contractor shall defend all suits or claims for infringement of any patent or copyrights and shall indemnify and save the Owner harmless from any loss on account thereof, except that Owner shall defend all such suits and claims and shall be responsible for aLL such loss when a particular design, device, material or process or the product of a particular manufacturer or manufacturers is speci- fied or required in these contract documents by Owner; provided, however, if choice of alternate design, de- vice, material or process is allowed to the Contractor, then Contractor shall indemnify and save Owner harm- less from any loss on account thereof. If the material or process specified or required by owner is an in- fringement, the Contractor shall be responsible for such loss unless he promptly gives written notice to the Owner of such infringement. 31. LAWS AND ORDINANCES The Contractor shall at all times observe and comply with all federal, state and local laws, ordinances and regulations, which in any manner effect the contract or the work, and shall indemnify and save harmless the Owner against any claims arising from the violation of any such laws, ordinances, and regulations, whether by the Contractor or his employees. If the Contractor observes that the plans and specifications are at variance therewith, he shall promptly notify the Owners' Representative in writing and any necessary changes shall be adjusted as provided in the contract for changes in the work. If the Contractor performs any work knowing it to be contrary to such laws, ordinances, rules and regulations, and without such notice to the Owner's Representative, he shell bear all costs arising therefrom. The Owner is a municipal corporation of the State of Texas and the law from which it derives its powers, in- sofar as the same regulates the objects for which, or the manner in which, or the conditions under which the Owner may enter into contracts, shall be controlling, and shall be considered as part of this contract to the same effect as though embodied herein. 32. ASSIGNMENT AND SUBLETTING The Contractor further agrees that he will retain personal control and will give his personal attention to l the fulfillment of this contract. The Contractor further agrees that subletting of any portion or feature of the work, or materials required in the performance of this contract, shall not relieve the Contractor from his full obligations to the Owner, as provided by this contractual agreement. 33. TIME FOR COMPLETION AND LIQUIDATED DAMAGES It is hereby understood and mutually agreed by and between the Contractor and the Owner, that the date of beginning and time for completion as specified in the contract of work to be done hereunder are essential conditions of this contract; and it is further mutually understood and agreed that the work embraced in this contract shall be commenced on a date to be specified in the Notice to Proceed. If the Contractor should neglect, fail, or refuse to complete the work within the time herein specified, or any proper extension thereof granted by the Owner, then the Contractor does hereby agree as part.of the con- sideration for the awarding of this contract, the Owner may withhold permanently from Contractor's total compensation, the sum of $50.00 (FIFTY DOLLARS) PER DAY, not as a penalty, but as Liquidated damages for the -34- r i breach of the contract as herein set forth for each and every calendar day that the Contractor shall be in default after the time stipulated for completing the work. It is expressly understood and agreed, by and between Contractor and the Owner, that the time for the com- pletion of the work described herein is reasonable time for the completion of the same, taking into consid- eration the average climatic change and conditions and usual industrial conditions prevailing in this local- ity. The amount is fixed and agreed upon by and between the Contractor and the Owner because of the impractica- bitity and extreme difficulty in fixing and ascertaining actual damages the Owner would in such event sus- tain, and the amount is agreed to be damages the Owner would sustain and shall be retained by the Owner from current periodical estimates for payments or from final payment. r } It is further agreed and understood between the Contractor and Owner that time is of the essence of this contract. 34. TIME AND ORDER OF COMPLETION It is the meaning and intent of this contract, unless otherwise herein specifically provided, that the Con- tractor shall be allowed to prosecute his work at such time and sessions, in such order of precedence, and in such manner as shall be most conductive to economy of construction; provided, however, that the order and time of prosecution shall be such that the work shall be substantially completed as a whole and in part, in accordance with this contact, the plans and specifications, and within the time of completion designated in the proposals; provided, also, that when the Owner is having other work done, either by contract or by his own force, the Owners Representative may direct the time and m mer of constructing work done under this contract so that conflicts will be avoided and the construction of the various works being done for the Owner shall be harmonized. The Contractor shall submit, at such times as may reasonably be requested by the Owner's Representative, r, schedules which shall show the order in which the Contractor proposes to carry on the work, with dates at which the Contractor will start the several parts of the work and estimated dates of completion of the sev- eral parts. 35. EXTENSION OF TIME The Contractor agrees that he has submitted his proposal in full recognition of the time required for the r completion of this project, taking into consideration the average climatic range and industrial conditions prevailing in this locality, and has considered the liquidated damage provisions of paragraph 33 hereinabove set forth and that he shall not be entitled to, nor will he request, an extension of time on this contract, except when his work has been delayed by an act or neglect of the Owner, Owner's Representative, employees of the Owner or other contractors employed by the owner, or by changes ordered in the work, or by strike, walkouts, acts of God or the public enemy, fire or flood. The Contractor may apply in writing for an ex- tension of time, submitting therewith all written justification as may be required by Owner's Representative P" for such an extension as requested by Contractor. The Owner's Representative within ten (10) days after re- ceipt of a written request for an extension of time by the Contractor. supported by all requested docu- mentation shall then submit such written request to the City Council of the City of Lubbock for their con- sideration. Should the Contractor disagree with the action of City Council on granting an extension of time, such disagreement shalt be settled by arbitration as hereinafter provided. 36. HINDRANCE AND DELAYS In executing the contract agreement, the Contractor agrees that in undertaking to complete the work within the time herein fixed, he has taken into consideration'" made allowances for all hindrances and delays in- cident to such work, whether growing out of delays in securing material or workmen or otherwise. No charge r -35- P shall be made by the Contractor for hindrance or delays from any cause during the progress of any part of the work embraced in this contract except where the work is stopped by order of the Owner or Owner's Representative for the Owner's convenience, in which event, such expense as in the judgment of the Owner's Representative that is caused by such stoppage shall be paid by Owner to Contractor. 37. QUANTITIES AND MEASUREMENTS No extra or customary measurements of any kind will be allowed, but the actual measured or computed length, area, solid contents, number and weight only shall be considered, unless otherwise specifically provided. In the event this contract is let on a unit price basis, then Owner and Contractor agree that this contract, Including the specifications, plans and other contract documents are intended to show clearly all work to be done and material to be furnished hereunder. Where the estimated quantities are shown for the various classes of work to be done and material to be furnished under this contract, they are approximate and are to be used only as a basis for estimating the probable cost of the work and for comparing their proposals of- fered for the work. It is understood and agreed that the actual amount of work to be done and the materials to be furnished under this contract may differ somewhat from these estimates, and that where the basis for payment under this contract is the unit price method, payment shall be for the actual amount of work done and materials furnished on the project. 38. PROTECTION OF ADJOINING PROPERTY The Contractor shall take proper means to protect the adjacent or adjoining property or properties in any way encountered, which may ,be injured or seriously affected by:any process of construction to be undertaken under this agreement, from any damage or injury by reason of said process of construction; and he shall be liable for any and all claims for such damage on account of his failure to.fully protect all adjacent property. The Contractor agrees to indemnify, save and hold harmless the Owner against any claim or claims for damages due to any injury to any adjacent or adjoining property, arising or growing out of the perfor- mance of this contract, but such indemnity shall not apply to any claim of any kind arising out of the exis- tence or character of the work. 39. PRICE FOR WORK In consideration of the furnishing of all necessary labor, equipment and material and the completion of all work by the Contractor, and on the delivery of all materials embraced in this contract in full conformity with the specifications and stipulations herein contained, the Owner agrees to pay the Contractor the price set forth in the proposal attached hereto, which has been made a part of this contract, and the.Contractor hereby agrees to receive such price in full for furnishing all materials and all labor required for the aforesaid work, also, for all expenses incurred by him and for well and truly performing the same and the whole thereof in the manner and according to this agreement, the attached specifications, plans, contract documents and requirements of Owner's Representative. 40. PAYMENTS No payments made or certificates given shall be considered as conclusive evidence of the performance of the contract, either wholly or in part, nor shall any certificate or payment be considered as acceptance of de- fective work. Contractor shall at any time requested during the progress of the work furnish the owner or Owner's Representative with a verifying certificate showing the Contractor's total outstanding indebtedness in connection with the work. Before final payment is made, Contractor shall satisfy owner, by affidavit or otherwise, that there are no outstanding liens against Owner's premises by reason of any work under the con- tract. Acceptance by Contractor of final payment of the contract price shall constitute a waiver of all claims against owner which have not theretofore been timely filed as provided in this contract. -36- 41. PARTIAL PAYMENTS on or before the tenth day of each month, the Contractor shall submit to Owner's Representative an applica- tion for partial payment. Owner's Representative shall review said application for partial payment and the progress of the work wade by the Contractor and if found to be in order shall prepare a certificate for par- tial payment showing as completely as practical the total value of the work done by the Contractor up to and including the last day of the preceding month; said statement shall also include the value of all sound ma- terials delivered on site of the work that are to be fabricated into the work. The Owner shall then pay the Contractor on or before the fifteenth day of the current month the total amount of the Owner's Representative's Certificate of Partial Payment, less 5% of the amount thereof, which 5% shall be retained until final payment, and further, less all previous payments and all further sums that may be retained by Owner under the terms of this agreement. it is understood, however, that in case the whole work be near to completion, and this fact is certified to by Owner's Representative and some unexpected and some unusual delay occurs due to no fault or negligence on the part of the Contractor, the Owner may upon written recommendation of Owner's Representative pay a reasonable and equitable portion of the retained per- centage due Contractor. 42. FINAL COMPLETION AND ACCEPTANCE Within thirty-one (31) days after the Contractor has given the Owner's Representative written notice that the work has been completed or substantially completed, the Owner's Representative and the Owner shall in- spect the work and within said time, if the work be found to be completed or substantially completed in ac- cordance with the contract documents, the Owner's Representative shall issue to the Owner and Contractor his certificate of completion, and thereupon it shall be the duty of the Owner within thirty-one (31) days to issue a certificate of acceptance of the work to the Contractor. 43. fINAL PAYMENT r• Upon the issuance of the certificate of completion, the Owner's Representative shall proceed to make final i measurement and prepare a final statement of the value of all work performed and materials furnished under the terms of the agreement, and shall certify same to the owner, who shall pay to the Contractor an or be- fore the 31st day after the date of certificate of completion, the balance due Contractor under the terms of this agreement, provided he has fully performed his contractual obligations under the terms of this con- tract; and said payment shall become due in any event upon said performance by the Contractor. Neither the certificate of acceptance nor the final payment, nor any provisions in the contract documents shall relieve the Contractor of the obligation for fulfillment of any warranty which may be required in the special condi- tions (if any) of this contract or required in the specifications made a part of this contract. 44. CORRECTION OF WORK BEFORE FINAL PAYMENT FOR WORK Contractor shall promptly remove from Owners' premises all materials condemned by the Owner's Representative on account of failure to conform to the contract, whether actually incorporated in the work or not, and Con- tractor shall at his own expense promptly replace such condemned materials with other materials conforming L to the requirements of the contract. Contractor shall also bear the expense of restoring all work of other contractors damaged by any such removal or replacement. If Contractor does not remove and replace any such condemned work within a reasonable time after a written notice by the Owner or the Owner's Representative, owner may remove and replace it at Contractor's expense. 45. CORRECTION OF WORK AFTER FINAL PAYMENT Neither the final payment nor certificate nor any provision in this contract shalt relieve the Contractor of responsibility for fault materials or workmanship, and he shall pons ty y p, remedy any defects due thereto and pay for any damage to other work resulting therefrom, which shall appear within a period of one (1) year from the �" -37- date of substantial completion. fects with reasonable promptness. 46. PAYMENT WITHHELD 47. 48. The Owner or the Owner's Representative shall give notice of observed de - The Owner may, on account of subsequently discovered evidence, withhold or nullify the whole or part of any certificate to such extent as may be necessary to protect himself from loss on account of: (a) Defective work not remedied. (b) Claims filed or reasonable evidence indicating possible filing of claims. (c) Failure of the Contractor to make payments promptly to subcontractors or for materials or labor. (d) Damage to another contractor. When the above grounds are removed, or the Contractor provides a surety bond satisfactory to the Owner, which will protect the Owner in the amount withheld, payment shall be made for amounts withheld because of them. TIME OF FILING CLAIMS It is further agreed by both parties hereto that all questions of dispute or adjustment presented by the Contractor shall be in writing and filed with the Owner's Representative within fifteen (15) days after the Owner's Representative has given any directions, order or instruction to which the Contractor desires to take exception. The owners' Representative shall reply to such written exceptions by the Contractor and render his final decision in writing. In case the Contractor should appeal from the decision of the Owner's Representative, any demand for arbitration shall be filed with the Owner's Representative and the Owner in writing within ten (10) days after the date of delivery to Contractor of the final decision of the Owner's Representative. It is further agreed that final acceptance of the work by the Owner and the acceptance by the Contractor of the final payment shall be a bar to any claim by either party, except where noted other- wise in the contract documents. ARBITRATION All questions of dispute under this agreement shall be submitted to arbitration at the request of either party to the dispute. The parties may agree upon one arbitrator, otherwise, there shall be three; one named in writing by each party and the third chosen by the two arbiters selected; or if the arbiters fail to se- lect a third within ten (10) days, he shall be chosen by the District Judge, 72nd Judicial District of Texas. Each arbiter shall be a resident of the City of Lubbock. Should the party demanding arbitration fail to name an arbiter within ten (10) days of the demand, his right to arbitrate shall lapse, and the de- cision of the owner's Representative shall be final and binding on him. Should the other party fail to choose an arbiter within ten (10) days, the Owner's Representative shall appoint such arbiter. Should ei- ther party refuse or neglect to supply the arbiters with any papers or information demanded in writing, the arbiters are empowered by both parties to take Ex Parte Proceedings. The arbiters shall act with promptness. The decision of any two shall be binding on both parties to the contract, unless either or both parties shall appeal within ten (10) days from date of the award by the ar- biters, and it is hereby agreed that each party shall have the right of appeal and all proceedings shall be according to and governed by Arbitration Statutes of Texas, being Article 224, et seq., Vernon's Annotated Civil Statutes. THE DECISION OF THE ARBITERS UPON ANY QUESTION SUBMITTED TO ARBITRATION UNDER THIS CONTRACT SHALL BE A CONDITION PRECEDENT TO ANY RIGHT OF LEGAL ACTION. -38- r The arbiters, if they deem the case demands it, are authorized to award the party whose contention is sus- tained, such sums as they deem proper for the time, expense and trouble incident to the appeal, and if the appeal was taken without reasonable cause, they may award damages for any delay occasioned thereby. The ar- biters shall fix their own compensation, unless otherwise provided by agreement, and shall assess the costs and charges of the arbitration upon either or both parties. The award of the arbiters must be made in writ- ing and shall not be open to objection on account of the form of proceedings or award. 49. ABANDONMENT BY CONTRACTOR In case the Contractor should abandon and fail or refuse to resume work within ten (10) days after written notification from the Owner or the Owner's Representative, or if the Contractor fails to comply with the or- ders of the Owner's Representative, when such orders are consistent with this contract, this Agreement, or the Specifications hereto attached, then the Surety on the bond shall be notified in writing and directed to commptete the work and a copy of said notice shall be delivered to the Contractor. '., After receiving said notice of abandonment, the Contractor shall not remove from the work any machinery, equipment, tools, materials or supplies then on the job, but the same, together with any materials and equipment under the contract for work, may be held for use on the work by the Owner or the Surety of the Contractor, or another contractor, in completion of the work; and the Contractor shall not receive any I'"' rental or credit therefore (except when used in connection with Extra York, where credit shall be allowed as provided for under paragraph 24 of this contract); it being understood that the use of such equipment and materials will ultimately reduce the cost to complete the work and be reflected in the final settlement. In case the Surety should fail to commence compliance with the notice for co pletion hereinbefore provided for within ten (10) days after service of such notice, then the Owner may provide for completion of the work in either of the following elective manners: (a) The Owner may employ such force of men and use of machinery, equipment, tools, materials and sup- plies as said Owner may deem necessary to complete the work and charge the expense of such labor, machinery, equipment, tools, materials and supplies to said Contractor, and the expense so charged shall be deducted and paid by the Owner out of such moneys as may be due, or that may thereafter at any time became due to the Contractor under and by virtue of this Agreement. In case such expense is less than the sum which would have been payable under this contract, if the same had been com- pleted by the Contractor, then said Contractor shall receive the difference. In case such expense is greater than the sum which would have been payable under this contract, if the same had been com- pleted by said Contractor, then the Contractor arK/or his Surety shall pay the amount of such excess to the Owner; or (b) The Owner, under sealed bids, after notice published as required by law, at least twice in a newspa- per having a general circulation in the County of location of the work, may let the contract for the completion of the work under substantially the same terms and conditions which are provided in this contract. In case of any increase in cost to the Owner under the new contract as compared to what would have been the cost under this contract, such increase shall be charged to the Contractor and the Surety shall be and remain bound therefore. However, should the cost to complete any such new contract prove to be less than that which would have been the cost to complete the work under this contract, the Contractor or his Surety shall be credited therewith. When the work shall have been substantially completed, the Contractor and his Surety shall be so notified ! and certificates of completion and acceptance, as provided in paragraph 42 hereinabove set forth, shad be issued. A complete itemized statement of the contract accounts, certified to by Owner's Representative as r.. being correct shall then be prepared and delivered to Contractor and his Surety, whereon the Contractor or his Surety, or the Owner as the case may be, shall pay the balance due as reflected by said statement within 30 days after the date of certificate of completion. C In the event the statement of accounts shows that the cost to complete the work is less than that which would have been the cost to the Owner had the work been completed by the Contractor under the terms of this contract, or when the Contractor and/or his Surety shalt pay the balance shown to be due by them to the owner, then all machinery, equipment, tools, materials or supplies left on the site of the work shall be turned over to the Contractor and/or his Surety. Should the cost to complete the work exceed the.contract price, and the Contractor and/or his Surety fail to pay the amount due the Owner within the time designated hereinabove, and there remains any machinery, equipment, tools, materials or supplies on the site of the work, notice thereof, together with an itemized list of such equipment and materials shall be mailed to the Contractor and his Surety at the respective addresses designated in this contract; provided, however, that actual written notice given in any manner will satisfy this condition. After mailing, or other giving of such notice, such property shall be held at the risk of the Contractor and his Surety subject only to the duty of the Owner to exercise ordinary care to protect such property. After fifteen (15) days from the date of said notice the Owner may sell such machinery, equipment, tools, materials or supplies and apply the net sum derived from such sale to the credit of the Contractor and his Surety. Such sale may be made at either public or private sale, with or without notice, as the Owner may elect. The Owner shall release any machin- ery, equipment, tools,'materials, or supplies which remain on the •jobsite and belong to persons other than the Contractor or his Surety, to their proper owners. 50. ABANDONMENT BY OWNER In case the Owner shall fail to comply with the terms of this contract, and should fail or refuse to comply with said terms within ten (10) days after written notification by the Contractor, then the Contractor may suspend or wholly abandon the work, and may remove therefrom all machinery, tools, and equipment, and all materials on the ground that have not been included in payments to the Contractor and have not been incorpo- rated into the work. Thereupon, the Owners Representative shall make an estimate of the total amount earned by the Contractor, which estimate shall include the value of all work actually completed by said Con- tractor at the prices stated in the the attached proposal, the value of all partially completed work at a fair and equitable price, and the amount of all Extra Work performed at the prices agreed upon, or provided for by the terms of this contract, and a reasonable sum to cover the cost of any provisions made by the Con- tractor to carry the whole work to completion, and which cannot be utilized. The Owner's Representative shall then make a final statement of the balance due the Contractor by deducting from the above estimate all previous payments by the owner and all other sums that may be retained by the Owner under the terms of this Agreement, and shall certify same to the Owner who shall pay to the Contractor on or before thirty (30) days after the date of the notification by the Contractor the balance shown by said final statement as due the Contractor, under the terms of this Agreement. 51. BONDS The successful bidder shall be required to furnish a performance bond and payment bond in accordance with Article 5160, Vernon's Annotated Civil Statutes in the amount of 100% of the total contract price, in the event said contract price exceeds $25,000.00. If the contract price does not exceed $25,000.00, the statu- tory bonds will not be required. All bonds, if required, shall be submitted on forms supplied by the Owner, and executed by an approved Surety Company authorized to do business in the State of Texas. And it is fur- ther agreed that this contract shall not be in effect until such bonds are so furnished. 52. SPECIAL CONDITIONS In the event special conditions are contained herein as part of the contract documents and said special con- ditions conflict with any of the general conditions contained in this contract, then in such event the special conditions shall control. .40- r• 53. LOSSES FROM NATURAL CAUSES i^ Unless otherwise specified herein, all loss or damage to the Contractor arising out of the nature of the work to be done, or frcm the action of the elements, or from any unforeseen circumstance and the prosecution of the same, or from unusual obstructions or difficulties which may be encountered in the prosecution of the work, shall be sustained and borne by the Contractor at his own cost and expense. 54. INDEPENDENT CONTRACTOR pr, i Contractor is, and shall remain, an independent contractor with full, complete and exclusive power and au- thority to direct, supervise, and control his own employees and to determine the method of the performance of the work covered hereby. The fact that the Owner or Owner's Representative shall have the right to ob- serve Contractor's work during his performance and to carry out the other prerogatives which are expressly reserved to and vested in the Owner or Owner's Representative hereunder, is not intended to and shall not at any time change or effect the status of the Contractor as an independent contractor with respect to either the Owner or Owner's Representative or to the Contractor's own employees or to any other person, firm, or corporation. 55. CLEANING UP POW The Contractor shall at all times keepfree from accumulation of debris caused the premises by the work, and at the completion of the work he shall remove all such debris and also his tools, scaffolding, and surplus r+ materials and shall leave the work room clean or its equivalent. The work shall be left in good order and condition. In case of dispute owner may remove the debris and charge the cost to the Contractor. M" -41- (THIS PAGE LEFT BLANK INTENTIONALLY) CURRENT WAGE DETERMINATIONS -42- (THIS PAGE LEFT BLANK INTENTIONALLY) OGV:da RESOLUTION Resolution #2502 January 8, 1987 Agenda Item #18 WHEREAS, the City Council has heretofore established the general ;prevailing rate of per diem wages for each craft or type of workmen or mechanics needed to execute public works contracts for the City of Lubbock .'in accordance with the provisions of Vernon's Ann.Civ.St., Art. 5159a; and if WHEREAS, such wage rates were established by Resolution No. 719 ,!enacted February 12, 1981, updated by Resolution No. 1590 enacted February 123, 1984; and WHEREAS, such rates need to be updated at the present time in order .'to reflect the current prevailing rate of per diem wages; NOW THEREFORE: BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK: THAT the general prevailing rate of per diem wages for public works contracts shall be as set forth in the following named exhibits, which exhibits shall be attached hereto and made a part hereof for all intents and purposes: Exhibit A: Building Construction Trades Exhibit B: Paving and Highway Construction Trades j Exhibit C: Electrical Trades j Exhibit 0: Overtime Rate Exhibit E: Weekend and Holiday Rate Such wage rates are hereby found and declared to be the general prevailing .!rate of per diem wages in all localities where public works are undertaken l+on behalf of the City of Lubbock and such wage rates shall be included in all public works contracts as provided by law. ;Passed by the City Council this 8th day of January 1987. Ranett"oyd, City Secretary APPROVED A9 T• NTENT: Bi 1 Pyne, Dilrector of Building Services ro e. B.C. McMINN, MAYOR APPROVED AS TO FORM: Do Id G. Vandiver, First Assistant City Attorney EXHIBIT A City of Lubbock Building Construction Trades Prevailing Rates Craft Acoustical Ceiling .Installer Air Conditioner Installer Air Conditioner Installer -Helper Bricklayer Bricklayer -Helper Carpenter Carpenter -Helper Cement Finisher Drywall Hanger Electrician Electrician -Helper Equipment Operator - Heavy Light Floor Installer Glazier Insulator, Piping/Boiler Insulator -Helper Iron Worker Laborer, General Mortar Mixer Painter Plumber Plumber -Helper Roofer, Roofer -Helper Sheet Metal Worker Sheet Metal Worker -Helper Welder —Certified Hourly Rate $11.60 8.35 5.50 10.50 5.00 11.00 5.50 7.35 8.70 10.50 5.25 8.00 5.70 8.00 7.50 9.50 5.00 7.30 4.75 5.60 8.75 9.25 6.00 7.65 4.75 8.75 5.50 8.00 r.� e l� 4 EXHIBIT B Paving and Highway Construction Prevailing Wage Rates !" Craft Hourly Rate Asphalt Heaterman $5.25 r, Asphalt Shoveler 4.75 Concrete Finisher 7.35 Concrete Finisher -Helper 4.75 Electrician 10.50 r" Flagger 4.75 Form Setter 6.50 Form Setter -Helper 5.50 ,., Laborer, General 4.75 Laborer, Utility 5.80 Mechanic 6.50 Mechanic -Helper 6.00 r— POWER EQUIPMENT OPERATORS r. Asphalt Paving Machine 6.00 Bulldozer 5.25 Concrete Paving Machinist 6.50 Front End Loader 5.85 '~ Heavy Equipment Operator 6.40 Light Equipment Operator 6.40 Motor Grade Operator 8.00 r, Roller 5.25 Scraper 5.25 Tractor 5.50 Truck Driver - �" Light 5.25 Heavy 5.25 rr R ; e 4 t EXHIBIT C Electric Construction Trades Prevailing Wage Rates Craft Hourly Rate Power Line Foreman $11.00 Lineman Journeyman 10..45 Lineman Apprentice Series 8.90 Groundman Series 7.25 EXHIBIT D Prevailing Wage Rates Overtime Rate The rate for overtime (in excess of forty hours per week) 'is'l 1/2 times base rate. EXHIBIT E Prevailing Wage Rates Weekend and Holiday Rate The rate for weekend and holiday is 1 1/2 times base 'rate. SPECIFICATIONS -43. (THIS PAGE LEFT BLANK INTENTIONALLY) r AIRPORT WEST WING PSI/ROOF CONSULTING DIVISION LUBBOCK, TEXAS HOBBS, NEW MEXICO DIVISION 1 - GENERAL REQUIREMENTS SECTION 01010 SUMMARY OF WORK 1.01 SCOPE A. Type of Contract Lump Sum. B. Description - The work included in this contract for this project consists of furnishing all labor, materials, services, equipment, and appliances required in conjunction with or properly incidental to the work, as shown and described in the drawings and specifications entitled "Reroofing Project, Airport West Wing, Lubbock, Texas". All work shall be performed in conformance with the plans and specifications dated August 1991, addenda thereto, and any change orders that may be issued. C. Contractor's Duties 1. Except as specifically noted, provide and pay for.(a) labor, materials and equipment, (b) tools, construction equipment, and machinery, (c) water, heat, and utilities required for construction, (d) other facilities and services necessary for proper execution and completion of work. 2. Secure and pay, as necessary, for the proper execution and completion of work, at time of receipt of bids, (a) permits, (b) government fees, (c) licenses. 3. Give required notices. 4. Comply with codes, ordinances, rules/regulations, orders and other legal requirements of public authorities which bear upon performance of work. 5. Enforce strict discipline and good order among employees. Do not employ (a) unfit persons, (b) persons not skilled in assigned task. 1.02 CONTRACTS A. Construct work under single lump sum contract. 1.03 WORK BY OTHERS A. Electrical, mechanical, and plumbing. 01010-1 r AIRPORT -WEST WING PSI/ROOF CONSULTING DIVISION LUBBOCK, TEXAS HOBBS, NEW MEXICO 1.04 OWNER -FURNISHED PRODUCTS A. None. 1.05 CONTRACTOR USE OF PREMISES A. The contractor will note that the building will be occupied and in use during construction operations. The contractor will work closely with The City of Lubbock, and their staff during the construction work. B. Any damage to the existing property shall be repaired prior to final acceptance. 01010-2 i AIRPORT WEST WING PSI/ROOF CONSULTING DIVISION r" LUBBOCK, TEXAS HOBBS, NEW MEXICO m r SECTION 01210 PRECONSTRUCTION CONFERENCE 1.01 PRECONSTRUCTION CONFERENCE r A. The general contractor and job site superintendent shall attend a preconstruction conference prior to the performance of any roofing work. The owner will notify the contractor prior to the meeting. The material manufacturers selected by the contractor shall be present at the preconstruction conference. 1.02 PROGRESS MEETING A. During the course of the construction work, the contractor shall schedule two (2) visits from the representative of the material manufacturer. The contractor shall notify the engineer ten (10) days in advance of material manufacturer representative's scheduled inspection. 01210-1 r (THIS PAGE LEFT BLANK INTENTIONALLY) AIRPORT WEST WING LUBBOCK, TEXAS SECTION 01300 SUBMITTALS PSI/ROOF CONSULTING DIVISION HOBBS, NEW MEXICO 1.01 CONSTRUCTION SCHEDULES A. The contractor shall submit a construction schedule showing starting dates and completion dates for each phase of construction work. 01300-1 (THIS PAGE LEFT BLANK INTENTIONALLY) AIRPORT WEST WING PSI/ROOF CONSULTING DIVISION LUBBOCK, TEXAS HOBBS, NEW MEXICO r.. SECTION 01500 i CONSTRUCTION FACILITIES AND UTILITIES 1.01 ACCESS A. The contractor shall provide workmen and inspectors with safe access to all roof surfaces. Access to roof surfaces shall be over perimeter edge through the use of OSHA -approved ladders. B. Contractor's Access Area 1. The contractor will be required to limit his access to the construction areas as directed by the contracting party. The areas shall be clearly identified by signs as a danger area. All persons entering these areas will be required to wear hard hats. These areas will be restricted for the contractor's vehicles, asphalt kettles, material storage and other equipment. The contractor shall daily clean the areas of any debris generated by the construction of these projects. 2. The workmen shall not enter the interior area of the building unless working on pipes or vent connections for mechanical units. Upon completion, these areas shall be thoroughly cleaned of all dirt, dust, bituminous material and debris. 1.02 LATRINES A. The contractor shall provide latrines for the use of his employees. Contractor's employees will not be allowed to use building facilities. 1.03 SECURITY "w A. Access to the roof surfaces will be limited to designated representatives of The City of Lubbock, representatives of PSI/Roof Consulting Division, workmen and representatives of the Contractor, and representatives of the material manufacturer providing the material. Any individuals requesting permission to visit the project sites other than those mentioned shall request permission from the contracting party, and PSI/Roof Consulting Division. B. The contractor shall assume full responsibility for protection and safekeeping of materials and/or equipment stored on premises. The City of Lubbock will assume no responsibility for security of materials and/or equipment. 01500-1 No Text AIRPORT WEST WING PSI/ROOF CONSULTING DIVISION r: LUBBOCK, TEXAS HOBBS, NEW MEXICO �.. SECTION 01600 ` HOIST EQUIPMENT r- 1.01 HOIST EQUIPMENT .. A. Rooftop hoisting equipment shall be properly assembled and maintained. Only employees of the contractor that are thoroughly familiar with hoisting equipment shall operate such equipment. All such equipment shall be erected and supported r" so that it will not damage the existing structural deck or new roofing. 01600-1 r- (THIS PAGE LEFT BLANK INTENTIONALLY) AIRPORT WEST WING LUBBOCK, TEXAS t SECTION 01700 PSI/ROOF CONSULTING DIVISION HOBBS, NEW MEXICO CONTRACT CLOSEOUT 1.01 FINAL INSPECTION A. Upon completion of all work relating to these projects, the Engineer will notify the Contractor for date of final inspection. Representative of the Contractor and material manufacturer shall be present for final inspection. During r' final inspection, a punch list of items to be completed will be generated and presented to the Contractor. All items will be completed before final acceptance. 1.02 WARRANTIES 1' A. Contractor's Guarantee - Upon completion of the project, submit to the Engineer, in triplicate, a guarantee on the roofing Contractor's business letterhead. The guarantee shall contain r. the following: Re: Reroofing Project Airport West Wing Lubbock, Texas THE ROOF WORK WHICH HAS JUST BEEN COMPLETED IS GUARANTEED FOR A PERIOD OF TWO (2) YEARS FROM THE DATE OF COMPLETION AND FINAL ACCEPTANCE. The warranty is to be assignable without charge if the intended use of the building remains similar and consistent with its usage at the commencement of the warranty. The Contractor warrants that all work performed under this contract conforms to the contract requirements and is free from any defective material or workmanship performed by the Contractor. Under this warranty, the Contractor shall remedy, at own expense, any such failure. Failure shall be defined as water leakage at any point within the building through the roofing system, at its associated flashing, and sheet metal work. Failure shall also be defined as blistering, splitting, bitumen drippage, buckles or wrinkles, slippage of the new roof membranes, foam delamination, coating failure, or pinholing. The Contractor will be required to make temporary repairs within forty-eight (48) hours of notice of roof, failure. Upon completion of temporary repairs, the Contractor will repair that area of the roof affected by the failure to the original condition within a period of seven (7) days. BY: (Officer in Corporation) (Corporate Seal) r (NOTARIZED) 01700-1 r AIRPORT WEST WING PSI/ROOF. CONSULTING DIVISION LUBBOCK, TEXAS HOBBS, NEW`MEXICO B. Manufacturer's Roof Guarantee: In addition to Contractor's Guarantee, the Contractor shall furnish an unlimited penal sum material manufacturer's roof guarantee. Guarantee shall be for a minimum of ten (10) years and shall include a flashing endorsement. Guarantee shall cover workmanship and materials. 1.03 CLEANING A. The contractor shall thoroughly clean the contractor's access areas of all trash, debris, dust, dirt, etc. upon completion of the contract. The contractor shall clean any stains on perimeter walls resulting from the contractor's work. Perimeter walls shall be cleaned to the satisfaction of PSI/Roof Consulting Division and The City of Lubbock. Replace any damaged landscaped areas surrounding the perimeter of the projects to the complete satisfaction of PSI/Roof Consulting Division and The City of Lubbock. ¢- B. To ensure maximum safety, sanitation, and a reasonably neat appearance at all times, clean up all materials and debris left _ over from the existing roof removal and new roof construction at the close of each day, haul away material and debris from sites and dispose of, at Contractor's expense, at legal dump sites. 01700-2 AIRPORT WEST WING PSI/ROOF CONSULTING DIVISION LUBBOCK; TEXAS HOBBS, NEW MEXICO SECTION, 07510 BUILT-UP BITUMINOUS ROOFING PART I - GENERAL 1.01 RELATED WORK SPECIFIED ELSEWHERE r. A. Sheet Metal Work ................................. Section 07600 1.02 APPLICATOR'S QUALIFICATIONS A. Contractor shall submit, with his bid, evidence that his company is an approved roofer for the material manufacturer providing the roof guarantee. 1.03 SUBMITTALS A. Prior to application of any roofing materials, the roofing contractor shall submit to the engineer the materials manufacturer's literature and descriptive information as to the materials proposed for the roofing projects. B. Certification that materials meet ASTM and Federal specifications. C. Manufacturer's recommended instructions for installation of membrane. 1.04 PRODUCT DELIVERY, STORAGE AND HANDLING A. Contractor shall store material in accordance with material manufacturer's recommendation. B. All felt rolls, insulation, and water -sensitive products shall be protected from the elements at all times. C. Felt rolls shall be stored on end and off ground. D. Material shall be labeled for ready identification. Labels shall include name of manufacturer and name and number of the product. E. The contractor shall store only that material on the roof surface that can be used in one day. 07510-1 AIRPORT WEST WING PSI/ROOF CONSULTING DIVISION LUBBOCK, TEXAS HOBBS, NEW MEXICO F. The material stored on the roof surface shall be scattered over the roof deck to avoid damage to the structural roof system. Concentrated loads of high magnitude will not be permitted on the roof. G. The contractor shall use extreme care in transporting materials across the roof surface. The contractor may have to make temporary repairs to damaged areas of the existing built-up roof or urethane where 'workmen have damaged the existing built-up roof in transporting materials. H. The contractor shall furnish all required storage enclosures and safeguards. 1.05 ENVIRONMENTAL REQUIREMENTS A. Minimum Ambient Temperature for Application Contractor shall not install any built-up roofing material or roof insulation at temperatures below 400 F. It will be the contractor's responsibility to determine when weather conditions are acceptable for application of roofing system. B. Contractor shall keep the building interior protected at all times from the elements. PART II - PRODUCTS 2.01 ASPHALTIC MATERIALS A. Primer: ASTM D 41. B. Asphalt: ASTM D 312, Type III. C. Felt: ASTM D 2178, Perma Ply IV, Owens-Corning Fiberglas, or approved equal. D. Base Sheets Perma Ply No. 28, Owens-Corning Fiberglas, or approved 'equal E. Base Flashing: Three -Ply Fiberglas Top -Coated. No torch -on modified bitumen permitted. F. Walkpad: 5/8" Evanite. G. Plastic Cement: Federal specification SS-C-153,-Type I, or approved equal; non -asbestos fibrated. H. Wood Fiber Cants: LLL-I-535. 07510-2 1 AIRPORT WEST WING LUBBOCK, TEXAS i PSI/ROOF CONSULTING DIVISION HOBBS, NEW MEXICO I. Insulation: ` 1. 3' X 4' X 3/411, LL-I-535, Wood fiber. 2. Tapered Edgestrip - 210" taper, wood fiber. 3. 3' X 4' X 3/411, HHI-5296, perlite. J. Roof Coating: ASTM D 2824, Type III, fibrated; minimum two (2) pounds per gallon aluminum flake, (non -asbestos only). ` K. Red Rosin: Five (5) pounds per square. r" L. Oakum: To seal penetrations. 2.02 GRAVEL A. ASTM D 1863: 3/8" - 5/811; submit sample; light in color. 2.03 WOOD - NAILERS, CURBS, CANTS A. Treated Wood: AWPI LP-2. B. Plywood: Exterior Grade, CDX. C. Wood Cants: Treated AWPI LP-2 2.04 FASTENERS A. Insulation: OCF Glasfast with plastic stress plates. r B. Wood Nailers: 1/411.toggle bolts. C. Base Sheet: Tube-Loc Nails (lightweight concrete); 1" Simplex Nails with caps (wood deck). D. Self -Tapping Screws. r E. Wood Screws. F . 3/ 16" Lag S crews . 2.05 EMERGENCY SUPPLIES A. Temporary Roof Patch: Seal-X t-r-p, American Colloid Company f (312) 966-5720; four (4) 25-pound sacks. �,. B. All Weather Plastic Cement: two (2) 5-gallon containers. C. Tarps: Two (2) 20' x 100' Plastic. r D. Water pumps: Two (2) 30-gallon per minute capacity. E. Hoses: Two (2) 50' hoses. f"' t 0751,0-3 r t AIRPORT WEST WING LUBBOCK, TEXAS PSI/ROOF CONSULTING DIVISION HOBBS, NEW MEXICO 2.06 MISCELLANEOUS A. Angle Iron: 2" x 2" x 3/1611 x 311. B. Expansion Joint: Manville Style CF, curb -to -curb. C. Batt Insulations' Vinyl -backed fiberglas. D. Conduit: Match existing. PART III - EXECUTION 3.01 SEQUENCE OF OPERATIONS A. The Contractor shall not use a completed roof surface as an area for transporting or storing roofing materials. B. The Contractor shall schedule his work and maintain a sufficient work force to substantially complete the reroofing work on a day-to-day basis. This includes removal and replacement of built-up roofing, insulation, wood nailers, cants and flashings. C. Work under mechanical units shall be completed prior to beginning field work. D. The contractor shall fully complete work in one area prior to proceeding to the next area. The contractor shall only work in one area at a time. 3.02 PREPARATION OF ROOF SURFACE AREA A. The contractor shall remove all existing roof material from the roof areas indicated. The existing deck shall be thoroughly broomed clean of all debris, dust, dirt, and aggregate. The contractor shall repair any damaged areas. Gypsum deck shall be repaired with Pyrofil. Pyrofil shall dry a minimum of two (2) hours. Metal deck damaged areas exceeding two (2) square feet shall be replaced with material to match the existing deck. Metal deck damaged areas measuring less than one (1) square foot shall be covered with sheet metal screw -fastened to the deck. B. Removal of existing roofing over the perimeter edge shall be by means of a trash chute or enclosed containers. The contractor shall use extreme care in removing materials from the roof surface to trash trucks. Damage to exterior walls shall be repaired by the contractor. 07510-4 r AIRPORT WEST WING LUBBOCK, TEXAS i PSI/ROOF CONSULTING DIVISION HOBBS, NEW MEXICO C. The contractor shall not remove any more existing material than can be properly protected with a completed built-up roof on the same day. Once the tear -off operation begins, the contractor assumes full responsibility for leakage in these areas. D. All roof debris becomes the property of the roofing contractor. Debris shall be removed on a daily basis. E. Contractor, shall verify with owner all abandoned items to be removed from roof surface. Repair decking according to 3.02A as required. 3.03 TEMPORARY WATER STOPS A. Water stops consisting of FOUR (4) PLIES of fiberglass membrane and moppings of asphalt shall be applied at the end of each day's work over exposed areas of roofing felt. Felt plies shall be 911, 1801, 2711, and 36". The four plies of membrane shall extend onto the new roofing and over and onto the adjacent existing roofing after the surface has been thoroughly cleaned of all gravel, dust, dirt, and debris. The temporary 17 measures shall be removed prior to the resumption of any additional work. LEAKAGE AT THIS POINT IS THE SOLE RESPONSIBILITY OF THE ROOFING CONTRACTOR. r B. The contractor shall keep two (2) thirty-three gallon per minute water pumps on the roof at all times. C. The contractor shall keep two (2) 20' X 100' plastic tarps on the project at all times. D. The contractor shall keep on the project site. four (4) 25-pound sacks of Temporary Roof Patch emergency waterproofing product. The product shall be kept dry and on the roof surface at all r times throughout the course of the project. The contractor may obtain product information from American Colloid Company at (312) 966-5720. E. The contractor shall keep two (2) 5-gallon containers of All Weather Plastic Cement on the project site at all times for use in emergency situations. F. Water diverters shall be installed on the building interior under the area of work on a day-to-day basis. A minimum of two (2) 6' x 10' water diverters shall be installed and in operation under the roofing operation. 3.04 BITUMEN HEATING A. Asphalt shall not be heated above 525" F. or applied at a f" temperature below 400' F. i 07510-5 F, AIRPORT WEST WING LUBBOCK, TEXAS PSI/ROOF,CONSULTING DIVISION HOBBS, NEW MEXICO -B. The contractor may obtain Equiviscous Temperature (EVT) information from the asphalt manufacturer. If EVT information is available, the contractor may heat asphalt, within these limits: C.' Asphalt shall be delivered to the point of application at a temperature recommended by the material manufacturer. D. The contractor shall use thermostatically controlled pumper - type heating kettles. All kettles shall be equipped with a calibrated thermometer. E. The contractor shall maintain a minimum of.three (3) thirty pound fire extinguishers on the project at all times. One fire extinguisher shall be kept with each heating kettle and one on the roof surface near each roofing operation. 3.05 ROOF SYSTEMS (BASE BID) A. 1) LIGHTWEIGHT CONCRETE DECK: After proper examination and repair of deck, base ply should be unrolled and allowed to relax. Nail base sheet nine inches.(911) on center at side laps and stagger nail maximum twelve inches (1211) on center two (2) lines eleven inches (1111) to thirteen inches (1311) from each edge of the base ply. Set one (1) layer of 3/4" perlite insulation in hot thirty (30) pound mopping of Type III asphalt with the mopping surface on top. Endjoints of each course shall be staggered. All edges of insulation shall rest on a bearing surface. 2) METAL DECK: Sweep clean deck of all dirt and debris. Mechanically fasten first layer of 3/4" wood fiber insulation to deck using one (1) fastener every two _(2) square feet. Second layer of 3/4" wood fiber insulation shall be set in hot uniform thirty (30) pound mopping of Type III asphalt with the mopping surface on top. Second layer of insulation shall be applied so joints offset a minimum of six inches (611) from first layer. 3) WOOD DECK: Sweep clean deck of all dirt and debris. Verify deck is supported and secured. Repair any damaged decking. Upon completion of repairs,, Contractor shall apply red rosin with two inch (211) side laps and four inch (411) end laps; tack into place. Allow base ply to relax unrolled prior to attachment. Apply base ply with two inch;(2") side laps and four inch (411) end laps mechanically secure maximum nine inches (911) on center of side laps and a maximum of eighteen inches (1811) on center on two (2) lines eleven inches (1111) to thirteen inches (1311) from each edge staggered; mechanically fasten using one inch (111) Simplex capped nails. Upon completion of base sheet, the Contractor shall then set 3/4" perlite insulation in a hot uniform thirty (30) pound mopping of Type III asphalt with the mopping surface on top. End joints of insulation shall be staggered. 07510-6 r AIRPORT WEST WING PSI/ROOF CONSULTING DIVISION LUBBOCK, TEXAS HOBBS, NEW MEXICO r, B. At all intersections of the roof at vertical surfaces, wood fiber cants shall be installed. The Contractor shall set all cants in a full mopping of asphalt on top of the wood nailer. C. Over properly installed insulation, Contractor shall install four (4) plies of Perma Ply IV fiberglass felt, or approved equal, in shingle fashion set in asphalt. Each ply of felt r., shall lap the preceding ply of felt by 27-1/2" and shall result in an 8-1/2" lap exposure. PHASE APPLICATION WILL NOT BE ALLOWED. 3.06 BID ALTERNATE #1 (LIGHTWEIGHT CONCRETE DECK; WOOD DECK) A. Over properly installed base sheet, the Contractor shall install three (3) plies of Perma Ply R fiberglas felt in shingle fashion set in asphalt. Each ply of felt shall lap the preceding ply of felt by 24-2/3" and shall result in an 11-1/3" lap exposure. PHASE APPLICATION WILL NOT BE ALLOWED. B. NOTE: Delete all horizontal wood nailers except as noted in plans. 3.07 APPLICATION OF GRAVEL A. Gravel shall be thoroughly clean and dry at the time of application. r B. Storage plies of gravel surfacing shall be placed on sections which have been first poured and mopped with bitumen. Aggregate shall not be placed directly on bare felts at any time. Storage of aggregate on plywood runways is acceptable. Windrowing of gravel in acceptable on protected surfaces. The Contractor is cautioned not to store any more gravel or �• aggregate in one area than the building structure can withstand. C. Flood the completed roof surface with approximately sixty (60) pounds of Type III asphalt per square, and while the asphalt is hot and fluid, install approximately four hundred (400) pounds of aggregate per square. 3.08 APPLICATION OF BITUMINOUS FLASHINGS AND SHEET METAL r A. Metal flanges shall be pre -primed with asphaltic primer on both sides. Metal flanges shall be set in a full troweling of plastic cement and nailed three inches (311) on center. The r flange shall be stripped off with two (2) plies of fiberglass felt, one twelve inches (1211) and one eighteen inches (18"), set in plastic cement. Plies of fiberglass felt shall not exceed twelve feet (12') in length. (Coordinate with Section 07600.) 07510-7 r 4 AIRPORT WEST WING LUBBOCK, TEXAS B. PSI/ROOF CONSULTING DIVISION — HOBBS, NEW MEXICO BASE FLASHINGS (THREE-PLY TOP -COATED) Embed one (1) ply not more than twelve feet (121) long in a smooth, uniform layer of hot Type III asphalt applied at the rate of twenty-five (25) pounds per one -hundred (100) square feet, or a uniform layer of flashing cement. Lap end laps a minimum of three inches (311).. The material should extend from' a point not less than four inches (411) above the top of the cant to a point on the finished roofing plies at least two inches (211) beyond the toe of the cant. 2. -Embed successive plies not more than twelve feet (121) long in a smooth, uniform layer of hot Type III asphalt applied at the rate of twenty-five (25) pounds per one -hundred (100) square feet, or a uniform layer of flashing cement. Lap end laps a minimum of three' inches (311), and stagger twenty-four inches (2411) from the preceding end laps. This ply should extend one inch (111) further up the vertical wall and one inch (111) further out over the finished roofing plies than the preceding ply. 3. Nail through plies with large head nails, maximum six inches (611) on center, one inch (111) below the top edge. Coat entire top ply with uniform layer of flashing cement or a uniform layer of hot Type III asphalt applied at the rate of 25 pounds per one -hundred (100) square feet. C. All base flashings shall be, coated with aluminum, roof coating at the rate of one (1) gallon per square. 3.09 LAB ANALYSIS A. PSI/Roof Consulting Division and The City of Lubbock reserve the right to remove five (5) 12" x 121"or 4" x.40" samples from the roof for laboratory analysis. The sample will include felts and insulation. The contractor shall remove areas selected by PSI/Roof Consulting Division and replace materials with identical roofing materials as installed. Roofing felts shall extend 611, 1211, 1811,'and 24" past the sampled areas. 3.10 SAFETY A. The contractor shall note that the contracting party and PSI/Roof Consulting Division assume no responsibility for the safety of the contractor's employees. SAFETY OF THE CONTRACTOR'S EMPLOYEES IS SOLELY THE RESPONSIBILITY OF THE ROOFING CONTRACTOR. 07510-8 AIRPORT WEST WING PSI/ROOF CONSULTING DIVISION LUBBOCK, TEXAS HOBBS, NEW MEXICO 3.11 ELECTRICAL A. All damage to electrical components shall be replaced by a licensed electrician at the roofing contractor's expense. B. All associated electrical work shall be performed by a licensed electrician. 07510-9 (THIS PAGE LEFT BLANK INTENTIONALLY) AIRPORT WEST WING PSI/ROOF CONSULTING DIVISION r LUBBOCK, TEXAS HOBBS, NEW MEXICO l SECTION 07600 k k SHEET METAL WORK PART I - GENERAL 1.01 RELATED WORK SPECIFIED ELSEWHERE A. Built -Up Bituminous Roofing .......................Section 07510 1.02 SUBMITTALS A. Shop Drawings: Shop drawings for each new sheet metal flashing installed. The contractor will note that the drawings are approximate. The contractor must verify all field conditions by personal inspection. PART II - PRODUCTS L 2.01 SHEET METAL r A. 24 Gauge Metal: 24 gauge galvanized metal, unless otherwise shown on plans, approximate thickness .0239"; 1.1562 lbs/sq. ft.; submit sample. r" B. Lead: Weight, 2-1/2 lbs/sq.ft., plumbing vents, roof drains. t , C. Solder: ASTM D32, Alloy gauge 58, 50% tin, 50% lead. D. Finish Paint: Vinyl Acrylic Latex type, flat, containing at least 47% non-volatile content by weight and 28% by volume. 1. Pratt and Lambert - Prohide Latex House Paint or approved equal. 2. Color to be selected by The City of Lubbock. E. Sealant: Tremco Dymeric-Sealant. F. Pourable Sealer: Carlisle Sure -Seal Pourable Sealer. f q, 07600-1 P AIRPORT WEST WING LUBBOCK, TEXAS PART III - EXECUTION 3.01 INSPECTION PSI/ROOF CONSULTING DIVISION HOBBS, NEW MEXICO A. The Contractor shall thoroughly examine all surfaces that are to receive sheet metal caps, counterflashings, pitch pans, conductor heads, downspouts and bases. The Contractor will note that the plans depicting metal flashing details are approximate and must *be verified by field examination and measurements. B. Prior to the application of sheet metal flashings, the Contractor shall have installed all wood nailers, cants, built-up roofing and built-up base flashings. The Contractor shall verify that all substrates are smooth and clean to the extent needed for sheet metal work. C. Contractor shall verify that all mechanical equipment is in working order prior to commencement of roofing work. Any equipment not in working order shall be submitted in writing to the engineer prior to the commencement of roofing work. It is the contractor's responsibility to insure that all mechanical equipment be in working order at the completion of the roofing project. 3.02 INSTALLATION A. Fabricate all sheet metal caps and counterflashings in eight feet (81) to ten feet (101) lengths. Each leg of the inside and exterior corners shall be eighteen inches (1811). Corners for all wall caps shall be mitered, seamed and sealed. B. The Contractor shall install all sheet metal work in a water- tight fashion without waves, warps, buckles, fastening stresses or distortion. C. Joints: All field joints shall be lapped six inches (611) and sealed. D. Pitch Pans/Vent Bases/Mechanical Bases/Gutter, Etc.: All new sheet metal work for penetrations through the roof shall have vertical and horizontal seams soldered and pop riveted. Pop rivets shall be spaced no more than one inch (111) on center. E. Painting: ALL NEW AND EXISTING sheet metal shall be painted with two (2) coats of paint. This includes counterflashings, pitch pans, cap flashings, conductor heads, downspouts and gutters; color to be selected by The City of Lubbock. F. Coordinate installation of sheet metal with requirements of Section 07510, Paragraph 3.07A. 07600-2 F i 4 r POO i po SPECIAL CONDITIONS h x F (THIS PAGE LEFT BLANK INTENTIONALLY) E City of Lubbock P.O. Box 2000 Lubbock, Texas 7J457 + _ 606-767-3000 LYDIC-HOOKS ROOFING COMPANY PO BOX 2605 i ATTN: RALPH N. HOOKS, JR. i LUBBOCK, TX 79408. SUBJECT: Re -Roof West Airport Terminal Phase -I January 23, 1992 The City of Lubbock, having considered the proposals submitted and opened on the loth day of January, 1992, for work to be done and materials to be furnished in and for: City of Lubbock Bid # 11756 Re -Roof West Airport Terminal Phase I as set forth in detail in the Specifications, Plans, and Contract Documents for such work for the City of Lubbock; it appearing that your proposal is fair, equitable and to the best interest of said City, please take notice that said proposal was accepted by the City Council of the City of Lubbock on the January 23, 1992, at the bid price contained therein, subject to the execution of and furnishing of all other documents specified and required to be executed and furnished under the contract documents. It will be necessary for -you to execute and furnish to the City of Lubbock all such documents within ten (10) days from your receipt of this Notice. The five percent (5%) bid security, submitted with your proposal, will be returned upon the execution of such contract documents and bonds within the above specified ten (10) day period. In the event you should fail to execute and furnish such contract documents and bonds within the time limit specified, said bid security will be retained by the City of Lubbock. CITY OF LUBBOCK Gene Eads, C.P.M. Purchasing Manager No Text