Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Resolution - 3546 - Contract - High Plains Pavers - 1991 Street Maintenance Program - 02_14_1991
Resolution No. 3546 February 14, 1991 Item #27 HW:js RESOLUTION BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK: THAT the Mayor of the City of Lubbock BE and is hereby authorized and directed to execute for and on behalf of the City of Lubbock a Contract by and between the City of Lubbock and High Plains Pavers for 1991 Street Maintenance Program at various locations throughout the City of Lubbock, attached here- with, which shall be spread upon the minutes of the Council and as spread upon the minutes of this Council shall constitute and be a part of this Resolution as if fully copied herein in detail. Passed by the City Council this ATTEST: e uoya, ulty sec 'APPROVED AS TO CONTENT: ene Ea s, Purch sing Mana er ;APPROVED AS TO FORM: i lHaro d Willard, Assistant City jAttorney 14th day of February , 1991. B. C. MCMINN, MAYOR p- r-- p" p- LUBBOCK TEXAS CITY OF LUBBOCK SPECIFICATIONS FOR 1991 MAINTENANCE PROGRAM BID NO. 11103 CITY OF LUBBOCK, TEXAS SPECIFICATIONS AND CONTRACT DOCUMENTS FOR 1991 MAINTENANCE PROGRAM Maggie Trejo T.J. Patterson M.J. "Bud" Adderton B.C. McMINN, MAYOR City Council Bill Malloy Gary D. Phillips Joan Baker Larry Cunningham, City Manager Jim Bertram, Assistant City Manager of Development Services Larry Hoffman, Director of Transportation Street Department (THIS PAGE LEFT BLANK INTENTIONALLY) CM 0 INDEX NOTICE TO BIDDERS ADVERTISEMENTS FOR BIDS GENERAL INSTRUCTION TO BIDDERS (SECTION 1) 1. Scope of Work 2. Contract Documents 3. Plans For Use by Bidders 4. Time and Order for Completion 5. Payment 6. Affidavits of Bills Paid 7. Materials and Workmanship 8. Guarantees 9. Plans for the Contractor 10. Protection of the Work 11. Texas State Sales Tax 12. Protection of Subsurface Lines and Structures 13. Barricades and Safety Measures 14. Explosives 15. Contractor's Representative 16. Insurance 17. Provisions Concerning Escalator Clauses 18. Preparation or Proposal 19. Bound Copy of Contract Documents 20. Working Hours 21. Subcontractor LIST OF SUBCONTRACTORS BID PROPOSAL CONTRACT PAYMENT BOND PERFORMANCE BOND CERTIFICATE OF INSURANCE GENERAL CONDITIONS OF THE AGREEMENT 1. Owner 2. Contractor 3. Owner's Representative 4. Contract Documents 5. Interpretation of Phases 6. Subcontractor Page I-4 I-4 I-5 I-5 I-5 I-6 I-6 I-7 I-7 I-8 7. Written Notice 8. Work 9. Substantially Completed 10. Layout of Work 11. Keeping of Plans and Specifications Accessible 12. Right of Entry 13. Lines and Grades 14. Owner's Representative's Authority and Duty 15. Superintendence and Inspection 16. Contractor's Duty and Superintendence 17. Contractor's Understanding 18. Character of Workers 19. Construction Plant 20. Sanitation 21. Observation and Testing 22. Defects and Remedies 23. Changes and Alterations 24. Extra Work 25. Discrepancies and Omissions 26. Right of Owner to Modify Methods and Equipment 27. Protection Against Accident to Employees and the Public 28. Contractor's Insurance 29. Protection Against Claims of Subcontractors, Laborers, Materialmen, Furnishers of Machinery, equipment & Supplies 30. Protection Against Royalties or Patent Invention 31. Laws and Ordinances 32. Assignment and Subletting 33. Time of Completion and Liquidated Damages 34. Time and Order of Completion 35. Extension of Time 36. Hindrance and Delays 37. Quantities and Measurements 38. Protection of Adjoining Property 39. Price for Work 40. Payments 41. Partial Payments 42. Final Completion and Acceptance 43. Final Payment 44. Correction of Work Before Final Payment for Work 45. Correction of Work After Final Payment 46. Payment Withheld 47. Time of Filing Claims 48. Arbitration 49. Abandonment by Contractor II-2 II-2 II-3 II-3 II-3 II-3 II-4 II-4 II-5 II-5 II-5 II-6 II-6 II-6 II-7 II-8 II-8 II-9 II-10 II-10 II-11 II-12,13 II-13 II-20 II-20 II-20 II-21 II-21 II-22,23 50. Abandonment by Owner II-24 51. Bonds II-25 52. Special Conditions II-25 -' 53. Losses from Natural Causes II-25 54. Independent Contractor II-26 55. Cleaning up II-26 SPECIAL CONDITIONS (SECTION III) 1. Changes in the Work III-1 2. Superintendence III-1 3. Prosecution of Work III-2 4. Barricades & Danger, Warning, �- Detour Signs & Traffic Handling III-3 5. Maintenance of Detours III-4 6. Public Safety and Convenience III-4 ,., 7. Water III-5 8. Restrictions and Requirements for Construction III-5,6,7 9. Removing Obstructions III-8 10. Test of Materials III-8 11. Subcontractor III-9 12. Underground Utilities III-10 13. Partial Payment III-10 14. Correction of Work After Final Payment III-10 15. Labor III-11 Wage Rates List of Street Improvements MATERIALS OF CONSTRUCTION (SECTION IV) 1. GENERAL ( Concrete) IV-1 2. CONCRETE IV-1 A. Cement IV-1 B. Aggregate IV-1 C. Water IV-2 D. Concrete Materials Test IV-2 E. Concrete Design IV-3 }- F. Classification IV-4 G. Mixing IV-5 H. Curing IV-5 3. STEEL REINFORCING IV-5 A. Wire Mesh IV-5 B. Bar Reinforcing IV-6 4. JOINT MATERIAL IV-6 A. Expansion Joint Materials IV-6 B. Joint Sealing Material IV-6 5. FORMS IV-6 6. FLEXIBLE BASE (CALICHE) IV-7 A. Description IV-7 B. Material IV-7 7. ASPHALT STABILIZED BASE -PLANT MIX (THD ITEM 292 ) IV-7 A. Description IV-8 B. Materials IV-8 C. Asphaltic Materials IV-9 8. MIXING PLANTS - EOUIPMENT (BLACK BASE & HOT MIX) IV-10 A. Weigh Batch Type IV-10-12 B. Continuous Mixing Type IV-13,14 C. Drum Mix Plant IV-15,16 D. Asphaltic Material Heating Equipment IV-17 E. Spreading & Finishing Machine IV-17 F. Rollers IV-18,19 G. Stockpiles, Storage, Proportioning & Mixing IV-20-22 H. Construction Methods IV-23,24 I. Compacting IV-25 J. Surface Finish IV-26 K. Protection of the Work & Opening to Traffic IV-26 L. Surface Density Test IV-26 9. ASPHALTS IV-26 10. HOT MIX ASPHALTIC CONCRETE SURFACE IV-27 A. Aggregate IV-27,28 B. Asphaltic Material IV-29 C. Paving Mixtures IV-30 D. Laboratory Control IV-31 E. Tolerances IV-32 F. Extraction and Gradation Tests IV-33 11. SILO STORAGE IV-34 12. BARRICADES AND SIGNS IV-34 13. SEAL COAT AND TWO -COURSE MAINTENANCE IV-35 A. General (Two -Course) IV-35 B. Asphalt IV-35 C. Asphalt Heaters IV-35 D. Aggregates for Seal and Two -Course Purposes IV-36 E. Repair of Existing Reinforced EarthR Panel IV-36 DETAILS OF CONSTRUCTION (SECTION V) 1. CONCRETE V-1 A. Curb and Gutter (Class A Concrete) V-1-5 ... B. Reinforced Concrete 30" Separate Gutter (Class E Concrete) V-5 C. Reinforced Concrete Valley Gutters (Class C & E Concrete) V-5 D. Reinforced Valley Paving Slab & Alley Returns (Class E Concrete) V-6-8 E. Reinforced Concrete Median Curb (Class A Concrete) V-7 F. Reinforced Concrete Railroad Crossing (Class F Concrete) V-9 G. Reinforced Concrete Drainage Slabs (Class A Concrete) V-10 H. Concrete Pavement (Class C Concrete) V-10-22 I. Concrete Mixing and Placing V-22-30 2. EARTH WORK V-30 A. Subgrade Preparation for curb and gutter, streets,paving, (asphalt and concrete), alley returns, alley paving, valley gutters, and earth work. V-30-33 B. Embankment V-33-36 3. BASE COURSE V-36 A. Hauling and Placing V-37 B. Processing V-37 C. finishing V-38 �.. 4. HOT MIX ASPHALTIC CONCRETE SURFACE V-39 A. Description V-39 Temperature Requirements V-39-45 5. CLEANUP V-45 6. PROTECTION OF EXISTING UTILITIES V-46 A. Adjustments of Valves and Manholes V-46 B. Installation, Adjustments, and Protection of Utilities and Traffic Installation V-46-48 7. SALVAGING AND REPLACING BASE V-49 A. Description V-49 B. Construction Methods V-49 8. SALVAGING AND STOCKPILING BASE MATERIAL V-50 -- A. Description V-50 B. Construction Methods V-50 9. SEALING AND TWO -COURSE SURFACE TREATMENT V-50 A. Preparation of Surface V-50 B. Handling and Applying Asphalt V-50,51 C. Rate of Application of Materials V-52 D. Handling and Applying Aggregates V-52 E. Handling & Applying Asphalt & Aggregates for Night Work V-53 F. Required Rolling (1 hour per 1000 S.Y. of Surface Sealed) V-53 G. Patching Ahead of Seal or Two -Course Maintenance V-54 H. Cleanup V-55 I. "Reinforced Earth" Panel V-55 SITE WORK METHODS AND PAYMENT (SECTION VI) GENERAL 1 1,2 & 3 Asphalt Applied for Sealing and Two -Course 1 4 & 5 Aggregate for Seal Coat & Two -Course 1 6 Patching with 3" of Black Base 1 7 Patching with 6" of Black Base 1 8 Patching with 6" of 3-Sack Stabilized Caliche 2 9 Patching with 1-1/2 inches of hot -mix 2 10 Curb and Gutter 2 11 Valley Gutter 3 12 "Reinforced Earth" Panel 3 CONSTRUCTION DETAIL ILLUSTRATIONS 1. Trailer Mounted Sign 2. Type "A" Barricade 3. Panel Barricade 4. Construction Signs 5. Flagmen Detail NOTICE TO BIDDERS (THIS PAGE LEFT BLANK INTENTIONALLY) NOTICE TO BIDDERS BID # 11103 Sealed proposals addressed to Gene Eads, Purchasing Manager, City of Lubbock, Texas, will be received at the office of the Purchasing Manager, 1625 13th St., Room L-04, Lubbock, Texas, 79401, until 2:00 o'clock a.m. on the 25th day of January, 1991, to furnish all labor following described project: 1991 Street Maintenance Program After the expiration of the time and date above first written, said sealed proposals will be opened by the Purchasing Manager at his office and publicly read aloud. It is the sole responsibility of the bidder to insure that his bid is actually in the office of Gene Eads, Purchasing Manager for the City of Lubbock, prior to the expiration of the date above first written. The City Council will consider the bids on the 14th day of February, 1991, at Municipal Bldg., Lubbock, Texas. or as soon thereafter as may be reasonably convenient, subject to the right to reject any or all bids and waive any formalities. The successful bidder will be required to furnish a performance bond and payment bond in accordance with Article 5160, Vernon's Ann. Civil St., in the amount of 100% of the total contract price in the event that said contract price exceeds $25,000.00. If the contract price does not exceed $25,000.00 the said statutory bonds will not be required. Bidders are required, whether or not a payment or performance bond is required, to submit a cashier's or certified check issued by a bank satisfactory to the City of Lubbock, or a proposal bond from a reliable surety company, payable without recourse to the order of the City of Lubbock in an amount not less than 5% of the amount of the bid submitted as a guarantee that bidder will enter into a contract and execute all necessary bonds (if required) within 10 days after notice of award of the contract to him. It shall be each bidders sole responsibility to inspect the site of the work and to inform himself regarding -� all local conditions under which the work is to be done. It shall be understood and agreed that all such factors have been thoroughly investigated and considered in the preparation of the bid submitted. The plans, specifications, proposal forms and contract documents may be examined at the office of the Purchasing Manager for the City of Lubbock, Texas. Attention of each bidder is particularly called to the schedule of general prevailing rate of per diem wages included in the contract documents on file in the office of the Purchasing Manager of the City of Lubbock, which document is specifically referred to in this notice to bidders. Each bidder's attention is further directed to provision of Article 5159a. Vernon's Ann. Civil St., and the requirements contained therein concerning the above wage scale and payment by the contractor of the prevailing rates of wages as heretofore established by owner in said wage scale. The City of Lubbock hereby notifies all bidders that in regard to any contract entered into pursuant to this advertisements, minority and women business enterprises will be afforded equal opportunities to submit bids in response to this invitation and will not be discriminated against on the grounds of race, color, sex, or national origin in consideration for an award. There will be a pre -bid conference on 15th day of January, 1991. at 10:00 o'clock a.m. Committee Room #103, Municipal Building, 1625 13th Street CITY OF LUBBOCK BY: G Eads, C.P.M. Purchasing Manager ADVERTISEMENTS FOR BIDS BID # 11103 Sealed proposals addressed to Gene Eads, Purchasing Manager, City of Lubbock, Texas, will be received at the office of the Purchasing Manager, Municipal Building, 1625 13th Street, Room L-04, Lubbock, Texas. 79401 until 2:00 o'clock p.m. on the 25th day of January, 1991, to furnish all labor and materials and perform all work for the construction of the following described project: 1991 STREET MAINTENANCE PROGRAM After the expiration of the time and date above for written, said sealed proposals will be opened by the Purchasing Manager at his office and publicly read aloud. The plans, specifications, proposal forms and contract documents may be examined at the office of the Purchasing Manager for the City of Lubbock, Texas Attention of each bidder is particularly called to the schedule of general prevailing rate of per diem wages included in the contract documents on file in the office of the Purchasing Manager of the City of Lubbock, which document is specifically referred to in this notice to bidders. Each bidder's attention is further directed to provision of Article 5159a. Vernon's Ann. Civil St., and the requirements contained therein concerning such wage scales and payment by the Contractor of the prevailing rates of wages as heretofore established by the City of Lubbock The City of Lubbock hereby notifies all bidders that in regard to any contract entered into pursuant to this advertisements, minority and women business enterprises will be afforded equal opportunities to submit bids in response to this invitation and will not be discriminated against on the grounds of race, color, sex, or national origin in consideration for an award. There will be a pre -bid conference on the 15th day of January, 1991, at 10:00 o'clock a.m., Committee Room #103, Municipal Building, 1625 13th Street �- BY: Gene Eads. C.P.M. Purchasing Manager (THIS PAGE LEFT BLANK INTENTIONALLY) GENERAL INSTRUCTIONS TO BIDDERS r (THIS PAGE LEFT BLANK INTENTIONALLY) 0 GENERAL INSTRUCTION TO BIDDERS "-- 1. SCOPE OF WORK The work to be done under the contract documents shall consist of the following; sealing and two -course maintenance and patching. The Contractor shall furnish all labor, superintendence, machinery, equipment and all materials necessary to complete this project in accordance with contract documents. 2. CONTRACT DOCUMENTS All work covered by this contract shall be done in accordance « with contract documents described in the General Conditions. All bidders shall be thoroughly familiar with all of the requirements set forth on the contract documents for the construction of this project and shall be responsible for the satisfactory completion of all work contemplated by said contract documents. 3. PLANS FOR USE BY BIDDERS It is the intent of the City of Lubbock that all parties with an interest in submitting a bid on the project covered by the contract documents be given a reasonable opportunity to examine the documents and prepare a bid without charge or forfeiture of deposit. The contract documents may be examined without charge as noted in the Notice to Bidders. 4. TIME AND ORDER FOR COMPLETION The construction covered by the contract documents shall be fully completed within the time schedule described below, and as set forth in the Bid Proposal - Bid for Unit Price. (A) The patching, with locations and materials as designated by the City's representative, may begin as soon as the Contractor receives the Notice to Proceed. (B) The sealing and two -course application shall not begin until June 1, 1991, and shall be completed by September 1, 1991. All sealing and two -course application shall cease on September 1, 1991. All remaining streets or designated areas not completed shall be carried -over and completed after June 1, 1992, at the original bid price. The Contractor shall I-1 pay to the owner $200.00 per day for each calendar day after September 1, 1991, until acceptance of the project as liquidated damages. No credit will be given for bad weather days or other delays occurring before September 1, 1991. Any additional base failures, those in addition to the areas originally marked and measured by the Owner's Representative, that appear after September 1, 1991, and before the sealing and two -course is applied in 1992, shall be the responsibility of the Contractor. The Contractor shall make a prompt and diligent effort to repair these failures, and shall bear all expense related to the repair of these additional failures. The Contractor shall submit, within two weeks after the award of the contract, a progress schedule of the work contemplated by the contract documents. In the event it is determined by the City that the progress of the work is not in accordance with the progress schedule so submitted, the City may direct the Contractor to take such action as the City deems necessary to insure completion of the project within the time specified. 5. PAYMENT All payments due to Contractor shall be made in accordance with the provisions of the General Conditions of the contract documents. 6. AFFIDAVITS OF BILLS PAID The City of Lubbock, prior to final acceptance of this project, requires the Contractor to execute an affidavit that all bills for labor, materials and incidentals incurred in the construction of the improvements contemplated by the contract documents have been paid in full and that there are no claims pending, of which the Contractor has been notified. 7. MATERIALS AND WORKMANSHIP The intent of these contract documents is that only materials an workmanship of the best quality and grade will be furnished. The fact that the specifications may fail to be sufficiently complete in some detail will not relieve the Contractor of full responsibility for providing materials of high quality and for protecting them adequately until incorporated into the project. The presence or absence of a representative of the City on the construction site will not relieve the Contractor of full responsibility of complying with this provision. The specifications for materials and I-2 methods set forth in the contract documents provide minimum standards of quality which the Owner believes necessary to procure a satisfactory project. The City of Lubbock laboratory test results shall be the sole consideration for approval of materials, mix designs, adequacy of procedures, etc...The results of such testing shall be evaluated and final approval given by the City Engineer. 8. GUARANTEES All equipment and materials incorporated in the project and all construction shall be guaranteed against defective materials and workmanship. Prior to final acceptance, the Contractor shall furnish to the Owner, a written general guarantee which shall provide that the Contractor shall remedy any defects in the work, and pay for any and all damages of any nature whatsoever resulting in such defects, when such defects appear within one year from date'of final acceptance of the work as a result of defective materials or workmanship, at no cost to the Owner (City of Lubbock). 9. PLANS FOR THE CONTRACTOR The Contractor will be furnished five (5) sets of drawings, specifications, and related contract documents for his use during construction. Plans and specifications for use during construction will only be furnished directly to the Contractor. The Contractor shall then distribute copies of plans and specifications to suppliers, subcontractors, or others, as required for proper prosecution of the work contemplated by the Contractor. 10. PROTECTION OF THE WORK The Contractor shall be responsible for the care, preservation, conservation, and protection of all materials, ,., supplies, machinery, equipment, tools, apparatus, accessories, facilities, and all means of construction, and any and all parts of the work, whether the Contractor has been paid, partially paid, or not paid for such work, until the date the City issues its certificate of completion to the Contractor. The City reserves the right, after the bids have been opened and before the contract has been awarded, to »- require a bidder the following information: (A) The experience record of the bidder showing completed jobs of a similar nature to the one covered by the proposed contract and all work in progress with bond amounts and percentage completed. I-3 (B) A sworn statement of the current financial condition of the bidder. (C) Equipment schedule. 11. TEXAS STATE SALES TAX This contract is issued by an organization which qualifies for exemption provisions pursuant to provisions of Article 20.04 of the Texas Limited Sales, Excise and Use Tax Act. The Contractor must obtain a limited sales, excise and use tax permit which shall enable him to buy the materials to be incorporated into the work without paying the tax at the time of purchase. 12. PROTECTION OF SUBSURFACE LINES AND STRUCTURES It shall be the Contractor's responsibility to prosecute the work contemplated by the contract documents in such a way as to exercise due care to locate and prevent damage to all underground pipelines, utility lines, conduits or other underground structures which might or could be damaged by the Contractor during the construction of the project contemplated by these contract documents. The City of Lubbock agrees that it will furnish the Contractor, upon request, the location of all such underground lines and utilities of which it has knowledge. However, such fact shall not relieve the Contractor of his responsibilities aforementioned. All such underground lines or structures cut or damaged by the Contractor during the prosecution of the work contemplated by this contract shall be repaired immediately by the Contractor to the satisfaction of the City of Lubbock, Texas, at the Contractor's expense. 13. BARRICADES AND SAFETY MEASURES The Contractor shall, at his own expense, furnish and erect such barricades, fences, lights, and danger signals, and shall take such other precautionary measures for the protection of persons, property and the work as may be necessary. The Contractor will be held responsible for all damage to the work due to failure of barricades, signs, and lights to protect it, and when damage is incurred, the damaged portion shall be immediately removed and replaced by the Contractor at his own expense. The Contractor's responsibility for maintenance of barricades, signs, and lights shall not cease until the date of issuance to the Contractor of City's certificate of acceptance of the project. I-4 14. EXPLOSIVES The use of explosives will not be permitted unless written permission to do so is obtained by the Contractor from the City. In all cases where written permission is obtained for �- the use of explosives, the Contractor shall assume full responsibility for all damage which may occur as a direct or indirect result of the blasting. In addition in all cases ,.., where explosives are authorized to be used, the Contractor shall use utmost care so as not to endanger life or property and the Contractor shall further use only such methods as are currently utilized by persons, firms, or corporations engaged in similar type of construction activity. Explosive materials shall not be stored or kept at the construction site by the Contractor. In all cases where explosives are to be used during the construction of the project contemplated by this contract, it shall be the duty of the Contractor to notify each utility company having structures (above or below the ground) in proximity to the site of the work of the Contractor's intention to use explosives, and such notice shall be given sufficiently in advance to enable the companies to take such steps as they may deem necessary to protect their property from injury. Such notice however, shall not relieve the .— Contractor of responsibility for any damage resulting from his blasting operation. 15. CONTRACTOR'S REPRESENTATIVE The successful bidder shall be required to have a responsible local representative available at all times while the work is in progress under this contract. The successful bidder shall be required to furnish the name, address and telephone number where such local representative may be reached during the time that the work contemplated by this contract is in progress. 16. INSURANCE The Contractor shall not commence work under this contract until he has obtained all insurance as required in the General Conditions of the contract documents, from an underwriter authorized to do business in the State of Texas and satisfactory to the City. Proof of coverage shall be furnished to the City and written notice of cancellation or any material change will be provided ten (10) days in advance of cancellation or change. All policies shall contain an agreement on the part of the insurer waiving the rights to subrogation. I-5 The insurance certificates furnished shall name the City as an additional insured and shall further state that all subcontractors are named as additional insured, or in the alternative shall be accompanied by a statement from the Contractor to the effect that no work on this particular project shall be subcontracted. 17. PROVISIONS CONCERNING ESCALATOR CLAUSES Proposals submitted containing any conditions which provide for changes in the stated bid price due to increases or decreases in the cost of materials, labor or other items required for the project will be rejected and returned to the bidder without being considered. 18. PREPARATION OF PROPOSAL The bidder shall submit his proposal on forms furnished by the City. All blank spaces in the form shall be correctly filled in and the bidder shall state the price both in words and numerals, for which he proposes to do the work contemplated or furnish the materials required. Such prices shall be written in ink, distinctly and legibly, or typewritten. In case of discrepancy between the price written in words and the price written in figures, the price written in words shall govern. If the proposal is submitted by an individual, his name must be signed by him or his duly authorized agent. If a proposal is submitted by a firm, association, or partnership, the name and address of each member must be given and the proposal signed by a member of the firm, association or partnership, or person duly authorized. If the proposal is submitted by a company or corporation, the company or corporate name and business address must be given, and the proposal signed by an official or duly authorized agent. Powers of attorney authorizing agents or others to sign proposals must be properly certified and must be in writing and submitted with the proposal. The proposal shall be executed in ink. Each proposal shall be enclosed in a sealed envelope, addressed as specified in the Notice to Bidders, and endorsed on the outside of the envelope in the following manner: (A) Bidder's name. (B) Proposal for (description of the project). Bid proposals may be withdrawn and resubmitted at any time prior to the time set for opening of the bids, but no proposal may be withdrawn or altered thereafter. I-6 r- 19. BOUND COPY OF CONTRACT DOCUMENTS Bidder understands and agrees that the contract to be executed by bidder shall be bound and include the following: (A) Notice to Bidders. (B) General Instructions to Bidders. (C) Bidder's Proposal and List of Subcontractors. (D) Statutory Bond (if required). (E) Contract Agreement. (F) General Conditions. (G) Special Conditions (if any). (H) Specifications. (I) Insurance Certificates. (J) All other documents made available to bidder for his inspection in accordance with the Notice to Bidders. If plans and Specification are to bulky or cumbersome to be physically bound, they are to be considered incorporated by reference into the aforementioned contract documents. 20. WORKING HOURS Construction work under this contract requiring an inspector will not be performed on weekends or holidays unless the following conditions exist: (1) The project being constructed is essential to the City of Lubbock's ability to provide the necessary service to its citizens. (2) Delays in construction are due to factors outside the control of the Contractor. The Contractor is approaching the penalty provisions of the contract and the Contractor can show he has made a diligent effort to complete the contract within the allotted time. Before construction work requiring an inspector is to be performed on weekends or holidays the Contractor must notify the Owner's Representative not less than three full working days prior to the weekend or holiday he desires to do the work and obtain written permission from the Owner's Representative to do such work. The final decision on whether to allow construction work requiring an inspector on weekends or holidays will be made by the Owner's Representative. I-7 21. In any event, if a condition should occur or arise at the site of this project or from the work being done under this contract which is hazardous or dangerous to property or life, the Contractor shall immediately commence work regardless of the day of the week or the time of the day, to correct or alleviate such condition so that it is no longer dangerous to property or life. No work will be allowed from November 1st through January 2nd unless approved by the Engineer. The Contractor may utilize the services of specialty subcontractors on those parts of the work which, under normal contracting practices, are performed by specialty subcontractors. The Contractor shall not award any work to any subcontractor without prior written approval of the Owner, which approval will not be given until the Contractor submits to the owner a written statement concerning the proposed award to the subcontractor, which statement shall contain such information as the Owner may require. The Contractor shall be as fully responsible to the owner for the acts and omissions of his subcontractors, and of persons either directly or indirectly employed by them, as he is for the acts and omissions of persons directly employed by him. The Contractor shall cause appropriate provisions to be inserted in all subcontracts relative to the work to bind subcontractors to the Contractor by the terms of the General Conditions and other contract documents insofar as applicable to the work of subcontractors and to give the Contractor the same power as regards terminating any subcontract that the Owner may exercise over the Contractor under any provision of the contract documents. Nothing contained in this contract shall create any contractual relation between any subcontractor and the Owner and said subcontractor will look exclusively to the Contractor for any payments due the subcontractor. The Contractor is required to list the subcontractors to be utilized on the work on the forms included in these documents. This "List of Subcontractors" form shall be completed and submitted with the Bidder's Proposal. I-8 .-. BID PROPOSAL (THIS PAGE LEFT BLANK INTENTIONALLY) BID PROPOSALS BID FOR UNIT PRICE PLACE:J,, tJ bC� DATE: _;i r-- PROJECT NO: Proposal of ( .�A /y _s _ EA V k 9 _T1��, (hereinafter called " bidder") To the Honorable Mayor and City Council City of Lubbock, Texas (hereinafter called Owner) Gentlemen: -- The Bidder, in compliance with your invitation for bids for the sealing and two -course asphalt surface on existing streets, having carefully examined the plans, specifications, instructions to bidders, notice to .� bidders and all other related contract documents and the site of the proposed work, and being familiar with all of the conditions surrounding the construction of the proposed work, and being familiar with all of the conditions surrounding the construction of the proposed project including the availability of materials and labor, hereby proposes to furnish all labor, materials, and supplies; and to construct the project in accordance with the plans, specifications and contract documents, within the time set forth therein and at the prices stated in Exhibit "A". The bidder binds himself on acceptance of his proposal to execute a contract and any required bonds, according to the accompanying forms, for performing and completing the said work within the time stated and for the prices stated in Exhibit "A" on this proposal. After the contract is awarded, the bidder will furnish the Street Superintendent, within two weeks, a list of the above units as to the starting and completion date on each unit listed in the contract. The Superintendent will set certain priorities on the order of the streets - to be reconstructed. Bidder hereby agrees to commence the work on the above project on or before a date to be specified in a written "Notice to Proceed" of the Owner and to fully complete the sealing and two -course asphalt surface between June 1, 1991 and September 1, 1991. The Bidder further agrees that all two -course application shall cease September 1, 1991; and that all remaining streets or designated areas not completed shall be carried -over and completed after June 1, 1992, the original bid price. The Bidder also agrees to pay the Owner as liquidated damages, the sum of $200.00 (two -hundred dollars) for each consecutive calendar day starting on September 2, 1991, and ending on the day of acceptance of the project by the City Council. Bidder hereby certifies that he is aware of and agrees to no credit being given on the liquidated damages on at for bad weather days, materials supply difficulties or other delays occurring before September 1, 1991. Any additional base failures, those in addition to the areas originally marked and measured by the Owner's Representative, that appear after September 1, 1991, and before the sealing and two -course is applied in 1992, shall be the responsibility of the Contractor. The Contractor shall make a prompt and diligent effort to repair these failures, and shall bear all expenses related to the repair of these additional failures. Bidder understands and agrees that this bid proposal shall be completed and submitted in accordance with instruction number 18 of the General Instructions to Bidders. Bidder understands that the Owner reserves the right to reject any or all bids and to waive any formality in the bidding. The undersigned Bidder hereby declares that he has visited the site of the work and has carefully examined the plans, specifications, and contract documents pertaining to the work covered by this bid, and he further agrees to commence work on or before the date specified in the written notice to proceed, and to substantially complete the work on which he has bid; as provided in the contract documents. Enclosed with this proposal is a Cashier's Check or Certified Check for Dollars ( ) or a Proposal Bond inthe smo Dollars ( ), which it is agreed shall a collected and retained y the Owner as liquidated damages in the event the proposal is accepted by the Owner and the undersigned fails to execute the necessary contract documents and the required bond (if any) with the Owner within ten (10) days after the date of receipt of written notification of acceptance of said proposal; otherwise said check or bond shall be returned to the undersigned upon demand. Bidder understands and agrees that the contract to be executed by Bidder shall be bound and include all contract documents made available to him for his inspection in accordance with the Notice to Bidders. Contractor BY : el*l A L LL vy �.z L I A V\,S ] L, f 65 //JI—EJifT (Seal if Bidder is a Corporation) ATTEST: Secre ary 5+Alt- EXHIBIT A, PAGE 1 BID PROPOSAL BID FOR UNIT PRICE CONTRACTS 1991 Maintenance Program Item Quantities Total No. & Units Description of Item & Unit Price Amount --------------------------------------------------------------------------------- 1. 213,771.0 GALS. AC-5 polymerized asphalt +3% latex by volume (2% by weight)application of 0.30 gallon/S.Y. for course #1 to the existing surface including furnishing, cleaning and applying, per gallon; 0 %V L DOLLARS ($ e ) V E CENTS $ 23 SIx 2. 270,774.0 GALS. AC-5 polymerized asphalt +3% latex by volume (2% by weight) application of 0.38 gallons/S.Y. for course #2 applied to existing surface including furnishing, cleaning and applying, per gallon; 3. 4. a E_ DOLLARS ($ W F_ L U A CENTS 35,180.0 GALS. AC-5 polymerized asphalt +3% latex by volume (2% by weight) application of 0.28 gallons per square yard (pre -coated grade No. 4 crushed stone or gravel seal coat) applied to existing surface including cleaning, furnishing and applying, per gallon; Q DOLLARS ($) CENTS 9,312.0 C.Y. Surface aggregate (THD P.S. Grade No. 4 pre -coated crushed gravel, with a minimum of 90% crushed faces, pre -coated; crushed stone meeting sliver count and soundness test) including loading, freight, unloading spreading, brooming, blading and rolling (one hour per 1000 square yards) per cubic yard; DOLLARS ($ _� OF b tJ) CENTS 88 $30--.fir zd6 O O $27934 o EXHIBIT A, PAGE 2 BID PROPOSAL BID FOR UNIT PRICE CONTRACTS 1991 Maintenance Program Item Quantities Total No. & Units Description of Item & Unit Price Amount --------------------------------------------------------------------------------- 5. 11,495.0 C.Y. Surface aggregate (THD P.B. Grade No. 2 special precoat crushed gravel with a minimum of 90% crushed faces, pre -coated crushed stone meeting sliver count and soundness test) including loading, freight unloading, spreading, brooming, blading and rolling (one hour per 1000 square yards) per cubic yard; DOLLARS ($ A &,6Z ) N [2 CENTS 6. 3,000.0 S.Y. Patching with Black Base including removal and disposal of asphalt surface, caliche base, and subgrade if soft or unstable to a depth of 4-1/2" and replacing with 3" of black base and 1-1/2" of Type "C" Hot Mix complete in place per square yard; ;Al 41 DOLLARS ($ /�1 D CENTS $_5'7 ooe�— • T 7. 14,000.0 S.Y. Patching with Black Base including removal and disposal of asphalt surface, caliche base, and subgrade if soft or unstable to a depth of 7-1/2" and replacing with 6 of black base and 1-1/2" of Type "C" Hot Mix complete in place per square yard; 7-�W N iY F/' V DOLLARS ($ a `� J C�f1 r V CENTS $3Gr zoo'® T EXHIBIT A, PAGE 3 BID PROPOSAL BID FOR UNIT PRICE CONTRACTS 1991 Maintenance Program Item Quantities Total No. & Units --------------------------------------------------------------------------------- Description of Item & Unit Price Amount 8. 500.00 S.Y. Patching with 3 sack cement stabilized caliche base including removal and disposal of asphalt surface, caliche base, and subgrade if soft or unstable to a depth of 7-1/2" and replacing with 6" of 3 sack cement stabilized caliche and 1-1/2" of Type "C" Hot Mix complete in place per square yard of stabilized base; DOLLARS ($ O p L� CENTS $-- 9. 2,000.0 S.Y. Patch with 1-1/2" of Type "C" A.C. pavement with approved crushed stone or approved crushed gravel, including removal and disposal of existing asphalt surface, including prime and tack coat, complete in place per square yard; /l( % DOLLARS j b CENTS 00 $ 10. 200.0 L.F. Curb and Gutter: 6" concrete (3,000 #/ 7 day,Class) High Early Cement 30" wide separate gutter or sawtooth curb and gutter, including removal and disposal, subgrade preparation, complete in place with location as directed by the Engineer, per linear foot. %-14 ;A DOLLARS ($ 161 0 CENTS o� $ z mo— ll. 1,500.0 S.Y. Valley Gutter: 8" reinforced concrete (3,600 #/28 day, Class C), 6x6-6/6 wire, valley gutter including removal and disposal, subgrade preparation, complete in place with location as directed by the Engineer, per square yard. DOLLARS ($ CENTS oa EXHIBIT A, PAGE 4 BID PROPOSAL BID FOR UNIT PRICE CONTRACTS 1991 Maintenance Program Item Quantities Total' No. & Units Description of Item & Unit Price Amount ------------------------------------------------------------------------------ 12. 1 "Reinforced Earth" Repair Panel, complete in place, including furnishing, all manipulations, all materials necessary, and all expenses related to ti the on -site presence of a "Reinforced Earth" representative. �a %+� 1 FP V h v N .D ? _q0 LLARS9. ($ b 0\ } 0 CENTS TOTAL BID (ITEMS 1 through 12) ($ i 7G3 G02,00 } v--^----- CENTS BY: �'� /� Cj C /I J, 1�� F ,�, -- A NN S TITLE: �z / �� ,2E/ 1 E LIST OF SUBCONTRACTORS This form shall be completed and submitted with the Bidder's Proposal. Minority Owned YES NO 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. (THIS PAGE LEFT BLANK INTENTIONALLY) SEABOARD SUR Y COMPANY HOME OFFICE: NEW YORK. N. Y. PROPOSAL BOND Know all Am hg t4rsr Frrsrnts: THAT WE, HIGH PLAINS PAVERS, INC. as principal, and SEABOARD SURETY COMPANY, a corporation under the laws of the State of New York, having its principal place of business in the City of New York, New York, as surety, are held and firmly bound unto CITY OF LUBBOCK, TEXAS as obligee, in the sum of FI VE-PRECENT (5% ) OF GREATEST AMOUNT BID DOLLARS, lawful money of the United States of America, for the payment of which, well and truly to be made, we bind ourselves, our heirs, executors, administrators, successors and assigns, jointly and severally, firmly by these presents. SIGNED, sealed and dated this 16 day of JANUARY 19 91 WHEREAS, the said principal is herewith submitting its proposal for STREET IMPROVEMENTS THE CONDITION OF THE ABOVE OBLIGATION IS SUCH, that if the aforesaid principal shall be awarded the contract upon said proposal and shall within the required number of days after the notice of such award enter into a contract and give bond for the faithful performance of the contract, then this obligation shall be null and void; otherwise the principal and surety will pay unto the obligee the difference in money between the amount of the bid of the said principal and the amount for which the obligee may legally contract with another party to perform the said work if the latter amount be in excess of the former; but in no event shall the surety's liability exceed the penal sum hereof. HIGH PLAINS PAVERS. Principal SEABOARD SURETY COMPANY Le a aye Form 136 i A rney-in-Fact (THIS PAGE LEFT BLANK INTENTIONALLY) No Text (THIS PAGE LEFT BLANK INTENTIONALLY) P. - CONTRACT .1, (THIS PAGE LEFT BLANK INTENTIONALLY) CONTRACT THE STATE OF TEXAS COUNTY OF LUBBOCK THIS AGREEMENT, made and entered into this 14th day a=f_ February, 1991, by and between the City of Lubbock, County of -- Lubbock, State of Texas, acting by and through B.C. McMinn;, Mayor, and thereunto authorized to do so, hereinafter referred to as OWNER, and High Plains Pavers, Inc. of the City of Plainview, County of Hale, and State of Texas, here=nafter referred to as CONTRACTOR. WITNESSETH: That for and in consideration of the payments and agreements hereinafter mentioned, to be made and performed by the OWNER and under the conditions expressed in the bond bearing even date herewith (if any), the CONTRACTOR hereby agrees with the OWNER to commence and complete the construction of certain improvements described as follows: Bid #11103 - 1991 MAINTENANCE PROGRAM IN THE AMOUNT OF $1,703,002.000 and all extra work in connection herewith, under the terms as stated in the Contract Documents and at his (or their) own proper cost and expense to furnish all materials, supplies, machinery, equipment, tools, superintendence, labor, insurance and other accessories and services necessary to complete the said construction in accordance with the Contract Documents, as defined in the General Conditions of the Agreement. The CONTRACTOR hereby agrees to commence work within ten (10) days after the date written notice to do so shall have been given to him and to substantially complete same within the time specified in the Contract Documents. The OWNER agrees to pay the CONTRACTOR in current funds for the performance of the Contract in accordance with the proposal submitted therefor, subject to additions and deductions, as provided in the Contract Documents, and to make payment on account thereof as provided therein. IN WITNESS WHEREOF, the parties to these presents have executed this contract in six (6) counterparts, each of which shall be deemed an original, in the year and day first above mentioned. City Secretary AP P OVED, AS TO CONTENT: ATTEST: G" �;stgaf Secretary _CITY OF LUBBOCK, TEXAS Mayor B.C. McMINN HIGH PLAINS PAVERS, INC. CONTRACTOR BY: TITLE:��5 COMPLETE ADDRESS: P.O. BOX 398 PLAINVIEW, TX 79073-0398 0- PAYMENT BOND (THIS PAGE LEFT BLANK INTENTIONALLY) STATUTORY PAYMENT BOND PURSUANT TO ARTICLE 5160 OF THE REVISED CIVIL STATUTES OF TEXAS AS AMENDED BY ACTS OF THE 56TH LEGISLATURE, REGULAR SESSION, 1959 r— KNOW ALL MEN BY THESE PRESENTS, thaat� (hereinafter called the PrincipaL(s), as Principal(s), and SEABOARD SURETY COMPANY (hereinafter called the Suret , s Surety r l firm rj� � called the Obligee), in'the` Dollars (S✓ilf�.�r7„ �Wful money of the United States for the payment whereof, the said Principal and Surety bind themselves, and their heirs, adminis- trators, executors, successors and assigns, jointly and severally, firmly by these presents. WHE AS, the Principal has entered into/a cert in written contract with the obligee, dated t day of 19 to 1 j �� G ciG1�oG�� ��cCi.S r-. �'� � wit✓ G.2_ i lf�G� /` � and said Principal under the law is required before commencing the work provided for in said contract to execute a bond in the amount of said contract which contract is hereby referred to and made a part hereof as fully and to the same extent as if copied at length herein. NOW, THEREFORE, THE CONDITION OF THIS OBLIGATION IS SUCH, that if the said Principal shall pay all claimants supplying labor and material to him or a subcontractor in the prosecution of the work provided for in said con- tract, then, this obligation shall be void; otherwise to remain in full force and effect; PROVIDED, HOWEVER, that this bond is executed pursuant to the provisions of Article 5160 of the Revised Civil Statutes of Texas as amended by Acts of the 56th Legislature, Regular Session, 1959, and all liabilities on this bond shall be determined in accordance with the provisions of said Article to the same extent as if it were copied at Length herein. YITNES EREOF, a said Principal (s) and Surety (s) have signed and sealed this instrument this day of 19ZZ SEABOARD SURETY COMPANY Surety Principa� (,"-- La_� A) V'� E ly: - -- & � U � 6_- () By: (Title) By: (Title) a'.✓( Mop VES AGENCY 79073-0650 T e undersign aurety compa y represents that it is duly qualified to do business in Texas, and hereby des- ignate % Gresident in Lubbock County to whom any requisite notices may be delivered and on whom service of process may be had in matters arising out of such suretyship. SEABOARD SURETY COMPANY Surety Approved as to form: TWO City of Lu ck Y�1&t& C B i OL�ff' �j ity Attorney *Note: If signed by an officer of the Surety Company there must be on file a certified extract from the by-laws showing that this person has authority to sign such obligation. If signed by an Attorney in Fact, we must have copy of power of attorney for our files. "we SURM COMWAN a" 1430 OPP OVA. "FM immwv you C&ry L. 94"0 Of LAVtO JFAy* B&IJ ad x-lo &Aft WKWomft 00tmw *W"o - I I -i am* a WSOM to &W SWMPOPA aid WV ft i 9 br mbvk gow a. 1"b aomo mo o l won* CMVww*v049&ftftm SIP% AAOMMVM4fir &Wt "Owgk4 MmWv 11*,►4*vi", io k0ftgo OW rft"J%ow"oft # r * +Raw -0400% .: +_ +p,new-w*aw ft"" a► ! + !' *+ Mf ■w►ow ow wfwow *,r #:r Osa .R q%w .Owe OWFAMOM M r r. w rAWUF ft -ROM OOP ataw%ft V 'w P 'M aka -* i� � a� - o Ifty ollP v# 0144tw ~ A fir! &PomoF+'P�t A.� ariaA�IIEiR ul,V ow q0 - A L • ^Afro 10 ASO J* t � M 430 bDam~ an swat2 r ibis - 00 sict*ol t . of 'r�+t + # i�►O�Me<lf+yM+ i +i � tedc4avow. ONO OW rk"lM vift� �D� i YrM-* wo of, Itor- • oF, 4 ; M '7�7�'i'*'���'�Mr7FMsrn�k�1g1YF1�YAgof����# 411M#,��t' 4w�1�*�Rt�l11�s��rtr+.y+a�N�1'�r WF "mew" imp as 00 cowm�cwAmmwb-v go oww" 10, "Mm "D di Ali! dlf M Mio-.Woww !rw of o* commoft ally w wo oww'. 0 a. Awv,*. awe *w 4ft **onablo o m.w + r +�s. ++rrt wr FAr g* to v"o A +M:mo a u a,+idw wn U � 0 00 or4wm "Pommy +ate 40 40momw ++- aw OF wo .0 V* dMMuF so !E "^0 OF 00 <Aowft *mw FMB aaww" %Mww+0 VAN, immommo4 MPMk V* %v+A** % ifi� Oft ~ M 0 OWO ft-lW *•w #.K+► *WW .-* -.d *- +.*%A% Win" WO:wjt #ram qi aM111k~ lll" IN111111PIP1140' �r �I�Y�iYiY �Yifil�'li��i'�iL'fii�Y'.ii"�81�ilY�i::••c � c IMF My amo s'Cr.wrabr l+;a auai,llGV.'III IVYW TUrK, uiateiz'tszf-b444. PERFORMANCE BOND .- (THIS PAGE LEFT BLANK INTENTIONALLY) STATUTORY PERFORMANCE BOND PURSUANT TO ARTICLE 5160 OF THE REVISED CIVIL STATUTES OF TEXAS AS AMENDED BY ACTS OF THE 56TH LEGISLATURE, REGULAR SESSION 1959 '— KNOW ALL MEN BY THESE PRESENTS, t ati t� (hereinafter called the Principal(s), as Principal(s), and SEABOARD SUREW COMPANY� (hereinafter called t r s) `as Sure f' r ,c Sco called the Obligee),��am�xi Dollars (f✓�4Pc.wful money of the United States for the payment whereof, the said Principal and Surety bind themselves, and their he i;7�s , administra- tors, executors, successors and assigns, jointly and severally, firmly by these presents. WHEREA , the Principal has ender into ' ce i wr t c tact �'th e; O�bl�ee, dated tFj�l'�of � 19- , t plll� and said principal under the law is required before commencing the work provided for in said contract to execute a bond in the amount of said contract which contract is hereby referred to and made a part hereof as fully and to the same extent as if copied at length herein. NOW, THEREFORE, THE CONDITION OF THIS OBLIGATION IS SUCH, that if the said Principal shall faithfully per- form the work in accordance with the plans, specifications and contract documents, then this obligation shall be void; otherwise to remain in full force and effect. PROVIDED, HOWEVER, that this bond is executed pursuant to the provisions of Article 5160 of the Revised Civil Statutes of Texas as amended by Acts of the 56th Legislature, regular session 1959, and all liabilities on this bond shall be determined in accordance with the provisions of said article to the same extent as if it were copied at length herein. IN WITNESS EREOF, the said Principal (s) and Surety (s) have signed and sealed this instrument thiv� ay of 19�� �. s UM CO pANY Surety Principal *BYi/ i By: z /_ 4 (Title) t— (Title) M'h.iR&7AN-EAi.IEv AGiNCY poDRAWER 650 By: PLANVIEW, TEAS 79073-0650 (Title) .�, By: (Title) The ers gned rety compaanny represents that it is duly qualified to do business in Texas, and hereby designate'���u `f eF sident in Lubbock County to whom any requisite notices may be delivered and on whom service of process may be had in matters arising out of such suretyship. SEABOARD► SURETY COMPANY Surety Approved as to Form City of /k� City Attorney (Title) - *Note: If signed by an officer of the Surety Company, there must be on file a certified extract from the by-laws showing that this person has authority to sign such obligation. If signed by an Attorney in Fact, we must have copy of power of attorney for our files. CERTIFICATE OF INSURANCE p- (THIS PAGE LEFT BLANK INTENTIONALLY) 91 I9.111 IF C-I NSUR1tGE ---- PRODMERT "A3f�3"3iB�:>�3i-�� I Jim Posey Agency I NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS CERTIFICATE DOES NOT REND, k k I EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. k I R.O. Drawer 130 k - --- ------------1 I Plainview , TX I k 179073-013bI COMPANIES AFFORDING COVERAGE 1 I PH0MOO-293-5300 I 1 I INSURED I COMPANY LETTER A CRUM & FORSTER COMMERCIAL I II— _w.---_-____ M--- --I PLAINS PAVERS, INC. I COMPANY LETTER B -Hartford Insurance- Group ---_-I I HHIGH U WALL I P.O. BOX 398 1 COMPANY LETTER C I I PLAINIVEW, TX I ----_--- ----- --I 1 79073- 1 COMPANY LETTER D k 1 I COMPANY LETTER E I I } COVERAGES --------- - I k THIS IS TO CERTIFY THAT POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY I I PERIOD INDICATED. NOTWITHSTANDINNG ANY REGUIREMENT TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO I I WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS RWECT TO I I ALL TERMS, EXCLUSIONS, AND CONDITIONS OF SUCH POLICIES, LIMITS SHORN MAY HAVE BEEN EDUCED BY PAID CLAIMS. I I COI TYPE OF INSURANCE I POLICY NUMBER I POLICY EFF I POLICY EXP I ALL LIMITS IN THOUSANDS I ILTRI I I DATE I DATE I I I I GENERAL LIABILITY I I I I CORAL AGGREGATE 12000 1 1 1 1 - -- ----1 —I 1 1 I AI IX3 COM01ERCIAL GM LIABILITY k 1543 026266 9 02/01 /91 02/01 /92 1 PRODS-COMP/OPS ACG. 11000 1 1 k 13 E 3 CLAIMS MADE K 3 OCC. k I I I PERS. & ADVG. INJURYI k I AI IX3 OWNERIS & CONTRACTORS 1 543 028266 9 02/01 /91 02/01 /92 1 EACH OCCURRENCE 11000 1 I I PROTECTIVE I I I 1-------------------I --- I I 1 I I I I FIRE DAMAGE I I 1 l t 3 1 1 1 1 (ANY ONE FIRE) I I 1 1 1: 3 1 1 1 1 MEDICAL EXPENSE I I 1 1 I I I I (ANY ONE PERSON) 15 1 I 1 AUTOMOB I LE L I AB I I I I CSL 11000 1 k Al 00 ANY AUTO 11335881709 02/01 /91 02/01 /92 1 BODILY INJURY k I I Al W ALL OWNED AUTOS I of 02 / 01 / 91 02 / 01 / 92 1 (PER PERSON) I I I Al 00 SCHEDULED AUTOS k it 02 / 01 / 91 02 / 01 / 92 1------------------ k----------1 I Al W HIRED AUTOS I to 02/01 /91 02/01 /92 1 BODILY INJURY I I I Ak 00 NON -OWNED AUTOS I of 02/01 /91 012/01 /92 1 (PER ACCIDENTI I I I I G I GARAGE LIABILITY I I I I I I I I I I I PROPERTY I I 1 1 EXCESS LIABILITY I I I I I EACH OCC I AGGREGATE I I Al IXI UMBRELLA FORM 1523-5563104 02/01 /91 012/01 /92 1 1 1 1 I I i I OTHER THAN UMBRELLA FORM 1--1- ---- ---I I I 1 1 15000 1 5000 1 ------ --I-------------I ----- I - -------- I I ------I I I k I STATUTORY I I BI WORKERS' COMP 171WZCF9466 02/01 /91 02/01 /92 500 EACH ACC I I I AND I 1 1 500 DISEASE -POLICY LIMIT I I BI EMPLOYERS' LIAR 171WZCF9466 02/01/91 02/01/92 500 DISEASE -EACH EMPLOYEE I [OTHER l k 11 k k k 1 1 1 k I 1 1 1 1 I 1 1 I DESCRIPTION OF OPERATIONS/LOCATIW/VEHICLES/SPECIAL ITEMS Paving Contractor 1 1 1 1 1 1 1 1} CERTIFICATE HOLDER l-------=— k 1 ---_--__-? CANCELLATION 1 = SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EX- I k = PIRATION DATE THEREOF THE ISSUING COMPANY WILL ENDEAVOR TO VAIL 10 1 k City of Lubbock I = DAYS WRITTEN NOTICE Th THE CERTIFICATE HOLDER NAMED TO THE LEFT BUT I = FAILURE TO MAIL SUCH NOTICE SHALL IMPOSE NO OBLIGATION OR LIABILITY GE 1 k Lubbock, TX I = ANY IIINND UPON THE COMPANY, IT TS OR REPRESENTATIVE k = AUTHORIZED R£PRESENTATI- _ A I CERTIFICATE OF INSURANCE TO: CITY OF LUBBOCK DATE: Type of Lubbock, Texas Project: THIS IS TO CERTIFY THAT (Name and Address of Insured) is, at the date of this certificate, in- sured by this Company with respect to the business operations hereinafter described, for the types of insurance and in accordance with the provisions of the standard policies used by this Company, the further hereinafter described. Exceptions to standard policy noted hereon. TYPE OF INSURANCE Policy No. Effective Expires Limits of Liability Workmen's Compensation Owner's Protec- Per Person S tive or Contin- Per Occurrence S gent Liability -------------------------------------------------------------------------------------------------------------------- Property Damage S Contractor's Per Person S Protective or Per Occurrence $ Contingent Property Damage S Liability -------------------------------------------------------------------------------------------------------------------- Per Person $ Automobile Per Occurrence $ -------------------------------------------------------------------------------------------------------------------- Property Damage $ Comprehensive General Liability S Umbrella Liability S -------------------------------------------------------------------------------------------------------------------- The foregoing Policies (do) (do not) cover all sub -contractors. r — Locations Covered DESCRIPTION of Operations Covered The above policies either in the body thereof or by appropriate endorsement provide that they may not be changed or canceled by the insurer in less than the legal time required after the insured has received written notice of such change or cancellation, or in case there is no legal requirement, in less than five days in advance of cancellation. FIVE COPIES OF THIS CERTIFICATE MUST BE SENT TO THE OWNER. (Name of Insurer) By: Title (THIS PAGE LEFT BLANK INTENTIONALLY) 0 P� 0- Approved hand manipulated mechanical vibrators shall be furnished in the number required for provision of proper consolidation of the concrete along forms, at joints and in areas not covered by mechanically controlled vibrators. These vibrators shall be sufficiently rigid to insure control of the operation position of the vibrating head. Complete and satisfactory consolidation of the concrete pavement is a most important requirement of this specification. Cores taken shall be carefully examined for voids, honeycombing or other evidence of incomplete consolidation. If such evidence is present, changes in the consolidation procedures and/or equipment will be made to insure satisfactory consolidation. (11) Finishing Machine -Finishing. All concrete pavement shall be finished mechanically with approved power - driven machines, except as herein provided. Hand -finishing will be permitted on the transition from a crowned section to a superelevated section without crown or curves, and on straight line superelevation sections less than 300 feet in length. Hand -finishing will also be permitted on that portion of a widened pavement outside the normal pavement width, on sections where the pavement width is not uniform, or required monolithic widths are greater than that of available finishing machines. Machine -finishing of pavement shall include the use of power -driven spreaders, power -driven vibrators, power -driven transverse strike -off, and screed, or such alternate equipment as may be substituted and approved by the Engineer. All concrete shall be consolidated by a �^ mechanical vibrator. As soon as the concrete has been spread between the forms, the approved mechanical vibrator shall be operated to consolidate the concrete and remove all voids. Hand -manipulated vibrators shall be used for areas not covered by the mechanical vibratory unit. V-16 The transverse finishing machine shall first be operated to compact and finish the pavement to the required section and grade, without surface voids. The machine shall be operated over each area as many times and at such intervals as directed. At least two trips will be required and the last trip over a given area shall be a continuous run of not less than 40 feet. After completion of finishing with the transverse finishing machine a transverse drag float may be used. The consistency of the concrete as placed should allow the completion of all finishing operations without the addition of water to the surface. When field conditions are such that additional moisture is needed for the final concrete surface finishing operation, the required water shall be applied to the surface by fog spray only and shall be held to a minimum. After finishing is complete and the concrete still workable, the surface shall be tested for trueness with an approved 10-foot steel straightedge. The straightedge shall be operated from the side of the pavement, placed parallel to the pavement centerline and passed across the slab to reveal any high spots or depression. The straightedge shall be advanced along the pavement in successive stages of not more than one-half its length. Practically perfect contact of the straightedge with the surface will be required, and the pavement shall be leveled to this condition, in order to insure conformity with the surface test required below, after the pavement has fully hardened. Any correction of the surface required shall be accomplished by adding concrete if required and by operating the longitudinal float over the area. The surface test with the straightedge shall then be repeated. For one -lane pavement placement and uniform widening, the equipment for machine -finishing of concrete pavement shall be as directed by the Engineer but shall not exceed.the requirements of these specifications. After completion of the straightedge operation, as soon as construction operations permit, texture shall be applied with 1/8-inch wide V-17 Mixes will be -designed and made in sufficient number to represent a'wide range of water -cement ratios. These mixes shall comply with the requirements herein prescribed for workability. From these preliminary tests the water -cement ratio required to produce concrete of the specified strength will be selected by the Engineer. The Contractor may at any time present in writing a suggested mix design and the Engineer will make the tests necessary to determine its acceptability under these specification requirements. For mixing the concrete to be used in making the preliminary test specimens, the Contractor shall furnish and operate the mixer approved for use on this project. A minimum one cubic yard batch shall be mixed or a batch of sufficient size to afford proper mixing, whichever is the greater. In lieu of the above mixer and procedure, the Contractor may furnish a portable mixer of sufficient rated capacity to mix a minimum three -sack batch; in which case, the batch mixed for the preliminary test shall not be less than the rated capacity of the mixer furnished. No additional compensation will be allowed for equipment, materials or labor involved in making preliminary test specimens. After the mix proportions and water -cement ratio required to produce concrete of the specified strength have been determined, placing of the �^ concrete may be started. Type I cement shall have a specified surface area within a range of 1,600 to 1,900 square centimeters per gram. A change in the specific surface of the cement of more than 100 square centimeters per gram may require a new mix r design. U (16) Subgrade and Forms Preparation of subgrade. Rolling and sprinkling shall be performed when and to the extent directed, and the roadbed shall be completed to or above the plane of the typical sections shown on the plans and the lines and grades established by the Engineer. V-20 T and device shown on plans or by approved method and device equivalent thereto. Tightly adhered scale or rust which resists removal by vigorous wire brushing need not be removed except that excessive loss of section to the reinforcement due to rust shall be cause for rejection. Excessive loss of section shall be defined as loss of section to the extent that the reinforcement will no longer meet the physical requirements for the size and grade of steel specified. Where plans require an assembly of parts at pavement joints, the assembly shall be completed, placed at required location and elevation, and all parts rigidly secured in required position by the method and devices shown on plans. Dowel bars shall be accurately installed in joint assemblies in accordance with plans, each parallel to the pavement surface and to the center line of the pavement, and shall be rigidly secured in required position by such means (as shown on plans) that will prevent their displacement during placing and finishing of the concrete. (4) Joints When the placing of concrete is stopped, a bulkhead of sufficient cross sectional area to prevent deflection, accurately notched to receive the load transmission devices or dowels if required,- and shaped accurately to the cross section of the pavement shall be provided and installed as a back_ -up for the joint filler and rigidly secured in required position to permit accurate finishing of the concrete up to the joint. After concrete has been finished to the joint, formation of the joint seal space and finishing of the joint shall be executed. The back-up bulkhead shall remain in place until immediately prior to the time when concrete placing is resumed, when it shall be carefully removed in such manner that no element of the joint assembly will be disturbed. The exposed portion of the joint assembly shall be free of adherent concrete, dirt or other material at the time placing of concrete is resumed. If necessary for proper installation of joint sealer, excessive spalling of the joint groove shall be,repared to --the satisfaction of the Engineer in the manner which he prescribes. Careful workmanship shall be exercised in the construction of all joints to insure that the concrete sections are completely separated by an open joint or by the joint materials and to insure that the joints will be true to the outline indicated. (5) Weakened Plane Joints Weakened plane joints shall consist of transverse contraction joints and longitudinal joints and shall be sawed as specified on the plans or as directed by the Engineer. When the joints are sawed, the saw shall be power driven, shall be manufactured especially for the purpose of sawing concrete, and shall be capable of performing the work. Saw blades shall be designed to make a clean smooth cut having a width and depth of cut as detailed on the plans. Tracks adequately anchored, chalk, string line or other approved methods shall be used to provide true alignment of the joints. The concrete saw shall be maintained in good operating condition and the Contractor shall keep a stand-by power saw on the project at all times when concrete operations are under way. If membrane curing is used, the portion of the seal which has been disturbed by sawing operations shall be restored by the Contractor by spraying the area with additional curing seal. (6) Contraction Joints Transverse contraction joints shall be formed or sawed joints perpendicular to the centerline and surface of the pavement. Where sawed joints are used, contraction joints at approximately 10 to 15-foot intervals shall be sawed as soon as sawing can be accomplished without damage to the pavement and before 12 hours after the concrete has been placed, the exact time to be approved by the Engineer. The remaining contraction joints shall be sawed in a uniform pattern as directed by the Engineer, and they shall be V-2 6 completed before uncontrolled cracking of the pavement takes place. All joints shall be completed before permitting traffic to use the pavement. (7) Longitudinal Joints Longitudinal joints shall be sawed within two days after construction of the pavement. Sawing shall not cause damage to the pavement and the grooves shall be cut with a minimum of spalling. No traffic (including construction traffic) shall be permitted on the pavement until the longitudinal joint is cut. (8) Joint Sealers After the joints in the hardened concrete have been repaired (if necessary) and cleaned to the satisfaction of the Engineer, the joints will be filled with the W.R. Meadows sof-seal or approved equivalent. After the sealant is installed it will effectively seal the joints against water, dirt and stones throughout repeated cycles of expansion and contraction. (9) Asphalt Board Premolded materials, wherever used, shall be anchored to the concrete on one side of the joint by means of copper wire or nails not lighter than No. 12 B&S gage. Such anchorage shall be sufficient to overcome the tendency of the material to fall out of the joint. (10) Spreading and Finishing All concrete pavement shall be consolidated by a mechanical vibrator. As soon as the concrete has been spread between the forms, the approved mechanical vibrator shall be operated to consolidate the concrete and remove all voids. Hand manipulated vibrators shall be used for areas not covered by the mechanical vibratory unit. After finishing is completed and the concrete still workable, the surface shall be tested for trueness with an approved 10-foot steel straightedge. The straightedge shall be operated from the side of the pavement, placed parallel V-27 to the pavement centering and passed across the slab to reveal any high spots or depressions. The straightedge shall be advanced along the pavement in successive stages of not more than one-half its length. Practically perfect contact of the straightedge with the surface will be required, and the pavement shall be leveled to this condition, in order to insure conformity with the surface test required after the .-5 pavement has fully hardened. Any correction of the surface required shall be accomplished by adding concrete if required and by operating the longitudinal float over the area. The surface test with the straightedge shall then be repeated. Extra water will not be added for finishing. After completion of the straightedge operation, the first pass of the burlap drag shall be made as soon as construction operations permit and before the water sheen has disappeared from the surface. This shall be followed by as many passes as required to produce the desired texture depth. There shall be no unnecessary delays between passes. The drag shall be wet during use and maintained clean and free from encrusted mortar. It is the intent that the average texture depth resulting from the number of tests directed by the Engineer be not less N„ than 0.025 inches with a minimum texture depth of 0.020 inches for any one test. Should the texture depth fall below that intended, the finishing procedures shall be revised to produce the desired texture. The Contractor shall have available at all times �^ hand brooms with stiff bristles for the purpose of providing textures when the pavement surface is in such a condition that the burlap drag or other methods being employed will not provide the desired texture. After completion of dragging and about the time "-' the concrete becomes hard; the edge of the slab and joints shall be carefully finished as directed by the Engineer, and the pavement shall ., be left smooth and true to line. V-28 (11) Protection of Pavement and Opening to Traffic The Contractor shall erect and maintain the barricades required by plans and such other standard and approved devices as will exclude public traffic and traffic of his employees and agents from the newly placed pavement for the periods of time and at locations hereinafter prescribed by the Engineer. Portions of the roadway, or crossings of the roadbed required to be maintained open for use by traffic, shall not be obstructed by the above required barricades. The pavement shall be closed to all traffic, including vehicles of the Contractor, until the concrete is at least 7 days old. This period of closure to all traffic may be extended if, in the opinion of the Engineer, weather or other conditions make it advisable to provide an extension of the time of protection. At the end of the 7 day period and as long thereafter as ordered by the Engineer, and if so desired by the Contractor, the pavement may be opened for use by vehicles of the Contractor provided the, gross weight (vehicle plus load) of such vehicles does not exceed 14,000 pounds. Such opening, however shall in no manner relieve the Contractor from his responsibilities for the work. On those sections of the pavement thus opened to traffic, all joints shall first be sealed, the pavement cleaned and earth placed against the pavement edges before permitting vehicles thereon. After the concrete in any section is 14 days old, or as long thereafter as ordered by the Engineer, such section of pavement may be opened to all traffic as required by plans or when so directed by the Engineer. On those sections of the pavement thus opened to traffic, all joints shall first be sealed, the pavement cleaned, earth placed against the pavement edges and all other work performed as required for the safety of traffic. When High Early Strength Concrete, resulting from the use of Type III cement as required by plans or special provisions, is used, the pavement may be opened to all traffic after the concrete is 7 days old, or as long thereafter as V-29 ordered by the Engineer, subject to the same provisions governing the"opening after 14 days as above prescribed. Where the Contractor desires to move any equipment not licensed for operating on public streets, on or across any pavement opened to traffic, he shall protect the pavement from all damage by means of two-ply timber mats of 2 inch stock or runways of heavier material laid on a layer of earth, all as approved by the Engineer. The Engineer may require the opening of pavement to traffic prior to the minimum time specified above under conditions of emergency which in his opinion require such action in the interest of the public. In no case shall the Engineer order opening of the pavement to traffic within less than 72 hours after the last concrete in the section is placed. The Contractor shall remove all obstructing materials, place earth against the pavement edges and perform other work involved in providing for the safety of traffic as required by the Engineer in ordering emergency opening. Orders for emergency opening of the pavement to traffic will be issued by the Engineer in writing. 2. Earth Work A. Subarade Preparation for curb and clutter, streets, paving (asphalt and concrete) alley returns, alley paving, valley gutters, and earth work. Description Sub -grade preparation shall include the removal, haul and disposal of all obstructions, including existing curbs, gutters, paving materials, base materials, concrete slabs and other obstructions shown on the plans or as designated by the Engineer and,all scarifying, pulverizing, wetting, disking, blading and rolling with compactors to a depth of at least 6" on residential streets and to a depth of 12" on major thoroughfares and collector streets. Compactors will be used from the bottom to the finished sub -grade elevation to compact the subgrade to 95% Standard Proctor Density (A.S.T.M. D-698) in conformity to the line, grade and sections as shown on the plans or as established by the Engineer. V-30 After the obstructions have been removed, or in conjunction with such removal, the street bed and/or alley return foundation and/or sidewalk foundation shall be excavated and shaped in conformity with the typical section and to the line and grades as shown on the plans or as established by the Engineer. All unstable or otherwise objectionable material shall be removed from the subgrade and replaced with approved material. The excavation shall be done in such a manner as to require a minimum of fill to bring the subgrade to the correct elevation. When the subgrade is too low as initially excavated, the Contractor shall place additional soil or caliche in layers not exceeding four (411) inches and compact each layer by moistening and rolling. (1) Scraper Work The utilization of a scraper for excavation and shaping of subgrade and base is permitted with exceptions which are determined by depths of utility lines. Unless otherwise specified by the Engineer, the scraper shall not exceed 23 cubic yards capacity as rated loaded flush by the manufacturer. (2) Compaction The subgrade will be wetted and rolled to secure 95% Standard Proctor Density. Before placement of the base and/or curb and gutter and/or concrete valley gutter and/or alley return slab and/or sidewalk, the subgrade will be checked by test rolling six (6) times or more if required by the Engineer with a self-propelled roller weighing not less than 35 tons. Any soft of unstable spots found by test rolling will be corrected by removing the soft or unstable material and replacing it with suitable soil compacted to 95% Proctor Density. The areas so corrected shall be test rolled as specified above. (3) Intersection Special care shall be exercised in grading street intersections where dips are located so that the cross profiles present a smooth riding surface and so that the compacted base thickness will not be less than six (611) or nine (911). Crown section shall begin to decrease 60 feet back of end of radius for residential streets. Wider street dips will be blue topped as shown on the detail sheet. V-31 (4) Prosecution of the Work The Contractor may proceed with subgrade preparation on any schedule he may select except that, unless hindered by factors beyond his control, not more than seven (7) calendar days shall elapse between the time subgrade preparation is begun and the spreading and compacting of the caliche base has started. Measures shall be taken by the contractor not to leave driveways impassable during the night hours. (5) Excess Materials Materials excavated in excess of that needed in fill and backfill behind curb shall be wasted by the Contractor. Care shall be taken by the Contractor to -- use only topsoil in the backfill behind the curbs. The Contractor may dispose of the surplus excavated material in any manner not objectionable to the public, and it is his responsibility to locate a suitable site for dumping the waste excavation. In any event, the Contractor shall not dispose of the surplus materials in any of the lake areas either outside or within the city limits. Location of disposal sites near any lake area must be approved by the Engineer. (6) Subgrade for Alley Paving The preparation of the subgrade for concrete alley paving shall be done in the same manner as other subgrade excavation which requires scarifying, wetting, disking, blading, rolling, and compacting. The Contractor will be required to excavate around existing improvements such as gas meter, water meters, poles, etc. Each of these obstructions shall be the responsibility of the Contractor. Trees that conflict ®- with the improvements shall be removed by the Contractor upon approval of the Engineer. The Contractor shall shape to subgrade to the cross- section shown on the plans and to the lines and grades established by the Engineer. After the forms are set and before the reinforcing is placed, the Contractor shall finally shape the subgrade so that there will be a minimum thickness of concrete of five (511) inches at the centerline and seven and one-half inches (7-1/211) at the outside edges. All areas where fill material is required shall be compacted. The subgrade shall be wetted and rolled to secure 90% Proctor Density in the upper six (611) making a firm foundation for the alley paving. V-32 The Contractor will be required to shape the portion of the alley outside of the limits of the concrete slab so that all drainage in the alley will be to the invert of the concrete slab. Excess excavated materials shall be hauled to any approved location. B. Embankment Description Prior to placing any embankment, all "Preparing Right -Of - Way" and/or "Clearing and Grubbing" operations shall have been completed on the excavation sources and areas over which the embankment is to be placed. Stump holes or other small excavations in the limits of the embankment shall be backfilled with suitable material and thoroughly tamped by approved methods before commencing embankment construction. The surface of the ground, including plowed loosened ground, or surface roughened by small washes or otherwise, shall be restored to approximately its original slope by blading or other methods and where indicated on plans or required by the Engineer, the ground surface thus prepared shall be compacted by sprinkling and rolling. Where embankments are to be placed adjacent to or over existing roadbeds, the roadbeds slopes shall be plowed or scarified to a depth of not less than six (611) inches and the embankment built up in successive layers, as hereinafter specified, to the level of the old roadbed before its height is increased. Then, if directed, the top of the roadbed shall be scarified and recompacted with the next layer of the new embankment. The total depth of the scarified and added material shall not exceed the permissible depth of layer. Trees, stumps, roots, vegetation, or other unsuitable materials shall not be placed in embankment. Except as otherwise required by the plans, all embankment shall be constructed in layers approximately parallel to the finished grade of the roadbed and unless otherwise specified each layer shall be so constructed as to provide a uniform slope of 1/4" inch per foot from the center line of the roadbed to the outside. Embankments shall be constructed to the grade established by the Engineer and completed embankments shall correspond to the general shape of the typical sections shown on the plans and each section of the embankment shall correspond to the detailed section or slopes established by the Engineer. After completion of the roadway, it shall be V-33 continuously maintained to its finished section and grade until the project is accepted. Except as otherwise specified, earth embankments shall be constructed in successive layers for the full width of the individual roadway cross section and in such lengths as are best suited to the sprinkling and compaction methods utilized. Layers of embankment may be formed by utilizing equipment which will spread the material as it is dumped, or they may be formed by being spread by blading or other acceptable methods from piles or windrows dumped from excavating or hauling equipment in such amounts that material is evenly distributed. -- Minor quantities of rock encountered in constructing earth embankment shall be incorporated in the specified embankment layers, or may be placed in accordance with the requirements for the construction of rock embankments in the deeper fills within the limits of haul shown on the plans, provided such placement of rock is not immediately adjacent to structures. Also, rock may be placed in the portions of embankments outside the limits of the completed roadbed width where the size of the rock prohibits their incorporation in the normal embankment layers. Each layer of embankment shall be uniform as to material, density and moisture content before beginning compaction. Where layers of unlike materials abut each other, each layer shall be featheredged for at least 100 feet or the material shall be so mixed as to prevent abrupt changes in the soil. No material placed in the embankment by dumping in a pile or windrow shall be incorporated in a layer in that position, but all such piles or windrows shall be moved.by blading or similar methods. Clods or lumps of material shall be broken and the embankment material mixed by blading, disking, or similar methods to the end that a uniform material or uniform density is secured in each layer. Water required for sprinkling to bring the material to the moisture content necessary for maximum compaction shall be evenly applied and it shall be the responsibility of the Contractor to secure a uniform moisture content throughout the layer by such methods as may be necessary. In order to facilitate uniform wetting of the embankment material, the Contractor shall water at the material source if the sequence and methods used are such as not to cause an undue waste of water. Such procedure shall be subject to the approval of the Engineer. V-34 (1) Compaction The compaction method shall require that each layer shall be compacted to the required density by any method, type, and size of equipment which will give the required compaction. The depth of layers, prior to compaction, shall depend upon the type of sprinkling and compaction equipment used. Prior to and in conjunction with the rolling operation, each layer shall be brought to the moisture content necessary to obtain the required density and shall be kept leveled with suitable equipment to insure uniform compaction over the entire layer. For each layer of earth embankment and select material, it is the intent of this specification to provide the density as required herein, unless otherwise shown on the plans. The required compaction shall be 95% Standard Proctor Density A.S.T.M. D-698. After each section of earth embankment or select material is complete, tests as necessary will be made by the Engineer. If the material fails to meet the density specified, the course shall be reworked as necessary to obtain the specified compaction, and the compaction method may be altered on subsequent work to obtain specified density. Such procedure shall be determined by, and subject to, the approval of the Engineer. At any time, the Engineer may order proof rolling to test the uniformity of compaction of the embankment subgrade. All irregularities, depressions, weak or soft spots which develop shall be corrected immediately by the Contractor. Should the subgrade, due to any reason or cause, lose required stability, density, or finish before the pavement structure is placed, it shall be recompacted and refinished at the sole expense of the Contractor. Excessive loss of moisture in the subgrade shall be prevented by sprinkling, sealing, or covering with a subsequent layer of granular material. Excessive loss of moisture shall be construed to exist when the subgrade soil moisture content is more than 4 percent below the optimum for compaction to Standard Proctor Density. (Also see Section V, Item 2 (A] Compaction.) V-35 At Culverts Embankments adjacent to culverts which cannot be compacted by use of the blading and rolling equipment used in compacting the adjoining sections of embankment shall be compacted in the manner prescribed below. a - The following requirements shall apply to the backfilling of pipe culverts in addition to the pertinent portions of the general requirements given in the preceding section. After the bedding has been prepared and the pipe installed as required by the pertinent specifications, selected materials from excavation or borrow shall be placed along both sides of the pipe equally, in uniform -� layers not to exceed six (611) inches in depth (loose measurement), wetted and thoroughly compacted so that on each side of the pipe there shall be a berm of thoroughly compacted materials at least as wide as the external diameter of the pipe, except insofar as undisturbed material obtrudes into this area. The method and degree of compaction shall be same as specified above. Filling and/or backfilling shall be continued in this -- manner to the elevation of the top of the pipe. Special care shall be taken to secure thorough compaction of the material placed under the haunches of the pipe. All fill or backfill below the top of the pipe shall be compacted mechanically in the same manner and to the density prescribed above, regardless of whether or not such material is placed within the limits of the embankment or roadbed.In the case of embankments, the remainder of the fill above the top of pipe shall be placed in accordance with the provisions for placing roadway embankment as prescribed in the pertinent specification included in the contract. No construction traffic will be permitted to cross any pipe culvert until the specified minimum depth of fill above the pipe has been placed and consolidated in accordance with these provisions. 3. Base Course The base course shall consist of a minimum of six (611) or nine (911) inches of compacted approved caliche, black base or combination of caliche and black base material shaped in accordance with the typical cross -sections provided in the plans and to the grades established by the Engineer. V-36 r A. Hauling and Placing Approved base material shall be hauled in vehicles of uniform capacity to the site and dumped evenly so that an adequate quantity of material will be placed to provide a minimum of six (611) inches of compacted base material on all units except major thoroughfares streets. On these streets the Contractor will construct nine (911) inches of compacted base material. B. Processing Processing of caliche base shall be accomplished in multiple lifts of three (311) inches in compacted depth. Each lift or layer shall be thoroughly moistened and rolled as it is cut from the windrow. After all of the material is cut from the windrow to the sides, it shall be cut back to the center in lifts of three (311) inches and thoroughly moistened and rolled again. Succeeding layers shall then be placed similarly until the caliche base course is completed and 95% Proctor Density has been attained. All nine (911) inch compacted caliche base shall be accomplished in three (311) inch lifts. The caliche course shall then be sprinkled as required and rolled with compactors as directed until a uniform compaction of 95% of "Standard Proctor Density" is secured. Throughout this entire operation, the shape of the course shall be maintained by blading; and the surface upon completion shall be smooth and in conformity with the typical sections shown on plans and to the established lines and grade. Processing of asphaltic base shall be as directed by the Engineer and similar to that described under Hot Mix Asphaltic Concrete Surface. Lift thickness will be indicated by the Engineer or as shown on the paving plans: Electronic screed controls will be required for placing black base on grade. The density required will be determined by the Engineer after material to be used has been approved. All areas and "nests" of segregated coarse or fine material shall be corrected or removed and replaced with well graded material as directed by the Engineer. Each layer of black base will be test rolled six (6) times with a 35 ton roller and approved by the Engineer before succeeding layers are placed. A delay in construction of the next succeeding layer of black base caused by rain, snow, etc. will require re -rolling and approval prior to construction of the next layer. The utilization of the traffic to compact and bind the base is an essential part of the construction, and whenever V-37 possible the base course shall be opened to traffic, and the Contractor shall direct and distribute the traffic uniformly over the entire width of the base course. During the period of at least seven (7) days that traffic is being directed over the base, the caliche base shall be satisfactorily maintained by the use of water trucks, blades, drags and such other equipment as is required. The base course shall be so maintained until the wearing surface is placed thereon. The surface shall not be placed on base course that exceeds optimum moisture by two (2%) per cent. C. Finishing Description The compacted base shall be finished and shaped immediately preceding the application of the surface treatment. All loose or unconsolidated material shall be removed and the surface moistened and rolled with a steel wheel roller. All irregularities, depression or weak spots which develop during compaction shall be corrected by scarifying the areas affected, adding or removing material as required, reshaping and recompacting by sprinkling and rolling. (1) Weak Spots in Base The finished base shall be checked by a minimum of six (6) test rollings with a 35 ton roller. Any weak spots found shall be remedied before the surface is applied. The weak spots may be remedied by reprocessing the area in which the weak spot is found in which case the base will be allowed to cure for 72 hours before the surface �-^ is applied. If the Contractor chooses, he may repair the weak spot by removing the material involved and replacing it with type "C" hot mix or asphalt stabilized base. In this case the surface may be applied as soon as the hot mix patch has been compacted and cooled to ambient temperature. (2) Allowable Deviation in Finish r- Immediately prior to placing of surfacing, the base shall be checked and any deviation in excess of three -eights (318) inch from the established Tirade or true cross section shall be corrected as provided above for defects. Longitudinally a straightedge 10 feet long shall be used to detect any deviation which shall be corrected as defects. V-38 4. HOT MIX ASPHALTIC CONCRETE SURFACE A. Description This item shall consist of 1-1/2" compacted T.H.D. Type "C" hot mix asphaltic concrete surface, using approved crushed stone aggregate, constructed over a compacted base. The base shall be primed and a tack coat applied as required. (1) General (Test Method Tex-207-F) It is the intent of this specification that the material be placed and compacted to a density of 95 to 100 percent of that density developed in the laboratory test method of molding stability specimens with a minimum compacted thickness of one and one half inches (1-1/211). Sufficient density tests will be made in order to determine that the compaction procedure used by the Contractor is adequate and proper to accomplish the intent as stated above. If the mixture produced does not have the specified qualities, it shall be changed until it does. The pavement shall be constructed on the previously completed and approved subgrade, base, existing pavement, bituminous surface or in the case of a bridge, on the prepared floor slab, as herein specified and in accordance with the details shown on the plans. B. Temperature Requirements (The temperature readings to be used will be as reported by the National Weather Service on an hourly report [telephone number - 762-0141.]) (1) HMAC - November 1 until April 1 a. The asphaltic mixture shall not be placed when the air temperature is below 550 degrees F and falling. b. The asphaltic mixture may be placed when the air temperature is above 500 degrees F and rising. (2) HMAC - April 1 till November 1 a. The asphaltic mixture shall not be placed when the air temperature is below 500 degrees F and falling. b. The asphaltic mixture may be placed when the air temperature is above 450 degrees F and rising. V-39 (3) Asphalt Stabilized.Base a.The asphaltic mixture shall not be placed when the air temperature is below 450F and falling. b.The asphaltic mixture may be placed when the air temperature is above 40OF and rising. The Engineer may use his discretion to require a cover over the asphaltic mixture when being hauled from the plant to the job site. If the temperature of a load of asphaltic concrete measured while passing through the lay -down machine is 250F less than the mixing temperature, the load may be rejected by the Engineer and payment will not be made for the rejected material. C. Preparation of Base and Areas Bordering s-, The compacted base upon which the hot mix asphaltic concrete surface is to be placed shall be prepared and cleaned, as required by the Engineer, before the prime coat is applied. D. Prime Coat The prime coat shall consist of an application of .25 gallons per square yard of MC asphalt. E. Tack Coat Before the asphaltic mixture is laid, the surface upon ^�- which the tack coat is to be placed shall be cleaned thoroughly to the satisfaction of the engineer. The surface shall be given a uniform application of tack coat using asphaltic materials of this specification. This tack coat shall be applied, as directed by the engineer, with approved sprayer. Where the mixture will adhere to the surface on which it is to be placed without the use of a tack coat, the tack coat may be eliminated by the Engineer. All contact surfaces of curbs and structures and all joints shall be painted with a thin uniform coat of the asphaltic �- material meeting the requirements for tack coat. The tack coat shall be rolled with a pneumatic tire roller as directed by.the Engineer. F. Transporting Asphaltic Concrete The asphaltic mixture, prepared as specified above shall be hauled to the work site in tight vehicles previously V-40 cleaned of all foreign material. The dispatching of the vehicles shall be arranged so that all material delivered may be placed, and all rolling shall be completed during day -light hours. The inside of the truck body may be given a light coat of oil, lime slurry or other material satisfactory to the Engineer, if necessary, to prevent mixture from adhering to the body. In cool weather or for long hauls, canvas covers and insulating of truck bodies may be required. Vehicles of the semi -trailer type are prohibited. G. Placinct Generally the asphaltic mixture shall be dumped and spread on the approved prepared surface with the specified spreading and finishing machine in such manner that when properly compacted the finished pavement will be smooth, of uniform density and will meet the requirements of the typical cross sections and the surface tests. During the application of asphaltic material, care shall be taken to prevent splattering of adjacent pavement, curb and gutter, and structures. The surface course shall be laid in a compacted layer with a minimum compacted thickness of one and one-half inches (1-1/2"). A level up course, 1/2" or more in thickness, shall require the use of black base or a coarse grade of hot mix approved by the Engineer. It shall be spread and compacted to lines and grades as established by the Engineer. When the asphaltic mixture is placed in a narrow strip along the edge of an existing pavement, or used to level up small areas of an existing pavement or placed in small irregular areas where the use of a finishing machine is not practical, the finishing machine may be eliminated when authorized by the Engineer, provided a satisfactory surface can be obtained by other approved methods. Adjacent to flush curbs, gutters, liners and structures, the surface shall be finished uniformly high so that when compacted it will be slightly above the edge of the curb and flush structure. All joints shall present the same texture density, and smoothness as other sections of the course. The joints between old and new pavements or between successive day's work shall be carefully made to insure a continuous bond between old and new sections of the course. V-41 The transverse edges of .old pavement and, if required by the Engineer, the successive days pavement shall be sawed with an approved concrete saw to expose an even vertical surface for the full thickness of the course. All contact surfaces of previously constructed pavement shall be painted with a thin uniform coat of hot bituminous material before the fresh mixture is placed. H. Compacting As directed by the Engineer, the pavement shall be compacted thoroughly and uniformly to the required density. The specified rollers shall be used, except as provided in paragraph (3) below. Rolling with the three wheel and tandem rollers shall start longitudinally at the sides and proceed toward the center of the pavement, overlapping on successive trips by at least half the width of the rear wheels unless otherwise directed by the Engineer. Alternate trips of the roller shall be slightly different in length. On super -elevated curves, rolling shall begin at the low side and progress toward the high side unless otherwise directed by the Engineer. Rolling with pneumatic roller shall be done as directed by the Engineer. Rolling shall be continued until required compaction is obtained and all roller marks are eliminated. One tandem roller, two pneumatic rollers and at least one three wheel roller, as specified above, shall be provided for each job. Additional rollers shall be provided if needed.The motion of the roller shall be slow enough at all times to avoid displacement of the mixture. If any displacement occurs,it shall be corrected at once by the use of rakes and of fresh mixture where required. The roller shall not be allowed to stand on pavement which has not been fully compacted. To prevent adhesion of the surface to the roller, the wheels shall be kept thoroughly moistened with water, but an excess of water will not be permitted. All rollers must be in good mechanical condition. Necessary precautions shall be taken to prevent the droppings of gasoline, oil, grease or other foreign matter on the pavement, either when the rollers are in operation or when standing. When indicated on the plans or permitted by the Engineer in writing, the pavement may be compacted to the required density by the use of compacting equipment other than that specified herein. Hand tamping. The edges of the pavement along curbs, headers and similar structures, and all places not accessible to the roller, or in such positions as will not V-42 allow thorough compaction with the roller, shall be thoroughly compacted with lightly oiled tamps. Rolling with the trench type roller will be required on widening areas in trenches and other limited areas where satisfactory compaction cannot be obtained with the three wheel and tandem rollers. I. Surface Tests The surface of the pavement, after compaction , shall be smooth and true to the established line, grade and cross section, and when tested with a 10 foot straight edge placed parallel to the centerline of the roadway or tested by other equivalent and acceptable means, except as provided herein, the maximum deviation shall not exceed 1/8 inch in 10 feet, and any point in the surface not meeting this requirement shall be corrected as directed by the Engineer. When placed on existing surfaces, the 1/8 inch deviation in 10 feet requirement may be waived by the Engineer. J. Surface Density Test See Section IV, Item 10-D. Laboratory Control.. K. Equipment Spreading and Finishing Machine. The spreading and finishing machine shall be of a type approved by the Engineer, shall be capable of producing a surface that will meet the requirements of the typical cross section and the surface test, when required, and shall have adequate power to propel the delivery vehicle in a satisfactory manner when the mixture is dumped into the finishing machine. The finishing machine shall be equipped with a flexible spring and/or hydraulic type hitch sufficient in design and capacity to maintain contact between the rear wheels of the hauling equipment and the pusher rollers of the finishing machine while the mixture is being unloaded. The finishing machine shall be operated in a low gear, or as directed by the Engineer, at a speed to produce a surface that will meet the requirements of the typical cross section and surface test. Any vehicle.which the finishing machine cannot push or propel in such a manner as to obtain the desired lines and grade without resorting to hand finishing will not be allowed to dump directly into the finishing machine. Vehicles dumping into the finishing machine shall be mechanically and/or automatically operated in such a manner V-43 that overloading the finishing machine being used cannot occur and the required lines and grade will be obtained without resorting to hand finishing. Dumping of the asphaltic mixture in a windrow and then placing the mixture in the finishing machine with loading equipment will be approved by the Engineer,provided that the loading equipment is constructed and operated in such a manner that substantially all of the mixture deposited on the roadbed is picked up and placed in the finishing machine without contamination by foreign material of the mixture. The loading equipment will be so designed and operated that the finishing machine being loaded will obtain the required line, grade and surface without resorting to hand finishing. Any operation of the loading equipment resulting in the accumulation and subsequent shedding of this accumulated material into the asphaltic mixture will not be permitted. Forms. The use of forms will not be required except where necessary to support the edges of the pavement during rolling. If the pavement will stand rolling without undue movement, binder twine or small rope may be used to align the edges. Motor Grader. The motor grader, if used, shall be self- propelled power motor grader; it shall be equipped with pneumatic tired wheels; shall have a blade length of not less than 12 feet; shall have a wheel base of not less than 16 feet ; and shall be tight and in good operating condition and approved by the Engineer. Pneumatic Tire Rollers. The pneumatic tire roller shall be "- an acceptable self-propelled roller mounted on pneumatic tired wheels, with the weight capable of being varied uniformly from 275 to 550 pounds per inch width of tire tread, so constructed as to be capable of being operated in both a forward and a reverse direction and shall have suitable provision for moistening the surface of the tires while operating. All tires of the same roller shall be smooth tread of equal size and diameter and shall be arranged in such a manner that the gap between the tires of one axle will be covered by the tires of the other. The tire pressure of each tire shall be adjusted as directed by the Engineer and this pressure shall not vary by more than 5 pounds per square inch. Two Axle Tandem Roller. This roller shall be an acceptable power driven tandem roller weighing not less than 8 tons. V-44 r Three Wheel Roller. This roller shall be an acceptable power driven three wheel roller weighing not less than 10 tons. Trench Roller. This roller shall be an acceptable power driven trench roller equipped with sprinkler for keeping the wheels wet and adjustable road wheel so that the roller may be kept level during rolling. The drive shall be not less than 20 inches wide.The roller under working conditions shall produce 325 pounds per linear inch of roller width and be so geared that a speed of 1.8 miles per hour is obtained in low gear. Straightedges and Templates. When directed by the Engineer, the Contractor shall provide acceptable 10 foot straightedges for surface testing. Satisfactory templates shall be provided as required by the Engineer. All equipment shall be maintained in good repair and operating condition and shall be approved by the Engineer. The Contractor shall furnish such suitable machinery, equipment, and construction forces as may be necessary, in the opinion of the Engineer, for the proper prosecution of the work, and failure to do so may cause the Engineer to withhold.all estimates which have or may become due or the Engineer may suspend work until his requests are complied with. L. Opening to Traffic The pavement shall be opened to traffic when directed by the Engineer. All construction traffic allowed on the pavement shall comply with City Ordinance governing traffic on City Streets. If the surface ravels,corrugates or shoves, it will be the contractor's responsibility to correct this condition at his expense. 5. Cleanup Within three days after completion of any Sub -Unit of paving the Contractor shall clean, remove rubbish and temporary structures from the street, restore in an acceptable manner all property, both public and private, which has been damaged during the prosecution of the work, and leave the site of the work in a neat and presentable condition throughout. The cost of the "cleanup" shall be included as a part of the cost of the various items of work involved, and no direct compensation V-45 will be made for this work. This work shall be done before final acceptance of the Sub -Unit will be considered. The cleanup shall include the the area between the curb and be filled with good top soil. -° is higher than the top of the required to cut this area down between the property line and sloping, filling and shaping of property line. This area shall When the ground behind the curb curb, the Contractor will be to provide a smooth, even slope the curb 6. PROTECTION OF EXISTING UTILITIES A. Adjustment of Valves and Manholes The City Forces will place valve boxes and manholes on finished grade after the base has been finished to grade. The Contractor shall allow the City Forces at least 3 days to do this work after finishing the base and before application of asphalt. It shall be the responsibility of the Contractor to notify the Water and Sewer Department 48 hours after curb and gutter has been completed so that the City Forces can properly schedule their work. In all alleys the City Forces will set the valve boxes and manholes to grade after the forms are in place. Any variation in this procedure that causes expense to the City shall have the approval of the Engineer, and such expense shall be borne by the Contractor. B. Installation, Adjustments, and Protection of Utilities and Traffic Installations The plans show only approximate locations of utilities as obtained from the various utility companies and shall not relieve the Contractor from familiarizing himself with all underground utilities. It is not implied that all existing utilities are shown on the plans. The City of Lubbock does not assume any responsibility for any utility lines which are not shown on the plans. The utility companies will attempt to move all utilities ` that can be reasonably removed prior to beginning of construction; however, this does not relieve the Contractor from any damage that he might do to any utility property. -- In case of any damage, the Contractor shall immediately notify the utility company. City Water and Sewer 762-6411,Ext.2595 Lubbock Power and Light 762-6411,Ext.2554 City Traffic Shop V-46 762-6411, Ext.2140,2144 Energas Traffic Shop Southwestern Public Service Southwestern Bell Telephone Cox Cable of Lubbock City Traffic Engineering 741-4200 763-2881 741-6101 793-2222 762-6411,Ext.2132 Sequence: The sequence of utility adjustments has been mutually agreed upon by the utility companies in the City of Lubbock and will attempt to follow the following schedule: Plans for contract project will be delivered to all utility companies two weeks prior to opening bids. As a general rule, these projects will have been staked. The utility companies will relocate all items necessary, locate and flag all meters, valves, manholes, underground cables, etc., prior to the date the Contractor is to begin construction. After the subgrade is completed on alley paving projects, and after the base is completed on all street paving projects, all manholes, valve boxes , etc., will be set to finished grade by the utility companies. The site shall be left in a clean condition. On all projects, including private contracts, the Contractor shall exercise care not to damage any sanitary sewer pipe or manholes, storm sewer pipe or manholes, or telephone cable or manholes, water or gas lines, valve boxes , meter boxes, nor any other pipe or utility. If necessary, the Contractor shall call the department or company concerned and make arrangements for adjusting the manhole, valve box, meter box,or other utility to grade. On all projects for which he is awarded a contract, the Contractor will be responsible during the construction period for any damages to manholes, valve boxes, meter boxes, and other utilities. Should any item be damaged during the process of construction, the Contractor is to notify the affected utility company and the City inspector. The utility company will immediately repair the damaged item. Any bills for damage will be sent through the Department of Engineering. The Department of Engineering will process all bills and fix responsibility for damage and govern the extent of repair. V-47 Private contracts do not have plans, but utility companies will be furnished cut sheets and notified of impending construction by letter. Other items such as adjustments, damages, etc. will be handled the same as for bid let projects. The utility companies will schedule their work with the Contractor. When utility adjustments commence before the contract is awarded, it will be the responsibility of the .- utility company to barricade the project. Unless otherwise agreed upon by the City and the utility companies involved, the sequence of installation of underground utilities shall be as follows: Utility Sequence Sewer First Electric (Primary) Second Electric (Secondary) Third Telephone Fourth (last if no power or T.V.) -- T.V. Cable Fifth Water Sixth Gas Seventh Traffic Engineering Eighth On all projects, including private contracts, the Contractor shall not place curb and gutter or base material at points where underground utilities cross or propose to cross until such utilities have been adjusted or installed. V-48 7. SALVAGING AND REPLACING BASE A. Description "Salvaging and Replacing Base" shall consist of removing the existing base material where shown on plans, such temporary storage as is necessary, and the replacement of this material on the prepared roadbed as herein specified and in conformity with the typical sections shown on plans and to the lines and grades as established by the engineer. B. Construction Methods (1) Salvaging Existing Base The existing base, including any bituminous mat not shown on plans to be salvaged, shall first be cleaned of all dirt or other objectionable material by blading, brooming or other approved methods, then scarified to the width and depth as may be required to provide the estimated amount of salvaged material per station as shown on the plans. Subgrade shall be reworked, if necessary, as directed by the Engineer. Any bituminous mat encountered shall be broken into particles not more than two inches in size, and incorporated uniformly with the existing base. The material thus salvaged shall be placed in stockpiles or windrows until sufficient subgrade has been prepared to receive the salvaged material; then, if the Contractor so elects, the remaining old base material as salvaged may be placed directly upon the prepared subgrade as directed by the Engineer, thus eliminating the necessity of stockpiling. It shall be the responsibility of the Contractor that all the available material shall be salvaged and replaced and shall be kept reasonably free of soil from the subgrade or roadbed during the salvaging and replacing operations. When material is windrowed or stockpiled, it shall be so placed not to interfere with traffic, proper drainage or the general progress of the work. (2) Preparation of Subgrade Preparation of subgrade shall be in accordance with Section V, Item 2 Earth Work of these specifications. (3) Replacement of Salvage Material The salvage material shall be in accordance with Section V, Item 2 Earth Work of these specifications. V-49 8. Salvaging and Stockpiling Base Material A. Description This item shall consist of salvaging base material from places shown on the plans or as directed by the Engineer and of stockpiling that material where shown on the plans or directed by the Engineer. B. Construction Methods Trash, wood brush, stumps and other objectionable material at the storage site shall be removed and disposed of as directed by the Engineer prior to the beginning of work required by this item. The base material, including any asphalt mat, which may not be shown on the plans, shall be cleaned of all dirt or other objectionable material. Asphaltic materials shall be broken into pieces not more than two inches in size and incorporated uniformly with the salvaged base material. Material to be salvaged shall be worked into stockpiles or windows and loaded by approved equipment into approved equipment for hauling to the stockpile site. It shall be the responsibility of the Contractor that all the available material shall be salvaged and kept reasonably free of soil from subgrade or road bed during the salvaging operations. The operation shall be conducted in such manner as not to interfere with traffic, drainage or the general requirements of the work. After the material is deposited in the stockpile area, it shall be worked into a neat compact stockpile. 9. SEALING AND TWO -COURSE SURFACE TREATMENT A. PREPARATION OF SURFACE Before the sealing operation is started the Contractor will be reauired to patch all areas that have failed or raveled as marked by the Engineer. The City of Lubbock Street Department will sweep the streets before the sealing and two -course operation is started. Asphalt shall not be applied when general weather conditions, in the opinion of the Engineer, are not suitable. B. HANDLING AND APPLYING ASPHALT .,, All storage tanks, piping, retorts, booster tanks and distributors used in storing or handling asphalt shall be kept clean and in good operating condition at all times, and they shall be operated in a manner that there will be r" no contamination of the asphalt with foreign material. V-50 Asphalt is not to be heated above 4000 F at any time, and when applied, it shall be at a temperature which will insure a Furol Viscosity of between 50 and 60 at the time of application. The Engineer will select the temperature of application, and the Contractor shall apply the asphalt at a temperature within 15 degrees of the temperature selected. All asphalt material heated above 4000 F will be rejected. Recirculating tank car heating equipment shall be equipped with an approved type recording thermometer. Asphalt shall be applied to the clean surface by an approved type of self propelled hydro -statically controlled pressure distributor so operated as to distribute the material in the quantity specified, evenly and smoothly, under pressure necessary for proper distribution. The Contractor shall provide all of the heating equipment and in the distributor, for determining the rate at which it is applied, and for securing uniformity at the junction of the distributor loads. The beginning and ending of each shot of asphalt shall start and stop on a strip of heavy kraft paper of not less than thirty inches in width. Asphalt for pre -coated seal coat and two -course application shall not be applied unless covering with aggregate is assured within ten (10) minutes. No asphalt shall be applied when wind velocity is 25 M.P.H. or more. Asphalt shall not be applied if the ambient temperature is below 65 F. Any block or blocks that receives a seal coat or two -course asphalt application that exceeds the rate set by the Engineer by .04 or more will not be accepted until the bleeding is stopped. The Contractor will be required at his expense to furnish extra rock and equipment necessary to control this bleeding. After the bleeding is stopped, the City will then assume the maintenance of the block or blocks that were shot heavy. Application of asphalt on street returns shall be accomplished by the distributor bars unless otherwise directed by the Engineer. In areas regarded by the Engineer as inaccessible to the distributor, use of the hand hose will be permitted, as directed by the Engineer. Care shall be taken during application of any asphalt to shield the curb and gutter from asphalt spray. Manholes and valve boxes will be covered before each application of asphalt and immediately uncovered after the application of aggregate and before rolling operations. Successive applications of asphalt shall be made in the same manner after application aggregate. V-51 C. RATE OF APPLICATION OF MATERIALS S.H.D. Gals Spread Grade No. of Asphalt/S.Y. Ratio 1. Seal Coat (Pre -coated crushed stone or pre -coated -- gravel) #4 0.28 1:100 2. Two -Course P.B. Pre -coated crushed stone or pre -coated gravel I" ( a ) Thoroughfares #2 Special 0.30 1:62 #4 0.38 1:90 (b) Collectors ,#2 Special 0.30 1:62 #4 0.38 1:90 D. HANDLING AND APPLYING AGGREGATES Immediately after making the first application of asphalt over the full width of the street, the surface shall be covered with aggregate, spread with an approved type self- propelled aggregate spreader on which the rate of application of rock and the speed of travel may be controlled by the operator. Applications shall be at the rates herein specified or at rates as directed by the Engineer. After the aggregate has been spread, it shall be bladed with an approved blade grader and broomed with a heavy drag broom. If necessary to obtain a uniform distribution of aggregate or to fill low areas, hand spotting and hand brooming of the aggregate shall be required. Care shall be taken in dip sections to maintain "^ an accurate flow line. Considerable hand work may be required at intersections and at joints in order to maintain a uniform distribution of the aggregate, to -• prevent the incorporation of foreign materials such as caliche and dirt, and to construct smooth joints. In any event, care shall be taken to avoid pulling the drag broom over dirt or caliche surfaces or over wasted aggregate at the edges of the area being surfaced. After the first and second application of aggregate on the two -course, it will be thoroughly rolled with pneumatic V-52 rollers, bladed, dragged and all thin spots spotted with extra aggregate, then bullwheeled with an approved three - wheeled roller weighing not less than ten (10) tons. Aggregate on seal coat will be dragged with a drag broom and all thin spots covered with extra aggregate and thoroughly rolled with pneumatic rollers. In all cases, rolling shall be continued until the surface presents a smooth appearance. Gutter edges shall be cleansed of aggregate before such application of asphalt and this aggregate will not be "ridged" along the gutter edge but if placed back on the surface area shall be well scattered. There should be a slight excess of aggregate on the surface after completion of the work specified above. Care shall be taken in loading aggregate from the stockpiles to prevent getting dirt and other foreign matter into aggregates. Loads of aggregate containing dirt will be rejected. E. HANDLING ASPHALT AND AGGREGATE FOR NIGHT WORK Application of asphalt and aggregate at night shall be applied by the same methods as for daylight application except that all equipment that is to be used on the street after shall have sufficient lights in compliance with State vehicle code. Additional lights will be required on the back end of the asphalt distributor, the aggregate spreader and at the aggregate stock pile area. (No night work will be authorized unless approved by the Engineer.) F. REQUIRED ROLLING (1 HOUR PER 1000 S.Y. OF SURFACE SEALED) The completed asphalt surface shall be broomed and rolled with pneumatic rollers immediately after the asphalt is covered with aggregate. The entire surface that is sealed will receive on hour rolling for each 1000 S.Y. the same day that the asphalt is applied no back rolling will be Permitted (unless a rain storm occurs during the day then that surface may be rolled the next day). At least three pneumatic rollers will roll directly behind the aggregate spreader and drag broom, each roller making several complete passes across the entire width of the street, additional pneumatic rollers will follow approximately one block behind the first three rollers of which each additional roller will make several complete passes across V-53 the entire width of the street until one hour of rolling has been obtained for each 1000 S.Y. before moving on to the next block. The City will assume maintenance on these streets the following day after the rolling has been completed. G. PATCHING AHEAD OF SEAL OR TWO -COURSE MAINTENANCE The black base and cement stabilized caliche material to be used in patching ahead of the seal coat or two -course maintenance shall be used at locations as directed by the Engineer. No substitutions shall be permitted without prior approval from the Engineer. The areas to be patched shall r" be only as marked and measured by the Owner's Representative. The area to be patched shall be barricaded at all times during patching operations. However, if the Owner's Representative permits the patched area to be opened to traffic prior to placing the final hot -mix surface, the Contractor shall taper the edges of the patch with mix to minimize any bumps or inconvenience to traffic. (1) PATCHING WITH BLACK BASE Patching shall include removing the existing surfacing, either three (3) or six (6) inches of the existing base (as the Engineer directs), and, if the sub -grade is unstable, it will be removed and replaced with black base. The excavated base will then be replaced with asphalt stabilized base material (either three (3) or six (6) inches), as directed by the Engineer, and compacted to 95% of design density. The surface course, 1 1/2" of Type "C" hot mix, shall then be placed and rolled until the required density is obtained. The edges of the patch shall be vertical and shall be tacked before placing the black base and the 1-1/2 inches of type "C" hot -mix. All hot -mix edges will meet the grade of the existing surface. (2) PATCHING WITH 6" OF THREE SACK CEMENT STABILIZED CALICHE Same as above except six (6) inches of three (3) sack cement stabilized caliche will be used in lieu of six (6) inches of black base. At all times the patching area will be barricaded, if open to traffic before the Type "C" mix is placed, the V-54 edges of the patch will be leveled up with mix to eliminate the bumps. NOTE: Both black base and cement stabililzed caliche are anticipated being used, with locations of each type of material to be directed by the Engineer. (3) PATCHING WITH 1-1/2" OF TYPE "C" HOT -MIX Same as above (patching with black base) except only the existing asphalt surface will be removed. H. CLEANUP Immediately after each application of asphalt, the Contractor shall clean, remove paper, piles of asphalt from manholes and water valves, extra aggregate that is in the gutter, rubbish and temporary structures from the street, restore in an acceptable manner all property, both public and private, which has been damaged during the prosecution of the work, and leave the site of the work in a neat and presentable condition throughout, The cost of the "cleanup" shall be included as part of the cost of the various items of work involved, and no direct compensation will be made for this work. This work shall be done before final acceptance. I. "Reinforced Earth" Panel The repair is to take place on the southeast side of the Quirt Avenue overpass located at E. 34th St. and Quirt Avenue. A representative of Reinforced Earth shall be present when the actual repair procedure is carried out. The repair procedure shall follow recommendations of the Reinforced Earth Company, as outlined in "Replacement of Concrete Facing Panels on a Reinforced Earth Structure" (February, 1989 bulletin). V-55 SITE WORK MEASUREMENT AND PAYMENT -• GENERAL The unit price bid on each item, as stated in the proposals, shall include furnishing all labor, superintendence, machinery, equipment and materials, except materials specifically specified to be furnished by the Owner, necessary or incidental to complete the various items of work in accordance with the plans and specifications. Cost of work or materials shown on the plans or called for in the specifications and on which no separate payment is made shall be included in the bid prices on the various pay items. 1 2 AND 3 ASPHALT APPLIED FOR SEALING AND TWO -COURSE PURPOSES shall be paid for actual gallons used in the City's Maintenance Program —This unit price shall be full compensation for furnishing, sweeping and applying asphalt as described in Section IV and all manipulations, labor, tools equipment and incidentals to complete the work herein specified. 4 and 5 AGGREGATE FOR SEAL COAT AND TWO -COURSE (P.B. GRADE #2 SPECIAL AND #4 PRE -COATED CRUSHED STONE OR CRUSHED GRAVEL) Payment of this unit price bid shall be made for actual yardage used in the process of sealing, and two -course. All pre -coated gravel or pre -coated crushed stone shall have a -" maximum of twenty percent (15%) loss when tested by the (4) four cycle magnesium sulfate soundness test A.S.T.M. of the particles retained on the No. 4 sieve with more than one :-- crushed face, as determined by Test Method Tex. 413-A. This payment being full compensation for furnishing and placing all materials including spreading, brooming and rolling with pneumatic roller and all necessary clean-up labor, tools, equipment and incidentals necessary for the completion of work as herein specified. 6. PATCHING WITH 3 INCHES OF BLACK BASE Measurements shall be made of the actual area patched, and shall be paid for at the unit price bid per square yard of patching. This unit price shall be full compensation for removal of asphalt, caliche base and any subgrade that is soft or unstable and including tack coat, 3" of black base and 1-1/2" of type "C" Hot -Mix including removal, haul and disposal of materials excavated, hauling, rolling, tamping and placing 1-1/2" of Hot -Mix surface and all manipulations, labor, tools, equipment, traffic provisions, barricades, flagmen and other incidentals necessary to complete the work as herein specified. 1 7. PATCHING WITH 6 INCHES OF BLACK BASE Measurements shall be made of the actual area patched, and shall be paid for at the unit price bid per square yard of patching. This unit price shall be full compensation for removal of asphalt, caliche base and any subgrade that is soft or unstable and including tack coat, 6" of black base and 1-1/2" of type "C" Hot -Mix including removal, haul and disposal of materials excavated, hauling, rolling, tamping and placing 1-1/2" of Hot -Mix surface and all manipulations, labor, tools, equipment, traffic provisions, barricades, flagmen and other incidentals necessary to complete the work as herein specified. 8. PATCHING WITH 6" INCHES OF 3 SACK CEMENT STABILIZED CALICHE Measurement shall be made of the actual area patched, and shall be paid for at the unit price bid per cubic yard of three sack cement stabilized caliche. This unit price shall be full compensation for removal of asphalt, caliche base and any sub -grade that is soft or unstable and including tack coat, six (611) inches three (3) sack cement stabilized caliche and 1-1/2" of Type "C" Hot -Mix, including removal, haul disposal of materials excavated, hauling, placing, rolling, tamping and placing 1-1/2" of hot -mix surface and all manipulations, labor, tools, equipment, traffic provisions, barricades, flagmen and other incidentals necessary to complete the work as herein specified. 9. PATCHING WITH 1-1/2 INCHES OF HOT -MIX Measurement shall be made of the actual area and shall be paid for at the unit price bid per square yard. This unit price shall be full compensation for removal and disposal of the existing surfaces (asphalt), all sawing, brooming, blading, wetting, and rolling, loading, hauling and wasting all excess excavated material, removing and disposing of all obstructions noted on the plans or as become necessary, prime coat and tack coat, and for the furnishing and placing one and one-half inches (1-1/211) of Type "C" hot -mix, including freight, preparing, hauling and placing all materials, and all manipulations, labor, tools, equipment, and incidentals necessary to complete the work as herein specified. 10. CURB AND GUTTER Measurements shall be made of the actual linear feet removed and replaced, and shall be paid for at the unit price per linear foot. This unit price shall be full compensation for removal and disposal of the existing curb 2 and gutter, for preparation of the subgrade, and for construction of the new 30" curb and gutter; including all manipulations, labor, tools, equipment, hauling, placing all materials, expansion joint material, curing compound, concrete additives, and incidentals necessary to complete the work as herein specified. 11. VALLEY GUTTER Measurements shall be made of the actual area removed and replaced, and shall be paid for at the unit price per square yard. This unit price shall be full compensation for removal and disposal of existing materials, preparation of the subgrade, and for construction of the new reinforced 8" valley gutter; including all manipulations, labor, tools, equipment, hauling, placing all materials, joint material, curing compound, concrete additives, reinforcing materials, and incidentals necessary to complete the work as herein specified. 12. "REINFORCED EARTH" REPAIR PANEL Payment will be on lump sum basis for the repair procedure of the damaged panel on the Quirt Avenue overpass. This unit price shall be full compensation for furnishing and placing the repair panel; including all manipulations, labor, tools, equipment, providing all materials and incidentals necessary to complete the work as herein specified. All expenses related to the necessity of the "Reinforced Earth" representative being present while the repair procedure is carried out shall be the resonsibility of the contractor. 3 (THIS PAGE LEFT BLANK INTENTIONALLY) Prior to stockpiling of aggregates the area shall be cleaned of trash, weeds and grass and be relatively smooth. Aggregates shall be separated into stockpiles of different gradation, such as a large coarse aggregate and a small coarse aggregate stockpile and such that the grading requirements of the specified type will be met `^ when the piles are combined in the asphaltic mixture. No coarse aggregate stockpile shall contain more than 10 percent by weight of materials that will pass a No. 10 .., sieve except as noted on the plans or provided for by special provision. Fine aggregate stockpiles may contain small coarse aggregate in the amount of up to 15 percent by weight, 100 percent of which shall pass a 1/4 inch sieve, however, the coarse aggregate shall meet the quality tests specified herein for "Coarse Aggregates." Suitable equipment of acceptable size r-- shall be furnished by the Contractor to work the stockpiles and prevent segregation of the aggregates. If the Contractor utilizes an asphalt continuous mix plant, the various aggregate stockpiles of different gradation will be stockpiled in the same manner as described for stockpiling of aggregate for asphalt stabilized base. That is the stockpiling of the aggregate shall be made up of layers of material not to exceed two feet in height of each layer. The edge of each succeeding layer shall extend inward so as not to overlap the edge of the layer below. In loading from the stockpile, the material shall be loaded by making successive vertical cuts through the entire depth of the stockpile. (1) Coarse Aggregate The coarse aggregate shall be that part of the aggregate retained on a No. 10 sieve; shall consist of clean, tough, durable fragments of crushed stone of uniform quality throughout; mixing or combining crushed gravel and crushed stone will not be permitted. The aggregate shall be crushed to the extent that produces a minimum of 90% crushed faces when tested in accordance with Test Method (Tex.-413-A). The aggregate shall have a maximum of 15% loss when subjected to 4 cycles of the Magnesium Sulfate Soundness Test (A.S.T.M. C-88-83). When coarse aggregate is tested in accordance with Test Method Tex.-217-F, the amount of organic matter, clays, loams or particles coated therewith or other undesirable materials shown on the plans shall not exceed 2 percent. IV-28 when it is specified that the coarse aggregate be sampled during delivery to the plant, from the stockpile, or from the cold bin, the material removed when tested in accordance with test method Tex.-217-F (Part II, Decantation), shall not exceed 2 percent. The plasticity index of that part of the fine aggregate contained in the coarse aggregate passing the No. 40 sieve shall not be more than 6 when tested by the Test Method Tex.-106-E. However, where the coarse aggregate contains less than 5% of fine aggregate and the fine aggregate is of the same or similar material as the coarse aggregate, the P.I. requirements for the material passing the No. 40 sieve may be waived by the Engineer in writing. when it is specified that the coarse aggregate be sampled from the hot bins and tested in accordance with Test Method Tex.-217-F (Part II Decantation), the amount of material removed shall not exceed 1 percent. Tests performed as specified herein represent material processed or placed until a subsequent test is performed. The coarse aggregate shall have an abrasion of not more than 40 percent loss by weight when subjected to the Los Angeles Abrasion Test, Test Method Tex-410A. Coarse aggregate from each source shall meet the abrasion requirements specified. (2) Fine Aggregate The fine aggregate shall be that part of the aggregate passing the No. 10 sieve and shall consist of sand or screenings or a combination of sand and screenings. The plasticity index of that part of the sand passing the No.40 sieve shall not be more than 6 when tested by Test Method Tex-106-E. The plasticity index of that part of the screenings passing the No. 40 sieve shall be not more than 9, unless otherwise shown on plans, when tested by Test Method Tex-106-E. Fine aggregate from each source shall meet plasticity requirements. Sand shall be composed of durable stone particles free from injurious foreign matter. Screenings shall be of the same or similar material as specified for coarse aggregate. (3) Mineral Filler IV-29 The mineral filler shall consist of thoroughly dry stone dust, slate, dust, portland cement or other mineral dust approved by the Engineer. The mineral filler shall be free from foreign and other injurious matter. When tested by Test Method Tex-200-F (Dry Sieve �.. Analysis), it shall meet the following grading requirements: Passing a No. 30 sieve Per Cent By Weight 100 Passing a No. 80 sieve, not less than 90 Passing a No. 200 sieve, not less than 65 (B) ASPHALTIC MATERIAL (1) Asphalt for Paving Mixtures Asphalt for the paving mixtures shall be of the types of oil asphalt as determined by the Engineer. The grade of asphalt used shall be as designated by the Engineer after design tests have been made using the mineral aggregates that are to be used in the project. If more than one type of asphaltic concrete mixture is specified for the project, only one grade of asphalt will be required for all types of mixtures, unless otherwise shown on plans. The Contractor shall notify the Engineer of the source of his asphaltic material prior to production of the asphaltic mixture and this source shall not be changed during the course of the project except on written permission of the Engineer. (2) Tack Coat '^ The asphaltic material for tack coat shall meet the requirements for Cut -Back Asphalt RC-2, or shall be a Cut -Back Asphalt made by combining 50 to 70 percent by volume of the asphaltic material as specified for the type of paving mixture with 30 to 50 percent by volume of gasoline and/or kerosene. If RC-2 Cut -Back Asphalt is used, it may, upon instructions from the Engineer, be diluted by addition of an approved grade of gasoline and/or kerosene, not to exceed 15 percent by volume. IV-30 (C) PAVING MIXTURES Types The paving mixture shall consist of a uniform mixture of coarse aggregate, fine aggregate and asphaltic material. The grading of each constituent of the mineral aggregate shall be such as to produce, when properly proportioned, a mixture which, when tested in accordance with Test Method Tex-200-F (Dry Sieve Analysis), will conform to the limitations for master grading given below for the type specified. (1) Type "C" (Coarse Graded Surface Course) Passing 7/8" sieve ............................ 100 Passing 5/8" sieve......... ............98 to 100 Passing 5/8" sieve, retained on 3/8" sieve....................................12 to 25 Passing 3/8" sieve, retained on No. 4 sieve....................................15 to 30 Passing No. 4 sieve, retained on No. 10 sieve .................................... 12 to 30 Total retained on No.10 sieve.....................................53 to 65 Passing No. 10 sieve, retained on No. 40 sieve .................................... 10 to 20 Passing No. 40 sieve, retained on No. 80 sieve ..................................... 5 to 15 Passing No. 80 sieve, retained on No. 200 sieve......................................5 to 15 Passing No. 200 sieve ..................... .1 to 6 (2) Modified Type "C" (Coarse Graded Surface Course) The Engineer may designate the use of a modified Type "C" Surface Course. This design will stay in the limits of the above Type "C" but may vary from the upper limits of certain sieve designations to the lower limits of other sieve designations. (D) LABORATORY CONTROL IV-31 If the Contractor or supplier wish to use a material or location not previously approved by the City of Lubbock, he will be required to request approval in writing of the material not less than 60 days prior to anticipated use of the material. The City of Lubbock laboratory test results shall be the sole consideration for approval of materials, mix designs, adequacy of procedures, etc.. The results of such testing shall be evaluated and final approval given by the Street Superintendent. s-. The City of Lubbock will utilize its own testing laboratory to monitor the plant mixing for Black Base and Hot Mix. This laboratory control will be provided by the City of Lubbock. A representative of the City Engineer will be at the plant with full authority to control the mixing operation. In those instances where irregularities occur and the limits of the specification are exceeded for aggregate, ,.. black base, or hot mix, appropriate corrections will be required. (E) Tolerances The Engineer will designate the exact grading of the aggregate and asphalt content to be used in the mixture. The paving mixture produced shall not vary from the designated grading and asphalt content by more than the tolerances allowed herein and shall remain within the limitation of the master grading specified. The respective tolerances, based on the percent by weight of the mixture, are listed as follows: Per Cent by Weight Passing 5/8" sieve, retained on 3/8" sieve ........................ .+ or -3 Passing 3/8" sieve, retained on No. 4 sieve ............................... .......+ or -3 Passing No. 4 sieve, retained on No. 10 sieve .......................................+ or -3 Total retained on No. 10 sieve .............. ......................+ or -3 Passing No. 10 sieve, retained on No. 40 sieve .......................................+ or -2 IV-32 Passing No. 40 sieve, retained on No. 80 sieve... ..................................+ or -2 Passing No. 80 sieve, retained on No. 200 sieve .......................................+ or -2 Passing No. 200 sieve .......................................+ or -2 Asphalt Material ..........................+ or -0.2 (F) EXTRACTION AND GRADATION TESTS Samples of the mixture when tested in accordance with Test Method Tex-210-F shall not vary from the grading proportions of the aggregate and the asphalt content designated by the Engineer by more than the respective tolerance specified above. (See Section IV-7-C (1) for methods of extraction of asphalt) During construction, if grading or asphalt content exceeds the tolerances stated herein, production will be discontinued until such time as the Hot -Mix Asphaltic Concrete mixture has been corrected and subsequent grading and extraction tests indicate results within the tolerance stated herein. All Hot Mix Asphaltic Concrete mixture so constructed, which exceeds the tolerances as stated herein will be removed and replaced at no cost to the Owner. (1) Sampling and Testing It is the intent of this specification that the mixture will be designed to produce a mixture of optimum density and stability, as determined by the Engineer, when tested in accordance with these specifications and applicable ASTM procedures. Samples of the completed pavement shall be removed from locations designated by the Engineer to enable him to determine the composition, compaction, and density to the pavement. Samples for each day, or fraction thereof, shall be taken by City personnel. The Contractor shall replace the pavement removed from core holes at no cost to the City. If the pavement is deficient in composition, compaction, or thickness, satisfactory correction shall be made, as directed by the Engineer. IV-33 r- Thoroughfare Residential Traffic Traffic (2) Design Method Min. Max. Mina Max. Marshall No. of compaction blows, each end of specimen 75 50 Stability, Lbs. 1200 --- 1000 --- Flow, units of 0.01 in 8 16 8 18 % Air Voids Surfacing or Leveling 3 5 3 5 Stability and density tests are control tests. if the laboratory stability and/or density of the mixture produced has a value lower than that specified, and in the opinion of the Engineer is not due to change in source or quality of materials, production may proceed, and the mix shall be changed until the laboratory stability and density equals or exceeds the specified values. If there is, in the opinion of the Engineer, an apparent change in any material from that used in the design mixtures, production will be discontinued until a new design mixture is determined by r- trial mixes. 11. SILO STORAGE A silo storage system may be used during the normal day's operation. The mixture coming out of the silo storage must be of equal quality and temperature to that coming out of the mixing plant. Any operation that has tendency to segregate the mixture or fails to maintain a thorough and uniform mixture and temperature shall not be used. If any load of mixture coming out of the silo storage system fails to meet the asphalt specifications or gradation requirements, then the total contents of the silo storage system shall be condemned. 12. BARRICADES AND SIGNS Barricades shall be constructed of clean, sound lumber, shall be of first-class workmanship, and all surfaces above ground shall be painted with an approved brand of white paint to secure thorough coverage and a uniform white color. In no case shall less than two coats be used. The paint for barricade stripes shall be reflective orange and reflective white. All dimension striping, lighting, painting, coloring IV-34 and placement of barricades shall be in accordance to the details and design as set forth in the Texas Manual on UNIFORM TRAFFIC CONTROL DEVICES for Street and Highways, Part VI, issued in May, 1983. The Contractor shall maintain each barricade in a neat acceptable condition and furnish replacements when necessary or requested by the Engineer. Each sign shall be displayed only for the specific purpose prescribed for it. Before any detour or temporary route is open to traffic all necessary Regulatory, Warning and Guide signs shall be in place. Signs required by temporary conditions or restrictions shall be removed immediately when those conditions cease to exist or the restrictions are withdrawn. Guide signs directing traffic to and on temporary routes or detours shall be removed when no longer applicable. Important is standardization with respect to design and placement, and uniformity of application is equally important. Identical conditions should always be marked with the same type of sign, irrespective of where those particular conditions occur. All signs that are to convey their message during hours of darkness shall be reflectorized or illuminated. Signs for daytime use only may be non-reflectorized but a fluorescent background material will be used for increased daytime visibility if requested by the Engineer. Where there is serious interference from extraneous light sources, and a reflectorized sign is not likely to be effective, an illuminated sign will be used. Construction warning signs shall have a black legend on an orange background and shall conform to the standards as to size, shape and color as outlined in the Texas Manual on UNIFORM TRAFFIC CONTROL DEVICES mentioned above. Barricades, flares, and signs are a necessity in the construction involved in this contract. The provision of these items by the Contractor should be considered in the bid prices submitted, as no separate compensation will be made, unless indicated otherwise in the plans or the proposal. No work will be permitted on any project prior to installation of barricades or other warning devices at the beginning and end of the construction area. IV-35 13. SEAL COAT AND TWO -COURSE MAINTENANCE ►.. A. GENERAL The following paragraphs give the specifications on -^ the various materials which are to be used in seal coat and two -course maintenance projects. All materials shall be subject to the approval of the Engineer before being used. B. ASPHALTS Asphalts for use on this project shall comply with Texas State Highway Department Specifications, Item 300 including revisions, and a certified copy of the test results will be furnished to the City C. ASPHALT HEATERS Asphaltic material heating equipment shall be adequate to heat the amount of asphaltic material required to the desired temperature. Asphaltic material may be heated by steam coils which shall be absolutely tight. Direct fire heating of asphaltic materials will be permitted, provided the heater used is manufactured by a reputable concern and there is positive circulation of the asphalt throughout the heater. Agitation with steam or air will not be permitted. The heating apparatus shall be equipped with a recording thermometer with a 24-hour chart that will record the temperature of the asphaltic material where it is the highest temperature. D. AGGREGATE FOR SEAL AND TWO -COURSE PURPOSES All gravel or pre -coated gravel or pre -coated crushed stone shall have a maximum of fifteen percent (15%) loss when tested by the four (4) cycle magnesium sulfate soundness test A.S.T.M. C-88-76. Pre -coated or crushed gravel shall have a minimum of 90 percent of the particles retained on the No. 4 sieve with more than one crushed face, as determined by Test Method Tex-413-A (particle count) and T.H.D. 302.2. The percent of flat or elonged slivers of stone or gravel for any course, shall not exceed 25%, when tested in accordance with Test Method Tex 224-F. Final acceptance of the aggregate shall be made only after the material is in stockpile in the City of Lubbock. '- IV-36 The City of Lubbock laboratory test results shall be the sole consideration for approval of materials, mix designs, adequacy of procedures, etc.. The results of such testing shall be evaluated and final approval given by the Street Superintendent. SEAL COAT Aggregate grading (S.H.D. P.B. #4 Pre -Coated Crushed Gravel, Pre -Coated Crushed Stone). Percent by Weight Retained on 5/8" sieve ...................0 - 0 Retained on 1/2" sieve ...................0 - 5 Retained on 3/8" sieve ..................20 - 45 Retained on #4 sieve....................85 - 100 Retained on #10 sieve...................95 - 100 Aggregate Grading (S.H.D. P.B. #2 Special Pre -Coated Crushed Gravel, Pre -Coated Crushed Stone). Percent by Weight Retained on 7/8" sieve...................0 - 3 Retained on 3/411 sieve...................6 - 9 Retained on 5/8" sieve..................45 - 80 Retained on 1/2" sieve..................80 - 100 Retained on #10 sieve...................98 - 100 TWO -COURSE Aggregate Grading (S.H.D. P.B. Gr. #2 Special Pre Coated Crushed Gravel, Pre -Coated Crushed Stone). Aggregate Grading (S.H.D. P.B. Gr. #4 Pre -Coated Crushed Gravel, Crushed Stone). STOCKPILES The location of all stockpiles of aggregate shall be approved by the Engineer prior to unloading as to zoning requirements, smoothness and compaction of the ground, and traffic conditions. Stockpiles of aggregate to be incorporated into the project shall be protected from dust by drift fences of any suitable material approved by the Engineer, when sandstorms possibilities exist. Care will be taken to prevent dusty conditions in the stockpiles area from any sources. IV-37 0- E. REPAIR OF EXISTING "REINFORCED EARTH" PANEL "Reinforced Earth" is a construction material formed by the association of cohesionless soil and metallic reinforcements which together form an integral structure. The repair is to take place on the southeast side of the Quirt Avenue overpass, located at E. 34th Street and Quirt Avenue. NOTE: Prior to any repair or replacement of Reinforced Earth facing panels, contact: The Reinforced Earth Company 1909 Central Drive, Suite 200 Bedford, Texas 76021 The Reinforced Earth Company is the only source for all required materials for panel replacement as well as on site construction assistance. A representative of Reinforced Earth shall be present when the actual repair procedure is carried out. IV-38 Details of Construction 1. Concrete A. Curb and Gutter (Class A -Concrete) Description This item shall consist of Portland Cement 30" concrete curb and gutter, 24" concrete curb and gutter, 30" separate gutter, or 24" separate gutter, as shown on the plans or as directed by the Engineer, and shall be constructed of Class A concrete. Included in the curb and gutter item is the subgrade preparation and the filling and shaping of the area behind the curb. (1) Curb Openings Separate gutter sections will be placed only across alleys and driveways presently in use or where definitely planned for future property improvements. It shall be the responsibility of the contractor to contact the property owner and determine the proper location of driveways before curb and gutter is constructed. All gutters across new or proposed driveways must meet the requirements set forth in the City Sidewalk and Driveway Regulations, Ordinance Number 1466 and amendments thereto and gutters across existing driveways will be required to conform to said regulations if no hardship to the existing property improvements is involved. In any event, all curb and gutter to be poured must have the engineer's approval as to driveway widths and location, in addition to the section, and line and grade approval before any pour is started on any curb and gutter unit. (2) Excavation and Subgrading (See Section V-2) Excavation for the curb and gutter shall be made with the excavation of the entire street. The excavation shall be done to the lines and grades set by the engineer and in such a manner as to require a maximum 1/2" (inch) of fill to bring the subgrade to the correct elevation. Subgrade that is undercut 1" (one inch) or more shall be brought to the correct elevation by scarifying, wetting, disking, blading, rolling and compacting to 95% Standard Proctor Density (A.S.T.M. D- 698) with pneumatic rolling to correct elevation prior to setting forms. Before completion of curb and gutter, all traffic signs and street name markers found in the way of paving will immediately be relocated behind the proposed curb and gutter by the Contractor. V-1 (3) Setting Forms Forms for concrete and gutter shall be set to the lines and grades established by the engineer after the subgrade has been prepared. The forms shall be held together and in place in such a manner that they will ►- not move during the placing and working of the concrete. The forms shall be cleaned and oiled prior to pouring concrete. Face forms and construction joints (removable metal plates) shall be set to hold the concrete for the curb in place until it is to be finished. Forms for radii shall be set in the same manner as the straight forms except that no face form will be required if a true section is obtained by other methods. The radii forms shall be set in such a manner that the curve will be true. (4) Placement (Including Making Joints) Sufficient concrete shall be placed to allow for shrinkage and extra material for finishing, and the �^ concrete shall be floated and troweled to the approximate section, and only after the concrete receives a partial set shall the face forms be removed. <.� The section shall then be shaped to the true cross- section by the use of a metal -screed which is shaped to the true cross-section. "^ A "mule" screed shall be used only to shape to true cross-section when topping material is provided and pushed along on the front edge of the mule. Curb and gutter shall be constructed with an expansion Joint at the tangent point of each return at intersections and at intervals of no more than forty (40) feet between the intersections. Forty feet intervals may be waived if curb and gutter machine is used. Expansion joints shall be of the material hereinbefore specified. Construction joints formed by removable metal plates (templates) accurately shaped to the cross-section of the curb and gutter shall be located at the mid -point of each section between expansion joints or as directed by the engineer. Contraction joints shall be placed at ten foot intervals. All joints shall be perpendicular to the surface of the concrete and to the axis of the section. V-2 (5) Finishing A ten (10) foot metal "straight -edge" shall be used to strike the flow line to grade, continuously along the flow line of the gutter. This operation shall be followed with a four (4) foot spirit level to assure the continuous grade down the flow -line the length of the gutter. Curb and gutter shall be finished uniformly by wood trowelling to an accurate cross-section. Extra water will not be added for finishing. The final finish will be accomplished with a brush, the last stroke being one from the back of curb to the lip of gutter. Both sides of all joints, the lip of gutter, and the back edge of the curb shall be finished with a 1/4" radius edging tool before the final brushing. Curves at the top and bottom of the section shall present a uniform appearance without "waves" in the face of the curb or "pockets" in the gutter. Concrete shall not be poured during sand storms. Concrete shall be protected to maintain temperature of not less than 50 degrees F. for five days after placement. If aggregate and water are heated, they shall not be heated above 90 degrees F. Concrete shall not be placed when the ambient temperature is less than 40 degrees F. It shall be the responsibility of the Contractor to anticipate as nearly as possible changes in weather conditions which would affect the placement and protection of the concrete, and be prepared to protect freshly placed concrete when sudden changes in the weather make such protection necessary. (6) Removing Forms Special care is required of the Contractor in his removing of pins and of forms. Pins shall be pulled from the ground to free forms. If hammering is found to be necessary, a light, one (1) pound hammer shall be used. The contractor shall not place forms or pins on newly finished concrete. Loading and unloading of forms from a truck shall be executed by two workmen. It is the duty of the Contractor to remove any warped forms found in any section of forms, before it is poured. When forms are pointed out as defective, those forms shall then be removed from the job site and not returned until they have been inspected by the Engineer. V-3 r-• (7) Machine Laid Curb and Gutter Class A concrete shall be used for machine laid curb and gutter. The slump of the concrete shall be as directed by the Engineer. Reinforcing steel, if required, shall conform to Section 3 under Materials of "^ Construction. The curb and gutter shall be laid by an extrusion machine approved by the Engineer. Immediately prior to placing the curb and gutter, the previously approved foundation shall be thoroughly cleaned. '-` The line for top of curb shall be maintained from a guideline set by the Contractor from survey marks established by the Engineer. Curb outline shall strictly conform to the details shown on the plans. The approved mix shall be fed into the machine in such a manner and at such consistency that the finished curb will present a well compacted mass with a surface free from voids and honeycombs and true to established shape, line, and grade. Additional surface finishing shall be performed immediately after extrusion. Extra water will not be added for finishing. Unless otherwise specified by the Engineer, joints shall be constructed as follows: Expansion joints shall be located at each end radius at intersections and alley returns and at the beginning of the pour, and dummy grooved joints shall be spaced at 10 foot intervals between the expansion joints. (8) Curing All concrete work shall be covered with heavy water- proof type paper to prevent loss of moisture and to prevent direct sunlight from striking the concrete, as soon as it has set sufficiently enough to prevent marking. In lieu of this method of curing, the curb and gutter may be cured by applying a liquid membrane coating to all exposed surfaces, provided such material and method is first approved by the Engineer. (9) Filling Behind Curb After the forms are removed and the concrete has cured, the contractor shall fill the area behind the curb with top soil. The area between the sidewalk and the curb or r V-4 property line and curb, if no sidewalk exists, shall be leveled and sloped toward the curb in a manner satisfactory to the property owner and/or Engineer. Fill should be done prior to dumping caliche. (10) Replacement of Damaged Curb and Gutter or Gutter No patching of any nature shall be allowed in repairing any damage to curb and gutter which occurs during the construction process of paving improvements in any unit prior to the acceptance of said unit. Where damage occurs, the section of curb and gutter or gutter containing the damaged portion shall be removed to the nearest joints and shall be replaced with new construction, prior to surfacing of that section of street. Concrete surface finish marred by vandals, rain or sand during setting time shall be immediately repaired with an approved epoxy material; all abused concrete surface, along with structural damage and defective flow line found at time of surfacing shall be handled as described in sentence 2 above. B. Reinforced Concrete 30" Separate Gutter (Class E Concrete) Description This item shall consist of Portland cement 30" separate gutter constructed in accordance with the typical curb and gutter sections included in these specifications and at locations as shown on the plans or as directed by the Engineer. (1) Subgrade Preparation (See Section V-2) (2) Reinforcing Steel - See Section 3 Under Materials of Construction (3) Placement of Reinforcement Care shall be taken to tie the (3) three horizontal # 3 bars to the (3) three vertical # 3 bar pins at a point 3" above the bottom. C. Reinforced CONCRETE VALLEY GUTTERS (CLASS C and Class E Concrete) Description V-5 This item shall be constructed of class C concrete for thoroughfare or collector street valley gutters and Class E concrete for residential street valley gutters and consists of the construction of an eight (8) inch concrete slab on thoroughfare or collector streets or a (6) inch concrete slab on residential streets reinforced with 4-Number 3 bars on one and one-half (1-1/2) foot spacing for 5 foot wide valley gutters,(Cross bars shall be #3 bars 4-1/2 feet long) or with 61Ix6" 6 gauge wire mesh. Fillet areas shall be reinforced as shown on the plans and constructed to the lines and grades as shown on the plans and as designated by the Engineer. Details of construction are the same as for curb and gutter where they can be directly applied. (1) Subgrade Preparation (See Section V-2) (2) Reinforcing Steel - See Section 3 under Materials of Construction. (3) Placement of Reinforcement Care shall be taken to hold the steel in the center of the slab, high chairs or precast concrete blocks shall be located at three (3) foot centers. Lapping distance shall be 40 diameters, and the lap shall be tied at three points with wire if steel bars are used. D. Reinforced Alley Paving Slab and Alley Returns (Class E Concrete) Description This item shall consist of reinforced concrete paving of variable thickness (5" to 7-1/211) constructed in the center 10 feet of alleys and shall be constructed of Class E concrete. All alley paving and alley returns shall be constructed in accordance to the Alley Paving Details. (1) Forming Forms for alley slab shall be placed where necessary to form the outside edge of slab (where slab is not bordered by concrete curb and gutter or other permanent improvements such as building, docks, etc.)and where necessary to form construction and expansion joints (See "Alley Paving Details" on plans). On all edges, V-6 joints, etc. to be formed, the forms shall extend the entire depth of concrete. (2) Subgrade Preparation (See Section V-2) ( 3 ) Reinforcing Care shall be taken to securely hold the welded wire mesh 3" above the bottom of the slab by use of high chairs or pre -cast concrete blocks. Concrete shall not be poured during sandstorms. Concrete shall be protected to maintain temperature of not less than 50 degrees F. for five (5) days after placement. If aggregate and water are heated, they shall not be heated above 90 degrees F. Concrete shall not placed when the ambient temperature is less than 40 degrees F. It shall be the responsibility of the Contractor to anticipate as nearly as possible changes in weather conditions which could effect the placement and protection of the concrete, and to be prepared to protect freshly placed concrete when sudden changes in the weather make such protection necessary. (4) Finishing Concrete shall be deposited so as to conform roughly to the finished cross-section. Sufficient concrete shall be placed to allow for shrinkage and extra material for finishing. Extra water will not be added for finishing. The shape and flow line of the alley paving slab may be established by the use of two (211) inch by four (411) inch wood screeds, or other approved removable devices, accurately staked to line and grade. If such devices are used they shall be in place before the final finishing of the subgrade and the subgrade shall be finished so that the concrete slab will be of the proper depth. The concrete shall be "struck off" to the true section and finished smooth by floating and troweling. The final finish shall be provided by brushing to provide a nonskid surface for traffic. Particular care shall be taken in the final troweling and finishing so that the finished slab presents a smooth straight surface without waves in the edge and without pockets in the flow line. V-7 (5) Curing and Protection All concrete work shall be covered with burlap or other suitable material as soon as it has set sufficiently to prevent marking and kept wet continuously for at least (4) days. Care shall be taken to prevent mechanical injury to concrete work during this period and until the work is accepted. Any work damaged prior to acceptance shall be repaired by the Contractor at his own expense and to the satisfaction of the City Engineer. The Citv Sanitation Department shall be notified of all alley return and alley uavinq construction, and if possible, the length of time said return and/or alley shall be closed to traffic. The Contractor shall properly flare and barricade alley returns and alleys during the period of construction and as long afterward as the Engineer may require for curing and achieving strength. Before opening alley returns to traffic, the contractor shall properly fill and level by hand, (no maintainer shall be used until full strength of concrete is achieved), the adjacent approaches from the street and alley. In all cases, no alley or alley return shall be opened to traffic without the approval of the City Engineer. (6) Removing Forms Special care is required of the Contractor in his removing of pins and moving of forms. Pins shall be pulled from the ground to free forms. If hammering is found to be necessary a light, one (1) pound hammer shall be used. The contractor shall not place forms or pins on newly finished concrete. Loading and unloading of forms from a truck shall be executed by two `-" workmen. It is the duty of the Contractor to remove any warped forms found in any section of forms, before it is poured. When forms are -- pointed out as defective, those forms shall then be removed from the job site and not returned until they have been inspected by the Engineer. (7) Replacement of Damaged Concrete or Concrete Surface V-8 Only patching of very minor nature will be allowed in alley paving. Any substantial damage occurring to the alley paving prior to the acceptance of the unit in which the damage occurs will be remedied by removal and replacement of the entire section or sections of alley paving that has been damaged. Any slab removed to a joint other than a doweled expansion joint will be replaced using joint section B-B in the Special Detail Sheets of these specifications. Extreme care shall be taken by the Contractor during "Setting -Up" period to prevent vandals, sand or rain from marring the surface finish to avoid being handled as described in sentence 2, above. E. Reinforced Concrete Median Curb (Class A Concrete) This item shall consist of reinforced concrete slab (611) inches thick and may be placed on asphalt surface on caliche base, or on asphalt surface on concrete base. Median slab shall be doweled as shown on the plans. Details of concrete placement, finishing, and curing shall be used where applicable. (1) Subgrade Preparation (See Section V-2) F. Reinforced Concrete Railroad Crossing (Class F Concrete) Description This item shall consist of the construction of Class F reinforced concrete as shown on Concrete Railroad Crossing Details. (File #2-B-92 [2]). (1) Subgrade Preparation (See Section V-2) (2) Reinforcing Steel Bars to be Used) Reinforcing steel to be used on this project shall conform to A.S.T.M. Designation A-432 and shall be deformed to A.S.T.M. 305 requirements. (3) Placement of Reinforement Care shall be taken to hold the (1/211) bars above the bottom of the foundation slab and above the railroad ties as shown on the plans. V-9 In the top slab the vertical and horizontal bars shall be securely tied with wire. �. G. Reinforcing Concrete Drainage Slabs (Class A Concrete) �-- This item shall consist of a concrete slab (511) thick and containing wire mesh reinforcing which shall conform to "Standard Specification for Welded Steel Wire Fabric For Concrete Reinforcement" ASTM Designation A-185. A transverse dummy groove contraction joint, as described in illustration 2-A-101, will be required every (13) feet. (1) Subgrade Preparation (See Section V-2) H. Concrete Pavement - Class C concrete Description This item shall consist of a pavement of portland cement concrete, with reinforcement as shown on plans, constructed as herein specified on the prepared subgrade and one inch of sand cushion or other base course in conformity with the thickness and typical cross sections shown on plans and to the lines and grades established by the Engineer. Concrete shall be considered of satisfactory quality provided it is made (a) of materials accepted for the job, (b) in the proportions established by the Engineer and (c) Mixed, placed, finished and cured �^ in accordance with the requirements herein specified. Materials (1) Cement The cement shall be Type I or Type III standard brand of Portland cement. If the use of high early strength cement is not specified, and the Contractor desires to use it, he shall obtain written permission of the Engineer and shall assume all additional costs incurred by the use of such cement. Type I and Type III cement shall conform to the requirements of ASTM Designation: C150. When Type III cement is used, the average strength at the age of 7 days shall be higher than that attained at 3 days. Either the tensile V-10 or the compression tests may be used for either type cement. In addition to the requirements of ASTM Designation C150, the specific surface area of Type I cement shall not exceed 2,000 square centimeters per gram as measured by the Wagner Turbidmeter in accordance with Test Method Tex- 310-D. (2) Admixtures Unless otherwise provided in the plans or special provisions, approved types of admixtures to minimize segregation, to improve workability, or to reduce the amount of mixing water may be used in the rate of dosage specified by the Engineer. Admixtures shall not be used to replace cement. Admixtures shall comply with all the requirements and be measured and dispensed in accordance with T.H.D. Item 437, "Concrete Admixtures". (3) Coarse Aggregate. Coarse aggregate shall consist of durable particles of crushed limestone (Brownwood Type) of reasonably uniform quality throughout, free from injurious amounts of salt, alkali, vegetable matter or other objectionable material, either free or as an adherent coating on the aggregate. It shall not contain more than 0.25 percent by weight of clay lumps, nor more than 1.0 percent by weight of shale nor more than 5.0 percent by weight of laminated and/or friable particles when tested in accordance with Test Method Tex-413-A. Coarse aggregate shall have a wear of not more than 45 percent when tested according to Test Method Tex-410-A and when tested by standard laboratory methods shall meet the following grading requirements: Retained on 1-3/4" sieve......................0% Retained on 1-1/2" sieve................0 to 5 % Retained on 3/4" sieve.................30 to 65% Retained on 3/8" sieve.................70 to 90% Retained on No. 4 sieve...............95 to 100% V-11 P- Loss by Decantation Test Method Tex-406-A ...1.0% Maximum All aggregate shall be handled and stored in such a manner as to prevent size segregation and contamination by foreign substances. When segregation is apparent, the aggregate shall be remixed. At the time of its use, the aggregate shall be free from frozen material. Aggregate that contains more than 0.5 percent free moisture by weight shall be stockpiled for at least 24 hours prior to use. r` Adequate storage facilities shall be provided for all approved materials. The intermixing of nonapproved materials with approved materials either in stockpiles or in bins will not be permitted. Aggregates from different sources shall be stored in different stockpiles unless otherwise approved by the Engineer. Aggregates shall be stockpiled in such a manner to prevent segregation, and maintained as nearly as possible in a uniform condition of moisture. Each aggregate stockpile shall be reworked with -- suitable equipment as required by the Engineer to remix the material to provide uniformity of the stockpile. (4) Fine Aggregate. Fine aggregate shall consist of sand or a combination of sands, and shall be composed of clean, hard, durable,uncoated grains. Unless otherwise shown on plans, the acid insoluble residue of the fine aggregate shall be not less than 28 percent by weight when tested in accordance with Test Method Tex-612-J. ~' (5) Fine Aggregate Exclusive of Mineral Filler Fine aggregate shall be free from injurious ^^ amounts of salt, alkali or vegetable matter. It shall not contain more than 0.5 percent by weight of clay lumps. When subjected to the ., color test for organic impurities, Test Method Tex-408-A, the fine aggregate shall not show a color darker than the standard. V-12 Unless specified otherwise, fine aggregate shall meet the following grading requirements: Retained on 3/8" sieve.....................0% Retained on No.4 sieve.. .... o ... ......0 to 5% Retained on No. 8 sieve..............0 to 20% Retained on No. 16 sieve............15 to 30% Retained on No. 30 sieve.. ... ..... ..35 to 75% Retained on No. 50 sieve........ ... o70 to 90% Retained on No. 100 sieve.. ... ..... 90 to 100% Retained on No. 200 sieve .... ..... .97 to 100% Fine aggregate will be subjected to the Sand Equivalent Test (Test Method Tex-203-F). The sand equivalent value shall not be less than 80, or less than the value shown on the plans, whichever is greater. (6) Mineral Filler Mineral filler shall consist of clean stone dust, crushed sand, crushed shell or other approved inert material. When tested in accordance with Test Method Tex-401-A, it shall meet the following requirements: Retained on No. 30 sieve.....................0% Retained on No. 200 sieve...............0 to 35% At the time of its use the mineral filler shall be free from frozen material, and aggregate containing foreign material will be rejected. (7) Mixing Water Water for use in concrete and for curing shall be free from oil acids, organic matter or other deleterious substances and shall not contain more than 1,000 parts per million of chlorides as CL. nor more than 1,000 parts per million of sulfates as SO4. V-13 Water from municipal supplies approved by the State Health Department will not require testing, but water from other sources will be sampled and tested before use. Test procedure shall be in accordance with AASHO Designation: T 26. (8) Steel Dowel Bars Steel bar dowels, if used in accordance with provisions of project plans, shall be of the size and type indicated on plans and shall be open-hearth, basic oxygen or electric -furnace steel conforming to the mechanical properties specified for grade 60 in ASTM Designation: •-^ A615. The free end of dowel bars shall be smooth and free of shearing burrs. r- (9) Steel Reinforcement Unless otherwise shown on the plans, steel reinforcing bars as required including the tie bars shall be open-hearth, basic oxygen or electric -furnace new billet steel of Grade 60 or Grade 40 for concrete reinforcement. Bars that require bending shall be Grade 40 conforming to requirements of ASTM Designation: A-615. High yield reinforcing steel shall be either (1) open-hearth, basic oxygen or electric -furnace new billet steel conforming to the requirements of ASTM Designation: A-615 Grade 60 or (2) rail steel bars for concrete reinforcement, conforming to the requirements of ASTM Designation: A-616 Grade 60. (Bars produced by piling method will not be accepted). Where prefabricated wire mats are specified or permitted, the wire shall be cold worked steel wire conforming to the requirements of ASTM Designation: A 496, except that steel shall be made by open-hearth, electric -furnace, or basic oxygen processes. The prefabricated wire mats shall conform to the requirements of ASTM Designation: A 497. Mats that have been bent or wires dislocated or parted during shipping or project handling shall be realigned to within one-half inch of the original horizontal plane of the mat. Mats with any portion of the wires out of vertical alignment more than one-half V-14 inch after realignment and/or wires dislocated or mutilated so that, in the opinion of the Engineer, they do not represent the original mat, shall be rejected. The mats may be clamped or wired so that the mats will retain the horizontal and vertical alignment as specified by the plans or as approved by the Engineer. Deformed wire may be used for tie bars and load transfer bars that require bending. When fabricated steel bar or rod mats are specified, the mats shall meet the requirements of ASTM Designation: A-184. (10) Mechanical Vibratory Equipment All concrete placed for pavement shall be consolidated by approved mechanical vibrators designed to vibrate the concrete internally. The internal type will be used for full -depth placement. Vibratory members shall extend across the pavement practically to, but shall not come in contact with,the side forms. Mechanically operated vibrators shall be operated in such a manner as to not interfere with the transverse or longitudinal joints. Separate vibratory units shall be operated at sufficiently close intervals to provide uniform vibration and consolidation to the entire width of the pavement. The frequency in air of the internal spud type vibratory units shall be not less than 8,000 cycles per minute and not less than 5,000 cycles per minute for tube types and the method of operation shall be as directed by the Engineer. The Contractor shall have a satisfactory tachometer available for checking the vibratory elements. The pavement vibrators shall not be used to level or spread the concrete but shall be used only for purposes of consolidation. The vibrators will not be operated where the surface of the concrete, as spread, is below the elevation of the finished surface of the pavement, except for the first lift of concrete where the double strike off method of placement is employed, and the vibrators shall not be operated for more than 15 seconds while the machine upon which they are installed is standing still. V-15 B. Bar Reinforcing Reinforcing steel to be used on this project shall conform to A.S.T.M. Designation A-432 and shall be deformed to A.S.T.M. 305 requirements unless otherwise shown on the plans. C. Fiber Reinforcing (1) The fiber used shall be 100 percent virgin polypropylene collated, fibrillated fibers specifically manufactured for use as concrete reinforcement, containing no reprocessed olefin materials. (2) The physical characteristics of the fiber to be used is as follows: Specific Gravity -0.91; Tensile Strength - 70 to 110 ksi; Length of fibers - 1/211. (3) Fibrous concrete reinforcement materials provided by this section shall produce concrete conforming to the requirements for each type and class of concrete listed in Section IV-2-E. Quantities to be used shall conform to manufacturer's recommendations, unless otherwise directed by the Engineer. 4. JOINT MATERIAL A. Expansion Joint Materials Bituminous premolded expansion joint material shall conform to Item No. 420.2 (a) of the Texas State Highway Department Specifications. ,.-. Expansion joints shall be placed as shown on the plans or as directed by the Engineer. B. Joint Sealing Material Joint sealing material shall be W.R. Meadows sof-seal.or approved equivalent 5. FORMS Forms for curb and gutter and alley paving may be of wood or metal, of a section satisfactory to the Engineer, straight, free of warp, and a depth equal to the depth of the concrete ` section formed. Forms shall be constructed accurately to the IV-6 line and grade as established in the field, shall be adequately braced so that they will not move during the placing of the concrete, and shall remain in place at least twelve (12) hours after placing concrete. Forms shall be oiled with a light oil before each use and forms which are to be re -used shall be cleaned immediately after each use and maintained in good condition. Curb forms shall be such that the face of the curb can be formed by use of a face form held in place by steel templates. Forms used for curb shall meet all of the above specifications, except that face forms on curb radii may be omitted if a true section and an accurate flow can be obtained by other methods approved by the Engineer. In no case will a concrete pour be started without the approval of the Engineer. No forms shall be placed until the subgrade is within inch (111) of its finished grade. Forms for alley slabs may be used as a guide for screeding. Where longitudinal construction joints are required, the form shall be so constructed as to provide a 1-1/8 inch "V" shaped groove in the face. 6. FLEXIBLE BASE (CALICHE) A. Description "Flexible Base (Caliche)" shall consist of a foundation course for surface course or for other base courses. It shall be composed of caliche and stone materials and shall be constructed as herein specified in one or more courses in conformity with the typical sections shown on plans and to the lines and grades as established by the Engineer. B. Material (1) The material for the base course shall consist of argillaceous limestone, calcareous or calcareous clay particles, conglomerate, gravel, sand or other granular materials. The material source shall be approved by the Engineer. All the acceptable material shall be crushed and returned to the screened material again in such manner that a uniform product will be produced. Samples for testing the material shall be taken prior to the compaction operations. (2) The material will conform to the requirements: Sieve Size 2" 1-1/2" 7/8" 1/2" #4 #40 ------------------------------------------------------- % retained 0 0-5 8-30 30-55 50-70 70-90 Material passing the No. 40 sieve shall be know as "Soil Binder" and shall meet the following requirements IV-7 when prepared in accordance with Test Method Tex 101-E procedure: Liquid Limit - 45 maximum; plasticity Index - 15 maximum, 3 minimum; and, Linear Shrinkage - 10 maximum (3) Wet Ball Mill Test of Flexible Base Material The material, when tested in accordance with Texas Method 116-E, shall have a maximum allowable value of 55. 7. ASPHALT STABILIZED BASE -PLANT MIX (THD Item 292) A. Description ^s This item shall consist of base courses to be composed of a compacted mixture of graded gravel base material from sources approved by the Engineer, (Once the source is .,, selected the contractor will not change to another source without the Engineer's approval) and asphaltic material, mixed hot in an approved mixing plant. The percent asphalt shall be determined by the Engineer in accordance with Test Method Tex 126-E and Tex 204-F or other established procedures. B. Materials (1) Mineral Aggregate (Graded Gravel) The material shall be crushed and shall be screened as necessary to meet the requirements hereinafter specified and shall consist of durable aggregate particles otherwise specified below. (2) Stockpiling. Storage, Proportioning and Mixing Stockpiling of Aggregates. Prior to the mixing operations with asphaltic material, processed mineral aggregate shall be stockpiled on an area previously cleared of trash, weeds and grass and smoothed as directed by the Engineer. The aggregate stockpiles shall be not less than 10 feet in height and constructed in layers not exceeding 18 inches in depth or as directed by the Engineer. The plant shall have and maintain at least a two day supply of aggregate on hand unless otherwise directed by the Engineer. Material shall be stockpiled in such a manner as to prevent segregation of aggregate and mixing of aggregate from stockpiles and/or other sources. The gradation requirements for the individual stockpiles IV-8 and proportioning from these stockpiles will be the contractor's responsibility. (3) Gradation Unless otherwise specified, the grading of the mineral aggregate shall conform to the limitations as shown below: This mixture shall meet the T.H.D. 1982 Specification Item (292) Grade 4 -- Grading requirements percent retained -sieves 1-1 2" 7 8" 1 L2" #4 #40 0 8-30 30-55 50-70 70-90 Material passing the No. 40 sieve shall be known as "Soil Binder" and shall meet the following requirements when prepared in accordance with the Test Methods Tex -101-E procedure: The liquid limit shall not exceed................45 The plasticity index shall not exceed ............ 15 The linear shrinkage shall not exceed ............ 05 Samples for testing the material shall be taken prior to the mixing operations. Where more than one material is used, tests will be on the combined materials. The mineral aggregate shall not contain more than 0.5% moisture prior to entering the pugmill for mixing with asphalt. C. Asphaltic Materials Asphalt for the paving mixture shall be of the type as determined by the Engineer and shall meet the requirements of Item 300, THD Specs, 1982 "Asphalt, Oils, and Emulsions." The grade of asphalt used shall be designated by the Engineer. The contractor shall notify the Engineer of the source of his asphaltic material prior to design or production of the asphaltic mixture and this source shall not be changed during the course of the project, except when authorized by the Engineer. (1) Asphaltic Stabilized Mixture The mixture shall consist of a uniform mixture of mineral aggregate and asphaltic material. The mineral aggregate will conform to the gradation requirements IV-9 specified. The asphaltic material shall form from 4 to 9% percent of the mixture by weight. The design percent asphalt shall be determined in accordance with Test Method Tex.-126-E or Test Method Tex.-204-F and procedures outlined in the SDHPT Bulletin C-14. The percent of asphalt in the mix shall be determined by v Extraction ASTM D-2172, ASTM D-4125 Method of Test for asphalt content by Nuclear Method, Test Method Tex-210 -F or Test Method Tex.-126-F. P_ (2) Tack Coat Asphaltic materials shall meet the requirements of the Item, "Asphalts, Oils, and Emulsions THD Item 30011, as approved by the Engineer. (3) Tolerances The Engineer will designate the asphalt content to be used in the mixture after design tests have been made with the aggregate to be used in the project. When tested as determined by the Engineer, samples of the mixture shall not vary from the asphalt content designated by the Engineer by more than 0.2 percent dry weight (based on total mixture). Asphaltic concrete pavement and asphaltic stabilized base shall be machine layed and the equipment shall meet the requirements of THD 1982 specifications Item 528. Automatic screed controls for concrete spreading and finishing machines. "" 8. EQUIPMENT - MIXING PLANTS BLACK BASE AND HOT -MIX All equipment for the handling of all materials and mixing and .-. placing of the mixture shall be maintained in good repair and operating condition and subject to approval of the Engineer. Any equipment found to be defective and affecting the quality of the mixture will be replaced. Mixing plants may be the weigh -batch type or the continuous mixing type or the drum mix type. All types of plants shall be ^ equipped with satisfactory conveyors, power units, aggregate handling equipment, bins and dust collectors and shall consist of the following essential pieces of equipment. When requested by the Engineer, weigh -batch and continuous types of mixing plants shall be equipped with automatic proportioning devices in accordance with the Item, "Weighing and Measuring Equipment." If automatic recording devices are IV-10 required by the plans, they shall be in accordance with the THD Item, "Weighing and Measuring Equipment." A. Weigh -Batch Type (1) Cold Aggregate Bin and Proportioning Device The number of compartments in the cold aggregate bin shall be equal to or greater than the number of stockpiles of individual materials to be used. The bin shall be of sufficient size to share the amount of aggregate required to keep the plant in continuous operation and of proper design to prevent overflow of material from one compartment to another. The proportioning device shall be such as will provide a uniform and continuous flow of aggregate in the desired proportioning in a separate compartment. ( 2 ) Dryer The dryer shall be the type that continually agitates the aggregate during heating and in which the temperature can be so controlled that the aggregate will not be injured in the necessary drying and heating operations required to obtain a mixture of the specified temperature. The burner, or combination of burners, and type of fuel used shall be such that in the process of heating the aggregate to the desired or specified temperature, no residue from the fuel shall adhere to the heated aggregate. A recording thermometer shall be provided which will record the temperature of the aggregate prior to the mixing operation. The dryer shall be of sufficient size to keep the plant in continuous operation. (3) Screening and Proportioning The screening capacity and size of the hot aggregate bins shall be sufficient to screen and store the amount of aggregate required to properly operate the plant and to keep the plant in continuous operation at full capacity. The hot bins shall be constructed so that oversize and overload material will be discarded through overflow chutes. Provisions shall be made to enable inspection forces to have easy and safe access to the proper location on the mixing plant where representative samples may be taken from the hot bins for testing. The plant shall be equipped with at least three hot bins. The aggregate shall be separated into IV-11 r., the number of bins indicated on the plans or as directed by the Engineer. (4) Aggregate Weigh Box and Batching Scales The aggregate weigh box and batching scales shall be of sufficient capacity to hold and weigh a complete batch of aggregate. The weigh box and scales shall conform to the requirements of T.H.D. Item 520,1982, "Weighing and Measuring Equipment." (5) Asphaltic Material Bucket and Scales The asphaltic material bucket and scales shall be of sufficient capacity to hold and weigh the necessary asphaltic material for one batch. If the material is measured by weight, the bucket and scales shall conform to the requirements of the Item, "Weighing and Measuring Equipment." If a pressure type flow meter is used to measure the asphaltic material, the requirements of T.H.D. Item 520, 1982, "Weighing and Measuring Equipment," shall apply . ( 6 ) Mixer The mixer shall be of the pug mill type and shall have a capacity of not less than 3,000 pounds (of natural aggregate mixture)in a single batch, unless otherwise shown on the plans. The number and position of blades shall provide a uniform mix. The mixer shall be equipped with an approved spray bar that will distribute the asphaltic material quickly and uniformly throughout the mixer. Any mixer that segregates the mineral aggregate or fails to secure a thorough and uniform mixture with asphaltic material shall not be used. This shall be determined by mixing the standard -� batch for the required time, then dumping the mixture, taking samples from its different parts and testing by Test Method Tex-210-F to show that the batch is uniform throughout. All mixers shall be provided with an automatic time lock that will lock the discharge doors of the mixer for the required mixing period. The dump door or doors and the shaft seals of the mixer shall be tight enough to prevent spilling of aggregate or mixture from the mixer. (7) Surge -Storage System A surge -storage system may be used. It shall be adequate to minimize production interruptions during the normal day's operation. A device such as a gob IV-12 hopper or other similar devices approved by the Engineer to prevent segregation in the surge -storage bin will be required. If the Contractor elects to use a surge -storage system, scales conforming to the requirements outlined herein will be required. (8) Scales Scales may be standard platform truck scales or other equipment such as weigh hopper (suspended) scales approved by the Engineer. All scales shall conform to the item, "Weighing and Measuring Equipment". If trucks scales are used, they shall be placed at a location approved by the Engineer. If other weighing equipment is used, the Engineer may require weight checks by truck scales for the basis of approval of the equipment. B. Continuous Mixing Type (1) Cold Aggregate Bin and Proportioning Device Same as for weigh -batch type of plant. ( 2 ) Dryer Same as for weigh -batch type of plant. (3) Screening and Proportioning Same as for weigh -batch type of plant. (4) Hot Aggregate Bin The hot bins shall be so constructed that oversize and overload material will be discarded through an overflow chute. Hot aggregate bins that become deficient in material shall activate a switch that automatically stops the plant until proper adjustments are made. (5) Hot Aggregate Proportioning Device The hot aggregate proportioning device designed that when properly operated, continuous flow of aggregate into the maintained. (6) Asphaltic Material Spray Bar shall be so a uniform and mixer will be IV-13 The asphaltic material spray bar shall be so designed that the asphalt will spray uniformly and continuously into the mixer. (7) Asphaltic Material Meter �-^ An asphaltic material recording meter meeting the requirements of the Item, "Weighing and Measuring Equipment", shall be placed in the asphalt line leading to the spray bar so that the cumulative amount of asphalt used can be accurately determined. Provisions of a permanent nature shall be made for checking the accuracy of the meter output. The asphalt meter and line to the meter shall be protected with a jacket of hot oil or other approved means to maintain the temperature of ^� the line and meter at or near that temperature specified for the asphaltic material. Unless otherwise shown on the plans, the temperature of the asphaltic material entering the recording meter shall be maintained at ± 10 F of the temperature at which the asphalt metering pump was calibrated and set. Inability to maintain this tolerance in temperature shall result in an adjustment of the pay quantity for the asphaltic material. If a pressure type flow meter is used to measure the asphaltic material, the requirements of the Item, "Weighing and Measuring Equipment", shall apply. (8) Mixer The mixer shall be of the pug mill continuous type and shall have a capacity of not less than 40 tons of mixture per hour. Any mixer that has a tendency to segregate the aggregate or fails to secure a thorough and uniform mixing of the aggregate with the asphaltic material shall not be used. The dam gate at the discharge end of the pug mixer and/or pitch of the mixing paddles shall be so adjusted to maintain a level of mixture in the pug mixer between the shaft and the lower paddle tip (except at the discharge end). (9) Surge -Storage System A surge storage system may be used. It shall be adequate to minimize production interruption during the normal day's operation. A device such as a gob hopper or other similar devices approved by the IV-14 Engineer to prevent segregation in the surge -storage bin will be required. If the Contractor elects to use a surge -storage system, scales conforming to the requirements outlined herein will be required. (10) Scales Scales may be standard platform truck scales or other equipment such as weigh hopper (suspended) scales approved by the Engineer. All scales shall conform to the Item "Weighing and Measuring Equipment." If truck scales are used, they shall be placed at a location approved by the Engineer. If other weighing equipment is used, the Engineer may require weight checks by truck scales for the basis of approval of the equipment. C. DRUM MIX PLANT Unless otherwise shown on the plans, the Contractor may, at his option elect to use the drum mixing process in the mixing of asphalt stabilized base material. The plant shall be adequately designed and constructed for the process of mixing aggregates and asphalt in the dryer -drum without preheating the aggregates. The plant shall be equipped with satisfactory conveyors, power units, aggregate handling equipment and feed controls and shall consist of the following essential pieces of equipment. (1) Cold Aggregate Bin and Feed System The number of compartments in the cold aggregate bin shall be equal to or greater than the number of stockpiles of individual materials to be used. The bin shall be of sufficient size to store the amount of aggregate required to keep the plant in continuous operation and of proper design to prevent overflow of material of one bin to that of another bin. The feed system shall provide a uniform and continuous flow of aggregate in the desired proportion to the dryer. Each aggregate shall be proportioned in a separate compartment with total and proportional control. The system shall provide positive weight measurement of the combined cold -aggregate feed by use of belt scales or other approved devices. Provisions of a permanent nature shall be made for checking the accuracy of the measuring device as required by the Item, "Weighing and Measuring Equipment". When a belt scale is used, IV-15 mixture production shall be maintained so that the scale normally operates between 50 percent and 100 percent of its rated capacity. Belt scale operation below 50 percent of the rated capacity may be allowed by the Engineer if accuracy checks show the scale to meet the requirements of the Item, "Weighing and Measuring Equipment", at the selected rate and it can be satisfactory demonstrated to the Engineer that mixture uniformity and quality have not been adversely 1_ affected. (2) Scalping Screen A scalping screen shall be required, unless otherwise shown on the plans, and shall be located ahead of any weighing device. (3) Asphaltic Material Measuring System An asphaltic material measuring device meeting the requirements of the item, "Weighing andmeasuring Equipment," shall be placed in the asphalt line leading to the dryer -drum mixer so that the cumulative amount of asphalt used can be accurately determined. Provisions of a permanent nature shall be made for checking the accuracy of the 'measuring device output. ., The asphalt measuring device and line to the measuring device shall be protected with a jacket of hot oil or other approved means to maintain the temperature of the line and measuring device near that temperature specified for asphaltic material. Unless otherwise shown on the plans, the temperature of the asphaltic material entering the measuring device shall be -, maintained at ±100F of the temperature at which the asphalt measuring device was calibrated and set. If a pressure type flow meter is used to measure the asphaltic material, the requirements of the Item, "Weighing and Measuring Equipment", shall apply. (4) Synchronization Equipment for Feed Control System The asphaltic material feed control shall be coupled with the total aggregate weight measurement device in such manner as to automatically vary the asphalt feed as required to maintain the required proportion. (5) Drum Mix IV-16 The drum mixing system shall be of the type that continually agitates the aggregate and asphalt mixture during heating and in which the temperature can be so controlled that the aggregate and asphalt will not be damaged in the necessary drying and heating operations required to obtain a mixture of the specified temperature. A continuously recording thermometer shall be provided which will indicate the temperature of the mixture as it leaves the drum mixer. (6) Surge Storage System A surge storage system will be required. It shall be adequate to minimize the production interruptions during the normal day's operations and shall be so constructed to minimize segregation. A device such as a gob hopper or other similar device approved by the Engineer to prevent segregation in the surge -storage bin will be required. (7) Scales Scales may be standard platform truck scales, belt scales or other equipment such as weigh hopper (suspended) scales approved by the Engineer. All scales shall conform to the Item, "Weighing and Measuring Equipment." If truck scales are used, they shall be placed at a location approved by the Engineer. If other weighing equipment is used, the Engineer may require weight checks by truck scales for the basis of approval of the equipment. D. ASPHALTIC MATERIAL HEATING EQUIPMENT Asphaltic material heating equipment shall be adequate to heat the amount of asphaltic material required to the desired temperature. Asphaltic material may be heated by steam coils which shall be absolutely tight. Direct fire heating of asphaltic materials will be permitted, provided the heater used maintains a positive circulation of the asphalt throughout the heater without damage to the asphalt. Agitation with steam or air will not be permitted. The heating apparatus shall be equipped with a recording thermometer with a 24-hour chart that will record the temperatures of the asphaltic material at the highest temperature. E. SPREADING AND FINISHING MACHINE The spreading and finishing machine shall be of a type approved by the Engineer, shall be capable of producing a IV-17 r surface that will meet the requirements of the typical cross section and the surface test, when required, and when the mixture is dumped directly into the finishing machine shall have adequate power to propel the delivery vehicles in a satisfactory manner. The finishing machine shall be equipped with a flexible spring and/or hydraulic type hitch sufficient in design and capability to maintain contact between the rear wheels of the hauling equipment and the pusher rollers of the finishing machine while the mixture is being unloaded. The use of any vehicle which requires dumping directly into the finishing machine and which the finishing machine cannot push or propel in such a manner as to obtain the desired lines and grades without resorting to hand finishing will not be allowed. Vehicles dumping directly or indirectly into the finishing machine shall be so designed and equipped that unloading into the finishing machine can be mechanically and/or automatically operated in such a manner that overloading the finishing machine being used cannot occur and the required lines and grades will be obtained without resorting to hand finishing. Unless otherwise shown on the plans, dumping of the asphaltic mixture in a windrow and then placing the mixture in the finishing machine with loading equipment will be permitted provided that the loading equipment is constructed and operated in such manner that substantially all of the mixture deposited on the roadbed is picked and loaded in the finishing machine without contamination by foreign material of the mixture and excessive temperature loss is not encountered. The loading equipment will be so designed and operated that the finishing machine being loaded will obtain the required line, grade and surface without resorting to hand finishing. Any operation of the loading equipment resulting in the accumulation and subsequent shedding of this accumulated material into the asphaltic mixture will not be permitted. Automatic screed controls, if required, shall meet the requirements of the Item, "Automatic Screed Controls for Asphaltic Concrete Spreading and Finishing Machines". F. Rollers It shall be the responsibility rolling equipment available o the paving mixture in place as the laydown operation. Rollers qualifications for their type of the Contractor to have n the job to properly compact required without delay to provided shall meet the as follows: IV-18 (1) Pneumatic Tire Rollers (Required on all Black Base and Hot Mix Surfacing) The rollers shall be acceptable medium pneumatic tire rollers conforming to the requirements of the Item, "Rolling (Pneumatic Tires)," Type B, unless otherwise specified on the plans. (2) Two Axle Tandem Roller (Required on All Hot Mix Surfacing) This roller shall be an acceptable power driven tandem roller weighing not less than 8 tons. (3) Three Wheel Roller (Required on All Black Base and Hot Mix Surfacing) This roller shall be an acceptable power driven three wheel roller weighing not less than 10 tons. (4) Three Axle Tandem Roller This roller shall be an acceptable power driven three axle roller weighing not less than 10 tons. (5) Trench Roller This roller shall be an acceptable power -driven trench roller equipped with sprinkler for keeping the wheels wet and adjustable road wheel so that the roller may be kept level during rolling. The drive wheel shall be not less than 20 inches wide. The roller under working conditions shall produce 325 pounds per linear inch of roller width and be so geared that a speed of 1.8 miles per hour is obtained in low gear. (6) Vibratory Steel -Wheel Roller (Required on all Black Base) This roller shall have a minimum weight of 6 tons. The compactor shall be equipped with amplitude and frequency controls and specifically designed to compact the material on which it is used, and shall be operated in accordance with the manufacturer's recommendations or as directed by the Engineer. (7) Straightedges and Templates When directed by the Engineer, the Contractor shall provide acceptable 10-foot straightedges for surface IV-19 testing. Satisfactory templates shall be provided as required by the Engineer. (8) Alternate Equipment When permitted by the Engineer in writing, equipment other than that specified which will consistently produce satisfactory results may be used. ( 9 ) Inspection It will be the Contractor's responsibility to provide safe and accurate means to enable inspection forces to take all required samples, and to provide permanent means for checking the output of any specified metering device and to perform the calibration checks as �- required by the Engineer. G. STOCKPILING STORAGE PROPORTIONING AND MIXING (1) Stockpiling of Aggregates Prior to mixing operations with asphaltic material, processed mineral aggregate shall be stockpiled on an area previously cleared of trash, weeds and grass and smoothed as directed by the Engineer. The aggregate stockpiles shall be not less than 10 feet in height and constructed in layers not exceeding 18 inches in depth or as directed by the Engineer. The plant shall have and maintain at least a two-day supply of aggregates on hand, unless otherwise directed by the Engineer. Material shall be stockpiled in such a manner as to prevent segregation of aggregate and mixing of aggregates from stockpiles and/or sources. More than one stockpile will be permitted unless otherwise shown on plans.The gradation requirements for the individual stockpiles and proportioning from these stockpiles will be the Contractor's responsibility as approved by the Engineer. (2) Storage and Heating of Asphaltic Materials The asphaltic material storage shall be ample to meet the requirements of the plant. Asphalt shall not be heated to a temperature in excess of that specified in the Item,"Asphalts, OIls and Emulsions". All equipment ,., used in the storage and handling of asphaltic material shall be kept in a clean condition at all times and shall be operated in such manner that there will not be contamination with foreign matter. IV-20 (3) Feeding and Drying of Aggregate The feeding of various sizes of aggregate to the dryer shall be done through the cold aggregate bin and proportioning device in such a manner that a uniform and constant flow of materials in the required proportions will be maintained. The aggregate shall be dried and heated to the temperature necessary to produce a mixture having the specified temperature. In no case shall the aggregate be introduced into the mixture unit at a temperature more than 4000 F. (4) Proportioning The proportioning of the various materials entering the asphaltic mixture shall be the responsibility of the Contractor as approved by the Engineer and in accordance with these specifications. The asphaltic material and aggregates may be proportioned by weight or by volume based on weight using the specified equipment. (5) Mixing (a) Weigh -Batch Type Mixer In the charging of the weigh box and in the charging of the mixer from the weigh box such methods or devices shall be used as are necessary to secure a uniform asphalt mixture. In introducing the batch into the mixer, all mineral aggregate shall be introduced first and shall be mixed thoroughly for a period of 5 to 20 seconds, or as directed, to uniformly distribute the various sizes throughout the batch before the asphaltic material is added. The asphaltic material shall then be added and the mixing continued for a total mixing period of not less than 30 seconds. This mixing period may be increased, if in the opinion of the Engineer, the mixture is not uniform. The differential in temperature of the aggregates and the asphalt as they enter the pug mixer shall not exceed 250 F. Temporary storing or holding of the asphaltic mixture by the surge -storage system may be used during the normal day's operation. Overnight storage will not be permitted unless authorized in the plans or in writing by the Engineer. The mixture coming out of the surge -storage bin must be of equal quality to that coming out of the mixer. IV-21 (b) Continuous -Type Mixer The amount of aggregate and asphaltic material entering the mixer and the rate of travel through the mixer shall be so coordinated that a uniform mixture of the specified grading and asphalt '~ content will be produced. The differential in temperature of the aggregates and the asphalt as they enter the pug mixer shall not exceed 250 F. Checks on asphalt used shall be made at least twice daily comparing the asphalt used in ten loads of completed mix as shown on the asphalt recording meter and the design amount for these ten loads. The acceptable percent of variation between the asphalt used and the design amount will be as shown on the plans or as determined by the Engineer. Temporary storing or holding of the asphaltic „ mixture by the surge -storage system may be used during the normal day's operation. Overnight storage will not be permitted unless authorized in the plans or in writing by the Engineer. The mixture coming out of the surge -storage bin must be of equal quality to that coming out of the mixer. (c) Drum -mix Plant The amount of aggregate and asphaltic material entering the mixer and the rate of travel through the mixing unit shall be so coordinated that a uniform mixture of the specified grading and asphalt content will be produced. Temporary storing or holding of the asphaltic mixture by the surge -storage system will be required during the normal day's operation. Overnight storage will not be permitted unless authorized in the plans or in writing by the Engineer. The mixture coming out of the surge storage -bin must be of equal quality to that coming out of the mixer. The mixture, when discharged from the plant, shall have a moisture content not greater than 1 percent by weight unless otherwise shown on the plans and/or specified by the Engineer. The moisture content shall be determined in accordance with Test Method Tex-212-F, Part II. The mixture produced from each type of mixer shall not vary from the specified mixture by more than the tolerances herein specified. IV-22 The asphaltic mixture from each type of mixer shall be at a temperature between 3000 F and 3500 F when discharged from the mixer. The Engineer will approve the temperature within the above limitations, and the mixture when discharged from the mixer shall not vary from this selected temperature more than 250 F. H. CONSTRUCTION METHODS Temperature Reauirements A. HMAC - November 1 to April 1 1. The asphaltic mixture shall not be placed when the air temperature is below 550 F and falling. 2. The asphaltic mixture may be placed when the air temperature is above 500 F and rising. B. HMAC - April 1 until November 1 1. The asphaltic mixture shall not be placed when the air temperature is below 500 Fund falling. 2. The asphaltic mixture may be placed when the air temperature is above 450 F and rising. C. Asphalt Stabililzed Base 1. The asphaltic mixture shall not be placed when the temperature is below 452F and falling. 2. The asphaltic mixture may be placed when the air temperature is above 40OF and rising. The engineer may use his discretion to require a cover over the asphaltic mixture when being hauled from the plant to the job site. The air temperature shall be taken in the shade away from artificial heat or as reported by the National Weather Service on their hourly report (Telephone No. 762-0141). It is further provided that the prime coat, tack coat or asphalt stabilized base shall be placed only when the general weather conditions and temperature and moisture conditions of the subbase or subgrade,in the opinion of the Engineer, are suitable. If, after being discharged from the mixer and prior to placing, the temperature of the asphaltic mixture is 250 F or more below the temperature approved by the Engineer, all IV-23 or any part of the load may be rejected and payment will not be made for the rejected material. (1) Prime Coat The prime coat shall consist of an application of 0.25 gallons per square yard of MC asphalt. The asphalt stabilized base shall not be applied on a previously primed course until the prime coat has completely cured to the satisfaction of the Engineer. (2) Tack Coat Before the asphaltic mixture is laid, the surface upon which the tack coat is to be placed shall be cleaned thoroughly to the satisfaction of the Engineer. The surface shall be given a uniform application of tack coat using asphaltic materials of this specification. This tack coat shall be applied, as directed by the Engineer, with an approved sprayer at a rate not to exceed 0.10 gallon per square yard of surface. Where the mixture will adhere to the surface on which it is to be placed without the use of a tack coat, the tack coat may be eliminated by the Engineer. All contact surfaces of curbs and structures and all joints shall be painted with a thin uniform coat of the asphaltic material meeting the requirements for tack coat. The tack coat shall be rolled with a pneumatic tire roller when directed by the Engineer. (3) Transporting The asphaltic mixture, prepared as specified above shall be hauled to the work in tight vehicles previously cleaned of all foreign material. The dispatching of the vehicles shall be arranged so that all material delivered may be placed, and all rolling shall be completed during daylight hours. The inside of the truck body may be given a light coat of oil, lime slurry or other material satisfactory to the Engineer, if necessary, to prevent mixture from adhering to the body. In cool weather or for long hauls, canvas covers and insulating of truck bodies may be required. Vehicles of the semi -trailer type are prohibited, unless approved by the Engineer. (4) Placinct Generally, the asphaltic mixture on the approved prepared surface spreading and finishing machine, properly compacted, the finished uniform density, and will conform shall be dumped and spread with the specified in such a manner that when course will be smooth, of with the typical sections IV-24 shown on the plans and to the lines and grades established by the Engineer. During the application of asphaltic material, care shall be taken to prevent splattering of adjacent pavement, curb and gutter and structures. The mixture shall be spread and compacted in layers or lifts as specified on the plans or as directed by the Engineer. The sequence of compacting shall be such that undue displacement of the edge of the course does not occur. On deep lifts, the edge of the course may be rolled with a motor grader wheel or similar equipment or supported by blading a roll of earth against the edge of the course prior to compacting the surface. When the asphaltic mixture is placed in a narrow strip along the edge of an existing pavement, or used to level up small areas of an existing pavement or placed in small irregular areas where the use of a finishing machine is not practical, the finishing machine may be eliminated when authorized by the Engineer, provided a satisfactory surface can be obtained by other approved methods. I. COMPACTING (1) As directed by the Engineer, the asphalt stabilized base shall be compacted thoroughly and uniformly with the specified rollers. In lieu of the rolling equipment specified, the Contractor may, upon written permission from the Engineer, operate other compacting equipment that will produce equivalent relative compaction as the specified equipment. If the substituted compaction equipment fails to produce the desired compaction as would be expected of the specified equipment, as determined by the Engineer, its use shall be discontinued. When directed by the Engineer, the initial compaction shall be accomplished with pneumatic tire rollers. (2) When rolling with the three wheel, tandem, or vibratory rollers, rolling shall start longitudinally at the sides and proceed toward the center of the pavement, overlapping on successive trips by at least half the width of the rear wheel unless otherwise directed by the Engineer. Alternate trips of the roller shall be slightly different in length. On super -elevated curves, rolling shall begin at the low side and progress toward the high side unless otherwise directed by the Engineer. When rolling with vibratory steel wheel rollers, the manufacturer's recommendation shall be followed unless directed otherwise by the Engineer. Rolling with pneumatic -tire roller shall be done as IV-25 directed by the Engineer. Rolling shall be continued until no further increase in density can be obtained and all roller marks are eliminated. The motion of the roller shall be slow enough at all times to avoid displacement of the mixture. If any displacement occurs, it shall be corrected at once by the use of a rake, and of fresh mixtures where required. The roller shall not be allowed to stand on any portion of the pavement mixture which has not been fully compacted. .� To prevent adhesion of the mixture to the roller, the wheels shall be kept thoroughly moistened with water, but an excess of water will not be permitted. All rollers must be in good mechanical condition. �- Necessary precautions shall be taken to prevent the dropping of gasoline, oil, grease or other foreign matter on the roadway, either when the rollers are in '- operation or when standing. I- (3) Hand Tamping The edges of the pavement along curbs, headers and similar structures, and all places not accessible to the roller, or in such positions as will not allow thorough compaction with the rollers, shall be thoroughly compacted with lightly oiled tamps. J. SURFACE FINISH The compacted material shall conform to the typical cross sections, lines and grades as shown on plans and directed by the Engineer and shall have a smooth surface with a reasonably uniform texture acceptable to the Engineer. Unacceptable finished surfaces may be corrected by the placement of additional mixture, all at the expense of the Contractor. K. PROTECTION OF THE WORK AND OPENING TO TRAFFIC The completed asphalt stabilized base course shall be opened to traffic as provided by the plans and as directed by the Engineer. All construction traffic allowed on the base course shall comply with the State laws governing ~' traffic on highways unless otherwise authorized by the Engineer. When another roadway surface is provided for the traveling public and construction traffic through the .., project, the Engineer may prohibit traffic on the completed base course. L. SURFACE DENSITY TEST IV-26 City personnel will provide density test and results throughout the construction process at no cost to the contractor. Samples of the compacted pavement shall be removed from locations designated by the Engineer to enable him to determine the composition, compaction, and density of the pavement. Samples from each day, or fraction thereof, shall be taken by City personnel. The Contractor shall replace the pavement removed from core holes at no cost to the City. If the pavement is deficient in composition, compaction, or thickness, satisfactory correction shall be made, as directed by the Engineer. 9. ASPHALTS Asphalts for use on this project shall comply with Texas State Highway Department Specification, Item 300. 10. HOT MIX ASPHALTIC CONCRETE SURFACE (A). Aggregate General The mineral aggregate shall be composed of coarse aggregate, a fine aggregate, and if required, a mineral filler. Samples of coarse aggregate, fine aggregate and mineral filler shall be submitted to the City of Lubbock Testing Laboratory for testing and approval by the Engineer. Approval of other material and of the source of supply must be obtained from the Engineer prior to delivery. The combined mineral aggregate, after final processing by the mixing plant, and prior to addition of asphalt and mineral filler, shall have a sand equivalent value of not less than 34, unless otherwise shown on the plans when tested in accordance with Test Method Tex.-203-F. The percent of flat or elongated slivers of stone for any course shall not exceed 25%,when tested in accordance with Test Method Tex 224-F. Aggregate that appears susceptible to film stripping, when tested in accordance with Test Method Tex 218-F or ASTM D-1664, shall be rejected or conditioned with an anti -stripping agent, as directed by the Engineer. IV-27 streets other than thoroughfares and collectors and for alley returns, alley paving and reinforced gutter sections; Class F concrete is used for railroad sections. G. Mixing All aggregates shall be accurately weighed or measured by volume. The concrete shall be mixed in an approved batch mixer equipped with an accurate water measuring tank, and shall be mixed for one and one-half minutes after all material is in the mixer. "Ready Mixed" or "Transit Mixed" concrete may be used. If used it shall conform to these specifications and the "Standard Specifications for Ready Mixed Concrete," A.S.T.M. Serial Designation C94-38 and Item No. 502 of the Texas State Highway Specifications. After mixing, the concrete shall be transported to the forms in a manner which will prevent separation or segregation of the aggregates and shall be placed without undue delay. It shall be deposited as nearly as practicable in its final position in order to avoid rehandling or flowing of the concrete. No water shall be added to the concrete to facilitate finishing. H. Curing Compounds Compounds used to form an air tight membrane over fresh concrete surface for curing purposes shall conform to Item 526, Texas State Highway Specifications and "A.S.T.M." Serial Designation C-309. 3. REINFORCING MATERIALS A. Wire Mesh Wire mesh reinforcing shall conform to "Standard Specifications for Welded Steel Fabric for Concrete Reinforcement" ASTM Designation A-185. Mesh reinforcement shall be of the size shown on the plans. All reinforcement shall be permanently marked with grade identification marks or shall, on delivery, be accompanied by a manufacturer's guarantee of grade and compliance with these specifications. Reinforcement stored on the site shall be protected from accumulations of grease, mud or other foreign matter and from rust producing conditions and shall be free from rust, scale, oil, mud or structural defects when incorporated into alley slab, or valley gutters. IV-5 with 5% air entrainment (±1-1/2% tolerance). The concrete mix design shall be based on water -cement ratio, and shall be as follows for the different classes of concrete. Minimum Sacks Max. Gal. Max. Slump Class Cement per C.Y. Water per sack in inches A 5 6.5 4 C 6 6 3 E 5.5 5.5 3 F 6 5.5 2 The concrete mix design for the different classes shall also be such that the compressive and flexural strength for each class shall not be less than the following: Class 3 day 7 day A --- 2100 C --- 3000 E 2500 3000 F 2900 3500 Minimum Average for any test beam strength 600 28 day 3000 3600 Any concrete failing to meet these strength requirements or air content shall be removed and replaced. Low Strength Concrete Any class of concrete incorporated in any part of the project which does not meet the strength requirements specified above, shall be considered low strength concrete. Low strength concrete shall be removed and replaced at the expense of the Contractor. The Engineer shall determine the exact limits of any low - strength concrete required to be removed and replaced under the provisions of this paragraph. The methods to be used in removing and replacing such concrete shall be approved by the Engineer. F. Classification Unless otherwise shown on the plans: Class A concrete shall be used for curb and gutter, drainage channels, medians, inlet boxes, headwalls and sidewalks; Class C concrete shall be used for concrete paving and valley gutters constructed in thoroughfare and collector streets; Class E concrete shall be used for valley gutters on IV-4 A strength test shall consist of five standard test cylinders made from a composite sample obtained in accordance with the requirements of ASTM Designation C-172. Two of the cylinders shall be tested at 3 or 7 days and at 7 or 28 days. The fifth cylinder shall be held available for subsequent testing, if determined necessary by the Engineer. The test result shall be the average of the two 7 or 28 day specimens, except that, if one specimen in the test shows manifest evidence of improper sampling, molding, or testing, it shall be discarded and the remaining two strengths averaged. Should more than one specimen representing a given test show definite defects, due to improper sampling, molding or testing, the entire test shall be discarded. The result of the 7 or 28 day strength tests shall be used as the basis for accepting or rejecting the concrete represented. The results of the 3 or 7 day strength tests will be compared with the 3 or 7 day strength of the preconstruction test cylinders for the type and slump of the concrete being produced. Should the 3 or 7 day strengths indicate a deficiency in the 7 or 28 day strengths, the Engineer may require a temporary change in proportions to correct such deficiency. Such change shall remain in effect until the 7 or 28 day strength of the material in question is determined, at which time the change shall become permanent or shall be rescinded, depending upon the results of the 7 or 28 day test. The engineer shall record the delivery ticket number for the concrete and the exact location in the work at which each load represented by a strength test is deposited. E. Concrete Design Concrete conforming to these specifications may be "Ready Mix" but transporting vehicles shall be operated such as to insure delivery and placement in forms without loss or segregation of ingredients and within one hour of mixing time. Continuous mixing during transit will be insisted upon. Mix Design All concrete for curb and gutter, valley gutters, fillets and alley stubs, alley slabs, drainage channels, inlet boxes, headwalls, and medians shall be Class A concrete IV-3 taken to prevent dusty conditions in the stockpile area from any sources. C. Water Water shall be clean, clear, free from oil, acid or organic matter and free from injurious amounts of alkali, salts or other chemicals. D. Concrete Materials Test Pre -Construction Tests The contractor will submit test certificates from an approved commercial laboratory on all aggregates proposed for useonthis work. Tests should be made approximately 20 days before beginning the concrete operation. The contractor will submit in advance of construction the design mix and the result of compression tests made by a commercial laboratory. These will be made on each type of concrete mix design proposed for use on this project. Tests shall be made on 6 cylinders for each mix, 3 tested in 3 or 7 days, 3 tested at 7 or 28 days. Additional tests shall be furnished if material source is changed or if concrete used varies from the original design. The Engineer shall approve the mix design after the pre - construction tests have been completed. Construction Tests Tests of the aggregates and the concrete will be made by the Engineer during construction to determine conformity with the specifications. Test cylinders will be made in accordance with the Method of Making and Curing Concrete Compression and Flexure Test Specimens in the Field (ASTM Designation C-31). The specimens shall be cured under standard moisture and temperature conditions in accordance with requirements of ASTM C-31. Strength tests shall be made, in general, for each day's run or for each 50 cubic yards of concrete if a day's run greatly exceeds this amount but these tests may be made entirely at the discretion of the Engineer. Strength tests on Class "C" Concrete shall be made for approximately each 30 cubic yards or every third truck on each day's run. The costs of all such testing will be borne by the City but the Contractor shall cooperate in securing and storing samples and shall furnish all materials required for sampling. IV-2 MATERIALS OF CONSTRUCTION . 1. GENERAL The following paragraphs give the specifications on the various materials which are to be used in this project. On minor items a certificate from the manufacturer may be required, certifying that the material or equipment meets the specifications for such material as specified herein. All materials shall be subject to the approval of the Engineer before being used. 2. CONCRETE A. Cement Cement shall conform to "Standard Specifications and Test for Portland Cement, "A.S.T.M." Serial Designation C150, Type I and Type III, and shall be an approved brand. B. Aggregate Description Concrete aggregates shall consist of natural, washed and screened sand, and washed and screened gravel or clean crushed stone conforming to "Standard Specification for Concrete Aggregate, "A.S.T.M. Serial Description C-33-39 and item No. 360 of the Texas State Highway Specifications. Coarse aggregate for Class "C" Concrete (Street Paving) shall be crushed limestone (Brownwood Type). The aggregate shall be well graded from coarse to fine and shall be free from injurious amount of clay, soft or flaky materials, loam or organic impurities. All aggregate shall be approved by the Engineer before use. Maximum size of aggregate shall be 1-1/2 inches. Aggregate for concrete construction proposed to be used in this project shall have a loss not to exceed 18% when subjected to 5 cycles of the Magnesium Sulfate soundness test A.S.T.M. Designation C-88-76. Stockpiles The location of all stockpiles of aggregate shall be approved by the Engineer prior to unloading as to zoning requirements, smoothness and compaction of the ground, and traffic conditions. Stockpiles of aggregate to be incorporated into the project shall be protected from dust by drift fences of any suitable material approved by the Engineer, when sandstorm possibilities exist. Care will be IV-1 SRI 13 Ci 91 92 93 94 2 NO. s F — 5alila 91140 � c9 147 ]146 1,45 RD. Sl bil Im I189 1191 SECTION —LI E > zv SECTION Z BLOCK is TRACT "A" p 0 91 - of 44H - nod 4. qm,�- q , , -mj' �7- z S. W.11'. !A 194.91 192 put Ix GnELL INN r --FET w L NO- s6b01vI0ED . 6 I?.. Z Tc FORPHAM'- El 2 p4f_ l 14, z Flip Co- 0 28 28 Lis �RY ST,:,EMORY ST. T-511, DA ,TH S 6�-z CORNEL STt T" f62 _LATE ST. 0 T V '276 I sc .61 40o [I'll IVA' 45 277 62 (ka - '2,8 68 51 'Q',.44 61 ,Sl 6"; — -1 4'43 s — — — "20: - 17W ac t s z 40 :3ti 22 2 2 Z. 9T 80 ,�� ET it -OL— DIJ.115 EET at'll �TR 7� oo"a�,d� - IdI4 4y 39 .4 0 �3 5 � -7- ITIIIIT .23332323 , 1 11 2tl 4 2- 255 67�� WESTER PARK AD ir)N Lc A J. StRUT na`x40 IN PW k�. 'TR i t'.N ; 'ki LOU,. 4;TW STREET B Th.CT C. sb&: r 61,1 N o w +cl, si- 2W%BUSTC LON nt I FOUNT.INS 9 Z" '-. 5-, iF. iN, TR aLi "ZI -EAT LL LL LCT 1-4 %TV V-2c, NEWMAN 40 Z2 TnACT• V W- 102 52ND. 21 L 104 16A TRACT I 1.8 26 is T �,4' 101 BACON HEIGHTF I NZ as TRACT -A ADOMON y \ F WEN ��.e urT , a.' G - 1 4 it 99 " 01 1.0000.'i i n 111TH. 54 T H. 2!-4 io, ;tj 109 110 TRACT 'H' TRACT 3 1 A TR ACT'F'.- TRACT V 112. �",' -. i 10 0,10 C, C. KNOTT ADD. C.C. KNOTT ADD. C.C.KNbTT ADDITIWn,�-.4 4. 1 17o., sGrR QI To C.C. KNOTT V,� a TR J 113 ADDITION . . . . . . . TR. TRACT A SECT -QN,,,- 28 e CITY PRO o TR 6 L 0$lK 2 J 2. , 58TH. \x61, _ _� .. _.1Cr ] LY. I:: e.AC' i1 )\\\ + 6 — I 12 3 4 5 6 Sao irk 1919 171 15 0 9TM.Oky,- 4 5 \ y 4L- 10 .1 1615 14 4.�• \ N TRACT 6 BN. 5' 6 9 SPUR ILI 14 1 0918 17 �1't F= Qom/) " !((I II .sE+O°°1d -.6 0 4. 11 N Tl- I r 7 CA ,4 -F 16 4 V N cl 1. .5 i'4. '44 4 55. 1 AP.MD. IS ni / 0+ � cs 56 57 i /� `.. \ 1, �• I In ,6 .71 Z6. •TRAC:f 58j_y jk\. OIA z ew glDl 09, SENTRY PARK SENTRY Tic, TR. 'C' PARK '12 FARRAR PARK 7 ?6 too� 6 67 T WE' 8, '41 AIR TRACT A C T "A" zw 9 5 19 �22222255-55- LO _141 92 t-w V 2 21 iuN l-%v- P, FIT LOT 2 Lo iT AWT 0 -J. Ok -A LAV4 I _11 cc c .1 76TM. STREET + STREET 7) 290 4.9 2.5 :4�:� 'N :!2-:5,'S A&A 77 2. z jz L-:. 77TM STRUT 17TH 2 31REET Ir - 3'3 3-4 '315 .3-6 3 7 313 519 U0 Z�2 110 20216 ZJ K.7 _kLL 332 33, 3303291328;32,•it .12 .73-14 e. H STREET ?STM STREET R. 1.,w � ..:van. -a - 117LI", 4111P 16, 'Go z L.L L -7 35 9 91 5 , rl s 88il 7 "6_ _511.357,356 . 3!53Vt3 152 sit !ST14 �4, 4Z j 144 t4l 150: .,t' .-I ., !1, 116 11=4! �5 S3 gSTH ST ET sn -w Q. Lai - 66 36 , 368 36 2 375 3- ? 75:376 i3l1 li;g! :.3'r, t",:134 i,33 11L m Z. N41 wi,f < f 58y1388 3111 33. !Q011211122 34 14 5. -, 1 9 : > 35 -.736 i n-p'a TK1q i BOTH •�FBOTH SSSR E ET IF a. 1, 36 1 26 'V,s PT57 BOTH STREETS 6C Z7 27 CIS r -n 4 z 0 .739 I. R -3 . �9' 1 '69 -..Is. �a. 439 r a 106 2 41 93 84 78 41 92 T85 .403 409 1B 9 19740 ` 2i to 2;Z4,.*41?7425e x �.32 4 4 s ZI '402 si. 0. P-= 91 I M4 z 1. fi. _� 2 < !742 4. 4t. 441! 4 . 7.- - F! > to :Bd.74 12 4j B2" 1,_3F I -41 T- 1-9.2 �239, 4 '32 .e9l - " l�= 5 .9.8 9V;l 44, 936-: "'-w Esau2 X!!:� T R •'B' 7e-% T- a'2 7 43i � AD THE VEA:10WS ADD' TRACT' C' 9 4 45 z>z 94gi ADD. 83RD ST 14: Sao EZ a SS B;; . =Z1 pr'.� =1 86 8*85 aea ST. H;lj j,60" 7. 7g�7._ f 7 7 84TH. '. Is 1W 5264543. 5 n 85 Ar3 aso . a, zr� C2, j ;I a 30JI SS 81768!3,9 Bz, S�Iml.,PSG� 3�Dk f M "' 90a 21_ e 6? SA 64J 1.11411.!l ? d 86TH STREEIN, mi STREET TO N IS2 1 1 - I Z 17 '117; 7- 6, STREET IN i i, 08 8 1"I .d .,70 ""'n.if" d INT 87 TH. STREET 1;6 115.34 131i 152 1131 11 l12 PLACE Us-!, 171 1 T 711 39 6 88 TH STREET "i;"r 2 TRACT 'A" j. -.STREET 69TH. R B 26 9 728Tenize 281283282m,�,j 27q,27ti -11, r,, 3! �26 %, 2,6, 025 245 STP.EZT 1 9 32 32. 4 1JE 113 .:.1 i'l �1 j �1.91 5 r 90TH TRE i - X' 3.36 * 1 11 4 .130 431!Z!11 340 3* 331 la-pl`. 1 3 -,3 2 !3 32Q2,p w • E d"! STREET t 661 :!Ty jF ICBOCM 91 ST STREET 'A Al r r. _0 r__ 7- r. , .,4 S-REET 474 �A' L PARK PROPERTY 1114,- 4.4 j+4+-1 4 w 92 1`11D. nSTRE T STREET 7 3 474 4- 4rUF�.V 1--I* 4�46's! -4- 4SFI4P4% 'I Li 479 7 4 4761475A Z31, 30 483.48a-4aSItBEMBTeP1 s =89e 93 a • W96497�98.499 I rq STREE- saosl9is"S 5'17, 5 7;k.6 `1 . 582 58 A TR F F T 94TH STREET - 55 56,57ji�615 04,6,3 (.1 6t, 5a75966 31 Bs 9146363 6 .95 11�3,i,w ..... 6- ten"w"Jo. -7 95TH 1oj p 1;1. rZ71749C689W6916W..685684IM3;7 I�06M�716"67665 �74 673Val!h67OW96%A7,." 4KE !,Is 411 It 71ST. 'S .L ADD. leg lis 16 ?[i�19 sr 'st 73RD. 51 16x j z '6?jGsi ��. �2 3�01VZ,.91!2 '27 5' Q4 3'k2 :12 - 6 �12 .1 !z 1 70 PLAI;F, FT 7--, l Sm t 71 ST W STREET 93 .. 9t ! 96 83182 �61 9.0 76 0 SI St I 72ND. STREET 1.0 "g FFIE Wig, '67 :114fl931 11111 TIS I W 189 Ili a ST. 73RD. 5 2 z 3 1 A 4 [a li �7i _Z' EEL. 7-7-- 11-71;i� 77 465!�6-:11•63:462,46:1460459145.8457 5r!".I45.46 4 a�� I 671 j672 67 674� G,672](514 660 Is I.,. .;Ty666166i7 �66 SENTRY PARK_j T R. 'S' O 'A11 7 -IT91 CS 'aJ z .1141 -1314 1 41�l < 'P. STREET _Is 6 .71 ygW-,' P - 'T 1 .1 74TH. "All '7 STREET = TRACT 'C' FARRAR ESTATES '245 244 24,11ZQ Z' 7 239238 a: - MIA - -11, c.t3z 91 -emm 3 254i255 a 48217 Xz 50 25 1 & Z go W .6 �7 . I IT, 40 , .7. r.. . . J. I . DW STREET -7 STRI z66i265.264,263 262!261 1.1�4 2.7 I 'I STREET 76TH 71- ep STIR , .0 , .2 65 E7757 53411M 1115 -7 gas U? �52191129 3' -.1-1 4. TRACT' W LID! A UOT-2 ow sa 68 TW 73rd. - 63 64 TRA'T FARRAR EqTOL FT-7- O\ _V5 !3N 1: -17 -16135 22;3� J-6 T .. jo- 2 219 2202ZI 21 __A2__A4 77TH St 11 77TH STREET h 77TN. R EET r ii. W u 7•o' 1 W Igo !�21012091201! 20- 2)6.'ZO5 3 3 .Ssa J."636 635 634 315 1316 3471319:319 320[32.n 3 -.33,332 '130,32913281327 Z a g . I- It, • 74 Is �61� ;33, 1 3,! 3-1 :M3132r,6 2 1173.?4' .9 . A, L 78TM ST 78TH STREET F7BTH STREET %.Z es. ei esIs Is s' r-'cr -was 1oIg I I., '6' Is. 57�'• t Ate, t7f-166 166't64 3 !Zl' IQ� -07 C? 1.43 1144 145, 47,1" 149150 '5F 1�5 15, LAC a .6. . . ,, .1 53, 3'�' 14 �lf 146 '1 1.�SIIMIW m ST R 979TR ST ET T " To ". . . T.. .1 ' 12, El I =11111 IIA 11�3 1 ..'ri .1 11 116 5V4 M I .86'c IiT "'2 _1b 30 era 735 4 5 57384 TT . " 1 2') " � 7', - - .2. U.: ul �. To 1. 736 80THI S T' BOTH Sr 7,, n. iz"r;i _WLI IT, 7t, 9 91H C-6 sill Ra�� � 4 . A ipe ATso ea' F,%-A -.!6 3912- ':,OT 4aS E .-416 .2.2 3 3 .39., i. .71 a: 254 Z5 ;a IT m -t-2el 105^Z' -ACT ss.-a (56?558 0-6 A2 41 1 m I1. 7,. _nz- 9- _5.1_ :Z'1. AiLlmg 4":*. ------------- 7- STREET TR 61 Li 4 . la TNACT 0 !G' z s2 TRACT F -RACT "0 Tq TR E j IJ4 4 '8 T-- —1 �q's go • FO i A ,ET Si,! ----------- 1KINC� -it. "I IIJ J 4, 1. .1 85 TH, AUP. " , , -"'� 2" STREET iz Y'll 4 7 Z. 4 L HE 0A r 14 86 T,. ST 31- -7> . . . . . . . . . . . . . . Am-- 1 *a Cr . 33 I3!5 Cc. —ET V; r STREET -7 T I T E3 --T zj�-_jj se:, 31 f. y, 62f 3 P! TPACT 'B' 62� E15RO. St 'CJV i29 ?1 = rr l3 ST E 3 .99 28 los 3 5 ST. 6-7 ST se•TigT 71 841h ST. T_ , r > P4 > En l -1 85TH. ST' 17•�9 WIN. L L T. T�..694- !6 A" Ljj_�v 'L, ago- 24 �j.T72, ff Sl� 561h ST I S_6TH L 12 L 0 0 0 f 740. .2 ST. 6-1,41 15 Q% PG j2s — 56 14, �.R�.23 5� 14 7. 133,17 2 1313 1 -2--,' P9 x .12 87TH ,122 -5. 742- ST. 87th ST 26 1 !:j!B 2� 34. 43 7 �l ;0 28 -,71912 T M _!J � !:L sl. .7, .1 4. 41 a1! 11 ':' 57 "4 ' 1 4, .89 12C 12 2 67th 2,7 �4 W 31 '46"i z, -- - 2 — ' '--(I - T .2 Ij2 17 53 ;,0.2 71 7t' '52 .0 - 755 'Z7 15 �V 4 43� ''4c 113 5c ;59 0 BE; a IFT FT, 14 cal 55 6 ';TREET 17L 144� Th. FLE = 9 9 _rTFM 6• 7', I 1 1.9. 1 1!; Sy 0 z IS 17.5111. 1I.J i7 1771 ' :11 177 GC 1,68 •5E ''. `.G 9 \` NY, 7 47 T. .1 _'T REI r TRACI "B" 1' �78 1 �2 2 205 07 209 21 "9.- 19 so 2:5 568 569 94, 4 2. "71 23< 492 ND. 57 146 47� •"7 -It 0- ST. i STREET s w -1 T � T�_ ;7 558 -',7 7 ST K -.74- S14 .7 3 96 TREE 5 545 la, . -Y 489 V �, 344 34 369 kp, 44 �.54 ?47 2- 4 1 3283 7- .3 *59 352, ?-I� .35c), •2R. • 96 T*. . ............ CITY LIMITS .7 L," .S 4 1x IZ~IQ ;4I E - � f 41 al 5 �6 1' 18 19 2d 2 81 80 i9. 782 77 76 Y" • 4 65 TH _ 65T ST • Q 98 6 54 T6 T64 IS 14 1 ; 1 p 34 LEROY _ 120191 17%g I9 !91T°Al ra 13 I II j `�,^ O-\ ,.• 9,6 S- 1 $T w ST • y _ ''6zr as p5 a'6 e en F6TI1 "T.- .,> b"e Tor T SOU THWE,�1'- NAV _ I TRACT T7+ACT TRACT ELMORE. E. 679 _668 T b g5T W 'As4 75A'e 4° 3 2 ,JI I'. a :..0.. ..0 ., :. 8.. 6'•B W a fi.R..4. • 2 O I •� e w TRACT "4" J 1I�� .( 67C' 665 659' I +d = 6 , ` 7 _ B 9 1C 2 A il70 10 s S T.^,:CT y :Y • =675. '6'I 3i64� E8.�6 .�.1 } w , . . ^�i",.-= •(i'7TH �.. .._. STREf2- _'•••--_ 2 Q p. w y PACT ,: RoN PARK s 54 •7s: 67 O6 66 681 0� a 9 TRACT•;T,i ! ., 0.. F .TRACT x i.+'•68 T� "F" TRACT �L4- 09 80 EBI 682683 689 68• 6f TR."N" E F TRACT�FjQ '„ q .. E O� 96 � 6 694 693 69: C• \ L' 7 I h BoCk 6 aF�G.(��� I _ 69 TH _ Tfl4CTr " Trv�C•' q w r z Q\� FURR HS �. O TR •u- 4 e: 3 709 TIJ 2. Y•ti. S 6 - 3 `4z -'T29 728 T27 72 j W 0 L F H 70 TH •' '33 '.4 '3 CI pTaP E. ^ 33z' TI p 16 h . p LOT I� s .7 Block7 T�.f1'+ •' 'R 253': •:° ne aiT •'^ :G i � V'T°, � 2 1Y 45 14 1 Q .99 - -.IB 'f � ' 13 I B. . A D D. g ��/V 999 � LOT I e 4144 35 ¢ 228 19, + 12 4 _ i7re I•' vS. ✓: BILK I s 43 3G=?.2• 2U, '!l. .II9 �"f110K_�.a`75e?'s 51 3�F U'L�S::_1xJr Bi 7 es yQ7 92 ?gyp J++ •- a n - • 71 S'. STREET 57. ,r a ?3i92I911ai 89I88Ie+61838401 62Ia. 8 0; •T �, t��f6t„ f!` Cr a`'" w• ;��{{�Ldi.:cBlle91'P� gt. -I-Lr ,<L,I• I• ..L...1 _ L./T 1� LOT. r 1 0 _ ST. fiLK. B w'-Ys •2 �2`.:2 2'<�2:1=2,�11 _:l illl II II I14: �"L n` � .B O�\ a+ 1 7 0- LOT 3 \ n, r�i Y:ii 35 '36 '!'I•_SII'9I:4.; la1 1<a 1e ? 144n +�14@ 14!. _ .-yA •p 2'A'1 A . 6 ST.+ as :. 7�: BL r 2 6:1'`3�15BI5TI.5.6 °51 �•-" SSI52�16 I! �. , O� _ 2 m ' 2A18 " 1 33 74 Ti, 'STREET - ay n dig '90. r ;193. 4a �„• S157,�168 l •69� f2 - 61'� 5 .cwa:,2 ^ry. .w S.•q ,_� ST. - 134 43 10 i'a6s a SSrFw ;SH .. 'r1 7 7p8 63: '60 51'°a:46 1+'$ 'I o :'h ACT 135 .4: Ici 154'4:"159 166''a P171 64 •59 52'. 47 -�17 ?.92 136 ::41 14B 153 • 0. 16J 185' 172 63 - 78 33: 0 d4 *.7 1 • T9ACT' m W O Iy7. - W ^16/.' I§0 RITj 6 37 5¢.i J �� .'r �B� "' ■ ;99 200 a 49+ i TJ 8• •• a '•=r ' _ >..N. 174i e8. Q.•�62 Si.'?¢ .y1' i'•• +o, ST.767H EET h 1 •98 IB 19 '97 :9E 1 •, ,r o '61 22- DRIVE 266 263 262 261 26DA' 2594 t BS,Iea s83 16 181 - 1T9 IT. I7T :7 •5 68 N TI.1 72 >x T` . �6 BU R- 258e,. • w Ty 24t 25, BS 26 2T 2Q 29. 30r 2 223 224' 22 226 2 257A '9'? 19 '9c 195 '94 -9T -y; 199: 201 220320• II 11 T0. 0 707 74 '•� • • ` 2e6A 77 r 1 3 35^ 34 94 >3 32 30 30 6 77 TH. STRE•f S227 y +: - STREI.T 2 '' ,2g 221 219216217�216215214213212211210202C8207u(� i0' ^e+ , sr 233 232 w " 31 23 •229 ' 7544 + + ]: ,116 •-, ! " . BO +' ' 228 ' 2336 " 7 ryrH :0 i d1' bf., 9. 2d}A• ^22,42242252 227228229230231 223327423!23 23T 3 2392 Ir�41 iB 101 . - O'. 24B 24 25 •�# .52a +78T1+ 5'REET •' •• 99 6 97 96 95 :� 93 92 9. 9: 523524 52 52 •9' L7 '•8A 28 28 2812 2792782772T6 ?424 2+ , + O STREET 2 12 121 �.20 I9. 118. ��+-.- `Z :� �S J23 4� +2f 7"7E 29130 31 i•' I - ' 117 II6' IIS ` 27q' T, yj 1, I :' ' F 83 SIU 51I 512 St} 4�517 51 S 26 28's99 28 291- 292• 273 ! a7 + Q _ '4 1C3 I Bpi _ 44 0& ' 7 F52 23! 25 236 57 258 - , 7:1TH. EcSTR y135 _ 79 TH. • -• S•T. i 3 502 501 499 C • 8 321326 2 32 32 iP2' ; ?3 2712TQ' a STREET _ '.a 7 _ ' _ :. •x d' 89 909 91' - r j W 32 9 2% 691269 67 2c$ 2 265 2 263 61 41 - 1 14 '2 J •. 29T' �.. f C £4ti _ 491 4l3 ' wK -.G 37 G9B 349 33C 331 3 73J4 _ 9- ..9Qe• 1 6 3 ■ 31 "e93. 92 w e. 33;5• V :. ,+�29930 e01 }p2303} .-1+:{7 94 .a5 < 80 TIt STREET 0� .. IS1' STREET • / \ • S ° ' 80TNtl s r i 2 8 I e t4x .': .,2 a33 a3a 435 436 Wr .q6. b9 440 4N 442y 443 •: •'7' . , • .: s ` 41 + ±37 316�`S:G 31431}j3123113105 7083C7+" .29 420 42T 426 25 424 422 421 142014191419 417 IB 415 3 r • 52 "' ' 81 ST STREET a0 j41 3a234334 345b46 47134E 34935C.�SSI1352'35333. el 36" e21 B' <Bc .c81 -a67. 16 S 452 '451 ` 406"'�5 BOTH STREET 8? 22 + 35: 7 ° cB3 •1 490 <-16B 65 : '453 45C W •4pT 40l'?, ' +. �jc. ,�389 5; ; !382' 36L 3 359 56 5 356353 S F .402, • 61 ; 71 3a : •23 6 4B4 j�9 469 a6a . aSa ae9 4C8 �a0d�sy 3a 377 774 363 __ I i1CA,•-..---.._ ___ _...�__ _ ��3, 60 • .3 r� 5 CB_s yl' o'B '�I O 456 446 409 '399;` 390= •387 378 373 384 -„ C•• .5z _ -I c63 'io KINGS GATE NOFt'Hy� !_ 6, - 58+2!.5'_ j Io13 aT1 fa462.1p.4 b 447. y 410 39B_ o�, 3B6• ;j 379 13T2 385 __ _ H1 _1 Y 2G IJ • `4B„ �ny '45T' 4 '•411 ' 79T- �'392 385- j-380 371 ?: 766 r a •_ r • l2 s•_ 81 S'3G IC'C O' s3 -1 •-/�. `i-�) YSB 45['n "o;2- 39612 3931 39a. S�3B1. 3jC:O 367 ` - i__� -r4. ' 9 _>r•27. 439:. 1" 47__J�{4%i 6-1-�/-Y '<39 •�' 4:<+: ,rb'3. '_•9S x�.-'9a:: �3e3' '`:Az 36 '%36 '�"3 1 •1 .--. 'i •'l �.a'L;Ii.•'.: I hI Ss•a+rf."'1't .. .. �-----.�._�.. _- _:W..' '" _JI F-- L- 69TM... ri�i. yl�r� t _ a tilN NI•Ri.I� �I.. RI^. F TS I 7 ara I A= •'' •� II''T`I vw� E2 IS- STREET n- Rs9a `; Io1f113re: p13'13146a;1;K 1 r - 14Q �aLog a� 'SOU fins ,• 0r C• 213'.' 4 'J' yTf `� TJ11 TRACT TR4CT I p 16 _235 G wr F TR4CT • EIss13k' 3a s 'TRACT E jTRACT BI616T 168 169- li0aL-.aaj 16 ADD ` a It 71 Sr 7s •2n ® Lt26' Iw. , ••'_I:i_ •_ '�,. 37 '\ a4i '1'� fr7.Ti ? ae �?O CE:7b ,oJ.51 !a•+t 4Fr IY�-' 196 95 19a 193 192 191 FYi IB9 289 0 .9! RA .te a' R15 i70 i.!' ' S. W r4i' S �. .• :'r'�'' f n TI°MES SQUARE ADDITION a zr, a s5P0 v u•{\ ,° oat \o LOT I _ A TRACT-3'.w. 00 i se •`I sa %'I 3 I B:� a or \'St �.a° �y Pa TR 0 w m 3 73RI i cy,, LOT 4a ! 1-8-1 re-2 II = [T9f .i'3.__i:� 0 "rJ r3S.sy 21:,6,• ,yf .9_ JO"! 60' 73Ro. CI. IRe'•1 _ WU[ 't SS OY I TJQ 2f, I.:GE' j _aY J.:.°.+> r J l Ina TRACT a' v'9 •Ir 8nR'1 00• %A w� T , s9 -> SPORT'M Y TRACT'." A00.I nW Z a m - TR F' Pd - .�:su 9. ruo-..•n �n •n _.. -- R r x',? CN t" [1, rI y girwrF E.,rlYuw n. IL�l f.. ." Wiry A•,3a' �.'I>74T i y LCT "T OT LCT LOT L4•'Po >: 6 J 34 U+r 2A LOT GC•RnCT n�S r ,p a t '• -i�JiC P� 20 LE tF 2G 2H 21 2J - K ` ¢- 7' '.r . riy`I -•'t �q1 Irq'[5+1T Sjril M •�•I i�f60• 2f. 1'i ,zrs n+.. •B 2N• -" y' iiT7 �� �-764 41162 IIf-w I� -25 24 23 2T21 7D 19 8117T6 14 12 I 0• D I b i la '� T� -- - �j 6T 'R `•''7e y rm- �1 F1 { 311 r. l l�_ 1 ,° I x ��m' o I n� - { - 1-1 tc• I cQa1 LOT 4 '.2 ! �'C �I�A��'ryq t1. 1 :.I Q m 14 TNPLACE S116 j13ll Q 79I I' 173 1 311i• I T 8 6+6;' S -?6 427 28 2^. O 31 � 3334 , 3S 36 3) 38 .�+Q,1"G 3G;jl��_ - >I . O I 3 y20 117 __!1 I eC �� 5, 3 i+5'"'�5 140 48 47 �4 t1 - [B /^�'( ,�^S c1-�e�ll le 43 42 4i 40x I,yf�,ill& IB"L Ig�-I` IBaIIBS 188 8�I{Pw 199 a jTRACT T2 *�ff 1tJ� e'.I TY I,Ta"ITS Lf2 L3L1 t?86e. - 75TK STREET n11• ` '5.,�:7c'Tn. 9•.5.,e a-�?$g "�i 1:I �aTil kT �pC j\ 75T1 STREET fIS' lu lr'fTrl 1O ' .' A 10 'a fi'�'f'•r Sa P, �''pobT •+, /" 54 7:53 {5fi157 S8 59 160 61 162 63 161 65166 67� 68. q \4 I Fr., ft 9 �19y ""'a,oex..j_il�/,•ii�1�d '� I TT Tom,, o jal �'TTr__-�G =. 77 .t 75 7a 15 I:•0 �69 �r± T�pi�i1'a03S 38.3�3 35 +a e3g 321c �G•2,, eza.�ia: q lTo'I a„o ryl of >o ro ° o Iro o vId. ole3 " 8 ' r"'� coI w,<oya s An 6o so, foY a C� 28'27s1 29 '822r ' 830 �.0• T6 iR _ TREET y! f761h S 'i if 77TH. is L L a o X 7Eth S7 aya �_. / f '•1`T"T"'f" �ro A' - � -- 5,r,• - �lRnei/ •{..1 fq! as x'r9i N31 ¢' 0• ID 103: 107 r 109110 ill 2j'N�3 Ia r113 11 11. . T E• ytije� I„.a II Ir t .P I a e 5 C6 <7 a 4P r i _ _ _1 ggII ?37"_73•�-3<.3y75 a sa LI_Il _f._ >_ L°� .IT.I•._:_..L-- a 5 10 I '� 45B, I 'Lyp CI g IL59 i ,I wlm27t lr� .yam�F7 7- TT I i , g?'eo l" 11 ..-� T� TRACT A I I � (�F4 �zZ 393 oeu) kkkfff 1 13313 i31I: d129H28127 i26'12�124I R31122 :121, 120,919,11 -I Stl 5TI56I5 S+kkk -:T ".l '-' • •2..P�a 221 :.9.LTl3I AIAL'�m1 '-.T, o1n T4 71 f zs 12\1=a[]S97 'ETnp"< -w--i 'w 7i_T H: oL 2201 Z @ 113 1;i6113) 138 49 Ia0 141'la2 H3 tdt4li$46, 1a7IW N5 I.13 0 TRAL7 F TR.'D' r17TH rFE II.1I •Ak2 _ II J. ...�` I _.. 6 / 2 - E36i. u7i I 151 i , Iq ib E. I II ri•� �TSL . y2 11 v3 ) YI n ,R a 240aW 9 �•Jt: q - I�tr fa IS TRACT I. AN IT °I.6�1•+a.,a I.IE:tlI I 94 li i� ••I' a iun2g1 21 �'r,.� [J^o 2 20j 20.I a 07204 0$It lq'211 2�ZzI�S 2oy.lj2 16 k s „B„�' I TR a_� : •x 78TH 37 BEET, .. ._ ' zstsi JLeDI) TE 75 SITE c• x STREET W .. ...60- ♦a aG B 6 .. _ .. 60 !0 •� b•60 .. _ _ ., 0 66 6aI6p 2. .. .. _ .. �".9'�!e 117 16 'S1' i1i 1321IYI_I I 1291291+77 125N24123122121�I119 IBI17'116115 9 6768 61 64 r� S�.P 4 I5 I 1176,1'.9 IbG Ial K2 183184195168 1B: Is,! W W 8S'I� - 65 a a5 la- BI � I'YiOJi iO(aT� �•• , _ r ; LOT 2. «tof x101 4 lao'IctllaYlas' .. a I"a4 I 'A b `3713813 'I MI I•T21 a431a q I 14 lad li I 131 14153 sail • 156 _ 1,1017r�17275 a 75 6 :.t ca Ij ! I Is 16 17 I6 120= 3 I32 PI 150 M3If0814T1%NS Na 143i1a2 K18 " : :' �$TREF.T R.'!C Y. a5 J •� _ •• .. .. .. 60 45 }e - !0 60 _ a0 66' P10•P- yl $y 3 . j .. , - 31'n a I yEO •' a i 6 V T a no ' f 17 6 Sh7a 17 1 I'1 1?O 9 G/ 164 I6: 162 161 1591S3 Is(H aT S 4 3 82 81 e f 9 28 2T 26 25 2q 23 IM �--S � i 4a as 3" 3 ET�2 6 .9 . 1i BS afaa`i ("+SI 79 TW $.TREET jT 177VTH. STRE o -L1� `__ I I 6 •i ,3 C a _ •."' Tx f.CT 4 '� �' �''_'� I� i 76137138 13 O• Q B7 78 6 17tiI1 2d i n° 'I 162 " t£7, '21 72ES?f w 21an. I „6 �. 7T 6 12 r 3 Ia 121 C'J 119I119 IlT i116 II15111 89 I I 7E 6 m 5 17 1if @0 81'.192 1641 18/I IB 8S19q'91 g21193 19 I9 13619 1981= 1 8 BQ 90 91 SL T C 17�+ 12N sy 110, 7 T- 1 ' - - b e & I .. .I f'-„ ea 6 ^ R•f0� I +a' .. .. so Stl , e .. .. i eaa�e; 'Ifr n 80TH SY. " 90 75 ` r-" I ° BOTH. •'j STREET •'i - W,a R a �! _ q _ - • , .. .,if f 4B 60 e0 fJ S:r e0 .. - •. • .• W N •166 _IW IOB 110111 '1121it f „ n C 2a S' 1r l21¢ 17 162IS 13Z121 1 I 7 CB - lL t ;°5 49 B ^7 % S a4 43 42 41 _I 73 'a `F - ite . I- 03 9le rJ3��3a s(,7 ICI 999R ,97 BI9S"• 2 i- JI I. ., 1. sd 4s y17REET .' . .. _ 10 n 1112 n3 u a Y S 5 56 7 59 60 I - ^ fa ■ 29 n I_ - Iea ""�Ij a0 6av _ ' J 7!'y 5C' i4'" 1. ry 60 % - I.l''• a13f, 9�. \ r z f•I 6 59 •• "7 •"�.a 9 . 7" T31 a,�. ..7� .49 4441 l� BIT[a .. 60' SJ �•n ao .ao e6' . .,� 7riE 815T STREET rc '"-S:S-- !a --y � ' ,Q6'7' I T Iis I.i .IT6 7'e=ar.,R `'�253 I fF �se�s rRs1 s.� z4a �w -- ~ m U p I ;B N� 1 sa �_ �'131n7�1a2J•f 1e I •9 ' ata J 9a l le_i.l _i71 ` �' a�a-�1� 211, , `„ L2 I tz `6 R +?mil :z y .28:m'.$29!to 4� `O� .• ► fr- Imo_ f p"'l " n-A� R'!J 2 {Z7 74 . 7! :L,J2A8. . •3. so .. .. .. .. ,. I .. .. .. ° cr I r w ~ �_� .-.� _--' -._. _.. _._. T'n,hy_'ti'J ''r. yf2 5 ..=•n,it4- ZY 9' { I Id1x-z» i6i ' �a9/ a w t•0 '�: 7� _ • r; . 2f i"b HIGH PLAIN ADD. Qa5 nI x^I z $9? Ir•9 r I;'-+�9II: cis 1 }I TRACT i tl 2ae2!2 M R,• f i! i'° u QF' 'w N 94 S' EET ■ r -lsa�w6'^[C a r- o _ � 'ms• Sr I Ial.f) .�I u 1 tf I �.� •.af i Lt . LINC-Y •n ,yT� [�u NHL7E 1„0 Y ` `\�• I I ~ T SIR STR[Er Z-.ri. '_k7ci'1 T4:•.1 1 f e 5nr 5 Weir • Na mac. ♦oaT' x + ' • _ .a. . Y424':, , Tom^ 1-R7'-- • rf. + �-7T 4: � �._ 57aFEI 423 ffi} - ~az'.' 14T II� .. ... e.a+..... •.f i`•R�1:a q''T- v.• ... 9•] 4.4 60b 4 sI di 356.13 is rv, Cb 6 C, C. j-, C. 7 Cc 61 rz P LIVE OAK TR! G. I ADD. t CT:H 0 TRA ",IT *N* I T I' 73 Flo. ST. STORM NATE R Sl�,,GE 4 6 FI , 5 , . 74TH 5 T H` T E Z LOTS .3 '"l, 0.11 TNUT FWB 76TH. STREET 3 8 767H sTREE fs 0 78 b 58 .1�134 Lin> T- 101 02,0:�?Ofc. '6, '9 I� P!T 4 kAC' , G 99 100 T L Imi 5 .11 TAEET 0 TM. STREEV�'i Ue 14 77T Oi 121 rat'123 12411125 - ;j_Q:1_tIY -.73 11W.- 7 2 IT.: 05_1:4 78TH STREET J7 78 60;!A 16 65�j .'Jr33malw Yj Z02 -J zl�,;� 79 T". sm. um 79TH. STREET 27 1310:55K, TRACT 3,1 r, uAOia 33 2 N;.:'2, 2 8 as't 901 6C, H k ST111" 3r I .4 F. I .!, "CR A.0 Im.; t. r a T is- ea 7 3 ?E8 -..:.7 - 1— 1 363 .363 T R - 3 ek I 4L".. .:*, A! !... .,. EET 81TR A ! f i c F `2 _NJ 2, Z7. l? DEN 7,i I.c."., �3I.—L 2'7'CP .- , iab 2271 ? :2N -e ±awrp, q.L I- . -N -pig _I r6Ary'tz �7A I-! 7,13 CL, L—Q113 U�Q_ ILL;] EA1.j 63 STREET•PP 23 .6 V4 14. dc lt, A- , POTOMAC PAF)t/ 7 41 J 441 TRACTV d Arlo. TRACT TRACT; TRACT-E 289 v E A s, .T. s r R t f, t)♦S- ef,O��Ix 17..H,6 �•bn YTRTI! i II �' b� ! l�T n .. .. eT♦TTTT EAST' 11 /� f HN q EAST IA TM. � STREET nT 52 �_ !! " x rs g fi ^- P�BLK-I N t )♦ e. �/ . m \� >t 3 : -,� )+ - so ., 8 �S 2 1 ? 5t" t 29i 8 363 ;6A. o r F ]T )T TO $ iC� H g y♦ t S I. 26 43181 ��•Ta V ♦! 6� Q 62 - z ' ,\\ es �I 16 za c $s EZA 6f a 311 A 1\\In TM �� ie 22 39= J1I\N.q\\(I(\ J/ pp.' \,/\v/ �+i^' I > ! xif ' .<1 • _ _ 43 �y "pecr 6) 6eo 161' ,6, ,SB 13T ,56 Q 133 ,s. I!! .12 A _ i 9 I Ig OL 1 ory •...Rvr..•.wz �r � •o.rr . -fir FE t_.r, SOUTH PLAINS ,. ,LIONS CLUB,, :ONONA0C wT•2 • BOYS CLUB eLN 'e I ADD. F ADDITION ''• •zo, ••r zi. , BEAST 2.TN S'REET b ! 6 T f a6 ))2! z?2 '. >r ' E. u5 zV 40.W _ •+. 6 8 CAST 26TN R E 5, w,• 2 SD ` ♦ , ! 2 _ 66 !o �•5. 67e {y oT 2,3] e 10 N I�ILEAST�, IjQ• 27 } v� EAST 26TN. Ig'_vti^�,1 �g WMEATIEY. E I "IN 877 ELEMEP7TARY . Ir . I l:, IF ,� - "IfL♦q 18 \ti1 a \ }t i A ,4 lu er T p + t 4.,. p.r >oc�•I.•••A , F ioa'fi�y,lOr+ v ,...A \ \ •., [� 8 SCHOOL + ' E,.Sr •�1G 3OT- 9 l'neET \\\\ J i ;,K2 t • a, L \ 10 EAST D,ST 0. ... - s• 4 \ V •0 r •0 G •A Yr I I 1•_ S A 2s .• -� L Tr o ! � I (�'j � • LIE \ 9E . �fI h BLOCK 5 e e � L � '. • �a#t npt."f°�TRaCT-O!�"a R2 z 39, z W a °q CITY r. 11T 6 .23. 43 30 } <a 5 >p 2 ,o fo Sr•a M14•], RRORE 10 19' 6 ,.•_t. 7_ .[ < ti ♦ :a2' �` LO I W $47. ♦4 j+37e 4 - 7 16 • i .� } _LOTH tDT- _G 71 t- ° y5. .3 S' B 13 4 S 6 ' 64 7 I } r t 13 1 14 1] w • O w{x a . d x+ !3 3 •1 �+Fv $ 9 N 2 I • . E. STM. ST. 2' 78 29 30 1 3 33 34 P T < -10 - 13a u' a3' ' . .. P{7C)FE R'V a CA 3' 51Ry sS4[[*Y 28 9 s0 ' alo 1a1 f r 1p' i27 ST CAS; 6TN. ! 1 f!.•0 !aT 7: M 1 112:11110 9 6 7 6 `IL�'14 IS b I 18192fj ;1O 'o y :a+13 254 !!5 �36 D Iz al a3 J$ r4 - 4 4� ,3-TD f- EAST $ 7TK STR ------- _ E 7T. ST 9 6 7 6 5 4I1 n- I 'Z1�ITI'LI{7''9� 8? 7 6 3¢ �2 a LOT A 8L 3 ^ I f�a a '?l 4 VI 1415 1! 7 19 20 3 I 121314 IS I IB I9 2 as a7 w Z b1 fo 9 w ti �1.�7._LJy E 6TN .o ... n — - u E w. STREET " 1� 17 16 s 14 13 A$T ,p BTN r l i70' \p wa' W Jo3 w'§ 'a43 13j'S 6 „1 1 9 6 7 6 5 4 3 2= ISM 3'2 t1 :O 9 B 7 6 5 1 ! 2 1 - •♦S. ' I1 14 z A 2 2 4 " • �I� �7 s ! i •' � 10 Is > 13 . S 8 9 1415 16 17 18 I 21 3 4 15 '7 W 19 cYl t' 12 S S I c J 17 M -6 $ 1 'a+ EAS - ' I',,,555TTT••• ' 7 8 ' I EyA9T _ 9TN. STREET i, 3`1 9TN. 'z 'I-6 M 91918 ] ' 6 9 11 2 1 f1�- , I2' O� -.V'I `..�� ♦ , 4 7 TN STB ! 21 z : 3 8 IBM" ON 1 01-111 1111 IIlR��100 1110,11 e 1 : — to ; �*R-•; 6 d xxoe\ . I' aa•. z' IQT x • '= at 2 M12 2 3 4 - r I . Jo a0 9 09 6 7�6 55 4 3'j�j"�IjJ.T97� �� ^L _ 2ao S y 1..1 � b. MAFT111 EZ ADD •tN a' t.T_• �� .ip:. a•a �: .b. �� TR 1 � �TF 6u O AEAST MA1 STREET St s ^ 2 '4 a _ .. a T F . _ *V!. la EAST MAIn 7 6 5 4 3 2 l e V , _ .. ro3o E d 1 d J. o _ 7'7 11 ' !0' ) !O .. M1O d •lY a' �!330' d :1G .M1 b31 E EAST ------'---'— --- '---$FiA4 DWA`F--- - - .. z 1 i> 9 617 6] 4 3 $ 4 3 2 1"VAND4• a BRODWAY 4 u y �� 3 M 1y 6 7 9 LOT 1 > EA S N. -47t7 131 STREET y 3 •1 �WALTER POSEY 7 6 3 4 s z f 1JB�"M1' " SCHOOL 9 1 14 EAST , 14 TN. STREET A >o 5 4 3 6 7 f 9 p w 12 IS M IS E 17 18 19 i� YYRTLE 2 2 a RIV[ 11 S 3 N0 2 3 .� ISO N AD 3] t t q' 40 EAST i IS TN. TREET y 4 y 7 6 9 1 u 12 15 { 13 IT' 1{ A .. L�TNI 2A i 2A1.0 - AOD ��tf¢�1Ti^•''jr — -- 96.. 33 —` 54 MA. " 'S ao u wo7 r: OD ' M - 5 EAST $ If TN. STREET 2 32 _ 33 fu���bFroa aair�{ ss 5' "' s6 7s g $- i P�BL K•I0�1 34 e:r So :: > 37 of f Sr °• b. M19 M16 M1' ,6 ? - A9 g A x' .30 ! ro: sa3 4SB @ a 1 TN.Ra sT 35 - 47 59 0 21 '2? aRwq,. 29iit 369 36A a AD eso ( rcrc 7 t 12 28 A37 A I 1 r To, 8 • y' 74 't s .14 26 - e),`V 45 6' n / LOT1 7 �.ar • IS 2c A3161 .! 74 V '` - Y 62 13 -' : 16 24 o $36tt, •" x v 69 A 63 " IO2 a q23 wf"' \\If�W/I\\ A\ ' 21 > % [ •0 41 43 • F -60 1141 e srgff7 za . 46 ADOl y,1 u b6 R ET E6� 162; 161 1sB 137 Is{ � 91]S 13+ 13! a •as! • '4 : r I7t i :0 giii IS E[T 9 REGIS ST. (F. M. 2641) SECTION 7 BLOCK A .,Tr jf• .•t•'•t•��'r•••t,.t, �:vir i�}r.•Irt•+{•I � �•rri w.WwreM •'�tbrr*.R+br,s+♦tM.N�•A* �I..�l•r. � K.♦I. . ..3 _1_.. ..: _ 1U111 r .9. �1 M Y r7a.+•• • r<e., p1u s.: N:Y..t i •��w�.v}9 +ry.SY>'.' SS.1r•S .j..o.s'frq•••. ' •' 6r � aa I- K _: i_ tt i_. 1 ..-`•.4.n..MriW..•wr�.-h �••�. y. r:•w rlsnMnl_ .. � % 10LIDAY P A R K LOT-2 ADD. sue nl VIO[O SECTION 22 BLOCK A TEXAS TECH UNIVERSITY PROPERTY SECTIO BLOCK TEXAS TECH UN rJrr... I LOT I I i u i p9� 1 .LV LOT 2 Ldi ReAe r 17�-.____� -- - l.ar gHOLI CFr P:.hN ..L� 4 RS�LEE - �ns5.!0, 100• Ylal 4' D.:o Ii_._ 368' PS PNt � i N poE GE = Po ,oal �`O QCD Um3a I -z°_°Ba,x_fc-cxa xrrft -o� I "Sla." a I rl TTN LOT 850 •'� k r ,� el ar ay. uBlas'a In mlm'm..� T! TS r3 13 Ta I TS I '- I 9 flal i " eSml BSv IS_, \\ :: 2425262728 293031 3 9^q�11 12nllinl9�l5 rI6 :17 " . .. .. .. .. 'BEET5 TH. s y _ r '• _ cn 24 75 26 27 2a 29 3n 31 32 •o r4N'n ,gism 1' w9.af as as a'I TY 1 I? e ^ 18A 914 6 2 1 ' E 4 .. 88'9*9-BIIO II -AP• z ``-_ z' a sa 27 N�•;I i RF.ET 5TH ^4 3 7T E 2.•, �6 : ' 28 ; 3 n I • _ P y a I z I rya„: 8 "' 6 5 4 3 .. .. .. , TREET )H q I I Ia'zi 8^o9- 0 26a.a_ 5C 74 25 26 7.:.'.8 29 "30 a salsa u-1.Iro- LI-Oe.c ^ 12 y F a13.2!1 ' .ri musA s.9d'I I 1 ^ I os 9 u _ - O mT N n a�o fR-'� - STREET .. - BT 23 4j 124'� 9'.� 12°` LJip'T30 H 1s - a 19 ^ DE• t�5t 17 iB 19 zO 21 7 •r• 24 75 2s 'a 29 7:s I P�a 3 Nt R, g?PpPE� srs416 6,6.( a � 6TH STREET V g "P)EpSp LOT I GH ppp. >. moo: Jla _ II a ` I-NP°�;°T11zo IfH.6J Izs' o - i^ _'6 15 4 0 e Iib00.9,111l. �'3` !�503a934!6ar(3.7C `}±•)•ii - ' Si REET •. 9Tn. mz9n 16 T -0 8 ^ >' 7 R: 28 _ )L1 _ __L-.1_� z - zs I s _ _ 389 e A 9T .. - i.. .. _ w � i>s a •!" s 9 'l.0 Al a .. .5 76 27 is 20120 - s:+ ,6 zcu 2� �-{j 3, 5 I s� 21 9'H STREET c-o'T?582692-6?3329 i003 C''3i`` i'i q o_ l:t .IQ� m 4'r 3 2 I =Ito` 6 5„ 14 3 K ce E2 i`GA13 9 8' *' y 318 I7 161315 43Z.9 2 31 O L'093081301 3]b - 12. i,l� - 5 , STREET 10 TH Ti 1 l0 11 1 12 13 114 15 16 17 • , '6 ra l e a 6a {�,.9r rr a ,°.17 .8 I] n ,l 3 2' 41', '�6 2 I d. 2"9!603! 94 ' 289 2B3 :90i29 92 .:29096296'9. 982s� 9 ° 3 9 9 a 7 6 5 a L 5'' aY T ear d115 or eN''' �.G 5 3 � '3 2 II I10! 9 B - G 5 14 3 21 O ^, 72j�862�8528]QB,�F4il �12dJ,7�27a'21T �76 3Te ! R.. •• STREET �` 1 ,asj I f31lJ Si 56 .9 B• 9T32 aS e Q• �' I TH. r T° .� 63I ^ ° 17I IP •9 20 ' 2223 I29%5126 27 2B :?9 30 31 3A� 11 12 6)? `4 15 I I6 .7 512 I 3T2 _-� SO. ss fs 42KrT3 'fa �l I ' ,�Y\ i IO y •.a �,10 e za3 so 9z 1=226126217Fi5-�.i Z° - _ I 7 16 S -i 1 3 m _ .� as - zrz.Q '3 pNEKs !£ t.; . �• Q 9 m ^ .. _ .. .. 1 7 6 r 5 r a s �25T 256'S Sa�- F• STREET rg IcTH ? T 8 9 20 21 72 23 I.4 25 ZG 27 26 29 :30 424iC G1R CRv11Dt � R io �;r a3gjI za�z.a, za;y? ny'.�t"c ' >•s0 T1sS TlaS 'SS''!': Tr3 ITS T6 5 a- 3 z oe suae o 6s a bea '_9rz• 1 102 o 13.a I O Le^'lI I z313'rI2 -SS TS S 'S I� 'S 1>-H 0B PT Pg 69 r0 <23. ¢ _12] SSi2.A1233232231: 9W p - I!`] o k>o STREET •. .. 7 5 •12 '�a a 3 2 !99„' ,I ^• !ri ]C 63 i' I4r 6e ,S 17:.R '9 20 2 22 123 2a 25 26 27 28 �°7 . 3 a.0'rl 17^I 13'n.,,7fli 13TH aros T> ry'2a 6 GEORGE RUSH s•6 ]^'aoz o To !s ors .�rT'�w) :�1. ?F., 7, !_a90 r ° 21a1219i '.2607, N �I�'6I 454I. 413412 a1 410°. c� 3 1® ,� •� .� >�tianbo� 6 IS 14 13 12 II 10 9 8 6 5 e!i ^ LY' •_ITLJI B° ea .I e r Ia TH .. .. .. STREET r. ' I�_; �a 404 409 J a a 9"9r 3 I 1a5 1341 SS 131't30 29' 9 - TI 61 LS 124 ' 2 0, 2 . ' a' �dtH R STREETa x I!a 19 zo a zz z3 za s.5 z6 2728 iELEMENTARY SCHOOL v 5 4i1 3 2 14TH Sg T E-T �9d ���� a � �6i a�e ' �142'li 4 4514,a7H0149•_pM '5152,1731 5a� T 345 4a 43 36 ti 4jj }3 38 �IL,_LL_ I as L')2' 90 h 16 s la 13 Iz�' I 10 9 8 1 I G 5 �7��`: ' 0 b Q 6 0.. � ��"�_� I� -°!S!1. STREET fyi'.."_,__.r .. 1.3I 50t�- I I ISl1 81 I5TH. 9 STREET 1 ly-. ° aso �.,7.�a o17 !e 9 20 21 23�2a 25 26 27 28 9 30 31 3F z �' i 5TH c-RFET yc3. ) ��� - 68r ,tS�l_I 2�r 5 : 3 ]! 11 'b01181 18 183184 r85 86` d' 681g9190 9 193 9119� - Ar_� G IB8187 2 166 la` 8< a3 83 1d 1E3 83 Idl n' 90^ _ �'66a�, �63 I y-1 - j I 6a�� as°rt9 �r3 12211210 'i Yd.6r2057A! 20Q'9919a 191 I. `A 16 7 1 IO 9 O 3 z z 4 13 12 II 8 7 6 5 4 3 2I < a9 n 6s » 4 51 1 81 80 6"H - ..STREET ! 7• r9 T >a 2s r°°' V 9 n�69 9 T ^ T� aaa6esQa)o P �. !GTH 6 HEFT xe o_ 8 T 16 5 a 13 2 0 9 -8 7 6 5 a ,3 2".• 013 14 15 16 11 IB 19 20 21 22 23 24'R ,fr 491a1 a9 r ��r 8 19 20 21 - 23 24 2S 26 27 28 29 1 132 33 3a 3.. vao v. �/ 1 i' .. I i rJ a �L� r a �3 S a } 2 I l37 '3B '39 40 + 42 aTH ST REF.T ,r 2 m -3 p� r 9c T / PO 9.T lay .. � .. C 11T - ilia // _._ TH ST R5' _ 53a 52SI SO 49 4B la7 4 44 43I42 41 Wi 39 3a 1373� " S 17 �H$ o° w •• pT 106 04:03 5B 9 0, 0. 00 I r 9 a 54 55 56 57 159 ,60 61 '62 63 64 16b 167 68,6917017= u23 i 2a ` R 5 6 I ' ' B I rp r 4 1 I .. i 11 pp.��2a• '. z iaf2 ♦,9S X''i9H PLACE yf 29'2'. L0T 5 99 RB P16685 ea a3,az6r �sOIT9�Ta rT .'615r T3h-` CITY PROPERTY az 11 0 'J 4! 13 r� `© 90'9 9> S3 194 T96 9T 98S9 IW 101 N11103'104 r05 f6, (jY A .B TH STuc E- lJ .. I _ I 9 Iso fiTH � T. ) e. m', BTH - ..STi -`�rh' i R� I!2 3!•L In ci' 123122J21 I120119 IB 17 5 �Ir15 ii4 1131121 1101r09.4 I 22�- 1•�3 ( 5 �7 IZ 15 6 '', o��P� Ir e= $� I xso.rr _ '� ,!a I •- r ,'-J Ic 71 :8 11. PLJ •-4 y7 �t^,-�j2 2 2 :I o V'3 2 °-- N I h9yl'� 4- i Izo• ,zo ,zo' ,x� - R i.] ]! i )a3 r to t•. I x]0 B]4 1t>' �•_' �_` � -r_. J}. (�J 1 '4 :5 I'2 `ram L ' ~' CC LEI L UT CLK IS 3 IS METHODIST HOSPITAL 4 51, J" 2 P.. VE � ^ �-'---:I. "T. STREET------ ------ ------- ----�-�zn�` a8 T. STREET ily 10 10 17 REET 1-11. .� _ ' ' ---- - -- -- 14 Is WAS fr I Ir111.�21I.1_nII r .IlII..O-TII] LL-1 �♦ff' 3-5 3-0 ii LI !JSr 'II I1rL- lSy,I1i._a-.l!:} • 1_- = re3 LL_J 1..-�T6 �i a4 43 9 7 68�aD1SI 271128'q 62 4I"87�5•T_�il4 a 11 73 IkI`IL T 6a23Si,T5BRG?S E.I 6EsT 1 _r ". IIt6yI 0,4l s5Rs I9T�:,J3iIhIJG W, aT_]1-n5io8o1 ° `1---- 1---TiT-,. ••ioWn I-.--STREET�_ - a ' , , \_ 6S��I89-T- 8B2 W777 1656j6°L6Jai '3;;h7.: 3I136 7G 7° T4 s 727: 34 ,�4133�32!�r92 9394 5 I--)-rpr�(T7'��t, ° X. st! eA f0 TO ] +•LOT ` '•' + < ° - a20aB ILOT 204AI ..c;,.•. 0 0 z4 1 �e -"Teo a4'�io l*-.r .. �,� a9T'. �.. I4 PFIVa TE .S rREE'>'-:QP� )•csu• li '(y FR 2 r„2131 69 69 7C 71 2 73 74 7] 7fi 77 7R 9 80 IBa r831tl21W1 tl017. 1, s 90' >' �- i5T7LII l°� W r 2 r -- -s :a114 r 151 I. 93 94 93 F2 91 06 8B tl7 e6 83 A4 83 82 tll B° 186187 ISO 189:9017 :9119 ` 04 I Nv, ," -�i na LOT LOT Sob. 97 981,93 IOO IOI g2l_103 Ie4105 106107108110911 202�201 L 19Y 16^:8:'U�y193 lscQ�(y Y R� °� <» 1 9 6 7 6 5 1 3 2 60 I 1; �a SS"� ^e•a.o°� I pP L V•' o a tte• I> pH JSN6 POH i >5' I ^ •a a 1.« F 1R e; F i E U n !s -� �,, 6a a '` J�Ep II{ J4 f. C y`t II 12 3 la t5 6 19 19I2A I Pv LAtN 270 = �estw I M1 I ,IaP -41 .`I MY,'R r STRUT $ �{]� '01 s5.Hpn <aaa,>4 IJI ON POO 1 3e - G. LOT•.IstOH p 30 29 2a 2T 26 :2a ,I _ • ?q 1'F 16 15 i r411}, 2 II q,r 9' 817 6 5 3 Ia2> alal 2 Ro-� i,� F0 > PO H•' J p001 s 4 4 l ^' r e K « IP I LOT A I'-, c, at Y 322} 5�623139P.ax z. r:.. F. 31 33 34 35 36 3? 38 3J• a ,'C0 2; 22 23 24 25 26:p27 28129 I30ca°� I - - 52 NO. ;--y - ` .; p.!'j �.. .. _ •• Ts IN 'c 4au ,a.e>» .. - �� STREET , »asaX I x28_ >°°`4L`'aa> >17 16 13 14 13112 11 10 9 6 7 fi SI 4a, ]a _3 2S�iJn _ T o 11 ,5'S4 48 aT ;a6 45 a4 s3 42 a1a4 = 50. 9 48 7 6 S a 43 ;'a2 41 40 39 3B 3T 36, 3 I = • ea i ^ •a ,1 �u>. ec _. _,_ ._ • .. :a 2L.9 a e 311230 - '42!41 4-1 50 SI 52 53 54 5S 56 5".15 • 51 7 52 S} 54 3S 9fi 3T1 SB 39 60 61 62 I63. 6kil �ncewl6A 11:. IBA ,bR 20p 21 t'?tAr-3 • a „`,I 2 22111 19 20 21 22 23 24 25 26'2T 28 29 3031 a 32 33 3sE 3' E•so c �. = 8• 77 76 7S 7{ 73 72;� 71 70 69 6B 67 6 65f ^ zR9y1 !• i •9'a• s• > - - - - . .. n sY a T' _ eY ,- •' , ^.1 1° y 'S3R7 STREET ?z>•: gi a .. e• sa .. _ .. � v o0 ry 9 9O �1 12 3 4!< ' 6•d °If �.v 254� Z • .. .. .. _ .. .. .. .. .. a X STREET � 53 RC TIT W 122 121.12 52 51 SO 45 M 43 42 a1 4p. 39 38 37 -6149 50 6tl 67 661 6 65 Ifi2 61 6115 7 33 35' s a .32 31 631T0 71 72 3 741516 7E'i'8 79 'J90 BI 92 83 84185 88 87 i8B tl9 30�91 92!9 9 - 0 C a Ixs'" 11.E 1 1 - I i ,EyEQs, N7T_I p ` 8 9 10 4 $ 12'12 25 53 `54 35 36 S7 S. ]9 60 fii 62 3 64 65 66 6T 68 69 70 as s eotbrl I f•" ,a.51 I »>a]. t .r 4a' w ao co oC °s• x •e a< <• .. .. .. .. .. .. . ; P_ STREET es54711. e54 TH. ST r-54TM. STREET 54TR9 e• so .' - j ° W 20 ae 2041203 201 w5xa .• - n ,o • ca ee ro a° sa xI86 85 84 .. •• .. ,�J a rs es < a p `iy�9697 9B 491' 1;ix 14/143 N6E '31I 12912Q 12l1 �' .. ., ro •s.z ozlso' . 12 1} 40 �39;383T 36 Z 2� 1 83 82 B1 80 79I78 77 76 7a� 173 7 71 . rfi' ' o r •c ca sa' m as o.• ro >o O 11 [ 14 St 1.1.- r�p OB 25 21 211 21221 210 t5 ufc I10 109108 107 106 q5 104103 g2101 I 13313i 17$ 136137 « `8T 88 89 90 91 92 93 44 95 96 97 9fl 99 100 10 10 1 ao' s� s> • .. .. .. _ .. i ea. a° si s a: < 8� .. so 1 55TR. S., �Y"._ rl 55TN. .. ... .. .. .. .. .. .. .. .. STREET ii a �p0 n . ? a4 80 >p9 . R •a !!t1a Tn ee ea TO A' 5 eas al.e >0 + TO 9 j ° u N zz3 I z19 as 2n" zlfi Its IIS I11I19 l1211123 I4 I4I 14 13 138 `r419 IIB 117 116 115 110 113 112 ill 111) 10 I�I I6 17 18 20 22 07 10@ 11 105 10 10- 2 • i1: j'a-F' »,I' ^!e^i '° b '-e �_ 23Q 2..aA 2...3. 2.... 2..3.. 5. 2.... .. 2T3.s .>: •j°1•,a,o e13dT4 .eI.�t• 3.3y ••:�..l•aa1l e7o2'.. la6o a3o1' 2a4Ys' 12a6"s i2�s5' 1s4o, Wa 1e8afi 187 r dt5 _24axe148a41 IT18a » o L'6/3 1a802 >< II»BI ti18-ti 0 1715911 17.b.7 ' I.7, 6 1a7l3.•1° J17- 3•8 »d 5IS6S15•14 7°125 2B •O29 t sca .., .. 3 ->65T. 56 TN. STREET .9. 1•75116E••0IOi0I.6.)a1 I«fi16 2 � 11A66_ 38ri1516b9/!awTI 1x666 6 F 34 W1e3 84 75 14!3 72�•- _ ,=OI 102 7617e1?_8 76 f'�p` l _ N :412i2 ::4324 245 246 4` k PpR�„ 8• a' ;0 II 12' 13_. 187188189190 191 192 19' 194195196197 120020, X72 030 206 DS 2 207 4,OHEE l;af •e a eo so + �1 a0 •o °a x 1O-� 8T'«a 57T N. ;T .X to RS 57TN]!' T 7 " > STNEET - 57T s$SS• w 7. T>, .'c< a as » - ,s 1 ° RGw OF a •81 6 - 25> :54 23:t 25 :31 250 24 _ HU S9 <e9 r4>i ]5104103 ¢>'� 9' c i •0 AJOITIOR a IB 7 3 t_ 2 227 228 225 I224 �2.23 222�221 22 219 218 2'7 a 216 15 14 13 212 211 210 2 _ 208 _ '7 L! 5,lia` e = t07-1 V S _ .o » w 121 I2 l0T-I 2" g' 2 L3T'S 35 2G 201 �i2C 21 22 2324 25_ Lal 24221t 2a4245 24 2a7I24824 250251 2520253 54 55?. 23725825 2 26i 3 n o • I - o e LATES A-^:. 9'S4' i>9g 60 >c ,o •r 4a' G !! sa .. ea e� ,5' Ts'lea as .. .. .. T' e5 . 3_-- a is ea z:o 60o Tn' eo' 1 eo To' I .. .. .. .. .. .. .. .. .. .. - o �3' 3 66'.' 66R665f66i663 66 . 60: -59 658 65. m '' I � 2a 273 7.26 227122822 23 231 23^ 2 • 234235 236 37 23 313 314 315I316 317 318 1 e '• I p_ u 5 6 7 9 9 10 II 12 1 14=x -1 _ I6 17 IS 19 20 fip3 iRE ET �332 31 330329 3281327326 25 32 32S 322321 20 u - W 5 334333 EVANS JUNIOR HIGH SCHOOL ,a so', _ .. e' ADDITION 66 s9TN. x I ` + >: 38 i37k36 3 4332 ]1 it 29 28 27 26 23 24 23 2�.° 13 a •° -T s' Ts » »' To 7! i5G a5._ n o n s ao 1!' A _ V1 d3 338 3 3 341-4: 343 ! 473< 349�350 1 92 - W "« I : �_ al I` 33�40 al a2 3 44 43 a6 47 44 49 50 SI 32 53. 54 5 5� 7.95i9429 29 291I2 2892 26. 862B: 2B428 282781 2s-N-yl'W u' sS >s7 6C ,� ,. .. „ , ' .. .. ,. _ .. .. .. .. ,o Ss' ! »' +o' as' 7e' I °a ° e .. „ .. .. .. .. - -' .. .•T - _ STREET 60TK sd I:r r]a ., 131 - ]30i u s r S4 SS . ° S4 .. .. " .• .. .. •. .. 70' a '' as » Tc .. •' .. .. .. ,s n' as sa' e ,189 R 88 sll a 86� f 6 X 803 �82 81 �80179 78177 .6 7 W zs .'3 '2 %1 ,� 69 6 67 Fb .6 64 63 62 61 60 59 S& Sf �6 97 298'g9 3:p 301 302 3'S 30G •• Y7B 309 310 31I so a u S9: 171 2'3 1 411 2 43a 435 ♦ 5'84 L Y i5�r '' 'rSc a S ac 172 n2.4 I 412 433 936 ;'487 a < 4891490 91 492a9 32 1 30I.9 28 27 26 I •e 24 23 22 21 20 19 18_ I� 6 IS 14 13 12 I I I O 9 8 7 6 3 4 '3 2 G I. « a q' se' I n I + Ime as a e Y s ao u » e° ea' - a5 »' T ' •° e 5b' 173 n° 413 ' 432 43Y ' 61 St s'REE'X it 615T. 5 e' 1e °K •o a 's+ •STREET • R 22112 }s,al4 R 431 438' �486 n »' - r 5 n• ra a! k3< >S r, » rs' u• s� ar a' »' e°' as »' as' •o ra +s »' «, a' »' » °> '174 ^' 14,r ;1 96 14 9 331 S4 i5 36 37 3Z & 39-'4 I `12, �4 4 46 a - §ce "49 SO 51 S2 53 S4 55 56 37 58 S9 60 BI 62' 63 O +, a 415 'a 439 To- 2 � +,t) 0 Sa '9ea T �- », • ea I •9 .20 •Z. 176. - � al • �2B �i , eo 4 °O 2' I a 9 20 2 '98 •41 - 4n 133,4 • R0, - .{6a`'b ., 66 q :Q,,I� ��,' > .a•. e � Q ,'A '• _ R, 9 6-"- .S y 6Hs,"I69 ,17 T2 7i 7{ 73 T81 T7 IC sa' ws 9h I-T 0 0 0 a.1 f'a0 _ °d , '+a s ,•19l<, :J ,iSS ,'b 12 ' • O s>a> _ _ LLL 09 it i0 ° } IS " as 119f „ Irn17B. pp;A OB 41 `7 ii .i RSO6a4 t9 'Ia5 )� > 3 •2 M ;% 04 �L 15G 57 IS r 23� 11843 <�6a`y7t� 6 NDaa!<zzs : a - ST. R 3 p2 Vie` 4 �'' ail � 44 � ., se'. SL 24 �J• C 13B ISO P,t, e117 f �. Z • » I v as l a ,g0. 2 •6 I Oa 193 O ' e T�'� as ,° *�y•tl `3�, ' e] e° e4' Tr 4J 'y aI_ ,, <F , 1a9 s 323 16, ,y• 9J�1e9'IIe� Bi B3 ez 41 60 7�,'7e3 O .. rF 425 yT 480 oa � V a 19 139 ,y9 ,126- •de9��,•J+aA;ti�a I I ° adjj �BS A4 ` •P O� 'tW' ,'O 4:4 ^e P •479 309' � 527 ,3° 240 f. 6 ® 14 s 2l • a90 3L! ao .o ,e 4 OS tb Of 27 4 v a � a° 26 � �I :. % , s � .39 •!' �. 7 19_ .160 147 � a. � il� .051 4%195� 96 197 98�1e 9'" r o 'io:a `5,0 �'Q. .3 Oq o- ya l,at" 477 11. 25 5i3.3f' a 8 E Ifi2 j, '128„ ,q' 8 .z n • 5' e T r^19 2 201 202 i '79 L O .si 9 78 12 . � E•, ]24 53 X ! R,b `��' e� BS � 23 Z�, � 191 i9.3 '' I B .>L�4`r OP,. fi29 113112 4 s 6'R 7.� a a3T» ^ w << w loa-v ro 7 c °,� ,a a 473 OP : 723 S35 28 O 189 'wF64 105 104h03LL02Oi r - ,'35 • n 3R7{ 1i 52'L a Is C 23 - ^b1'. 9 J 28} 11 �Id 131 � O 3 O S " R •i;c � is 'i> 743742 33"4 _� �� i7a IS 14 0 521 37 : ., a:� a �90/990 28 234 ,i2 188. �4 p65 14• is F 13^ I10 .. 46 !D` a>• I.I , a STREET 1 P� °e e° t ^20 ,4, 6 v. �j21d,,8�( ^ 166 101 133 1 y f �•��5 ,. 5253'23$!25T:2 « >'A 338 P 96 23 281 23 '3 s Oi' 67 Ia0 3a sa'T°a Ts'ts a ._-y "� 7�. T2 ,,29 •.Y0 y,��•/ TIA S ^0 6 e ! )8 O e 547 sO6b s _ 313 29 ,s SJ �I � °e �86 ., 97 • n't)t as a� 539 '�,R � 2]I� L .16 139 b 133 t5 - c V6 '05 °°I>. 54 , 48 .�83.: :>t 24 :27 L30 .?e F• 1b 'S' °C uaa>a aiN. SrXo x, 'i fI i , 04 84 O,P 54'0 � 49 4 R R ` 31 295 78 9P 215 IBd i 169 13_ i � a' • r �72 ;1 7t8 T'. t 6 T �44" PyP ` ' � 583 0 a•<:, 4 . 55 � ,re t r• II 2%� . +��T7 5 e2� O 216 18 ° - '°.<�S A!. `: 6 t2s63;2621261� 23 - ' 7' sAi ? p 02 582 °568 °° :' S31 591V i3 i 0 3]p s, °' 0 ` 297 �4 2 y 1 . IS• •O 4&. �i'p 6- J[ •6. TN. ST , ', i'OI ' L 1� rr.. 59.. JE J6 Q � O 4a� � , 16 7 J ai ��', 76e1� \ IEa '°e '''rrr��� 'b0 dy ,e �. ` 553 Q•n 0] 317 !!� sP TS 227 y _., L _ ',24 ; ,o 7`S�q oLL 8: r,�.. ,f 57I S64 3{ 594 ' 04 -° 31 �7 30 a !<• T s. , I c 246 �- Qb z DRIVE ! M 69' o° 79 a 563 `O 5 59 T, °° 3 •Sj{ H :'Y 319 3O .. � :220 '79u „636 �. dT5': 2.? P `36 5 •`a", 2 i. 09 iz, 226 :221' 178* � X- 561 a 597 ai ex /` \ 310 �2a,a <23 b137'i598� �,-ai6•a:666z]5Q,237 '�s°s'0r -3�6''6i 6!9z 'i -I. +d:n'Fe,S2/�6>Dy . I ae0is I.-,$ta53_7�asoSS ' I�_36a�gaas'03fi! !.4 _•_`•�1-a '-„9ro6".,5Q 5�39a"o E)a.e'��__e.1-T t e95 s ETt(Ff-_ '�'-.•e<Jl�la'1's76dW I :teo 7l7 -' 11.I,_�-T` -TT-2 r: -�Ja s ,s,>-7`3�.•3'u'�_ie4• swk l - r.•.: ia..5..T. ,"���i'.GZS,3_',-. . •,415 2r-222 .1'.1737 Wi 45B= <}31iE'.3323}444-66R,. EET �j 9 5'ex. EF6 67f-y � CE t°ptd la-a/�3,47y�d«�_' 'R�'�ti_).•� .5 x.awIs�nsi.,r sme,a ,8M10 u6 6. 162163 WS 9 4RTH STREET Tr_ T,_•..:. �IIIJ '.�I ,2•'�Jr/7.`.I��7L'fI 12/1/,I/: 2®8�,�j7{ya)�iY1 X1 `e 'T.6 lI t_ IF I :(r'6_ 6. 60 .2 '31 7 i5 17,1?, 177 f-L I. _J --I T-T 1 7, .17 �7 S-9- 1. . . 7,i, , -.", T , 7- -i 6 7 686 _T LOT 204 A:' "LOT k. 497. ✓ :20- 9 z A ;4 1.0 52 11-11,- v, b ';�I)j a 8 67 ISC ito 184 183 10.1 .,Pin 4 04 T ID 0.: ,W- W a '03 oc Or '08 01� 11 2, 9 aomt� .06 g; A c 91198 99 00,:), 1.0 t Ct t; )kE 0 'j 2 STREET 14 .-A 2 7 6 �V ' STREET ar, .2 ;3 •I-c jL USIT_ ."r 4 15 .-E 5,ST S'RF.E' 9 a 7 6 4 a 3 7 2 1 129 01 2 ul T1.2 113 14 I*S, 17 IS 19 1 3TS Gille �9 L 2 33k� L wo. • 52 ND� 4�. S TRE FT A E E 7 9 a 7 6 5 3 1 1. r, pi� a 47, -6 4 44 43 42 L 9 36 37 17- I" 5� 1 , 4 41 1! 4. 1 �ITX jl'� 1 .1 401 3' Z� 6 3 0. •41 4J 5, 52 53 5� 55 56 5 5• 53 54 W.7'. 1.2 IS 1115 17 18 20 'Elm IS 4 1 11 474 1�1 F_ o. 0 IS, 1.1. ,414 1976 1 1, 1 50 S3R-. x STREET E I �34 6 5 1 11 71�, 12 :z S716-616514i I '. I , , I-,, I " i -'. _ .1 ". L 162 6 605 Iz 5 rR 13 17 16 29 �111411EJII, 17'r"177�r 2 T11-212 IS I m 6 79 �!1187169jail 9OT91 9. 10- 3,4 a 4 .5,T I -A -1 '34T" 54TH '5 S�REET 3 5.7.0 T'c ST. 54 T. `0 2 1 2 13 iLO7 2 2 206 202 261 12 1 W38j.'r 96 97 98 99 1 4 -Do 2'aZir 2IT121 21Z IS "0 1 1 8107 106 05 104103102;01. 1 5859 A '2 14 51 f3p .9 G 5 IT-, 171 1 L.1 ... I , X 7w_ y Ill .1. 117 11. 11. 20 121122123 14 11 5 4 3 26 2 c, 1.8 2 kA S it I 50 -• 2 !1 1 4 sla, 213, :34 13 f. 1%1 1 12;[12.111161.21 124 F1411 IS, 1.11 1228 &S 6 37 29 a 66 6-., G. 69-11 IT -0 ST 56 TH gt 3t 45 .1 z z 2. 2 j, 1, 9 1 40 1 "7 16� 1 1 �47 ".3 2 a 5 4 3 2, 1 '71 w 5 • U11*4- 9 6 97 T.." 11 12 '0 1 It, II P, IQ,., -to I -� (3 " " 1 lar nd a1ft2f ST. s 571 N. ST SITH o "0 :0 of " as 'pOpet, - TWE, 1 44 A 2 2 �!5' 250 2 3 •g . z �,2 4 'T%0% L 8 ie. I . 1 -1 1 1 10 10.51104103 "Do LOT-, ;E - A 7 a 9 0 11., 1 - F.S11.14 I, 'A, 419 L *s 1.6 1 60' 1 1. 1, a(O.TOES A 111 1.7 M Z_ -T se'r H 10 it 12 la! 14-tho EVANS JUNIOR HIGH SCHOOL 59 TN L i STREET - Q 11 's TH. VALET A 9" ADDITION 129 28 2=7 26 2SL 4039 36 17 2,3t '3t 31) 441 F-71- un.- 's 40 41 4Z 4 5 47 49 49 50 51 52 o Sr su 6 +11+r.� 44 4r, 46 5, STREET 56 IV, 82 1 78 TF 67 77 69 G 0 7 66 4 63 6261 9.8 57 711. 225 434 435 'R "W: L e- r." .9r!41 - 2912. 1 V a 9 9� 1 2214 1 412 1 �36� ; I 'vi 7?I.v A: 0 - - t, fa -13 11 432 4317 1 �7 1 1 1 �g kTc icoI• -'IS T 17REE19 Vt GIST 61s 61ST STREET 411 -3,.-. Qft 74 .486 ;1 ;7 811'K% l2q.22112j.; 12, 62 11. 17. ;TO' 76 'I go JA 1 g412-. 02 <tgl Ono 22__ IX nf. 67 38 AD, 9 2 4 421;1..14.1 J411;.ow 074 536 S 18 SI I 6, 60, '.. S? U zT. OP` �47' 232 -14 W '5d LEROY 65 TH ST E L M�ORE CITY PROPERTY PARK ... 7 E c a {a 5'r "'r-77- HE 16p, lots-, 0 ID-6- I..• 1.0 � P6� 660' 0 7 20 --m 7 t MAP T *V ..''A All • ., 3 �� , "7• "J .21 i.J 3W,2j:� to I Jwj. i m ;w 4 '1. rr P2 2211 5-v-, il I .. M as 45T. T T .70 E 7 I.- 1119 17.16 11 e,3 it Ms en 5 .52 31 j 50 0 - 1 9 94 ZL:'� 12- 122 �23,N. 125 4z 4 H STREET L M7 4 77 358' 37 3 V?! 6411.1! 47TH.l 11TI STREET 47TH A STREET 17 0 1 ; 11 LOT . . . . . . .10 ON 123 24, Tap SO LOT- A K w go* U.03 A 48Tr!. STREET X V +4 L-L. _-, 47647 74 . 1 )441 L.L_LL - O-E 7T 94t 9 Y. 331 4. .9Tn. -1. T-Al E _T'A LOT-535 pN p-, rl 44 114 C 6OFt '16 47 C LOIS14 31 TRACT 6 TRM C T TRACT D Sloan III 98 TRACT A 51.9 SIN! 23 Sao "0. OR T�l� .115 It o 'l, ... C Et"Ob.. 91. 50 TH. OUSTE 1.- 340 200 333� LOT I b LOT 30-� X to LOT AI LONGT w ! 97 : QlZ,_, Eq ts"40"X0 ILD I NOR )N NOD, twit, ADDITION 03 9 51 ST. 1 ,,DID l' 111J1111j iI�I oc, y. ;1 ISII 3.� .��BJ.1.11 12 1�2 27 2829 30ll S SS 14 35S1 319l� 14S 2 L. . ."• m 72 1 52 No STRE E �t 52ND Z STREET "rg 77 541 C4 3 1.; 14-� 14-114 ag I il.i J_ .7 ;f-L am 11.12 'A 53 RD STREET 101 BACON Niy 147I 145 1431 1 �g [it Ill 1366 11 Ill 131 1 21 8 *q, I 2 TRACT TRACT - 'A' HEIG 2 15 MG 641.119116 s9mg, 2 HITS ADDITION 4• 0 54TH, STREET M.. 1- F J. _AlLqL___j ., . . 1'. 1'.. 1 . '.. i., w I ll , , "'I 4 13 0 9 7 16 5 4 13 2 It 9 a 1 7 6 20'X .2210 . �k. q 22A 25126 r7 4 .1 �.l 1.11 �E I- 1. 2;� 13 fi r,,r,: 17. 15.11 '00, -9 '5k STREET$ §Q 53* T'RAIT-. 504348 .TRACT 0 a4 t! TRACT r• 59 6 jl� 73114 78 "14 59 6 61 62 63 11fll..1111 ------ ------ IF" STREET - 0 $70 eg'se 87 ps IRS 84 FS 1,,� 2 61 0, f c I j,c SCHOOL RACj:B 95 97 7 9:9,9 313.1" 82 S-1 STREET 311.31' .6 D'e.11T TR. LL T R A CT It ,9 19 98 9796 95 94 93 �9, ,.I' oc� - - �' -�! Ill A I 7s. od DO loi .1111 m.r till r 1 2 3 4 5 6 7 6 9 10 1 2 3 4 5 16 It il0 1 2 3 I4 5 6 7 a 4 19 3 0 7 6 5 4 1 1 4Q Co 141312Bo 12019 1 17 14 13 12 j -1, T..., 12 13 141316 1718 19 20 STREET 9 4 7 a 9 12 4 10 11 3 4 5 6 a 9 9 Sr/ 7 5 zo I'll 1 1 13112", 18 7 IS T 'a - - ll.,j -1 " ' - ld It. - - 1127, 1 14 13 114 14T 11 F. 112fl.-.5 A 1 3 4 5 6 7 2 4" 9" 11 2- 3 4 5 71; -0 IA 3 ici N 110 . 2 IT R A' 1,9 4 20 17 14 13 12 .66 20!19 to IT 2 19 IS 1 17! 16 15 141 31'! It 4 5 'A 1 2 3 4 5 6 910 2 7 0 0 '1 8 O�A ;jt0'j TRA�l "IFFo 14 Bo 4c 13 I6 15 ..P I, FT 9 2, 3 7 8 I� 1.0 10 9 0 7 5 : 215 TS 2 5 6 7 6 9 10 11 12 3 14 15 X 17 4 9 6 1 4 4 37 45 2N I ILI IF r 1 5 1! 81 6l2 0 II Il 13 la Rv STREET 3 TRACT A --I 1 42 4' 7 2 .1213p4 26 F 11 -IlvkIS 20 E2. IT, E__ CORD 00 }14 S ENIOR LOT R� H SCHOOL , ;0 e x 90. �.lililJ Cw lklkN�-t- V I I FIVE t LOT -I POINT ' ,i tsar 1�9 eta •orMl e, ax 14T- , m lo0 1 w roa . loo loo to Iw loo oe m roo Im loo ea fi0' 9 Epp: R wo _ .. .. m j '♦ 13 2 1 Q 6 5 4 3 2 1.0 9 6, e 7 8�....',.9 10 II 12 7 8 9 O I I� 2 7 8 9 10 12 a B 8 10 II 129 8 9 10 II 1J 0 In 12 L 1 g 4 3 2 1 6 7 9 3 2 1 6 3 4 3 2 1 ` L _• /�T. - .. T - _ / _ Ij" 5)- 0' II IJ T e 9 610 ! u 17 7 8 9 7 0 n Iz ao0;_ '7 1 91B ��o 11 12 I 8T1}. •• .. : STREET _ P�Ifi' » .• » 06 3 C } 2 1' 6 S 4 ! 2 1 6 5 } 1 6 3 4 ! 2 I i 6 1 S ♦ 12 I 6 5 4 }- n - - 1 - I 12 II 10 9 - 9 10 IO II 12 7 8 9 -0 1I 12 l7 S 9 IO I1 12 1 B 9 IO III 12N �? 16� 3 10 12 a 9 .0 1I 12 T g I Is z I p 7 8 9 t0 II 12• 6 T 1. S 9 4 3 2 91710 II t� 12 3 2 1 8 •3 4 ! 2 6 3 4 i 3 2 1 6 5 IO II 1212 7 8 9 10 11 12 I 78 9 'Ir1 /0 II 12 7 8 'G 4 3 2 I 10 9 8 7 a;3 4 3 2 1 10 9 8 7�8'• 3 2 1 g191 L - � I 17 18 19 20 I1 2 t!'I{ IS 6 17 1B 19201 II 12 131♦�IS 6 1718 19 20 Ill i1211314 '• �• STREET �� 3 211 IO 9I8 7 6 51i I3 2r1 ,10 lffiffill w 10 9 8 7 6IS a l 3 2 1 II 12 13 14 I 6117 IS 19 20 397. D .. !f W 73 34 3 32 31 ' 70. 29' 28 27 26' 25 2322 1 9 18 17 IB IS 14 13 12 11 10 9 8 T 6 3 4 2 1 3 i 1 �_ .2 '6175' 7a 73172 7f!' T069 GB 6T 6665 64 'lE2 G G9371561SSI34133 32 SI 3049-.814T•461 5 4a143i 41a IB 115 KINi�' 5613.. 13_ 413.4'J 1eIS,2I1eSI24� _�nO1- • 1.4j 142141 Ifi,T 3 3 1 I 132�131 Ia a?3 mgg810708.7 I12 �I868584qS1q99TT p IQ 1♦814Tg6451' I IH28127121581-B12�B12 a4TN L 9 19519 19 19 19 �9018918818T1861�.._1 182 181 I IT I7T1 17 17♦ 1 17a171 1 16 168:IBTIK�11 - �16 16 o-- -T-r 37 36 S 31 • > 311.922922822T13r22922 ! ml IB 17 I3 K 13..I ' tl I 3Y9�1' 7�6 Z7 �2201 :. .. _� �Sa'A',ao' .. .. .. ;..I.lae a2 ••.�.e', .. .. -I6 1_ R A6 3 397. D .. !f W 73 34 3 32 31 ' 70. 29' 28 27 26' 25 2322 1 9 18 17 IB IS 14 13 12 11 10 9 8 T 6 3 4 2 1 3 i 1 �_ .2 '6175' 7a 73172 7f!' T069 GB 6T 6665 64 'lE2 G G9371561SSI34133 32 SI 3049-.814T•461 5 4a143i 41a IB 115 KINi�' 5613.. 13_ 413.4'J 1eIS,2I1eSI24� _�nO1- • 1.4j 142141 Ifi,T 3 3 1 I 132�131 Ia a?3 mgg810708.7 I12 �I868584qS1q99TT p IQ 1♦814Tg6451' I IH28127121581-B12�B12 a4TN L 9 19519 19 19 19 �9018918818T1861�.._1 182 181 I IT I7T1 17 17♦ 1 17a171 1 16 168:IBTIK�11 - �16 16 o-- -T-r 37 36 S 31 • > 311.922922822T13r22922 ! ml IB 17 I3 K 13..I ' tl I 3Y9�1' 7�6 Z7 �2201 :. .. _� �Sa'A',ao' .. .. .. ;..I.lae a2 ••.�.e', .. .. -I6 1_ R A6 3 STREET 4 3 2 1 � 6 S 4 ! 2 1 6 3 � 07 18 9 10 11 12 B 9 10 ! 11 12 7 8 IIr 'g STREET_ 4 3 2� E II 6 I 18 r09 8 9 10 II 12 8 IDa 100 D6 S pe' etl 4 r` 2 1 '7 OQtoo IJO' •• •• •100' lee' 00 r i 6 S 4 3 i 1 I i 6 S cF - •7 13 Y � � 20 B 9 10 11 12 i B 9 IO 11 42 iOTH .. .. I =�6 5 4 13V! 2 -' 1 6 I g 9 ! 2 1 L_ STREE- f 6�5 i co' 8 J2cL1�...I� zs , , 9 O 11 i 12 r- I�` � II�12 7 I B 8 loo' p'i:oCl ( � 1 � ^.TRE ET I: ei lS I4 1312 II 10'9 8 :' 6'Si4 3 2 1 24,2 27. � 2(,51918 d�13 .0 21122 I �L�� 23 1 1 5 6 2%2a l •• J L �. 19I.i0 :11 3aT!! 1 d ?'2T..2B 29 ,30 31 32 33 .l•..L••� 1`4 L S REET 7 5 4 3 2 I 17 7 IDD 8 9 10 11 12 100' I _ 49 40 47 6 33 ^��jI�3 �I42�141 ap 93a�13'7I�38 35 }5�74�()13.fL72 1 34 SS 8 57 58 59 60181 62163 6465- 866 8 j6n7T8 79 SO +1,82�93� : STREET % B3 82 81 8o A 178 77 76 75174 73172 71 70 69 23!Iza12 122 12f �• Ila' 1 B9 89 90 91 ',1 3 94. 95 9101102126j1271 12 I ISI 1 031' .. ._ .. :.S7T'RjE�ET. � .. +_ -. .. .... I� :1'916tI1��IK111 ,12 11 1! I�l,q]106P07�� �9 6 I �� Ga fQOT -� ,6.2 ^ :. w . t•5 •eY'.•~ L. I.. I T ....... ...... 323 2 4c 6Ta�IH�.� 20'yy 46�__1 255261 4 ••• 4 344 ] 347u47y41 97 73 3 341 •• •. 31 7 •r ,2 r 9 1 9 'Sy STREETD 4S NMIK q6 KS M{10.41k.1141• 13 �„ 160 cs 6 ! n B TT 76 733)4 < 7! •1' 61� -• gq 2 i'155:156137 1 « 1591 ICI 16� IW 16.5 16 16616sJ170 q ,. .. ...' c .. .. .. .. .. .. .. 30 a � n 6r9EET ..� .. I , 8 lu l7 X ST4E�E�T 47TN 47TK' 4Y TN. _ I. i ss w :. .r .. .. » _ .. a '�" 3 ♦ 00,. _._l�si ���w Soo ` I lLI. f 312411 104fD iG 0.'40ti g,• 3 0 I �-: 5'. 9 94 9 4 U _ P? �Os'' �01791701t,`. 11 01) I: . Mp4yT, LOT -I T40N 17019 l6' >. rc o ZTT ''77'' 6 "'r- -^'• o `9T P00 a` r`7 sl NO 3 - O 3 131 lL4 2 IZM26k2yt2a - eNl � I_3TT�Y �j.'. 1 lail 4 Ri 182 IB IB,O,j'16'sl+ 19TIr a 8�: �' .:w^sr co sd eY a J - I y :OT-4 •^ ue .. - .- . sx. •: er .. I. .. ..I-'» I. _I.I.. .. .. �.. .. .. ao•'q• \\O § e 21.oa n87r. STREET V .. .. x6. d�i�' ::v4+e�zi!'•T,'>�8T*�'F' it WK -. ;- ,x Tfst'1' I T 7 7 7 7 7I 7 fie 3 x'j{4 y�s4jj4';'�a��a!I{o,•",cj�'4a��Xta'¢�y4j)'a:'4G��'4,-•sT'Co�jT6�aT.j{ �I 11 I I I I I I I I I I _t•al E o f o .I• T,1A? no o .e ,s - I 93 i49 9 __�-yp!flfY-��aW�514B1483,Q4R- 784T - ? 5 `I 6! 66' T'. • w 4w9s �aV µ 4 V Naa•_ •.I . C, 49TN6T rETa 'X e LO T-3!! r � pN , 5 = ± slb FOR!!!"' �. a ,r•-•.} t I ••r \�\' LOT•S3{ +• 5367If s 12 I� 9B 7 � S:Oy10.!'•Jc N\ ~ �� ., e, , ; � • � TRACT A TRACT B TRACT C 'X TRACT J ,0 7-�'�� I it I__ : 53) •^ 333 �- I p13b22S21'SID3,9�SrP 3!7 , 1 `�—_1.-- F J y • .---._ � ._ •` "S Sol. fe' Iw• � a••. Izo' i_o .'. r ,f Sfi F .. .. .. .. . 1 ' .. .•' w I .,� L e.e aUSTE .x9.e A --�� sa K 1:•l0 •• 's 1 'a0 L�� _.—says.. - I'-iOb" r ��_.. -44, fie rfi! Laoo.�'��� Op,EP-OT, � �. ,. _fi,,,.bi I •." Ot.� q •� _ �;gEEM NOR- D ,N -� LOT ., r '= LOT 41 8� l77 1 6 Z. +`-"1,95.•2a 400 Poo ! � ��• o r � AvU'TION• _ is .•�!' ��p (�� Tom, 'e 012 '! •�l la.x f ,I - • !If ,I fl 9j.i �T�..1-Tf•14 17 i1a 1.117 :11.Oi1,..:I.}t}•�!!1!6'!Tjla iM•• •i s ♦!,{ 9 1-n ..1:7 !N5 i.'l le � ! {` e"�I'^I � 1 "! 1 _! I i` � 1I LI�_L��J .,•�.+. !��_a�;_ L ' ! sLi 1,i c�-ova a e w. � �� 1••:fa{ -!••I • 4 1 n 9 tI r T ..Iulaa a! a e! � a an 9a4 !r pe !3 e4 sa .aT .a n! ni � 4f '' `__._ I ,' � d is ; I ! � r � I ' _ ' . i _ , �� •' _ "�� � ... l• I ,�I ; 1 . � jj• 'Qt I 1 ' � ! t I t 1 I t , T� P •�.\i . - T 1" ' � ,.f. � I-�.`•%�eI _ . « .ja,j„ I._ Ysj9+j,•Na .�r,,.:.� ,..:rcln+•rlw'•- ..,.c/,.: . r}t.., ei a j i. _ ... I� aL al...e vT • � �I ���o_t4� /SR • • 27+ Is ;i«, ��c;a a .� ! r: 'S_i lir z 26 is I II '' ,or n Lore ti� '� ti ,n • i I' 1 l l I -•I°` V 1 is I•J � ► 4 ah 11 . .v; 20 • f • o1v f R•cNI12 1, I Gw ° �. s• •!s 40 3. ] 9 I'BVj�6 ) 7 a OI • f � ,» fa saw .. .. t �r lo: x�oL �a{,� I•a.Tf ro •r •o >r � > .._ -- S-4or.0 • a• Ir "-a <� \ frw - •b •>4 - •x••� la].L� •�•r •Iw T• ". i K-1 DQCT-�TT_11-I LL T •LOT-1�rTLOT-)Xn5 L3 D+--onDRtH^ :c TRACT-W TRACT- `B' • TRACT-"C" f +�>ol_ AMT'D" - o •o •>SI ST. b p•• I AGEE-►HARR AGEE- •I]• 12� II� IO 9 B'. • C 0 B io' 1 RHARA o - A DO = l ' l ~9 • - LOT-1 - a u.aa• I i _xap' ' I LOT-2 " •DOITIO" 'I" A020. Y +p w T 63 e 7 7eI T5 74 T3 72 1 70 a' ' A ta.I. • a4o. 1• +ro.' +t,••' •r.•i •:o.ai ,xf.a: � t 32MD. o 52 R0. _ a.D.• • 361 as )y T• ] )f 77 74 13 12 T T SO Sr 52 '3 54 ]S lfl y e 10 1D• ILq ID2 ql q0 Y 9 9( 3 9•'SS 92 91 90 e9 ee gl e6 � 2 2 2 �5 _. _ _- - NS _ 7 211 91BI 71(ulw �AODITIOH �I�It'' r--'� -_.�. I I 1j 4-1. -2a <1220I21f 4 I7 16 i7I♦aTS ♦. ♦S •2 • Ia0 a L a] q•_ - Iq Itl 112 11 II I IS I 11 IN 19I ' ITI 12Z Q31 123 2 12 I 1 i --_ •o .. .. .. n ]3 R0.a .. a' ,• a >o' a' .. +]' ao _ jag' w >• •o n S3 RD. 'aa, •i .l.. .. - ! i O.. STREET O ax a.: `D 'IL>o • w n •o n a-7,a n >a a - - ,. .. - .. q I x 03T[O►AT XY Wc53 2 1)f I19 1f la, ei if La♦ .$ •a Itl �' r9 L•: 21 2? 23 IN 33 b .. .. ., .. _ .. S 1 IS W 1ST 136I 1 - "O .. .. 1 _ • I ADD - ± �a� _ , ISI I M W 4 41 1 13 I 3 "_ - TO •• - �� 12 IT I I70 Ip Nkow Joe Ks. K l ♦ 1! . 2 t q 9 ♦e� 161 162 16 I I6 `O ' � 1 � ►T •N+ 16 168 16317 111 'p f7a fn ITi 1" 178 T I If1 IQ b -It 12I 3 •16 . 54TH'.: T >a' •o 1 l4 IS IT 16 9 Ib' O IT] 1•c I>a •0' f r Y }• N - •' - f,'aa a•' {•' ai a: ar a aa' > " STREET E » >5 > •p > ,p a b l - - ws0„ - - _ 36 ]S 5 5 •d 129•I30 t3� 13 .' I>, IN I!3 I!6 ,. rs GD 39 SB 31 > 0 o I " 63 4 f3 61 2w� 1 O 0e O •a di •9 ••' a•' •• •• w •i '• H S, ' >yt. 29 2B 2T 26,+23 4 S w 'o ^ n >,_.1�3 • ui[_. T G fn 1G 19 b ep� a ((�� V 1 9T 1% 19] 94 193 92191 90189 :tlB IB 1ij61g•,j ' : 1 '12. t22 2 120 t19120 tl9 TO - 3 >6 n 4 6T 66 I3 t2 1 10 9 g T 6 ] 4 H `1•-L`yL- SI is >!' T. TOT TO > r0 •0' 0- � 21I 212 13 I _ _ • R 'a = R�.3+� � 37 8♦! 0 41 2�♦ � s •5 7o n n a > ai L, so f0 n.! Ta. •p K 17 IB 1$ 122 12 25 31 3 }:TH. _„T • SSTN. •' •• a+ - • ai •• •i a] > STREET - w as 0 11 11] IN 14 IS If 17 Is I9 20 21 22 2S 21-2} 6 91^9d 9�,10010 a2 I4 S 3d }7 O - H ♦ !! •f •• •0' T a 446 '- •6 - 7 1 • - .. .. •• fr to .. 31 ' w 11 - 3 3 4N 3 31 .. b e o o N Ila .9 37 36 3! 54 J3 Y 31 !�cTO271 •• .. rpm w • } � SO 29 2f 2T• K K 93 '12 91 tb M M 67 b E T 6B 6 2'. a33 y6137 a38 39 36 TH •. - _ - .. _ _ 1 2 6 _ _ T w w n >6 T A 00 �1 282 .. - •o •] •O •0 .. .. .. .. _ .. •a' ao tlo o •i STREET - 39 40 !I ♦2 ♦! •♦ 43 46 4T . SO }P�a f� f6 VT ff f9 A TI 72 w 03 2301 97 • 3 9 291 9p 89 eB BT B6 2B3 84 B 4Ty, ♦7! R a71 4T0 9 - l ] „ „ ^ _ w e]' 62 BI a0 T9 7B 17 T6 3 Tl 73 72' 71 76 69 34+I33 54 33 S2 31 3 4 >1 ' 0 - - b ai •0' .. •0 •] {0 10' .. .. ,. •0 •, Tf 9d IS •: q > t-'• O II b 40 8 - n AA 480481 A I$ r 357TH ? >! w 1 I 1♦ S 16 IS I 19 O 1 22 3 324 S 75 Ale T TB .. - a .. •• .. •• • b • - - .. •0 f • >. .. .. .. <<T 3 7 TH o f : •a ,o d •o' b o' STREET a E BS IB6 BT Be B9 90 910 92 93 94 93 %9T� , 2' 2! 21 25 26 27 282935 p 2 - b yp 1 - •• .. .. 9 w + 33 350 % 333b3w 332 2 ah +a b3 9•• 2 91 'Ir fil 112 111 10 109 IOD 107 IOi 10] 104 IDS 102 11 100 w <0_ .' 2019 18 17 16 IS 14 3 x•d 10 ar 4e :. 32 333 54 "iw� =raSBrTH ne A 3 1 a0 3p3b6M ]_ e] Se) t ]6B8I 3fB9 0 337709 370 37T 1f_ • :f0Y- < "f90,9 a96 9T •n-,. - 1f9apw' +�< yN♦ 335z,a 3-wI r N9 .OS3 22„�Q60a - ` E P W !O o R T H371 -373 Q4' 12SZ1 A,,oSTREET o _ 91 ADDITION SITNIJ 141' .2 M19]39 5O9D9 a<CJ L �B TLTr DeD-lT]57-- prl0t5 n • R it STREET x T PARSONS u S ^n n • a3'u w Io r> ELEMENT ` p �I a_ I p' 1 IS IS" ISe l3f I}S 13• IS] 132 ISI ISO w1wI 232231230229 '6 T 59TH. STREET O • >o i1'! b 1 -T >, SCHOOL _ " n IA Bd 1:+T I% 193 194 IY3 192 9i IYO Ig9 IBB IFQ IB6 !4 3S 3f 37 SB - - - ^ u '^ O O n n r w fOTX. •o - .. .. ' t STREET'9 u n • e g R L� ■ ,� Y 1D a Ta' • ep fp n ao fp a, W o o O $ a' o o �• +' h n r 2p 202 3 20-1 206 -1 ZOB 210 211 i2 213 2K- I ri1 2M 3 a • •o .. .. m .4 o u r r n n •' 60 TH •x •O •> • ' STREET t •: 1f• •O' a0 Tf T,' TO' l0 if 261' T T 264 I.. d O _ 07 •0 }I� • -p Y N u - a• iil 1• - ^ r - •i a0' f0 I]' fD= f0' •! SO' Ir, qq x N St STREET Y 286 • 26 a m o l TI„u �7---„u-��1 `��' u •, r6 b� , w' _ •• • w w : .. �72"2 • iO v to'I-w 1.?l ..I 1y1•+f+o l+>.7 n• w:ti e•3943. q).3G 433. 4. .. .3231 B " w }, fIST. •• ro .. ro ..}TREET �'1 'Yt T' M - 2Tw' i 2 • ' 29 •� $ Z S $ $ �'� r R o R o R ,� _ .� ti p- °2 •d 3• s a '�, 2e o .9 1 7 S R . - - ti _ _ _ I t 62"0. = STREET 6 2 ' eel• 1 t f2RD. • n n n ' ' 'STREET XIO ti P. C •3{gRD$ 5� STREET t•� `-• '!" m o e . A. j iZ 2 -y.... o�'m�o b r��og r� wio w`wa �a ---i5 y ��•• K 3 •� = faTK - - s m 'j STREET. 154TH. SS ^• aip qj� (f O O a„ •0 b • _ E7 �O S _ • ajy •> n aD0' i E•y; � 2 N P A a a Orv, a e$g, w m C 1 RO A Sl 5 "3k F� C a & d 3 w It iRa8 1R A S < 1tw F3 � li4 .9 :d id • fl i • m�7y .n^ � Ru4, S65TH. STREET oy u 4.3 • „r a 37T `M a a PR8t a 8& etA;11 "$ao8 88 8 8 Sp - .Iz- moo 3e; o ^ i o o 9 0 0 0 0 0 t0 0 0 o is I `wu•a•a [uT. ?. �♦^. W 3B2 0 0 0 0 Op o 1 A A •2 •L at 0 3 ]o - o t3 7 a! Q aS' - A •12' Ia0' TE e' ax: rE •fo T: 1.0 •:J� I (�! d s 'D c w f • •x •o •p • gg b^ N a 1 xaf m _ ' .y _� $ o 0 o Q o o e o o c o o •$ _ o �_ �_ o_ S o o_ o� o 0 o o o �c a� a o �, w t _ - - •e � � •o - - � Tao « a�xQ�• mom• _ A i •1O. « b •: _ 13 12 tl D 9 SOUTH Uf4 ; 'ERSI+• ADOITIO TRACT -A =� _ M • •O L.:+. �F' M O N T E R Y °I ,�ITII- I3�6�IIlel 9`10I IN:. 31.T°i6�?�!�^� Vad+ I>Dla O p^ ' �uII MTI 1��^J T11• ' F-I - - - 4�`�" I 11 � T4.T«T)I[9 s rI �6�� 5 � ,�� 1NTN. 3T. a :.��I• U --- - I s I. I Y J //19 18 n lx is N 171815 i 1) I• 19 220 Q O, - - 9 71 F IS 2 ..- O • b J '* 19TN. O. ',.'STRE ' i s N is •Ia0 9TN._ `P L HIGH 5 CHOOL .. .:.. . ........-.^ ....- .. �32 ' 3-o1z ]o.Is- __ « .. __T i!• S 2 1 t 10 9 8 1 2(j• 2in0 �� 0 9 •' 6 7 1 3 2f01 Is K- ui as .a w ,., sl ab.n too fO11i 1xir./i Rli w•w p s sao �7.3. 31 c rl TRACT- A' R./,/,•TRACT- 'B' TRACT-"C" AY ADD. 1y ? TRACT DIo TRACT A .,_,,• TRACT "Ca I< A 0• MONTE REY CENTER ADD. _a•..a1 • } 1.2 t!'OTa ,a A laa.oz•� 29 91 I ST. 9 f DI 9 9 ff,. ! 91 3 92 91 •9 °• 27226 7 K11 r j• °' O ao � 29 O :q Nr 112 11 N I IS 11 I18 19 1 121 R2, 23 1 ri z 12 1 I 1 I ^53 RD ST • ' r o , • a! w' w' 1a/ oa; a28� y,p�o 2!0 .» •' E22 a.•. a' 53 . ws " •! f - a. b!) !6 SS 8 279 2TdITT 17- � Y ' !J 1•,. .. .. .. j�y� 13 IS• 1>7 q{ 1 b Na as na!♦" - 0 •••-CT'•'NONTER Er .. 1. .. ISI - • _ 11 .. 1 I! 1 3 _ I) 2T1 y. 4 P • b CENTER A00 1O - i o'ro A ` " S° 26 -[• yam' 3!• S•TN. Sal •Nn 161 16216 I K 16 n 7tTN • 214 jp I68 I I 171 na m n m rn m lal It218 �11' IaOI t � ' u ZW ' • IS• ,,� w 1 U 11 - .. .. _ .. - .. .. -STREET Y S• N •• s/'N a: as •i .. a'a: .. s: ai . 269i26. 167 2[6 2i1 f O ,P 1 IS O 11 Ta p }•1 n 7'i. TI I N 'T 418• J t' S Q.S a0 10 f • T { ! 1 F•O. » »! • •, .. ���... a Zia I'i 17� `'P If 3 2 1 O 08 19 Iw 97 a! N of n ai •• a/ a� at 191•91 193 921911 1 "18 1 ISS 0TQs°' S o 2.1x•STXR72 Si 232 251 23 2M 2•• 2.T ' 13211 ' •4 '2;« ; )� �. S J SI !1 19 , ,9 >• STREmTr S;TN. • ' as' •• N s^' a• .i 17 .6 •S H .3 12 . S Sa 5T •o p .a !S w .. • N - N• •T .. •S• S 1 S Na • N"11''P 9s ro3 K �O![ S SI 1�lS O • OzS 20 208 209 21O 211 . 41 - S 3 ItY �b u »� KS •• .• •!' w. fi 1N 1w � 1`aj+ Nauy �a �• 0 61. � n, 6• 6! [ 6T 6f 69 T )• I � o w w iO LLLtPPP"``LL�__ I 36 TN. • S 18] • 561N ad M A' »' aS' 1 I 2 268 _ �pIV.-��I t' Al R 7T 78 79 81 282 •S3 '•/ rJ 1• 2 203202201 a0 1Ta• 90 ] . `J<• �� , • Mx •5 i1 •I •1 StREET • StT ;. iO .. .. ,p'• 'M ° K71GC S, .i W •O- t _ b ft 'J9 b"T IY a' fq T• 7• 7T 7i 75 ]V • •o s. r /" Z I �• ♦ 44! ii r 9D Ill T a0 .. / •S N .. b p' - w• ai a0' a3 - •°' ,0 I6fS - _ 3 3D1 0 ••yy u• .• , 9T 2291 90 •9 •T •1 8• e • I7S 1T6 1771T• IT9 I• = IB 18 i�h- f YZ 1 M 93 9• '^ STY :.ptlp 20i •/ •!' •o r , � '° •s' N aT f• fe qD lOI 42 p ] a � « ° ^ " - I .• T� S ..I S>✓� b if ,a of •9• a ,. M, q•105 o OT b p • "'M. t0 ST S1TN, s r! 10•Ts t 0 11 I I N IS K S 1 !3 � M ItS - •. - •l.f { K s '"f' 17. J73ITI ITI ITO Kf Ii• Kan ' 1 • •° as S7REEi 19 O I I2 J2. 7 TS 122 121 120 119 11• II) rp M ,o S7' N. 2 •s •d p' p' •d 0' 1 ! • IK.^ Ip• ••I al' 11[ IIS IN IIS 11? flf a b S »S so _ - „ F .T ^I , .�'-29• _ �. ya a - q 1 �3 70 9 N .e 2 •! a0 .. _ •O a0 •O O •S �w r J19 t!• ^ 16 o125 1 12T I - - S1 3% 335 1• 332 31 2>�, l07fJ 0[ ]D3 J0. 30! S02 SDI r .f = 2• 129 I ISI I]2 1J] z i61 157 I;♦ S a 1 n. ».a •0' - _ l R 1_ •r v. _�_.- • a' _ .. j -s2 33 « -- •, o « • a b a! •a^S�� 1.- 1 ,�'W S » ' S a1" r 68 9 3]0 171 '2 3p7 Til•' 93: 'I WS 314 3� 39 1« 2 3 • • A «pESERET ` i .. i > I33 1SI 15! e, OI ISO g a STORE ET'0. Y I ` 78 TN 3 •• ad a' Mrs 132' a,rr SL•2 :3N •sT s '�9 ITI~ • l9TN". Rt x] » N. )f _ J1 1 1r '�' J1I•i SI «• J12 •-]Iw• I « 339 9 liaS[D-.31 Y♦O o FF 7 f 9 Sri 77 7+ •O. DiO 13•1 59TNSaT(: r'[.g•1,f�•nl•II]'a��Y.-�.3•s ! I 60li P11 a1f2S• t, 2S 2»2I « wne„' ���N �!!•] »raS.s»Ir ] STREET. 1 PARSONS R N. I n ELEMENTRY 3C'^ LOT'1 S30 SCHOOL • �n. I x I I �Q u 5155 STREET « TN. ! r1�LL 34 , D p aaeD[ao(Y _ e 1 •I•+.{. 1 i`;1 •i fan 10 s`'s^ orAla�p£p 601iNu 7 _ oou SS CITY a�TI OPERTTAP 1,I o o S� ote .otl V nT' $ /3 iab isf s0[ ♦ar 1L i ><613T t 149' .99}9f 92 1) •1I1,.1. t- ••�-u Y S a3 9 W> •Y 61O . n e ! 15T CITY "Or, CITY PRO►1RTT ►Q[L-fk 1 t ri w 2 2i - w" _ d �e r o l •o•i STREET i 11.0' -•H-- _----_ 1 • v ^ �_ R i $ +- :i .�, „ _ ^ - U •�li ro TI.a• 11 w/.•1 1_zd...... 1. z/Nc • r A ^ • •D ai • n _ PPaK :' w CIT7 III 2ND. WWI a _ INSroo eay�1Y TRACT A I}. SWIM CLUB n Eli RT !: X C K�* 1: ADC ITION 334' X - tcm a 1 , CITY PROPERTY �w•rl.••11 •• .• .. {3RD. IN yl! TNP v 1262 PJ JELOT 219 d0 rolp m m 9 S m o e 8 m n x S o o SIR+ •'•• iS�Na�16' w n - T._____7•abd_______ .x •.T. •~ 1 � 111101 o 9r7 �Fill-0-0- : 0; b LIVE - OAK -o-' i '�i yTrL:i i LIVE OAK ADD t' LOT -A' ;9S � a 2 's ' LOT-B $ OiR R t R X�o - O SO•K TRACT J_- X465 EX STREET X r ! 65TN. LIV[wisp 1.. 1b p 1 �^ .. . LOT 1 .25 156 239 247 249 - 1 ; �.I• °° 1 ^a �a�ttX a�f Rya s & aaeB ADD ADDITION : _ • o fl• zss zsd rs�tsz^^zs_PJoo"' o' • _ o 0 0 !s ao •n• 1 - ro , q a/• p• la' w' w • s�• 1 • ao • • •P w O a p i •iI a :. c D I•s 10 1 I! I• 1! 12 11 u ! 9 T [ 5 ♦ S 1S Q • _ _ _ _ gg �DIt gg O S C2 oo $ f.1V OA K tD r _ . 2191 9) K 19 20 21 2z 23 N 2! 2i x7 2a 29 )D 31« X i Q •� • •a' b •0' ra N rY b' •o ,f' ao' i ae' •o' •d •: ro - - _ io 4F- 0 A 3 2 1 13 12 11 its -r I too, '21.3 .4 17 -8 If 20 11 1 a I? Is 21 22 S i 103 I Is Ii 1{"1. 13 7 • 5 4 3 2 111 S 4 / 3 471613 q1 12 MAP I-J 71 T TO 12 11 10 2 a 7 6 5 6, 1 2 31 INNE11p 12, 'I RE.ET 1 .7 Ill 0 T i T 4' STH. c.— 5 Is 17 to 19 i 12 13 14 IS 17 IS is 20 to 7 TREE. W I 34TH, 3 1 7 5 4 P. F. SCH 1r IIN gz%* !=jmt a F- Comm== tnw= MStill" hS 4 OWNS V. NO � PC. 11 A IOWA 1999021; poll N. X VISION 91091 J�g - milli - N101 1010"Wil all. - ANNIN 110IM911-1121 ionic 9 �- A 2 IBM IN -11 .0121:1 pwk I a 0 7 to 14 65 16 17 9 solI- STREETt 0"' nr.,=M mm. rill II 10 a ? 6 ; 4! el P 4 W H E E LOCK 21 22 I RE T P. SCHOOL 3 2 1 0�'r A 4 0 9 8 T 6 2 1 5 4 3 z t 2 �3 6 1. .2 43 K 1 9 1 0 IS 20 14 so (2 kT.,--.- IS i, I STREET 'd 1 4 3 RD•,', 3 T E 2 t -- - -- -- A Q 6 2" 1 .0 9 a 7 1 A ISaJ 10 11 6 Is 4 3 2 7' IN ISBN ( n!5 4 .7 11119 .0 11 12 SYREE w e 9 4 21 10 a 7 S S A 3 2 4 ;T I I 2 (DO IS .. — 20 17 is I ?z .0 - I . •1. 11 IT STREET S 13 wt U7 41TH. - T 9 7 60 lob . . . R STREET Q4) 46TH. SIREII .6 TN. ;j; r — * - - 1 .1 .1 . - d :1; 17 t; I A. STREETS 16 1 47TH. STRE%'4 rt 17 TN 0 a 7 6 1 4 3• 2 a 7 fi� Z' 1 4 3 2 Ik Q 1 1 22 21 I I" i --.k 13 20 n 19 21 Is a "TH. 40� IT" IS 12 10, 4 3 2 1 1 It• 4 1 le 2 '2 i's 13 3 "TW ST. 9 112 A 0 a M 20 14 w 13 15- 9 18 • 104 TREE12 9T R. CONE A(DITION 20 27 A, 9 a 4 6 09 LOT B _.T F A Q) T. 10 A 2 $1.. 15, �6 '0 1 14 5 T •A M1.3i LOT-1 SLOT -I zq to WIS A00"" TRACT- A' ...,.TRACT- *B TRACT-"C" 0 TRACT A IGEE-P.... AGE it M 0 N T E R E Y r LOT A -2 AD/ LOT _tn' •.��1e {�; 'Ian, ```•�{*%� �� . _ 61T . ^.. .. .. - - .. ' : � ter • - �f. s 1 s: TI a �u { s/ O ^a y n . - 2 qq 1 e 2 11 12 / 13 12 11 10 f e 6 3 4•13a 2 1 0{ 7 10 1 IZ i! M t7 K IY K K 1 IS I/ I q U q ' - :z7e 4 O ° R St .. r 27A 8 I,1 .N OI STREET Si - - - - ST. 1 I _ to 36' ! •5 I S 2 1 �' 6 �J' 9 a 7 6 3 4 VN 241. 3. 3 1! 4 11 IO 9 6 7 f a 4 3 2 I F nY \V n w r •O a r o r' .. .. a - - - � 23 IS � Ni r• a •O ao •O •o 0 -. STREET 0 3]T1l J ST. n I ` ^ 3TT11 { 5 . 3. 1 If la { Ia M 13 12 11 T : 2 : I•a' llf' 9 . - { , z O ° q will- If ^ . 13 y y t II N IS 16 ' B dl 4 2s 26 27 2 3 I ^ _ ♦ • i 5 4 3 2 Io 11 12 13 N I❑ I 17 • 1 .. _ I• - a 29 Ifl lTt:• p•� f •O •. 3 TR[[T o 3a TN. - - ----- ' aT. i I: 38TH. ST. wiII t0 I 2 ] ♦ 3 i 7 t 9 I T{ 5 4 a 2 1 3 W 9 6 {! 4 l 2 1 10 9 7{ a/ S 2 1 11 f 6 7 6 a 1 3 2 1 q 9 �- { 3 1 ! 2 1 _ - 0 9 6 { 1 '2 K A la II I N la I{ IT 16 20 IJ N IS W I] I° 19 21_ MIS f2 N 19 21 II 12 r3 M 1 I{ T K B _ = 1 i Q N U 12 1,.11 12 t3 N IS I 17 n a X 3,. STREET I JSTH _ 'T .I y96�. a•- a' - )) W J zr ST. ^ 39TH •3 4 3 2 1 9 T 65 4 2 I Q 2 9• 3 f 3 4 S 2 1 2 1- ~ /h . �L 92 'r r •.. 6 t 9 i 0 9 8 T f •• 4, 4 1 4 6 Y � 3 4 `•o ; 4 ti 1 ao>. 14 uo I I :3 I1 I IT la • 12 IS 1{ 1 16 17 1819 21 3 Q ; i II 12 Is N IS K 17 0 19 20 ro .I 12 �! N IS 16 IT IB Ae `y ] 1t1 ^ I 12 I] M IS 17 ) T. STREET �__ _ .. .. .. -� _ .. .OT.H ST i 16 OT .. .. - N » •a U f (f 6 3 3 2 r l - 211 IDS a S♦! 2 1 I II 0 9 6 5 43 2 ,. 1 t N l0T 1 II 9 8 7 6 4 1 10 1 C 1 IS N IS 16 I la 19 I IS N IS 16 I] 18 19 21 1 12 13 11 IS 16 17, ^ na i •1i 41ST Ij SR , R n{ �j 2 /IRT. i • 113T. Id ST R 41ST7 .. .. .. - .. .. .. .. ' 1n. .. 12 11 10 9 • 0 9 B T 6 5 4 !\ O O 9 a] 6 ♦ 32 1 9a `,( 3 LI. `• � o Il! LOT Aj2 9 I 12 13 M IS 16 I 0 9 4 j• N },. 1 S {. II 12 13 14 IS 17 ao . - �,N` 2 ._ -I.:.( �� _ r r •& so fo .. llt.f •fi.a 1 -- ST 'l0 ^ �Sl 9a Ito - a a ^ 2 1 =0 9 ° K 6 3 1 s z 1 N a `7 s a Nsr.^ z 16 IS 14 13 a IC (z a s ti r F( 4 iY f 3 19 ^ Y 12 13 1/ IS 16 17 19 20 1 T4 $ _ "_ II 7 8 9 IP �I 16 IT I° 19 2 21 r alpf l• of •. l,ef I ^ .. .. .. .. .. • 1 y N 4 3 6 STR V Q34•z•ti♦ i 1. a r 3 r! ST R 4•R•x . d 431 4 .. .. a0 .. .. .. .. p STR 43R • , •, •T a a5y 31 ly{ 39 q {1 4 •, O s 9 a l 3{] 2 1 1 9 e] 6 3 4 3 2 « II 12 N p p !. 4) 11 10 9 • 1'1 U E ^ i Jr 1:i IB- S 11 13 tii •\a t. f' fl! •la' - 6 n55';5647 - '59 60't' 11 12 1] N IS H 19 20 II 12 IS I4 15 16 1 1a r9 2^ 71� 2_ t. 2 3 4 S tip _ 63 Nf pf• w ., K n' al �• - . >d - .. - •a af' - - _ .. sa' » I- R14 TH. ST. jj � 44TM. yT. �,� 43TH. .• ] 7 2 1 9s7{s•II3zI 09e7 yq Fit Ae^F �NJF s13 iw V 2 I 5 1 R IQ 6 1[ I7 la�l9 O it 12 13 I{ 11 1T IB 19 2Q D SC 1 e .ply` •+ Q . 23=• - v0 �0 �>'O 2 P a � 4 ' .. 23 - , - 46Tn0 ST ST, n S ♦STH. `TA ^ A'^ r•' rf •s a - N ` RI III I2113114 'V 3 I Q O �0 9 a 7 3 r (O 9 { T { 7 - 3 2^i ►: _4A 4° iki PQ _ 6 2�IE IO IC IBI - 060' ao' 21 5 I ' 7`' • ) AN I(. .. PPy uoml is }1 Y �I IS N I 6 [) K 2• I N IS K I ID t�i 20 I nn2� Sv a ^ rS. f• • f ai ati _ .. - _ r •3 ao •B' .. .. - - .. - w aD TG ,a' aw i rii !OG t,a, 46y i Pl' STREET R R 46TK IS' ST.o 46TH. ST. SeI1591160 ,6 5 1 I I' m 9 a 5 I ; I 0 9 B 7 i 4; 2 I w i 1 i D ; i 9 a,�(j S 1 I.3 2 1 10 9 ,D 7 6 3 1 3 2 �• 17 16 ,L 13 12 I • � 2 1 ^ - "L •L 1 I�B'JK411H3 rB IB7 ? I -T 21L r QI II Ij11 4 16 I° 9 20 it 12 13 N 15 16 17 18 19�jI r��J I 12 ON IS KIT w 9 20 I 12IS N 1 6 IT la K l9 eT 21 22 2 N 4]TH. ST =.� z°°""" a� sr STREET o ITM 47TH. YR^ 12 131421 S4 33 32 31 fa {71 '{S I61 {J 2 G l[_L» Se'ST % I54 SJ L S I{J,O• 9 e 71 6�� 7 1 3 2 1 10 9 a 7 6 3 1 3 J g 4 3 4 ,o IS; ell 111l 464T a49 SO I 73T{751T6 ]7079a 'Nlf2 a3 • SHi 67 Bf 96 .CH RHI d20 /f41ST1r 1 ., I 11 12 13 N 117 la 19 LO 11 12 IS 14 I 6 17 IB 9 ^ 1 _ _ 1 2 0 3 ./ a a a0 - .. _ .. O •! •f to .. .. .. .. ao �3)^ ". Ill• •r.f Ili , +e'BL`®'2T�i I+. 3TRE n � 4411 �s 46T; ST.• .. r _ .. .. .. .! .. • .. _ a. 1 •a so .. o n jia co .. .. .. .. .. o N .o) - - a N,. - -L= �7e' 3 4 2 Iq g9IOB IC OS q 3 0" IOI 9 9.,17 1 3 a 3 9E. O 9 1 a 7 6 S 1 3 2 1 'to 9° 7 6 3 4 3 12 I 11 6] 8 9 0 w r^�Ss> S ��j = �o s •si 9 �- [ 2 [ 9 -_- 7 CIO ` ISI1.6 ut111 11. 1 'ID 12 2 1 .262 - I O 1 12 13 N 16 A la B 20 II 12 1314 15 17JI°I9�a�, _L.. .. .. 9 a ao -1.- -• a .o .12..2"�) j p z P r - ISO PO P-lV ,(yPC 2bI�BS / r'T'_•-{a7 STREET 4f TN. u Oa I I _ t00 •a' F.�J f:.0 O''<=3 aY rt 1. 2 s, )' •O r • 9 .. srH „ a RNS T z `4 • _i_J ^� 1.1 �� µ 'l. r :. r'�!"� "Ifo • 7 6 4 I3 2 1 �_0 9 IB 7 6 5 4 J 2 '! �Isa Li ��� I_ a •`� •• 1 h ga,_J.�•i n 2a.��^ i m �y Iw- R o' 3 ���u p as ° oa ° I 1z 13 1. 1S 6 17 ID 19 zo a Iz 13 N s 6 n 1e 19 Izn2 5 4 s 1 4 Dse Q a t•. •( a �La ' lOTMC- -- ._."__ (S4".ERsacp.•�•l_..__ ✓•• '••`�4 r-I - - --__ _ STR[E,1 [' ]TNEET .• I•� LP _ i t •• _ / �"^^ 1.. ••..t ss a, •e 'ad ao `pql .ra• no , 1•.t • 'Ito, za •.z k a =r• ••=' _ ••• •J0. 1 .(� �•=It*�� r I Y� aRIaR- XU•M[aE • ! 1__ . ill-• _ _ _ ••• ... ! ro • ! •.• ..J l l-tat-J IOiO , i T CI�•�. C-01T i.>OI no. 'R I� G N M006 . -�A. ,l•.i f,arf,S I -ra 1 LOi1±OU : LOT-2 'I 2 w /t al.:A :O, r• °• °+9 .•t.� < .E I I ''TI tI�UM:ERC,lO'Y� • I I� ( • pia ( ••• �- -�_ 4J('i.UM ~�, ( i^ SC.O. 'r•r •• •a '�T r_ I - • rat ^•�••_•f -• r-•,��a!1G •1�. .'y'r ..�++6-Ea+:,t�', .. �.alv Iro�� I• •Y��i..� i a r- IL------'� �--- »uHr.t I l •►� T � �•1. •t ( 1 i 1�~ it:_.1 7:w ,•t�, [ - aaa• •' r. �' 9 i7•{r .J .;` -•�� -ri �.:,[•i7r>a,_. �,• .> ,.. (, ' LOT -I ::I •z Ho .v+.'t.•Rs+ r fa. , ,1 , .. n •.4 to .. .. r. a. •. •• w • a•s t. • . I•r -) ��1 IJ.: '��--T.JF�+1 •�\. 1 Y YI• 1•�• M .•• ••, a t+I>yl •� •oomo^i 1 u ! z LI ^ . � `., y.•.♦`"v:.�•t.�.••�w(f�.•/;�.•.�'q'���p'tY.i °.�•`���_��sT�'etf�ldi� „�,��. Fn.r7'-• � . ••��':. n •. �t.�.:' . • .� r4 •. .+Vi�.,, ... r.•"t-, h.�•. .. �\ •. 5 �a _ •.I•W'• t•�. 1 • •_ • .' to :a :t r i. a. •a.Y Y..• 41 ,). ,Sl )a .)•()1 .Y ..•�.f: •R.E RC Ror, FREE. LSD for ! L ! 8 2 a rjfl . 19 n „ •• ,^, I 4 EDT I R $ \NGS r^. A00. R11 •1 OB Tai 20 21 „ 22 PAR 21 2 ♦ A23 �► q fOOO ^ $ P00 - • 0J0.�P� ^ LOT 6 '00 �00' Im' n 1ea.t im' • • d NEW EAST IODd Y[AT •. ,vx •00 xJe.od 200• xJJ O ^-19 1 9 - I P „O O «i3 1111 987634 2 to ea 6J■ I 8 .r . q�g. -s•5 „ • i 2 -�12 tl 6 T= 18> 2 _ 1 ^ yP Its l6 I IB 19 21 23 •lea • a va .. rY „ 1 J 2. ri tl •Is \ nl' ro� 2 O�`ONE_-7.. m zl I7 3•\25 ♦ 3 2a31 E. 33•a. m'a`: B T 6 3 4 3 2 J 0 ♦ ,. 36rN. R 8 STREET $ 1 ,CVO as c 10•a•' w' T •♦•'„ 7 3 15.A I _321DI r i D vra' ) P♦ i� J COW LEY 3 i � I7II 4 >3 1 12 S 1^ _ 14 Q OP Y 6 3 3 5 4 917 so SB p 6 3 ^ 7aa LOT T 1 Q w I! e••° 37 TR, R ^ s 5 1 •6o ' Iro• Im' S^ . •s >tO aa•s . Iz1^m ° na E'r I• - •' 6 aar»' j R s i 1 3 �, . 4 6 S ♦ E rl 2 3 •1° 2 3 a, _•_.. 12 \'� _ '• N B NY 4 en.a' O 9 I s s o� oe t9 a° ra+.cF 'as9' - 11 10 'pQ '=3 b m„ 387 STREET i I•o- a t a •R •a a.u' T I 2 I A a.Lopuc t 7 6 5♦ s i •oe { 10 9 B„ LOT fo 16 19 29 POp,� 0 0JG S Z\ON uD 89 RIO II 12 IS 14^ IS : l =16- D ¢ I _ ! 4 5 6 14 TREET g = - ♦G\a PQQ� 39TM. c s i s •aO.O,O «'i > i i� AS A go, II 12'IS/ IS 617I IOII 13 •I�_n x•• STREET1ETREET AOTM •' -- oo n .. .. _ 12 I I 10 9 B 7 6 3 / ] 2 I 6 3 4 6 7 6 I$ I"4 3 2 1 13 12 1113 11 10 9 B 79 B 7 \• Ll-1y7 2 0 14 I 2 III I 3 T Ie 19 ' • O 10 it I12 13 14 15 16 IT J. '.4I 6I16 117 1.11 .IF 1 _ �- 11 e• ` j 16 17 IB I 0 21 22 23 24 2' 'f • no' I STREF $TREEY 9 6 7i6 3 1 3 2 14 1a 12 U l0 9 6 T 6 'sO1 5 _ S: 2 �I 0 11 12 13 M 'LS K 17 IB 11 IS 16 17 IB 19 20121 F—� • le 19 w eoi v f .. aF ro 3 242 ND� :TREET •> I w to q9 •.za, 5 4, 3 2 l0o �3�"R .�'o'k tPte B`I e" V YES t . Im LOT 3-A i . - j ro 6 5 4 3 1 BLK -Z x S. 23 G a a 3. 32!r-34 Se If 012 II A IO P9 f ] 6 3 A 4 3 Ib 7� S 2 1 sa a' a I I b l ft •O STREET. 2i ZB 31 ao w TS la4' Im n ra wo ,• '- I 2 4- 3 - '�iea I.I ar ra b u fo7w 7s•,"z In>' n r = 44 TM ' 1 v •. C B '2 2 rp 2 et ama 1 6 • 1�.13 12 I) 10 9 6 14 13 12 I1� 10 21 t. _1z Irz r4 l^ • �• 7y 10">O a•' 107 Im' C�li IQQ 40'� • .0 STREET '$ _- (65r"-_---T - qT la _ \\19 `` „.Y �y�.� - awl - ^'S 1 :• y - 3-ITL 1z 5 I4 ^ 3 STREET 0 ^ 3 Im .. yz� (18 r e lah�9_ Y • R i IZ6 I ♦ 13 12 'I1 10 9 F = >o y - 1 0 �,1ITT'R�a�h''�7J'-l��, • /4 t LL W v�LJ . 14 14611 I I I NSI ly •IS!�14�PLACE C J. R47 H. n 3TRF�r ' g2 »B u .M' ♦o .. so ,• a 9 o �' > '81 13 12 11 �3 9 R T e 1 9 6 7 I S 3 2 f ySTR EE7• �d � p Ir•' '0+-S 4 2 1 13 I IS 16 I IB 19 21 2 ad gym' az' - J _ 2 2 66 ♦ 46TH•,. o' STREET v • •O_�'f STREET ax •z 4 u ao xna �u-TM _ - „LL*� 1•�3' �0— VP VP rs - ca IILL �----a • ■ •v P LOT l4Q - .�7.••: 9 v e ! 1. M2 «�31 31 •J631 sr 3! XI3 3.'. ,>a TT T O a• ' Sf0 J♦ J�N ad• ^ r .)M. STREE ��Ibaab3lJF I Tv 6! 4 ! 2 I t[ B 7 6 R Ir q 12 it 10 9 B aY 14 roa m 3 • POST OFFICE TRA;'1 J a '. -.'yac•y-�'''„�O1 T'rG�- 7 6 S ♦ 3alt 16 li 19 20 21 22 2 xaas' 13 nls 15 IB 12r109 a151611�811 i --7--11 6 S 4; 2 1 �O Dl� 2- O .q1. LOT 1^ P, 2.A .� �2. 31 3 a .e laa_fl.a - Y 11 _ 2 3 a TRACT ia• 7 e acT♦ •2 TRACT 43f • awACT A. ^ • L•a I] '2 '1 ID 9 11I a ���rororo rrrF. x--`---y- _- aO aT eE Fr Y SZ No a 3 t iO0 FF o •zf( ' • r. - P.40 TM. ,F iaTgl ns IPa�p >laa•' i II Id! un rlq�PPVSp00 CMRIS HARWELL SCHOOL BLK.1 i'e I>d w I°>al a>•x` I y STREET E. 42ND 2 9 3 a.IR n ao at Ia3 I•av ♦ � 2 3 4� 6 = 7 B 9 10 LOTS LOTS IS I 12 -BLK3 aBLK.3: - g22S 21 19 IB 17 I6 IS 14: a ao 7 B 9 q II 12 - I)a ,43 RD. ST. oai' alp' a 2 J 1 5 6 2 i4� 7 R 2 B _ _ _ u�oN `+• a B 9 D It I2 29 29 13 9 LOT 2 B L I ' STREET ^ IJ4A • • b , bp.s x0 n�I � . � 22 21> 20 79 1817 I 514 I 12 II 10 9 B 76 3 11 1 a' •'a 6 eURLiNGTOM INI LOTI BLK,1 • 0 23 24 23 6 7 B 6 73B _- 1 3 2 I • 2 O ° 9A _ sU�` N LOT I :L t 11 ^ N e1K33 ° ♦ 12 � M� h 16 17 i8 H 1%001-5 + 3OR r,R �E46 TN. is 'ate _ n� - —•I 1fa Ra I■•u R1P r[a _ R13 ,4�1T R 4 3•a a � 8 Lclrr 39 = e 13 PROP G JgJ S 37 a\Q 5 ee_ 38 O� w�p _ a. a, •• •,a p P 1 . --� •,• R a•♦M' l F 1 I TA o aUR L1N OTOH I i I I L07 4 i A00' I. I • 1 0 tar Irr/. �1• ei t� ram natter �- .� t�� na I�iii ill=t�-�'\�. y l•�i�f M � � 1t �r1i S r1�91 �,tti � �I Q1 t%Ii ter• M� � tn.l �l s Q �nt� t� .� 6t0; �. ..t i rQL�I �w .,l�I � �rL! �I,N /Q�(� its [� fir•' .fit �� ]1,R9 t�SltQl ?M.•.1 eFF\/9 OI9T RT7ti R7LT R1Liy R w•rtli UYiI RI� ' 94 _� Tim � _,. • � ® .� _�� • 8f� t emu: NO �..� f �� • D•Q•ZD .. - Itrlr M:C R� ace, n�. �► m .40 1m, 9 i I DIB N �`S O 7 S 3 1ADD 2 f II RIJ11M ISK F �1 i5�16 TIe9 212 2 w>Z nle jn le 192 21 Sn .i 3 R 2 M7� - _ f 6 s 3 3 0omph Ie Is{ Ip ! ISK 17{Ie 19 - N 2 s " Lein Is 19 I , LOT I S !t. ! 2- 8 H q 12 II q 9 ! T 6 1 N i3 12 II 10 �9 e T 6 t 9 ex 2 .0, 2 r— 10 o S s s: 2A < 14n 9i1 716n KI. 1 • OK bile 21 ji a ' I ' •4 1 "OFT-1 FFFTTTI? 7+ Z 1 •' i t r B z z t 6 '�,�1e a 2 10 I ^ HAPPIe "llaro ADD LOT 1 LOT 2 e 6 Lae' I � tl� :e 1qo' a`SOtt s oTl 4r 3 _ i,oN ot LOT w3TOI LOT 3 IA LOT e T FlbtR� T 6 S S t y P<p OD 0"J I O 0 PS �Oi'6 a'P ` 8 9 10 l 13 2 w ., S d 1 3 4 on R iy e nl6 .S 6 t it sT e : r 7 e t0 9 S 10•ur 9 2 10 m 22 1 3 2 •I 7 11 12: II 2 �••s IS 14. . IS 1. 21 2 e IS 16 16 20 3 SL.l6 I7 le 9 9 . 19 4 Q A R I 2 19 �S ST r 3 4 3 6 � 3 S 1 e : 11 12• 13 10 6171e 3 2 1 eoo 2T �, LOT ♦ LOT I ^ • ► - P Aoo « J 1 z s• s e .o 00 for P • �•T le 19 20. 21 22" 23� 24 23•• _ A ..> oou .VNut R.r ODD •. 1 3 ALD 2 Gl�a. 1 Ism I 1 .0 .1 MAP 5- •Fr *40*a*4000 • - �£! � � cuNr. Nc PARKING 14, 2�4• ..I�\off �= y1 I STATE crtr ;26 DEi,T II AREA 11,�1 r ►RDE \ GITY 2YALLEr•NAYE _._. _.___.____'.. _.__... _... IDe ,tt: '• .. A S T ^< �,� E t to It, - ,t „r '� 6 ` •a• o �.�' 76 5 1 3 2 I ,W! 2 r.l °ti ':IN J',J 21,A4 i . 1 !» A P It °� 9 KIX SOM it A •y+P I a, i' ' sel 14IA �is 21 • p1G .�• RODS • - ♦ y rr Syy>_ 13 TN STREETS SUB 1t • \ 9' 6 7 6 s A ILl1 r ... Y ete RO 1111A4`--�y�,11 .I ♦ 3 LOT I .� — ' EAST 1♦TN STREET -E 14'NIN kr 6ADDITIOX f �AOWTioN - NN. K.SE.L. � lilt 9 8 7 6 loT 3 ADDITION W 4 I '>2 gp . > .•... at "°'t • i < 1415 1617 1 19 21 3 ` s _ . � 9 ` �• i _ E ISTN• t 12 11 10 9 B 7 1 5 2 �: „• o 7 .' IS IS 17 101 2 21 22 425 o / i • 1 \ CITY : ;� < .. .. .. .. .. .. . J \ \\ MS$ E 16 T. ? CITYiziiioeeiseibz` � o ��. PPOP�'RTr4 P ERTY ; e V 1234 P. 650- 651 -ISM 17 IB 19 21 V fyG •••♦ • 15 .. . '�•. 8 E 17 T N FRONIA '•� w tlomN �� 'f • _ IBIS N I; 12 11 O 5 B T 6 < t b^ LNBBOCK JOHNSTON yL >21 io p20r ;,volt. COITON OIL .' MI LL ff4� eb' lFMi' COR N DO b� f•aM ..` I ADDITION: ff0" 1 •le• 1 ' 2OTIL tp 5TREET .° w 12 O IeD 12 Ife ri\1 N(I` �.. 2 u ,. 2 3 10 • ! IOA u Z . D 8 ' 31 1 . 4 9 , x 4 •s eAWDIpOD >Ry 'BA<:s e 6 7 8 'i CAPO bet i00' S<: 6 7 8 6 I 4 13 < I 14y 91 -- --12 RI t2 I : 2 23BOOKER L -2 11 • ' 2 II.. L 3 WASNINGYOK -; 10 • <; IO R s 3 220214 4 19 6• , 4 30 s R5 a :s e RK C 6 T Ae.6e e,7 4° e e o 6. ir•o N r/ klc�L] s A z 13� zN20j� nz4 29 s 34 ITeb 43 z 4 3N 1 3 s��`'4 b �4 �.. b EAST =SRO. SlR ET I c >6 •I 16 I' I6 aoa ^ 1 NO ODr 3 14 S ! 14 - I l E f 3 ' Iti • z •G0�b 4 13 • 13 • 4 ID ELEM N 4 35 5 5 12 12 I2 ` : 5 21 12 $ s 12 +7 S si.o' •..� cold __, 6 II , 6 11 • 6 1 28 . 6 II 5 nb t I R 10. 7 10 7 SC L 7 t0 B4 S •' • e 9 e B f 6 9 B 9 181 t0 A 4~ "e s •, ♦: :w fe .IS 14r4 .IS 14 16 13 16 13 ' I 4 r• •0' n3sD . 3 6» •• .I 12 I 12 :I I I 12 RI •0I2$ RI' •2 •1 12 A•r �I as •J 2 11 : 2 11 I 2 II , 2. it , 2 ' II 2 11 > �..� •Nat • 3 1 10 • 5 10 ' r 3 to 3 10 3 ID 10 10 4 9♦ I I 9 4 27 9 / 36 3. 4 41 3 m 45 3 1 �e eo•teXr e s e* a i.s 1 6 T. 7 7 7 8 6 7 7 R A6,w .T � A ».12• t1D'� QP 'I4 IS .14 13 E. 25T • -R 11•YI7 O I 12 I r I 12 O tl,OO ` 8 I �- • 2 II + •2 2 II oOP 11 2 II 2 S• .?� 3 t 5 '<' i \.O , I E. 25T • f ' '• • 90 {/\1J2 �pp �: • 4 9 40 s 46 e 4 y �z86 T m 4 07itj •e7 a0 , •)� rw 7.°. + B EAST 26TN. 4 o y J r r•o -4 I,• e • w A.• 8 . 9..0 1 2 3 9 2 2S 3 38 47 3 e z 48 - 3 t 52 4 �,I B CORO 00 30 1 : z , n z •24 57 z7 4 z s 6: iN ff t•W �'°• 0 26 / 3 ; 1 4 ' e21 30 A22 55 B • i 1•4•:1 _ S r • 4 al QyP DQ � 6� A 919 .2.• 19 E. 21 TN T. W 11 T rY LO 2 pOO. '16 S 16 NOTE' I 10 . • 15 .�� 6 15, 56 6 • ,f 2T N T I♦ .. Tv • _.�.. ..M . ,.. . p G'IR'• 13..• P li c, ev 29 FOUNDRY. MAE MDN 'ttl ` ADD• ft0 D Al0 T 2 � tto • SIMMONS PARK 6 sa IS 2 1 EAST 5TH.5T. •eT. •' A Y d•' 2 - A R K W b.,• T R A c Is P O P c n �3 1{ Bi M N �� •w_ E � EAST 6TH, 5T- pGK <iys iees'iz i `ti I K y` It l W N 16 16 17 1 t3 EAST 7TH. ST.R 1 j9t 7 63 4S Y I• 4 T zn.za 7 ♦ Y 11 I 9 14 1! 16 17 1 (Y 4 EAST �1� P /0 9 i 8° i EABTH st U . •1jL- ' __ �•"" ` ar ITI $ 'll EAST 9TH. STREET " �� 1 rh Ja• 1 2 3 4 e 9 10 11 4 13 •I A I N S y�4 0 "tia CITY PROF Ilya 12 q 0 M 77 a 1• 21 222324 e 1 517 NDS I• ll-- 1 2 3 4 3 � t d II IS •o sue• N 1$ b 17 18 �DOotS4O.N cUNNACNAM N G '� w yea- `L\�? E. su9. st PL pKFZ" CRY b AREA l''I + PROF I CITY 2 Hn Vr. ra: .1... VALLEY-HIVEa { !I 3• I�F raa•' 'see • < E A 4S T ,a• a an °' e 6 4 vg, J, oe�o I m I 21 T + _ t • ' I I • $ O�,��Q,�j-7�y�j��%jT7�/�[7��"JT�,y�q.❑� 111E. 6 Y I i• .'yySLLL`1jJ 1... -f� ► ' .y' � i lar.! I Isei r3TR11! $ 9 8 7 6 S 4 3 2 I FFr STREET Y SOB m' I R° R LOT I uNDRY , .a• a• O' rOUNORY, 2 as 1 W ` A OO• l0 T 2 N4' tlw 112 1 I 15 16 17 I8 19 21 11 15 16 1) Is 19 20 , a. a w { e ao •a EAST 11 TH STREET - E 14 TH. $ 1 IT1ON K. S E. L. - a0L - we•.\ ? - ,y'•, � II1 9 e. 7634 321 1y 98 7634 i2 1- Y.11•{• / z LOT 3 ADDITION _ u 4 e 14 5 1617 1 I9 71 3 �tl 7 13 H !7 16 t9 -s • •s eo 15TH � 121110987 4321 }8�876343P PO •e, l •a•' aaF R _ P su ao 7 6 ^II 1 15 16 17 18 111 CITY +J\ IS I6 i7181 L22 1 ^ 9 E 16 TH. t. •�, : CITY z PPOP�ibT1Y `, P ERTY i V 1254 R 65D• 651 ♦ • _ a1 ae { E FRONIA fa••« m aoaoE\.17TH sa n$ 10 .. � ,,` - • 16 f3 w IS 12 II 0 9 I 7 6 _ a,'♦ \O� `�.�, V ^ JOHNSTON >L xt o I,2O0 • 1slkty L •e LOTS•0 I •' 4 : ,WHIIEHEAO At:. E A S T 19 TH. ' a - - .e ^ -( a E_ 19 TH - .f NO x I Y O 1 JOI t19NNNN i ; QpG LU BB OICK •1•' 1 - ernccT 3 PROF!) !'ao 12 Its is 1 1p**2 • Imo'• a lOA i . 3co W R 3 wd ? u�a I• I ZA uaeY � i i g i y q ,• '4 g 1 12 I 12 R S E v IT •2 11 ,2 11 r •• r F •6 �- I46TON -3 10 , . 3 10 • � 4 19 r, .4 30 9 u 14 w+ r r RK A s 9 + 3 e e : 5 s•i 4' \ .I c ,i ..�' �= .. r, '� o+a 122 N0. T. _ss�� � �i4 6 I .° • 13 a 20 . z 29 s 34 ;: 43 z &SR° sTnECT M A E S I M M ON S PA R K j i z No Text No Text 15 r r j J i¢ �5bysd'V� •,a )x r e+Y ei 'T{;ltM i l07 .. _ l rt E STREET Y xQ .�[ �2 II Y e� t e S• J 2 iL --1 r 2 I AOO 1 Co ,�`�li'• �• 18 f 17 LOI.2 , t 1 nr mvLJ �J I•ils s n le 1 n =� 7 e r • r. LOT 2 la r TE FORDHAM �J ,•r 1 2 1 12 II q 9 e] 6 S 1] 2 I • li - w,. ML LOT 1LOT 3 •.+' INo 00 1 e • zl 7 :•lo a • a' �:I' zl zz J '� Is. z` e ,. LOT I �_T �•o roe• •• - roe w w • • ^ •to •I t ntw AOOITION re 6 I.f I.E I-0 I-C I-B-I.A_ •I,Y• 4E0 :V •t'., A O pVL 9 ' I 2.F 2.E 2-D 2-L 2'B .�" A. , • _ OP4L � S T :�Vf•O ♦� +' ti.\i': - •e ei _ . ? I Oe' ♦ 4 2 P EMORY 0• STREET 6 M ,y►7�� �r'I 6 Y .,♦,x. ♦ S ' T • ` ; ij PI ♦•es 1 . POpIl10N *OO �oinT 1 h.1j •-_-____�-----_-1 b•_ •: OUKE STREET • •♦t oa C ° BLOCK I _ - - ; R R \o -av a, "A t LUBBOCK MACHINE Pv OE ADDITION \�� •( , Il, o a Itl •• ' • � ,�. ,ee' •111'4t'lll' Kr ylGa O r�AI/.,/wt • LaT 1 \ ,!0 O •�Y NOT ;••. G AL .T' spa+ r• �a .•, - _ suemwD-A \l �R P o� TT PROP 0 • 'S �yG CITY { \, loi r a•'�'o♦ P � •..00x u �» P 00 i•1 YVL LI N3 AOO. f • ,O'• 1 °°.1,' LOT 4 G .0 2 4 %'• Ni x ' STREETR 20V ]lM _ nx `•. J 1 1 u _ �.ilOx• J o Co 22 O 2s a >,VPE LOT 2. Iz. ID 73. Isla a �. 6 % ;Y• LOT .2 b i 1' • ' i 'a c a ' ----------J--'1 II' yo. ••• 1 SS31' Ii d 'iil BLOCK 22 i 1•cl,nlrl+.0l"4l•'t+Trl Wlui;a':ar•M.rfv IST]I q --- .r...,. �p_'c—�-4 __ ♦•4a•{4�S t xTo' LOT L..' I� 'R• TEtt� e .6 y T 6U40A AOO. pro' B.. ♦°I48 6' Lbr1 '•1 PL ACt • '• eLK 21 KIMBELLe •.n O N,>4 KI 13111 -9B I t' n LOT 1 u � No 2 12 A DD. se ' •e' ero• ' 716 19 21 S.•.•e g , •o' ,'ST, t'ND. 'T. Tt �•' r x >t •� tr l 9 qu x •i •n I In RI I • • '0.1•• LOT 3 10I4 11 j 9 • IS 10 •S 16 17 Ie 19 2 2t 2) 21 P) - d• , 7 • t6 9 •• 4 S IOY. - 440.E . 7 9 • ENO. •111r1 n T, PLACE e • 19 { 6 . .B^ 7.. .4 rS w 3 2^ I S a MI x• 2 •13 u I 2 3S 2 S . • 19 2 _ WS q S Q • S ' K7 1±I 1) H' IS 16 17. 10 e 9 • 6 I 9 , • II 9 B 7 13 p'_ ♦ . fY ems•' O 87 B 2\ 6 � '6. 6 •o' e I A 1 dry,• •3'RO.• .e• sT. Ya RO. ST 76+_5 1 1 14 : 1 2 34 5" 6 t.•' Y 10 e u w 9 Q B _ S 3 Iz L U BOCK o'�'tsoo ' I I 7 � nw>a n •n. er 7 • 4 1 II 4 6 e LL4 x 5 10 s. a g9e7 H 0 U S I N nlzn s 4 . O -13 7 e 3. NI 9 . IS 1 6 '' - •T 6 S 3 'b 1: 1 23{ e 6 . I6 s= ,. , P R 0 E C T "—'.OT w • • 17 4 : 12 4 e 4 9 • . S FOLKS 1 D. le 3. > I9 7 `• HOME zY /1 9 a 7 W � 2 I J IS 14 R i'r � i � •tl.• ,S .N' ` • 7 t ! STREET ••' J „ LUBBOCR = o `.7 IS >r YuNICIPAL LI 7 VV 6 PAT 8 9 R 0 11 12 13 E<o 16 •o• -_------ •y AND 7 r •I• w M AT[K ►' r as i �• r', "'. �a r» Oil I I1 mP�av 99 rr�QOi�,�' • � 0� r �l T Vi A i o STREET R A yt o ,° S i 3 2 12 •r 2 1, • LOT I . ADD.+ r • ♦°4• a• IS IT ry07 2 • a t aoo o 16 T e 9 \� L0T2 : T A \Pf, HS F. r •3. 32 r. t2 a S 21 p5� 4a ,LOTIe _ 23 3 • Is•• 0 24 6 �e LOT" - ' Y ta.• I.i I.E I-p 1—C 1-f =1-.- ,•Y __ •e E AD Ile l 9Of- 2-F 2-E 2-D 2-D 2-B a -A+ - • _ �OPO : 7 7 ? 4 O. EMORv O STREET 0 ��� Lal•f�r i•• ba �OUKE STREET--_---�---___—_1 — aoT a .r ••• •. a•r.•- •. ' P t ; O 6' i W• E BLOCK I oo• a AAA army Q\ Ito LUBBOCK MACHINE Pv r,l; ADDITION \C, o I F n LPG \ xt i 1J ° ra.• � r• ' ° aeo' 'Ill�x4/'lll' v 1gC'rrk `PROPERTT N07 ' I Bt\ pty Mt jM°� •° \NS iyE i SUBDIVID'p `fib CITT �OPf• OyV s 0•i 6 :. .� ED :8:• "b _ _ r •,a 9�y, ..a•• TT CITY ,3 ,PROP 0 r . twae yt LI K7 � xm If ADP LDT • L d t li. es+ z zac�N,. a�kSF� 1920 :• u �STRECTA ]•M 1 _ ` Y` `.I I E e, .• 3 f 21 u;I z3 41 23 a _ I. ,O.p.1.uP < LOT 11-4 3 i''r "LA 20 lz is 12 < 13 `\ { %w• LOT .2 1� i 13 'I .I •' _ _ __ id• e 8 s' �w29 16 I St' i ,6 'NI BLOCK 22 �; i� •'G y Y I ST. ST. LOT t2 t • i6� J:f LD• f R I� ,! 7 GUADALUPE 3 POD• W A . A00. �E..S' 11 e - 13 ,�r• G • LOrI ' lao 3 ! ,.I PL 4Ck eLKzl KIMBELL• •'„ O 1'°'4. As It -Y Kr •is'u �es K LOT I c 13.2 12 ADD. °' T I• 3 1 W' ar0• i T I► If•{.N ':N f7. R r 2) • f 'P I n Q 11 a ,>t 1 ' 42 ell .0 /1.• RI i ' ] 4♦21:07 10: Is 11 se. a•.1{' LOT S 0 t ( 24 2 f• • Is a w I v Is 1f z xl x3A z p a I, d g t 1e ,• •,. w rl r. n ,a ,• '� PFRI, • 19 2 ifT. { s 3 2•• I�,', 2 �a v l 234 s 6 a n.t' :3•.a• uo.t• siat' x+t t• � �at• NO r.a • - - 2 Iw az � ` No. '0M v0.4 ° EMORY ST. tui e•er tat' to w.er O xasx .ea v,.ee ••� DUKE ST. •a s 103 101 O `5\posa i'.,4iia • i� •3.i 1• 1 1 1 . I• �� 2/ •IB 3 I e•d 4 �.b rq B q GOLGAT `2 I • G /. II » g / � j• 3/2/• 6 5 2 Af /b9 2 1 TR • /b, 4 � 1 d' yr 6 1 SUse B>'r 3 4 a Tq d 2 eLK I II 12 - /0 N y ••, teo. STREET � e 72 71 N 2 2 � QO 10 °O a° N 2 P` 'V° �• 2 I• 2 yJHV pQ• 2 �` 3 Q , '9 ... r 2 la• 4. y N 2,•.' I t•.. I! II 23 .23 2 2 73 22 .22 10 2 • 2 21 .21 e . 21 .2, , ' • 2, 6 i .1e.45,t .ie 44 a .,e 3 a ,1e 42 T� .le 4 STANTON 3 IND• ADD. T. ease© f4 pIATIV..y JE' b /.n o > • ns.l ON z z \ t biz K Poo\ s•x STRrET - Z Et .t 89 <Iry •LPL �, o. 9 / H t• CITY PROI ERTY NORTN AV U y $CNO 97 L 96 O/,'^ Hat e• a i 1 a3P t' SFOt M•• 83 h./lr 32 iW-M KIM" Rau •1` �r� .. Ik47� 1l�191.. rti!!0 !I e• I it b MARSHALL ST. I iso eRN� M' 1 � 1 H K W - a t o C d - Tr. 2 P�P a v 2 3a I e I NG c�\ E\,E" Po0 � 1 2 4 0— t507 62 _ I] y 10 `� JII► `> / 6 II t0° 58 O -' ~STREET e 22 GUA De.U►C C I 2z t:---! 22 �' 27 f,e. r: ♦ \\ z I s zo � � zuj ] .2�s � n �a PLO � � 2� \ 33 '•I<If T 40 le o 99 @I - - .,•✓ I I,(>1 ) \,\ ' ..e. ;0 .'tf o: e-1 ,] -T. (o:� -.;� n :t-;:'-Iw°�\� IL. _ �IS`J^��ON I� �••��\\. a ,`jr Page Two 1991 CONTRACT MAINTENANCE PROGRAM: Thoroughfares 29-Nov-90 Crack Seal and Single Course: #4 Pre -Coat, AC5 W/ 3% Latex ASPHALT ROCK ROCK AREA --------------- RATE ASPH. ------------ -------------- RATE C.Y. RATE C.Y. MAP DIST. STREET FROM TO LENGTH WIDTH ADJ. AREA # 2 # 4 29,30 4,5 82nd Street E ER Slide Road ELL Quaker Avenue 5,350 82 48,744 0.28 13,648 1:90 542 28 4 82nd Street `VG @ University Avenue VG @ Elgin Avenue 2,596 82 + adj. 23,770 0.28 6,656 1:90 264 6 1 Avenue H N ER 3rd Street NLL 4th Street 770 84 + adj. 7,462 0.28 2,089 1:90 83 23 6 North Quaker NLL 4th Street Loop 289 5,350 60 35,667 0.28 9,987 1:90 396 29 4 Quaker Avenue Loop 289 82nd Street (dips at 1,100 82 - adj. 10,000 0.28 2,800 1:90 111 78th S 80th Streets) --------- --------- --------- Page Two - TOTALS = 125,643 35,180 1,396 ------------------ --- TOTAL Thoroughfares - One -Course: 125,643 35,180 1,396 Page MAP Three DIST. 1991 Two -Course: 1st STREET FROM CONTRACT MAINTENANCE PROGRAM: Collectors Course #2 Pre -Coat - 2nd Course #4 Pre-Coat,ACS W/ 3% Latex AREA TO LENGTH WIDTH ADJ. AREA ASPHALT -----------"--- RATE ASPH. ROCK ------------ RATE C.Y. # 2 29-Nov-90 ROCK -------------- RATE C.Y. # 4 35 6 1st Place E ER Chicago Avenue WLL Brentwood 570 32 2,027 0.30 608 1:62 33 0.38 770 1:90 23 3 1 1st Street ELL University VG @ Avenue U 2,532 32 9,003 0.30 2,701 1:62 145 0.38 3,421 1:90 100 35 6 2nd Drive W ER Brentwood Deadend E./Brentwood 625 32 2,222 0.30 667 1:62 36 0.38 844 1:90 25 3 1 2nd Place ELL University 650' E. of University 650 26 1,878 0.30 563 1:62 30 0.38 714 1:90 21 3 1 2nd Street ELL University WLL Avenue U 2,546 32 9,052 0.30 2,716 1:62 146 0.38 3,440 1:90 101 3 1 3rd Place ELL University VG @ Avenue X 622 26 1,797 0.30 539 1:62 29 0.38 683 1:90 20 25 2 East 5th Street VG @ Walnut WLL Yucca 315 26 910 0.30 273 1:62 15 0.38 346 1:90 10 25 2 East 6th Street ELL Walnut WLL Zenith 622 32 2,212 0.30 663 1:62 36 0.38 840 1:90 25 7 1 6th Street WLL Avenue G Alley W. of Avenue G 150 51 850 0.30 255 1:62 14 0.38 323 1:90 9 8 1 8th Street VG @ Avenue A Alley W. of Avenue A 160 48 853 0.30 256 1:62 14 0.38 324 1:90 9 7 1 Sth Street ELL Avenue E Alley E. of Avenue E 95 51 544 0.30 163 1:62 9 0.38 207 1:90 6 8 1 9th Street VG @ Avenue A ELL Avenue B 293 51 1,660 0.30 498 1:62 27 0.38 631 1:90 18 8 1 loth Street WLL Avenue A W ER Avenue B 372 51 2,108 0.30 632 1:62 34 0.38 801 1.90 --------- 23 --------- 0.30 --------- 10,534 ------ 0.38 13,344 --------- Page --------- Three - TOTALS = 35,116 --------- 23,878 ------ 568 390 Page Four 1991 CONTRACT MAINTENANCE PROGRAM: Collectors 29-Nov-90 Two -Course: 1st Course #2 Pre -Coat - 2nd Course 44 Pre-Coat,ACS W/ 3% Latex ASPHALT ROCK ROCK AREA --------------- RATE ASPH. ------------ RATE C.Y. -------------- RATE C.Y. MAP DIST. STREET FROM TO LENGTH WIDTH ADJ. AREA # 2 # 4 7 1 13th Street E ER Avenue 0 ELL Avenue Q 832 51 4,715 0.30 1,414 1:62 76 0.38 1,792 1:90 52 7,11 2 22nd Street WLL Avenue G E ER Avenue H 375 32 1,333 0.30 400 1:62 22 0.38 507 1:90 15 1-A 3 23rd Street WLL Flint Avenue ELL Indiana Avenue 1,970 26 5,691 0.30 1,707 1:62 92 0.38 2,163 1:90 63 11 2 23rd Street VG @ Avenue H ELL Texas Avenue 305 26 881 0.30 264 1:62 14 0.38 335 1:90 10 11 2 23rd Street WLL Texas ELL Avenue K 570 26 1,647 0.30 494 1:62 27 0.38 626 1:90 18 11 2 23rd Street WLL Avenue K E ER Avenue L 258 26 745 0.30 224 1:62 12 0.38 283 1:90 8 '11 2 23rd Street W ER Avenue L ELL Avenue P 1,326 26 + adj. 3,834 0.30 1,150 1:62 62 0.38 1,457 1:90 43 11 2 24th Street VG @ Avenue E I-27 485 26 1,401 0.30 420 1:62 23 0.38 532 1:90 16 21 3 24th Street WLL Indiana Avenue ELL Memphis 2,558 26 7,390 0.30 2,217 1:62 119 0.38 2,808 1:90 82 10 2 E. 26th Street W ER Cedar Avenue Alley E. of,Glohe 1,585 26 4,579 0.30 1,374 1:62 74 0.38 1,740 1:90 51 26 2 E. 28th Street ELL Teak Avenue Alley E. of Vanda 950 38 4,011 0.30 1,203 1:62 65 0.38 1,524 1:90 45 26 2 E. 29th Street ELL Teak Avenue WLL Beech Avenue 2,380 32 8,462 0.30 2,539 1:62 136 0.38 3,216 1:90 94 12 2 35th Street WLL Avenue G ELL Avenue H 320 26 924 0.30 277 1:62 15 0.38 351 1:90 --------- 10 --------- --------- 0.30 13,683 ------ 0.38 17,334 --------- Page --------- Four - TOTALS = 45,613 --------- 31,017 ------ 737 507 Page MAP Five DIST. STREET 1991 CONTRACT MAINTENANCE PROGRAM: Two -Course: 1st Course #2 Pre -Coat - 2nd Course FROM TO Collectors #4 Pre-Coat,AC5 W/ LENGTH WIDTH 3% Latex AREA ADJ. AREA ASPHALT --------------- RATE ASPH. ROCK ------------ RATE C.Y. U 2 29-Nov-90 ROCK -------------- RATE C.Y. H 4 12 2 36th Street VG @ Avenue G 75' E. of Avenue H 275 36 - adj. 978 0.30 293 1:62 16 0.38 372 1.90 11 12 2 40th Street VG @ Avenue A ELL Avenue B 505 32 1,796 0.30 539 1:62 29 0.38 682 1:90 20 12 2 40th Street ELL Avenue B ELL Avenue D 605 36 3,220 0.30 966 1:62 52 0.38 1,224 1:90 36 14 3 50th Street WLL Elgin Avenue ELL Flint (Serv. Rd.) 630 22 1,540 0.30 462 1:62 25 0.38 585 1:90 17 18 5 54th Street ELL Utica Avenue VG @ Salem Avenue 1,283 32 4,562 0.30 1,369 1:62 74 0.38 1,733 1:90 51 1B 5 55th Drive NLL 58th Street VG @ Salem Avenue 1,614 38 6,815 0.30 2,044 1:62 110 0.38 2,590 1:90 76 20 4 58th Street W ER Indiana Avenue E ER Memphis Avenue 2,550 38 10,767 0.30 3,230 1:62 174 0.38 4,091 1:90 120 18 4,5 58th Street ELL Slide Road 175' East/Slide Road 175 40 778 0.30 233 1:62 13 0.38 296 1:90 9 34 5 58th Street VG @ Slide Road W ER Bangor Avenue 1,573 40 6,991 0.30 2,097 1:62 113 0.38 2,657 1:90 78 18 4,5 58th Street VG @ Toledo Avenue ELL Vicksburg Avenue 1,287 40 5,720 0.30 1,716 1:62 92 0.38 2,174 1:90 64 18 4 59th Street ELL Slide Road 170' East/Slide Road 170 32 604 0.30 181 1:62 10 0.38 230 1:90 7 19 4 60th Street WLL Memphis Avenue ELL Quaker Avenue 2,606 38 11,003 0.30 3,301 1:62 177 0.38 4,181 1:90 122 18 4 60th Street ELL Slide Road E ER York Avenue 825 32 2,933 0.30 880 1:62 47 0.38 1,115 ------ 1,90 --------- 33 --------- --------- 0.30 17,311 0.38 21,930 Page Five -TOTALS = 57,707 - 39,241 932 644 Page Six 1991 CONTRACT MAINTENANCE PROGRAM: Collectors 29-Nov-90 Two -Course: 1st Course #2 Pre -Coat - 2nd Course #4 Pre-Coat,AC5 W/ 3% Latex ASPHALT --------------- ROCK ------------ ROCK -------------- AREA RATE ASPH. RATE C.Y. RATE C.Y. MAP DIST. STREET FROM TO LENGTH WIDTH ADJ. AREA # 2 # 4 18 4 62nd Street ELL Slide Road One Block East 320 42 1,493 0.30 448 1:62 24 0.38 567 1:90 17 15,27 4 67th Street ELL Indiana Avenue Cul-de-Sac E./Indiana 370 32 + adj. 1,816 0.30 545 1:62 29 0.38 690 1.90 20 20 4 67th Street SLL Salem Avenue NLL S. Loop 289 1,023 38 4,319 0.30 1,296 1:62 70 0.38 1,641 1:90 48 28 3 70th Street VG @ Avenue W ELL University Avenue 1,042 32 3,705 0.30 1,111 1:62 60 0.38 1,408 1:9U 41 28 4 74th Street WLL University Avenue ELL Elgin Avenue 2,589 40 11,507 0.30 3,452 1:62 186 0.38 4,373 1:90 128 27 4 76th Street WLL Elgin Avenue ELL Flint Avenue 632 38 2,668 0.30 801 1:62 43 0.38 1,014 1:90 30 30 5 84th Street WLL Vicksburg Avenue Wayne Avenue 327 32 1,163 0.30 349 1:62 19 0.38 442 1:90 13 32 5 Aberdeen Avenue NLL 82nd Street SLL 79th Street 936 38 3,952 0.30 1,186 1:62 64 0.38 1,502 1:90 44 14 3 Akron Avenue SLL 34th Street NLL 36th Street 622 26 1,797 0.30 539 1:62 29 0.38 683 1:90 20 14 3 Akron Avenue N ER 38th Street SLL 36th Street 615 32 2,187 0.30 656 1:62 35 0.38 831 1:90 24 32 5 Albany Avenue VG @ 68th Street NLL 66th Street 500 20 1,111 0.30 333 1:62 18 0.38 422 1:90 12 32,34 5 Albany Avenue NLL 66th Street S. Loop 289 550 38 2,322 0.30 697 1:62 37 0.38 882 1:90 26 8 1 Avenue B N ER 9th Street VG @ 10th Street 353 51 2,000 0.30 600 1:62 32 0.38 760 1:90 22 0.30 12,013 0.38 15,215 --------- ------ --------- --------- Page Six- TOTALS = 40,040 27,228 646 445 Page MAP Seven DIST. STREET 1991 CONTRACT MAINTENANCE PROGRAM: Two -Course: 1st Course #2 Pre -Coat - 2nd Course FROM TO Collectors #4 Pre-Coat,AC5 W/ 3% Latex AREA LENGTH WIDTH ADJ. AREA ASPHALT --------------- RATE ASPH. ROCK ------------ RATE C.Y. # 2 29-Nov-90 ROCK -------------- RATE C.Y. # 4 8 1 Avenue B SLL Main Street Alley S. of Main 300 51 1,700 0.30 510 1:62 27 0.38 646 1:90 19 11 2 Avenue C S ER 19th Street NLL 23rd Street 1,266 51 7,174 0.30 2,152 1:62 116 0.38 2,726 1:90 80 11 2 Avenue C VG @ 23rd Street NLL 26th Street 1,256 51 7,117 0.30 2,135 1:62 115 0.38 2,705 1:90 79 7 1 Avenue E S ER 4th Street S ER 8th Street 1,365 51 7,735 0.30 2,321 1:62 125 0.38 2,939 1:90 86 11 2 Avenue E I-27 NLL 23rd Street 672 51 3,808 0.30 1,142 1:62 61 0.38 1,447 1:90 42 11 2 Avenue E NLL 23rd Street NLL 26th Street 1,211 36 4,844 0.30 1,453 1:62 78 0.38 1,841 1:90 54 11 2 Avenue F VG @ 25th Street I-27 790 26 2,282 0.30 685 1:62 37 0.38 867 1:90 25 7 1 Avenue G SLL 4th Street Alley S./Gth Street 877 51 4,970 0.30 1,491 1:62 80 0.38 1,888 1:90 55 12 2 Avenue G SLL 34th Street S ER 36th Street 605 26 1,748 0.30 524 1:62 28 0.38 664 1:90 19 11 2 Avenue J SLL 31st Street NLL 34th Street 946 26 2,733 0.30 820 1:62 44 0.38 1,038 1:90 30 13 2 Avenue P SLL 34th Street NLL 50th Street 5,250 32 18,667 0.30 5,600 1:62 301 0.38 7,093 1:90 207 1 2 Avenue P VG @ 19th Street NLL 30th Street 3,950 26 11,411 0.30 3,423 1:62 184 0.38 4,336 1:90 127 1 2,3 Avenue P NLL 30th Street SLL 32nd Street 691 32 2,457 0.30 737 1:62 40 0.38 934 1:90 --------- 27 --------- 0.30 --------- 22,993 ------ --------- 0.38 29,124 ------ --------- Page Seven -TOTALS = 76,646 --------- 52,117 1,236 85C Page Eight 1991 CONTRACT MAINTENANCE PROGRAM: Collectors 29-Nov-90 Two -Course: 1st Course #2 Pre -Coat - 2nd Course #4 Pre-Coat,AC5 W/ 3% Latex ASPHALT ROCK ROCK AREA --------------- RATE ASPH. ------------ RATE C.Y. -------------- RATE C.Y. MAP DIST. STREET FROM TO LENGTH WIDTH ADJ. AREA # 2 # 4 1 2 Avenue P SLL 32nd Street NLL 34th Street 625 26 1,806 0.30 542 1:62 29 0.38 686 1:90 20 4 1 Avenue R SLL Baylor SLL Auburn 665 26 1,921 0.30 576 1:62 31 0.38 730 1:90 21 1 3 Avenue U SLL 23rd Street NLL 34th Street 3,860 26 11,151 0.30 3,345 1:62 180 0.38 4,237 1:90 124 1 3 Avenue W SLL 19th Street NLL 22nd Street 1,016 26 2,941 0.30 882 1:62 47 0.38 1,118 1:90 33 3 1 Avenue X SLL 3rd Street NLL 4th Street 610 26 1,762 0.30 529 1:62 28 0.38 670 1:90 20 3 1 Boston Avenue SLL Erskine NLL 1st Street 3,297 32 11,723 0.30 3,517 1:62 1B9 0.38 4,455 1:90 130 3 1 Boston Avenue NLL 1st Street SLL 1st Place 362 38 1,528 0.30 459 1:62 25 0.38 581 1.90 17 3 1 Boston Avenue SLL 1st Place NLL 3rd Street 963 32 3,424 0.30 1,027 1:62 55 0.38 1,301 1:90 38 3 1 Boston Avenue NLL 3rd Street RR @ Santa Fe Drive 260 71 2,051 0.30 615 1:62 33 0.38 779 1:90 23 14 3 Boston Avenue S ER 42nd Street NLL 50th Street 2,572 26 7,430 0.30 2,229 1:62 120 0.38 2,323 1:90 83 35 6 Brentwood SLL Amherst VG @ Loop 289 1,494 32 5,312 0.30 1,594 1:62 86 0.38 2,019 1:90 59 32 5 Chicago Avenue S ER 73rd Street Alley N./77th Street 1,022 42 4,769 0.30 1,431 1:62 77 0.38 1,812 1:90 53 33 5 Chicago Avenue SLL 82nd Street S ER 89th Street 2,696 42 12,581 0.30 3,774 1:62 203 0.38 4,781 1:90 --------- 140 --------- 0.30 --------- 20,520 ------ 0.38 25,992 --------- Page --------- Eight -TOTALS = 68,399 --------- 46,512 ------ 1,103 761 Page Nine 1991 CONTRACT MAINTENANCE PROGRAM: Collectors 29-Nov-90 Two -Course: 1st Course #2 Pre -Coat - 2nd Course #4 Pre-Coat,ACS W/ 3% Latex ASPHALT --------------- ROCK ROCK AREA RATE ASPH. ---------=-- RATE C.Y. -------------- RATE C.Y. MAP DIST. STREET FROM TO LENGTH WIDTH ADJ. AREA # 2 # 4 4 1 Compress Avenue NLL 19th Street End of Paving 900 48 4,800 0.30 1,440 1:62 77 0.38 1,824 1:90 53 35 6 Elkhart Avenue NLL 4th Street SLL Auburn Drive 2,700 38 11,400 0.30 3,420 1:62 184 0.38 4,332 1:90 127 35 6 Elkhart Avenue VG @ Erskine VG @ Harvard 1,516 38 6,401 0.30 1,920 1:62 103 0.38 2,432 1:90 71 24 1 E. Purdue E ER I-27 Magnolia 3,681 17 6,953 0.30 2,086 1:62 112 0.38 2,642 1:90 77 5 1 Fordham WLL N. Avenue Q Drive ELL N. Avenue N 205 32 729 0.30 219 1:62 12 0.38 277 1:90 8 27 4 Gary Avenue SLL 78th Street NLL 82nd Street 1,266 38 5,345 0.30 1,604 1:62 86 0.38 2,031 1:90 59 15 1 Grinnell Street WLL N. Avenue Q Drive ELL N. Avenue N 391 32 1,390 0.30 417 1:62 22 0.38 528 1:90 15 2 1 Harvard WLL N. Avenue S E ER N. Avenue T 660 20 1,467 0.30 440 1:62 24 0.38 557 1:90 16 2 1 Harvard E ER N. Avenue T ELL N. Avenue U 474 48 2,528 0.30 758 1:62 41 0.38 961 1:90 28 24 6 Harvard VG @ Elkhart ELL Frankford 417 38 1,761 0.30 528 1:62 28 0.38 669 1:90 20 31 4 Indiana Drive VG @ Indiana Avenue NLL 82nd Street 1,470 44 7,187 0.30 2,156 1:62 116 0.38 2,731 1:90 80 5 1 Itasca Avenue ELL N. Avenue N WLL N. Avenue Q Drive 763 32 + adj. 2,800 0.30 840 1:62 45 0.38 1,064 1:90 31 5 1 Jarvis ELL N. Avenue N WLL N. Avenue Q Drive 946 32 3,364 0.30 1,009 1:62 54 0.38 1,278 1:90 37 0.30 16,837 0.38 21,326 --------- --------- Page Nine -TOTALS = 56,125 --------- 38,163 ------ 904 622 l l 1 I 1 l l l I 1 I Page Ten 1991 CONTRACT MAINTENANCE PROGRAM: Collectors 29-Nov-90 Two -Course: 1st Course #2 Pre -Coat - 2nd Course #4 Pre-Coat,ACS W/ 3% Latex ASPHALT ROCK ROCK '---=---------------------- -------------- AREA RATE ASPH. RATE C.Y. RATE C.Y. MAP DIST. STREET FROM TO LENGTH WIDTH ADJ. AREA # 2 # 4 5 1 Kemper ELL N. Avenue N WLL N. Avenue Q Drive 954 32 3,392 0.30 1,018 1:62 55 0.38 1,289 1.90 38 31 4 Knoxville Drive VG @ Memphis Drive VG @ Kenosha Avenue 675 32 + adj. 2,940 0.30 882 1:62 47 0.38 1,117 1:90 33 8 1 Main Street WLL Avenue A Alley W. of Avenue 8 534 51 3,026 0.30 908 1:62 49 0.38 1,150 1:90 34 21 3 Memphis Avenue NLL 22nd Street NLL 34th Street 4,245 38 17,923 0.30 5,377 1:62 289 0.38 6,811 1:90 199 5 1 N. Avenue L NLL Jarvis SLL Kemper 284 32 1,010 0.30 303 1:62 16 0.38 384 1:90 11 5 1 N. Avenue P SLL Erskine W ER N. Avenue Q Dr. 1,311 24 3,496 0.30 1,049 1:62 56 0.38 1,328 1:90 39 24 1 N. Cedar Avenue E. Purdue E. Quinn 336 19 709 0.30 213 1:62 11 0.38 270 1:90 8 24 1 N. Elm SLL Regis NLL E. Purdue 674 19 1,423 0.30 427 1:62 23 0.38 541 1.90 16 24 1 N. Ivory E. Quinn SLL E. Kent 2,378 20 5,284 0.30 1,585 1:62 85 0.38 2,008 1:90 59 21 6 Peoria Avenue SLL 18th Street NLL 19th Street 384 32 1,365 0.30 410 1:62 22 0.38 519 1:90 15 24 1 E. Quinn N. Cedar N. Ivory 2,000 20 4,444 0.30 1,333 1:62 72 0.38 1,689 1:90 49 25 2 Redbud Avenue VG @ E. 13th Street NLL E. 14th Street 340 26 982 0.30 295 1:62 16 0.38 373 1:90 11 2 1 Stanford VG @ University VG @ Akron 622 32 2,212 0.30 663 1:62 36 0.38 840 1:90 --------- 25 --------- --------- 0.30 14,463 ------ 0.38 18,319 Page Ten - TOTALS = --------- 48,206 --------- 32,782 ------ 777 --------- 537 Page Eleven 1991 CONTRACT MAINTENANCE PROGRAM: Collectors 29-Nov-90 Two -Course: 1st Course #2 Pre -Coat - 2nd Course N4 Pre-Coat,AC5 W/ 3% Latex ASPHALT ROCK ROCK AREA --------------- RATE ASPH. ------------ RATE C.Y. -------------- RATE C.Y. MAP DIST. STREET FROM TO LENGTH WIDTH ADJ. AREA N 2 k 4 22 6 Toledo Avenue SLL 4th Street S ER 7th Street 985 38 4,158 0.30 1,247 1:62 67 0.38 1,580 1:90 46 17 5 Utica Avenue VG @ 50th Street N ER 52nd Street 606 38 2,559 0.30 768 1:62 41 0.38 972 1:90 28 20 4 Utica Avenue VG @ 74th Street NLL 82nd Street 2,600 38 + adj. 11,422 0.30 3,427 1:62 184 0.38 4,340 1:90 127 3 1 Uvalde Avenue SLL 2nd Street SLL 2nd Place 331 26 956 0.30 287 1:62 15 0.38 363 1:90 11 3 1 Vernon Avenue SLL 2nd Street NLL 2nd Place 303 26 875 0.30 263 1:62 14 0.38 333 1:90 10 22 6 Vicksburg S ER 13th Street NLL 19th Street 2,341 32 8,324 0.30 2,497 1:62 134 0.38 3,163 1:90 92 30 5 Vicksburg NLL 98th Street Alley S./93rd Street 1,163 42 5,427 0.30 1,628 1:62 88 0.38 2,062 1:90 60 30 5 Wayne Avenue 84th Street WLL Vicksburg 1,178 32 + adj. 4,500 0.30 1,350 1:62 73 0.38 1,710 1:90 50 --------- 0.30 --------- 11,467 ------- ------- 0.38 14,523 --------- Page Eleven- TOTALS = --------- 38,221 --------- --------- 25,990 -------- ------ 616 ------- 424 ------- TOTAL Collectors - Two -Course: --------- 466,075 0.30 -------- 139,821 ------- 7,519 ------- 5,180 0.38 177,107 TOTAL Thoroughfares - Two -Course: 246,498 0.30 73,950 3,976 2,736 0.38 93,667 TOTAL Thoroughfares - One -Course: 125,643 0.28 35,180 1,396 G R A N D T 0 T A L= 838,216 519,725 11,495 9,312 A .'7lMIS 161�19 21 ! S■ lRti.. O!G'�! �lii mmmommomommw p nommonmomm oil I loll 1. 3 2 1 �3\ 10 i L 1. 3 2 1 �3\ 10 i L f 48 LUBBOCK HIGH SCHOOL w wo .d �` V�lI MIR , •IYLD•T 0 �f .:� -TIC 11-1 a.. .YRfOYf fT•M•tt .. KK.S Y[.T FF& REC CLMt[. �1.D' P t 1 ]rYR-IF rE.• 9.Rf9.�T EIM1M' .S]ClplOfY .Ll [RGRR somlom 27 2a 3 30 31 32 p( 1 2 10! r 1Y0' 5 g 2 s oo' ao f!' L fd 7 4]4 GS ♦ - 3 2 1 9 �w 12 114 IS 116 119 19 aD s 8 7 6 54 3 2 1• W a 7 B S• 3 2 F. ` 6 7 6 S a 32 1 <♦ 5 2 1 9 9t 1112 I3 MI51 IBre 9q 11 I11IS 161716re8 9 u2gNS 7679 -I6 I . . . . - . . MINIMUM SEEM :...1 1.1 � THH. P.L 7�ff �emm S �., 9 P 9�24'H STREET S 10 W . 1211g9 B 7 ♦ 321 }4 Q P i brr 3 ,m' L � Tf w9 10 11 12 1314 131 I IS NN121I g9.{676 S ♦ 32_ G ^25 1H. STREET •o T• ry - n » t �. 1! 7 . 3♦ 3 2 1 e IA 3 as 5 3� z 4 ,o d ROSCOE WIL SON_ - A A 3 �• �[ 11 12 _ w9 10 11 3 14 13 � 7 ]B 9 O StRE[T Q _ 2 1 D• B 7 6 3• 3 Z� I i d U t0 9 9 7. 3♦ 3 2 t WAGNER 1..L.2i II 12 1314 17 R I I� 11 IS 19 I x tT STREET 27TH. F 24 TRACT 'A L (� �jti p _ p. 9 ... m�L� �a t • . b� G Q 33: RICE of ST. �..e aT y e•1y no 32, a 7 6 5 0 3 31 4 4 _ 9 er a . zp a t zs 2B O'� �Ip U• 9 i I R II 12 13 19 IS 16 I] IQ , .FR ...r eoE w .. . _ �,�V zro.3 OUEENS ST. 90UEE NS 9TR EET x 714 23 : p 5 .�G Is 22 . lJ 'II 1213 1415 16171 n y PRINCE TON ST. • 20 . .. . _ F >e T 6 3 a 3 2 19 y q I' o OB ER Jm "• _ IS 16 6 O ,i STD Ifi 2: .iC mT. 17 : IZ r3• A 16 10 S a3• .. I �!0 • .0 • �.. ql yOS E R L I N ST. OBERLIN ST. y /!mom' z F 2 919 21. a[ , II 12 : IB 3- 3 777— 3e I .• I6 5 ., 15 7 Go` , \ 3w I4 T t TRACT •8` �• ,r rte. •• eo...r !\� 6n 13 B 8 �`TIIAR /.23 2 Iql, ' P T $ 12 b 'rr.... �z>•r• ei Go .O'n1 • o L a> _ - T VL C Q P I LN v: POG ft� I ``ErwUJI dl M • . I N '~�enrrrr4r/1��'•T/ � PROP. l I Zt11 99, y GRINNELL P 3 V Rasa i 6�Pz Pa POO`t�O�> �LOPOs P�-\Aed� or S r y PLAINS o.S LA 9 [' LOT I i I� a Ik, _ • \AoomoNC •�b, .6' m T = r.•:• e = z�s 28• 21 x \ •2T s 5 6 PQO. Pp0 •, 3 L� I .14.4+ ' '24 �0 sf �,Ny ,•z ,' LOT 3A - e,. .r•,,.� „ STAN TONS391N0ADD. NN-L d ,r•r¢ 104 103 101 s 2 0 t 86 STANTON's IND. AD TRW ` C I T T P R 0 P E R' T`V ••, ••-i a o..• azo.i z..i . z o Ta:��� I10 - 111 - 112 a P _R 89 EMORY ST W].• �` P' `.T .ay •• •"`.o �9 ,. • • DUKE ST, id CITY PRO E NORTN AV O `010a x• ,!J •• • 4 OCNO L O >V 6 �Is'I. r3 Iz u 9 e T 6 3+ 3 z w 97 96 r� ,�1xnn9 . i s ri I �'a r)HAM sT\ 00, 02 n oN o1OT 3 P P .N o 'LA IN N E - — w» as .-.. .. .. •. .. •••a mmw om ••1r. . 4 7LA1 NS GAS " R /�•• 2021 1/ 15•161 I81 2122 3 26' 6 S ♦ 3 - q0 •la.a• aaa.. lx+.a• aao• aoa.• - axe.• _ m• _•% T ! 7 ♦ S w II 12 •' :° . 1 LOT 1 i I : .0 H1 12 p :3 2 ea< 1312 II 109 8 7 6 S 1 3 2 10 • • AOOITIONC p, .1 iw a a Iw as 7 c 9 10 II 12 2 • as .. ao as - • • e �. j t+ Iw. _ •a w o' eo a 87 +y 0 9 10 11 2 3 a 14 It 18 19 21 an 3 4 26 •7 8 aaa♦a e 4 ' W ` \ EMORY ' a ST •o � ! 2 I 13 12 11 l0 9 6 7 G S / ! 2 I 6 S ♦ 3 2 I, R. W. + ,_ l_te vnun a•.rNnr 111 to a•A t' ae n si •O m .. - _ .. .. .. .. .. .. - .. .. .. .. MATT NE WS �/ •a•• aaY 11 _ •„ I DUKE STJUNIOR 1/ 1{16 HIGH SCHOOL 2 '0 104 103 �I Ot{a S 2 1 IS I2 11109 6 7 6 ! 1 i 2 1 6 5♦ S 2 Ic �� �� .t .♦ . 4 aa ar. 16 t i t 1 I 6 IT 18 TB IB 1716 I9 108 1 2 4 26 7 8 9 N) II IZ L a: I teo t I.rr C� '•4 ea 0 _ - - io NtLL STREET 4— o. 4 7 6 3 a :s 2: 1312 11 1 9 8 7 6 5 4 3 2 1 6 3 1 ! 2 a _I a 2 3 / S 6 i 3 n• ' a a.•... ' ;hl •• i' 4•, - 0 ae a ae' ° +q' CORNELL ST y��° Q,♦ . 3 " m �,e6 W BI .' '4 4 . STREEw• �• rao'• Is Is n o 9 e s., e q ror �]sr'• ,r<Oq 2 �zl 19 19 1T Id a 11 IS A. •12 - II^ 10 9 6 S 1 ! { I 6 S 1 ! 2° 1 . + • s� 4 e•1e 1 C 6 COLGATE ST. •0' IT* 8 ♦ 3 2 3 3 2 ❑+ I » 14 13 12 It 10 9 It.' 9 I 1 6 ! 1 ' Y COLGAT •.- 11 1 9 8 4 3 2 1 6 3 2 1 tt' • 'j'+ 1 I q• i .. .. .. ..Iso' .� 21 22 23'� 21 ri 26 27 28 29 !O 31 32 ' 0 b- '� •u ► 2 h I ♦ • 9 c•9 7 R I II 12 - - � �' 21 22 ri 21 25 26 27 2 29 30 31 32 �� �• I.o. _ s; 11 BQYLOR STREET ET aO :a._», : � « S a II ao 48 17 K /5 ♦/ /3c 1�z �I ♦O b9 S7 _ " 21 •z 46 47 46 15 4 10 1! • 41 ♦O 39 38 • I•e' leo' uz.•' I 77 76 lao - - 1a• 76 $ R 55 56 57 56 59 60 61 62 6] 61 P. 6S 66 67 " •O0 R M� 19 a•21 ' 33 56 S7 76 59 60 •' '••+� 75 74 00 P zw.• -AU URN / i ®ItiYZ7 960 �i a�� e�oowao��o���oD�aovo� ���oDQa000�o � • • �• •® 000TER WOMEN 11 WWII ��� SCHOOL �• ���� �������� »_m.�HIS - �0� ara sm_ I Isrol-B.s� 0 � -ill ZI��� 000 ���oov�ao�avD®ono 14411, �G�oOfiO�i000�` ��ooa voo�� a 0� • SCHOOL gffwoDa09�0��` �09D�`'", - ii�����OVO0000Ol �'��i•` .09��� �0 ®��l���i� - �� ONQ �IQ'all � ti ..OPvq 1� 'I.a. . . . Kim GENERAL CONDITIONS OF THE AGREEMENT (THIS PAGE LEFT BLANK INTENTIONALLY) GENERAL CONDITIONS OF THE AGREEMENT 1. OWNER Whenever the owner, or the expression Party of the tlFirst Part, or First Party, are used in this contract, it shall be understood as referring to the City of Lubbock, Texas. 2. CONTRACTOR Whenever the word Contractor, or the expression °-^ Party of the Second Part, or Second Party, is used, it shall be understood to mean the person,`persons, co -partnership or corporation, to wit: HIGH PLAINS PAVERS, INC. who has agreed to perform the work embraced in this contract, or to his or their legal representative. 3. OWNER'S REPRESENTATIVE Whenever the word Owner's Representative, representative, or Engineer is used in this contract, it shall be understood as referring to Don Jennings, Street Superintendent, City Hall, Lubbock, Texas, under whose supervision these contract documents, including the plans and specifications, were prepared, and who will inspect constructions; or to such other representative, supervisor, or inspector as may be authorized by said Owner to act in any particular under this agreement. Engineers, supervisor or inspectors will act for the Owner under the direction of Owner's Representative, but shall not directly supervise the Contractor or men acting in behalf of the Contractor. 4. CONTRACT DOCUMENTS The contract documents shall consist of the Notice to Bidders, General Instructions to Bidders, Proposal, Signed Agreement, Statutory Bonds (if required), General Conditions of the Agreement, Special Conditions of the Agreement (if any), Specifications, Plans, Insurance Certificate, and all other documents made available to Bidder for his inspection in accordance with the Notice to Bidders. 5. INTERPRETATION OF PHRASES Whenever the words "Directed," "Permitted," "Designated." "Required," "Considered Necessary," "Prescribed," or words of like import are used, it shall be understood that the direction, requirement, permission, order, designation or prescription of the Owner's Representative is intended; and similarly, the words "Approved," "Acceptable," "Satisfactory," or words of like import shall mean approved by or acceptable or satisfactory to the Owner's Representative. Whenever in the Specifications or drawings accompanying this agreement, the terms of description of various qualities relative to finish, workmanship, or other qualities of similar kind which cannot, from their nature, be specifically and cleared described and specified, but are necessarily described in general terms, the fulfillment of which must depend on individual judgment, then in all such cases, any question of the fulfillment of said Specifications shall be decided by the Owner's Representative, and said work shall be done in accordance with hid interpretations of the meaning of the words, terms, or clauses defining the character of the work. 6. SUBCONTRACTOR The term Subcontractor, as employed herein, includes only those having a direct contract with the Contractor for performance of work on the project contemplated by these contract documents. Owner shall have no responsibility to any Subcontractor employed by Contractor for performance of work on the project contemplated by these contract documents, but said Subcontractors will look exclusively to Contractor for any payments due Subcontractor. 7. WRITTEN NOTICE Written notice shall be deemed to have been duly served if delivered in person to the individual or to a member of the firm or to an officer of the corporation for whom it is intended, or if delivered at or sent certified mail to the last business address known to him who gives the notice. 8. WORK Unless otherwise stipulated, the Contractor shall provide and pay for all materials, sullies, machinery, equipment, tools, superintendence, labor, insurance, and all water, light, power, fuel, transportation and all other facilities necessary for the execution and completion of the work covered by the contract documents. Unless otherwise specified, all materials shall be new and both workmanship and materials shall be of a good quality. The Contractor shall, if required, furnish satisfactory evidence as to the kind and quality of materials. Materials or work described in words which so applied have well known, technical or trade meaning shall be held to refer such recognized standards. All work shall be done and all materials furnished in strict conformity with the contract documents. 9. SUBSTANTIALLY COMPLETED The term "Substantially Completed" is meant that the structure or project contemplated by the -^ contract documents has been made suitable for use or occupancy or the facility is in a condition to serve its intended purpose, but still may require minor miscellaneous work and adjustment. 10. LAYOUT OF WORK Except as specifically provided herein, the Contractor shall be responsible for laying out all work and shall accomplish this work in a manner �- acceptable to the Owner's Representative. The Owner's Representative will check the Contractor's layout of all major structures and any other layout work done by the Contractor at Contractor's request, but this check does not relieve the Contractor of the responsibility of correctly locating all work accordance with the Plans and ^" Specifications. 11. KEEPING OF PLANS AND SPECIFICATIONS ACCESSIBLE The Contractor shall be furnished with 5 copies of all Plans, Profiles and specifications without expense to him and he shall keep one copy of same consistently accessible on the job site. 12. RIGHT OF ENTRY The Owner's Representative may make periodic visits to the site to observe the progress and quality of the executed work and to determine, in general, if the work is proceeding in accordance with the contract documents. He will not be required to make exhaustive or continuous on -site inspections to check the quality or quality of the work, nor will he be responsible for the construction means, methods,techniques, sequences or procedures, or the safety precautions incident thereto. His efforts II-3 will be directed towards providing assurances for the Owner that the completed project will conform to the requirements of the contract documents, but he will not be responsible for the Contractor's failure to perform the work in accordance with the Contract Documents. On the basis of his on -site observations, he will keep the Owner informed of the progress of the work and will.endeavor to guard the Owner defects and deficiencies in the work of the Contractor. 13. LINES AND GRADES All lines and grades shall be furnished by the Owner's Representative whenever necessary for the commencement of the work contemplated by these contract documents or the completion of the work contemplated by these contract documents. Whenever necessary, Contractor shall suspend his work in order to permit Owner's Representative to comply with this requirement, but such suspension will be as belief as practical and Contractor shall be allowed no extra compensation therefore. The Contractor shall give the Owner's Representative ample notice of the time and place where lines and grades will be needed. All stakes, marks, etc., shall be carefully preserved by the Contractor, and in case of careless destruction or removal by him, his Subcontractors, or his employees, such stakes, marks, etc., shall be replaced by the Owner's Representative at Contractor's expense. 14. OWNER'S REPRESENTATIVE'S AUTHORITY AND DUTY Unless otherwise specified, it is mutually agreed between the parties to this agreement that the Owner's Representative shall review all work included herein. He has the authority to stop the work whenever such stoppage may be necessary to insure the proper execution of the contract. In order to permit delays and disputes and to discourage litigation, it is further agreed that the Owner's Representative shall, in all cases, determine the amounts and quantities of the several kinds of work which are to be paid for under this contract. He shall determine all questions in relation to said work and the construction thereof, and shall in all cases, decide every question which may arise relative to the execution of this contract on the part of said Contractor. The Owner's Representative's estimates and findings shall be conditions precedent to the right of the parties hereto to arbitration or to any action on the contract, and to any rights of the Contractor to receive any money under this contract; provided, however, that should Owner's Representative render any decision or give direction, which in the opinion of either party hereto, is not in accordance with the meaning and intent of this contract, either party may file with said Owner's Representative within 30 days his written objection to the decision or direction so rendered, and by such action may reserve the right to submit the question so raised to arbitration as hereinafter provided. It is the intent of this agreement that there shall be no delay in the execution of the work, therefore, written decisions or direction of the Owner's Representative as rendered shall be promptly carried out, and any claim arising therefrom shall be adjusted to arbitration as hereinafter provided. 15. SUPERINTENDENT AND INSPECTION It is agreed by the Contractc Representative shall be and i appoint from time to time suc engineers, supervisors, or it Owner's Representative may de the materials furnished and t this agreement, and to see th furnished and said work is do the specifications therefore. furnish all reasonable aid ar by the subordinate engineers, inspectors for the proper ins examination of the work. The regard and obey the direction any subordinate engineers, sL inspectors so appointed, wher instructions are consistent u this agreement and accomvanvi r that the Owner's s hereby authorized to h subordinate spectors as the said am proper to inspect he work done under at said material is ne in accordance with The Contractor shall 3 assistance required supervisors, or pection and contractor shall s and instructions of pervisors or such directions and ith the obligations of na plans and specifications, provided, however, should the Contractor object to any orders by any subordinate engineer, supervisor or inspector, the Contractor may within six (6) days make written appeal to the Owner's Representatives for his decision. 16. CONTRACTOR'S DUTY AND SUPERINTENDENCE The Contractor shall give personal attention to the faithful prosecution and completion of this contract and shall keep on the work, during its progress, a competent superintendent and any necessary assistants, all satisfactory to Owner's Representative. The Superintendent shall represent the Contractor in his absence and all directions given to him shall be binding as if given to the II-5 Contractor. Adequate supervision by competent and reasonable representatives of the Contractor is essential to the proper performance of the work and lack of such supervision shall be grounds for suspending operations of the Contractor. The work, from its commencement to completion, shall be under the exclusive charge and control of the Contractor and all risk in connection therewith shall be borne by the Contractor. The Owner or Owner's Representative will not be responsible for the acts or omissions of the Contractor, or any subcontractors, or any of his agents or employees, or any other persons performing any of the work. 17. CONTRACTOR'S UNDERSTANDING It is understand and agreed that the Contractors has, by careful examination, satisfied himself as to the nature and location of the work, the confirmation of the ground, the character, quality and quantity of materials to be encounter, the character of equipment and facilities needed preliminary to and during the prosecution of the work, and the general and local conditions, and all other matters which in any way effect the work under this contract. No verbal agreement or conversation with any officer, agent, or employee of the Owner, either before or after the execution of this contract, shall effect or modify any of the terms or obligations herein contained. 18. CHARACTER OF WORKERS The Contractor agrees to employ only orderly and competent workers skillful in the performance in the type of work required under this contract, to do the work; and agrees that whenever the Owner's Representative shall inform him in writing that any worker or workers on the work, are, in his opinion, incompetent, unfaithful, or disorderly, such worker or workers shall be discharged from the work and shall not again be employed on the work without the Owner's Representative's written consent. 19. CONSTRUCTION PLANT The Contractor shall provide all labor, tools, equipment, machinery and materials necessary in the prosecution and completion of this contract where it is not otherwise specifically provided that the Owner shall furnish same, and it is also understood that the Owner shall not be held responsible for II-6 the care, preservation, conservation, or protection of any materials, tools, equipment or machinery or any part of the work until it is finally completed and accepted. The building of structures for the housing of men or equipment will be permitted only at such places as the Owner's Representative shall direct, and the sanitary conditions of the grounds in or such ,.. structure shall at all times be maintained in a manner satisfactory to the Owner's Representative. 20. SANITATION Necessary sanitary conveniences for the use of laborers on the work site, properly secluded from public observation, shall be constructed and maintained by the Contractor in such manner and at such points as shall be approved by the Owner's Representative and their use shall be strictly enforced. 21. OBSERVATION AND TESTING The Owner or Owner's Representative shall have the right at all reasonable times to observe and test the work. Contractor shall make necessary arrangements and provide proper facilities and access for such observation and testing at any location wherever work is in preparation or progress. Contractor shall ascertain the scope of any observation which may be contemplated by Owner or Owner's Representative and shall give ample notice as to the time each part of the work will be ready for such observation. Owner or Owner's Representative may reject any work found to be defective or nor in accordance with the contract documents, regardless of the stage of its completion or the time or place of discovery of such errors, any regardless of whether Owner's '~ Observer has previously accepted the work though oversight or otherwise. If any work should be covered without approval or consent of the Owner, it must, if requested by Owner or Owner's Representative be uncovered for examination at Contractor's expense. In the event that any part of the work is being fabricated or manufactured at a location where it is not convenient for Owner or Owner's Representative go make observations of such work or require testing of said work, then in such event Owner or Owner's Representative may require Contractor to furnish Owner or Owner's Representative certificates of inspection, testing -- or approval made by persons competent to perform such tasks at the location where that part of the work is being manufactured or fabricated. All such tests will be in accordance with the methods prescribed by the American Society for Testing and Materials or such other applicable organization as may be required by law or the contract documents. If any work which is required to be inspected. tested, or approved, is covered up without written approval or consent of the Owner's Representative, it must, if requested by the Owner or Owner's Representative, be uncovered for observation and testing at the Contractor's expense. The cost of all such inspections, tests, and approvals shall be borne by the Contractor unless otherwise provided herein. Any work which fails to meet the requirements of any such tests, inspections or approval, and any work which meets the requirements of any such tests or approval but does not meet the requirements of the contract documents shall be considered defective. Such defective work shall be corrected at the Contractor's expense. Neither observations by the Owner or Owner's Representative, nor inspections, tests, or approvals made by Owner, Owner's Representative, or other persons authorized under this agreement to make such inspections, tests, or approvals, shall relieve the Contractor from his obligation to perform the work in accordance with the requirements of the contract documents. 22. DEFECTS AND THEIR REMEDIES It is further agreed that if the work or any part thereof, or any material brought on the site of the work for use in the work or selected for the same, shall be deemed by the Owner or Owner's Representative as unsuitable or not in conformity with plans, specifications and contract documents, the Contractor shall, after receipt of written notice thereof from the Owner Representative, forthwith remove such material and rebuild or otherwise remedy such work so that it shall be in full accordance with this Contractor. It is further agreed that any remedial action contemplated as hereinabove set forth shall be at Contractor's expense. 23. CHANGES AND ALTERATIONS The Contractor further agrees that the Owner may make such changes and alterations as the Owner may see fit, in the line, grade, form, dimensions, II-8 plans or materials for the work herein contemplated, or any part thereof, either before or after the beginning of the construction, without affecting the validity of this contract and the accompanying bond. If such changes or alterations diminish the quality of the work to be done, they shall not constitute the basis for a claim for damages, or anticipated profits on the work that may be dispensed with. If .., they increase the amount of work, and the increased work can fairly be classified under the specifications, such increase shall be paid according to the quantity actually done and at the unit price established for such work under this contract; otherwise such additional work shall be paid for as provided under Extra Work. In case the Owner shall make such changes or alternatives as shall make unless any work already done or material already furnished or used in said work, then the Owner shall recompense the Contractor for any material or labor so used, and for any actual loss occasioned by such change, due to actual expense incurred in preparation for the work as originally planned. 24. EXTRA WORK The term "extra work" as used in this contract shall be understood to mean and include all work that may be required by the Owner or Owner's Representative to be done by the Contractor to accomplish any change, alteration or addition to the work as shown on the plans and specifications or contract documents and not covered by Contractors' proposal, except as provided under Changes and Alterations herein. It is agreed that the Contractor shall perform all extra work under the direction of the Owners Representative when presented with a written work order signed by the Owner's Representative, subject, however, to the right of the Contractor to require written confirmation of such extra work order by the Owner. It is also agreed that the �^ compensation to be paid to the Contractor for performing said extra work shall be determined by one or more of the following methods: Method (A) - By agreed unit prices; or Method (B) - By agreed lump sum; or Method (C) - If neither Method (A) or Method (B) Be agreed upon before the extra work is commenced, then the Contractor shall be paid the actual field cost of the work, plus -- Fifteen (15%) per cent. II-9 In the event said extra work be performed and paid for under Method (C), then the provision of this paragraph shall apply and the "actual field cost" is hereby defined to include the cost of all workmen, such as foremen, timekeepers, mechanics and laborers, and materials, supplies, teams, trucks, rental on machinery and equipment, for the time actually employed or used on such extra work, plus actual transportation charges necessarily incurred, together with all expenses incurred directly on account of such extra work, including Social Security, Old Age Benefits, Maintenance Bonds, Public Liability and Property Damage and Workmen's Compensation and all other insurance as may be required by law or ordinance or directed by the Owner or Owner's Representative, or by them agreed to. Owner's Representative may direct the form in which accounts of the actual field cost shall be kept and records of these accounts shall be made available to the Owner's Representative. The Owner's Representative may also specify in writing, before the work commences, the method of doing the work and the type and kind of machinery and equipment to be used; otherwise, these matters shall be determined by the Contractor. Unless otherwise agreed upon, the prices for the use of machinery and equipment shall be determined by using 100%, unless otherwise specified, of the latest Schedule of Equipment and Ownership Expenses adopted by the Associated General Contractors of America. Where practical, the terms and prices for the use of machinery and equipment shall be incorporated in the written extra work order. The fifteen per cent (15%) of the actual field cost to be paid to Contractor shall cover and compensate him for his profit, overhead, general superintendence, and field office expense, and all other elements of cost and expense not embraced within the actual field cost as herein defined, save that where the Contractor's Camp or Field Office must be maintained primarily on account of such Extra Work, then the cost to maintain and operate the same shall be included in the 'actual field cost." No claim for extra work of any kind will be allowed unless ordered in writings by the Owner's Representative. In case any orders or instructions appear to the Contractor to involve extra work for which he should receive compensation or an adjustment in the construction time, he shall make written request to the Owner's Representative for a written order authorizing such extra work. Should a difference of opinion arise as to what does or does not constitute extra work, or as to the payment therefore, and the Owner's Representative insists upon its performance, the Contractor shall proceed with the work after making written request for written order and shall keep adequate and accurate account of the actual field cost thereof, as provided under Method (C). The Contractor will thereby preserve the right to submit the matter of payment to arbitration as herein below provided. 25. DISCREPANCIES AND OMISSIONS It is further agreed that it is the intent of this contract that all work described in this proposal, the specifications, plans and other contract -� documents, is to be done for the prices quoted by the Contractor and that such price shall include all appurtenance necessary to complete the work in accordance with the intent of these contract documents as interpreted by Owner's Representative. If the Contractor finds any discrepancies or omissions in these plans, specifications, or contract documents, he should notify the Owner's Representative and obtain a clarification before the bids are received, and if no such request is ,- received by the Owner's Representative prior to the openings of bids, then it shall be considered that the Contractor fully understands the work to be ,* included and has provided sufficient sums in his proposal to complete the work in accordance with these plans and specifications. It is further understood that any request for clarification must ._ be submitted no later than five days prior to the opening of bids. 26. RIGHT OF OWNER TO MODIFY METHODS AND EQUIPMENT If at any time the methods or equipment used by the Contractor are found to be inadequate to secure the quality of work with the rate of progress required under this contract, the Owner or Owner's Representative may order the Contractor in writing to increase their safety or improve their character and efficiency and the Contractor shall comply with such order. if, at any time, the working force of the Contractor is inadequate for securing the progress herein specified. the Contractor shall, if so ordered in writing, increase his force or equipment, or both to such an extent as to give reasonable assurance of compliance with the ^- schedule of progress. 27. PROTECTION AGAINST ACCIDENT TO EMPLOYEES AND THE PUBLIC The Contractor shall take out and procure a policy or policies of Workmen's Compensation Insurance with an insurance licensed to transact business in the State of Texas, which policy shall comply with the Workmen's Compensation Laws of the State of Texas. The Contractor shall at all times exercise reasonable precaution for the safety of employees and others on or near the work and shall comply with all applicable provisions of federal, state and municipal laws and building and construction codes. All machinery and equipment and other physical hazards shall be guarded in accordance with the "Manual of Accident Prevention in Construction" of Associated General Contractors of America, except where incompatible with federal, state or municipal laws or regulations. The Contractor, his sureties and insurance carriers shall defend, indemnity and save harmless the Owner and all of its officers, agents and employees from all suits, actions, or claims of any character whatsoever, brought for or on account of any injuries or damages received or sustained by any person or persons or property, on account of any negligent act or fault of the Contractor or any subcontractor, their agents or employees, in the execution and supervision of said contract, and the project which is the subject matter of this contract, on account of the failure of Contractor or any subcontractor to provide necessary barricades, warning lights, or signs, and will be required to pay any judgment with costs which may be obtained against the Owner or any of its officers, agents, or employees including attorney's fees. The safety precautions taken shall be the sole responsibility of the Contractor, in his sole discretion as an Independent Contractor; inclusion of this paragraph in the Agreement, as well as any notice which may be given by the Owner, the Owner's Representative concerning omissions under this paragraph as the work progresses, are intended as reminders to the Contractor of his duty and shall not be constructed as any assumption of duty to supervise safety.precautions by either the Contractor or any of his subcontractors. 28. CONTRACTOR'S INSURANCE II-12 The Contractor shall procure and carry at his sole cost and expense throughout the life of .this contract, insurance protection as hereinafter specified. Such insurance shall be carried with an insurance company licensed to transact business in the State of Texas and shall cover all operations in connection with this contract, whether performed by the Contractor or a subcontractor, or separate policies shall be provided covering the operation r: of each subcontractor. (A) Workmen's Compensation and Employer's Liability Insurance As required by State statute covering all employees employed on a work whether employed by the Contractor or any subcontractor on the job. (B) Comprehensive General Liability Insurance The Contractor shall have Comprehensive General Liability Insurance with limits $500,0OO Bodily Injury and $300,000 Property Damage per occurrence to include: -- Premises and Operations Explosion and Collapse Hazard Contractual Liability (Incidental) Independent Contractors Coverage Personal Injury (with exclusion "C" waived) The City is to be named as an additional insured on this policy for this specific job and a copy of the endorsement doing so is to be �. attached to the Certificate of Insurance. (C) Automobile Insurance The Contractor shall procure automobile insurance providing coverage as follows: In an amount not less than $ 100,000.00 for •~ injuries, including accidental death, to any one person, but not less than $ 300,000.00 per occurrence, and in the amount of not less than .,. $ 100,000.00 for property damage. (D) Excess or Umbrella Liability Insurance The Contractor shall have Excess or Umbrella Liability Insurance in the amount of $1,000,000 with coverage to correspond with Comprehensive General Liability and Comprehensive Automobile Liability coverages. The City is to be named as an additional insured on this policy for this specific job and a copy of the endorsement doing so is to be attached to the Certificate of Insurance. (E) PROOF OF COVERAGE Before work on this contract is commenced, each Contractor and subcontractor shall submit to the Owner for approval 6 certificates of insurance covering each insurance policy carried and offered as evidence of compliance with the above insurance requirements, signed by an authorized representative of the insurance company setting forth: (1) The name and address of the insured. (2) The location of the operations to which the insurance applies. (3) The name of the policy and type or types of insurance in force thereunder on the date borne by such certificate. (4) The expiration date of the policy and the limit or limits of liability thereunder on the date borne by such certificate. (5) A statement that the insurance of the type afforded by the policy applies to all of the operations of whatever character, which are undertaken by the insured during the performance of this contract, provided such operations are required in the performance of the contract. (6) A provision that the policy may be canceled only by mailing written notice to the named insured at the address shown in the policy stating when, not less than ten (10) days thereafter, cancellation of such policy shall be effective, with a copy to the Owner of said letter of intent. 29. PROTECTION AGAINST CLAIMS OF SUBCONTRACTORS LABORERS MATERIALMEN AND FURNISHERS OF MACHINERY, EQUIPMENT AND SUPPLIES The Contractor agrees that he will indemnity and save the Owner harmless from all claims growing out of any demands of subcontractors, laborers, workmen, mechanics, materialmen and furnishers of II-14 machinery and parts thereof, equipment, power tools, all suppliers, including commissary, incurred in the furtherance of the performance of this contract. When Owner so desires, the Contractor shall furnish satisfactory evidence that all obligations of the nature hereinabove designated have been paid, discharged or waived. If during the progress of the work, Contractor .� shall allow any indebtedness to accrue for work furnished by any of those designated in the preceding paragraph and shall fail to pay and discharge any such indebtedness within five (5) days after demand is made, then Owner may, during the period for which such indebtedness shall remain unpaid, withhold from the unpaid portion of this contract, a sum equal to the amount of such unpaid indebtedness or may apply the sum so withheld to discharge any such indebtedness. - any and all communications between any party under this paragraph must be in writing. 30. PROTECTION AGAINST ROYALTIES OR PATENT INVENTION The Contractor shall pay all royalties and license fees, and shall provide for the use of any design, device, material or process covered by letters patent or copyright by suitable legal agreement with the Patentee or Owner thereof. The Contractor shall defend all suits or claims for infringement of any patent or copyrights and shall indemnity and save the Owner harmless from any loss on account thereof, except that Owner shall defend all such suits and claims and shall be responsible for all such loss when a particular design, device, material or process or the product of a particular P., manufacturer or manufacturers is specified or required in these contract documents by Owner; provided, however, if choice of alternate design, device, material or process is allowed to the Contractor, then Contractor shall indemnify and save Owner harmless from any loss on account thereof. If the material or process specified or '^ required by Owner is an infringement, the Contractor shall be responsible for such loss unless he promptly gives written notice to the Owner of such infringement. 31. LAWS AND ORDINANCES The Contractor shall at all times observe and comply with all federal, state and local laws, ordinances and regulations, which in any manner �- effect the contract or the work, and shall II-15 indemnify and save the Owner against any claim arising from the violation of any such laws, ordinances, and regulations, whether by the Contractor or his employees. If the Contractor observes that the plans and specifications are at various therewith, he shall promptly notify the Owner's Representative in writing and any necessary changes shall be adjusted as provided in the contract for changes in the work. If the Contractor performs any work knowing it to be contrary to such laws, ordinances, rules and regulations, and without such notice to the Owner's Representative, he shall bear all costs arising therefrom. The Owner is a municipal corporation of the State of Texas and the law from which it derives its powers, insofar as the same regulates the objects for which, or the manner in which, or the conditions under which the Owner may enter into contracts, shall be controlling, and shall be considered as part of this contract to the same effect as though embodied herein. 32. ASSIGNMENT AND SUBLETTING The Contractor further agrees that he will retain personal control and will give his personal attention to the fulfillment of this contract. The Contractor further agrees that subletting of any portion or feature of the work, or materials required in the performance of this contract, shall not relieve the Contractor from his full obligations to the Owner, as provided by this contractual agreement. 33. TIME FOR COMPLETION AND LIQUIDATED DAMAGES It is hereby understood and mutually agreed by and between the Contractor and the Owner, that the date of beginning and time for completion as specified in the contract; and it is further mutually understood and agreed that the work embraced in this contract shall be commenced on a date to be specified in the Notice to Proceed. If the Contractor should neglect, fail, or refuse to complete the work within the time herein specified, or any proper extension thereof granted by the Owner, then the Contractor does hereby agree as part of the consideration for the awarding of this contract, the owner may withhold permanently from Contractor's total compensation, the sum of two -Hundred Dollars ($200.00), not as a penalty, but as liquidated damages for the breach of the contract as herein set forth for each and every calendar day that the Contractor shall be in default after the time stipulated for completing the work. (See Bid Proposal -Bid for Unit Price for additional information). It is expressly understood and agreed, by and between Contractor and the Owner, that the time for the completion of the work described herein is �. reasonable time for the completion of the same, taking into consideration the average climatic change and conditions and usual industrial conditions prevailing in this locality. The amount is fixed and agreed upon by and between the Contractor and the Owner because of the impracticability and extreme difficulty in fixing and ascertaining actual damages the Owner would in such event sustain, and the amount is agreed to be damages the Owner would sustain and shall be retained by the Owner from current periodical estimates for payments or from final payment. It is further agreed and understood between the Contractor and Owner that time is of the essence of this contract. 34. TIME AND ORDER OF COMPLETION It is the meaning and intent of this contract, unless otherwise herein specifically provided, that the Contractor shall be allowed to prosecute his work at such time and sessions, in such order of ^� precedence, and in such manner as shall be substantially completed as a whole and in part, in accordance with this contract, the plans and .- specifications, and within the time of completion designated in the proposals; provided, also, that when the Owner is having other work done, either by contract or by his own force, the Owner's Representative may direct the time and manner of constructing work done under this contract so that conflicts will be avoided and the construction of °^ the various works being done for the Owner shall be harmonized. The Contractor shall submit, at such times as may reasonably be requested by the Owner's Representative, schedules which shall show the order in which the Contractor proposes to carry on the work, with dates at which the Contractor will start the several parts of the work, and estimated dates of completion of the several parts. (See Special Conditions for additional information). II-17 35. EXTENSION OF TIME The Contractor agrees that he has submitted his proposal in full recognition of the time required for the completion of this project, taking into consideration the average climatic range and industrial conditions prevailing in this locality, and has considered the liquidated damage provisions of paragraph 33 hereinabove set forth and that he shall not be entitled to, nor will he request, an extension of time on this contract, except when his work has been delayed by an act or neglect of the Owner or other contractors employed by the Owner, or by changes ordered in the work, or by strike, walk -outs, acts of God or the public enemy, fire or flood. The Contractor may apply in writing for an extension of time, submitting therewith all written justification as may be required by Owner's Representative for such an extension as requested by Contractor. The Owner's Representative within ten (10) days after receipt of a written request for an extension of time by the Contractor supported by all requested documentation shall then submit such written request to the City Council of the City of Lubbock for their consideration. Should the Contractor disagree with the action of City Council on granting an extension of time, such disagreement shall be settled by arbitration as hereinafter provided. 36. HINDRANCE AND DELAYS In executing the contract agreement, the Contractor agrees that in undertaking to complete the work within the time herein fixed, he has taken into consideration and made allowances for all hindrances and delays incident to such work, whether growing out of delays in securing material or workmen or otherwise. No charge shall be made by the Contractor for hindrance or delays from any cause during the progress of any part of the work embraced in this contract except where the work is stopped by order of the Owner or Owner's Representative for the Owner's convenience in which event such expense as in the judgment of the Owner's convenience in which event such expense as in the judgment of the Owner's Representative that is caused by such stoppage shall be paid by Owner to Contractor. 37 QUANTITIES AND MEASUREMENTS II-18 M No extra or customary measurements of any kind will be allowed, but the actual measured or computed length, area, solid contents, number and weight only shall be considered, unless otherwise specifically provided. In the event this contract is let on a unit price basis, then Owner and Contractor agree that this contract, including the specifications, plans and �- other contract documents are intended to show clearly all work to be done and material to be furnished hereunder. Where the estimated quantities are shown for the various classes of work to be done and material to be furnished under this contract, they are approximate and are to be used only as a basis for estimating the probable cost of the work and for comparing their proposals offered for the work. It is understood and agreed that the actual amount of work to be done and the materials to be furnished under this contract may differ somewhat from these estimates, and that where the basis for payment under this contract is the unit price method, payment shall be for the actual amount of work done and materials furnished on the project. 38. PROTECTION OF ADJOINING PROPERTY The Contractor shall take proper means to protect the adjacent or adjoining property or properties in any way encountered, which may be injured or seriously affected -by any process of construction to be undertaken under this agreement, from any damage or injury by reason of said process of construction; and he shall be liable for any and all claims for such damage on account of his -- failure to fully protect all adjacent property. The Contractor agrees to indemnify, save and hold harmless the Owner against any claim or claims for damages due to any injury to any adjacent or adjoining property, arising or growing out of the performance of this contract, but such indemnity shall not apply to any claim of any kind arising out of the existence or character of the work. 39. PRICE FOR WORK In consideration of the furnishing of all necessary labor, equipment and material and the completion of all work by the Contractor, and on the delivery of all materials embraced in this contract in full conformity with the specifications and stipulations herein contained, the Owner agrees to pay the Contractor the price set forth in the proposal attached hereto, which has been made a part of this contract, and the Contractor hereby agrees to receive such price in full for furnishing all materials and all labor required for the aforesaid work, also, for all expenses incurred by him and for well and truly performing the same and the whole thereof in the manner and according to this agreement, the attached specifications, plans, contract documents and requirements of Owner's Representative. 40. PAYMENTS No payments made or certificates given shall be considered as conclusive evidence of the performance of the contract, either wholly or in part, nor shall any certificate or payment be considered as acceptance of defective work. Contractor shall at any time requested during the progress of the work furnish the Owner or Owner's Representative with a verifying certificate showing the Contractor's total outstanding indebtedness in connection with the work. Before final payment is made, Contractor shall satisfy Owner, by affidavit or otherwise, that there are no outstanding liens against Owner's premises by reason of any work under the contract. Acceptance by Contractor of final payment of the contract price shall constitute a waiver of all claims against Owner which have not theretofore been timely filed as provided in this contract. 41. PARTIAL PAYMENTS On or before the tenth day of each month, the Contractor shall submit to Owner's Representative an application for partial payment. Owner's Representative shall review said application for partial payment and the progress of the work made by the Contractor and if found to be in order shall prepare a certificate for partial payment showing as completely as practical the total value of the work done by the Contractor up to and including the last day of the preceding month. The Owner shall then pay the Contractor on or before the fifteenth day of the current month the total amount of the Owner's Representative's Certificate of Partial Payment, less 5% of the amount thereof, which 5% shall be retained until final payment, and further, less all previous payments and all further sums that may be retained by Owner under the terms of this agreement. It is understood, however, that in case the whole work be II-20 near to completion, and this fact is certified to by Owner's Representative and some unexpected and some unusual delay occurs due to no fault or negligence on the part of the Contractor, the Owner may upon written recommendation of Owner's Representative pay reasonable and equitable portion of the retained percentage due Contractor. 42. FINAL COMPLETION AND ACCEPTANCE Within thirty-one days (31) days after the Contractor has given the Owner's Representative written notice that the work has been completed or substantially completed, the Owner's Representative and the Owner shall inspect the work and within said time, if the work be found to be completed or -- substantially completed in accordance with the contact documents, the Owner's Representative shall issue to the Owner and the Contractor his certificate of completion, and thereupon it shall be the duty of the Owner within thirty-one (31) days to issue a certificate of acceptance of the work to the Contractor. 43. FINAL PAYMENT �.- Upon the issue of the certificate of completion, the Owner's Representative shall proceed to make final measurement and prepare a final statement of the value of all work performed and materials furnished under the term of the agreement, and shall certify same to the Owner, who shall pay to the Contractor on or before the 31st day after the �- date of certificate of completion, the balance due Contractor under the terms of this agreement, provided he has fully performed his contractual obligations under the terms of this contract; and said payment shall become due in any event upon said performance by the Contractor. Neither the certificate of acceptance nor the final payment, nor any provisions in the contract documents shall relieve the Contractor of the obligation for fulfillment of any warranty which may be required �^ in the special conditions (if any) of this contract or required in the specifications made a part of this contract. 44. CORRECTION OF WORK BEFORE FINAL PAYMENT FOR WORK Contractor shall promptly remove from Owner's -' premise all materials condemned by the Owner's Representative on account of failure to conform to the contract, whether actually incorporated in the �-- work or not, and Contractor shall at his own EMU II-21 expense promptly replace such condemned material with other materials conforming to the requirements of this contract. Contractor shall also bear he expense of restoring all work of other contractors damaged by any such removal or replacement. If Contractor does not remove and replace any such condemned work within a reasonable time after a written notice by the Owner or the Owner's Representative. Owner may remove and replace it at Contractor's expense. 45. CORRECTION OF WORK AFTER FINAL PAYMENT Neither the final payment nor certificate nor any provision in this contract shall relieve the Contractor of responsibility for faulty materials or workmanship, and he shall remedy and defects due thereto and pay for any damage to -other work resulting therefrom, which shall appear within a period of one (1) year from date of substantial completion. The Owner or the Owner's Representative shall give notice of observed defects with reasonable promptness. 46. PAYMENT WITHHELD The Owner may, on account of subsequently discovered evidence, withhold or nullify the whole or part of any certificate to such extent as may be necessary to protect himself from loss on account of: (A) Defective work not remedied. (B) Claims filed or reasonable evidence indicating possible filing of claims. (C) Failure of the Contractor to make payments promptly to subcontractors or for material or labor. (D) Damage to another contractor. When the above grounds are removed, or the Contractor provided a surety bond satisfactory to the Owner, which will protect the Owner in the amount withheld, payment shall be made for amounts withheld because of them. 47. TIME OF FILING CLAIMS It is further agreed by both parties hereto that all questions of dispute or adjustment presented by the Contractor shall be in writing and filed with II-22 the Owner's Representative within fifteen (15) days after the Owner's Representative has given any directions, order or instruction to which the 'w Contractor desires to take exception. The Owner's Representative shall reply to such written. exceptions by the Contractor and render his final decision in writing. In case the Contractor should appeal from the decision of the Owner's Representative, any demand for arbitration shall be filled with the Owner's Representative and the Owner in writing within ten (10) days after the date of delivery to Contractor of the final decision of the Owner's Representative. It is further agreed that final acceptance of the work by the Owner and the acceptance by the Contractor of the final payment shall be a bar to any claim by either party, except where noted otherwise in the contract documents. 48. ARBITRATION All questions of dispute under this agreement shall be submitted to arbitration at the request of "^ either party to the dispute. The parties may agree upon one arbitration, otherwise, there shall be three; one named in writing by each party and the third chosen by the two arbiters selected; or if the arbiters fail to select a third within ten (10) days, he shall be chosen by the District Judge, 72nd Judicial District of Texas. Each arbiter shall be a resident of the City of Lubbock. Should the party demanding arbitration fail to name an arbiter within ten (10) days of the demand, his right to arbitrate shall lapse, and the decision of the Owner's Representative shall be final and binding on him. Should the other party fail to choose an .., arbiter within ten (10) days, the Owner's Representative shall appoint such arbiter. Should either party refuse or neglect to supply the arbiters with any papers or information demanded in writing, the arbiters are empowered by both parties to take Ex Parte Proceedings. The arbiters shall act with promptness. The decision of any two shall be binding on both parties to the contract, unless either or both parties shall appeal within ten (10) days from date of the award by the arbiters, and it is hereby agreed that each party shall the right of appeal and all proceedings shall be according to and governed by Arbitration Statutes of Texas, being Article 224, et seq., Vernon's Annotated Civil Statutes. THE DECISION OF THE ARBITERS UPON ANY QUESTION SUBMITTED TO ARBITRATION UNDER THIS II-23 CONTRACT SHALL BE A CONDITION PRECEDENT TO ANY RIGHT OF LEGAL ACTION. The arbiters, if they deem the case demands it, are authorized to award the party whose contention is sustained, such sums as they deem proper for the time, expense and trouble incident to the appeal, and if the appeal was taken without reasonable cause, they may award damages for any delay occasioned thereby. The arbiters shall fix their own compensation, unless otherwise provided by agreement, and shall assess the cost and charges of the arbitration upon either or both parties. The award of the arbiters must be made in writing and shall not be open to objection on account of the form of proceedings or award. 49. ABANDONMENT BY CONTRACTOR In case the Contractor should abandon and fail or refuse to resume work within ten (10) days after written notification from the Owner or the Owner's Representative, or if the Contractor fails to comply with the orders of the Owner's Representative, when such orders are consistent with this contract, this agreement, or the Specifications hereto attached, then the Surety on the bond shall be notified in writing and directed to complete the work and a copy of said notice shall be delivered to the Contractor. After receiving said notice of abandonment, the Contractor shall not remove from the work any machinery, equipment, tools, materials or supplies then on the job, but the same, together with any materials and equipment under the contract for work, may be held for use on the work by the Owner or the Surety of the Contractor, or another contractor, in completion of the work; and the Contractor shall not receive any rental or credit therefore (except when used in connection with Extra Work, where credit shall be allowed as provided for under paragraph 24 of this contract); it being understood that the use of such equipment and materials will ultimately reduce the cost to complete the work and be reflected in the final settlement. In case the Surety should fail to commence compliance with the notice for completion hereinbefore provided for, within ten (10) days after service of such notice, then the Owner may provide for completion of the work in either of the following elective manners: II-24 (A) The Owner may employee such force of men and use of machinery, equipment, tools, materials and supplies as said Owner may deem necessary to complete the work and charge the expense of such labor, machinery, equipment, tools, materials and supplies to said Contractor, and - the expense so charged shall be deducted and paid by the Owner out of such moneys as may be due, or that may thereafter at any time become due to the Contractor under and by virtue of this agreement. In case such expense is less than the sum which would have been payable under this contract, if the same had been completed by the Contractor, then said Contractor shall receive the difference. In case such expense is greater than the sum which would have been payable under this contract, if the same had been completed by said Contractor, then the Contractor and/or his surety shall pay the amount of such excess to the Owner; or (B) The Owner, under sealed bids, after notice published as required by law, at least twice in a newspaper having a general circulation in the County of location of the work. may let the contract for the completion of the work under substantially the same terms and conditions which are provided in this contract. In case of any increase in cost to the Owner under the new contract as compared to what would have been the cost under this contract, such increase shall be charged to the Contractor and the Surety shall be and remain bound. therefore. However, should the cost to complete any such new contract prove to be less than that which would have been the cost to complete the work under this contract, the Contractor or his Surety shall be credited therewith. When the work shall have been substantially completed, the Contractor and his Surety shall be so notified and certificates of completion and acceptance, as provided in paragraph 42 -- hereinabove set forth, shall be issued. A complete itemized statement of the contract accounts, certified to be the Owner's Representative as being correct shall then be prepared and delivered to Contractor and his Surety, whereon the Contractor or his Surety, or the Owner as the case may be, shall pay balance due as reflected by said statement within 31 days after the date of certificate of completion. II-25 In the event the statement of accounts shows that the cost to complete the work is less than that which would have been the cost to the Owner had the work been completed by the Contractor under the terms of this contract, or when the Contractor and/or his Surety shall pay the balance shown to be due by them to the Owner, then all machinery, equipment, tools, materials or supplies left on the site of the work shall be turned over to the Contractor and/or his Surety. Should the cost to complete the work exceed the contract price, and the Contractor and/or his Surety fail to pay the amount due the Owner within the time designated hereinabove, and there remains any machinery, equipment, tools, materials or supplies on the site of the work, notice thereof, together with an itemized list of such equipment and materials shall be mailed to the Contractor and his Surety at the respective addresses designated in this contract; provided, however, that actual written notice given in any manner will satisfy this condition. After mailing, or other giving of such notice, such property shall be held at the risk of the Contractor and his Surety subject only to the duty of the Owner to exercise ordinary care to protect such property. After fifteen (15) days from the date of said notice the Owner may sell such machinery, equipment, tools, materials or supplies and apply the net sum derived from such sale to the credit of the Contractor and his Surety. Such sale may be made at either public or private sale, with or without notice, as the Owner may elect. The Owner shall release any machinery, equipment, tools, materials, or supplies which remain on the job site and belong to persons other than the Contractor or his Surety, to their proper owners. 50. ABANDONMENT BY OWNER In case the Owner shall fail to comply with the terms of this contract, and should fail or refuse to comply with said terms within ten (10) days after written notification by the Contractor, then the Contractor may suspend or wholly abandon the work, and may remove therefrom all machinery, tools, and equipment, and all materials on the ground that have not been included in payments to the Contractor and have been incorporated into the work. Thereupon, the Owner's Representative shall make an estimate of the total amount earned by the Contractor, which estimate shall include the value II-26 of all work actually completed be said Contractor at the prices stated in the attached proposal, the value of all partially completed work at a fair and equitable price, and the amount of all Extra Work performed at the prices agreed upon, or provided for by the terms of this contract, and a reasonable sum to cover the cost of any provisions made by the Contractor to carry the whole work to completion, and which cannot be utilized. The Owner's Representative shall then make a final statement of the balance due the Contractor by deducting from the above estimates all previous payments by the Owner and all other sums that may be retained by the Owner under the terms of this agreement, and shall certify same to the Owner who shall pay to the Contractor on or before thirty (30) days after the date of the notification by the Contractor the balance shown by said final statement as due the Contractor, under the terms of this agreement. 51. BONDS The successful bidder shall be required to furnish a performance bond and payment bond in accordance with Article 5160, Vernon's Annotated Civil Statutes in the amount of 1000 of the total contract price, in the event said contract price exceeds $25,000.00. If the contract price does not exceed $25,000.00, the statutory bonds will not be required. All bonds, if required, shall be submitted on forms supplied by the Owner, and executed by an approved Surety Company authorized to do business in the State of Texas. And it is further agreed that this contract shall not be in effect until such bonds are so furnished. 52. SPECIAL CONDITIONS In the event special condition are contained herein as part of the contract documents and said special condition conflict with any of the general conditions contained in this contract, then in such event the special conditions shall control. 53. LOSSES FROM NATURAL CAUSES Unless otherwise specified herein, all loss or damage to the Contractor arising out of the nature of the work to be done, or from the action of the elements, or from any unforeseen circumstances and the prosecution of the same, or from unusual obstructions or difficulties which may be encountered in the prosecution of the work, shall II-27 be sustained and borne by the Contractor at his own cost and expense. 54. INDEPENDENT CONTRACTOR Contractor is, ans shall remain, an independent contractor, with full, complete and exclusive power and authority to direct, supervise, and control his own employees and to determine the method of the performance of the work covered hereby. The fact that the Owner or Owner's Representative shall have the right to observe Contractor's work during his performance and to carry out the other prerogatives which are expressly reserved to and vested in the owner or Owner's Representative hereunder, is not intended to and shall not at any time change or effect the status of the Contractor as an independent contractor with respect to either the Owner or Owner's Representative or to the Contractor's own employees or to any other person, firm, or corporation. 55. CLEANING UP The Contractor shall at all times keep the premise free from accumulation of debris cased by the work, and at the completion of the work he shall remove all such debris and also his tools, scaffolding, and surplus materials and shall leave the work broom clean or its equivalent. The work shall be left in good order and condition. In case of dispute Owner may remove the debris and charge the cost to the Contractor. II-28 SPECIAL CONDITIONS ,r 1. CHANGES IN THE WORK The Local Public Agency may make changes in the scope of the work required to be performed by the Contractor under the Contract or making additions thereto, or by omitting work therefrom,,without involving the Contract, and without relieving or releasing the Contractor from any of his obligations under the contract or any guarantee given by him pursuant to the Contract provisions, and without affecting the validity of the guaranty bonds, and without relieving or releasing the surety or sureties of said bonds. All such work shall be executed under the terms of the original Contract unless it is expressly provided otherwise Except for the purpose of affording protection against any emergency endangering health, life, limb or property, the Contractor shall make no change in the materials used or in the specified manner of constructing and/or installing the improvements or supply additional labor, services or materials beyond that actually required for the execution of the contract, unless in pursuance of a written order from the local Public Agency authorizing the Contractor to proceed with the change. No claim for an adjustment of the contract price will be valid unless so ordered. If applicable unit prices are contained in the agreement (established as a result of either a unit price bid or a Supplement Schedule of Unit Prices) the Local Public Agency may order the Contractor to proceed with desired changes in the work, the value of such changes to be determined by the measured quantities.involved and the applicable unit prices specified in the contract; provided that in case of a unit price contract the net value of all changes does not increase or decrease the original total amount shown in the Agreement by more than twenty- five (25%) percent. 2. SUPERINTENDENCE The Superintendent and/or his assistants will not be allowed to serve two functions simultaneously, such operating �- machinery and acting as Superintendent at the same time. The Superintendent must be free of individual responsibilities to enable him to give the entire project his constant attention to facilitate the progress thereof. 3. PROSECUTION OF WORK The Contractor may proceed with subgrade preparation of earthwork on any schedule that he may select and on any location in the contract unless hindered by factors beyond his control. Not more than three (3) calendar days shall elapse between the time subgrade preparation is begun and the time of spreading and compaction of the caliche base. During the construction the Contractor is to close to traffic streets as directed by the Engineer. The Contractor will before starting any work on any street, erect barricades and signs, or provide sufficient flagmen to give notice to vehicular traffic, also two special trailer mounted signs and arrows flash left, right or both at the same time at least 25 times per minute, see detail 2-S-126 and Section 6E-7 of the traffic control manual. During the period the Contractor is directing traffic over the base, the surface shall be satisfactorily maintained by the use of sprinkling and blading as required so that no hazard will result. The base course shall be maintained until the wearing surface if placed thereon. At no time during the period of construction shall driveways and/or alleys be left impassable between the night hours of 6 P.M. to 6 A.M. except during the construction of the curb and gutter for which the driveways and/or alleys shall remain closed not more than 4 days including 72 hours for curing. The Contractor will be required to place and level the caliche as each block is subgraded and in no case shall the caliche be permitted to remain as dumped overnight. The Contractor will during the progress of the work erect and maintain for twenty-four hours a day such barricades and warnings necessary to give notice to vehicular and pedestrian traffic of any and all obstructions and insofar as possible keep the streets and/or alleys on which work is being done in a passable condition. During the time that the curb and gutter is being poured and cured and until the caliche is leveled, the Contractor shall have flares and warning signs placed at each end of the block. When the subgrade excavation causes an abrupt drop in the driving portion of the street the Contractor shall level the drop by dumping a sufficient amount of approved caliche on the subgrade. During the time the concrete is curing in the alleys and until it can be opened to traffic, the Contractor shall maintain warning signs on barricades with flares at each end of the block until this alley can be opened to traffic. III-2 The flagmen will be required to wear vests and use the type of flag as shown on flagging detail sheet in specifications. All equipment working on the streets will at all times have at least two (2) red, orange or fluorescent red -orange flags at least 16" x 16" in size. These flags shall be mounted high enough on the equipment so that they will be visible to all traffic meeting or passing the equipment. �., Before work is started on any street it will be the responsibility of the Contractor to notify each property owner that has a car or cars parked in their driveways or garages so that each owner might have the opportunity to move '— their cars. The Contractor shall schedule his work on major thoroughfares and collectors at least 5 days in advance, in order that businesses may have time to adjust their plans. On all thoroughfares and collectors, the Contractor and the City's Representatives will work with each of the businesses, hospitals, schools, etc., so that only part of the driveways into their parking lots will be closed. At no time will any parking lot be completely closed, without prior approval from the Owner's Representative, unless the work is being accomplished at night and the businesses are closed. The Contractor shall be responsible for notifying affected -- businesses of the proposed work and the projected schedule for completion of this work. Immediately after each applications of asphalt, re- construction or black base construction the Contractor shall clean, remove paper, surplus aggregate or paving materials from gutters, rubbish and temporary structures from the street, restore in an acceptable manner all property, both public and private which has been damaged during the prosecution of the work, and leave the site of the work in a �. neat and presentable condition throughout. The cost of the "cleanup" shall be included as part of the cost of the various items of the work involved, and no direct compensation will be made for this work. The Contractor should familiarize himself with the Texas Manual on UNIFORM TRAFFIC CONTROL DEVICES for Streets and Highways. Part VI, published August 31, 1979. 4. BARRICADES AND DANGER, WARNING AND DETOUR SIGNS AND ,. TRAFFIC HANDLING The Contractor shall have the sole responsibility for providing, installing, moving, replacing, maintaining, cleaning and removing upon completion of work, all barricades, warning signs, barriers, cones, lights, signals and other such type devices for handling traffic control as indicated in the plans or as directed by the Engineer. All barricades, warning signs, barriers, cones,lights,signals and other such type devices shall conform to details shown on the plans and as indicated in the Texas Manual on Uniform Traffic Control Devices. The Contractor may provide special signs not covered by plans to protect the traveling public against special conditions or hazards, provided however, that such signs are first approved by the Engineer. Upon completion of the work, all barricades, warning signs, barriers, cones, lights, signals and other such type devices and evident thereof shall be removed by the Contractor. 5. MAINTENANCE OF DETOURS The Contractor shall do such work as may be necessary to maintain detours and facilities for safe public travel in accordance with the Traffic Control Plan and these specifications. There shall be maintained in passable condition, such temporary roads and structures as may be necessary to accommodate public travel. Temporary approaches and crossings of intersecting highways shall be provided and maintained in a safe and passable condition by the Contractor at his entire expense. 6. PUBLIC SAFETY AND CONVENIENCE Ingress and egress to private property shall be provided as specified in the plans or as directed by the Engineer. The Contractor shall plan and execute his operations in a manner that will cause the minimum interference with traffic. The Contractor shall secure the Engineer's approval of his proposed plan of operation. Sequence of work and methods of providing for the safe passage of traffic before it is placed into operation. If at any time during construction the approved plan does not accomplish the intended purpose, due to weather or other conditions affecting the safe handling of traffic, the Contractor shall immediately make necessary changes therein to correct the unsatisfactory conditions. At night or otherwise, all equipment not in use shall be stored in such a manner and at such locations as not to interfere with the safe passage of traffic. The Contractor shall provide and maintain flaggers at such points an for such periods of time as may be required to provide for the safety and convenience of public travel and Contractor's III-4 personnel, and as directed by the Engineer. Flaggers shall be English speaking, courteous, well informed, physically and mentally able to effectually perform their duties in "^ safeguarding and directing traffic and protecting the work, and shall be neatly attired and groomed at all times when on duty. When directing traffic, flaggers shall use standard attire, flags and signals and follow the flagging procedures set forth in the Texas Manual on Uniform Traffic Control Devices for Streets and Highways. 7. WATER Water for this project will be furnished by the City of Lubbock at fire hydrants designated by the Contractor for which there will be no charge. The Contractor will be furnished loading racks by the City Water and Street Superintendent at no charge for the first rack but for each additional rack there will be a charge of ten dollars. The Contractor will also be charged ten dollars for each move of each loading rack after the first set-up. The loading rack will be equipped with a valve which will be pad -locked at all times except when the Contractor's truck is loading. The valve on the loading rack shall be used by the Contractor and at no time will the Contractor use the fire hydrant valve.The padlock on the rack valve shall be furnished by the Contractor. The Contractor shall not use any fire hydrants -- for water loading unless there is an authorized rack on the fire hydrant. The Contractor will not be allowed to use water from authorized loading racks except on City approved projects. Water, which is supplied by the City, is intended for use in compacting subgrade and base and maintaining dust control. It is not the intention of the City to furnish water for use in mixing concrete. 8. RESTRICTIONS AND REQUIREMENTS FOR CONSTRUCTION A. The Contractor will need special permission to be permitted to work on weekends or legal holidays and shall do no work on any contract item before daylight or later than one hour after sundown, except as directed and approved by the Engineer. No work will be allowed between November 1 and January 2, unless approved by the Engineer. B. A 1:2 dilute emulsion treatment at a rate of .10 gallon per square yard will be applied to the A.C. surface within ten days of the placement of the A.C. surface. C. TEMPERATURE REQUIREMENTS (The temperature readings to be used will be as reported by the National Weather Service on an hourly report (Telephone Number 762-0141)]. (1) HMAC - November 1 until April 1 a. The asphaltic mixture shall not be placed with the air temperature is below 550F. and falling. b. The asphaltic mixture may be placed when the air temperature is above 50OF and rising. (2) HMAC - April 1 untill November 1 a. The asphaltic mixture shall not be placed with the air temperature is below 500F. and falling. b. The asphaltic mixture may be placed when the air temperature is above 450F. and rising. (3) Asphalt Stabilized Base a. The asphaltic mixture shall not be placed when the air temperature is below 450F and falling. b. The asphaltic mixture may be placed when the air temperature is above 40OF and rising. The Engineer may use his discretion to require a cover over the asphaltic mixture when hauled from the plant to the job site. D. Unless otherwise approved by the Engineer, the minimum temperature of asphaltic materials immediately after placement by the laydown machine will be 300OF for HMAC and 2750F for asphalt stabilized base. E. Standby rollers shall be located at the job site for immediate use if needed. F. Proof rolling will be required on subgrade, caliche base, black base, embankment or surface. After rain showers if deemed necessary by the Engineer each item that was approved will be re - rolled. The proof rolling will be performed III-6 with six passes over the area using a self- propelled 25 ton pneumatic roller with certified weight certificate. G. Preliminary approval, by the Engineer, of aggregate at the pit and crusher location shall be required, prior to delivery to local stockpiles. Final approval of the stockpile material will be required by the Engineer, after which no additional .. aggregate will be added to the approved stockpile prior to the sealing operation. H. During the period of re -construction and two course construction the Contractor will not use private driveways for turning or parking his equipment. Any damage to sidewalks, driveways, P- slabs or curb and gutter will be repaired at the Contractor's expense. ,. I. At no time during the reconstruction of streets will the Contractor completely close any street to all traffic without the Engineer's approval. On most major thoroughfares only one-half will be reworked at a time, and, on some narrow streets the full width will be reworked. On the two - course streets one-half will be closed and r- the traffic will be detoured on the other side. When business are on one or both sides, shorter shots will be made to cause less inconvenience to the public & the businesses. J. Before any portion of any street is closed to traffic the Contractor will be required to have sufficient equipment on the site to start the reconstruction, and at no time will any section of the closed area be left three (3) days without some type of work being performed. If there is a shortage of equipment to work on all areas of the closed section then the Contractor will be required to provide additional equipment before the next area is closed. After the work is started, no equipment will be removed from this site to another. It is the intent of these requirements to reconstruct and place the two - course on the streets as listed in the contract with the least inconvenience to the property owners and the traveling public. K. At no time during the construction, re -construction or sealing and two -course maintenance will any equipment be taken across any curb or gutter, valley gutter, alley III-7 return, or sidewalk without first placing a dirt or caliche fill, of at least one foot, above the existing concrete. Any broken or damaged concrete (broken or damaged by Contractor's equipment) will be removed and replaced at the Contractor's expense. 9. REMOVING OBSTRUCTIONS The Contractor shall familiarize himself with the existing obstructions including sidewalks, trees, poles, etc., prior to building. It shall be the Contractor's responsibility to remove these obstructions at the direction of the Engineer except that the utility companies will move their equipment at no cost to the Contractor. The Contractor will receive no compensation for delay caused by the Utility Companies in relocating or removing their equipment. 10. TEST OF MATERIALS The City of Lubbock laboratory test results shall be the sole consideration for approval of materials, mix designs, adequacy of procedures, etc.. The results of such testing shall be evaluated and final approval given by the Street Superintendent. A. CALICHE BASE MATERIALS Before caliche materials can be used on any street, current (not older than 30 days) test reports will submitted to the Street Superintendent for approval. Test reports will be required every 30 days as this material is used on City Streets. During the construction period, tests that fail will require re -testing. B. Asphalt Stabilized Base The Contractor, or supplier of such materials, shall submit to the City Materials Testing Lab, as soon as possible after the Notice to Proceed is issued, a sample for gradation testing and magnesium sulfate testing. The gradation requirements shall meet those established in Item 7-B(3) of Section 4 (p.8). The maximum loss from Magnesium Sulfate testing, when tested in accordance with ASTM C-88-76 (4 cycle), shall not exceed fifteen (15) percent. C. HOT MIX AND SEAL COAT AGGREGATE The Contractor, or supplier of such materials, shall submit to the City Materials Testing Lab, at least III-8 ninety (90) days prior to the beginning of the sealing operations, samples of the various grades of aggregate to be used in the reconstruction hot mix and the seal coat operations for gradation testing, crushed face counts, Flakiness Index tests, and magnesium sulfate tests. The gradation requirements shall meet those established in Texas Department of Highways and Public Transportation (1982) Item 302.4. The crushed face count, Flakiness Index, and Magnesium Sulfate require ments shall meet those established in Section IV, Item 10 A and Item 10 A (1) (pp 27-28). D. Cement Certified mill tests on each car or transport. D. Base Density Tests The City of Lubbock•Materials Testing Laboratory will provide density tests on the caliche base and/ or black base. NOTE: See Section IV-10-D (Laboratory Control) for retesting material where irregularities occur and the limits of the specifications are exceeded for aggregate, base materials, black base and hot -mix and concrete construction. 11. SUBCONTRACTOR The Contractor shall not award any work to any subcontractor without prior written approval of the Owner, which approval ^^ will not be given until the Contractor submits to the Owner a written statement concerning the proposed award to the subcontractor, which statement shall contain such information as the Owner may require. The Contractor shall be as fully responsible to the Owner for the acts and omissions of his subcontractors, and of persons either directly or indirectly employed by them, as he is for the acts and omissions of persons directly employed by him. The Contractor shall cause appropriate provisions to be inserted in all subcontracts relative to the work to bind subcontractors to the Contractor by the terms of the General Conditions and other contract documents insofar as applicable to the work of subcontractors and to give the Contractor the same power as regard terminating any subcontract that the Owner may exercise over the Contractor under any provision of the contract documents. III-9 Nothing contained in this contract shall create any contractual relation between any subcontractor and the Owner and said subcontractor will look exclusively to contractor for any payments due subcontractor. 12. UNDERGROUND UTILITIES The Contractor's attention is directed to the fact that pipelines and other underground installations as may be shown of the plans have been taken from the best available information. There may be other pipelines or installations. The Contractor shall save harmless the City from any and all suits or claims resulting from damage by his operations to any pipeline or underground installation. It is the Contractor's responsibility, during the period of street construction, to insure that all utility cuts in the limits of street construction have been properly backfilled, compacted and the top 6" inches backfilled with 3-sack concrete. It is not the intent to require the Contractor to provide for the utility cut repair but for the individual utility company making the cut to provide their own repairs. In the case of a City underground installation, the Contractor may be required, at the Engineer's option, to repair the cut with 3-sack cement stabilized caliche at the unit price bid. 13. PARTIAL PAYMENTS On or before the tenth day of each month, the Contractor shall submit to Owner's Representative an application for partial payment. Owner's Representative shall review said application for partial payment and the progress of the work made by the Contractor and if found to be in order shall prepare a certificate for partial payment showing as completely as practical the total value of the work done by the Contractor up to and including the last day of the preceding month. 14. CORRECTION OF WORK AFTER FINAL PAYMENT Neither the final payment nor certificate nor any provision in this contract shall relieve the Contractor of responsibility for faulty materials or workmanship, and he shall remedy and defects due thereto and pay for any damage to other work resulting therefrom, which shall appear within a period of one (1) year from date of final acceptance of the project. The Owner or the Owner's Representative shall give notice of observed defects with reasonable promptness. 15. LABOR The Contractor must abide by the Wage and Hour Laws of the State of Texas, or the U.S. Department of Labor, and must not pay less than the rate legally prescribed or as set forth herein, whichever is higher. Payment for time worked over forty -hours per week shall be p.. made at one and one-half (1-1/2) times the above prevailing rates. Payment for time worked on legal holidays shall be paid at two (2) time the regular governing per diem wage rates. Any laborer, workman or mechanic required or permitted to work in excess of eight (8) hours per calendar day, under the emergency exceptions to House Bill No. 115 of the 44th Legislature invoked by HCR No. 201 of the 47th Legislature shall be paid on the basis of eight (8) hours constituting a days work. The prevailing wage rates for this contract are shown in the following pages. • 'r Resolution #2502 January 8, 1987 Agenda Item #18 ft DGV:da 017C(11 IITTf)M WHEREAS, the City Council has heretofore established the general prevailing rate of per diem wages for each craft or type of workmen or mechanics needed to execute public works contracts for the City of Lubbock in accordance with the provisions of Vernon's Ann.Civ.St., Art. 5159a; and WHEREAS, such wage rates were established by Resolution No. 719 enacted February 12, 1981, updated by Resolution No. 1590 enacted February 23, 1984; and WHEREAS, such rates need to be updated at the present time in order to reflect the current prevailing rate of per diem wages; NOW THEREFORE: BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK: THAT the general prevailing rate of per diem wages for public works contracts shall be as set forth in the following named exhibits, which exhibits shall be attached hereto and made a part hereof for all intents and purposes: Exhibit A: Building Construction Trades Exhibit B: Paving and Highway Construction Trades Exhibit C: Electrical Trades Exhibit D: Overtime Rate Exhibit E: Weekend and Holiday Rate Such wage rates are hereby found and declared to be the general prevailing rate of per diem wages in all localities where public works are undertaken on behalf of the City of Lubbock and such wage rates shall be included in all public works contracts as provided by law. Passed by the City Council this 8th day of January 1987. B.C. McMINN, MAYOR Y ;Ranett&,Boyd, City Secretary v APPROVED TO ONTENT: APPROVED AS TO FORM: Bi 1 P yne, D �Dol�dG.rector of BuildingVandiver, First Services Assistant City Attorney EXHIBIT A City of Lubbock Building Construction Trades Prevailing Rates Craft Acoustical Ceiling Installer Air Conditioner Installer Air Conditioner Installer -Helper Bricklayer Bricklayer -Helper -- Carpenter Carpenter -Helper Cement Finisher Drywall Hanger _ Electrician - Electrician -Helper Equipment Operator - Heavy Light Floor Installer Glazier Insulator, Piping/Boiler Insulator -Helper Iron Worker '^ Laborer, General Mortar Mixer Painter Plumber Plumber -Helper Roofer Roofer -Helper Sheet Metal Worker Sheet Metal Worker -Helper - Welder - Certified Hourly Rate $11.60 8.35 - 5.50 10.50 5.00 11.00 5.50 7.35 8.70 10.50 5.25 8.00 5.70 8.00 7.50 9.50 5.00 7.30 4.75 5.60 8.75 9.25 6.00 7.65 4.75 8.75 5.50 8.00 EXHIBIT B Paving and Highway Construction Prevailing Wage Rates Craft Asphalt Heaterman Asphalt Shoveler Concrete Finisher Concrete Finisher -Helper Electrician Flagger Form Setter Form Setter -Helper Laborer, General Laborer, Utility Mechanic Mechanic -Helper POWER EQUIPMENT OPERATORS Asphalt Paving Machine Bulldozer Concrete Paving Machinist Front End Loader Heavy Equipment Operator Light Equipment Operator Motor Grade Operator. Roller Scraper Tractor Truck Driver - Light Heavy . Hourly Rate $5.25 4.75 7.35 4.75 10.50 4.75 6.50 5.50 4.75 5.80 6.50 6.00 6.00 5.25 6.50 5.85 6.40 6.40 8.00 5.25 5.25 5.50 5.25 5.25 - t EXHIBIT C Electric Construction Trades Prevailing Wage Rates Craft Hourly Rate Power Line Foreman $11.00 Lineman Journeyman 10.45 Lineman Apprentice Series 8.90 Groundman Series 7.25 EXHIBIT D Prevailing Wage Rates Overtime Rate The rate for overtime (in excess of forty hours per week) is 1 1/2 times base rate. EXHIBIT E Prevailing Wage Rates Weekend and Holiday Rate The rate for weekend and holiday is.l 1/2 times base rate. Page One 1991 CONTRACT MAINTENANCE PROGRAM: Thoroughfares 29-Nov-90 Two -Course: 1st Course #2 Pre -Coat - 2nd Course #4 Pre-Coat,AC5 W/ 3% Latex ASPHALT --------------- ROCK ROCK AREA RATE ASPH. ------------ RATE C.Y. -------------- RATE C.Y. MAP DIST. STREET FROM TO LENGTH WIDTH ADJ. AREA # 2 # 4 12 2 34th Street WLL Avenue A E ER Avenue H 2,520 74 20,720 0.30 6,216 1:62 334 0.38 7,874 1:90 230 no map 6 34th Street WLL Inler Road ELL Quitsna 5,290 21 12,343 0.30 3,703 1:62 199 0.38 4,690 1:90 137 19,20 4,5 50th Street WLL Indiana Avenue WLL Orlando 3,975 82 36,217 0.30 10,865 1:62 584 0.38 13,762 1:90 402 19 5 50th Street WLL Orlando 150' East of Quaker 1,075 50 5,972 0.30 1,792 1:62 96 (North side only) 0.38 2,269 1:90 66 14 3,4 50th Street WLL University WLL Elgin Avenue 2,590 82 23,598 0.30 7,079 1:62 381 0.38 8,967 1:90 262 15,27 4 66th Street ELL Indiana Avenue 640 ' W. of Elgin Ave 1,948 44 9,524 0.30 2,857 1:62 154 0.38 3,619 1:90 106 16 3 66th Street ELL University Avenue 800' West of Avenue W 651 40 2,893 0.30 868 1:62 47 0.38 1,099 1:90 32 15,27 4 Indiana Avenue S ER 67th Street Alley N. of 62nd St. 1,830 86 + adj. 18,487 0.30 5,546 1:62 298 0.38 7,025 1:90 205 36 6 Milwaukee Avenue NLL 4th Street City Limit N./Erskine 5,945 22 + adj. 16,132 0.30 4,840 1:62 260 0.38 6,130 1:90 179 19,29 4 Quaker Avenue SLL 63rd Street South Loop 289 1,750 68 13,222 0.30 3,967 1:62 213 0.38 5,024 1:90 147 no map 6 Quitsna SLL 19th Street 150' South/34th St. 5,416 21 12,637 0.30 3,791 1:62 204 0.38 4,802 1:90 140 17 5 Slide Road SLL Brownfield Highway 50th Street 5,550 80 - adj. 48,889 0.30 14,667 1:62 789 0.38 18,578 1:90 543 9 2 East Broadway Jt. West of Quirt Jt. West/Park Ent. 3,158 72 + adj. 25,864 0.30 7,759 1:62 417 0.38 9,828 ------ 1:90 --------- 287 --------- 0.30 --------- 73,950 0.38 93,667 Page One -TOTALS = 246,498 167,617 3,976 2,736 TOTAL Thoroughfares - Two -Course: ---------- 246,498 --------- 167,617 ------ 3,976 2,736