Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Resolution - 2009-R0560 - Contract - Wright Construction Company - 12 Inch Water Line Re-Routing - 12_16_2009 (3)
Resolution No. 2009-RO560 December 16, 2009 Item No. 5.8 RESOLUTION BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK: THAT the Mayor of the City of Lubbock BE and is hereby authorized and directed to execute for and on behalf of the City of Lubbock, Contract No. 9301 for a 12 inch water line re-route at West Loop 289 and 19'h Street, per ITB 10-023-FO, by and between the City of Lubbock and Wright Construction Company of Grapevine, Texas, and related documents. Said Contract is attached hereto and incorporated in this resolution as if fully set forth herein and shall be included in the minutes of the City Council. Passed by the City Council this 16th ATTEST: Rebecc arza, City Secretary APPROVED AS TO CONTENT: Marsha Reed, P.E., Chief Operations Officer APPROVED AS TO FORM: C ad Weaver, Assistant City Attorney vwxedocs/RES.Contract-Wright Construction December 1, 2009 day of December , 2009. � wry � TOM MARTIN, MAYOR CONTRACT AWARD DATE: CITY OF LUBBOCK SPECIFICATIONS FOR 12 Inch Water Line Re -Route at West Loop 289 and 19"' Street ITI3 # 10-023 -FO Contract # 9301 Plans & Specifications may be obtained from THE REPRODUCTION COMPANY www.thereproductioncompany.com Phone: (806) 763-7770 "A City of Planned Progress" CITY OF LUBBOCK Lubbock, Texas I I Cut along the outer border and affix this label to your sealed bid envelope to identify it as a "Sealed Bid". Be sure to include the name of the company submitting the bid. ,----------------------------------------------------------------------- SEALED BID • DO NOT OPEN BID NO: #10-023-FO TITLE: 12 Inch Water Line Re -Route at West Loop 289 and 19t� Street DUE DATE/TIME: December 1, 2009 at 2:00 P.M. SUBMUTED BY: ' (PRINT NAME OF COMPANY) --------------------------------------------------------------------- Bid must be addressed to: Marta Alvarez, Purchasing Manager City of Lubbock 1625 13th Street, Room 204 Lubbock, Texas 79401 2 CITY OF LUBBOCK � INVITATION TO BI L< FOR H-1 TITLE: 12 Ic Water Line Re -Route a West Loop 29and l9hStreet � ADDRESS: LUBBOCK, TEXAS � � � � � � � I B NUMBER: 10 023- O r» Contract *901 � � � � PROJECT NUMBER: 91035.9241 � � � CONTRACT PREPARED BY: PURCHASING AND CONTRACT MANAGEMENT � l \� L: i City of Lubbock, TX PURCHASING AND CONTRACT MANAGEMENT Contractor Checklist for ITB # 10-023-FO Before submitting your bid, please ensure you have completed and included the following: 1. ✓ Carefully read and understand the plans and specifications and properly complete the BID SUBMITTAL FORM. Bid submittal form MUST be completed in blue or black ink or by typewriter. Signatures must be original, in blue or black ink, and by hand. Amounts shall be written in both words and numerals and in the event of a discrepancy the amounts written in words shall govern. Include corporate seal and Secretary's signature. Identify addenda received (if any). Include firm's FEDERAL TAX ID number or Owner's SOCIAL SECURITY number. 2. v,/ Iriclude 1111) BOND or C.ASHIER'S OR CI RTIF)li D CHECK as your bid surely. Failure to provide a bid surety NVILL result in automatic rejection of your bid. 3. ✓ Clearly mark the bid number, title, due date and time and your company name and address on the outside of the envelope or container. 4. J Ensure your bid is RECEIVED by the City of Lubbock PURCHASING AND CONTRACT MANAGEMENT prior to the deadline. Late bids will not be accepted. 5. ✓ Complete and sign the CITY OF LUBBOCK INSURANCE REQUIREMENT AFFIDAVIT. This must include the signature of the agent or broker. Contractor's signature must be original. 6. ✓ Complete and sign the SAFETY RECORD QUESTIONNAIRE. All "YES" responses must be explained in detail and submitted with Bid. 7. ✓ Complete and sign the SUSPENSION AND DEBARMENT CERTIFICATION. Include firm's FEDERAL TAX ID number or Owner's SOCIAL SECURITY number. 8. ✓ Complete and submit the PROPOSED LIST OF SUB -CONTRACTORS. DOCUMENTS REQUIRED WITHIN TWO BUSINESS DAYS AFTER CLOSING 1. Complete and submit the FINAL LIST OF SUB -CONTRACTORS. 1; LAFAILURE TO PROVIDE ANY OF THE ABOVE MAY RESULT IN YOUR BID BEING DEEMED NON -RESPONSIVE AND, THEREFORE, NOT FURTHER EVALUATED. PLEASE INCLUDE THIS j COMPLETED PAGE AS THE FIRST PAGE OF YOUR BID SUBMITTAL. WfTc.►a-T C.vA Co;1rrL, (Type or Print Company Name) a INDEX 1. NOTICE TO BIDDERS 2. GENERAL INSTRUCTIONS TO BIDDERS 3. BID SUBMITTAL — (must be submitted by published due date & time) 3-1. UNIT PRICE BID SUBMITTAL FORM 3-2. CITY OF LUBBOCK INSURANCE REQUIREMENT AFFIDAVIT 3-3. SAFETY RECORD QUESTIONNAIRE 3-4. SUSPENSION AND DEBARMENT CERTIFICATION 3-5. PROPOSED LIST OF SUB -CONTRACTORS 4. POST -CLOSING DOCUMENT REQUIREMENTS — (to be submitted no later than two business days after the close date when bids are due.) 4-1. FINAL LIST OF SUB -CONTRACTORS 5. PAYMENT BOND 6. PERFORMANCE BOND 7. CERTIFICATE OF INSURANCE 8. CONTRACT 9. GENERAL CONDITIONS OF THE AGREEMENT 10. DAVIS BACON WAGE DETERMINATIONS 11. SPECIAL CONDITIONS (IF APPLICABLE) 12. SPECIFICATIONS 5 NOTICE TO BIDDERS ITB #10-023-FO Sealed bids addressed to Marta Alvarez, Purchasing Manager, City of Lubbock, Texas, will be received in the office of the PURCHASING AND CONTRACT MANAGEMENT, City Hall, 1625 13th Street, Room 204, Lubbock, Texas, 79401, until 2:00 P.M. on December 1, 2009, or as changed by the issuance of formal addenda to all planholders, to furnish all labor and materials and perform all work for the construction of the following described project: "10-023-FO -12 Inch Water Line Re -Route at West Loop 289 and 19'b Street" After the expiration of the time and date above first written, said sealed bids will be opened in the office of the Purchasing and Contract Management Office and publicly read aloud. It is the sole responsibility of the bidder to ensure that his bid is actually in the office of the PURCHASING AND CONTRACT MANAGEMENT for the City of Lubbock, before the expiration of the date above first written. Bids are due at 2:00 P.M. on December 1, 2009 on and the City of Lubbock City Council will consider the bids on December 17, 2009, at the Municipal Building, 1625 13th Street, Lubbock, Texas, or as soon thereafter as may be reasonably convenient, subject to the right to reject any or all bids and waive any formalities. The successful bidder will be required to furnish a performance bond in accordance with Chapter 2253, Government Code, in the amount of 100% of the total contract price in the event that said contract price exceeds $100,000 and the successful bidder will be required to furnish a payment bond in accordance with Chapter 2253, Government Code, in the amount of 100% of the total contract price in the event that said contract price exceeds $25,000. Said statutory bonds should be issued by a company carrying a current Best Rating of "A" or better. The bond must be in a form acceptable to the City Attorney, and must include the contract award date. Bidders are required. whether or not a payment or performance bond is required. to submit a cashier's or certified check issued by a bank satisfactory to the City of Lubbock, or a bid bond from a reliable surety company, payable without recourse to the order of the City of Lubbock in an amount not less than 5% of the total amount of the bid submitted as a guarantee that bidder will enter into a contract and execute all necessary bonds (if required) within ten (10) business days after notice of award of the contract to him. FAILURE OF THE BIDDER TO INCLUDE BID SECURITY WITH THE BID SUBMITTAL SHALL CONSTITUTE A NONRESPONSIVE BID AND RESULT IN DISQUALIFICATION OF THE BID SUBMITTAL. It shall be each bidder's sole responsibility to inspect the site of the work and to inform himself regarding all local conditions under which the work is to be done. It shall be understood and agreed that all such factors have been thoroughly investigated and considered in the preparation of the bid submitted. There will be a non -mandatory pre -bid conference November 17, 2009 at 10:00 A.M. in the City Hall , PURCHASING CONFERENCE ROOM 204.1625-13'b Street. Lubbock. Texas. Bidders may view the plans and specifications without charge at The Reproduction Company, 2102 Avenue Q, Lubbock, Texas 79405 or at www.thereproductioncompany.com. ONE SET OF PLANS AND SPECIFICATIONS MAY BE OBTAINED, AT THE CITY'S EXPENSE, FROM THE REPRODUCTION COMPANY WITH A $100 REFUNDABLE DEPOSIT, Phone: (806) 763-7770. Deposit Checks shall be made PAYABLE TO THE CITY OF LUBBOCK, and will be refunded if documents are returned in good condition within Sixty (60) days after the opening of bids. Additional sets r of plans and specifications may be obtained at the bidder's expense. Attention of each bidder is particularly called to the schedule of general prevailing rate of per diem wages included in the contract documents on file in the office of the PURCHASING AND CONTRACT E MANAGEMENT of the City of Lubbock, which document is specifically referred to in this Notice to Bidders. Each bidder's attention is further directed to Texas Government Code, Chapter 2258, Prevailing Wage Rates, and the requirements contained therein concerning the above wage scale and payment by the contractor of the prevailing rates of wages as heretofore established by owner in said wage scale. The City of Lubbock hereby notifies bidders that in regard to any contract entered into pursuant to this j advertisement, minority and women business enterprises shall be afforded equal opportunities to submit bids 1 in response to this invitation and will not be discriminated against on the grounds of race, color, sex, disability, or national origin in consideration for an award. The City of Lubbock does not discriminate against persons with disabilities. City of Lubbock pre -bid meetings and bid openings are available to all persons regardless of disability. If you require special assistance, please contact the PURCHASING AND CONTRACT MANAGEMENT at (806) 775-2171 or write to Post Office Box 2000, Lubbock, Texas 79457 at least 48 hours in advance of the meeting. CITY OF LUBBOCK RUX orta SENIOR BUYER GENERAL INSTRUCTIONS TO BIDDERS GENERAL INSTRUCTIONS TO BIDDERS ] BID DELIVERY, TIME & DATE t_ 1.1 The City of Lubbock is seeking written and sealed competitive bids to furnish ITB # 10-023-FO 12 Inch Water Line Re -Route at West Loop 289 and 19th Street per the attached specifications and contract documents. Sealed bids will be received no later than 2:00 p.m. December 1, 2009 at the office listed below. Any bid received after the date and hour specified will be rejected and returned unopened to the bidder. Each bid and supporting documentation must be in a sealed envelope or container plainly labeled in the lower left-hand corner: "ITB #10-023-FO, 12 Inch Water Line Re - Route at West Loop 289 and 19th Street" and the bid opening date and time. Bidders must also include their company name and address on the outside of the envelope or container. Bids must be addressed to: Marta Alvarez, Purchasing Manager City of Lubbock 1625 13th Street, Room 204 Lubbock, Texas 79401 1.2 Bidders are responsible for making certain bids are delivered to the PURCHASING AND CONTRACT MANAGEMENT. Mailing of a bid does not ensure that the bid will be delivered on time or delivered at all. If bidder does not hand deliver bid, we suggest that he/she use some sort of delivery service that provides a receipt. 1.3 Bids will be accepted in person, by United States Mail, by United Parcel Service, or by private courier service. No bids will be accepted by oral communication, telephone, electronic mail, telegraphic transmission, or telefacsimile transmission. THE CITY WILL NOT ACCEPT FAX BIDS. 1.4 The City of Lubbock reserves the right to postpone the date and time for opening bids through an addendum. 2 PRE -BID MEETING For the purpose of familiarizing bidders with the requirements, answering questions, and issuing addenda as needed for the clarification of the Invitation to Bid (ITB) documents, a non -mandatory pre -bid meeting will be held at November 17, 2009 at 10:00 A.M. in the City Hall , Purchasing Conference Room 204,1625-13t Street, Lubbock, Texas. 2.1 All persons attending the meeting will be asked to identify themselves and the prospective bidder they represent. 2.2 It is the bidder's responsibility to attend the pre -bid meeting though the meeting is not mandatory. The City will not be responsible for providing information discussed at the pre -bid meeting to bidders who do not attend the pre -bid meeting. 3 ADDENDA & MODIFICATIONS 3.1 Any changes, additions, or clarifications to the ITB are made by ADDENDA information available over the Internet at www.bidsync.com. We strongly suggest that you check for any addenda a minimum of forty-eight hours in advance of the response deadline. BUSINESSES WITHOUT INTERNET ACCESS may use computers available at most public libraries. 3.2 Any bidder in doubt as to the true meaning of any part of the specifications or other documents may request an interpretation thereof from the Purchasing and Contract Management Office. At the request of the bidder, or in the event the Purchasing and Contract Management Office deems the interpretation to be substantive, the interpretation will be made by written addendum issued by the Purchasing and Contract Management Office. Such addenda issued by the Purchasing and Contract Management Office will be available over the Internet at www.bidsync.com and will become part of the bid package having the same ,.' 9 i-_ binding effect as provisions of the original ITB. NO VERBAL EXPLANATIONS OR INTERPRETATIONS WILL BE BINDING. In order to have a request for interpretation considered, the request must be submitted in writing and must be received by the City of Lubbock Purchasing and Contract Management Office no later than five (5) calendar days before the bid closing date. 3.3 All addenda, amendments, and interpretations of this solicitation shall be in writing. The City of Lubbock shall not be legally bound by any amendment or interpretation that is not in writing. Only information supplied by the City of Lubbock Purchasing and Contract Management Office in writing or in this ITB should be used in preparing bid responses. All contacts that a bidder may have had before or after receipt of this ITB with any individuals, employees, or representatives of the City and any information that may have been read in any news media or seen or heard in any communication facility regarding this bid should be disregarded in preparing responses. 3.4 The City does not assume responsibility for the receipt of any addendum sent to bidders. 4 EXAMINATION OF DOCUMENTS AND REQUIREMENTS 4.1 Each bidder shall carefully examine all ITB documents and thoroughly familiarize itself with all requirements before submitting a bid to ensure that their bid meets the intent of these specifications. 4.2 Before submitting a bid, each bidder shall be responsible for making all investigations and examinations that are necessary to ascertain conditions and requirements affecting the requirements of this Invitation to Bid. Failure to make such investigations and examinations shall not relieve the bidder from obligation to comply, in every detail, with all provisions and requirements of the Invitation to Bid. 4.3 Notices of any discrepancies or omissions in these plans, specifications, or contract documents, shall be given to the Purchasing and Contract Management Office and a clarification obtained before the bids are received, and if no such notice is received by the Purchasing and Contract Management Officer prior to the opening of bids, then it shall be deemed that the bidder fully understands the work to be included and has provided sufficient sums in its bid to complete the work in accordance with these plans and specifications. If bidder does not notify Purchasing and Contract Management Officer before bidding of any discrepancies or omissions, then it shall be deemed for all purposes that the plans and specifications are sufficient and adequate for completion of the project. It is further agreed that any request for clarification must be submitted no later than five (5) calendar days prior to the opening of bids. BID PREPARATION COSTS 5.1 Issuance of this ITB does not commit the City of Lubbock, in any way, to pay any costs incurred in the preparation and submission of a bid. 5.2 The issuance of this ITB does not obligate the City of Lubbock to enter into contract for any services or equipment. 5.3 All costs related to the preparation and submission of a bid shall be paid by the bidder. 6 TRADE SECRETS CONFIDENTIAL INFORMATION AND THE TEXAS PUBLIC INFORMATION ACT 6.1 If you consider any portion of your bid to be privileged or confidential by statute or judicial decision, including trade secrets and commercial or financial information, clearly identify those portions. 6.2 The Cityof Lubbock will honor our notations of trade secrets and confidential information and decline Y to release such information initially, but please note that the final determination of whether a particular portion of your bid is in fact a trade secret or commercial or financial information that may be withheld from public inspection will be made by the Texas Attorney General or a court of competent jurisdiction. In the event a public information request is received for a portion of your bid that you have marked as being confidential information, you will be notified of such request and you will be required to justify your legal position in writing to the Texas Attorney General pursuant to Section 552.305 of the J Government Code. In the event that it is determined by opinion or order of the Texas Attorney General or a court of competent jurisdiction that such information is in fact not privileged and confidential under 10 �1 Section 552.110 of the Government Code and Section 252.049 of the Local Government Code, then such information will be made available to the requester. 6.3 Marking your entire bid CONFIDENTIAL/PROPRIETARY is not in conformance with the Texas Open Records Act. LICENSES PERMITS TAXES The price or prices for the work shall include full compensation for all taxes, permits, etc. that the bidder is or may be required to pay. UTILIZATION OF LOCAL BUSINESS RESOURCES Prospective bidders are strongly encouraged to explore and implement methods for the utilization of local resources, and to outline in their bid submittal how they would utilize local resources. 9 CONFLICT OF INTEREST 9.1 The bidder shall not offer or accept gifts or anything of value nor enter into any business arrangement with any employee, official or agent of the City of Lubbock. 9.2 By signing and executing this bid, the bidder certifies and represents to the City the bidder has not offered, conferred or agreed to confer any pecuniary benefit or other thing of value for the receipt of special treatment, advantage, information, recipient's decision, opinion, recommendation, vote or any other exercise of discretion concerning this bid. 10 CONTRACT DOCUMENTS 10.1 All work covered by the contract shall be done in accordance with contract documents described in the General Conditions. 10.2 All bidders shall be thoroughly familiar with all of the requirements set forth on the contract documents for the construction of this project and shall be responsible for the satisfactory completion of all work contemplated by said contract documents. 11 PLANS FOR USE BY BIDDERS It is the intent of the City of Lubbock that all parties with an interest in submitting a bid on the project covered by the contract documents be given a reasonable opportunity to examine the documents and prepare a bid without charge or forfeiture of deposit. The contract documents may be examined without charge as noted in the Notice to Bidders. 12 BIDDER INQUIRIES AND CLARIFICATION OF REQUIREMENTS 12.1 It is the intent and purpose of the City of Lubbock that this request permit competitive bids. It shall be the bidder's responsibility to advise the Purchasing and Contract Management Officer if any language, requirements, etc., or any combinations thereof, inadvertently restricts or limits the requirements stated in this ITB to a single source. Such notification must be submitted in writing and must be received by the City of Lubbock Purchasing and Contract Management Office no later than five (5) calendar days before the bid closing date. A review of such notifications will be made. 12.2 NO BIDDER SHALL REQUEST ANY INFORMATION VERBALLY. ALL REQUESTS FOR ADDITIONAL INFORMATION OR CLARIFICATION CONCERNING THIS INVITATION TO BID (ITB) MUST BE SUBMITTED IN WRITING NO LATER THAN FIVE (5) CALENDAR DAYS PRIOR TO THE BID CLOSING DATE AND ADDRESSED TO: 11 Felix Orta, Senior Buyer City of Lubbock Purchasing and Contract Management 1625 13th Street, Room 204 Lubbock, Texas 79401 Fax: 806-775-2164 t Email: forta@mylubbock.us �} Bidsync: www.bidsvnc.com 13 TIME AND ORDER FOR COMPLETION 13.1 The construction covered by the contract documents shall be substantially completed within NINETY (90) WORKING DAYS from the date specified in the Notice to Proceed issued by the City of Lubbock to the successful bidder. 13.2 The Contractor will be permitted to prosecute the work in the order of his own choosing, provided, p i however, the City reserves the right to require the Contractor to submit a progress schedule of the work ( ] contemplated by the contract documents. In the event the City requires a progress schedule to be submitted, and it is determined by the City that the progress of the work is not in accordance with the progress schedule so submitted, the City may direct the Contractor to take such action as the City deems necessary to ensure completion of the project within the time specified. 14 PAYMENT All payments due to Contractor shall be made in accordance with the provisions of the General Conditions of the contract documents. 15 AFFIDAVITS OF BILLS PAID The City of Lubbock reserves the right, prior to final acceptance of this project to require the Contractor to execute an affidavit that all bills for labor, materials and incidentals incurred in the construction of the improvements contemplated by the contract documents have been paid in full and that there are no claims pending, of which the Contractor has been notified. 16 MATERIALS AND WORKMANSHIP The intent of these contract documents is that only materials and workmanship of the best quality and grade will be furnished. The fact that the specifications may fail to be sufficiently complete in some detail will not relieve the Contractor of full responsibility for providing materials of high quality and for protecting them adequately until incorporated into the project. The presence or absence of a representative of the City on the site will not relieve the Contractor of full responsibility of complying with this provision. The specifications for materials and methods set forth in the contract documents provide minimum standards of quality, which the Owner believes necessary to procure a satisfactory project. 17 GUARANTEES 17.1 All equipment and materials incorporated in the project and all construction shall be guaranteed against defective materials and workmanship. Prior to final acceptance, the Contractor shall furnish to the Owner, a written general guarantee which shall provide that the Contractor shall remedy any defects in the work, and pay for any and all damages of any nature whatsoever resulting in such defects, when such defects appear within ONE year from date of final acceptance of the work as a result of defective materials or workmanship, at no cost to the Owner (City of Lubbock). 17.2 Notwithstanding any provisions contained in the contractual agreement, the Contractor represents and j warrants fault -free performance and fault -free result in the processing date and date -related data J (including, but not limited to calculating, comparing and sequencing) of all hardware, software and firmware products delivered and services provided under this Contract, individually or in combination, as 12 the case may be from the effective date of this Contract. Also, the Contractor warrants calculations will be recognized and accommodated and will not, in any way, result in hardware, software or firmware failure. The City of Lubbock, at its sole option, may require the Contractor, at any time, to demonstrate the procedures it intends to follow in order to comply with all the obligations contained herein. 17.3 The obligations contained herein apply to products and services provided by the Contractor, .its sub- contractor or any third party involved in the creation or development of the products and services to be di delivered to the City of Lubbock under this Contract. Failure to comply with any of the obligations contained herein, may result in the City of Lubbock availing itself of any of its rights under the law and under this Contract including, but not limited to, its right pertaining to termination or default. i( 17.4 The warranties contained herein are separate and discrete from any other warranties specified in this Contract, and are not subject to any disclaimer of warranty, implied or expressed, or limitation to the Contractor's liability which may be specified in this Contract, its appendices, its schedules, its annexes or any document incorporated in this Contract by reference. 18 PLANS FOR THE CONTRACTOR The contractor will, upon written request, be furnished up to ten sets of plans and specifications and related 5 contract documents for use during construction. Plans and specifications for use during construction will only be furnished directly to the Contractor. The Contractor shall then distribute copies of plans and specifications to suppliers, subcontractors or others, as required for proper prosecution of the work contemplated by the Contractor. 19 PROTECTION OF THE WORK The Contractor shall be responsible for the care, preservation, conservation, and protection of all materials, supplies, machinery, equipment, tools, apparatus, accessories, facilities, and all means of construction, and any and all parts of the work whether the Contractor has been paid, partially paid, or not paid for such work, until the date the City issues its certificate of completion to Contractor. The City reserves the right, after the bids have been opened and before the contract has been awarded, to require of a bidder the following information: (a) The experience record of the bidder showing completed jobs of a similar nature to the one covered by the intended contract and all work in progress with bond amounts and percentage completed. (b) A sworn statement of the current financial condition of the bidder. (c) Equipment schedule. 20 TEXAS STATE SALES TAX 20.1 This contract is issued by an organization which qualifies for exemption provisions pursuant to provisions of Article 20.04 of the Texas Limited Sales, Excise and Use Tax Act. 20.2 The Contractor must obtain a limited sales, excise and use tax permit which shall enable him to buy the materials to be incorporated into the work without paying the tax at the time of purchase. 21 PROTECTION OF SUBSURFACE LINES AND STRUCTURES It shall be the Contractor's responsibility to prosecute the work contemplated by the contract documents in such a way as to exercise due care to locate and prevent damage to all underground pipelines, utility lines, conduits or other underground structures which might or could be damaged by Contractor during the construction of the project contemplated by these contract documents. The City of Lubbock agrees that it will furnish Contractor the location of all such underground lines and utilities of which it has knowledge. However, such fact shall not relieve the Contractor of his responsibilities aforementioned. All such underground lines or structures cut or damaged by Contractor during the prosecution of the work contemplated by this contract shall be repaired immediately by Contractor to the satisfaction of the City of Lubbock, Texas, at Contractor's expense. 22 BARRICADES AND SAFETY MEASURES The contractor shall, at his own expense, furnish and erect such barricades, fences, lights and danger signals, and shall take such other precautionary measures for the protection of persons, property and the work as may be 13 ( _>> necessary. The Contractor will be held responsible for all damage to the work due to failure of barricades, signs, and lights to protect it, and when damage is incurred, the damaged portion shall be immediately removed and replaced by Contractor at his own cost and expense. The Contractor's responsibility for maintenance of barricades, signs, and lights shall not cease until the date of issuance to Contractor of City's certificate of acceptance of the project. 23 EXPLOSIVES 23.1 The use of explosives will not be permitted unless written permission to do so is obtained by the Contractor from the City. In all cases where written permission is obtained for the use of explosives, the Contractor shall assume full responsibility for all damage, which may occur as a direct or indirect result of the blasting. In addition, in all cases where explosives are authorized to be used, the Contractor shall use utmost care so as not to endanger life or property and the Contractor shall further use only such methods as are currently utilized by persons, firms, or corporations engaged in similar type of construction activity. 23.2 Explosive materials shall not be stored or kept at the construction site by the Contractor. 23.3 In all cases where explosives are to be used during the construction of the project contemplated by this contract, it shall be the duty of the Contractor to notify each utility company having structures (above or below the ground) in proximity to the site of the work of Contractor's intention to use explosives, and such notice shall be given sufficiently in advance to enable the companies to take such steps as they may deem necessary to protect their property from injury. Such notice, however, shall not relieve the Contractor of responsibility for any damage resulting from his blasting operations. 24 CONTRACTOR'S REPRESENTATIVE The successful bidder shall be required to have a responsible local representative available at all times while the work is in progress under this contract. The successful bidder shall be required to furnish the name, address and telephone number where such local representative may be reached during the time that the work contemplated by this contract is in progress. 25 INSURANCE 25.1 The Contractor shall not commence work under this contract until he has obtained all insurance as required in the General Conditions of the contract documents, from an underwriter authorized to do business in the State of Texas and satisfactory to the City. Proof of coverage shall be furnished to the City and written notice of cancellation or any material change will be provided ten (10) days in advance of cancellation or change. All policies shall contain an agreement on the part of the insurer waiving the right to subrogation. The Contractor shall procure and carry at his sole cost and expense through the life of this contract, insurance protection as hereinafter specified. Coverage in excess of that specified herein also shall be acceptable. Such insurance shall be carried with an insurance company authorized to transact business in the State of Texas and shall cover all operations in connection with this contract, whether performed by the Contractor or a subcontractor, or separate policies shall be provided covering the operation of each subcontractor. A certificate of insurance specifying each and all coverages shall be submitted before contract execution. 25.2 PROOF OF COVERAGE SHALL BE FURNISHED TO THE CITY OF LUBBOCK IN THE FORM OF A CERTIFICATE OF INSURANCE. THE INSURANCE CERTIFICATES FURNISHED SHALL NAME THE CITY OF LUBBOCK AS A PRIMARY ADDITIONAL INSURED AND PROVIDE A WAIVER OF SUBROGATION IN FAVOR OF THE CITY OF LUBBOCK AS REQUIRED BELOW, OR IN THE ALTERNATIVE, SHALL BE ACCOMPANIED BY A STATEMENT FROM THE CONTRACTOR TO THE EFFECT THAT NO WORK ON THIS PARTICULAR PROJECT SHALL BE SUBCONTRACTED. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO PROVIDE TO THE OWNER ALL PROOF OF COVERAGE INSURANCE DOCUMENTS INCLUDING WORKERS COMPENSATION COVERAGE FOR EACH SUBCONTRACTOR. 14 .4 26 LABOR AND WORKING HOURS 26.1 Attention of each bidder is particularly called to the schedule of general prevailing rate of per diem wages included in these contract documents. The wage rate that must be paid on this project shall not be less than specified in the schedule of general prevailing rates of per diem wages as above mentioned. The bidders' attention is further directed to the requirements of Texas Government Code, Chapter 2258, Prevailing Wage Rates providing for the payment of the wage schedules above mentioned and the bidder's obligations thereunder. The inclusion of the schedule of general prevailing rate of per diem wages in the contract documents does not release the Contractor from compliance with any wage law that may be applicable. Construction work under the contract requiring an inspector shall not be performed on weekends or holidays unless the following conditions exist: 26.1.1 The project being constructed is essential to the City of Lubbock's ability to provide the necessary service to its citizens. 26.1.2 Delays in construction are due to factors outside the control of the Contractor. The Contractor is approaching the penalty provisions of the contract and Contractor can show he has made a diligent effort to complete the contract within the allotted time. 26.2 Before construction work requiring an inspector is to be performed on weekends or holidays, the Contractor must notify the Owner's Representative not less than three full working days prior to the weekend or holiday he desires to do work and obtain written permission from the Owner's Representative to do such work. The final decision on whether to allow construction work requiring an inspector on weekends or holidays will be made by the Owner's Representative. 26.3 In any event, if a condition should occur or arise at the site of this project or from the work being done under this contract which is hazardous or dangerous to property or life, the Contractor shall immediately commence work, regardless of the day of the week or the time of day, to correct or alleviate such condition so that it is no longer dangerous to property or life. 27 PAYMENT OF EMPLOYEES AND FILING OF PAYROLLS The contractor and each of his subcontractors shall pay each of his employees engaged in work on the project under this contract in full (less mandatory legal deductions) in cash, or by check readily cashable without discount, not less often than once each week. The Contractor and each of his subcontractors engaged at the site of the work shall not later than the seventh day following the payment of wages, file with the Owner's Representative, or Engineer, a certified, sworn, legible copy of such payroll. This shall contain the name of each employee, his classification, the number of hours worked on each day, rate of pay, and net pay. The affidavit shall state that the copy is a true and correct copy of such payroll, that no rebates or deductions (except as shown) have been made, or will in the future be made from the wages paid as shown thereon. The Contractor must classify employees according to one of the classifications set forth in the schedule of general prevailing rate of per diem wages, which schedule is included in the contract documents. The Contractor shall forfeit as a penalty to the City of Lubbock on whose behalf this contract is made, sixty dollars for each laborer, workman, or mechanic employed for each calendar day, or portion thereof, such laborer, workman or mechanic is paid less than the wages assigned to his particular classification as set forth in the schedule of general prevailing rate of per diem wages included in these contract documents. 28 PROVISIONS CONCERNING ESCALATION CLAUSES Bids submitted containing any conditions which provide for changes in the stated bid price due to increases or decreases in the cost of materials, labor or other items required for the project will be rejected and returned to the bidder without being considered. 29 PREPARATION FOR BID 29.1 The bidder shall submit his bid on forms furnished by the City. All blank spaces in the form shall be correctly filled in and the bidder shall state the price both in words and numerals, for which he intends to do the work contemplated or furnish the materials required. Such prices shall be written in ink, distinctly 15 ai 30 31 and legibly, or typewritten. In case of discrepancy between the price written in words and the price written in figures, the price written in words shall govern. 29.2 If the bid is submitted by an individual, his name must be signed by him or his duly authorized agent. If a bid is submitted by a firm, association, or partnership, the name and address of each member must be j given and the bid signed by a member of the firm, association or partnership, or person duly authorized. If the bid is submitted by a company or corporation, the company or corporate name and business address must be given, and the bid signed by an official or duly authorized agent. Powers of attorney authorizing-J agents or others to sign bids must be properly certified and must be in writing and submitted with the bid. J The bid shall be executed in ink. 29.3 Each bid shall be enclosed in a sealed envelope, addressed as specified in the Notice to Bidders, and endorsed on the outside of the envelope in the following manner: 29.3.1 Bidder's name: j 29.3.2 Bid for ITB# 10-023-FO 12 Inch Water Line Re -Route at West Loop 289 and 19th f Street 29.4 Bid submittals may be withdrawn and resubmitted at any time before the time set for opening of the bids, 1 .1 but no bid may be withdrawn or altered thereafter. 29.5 Pursuant to Texas Local Government Code 252.043(g), a competitive sealed bid that has been opened may not be changed for the purpose of correcting an error in the bid price. THEREFORE, ANY CORRECTIONS TO THE BID PRICE MUST BE MADE ON THE BID SUBMITTAL FORM PRIOR TO BID OPENING. BOUND COPY OF CONTRACT DOCUMENTS Bidder understands and agrees that the contract to be executed by bidder shall be bound and will include the following: (a) Notice to Bidders. (b) General Instructions to Bidders. ' (c) Bidder's Submittal. (d) Statutory Bonds (if required). (e) Contract Agreement. (f) General Conditions. (g) Special Conditions (if any). (h) Specifications. (i) Insurance Certificates for Contractor and all Sub -Contractors. 0) All other documents made available to bidder for his inspection in accordance with the Notice to Bidders. If Plans and Specifications are too bulky or cumbersome to be physically bound, they are to be considered incorporated by reference into the aforementioned contract documents. QUALIFICATIONS OF BIDDERS The bidder may be required before the award of any contract to show to the complete satisfaction of the City of Lubbock that it has the necessary facilities, ability, and financial resources to provide the service specified therein in a satisfactory manner. The bidder may also be required to give a past history and references in order to satisfy the City of Lubbock about the bidder's qualifications. The City of Lubbock may make reasonable investigations deemed necessary and proper to determine the ability of the bidder to perform the work, and the bidder shall furnish to the City of Lubbock all information for this purpose that may be requested. The bidder's bid may be deemed not to meet specifications or the bid may be rejected if the evidence submitted by, or investigation of, the bidder fails to satisfy the City of Lubbock that the bidder is properly qualified to carry out the obligations of the contract and to complete the work described therein. Evaluation of the bidder's qualifications shall include: (a) The ability, capacity, skill, and financial resources to perform the work or provide the service required. 16 1..1 (b) The ability of the bidder to perform the work or provide the service promptly or within the time specified, without delay or interference. (c) The character, integrity, reputation, judgment, experience, and efficiency of the bidder. (d) The quality of performance of previous contracts or services. (e) The safety record of the Contractor and proposed Sub -Contractors Before contract award, the recommended contractor for this project may be required to show that he has experience with similar projects that require the Contractor to plan his work efforts and equipment needs with City of Lubbock specifications in mind. Demonstration of experience shall include a complete list of ALL similar municipal and similar non -municipal current and completed projects for the past three (3) years for review. This list shall include the names of supervisors and type of equipment used to perform work on these projects. In addition, the Contractor may be required to provide the name(s) of supervisor(s) that will be used to perform work on this project in compliance with City of Lubbock specifications herein. 32 BID AWARD 32.1 The City of Lubbock reserves the right to reject any or all bids, reject any particular item on a bid, and to ' waive immaterial formalities and to accept the offer most advantageous to the City of Lubbock in its sole discretion. Unless otherwise specified herein, the City shall award the bid based on the total bid for Bid Items _1 through 12 plus the sum of any Alternate Bids or Options the City may select. 32.2 All bids are evaluated for compliance with specifications before the bid price is considered. Response to specifications is primary in determining the best low bid. Failure to comply with the specifications may result in disqualification of the bid. 32.3 In case of tie bids, preference will be given to local bidders. Consistent and continued tie bidding may be cause for rejection of bids by the City of Lubbock and/or investigation by the Attorney General to determine possible Anti -Trust violations. 32.4 Before the City may award a bid to a nonresident bidder, the nonresident bidder's bid must be lower than lowest bid submitted by a responsible Texas bidder by the same margin or amount that a Texas bidder would be required to underbid the nonresident bidder in the nonresident bidders' home state. 32.5 Any contract made, or purchase order issued, as a result of this Invitation to Bid, shall be entered into the a, State of Texas and under the laws of the State of Texas. In connection with the performance of work, the Bidder agrees to comply with the Fair Labor Standard Act, Equal Opportunity Employment Act, and all other applicable Federal, State, and Local laws, regulations, and executive orders to the extent that the t_. = same may be applicable. 32.6 NO INDIVIDUAL OF ANY USING DEPARTMENT HAS THE AUTHORITY TO LEGALLY AND/OR FINANCIALLY COMMIT THE CITY TO ANY CONTRACT, AGREEMENT OR i-� PURCHASE ORDER FOR GOODS OR SERVICES, UNLESS SPECIFICALLY SANCTIONED BY THE REQUIREMENTS OF THIS INVITATION TO BID. 33 ANTI -LOBBYING PROVISION 33.1 DURING THE PERIOD BETWEEN THE BID CLOSE DATE AND THE CONTRACT AWARD, BIDDERS, INCLUDING THEIR AGENTS AND REPRESENTATIVES, SHALL NOT DIRECTLY DISCUSS OR PROMOTE THEIR BID WITH ANY MEMBER OF THE LUBBOCK CITY COUNCIL OR CITY STAFF EXCEPT IN THE COURSE OF CITY - SPONSORED INQUIRIES, BRIEFINGS, INTERVIEWS, OR PRESENTATIONS, UNLESS REQUESTED BY THE CITY. 3 33.2 This provision is not meant to preclude bidders from discussing other matters with City Council members or City staff. This policy is intended to create a level playing field for all potential 17 bidders, assure that contract decisions are made in public, and to protect the integrity of the bid process. Violation of this provision may result in rejection of the bidder's bid. 34 PREVAILING WAGE RATES 34.1 Bidders are required to comply with Texas Government Code, Chapter 2258, Prevailing Wage Rates, with respect to the payment of prevailing wage rates for the construction of a public work, including a building, highway, road, excavation, and repair work or other project development or improvement, paid for in whole or in part from public funds, without regard to whether the work is done under public supervision or direction. A worker is employed on a public work if the worker is employed by the contractor or any subcontractor in the execution of the contract for the project. 34.2 A worker employed on a public work by or on behalf of the City of Lubbock shall be paid not less than the general prevailing rate of per diem wages for the work of a similar character in the locality in which the work is performed, and not less than the general prevailing rate of per diem wages for legal holiday and overtime work. 34.3 The State of Texas has adopted the Federal Davis -Bacon wage rates for use in Texas pursuant to and in accordance with the Texas Government Code, Section 2258.022. Bidders may access the U. S. Department of Labor web site at the following web address to obtain the rates to be used in Lubbock County: http://www.gpo.gov/davisbacon/alistates.htm 1 34.4 It shall be the responsibility of the successful bidder to obtain the proper wage rates from the web site for the type of work defined in the bid specifications. 34.5 A contractor or subcontractor who violates Texas Government Code Section 2258.023 shall pay to the City of Lubbock $60 for each worker employed for each calendar day or part of the day that the worker is paid less than the wage rates stipulated in the contract. 18 BID SUBMITTAL FORM No Text ITB #10-023-FO, Addendum #3 REVISED BID SUBMITTAL FORM UNIT PRICE BID CONTRACT DATE: Qet. r.6se— I, Zo o -t PROJECT NUMBER: #10-023-FO - 12 Inch Water Line Re -Route at West Loop 289 and 19th Street Bid of W e_-.r,6 H i C e N -i .-rx o.- C e. 1, Z ra L'. (hereinafter called Bidder) To the Honorable Mayor and City Council City of Lubbock, Texas (hereinafter called Owner) Ladies and Gentlemen: The Bidder, in compliance with your Invitation to Bid for the construction of a 12 Inch Water Line Re -Route at West Loop 289 and 19th Street, having carefully examined the plans, specifications, instructions to bidders, notice to bidders and all other related contract documents and the site of the intended work, and being familiar with all of the conditions surrounding the construction of the intended project including the availability of materials and labor, hereby intends to furnish all labor, materials, and supplies; and to construct the project in accordance with the plans, specifications and contract documents, within the time set forth therein and at the price stated below. The bidder binds himself on acceptance of his bid to execute a contract and any required bonds, according to the accompanying forms, for performing and completing the said work within the time stated and for the prices stated below. (Payment will be for actual quantities constructed) BASE BID: Item Units and Item Unit Total No. Ouantity Description Price Amount 1. 2 EA Furnish and install 12" X 10" tapping sleeve and valve and valve box including excavation, gravel embedment, backfilled to 95% proctor, testing, pavement cuts, disposal of spoils and all necessary accessories, complete and in place. . 8 o ,1/940 �. TOTAL ITEM #l:0r e:1-Hoi)p"o tAz"s HoNoaz,y fotr'Ty 0owAR-s i;AL-N $ /EA( (Unit Price Amounts shall be shown in both words and numerals. In case of discrepancy, the amount shown in words shall govern.) 2. 2175 LF Standard Furnish and install 12 inch Class 150 Pipe including detection wire, any required trench protection, tape, excavation, gravel embedment, backfilled to 95% proctor, testing, pavement cuts, disposal of spoils and all necessary accessories, complete and in place, per linear foot. Z 9 ea so TOTAL ITEM#2: T,.,ZVA 7 NsrA%d°LLAe.sSEYE"TXe-Cm N*-POoT $ /LF G!t 57 ) (Unit Price Amounts shall be shown in both words and numerals. In case of discrepancy, the amount shown in words shall govern.) 3. 247 LF Furnish and install 24" Steel Casing by jack and boring and install 12 inch pipe, including excavation, trench protection, any required shoring of launching and receiving pits, backfilling and compaction of pits, installing the pipe 24" and 12", pipe material for both 24" and 12" , casing spacers, casing end seals and disposal a of spoils and complete with all necessary appurtenances and testin.9. TOTAL ITEM #3 : O ra t% Ho 1N Go FT. P 1 Fou A- O o,.,- A it i fie- Fo.-r $ /LF( 3 8 D 3 S _) _ (Unit Price Amounts shall be shown in both words and numerals. In case of discrepancy, the afhount shown in words shall govern.) 10-023-FOAddend3.doc ITB #10-023-FO, Addendum #3 BASE BID: Item Units and Item Unit Total No. Ouantity Description Price Amount 4. 1,075 LB Furnish and install ductile iron fittings including excavation, trench protection, backfilling and compaction of pits, installing the pipe, pipe material, casing spacers, casing end seals and disposal of spoils and complete in place with all necessary appurtenances. Z TOTAL ITEM #4: w e 'P at 4-i 32, %F Z H?7 C V HT s. f e; R- L B $ /LB( Z cl 0 1 ) (Unit Price Amounts shall be shown in both words and numerals. In case of discrepancy, the amount shown in words shall govern.) 5. 2 EA 12" Insta Valve or Hydra Stop including excavation backfilled to 95% of proctor, testing, pavement cuts and disposal of spoils. 9/ 7So TOTAL ITEM#5: Nsr•6 1 rioGAtcvr $ /EA( 1 9 J 00 (Unit Price Amounts shall be shown in both words and numerals. In case of discrepancy, the aan count shown in words shall govern.) 6. 2 EA Cut and plug existing 12 inch pipe including any excavation, backfilled to 95% proctor, testing, pavement cuts, disposal of spoils and all necessary accessories, complete and in place. s -7 S - 0 I o_ TOTAL ITEM#6: SC-/Z%A HgVAPa60 FzFTx 064611tS C:PtC-%+ $ /EA( 14 10 0 ) (Unit Price Amounts shall be shown in both words and numerals. In case of discrepancy, he amount shown in words shall govern.) 7. 2 EA Connect Proposed water main to existing water main, including excavation, gravel embedment, backfilled to 95% proctor, testing, pavement cuts, disposal of spoils and all necessary accessories, complete and in place. 2. ,100 •_ TOTAL ITEM #7: I,, T00+IA 40 014eHO1-10P&P 00Lt,^#Ls Ga-,r $ /EA( t ZOO (Unit Price Amounts shall be shown in both words and numerals. In case of discrepancy, the amount shown in words shall govern.) 8. 711 SY Pavement repair to the asphalt or concrete as needed. 4o. TOTALITEM#8: Foa.T:j Foot- POO-OAK-s eca- $ /SY 1 Z 8 M ) (Unit Price Amounts shall be shown in both words and numerals. In case of discrepancy, the Amount shown in words shall govern.) 9. 1 LS Conduct a field survey of all proposed water mains adjustment installation and valves and provide the x, y, and z coordinates of all the water mains and valve locations. In both state plane coordinates and TxDOT surface coordinates 1, ono $ o_ TOTAL ITEM #9: O m 3'TH ay i Am o $ /LS( 1, 000 ) (i Tnit Price Amounts shall be shown in both words and numerals. In case of discrepancy, tleaiilount shown in words shall govern.) 10-023-FOAddend3.doc ITB #10-023-FO, Addendum #3 BASE BID: Item Units and- Item Unit Total No. Ouantity Description Price Amount 10. 1 LS Provide and maintain a Storm Water Pollution Prevention Program to prevent silt runoff into existing storm water systems and playa lakes. This item shall include all equipment, tools, fees, required documents and labor TOTAL ITEM #10:'Te- -L2,r T -a..o F:r r> (Unit Price Amounts shall be shown in both words shown in words shall govern.) 5,5o0 4 ._ ca 00L' cA¢s $ /LS( 3. So o ) id numerals. In case of discrepancy, the amount 11. 1 LS Furnish and install Traffic Control Plan, including signs, barricades, arrow boards as required by TMUTCD complete in place with all necessary appurtenances. 2 (000%' +% TOTAL ITEM II: Szx Hu"op-go Po,- ,Fq i ?/LS( 2., Co o d ) (Unit Price Amounts shall be shown in both words and numerals. In case of discrepancy, the amount shown in words shall govern.) 12. 1 LS Equipment mobilization/demobilization. Provide all equipment and tools to complete, project, insurance, bonds, move in/out related costs and preparation of NOI and NOT complete. �s fo, TOTAL ITEM 12: 5= ,F TH o o j P, ri,o Hs H as iA j ",p a. 3 a 10 o ,. L, Pi. s $ /LS( G. 9 o o ) (Unit Price Amounts shall be shown in both words and numerals. In case of discrepancy, the amount shown in words shall govern.) 13. 2 EA Furnish and install 12 inch gate valve, valve box and fittings including excavation, gravel embedment, backfilled to 95% proctor, testing, pavement cuts, disposal of spoils and all necessary accessories, complete and in place..— 1�700 •� TOTAL ITEM 13 : o N G TH a - } R »4 0. I,,poL s EA,." $ /EA( 3, 4 0 0 ) (Unit Price Amounts shall be shown in both words and numerals. In case of discrepancy, the amount shown in words shall govern.) 14. 118 LF Furnish and install 24" Steel Casing by open cut and install 12 inch pipe, including excavation, trench protection, backfilling and compaction of pits, installing the pipe 24 and 12", casing spacers, casing end seals and disposal of spoils and complete with all necessary appurtenances and testing. `t' 1 8 $ CIOVSu�` -� �� TOTAL ITEM 14: d l,M $ /LF( -e- b +- (Unit Price Amounts shall be shown in both words and numerals. In case of discrepancy, the amount shown in words shall govern.) BASE BID (ITEMS 1 THROUGH 14 INCLUSIVE) TOTAL BID: 00C H+,a01-Z0 Nxr4E-ry 6r+07NovW M:T.tAeT 10o"aws (Unit Price Amounts shall be shown in both words and numerals. In case of discrepancy, the amount shown in words shall govern.) AUTHORIZED SIGNATURE 10-023-FOAddend3.doc E r €L Bidder hereby agrees to commence the work on the above project on a date to be specified in a written "Notice to Proceed" of the Owner and to substantially complete the project within 90 (NINETY) WORKING DAYS thereafter as stipulated in the specifications and other contract documents. Bidder hereby further agrees to pay to Owner as liquidated damages the sum of $1,000 (ONE THOUSAND) each WORKING DAY in excess of the time set forth herein above for completion of this project, all as more fully set forth in the general conditions of the contract documents Bidder understands and agrees that this bid submittal shall be completed and submitted in accordance with instruction number 28 of the General Instructions to Bidders. Bidder understands that the Owner reserves the right to reject any or all bids and to waive any formality in the bidding. The Bidder agrees that this bid shall be good and may not be withdrawn for a period of thirty (30) calendar days after the scheduled closing time for receiving bids. The undersigned Bidder hereby declares that he has visited the site of the work and has carefully examined the plans, specifications and contract documents pertaining to the work covered by this bid, and he further agrees to commence work on or before the date specified in the written notice to proceed, and to substantially complete the work on which he has bid; as provided in the contract documents. Bidders are required, whether or not a payment or performance bond is required, to submit a cashier's check or certified check issued by a bank satisfactory to the City of Lubbock, or a bid bond from a reliable surety company, payable without recourse to the order of the City of Lubbock in an amount not less than five percent (5%) of the total amount of the bid submitted as a guarantee that bidder will enter into a contract, obtain all required insurance policies, and execute all necessary bonds (if required) within ten (10) business days after notice of award of the contract to him. 6 GV--, Bidder's Initials 23 Enclosed with this bid is a Cashier's Check or Certified Check for Dollars (S ) or a Bid Bond in the sum of S 10 Dollars ($ ), which it is agreed shall be collected and retained by the Owner as liquidated damages in the event the bid is accepted by the Owner and the undersigned fails to execute the necessary contract documents, insurance certificates, and the required bond (if any) with the Owner within ten (10) business days after the date of receipt of written notification of acceptance of said bid; otherwise, said check or bond shall be returned to the undersigned v upon demand. Bidder understands and agrees that the contract to be executed by Bidder shall be bound and include all contract documents made available to him for his inspection in accordance with the Notice to Bidders. Pursuant to Texas Local Government Code 252.043(a), a competitive sealed bid that has been opened may not be changed for the purpose of correcting an error in the bid price. THEREFORE, ANY CORRECTIONS TO THE BID PRICE MUST BE MADE ON THE BED SUBMITTAL FORM PRIOR TO BED OPENING. (Sea] if Bidder is a Corporation) ATTES . Secretary Bidder acknowledges receipt of the following addenda: Addenda No. Date I ► A 1 0 Addenda No. �_ Date 1, % /o Addenda No. _� Date tt ! ss/oy Addenda No. Date Date: 00 `y Authorized Signature V,0-AA Mzl.t.62 � t;ai'x0h011rT02. (Printed or Typed Name) W4-s(.t4T C.•N>T. Co" SNP. Company C9 d I W. \rJ rk L-%- S T. Address &0-0w0LrvSrA41., 7^0-jLp+NT City, County T e 7(a aS 1 State Zip Code Telephone: 61 - + 8 1- 2.5 t 4 Fax: 6 1 —1 - 4 6 I- 1) too, Email: 16MSL,L6a.E. WA-S-16WFC•�►a�.Gor� FEDERAL TAX ID or SOCIAL SECURITY No. -75- -Z302ZsC.-7 M/WBE Firm: Woman Black American Native American Hispanic American Asian Pacific American Other (Specify) ITB C0-023-FO, Addendum City of Lubbock PURCHASING & CONTRACT MANAGEMENT DEPARTMENT ROOM 204, MUNICIPAL BUILDING 1625 13T" STREET LUBBOCK, TEXAS 79401 PH: (806) 775-2167 FAX: (806) 775-2164 http://purchasing.ci.lubbock.tx.us DATE ISSUED: CLOSE DATE: ADDENDUM #1 ITB #10-023-FO 12 Inch water Line Re -Route at West Loop 289 and 191h Street November 19, 2009 December 1, 2009 @ 2:00 P.M. The following items take precedence over specifications for the above named Invitation to Bid. Where any iten called for in the ITB documents is supplemented here, the original requirements, not affected by this addendum, shall remain in effect. Bidders attention is invite to review the following. 1. Bidders must submit the "REVISED" BID SUBMITTAL FORM. 2. General Instructions to Bidders, Section 32.1 have been revised. 32 BID AWARD 32.1 The City of Lubbock reserves the right to reject any or all bids, reject any particular item on ; bid, and to waive immaterial formalities and to accept the offer most advantageous to the City o Lubbock in its sole discretion. Unless otherwise specified herein, the City shall award the bic based on the total bid for Bid Items _1 through 13 plus the sum of any Altemat( Bids or Options the City may select. All requests for additional information or clarification must be submitted in writing and directed to: Felix Orta, Senior Buyer, City of Lubbock, P.O. Box 2000, Lubbock, Texas 79457 Questions may be faxed to (906) 775-2164 or Email to forta(cr;mylubbock.us THANK YOU, ;?e&.t Nu Felix Orta Senior Buyer City of Lubbock It is the intent and purpose of the City of Lubbock that this request permits competitive proposals. It shall be the bidder's responsibility to advise the City of Lubbock Purchasing Manager if any language, requirements, etc., or any combinations thereof, inadvertently restricts or limits the requirements stated in this ITB to a single source. Such notification must be submitted in writing and must be received by the Purchasing Manager no later than five (5) business days prior to the bid close date. A review of such notifications will be made. 10-023-FOAddend1.doc ITB 010-023-FO, Addeodum City of Lubbock PURCHASING & CONTRACT MANAGEMENT DEPARTMENT ROOM 204, MUNICIPAL BUILDING 1625 13T" STREET LUBBOCK, TEXAS 79401 PH: (806) 775-2167 FAX: (806) 775-2164 http://purchasing.ci.lubbock.tx.us DATE ISSUED: CLOSE DATE: ADDENDUM #2 ITB #10-023-FO 12 Inch water Line Re -Route at West Loop 289 and 19th Street November 20, 2009 December 1, 2009 @ 2:00 P.M. The following items take precedence over specifications for the above named Invitation to Bid. Where any iter called for in the ITB documents is supplemented here, the original requirements, not affected by this addendum shall remain in effect. Bidders attention is invite to review the following. 1. Specifications for Section 01010, Summary of Work have been updated. PART 1 - GENERAL 1.3 PROJECT DESCRIPTION A. This project involves a relocation of a 12" water main with new pipe, jack and bore and encasement within the Texas Department of Transportation right of way. Major work items on the project include installation of approximately: B. 2175-ft 12-in water line, C. 365 linear feet of 24" casing with 12" pipe. All requests for additional information or clarification must be submitted in writing and directed to: Felix Orta, Senior Buyer, City of Lubbock, P.O. Box 2000, Lubbock, Texas 79457 Questions may be faxed to (806) 775-2164 or Email to fortat'a,mylubbocLus THANK YOU, 57C&A; Felix Orta Senior Buyer City of Lubbock It is the intent and purpose of the City of Lubbock that this request permits competitive proposals. It shall be the bidder' responsibility to advise the City of Lubbock Purchasing Manager if any language, requirements, etc., or any combinations thereof inadvertently restricts or limits the requirements stated in this ITB to a single source. Such notification must be submitted in writing - and must be received by the Purchasing Manager no later than five (5) business days prior to the bid close date. A review of such notifications will be made. 10-023-FOAddend2.doc ITB #10-023-FO, Addendum #3 City of Lubbock PURCHASING & CONTRACT MANAGEMENT DEPARTMENT ROOM 204, MUNICIPAL BUILDING 1625 13T" STREET LUBBOCK, TEXAS 79401 PH: (806) 775-2167 FAX: (806) 775-2164 http://purchasing.ci.lubbock.tx.us DATE ISSUED: CLOSE DATE: ADDENDUM # 3 ITB #10-023-FO 12 Inch water Line Re -Route at West Loop 289 and 19th Street November 25, 2009 December 1, 2009 @ 2:00 P.M. The following items take precedence over specifications for the above named Invitation to Bid. Where any item called for in the ITB documents is supplemented here, the original requirements, not affected by this addendum, shall remain in effect. Bidders attention is invite to review the following. - 1. Bidders must submit the "REVISED" BID SUBMITTAL FORM. 2, General Instructions to Bidders, Section 32.1 have been revised. 32 BID AWARD 32.1 The City of Lubbock reserves the right to reject any or all bids, reject any particular item on a bid, and to waive immaterial formalities and to accept the offer most advantageous to the City of Lubbock in its sole discretion. Unless otherwise specified herein, the City shall award the bid based on the total bid for Bid Items _1 through 14 plus the sum of any Alternate Bids or Options the City may select. All requests for additional information or clarification must be submitted in writing and directed to: Felix Orta, Senior Buyer, City of Lubbock, P.O. Box 2000, Lubbock, Texas 79457 Questions may be faxed to (806) 775-2164 or Email to forta(&,mylubbock;us THANK YOU, e�c'x data Felix Orta Senior Buyer City of Lubbock It is the intent and purpose of the City of Lubbock that this request permits competitive proposals. It shall be the bidder's responsibility to advise the City of Lubbock Purchasing Manager if any language, requirements, etc., or any combinations thereof, inadvertently restricts or limits the requirements stated in this ITB to a single source. Such notification must be submitted in writing and must be received by the Purchasing Manager no later than five (5) business days prior to the bid close date. A review of such notifications will be made. 10-023-FOAddend3.doc Merchants Bonding Company P.O. BOX 26720 • AUSTIN, TX 78755-0720 BID BOND PUBLIC WORK KNOW ALL PERSONS BY THESE PRESENTS: That Wright Construction Co., Inc. 601 W. Wall Street, Grapevine, TX 76051 (hereinafter called the Principal) as Principal, and the MERCHANTS BONDING COMPANY (Mutual) a corporation of the State of Iowa, with its Home Office in the City of Des Moines, Iowa, (hereinafter called Surety), as Surety, are held and firmly bound to the City of Lubbock 1625 13th Street, Room 204, Lubbock, TX 79401 (hereinafter called the Obligee) in the full and just sum of ($ 5% GAB *************************************************** ) Five Percent of the Greatest Amount Bid********************************************************************************* Dollars good and lawful money of the United States of America, to the payment of which sum of money well and truly to be made, the Principal and Surety bind themselves, their heirs, executors, administrators, successors and assigns, jointly and severally, firmly by these presents. Signed and dated this 25th day of November 2009 THE CONDITION OF THIS OBLIGATION IS SUCH, that, if the Obligee shall make any award to the Principal for Bid # 10-023-FO - 12 Inch Water Line Re -Route at West Loop 289 and 19th Street according to the terms of the proposal or bid made by the Principal therefor, and the Principal shall duly make and enter into a contract with the Obligee in accordance with the terms of said proposal or bid and award, and shall give bond for the faithful performance thereof with the MERCHANTS BONDING COMPANY (Mutual) and Surety, or with other Surety or Sureties approved by the Obligee; or if the Principal shall, in case of failure to do so, pay to the Obligee the damages which the Obligee may suffer by reason of such failure, not exceeding the penalty of this bond, then this obligation shall be null and void; otherwise it shall be and remain in full force and effect. IN TESTIMONY WHEREOF, the Principal and Surety have caused these presents to be duly signed and sealed. Witness: _ [J I By i- Attest: By CON 0333 AU (9100) Wright ConsVjuction 4.,Inc. NG&'OMPANY (Mutual) , Attorney -In -Fact 2 POWER OF ATTORNEY Merchants Bonding Company (Mutual) Nations Bonding Company Bond No. Bid Bond KNOW ALL PERSONS BY THESE PRESENTS: That MERCHANTS BONDING COMPANY (MUTUAL) is a corporation duly organized under the laws of the State of Iowa, and that NATIONS BONDING COMPANY is a corporation duly organized under the laws of the State of Texas (herein collectively called the "Companies"), and that the Companies do hereby make, constitute and appoint Clydene Johnson, Dustin Parker, Kathy Sells and/or Carolyn J. Scott of Grapevine and State of Texas their true and lawful Attorney -in -Fact, with full power and authority hereby conferred in their name, place and stead, to sign, execute, acknowledge and deliver in their behalf as surety any and all bonds, undertakings, recognizances or other written obligations in the nature thereof, subject to the limitation that any such instrument shall not exceed the amount of: FIVE MILLION ($5,000,000.00) DOLLARS and to bind the Companies thereby as fully and to the same extent as if such bond or undertaking was signed by the duly authorized officers of the Companies, and all the acts of said Attorney -in -Fact, pursuant to the authority herein given, are hereby ratified and confirmed. This Power -of -Attorney is made and executed pursuant to and by authority of the following bylaws adopted by the Board of Directors of Merchants Bonding Company (Mutual) on November 16, 2002 and adopted by the Board of Directors of Nations Bonding Company on April 19, 2003. "The Chairman of the Board or President or any Vice President or Secretary shall have power and authority to appoint Attorneys -in -Fact, and to authorize them to execute on behalf of the Company, and attach the Seal of the Company thereto, bonds and undertakings, recognizances, contracts of indemnity and other writings obligatory in the nature thereof. The signature of any authorized officer and the Seal of the Company may be affixed by facsimile to any Power of Attorney or Certification thereof authorizing the execution and delivery of any bond, undertaking, recognizance, or other suretyship obligations of the Company, and such signature and seal when so used shall have the same force and effect as though manually fixed." In Witness Whereof, the Companies have caused this instrument to be signed and sealed this 16th day of January, 2006. .. • .. . ,•'o14 D f!V*-•. L,o�POg4� C) z -o- o:Q. 2003 aa; •.fib •� . STATE OF IOWA COUNTY OF POLK ss. MERCHANTS BONDING COMPANY (MUTUAL) NATIONS BONDING COMPANY By/-,C,7 ��� President On this 16th day of January, 2006, before me appeared Larry Taylor, to me personally known, who being by me duly sworn did say that he is President of MERCHANTS BONDING COMPANY (MUTUAL) and NATIONS BONDING COMPANY; and that the seals affixed to the foregoing instrument are the corporate seals of the Companies; and that the said instrument was signed and sealed in behalf of the Companies by authority of their respective Boards of Directors. In Testimony Whereof, I have hereunto set my hand and affixed my Official Seal at the City of Des Moines, Iowa, the day and year first above written. ��NCINDY SMYTH �17 Commission Number 173604 My Commission Expires March 16, 2005 STATE OF IOWA Notary Public, Polk county, Iowa COUNTY OF POLK ss. I, William Warner, Jr., Secretary of MERCHANTS BONDING COMPANY (MUTUAL) and NATIONS BONDING COMPANY, do hereby certifv that the above and foregoing is a true and correct copy of the POWER -OF -ATTORNEY executed by said Companies, which is still in full force and effect and has not been amended or revoked. In Witness Whereof, I have hereunto set my hand and affixed the seat of the Companies on this 25th day of November, 2009 .Q'N -... c•�'• • : C,�A 9'4 :0 Z '.� 2003 a-0 • •.may-. .�.: • At . ��\NG Cpy• OPPOq' ��•� : y 1933 "AY Secretary NBC 0103 (1/06) IMPORTANT NOTICE To obtain information or make a complaint: You may contact your insurance agent at the telephone number provided by your insurance agent. You may call Merchants Bonding Company's toll -free telephone number for information or to make a complaint at: 1-800-678-8171 You may contact the Texas Department of Insurance to obtain information on companies, coverages, rights or complaints at: 1-800-252-3439 You may write the Texas Department of Insurance at: P. O. Box 149104 Austin, TX 78714-91 04 Fax: (512) 475-1771 Web: http://www.tdI,state.tx.us E-mail: ConsumerProtection@tdi.state.tx.us PREMIUM AND CLAIM DISPUTES: Should you have a dispute concerning your premium or about a claim you should contact the agent first. If the dispute is not resolved, you may contact the Texas Department of Insurance. ATTACH THIS NOTICE TO YOUR POLICY: This notice is for information only and does not become a part or condition of the attached document. CITY OF LUBBOCK INSURANCE REQUIREMENT AFFIDAVIT To Be Completed by Bidder and Agent Must be submitted with Bid I, the undersigned Bidder, certify that the insurance requirements contained in this bid document have been reviewed by me with the below identified Insurance Agent/Broker. If I am awarded this contract by the City of Lubbock, I will be able to, within ten (10) business days after being notified of such award by the City of Lubbock, furnish a valid insurance certificate to the City meet�g all of the requirements defined in this bid. LeMo(,E (-Je!�0- Contractor (Print) 'S FIRM NAME: Wright Construction Co., Inc. (Print or Type) CONTRACTOR'S FIRM ADDRESS: 601 W. Wall Street Grapevine, TX 76051 Name of Agent/Broker: Kathy Sells, Box Insurance Agency Agent / 13ok (Signature) Address of AgentBroker: 1200 S. Main Street, Suite 1600 City/State/Zip: Grapevine, TX 76051 Agent/Broker Telephone Number: ( 817 ) 481-3529 Date: 11 /25/09 NOTE TO CONTRACTOR If the time requirement specified above is not met, the City has the right to reject this bid and award the contract to another contractor. If you have any questions concerning these requirements, please contact the Purchasing and Contract Management 0111cer for the City of Lubbock at (806) 775-2163. BID # 10-023-FO -12 Inch Water Line Re -Route at West Loop 289 and 19th Street 0 SAFETY RECORD QUESTIONNAIRE The City of Lubbock City Council desires to avail itself of the benefits of Section 252.0435 of the Local Government Code, and consider the safety records of potential contractors prior to awarding bids on City contracts. Pursuant to Section _. 252.0435 of the Local Government Code, City of Lubbock has adopted the following written definition and criteria for accurately determining the safety record of a bidder prior to awarding bids on City contracts. The definition and criteria for determining the safety record of a bidder for this consideration shall be: The City of Lubbock shall consider the safety record of the bidders in determining the responsibility thereof. The City may consider any incidence involving worker safety or safety of the citizens of the City of Lubbock, be it related or caused by environmental, mechanical, operational, supervision or any other cause or factor. Specifically, the City may consider, among other things: Complaints to, or final orders entered by, the Occupational Safety and Health Review Commission (OSHRC), against the bidder for violations of OSHA regulations within the past three (3) years. b. Citations (as defined below) from an Environmental Protection Agency (as defined below) for violations within the past five (5) years. Environmental Protection Agencies include, but are not necessarily limited to, the U.S. Army Corps of Engineers (USACOE), the U.S. Fish and Wildlife Service (USFWS), the Environmental Protection Agency (EPA), the Texas Commission on Environmental Quality (TCEQ), the Texas Natural Resource Conservation Commission (TNRCC) (predecessor to the TCEQ), the Texas Department of State Health Services (DSHS), the Texas Parks and Wildlife Department (TPWD), the Structural Pest Control Board (SPCB), agencies of local governments responsible for enforcing environmental protection or worker safety related laws or regulations, and similar regulatory agencies of other states of the United States. Citations include notices of violation, notices of enforcement, suspension/revocations of state or federal licenses or registrations, fines assessed, pending criminal complaints, indictments, or convictions, administrative orders, draft orders, final orders, and judicial final judgments. c. Convictions of a criminal offense within the past ten (10) years, which resulted in bodily harm or death. d. Any other safety related matter deemed by the City Council to be material in determining the responsibility of the bidder and his or her ability to perform the services or goods required by the bid documents in a safe environment, both for the workers and other employees of bidder and the citizens of the City of Lubbock. In order to obtain proper information from bidders so that City of Lubbock may consider the safety records of potential contractors prior to awarding bids on City contracts, City of Lubbock requires that bidders answer the following three (3) questions and submit them with their bids: ' QUESTION ONE Has the bidder, or the firm, corporation, partnership, or institution represented by the bidder, or anyone acting for such F firm, corporation, partnership or institution, received citations for violations of OSHA within the past three (3) years? t.3 r YES 1 TKO If the bidder has indicated YES for question number one above, the bidder must provide to City of Lubbock, with its bid submission, the following information with respect to each such citation: 5EZ AsZR-V-�Zo Date of'offense location of establishment inspected, category of offense final disposition of offense if any, and penalty assessed. %3.L1`ti Bidder's Initials 26 QUESTION TWO Has the bidder, or the firm, corporation, partnership, or institution represented by the bidder, or anyone acting for such firm, corporation, partnership or institution, received citations for violations of environmental protection laws or regulations, of any kind or type, within the past five years? Citations include notice of violation, notice of enforcement, suspension/revocations of state or federal licenses, or registrations, fines assessed, pending criminal complaints, indictments, or convictions, administrative orders, draft orders, final orders, and judicial final judgments. YES NO If the bidder has indicated YES for question number two above, the bidder must provide to City of Lubbock, with its bid submission, the following information with respect to each such conviction: Date of offense or occurrence, location where offense occurred, type of offense, final disposition of offense, if any, and penalty assessed. QUESTION THREE Has the bidder, or the firm, corporation, partnership, or institution represented by bidder, or anyone acting for such firm, corporation, partnership, or institution, ever been convicted, within the past ten (10) years, of a criminal offense which resulted in serious bodily injury or death? YES NO If the bidder has indicated YES for question number three above, the bidder must provide to City of Lubbock, with its bid submission, the following information with respect to each such conviction: Date of offense, location where offense occurred, type of offense, final disposition of offense, in any, and penalty assessed. ACKNOWLEDGEMENT THE STATE OF TEXAS COUNTY OF LUBBOCK I certify that I have made no willful misrepresentations in this Questionnaire nor have I withheld information in my statements and answers to questions. I am aware that the information given by me in this questionnaire shall be investigated, with my full permission, and that any misrepresentations or omissions may cause my bid to be rejected. Signature F—s'Ti 0, P, T G �- 0, ' Title I 11 27 SUSPENSION AND DEBARMENT CERTIFICATION Federal Law (A-102 Common Rule and OMB Circular A-110) prohibits non -Federal entities from contracting with or making sub -awards under covered transactions to parties that are suspended or debarred or whose principals are suspended or debarred. Covered transactions include procurement contracts for goods or services equal to or in excess of $25,000 and all non -procurement transactions (e.g., sub -awards to sub -recipients). Contractors receiving individual awards of $25,000 or more and all sub -recipients must certify that their organization and its principals are not suspended or debarred by a Federal agency. Before an award of $25,000 or more can be made to your firm, you must certify that your organization and its principals are not suspended or debarred by a Federal agency. I, the undersigned agent for the firm named below, certify that neither this firm nor its principals are suspended or debarred by a Federal agency. COMPANY NAME: W R-T �.H i C • hH : 1 R-vLT=0r- C • .� Z F-i c_ , ._ FEDERAL TAX ID or SOCIAL SECURITY No. 7 S— Z. Signature of Company Official: Printed name of company official signing above: 09-AO M.TL-c.BIZ. Date Signed c_ E r,*0e✓ 1. 2,0 o PROPOSED LIST OF SUB -CONTRACTORS Company Name and City Minority Owned r Yes or No _T C� ❑ �•o NES?o.IZ PAJ=e+a �w.ALs�.�.o� ) r.. ❑ L`Y V-'T -T t. ❑ L" ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ 0 El ❑ ❑ ❑ ❑ THIS FORM SHALL BE COMPLETED AND RETURNED ALONG WITH YOUR BID IF NO SUB -CONTRACTORS WILL BE USED PLEASE INDICATE SO 29 c� POST -CLOSING DOCUMENT REQUIREMENTS The below -listed document must be received in the Purchasing and Contract Management Office Not Later Than TWO BUSINESS DAYS after the close date when bids are due. FINAL LIST OF SUB -CONTRACTORS 31 Dec u I cuuu �: e Mn 817-481-2369 p. 2 FINAL LIST OF SUB -CONTRACTORS Company Name and City Minority Owned I Yes or No ri ce, 2. MIL.V-:rd S9AqT4_Qs E( [I 3. t. -,. 9 ) T ^ 4. f 0 1& -T)L [3 [4" 4. V TCL V4 L 'T 5. 6. 7. 0 0 8. D 0 9. ❑ D 10. D 11 11. 12. 13. ❑ 0 14. ❑ 0 15. ❑ 0 16. D 0 THIS FORM SHALL BE COMPLETED AND RETURNED NOT LATER THAN TWO BUSINESS DAYS AFTER THE CLOSE DATE WHEN BIDS ARE DUE IF NO SUB -CONTRACTORS WILL BE USED PLEASE INDICATE SO 32 r O a -- -- ---- _._ w _. �F - -..._ .. ,A...« . .. r. _. k STATUTORY PAYMENT BOND PURSUANT TO SECTION 2253.021(a) OF THE TEXAS GOVERNNIENT CODE (CONTRACTS MORE THAN $25,000) Bond No. TXC 81649 KNOW ALL MEN BY THESE PRESENTS, that Wright Construction Co., Inc. (hereinafter called the Principa)(s), as Principal(s), and Merchants Bonding Company (Mutual) _ (herci,mfter called the Surety(s), as Surety(s), are held and firmly bound unto the City of Lubbock (hereinafter called the Obligee); in the amount of One Hundred Ninety One Thousand Ninety '`'`Dollars ($ 191,090.00*_� lawful money of the United States for the payment whereof, the said Principal and Surety bind themselves, and their heirs, administrators, executors, successors and assigns, jointly and severally, firmly by these presents. 1A,'HEREAS, the Principal has entered into a certain written contract with the Obligee, dated the _lath_ day of December , 2009, to construct 12 Inch Water Line Re -Route at West Loop 289 and 19th Street and said Principal under the law is required before commencing the work provided for in said contract to execute a bond in the amount of said contract which contract is hereby referred to and made a part hereof as fully and to the same extent as if copied at length herein. NOW, THEREFORE, THE CONDITION OF THIS OBLIGATION IS SUCH, that if the said Principal shall pay all claimants supplying labor and material to him or a subcontractor in the prosecution of the work provided for in said contract, then, this obligation shall be void; otherwise to remain in full force and effect; PROVIDED, HOWEVER, that thus bond is executed pursuant to the provisions of Section 2253.021(a) of the Texas Government Code, and all liabilities on this bond shall be determined in accordance with the provisions of said Article to the same extent as if it were copied at length herein. IN WITNESS WHEREOF, the said Principal (s) and Surety (s) have signed and sealed this instrument this 28th day of December 2009. Merchants Bonding Company (Mutual) Wright Construction Co., Inc. Surety (Company Name) (Title aroly4�y Attorney -In -Fact (Printed Nai ,� "- (Tit 34 I T The undersigned surety company represents that it is duly qualified to do business in Texas, and hereby clesignates Cara D. Hancock an agent resident in Lubbock County to whom any requisite notices may be delivered and on whom, service of process may be had in matters arising out of such suretyship. Cara D. Hancock Merchants Bonding Company (Mutual) Gallagher Risk Management Services Surety Lubbock, TX 79423 * By: Attornev-In-Fact Approved as to form: City of U I3y: City Attorney * Note: If signed by an officer of the Surety Company there must be on file a certified extract from the by-laws showing that this person has authority to sign such obligation, If signed by an Attorney in Fact, we must have copy of power of attorney for our files. 35 PERFORMANCE BOND STATUTORY PERFORMANCE BOND PURSUANT TO SECTION 2253,021(a) OF THE TEXAS GOVERNMENT CODE (CONTRACTS MORE THAN $100,000) Bond no. TXC 81649 Wright Construction Co., Inc. KNOW ALL MEN BY THESE PRESENTS, that n (hereinafter called the Principal(s), as Principal(s), and _i Merchants Bonding Company (Mutual) (Lzreinafter ca led the Surety(s), as Surety(s), are held and firmly bound unto the City of Lubbock (hereinafter called the Ohligee), in the amount of One Hundred Ninety One Thousand Ninety *'Dollars ($191,090.00**) lawful iiloney of the United States for the payment whereof, the said Principal and Surety bind themselves, and their heirs, ,administrators, executors, successors and assigns, jointly and severally, firmly by these presents. WHEREAS, the Principal has entered into a certain written contract with the Obligee, dated the 16th day of December , 2009, to construct 12 Inch Water Line Re -Route at West Loop 289 and 19th Street and said principal under the law is required before commencing the work provided for in said contract to execute a bond in the amount of said contract which contract is hereby referred to and made a part hereof as fully and to the same extent as if copied at length herein. NOW, THEREFORE, THE CONDITION OF THIS OBLIGATION IS SUCH, that if the said Principal shall faithfully perform the work in accordance with the plans, specifications and contract documents, then this obligation shall be void; otherwise to retrain in full force and effect. PROVIDED, HOWEVER, that this bond is executed pursuant to the provisions of Section 2253.021(a) of the Texas Government Code, and all liabilities on this bond shall be determined in accordance with the provisions of said article to the same extent as if it were copied at length herein. IN WITNESS WHEREOF, the said Principal (s) and Surety (s) have signed and sealed this instnnnent this 28th day of December , 2009. Merchants on ing Company (Mutual) Surety * By: rney-I n-Fact 36 Wright Construction Co., Inc. (Company Name) The undersigned surety company represents that it is duly qualified to do business in Texas, and hereby designates Cara D. Hancock an agent resident in Lubbock County to whom any requisite notices may be delivered and on whom service of process may be had in matters arising out of such suretyship. Cara D. Hancock Gallagher Risk Management Services P.O. Box 53910 Lubbock, TX 79423 Merchants Bonding Company (Mutual) Surety _ 10 *By: lgnUJ./SZo$, Attorney -In -Fact Approved as to Form City of L a By:_ City Attorney * Note: If signed by an officer of the Surety Company, there must be on file a certified extract from the by-laws showing that this person has authority to sign such obligation. If signed by an Attorney in Fact, we must have copy of power of attorney for our files. 37 A POWER OF ATTORNEY Merchants Bonding Company (Mutual) Nations Bonding Company Bond No. TXC 81649 KNOW ALL PERSONS BY THESE PRESENTS: That MERCHANTS BONDING COMPANY (MUTUAL) is a corporation duly organized under the laws of the State of Iowa, and that NATIONS BONDING COMPANY is a corporation duly organized under the laws of the State of Texas (herein collectively called the "Companies"), and that the Companies do hereby make, constitute and appoint Clydene Johnson, Dustin Parker, Kathy Sells and/or Carolyn J. Scott of Grapevine and State of Texas their true and lawful Attorney -in -Fact, with full power and authority hereby conferred in their name, place and stead, to sign, execute, acknowledge and deliver in their behalf as surety any and all bonds, undertakings, recognizances or other written obligations in the nature thereof, subject to the limitation that any such instrument shall not exceed the amount of: DIVE MILLION ($59000,000.00) DOLLARS and to bind the Companies thereby as fully and to the same extent as if such bond or undertaking was signed by the duly authorized officers of the Companies, and all the acts of said Attorney -in -Fact, pursuant to the authority herein given, are hereby ratified and confirmed. This Power -of -Attorney is made and executed pursuant to and by authority of the following bylaws adopted by the Board of Directors of Merchants Bonding Company (Mutual) on November 16, 2002 and adopted by the Board of Directors of Nations Bonding Company on April 19, 2003. "The Chairman of the Board or President or any Vice President or Secretary shall have power and authority to appoint Attorneys -in -Fact, and to authorize them to execute on behalf of the Company, and attach the Seal of the Company thereto, bonds and undertakings, recognizances, contracts of indemnity and other writings obligatory in the nature thereof. The signature of any authorized officer and the Seal of the Company may be affixed by facsimile to any Power of Attorney or Certification thereof authorizing the execution and delivery of any bond, undertaking, recognizance, or other suretyship obligations of the Company, and such signature and seal when so used shall have the same force and effect as though manually fixed." In Witness Whereof, the Companies have caused this instrument to be signed and sealed this 16th day of January, 2006. . • • • . . •.0 . D r/VC.. Z:2 -o- o;Q: °'. 2003Al a; .• STATE OF IOWA •" COUNTY OF POLKss. ;moo?DRPUq •.q' c 1933 �1a MERCHANTS BONDING COMPANY (MUTUAL) NATIONS BONDING COMPANY By/'.f-7 7`7� President On this 16th day of January, 2006, before me appeared Larry Taylor, to me personally known, who being by me duly sworn did say that he is President of MERCHANTS BONDING COMPANY (MUTUAL) and NATIONS BONDING COMPANY; and that the seals affixed to the foregoing instrument are the corporate seals of the Companies; and that the said instrument was signed and sealed in behalf of the Companies by authority of their respective Boards of Directors. In Testimony Whereof, I have hereunto set my hand and affixed my Official Seal at the City of Des Moines, Iowa, the day and year first above written. �+ CINDY SMYTH. Commission Number 173604 ow. My Commission Expires STATE OF IOWA March 16, 24 Notary Public, PON County, Iowa COUNTY OF POLK ss. I, 1Nlliam Warner, Jr., Secretary of MERCHANTS BONDING COMPANY (MUTUAL) and NATIONS BONDING COMPANY, do hereby certify that the above and foregoing is a true and correct copy of the POWER -OF -ATTORNEY executed by said Companies, which is still in full force and effect and has not been amended or revoked. In Witness Whereof, I have hereunto set my hand and affixed the seal of the Companies on this 28th day of December, 2009 oAPo99� • • Q: '.� 2003 a .•,gib.. •a ;�o�vaPoq •.9• v q� ti 1933 Secretary NBC 0103 (1106) IMPORTANT NOTICE To obtain information or make a complaint: You may contact your insurance agent at the telephone number provided by your insurance agent. You may call Merchants Bonding Company's toll -free telephone number for information or to make a complaint at: 1-800-678-8171 You may contact the Texas Department of Insurance to obtain information on companies, coverages, rights ar complaints at: 1-800-252-3439 You may write the Texas Department of Insurance at: P. O. Box 149104 Austin, TX 78714-9104 Fax: (512) 475-1771 Web: http:llwww,tdi.state.tx.us E-mail: ConsumerProtection@tdi.state.tx.us PREMIUM AND CLAIM DISPUTES: Should you have a dispute concerning your premium or about a claim you should contact the agent first. If the dispute is not resolved, you may contact the Texas Department of Insurance. ATTACH THIS NOTICE TO YOUR POLICY: This notice is for information only and does not become a part or condition of the attached document. SUP 0032 TX (7107) CERTIFICATE OF INSURANCE 38 ACORDTM CERTIFICATE OF LIABILITY INSURANCE DATE(MMIDD/YYYY) 111/25/2009 PRODUCER Phone: 817-481-3529 Fax: 817-424-1404 THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION Box Insurance Agency ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE 1200 S. Main Street, Ste. 1600 HOLDER. THIS CERTIFICATE DOES NOT AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. Grapevine TX 76051 INSURERS AFFORDING COVERAGE NAIC # INSURED INSURERA:St. Paul Fire and Marine 24767 Wright Construction Co., Inc. INSURERB:Bituminous Casualty Corporate 20095__________ 601 W. Wall St. Grapevine TX 760S1 wsuRERc: INSURER D: INSURER E: COVERAGES THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES. AGGREGATE LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. INSR ADD'L! y LTR { POLICY NUMBER POLICYEFFECTIVE POLICY EXPIRATION LIMITS $ i i GENERAL LIABILITY CLP 3269008 11/29/2009 11/29/2010 EACH OCCURRENCE i $ 11 000,_000 ____ X COMMERCIAL GENERAL LIABILITY ' r —J PREMISES-(Eaoccurence $ 100_, 0.0 0 , MEDEXP(Any one person) $ 5-000_____ _$ CLAIMS MADE IX Is OCCUR 8 ADV INJURY }$ 11Q Q Q Q Q Q___ X 'Xmj i _PERSONAL GENERAL AGGREGATE $ 2, 000_000__. [X iEIFS Excluded PRODUCTS-COMP/OP AGG $ 2 O00 _OOO _ _ T I� GEN'L AGGREGATE LIMIT APPLIES PER: PRO - I POLICY X I LOC $ I AUTOMOBILE LIABILITY CAP 3534217 X ANY AUTO 11/29/2009 11/29/2010 COMBINED SINGLE LIMIT (Ea accident) 0 , 0 0 0 BODILY INJURY $ (Per person) ALLOWNEDAUTOS . ' SCHEDULEDAUTOS 1 X -_ HIREDAUTOS iX NON -OWNED AUTOS BODILY INJURY (Per accident) iI $ — --- PROPERTY DAMAGE is (Peraccident) GARAGE LIABILITY ! s AUTO ONLY -EA ACCIDENT ` $ M ANY AUTO I ----I j r i j i ( I OTHERTHANEA ACC E $ AUTOONLY: AGG $ A . EXCESSIUMBRELLA LIABILITY !QK0901831 X^ OCCUR CLAIMS MADE 11/29/2009 11/29/2010 EACHOCCURRENCE $ 10-0001 0_00__ AGGREGATE 1$ l O O O O 1.O O O-_ $ i j` II DEDUCTIBLE t X RETENTION $10,000 $ $ ! WORKERS COMPENSATION AND WC 3534216 - EMPLOYERS' LIABILITY ANY PROPRIETOR/PARTNER/EXECUTIVE s OFFICERIMEMBER EXCLUDED? Ityes,describe under ' SPECIAL PROVISIONS below 11/29/2009 ll/29/2010 X WCYTATU- 17 ER- E.L. EACH ACCIDENT $ 11.0 Q 0 , 0 0 0 E.L. DISEASE - EA EMPLOYEE E.L. DISEASE -POLICY LIMIT $ 1 0 0 0 0 0 0 OTHER i I I DESCRIPTION OF OPERATIONS I LOCATIONS I VEHICLES I EXCLUSIONS ADDED BY ENDORSEMENT SPECIAL PROVISIONS e: BID# 10-023-FO - 12 Inch Water Line Re -Route at West Loop 289 and 19th Street City of Lubbock, its officers, agents and employees are Additional Insured on a Primary/Non-contributory basis as respects General Liability (per form GL-3085 (01/06) and form GL-4503 (04/07)), Auto Liability, and Umbrella Liability if required by written contract. Waiver of Subrogation applies in favor of same as respects General Liability, Auto Liability, Umbrella Liability, and Workers' Compensation if required by written contract. LA CERTIFICATE HOLDER CANCELLATION 1, SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED City Of Lubbock BEFORE THE EXPIRATION DATE THEREOF, THE ISSUING INSURER WILL ENDEAVOR TO MAIL 30 DAYS WRITTEN NOTICE TO THE 1625 13th Street, Suite 204 CERTIFICATE HOLDER NAMED TO THE LEFT, BUT FAILURE TO DO SO Lubbock, TX 79401 SHALL IMPOSE NO OBLIGATION OR LIABILITY OF ANY KIND UPON THE INSURER, ITS AGENTS OR REPRESENTATIVES. AUTHORIZED REPRESENTATI Ta A ACORD 25 (2001108) @ A C 0 R Ut OR 1988 1111'� IMPORTANT If the certificate holder is an ADDITIONAL INSURED, the policy(ies) must be endorsed. A statement on this certificate does not confer rights to the certificate holder in lieu of such endorsement(s). If SUBROGATION IS WAIVED, subject to the terms and conditions of the policy, certain policies may require an endorsement. A statement on this certificate does not confer rights to the certificate holder in lieu of such endorsement(s). DISCLAIMER The Certificate of Insurance on the reverse side of this form does not constitute a contract between the issuing insurer(s), authorized representative or producer, and the certificate holder, nor does it affirmatively or negatively amend, extend or alter the coverage afforded by the policies listed thereon. ACORD 25 (2001/08) vn-a a s at ■vr-% I L- v1 L-1r1v11-1 1 I I114%jU M11%.0G I n1 Inc i-jmn I PRODUCER (806) 376-6301 FAX (806) 376-1449 Neely, Craig & Walton, LLP A Member of the K&S Group PO Box 506 Amarillo, TX 7910S THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS CERTIFICATE DOES NOT AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW, INSURERS AFFORDING COVERAGE NAIC # INSURED Ewing Cable, Inc. p- 0. Box 7772 Amarillo, TX 79114-7772 INSURERA: Union Insuranlce Co INSURERB: Hartford Underwriters INSURERc: Hartford Lloyds Insurance Co INSURERD: INSURER E: . r-Ce THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES. AGGREGATE LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. INSR ADD1 TYPE OF INSURANCE POLICY NUMBER POLICY EFFECTIVE POLICY EXPIRATION LIMITS GIFNERAL LIABILITY 46SBMSA4616 03/09/2009 03/09/2010 EACH OCCURRENCE $ 11000,00 DAMAGE TO RENTED $ 100,00( X COMMERCIAL GENERAL LIABILITY CLAIMS MADE FX OCCUR MED EXP (Any one person) $ S OO PERSONAL & ADV INJURY $ 1 , 00O , OO C GENERAL AGGREGATE $ 2,000,00( GENI AGGREGATE LIMIT APPLIES PER: PRODUCTS - COMPIOP AGG $ 2,000,00( PRI LOC POLICY JECT AUTOMOBILE LIABILITY X ANY AUTO CNA 4329200 10/13/2009 10/13/2010 COMBINED SINGLE LIMIT (Ea accident) $ 1,000,00 A X ALL OWNED AUTOS SCHEDULED AUTOS X HIRED AUTOS X NON -OWNED AUTOS BODILY INJURY (Per person) $ BODILY INJURY (Per accident) $ PROPERTY DAMAGE (Per accident) $ GARAGE LIABILITY AUTO ONLY - EA ACCIDENT $ OTHER THAN EA ACC AUTO ONLY: AGG $ ANY AUTO $ EXCESSIUMBRELLA LIABILITY 46SBMBA4616 03/09/2009 03/09/2010 EACH OCCURRENCE $ 5,000,00 X OCCUR CLAIMS MADE AGGREGATE $ S , 000 , OO $ DEDUCTIBLE $ RETENTION $ WORKERS COMPENSATION AND 46 WE ZH3377 10/13/2009 10/13/2010 1 WCSTATU• OTH- B EMPLOYERS' LIABILITY ANY PROPRIETORIPARTNERIEXECUTIVE OFFICER/MEMBER EXCLUDED? E.L. EACH ACCIDENT $ 19000,000 E.L DISEASE - EA EMPLOYE1 $ 1,000,000 It yes, describe under SPECIAL PROVISIONS below E.L. DISEASE, POLICY LIMIT $ 1 , 000, 00 OTHER DESCRIPTION OF OPERATIONS I LOCATIONS I VEHICLES I EXCLUSIONS ADDED BY ENDORSEMENT I SPECIAL PROVISIONS Special Provisions: Re: 12" water line The City of Lubbock is Additional Insured on a Primary / Non-contributory basis as respects General liability, Auto Liability, and Umbrella Liability if required by written contract. giver of Subrogation applies in favor of same as respects General liability, Auto Liability, Umbrella Liability, and Worker's Compensation if required by written contract. City of Lubbock 16ZS 13th St. Lubbock, TX 79401 ACORD 25 (2001108) SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EXPIRATION DATE THEREOF, THE ISSUING INSURER WILL ENDEAVOR TO MAIL 10 DAYS WRITTEN NOTICE TO THE CERTIFICATE HOLDER NAMED TO THE LEFT, BUT FAILURE TO MAIL SUCH NOTICE SHALL IMPOSE NO OBLIGATION OR LIABILITY OF ANY KIND UPON THE INSURER, ITS AGENTS OR REPREESSJENT�A%TIVEES. AUTHORIZED REPRESENTATIVE !'W )/ / i' ll+ Z Jeff Neely,III,CPCU,CIC/PKG //�/ QACORD CORPORATION 1988 IMPORTANT If the certificate holder is an ADDITIONAL INSURED, the policy(ies) must be endorsed. A statement on this certificate does not confer rights to the certificate holder in lieu of such endorsement(s). If SUBROGATION IS WAIVED, subject to the terms and conditions of the policy, certain policies may require an endorsement. A statement on this certificate does not confer rights to the certificate holder in lieu of such endorsement(s). DISCLAIMER The Certificate of Insurance on the reverse side of this form does not constitute a contract between the issuing insurer(s), authorized representative or producer, and the certificate holder, nor does it affirmatively or negatively amend, extend or alter the coverage afforded by the policies listed thereon. ACORD 25 (2001/08) 01/05/2010 10:35 8067485012 V TECH ENV PAGE 02 - DATE (MWDD/Y ACOR IM CERTIFICATE OF LIABILITY INSURANCE YYY) i1 6/20W raooucER THIS CERTIFICATE 13 ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHT8 UPON THE CERTIFICATE BENT TREE INSURANCE AGENCY INC DOES HOLDER. THIS CERTIFICATE DOES NOT AMEND, EXTEND OR P.O. Box 118394 ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. Carrollton, TX 75011 (972)466-0084 INSURERS AFFORDING COVERAGE NAICN NSURED V-Tech Envirolnmental Services INSURER A, Amw'LCAA SaletY Cssuaity Ins- CO- INSURER B Texas Mutual Ins CqM&nY 1510 Buddy Holly INSURER C; Lubbock, TX 79401 INSURER D: $06.748.1700 INSURER E: Cnypoj 0% THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REOUIRGMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR -' MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES. AGGREGATE LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. WW MePOLICY NeAo TYPE QF INSURANCE NUMBER DAL VE DATEY N LIMITS GENERAL LIABILITY X COMMERCIAL GENERAL LIABILITY CLAIMSMAOE F:wl OCCUR EACH OCCURRENCE S 2,000,000 • _ h I PR ISE6 Es rance . 1 50,000 MEDEXP(Arty aaeparson) i _ 51000 PERSONALdADVINJURY $ 2,000,000 A X Arotessional Lia.• 015799-09-03 02-17-09 03-17-10 X Pollutionl Lia* GENERAL AGGREGATE s 2,000,000 GEML AGGREGATE LIMIT APPLIES PEW PRODUCTS-COMP/OP AGO S 2,000,000 P LOC X POLICY F ji _ AUTOMOBILE LIABILITY ANVAVTO COMBINED SINGLE LIMIT (Ea oWdent) $ BODILY INJURY (Par person) $ ALL OWNED AUTOS SCHEDULED AUTOS BODILYINJURY (Paraaoldant) s HIRED AUTOS NON-0WNEDAUTOS This agency does not (provide coverage. PROPERTY DAMAGE $ (Patawagnl) GARAGE LIABILITY ANYAVTO TLis agency does not provide Coverage . AUTO ONLY - EAACCII OTHERTHAN f AUTOONLY! EXCESS/UMBRELLA LIAQILITY OCCUR C) CLAIMSMADE DEDUCTIBLE RETENTION S Thin agent dose not provide cawarage. EACH OCCURRENCE AGGREGATE WORKERSCOMPENSATIONAND EMPLOYERS LIABILITY ANY PROPRIETOA/FARFNEn/FJIECUTNE )B OFYYFICERJUEMBER EIICLUllf07 ndew SPECIALPROVISIOONSbelow SBPOOO1082788 10-24-09 10-24-10 X 'TO LIMITS E.L. EACH ACCIDENT E.L. DISEASE - EA EA E.L. DISEASE - POLIC' *Professional and Pollution Liability are claims made. 1.. CERTIFICATE HOLDER CANCELLATIp i S 00.000 SHOULD ANY OF THE ABOVE DESCRIBED POLICIES SE CANCELLED BEFORE THE EXPIRATIOIN This is a generic certificate DATE THEREOF. THE ISSUING INSURER WILL ENDEAVOR TO MAILX= DAYS WRITTEN for information purposes. . NOTICE TO THE CERTIFICATE HOLDER NAMED TO THE LEFT, BUT FAILURE TO DO90 SHALL IMPOSE NO OBLIGATION OR LIABILRY OF ANY KIND UPON THE INSURER, ITS AGENTS OR REPRESENTATIVES. AUTHORIZED REPRESENTATIVE aCxxxxxxxx LxxxxXXxxXXxxxxxxXxxxxxxn:XXXXXXXxRXRXX i ACORD25(2001/08) 0 ACORD CORPORATION 1998 ACORA CERTIFICATE OF LIABILITY INSURANCE I UA1CtMM000/YYYY) 01/OS/2010 PRODUCER 281-890-9294 FAX 281-890-2229 Southern American Insurance Agency 8203 Willow Place S. Ste S00 THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS CERTIFICATE DOES NOT AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. Houston, TX 77070 INSURERS AFFORDING COVERAGE NAIC # INSURED INSURER A: Bituminous Insurance Company Mi cki a Service Company, Inc. INSURER B: P.O. Box S S 544 INSURER C: Houston, TX 772SS INSURERD: INSURER E: COVERAGES THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES. AGGREGATE LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. INSRADD' LTR NSR TYPE OF INSURANCE POLICY NUMBER POLICY EFFECTIVE DATE MM/DD/Y POLICY EXPIRATION DATE MM/DD LIMITS GENERAL LIABILITY CLP326S423 07/20/2009 07/20/2010 EACH OCCURRENCE $ 1,000,00 DAMAGETORENTED PREMISES Ea occurrence $ 300, 00 X COMMERCIAL GENERAL LIABILITY CLAIMS MADE � OCCUR MED EXP (Any one person) $ S,00 A X Blanket Add' l Insd PERSONAL & ADV INJURY $ 1,000,00 X Bl anket WOS GENERAL AGGREGATE $ 2,000,00 KEN'L AGGREGATE LIMIT APPLIES PER: PRODUCTS - COMP/OP AGG $ 2,000,00( POLICY X PRO -LOG JECT AUTOMOBILE LIABILITY ANY AUTO CAP3 S 3140S 07/20/2009 07/20/2010 COMBINED SINGLE LIMIT (Ea accident) $ 1,000,00( X BODILY INJURY (Per person) $ A ALL OWNED AUTOS SCHEDULED AUTOS HIRED AUTOS NON -OWNED AUTOS X X BODILY INJURY (Per accident) $ Blanket Add'l Insd X PROPERTY DAMAGE (Per accident) $ X I Bl an ket WOS GARAGE LIABILITY AUTO ONLY - EA ACCIDENT $ OTHER THAN EA ACC AUTO ONLY: AGG $_ ANY AUTO $ EXCESS/UMBRELLA LIABILITY CUP2S8SS60 07/20/2009 07/20/2010 EACH OCCURRENCE $ 2,000,00 X OCCUR CLAIMS MADE AGGREGATE $ 2,000,00( $ A $ DEDUCTIBLE X RETENTION $ 10 , 00 $ A WORKERS COMPENSATION AND EMPLOYERS' LIABILITY ANY PROPRIETOR/PARTNER/EXECUTIVEa OFFICERIMEMBER EXCLUDED? (Mandatory in NH) It yes, describe under SPECIAL PROVISIONS below WC3S31404 07/20/2009 07/20/2010 X I TORYLIMITS I I ER E.L. EACH ACCIDENT -- $ 1,000,000 E.L. DISEASE - EA EMPLOYEE, $ 1,000,000 E.L. DISEASE - POLICY LIMIT 1 $ 1,000,00 A OTHER 'Equipment Floater CLP3265423 07/20/2009 07/20/2010 Rented/Leased Equipment Per Item - $100,000 Per Loss - $200,000 rDESCRIPTION OF OPERATIONS / LOCATIONS / VEHICLES / EXCLUSIONS ADDED BY ENDORSEMENT I SPECIAL PROVISIONS E: 12" Water Line Re -Route Wright Construction Co, Inc. and City of Lubbock are additional insured on GL & Auto with waiver of subrogation on all policies when required by written contract. Insurance is primary & non-contrubutory s respects insureds operations. 30 days notice of cancellation, except 10 days for non-payment. ub'ect to policy terms conditions limitations & exclusions. 1: CERTIFICATE HOLDER CANCELLATION SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EXPIRATIO DATE THEREOF, THE ISSUING INSURER WILL ENDEAVOR TO MAIL 30 DAYS WRITTEN t NOTICE TO THE CERTIFICATE HOLDER NAMED TO THE LEFT, BUT FAILURE TO DO SO SHALL IMPOSE NO OBLIGATION OR LIABILITY OF ANY KIND UPON THE INSURER, ITS AGENTS OR Wright Construction Co, Inc. REPRESENTATIVES. 1611 13th Street AUTHORIZED REPRESENTATIVE Lu bock, TX 79401 G.a i%�iisvec Southern American Ins. A c , =ACORD 25 (2009/01) 01988-2009 ACORD CORPORATION. All rights reserved. The ACORD name and logo are registered marks of ACORD IMPORTANT If the certificate holder is an ADDITIONAL INSURED, the policy(ies) must be endorsed. A statement on this certificate does not confer rights to the certificate holder in lieu of such endorsement(s). If SUBROGATION IS WAIVED, subject to the terms and conditions of the policy, certain policies may require an endorsement. A statement on this certificate does not confer rights to the certificate holder in lieu of such endorsement(s). DISCLAIMER This Certificate of Insurance does not constitute a contract between the issuing insurer(s), authorized representative or producer, and the certificate holder, nor does it affirmatively or negatively amend, extend or alter the coverage afforded by the policies listed thereon. CITY OF LUBBOCK INSURANCE REQUIREMENT AFFIDAVIT To Be Completed by Bidder and Agent Must be submitted with Bid I, the undersigned Bidder, certify that the insurance requirements contained in this bid document have been reviewed by me with the below identified Insurance Agent/Broker. If I am awarded this contract by the City of Lubbock, I will be able to, within ten (10) business days after being notified of such award by the City of Lubbock, furnish a valid insurance certificate to the City meeting all of the requirements defined in this bid. Contractor (Original Signature) Contractor (Print) CONTRACTOR'S FIRM NAME: (Print or Type) CONTRACTOR'S FIRM ADDRESS: Name of Agent/Broker: Agent / Broker (Signature) Address of Agent/Broker: City/State/Zip: Agent/Broker Telephone Number: ( Date: NOTE TO CONTRACTOR If the time requirement specified above is not met, the City has the right to reject this bid and award the contract to another contractor. If you have any questions concerning these requirements, please contact the Purchasing and Contract Management Officer for the City of Lubbock at (806) 775-2163. BID # 10-023-FO -12 Inch Water Line Re -Route at West Loop 289 and 19th Street CONTRACTOR CHECKLIST A CONTRACTOR SHALL: (1) provide coverage for its employees providing services on a project, for the duration of the project based on proper reporting of classification codes and payroll amounts and filling of any coverage agreements; (2) provide a certificate of coverage showing workers' compensation coverage to the governmental entity prior to beginning work on the project; (3) provide the governmental entity, prior to the end of the coverage period, a new certificate of coverage showing extension of coverage, if the coverage period shown on the contractor's current certificate of coverage ends during the duration of the project; (4) obtain from each person providing services on a project, and provide to the governmental entity: (A) a certificate of coverage, prior to that person beginning work on the project, so the governmental entity will have on file certificates of coverage showing coverage for all persons providing services on the project; and (B) no later than seven days after receipt by the contractor, a new certificate of coverage showing extension of coverage, if the coverage period shown on the current certificate of coverage ends during the duration of the project; (5) retain all required certificates of coverage on file for the duration of the project and for one year thereafter; (6) notify the governmental entity in writing by certified mail or personal delivery, within ten (10) days after the contractor knew or should have known, of any change that materially affects the provision of coverage of any person providing services on the project; (7) post a notice on each project site informing all persons providing services on the project that they are required to be covered, and stating how a person may verify current coverage and report failure to provide coverage. This notice does not satisfy other posting requirements imposed by the Act or other commission rules. This notice must be printed in at least 19-point normal type, and shall be in both English and Spanish and any other language common to the worker population. The text for the notices shall be the following text provided by the commission on the sample notice, without any additional words or changes: PROOF OF COVERAGE SHALL BE FURNISHED TO THE CITY OF LUBBOCK IN THE FORM OF A CERTIFICATE OF INSURANCE. THE INSURANCE CERTIFICATES FURNISHED SHALL NAME THE CITY OF LUBBOCK AS A PRIMARY ADDITIONAL INSURED AND PROVIDE A WAIVER OF SUBROGATION IN FAVOR OF THE CITY OF LUBBOCK, OR IN THE ALTERNATIVE, SHALL BE ACCOMPANIED BY A STATEMENT FROM THE CONTRACTOR TO THE EFFECT THAT NO WORK ON THIS PARTICULAR PROJECT SHALL BE SUBCONTRACTED. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO PROVIDE TO THE OWNER ALL PROOF OF COVERAGE INSURANCE DOCUMENTS INCLUDING WORKERS COMPENSATION COVERAGE FOR EACH SUBCONTRACTOR 40 No Text REQUIRED WORKERS' COMPENSATION COVERAGE "The law requires that each person working on this site or providing services related to this construction project must (see reverse) be covered by workers' compensation insurance. This includes persons providing, hauling, or delivering equipment and materials, or providing labor or transportation or other service related to the project, regardless of the identity of their employer or status as an employee." "Call the Texas Workers' Compensation Commission at 512-305-7238 to receive information on the legal requirement for coverage, to verify whether your employer has provided the required coverage, or to report an employer's failure to provide coverage." and (8) contractually require each person with whom it contracts to provide services on a project, to: (A) provide coverage based on proper reporting of classification codes and payroll amounts and filing of any coverage agreements for all of its employees providing services on the project, for the duration of the project; (B) provide a certificate of coverage to the contractor prior to that person beginning work on the project; (C) include in all contracts to provide services on the project the language in subsection (e) (3) of this rule; (D) provide the contractor, prior to the end of the coverage period, a new certificate of coverage showing extension of coverage, if the coverage period shown on the current certificate of coverage ends during the duration of the project; (E) obtain from each other person with whom it contracts, and provide to the contractor: (i) a certificate of coverage, prior to the other person beginning work on the project; and (ii) prior to the end of the coverage period, a new certificate of coverage showing extension of the coverage period, if the coverage period shown on the current certificate of coverage ends during the duration of the project; (F) retain all required certificates of coverage on file for the duration of the project and for one year thereafter; (G) notify the governmental entity in writing by certified mail or personal delivery, within (ten) 10 days after the person knew or should have known, of any change that materially affects the provision of coverage of any person providing services on the project; and (H) contractually require each other person with whom it contracts, to perform as required by paragraphs (A) - (H), with the certificate of coverage to be provided to the person for whom they are providing services. 41 I I -1 CONTRACT 42 I' CONTRACT 9301 STATE OF TEXAS COUNTY OF LUBBOCK THIS AGREEMENT, made and entered into this 16th day of December, 2009, by and between the City of Lubbock, County of Lubbock, State of Texas, acting by and through the Mayor, City of Lubbock, thereunto authorized to do so, hereinafter referred to as OWNER, and Wright Construction Company of the City of Grapevine, County of - - Tarrant and the State of Texas hereinafter termed CONTRACTOR. WITNESSETH: That for and in consideration of the payments and agreements hereinafter mentioned, to be made and performed by the OWNER and under the conditions expressed in the bond bearing even date herewith (if any) the CONTRACTOR hereby agrees with OWNER to commence and complete the construction of certain improvements described as follows: BID 10-023-FO -12 Inch Water Line Re -Route at West Loop 289 and 19th Street and all extra work in connection therewith, under the terms as stated in the contract documents and at his (or their) own proper cost and expense to furnish all materials, supplies, machinery, equipment, tools, superintendence, labor, insurance and other accessories and services necessary to complete the said construction in accordance with the contract documents as defined in the General Conditions of Agreement. Wright Construction Company's bid dated December 1, 2009 is incorporated into and made a part of this agreement. The CONTRACTOR hereby agrees to commence work within ten days after the date written notice to do so shall have been given to him and to substantially complete same within the time specified in the contract documents. The OWNER agrees to pay the CONTRACTOR in current funds for the performance of the contract in accordance with the bid submitted therefore, subject to additions and deductions, as provided in the contract documents and to make payment on account thereof as provided therein. IN WITNESS WHEREOF, the parties to these presents have executed this agreement in Lubbock, Lubbock County, Texas in the year and day first above written. CONTRACTOR: Company W 1Z,y6%A-, C e ra J'T, C .3 100, . Address Cop 1 V . %VJ& L,.. S1' City, State, Zip &g A p 4 J S N iz `T x. 7 C. o f ATTEST: ;r Corporate Secretary CITY OF LUBBOCK, TEXAS OWNER): By: MA ATTEST: City Secretary ]� APP OVED AS T CONTENT: v a� Owner's epr entative Director APP AS TO FORM: City Attorney No Text RESOLUTIONS ADOPTED BY UNANIMOUS WRITTEN CONSENT OF THE BOARD OF DIRECTORS OF WRIGHT CONSTRUCTION CO., INC. Pursuant to the provisions of Article 410(B) of the Texas Business Corporation Act, the undersigned, being all of the Directors of Wright Construction Co., Inc., a Texas Corporation, (the "Corporation"), in lieu of a special meeting of the Directors, do hereby consent and agree to the adoption of the following resolutions: AUTHORIZATION TO EXECUTE CONSTRUCTION CONTRACTS WHEREAS, the Board of Directors have determined that, in order to facilitate the orderly and efficient manner in which the Corporation must do business and it being in the best interest of the Corporation to take such action, additional persons must be authorized to bind the Corporation to the rights and obligations of Construction Contracts when the President and Vice -President of the Company are not available; it is, therefore RESOLVED, that for one (1) year from the execution of this Unanimous Consent, Brad Miller, so long as he is employed by the Corporation, is authorized to execute Construction Contracts on behalf of the Corporation which bind the Corporation to the rights and obligations of such Construction Contracts up to the amount of $10,000,000.00 per Construction Contract. WAIVER OF NOTICE AND CONSENT WHEREAS, Pursuant to 9.1 OB of the Texas Business Corporation Act and Article III of the By -Laws provide that action may be taken without a meeting if a consent is signed by all board members and that regular meetings may be held without call and that notice of the time and place of the meeting may be waived; it is RESOLVED, that the Directors, by their signatures affixed to these Minutes of the Annual Meeting of Board of Directors, do hereby waive notice of the time and place of meeting, consent to the holding of the meeting, approve of the contents of the minutes, and direct that the original of the minutes be filed in the minute book of the Corporation. Unanimous Consent of the Board of Directors in lieu of a Special Meeting I 1 Date: Q' ac) Oni Date: ' ( ')u -UC Unanimous Consent of the Board of Directors in lieu of a Special Meeting 2 I GENERAL CONDITIONS OF THE AGREEMENT 45 Page Intentionally Left Blank 46 GENERAL CONDITIONS OF THE AGREEMENT 1. OWNER Whenever the word Owner, or First Party, are used in this contract, it shall be understood as referring to the City of Lubbock, Texas. 2. CONTRACTOR Whenever the word Contractor, or Second Party, is used, it shall be understood to mean the person, persons, co- partnership or corporation, to wit who has agreed to perform the work embraced in this contract, or their legal representative. OWNER'S REPRESENTATIVE Whenever the word Owner's Representative or representative is used in this contract, it shall be understood as referring to, City of Lubbock, or its representative Wood Franklin, Chief Engineer, so designated who shall inspect constructions; or to such other representatives, supervisors, architects, engineers, or inspectors as may be authorized by said Owner to act in any particular under this agreement. Engineers, supervisors or inspectors shall act for the Owner under the direction of Owner's Representative, but shall not directly supervise the Contractor or persons acting on behalf of the Contractor. 4. CONTRACT DOCUMENTS The contract's documents shall consist of the Notice to Bidders, General Instructions to Bidders, Bid, Signed Agreement, Statutory Bonds (if required), General Conditions of the Agreement, Special Conditions of the Agreement (if any), Specifications, Plans, Insurance Certificates, and all other documents made available to Bidder for inspection in accordance with the Notice to Bidders. The above described materials are sometimes referred to herein as the "contract" or "contract documents". 5. INTERPRETATION OF PHRASES Whenever the words "Directed," "Permitted," "Designated," "Required," "Considered Necessary," "Prescribed," or words of like import are used, it shall be understood that the direction, requirement, permission, order, designation or prescription of the Owner's Representative is intended; and similarly, the words "Approved," "Acceptable," "Satisfactory," or words of like import shall mean approved by or acceptable or satisfactory to the Owner's Representative. SUBCONTRACTOR The term Subcontractor, as employed herein, includes only those having a direct contract with the Contractor for performance of work on the project contemplated by these contract documents. Owner shall have no responsibility to any Subcontractor employed by Contractor for performance of work on the project contemplated by these contract documents, but said Subcontractors shall look exclusively to Contractor for any payments due Subcontractor. The City reserves the right to approve or disapprove the selection of any subcontractor(s). WRITTEN NOTICE Written notice shall be deemed to have been duly served if delivered in person to the individual or to a member of the firm or to an officer of the corporation for whom it is intended, or if delivered at or sent certified mail to the last business address known to the party who gives the notice. 47 8. CONTRACTOR'S RESPONSIBILITIES i Unless otherwise stipulated, the Contractor shall provide and pay for all materials, supplies, machinery, equipment, tools, superintendence, labor, insurance, and all water, light, power, fuel, transportation and all other facilities necessary for the execution and completion of the work covered by the contract documents. Unless otherwise specified, all materials shall be new and both workmanship and materials shall be of a good quality. The Contractor shall, if required, furnish satisfactory evidence as to the kind and quality of materials. Materials or work described in words which so applied have well known, technical or trade meaning shall be held to refer such recognized standards. All work shall be done and all materials furnished in strict conformity with the contract documents. 9. SUBSTANTIALLY COMPLETED The term "Substantially Completed" is meant that the structure or project contemplated by the contract documents has been made suitable for use or occupancy or the facility is in a condition to serve its intended purpose, but still may require minor miscellaneous work and adjustment. 10. LAYOUT Except as specifically provided herein, the Contractor shall be responsible for laying out all work and shall accomplish this work in a manner acceptable to the Owner's Representative. The Owner's Representative shall check the Contractor's layout of all major structures and any other layout work done by the Contractor at Contractor's request, but this check does not relieve the Contractor of the responsibility of correctly locating all work in accordance with the Plans and Specifications. 1 1. KEEPING OF PLANS AND SPECIFICATIONS ACCESSIBLE The Contractor shall be furnished copies of all Plans and Specifications without expense to Contractor and Contractor shall keep one copy of same consistently accessible on the job site. 12. RIGHT OF ENTRY 11 The Owner's Representative may make periodic visits to the site to observe the progress or quality of the executed work and to determine, in general, if the work is proceeding in accordance with the contract documents. Owner's Representative shall not be required to make exhaustive or continuous onsite inspections to check the quality or quantity of the work, nor shall Owner's Representative be responsible for the construction means, methods, techniques, sequences or procedures, or the safety precautions incident thereto. Notwithstanding the Owner's Representative's rights of entry hereunder, the Owner's Representative shall not be responsible for the Contractor's failure to perform the work in accordance with the Contract Documents. 13. LINES AND GRADES All lines and grades shall be furnished whenever Owner's Representative deems said lines and grades are necessary for the commencement of the work contemplated by these contract documents or the completion of the work contemplated by these contract documents. Whenever necessary, Contractor shall suspend its work in order to permit Owner's Representative to comply with this requirement, but such suspension shall be as brief as practical and Contractor shall be allowed no extra compensation therefore. The Contractor shall give the Owner's Representative ample notice of the time and place where lines and grades are needed. All stakes, marks, etc., shall be carefully preserved by the Contractor, and in case of careless destruction or removal by Contractor, its Subcontractors, or its employees, such stakes, marks, etc., shall be replaced by the Owner's Representative at Contractor's expense. 48 f _m 14. OWNER'S REPRESENTATIVE'S AUTHORITY AND DUTY Unless otherwise specified, it is mutually agreed between the parties to this Agreement that the Owner's Representative has the authority to review all work included herein. The Owner's Representative has the authority to stop the work whenever such stoppage may be necessary to ensure the proper execution of the contract. The Owner's Representative shall, in all cases, determine the amounts and quantities of the several kinds of work which are to be paid for under the contract documents, and shall determine all questions in relation to said work and the construction thereof, and shall, in all cases, decide every question which may arise relative to the execution of this contract on the part of said Contractor. The decision of the Owner's Representative shall be conclusive in the absence of written objection to same delivered to Owner's Representative within fifteen (15) calendar days of any decision or direction by Owner's Representative. In the absence of timely written objection by Contractor, as provided herein, any and all objection or objections shall be deemed waived. 15. SUPERINTENDENCE AND INSPECTION It is agreed by the Contractor that the Owner's Representative shall be and is hereby authorized to appoint from time to time such subordinate engineers, supervisors, or inspectors as the said Owner's Representative may deem proper to inspect the materials furnished and the work done under this Agreement, and to see that said material is furnished and said work is done in accordance with the specifications therefore. The Contractor shall furnish all reasonable aid and assistance required by the subordinate engineers, supervisors or inspectors for the proper inspection and examination of the work. The Contractor shall regard and obey the directions and instructions of any subordinate engineers, supervisors or inspectors so appointed, when such directions and instructions are consistent with the obligations of this Agreement and accompanying plans and specifications provided, however, should the Contractor object to any orders by any subordinate engineer, supervisor or inspector, the Contractor may within fifteen (15) calendar days make written appeal to the Owner's Representative for its decision. In the absence of timely written objection by Contractor, as provided herein, any and all objection or objections shall be deemed waived. 16. CONTRACTOR'S DUTY AND SUPERINTENDENCE The Contractor shall give personal attention to the faithful prosecution and completion of this contract and shall keep on the work, during its progress, a competent superintendent and any necessary assistants, all satisfactory to Owner's Representative. The superintendent shall represent the Contractor in its absence and all directions given to superintendent shall be binding as if given to the Contractor. It is expressly agreed that adequate supervision by competent and reasonable representatives of the Contractor is essential to the proper performance of the work and lack of such supervision shall be grounds for suspending operations of the Contractor. The work, from its commencement to completion, shall be under the exclusive charge and control of the Contractor and all risk in connection therewith shall be borne by the Contractor. The Owner or Owner's Representatives shall not be responsible for the acts or omissions of the Contractor, or any subcontractors, or any of Contractor's agents or employees, or any other persons performing any of the work. 17. CONTRACTOR'S UNDERSTANDING It is understood and agreed that the Contractor has, by careful examination, satisfied itself as to the nature and location of the work, the confirmation of the ground, the character, quality and quantity of materials to be encountered, the character of equipment and facilities needed preliminary to and during the prosecution of the work, and the general and local conditions, and all other matters which in any way affect the work under the contract documents. No oral agreement or conversation with any officer, agent, or employee of the Owner, or Owner's Representative either before or after the execution of this contract, shall affect or modify any of the terms or obligations herein contained. Subject to the rights of Owner as set forth in Paragraph 23 hereof, all modifications and/or amendments to the contract documents, shall be in writing, and executed by Owner's Representative and Contractor. 49 Unless otherwise specified herein, all loss, expense or damage to Contractor arising out of the nature of the work to be done, or from the action of the elements, or from any unforeseen circumstance and the prosecution of the work, shall be sustained and borne by the Contractor at its own cost and expense. 18. CHARACTER OF WORKERS The Contractor agrees to employ only orderly and competent workers, skillful in the performance in the type of work required under this contract, to do the work; and agrees that whenever the Owner's Representative shall inform Contractor in writing that any man or men on the work, are, in Owner's Representative's sole opinion, incompetent, unfaithful, disorderly, or otherwise unacceptable to Owner or Owner's Representative, such man or men shall be discharged from the work and shall not again be employed on the work without the Owner's Representative's written consent. 19. CONSTRUCTION PLANT The Contractor shall provide all labor, tools, equipment, machinery and materials necessary in the prosecution and completion of this contract where it is not otherwise specifically provided that Owner shall furnish same, and it is also understood that Owner shall not be held responsible for the care, preservation, conservation, or protection of any materials, tools, equipment or machinery or any part of the work until it is finally completed and accepted. The building of structures for the housing of men or equipment are permitted only at such places as the Owner's Representative shall consent or direct, and the sanitary conditions of the grounds in or about such structure shall at all times be maintained in a manner satisfactory to the Owner's Representative. 20. SANITATION Necessary sanitary conveniences for the use of laborers on the work site, properly secluded from public observation, shall be constructed and maintained by the Contractor in such manner and at such points as shall be approved by the Owner's Representative and their use shall be strictly enforced. 21. OBSERVATION AND TESTING The Owner or Owner's Representative shall have the right at all times to observe and test the work. Contractor shall make necessary arrangements and provide proper facilities and access for such observation and testing at any location wherever such work is in preparation or progress. Contractor shall ascertain the scope of any observation that may be contemplated by Owner or Owner's Representative and shall give ample notice as to the time each part of the work shall be ready for such observation. Owner or Owner's Representative may reject any such work found to be defective or not in accordance with the contract documents, regardless of the stage of its completion or the time or place of discovery of such errors and regardless of whether Owner's Representative has previously accepted the work through oversight or otherwise. If any such work should be covered without approval or consent of the Owner, it must, if requested by Owner or Owner's Representative, be uncovered for examination at Contractor's expense. In the event that any part of the work is being fabricated or manufactured at a location where it is not convenient for Owner or Owner's Representative to make observations of such work or require testing of said work, then in such event Owner or Owner's Representative may require Contractor to furnish Owner or Owner's Representative certificates of inspection, testing or approval made by persons competent to perform such tasks at the location where that part of the work is being manufactured or fabricated. All such tests shall be in accordance with the methods prescribed by the American Society for Testing and Materials or such other applicable organization as may be required by law or the contract documents. If any such work which is required to be inspected, tested, or approved is covered up without written approval or consent of the Owner or Owner's Representative, it must, if requested by the Owner or Owner's Representative, be uncovered for observation and testing at the Contractor's expense. The cost of all such inspections, tests and approvals shall be borne by the Contractor unless otherwise provided herein. Any work which fails to meet the requirements of any such tests, inspections or approvals, and any work which meets the requirements of any such t 50 tests or approvals but does not meet the requirements of the contract documents shall be considered defective, and shall be corrected at the Contractor's expense. Neither observations by the Owner or Owner's Representative, nor inspections, tests, or approvals made by Owner, Owner's Representative, or other persons authorized under the contract documents to make such inspections, tests, or approvals shall relieve the Contractor from its obligation to perform the work in accordance with the requirements of the contract documents. 22. DEFECTS AND THEIR REMEDIES It is expressly agreed that if the work or any part thereof, or any material brought on the site of the work for use in the work or selected for the same, shall be deemed by the Owner or Owner's Representative as unsuitable or not in conformity with plans, specifications and/or contract documents, the Contractor shall, after receipt of written notice thereof from the Owner's Representative, forthwith remove such material and rebuild or otherwise remedy Eli such work so that it shall be in full accordance with the contract documents. It is further agreed that any remedial action contemplated as hereinabove set forth shall be at Contractor's expense. 23. CHANGES AND ALTERATIONS The Contractor further agrees that the Owner may make such changes and alterations as the Owner may see fit, in the line, grade, form dimensions, plans or materials for the work herein contemplated, or any part thereof, either } before or after the beginning of the construction, without affecting the validity of this contract and the accompanying bond. If such changes or alterations diminish the quantity of the work to be done, they shall not constitute the basis for a claim for damages, or anticipated profits on the work that may be dispensed with. If they increase the amount of work, and the increased work can fairly be classified under the specifications, such increase shall be paid according to the quantity actually done and at the unit price established for such work under this contract; otherwise such additional work shall be paid for as provided under Extra Work. In case the Owner shall make such changes or alterations as shall make useless any work already done or material already furnished or used in said work, then the Owner shall recompense the Contractor for any material or labor so used, and for actual expenses incurred in preparation for the work as originally planned. 24. EXTRA WORK The term "extra work" as used in this contract shall be understood to mean and include all work that may be required by the Owner or Owner's Representative to be done by the Contractor to accomplish any change, alteration or addition to the work as shown on the plans and specifications or contract documents and not covered by Contractor's bid, except as provided under Changes and Alterations herein. It is agreed that the Contractor shall perform all extra work under the direction of the Owner's Representative when presented with a written work order signed by the Owner's Representative; subject, however, to the right of the Contractor to require written confirmation of such extra work order by the Owner. It is also agreed that the compensation to be paid to the Contractor for performing said extra work shall be determined by the following methods: Method (A) - By agreed unit prices; or Method (B) - By agreed lump sum; or Method (C) - If neither Method (A) or Method (B) be agreed upon before the extra work is commenced, then the Contractor shall be paid the lesser of the following: (1) actual field cost of the extra work, plus fifteen (15%) percent; or (2) the amount that would have been charged by a reasonable and prudent Contractor as a reasonable and necessary cost for performance of the extra work. 51 In the event said extra work be performed and paid for under Method (C)(1), then the provisions of this paragraph shall apply and the "actual field cost" is hereby defined to include the cost of all workmen, such as foremen, timekeepers, mechanics and laborers, materials, supplies, teams, trucks, rentals on machinery and equipment, for the time actually employed or used on such extra work, plus actual transportation charges necessarily incurred, together with all expenses incurred directly on account of such extra work, including Social Security, Old Age Benefits, Maintenance Bonds, Public Liability and Property Damage and Workers' Compensation and all other insurances as may be required by law or ordinances or directed by the Owner or Owner's Representative, or by__, them agreed to. Owner's Representative may direct the form in which accounts of the actual field cost shall be kept and records of these accounts shall be made available to the Owner's Representative. The Owner's 1 Representative may also specify in writing, before the work commences, the method of doing the work and the type and kind of machinery and equipment to be used; otherwise, these matters shall be determined by the Contractor. Unless otherwise agreed upon, the prices for the use of machinery and equipment shall be determined 1 by using 100%, unless otherwise specified, of the latest Schedule of Equipment and Ownership Expenses adopted by the Associated General Contractors of America. Where practical, the terms and prices for the use of machinery and equipment shall be incorporated in the written extra work order. The fifteen percent (15%) of the actual field cost to be paid to Contractor shall cover and compensate Contractor for its profit, overhead, general superintendence and field office expense, and all other elements of cost and expense not embraced within the actual field cost as herein defined, save that where the Contractor's Camp or Field Office must be maintained primarily on account of such Extra Work, then the cost to maintain and operate the same shall be included in the "actual field cost." No claim for extra work of any kind shall be allowed unless ordered in writing by Owner's Representative. In case any orders or instructions appear to the Contractor to involve extra work for which Contractor should receive compensation or an adjustment in the construction time, Contractor shall prior to commencement of such extra work, make written request to the Owner's Representative for a written order authorizing such extra work. Should a difference of opinion arise as to what does or does not constitute extra work or as to the payment therefore, and the Owner's Representative insists upon its performance, the Contractor shall proceed with the work after making written request for written order and shall keep adequate and accurate account of the actual field cost thereof, as provided under Method (C) (1). If Contractor does not notify Owner's Representative before the commencement of any extra work, any claim for payment due to alleged extra work shall be deemed waived. 25. DISCREPANCIES AND OMISSIONS It is further agreed that it is the intent of the contract documents that all work described in the bid, the specifications, plans and other contract documents, is to be done for the prices quoted by the Contractor and that such price shall include all appurtenances necessary to complete the work in accordance with the intent of these contract documents as interpreted by Owner's Representative. Notices of any discrepancies or omissions in these plans, specifications, or contract documents, shall be given to the Owners' Representative and a clarification obtained before the bids are received, and if no such notice is received by the Owner's Representative prior to the opening of bids, then it shall be deemed that the Contractor fully understands the work to be included and has provided sufficient sums in its bid to complete the work in accordance with these plans and specifications. If Contractor does not notify Owner's Representative before bidding of any discrepancies or omissions, then it shall be deemed for all purposes that the plans and specifications are sufficient and adequate for completion of the project. It is further agreed that any request for clarification must be submitted no later than five (5) calendar days prior to the opening of bids. 26. RIGHT OF OWNER TO MODIFY METHODS AND EQUIPMENT If at any time the methods or equipment used by the Contractor are found to be inadequate to secure the quality of work with the rate of progress required under this contract, the Owner or Owner's Representative may order the Contractor in writing to increase their safety or improve their character and efficiency and the Contractor shall i comply with such order. If, at any time, the working force of the Contractor is inadequate for securing the progress herein specified, the Contractor shall, if so ordered in writing, increase its force or equipment, or both, to such an extent as to give reasonable assurance of compliance with the schedule of progress. f ; 52 27. PROTECTION AGAINST ACCIDENT TO EMPLOYEES AND THE PUBLIC AND GENERAL INDEMNITY The Contractor shall take out and procure a policy or policies of Workers' Compensation Insurance with an insurance company licensed to transact business in the State of Texas, which policy shall comply with the Workers' Compensation laws of the State of Texas. The Contractor shall at all times exercise reasonable precaution for the safety of employees and others on or near the work and shall comply with all applicable provisions of federal, state and municipal laws and building and construction codes. All machinery and equipment and other physical hazards shall be guarded in accordance with the "Manual of Accident Prevention in Construction" of Associated General Contractors of America, except where incompatible with federal, state or municipal laws or regulations. The Contractor, its sureties and insurance carriers shall defend, indemnify and hold harmless the Owner and all of its officers, agents and employees against any all losses, costs, damages, expenses, liabilities, claims and/or causes of action, whether known or unknown, fixed, actual, accrued or contingent, liquidated or unliquidated, including, but not limited to, attorneys' fees and expenses, in connection with, incident to, related to, or arising out of, the Contractor's or any subcontractor's, agent's or employee's, in any manner whatsoever, omission, execution and/or supervision of this contract, and the project which is the subject matter of this contract. The safety precautions taken shall be the sole responsibility of the Contractor, in its sole discretion as an Independent Contractor; inclusion of this paragraph in the Agreement, as well as any notice which may be given by the Owners or the Owner's Representative concerning omissions under this paragraph as the work progresses, are intended as reminders to the Contractor of its duty and shall not be construed as any assumption of duty to supervise safety precautions by either the Contractor or any of its subcontractors. 28. CONTRACTOR'S INSURANCE The Contractor shall not commence work under this contract until he has obtained all insurance as required in the General Conditions of the contract documents, from an underwriter authorized to do business in the State of Texas and satisfactory to the City. Proof of coverage shall be furnished to the City and written notice of cancellation or any material change shall be provided ten (10) calendar days in advance of cancellation or change. All policies of insurance, required herein, including policies of insurance required to be provided by Contractor and its subcontractors, shall contain a waiver of any and all of the insurer's or payor's, in the event of self- insurance, rights to subrogation that any such insurer or payor, in the event of self-insurance, may acquire by virtue of payment of any loss under such insurance or self-insurance. All certificates of insurance submitted to the City in conformity with the provisions hereof shall establish such waiver. The Contractor shall procure and carry at its sole cost and expense through the life of this contract, insurance protection as hereinafter specified. Coverage in excess of that specified herein also shall be acceptable. Such insurance shall be carried with an insurance company authorized to transact business in the State of Texas and shall cover all operations in connection with this contract, whether performed by the Contractor or a subcontractor, or separate policies shall be provided covering the operation of each subcontractor. A certificate of insurance specifying each and all coverages shall be submitted prior to contract execution. PROOF OF COVERAGE SHALL BE FURNISHED TO THE CITY OF LUBBOCK IN THE FORM OF A CERTIFICATE OF INSURANCE ALONG WITH A COPY OF THE ADDITIONAL INSURED ENDORSEMENT. THE INSURANCE CERTIFICATES FURNISHED SHALL NAME THE CITY OF LUBBOCK AS A PRIMARY ADDITIONAL INSURED AND PROVIDE A WAIVER OF SUBROGATION IN FAVOR OF THE CITY OF LUBBOCK AS REQUIRED BELOW, OR IN THE ALTERNATIVE, SHALL BE ACCOMPANIED BY A STATEMENT FROM THE CONTRACTOR TO THE EFFECT THAT NO WORK ON THIS PARTICULAR PROJECT SHALL BE SUBCONTRACTED. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO PROVIDE TO THE OWNER ALL PROOF OF COVERAGE INSURANCE DOCUMENTS INCLUDING WORKERS COMPENSATION COVERAGE FOR EACH SUBCONTRACTOR ADDITIONAL INSURED SHALL INCLUDE COMPLETED OPERATIONS FOR THREE YEARS. 53 �-1 1 W B. C. D. E. F. Commercial General Liability Insurance (Primary Additional Insured and Waiver of Subrogation required) The contractor shall have Comprehensive General Liability Insurance with limits of $1,000.000 Combined Single Limit in the aggregate and per occurrence to include: Products & Completed Operations Hazard Contractual Liability Heavy Equipment PRODUCTS/COMP/OP MUST BE INCLUDED IN ADDITIONAL INSURED ENDORSEMENT Owner's and Contractor's Protective Liability Insurance. NOT REQUIRED Comprehensive Automobile Liability Insurance (Waiver of Subrogation Required) The Contractor shall have Comprehensive Automobile Liability Insurance with limits of not less than;^� Bodily Injury/Property Damage, $1,000,000 Combined Single Limit, to include all owned and J non -owned cars including: Employers Non -ownership Liability Hired and Non -owned Vehicles. 1 Builder's Risk Insurance/Installation Floater Insurance. NOT REQUIRED { Umbrella Liability Insurance NOT REQUIRED Worker's Compensation and Employers Liability Insurance (Waiver of Subrogation required) Worker's Compensation Insurance covering all employees whether employed by the Contractor or any Subcontractor on the job with Employers Liability of at least $500,000 Definitions: r Certificate of coverage ("certificate") - A copy of a certificate of insurance, a certificate of u authority to self -insure issued by the commission, or a coverage agreement (TWCC-81, TWCC- 82, TWCC-83, or TWCC-84), showing statutory workers' compensation insurance coverage for r-1 the person's or entity's employees providing services on a project, for the duration of the project. l J Duration of the project - includes the time from the beginning of the work on the project until the Contractor's/person's work on the project has been completed and accepted by the governmental entity. Persons providing services on the project ("subcontractor" in Section 406.096, Texas Labor Code) - includes all persons or entities performing all or part of the services the Contractor has undertaken to perform on the project, regardless of whether that person contracted directly with the Contractor and regardless of whether that person has employees. This includes, without limitation, independent contractors, subcontractors, leasing companies, motor carriers, owner - operators, employees of any such entity, or employees of any entity which furnishes persons to provide services on the project. "Services" include, without limitation, providing, hauling, or delivering equipment or materials, or providing labor, transportation, or other service related to a project. "Services" does not include activities unrelated to the project, such as food/beverage vendors, office supply deliveries, and delivery of portable toilets. 2. The Contractor shall provide coverage, based on proper reporting of classification codes and payroll amounts and filing of any coverage agreements, which meets the statutory requirements 54 of Texas Labor Code, Section 401.011(44) for all employees of the contractor providing services on the project, for the duration of the project. 3. The Contractor must provide a certificate of coverage to the governmental entity prior to being awarded the contract. If the coverage period shown on the Contractor's current certificate of coverage ends during the duration of the project, the Contractor must, prior to the end of the coverage period, file a new certificate of coverage with the governmental entity showing that coverage has been extended. The Contractor shall obtain from each person providing services on the project, and provide to the governmental entity: (a) a certificate of coverage, prior to that person beginning work on the project, so the governmental entity shall have on file certificates of coverage showing coverage for all persons providing services on the project; and (b) no later than seven days after receipt by the Contractor, a new certificate of coverage showing extension of coverage, if the coverage period shown on the current certificate of coverage ends during the duration of the project. The Contractor shall retain all required certificates of coverage for the duration of the project and for one year thereafter. The Contractor shall notify the governmental entity in writing by certified mail or personal delivery, within 10 days after the Contractor knew or should have known, of any change that materially affects the provision of coverage of any person providing services on the project. 8. The Contractor shall post on each project site a notice, in the text, form and manner prescribed by the Texas Workers' Compensation Commission, informing all persons providing services on the project that they are required to be covered, and stating how a person may verify coverage and report lack of coverage. 9. The Contractor shall contractually require each person with whom it contracts to provide services on the project, to: (a) provide coverage, based on proper reporting of classification codes and payroll amounts and filing of any coverage agreements, which meets the statutory requirements of Texas Labor Code, Section 401.01](44) for all of its employees providing services on the project, for the duration of the project; (b) provide to the Contractor, prior to that person beginning work on the project, a certificate of coverage showing that coverage is being provided for all employees of the person providing services on the project, for the duration of the project; (c) provide the Contractor, prior to the end of the coverage period, a new certificate of coverage showing extension of coverage, if the coverage period shown on the current certificate of coverage ends during the duration of the project; (d) obtain from each other person with whom it contracts, and provide to the Contractor: (1) a certificate of coverage, prior to the other person beginning work on the project; and 55 It (2) a new certificate of coverage showing extension of coverage, prior to the end of the coverage period, if the coverage period shown on the current certificate of coverage ends during the duration of the project; (e) retain all required certificates of coverage on file for the duration of the project and for one year thereafter; (f) notify the governmental entity in writing by certified mail or personal delivery, within 10 days after the person knew or should have known, of any change that materially affects the provision of coverage of any person providing services on the project; and (g) contractually require each person with whom it contracts to perform as required by paragraphs (a) - (g), with the certificates of coverage to be provided to the person for whom they are providing services. 10. By signing this contract or providing or causing to be provided a certificate of coverage, the Contractor is representing to the governmental entity that all employees of the Contractor who shall provide services on the project shall be covered by worker's compensation coverage for the duration of the project, that the coverage will be based on proper reporting of classification codes and payroll amounts, and that all coverage agreements will be filed with the appropriate insurance carrier or, in the case of a self -insured, with the commission's Division of Self -Insurance Regulation. Providing false or misleading information may subject the Contractor to administrative penalties, criminal penalties, civil penalties, or other civil actions. 11. The Contractor's failure to comply with any of these provisions is a breach of contract by the Contractor which entitles the governmental entity to declare the contract void if the Contractor does not remedy the breach within ten days after receipt of notice of breach from the governmental entity. Proof of Coverage Before work on this contract is commenced, each Contractor and subcontractor shall submit to the Owner for approval five Certificates of Insurance covering each insurance policy carried and offered as evidence of compliance with the above insurance requirements, signed by an authorized representative of the insurance company setting forth: (1) The name and address of the insured. (2) The location of the operations to which the insurance applies. (3) The name of the policy and type or types of insurance in force thereunder on the date borne by such certificate. (4) The expiration date of the policy and the limit or limits of liability thereunder on the date borne by such certificate. (5) A provision that the policy may be canceled only by mailing written notice to the named insured at the address shown in the bid specifications. (6) A provision that written notice shall be given to the City ten days prior to any change in or cancellation of the policies shown on the certificate. (7) The certificate or certificates shall be on the form (or identical copies thereof) contained in the job specifications. No substitute of nor amendment thereto will be acceptable. (8) If policy limits are paid, new policy must be secured for new coverage to complete project. (9) A Contractor shall: 56 (a) provide coverage for its employees providing services on a project, for the duration of the project based on proper reporting of classification codes and payroll amounts and filling of any coverage agreements; (b) provide a certificate of coverage showing workers' compensation coverage to the governmental entity prior to beginning work on the project; (c) provide the governmental entity, prior to the end of the coverage period, a new certificate of coverage showing extension of coverage, if the coverage period shown on the Contractor's current certificate of coverage ends during the duration of the project; (d) obtain from each person providing services on a project, and provide to the governmental entity: (i) a certificate of coverage, prior to that person beginning work on the project, so the governmental entity will have on file certificates of coverage showing coverage for all persons providing services on the project; and (ii) no later than seven days after receipt by the Contractor, a new certificate of coverage showing extension of coverage, if the coverage period shown on the current certificate of coverage ends during the duration of the project; (e) retain all required certificates of coverage on file for the duration of the project and for one year thereafter; (f) notify the governmental entity in writing by certified mail or personal delivery, within 10 days after the Contractor knew or should have known, of any change that materially affects the provision of coverage of any person providing services on the project; (g) post a notice on each project site informing all persons providing services on the project that they are required to be covered, and stating how a person may verify current coverage and report failure to provide coverage. This notice does not satisfy other posting requirements imposed by the Texas Worker's Compensation Act or other commission rules. This notice must be printed with a title in at least 30 point bold type and text in at least 19 point normal type, and shall be in both English and Spanish and any other language common to the worker population. The text for the notices shall be the following text provided by the commission on the sample notice, without any additional words or changes: L_ � REQUIRED WORKERS' COMPENSATION COVERAGE "The law requires that each person working on this site or providing services related to this construction project must be covered by workers' compensation insurance. This includes persons providing, hauling, or delivering equipment or materials, or providing labor or transportation or other service related to the project, regardless of the identity of their employer or status as an employee. " - , "Call the Texas Workers' Compensation Commission at 800-372-7713 or 512-804- 4000 6MyAdLstate.tx.usl to receive information of the legal requirements for coverage, to verify whether your employer has provided the required coverage, or to report an employer's fallure to provide coverage; " and 13, (h) contractually require each person with whom it contracts to provide services on a project, to: (i) provide coverage based on proper reporting of classification codes and payroll amounts and filing of any coverage agreements for all of its employees providing services on the project, for the duration of the project; (ii) provide a certificate of coverage to the Contractor prior to that person beginning work on the project; 57 (iii) include in all contracts to provide services on the project the following language: Fill "By signing this contract or providing or causing to be provided a certificate of coverage, the person signing this contract is representing to the governmental entity that all employees of the person signing this contract who will provide services on the project will be covered by workers' compensation coverage for the duration of the project, that the coverage will be based on proper reprinting of classification codes and payroll amounts, and that all coverage agreements will be filed with the appropriate insurance carrier or, in the case of a self -insured, with the commission's Division of Self -Insurance Regulation. Providing false or misleading information may subject the Contractor to administrative penalties, criminal penalties, ' civil penalties, or other civil actions."; (iv) provide the Contractor, prior to the end of the coverage period, a new certificate of coverage showing extension of coverage, if the coverage period shown on the current certificate of coverage ends during the duration of the project; (v) obtain from each other person with whom it contracts, and provide to the Contractor: (1) a certificate of coverage, prior to the other person beginning work on the project; and (2) prior to the end of the coverage period, a new certificate of coverage showing extension of the coverage period, if the coverage period shown on the current certificate of coverage ends during the duration of the l project; (vi) retain all required certificates of coverage on file for the duration of the project and for one year thereafter; (vii) notify the governmental entity in writing by certified mail or personal delivery, within 10 days after the person knew or should have known, of any change that materially affects the provision of coverage of any person providing services on the project; and,,. (viii) contractually require each other person with whom it contracts, to perform as required by paragraphs (i)-(viii), with the certificate of coverage to be provided to the person for whom they are providing services. 29. DISABLED EMPLOYEES Contractors having more than fifteen (15) employees agree to comply with the Americans with Disabilities Act of 1990, and agree not to discriminate against a qualified individual with a disability because of the disability of such individual in regard to job application procedures, the hiring, advancement, or discharge of employees, employee compensation, job training, and other terms, conditions, and privileges of employment. 30. PROTECTION AGAINST CLAIMS OF SUBCONTRACTORS LABORERS MATERIALMEN AND FURNISHERS OF MACHINERY, EQUIPMENT AND SUPPLIES Without limiting, in any way, manner or form, the indemnity provided by Contractor in paragraph 27 hereof, the Contractor agrees that it will indemnify and save the Owner and all of its officers, agents and employees, harmless against any and all claims, liabilities, losses, damages, expenses and causes of action arising out of, in any way, manner or form, the demands of subcontractors, laborers, workmen, mechanics, material men and furnishers of machinery and parts thereof, equipment, power tools, and supplies, incurred in the performance of 58 r this contract and the project which is the subject matter of this contract. When Owner so desires, the Contractor shall furnish satisfactory evidence that all obligations of the nature hereinabove designated have been paid, discharged or waived. 31. PROTECTION AGAINST ROYALTIES OR PATENT INVENTION The Contractor shall pay all royalties and license fees, and shall provide for the use of any design, device, material or process covered by letters patent or copyright by suitable legal agreement with the Patentee or owner thereof. Without limiting, in any way, manner or form, the indemnity provided by Contractor in paragraph 27 hereof, the Contractor shall defend all suits or claims for infringement of any patent or copyrights and shall indemnify and save the Owner, and all of its officers, agents and employees harmless from any loss on account thereof, except that Owner shall defend all such suits and claims and shall be responsible for all such loss when a particular design, device, material or process or the product of a particular manufacturer or manufacturers is specified or required in these contract documents by Owner; provided, however, if choice of alternate design, device, material or process is allowed to the Contractor, then Contractor shall indemnify and save Owner, and all of its officers, agents and employees harmless from any loss on account thereof. Notwithstanding anything herein to the contrary, if the material or process specified or required by Owner and/or this contract is an infringement, the Contractor shall be responsible for such loss unless it gives written notice of such infringement to the Owner's Representative prior to bidding. 32. LAWS AND ORDINANCES The Contractor shall at all times observe and comply with all federal, state and local laws, ordinances and regulations, which in any manner affect the contract or the work, and without limiting, in any way, manner or form, the indemnity provided by Contractor in paragraph 27 hereof, Contractor shall indemnify and save harmless the Owner, and all of its officers, agents, and employees against any claims arising from the violation of any such laws, ordinances, and regulations, whether by the Contractor, its employees, or subcontractors. If the Contractor observes that the plans and specifications are at variance therewith, he shall notify the Owner's Representative in writing prior to bidding and any necessary changes shall be adjusted as provided in the contract for changes in the work. In the absence of timely written notification to Owner's Representative of such variance or variances within said time, any objection and/or assertion that the plans and specifications are at variance with any federal, state or local laws, ordinances or regulations shall be deemed waived. If the Contractor, its employees or subcontractors perform any work contrary to such laws, ordinances, rules and regulations, and without such notice to the Owner's Representative, Contractor shall bear all costs arising therefrom. The Owner is a municipal corporation of the State of Texas and the law from which it derives its powers, insofar as the same regulates the objects for which, or the manner in which, or the conditions under which the Owner may enter into contracts, shall be controlling, and shall be considered as part of this contract to the same effect as though embodied herein. 33. SUBCONTRACTING The Contractor agrees that it will retain personal control and will give its personal attention to the fulfillment of this contract. The Contractor further agrees that subletting of any portion or feature of the work, or materials required in the performance of this contract, shall not relieve the Contractor from its full obligations to the Owner, as provided by the contract documents. 34. TIME FOR SUBSTANTIAL COMPLETION AND LIQUIDATED DAMAGES It is hereby understood and mutually agreed by and between the Contractor and the Owner, that the date of beginning and time for completion as specified in the contract documents, of work to be done hereunder are essential conditions of this contract; and it is further mutually understood and agreed that the work embraced in this contract shall be commenced as provided in the contract documents. 59 If the Contractor should neglect, fail, or refuse to substantially complete the work within the time herein specified, then the Contractor does hereby agree as part of the consideration for the awarding of this contract, the Owner may withhold permanently from Contractor's total compensation, the sum of $ 1,000 (ONE THOUSAND) each WORKING DAY , not as a penalty, but as liquidated damages for the breach of the contract as herein set forth for each and every working day that the Contractor shall be in default after the time stipulated for substantially completing the work. It is expressly understood and agreed, by and between Contractor and the Owner, that the time for the substantial completion of the work described herein is reasonable time for the completion of the same, taking into consideration the average climatic range and conditions and usual industrial conditions prevailing in this locality. The amount is fixed and agreed upon by and between the Contractor and the Owner because the actual damages the Owner would sustain in such event would be difficult and/or impossible to estimate, however, the amount agreed upon herein is a reasonable forecast of the amount necessary to render just compensation to Owner, and is expressly agreed to be not disproportionate to actual damages as measured at time of breach. IT IS FURTHER AGREED AND UNDERSTOOD BETWEEN THE CONTRACTOR AND OWNER THAT TIME IS OF THE ESSENCE OF THIS CONTRACT. 35. TIME AND ORDER OF COMPLETION It is the meaning and intent of this contract, unless otherwise herein specifically provided, that the Contractor shall be allowed to prosecute its work at such time and sessions, in such order of precedence, and in such manner as shall be most conductive to economy of construction; provided, however, that the order and time of prosecution shall be such that the work shall be substantially completed as a whole and in part, in accordance with this contract, the plans and specifications, and within the time of completion designated in the bid; provided, also, that when the Owner is having other work done, either by contract or by its own force, the Owner's Representative may direct the time and manner of constructing work done under this contract so that conflicts will be avoided and the construction of the various works being done for the Owner shall be harmonized. The Contractor shall submit, at such times as may reasonably be requested by the Owner's Representative, schedules which shall show the order in which the Contractor intends to carry on the work, with dates at which the Contractor will start the several parts of the work and estimated dates of completion of the several parts. 36. TIME OF PERFORMANCE The Contractor agrees that it has submitted its bid in full recognition of the time required for the completion of this project, taking into consideration the average climatic range and industrial conditions prevailing in this locality, and has considered the liquidated damage provisions of paragraph 34 hereinabove set forth and expressly agrees that it shall not be entitled to, nor will it request, an extension of time on this contract, except when its work has been delayed by an act or neglect of the Owner, Owner's Representative, employees of the Owner or other contractors employed by the Owner, or by changes ordered in the work, or by strike, walkouts, acts of God or the public enemy, fire or flood. Any request for extension shall be in writing with the written request for same setting forth all justifications, in detail, for the request, and submitted to Owner's Representative within twenty (20) calendar days of the occurrence of the event causing said delay. A failure by Owner's Representative to affirmatively grant the extension no later than twenty (20) calendar days of written submission by Contractor shall be deemed a denial, and final. Further, in the absence of timely written notification of such delay and request for extension, as provided herein, any request for extension by Contractor shall be deemed waived. 37. HINDRANCE AND DELAYS In executing the contract, the Contractor agrees that in undertaking to complete the work within the time herein fixed, Contractor has taken into consideration and made allowances for all hindrances and delays incident to such 1 work, whether growing out of delays due to unusual and unanticipated circumstances, difficulties or delays in securing material or workmen, or any other cause or occurrence. No charge shall be made by the Contractor for hindrance or delays from any cause during the progress of any part of the work embraced in this contract except 60 where the work is stopped by order of the Owner or Owner's Representative for the Owner's convenience, in which event, such expense as in the sole judgment of the Owner's Representative that is caused by such stoppage shall be paid by Owner to Contractor. 38. QUANTITIES AND MEASUREMENTS No extra or customary measurements of any kind will be allowed, but the actual measured or computed length, area, solid contents, number and weight only shall be considered, unless otherwise specifically provided. In the event this contract is let on a unit price basis, then Owner and Contractor agree that this contract, including the specifications, plans and other contract documents are intended to show clearly all work to be done and material to be furnished hereunder. Where the estimated quantities are shown, and only when same are expressly stated to be estimates, for the various classes of work to be done and material to be furnished under this contract, they are approximate and are to be used only as a basis for estimating the probable cost of the work and for comparing their bids offered for the work. In the event the amount of work to be done and materials to be furnished are expressly stated to be estimated, and only when same are expressly stated to be estimated, it is understood and agreed that the actual amount of work to be done and the materials to be furnished under this contract may differ somewhat from these estimates, and that where the basis for payment under this contract is the unit price method, payment shall be for the actual amount of work done and materials furnished on the project. 39. PROTECTION OF ADJOINING PROPERTY The Contractor shall take proper means to protect the adjacent or adjoining property or properties in any way encountered, which may be injured or seriously affected by any process of construction to be undertaken under this agreement, from any damage or injury by reason of said process of construction; and Contractor shall be liable for any and all claims for such damage on account of his failure to fully protect all adjacent property. Without limiting, in any way, manner and form, the indemnity provided by Contractor in paragraph 27 hereof, the Contractor agrees to indemnify, save and hold harmless the Owner, and any of its officers, agents and employees, against any and all claims or damages due to any injury to any adjacent or adjoining property, related to, arising from or growing out of the performance of this contract. 40. PRICE FOR WORK In consideration of the furnishing of all necessary labor, equipment and material and the completion of all work by the Contractor, and on the delivery of all materials embraced in this contract in full conformity with the specifications and stipulations herein contained, the Owner agrees to pay the Contractor the price set forth in the bid proposal attached hereto, which has been made a part of this contract, and the Contractor hereby agrees to receive such price in full for furnishing all materials and all labor required for the aforesaid work, also, for all expenses incurred by Contractor and for well and truly performing the same and the whole thereof in the manner j and according to this agreement, the attached specifications, plans, contract documents and requirements of Owner's Representative. 41. PAYMENTS No payments made or certificates given shall be considered as conclusive evidence of the performance of the contract, either wholly or in part, nor shall any certificate or payment be considered as acceptance of defective work. Contractor shall at any time requested during the progress of the work furnish the Owner or Owner's Representative with a verifying certificate showing the Contractor's total outstanding indebtedness in connection with the work. Before final payment is made, Contractor shall satisfy Owner, by affidavit or otherwise, that there are no outstanding liens against Owner's premises by reason of any work under the contract. Acceptance by Contractor of final payment of the contract price shall constitute a waiver of all claims against Owner, Owner's agents and employees, which have not theretofore been timely filed as provided in this contract. 61 42. PARTIAL PAYMENTS On or before the tenth day of each month, the Contractor shall submit to Owner's Representative an application for partial payment or, if the Contractor does not submit such application, the Owner's Representative shall -, determine the amount to be partially paid. Owner's Representative shall review said application for partial payment if submitted, and the progress of the work made by the Contractor and if found to be in order, shall prepare a certificate for partial payment showing as completely as practical the total value of the work done by the Contractor up to and including the last day of the preceding month. The determination of the partial payment by the Owner's Representative shall be in accordance with Paragraph 14 hereof. The Owner shall then pay the Contractor on or before the fifteenth day of the current month the total amount of the Owner's Representative's Certificate of Partial Payment, less 5% of the amount thereof, which 5% shall be retained until final payment, and further, less all previous payments and all further sums that may be retained by Owner under the terms of the contract documents. Any partial payment made hereunder shall not constitute a waiver by the Owner of any and all other rights to enforce the express terms of the contract documents, and all remedies provided therein, as to any and all work performed, to be performed and/or materials delivered hereunder, including, but limited to, work to which said partial payment is attributable. 43. SUBSTANTIAL COMPLETION Contractor shall give Owner's Representative written notice of substantial completion. Within thirty-one (31) working days after the Contractor has given the Owner's Representative written notice that the work has been substantially completed, the Owner's Representative and/or the Owner shall inspect the work and within said time, if the work be found to be substantially completed in accordance with the contract documents, the Owner's Representative shall issue to the Owner and Contractor a certificate of substantial completion. Notwithstanding the issuance of a certificate of substantial completion, Contractor shall proceed with diligence to finally complete the work within the time provided in this contract. 44. FINAL COMPLETION AND PAYMENT The Contractor shall give written notice to Owner's Representative of final completion. Upon written notice of final completion, the Owner's Representative shall proceed to make final measurement to determine whether final completion has occurred. if the Owner's Representative determines final completion has occurred, Owner's Representative shall so certify to the Owner. Upon certification by Owner's Representative of final completion, Owner shall pay to the Contractor on or before the 31 st working day after the date of certification of final completion, the balance due Contractor under the terms of this agreement. Neither the certification of final completion nor the final payment, nor any provisions in the contract documents shall relieve the Contractor of the obligation for fulfillment of any warranty which may be required in the contract documents and/or any warranty or warranties implied by law or otherwise. 45. CORRECTION OF WORK Contractor shall promptly remove from Owner's premises all materials condemned by the Owner's Representative on account of failure to conform to the contract documents, whether actually incorporated in the work or not, and Contractor shall at its own expense promptly replace such condemned materials with other materials conforming to the requirements of the contract documents. Contractor shall also bear the expense of restoring all work of other contractors damaged by any such removal or replacement. If Contractor does not remove and replace any such condemned work within a reasonable time after a written notice by the Owner or the Owner's Representative, Owner may remove and replace it at Contractor's expense. Neither the final payment, nor certification of final completion or substantial completion, nor any provision in the contract documents shall relieve the Contractor of responsibility for faulty materials or workmanship, and Contractor shall remedy any defects due thereto and pay for any damage to other work resulting therefrom, which j 62 shall appear within a period of one (1) year from the date of certification of final completion by Owner's Representative. 46. PAYMENT WITHHELD The Owner or Owner's Representative may, on account of subsequently discovered evidence, withhold or nullify the whole or part of any certification to such extent as may be necessary to protect itself from loss on account of: (a) Defective work not remedied and/or work not performed. (b) Claims filed or reasonable evidence indicating possible filing of claims. (c) Damage to another contractor. When the above grounds are removed, or the Contractor provides a surety bond satisfactory to the Owner, in the amount withheld, payment shall be made for amounts withheld because of them. 47. CLAIM OR DISPUTE It is further agreed by both parties hereto that all questions of dispute or adjustment presented by the Contractor shall be in writing and filed with the Owner's Representative within fifteen (15) calendar days after the Owner's Representative has given any direction, order or instruction to which the Contractor desires to take exception. Timely written notice of dispute as provided in this contract of any decision by Owner's Representative or Owner shall be a condition precedent to the bringing and/or assertion of any action or claim by Contractor of any right under this Contract. If the matters set forth in the notice of dispute are not granted or otherwise responded to by Owner's Representative within fifteen (15) calendar days of receipt of notice of dispute by Owner's Representative, said objections shall be deemed denied. Any decision by the Owner's Representative, or deemed denial by the Owner's Representative, shall be final and conclusive in the absence of fraud. It is further agreed that the acceptance by the Contractor of the final payment shall be a bar to any and all claims of the Contractor, and constitute a waiver of the right to assert any claim against Owner, Owner's agents and employees and Owner's Representative, by Contractor. 48. NON-COMPLIANCE AND/OR ABANDONMENT BY CONTRACTOR In case the Contractor should (1) abandon and fail or refuse to resume work within fifteen (15) calendar days after written notification from the Owner or the Owner's Representative, or (2) if the Contractor fails to comply with the written orders of the Owner's Representative, when such orders are consistent with this contract, then the Surety on the bond shall be notified in writing and directed to complete the work and a copy of said notice shall be delivered to the Contractor. In the event a bond is not required by law, or otherwise obtained by the Contractor, no further notice of such non-compliance to Contractor shall be required. After receiving said notice of abandonment or non-compliance , the Contractor shall not remove from the work any machinery, equipment, tools, materials or supplies then on the job, but the same, together with any materials and equipment under the contract for work, may be held for use on the work by the Owner or the Surety of the Contractor, or another contractor, in completion of the work; and the Contractor shall not receive any rental or credit therefore (except when used in connection with Extra Work, where credit shall be allowed as provided for under paragraph 24 of this contract); it being understood that the use of such equipment and materials will ultimately reduce the cost to complete the work and be reflected in the final settlement. In the event the Contractor, or Surety, whichever is applicable, should fail to commence compliance with the notice hereinbefore provided within ten (I0) calendar days after service of such notice, and/or shall fail to proceed with diligence to complete the project as contemplated and in compliance with all terms and provisions of the contract documents, then the Owner may exercise any and all remedies available to it pursuant to law, contract, equity or otherwise, including, but not limited to, providing for completion of the work in either of the following elective manners: 63 i. __ (a) The Owner may employ such force of men and use of machinery, equipment, tools, materials and supplies as said Owner may deem necessary to complete the work and charge the expense of such labor, machinery, equipment, tools, materials and supplies to said Contractor, and the expense so charged shall be deducted and paid by the Owner out of such moneys as may be due, or that may thereafter at any time become due to the Contractor under and by virtue of this Agreement. In case such expense is less than the sum which would have been payable under this contract, if the same had been completed by the Contractor, then said Contractor shall receive the difference. In case such expense is greater than the sum which would have been payable under this contract, if the same had been completed by said Contractor, then the Contractor and/or its Surety shall pay the amount of such excess to the Owner; or (b) The Owner, under sealed bids, after notice published as required by law, at least twice in a newspaper having a general circulation in the County of location of the work, may let the contract for the completion of the work under substantially the same terms and conditions which are provided in this contract. In case of any increase in cost to the Owner under the new contract as compared to what would have been the cost under this contract, such increase shall be charged to the Contractor and the Surety shall be and remain bound therefore. Should the cost to complete any such new contract prove to be less than that which would have been the cost to complete the work under this contract, the Contractor or his Surety shall be credited therewith. In the event the Owner's Representative elects to complete the work, as described above, when the work shall have been finally completed, the Contractor and his Surety shall be so notified and certification of completion as provided in paragraph 44 hereinabove set forth, shall be issued. A complete itemized statement of the contract accounts, certified to by Owner's Representative as being correct shall then be prepared and delivered to Contractor and his Surety, if applicable, whereon the Contractor or his Surety, or the Owner as the case may be, shall pay the balance due as reflected by said statement within 30 days after the date of certification of completion. In the event the statement of accounts shows that the cost to complete the work is less than that which would have been the cost to the Owner had the work been completed by the Contractor under the terms of this contract, or when the Contractor and/or his Surety, if applicable, shall pay the balance shown to be due by them to the Owner, then all machinery, equipment, tools, materials or supplies left on the site of the work shall be turned over to the Contractor and/or his Surety, if applicable. Should the cost to complete the work exceed the contract price, and the Contractor and/or his Surety, if applicable, fail to pay the amount due the Owner within the time designated hereinabove, and there remains any machinery, equipment, tools, materials or supplies on the site of the work, notice thereof, together with an itemized list of such equipment and materials shall be mailed to the Contractor and his Surety, if applicable, at the respective addresses designated in this contract; provided, however, that actual written notice given in any manner will satisfy this condition. After mailing, or other giving of such notice, such property shall be held at the risk of the Contractor and his Surety, if applicable, subject only to the duty of the Owner to exercise ordinary care to protect such property. After fifteen (15) calendar days from the date of said notice the Owner may sell such machinery, equipment, tools, materials or supplies and apply the net sum derived from such sale to the credit of the Contractor and his Surety, if applicable. Such sale may be made at either public or private sale, with or without notice, as the Owner may elect. The Owner shall release any machinery, equipment, tools, materials, or supplies that remain on the jobsite and belong to persons other than the Contractor or his Surety, if applicable, to their proper owners. The remedies provided to Owner by Iaw, equity, contract, or otherwise, shall be cumulative, to the extent permitted by law. It is expressly agreed and understood that the exercise by Owner of the remedies provided in this paragraph shall not constitute an election of remedies on the part of Owner, and Owner, irrespective of its exercise of remedies hereunder, shall be entitled to exercise concurrently or otherwise, any and all other remedies available to it, by law, equity, contract or otherwise, including but not limited to, liquidated damages, as provided in paragraph 34, hereinabove set forth. 64 F11 49. LIMITATION ON CONTRACTOR'S REMEDY The remedies of Contractor hereunder shall be limited to, and Owner shall be liable only for, work actually performed by Contractor and/or its subcontractors as set forth in the contract documents, and Owner shall not be liable for any consequential, punitive or indirect loss or damage that Contractor may suffer in connection with the project which is the subject matter of this contract. 50. BONDS The Contractor is required to furnish a performance bond in accordance with Chapter 2253, Government Code, in the amount of 100% of the total contract price in the event that said contract price exceeds $100,000 and the Contractor is required to furnish a payment bond in accordance with Chapter 2253, Government Code, in the amount of 100% of the total contract price in the event that said contract price exceeds $25,000. All bonds shall be submitted on forms supplied by the Owner, and executed by an approved Surety Company authorized to do business in the State of Texas. It is further agreed that this contract shall not be in effect until such bonds are so furnished. 51. SPECIAL CONDITIONS In the event special conditions are contained herein as part of the contract documents and said special conditions conflict with any of the general conditions contained in this contract, then in such event the special conditions shall control. 52. LOSS OR EXPENSE DUE TO UNUSUAL OR UNANTICIPATED CIRCUMSTANCES Unless otherwise specified herein, all loss, expense or damage to the Contractor arising out of the nature of the work to be done, or from the action of the elements, or from any unforeseen circumstance or from unusual obstructions or difficulties, naturally occurring, man made or otherwise, which may be encountered in the prosecution of the work, shall be sustained and borne by the Contractor at his own cost and expense. 53. INDEPENDENT CONTRACTOR Contractor is, and shall remain, an independent contractor with full, complete and exclusive power and authority to direct, supervise, and control its own employees and to determine the method of the performance of the work covered hereby. The fact that the Owner or Owner's Representative shall have the right to observe Contractor's work during Contractor's perfonnance and to carry out the other prerogatives which are expressly reserved to and vested in the Owner or Owner's Representative hereunder, is not intended to and shall not at any time change or effect the status of the Contractor as an independent contractor with respect to either the Owner or Owner's Representative or to the Contractor's own employees or to any other person, firm, or corporation. 54. CLEANING UP The Contractor shall at all times keep the premises free from accumulation of debris caused by the work, and at the completion of the work Contractor shall remove all such debris and also its tools, scaffolding, and surplus materials and shall leave the work room clean or its equivalent. The work shall be left in good order and condition. In case of dispute Owner may remove the debris and charge the cost to the Contractor. 55. HAZARDOUS SUBSTANCES AND ASBESTOS Hazardous Substances (herein so called), as defined in the Comprehensive Environmental Response, Compensation, and Liability Act (42 U.S.C.S. §9601(14)) and the regulations promulgated thereunder, as same may be amended from time to time, hydrocarbons or other petroleum products or byproducts and/or asbestos, in any form, shall not (i) be utilized, in any way, manner or form, in the construction of, or incorporation into, the Project; or (ii) be brought upon, placed, or located, by any party, on the Project site, or any other property of the City, without the written consent of the Owner's Representative. If Contractor believes that the utilization of a 65 Hazardous Substance, hydrocarbons or other petroleum products or byproducts and/or asbestos is necessary in the construction of the Project, or that it is necessary to place and/or otherwise locate upon the site of the Project or other property of the City, a Hazardous Substance, hydrocarbons or other petroleum products or byproducts and/or asbestos, Contractor shall notify the Owner's Representative, and request consent therefrom, at least twenty (20) days prior to such action. Owner's Representative may grant or deny the request of Contractor and provide whatever requirements such consent, if granted, is conditioned upon, in its sole and absolute discretion. If the request of Contractor is not granted, or otherwise not responded to, by Owner's Representative within five (5) ._ days of the receipt of said request, said request shall be deemed to be denied. In the event Owner's Representative shall consent to the request of Contractor, Contractor shall be responsible for ensuring that all personnel involved in the Project are (i) trained for the level of expertise required for proper performance of the actions contemplated by this Contract and, in particular, in all aspects of handling, storage, disposal and exposure of Hazardous Substances, hydrocarbons or other petroleum products or byproducts and/or asbestos; and (ii) are provided and utilize all protective equipment, including without limitation, personal protective gear, necessary to provide protection from exposure to Hazardous Substances, hydrocarbons or other petroleum products or byproducts and/or asbestos. 56. NONAPPROPRIATION All funds for payment by the City under this contract are subject to the availability of an annual appropriation for this purpose by the City. In the event of non -appropriation of funds by the City Council of the City of Lubbock for the goods or services provided under the contract, the City will terminate the contract, without termination charge or other liability, on the last day of the then -current fiscal year or when the appropriation made for the then -current year for the goods or services covered by this contract is spent, whichever event occurs first. If at any time funds are not appropriated for the continuance of this contract, cancellation shall be accepted by the Seller on thirty (30) days prior written notice, but failure to give such notice shall be of no effect and the City shall not be obligated under this contract beyond the date of termination. 57. THE CITY RIGHT TO AUDIT At any time during the term of this Contract and for a period of four (4) years thereafter the City or a duly authorized audit representative of the City, or the State of Texas, at its expense and at reasonable times, reserves the right to audit Contractor's records and books relevant to all services provided under this Contract. In the event such an audit by the City reveals any errors/overpayments by the City, Contractor shall refund the City the full amount of such overpayments within thirty (30) days of such audit findings, or the City, at its option, reserves the right to deduct such amounts owing the City from any payments due Contractor. 66 II DAVIS BACON WAGE DETERMINATIONS I Page Intentionally Left Blank 1 *140.11 GENERAL DECISION: TX20080028 02/08/2008 TX28 Date: February 8, 2008 General Decision Number: TX20080028 02/08/2008 Superseded General Decision Number: TX20070028 State: Texas Construction Types: Heavy and Highway Ell Counties: Ector, Lubbock, Midland, Potter, Randall, Taylor and Tom Green Counties in Texas. HEAVY (excluding tunnels & dams) and HIGHWAY PROJECTS (does not include building structures in rest area projects). Modification Number Publication Date 0 02/08/2008 * SUTX2004-001 11/09/2004 Rates Fringes Asphalt Distributor Operator ... $ 9.25 0.00 Asphalt Heater Operator ........ $ 11.21 0.00 Asphalt paving machine operator$ 11.16 0.00 Asphalt Raker ..................$ 9.51 0.00 Broom or Sweeper Operator ...... $ 8.57 0.00 Bulldozer operator ...........$ 9.76 0.00 Carpenter ......................$ 12.61 0.00 Concrete Finisher, Paving ...... $ 13.26 0.00 Concrete Finisher, Structures..$ 11.20 0.00 Crane, Clamshell, Backhoe, Derrick, Dragline, Shovel Operator .......................$ 11.00 0.00 Electrician ....................$ 17.00 0.00 Form Builder/Setter, Structures$ 9.26 0.00 Form Setter, Paving & Curb ..... $ 9.82 0.00 Front End Loader Operator ...... $ 10.52 0.00 Laborer, common ................$ 8.51 0.00 Laborer, Utility ...............$ 10.46 0.00 Mechanic .......................$ 16.85 0.00 Motor Grader Operator Rough .... $ 11.75 0.00 Motor Grader Operator, Fine Grade ..........................$ 13.50 0.00 Planer Operator ................$ 13.36 0.00 Roller Operator, Pneumatic, Self -Propelled .................$ 7.67 0.00 Roller Operator, Steel Wheel, Flat Wheel/Tamping.............$ 8.06 0.00 Roller Operator, Steel Wheel, Plant Mix Pavement .............$ 7.50 0.00 Scraper Operator ...............$ 8.50 0.00 Servicer .......................$ 8.98 0.00 Slip Form Machine Operator ..... $ 13.64 0.00 1 Tractor operator, Pneumatic .... $ 12.00 0.00 Traveling Mixer Operator ....... $ 12.00 0.00 Truck driver, lowboy -Float ..... $ 12.67 0.00 Truck driver, Single Axle, Heavy ..........................$ 8.50 0.00 Truck driver, Single Axle, Light. ......$ 8.08 0.00 Truck Driver, Tandem Axle, Semi -Trailer ...................$ 8.66 0.00 Welder .........................$ 15.25 0.00� Work Zone Barricade Servicer... ---------------------------------------------------------------- $ 8.28 0.00 WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental. ---------------------------------------------------------------- Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)). In the listing above, the "SU" designation means that rates listed under the identifier do not reflect collectively bargained wage and fringe benefit rates. Other designations indicate unions whose rates have been determined to be prevailing. WAGE DETERMINATION APPEALS PROCESS 1.) Has there been an initial decision in the matter? This can be: * an existing published wage determination * a survey underlying a wage determination * a Wage and Hour Division letter setting forth a position on a wage determination matter * a conformance (additional classification and rate) ruling On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis -Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.) and 3.) should be followed. With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to: Branch of Construction Wage Determinations l_1 Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W. I Washington, DC 20210 2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to: Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W. Washington, DC 20210 The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue. 3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to: Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W. Washington, DC 20210 4.) All decisions by the Administrative Review Board are final. Prevailing Wage Rates Overtime Rate The rate for overtime (in excess of forty hours per week) shall be as required by the Fair Labor Standards Act. 1 WV 111.3 Prevailing Wage Rates Legal Holiday Rate The rate for legal holidays shall be as required by the Fair Labor Standards Act. 0 1:50ba 12IB86 USDOL/OSHA/LUBBOCK PAGE ©2/04 U.S. DEPARTMENT OF LABOR OCCUPATIONAL SAFETY AND HEALTH ADNITNISTRATION In the Matter of: Wright Construction Company OSHA No.(s): 312386287 rNFORMAL SETTLLMEN7 AGREEMENT The undersigned Employer and the undersigned Occupational Safe), and Health Administration (OSHA), in settlement of the above citation(s) and penalties which wcrc issued on 10/09/09. hereby agree as follows: 1, The Employer agrees to correct the hazards identified in the citations, or as amended below. The Employer agrees to comply with all applicable abatement verification provisions of 29 C.F.R. §1903.19, including but not limited to, all certification, documentation, and posting requirements. Abatement certification shall be accomplished within 10 calendar days after the abatement date by mailing a letter to Occupational Safety and Health Administration, Lubbocl< Area Office, 1205 Texas Avenue, Room 806, Lubbock, TX 79401, stating that abatement has been completed, the date and method of abatement, and that affected employees and their representatives have been informed of the abatement. Any required abatement documentation shall be submitted along with the abatement certification. 3. The Employer agrees to pay the proposed penalties, if any, as issued with the above citation(s), or if amended by this Agreement, as amended below. Such penalty is to be remitted within S days of the signing of this Agreement. If the original signed Agreement and payment is not received in accordance with this time period, the Agreement shall be null and void and nil original penalties shall become payable along with appropriate fees, and interest. 4. The Employer and OSHA agree to amend the citations and penalties, if any, as follows: CITATION I PENALTY Cit 1, Item I Reclassified to Other than Serious, Penalty $1,200,00 Cit 1, .Item 2 Reclassified to Other than Serious, Penalty $1,200.00 I{TTAL PENALTY PROPOSED I $2,400.00 I 5. The Employer promises to permit OSRA access to the workplace 31 issue herein subsequent to the date fixed for abatement for the specific and limited purpose of determining if the conditions described in the citations have been corrected 1 ---- ,I,,,« UbUUL/USHA/LUBBDEK PAGE 63/04 6. The employer agrees to continue to comply with the applicable pro,,,isions of the Occupational Safety and Health Act of 1970, and the applicable safety and health Standards promulgated pursuant to the Act. 7 Neither this settlement agreement. nor the employer's failure to contest the citations at issue, shall constitute an admission by the employer of any violations of the Occupational Safety and Health Act to any third panics in any subsequent proceedings, except proceedings brought by the United States Government. 8. The Employer, by signing this settlement agreement, hereby waives its rights to contest the above citation(s) and penalties, as amended in paragraph 4 of the agreement. 9, The Employer agrees to immediately post a copy of this settlement agreement in a prominent place at or near the location of the violation(s) referred to in paragraphs 3 and 4 above. T1tis Agreement must remain posted until the violations cited hove been corrected, or for 3 working days (excluding weekends and Federal Holidays), whichever is longer. 10. Each party agrees to bear its own attorney's fees, costs and other expenses incurred by such party in connection with nny stngc of the above. referenced proceeding including, but not limited to, attomey's fees which may be available under the Equal Acccss to Justice Act, as amended. 11. The Employer agrees to provide training to its foremen and lead persons regarding required housekeeping and ladder use including required ladder angles and lengths. Richard F. Tapio for Occupational Safety And Health Administration (Signature and Date) 4 -1, !4' Lemoin g t, Pres V Co stritction (Sig atur and Date) y 'u04ILIbbD USDOL /OSHA/ LUBE30CK PAGE 64/ed NOTICE TO EMPLOYEES The law gives you or your representative the opportunity to object to any abatement dote set for a violation if you believe the date to be unreasonable. Any contest to the abatement dates of the citations amended in paragraph 3 of this Settlement Agreement must be mailed to the U.S. Department of Labor Area Office at ROOM 806, GEORGE MAHON FEDERAL BUILDTNG, 1205 TEXAS AVENUE, LUBBOCK, TY 79401; within 15 working deys (excluding weekends and Federal Holidays) of the receipt by the Employer of this Settlement Agreement. You or your representative also have the right to object to any of the abatement dates sct for violations, which were not amended, provided that the objection is mailed to the office shown above within the 15-working-day period established by the original citation. 3 U.S. Department of Labor Occupational Safety and Health Administration ROOM 806, GEORGE MAHON FEDERAL BUILDING 1205 TEXAS AVENUE LUBBOCK, TX 79401 Phone: (806)472-7681 FAX: (806)472-7686 Citation and Notification of Penalty To: Inspection Number: 312386287 Wright Construction Company Inspection Date(s): 10/02/2008 - 10/02/2008 and its successors Issuance Date: 10/08/2008 601 Wall Street Grapevine, TX 76051 Inspection Site: The violation(s) described in this Citation Loop 289 at Quaker and Notification of Penalty is (are) alleged Lubbock, TX 79414 to have occurred on or about the day(s) the inspection was made unless othenvise indicated within the description given below. This Citation and Notification of Penalty (this Citation) describes violations of the Occupational Safety and Health Act of 1970. The penalty(ies) listed herein is (are) based on these violations. You must abate the violations referred to in this Citation by the dates listed and pay the penalties proposed, unless within 15 working days (excluding weekends and Federal holidays) from your receipt of this Citation and Notification of Penalty you mail a notice of contest to the U.S. Department of Labor Area Office at the address shown above. Please refer to the enclosed booklet (OSHA 3000) which outlines your rights and responsibilities and which should be read in conjunction with this form. Issuance of this Citation does not constitute a finding that a violation of the Act has occurred unless there is a failure to contest as provided for in the Act or, if contested, unless this Citation is affirmed by the Review Commission or a court. Posting - The law requires that a copy of this Citation and Notification of Penalty be posted immediately in a prominent place at or near the location of the violation(s) cited herein, or , if it is not practicable because of the nature of the employer's operations, where it will be readily observable by all affected employees. This Citation must remain posted until the violation(s) cited herein has (have) been abated, or for 3 working days (excluding weekends and Federal holidays), whichever is longer. The penalty dollar amounts need not be posted antl may be marked out or covered up prior to posting. Informal Conference - An informal conference is not required. However, if you wish to have such a conference you may request one with the Area Director during the 15 working day contest period. During such an informal conference you may present any evidence or views which you believe would support an adjustment to the citation(s) and/or penalty(ies). Citation and Notification of Penalty Page I of 6 OSHA-2(Rev. 6193) If you are considering a request for an informal conference to discuss any issues related to this Citation and Notification of Penalty, you must take care to schedule it early enough to allow time to contest after the informal conference, should you decide to do so. Please keep in mind that a written letter of intent to contest must be submitted to the Area Director within 15 working days of your receipt of this Citation. The running of this contest period is not interrupted by an informal conference. If you decide to request an informal conference, please complete, remove and post the page 4 Notice to Employees next to this Citation and Notification of Penalty as soon as the time, date, and place of the informal conference have been determined. Be sure to bring to the conference any and all supporting documentation of existing conditions as well as any abatement steps taken thus far. If conditions warrant, we can enter into an informal settlement ,,. agreement which amicably resolves this matter without litigation or contest. Right to Contest - You have the right to contest this Citation and Notification of Penalty. You may contest all citation items or only individual items. You may also contest proposed penalties and/or abatement dates without contesting the underlying violations. Unless you inform the Area Director in writing that you intend to contest the citation(s) and/or proposed penalty6es) within 15 workinp, clays after receipt, the citation(s) and the or000sed penalty(ies) will become a final order of the Occupational Safety and Health Review Commission and may not be reviewed by any court or agency. Penalty Payment - Penalties are due within 15 working days of receipt of this notification unless contested. (See the enclosed booklet and the additional information provided related to the Debt Collection Act of 1982.) Make your check or money order payable to "DOL-OSHA". Please indicate the Inspection Number on the remittance. OSHA does not agree to any restrictions or conditions or endorsements put on any check or money order for less than the full amount due, and will cash the check or money order as if these restrictions, conditions, or endorsements do not exist. Notification of Corrective Action - For violations which you do not contest, you should notify the U.S. Department of Labor Area Office promptly by letter that you have taken appropriate corrective action within the time frame set forth on this Citation. Please inform the Area Office in writing of the abatement steps you have taken and of their dates, together with adequate supporting documentation, e.g., drawings or photographs of corrected conditions, purchase/work orders related to abatement actions, air sampling results, etc. (Please see attached "Corrective Action Verification.") Employer Discrimination Unlawful - The law prohibits discrimination by an employer against an employee for filing a complaint or for exercising any rights under this Act. An employee who believes that he/she has been discriminated against may file a complaint no later than 30 days after the discrimination occurred with the U.S. Department of Labor Area Office at the address shown above. Employer Rights and Responsibilities - The enclosed booklet (OSHA 3000) outlines additional employer rights and responsibilities and should be read in conjunction with this notification, Notice to Employees - The law gives an employee or his/her representative the opportunity to object to any abatement date set for a violation if he/she believes the date to be unreasonable. The contest must be mailed to the U.S. Department of Labor Area Office at the address shown above and postmarked within 15 working days (excluding weekends and Federal holidays) of the receipt by the employer of this Citation and Notification ®f Penalty. Citation and Notification of Penalty Page 2 of 6 OSHA-Mev, 6/9 3) A t: Corrective Action Verification Reference• Inspection Number: Dear Sir: OSHA's inspections are intended to result in the abatement/correction of violations of the OSHAct. To verify that this has been accomplished, Section t903.19 requires that an employer certif to OSHA, within ten (10) days of the final abatement date that each item cited has been corrected. This abatement certification letter must include the following: Name of Employer OSHA Inspection Number Citation and Item Numbers to which the submission relates The date each item was abated, specific action taken to abate each violation and appropriate documentation for the action taken. Where appropriate, this documentation should include photographs, work orders, purchase orders, personal protective equipment provided, standard operation procedures, copies of written programs, engineering controls, monitoring data, etc. Adequate supporting documentation may allow us to close the case file. The lack of adequate documentation could result in a follow -tip inspection. A statement that affected employees and their representatives have been informed of the abatement actions A statement that the information submitted is accurate The signature of the employer or the employer's authorized representative. Following is a sample format that may be used for this submittal: Name of Employer Citation Item No. Date Item Corrective Number Instance No. Abated Action Taken Date this letter of submission posted I certify that the information submitted is correct. Employer or Authorized Representative Citation and Notification of Penalty Page 3 of 6 OSHA-2(Rev, 6/93) U.S. Department of Labor Occupational Safety and Health Administration TES Cr ~ NOTICE TO EMPLOYEES OF INFORNIA'L CONFERENCE An informal conference has been scheduled with OSHA to discuss the citation(s) isstied on 10/08/2008. The conference will be held at the OSHA office located at ROOM 806, GEORGE MAHON FEDERAL BUILDING, 1205 TEXAS AVENUE, LUBBOCK, TX, 79401 on at . Employees and/or representatives of employees have a right to attend an informal conference. Citation and Notification of Penalty Page 4 of 6 OSHA-2(Rev. 6/93) U.S. Department of Labor Occupational Safety and Health Administration Inspection Number: 312386287 Q,•?f"` °F Inspection Dates:10/02/2008-10/02/2008 a 9 Issuance Date: 10/08/2008 _ a Fparps J� Citation and Notification of Penalty Company Name: Wright Construction Company Inspection Site: Loop 289 at Quaker, Lubbock, TX 79414 Citation 1 ltem 1 Type of Violation: Serious 29 CFR 1926.25(a): Debris was not kept cleared from work areas, passageways, and stairs, in and around buildings or other structures: On or about October 2, 2008 at the trench site located near the intersection of N TX Loop 289 and N Quaker Streets in Lubbock, Texas, debris, including but not limited to lumber, cable assemblies, a ladder laying on the ground parallel to trench, hammer, trench box rods, and a shovel, were strewn along the walk way along the length/edge of the trench. This created a slipping/tripping hazard to employees as they walked along this path to retrieve tools. etc. Date By Which Violation Must be Abated: Proposed Penalty: 10/ 15/2008 $ 1575.00 See pages 1 through 4 of this Citation and Notification of Penalty for information on employer and employee rights and responsibilities. s Citation and Notification of Penalty Page 5 of 6 OSHA-2 (Rev. 9/93) i-�j U.S. Department of Labor Occupational Safety and Health Administration Citation and Notification of Penalty Inspection Number: 312386287 Inspection Dates: 10/02/2008- 10/02/2008 o Issuance Date: 10/08/2008 q f� �W P Company Name: Wright Construction Company Inspection Site: Loop 289 at Quaker, Lubbock, TX 79414 Citation 1 Item 2 Type of Violation: Serious 29 CFR 1926.651(c)(2): A stairway, ladder, ramp or other safe means of egress was not located in trench excavations that were 4 feet (1.22m) or more in depth so as to require no more than 25 feet (7.62m) of lateral travel for employees: On or about October 2, 2008 at the trench site located at the intersection of N TX Loop 289 and N Quaker Streets in Lubbock, Texas, a commercial extension ladder was employed to provide ingress and egress from a 13.5 foot deep by 12 foot wide trench. However, the ladder was placed at approximately a 20 degree angle( to ground plane ), the ladder safety -shoes being placed on the concrete pipe in the trench and the ladder rails were leaning against the top trench wall edge. This configuration was not safe, as it exposed employees to a fall into the trench during egress or ingress. Date By Which Violation Must be Abated: Proposed Penalty: MCIHARD F. TAPI Area Director 10/ 15/2008 $ 1575.00 See pages 1 through 4 of this Citation and Notification of Penalty for information on employer and employee rights and responsibilities. Citation and Notification of Penalty Page 6 of 6 0SHfk-2 (Rev, 919�3) U.S. Department of Labor Occupational Safety and Health Administration ROOM 806, GEORGE MAHON FEDERAL BUILDING 1205 TEXAS AVENUE LUBBOCK, TX 79401 Phone: (806)472-7681 FAX: (806)472-7686 Company Name: Wright Construction Company u sPection Site; Loop 289 at Quaker, Lubbock, TX 79414 Issuance Bate: 10/08/2008 u sr Citation 1, Serious = $ 3150.00 TOTAL PROPOSED PENALTIES = $ 3150.00 To avoid additional charges, please remit payment promptly to this Area Office for the total amount of the uncontested penalties suirunarized above. Make your check or money order payable to: "DOL-OSHA". Please indicate OSHA's Inspection Number (indicated above) on the remittance. OSHA does not agree to any restrictions or conditions put on any check or money order for less than the full amount due and will cash the check or money order as if these restrictions or conditions do not exist. If a personal check is issued, it will be converted into an electronic fund transfer (EFT). This means that our bank ._; will copy your check and use the account information on it to electronically debit your account for the amount of the check. The debit from your account will then usually occur within 24 hours and will be shown on your regular account statement. You will not receive your original check back. The bank will destroy your original check, but will keep a copy of it. If the EFT cannot be completed because of insufficient funds or closed account, the bank will attempt to snake the transfer up to 2 times. Pursuant to the Debt Collection Act of 1982 (Public Law 97-365) and regulations of the U.S. Department of Labor (29 CFR Part 20), the Occupational Safety and Health Administration is required to assess interest, delinquent charges, and administrative costs for the collection of delinquent penalty debts for violations of the Occupational Safety and Health Act. Interest. Interest charges will be assessed at an annual rate determined by the Secretary of the Treasury on all penalty debt amounts not paid within one month (30 calendar days) of the date on which the debt amount becomes due and payable (penalty due date). The current interest rate is 5%. Interest will accrue from the date on which the penalty amounts (as proposed or adjusted) become a final order of the Occupational Safety and Health Review Corrunission (that is, 15 working days from your receipt of the Citation and Notification of Penalty), unless you file a notice of contest. Interest charges will be waived if the full amount owed is paid within 30 calendar days of the final order. Page 1 of 2 } Delinquent Charges. A debt is considered delinquent if it has not been paid within one month (30 calendar days) of the penalty due date or if a satisfactory payment arrangement has not been made. if the debt remains delinquent for more than 90 calendar days, a delinquent charge of six percent (6%) per annum will be assessed accruing from the date that the debt became delinquent. Administrative Costs. Agencies of the Department of Labor are required to assess additional charges for the recovery of delinquent debts. These additional charges are administrative costs incurred by the Agency in its attempt to collect an unpaid debt. Administrative costs will be assessed for demand letters sent in an attempt to collect the unpaid debt. ,� r•� RICHARD F. APIOP _ v Area Director I Date Page 2 of 2 U.S. Department of Labor Occupational Safety and Health Administration ,�, 1205 Texas Avenue, Room 806 i 1' Lubbock, TX 79401 ®� Phone: 806-472-7681 \N°TWI-1 Fax:806-472-7681 October 8, 2008 Wright Construction Company 601 Wall Street Grapevine, TX 76051 Re: OSHA Inspection Nunnber: 312386287 Dear Employer Inspection 312386287 of your workplace conducted on October 2, 2008 revealed no instances of Repeated, Willful, or Failure -to -Abate violations, nor were there a significant number of High Gravity Serious violations. Additionally, the compliance officer has reported that you have a good understanding of the actions necessary to correct the violations that were cited, and that you are willing to make those corrections by the date(s) specified in the citation. The good faith you have exhibited, and the absence of Repeated, Willful or Failure -to -Abate violations, makes your firm eligible for an Expedited Informal Settlement Agreement (EISA), Under this program, an employer and OSHA can enter into an Informal Settlement Agreement without going through the formal procedure of meeting in the Area Office. However, if you decide to enter into the Expedited Informal Settlement Agreement, you should be aware that you relinquish your right to contest the citations and penalties. The Expedited Informal Settlement Agreement can be used only where the sole issue of dispute is the dollar amount of proposed penalties. If you wish to discuss, change, or object to any other aspect of the inspection or citations - including abatement dates, validity of violations, classification of violations - then the Expedited Informal Settlement agreement cannot be used. Under those circumstances, you may request an Informal Conference with me and/or exercise your contest rights as explained elsewhere. You should carefully read the enclosed Expedited Informal Settlement Agreement to determine whether the terms of the agreement are acceptable to you. Key elements of the agreement call for OSHA to agree to a 40 per cent (40%) reduction in the total penalty amount proposed; for the Employer to correct the violations by the abatement date(s) set forth in the citation(s); for the Employer to provide evidence of corrective actions taken and to provide written certification that all terms have been abated at the time of final abatement. Please note that failure to comply with any of the terms set forth in the agreement will cause the penalty to revert to the initially proposed amount. a The signed agreement and a check for the full amount of the reduced penalty (40% off the total of initially proposed penalties) must be delivered to the Area Office prior to the expir.`.tion of the 15- working day contest period. if mailed, the letter must be postmarked not later than the day that the 15- working day contest period ends. If you have any questions regarding the Expedited Informal Settlement Agreement, please contact me at (806) 472-7681, ext 224. Sincerely, f ' RICHARD F. tAP Area Director Lubbock Area Office - OSHA RFTIpd U.S. Department of Labor Occupational Safety and Health Administration Lubbock Area Office 1205 Texas Avenue, Room 806 Lubbock, TX 79401 (806)472-7681 EXPEDITED INFORMAL SETTLEMENT AGREEMENT In the Platter of: Wright Construction Company OSHA lnsp�ction Number: 312386287 The undersigned Employer and the undersigned Occupational Safety and Health Administration (OSHA), in settlement of the above reverenced Citation(s) and Notification(s) of Penalty which were issued on October 8, 2008, hereby agree as follows: 1. The Employer agrees to correct the violations as cited in the above referenced citation(s). 2. The Employer agrees to provide evidence of the actions taken to correct the cited violations. . Upon correction of all violations, the Employer agrees to provide written certification to the Area Director that all of the violations have been corrected. The Employer agrees to post a copy of the written certification for a period of three days in the place the citations were posted as described in paragraph 7 of this Agreement. 4. OSHA agrees that the total penalty is amended to $1,890.00. Failure of the Employer to comply with the terms of this Agreement shall cause the penalty to revert to the initially proposed penalty of $3,150.00. 5. In consideration of the foregoing amendment(s) and/or modification(s) to the citation(s), the Employer hereby waives its right to contest said citation(s) pursuant to Section 10c of the Occupational Safety and Health Act of 1970. It is understood and agreed by the Occupational Safety and Health Administration and the Employer that the citation(s) as amended and/or modified by this Agreement shall be deemed a final order not subject to review by any court or Agency. 6. The employer agrees to immediately post a copy of this Settlement Agreement in the same manner and place as the Citation(s) (Citations are required by law to be posted in a prominent place at or near the location of the violation (s). Citations must remain posted until the violations cited have been corrected, or for three working days (excluding weekends and Federal Holidays), whichever is longer. 7. Each party hereby agrees to bear its own fees and other expenses incurred by such party in connection with any stage of this proceeding. For the Employer IOHRD F. TA- Occupational Safety and Health Administration Lubbock Area Office Date Signed / �. Alit '� /� �• Date Signed NOTICE TO EMPLOYEES The law gives you or your representative the opportunity to object to any abatement date set for a violation if you believe the date to be unreasonable. Any contest of the abatement dates of the citations referred to in paragraph I of this Settlement Agreement must be mailed to the U.S. Department of Labor Area Office at 1205 Texas Avenue, Room 806, Lubbock, TX 79401, within 15 working days (excluding weekends and Federal Holidays) of the receipt by the Employer of the original citations. IMPORTANT INFORMATION ABOUT PENALTY REDUCTIONS UNDER EISA (EXPEDITED INFORMAL SETTLEMENT AGREEMENTS) WHAT IS EISA? It is a way to reduce OSHA penalties by 40%. This is a pilot program offered by this OSHA office to increase the efficiency of business and government; other local OSHA offices may or may not be currently participating in this pilot program. WHY IS THE OTTER BEING MADE TO NNE? fi The recent inspection of your workplace uncovered no Repeated, Willful, or Failure -to -Abate violations of OSHA standards AND you are willing to correct the violations that were found no later than the dates shown on the citations. WHAT DO I HAVE TO DO? You have to agree to correct all the violations BY THE DATES shown on the citations AND provide evidence of the corrections. Submit the Corrective Action Verification Form (in the citation) to this office. STEP-BY-STEP, HOW WOULD I PROCEED? 1. Read and understand the Agreement. 2. If the terms are agreeable, sign the Agreement and return it to this office with a check for the reduced penalty amount. The agreement MUST be signed by you and POSTMARKED not later that the end of the 15 working day contest period. Correct the violation (Corrections MUST be made by the dates on the citations). 3. Send evidence of the corrections made (e.g., photographs, purchase orders, etc.). If you want, you can hold your evidence of corrections until everything has been corrected and then send it all out at once along with the Corrective Action Verification Form. 4. Fill out and sign the Corrective Action Verification Form, certifying that all of the violations have been corrected. Post one copy for your employees to see and send one copy to this OSHA office. WHAT IF I RUN INTO PROBLEMS AND CANNOT CORRECT ALL OF THE VIOLATIONS BY THE DATES ON THE CITATION? Contact this office as soon as you determine that you will not be able to correct the violations by the dates on the citations. If you can show a good reason for the delay, a new abatement date can be set. t_� SPECIFICATIONS Paine Intentionally Left Blank t I 12" WATER LINE RELOCATION AHEAD OF WEST LOOP 289 AND 19TH ST. PROJECT TECHNICAL SPECIFICATIONS MARCH 2O09 c 0