HomeMy WebLinkAboutResolution - 2007-R0158 - Ratify Application By SW Public Service Co. - Rate Changes, Fuel Reconciliation - 04_12_2007Resolution No. 2007-RO158
April 12, 2007
Item No. 6.4
RESOLUTION
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK:
THAT the Unanimous Stipulation filed in SOAH Docket No. 473-06-2536/PUC Docket
No. 32766 in relation to the Application of Southwestern Public Service Company for: (1)
Authority to Change Rates; (2) Reconciliation of Its Fuel Costs for 2004 and 2005; (3) Authority
to Revise the Semi -Annual Formulae Originally Approved in Docket No. 27751 and executed on
behalf of the City of Lubbock be and is hereby ratified by the City Council of the City of
Lubbock for and on behalf of the City of Lubbock, which is attached hereto and which shall be
spread upon the minutes of the Council and as spread upon the minutes of this Council shall
constitute and be a part of this Resolution as if fully copied herein in detail.
Passed by the City Council this 12th
ATTEST:
Reb cca Garza, City Secretary
APPROVED AS TO CONTENT:
Lee Ann Dumbauld
City Manager
APPROVED AS TO FORM:
Matthew L. Wade
Natural Resources Attorney
ml/ccdocs/sP5 rate case -stipulation res
April 9, 2007
day of April , 2007.
10
....
David A. Ddiller, Mayor
Resolution No. 2007—RO158
April 12, 2007
Item No. 6.4
RESOLUTION
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK:
THAT the Unanimous Stipulation filed in SOAH Docket No. 473-06-2536/PUC Docket
No. 32766 in relation to the Application of Southwestern Public Service Company for: (1)
Authority to Change Rates; (2) Reconciliation of Its Fuel Costs for 2004 and 2005; (3) Authority
to Revise the Semi -Annual Formulae Originally Approved in Docket No. 27751 and executed on
behalf of the City of Lubbock be and is hereby ratified by the City Council of the City of
Lubbock for and on behalf of the City of Lubbock, which is attached hereto and which shall be
spread upon the minutes of the Council and as spread upon the minutes of this Council shall
constitute and be a part of this Resolution as if fully copied herein in detail.
Passed by the City Council this 12th
ATTEST:
CQj=", __
Reb cca Garza, City Secretary
APPROVED AS TO CONTENT:
Lee Ann Dumbauld
City Manager
APPROVED AS TO FORM:
Matthew L. Wade
Natural Resources Attorney
ml/ccdocs/SPS rate case -stipulation res
April 9, 2007
day of April , 2007.
David A. Nfiller, Mayor
Resolution No. 2007—RO158
SOAH DOCKET NO.473-06-2536
PUC DOCKET NO.32766
APPLICATION OF
§
SOUTHWESTERN PUBLIC
§
SERVICE COMPANY FOR:
§
BEFORE THE STATE OFFICE
(1) AUTHORITY TO CHANGE
§
u
o
RATES; (2) RECONCILIATION OF
§
ITS FUEL COSTS FOR 2004 AND
§
OF -n�
6'�1
2005; (3) AUTHORITY TO REVISE
THE SEMI-ANNUAL FORMULAE
ORIGINALLY APPROVED IN
§
ADMINISTRATIVE HEARIN4,
DOCKET NO.27751 USED TO
§
ADJUST ITS FUEL FACTORS; AND
§
`F
(4) RELATED RELIEF
§
Ln
UNANIMOUS STIPULATION
(Filename: 7H9.doc;
Total Pages: 214)
Table of Contents
UNANIMOUS STIPULATION..................................................................................................... 3
Section 1. Agreement as to Base Rate Increase........................................................................ 4
Section 2. Effective Date of Rate Increase............................................................................... 4
Section3. Rate Design..............................................................................................................
5
Section 4. Resolution of Accounting Issues............................................................................. 5
Section 5. Service Commitments..............................................................................................
5
Section 6. 2004-2005 Reconciliation Request.......................................................................... 6
Section 7. Electrical Line Losses.............................................................................................. 7
Section 8. Resolution of Future Fuel Reconciliation Issues .....................................................
7
Section 9. System Average Fuel Cost Assignment to Existing Wholesale Contracts .............. 8
Section 10. Replacement Wholesale Agreements Eligible for System Average Fuel
CostAssignment...................................................................................................... 9
Section 11. Assignment of System Average Fuel Cost to Other Agreements .........................
10
Section 12. Limitations on Assignment of System Average Fuel Cost ....................................
10
Section 13. Litigation of the EPE Agreement..........................................................................
12
Section14. Fuel Factor.............................................................................................................
12
Section 15. Request to Share in Margins from Wholesale Non -Firm Sales .........................
13
Section 16. Electric Commodity Trading Margins...................................................................
13
Section 17. Reclassification of Facilities to Meet the Southwest Power Pool's
Definition of Transmission Facilities....................................................................
13
Section 18. Reclassification of Substation Equipment.............................................................
13
Section 19. Lea Power Partners................................................................................................
13
SOAR Docket No. 473-06-2536, PUC Docket No. 32766
Unanimous Stipulation
G:\Word\2005\0560004\7H9.doe Page l
Section 20. _PCRF Allocator.... :................................................................................................... 16
Section 21. Interruptible Credits...............................................................................................
16
Section22. Other Terms...........................................................................................................
17
Section 23. Waiver of Cross-examination................................................................................
17
Section 24. Obligation to Support this Stipulation ...........................................
Section 25. Effect of Modification of Stipulation....................................................................
17
Section 26. Effect of Stipulation in Other Regulatory Proceedings .........................................
18
Section 27. Multiple Counterparts............................................................................................
19
Exhibit A — Revenue Proofs.........................................................................................................
31
ExhibitB — Tariffs........................................................................................................................
38
Exhibit C — Depreciation Rates...................................................................................................
201
Exhibit D — Service Quality Commitments................................................................................
209
Exhibit E — Fuel Factor Formulae...............................................................................................
211
Certificateof Service..................................................................................................................
214
SOAH Docket No. 473-06-2536; PUC Docket No. 32766
Unanimous Stipulation
GAWord\2005\0560004\7H9.doc Page 2
SOAH DOCKET NO.473-06-2536
PUC DOCKET NO.32766
APPLICATION OF §
SOUTHWESTERN PUBLIC §
SERVICE COMPANY FOR: §
(1) AUTHORITY TO CHANGE §
RATES; (2) RECONCILIATION OF §
ITS FUEL COSTS FOR 2004 AND §
2005; (3) AUTHORITY TO REVISE §
THE SEMI-ANNUAL FORMULAE §
ORIGINALLY APPROVED IN §
DOCKET NO.27751 USED TO §
ADJUST ITS FUEL FACTORS; AND §
(4) RELATED RELIEF §
BEFORE THE STATE OFFICE
OF
ADMINISTRATIVE HEARINGS
UNANIMOUS STIPULATION
The parties to this Unanimous Stipulation, which is dated as of March 26, 2007, are the
Staff (Staff) of the Public Utility Commission of Texas (Commission), Southwestern Public
Service Company (SPS), the Alliance of Xcel Municipalities (AXM), the Office of Public Utility
Counsel (OPC), Texas Industrial Energy Consumers (TIEC), Occidental Permian Ltd. (OPL), the
State of Texas (State), West Texas Municipal Power Agency (WTMPA), Canadian River
Municipal Water Authority (CRMWA),. Texas Cotton Ginners' Association (TCGA), Golden
Spread Electric Cooperative, Inc. (Golden Spread), Tri-County Electric Cooperative, Inc.
(Tri-County), City of Lubbock (Lubbock), and Texas Farm Bureau (Farm Bureau). The
foregoing shall be referred to individually either as a Signatory or by the acronym assigned
above, and collectively as the Signatories. The Signatories submit this stipulation to the
Commission as representing a just and reasonable disposition of the issues related to this docket
consistent with the public interest; the Signatories request approval of this stipulation and entry
of findings of fact and conclusions of law consistent with that approval.
On May 31, 2006, pursuant to Sections 36.001-36.111 and 36.203 of the Public Utility
Regulatory Act, TEX. UTIL. CODE ANN. § 11.001 et seq. (Vernon 1998 & Supp. 2005) (PURA),
SPS filed its application with the Commission seeking authority to: (1) revise its base rates;
(2) reconcile its fuel and purchased power costs for 2004 and 2005; (3) revise the semi-annual
SOAH Docket No. 473-06-2536, PUCDocket No. 32766
Unanimous Stipulation
GAWord\2005\0560004\7H9.doc Page 3
formulae originally approved in Docket No. 27751 used to adjust its fuel factors; and (4) related
relief.
By this stipulation, the Signatories resolve all issues among them related to SPS's
application, and agree as follows:
Section 1. Agreement as to Base Rate Increase
SPS will institute an overall increase in base rate revenues of approximately $23 million
in its Texas retail service area, as more fully described in this stipulation. This base rate revenue
increase, which is a negotiated dollar amount, reflects adjusting for movements from fuel to base
rate treatment of the following: (a) TUCO Inc. (TUCO) non-traditional fuel costs (costs other
than mine costs, freight costs, and losses); and (b) Public Service Company of New Mexico
(PNM) demand charge credits.
Section 2. Effective Date of Rate Increase
The rate increase agreed to in this stipulation (as well as the treatment of the TUCO costs
and PNM credits as base rate items) shall be effective for usage on and after April 1, 2007, or on
such later date as may be approved by the Presiding Officer. The Signatories acknowledge that
the time required to obtain all necessary approvals of this stipulation may extend beyond that
date; therefore, immediately after execution of this stipulation by all parties, SPS will file, and
the remaining Signatories through this Stipulation will support, a Joint Petition for Interim Rates
seeking authorization for interim rates reflecting the rate increase described in this stipulation.
The Joint Petition for Interim Rates also will request that: (a) the interim rates be made effective
April 1, 2007, and that they remain in effect until superseded by the Commission's final order
approving rates as described in this stipulation; and (b) if the Commission enters an order
inconsistent with this stipulation, the interim rates will be void ab initio and SPS will refund the
over -recovery (if any) through a refund over a period equal to that in which the over -recovery
occurred beginning with the first full calendar month after the Commission order becomes final.
If the interim order resulting from the Joint Petition for Interim Rates is inconsistent with this
stipulation, any Signatory may request vacation of the order ab initio on the basis that it is not
the result of agreement of the parties as required by P.U.C. PROC. R. 22.125(c) and the remaining
Signatories shall support or not oppose the request.
SOAH Docket No. 473-06-2536, PUC Docket No. 32766
Unanimous Stipulation
G:\Word\2005\0560004\7H9.doc Page 4
Section 3. Rate Design
The annual base rate revenue increase of approximately $23 million will be allocated and
implemented through the rate design described in Exhibits A and B to this stipulation. The
Signatories acknowledge that the tariff sheets set forth in Exhibit B contain a new Transmission
Qualifying Facility Non -firm Standby Service tariff.
Section 4. Resolution of Accounting Issues
The Signatories have reached the following specific agreements as a part of the overall
resolution of this proceeding:
(a) Depreciation Rates. Effective for 2007, SPS will adopt new depreciation rates
set forth in Exhibit C to this stipulation, which are the depreciation rates
recommended in this docket by Staff witness Nara Srinivasa. If SPS's interim
rates are voided as set forth in Section 2, then SPS shall continue to book the
depreciation rates in effect on the date it filed this proceeding for all time periods
in which the interim rates were in effect.
(b) Amortization Period for Rate Case Expense. SPS shall amortize rate case
expenses over four years, using its and AXM's actual rate case expense as of the
end of briefing the litigated issue in this proceeding. Expenses incurred after that
time will be deferred to SPS's next base rate case.
(c) Franchise Fees. SPS will continue its prior practices for recovering municipal
franchise fees payments. Franchise fees of $6,247,329 will continue to be
collected in base rates. All current and future franchise fees not included in base
rates shall be surcharged in the municipality where the excess franchise fee is
authorized. The amount being surcharged for the Test Year was $4,269,293.
(d) AFUDC-Equity Calculation. The equity capital component used prospectively
for AFUDC calculation shall be 10.4 percent. By this agreement, however, the
Signatories do not represent that this value represents SPS's actual cost of equity
capital or that this rate of return on common equity was used to determine the
base rate revenue requirement and rate levels the Signatories have agreed to in
this stipulation.
(e) Demand -side Management. The total amount associated with the regulatory
asset for DSM capital expenditures ($20,333,344 total Company as of the Test
Year) shall be amortized over ten years. Findings of Fact Nos. 29, 30, 31, and 32
in the Commissions final order in Docket No. 11520, and Findings of Fact
Nos. 11 and 13 in the Commissions final order in Docket No. 13827 are not
altered or otherwise affected by this stipulation.
Section 5. Service Commitments
SPS will implement the service quality commitments shown in Exhibit D. As a part of
this effort, SPS commits that it will spend an additional $5 million per year in 2007 and in 2008
SOAK Docket No. 473-06-2536, PUC Docket No. 32766
Unanimous Stipulation
G:\Word\2005\0560004\7H9.doc Page 5
on service quality primarily on its distribution system. SPS will work with the Signatories to
ensure both that the spending is properly targeted and that SPS complies with its obligations as
set forth in this section.
Section 6. 2004-2005 Reconciliation Request
The Signatories agree to a black box settlement dollar amount of a $27 million reduction
in eligible fuel expense for the reconciliation period from the amount SPS originally requested in
this proceeding, as shown in the following table:
Description
Amount
December 31, 2003, Under -recovery Balance (excluding interest)
($23,842,076.55)
Fuel and Purchase Power Energy Cost: 1/04-12/05
($957,459,548.95)
Fuel Revenue Collected: 1/04-12/05
$731,464,991.20
Surcharge Collections: 1/04-12/05
$97,503,584.80
Margin Credit Transfers: 1/04-12/05
$585,081.63
Docket No. 29801 Credit Adjustments — Texas Allocated Amount
$13,750,025.52
Docket No. 32766 - Reduction in Eligible Fuel Expense
$27,000,000.00
December 31, 2005, Under -recovery balance (excluding interest)
($110,997,942.35)
This black box settlement resolves all fuel reconciliation issues concerning Texas retail rates
relating to the 2004-2005 reconciliation period, including: electrical line losses; coal mitigation;
coal standstill agreements with Arch; the Golden Spread Commitment and Dispatch Agreement;
the recovery of variable operation and maintenance (O&M) expense in eligible fuel; imputed
capacity associated with certain block energy purchases; costs associated with purchases from
Borger Energy Associates' Blackhawk facility; the wholesale sales agreement with the County of
Los Alamos, New Mexico; SPS's Wholesale Experimental Sales Rider; corrected calculation of
contracts assigned incremental costs; and assignment of System Average Fuel Cost (as defined in
Section 9) versus assignment of incremental fuel cost to wholesale sales.
SOAR Docket No. 473-06-2536; PUC Docket No. 32766
Unanimous Stipulation
G:\Word\2005\0560004\7H9.doc Page 6
Section 7. Electrical Line Losses
The Signatories agree that electrical line losses included in SPS's current fuel factors
shall remain in effect through April 30, 2007. SPS shall file a new electrical line loss study
(2007 Study) for calendar year 2006 on May 1, 2007, or as soon thereafter as possible, but in any
event no later than July 1, 2007. SPS agrees that all load, including all WTMPA load, shall be
assigned voltage adjusted line losses for purposes of this study. The 2007 Study will be filed
with the Commission for approval and shall be subject to challenge by the Commission Staff and
intervenors in that proceeding. The outcome of the line loss determination in this future
proceeding will not affect the base rates determined in Docket No. 32766 and will be effective as
of May 1, 2007, on a going -forward basis. The line losses resulting from this future proceeding
shall be recoverable through future fuel proceedings.
SPS will file a line loss study and an application for approval of new line loss factors
with the Commission to incorporate the impact of the Lea Power Partners Hobbs Generating
Facility, with line losses determined in that proceeding to be effective as of the commercial
operation date of the Lea Power Partners facility. The Signatories recognize that SPS may file
this line loss study after observing actual operating experience for one year after the Lea Power
Partners facility becomes operational, but the filing shall occur no later than 18 months after the
Lea Power Partners facility achieves commercial operation. The Signatories may intervene in
that proceeding, and any party to that proceeding may challenge the line loss study and the
proposed loss factors. Nothing in this Stipulation is intended to preclude any party from raising
any issue concerning the determination of loss factors in that proceeding.
Section 8. Resolution of Future Fuel Reconciliation Issues
SPS agrees that it will reduce eligible fuel expense in its fuel reconciliation proceeding
covering the 2006-2007 time period by $2.3 million. For this consideration (as well as the other
consideration stated in this stipulation), the Signatories agree that the following issues are
resolved as stated below for future fuel reconciliation proceedings before the Commission:
(a) All issues related to the prudence of the decision to enter into the 2001, 2003,
2005, and 2006 Arch contracts that were provided in the rate filing package, in
response to discovery, or the 2006 Standstill Agreements referenced in Thomas
A. lmbler's and Thomas Crowley's Rebuttal Testimony and provided through
supplemental discovery (i.e. those agreements known to the parties as of the date
of this stipulation) are resolved on a going -forward basis through the end of 2010.
SOAH Docket No. 473-06-2536; PUC Docket No. 32766
Unanimous Stipulation
GAWord\2005\0560004\7H9.doc Page 7
Parties may challenge the prudence of any Arch coal contract (including those
referenced above) relating to fuel costs incurred under these agreements after
2010. Nothing in this stipulation limits the ability of parties to challenge costs
incurred through 2010 associated with the ongoing administration of these
agreements in any appropriate proceeding;
(b) All issues related to the 2000 Amendment to the Golden Spread Commitment and
Dispatch Agreement are resolved for the period 2004-2007; and
(c) SPS agrees to move variable O&M expense under long-term purchased power
agreements currently recovered through fuel into base rates in its next general rate
case; however, these amounts remain recoverable in fuel until the effective date of
the final rate change in that proceeding (at which time fuel recovery of these costs
shall terminate). The prudence of, and whether a cost is, variable O&M expense
are subject to review in future fuel reconciliation proceedings.
Section 9. System Average Fuel Cost Assignment to Existing Wholesale Contracts
(a) "System Average Fuel Cost" for purposes of this stipulation shall mean the cost
of fuel and purchased energy procured to serve retail and wholesale sales for which this
stipulation pen -nits the assignment of system average fuel cost, all consistent with the types of
costs permitted to be recovered as Eligible Fuel Expense pursuant to P.U.C. SUBST. R. 25.236.
(b) For the purpose of this and future fuel reconciliation proceedings before the
Commission, the Signatories stipulate that on a going -forward basis, sales by SPS under existing
contracts to Central Valley Electric Cooperative, Inc., Farmers Electric Cooperative, Inc.,' Lea
County Electric Cooperative, Inc., Roosevelt County Electric Cooperative, Inc., Golden Spread,
Cap Rock Energy, WTMPA, PNM, and Tri-County (as well as amendments to such contracts
that do not adversely affect System Average Fuel Cost and other SPS retail to wholesale
transfers that may occur that would not adversely affect System Average Fuel Cost, such as a
sale of a part of SPS's distribution system) (collectively, Average Cost Eligible Contracts) may
be assigned System Average Fuel Cost for the remaining term of the existing agreements;
provided, however, that SPS will not assign System Average Fuel Cost to sales, if any, under the
Experimental Sales Rider to the wholesale full -requirements contracts. Successors and assigns
to Average Cost Eligible Contracts shall continue to qualify for assignment of System Average
The Signatories recognize that Farmers Electric Cooperative, Inc., provides station power service to a wind
farm located in PNM's control area, but that the power is purchased from SPS. The Signatories
acknowledge that this service receives System Average Fuel Cost and shall not affect the fuel cost
allocation permitted by this stipulation.
SOAH Docket No. 473-06-2536, PUC Docket No. 32766
Unanimous Stipulation
G:\Word\2005\0560004\7H9.doc Page 8
Fuel Cost if the succession or assignment: (1) does not change how the power and energy sold
under the contract was utilized on the effective date of this stipulation, and (2) does not
adversely affect System Average Fuel Cost.
(c) The Signatories acknowledge that power sales to WTMPA by SPS under its
current 15-year full requirements contract shall be assigned System Average Fuel Costs on an
ongoing basis for the remainder of the contract term for purposes of determining Texas eligible
fuel expense, but shall be subject to the conditions set forth in this paragraph. Beginning
January 1, 2007, SPS will credit SPS's Texas retail fuel costs with 39 percent of any non -fuel
revenue (including capacity and energy charges) that exceeds the amount of non -fuel charges
that would be applicable under SPS's lowest then -currently effective FERC cost of service rate
for full requirements service, recognizing that this amount may reach zero at some point during
the term of the contract with WTMPA. If the WTMPA rates are converted to cost -based rates by
agreement between SPS and WTMPA that results in a decrease in the rate charged by SPS to
WTMPA or are otherwise reduced by agreement of SPS and WTMPA such that the resulting
rates are less than the otherwise effective market -based rates upon conversion, the
above -described margin -sharing will continue as if the rate reduction had not occurred.
(d) The treatment of SPS's current sale to El Paso Electric Company (EPE) is
described in Section 13, below.
Section 10. Replacement Wholesale Agreements Eligible for System Average Fuel Cost
Assignment
For purposes of future fuel reconciliation proceedings before the Commission, the
Signatories stipulate that if SPS elects to make or is required to make sales under any
replacement agreement (which may take the form of a contract extension) for any Average Cost
Eligible Contract within the geographic footprint of the SPS control area as it `exists on the date
of this stipulation (inclusive of any transferred load from SPS retail to SPS wholesale, and
exclusive of any loads within the geographic footprint of the SPS control area that are currently
connected to a transmission line which is part of a non-SPS-control area), these sales may be
assigned System Average Fuel Cost, provided that the replacement agreements (or contract
extensions):
(a) are cost -based;
SOAR Docket No. 473-06-2536; PUC Docket No. 32766
Unanimous Stipulation
GAWord\2005\0560004\7H9.doc Page 9
(b) do not exceed current obligations, including retail load growth within the existing
SPS control area, of the Average Cost Eligible Contract customer;
(c) are for a minimum additional term of five years, but which may include
commercially reasonable termination provisions associated with customer needs
to plan for and add future generation supplies;
(d) may provide for conversions from full requirements service to partial
requirements service, where the partial requirements service also represents a
comparable use of system fuel and energy resources on the system; and
(e) may include customer protections against material changes in future conditions
such as implementation of retail competition or the sale of SPS generating assets.
The Signatories agree, subject to Section 11, below, that any sales by SPS to EPE or
;PNM under any replacement agreements are not eligible for allocation of System Average Fuel
Cost in future Commission proceedings.
Section 11. Assignment of System Average Fuel Cost to Other Agreements
Any wholesale customer contracts (other than those described in Section 9 or Section 10,
above) for which SPS seeks System Average Fuel Cost assignment must pass a system benefit
test of rate impacts on other customers, including SPS's retail customers. SPS agrees that it will
not assign System Average Fuel Cost to any such contracts for the purpose of setting Texas retail
rates unless and until the Commission approves such assignment, after consideration of SPS's
system benefit analysis and any objections to the system benefit analysis.
Section 12. Limitations on Assignment of System Average Fuel Cost
(a) It is the intent of the Signatories that, for purposes of any proceedings before the
Commission, System Average Fuel Cost may not be assigned to wholesale sales except to the
extent permitted under Sections 9, 10, and 11 of this Stipulation, and subject to the
Commission's resolution of the litigated matter set out in Section 13. The Signatories agree that
if a customer's contract demand under a wholesale agreement with SPS exceeds its
Requirements Load for any period of time (the difference between contract demand and
Requirements Load being referred to herein as Excess Power), to the extent that SPS delivers and
a customer uses Excess Power for any reason (e.g., resale into the wholesale market) it shall be
z Requirements Load is defined as an SPS customer's existing retail and existing contract load, and normal,
indigenous growth of that SPS customer's loads, within SPS's existing control area, but excluding existing
load that is not currently served by that SPS customer, either as retail load or through a contract.
SOAH Docket No. 473-06-2536; PUC Docket No. 32766
Unanimous Stipulation
G:\Word\2005\0560004\7H9.doc Page 10
presumed that SPS shall assign incremental fuel costa to such Excess Power sales for the purpose
of setting Texas retail rates. Provided, however, that this presumption shall not apply if (1) SPS
does not provide a right to Excess Power by contract, and (2) the FERC determines in a final,
non -appealable order in a non -settled contested proceeding, initiated by a party other than SPS,
that SPS must provide Excess Power at System Average Fuel Cost without restriction. SPS may
overcome this presumption in Texas only if the Commission determines, based on a filing by
SPS, after appropriate notice, and after any intervenors have an opportunity to be heard on any
issues raised by that filing, that a contract including Excess Power sale provisions will provide a
system benefit to SPS's retail customers, in which case SPS may assign System Average Fuel
Cost to such Excess Power sales. Nothing in this Section 12 shall be construed to create any
entitlement to Excess Power for any party. To the extent that it is shown that energy sold by SPS
to any wholesale customer is used for purposes other than those allowed System Average Fuel
Cost assignment in Sections 9-13, those sales shall be assigned incremental fuel cost for the
purpose of setting Texas retail rates, calculated in the manner described in the NUS in Docket
No. 29801.
(b) For the purpose of setting Texas retail rates, SPS shall not assign System Average
Fuel Cost to any energy that SPS's wholesale customer uses for any reason inconsistent with the
limitations set forth in Section 12(a). The Signatories recognize that: (1) an SPS customer with
an Average Cost Eligible Contract may participate in the Southwest Power Pool Energy
Imbalance Market or future energy markets, and (2) the sale of power under certain Average
Cost Eligible Contracts may make generation owned by wholesale customers, or power
purchased by wholesale customers from others, available for sale to the wholesale market that
would otherwise be needed by the wholesale customer to serve its Requirements Load, and that
such events alone do not change the nature of the cost assignment allowed under Sections 9 and
10.
(c) Nothing in this stipulation shall prohibit SPS from requesting Commission
approval of System Average Fuel Cost assignment under circumstances where the purpose or
effect of a transaction would pass a system benefit test of rate impacts on SPS's retail customers.
This provision shall not apply to an Average Cost Eligible Contract as it exists on the date of this
stipulation for its original term.
SOAH Docket No. 473-06-2536, PUC Docket No. 32766
Unanimous Stipulation
G:\Word\2005\0560004\7H9.doc Page 11
Section 13. Litigation of the EPE Agreement
a. SPS and the Signatories agree to litigate whether SPS's firm power sales to EPE
under the contract now in effect should be assigned System Average Fuel Cost or incremental
fuel costs for periods following the effective date of the final order in this docket.
b. If, as a result of the litigation contemplated by this section, SPS is entitled to
assign System Average Fuel Cost to sales under the current SPS/EPE agreement, beginning
January 1, 2007, SPS shall credit to SPS's Texas retail fuel costs 39 percent of any non -fuel
revenue received from EPE that exceeds the revenue that would be received under the
then -currently effective non -fuel portion of SPS's lowest FERC cost -of -service rate for partial
requirements service, recognizing that this amount may reach zero at some point during the term
of the agreement. If the EPE rates are converted to cost -based rates by agreement between SPS
and EPE that results in a decrease in the rate charged by SPS to EPE or are otherwise reduced by
agreement of SPS and EPE, the above described margin -sharing will continue as if such rate
reduction had not occurred.
C. If, as a result of the litigation contemplated by this section, SPS must assign
incremental fuel cost to the sales by SPS to EPE, the Signatories agree that, from the date of the
Commission's decision until December 31, 2008, such incremental fuel cost assignment shall be
based on a monthly pro-rata share of $6,300,000 per calendar year (the stipulated difference
between the incremental and average fuel cost for the EPE sale), and the resulting amount shall
be a credit to eligible fuel expense in the fuel reconciliation proceeding or proceedings covering
that time period. Beginning on January 1, 2009, SPS shall assign its actual incremental costs in
the then current year in a manner that is consistent with the method described in the
Non -unanimous Stipulation in Docket No. 29801.
d. SPS retains the right to appeal the Commission's decision in Docket No. 32685.
Section 14. Fuel Factor
SPS shall be entitled to continue using the formulaic approach to calculate its fuel factors
as originally approved in Docket No. 27751 and, consistent with the procedures established
therein, any party may challenge the formulaic approach in whole or in part. The formulae to be
used in the future are shown in Exhibit E. The formulae reflect the movement from fuel to base
rates associated with certain TUCO costs and PNM revenue credits described in Section 1. SPS
SOAR Docket No. 473-06-2536, PUCDocket No. 32766
Unanimous Stipulation
G:\Word\2005\0560004\7H9.doc Page 12
may refile its fuel factor formulae to reflect other changes requested in this proceeding and the
Signatories agree to make reasonable efforts to expedite resolution of that proceeding.
Section 15. Request to Share in Margins from Wholesale Non -Firm Sales
SPS satisfies the criteria set forth in P.U.C. SUBST. R. 25.236(a)(8) to share in the
margins from wholesale non -firm sales pursuant to P.U.C. SUBST. R. 25.236(a)(8) and that
authority should be granted to SPS. In SPS's next fuel reconciliation proceeding, all parties
would be free to advocate that SPS no longer satisfies the criteria set forth in P.U.C. SUBST.
R. 25.236(a)(8).
Section 16. Electric Commodity Trading Margins
The Signatories to the NUS in Docket No. 29801 agree to continue the treatment of
Electric Commodity Trading margins set forth in Section 7 of that agreement until the effective
date of a Commission order implementing different treatment, if any, in SPS's next general rate
case. No other Signatory to this stipulation opposes this treatment.
Section 17. Reclassification of Facilities to Meet the Southwest Power Pool's Definition of
Transmission Facilities
SPS's request to reclassify as distribution facilities transmission lines that are physically
radial to load, or operated radially due to a normally open switch in the line, that only serve
either one wholesale customer's load or only SPS retail load, is reasonable and should be
approved.
Section 18. Reclassification of Substation Equipment
SPS's request to reclassify certain substation equipment among the production,
transmission, and distribution functions to better align the classification with the function being
performed is reasonable and should be approved.
Section 19. Lea Power Partners
(a) Interim Recovery of Lea Power Partners Costs. The Signatories recognize and
agree that purchased capacity costs which are prudently incurred are of the same nature and kind
of cost that are traditionally allowed recovery in base rates under Texas ratemaking principles.
The Signatories agree that SPS may seek interim rates to recover certain purchased power costs
associated with capacity payments and fixed O&M payments made under the Power Purchase
Agreement between SPS and Lea Power Partners, LLC, (LPP) as set forth in this section.
SOAH Docket No. 473-06-2536; PUC Docket No. 32766
Unanimous Stipulation
GAWord\2005\0560004\7H9.doc Page 13
(b) General Description of Right to Recover Interim Rates. The Signatories agree
that SPS may seek interim rates to recover $1.5 million per month for the period beginning on
the later of the Commercial Operation Date of the LPP facility (as defined in the Power Purchase
Agreement between SPS and LPP) or the date SPS files its 2008 Texas base rate case. This
amount represents a black box compromise and settlement, wherein the Signatories agree that
SPS may obtain interim recovery of a portion of the Payments for Contract Capacity and
Payments for Dispatchability incurred by SPS under Sections 8.1 and 8.2 of the Power Purchase
Agreement (PPA) dated October 20, 2006, between LPP and SPS associated with the Lea Power
Partners Hobbs Generation Station project (LPP Project). Subject to the following conditions,
the Signatories agree that SPS may file a motion to implement interim rates by which SPS may
begin to recover these interim rates 35 days after the filing of its 2008 base rate proceeding, but
no earlier than the Commercial Operation Date. Signatories will not object to SPS's request for
interim rates in accordance with this agreement, and Signatories will waive any applicable
financial thresholds for obtaining interim rates. SPS will not recover any such interim rates until
and unless it files a base rate case that includes these LPP Project fixed costs in the proposed
revenue requirement.
(c) Calculation of Interim Rates. The Signatories agree that interim rates shall be
calculated and collected as follows:
• During 2008, SPS may recover the economic value of up to $49,296.00 for
each day (equivalent to $1.5 million per month) after the Commercial
Operation Date of the LPP Project or the date SPS files its next Texas base
rate case, whichever is later, subject to the limitations set forth in Section (0
below. This economic value may be recovered through interim rates collected
over a shorter period of time, as shown in the example below. The following
example illustrates the operation of this subsection:
• Assume that the Commercial Operation Date of the LPP Project occurs on
June 1, 2008 (213 days before the end of the year), and on that same date SPS
files a base rate case and request for interim rates to become effective on
July 5, 2008 (35 days from the date the rate case is filed and 179 days before
the end of the year). SPS would be allowed recovery of a total of $10,500,000
during 2008 (213 days times $49,296 per day). This results in an unadjusted
interim rate recovery level for 2008 of $58,659.22 per day from July 51h
through December 31, 2008 ($10,500,000 divided by 179 days).
SOAH Docket No. 473-06-2536, PUC Docket No. 32766
Unanimous Stipulation
G:\Word\2005\0560004\7H9.doc Page 14
• Beginning January 1, 2009, subject to the limitations set forth in Section (f)
below, the monthly recovery under interim rates will be $1.5 million (prorated
on a daily basis for partial months) and shall continue until the effective date
of base rates determined in the SPS base rate case.
(d) Requirement that the LPP Project Be Commercially Operational. The LPP
Project must be in combined -cycle commercial operation prior to allowing interim rates. To
qualify for recovery of interim rates, SPS must demonstrate that its payments for power from the
LPP Project are in accordance with the payment calculations found at Article 8 of the LPP
Purchase Power Agreement.
(e) Termination of Interim Rate Recovery. The interim cost recovery mechanism
authorized by this section shall terminate with the effective date of new base rates authorized in
SPS's 2008 rate case proceeding. Any costs attributable to the LPP Project that the Commission
deems to be recoverable in base rates shall be recovered through base rates as of the effective
date of final rates in that proceeding.
(f) Other Conditions. The Signatories agree that:
(i) There will be a true -up of the amounts collected through these interim
rates in order to ensure that SPS did not collect more through interim rates
than the Commission ultimately approves as an increase in SPS's base
rates in its next base rate case. If the Commission approves no increase in
base rates or a decrease in base rates, the entire amount collected through
interim rates will be refunded. If the Commission approves an increase in
base rates of less than $18 million per year, then a portion of the interim
rates will be refunded in proportion to the amount of the increase in base
rates compared to $18 million. For example, if the Commission approves
a base rate increase of $9 million, then SPS will refund half of the interim
rates it collected.
(ii) There will be a true -up of the amounts collected through the interim rates
in order to ensure that SPS did not collect more through the interim rates
than the Texas jurisdictional allocation of SPS's actual LPP Project costs
[Payments for Contract Capacity and Dispatchability described in
subsection (b), above] incurred from the Commercial Operation Date until
the effective date of new base rates authorized in SPS's 2008 rate case.
(iii) There will be a true -up of amounts collected through interim rates based
on the cumulative Capacity Availability Factor (CAF) measured over the
period from the date of Commercial Operation through the effective date
of new base rates authorized in SPS's 2008 rate case. This true -up shall
be calculated by dividing the actual cumulative CAF over the period from
the date of Commercial Operation through the effective date of new base
SOAR Docket No. 473-06-2536, PUCDocket No. 32766
Unanimous Stipulation
G:\Word12005\0560004\7H9.doc Page 15
rates authorized in SPS's 2008 rate case by 0.85. If the result of this
calculation is 1.0 or more, then no CAF adjustment (or true -up) shall be
made. If the result of this calculation is less than 1.0, then SPS shall true -
up and refund a proportional amount the costs recovered through interim
rates. For example, if the actual cumulative CAF over the interim period
is 0.80, then SPS shall refund 5.8824% [(0.85-0.80) divided by 0.85] of
the amounts collected through interim rates. For purposes of calculating
this true -up, the total amount of Scheduled Maintenance Energy (SME)
included in the CAF calculation over the interim period shall not exceed
the prorated portion of the annual amount of SME set forth in Section 10.1
of the LPP PPA. (Capitalized terms are as defined in the LPP PPA.)
Section 20. PCRF Allocator
Effective as of the same date as interim rates become effective pursuant to Section 2, the
Texas retail PCRF allocator shall be 52.5 percent and shall remain at that level until changed in a
future base rate proceeding. The PCRF tariff sheets reflecting this change are included in the
tariff sheets shown in Exhibit B.
Section 21. Interruptible Credits
(a) The Signatories agree that SPS may create a regulatory asset to accrue the
discounts from firm rates given to interruptible customers and the credits paid to interruptible
customers (collectively, Interruptible Credits) frorn the date rates become effective pursuant to
Section 2 until the date final rates from SPS's next Texas retail base rate proceeding become
effective. If SPS does not file a Texas retail base rate proceeding before December 31, 2008,
however, SPS shall discontinue accruing amounts paid as Interruptible Credits after December
31, 2008. The amount accrued under this section shall not exceed $475,000 per year (Texas
retail share), prorated on a daily basis for partial years. If SPS does not file a base rate case by
December 31, 2008, then beginning January 1, 2009, the amount of this regulatory asset shall
reduce by 1/48`h per month until it has reached zero.
(b) SPS shall amortize to expense any amounts accrued pursuant to paragraph (a) that
are approved by the Commission in SPS's next base rate case over a four-year period beginning
on the effective date of final rates determined in SPS's next Texas retail base rate proceeding.
(c) The Signatories agree that any party may raise any issue relating to these
Interruptible Credits in SPS's next Texas retail base rate proceeding including but not limited to
the reasonableness, amount, jurisdictional allocation or calculation of the Interruptible Credits
SOAR Docket No. 473-06-2536, PUC Docket No. 32766
Unanimous Stipulation
GAWord\2005\0560004\7H9.doc Page 16
and the amount to be recovered from Texas retail customers, but Signatories waive the
arguments that recovery of any accrued amounts requires SPS to make a financial integrity
showing (as to this point only, OPC does not oppose),° that SPS had no approval to accrue the
Interruptible Credits, and that the costs should be amortized over a different period than specified
in subsection (b), above.
Section 22. Other Terms
SPS will, in the 60-day period following the date of the execution of this stipulation,
work with Signatories on transmission cost recovery issues and consider the Signatories'
concerns and proposals. The Signatories (other than Staff) agree to notify the Commission Staff
of this provision and to urge the Commission to allow the Signatories the opportunity to attempt
to develop a consensus regarding a transmission cost recovery rule.
Section 23. Waiver of Cross-examination
The parties: (a) stipulate to the admission of SPS's application, notice affidavits, SPS's
rate filing package, and the pre -tiled testimony and exhibits of all parties to this docket, together
with all errata, updates, and supplements to the foregoing, and (b) except as may be necessary to
conduct the EPE agreement litigation described in Section 13, above, waive cross-examination of
all witnesses.
Section 24. Obligation to Support this Stipulation
The Signatories agree that they will support this stipulation before the Commission and
will take reasonable steps to ensure that the Commission enters an order consistent with this
stipulation.
Section 25. Effect of Modification of Stipulation
There are no third party beneficiaries of this agreement. Although this agreement
represents a settlement among the parties with respect to the issues presented in this docket, this
agreement is merely a settlement proposal submitted to the Commission, which has the authority
to enter an order resolving these issues. The Signatories agree that this agreement resolves issues
only with respect to the Texas retail jurisdiction and shall not be binding on nor have any effect
on proceedings in other jurisdictions.
° This waiver shall not constitute precedent for treatment of any deferred accounting and for any other case
involving this or any other utility.
SOAH Docket No. 473-06-2536; PUC Docket No. 32766
Unanimous Stipulation
G:1Word\2005\0560004\7H9.doc Page 17
This stipulation has been drafted by all the Signatories and is the result of negotiation,
compromise, settlement, and accommodation. The Signatories agree that this settlement is in the
public interest. The Signatories agree that the terms and conditions herein are interdependent.
The various provisions of this stipulation are not severable. None of the provisions of this
stipulation shall become fully operative unless the Commission shall have entered a final order
approving this stipulation. If the Commission issues a final order inconsistent with the terms of
this stipulation, each Signatory has the right to withdraw from this stipulation, to submit
testimony, and to obtain a hearing and advocate any position it deems appropriate with respect to
any issue in this stipulation.
Section 26. Effect of Stipulation in Other Regulatory Proceedings
This stipulation is binding on each of the Signatories only for the purpose of settling the
issues as set forth herein in this jurisdiction only and for no other purposes. The matters resolved
herein are resolved on the basis of a compromise and settlement. Except to the extent that this
stipulation expressly governs a Signatory's rights and obligations for future periods, this
stipulation shall not be binding or precedential on a Signatory outside of this proceeding or a
proceeding to enforce the terms of this stipulation. The Signatories recognize and agree that
Sections 4(e), 5, 7, 8, 9, 10, 11, 12, 13 (as to this provision only, for fuel issues only), 19, 20, and
21 all include forward -looking provisions and corresponding obligations. It is acknowledged that
a Signatory's support of the matters contained in this stipulation may differ from the position
taken or testimony presented by it in other dockets or other jurisdictions. To the extent that there
is a difference, a Signatory does not waive its position in any of those other dockets or
jurisdictions. Because this is a stipulated resolution, no Signatory is under any obligation to take
the same positions as set out in this stipulation in other dockets or jurisdictions, regardless of
whether other dockets present the same or a different set of circumstances, except as otherwise
may be explicitly provided by this stipulation.
The provisions of this stipulation are intended to relate to only the specific matters
referred to herein. By agreeing to this stipulation, no Signatory waives any claim it may
otherwise have with respect to issues not expressly provided for herein. It is further understood
and agreed that this stipulation represents a negotiated settlement of all issues in this proceeding.
SOAR Docket No. 473-06-2536, PUC Docket No. 32766
Unanimous Stipulation
G:\Word\2005\0560004\7H9.doc Page 18
This settlement represented by this stipulation resolves the stated issues in the Texas
retail jurisdiction only, and this Stipulation does not resolve any claims, issues or proceedings
pending in or pertaining to other jurisdictions.
Section 27. Multiple Counterparts
Each copy of this stipulation may not bear the signatures of all the Signatories but will be
deemed fully executed if all copies together bear the signatures of all Signatories.
Fully and duly authorized representatives of the Signatories have signed this stipulation
as of the date first set forth above.
STAFF OF THE PUBLIC UTILITY
CO MISSION OF TEXAS
By: ��u �
Patrick Sullivan
Attorney of Record
SOUTHWESTERN PUBLIC SERVICE
COWA
By:10
teven D. otd
Attorney of Record
ALLIANCE OF XCEL MUNICIPALITIES
M
Alfred R. Herrera
Attorney of Record
OFFICE OF PUBLIC UTILITY COUNSEL
Lanetta Cooper
Attorney of Record
SOAK Docket No. 473-06-2536, PUC Docket No. 32766
Unanimous Stpaladon
G:\Word\2005\0560004\7H9.doc Page 19
otherwise have with respect to issues not expmssly provided for herein. It is further understood
and agreed that this stipulation represents a negotiated settlement of all issues in this proceeding.
This settlement represented by this stipulation resolves the stated issues in the Texas
retail jurisdiction only, and this Stipulation does not resolve any claims, issues or proceedings
pending in or pertaining to other jurisdictions.
Section 27. Multiple Counterparts
Each copy of this stipulation may not bear the signatures of all the Signatories but will be
deemed fully executed if all copies together bear the signatures of all Signatories.
Fully and duly authorized representatives of the Signatories have signed this stipulation
as of the date first set forth above.
STAFF OF THE PUBLIC UTILITY
COMMISSION OF TEXAS
By:
Patrick Sullivan
Attorney of Record
SOUTHWESTERN PUBLIC SERVICE
COMPANY
By:
Steven D. Arnold
Attorney of Record
ALLIANCE OF XCEL MUNIf IPALITIES
ediLYIerrera
Attorney of Record
OFFICE OF PUBLIC UTILITY COUNSEL
By:
Lanetta Cooper
Attorney of Record
SOAH Docker No. 473-06-2536; PUCDaeket Na J2766
Uaanimoussipuladon
G:1Word12005\0560004Mi9.doc Pagg 19
This settlement represented by this stipulation resolves the stated issues in the Texas
retail jurisdiction only, and this Stipulation does not resolve any claims, issues or proceedings
pending in or pertaining to other jurisdictions.
Section 27. Multiple Counterparts
Each copy of this stipulation may not bear the signatures of all the Signatories but will be
deemed fully executed if all copies together bear the signatures of all Signatories.
Fully and duty authorized representatives of the Signatories have signed this stipulation
as of the date first set forth above.
STAFF OF THE PUBLIC UTILITY
COMMISSION OF TEXAS
By:
Pauick Sullivan
Attorney of Record
SOUTHWESTERN PUBLIC SERVICE
COMPANY
M
Steven D. Arnold
Attorney of Record
ALLIANCE OF XCEL MUNICIPALITIES
IN
Alfred R. Herrera
Attorney of Record
OFFICE OFAWSLIC UTIJITYiCOUNSEL
By:
Lanetta Cooper
Attorney of Re(
SOANDoeketNo. 473-06-2536, PUC Dockei No. 32766
Unanimous Sdpuladan
G:\Word\2005\0560004\71i9.doc Page 19
a[
TEXAS INDUSTRIAL ENERGY CONSUMERS
Y•
/,/ �, / � /, 411--, A � K
Rex VanMiddlesworth
Attorney of Record
OCCIDENTAL PERMIAN Ltd.
James Bushee
Attorney of Record
STATE OF TEXAS
10
Amalija J. Hodgins
Attorney of Record
WEST TEXAS MUNICIPAL POWER AGENCY
Maria Sanchez
Attorney of Record
CANADIAN RIVER MUNICIPAL WATER
AUTHORITY
M
Joe Pratt
Attorney of Record
"TEXAS COTTON GINNERS' ASSOCIATION
M.
Zach Brady
Attorney of Record
SOAR Docket No- 473-06-2536; PUC Dockeg Ne. 32166
Unanimous Mpuladon
G:1Word120055056000417H9.doc Page 20
22
TEXAS INDUSTRIAL ENERGY CONSUMERS
In
Rex VanMiddlesworth
Attorney of Record
OCCIDENTAL PERMIAN Ltd.
4
ames Bushee
ttorney of Record
STATE OF TEXAS
Amalija J. Hodgins
Attorney of Record
WEST TEXAS MUNICIPAL POWER AGENCY
Maria Sanchez
Attorney of Record
CANADIAN RIVER MUNICIPAL WATER
AUTHORITY
M
Joe Pratt
Attorney of Record
TEXAS COTTON GINNERS' ASSOCIATION
Zach Brady
Attorney of Record
SOAH Docket No. 473-06-2536; PUC Docket No. 32766
Unanimous S[ipulalion
GAWord\2005\0560004\7H9.doc Page 20
23
TEXAS INDUSTRIAL ENERGY CONSUMERS
Rex VanMiddlesworth
Attorney of Record
OCCIDENTAL PERMIAN Ltd.
LM
James Bushee
Attorney of Record
STATE OF TEXAS
Amalija J. Hodgins
Attorney of Record
WEST TEXAS MUNICIPAL POWER AGENCY
By:ww Ww.
Maria Sanchez
Attorney of Record"
W ivy
CANADIAN RIVER MUNICIPAL WATER
AUTHORITY
LIM
Joe Pratt
Attorney of Record
TEXAS COTTON GINNERS' ASSOCIATION
Lm-
Zach Brady
Attorney of Record
SOAR Docket No. 473-06-2536, PUCDocket No. 32766
Unanimous Stipulation
G:1Word120051056000417H9.doc Page 20
2�
TEXAS INDUSTRIAL ENERGY CONSUMERS
By:
Rex VanMiddlesworth
Attorney of Record
OCCIDENTAL PERMIAN Ltd.
By:
James Bushee
Attorney of Record
STATE OF TEXAS
By: -
Amalija J. Hodgins
Attorney of Record
WEST TEXAS MUNICIPAL POWER AGENCY
Maria Sanchez
Attorney of Record
CANADIAN RIVER MUNICIPAL WATER
AUTHORITY
By: age-4 /��
Joe Pratt
Attorney of Record
TEXAS COTTON GINNERS' ASSOCIATION
Zach Brady
Attorney of Record
SOAHDocket No. 473-06 2S36; PUCDocket No. 32766
Unanimous Stipulation
GAWord\20051056000417H9.doc Page 20
Z5—
TEXAS INDUSTRIAL ENERGY CONSUMERS
Rex VanMiddlesworth
Attorney of Record
OCCIDENTAL PERMIAN Ltd.
LIM
James Bushee
Attorney of Record
STATE OF TEXAS
Amalija J. Hodgins
Attorney of Record
WEST TEXAS MUNICIPAL POWER AGENCY
Maria Sanchez
Attorney of Record
CANADIAN RIVER MUNICIPAL WATER
AUTHORITY
Joe Pratt
Attorney of Record
TEXAS COTTON GINNERS' ASSOCIATION
By.
G�
Zac Brady
rney of Record
SOARDocked No. 473-06-2536; PUCDockel No. 32766
Unanimous Mpulalion
G:1Word120051056000417H9.doc Page 20
240
GOLDEN SPREAD ELECTRIC COOPERATIVE,
INC.
Golden Spread Electric Cooperative, Inc., joins in
this stipulation except as to sections 9(b), 10, 11 and
12, and does not oppose entry of an Order
consistent with this entire stipulation
By: 6--'6
I.Kaig ein
Attorney of Record
TRI-COUNTY ELECTRIC COOPERATIVE, INC.
John Arnold
Attorney of Record
CITY OF LUBBOCK
Matthew Wade
Attorney of Record
TEXAS FARM BUREAU
Catherine Webking
Attorney of Record
SOAR Docket No. 473-06-2536; PUC Docket No. 32766
Unanimous Slipuladon
G:\Word\2005\0560004\7H9.doc Page 21
�,
GOLDEN SPREAD ELECTRIC COOPERATIVE,
INC.
Golden Spread Electric Cooperative, Inc., joins in
this stipulation except as to sections 9(b), 10, 11 and
12, and does not oppose entry of an Order
consistent with this entire stipulation
Ila
Craig Silverstein
Attorney of Record
TRI-COUNTY ELECTRIC COOPERATIVE, INC.
B:
Y
o n Arnold
Attorney of Record
CITY OF LUBBOCK
Matthew Wade
Attorney of Record
TEXAS FARM BUREAU
Catherine Webking
Attorney of Record
SOAR Docket No. 473-06-2536; PUC Docket No. 32 766
Unanimous Stipulation
G:1Word12005'.056000417H9.doc Page 21
M
GOLDEN SPREAD ELECTRIC COOPERATIVE,
INC.
Golden Spread Electric Cooperative, Inc., joins in
this stipulation except as to sections 9(b), 10, 11 and
12, and does not oppose entry of an Order
consistent with this entire stipulation
By:
Craig Silverstein
Attorney of Record
TRI-COUNTY ELECTRIC COOPERATIVE, INC.
John Arnold
Attorney of Record
CITY OF LUBBOCK
By:
M tthew Wade
Attorney of Record
TEXAS FARM BUREAU
Catherine Webking
Attomey of Record
SOAK Docket No. 473-06-2536, PUC Docket No. 32766
Unanimous Stipulation
GAWord\20051056000417H9.doc Page 21
51
GOLDEN SPREAD ELECTRIC COOPERATIVE,
INC.
Golden Spread Electric Cooperative, Inc., joins in
this stipulation except as to sections 9(b), 10, 11 and
12, and does not oppose entry of an Order
consistent with this entire stipulation
Craig Silverstein
Attorney of Record
TRI-COUNTY ELECTRIC COOPERATIVE, INC.
John Arnold
Attorney of Record
CITY OF LUBBOCK
Matthew Wade
-Attorney of Record
TEXAS FARM BUREAU
By: G2�
Catherine Webking
Attorney of Record
SOAR Docket No. 473-06-2536, PUC Docket No. 32766
Unanimous Stipulation
G:\Word\2005\0560004\7H9.doc Page 21
80
Exhibit A — Revenue Proofs
SOAR Docket No. 473-06-2536, PUC Docket No. 32766
Unanimous Stipulation
G:\Word\20051056000417H9.doc Page 31
Southwestern Public Service Company
Settlement Base Revenue Increase by Rate Class
12 Months Ended September 30, 2005
Proposed Rate Class
Residential Service
Small Commercial Service
Commercial & Industrial Service
Small Municipal & School Service
Large Municipal and School Service
Street & Area Lighting Service
Total Texas Retail
W
N
Present
Base Revenue
94,452,128
13,786,462
171,779,149
433,262
9,299,168
5,642,796
Base Revenue Increase
Amount Percent Relative
$ 10, 832,122
793,163
10,240,457
51,280
484,298
538,027
$ 295,392,964 $ 22,939,347
Settlement
Base Revenue
11.5%
148%
$ 105,284,250
5.8%
74%
14,579,625
6.0%
77%
182,019,606
11.8%
152%
484,542
5.2%
67%
9,783,466
9.5%
123%
6,180,823
7.8%
100%
$ 318,332,311
Southwestern Public Sevice Company
Settlement Base Rate Revenue Reconciliation
12 Months Ended September 30, 2005
Line Rate Class
No. Proposed Rate Billing Units
I Residential
2
3 R Service & Facility Charge 2,522,902 Bills
4 Energy Charge - Summer
5 Energy Charge - Winter
6 Total
7
8 Total Revenue Requirement
9 Rounding Difference
10
12 Small General Service
13
14 SGS Service & Facility Charge
15 Energy Charge - Summer
16 Energy Charge - Winter
17 Total
18
19 Total Revenue Requirement
20 Rounding Difference
21
22
23 Small Municipal & School
24
25 SMS Service & Facility Charge
26 Energy Charge - Summer
27 Energy Charge - Winter
28 Total
29
30 Total Revenue Requirement
31 Rounding Difference
32
33
34 Larfle Municipal & School
35
36 LSS Service & Facility Charge
37 Demand Charge - Summer
38 Demand Charge - W inter
39 Energy Charge
40 Total
41
42 LMS Service & Facility Charge
37 Demand Charge - Summer
38 Demand Charge - Winter
39 Energy Charge
40 Total
41
42 CRMWA Adjustment
43 Total Revenue Requirement
44 Rounding Difference
1,006,992,444 kWh
1,449,640,630 kWh
2,456,633,074 kWh
Settlement
Settlement Base Rate
Rate Revenue
$ 5.10 / Month 12,866,800
S 0.04500 / kWh 45,314,660
S 0.03249 / kWh 47,098,824
92,413,484
105,284,250
(3,966)
345,388
Bills
S
t 1-00
/ Month
3,799,268
115.209,704
kWh
$
0.04250
I kWh
4,896,412
175,529,956
kWh
$
0.03350
/ kWh
5,880,254
290,739,660
kWh
10,776,666
14,579,625
(3,691)
45,910
Bills
4,470,144
kWh
$
0.03880
/kWh
173,442
9,737,856
kWh
$
0.03193
/ kWh
310,930
14,208,000
kWh
484,371
484,542
(17t)
7,311
Bills
$
15.00 I Month
109,665
230,010
kW-Mo
S
7.69 / kW-Mo
1,768,780
464,981
kW-Mo
S
6.33 / kW-Mo
2,943,332
154,772,405
kWh
$
0.00417 / kWh
645,401
304,948,696
kWh
5,467,177
9,773
Bills
$
15.00 / Month
146,595
224,728
kW-Mo
$
6.79 1 kW-Mo
1,525,906
369,249
kW-Mo
S
5.59 / kW-Mo
2,064,103
150,176,291
kWh
S
0.00351 /kWh
527,119
304,948,696
kWh
4,263,723
(52,486)
9,730,980
(80)
Southwestern Public Sevice Company
Settlement Base Rate Revenue Reconciliation
12 Months Ended September 30, 2005
Line Rate Class
No. Pronosed Rate Billine Units
I
Commercial & Industrial - General Service
2
3
SG Service & Facility Charge
207,016
Bills
4
Demand Charge - Summer
3,754,591
kW-Mo
5
Demand Charge- Winter
6,134,699
kW-Mo
6
Energy Charge
2,883,173,895
kWh
7
Total
2,883,173,895
kWh
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
PG Service & Facility Charge
Demand Charge - Summer
Demand Charge - Winter
Energy Charge
Total
LGS-T Service & Facility Charge - (Total)
Full Year Customers
Partial Year Customer
Demand Charge - Summer
Demand Charge - Winter
Energy Charge
Total
Total Commercial & Industrial - General Sen-ice
Rounding Difference
Commercial & Industrial - Standby Service
SST Service & Facility Charge
Tran & Dist Standby Capacity Fee
Gen Standby Cap Reservation Fee - Summer
Gen Standby Cap Reservation Fee - Winter
Energy Charge
Total
46,620 Bills
1,186,955 kW-Mo
2,232,701 kW-1v10
1,734,735,842 kWh
1,734,735,842 kWh
334
Bills
312
Bills
21.57
Bills
2,498,724
kW-Mo
4,553,787
kW-Mo
5,000,004,860
kWh
5,000,004,860
kWh
9,617,914,597 kWh
Settlement
Settlement
Base Rate
Rate
Revenue
$ 25.35 / Month
5,247,856
$ 9.29 /kW-Mo
34,880,151
$ 7.40 / kW-Mo
45,396,771
$ 0.00300 / kWh
8,649,522
94,174,300
11479 / Month
5,351,510
8.44 / kW-Mo
10,017,897
6.58 / kW-Mo
14,691,173
$ 000296 /kWh
5,134,818
35,195,397
$ 39,940.00 / Month
478,745
$ 1,519.23 / Month
$474,000
$ 220.00 / Month
4,745
$ 5.97 / kW-Mo
14,917,379
$ 4.25 / kW-Mo
19,353,595
$ 000280 /kWh
14,000,014
48,749,733
178,103,865
15,565
0 131IIs $
126.00 / Month 0
0 kw-Mo
4.04 /kW-Mo 0
0 kW-Mo
0.72 /kW-Mo 0
0 kW-Mo
0.46 / kW-Mo 0
0 kWh
0.00300 / kWh 0
0 kWh
PST Service & Facility Charge
0 Bills $
223.00 / Month
0
Tran & Dist Standby Capacity Fee
0 kW-hio
3.27 / kW-Mo
0
Gen Standby Cap Reservation Fee - Summer
0 kW -Mc,
0.71 / kW-Mo
0
Gen Standby Cap Reservation Fee - Winter
0 kW-Mo
0.45 / kW-Mo
0
Energy Charge
0 kWh
0.00296 /kWh
0
Total
0 kWh
0
TST Service & Facility Charge - (Total)
48 Bills $
8,064.00 / Month
97,440
Transmission Standby Capacity Fee
258,879 kW-Mo
1.16 / kW-Mo
300,300
Gen Standby Cap Reservation Fee - Summer
84,591 kW-Mo
0.66 / kW-Mo
55,830
Gen Standby Cap Reservation Fee - Winter
174,288 kW-Mo
0.42 / kW-Mo
73,201
Energy Charge
1,049,702 kWh
0.00280 /kWh
2,939
Total
1,049,702 kWh
529,710
Total Commercial & Industrial - Standby Service
1,049,702 kWh
528,796
Rounding Difference
914
34
Southwestern Public Sevice Company
Settlement Base Rate Revenue Reconciliation
12 Months Ended September 30, 2005
Line Rate Class
No. Proposed Rate Billing Units
1 Commercial & Industrial - Service Aereement
2
3 SAS -I Celanese
4 & SAS-2 Total Present Base Revenue (without fuel)
5 Less Metering & Billing Cost
6 Less Base Energy Cost
7 Total Adjusted Base Revenue
8
9 SAS-4 CRMWA
10 Total Present Base Revenue (without fuel)
Class Percentage Increase (SG)
II CRMWA Percentage Increase
12 Total Proposed Base Revenue
13 Less Metering & Billing Cost
14 Less Base Energy Cost
IS Total Adjusted Base Revenue
Add CRMWA Adjustment
Total CRNIWA Base Revenue
16
17 SAS-8 Degussa
18 Total Present Base Revenue (without fuel)
19 Percentage Increase (PG)
20 Total Proposed Base Revenue
21 Less Metering & Billing Cost
22 Less Base Energy Cost
23 Total Adjusted Base Revenue
24
25 Total SAS Revenue
26
27 Total Commercial & Industrial Service
28 Proposed Base Rate Revenue - Rebill
29 Total Revenue Requirement
30 Rounding Difference
31
32
33
34 Street & Area Liehtine Service
35 Area Lights
36 Municipal and State Street Lights
37 Company Owned
38 Non -Company Owned Lights
39 Total Municipal and State Street Lights
40
41 Total Base Rate Revenue
42 Maintenance Charges
43 Proposed Base Rate Revenue - Rebill
44 Total Revenue Requirement - As Allocated
45 Rounding Difference
46
47
48
49 Total PUCT
50 Proposed Base Rate Revenue - Rebill
51
52 Total Revenue Requirement
53 Rounding Difference
9,618,964,299 kWh
64.810,254 kWh
12,750,303,983 kWh
Settlement
Rate
Settlement
Base Rate
Revenue
2,875,232
6,470
841,741
2,027,021
1,536,151
5.96 %
9.377%
1,627,706
2,512
360,887
$1,264,307
S52,486
S 1,316,793
208,493
9.377%
228,043
2,686
129,740
S9 5,617
$3,386, )4 5
182,036 084
182019,606
16,479
3,795,754
2,257,981
126,285
2,394,266
6,180020
0
6,180,020
6,180,823
(803)
318,340,079
318,332,311
7,768
Present Revenue 295,392,964
Settlement Increase 22,939,347
Total Revenue Requirement 318,332,311
rrt
Southwestern Public Sevice Company
Settlement Base Rate Revenue Reconciliation
12 Months Ended September 30, 2005
Datemdnates
Settlement Settlement
(Units) (Urdts)
Rate
Revenue
Guard/Flood L.IaMho
Guard Lights
73,341
S
7.55
$ 553,725
Super Guard Lights
211.851
S
9.23
$1,955,385
Additional spans(sep 05)
2.2.217
S
2.19
S 48.655
Restrided Outdoor Lighting -Previous TNP area
400 W MV Guard Light
785
S
9.31
S 7.308
100 W HPS Guard Light
495
S
8.61
S 4,262
200 W HPS Guard Light
48
S
12.60
S 605
400 W MV Flood Light
0
S
9.59
400 W MH Flood Light
881
$
12.02
S 10,584
1000 W MH Flood Light
234
$
19.61
S 4.585
250 w HPS Flood Light
156
S
11.42
S 1.785
400 W HPS Flood Light
72
$
12.40
S 893
Subtotal
308.737
$2,587385
Flood Lights
$1.207,968
Total Base
29,873,317
$3,795,754
Flood Light Systems Detaa
819
High Pressure Sodium - Initial Unit
150
5423
$
16.09
$ 87,256
250
1189
$
17,43
$ 20.719
400
9903
$
18.44
S 182.615
1000
8877
$
27,93
$ 247,935
Metal Halide - Initial Unit
175
120
$
16.19
$ 1,943
250
473
$
17.35
$ 8,210
400
5193
S
18.05
S 93.735
1000
9650
S
27.62
S 266,527
High Pressure Sodium - Additional Units
150
236
$
6.97
$ 1.645
250
211
$
8.14
$ 1,718
400
2402
$
9.11
$ 21.883
1000
3111
$
18,53
$ 57.651
Metal Halide - Additional Units
175
24
$
7 O6
$ 169
250
95
$
806
$ 766
400
1166
$
8.73
$ 10.177
1000
6339
$
18.24
$ 115,623
Subtotal
55755
$1.118.572
Additional Flood Until Chames
Pale Charge (Wood Overhead)
35 R
6620
S 1,49
$ 9.864
40 R
7117
S 3.19
$ 22.703
45 R
1223
S 4.51
S 5,516
50 R
60
S 5.97
S 358
Pole Charge (Wood Underground)
30 R
0
S 3.03
$ -
35 R
156
S 4.52
S 705
40 R
136
S 6.23
S 847
45 R
60
S 7.56
S 454
50 R
0
$ 9.01
$ -
Pole Charge (Steel Overhead)
30 R
330
S 5.05
S 1,667
35 It
1008
S 6.54
S 6,595
40 R
643
S 8.25
3 5,306
45 R
84
S 9.57
S 804
Pole Charge (Steel Underground)
30 R
498
S 8.09
$ 4.029
35 R
882
S 9.58
S 8,450
40 R
1409
S 11,28
$ 15,897
45 R
492
S 12.61
$ 6.204
Subtotal
$ 89,397
Total Flood Light
$1,207,968
Southwestern Public Sevice Company
Settlement Base Rate Revenue Reconciliation
12 Months Ended September 30, 2005
Municipal Street Lighting
Settlement
Settlement
Lamp
Pale
Service
Lights
Number
Rate
Rate
Lumen
Type
Type
Type
Per Pole
Installed
(S)
(S)
Residential
7.000
MV
Wood
OH
1
194.326
$ 4,38
S
851.381
7.000
MV
Steel
OH
1
5,681
$ 6.13
S
34.845
7,000
MV
Steel
UG
1
3.541
S 6.98
$
24.706
7,1N}0
MV
Special
1
829
$ 7.55
S
6.256
7.000
MV
City of Lubbock
1
0
S 1.42
S
15,000
MV
SA-TSTI Amer
OH
1
180
$ 8.42
$
1,516
15,000
HPS
Woad
OH
1
9,924
$ 8.38
S
83,154
15.000
HPS
Steel
OH
1
96
$ 10.36
S
995
15.000
HPS
Steel
UG
1
132
$ 11.76
$
1.553
Commercial Areas and Traffic Arteries
20,000
MV
Woad
OH
2
96
$ 6.60
$
634
20,000
MV
Wood
OH
1
53,150
$ 7.40
$
393.535
20,000
MV
Steel
OH
2
360
$ 8.37
$
3,013
20,000
MV
Steel
OH
1
28.230
$ 10.26
$
289.723
20.000
MV
Steel
UG
2
908
S 10.25
$
9.288
20.000
MV
Steel
UG
1
7.695
$ 14.00
$
107.714
20,000
MV
Wood
Special
1
60
$ 18.62
$
1.117
35,000
MV
Wood
OH
1
1.176
$ 10.35
$
12,172
35.000
MV
Steel
OH
1
900
$ 13.07
$
11,760
35,000
MV
Steel
UG
1
636
$ 16.98
$
10.797
50,000
MV
Wood
OH
1
72
$ 12.56
S
905
50.000
MV
Steel
OH
1
1.467
$ 15.50
$
22.736
50.000
MV
Steel
UG
1
636
$ 19.27
$
12,253
15.000
HPS
Wood
OH
1
100
$ 8.37
$
837
15.000
HPS
Steel
OH
1
10
S 11.24
$
202
15.000
HPS
Steel
UG
1
54
$ 14.98
$
809
27,500
HPS
Woad
OH
1
3.842
$ 16.09
$
61.818
27.500
HPS
Steel
OH
1
1.290
$ 18.82
$
24.274
27,500
HPS
Sleet
UG
1
1.323
S 22,60
$
29.895
50,000
HPS
Wond
OH
1
0
$ 19.78
$
-
50,000
HPS
Steel
OH
1
0
S 22.82
$
-
50,000
HPS
Steel
UG
1
0
$ 26,71
$
-
Commercial Areas and Traffic Arteries
50.000
HPS
Wood
OH
1
5.958
$ 18.59
$
110.743
50,000
HPS
Special
1
5,949
S 21.98
$
130.775
Restricted Municipal Street
Lighting -previous TNP area
8,150
MV
Ornamental
OH
1
612
$ 11.36
$
6.951
9,500
HPS
Wood
OH
1
628
$ 6.85
S
4.299
9,500
HPS
Wood
UG
1
240
$ 9.31
$
2,234
9.500
HPS
Ornamental .
OH
1
12
$ 13.18
$
158
22.000
HPS
Wood
OH
1
602
$ 7,78
,
$
4,662
22.000
HPS
Woad
UG
1
24
$ 10.41
$
250
State Owned
Freeway Lighting System
20,000
MV
Slate/City Owned
1
2.088
$ 6.20
$
12.944
21,500
HPS
Special
1
17.739
S 4.38
$
77,718
MV-100 W
2.268
S 4.38
$
9.937
MV-1000 W
$ 13.76
$
HPS400 W
4.512
S 5.51
S
24,858
15,000
150 W
189
$ 4.38
S
826
Total Base
357,541
$2,384,266
Area Light Base
Revenue
$3,795,754
Street and Area Light Base
Revenue
$6,180.020
Settlement Amount
$6.180.823
Rounding Difference
$
(803)
7 %
Exhibit B — Tariffs
SOAR Docket No. 473-06-2536; PUC Docket No. 32766
Unanimous Stipulation
G:\Word\2005\0560004\7H9.doc Page 38
Section No. II-S
Sheet No. II-1
Xceffinerr
Revision No. 1
10VIRWIStINK vuettc SUVICe Page 1 of I
ELECTRIC TARIFF
GENERAL DESCRIPTION OF OPERATIONS
Southwestern Public Service Company is an integrated, publicly -held, generation,
transmission and distribution company supplying retail and wholesale electric utility
service in the counties and cities shown on Section No. III of this tariff. The Company
also serves retail and wholesale customers in the State of New Mexico. The Generation
and Transmission Map, Section No. II, Sheet No. II-1, page 2 of 2, details the primary
power supply and location of the Company.
This tariff, including all Rules and Regulations, and all applicable rate schedules, is on file
in the Company's Amarillo and Austin offices, and copies are obtainable by any Customer
without charge upon request.
PUBLIC UTILITY COMMISSION OF TEXAS I PRESIDENT AND CEO,
SOUTHWESTERN PUBLIC SERVICE COMPANY
12/1)
Section No. III-S
Sheet No. III-1
XCeffil7etgy"' Revision No. 5
e I of 1
SOUTHWESTERN IURL(C SERVICE Page
ELECTRIC TARIFF
LIST OF COUNTIES AND CITIES PROVIDED ELECTRIC UTILITY
SERVICE BY SOUTHWESTERN PUBLIC SERVICE COMPANY
COUNTY CITIES WITHIN COUNTY
Armstrong
Claude
Bailey
Muleshoe
Briscoe
Silverton
Carson
Groom, Panhandle, Skellytown, White Deer
Castro
Dimmitt, Hart
Cochran
Morton, Whiteface
Crosby
Crosbyton, Lorenzo, Ralls
Dallam
Dalhart
Dawson
Deaf Smith
Hereford
Donley
Floyd
Floydada, Lockney
Gaines
Seminole, Seagraves
Garza
Post
Gray
Lefors, McLean, Pampa
Hale
Abernathy, Hale Center, Petersburg, Plainview
Hansford
Gruver, Spearman
Hartley
Channing, Dalhart
Hemphill
Canadian
Hockley
Anton, Levelland, Ropesville
Hutchinson
Borger, Fritch, Sanford, Stinnett
Lamb
Amherst, Earth, Littlefield, Olton, Springlake, Sudan
Lipscomb
Booker, Darrouzett, Follett, Higgins
Lubbock
Idalou, Lubbock, New Deal, Shallowater, Slaton, Wolfforth
Lynn
Tahoka, Wilson
Moore
Cactus, Dumas, Sunray
Ochiltree
Perryton
Oldham
Adrian, Vega
Parmer
Bovina, Friona, Farwell
Potter
Amarillo
Randall
Amarillo, Canyon, Lake Tanglewood, Timbercreek, Palisades
Roberts
Miami
Sherman
Stratford, Texhoma
Swisher
Happy, Kress
Terry
Meadow, Wellman
Wheeler
Mobeetie, Wheeler
Yoakum
Denver City
PUBLIC UTILITY COMMISSION
OF TEXAS
PRESIDENT AND CEO,
SOUTHWESTERN PUBLIC SERVICE COMPANY
Lin
Section No. IV
XCeI Energy`" Sheet No. IV-1
SouTHwraTrRK Public sEcyicr Revision No. 82
Page 1 of 4
ELECTRIC TARIFF
TABLE OF SERVICE SCHEDULES
Sheet
Revision
No.
No.
Type of Service
Territory
IV-3
11
Residential Service
Texas service territory
IV-18
9
Secondary General Service
Texas service territory
IV-51
8
Service Agreement Summary
Gray County
Hoechst Celanese Chemical
Group, Inc.
IV-56
9
Service Agreement Summary
Phillips Petroleum Company
Phillips
Bishop Hills Property Owners
Potter County
Texas State Technical College
Amarillo
Chase Bank Tower
Amarillo
Texas State Park Board
Palo Duro Canyon
Hoechst Celanese Chemical
Pampa
Group, Inc.
IV-58
9
Service Agreement Summary
Cal Farley's Boys Ranch
Oldham County
Caprock Feeders
Gruver
IV-61
6
Service Agreement Summary
Potter, Carson, Roberts &
Canadian River Municipal
Hutchinson Counties
Water Authority
IV-65
11
Guard Light Service
Texas service territory
IV-69
25
Fuel Cost Recovery Factor
Applicable to rate schedules
where indicated
IV-73
4
Service Agreement Summary
Gray County
Hoechst Celanese Chemical
Group, Inc.
PUBLIC UTILITY COMMISSION OF TEXAS
(Continued)
PRESIDENT AND CEO,
SOUTHWESTERN PUBLIC SERVICE COMPANY
Xceffinergy-
30UrNWIMAN PUIIIC SERVICE
ELECTRIC TARIFF
Section No. IV
Sheet No. IV -I
Revision No. 82
Page 2 of 4
TABLE OF SERVICE SCHEDULES
Sheet Revision
No. No.
Type of Service
Territory
IV-77 10
Electric Service To a
Texas service territory
Qualifying Facility of
Aggregate Generation
Capacity of 100 KW or Less
IV-86 10
Energy Purchase From A
Texas service territory
Qualifying Facility
of Aggregate Generating
Capacity of 100 KW or
Less
IV-91 8
Municipal and State Street
Texas service territory
Lighting Service
IV-98 10
Miscellaneous Service Charges
Texas service territory
IV-99 6
Service Agreement Summary
Hutchinson County
J.M. Huber Corporation
IV-103 1
Late Payment Rider
Lubbock
IV-108 4
Large General Service -
Texas service territory
Transmission
IV-109 5
Service Agreement Summary
Hutchinson County, Texas
Phillips Petroleum
(except within the
Company -Transmission
incorporated limits of any
town or cityl
IV-117 1
Avoided Energy Cost Non -Firm
Texas service
Purchases from Qualifying
territory
Facility
PUBLIC UTILITY COMMISSION OF TEXAS
(Continued)
PRESIDENT AND CEO,
SOUTHWESTERN PUBLIC SERVICE COMPANY
49
Xcel Energy-
SOUr11WMIAN ►ublic Sf1Y1Cr
ELECTRIC TARIFF
TABLE OF SERVICE SCHEDULES
Sheet Revision
No. No. Type of Service Territory
Section No. IV
Sheet No. W-1
Revision No. 82
Page 3 of 4
IV-118 3
Flood Lighting Systems
Texas service territory
IV-124 1
Service Agreement Summary
SPS's wholesale
Central Valley Electric
jurisdiction
Cooperative, Inc.
Farmers Electric
Cooperative, Inc.
Roosevelt Electric
Cooperative, Inc.
Lea County Electric
Cooperative, Inc.
Cap Rock Energy Corporation
IV-135 1
Wholesale Fuel Cost
SPS's wholesale
Adjustment Clause
jurisdiction
IV-143 1
Residential Late Payment
Lubbock
Rider
IV-144 1
Service Agreement Summary
Amarillo
Highway Sign Lighting
IV-147 2
Experimental Industrial
Texas Service Territory
Interruptible Rate Rider
IV-150 1
Restricted Outdoor Lighting
Former TNP Panhandle
Service
service territory
IV-152 1
State University Discount
Texas Service Territory
Rate Rider
IV-170 1
Surcharge Rate Rider
Texas Service Territory
(Continued)
PUBLIC UTILITY COMMISSION OF TEXAS
PRESIDENT AND CEO,
SOUTHWESTERN PUBLIC SERVICE COMPANY
it')
Xcel Energy
EODrNWISTEIN EU!►IC SERVICE
ELECTRIC TARIFF
TABLE OF SERVICE SCHEDULES
Section No. IV
Sheet No. IV-1
Revision No. 82
Page 4of4
Sheet
Revision
No.
No.
Type of Service
Territory
IV-171
1
Surcharge Rate Rider
Texas Service Territory
IV-172
Orig.
Small General Service
Texas Service Territory
IV-173
Orig.
Primary General Service
Texas Service Territory
IV-174 Orig. Small Municipal and School Service Texas Service Territory
IV-1 75
0rig.
Large Municipal Service
Texas Service Territory
IV-177
Orig.
Interruptible Credit Option
Texas Service Territory
IV-1 78
Orig.
Golden Spread Electric Coop.
Texas Service Territory
IV-179
Orig.
Primary OF Standby Service
Texas Service Territory
IV-180
Orig.
Secondary OF Standby Service
Texas Service Territory
IV-181
Orig.
Transmission OF Standby Service
Texas Service Territory
IV-182
Orig.
Large School Service
Texas Service Territory
IV-183
Orig.
Transmission OF Non -Firm
Standby Service
Texas Service Territory
PUBLIC UTILITY COMMISSION OF TEXAS
PRESIDENT AND CEO,
SOUTHWESTERN PUBLIC SERVICE COMPANY
Section No. IV
Xeel Energy'" Sheet No. IV-3
SOU(NWISM14 f'Ustle StIvier Revision No. 11
Page 1 of 2
ELECTRIC TARIFF
RESIDENTIAL SERVICE
APPLICABLE: To residential customers for electric service used for domestic purposes in
private residences and separately metered individual apartments when all service is
supplied at one point of delivery, and measured through one kilowatt hour meter, where
facilities of adequate capacity and suitable voltage are adjacent to the premises to be
served. Single phase motors not to exceed 10 horsepower, individual capacity, may be
served under this rate.
TERRITORY: Texas service territory.
RATE: Service Availability Charge: $5.10 per month.
Energy Charge:
4.500¢ per kWh for all kWh used per month during each summer month
3.249¢ per kWh for all kWh used per month during each winter month.
WINTER MONTHS: The billing months of October through May.
SUMMER MONTHS: The billing months of June through September.
FUEL COST RECOVERY AND ADJUSTMENTS: The charge per kilowatt hour of the
above rate shall be increased by the applicable fuel cost recovery factor per kilowatt hour
as provided in DUCT Sheet IV-69. This rate schedule is subject to other applicable rate
adjustments as in effect from time to time in this tariff.
AVERAGE MONTHLY PAYMENT: Upon request, any residential customer may be billed
monthly based on a levelized payment plan. A customer's monthly payment amount is
calculated by obtaining the most recent twelve months of actual consumption and
dividing that amount by twelve, and applying the Company's current rates to the average
kWh consumption. The account will be trued -up every twelve months. The true -up
amount will be equal to the difference between the total of the prior twelve months'
levelized payments and the actual billings for the corresponding most recent twelve
month period.
CHARACTER OF SERVICE: A-C; 60 hertz; single-phase 120l240 volts; where available on
secondary, three phase 240 volts.
PUBLIC UTILITY COMMISSION OF TEXAS I PRESIDENT AND CEO,
SOUTHWESTERN PUBLIC SERVICE COMPANY
,rx—
Section No. IV
Xcel Energy'" Sheet No. IV-3
sourllW311AN ►ueiic $EXVICI Revision No. 11
Page 2 of 2
ELECTRIC TARIFF
LINE EXTENSIONS: The Company will make line extensions in accordance with its standard
line extension policy.
TERMS OF PAYMENT: Net in 16 days after mailing date. If the sixteenth day falls on a
holiday or weekend, the due date will be the next work day.
FRANCHISE FEE: All current and future franchise fees not included in base rates shall be
separately assessed in the municipality where the excess franchise fee is authorized. Bills
computed under the above rate will be increased by the additional franchise fees imposed
by the appropriate municipality or taxing authority in which jurisdiction the customer's
consuming facility resides, when applicable. The franchise fee will appear on the bill as a
separate item.
RULES REGULATIONS AND CONDITIONS OF SERVICE: Service supplied under this
schedule is subject to the terms and conditions set forth in the Company's Rules,
Regulations, and Conditions of Service on file with The Public Utility Commission of
Texas.
PUBLIC UTILITY COMMISSION OF TEXAS
PRESIDENT AND CEO,
SOUTHWESTERN PUBLIC SERVICE COMPANY
N
Section No. IV
Sheet No. IV-18
169 Xce j nerg11�,
1C 1
Revision No. 10
101(iNWE111AN PU111C $11VICE
Pagel of2
ELECTRIC TARIFF
SECONDARY GENERAL SERVICE
APPLICABLE: To all commercial and industrial electric service supplied at secondary
voltage and at one point of delivery, and measured through one meter, where facilities
of adequate capacity and suitable voltage are adjacent to the premises to be served.
Not applicable to temporary, breakdown, standby, supplementary, resale or shared
service, or to service for which a specific rate schedule is provided.
TERRITORY: Texas service territory.
RATE: Service Availability Charge: $25.35 per month
Energy Charge: 0.3000 per kWh for all kWh used during the month
Demand Charge:
$9.29 per kW of demand used per month during each summer month
$7.40 per kW of demand used per month during each winter month
WINTER MONTHS: The billing months of October through May.
SUMMER MONTHS: The billing months of June through September.
OPTIONAL SERVICE: Customers receiving service under this rate may elect to receive
interruptible service under the Interruptible Credit Option.
DEMAND: The Company will furnish at its expense the necessary metering equipment to
measure the customer's kW demand for the 30-minute period of greatest use during the
month. In the absence of a demand meter the Company will bill the customer's
demand using the monthly kilowatt-hours and an average load factor of 57.01 percent.
POWER FACTOR: Applicable to customers on this rate schedule with a peak demand of
200 kW or greater. Customer, at all times, will maintain at Company's point of delivery a
power factor of not less than 90% lagging.
PUBLIC UTILITY COMMISSION OF TEXAS PRESIDENT AND CEO,
SOUTHWESTERN PUBLIC SERVICE COMPANY
rj�
Section No. IV
Sheet No. IV-18
Xcef Energy,
Revision No. 10
SOUINWES1EIN PUIIIC $19VICE
Page 2 of 2
ELECTRIC TARIFF
POWER FACTOR: (cont.)
In the event a low voltage condition due to lagging power factor exists in a degree
sufficient to impair the Company's service, customer will install suitable capacitor or other
equipment necessary to raise the over-all power factor at the point of delivery to a
satisfactory value. Where such power factor correction equipment is used, customer will
install and maintain a relay, switch, or other regulating equipment for purpose of
disconnecting or controlling the power factor correction equipment in order to prevent
excessive voltage variations on Company's lines.
FUEL COST RECOVERY AND ADJUSTMENTS: The charge per kilowatt hour of the
above rate shall be increased by the applicable fuel cost recovery factor per kilowatt
hour as provided in PUCT Sheet IV-69. This rate schedule is subject to other
applicable rate adjustments as in effect from time to time in this tariff.
CHARACTER OF SERVICE: A-C; 60 hertz; single or three phase, at one available
standard voltage.
LINE EXTENSIONS: The Company will make line extensions in accordance with its
standard line extension policy.
TERMS OF PAYMENT: Net in 16 days after mailing date; 5 percent added to bill after 16
days. If the sixteenth day falls on a holiday or weekend, the due date will be the next
work day.
FRANCHISE FEE: All current and future franchise fees not included in base rates shall be
separately assessed in the municipality where the excess franchise fee is authorized.
Bills computed under the above rate will be increased by the additional franchise fees
imposed by the appropriate municipality or taxing authority in which jurisdiction the
customer's consuming facility resides, when applicable. The franchise fee will appear
on the bill as a separate item.
RULES, REGULATIONS AND CONDITIONS OF SERVICE: Service supplied under
this schedule is subject to the terms and conditions set forth in the Company's Rules,
Regulations and Conditions of Service on file with The Public Utility Commission of
Texas and the following conditions:
1- For those customers receiving secondary distribution voltage who desire to
elect primary distribution voltage, they may do so subject to the terms and conditions
of Primary/Secondary Conversions.
PUBLIC UTILITY COMMISSION OF TEXAS PRESIDENT AND CEO,
SOUTHWESTERN PUBLIC SERVICE COMPANY
r1 a
XceffinetW
$0UtNWE61E1N /UIl1C $fkvlcE
ELECTRIC TARIFF
SERVICE AGREEMENT SUMMARY
AGREEMENT WITH: Hoechst Celanese Chemical Group, Inc.
POINT OF SERVICE: Vicinity of Pampa, Texas (Metering Point #1)
RATE: $54,547.00 per month
Section No. IV
Sheet No. IV-51
Revision No. 8
Page 1 of 1
The above amount includes all kWh measured through Metering Point #1 up to the
kWh generated by CZ-1 during the billing month. The kWh measured through
Metering Point #1 in excess of the kWh generated by CZ-1 shall be added to the
consumption through Metering Point #2 for billing under the rate applicable to
Metering Point #2.
TAX ADJUSTMENT: Bills computed under the above rate will be increased by all or the
appropriate proportionate part of any present or new tax, or increased rate of tax or
governmental imposition or charge assessed directly against the sale or use of electric
energy.
1 PRESIDENT AND CEO,
PUBLIC UTILITY COMMISSION OF TEXAS SOUTHWESTERN PUBLIC SERVICE COMPANY
Section No. IV
bgo elEver Sheet No. IV-56
Revision No. 9
SOUINWESfl:RM Pflfllt SERVICE
Page 1 of 2
ELECTRIC TARIFF
SERVICE AGREEMENT SUMMARY
AGREEMENT WITH: Phillips Petroleum Company, Phillips, Texas.
RATE: Each 7,000 lumen wood pole overhead mercury vapor street light @ $7.55 per month.
Each 20,000 lumen mercury vapor light and each 400 watt 20,000 lumen mercury vapor
flood light on wood poles @ $ l 8.62 per month.
AGREEMENT WITH: Bishop Hills Property Owners, Amarillo, Texas.
RATE: Each 7,000 lumen mercury vapor post top light @ $7.55 per month.
AGREEMENT WITH: Amarillo College, Amarillo, Texas.
RATE: Each 7,000 lumen wood pole overhead mercury vapor street light @ $7.55 per month.
Each 20,000 lumen steel pole underground mercury vapor street light (two lamps per
pole) @ $23.57 per month.
AGREEMENT WITH: Chase Bank, Amarillo, Texas.
RATE: Floodlighting of Chase Bank Building, $223.17 per month.
AGREEMENT WITH: Texas State Park Board (Palo Duro Canyon).
RATE: Each 7,000 lumen mercury vapor overhead light @ $7.55 per month.
PRESIDENT AND CEO,
PUBLIC UTILITY COMMISSION OF TEXAS SOUTHWESTERN PUBLIC SERVICE COMPANY
[:�'h
Section No. IV
ja cel Energy Sheet No. IV-56
Revision No. 9
S001'HWESTESN ?Ville $11yict
Page 2 of 2
ELECTRIC TARIFF
SERVICE AGREEMENT SUMMARY
AGREEMENT WITH: Hoechst Celanese Chemical Group, Inc., Pampa, Texas.
RATE: Each 20,000 lumen steel pole mercury vapor street light @ $18.62 per month
(Underground Contribution)
TERMS OF PAYMENT: Net in 16 days after mailing date; 5 percent added to bill after 16
days. If the sixteenth day falls on a holiday or weekend, the due date will be the next
work day.
DETERMINATION OF ENERGY USE: 7,000 lumen lamp use 68 kWh per month
20,000 lumen lamp use 151 kWh per month
Floodlighting use 6,909 kWh per month
FUEL COST RECOVERY: The charge per kilowatt hour of the above rate shall be increased
by the applicable fuel cost recovery factor per kilowatt hour as provided in PUCT Sheet
IV-69.
FRANCHISE FEE: All current and future franchise fees not included in base rates shall be
separately assessed in the municipality where the excess franchise fee is authorized.
Bills computed under the above rate will be increased by the additional franchise fees
imposed by the appropriate municipality or taxing authority in which jurisdiction the
customer's consuming facility resides, when applicable. The franchise fee will appear
on the bill as a separate item.
PRESIDENT AND CEO,
PUBLIC UTILITY COMMISSION OF TEXAS SOUTHWESTERN PUBLIC SERVICE COMPANY
r—►
Section No. IV
Xce/Eney�.gr Sheet No. IV-58
1 Revision No. 9
SOUrNWISrIRH PU1ti6 SEIVIct
Page 1 of 1
ELECTRIC TARIFF
SERVICE AGREEMENT SUMMARY
AGREEMENT WITH: Cal Farley's Boys Ranch, Amarillo, Texas, and Caprock Feeders,
Gruver, Texas.
POINTS OF SERVICE: Northwest of Amarillo, Southwest of Gruver.
RATE: Each 7,000 lumen wood pole overhead mercury vapor light @ $7.55 per month.
Each 15,000 lumen wood pole overhead high pressure sodium light @ $9.23 per
month.
Each 20,000 lumen wood pole overhead mercury vapor light @ $18.62 per month.
DETERMINATION OF ENERGY USE: 7,000 lumen MV lamp uses 68 kWh per month
15,000 lumen HPS lamp uses 56 kWh per month
20,000 lumen MV lamp uses 151 kWh per month
TERMS OF PAYMENT: Net in 16 days after mailing date; 5 percent added to bill after 16
days. If the sixteenth day falls on a holiday or weekend, the due date will be the next
work day.
FRANCHISE FEE: All current and future franchise fees not included in base rates shall be
separately assessed in the municipality where the excess franchise fee is authorized.
Bills computed under the above rate will be increased by the additional franchise fees
imposed by the appropriate municipality or taxing authority in which jurisdiction the
customer's consuming facility resides, when applicable. The franchise fee will appear
on the bill as a separate item.
PRESIDENT AND CEO,
PUBLIC UTILITY COMMISSION OF TEXAS SOUTHWESTERN PUBLIC SERVICE COMPANY
r7
Section No. IV
Xce►Energr Sheet No. IV-61
,�r Revision No. 6
S09INW1111kN PUll1C $11vict
Page 1 of 2
ELECTRIC TARIFF
SERVICE AGREEMENT SUMMARY
AGREEMENT WITH: Canadian River Municipal Water Authority (CRMWA)
POINTS OF SERVICE: Pumping Plant No. 1 located at or near Sanford Dam and at the
beginning of the Main Aqueduct. Pumping Plant No. 2 located approx. 2 miles southwest
of Sanford, TX, and vicinity of Main Aqueduct Station 123+00, Pumping Plant No. 3
located approx. 4 miles south of Fritch, TX, and vicinity of Main Aqueduct Station
549+00. Pumping Plant No. 4 located approx. 12 miles northeast of Amarillo, TX, and
vicinity of Main Aqueduct Station 1313+50. Pump Station No. 21 and associated
waterfield load located approx. 12 miles N. of Pampa, TX and at the beginning of the
Conjunctive Use Project Aqueduct, Station 0+00. Pump Station No. 22 located approx. 4
miles southwest of Borger, TX, and vicinity of Conjunctive Use Project Aqueduct Station
1375+00.
RATE: The base rate for firm and interruptible service to CRMWA is:
1.644 ¢ per kWh for the first 3,500,000 kWh used per month.
1.279 0 per kWh for all additional energy used per month.
INTERRUPTIBILITY: When a scheduled interruption is requested in any month by
Southwestern, CRMWA will interrupt all load at Pump Stations Nos. I through 4 in
excess of two pumping units at each station and will also interrupt all load at Pump
Stations Nos. 21 through 22 in excess of one pumping unit at each station, and will
interrupt all load in the waterfield, including Booster Stations 31 and 32 and the wells
associated with these stations, with the exception of the wells feeding Pump Station No.
21 directly or which can be delivered to Pump Station No. 21 by gravity flow.
Uninterrupted wells will not have a connected load in excess of 2134 kW. Pump Station
Nos. 5 and 6 are not subject to interruption. Normal interruptions of load are not to
exceed 60 hours in any month except in an extreme emergency. When a scheduled
interruption of load extends such that CRMWA is unable to maintain sufficient water
storage, pumps may be restarted with two-hour notice to Southwestern. Energy served
during this period will be billed at the rate for the first block of energy.
NOTICE OF INTERRUPTION: Southwestern will give notice of need for interruption at least
two hours before the interruption is required. During peak load periods Southwestern
may give daily schedules of requested interruption one or two weeks in advance.
PRESIDENT AND CEO,
PUBLIC UTILITY COMMISSION OF TEXAS SOUTHWESTERN PUBLIC SERVICE COMPANY
r-I
Section No. IV
XcejEnergr Sheet No. IV-61
Revision No. 6
SOUTHWISTEIN PUItic SSIVICI
Page 2 of 2
ELECTRIC TARIFF
FUEL COST RECOVERY: The charge per kilowatt-hour of the above rate shall be increased
by the applicable fuel cost recovery factor per kilowatt-hour as provided in PUCT Sheet
IV-69.
POWER FACTOR: Synchronous motors will be installed on each of the pumping units in
CRMWA's pumping plants Nos. 1 through 4, and will be operated at Unity Power Factor.
The customer agrees to maintain a power factor of at least 0.95 on pumping units 21 and
22.
TERMS OF PAYMENT: Net in 16 days after mailing date; 5 percent added to bill after 16
days. If the sixteenth day falls on a holiday or weekend, the due date will be the next
workday.
DETERMINATION OF ENERGY FOR SECONDARY POINTS OF DELIVERY: The
kWh use for billing purposes for Pump Stations 21 and 22 shall equal 1.03 times the
measured kWh.
I PRESIDENT AND CEO,
PUBLIC UTILITY COMMISSION OF TEXAS SOUTHWESTERN PUBLIC SERVICE COMPANY
Section No. IV
Xcel Energy" Sheet No. IV-65
iournwisrtsm ►usite SEEYICE Revision No. 11
Page 1 of 2
ELECTRIC TARIFF
GUARD LIGHTING SERVICE
APPLICABLE: Under contract for night outdoor lighting service where facilities of adequate capacity
and suitable voltage are adjacent to the premises to be served. This tariff is closed to new
customers as of September 1, 2000 in accordance with the Public Utility Commission of Texas
Order in Docket 21190.
TERRITORY: Texas service territory.
RATE: Each 15,000 lumen high pressure sodium, wood pole, overhead bracket type light for $9.23 per
month.
Each 7,000 lumen mercury vapor, wood pole, overhead bracket type light for $7.55 per month.
One span of secondary line not exceeding 150 feet in length may be furnished under the above
rate. Service requiring more than one span of secondary line per light will be furnished by the
Company, provided the customer pays a rental charge of $2.19 per month for each additional
span not exceeding 150 feet in length.
TERMS OF PAYMENT: Net in 16 days after mailing date; 5 percent added to bill after 16 days. If
service is billed on a residential bill, the late payment charge will not be imposed. If the
sixteenth day falls on a holiday or weekend, the due date will be the work day.
DETERMINATION OF ENERGY USE: 15,000 lumen HPS lamp uses 56 kWh per month 7,000
lumen MV lamp uses 68 kWh per month.
FUEL COST RECOVERY: The charge per kilowatt hour of the above rate shall be increased by the
applicable fuel cost recovery factor per kilowatt hour as provided in PUCT Sheet IV-69.
However, Guard Light Service provided by Company which is electrically connected to a circuit
previously metered by Company for other electric service shall not have the above rate increased
by the applicable fuel cost recovery factor.
CONDITIONS OF SERVICE: The Company will construct, own, operate and maintain on the
customer's premises, the required number of 15,000 lumen, 150 watt, high pressure sodium
overhead lights, and/or the required number of 7,000 lumen, 175 watt, mercury vapor overhead
lights, mounted on a metal bracket, photo -electrically controlled, installed on Company's service
pole, a separate 30 foot pole, or installed on any suitable mounting device belonging to the
customer, and having a secondary line span not exceeding 150 feet in length. Lights will not be
installed on any mounting device which in the opinion of the Company is unsafe or not suitable
for this purpose.
PUBLIC UTILITY COMMISSION OF TEXAS
PRESIDENT AND CEO,
SOUTHWESTERN PUBLIC SERVICE COMPANY
rr
Section No. IV
Xcel Eri@W Sheet No. W-65
sourHWRlIERN Punkle SERY►ef Revision No. 11
Page 2 of 2
ELECTRIC TARIFF
GUARD LIGHTING SERVICE
CHARACTER OF SERVICE: A-C; 60 hertz; single phase; 120 or 240 volts.
TERM OF CONTRACT: A period of not less than three years.
LINE EXTENSIONS: The Company will make line extensions in accordance with its standard line
extension policy.
FRANCHISE FEE: All current and future franchise fees not included in base rates shall be separately
assessed in the municipality where the excess franchise fee is authorized. Bills computed under
the above rate will be increased by the additional franchise fees imposed by the appropriate
municipality or taxing authority in which jurisdiction the customer's consuming facility resides,
when applicable. The franchise fee will appear on the bill as a separate item.
RULES REGULATIONS AND CONDITIONS OF SERVICE: Service supplied under this schedule
is subject to the terms and conditions set forth in the Company's Rules, Regulations, and
Conditions of Service on file with The Public Utility Commission of Texas.
PUBLIC UTILITY COMMISSION OF TEXAS
PRESIDENT AND CEO,
SOUTiiWESTERN PUBLIC SERVICE COMPANY
5(0
Section No. IV
Sheet No. IV-69
XRevision
cel Energy,
No. 26
SOUTHWESTERN PU11IC SERVICE
Page I oft
ELECTRIC TARIFF
FUEL COST RECOVERY FACTOR
Application of fuel cost recovery factors are as follows:
SECONDARY DISTRIBUTION FUEL COST RECOVERY FACTOR:
The Secondary Distribution fuel cost recovery factor to be billed is 3.15190 per kilowatt-hour and shall
apply when service is metered at less than approximately 12 kV.
PRIMARY DISTRIBUTION FUEL COST RECOVERY FACTOR:
The Primary Distribution fuel cost recovery factor to be billed is 3.10890 per kilowatt-hour and shall
apply when service is metered at greater than or equal to approximately 12 kV and less than
approximately 69 kV.
SUB -TRANSMISSION FUEL COST RECOVERY FACTOR:
The Sub -transmission fuel cost recovery factor to be billed is 2.97570 per kilowatt-hour and shall apply
when service is metered at approximately 69 kV and less than approximately 115 kV or loss compensated
meters are used to include losses to the sub -transmission.
BACKBONE -TRANSMISSION FUEL COST RECOVERY FACTOR:
The Backbone transmission fuel cost recovery factor to be billed is 2.95880 per kilowatt-hour and shall
apply when service is metered at greater than or equal to approximately 115 kV or loss compensated
meters are used to include losses to the backbone transmission.
PURCHASED POWER COST RECOVERY FACTOR (PCRF)
Where:
A PCRF will be added to each rate schedule. The factor will be determined as follows:
PCRFcbss = ((P x AF) - CAcjass)BDcjass
P = Estimated purchased power costs, exclusive of fuel, on an annualized basis to cogenerator in excess
of the annualized amounts recovered in base rates.
AF = The demand allocation factor for each listed rate class used to allocate generation (production)
plant in the cost -of -service study most recently approved in the last rate case, as set forth below.
1 PRESIDENT AND CEO,
PUBLIC UTILITY COMMISSION OF TEXAS SOUTHWESTERN PUBLIC SERVICE COMPANY
r_rf
Xceffinerg►r
SOUTHWESTERN P1110C SERVICE
ELECTRIC TARIFF
Section No. IV
Sheet No. IV-69
Revision No. 26
Page 2 of 2
CA = A correction amount, including interest, for each rate class to correct for any variance between
actual allocated costs and actual revenues derived from the PCRF for the class. The CA balance for
the proceeding twelve months as of the end of November will be included in the PCRF calculation
for the next year as shown in the above formula. The allocated cost will be determined based on the
allocators set forth below.
BD = Estimated annual billing determinates for the rate class for the year the PCRF will be in effect.
Allocation Factors
The following are the allocation factors to be used in the calculation of the PCRF:
Rate Class
Demand Allocation Factor
(AF)
Residential
0.161445
Small General Service
0.015003
Commercial & Industrial
0.331165
Small Municipal & School
0.000597
Large Municipal & School
0.014839
Street & Area Lighting
0.001951
TOTAL RETAIL
0.525000
I PRESIDENT AND CEO,
PUBLIC UTILITY COMMISSION OF TEXAS SOUTHWESTERN PUBLIC SERVICE COMPANY
E
Section No. IV
Sheet No. IV-73
Xeei Energy Revision No. 4
SOUINWISUIN PUIIIC UAVICI
Page IofI
ELECTRIC TARIFF
SERVICE AGREEMENT SUMMARY
AGREEMENT WITH: Hoechst Celanese Chemical Group, Inc.
POINT OF SERVICE: Vicinity of Pampa, Texas (Metering Point #2)
RATE: The following contract rate is applicable to all power measured by Metering Point #2, and
power added to Metering Point #2 by Contract Provision, when the combined output of
generating plant CZ-1 and CZ-2 is equal to or greater than the combined Celanese plant load.
Contract Rate: 2.60¢/kWh
When, in any billing month, the combined output of generating plant CZ-1 and generating plant
CZ-2 is less than the combined Celanese plant load, the following supplemental rate is applicable
to that portion of demand and energy that exceeds such combined output at any time. Said
supplemental rate shall be applied to the excess demand and energy calculated in accordance
with Article II Section 2c of the contract.
Supplemental Rate: Applicable General Service Rate
FUEL COST ADJUSTMENT: The net charge per kWh delivered of the above contract rate shall be
increased or decreased 0.00240 per kWh for each 0.50 increase or decrease, or major fraction
thereof, per 1,000,000 Btu in the delivered cost of coal to Celanese per 1,000,000 Btu or
Southwestern's delivered cost of coal per 1,000,000 Btu at Harrington Plant plus $ -0- per
1,000,000 Btu, whichever is less, above or below $1.51 per 1,000,000 Btu during the preceding
month.
POWER FACTOR: The customer agrees to maintain a power factor of not less than 90 percent.
TAX ADJUSTMENT: Billings under this schedule may be increased by an amount equal to the sum of
the taxes payable under federal, state and local sales tax acts, and of all additional taxes, fees, or
charges (exclusive of ad valorem, state and federal income taxes) payable by the utility and
levied or assessed by any governmental authority on the public utility services rendered, or on
the right or privilege of rendering the service, or on any object or event incidental to the rendition
of the service, as the result of any new or amended laws after June 1, 1965.
MINIMUM: See Article U, Section 3 of the contract.
PRESIDENT AND CEO,
PUBLIC UTILITY COMMISSION OF TEXAS SOUTHWESTERN PUBLIC SERVICE COMPANY
C�)
Xceffinerg►y"
sourmwist11H RUllic $eRYIct
ELECTRIC TARIFF
ELECTRICAL SERVICE
TO A QUALIFYING FACILITY OF AGGREGATE
GENERATION CAPACITY OF 100 KW OR LESS
Section No. IV
Sheet No. IV-77
Revision No. 10
Page 1 of 1
APPLICABLE: Under contact for standby or supplemental power to customers for electrical
service to a customer -owned generation of 100 kW or less capacity where facilities of
adequate capacity and suitable voltage are adjacent to the premises to be served. Energy
shall be purchased from the qualifying facility in accordance with PUCT Sheet IV-86.
TERRITORY: Texas service territory.
RATE: Same as tariff for applicable class of service.
TERMS OF PAYMENT: Same as tariff for applicable class of service.
DEMAND: Same as tariff for applicable class of service.
FUEL COST RECOVERY: Sarre as tariff for applicable class of service.
CHARACTER OF SERVICE: Same as tariff for applicable class of service.
DEFINPI'ION OF QUALIFYING FACILITY: Qualifying Facility means a cogeneration
facility or a small power production facility which meets the criteria for qualification set
forth in Subpart B, Part 292, Subchapter K. Chapter I, Title 18 of the Code of Federal
Regulations.
MINIMUM: Same as tariff for applicable class of service.
LINE EXTENSIONS: The Company will make line extensions in accordance with its standard
line extension policy.
FRANCHISE FEE: All current and future franchise fees not included in base rates shall be
separately assessed in the municipality where the excess franchise fee is authorized. Bills
computed under the above rate will be increased by the additional franchise fees imposed
by the appropriate municipality or taxing authority in which jurisdiction the customer's
consuming facility resides, when applicable. The franchise fee will appear on the bill as a
separate item.
PRESIDENT AND CEO,
SOUTHWESTERN PUBLIC SERVICE COMPANY
PUBLIC UTILITY COMMISSION OF TEXAS
91
Section No. IV
�/
Sheet No. IV-86
_ Xcef fiiel`ar Revision No. 10
sourttwtsttrtk rustic s(tvice
Page 1 of 2
ELECTRIC TARIFF
ENERGY PURCHASE FROM A QUALIFYING FACILITY
OF AGGREGATE GENERATING CAPACITY OF 100 KW OR LESS
APPLICABLE: Under contract to all customers taking service under the Company's Electric Service to
a Qualifying Facility of Aggregate Generating Capacity of 100 kW or Less (PUCT Sheet IV-77),
with an installed aggregate generating capacity of 100 kW or less.
TERRITORY: Texas service territory.
RATE: The customer shall pay the Company $3.90 per month.
The Company shall credit to the customer's bill for service an amount equal to the kilowatt hours
produced by the Qualifying Facility (as defined under METERING below) and received by the
Company during the billing period multiplied by the cost of fuel at the generator and purchased
power per kilowatt hour for the billing month in which the energy was received. Such credit
shall not be applied unless the customer's account is current and no overdue amounts are
outstanding.
DEFINITIONS:
Qualifying Facility - a cogeneration facility or a small power production facility which meets the
criteria for qualification set forth in Subpart B. Part 292, Subchapter K, Chapter I, Title 18 of the
Code of Federal Regulations.
Net Consumption - meter is installed with detent to measure only the flow of energy from the
Company to the customer.
Net Production - meter is installed with detent to measure only the flow of energy from the
customer to the Company.
All Consumption - meter is installed with detent to measure all consumption of the customer,
whether provided by the Company or the Qualifying Facility.
All Production - meter is installed to measure all production of the Qualifying Facility whether
consumed by the customer or input to the Company.
PRESIDENT AND CEO,
SOUTHWESTERN PUBLIC SERVICE COMPANY
PUBLIC UTILITY COMMISSION OF TEXAS
Section No. IV
Sheet No. IV-86
Xceffinergyr Revision No. 10
SOVtHWISIERN PUILIC SERVICE
Page 2of2
ELECTRIC TARIFF
ENERGY PURCHASE FROM A QUALIFYING FACILITY
OF AGGREGATE GENERATING CAPACITY OF 100 KW OR LESS
METERING: The Company will furnish at its expense the necessary metering equipment to measure the
energy received from the Customer
The following metering options are available:
(1) Parallel operation with interconnection through a single meter that measures net
consumption. The net consumption shall be billed in accordance with PUCT Sheet
IV-77. Net production will not be metered or purchased by the utility, and therefore, the
rate above shall not apply.
(2) Parallel operation with interconnection through two meters with one measuring net
consumption and the other measuring net production. The net consumption shall be
billed in accordance with PUCT Sheet N-77. Net production shall be purchased at the
above rate.
(3) Parallel operation with interconnection through two meters with one measuring all
consumption and the other measuring all production. All consumption shall be billed in
accordance with PUCT Sheet IV-77. All production shall be purchased at the above rate.
(4) A Qualifying Facility of aggregate generating capacity of 50 kW or less interconnected
through a single meter that runs forward and backward. Any consumption shall be billed
in accordance with PUCT Sheet IV-77. Any production shall be purchased at the above
rate. The customer charge above shall not apply. Under this option, the Company may
install two meters with one measuring net consumption and the other measuring net
production. The excess of net consumption over net production shall be billed in
accordance with PUCT Sheet IV-77. The excess of net production over net consumption
shall be purchased at the above rate. The customer charge above shall not apply.
FRANCHISE FEE: All current and future franchise fees not included in base rates shall be separately
assessed in the municipality where the excess franchise fee is authorized. Bills computed under
the above rate will be increased by the additional franchise fees imposed by the appropriate
municipality or taxing authority in which jurisdiction the customer's consuming facility resides,
when applicable. The franchise fee will appear on the bill as a separate item.
I - I I � 5 �-,2- -
PRESIDENT AND CEO,
SOUTHWESTERN PUBLIC SERVICE COMPANY
PUBLIC UTILITY COMMISSION OF TEXAS
�n 2
Section No. IV
Sheet No. IV-91
XCel Energy~ Revision No. 8
SOUTHWIMIN Mile $11VIC[
Page 1 of 4
ELECTRIC TARIFF
MUNICIPAL AND STATE STREET LIGHTING SERVICE
APPLICABLE: To municipal and State of Texas Agency customers for street lighting service where
facilities of adequate capacity and suitable voltage are adjacent to the point of service.
TERRITORY: Texas service territory.
RATE:' The charge per lamp per month shall be in accordance with the following rates:
RESIDENTIAL AREAS
LAMP SIZE
LAMP TYPE
WOOD POLE
RESIDENTIAL TYPE STEEL POLE
Lumen
Overhead
Overhead** Underground*
7,000
MV
$ 4.38
$ 6.13 $ 6.98
15,000
HPS
8.38
10.36 11.76
COMMERCIAL AREAS AND
TRAFFIC ARTERIES
LAMP SIZE
LAMP TYPE
WOOD POLE
COMMERCIAL TYPE STEEL POLE
Lumen
Overhead
Overhead** Underground***
20,000 (2 lamps
per pole
MV
$ 6.60
$ 8.37 $ 10.25
20,000
MV
7.40
10.26 14.00
35,000
MV
10.35
13.07 16.98
50,000
MV
12.56
15.50 19.27
15,000
HPS
8.37
11.24 14.98
27,500
UPS
16.09
18.82 22.60
COMMERCIAL AREAS AND
TRAFFIC ARTERIES
LAMP SIZE
LAMP TYPE
EXISTING FEEDER NEW STREET LIGHT CIRCUIT
Lumen
CIRCUIT (50' POLES) (45'WOOD POLES OVERHEAD)
50,000
HPS
$18.59
$21.98
PUBLIC UTILITY COMMISSION OF TEXAS f PRESIDENT AND CEO,
SOUTHWESTERN PUBLIC SERVICE COMPANY
f2
Section No. IV
Sheet No. IV-91
XceiEnergy'" Revision No. B
SOurHWEfrFIN Public 1EIVICE
Page 2of4
ELECTRIC TARIFF
MUNICIPAL AND STATE STREET LIGHTING SERVICE
STATE OWNED FREEWAY LIGHTING SYSTEM
Available to all State owned and maintained street and highway lighting and incidental safety
lighting that is photocell controlled.
Lumen
Lamp Type
Underground
20,000
MV
$ 6.20
27,500
HIPS
4.38
_
MV-100 watt
4.38
MV-1,000 watt
13.76
-
HPS-400 watt
5.51
15,000
150 watt
4.38
* Applicable to both bracket type and post top luminaires.
** When City owned pole is used or a contribution by customer is made for steel poles, the rate
shall be the applicable wood pole overhead rate.
*** When underground is installed by City, the rate shall be the applicable steel pole overhead rate.
TERMS OF PAYMENT: Net in 16 days after mailing date; 5 percent added after 16 days if the
sixteenth day falls on a holiday or weekend, the due date will be the next work day.
DETERMINATION OF ENERGY USE:
MERCURY VAPOR
7,000 lumen lamp uses 68 kWh per month
20,000 lumen lamp uses 151 kWh per month
35,000 lumen lamp uses 257 kWh per month
50,000 lumen lamp uses 363 kWh per month
100 watt lamp uses 42 kWh per month
1,000 watt lamp uses 363 kWh per month
HIGH PRESSURE SODIUM
15,000 lumen lamp uses 56 kWh per month
27,500 lumen lamp uses 97 kWh per month
50,000 lumen lamp uses 159 kWh per month
400 watt lamp uses 159 kWh per month
PUBLIC UTILITY COMMISSION OF TEXAS I PRESIDENT AND CEO,
SOUTHWESTERN PUBLIC SERVICE COMPANY
Section No. IV
Sheet No. IV-91
Xcel Energy- Revision No. 9
SOMWEEMN OVILIC SERVICE
Page 3of4
ELECTRIC TARIFF
MUNICIPAL AND STATE STREET LIGHTING SERVICE
FUEL COST RECOVERY: The charge per kilowatt-hour of the above rate shall be increased by the
applicable fuel cost recovery factor per kilowatt-hour as provided in PUCT Sheet IV-69.
If any street light is permanently removed from service at the City's request, the City will pay to
the Company, at the time of removal from service of such light, the original cost of the
equipment taken out of service, less'depreciation of four percent per year. If any street light is
removed from service temporarily (at least two months) at the City's request, the monthly rate for
such light during such temporary disconnection will be the base charge per lamp as stated above.
Fuel cost recovery will not be charged or credited on any temporarily disconnected street light.
CONDITIONS OF SERVICE: The foregoing rates include the furnishing by the Company of the
electric energy necessary to operate the street lighting system, the replacement of lamps, and the
normal maintenance of fixtures, wires, transformers and all other component parts of the street
lighting systems, as such replacements and maintenance become necessary. In the event
maintenance and/or lamp and the glassware replacements become excessive due to vandalism or
similar causes, the Company will notify the City and the City will exert whatever means are at its
disposal in the form of law enforcement agencies or other protective measures to eliminate
destruction of street lighting equipment. If such vandalism persists, the Company reserves the
right to remove street lights.
The Company will install, own, operate and maintain the street lighting system. If, for any
reason, the Company is unable to continue service of particular equipment, such equipment, at
the option of the City, will be removed or replaced by the Company with currently available
equipment, and the City will pay the appropriate rate for new equipment.
Street light burning time will be from approximately one-half hour after sunset to approximately
one-half hour before sunrise.
STREET LIGHT OUTAGE REPAIR: SPS shall patrol all streetlights on a quarterly basis. SPS will
track street light outage information and report performance to any requesting city and/or state
agency within thirty (30) days after each quarterly patrol is completed. In addition, SPS will
implement a formal system to track street light outage performance and will track trouble reports
submitted by: (a) customers; (b) employees; (c) municipalities; and (d) routine SPS patrols. SPS
shall target to repair all street light trouble orders, exclusive of freeway lights, within seven
calendar days. If a municipal street light, exclusive of freeway lights, is not repaired within
PUBLIC UTILITY COMMISSION OF TEXAS I PRESIDENT AND CEO,
SOUTHWESTERN PUBLIC SERVICE COMPANY
Section No. IV
Sheet No. IV-91
XC@E Energy- Revision No. 8
sourHwESrESH IUlllt SERVICE
Page 4 of 4
ELECTRIC TARIFF
MUNICIPAL AND STATE STREET LIGHTING SERVICE
STREET LIGHT OUTAGE REPAIR (coot):
seven (7) calendar days after SPS receives notice of the specific streetlight trouble, SPS shall
issue a credit to the customer's bill equal to one month's charges for the respective street light.
Further, SPS shall issue an additional credit to the customer equal to a month's charges for each
such streetlight for each additional seven (7) calendar -day delay in completing repairs for each
affected streetlight. Freeway lights shall be repaired iri a reasonable amount of time taking into
account coordination with state transportation agencies and arranging traffic control for public
safety while SPS agents repair lights on freeways. SPS shall prepare a written street light
performance plan including periodic patrolling, advanced re-lamping, painting, and glassware
cleaning, and shall provide any city and/or state agency an annual streetlight -performance report
showing the number of streetlights for which SPS has issued credits, including an identification
of those streetlights for which SPS issued multiple credits, and the amounts of such credits. The
streetlight -performance plan shall be completed by December 1 of each year and the streetlight -
performance report shall be completed by the end of the First Quarter of the succeeding year to
which the report applies. Upon request, SPS shall also provide a detailed report to any
requesting city and/or state agency identifying the streetlights for which a trouble report was
received, the date the trouble report was received, the commitment date provided by SPS by
when the trouble would be repaired, and the date the trouble was repaired.
Notwithstanding the above conditions, both customer and SPS realize that storm outages and
other items outside of the control of SPS may affect repair times for street light outages. SPS
shall not be required to provide credits to customers for delayed repairs caused by or during such
events.
LINE EXTENSIONS: The Company will make line extensions in accordance with its standard line
extension policy.
FRANCHISE FEE: All current and future franchise fees not included in base rates shall be separately
assessed in the municipality where the excess franchise fee is authorized. Bills computed under
the above rate will be increased by the additional franchise fees imposed by the appropriate
municipality or taxing authority in which jurisdiction the customer's consuming facility resides,
when applicable. The franchise fee will appear on the bill as a separate item.
RULES REGULATIONS AND CONDITIONS OF SERVICE: Service supplied under this schedule
is subject to the terns and conditions set forth in the Company's Rules, Regulations, and
Conditions of Service on file with The Public Utility Commission of Texas.
PUBLIC UTILITY COMMISSION OF TEXAS PRESIDENT AND CEO,
SOUTHWESTERN PUBLIC SERVICE COMPANY
Section No. IV
Sheet No. IV-98
Xcei EneW Revision No. 10
saurNwrsrINK ►u►uc tEevice
Page 1 of 4
ELECTRIC TARIFF
MISCELLANEOUS SERVICE CHARGES
APPLICABLE: The service charges listed below are applicable to all customers served by Company
and are in addition to any other charges made under Company's tariff for electric service.
TERRITORY: Texas service territory.
Name
1. Returned Check Charge
2. After Hours Connection Charge
Inside City Limits
Outside City Limits
3. Field Collection Charge
4. Special Bill Form Charge
5. Account History Charge
6. Reconnect Charge:
For Inside City Limits
Reconnect during business hours
Reconnect during non -business hours
For Outside City Limits
Reconnect during business hours
Reconnect during non -business hours
7. Facilities Rental Charge
Charge
$ 16.00
$ 87.00
$108.00
$ 10.00
$ 10.00
$ 20.00 or cost, whichever is greater
$ 55.00
$ 87.00
$ 90.00
$108.00
2.00% per month applied to net
reproduction cost of facilities.
PUBLIC UTILITY COMMISSION OF TEXAS ( PRESIDENT AND CEO,
I SOUTHWESTERN PUBLIC SERVICE COMPANY
l0�
Section No. IV
Sheet No. IV-98
Xcel Ene - Revision No. 10
(� SOUTHWESTERN ►USLIC SERVICE
Page 2of4
ELECTRIC TARIFF
MISCELLANEOUS SERVICE CHARGES
8. Restoration of Tampered Service Charge
9. Temporary Service Charge
10. Meter Testing Charge
11. Load Control Equipment Charge
12. Miscellaneous Charges
13. Relocation of Facilities Charge
14. Non -Routine Charges
15. Pulse Metering Equipment
Installation and Replacement Charge
Installation Cost (One Output)
With Additional Output
Replacement:
Service Call
Up to 2 Components
All Components
Plus
Components
Meter Pulse Initiator
Pulse Termination Box
Pulse Isolation Relay
PUBLIC UTILITY COMMISSION OF TEXAS
$120.00 during business hours
each occurrence,
$150.00 during non -business hours
each occurrence, plus expense for
damages
At cost
At cost, not to exceed $81.00
At cost, see Articles IV and V of Electric
Demand Signal Agreement.
At cost
Cost of relocation.
At cost
$335
$485
$205
$235
$120
$ 10
$120
PRESIDENT AND CEO,
SOUTHWESTERN PUBLIC SERVICE COMPANY
WE
ik
xcel Energy-
SOUIH1IA M N P0511C SINVICS
ELECTRIC TARIFF
DESCRIPTION
Section No. IV
Sheet No. IV-98
Revision No. 10
Page 3 of 4
1 . Returned Check Charge is made when customer's check has been dishonored by the maker's
bank and returned to the Company.
2. After Hours Connection Charge is made when a new connect is requested by customer to be
made outside of regular working hours.
3. Field Collection Charge is made when Company makes contact at customer's premises for
collection of delinquent bill or deposits. Only one charge is made per month.
4. Special Bill Form Charge is made each time Company provides a manually prepared special
bill analysis.
5. Account History Charge is made each time the Customer requests and the Company provides a
billing/usage premise history or analysis for more than the most recent 36 months. The charges
for these services will equal the Company's labor, material, overhead, and data processing
expense for processing the request or $20.00, whichever is greater.
6. Reconnect Charge is made when Customer requests reconnection of electric service after
having been disconnected because of a delinquent account.
7. Facilities Rental Charge is made when customer rents facilities owned and maintained by the
Company.
8. Restoration of Tampered Service Charge is applied to any customer who has tampered with
the meter installed on the customers premises, or by any manner or means has prevented the total
energy from being registered by the meter installed for such purposes.
9. Temporary Service Charge is made when a customer requests temporary services. In addition
to the cost of service rendered under the applicable rate, the customer will be charged the cost of
installing and removing the facilities required to provide temporary service, in excess of any
salvage realized.
PUBLIC UTILITY COMMISSION OF TEXAS PRESIDENT AND CEO,
SOUTHWESTERN PUBLIC SERVICE COMPANY
Section No. IV
Sheet No. IV-98
Xcel Energ►y"' Revision No. 10
SOOtNWfitERN IUIEIC SERVICE
Page 4 of 4
ELECTRIC TARIFF
10. Meter Testing Charge is free for the first meter test. If the meter has been tested at the
customer's request and within a period of four years the customer requests a new test, the
company may charge the customer an amount to recover the cost of the test, not to exceed $81.00
for a residential customer, if the meter is determined to be functioning properly.
11. Load Control Equipment Charge is equal to the cost for materials, labor, transportation,
miscellaneous expenses, and all applicable overheads for the installation necessary to provide the
required signals. In certain cases, the customer may be charged for totalizing and/or recording
equipment. The customer will also be charged for the operation and maintenance expenses in
accordance with Articles IV and V of the Electric Demand Signal Agreement,
12. Miscellaneous Charges is made for services performed at the request of the customer but not
covered specifically by any rate. The charges will be the reasonable costs incurred for
performing such services including but not limited to, parts, labor and transportation.
13. Relocation of Facilities Charge is made when customer requests the relocation of facilities for
Customer's benefit or convenience.
14. Non -Routine Charge is made for maintenance and replacement of street lighting facilities, other
than what is provided for in the street light tariff. These costs include labor, materials,
transportation, processing, and special equipment. This includes, without limitation, cost for
traffic control as required by federal, state or local laws or regulations.
15. Pulse Metering Equipment Installation and Replacement Charge is made when Customer
requests access to pulse from the revenue meter in accordance with the Agreement and Terns
and Conditions for Pulse Metering Equipment Installation. Replacement of existing pulse
metering equipment is charged according to type of equipment customer requests to be replaced.
PUBLIC UTILITY COMMISSION OF TEXAS I PRESIDENT AND CEO,
SOUTHWESTERN PUBLIC SERVICE COMPANY
70
Xceffnergyft
soutH W1st1RN 00111C $11vict
ELECTRIC TARIFF
SERVICE AGREEMENT SUMMARY
Section No. IV
Sheet No. IV-99
Revision No. 6
Page IofI
AGREEMENT WITH: Degussa Engineered Carbons (Degussa)(formerly J.M. Huber Corp.)
POINT OF SERVICE: Vicinity of Borger, Texas
RATE: The Contract rate of 0.52460 per kWh used per month.
When, in any billing month, the kilowatt-hour (kWh) output of Degussa's generating
plant is less than Degussa's kWh load, the applicable general service rate shall apply to
that portion of demand and energy that exceeds the output, except during one month each
calendar year which is mutually agreed upon by SPS and Degussa for scheduled boiler
inspection and maintenance. In that month, all kWh's will be billed at the contract rate
above.
TERMS OF PAYMENT: Net in 16 days after mailing date; 5 percent added to bill after 16
days. If the sixteenth day falls on a holiday or weekend, the due date will be the next
work day.
FUEL COST RECOVERY: The net charge per kWh delivered under the above contract rate
shall be increased by the PRIMARY DISTRIBUTION FUEL COST RECOVERY
FACTOR provided in PUCT Sheet No. IV-69.
ORIGINAL CONTRACT PERIOD: January 1, 1989 through December 31, 1995.
ANNUAL MINIMUM CHARGE: The contract rate for an amount of kilowatt-hours
calculated by multiplying the maximum kW demand of Degussa's load experienced
during the twelve previous months by 5256 hours.
FRANCHISE FEE: All current and future franchise fees not included in base rates shall be
separately assessed in the municipality where the excess franchise fee is authorized. Bills
computed under the above rate will be increased by the additional franchise fees imposed
by the appropriate municipality or taxing authority in which jurisdiction the customer's
consuming facility resides, when applicable. The franchise fee will appear on the bill as a
separate item.
PRESIDENT AND CEO,
PUBLIC UTILITY COMMISSION OF TEXAS SOUTHWESTERN PUBLIC SERVICE COMPANY
11
Xcelfnergy"
SOUtHWIStIlk POILIC SERYICE
ELECTRIC TARIFF
LATE PAYMENT RIDER
APPLICABLE: To all customers other than residential customers.
TERRITORY: Lubbock, Texas.
Section No. IV
Sheet No. IV-103
Revision No. I
Page 1 of 1
LATE PAYMENT CHARGE: A charge of five percent for late payment shall be made on
all service bills, except residential, not paid within 21 days after the mailing date.
PUBLIC UTILITY COMMISSION OF TEXAS
PRESIDENT AND CEO,
SOUTHWESTERN PUBLIC SERVICE COMPANY
77
Section No. IV
ja XceILnergym Sheet No. N-I08
Revision No. 4
SourHWEstION 1u111C SERVICE
Pagel of 2
ELECTRIC TARIFF
LARGE GENERAL SERVICE - TRANSMISSION
APPLICABLE: To all commercial and industrial electric service supplied at transmission voltage
and at one point of delivery measured through one meter, where facilities of adequate capacity
and suitable voltage of 69 kV or higher are adjacent to the premises to be served.
Not applicable to temporary, breakdown, standby, supplementary, resale or shared service.
TERRITORY: Texas service territory.
RATE: Service Availability Billing Charge: $66.00 per month
Service Availability Charge Per Meter Per Month:
Voltage Level: 230 kV 115 kV 69kV Primary
$3,200.00 $2,620.00 $2,430.00 $150.00
Energy Charge: 0.280¢ per kWh for all kWh used during the month
Demand Charge: $5.97 per kW of demand used per month during each summer month
$4.25 per kW of demand used per month during each winter month
WINTER MONTHS: The billing months of October through May.
SUMMER MONTHS: The billing months of June through September.
OPTIONAL SERVICE: Customers receiving service under this rate may elect to receive interruptible
service under the Interruptible Credit Option.
DETERMINATION OF DEMAND: The kW determined from Company's demand meter for the
30-minute period of customer's greatest kW use during the month.
POWER FACTOR: Applicable to customers on this rate schedule with a peak demand of 200 kW
or greater. Customer, at all times, will maintain at Company's point of delivery a power factor
of not less than 90% lagging.
I PRESIDENT AND CEO,
PUBLIC UTILITY COMMISSION OF TEXAS SOUTHWESTERN PUBLIC SERVICE COMPANY
—77
ja Xceffinergy"
SourHWESIERN Pulllt SERVICE
ELECTRIC TARIFF
POWER FACTOR (coot):
Section No. IV
Sheet No. IV-108
Revision No. 4
Page 2 of 2
In the event a low voltage condition due to lagging power factor exists in a degree sufficient to
impair the Company's service, customer will install suitable capacitor or other equipment
necessary to raise the over-all power factor at the point of delivery to a satisfactory value.
Where such power factor correction equipment is used, customer will install and maintain a
relay, switch, or other regulating equipment for purpose of disconnecting or controlling the
power factor correction equipment in order to prevent excessive voltage variations on
Company's lines.
LOSS ADJUSTMENT: The meter readings used for billing shall be increased to include all
transformation losses when metering is installed on the secondary side of less than 69 kV of any
voltage transformation made on the customer's side of the point of service.
FUEL COST RECOVERY AND ADJUSTMENTS: The charge per kilowatt hour of the above rate
shall be increased by the applicable fuel cost recovery factor per kilowatt hour as provided in
PUCT Sheet IV-69. This rate schedule is subject to other applicable rate adjustments as in effect
from time to time in this tariff.
CHARACTER OF SERVICE: Three phase, 60 hertz, supplied to the entire premises at
approximately 69,000 volts or above.
LINE EXTENSIONS: All cost of equipment, supplies, and labor related to the installation of
facilities necessary to make service available shall be paid by the customer in advance. No
transformation will be made by the Company at the point of service.
'TERMS OF PAYMENT: Net in 16 days after mailing date; 5 percent added to bill after 16 days. If
the sixteenth day falls on a holiday or weekend, the due date will be the next work day.
FRANCHISE FEE: All current and future franchise fees not included in base rates shall be
separately assessed in the municipality where the excess franchise fee is authorized. Bills
computed under the above rate will be increased by the additional franchise fees imposed by the
appropriate municipality or taxing authority in which jurisdiction the customer's consuming
facility resides, when applicable. The franchise fee will appear on the bill as a separate item.
RULES, REGULATIONS AND CONDITIONS OF SERVICE: Service supplied under this
schedule is subject to the terrns and conditions set forth in the Company's Rules, Regulations and
Conditions of Service on file with The Public Utility Commission of Texas and to the terms and
conditions of any special contract service between Company and customer not in conflict
herewith.
PRESIDENT AND CEO,
PUBLIC UTILITY COMMISSION OF TEXAS SOUTHWESTERN PUBLIC SERVICE COMPANY
74
Xcel Energy"
SOUINWISURN Pullic $11vict
ELECTRIC TARIFF
SERVICE AGREEMENT SUMMARY
AGREEMENT WITH: Phillips Petroleum Company
Bartlesville, Oklahoma
POINTS OF SERVICE: Hutchinson County in Texas.
APPLICABLE: Only to transmission service at or above 69 kV.
RATE, Service Availability Billing Charge: $66.00 per month
Service Availability Charge Per Meter Per Month:
Section No. IV
Sheet No. IV-109
Revision No. 5
Pagel of 2
Voltage Level: 230 kV 115 kV 69kV Primary
$3,200.00 $2,620.00 $2,430.00 $150.00
Energy Charge: 0.280¢ per kWh for all kWh used during the month
Demand Charge:
$5.97 per kW of demand used per month during each summer month
$4.25 per kW of demand used per month during each winter month
NOTE: All meter readings of service under this tariff will be combined for billing purposes.
TERMS OF PAYMENT: Net in 16 days after mailing date; 5 percent added to bill after 16
days. If the sixteenth day falls on a holiday or weekend, the due date will be the next
work day.
DETERMINATION OF DEMAND: The kW determined from Company's demand meters
for the 30-minute period of customer's greatest kW use during the month.
PRESIDENT AND CEO,
PUBLIC UTILITY COMMISSION OF TEXAS SOUTHWESTERN PUBLIC SERVICE COMPANY
7-j�7
Section No. IV
Xcel Energy Sheet No. IV-109
'� Revision No. 5
SOUtHWISUIN FUNUC 111VICE
Page 2 of 2
ELECTRIC TARIFF
SERVICE AGREEMENT SUMMARY
LOSS ADJUSTMENT: The meter readings used for billing shall be increased to include all
transformation losses when metering is installed on the secondary side of less than 69
kV of any voltage transformation made on the customer's side of the point of service.
LINE EXTENSIONS: All cost of equipment, supplies, and labor related to the installation
cost of facilities necessary to make service available shall be paid by the customer in
advance. No transformation will be made by the Company at the point of service.
FUEL COST RECOVERY: The charge per kilowatt-hour of the above rate shall be
increased by the applicable fuel cost recovery factor per kilowatt-hour as provided in
PUCT Sheet IV-69.
CHARACTER OF SERVICE: A-C; 60 hertz; at one available standard transmission
voltage for each point of service.
MINIMUM CHARGE: The Demand Charge.
FRANCHISE FEE: All current and future franchise fees not included in base rates shall be
separately assessed in the municipality where the excess franchise fee is authorized.
Bills computed under the above rate will be increased by the additional franchise fees
imposed by the appropriate municipality or taxing authority in which jurisdiction the
customer's consuming facility resides, when applicable. The franchise fee will appear
on the bill as a separate item.
PRESIDENT AND CEO,
PUBLIC UTILITY COMMISSION OF TEXAS SOUTHWESTERN PUBLIC SERVICE COMPANY
76
Section No. IV
Sheet No. IV-117
Xcel Energy- Revision No. 1
sout1twEstERN FullIC $14VICE
Page 1 of 4
ELECTRIC TARIFF
PURCHASE OF NON -FIRM
ENERGY FROM QUALIFYING FACILITIES
AVAILABILITY
This tariff is available under contract and shall apply to purchases by the Company of non -firm
energy received from the Customer's Qualifying Facility which has a generating capability in excess
of 100 kilowatts. Purchases of non -firm energy will be made in accordance with the Public Utility
Commission of Texas ("PUCT") regulations (P.U.C. SUBST. R. 25,242). This tariff does not require
or provide for any electric service by the Company to the Customer. The Customer may request such
service from the Company and, if required by the Company, shall enter into separate contractual
agreements with the Company in accordance with the applicable electric tariff(s). Qualifying Facility
("QF") as used in this tariff, means a cogeneration or small power production facility which qualifies
under Title 18, Chapter 1, Subchapter K, Part 292, Subpart B of the Code of Federal Regulations
(Federal Energy Regulatory Commission's regulations implementing Sections 201 and 210 of the
Public Utility Regulatory Policies Act of 1978 with regard to small power production and
cogeneration).
Nothing in this tariff shall limit the authority of the Company and the Customer to negotiate and
agree to a rate for any purchase, or terms or conditions relating to any purchase, which differ from the
provisions of this tariff.
PAYMENT DETERMINATION
Company will pay the customer for non -firm energy received from the QF at a rate equal to
Company's hourly Adjusted Non -firm Energy Cost (ANFECI) times the kilowatt-hours delivered by
the QF each respective hour during the month times the specific predetermined loss factor appropriate
to Customer's QF.
Monthly Payment = Sum of hourly payments during the month minus the
montlily administrative charge
Hourly Payment; = ANFECi x kWhQF.i x LFQF
where:
ANFECi = Adjusted Non -firm Energy Cost for hour i as
expressed in dollars per kilowatt-hour and rounded
to six decimal places;
kWhQF,; = kilowatt-hours delivered by Customer's QF during
hour i of the month;
LFQF = predetermined Customer specific loss factor;
QF refers to Customer's specific qualifying facility;
and i refers to a specific hour within the month.
PRESIDENT AND CEO,
PUBLIC UTILITY COMMISSION OF TEXAS SOUTHWESTERN PUBLIC SERVICE COMPANY
% 7
Section No. IV
Sheet No. IV-117
XcelEnergy,- Revision No. 1
souTHWESrFdN rustic sinvicr
Page 2 of 4
ELECTRIC TARIFF
PURCHASE OF NON -FIRM
ENERGY FROM QUALIFYING FACILITIES
ANFECi represents the Company's adjusted average avoided energy cost for hour i as computed
in accordance with the PUCT regulations (P.U.C. SUBST. R. 25.242). The ANFECi factor for
each hour i of the month will be calculated as ninety-nine percent (99%) of Company's average
Non -Firm Energy Cost ("NFECi") for each respective hour.
The formula for ANFECi is as follows:
where:
ANFECi = 99 percent x NFECi
NFECi = non -firm energy cost factor for hour i of the month as expressed
in dollars per kilowatt-hour;
NFECi represents the Company's computed average non -firm avoided energy cost for each hour i
of the month. NFECi will be determined by Company as the difference in Company's production
costs with and without the total amount of non -firm energy provided by all QFs pursuant to this
tariff divided by the total amount of non -firm energy provided by all QFs pursuant to this tariff.
The formula for NFECi is as follows:
where:
CPC - CPC
l,i O,i
NFECi = TNFE;
CPCI,i = Company's reconstructed production costs, including purchased
power expenses, for hour i as if all non -firm energy supplied by
QFs pursuant to this tariff was generated by Company or
purchased from another source;
CPCo,i = Company's actual production costs, including purchased power
expenses (exclusive of purchased power costs for purchases
made from QFs pursuant to this tariff), for hour i with all
Customer's non -firm energy avoiding Company's production
costs or other purchased power expenses; and
TNFEi total non -firm energy provided during hour i by all QFs
supplying energy to Company pursuant to this tariff.
PRESIDENT AND CEO,
PUBLIC UTILITY COMMISSION OF TEXAS SOUTHWESTERN PUBLIC SERVICE COMPANY
WAN
Section No. IV
Sheet No. IV-117
XcelEherg►y- Revision No. I
SOUNWEfrERN fV1116 SERVICE
Page 3 of 4
ELECTRIC TARIFF
PURCHASE OF NON -FIRM
ENERGY FROM QUALIFYING FACILITIES
Company's System Planning Department will calculate a predetermined loss factor ("LFQO
applicable to Customer's specific QF to account for the increase or decrease in transmission
system losses attributable to the presence of the Customer's QF on Company's electrical system.
The loss factor will be determined using power flow analysis to calculate the annual average
incremental or decremental losses in the Company's system resulting from the purchase of non -
firm energy from Customer's QF.
If Customer requests in writing, and within six months of any payment period, Company shall
make available supporting information from which the monthly calculations for payment were
made.
The payments for non -firm energy will be made to Customer provided the PUCT recognizes such
payments as allowable purchased energy costs to be fully recoverable under the PUCT's
regulations (P.U.C. SUBST. R. 25.238).
Company will assess in accordance with the PUCT's regulations (P.U.C. SUBST. R. 25.242) a
monthly administrative charge to compensate for the computation and billing the hourly ANFECs
and the Customer's credit statement. This charge will be subtracted from Customer's monthly
credit statement regardless of whether Company has purchased non -firm energy from the
Customer's QF during such billing period. In the event the PUCT enters an order authorizing
Company to make any change in the above administrative costs which Company receives from
the Customer, such change shall be automatically implemented as a part of this tariff.
PAYMENT
Company shall read Customer's QF meter monthly, send a statement and make a payment on or
before the 200' calendar day after the meter is read; except that Customer will make arrangements
with Company to ensure that all payments to Company for electrical service will be made and are
current on or before the day of Company's payments to Customer. The statement will show the
summation of the hourly kilowatt-hours of energy metered and delivered by the Customer's QF,
the monthly average hourly ANFEC factor, the monthly administrative cost assessment by
Company, and the total credit amount to Customer or the amount due to Company.
PRESIDENT AND CEO,
PUBLIC UTILITY COMMISSION OF TEXAS SOUTHWESTERN PUBLIC SERVICE COMPANY
-1Q
Section No. IV
Sheet No. IV-117
Xcel Energy- Revision No. 1
SOUTHWES/ERN ►UItIC SIRVICI
Page 4 of 4
ELECTRIC TARIFF
PURCHASE OF NON -FIRM
ENERGY FROM QUALIFYING FACILITIES
CONTRACT
The sale of non -firm energy to the Company by Customer under this tariff requires a written
contract. The contract shall be negotiable by the Company and the Customer.
INTERCONNECTION COSTS
If the Company determines an interconnection study is necessary, the Company shall perform
such study within a reasonable period of time under reasonable terms and conditions agreed upon
by the parties. The Customer shall be responsible for the costs of such study. The
interconnection study shall determine the equipment and facilities, and the costs associated
therewith, that must be designed, purchased, installed, modified, replaced and/or removed to
economically, reliably, and safely integrate Customer's QF into the Company's electrical system.
The Customer shall pay any interconnection costs, which are defined as the costs of connection,
switching, metering, telemetering, transmission, distribution, safety provisions, or any other costs
directly related to the installation of physical facilities necessary to permit interconnected
operations with the Customer, to the extent such costs are in excess of the corresponding costs
that the Company would have incurred if it had not engaged in interconnection operations, but
instead generated an equivalent amount of electric energy itself or purchased an equivalent
amount of electric energy from other sources. Interconnection costs do not include any costs
included in the calculation of avoided costs.
FRANCHISE FEE
All current and future franchise fees not included in base rates shall be separately assessed in the
municipality where the excess franchise fee is authorized. Bills computed under the above rate
will be increased by the additional franchise fees imposed by the appropriate municipality or
taxing authority in which jurisdiction the customer's consuming facility resides, when applicable.
The franchise fee will appear on the bill as a separate item.
PRESIDENT AND CEO,
PUBLIC UTILITY COMMISSION OF TEXAS SOUTHWESTERN PUBLIC SERVICE COMPANY
C,
Section No. IV
Sheet No. IV-118
10 Revision No. 2
Xcel Energy`"
$00rNWt$rEAN Punic SERVICE
Pagel of 3
ELECTRIC TARIFF
FLOOD LIGHT SYSTEMS
APPLICABLE: Under contract to all night outdoor flood light service where facilities of adequate capacity and
suitable voltage are adjacent to the premises to be served. This tariff' will be closed to new customers as of
September 1, 2000 in accordance with the Public Utility Commission of Texas Order in Docket 21190.
TERRITORY: Texas service territory.
RATE: The charge per month shall be the sum of A + B + C.
A. Charge per light per month for the first light on each 30 foot wood pole with overhead service:
Lamp Wattage
Metal Halide
150
N/A
175
$16.19
250
17.35
400
18.05
1,000
27.62
B. Added charge per month each additional light per pole:
Lamp Wattage
Metal Halide
150
N/A
175
$ 7.06
250
8.06
400
8.73
1,000
18.24
C. Additional charge per month per pole:
High Pressure Sodium
$16.09
N/A
17.43
18.44
27.93
Hlah Pressure Sodium
$ 6.97
N/A
8.14
9.11
18.53
Added Charge
Added Charge
Added Charge
Pole
Per Overhead
Per Wood Pole
Added Charge
Per Steel Pole
Height
Wood Pole
Underground
Per Steel Pole
Under -ground
30'
$ .00
$3.03
$ 5.05
$ 8.09
35'
1.49
4.52
6.54
9.58
40'
3.19
6.23
8.25
11.28
45'
4.51
7.56
9.57
12.61
50'
5.97
9.01
N/A
N/A
PUBLIC UTILITY COMMISSION OF TEXAS I PRESIDENT AND CEO,
SOUTHWESTERN PUBLIC SERVICE COMPANY
C(
Section No. IV
Sheet No. W-118
Xcel Energy- Revision No. 2
SourNWISMIN rustic 211vi:E
Page 2of3
ELECTRIC TARIFF
FLOOD LIGHT SYSTEMS
TERMS OF PAYMENT: Net in 16 days after mailing date; 5 percent added after 16 days. If the sixteenth day
falls on a holiday or weekend, the due date will be the next work day.
DETERMINATION OF ENERGY USE:
Lamp
Metal halide
Wattage
Lumen kWh
150
--- ---
175
14,000 62
250
20,500 97
400
36,000 136
1,000
110,000 359
High Pressure Sodium
Lumen kWh
16,000 56
27,500 97
50,000 159
140,000 350
FUEL COST RECOVERY: The above rate shall be increased by the applicable fuel cost recovery factor per
kilowatt hour as provided in PUCT Sheet No. 1V-69. However, Flood Light Systems service provided by
Company which is electrically connected to a circuit previously metered by Company for other electric
service shall not have the above rate increased by the applicable fuel cost recovery factor.
CONDITIONS OF SERVICE: The Company will construct, own, operate and maintain on the customer's
premises, the required number of overhead flood lights, photo -electrically controlled, installed on
Company's poles of the type and size selected by the customer, and having a secondary line span not
exceeding 150 feet in length. One span of secondary line not exceeding 150 feet in length may be furnished.
under the above rate with each pole. Service requiring more than one span of secondary line per pole will
be furnished by the Company, provided the customer pays an additional charge of $2.19 per month for each
additional span not exceeding 150 feet in length.
The Company will not construct, own, or maintain underground lines on the customer's premises.
Construction for underground lines will be built to the specifications of the Company and will be arranged
and paid for by the customer. The customer is responsible for any trenching and backfilling necessary for
construction.
CHARACTER OF SERVICE: A-C; 60 hertz; single phase; 120 or 240volts.
TERM OF CONTRACT: A period of not less than three years.
LINE EXTENSIONS: The Company will make line extension in accordance with its standard line extension
policy.
PUBLIC UTILITY COMMISSION OF TEXAS I PRESIDENT AND CEO,
SOUTHWESTERN PUBLIC SERVICE COMPANY
Section No. IV
Sheet No. IV-118
fj] Xcei Energy Revision No. 2
SOMWIMIN ►UStIC SEAVICI
Page 3 of 3
ELECTRIC TARIFF
FRANCHISE FEE: All current and future franchise fees not included in base rates shall be separately assessed in
the municipality where the excess franchise fee is authorized. Bills computed under the above rate will be
increased by the additional franchise fees imposed by the appropriate municipality or taxing authority in
which jurisdiction the customer's consuming facility resides, when applicable. The franchise fee will
appear on the bill as a separate item.
RULES REGULATIONS AND CONDITIONS OF SERVICE: Service supplied under this schedule is subject
to the terms and conditions set forth in the Company's Rules, Regulations, and Conditions of Service on file
with The Public Utility Commission of Texas.
PUBLIC UTILITY COMMISSION OF TEXAS I PRESIDENT AND CEO,
SOUTHWESTERN PUBLIC SERVICE COMPANY
9
XcelEnetW
SOUtHW(fi(#N PUBLIC $(#VICE
ELECTRIC TARIFF
AGREEMENT WITH:
Rate
FERC
Number
Schedule
Central Valley Electric Cooperative, Inc.
952
114
Farmers Electric Cooperative, Inc.
954
115
Roosevelt County Electric Cooperative, Inc.
988
117
Lea County Electric Cooperative, Inc.
957
116
Cap Rock Energy Corporation
972
118
Section No. IV
Sheet No. IV-124
Revision No. 1
Page 1 of 2
AVAILABILITY: Available in the territory in which Company operates, to full requirements Wholesale Customers
for resale and distribution. Service under this rate schedule is subject to the terms and conditions specified
in the contract for electric service in effect between the parties as of the effective date of this rate schedule.
CHARACTER OF SERVICE: Service under this rate schedule shall be firm, and shall be 3 phase, 60 hertz
electric energy at the available standard transmission voltage, 69 kV or above. Customer shall receive
unbundled power and transmission services under the terms and conditions of FERC Order No. 888.
MONTHLY RATE:
Delivery Point Charge: $85.75 per delivery point
Demand Charge: $4.61 per kW/month at the input to the transmission system
Energy Charge: $0.03682 per kWh at the input to the transmission system.
The loss factor used to adjust the delivery point -metered quantities to the input to the transmission system shall be as
specified in the applicable Open Access Transmission Tariff under which transmission services are provided.
MEASUREMENT OF DEMAND: For transmission delivery points, the measured kW demand shall be the
maximum thirty (30) minute period of Customer use coincident with the Company's transmission peak
during the month.
For distribution delivery points (service voltage below 69 W), the measured kW demand as determined
above shall be multiplied by 1.074.
DETERMINATION OF BILLING DEMAND: The billing demand for each Customer shall be the sum of the
coincident measured demands from all delivery points, but not less than 65 percent of the highest sum of the
coincident measured demands established in the preceding eleven (11) months.
PUBLIC UTILITY COMMISSION OF TEXAS PRESIDENT AND CEO,SOUTHWESTERN PUBLIC SERVICE COMPANY
XcelEnergr
SOUINWISiERN PUltit SIRVICf
ELECTRIC TARIFF
Section No. IV
Sheet No. IV-124
Revision No. 1
Page 2 of 2
DETERMINATION OF ENERGY FOR DISTRIBUTION POINTS OF DELIVERY: The kWh used for billing
purposes for all distribution system points of delivery (service voltage below 69 kV) shall equal 1.032
times the measured kWh delivery at each such delivery point_
TRANSMISSION: Customer, or its designated agent, will arrange for all necessary transmission and ancillary
services under Company's Open Access Transmission Tariff on file with the FERC.
FUEL COST ADJUSTMENT: The above energy charges will be increased per kWh of sales equal to the
estimated fuel cost per kWh of sales in the current month and adjusted for the preceding two month's
estimate error. The energy charge adjustment shall be calculated in compliance with the formula and
conditions set forth in the Wholesale Fuel Cost and Economic Purchased Power Adjustment Clause, PUCT
Sheet No. 1V-135-
TAX ADJUSTMENT: Billings under this schedule may be increased by an amount equal to the sum of the taxes
payable under federal, state and local sales tax acts, and of all additional takes, fees or charges, (exclusive
of ad valorem, state and federal income taxes) payable by the utility and levied or assessed by any
governmental authority on the public utility services rendered, or on the right or privilege of rendering the
service, or on any object or event incidental to the rendition of service as the result of any new or amended
laws after July 1, 2006.
MINIMUM BILL: The customer charge and the demand charge for the month.
PAYMENT: SPS shall render to Customer (by regular mail, facsimile or other mutually acceptable means) for each
calendar month charges due under this agreement during the preceding month. On or before seventeen (17)
days after receipt of invoice, or if the 17'b day is not a business day, the immediately following business day,
Customer shall render by wire transfer (or as otherwise mutually agreed) the amount set forth on such
statement pursuant to the payment instruction SPS will provide to the Customer. Customer will be deemed
to have received its monthly bill on the date that it is electronically transferred by SPS, provided that such
bill is received by the Customer before 5:00 pm local time on such date. Overdue payments shall accrue
interest from, and including the due date to, but excluding, the date of payment at the FERC interest rate. If
Customer in good faith disputes a statement, customer shall provide a written explanation of the basis for
the dispute and pay the portion of such statement conceded to be correct no later than the due date. If any
amount disputed by Customer is determined to be due to SPS, it shall be paid within ten (10) days of such
determination, along with interest accrued at the FERC interest rate until date paid.
Nothing contained herein shall be construed as affecting in any way the right of the party furnishing service
under this rate schedule to unilaterally make application to the Federal Energy Regulatory Commission for a
change in rates under Section 205 of the Federal Power Act and pursuant to the Commission's Rules and
Regulations promulgated thereunder.
PUBLIC UTILITY COMMISSION OF TEXAS PRESIDENT AND CEO,
SOUTHWESTERN PUBLIC SERVICE COMPANY
n--
2.
Section No. IV
Sheet No. IV- 135
Xcel Energy- Revision No. 1
SOutHWEStERN rustic SERVICE
Page 1 of 4
ELECTRIC TARIFF
WHOLESALE FUEL COST AND ECONOMIC PURCHASED POWER
ADJUSTMENT CLAUSE (FCA)
The charges for wholesale service rendered during the current billing period, which shall be
a calendar month, measured at the output of the transmission system, shall be increased or
decreased by an adjustment amount, per kilowatt-hour (kWh) of sales, equal to the
difference (to the nearest $0.000001) between the estimated fuel cost (eF) per kWh of
estimated sales (eS) in the current billing period (m), and the base cost of fuel (b), with the
total charges adjusted by a dollar amount to correct for prior wholesale over or under
collections:
Adjustment Factor ($/kWh) = (eFm/eSm)-(Fb/Sb)
The base cost of fuel, (Fb/Sb) is $0.03443 per kWh.
Fuel costs (F), measured in $, shall be the cost of:
(i) fossil and nuclear fuel consumed in Company's own plants, and Company's share of
fossil and nuclear fuel consumed in jointly owned or leased plants or plants under
contract to toll Company -provided fuel. The cost of fuel shall include the items
listed in Account 151 (Fuel Stock) and Account 518 (Nuclear Fuel Expense) of the
Commission's Uniform System of Accounts for Public Utilities and Licensees, but
shall not include the gains or losses realized on the settlement of financial Kedge
transactions related to the costs of fuel purchased for electric generation from
Company -owned, jointly owned, leased or tolled generating capacity;
(ii) Plus, the actual identifiable fossil and nuclear fuel costs associated with energy
purchased for reasons other than identified in section (iii) below in order to serve the
sum of the Company's retail and wholesale requirements loads and wholesale firm
sale obligations undertaken for a term of purchase of one year or longer ("Obligation
Load'), including, without limitation, sales made to Public Service Company of New
Mexico ("PNM") under Service Schedule C of the Interconnection Agreement
between PNM and Company;
PRESIDENT AND CEO,
PUBLIC UTILITY COMMISSION OF TEXAS SOUTHWESTERN PUBLIC SERVICE COMPANY
1J
Section No. IV
Sheet No. N-135
xCE F17AP(iV'" Revision No. l
$0UINWESIERN /UIE1C SERVICE
Page 2 of 4
ELECTRIC TARIFF
(iii) plus, the "total cost of the purchase" of "Economic Power," as those terms are
defined in Section 35.14(a)(11) of the Commission's regulations, if the reserve
capacity of the Company is adequate independent of all other purchases where
non -fuel charges are included in either Fb or Fm;
(iv) plus, energy charges for any purchase including, without limitation, the total
energy costs associated with purchases from any wind energy projects to the
extent that the energy -related charges incurred for the purchase over the term of
the purchase are less than the Company's total avoided variable costs. For energy
purchases greater than one year, the Company will measure the monthly purchase
price relative to the Company's total monthly avoided variable cost. The
Company will only include in the FCA the lesser of the cumulative purchase price
or the total avoided variable cost incurred through the term of the purchase to
date;
(v) plus, the portion of the cost of purchases from Qualifying Facilities at or below
Company's avoided variable energy cost; and
(vi) less, the cost of fossil and nuclear fuel and the costs of energy purchases
recovered through all inter -system sales.
I--`- 5;�2_
I PRESIDENT AND CEO,
PUBLIC UTILITY COMMISSION OF TEXAS SOUTHWESTERN PUBLIC SERVICE COMPANY
e
Section No. IV
Sheet No. IV-135
Xcel Energy- Revision No. 1
S0U111WESTERN /Ult1C SERVICE
Page 3 of 4
ELECTRIC TARIFF
3. Sales (S), measured in kWh, shall be equated to:
(i) the sum, measured in kWh at the generator bus -bar or purchased power
interconnection point, of (1) generation, (2) purchases, and (3) exchange
received (the positive or negative difference between (a) the net actual
interchange between the Company's control area and other control areas and (b)
the net scheduled interchange between the Company's control area and other
control areas, due to the Company); and
(ii) less, inter -system sales, as referred to in section 2(vi) above.
4. The current month true -up adjustment applicable to a wholesale customer for prior
adjustment factor over- or under -collections shall be calculated as follows, with all
values referring to actual data or estimates for the prior month:
(i) actual fuel costs (F) divided by actual sales (S);
(ii) minus the estimated fuel costs (eF) divided by the estimated sales (es); and
(iii) times the Company's actual wholesale sales to the customer.
The true -up amount shall be debited or credited to the customer's current month's
billing.
5. (i) The fuel cost adjustment factor calculation shall not include:
(1) the net energy cost of electric energy generated by Company at the
Celanese Corporation (Celanese) chemical plant and consumed by
Celanese at that plant; and
I PRESIDENT AND CEO,
PUBLIC UTILITY COMMISSION OF TEXAS SOUTHWESTERN PUBLIC SERVICE COMPANY
Section No. IV
Sheet No. IV- l35
Xce1 Energy- Revision No. I
SOUINWESIIRN /UltIC SERVICE
Page 4 of 4
ELECTRIC TARIFF
(2) the kilowatt-hours generated at the Celanese chemical plant, not to
exceed the amount of electric energy consumed at that plant.
(ii) The fuel cost adjustment factor calculation shall include:
(1) the net energy cost of energy generated by the Company at the Celanese
chemical plant in excess of what was consumed by Celanese; and
(2) the kilowatt-hours generated at the Celanese chemical plant, in excess of what
was consumed by Celanese.
For Economic Power purchases referred to in section 2(iii) above, capacity, demand,
and transmission costs associated with such purchases shall qualify for inclusion if the
minimum annual planning capacity margin of 12% is projected to be satisfied for the
duration of the purchase without the purchase at issue. Within 45 days after changing
its planning capacity margin, the Company will file an amended fuel cost and economic
purchased power adjustment clause to incorporate the new criteria_ Purchases, other
than those used to demonstrate that the reliability criteria have been satisfied, shall be
eligible for inclusion under section 2(iii) above.
For Economic Power purchases referred to in section 2(iii) above, before any non -fuel
purchase charge may be included in Fm, the total cost of the purchase must be
projected to be less than total avoided variable cost, at the time a purchase was initiated.
J
I PRESIDENT AND CEO,
PUBLIC UTILITY COMMISSION OF TEXAS SOUTHWESTERN PUBLIC SERVICE COMPANY
nq
Section No. IV
Sheet No. IV-143
Xceffnergym Revision No. 1
sour"WIS111H P11111C SIIVICE
Page 1 of 1
ELECTRIC TARIFF
RESIDENTIAL LATE PAYMENT RIDER
APPLICABLE: To customers taking service under the Company's Residential Service rates.
TERRITORY: Inside municipal corporate limits of Lubbock, Texas.
LATE PAYMENT CHARGE: A charge of five percent for late payment shall be made on
all residential service bills not paid within 16 days after the mailing date.
I PRESIDENT AND CEO,
PUBLIC UTILITY COMMISSION OF TEXAS SOUTHWESTERN PUBLIC SERVICE COMPANY
Section IV
Sheet No. IV-144
Xce1 Ever ym Revision No. 1
IOUTHWISTIRN'UIIIC SERYItI Page I of 1
ELECTRIC TARIFF
SERVICE AGREEMENT SUMMARY
AGREEMENT WITH: Under contract to City of Amarillo, Texas for highway sign lighting.
TERRITORY: Amarillo, Texas.
RATE: 2.79¢ per kWh.
FUEL COST RECOVERY: The charge per kilowatt-hour of the above rate shall be
increased by the applicable fuel cost recovery factor per kilowatt-hour as provided in
PUCT Sheet No. IV-69.
MINIMUM CHARGE: $4.00 per meter for single phase service or $10.00 per meter for
three phase service.
LINE EXTENSIONS: The Company will make line extensions in accordance with its
standard line extension policy.
PRESIDENT AND CEO,
SOUTHWESTERN PUBLIC SERVICE COMPANY
PUBLIC UTILITY COMMISSION OF TEXAS
a/
Section No. IV
Sheet No. IV-147
Xce1Fnergr Revision No. 2
SOUTHWESTERN IU11IC SERVICE Page 1 of
ELECTRIC TARIFF
EXPERIMENTAL INDUSTRIAL INTERRUPTIBLE RATE RIDER
AVAILABILITY: Service under this Rider is available at the sole discretion of the Company and
only when the Company has available capacity in excess of the firm system requirement and if
such service will not in anyway impair Company's ability to serve the requirements of its firm
retail customers. This Rider is available under contract to customers having a total interruptible
demand of at least 1,000 kW during June, July, August, and September and whose facilities are
equipped with appropriate telemetering and control equipment to permit Customer to comply
with, or Company to implement curtailment requests.
Service under this Rider is available when taken in conjunction with firm service under the large
general service rate schedules. Supplementary Power Service under this Rider is available to
QFs and other power production facilities under specific contracts on a case -by -case basis.
This Rider expires on December 31, 2007.
MONTHLY RATE:
Service Voltage
Secondary Primary Transmission
Customer Charge:
If taken in addition to firm service $ 50 $ 50 $ 50
If not taken in addition to firm service $200 $639 $639
Demand Charge (per kW of Interruptible Demand):
Instantaneous - $6.26 $5.37 $2.76
Two hour notice - $7.12 $6.34 $3.48
Energy Charge:
per kWh used per month $0.0030 $0.00297 $0.0028
PUBLIC UTILITY COMMISSION OF TEXAS
PRESIDENT AND CEO,
SOUTHWESTERN PUBLIC SERVICE COMPANY
q2
Section No. IV
Sheet No. TV-147
oxcelaelw Revision No. 2
SOUTHWESTERN ?V11IC SERVICE Page 2 of 6
ELECTRIC TARIFF
DEFINITIONS: Instantaneous interruptible service is service that can be interrupted without
notice by means of underfrequency relays when the system frequency declines to 59.6 hertz or
through telemetering and control equipment at the control and discretion of the Company.
Noticed interruptible service is interruptible load that shall be interrupted by the Customer or
Company upon expiration of two hours (120 minutes) after notice was transmitted to the Customer
that an interruption will occur.
DETERMINATION OF DEMAND AND ENERGY: To be determined in accordance with the tariff
to which this rider is appended. In the event that both firm and interruptible service are measured
through the same electric meter, then the firm demand shall be established by Agreement and the
interruptible demand shall be the remainder of the measured demand. The firm demand so
established may be modified by the customer, subject to review and approval by Company, to reflect
changes in the customer's firm load due to normal load growth or load reductions.
When this Rider is attached to the Primary General Service or Secondary General Service tariffs, the
total billing demand shall be the sum of the interruptible demand and the firm demand, or 7500 kW
whichever is greater. In the event the sum of the interruptible demand and firm demand is less than
7,500 kW, the minimum demand charge shall be calculated as follows: 7,500 kW shall be prorated
to the firm and interruptible demands. Such prorated demands shall be billed according to the
appropriate firm and interruptible demand charges, plus $589 for the firm demand customer charge
plus $50 for the interruptible service.
When this Rider is attached to a firm service tariff, the energy served hereunder will be divided
between interruptible service and firm service utilizing the ratio each demand of Turn demand and
interruptible demand is to the total demand.
The demand recorded for the 12-hour period following restoration of service subsequent to
interruptions provided for under this Rider shall not be used in the calculation of total billing
demand.
LIMITATIONS ON INTERRUPTIONS: Interruptions under this Rider are limited as follows:
Daily Limit: No more than two curtailments per calendar day of up to a total of 12 hours, measured
from midnight to midnight, except in system emergencies, as described below.
Annual Limit: No more than 200 hours in any calendar year.
Interruptions lasting for any fraction of an hour shall be credited for one full hour toward the
annual limit.
J
I
PUBLIC UTILITY COMMISSION OF TEXAS PRESIDENT AND CEO,
SOUTHWESTERN PUBLIC SERVICE COMPANY
nn
Section No. IV
Sheet No. IV-147
x�r�IFnart�V� Revision No. 2
$OUIHWE$rEAN PU10C $11VICI
Page 3 of 6
ELECTRIC TARIFF
The Company reserves the right to perform test interruptions, in which the duration of the
interruption will not exceed one hour.
In the event that either customer has failed to comply with previous interruptions or actual
interruptions have not occurred in the prior 12 months which includes the current billing
month, the Company reserves the right to perform test interruptions, in which the duration of
the interruption will not exceed one hour.
Interruption time is measured from the time Customer's load is interrupted to the lesser of, (a)
Company restores service to the load, or (b) Company's facilities are capable of restoring
service to the load, whether or not Customer's facilities are capable of receiving service, or
(c) Company has given permission to Customer to restore service to its load, whichever is
less. During system emergencies or when Company has made public pleas to restrict electric
energy usage to essential needs because of an area or power pool shortage of electric power
and/or energy, interruptible loads served under this Rider may be interrupted continuously
without daily limit until such emergency condition has ended.
The only interruptions credited toward interruption time limits are those implemented by
Customer at the request of Company or those initiated by activation of control equipment by
Company, and those resulting from the operation of underfrequency relays installed in
connection with instantaneous interruptible service.
FUEL COST RECOVERY: The charge per kilowatt-hour of the above rate shall be increased by
the applicable fuel cost recovery factor per kilowatt-hour as provided in PUCT Sheet IV-69.
"TERMS OF PAYMENT: Net in 16 days after mailing date; 5 percent added to bill after 16 days.
If the sixteenth day falls on a holiday or weekend, the due date will be the next work day.
POWER FACTOR ADJUSTMENT: Customer, at all times, will maintain at Company's point of
delivery a power factor of not less than 90% lagging.
In the event a low voltage condition due to lagging power factor exists in a degree sufficient
to impair the Company's service, customer will install suitable capacitor or other equipment
necessary to raise the over-all power factor at the point of delivery to a satisfactory value.
Where such power factor correction equipment is used, customer will install and maintain a
relay, switch, or other regulating equipment for purpose of disconnecting or controlling the
power factor correction equipment in order to prevent excessive voltage variations on
Company's lines.
I
PUBLIC UTILITY COMMISSION OF TEXAS PRESIDENT AND CEO,
SOUTHWESTERN PUBLIC SERVICE COMPANY
OLL
Section No. IV
X+��l�n�r9'r Sheet No. IV-147
Revision No. 2
SOUTHWESTERN PUItic $EIMIc[ Page of 6
ELECTRIC TARIFF
GENERAL CONDITIONS:
Customer understands that failure to interrupt service when requested threatens the
reliability of service to other customers. Company may make intentional interruptions, up
to the Annual Limit, at any time and from time to time, at Company's sole discretion.
Company will attempt to provide as much prior notice as possible prior to interruptions.
Intentional interruptions may be made at any time, in the judgment of Company, when
demands for electricity exceeds or are expected to be likely to exceed the Company's
available electric supply for whatever reasons including, but not limited to, breakdown of
generating units, transmission equipment or other critical facilities; short or long-term
shortages of fuel or generation, transmission, and other facilities; and requirement or orders
of governmental agencies.
CONDITIONS OF SERVICE:
Customer desiring instantaneous interruptible service is required to install, own, operate and
maintain necessary monitoring devices and interruption -control equipment including
protective devices, on Customer's side of the point of delivery, as reasonably specified by
Company. In addition, Company shall install interruption -control equipment on Company's
side of point of delivery as reasonably determined necessary by Company to interrupt the
interruptible load. All interruption -control equipment shall be under the exclusive control of
Company, and the installation and maintenance of such facilities shall be at the expense of
Customer. Interruption -control equipment consists of but is not limited to, under -frequency
relays, switchgear, remote control and communications equipment including a
communications path, timers, trip counters, and/or other devices as specified by Company.
Remote control and communications equipment includes equipment necessary to provide
instantaneous load information to Company's designated system operating centers.
Operation of the equipment will remain under the control of Company and Company
reserves the right to inspect and test all interruption -control equipment and may review
Customers' maintenance records.
Customer desiring noticed interruptible service is required to install, own, operate and
maintain communications equipment as reasonably specified by Company to permit timely
notification of impending and actual curtailments. At any time when Noticed Interruption is
requested, if Customer fails to reduce his load to zero, or in the event that this Rider is
attached to the large general service tariffs and Customer fails to reduce his load to the Firm
demand established by Agreement, the Company, may, at its sole discretion, discontinue
delivery of any or all power to Customer.
PUBLIC UTILITY COMMISSION OF TEXAS ( SOUTHWESTERN
AND CEO,
TERN PUBLIC SERVICE COMPANY
Section No. IV
������ Sheet No. N-147
yIV Revision No. 2
soulHWEStERN PUBLIC $11VICE
Page 5 of 6
ELECTRIC TARIFF
NON-COMPLIANCE PENALTY:
The Demand Penalty Charge for non-compliance with the requested interruption of service
under this tariff is 150% of the difference between the demand charge per KW of interruptible
demand and the demand charge per KW for firm demand for the portion of interruptible load
that Customer failed to interrupt, but in no event shall the total of the Demand Penalty Charge
and rider demand charge exceed what Customer's cost would have been if all the contracted
interruptible load had been taken at firm demand during the period the penalty is applied to.
For the first occurrence of non-compliance: in the month of non-compliance, Customer is
billed the Demand Penalty Charge in addition to the Rider Demand charge.
For the second occurrence of non-compliance: in the month of non-compliance, Customer
is billed the Demand Penalty charge in addition to the Rider Demand charge. In addition,
Customer is billed the Demand Penalty charge for each of the last 12 months or each month
back to the previous request for interruption, whichever is less.
For the third occurrence of non-compliance: in the month of non-compliance, Customer is
billed the Demand Penalty charge in addition to the Rider Demand charge. In addition,
Customer is billed the Demand Penalty charge for each month back to the previous request
for interruption, plus the Demand Penalty charge for each month prior to the first
occurrence of non-compliance back to the previous request for interruption or 12 months,
whichever is less. After the third occurrence of non-compliance, Customer is billed on the
rate schedule for firm power for the remainder of the contract.
A Customer who has experienced a second occurrence of non-compliance and later
successfully complies with three consecutive requests for interruption (including any test
interruptions measuring the amounts of interruptible load disconnected on request) will be
forgiven one prior non-compliance occurrence. The first occurrence of non-compliance after
such forgiveness will be considered a second occurrence of non-compliance for determining
the level of penalty applicable.
The penalties provided above shall not apply to a test interruption if, within a reasonable time
not to exceed ten days, Customer determines the reason for the non-compliance and
verifies to Company that steps necessary to ensure future compliance have been taken.
In the first 12 months of service under this Rider to Customer, Company will not enforce the
provisions of this non-compliance section if, on each occasion of interruption, Customer
demonstrates the following.
1_1� 5;2--
PUBLIC UTILITY COMMISSION OF TEXAS SOUTHWESTERN PRESIDENT AND CEO, PUBLIC SERVICE COMPANY
a/-
Section No. IV
X��� ���� Sheet No. N-147
g/ Revision No. 2
SOUTHWESTUN'UttIC SERVICE
Page 6of6
ELECTRIC TARIFF
For Customers with firm and interruptible service measured through the same
meter: Upon interruption, Customer's measured total load is not greater than 110%
of the contracted firm demand.
For Customers with only interruptible service measured through a single meter:
upon interruption, Customer's measured interruptible load is not greater than 10% of
the highest demand established since service commenced under this rider.
Notwithstanding the non-compliance provisions above, if it is determined at any time
that the Customer has tampered with any communication equipment or breakers or has
bypassed or altered the devices intended to interrupt the load on request, then Customer
will be immediately billed on the rate schedule for firm power for the period since the
last request for interruption with which customer complied or for the 24-month period
just prior to such determination, whichever period is less.
CONTRACT TERM: This Rider is being offered on an experimental basis. An agreement for
service will be required for an initial term of 4 years when service is first rendered under
this Rider and shall continue thereafter until canceled according to the terms of this Rider.
Within the first year of service under this Rider, Customer may elect to have all, or portions
of, his Interruptible demand converted to Firm demand and upon 6 months written notice to
Company, subject to the availability of new firm power service.
After 1 year of service under this Rider, Customer may elect to have all, or portions of, his
interruptible demand converted to Firm demand, upon 2 years written notice to Company,
or sooner if conversion is mutually agreeable, subject to the availability of new firm power
service.
Interruptible service under this Rider may be reduced or canceled by Customer at any time
by providing Company written notice of cancellation not less than 6 months prior to date of
cancellation.
Upon conversion of loads or upon cancellation of Interruptible Service under this Rider,
Customer may not increase his remaining Interruptible demand, or initiate new service
under this Rider, for a period of 12 months following such conversion or cancellation and
then only subject to the availability of new Interruptible Service.
I PRESIDENT AND CEO,
PUBLIC UTILITY COMMISSION OF TEXAS SOUTHWESTERN PUBLIC SERVICE COMPANY
Section No. IV
Sheet No. IV-150
xcel Energy- Revision No. I
SOUrNWESrERN PUBLIC SINViC[
Page I of 3
ELECTRIC TARIFF
RESTRICTED OUTDOOR LIGHTING SERVICE
APPLICABLE: Under contract for night outdoor lighting service where facilities of adequate
capacity and suitable voltage are available and service is being provided at the time of
Company's acquisition of Texas -New Mexico Power Company's property in the counties of
Hansford, Ochiltree, and Lipscomb.
TERM OF SERVICE: No new customers will be added to this service. Existing equipment will
be replaced with standard Company equipment as wear -out and obsolescences occur.
TERRITORY: Areas in the counties of Hansford, Ochiltree, and Lipscomb previously served by
Texas -New Mexico Power Company.
GUARD LIGHTS
RATE: Each 21,500 lumen, 400 watt, mercury vapor lamp for $9.31 per month.
Each 9,500 lumen, 100 watt, high pressure sodium lamp for $8.61 per month.
Each 22,000 lumen, 200 watt, high pressure sodium lamp for $12.60 per month.
FLOOD LIGHTS
RATE: Each 21,500 lumen, 400 watt, mercury vapor lamp for $9.59 per month.
Each 34,000 lumen, 400 watt, metal halide lamp for $12.02 per month.
Each 110,000 lumen, 1,000 watt, metal halide lamp for $19.61 per month.
Each 25,500 lumen, 250 watt, high pressure sodium lamp for $11.42 per month.
Each 50,000 lumen, 400 watt, high pressure sodium lamp for $12.40 per month.
One span of secondary line not exceeding 150 feet in length may be furnished under the above rate.
Service requiring more than one span of secondary line per light will be furnished by the Company,
provided the customer pays a rental charge of $2.19 per month for each additional span not
exceeding 150 feet in length.
The Company will own, operate and maintain on the customer's premises, the required number of
lamps as requested by the customer, mounted on a metal bracket, photo -electrically controlled,
installed on Company's service pole, a separate 30 foot pole, or installed on any suitable mounting
device belonging to the customer, and having a secondary line span not exceeding 150 feet in length.
Lights will not be installed on any mounting device, which in the opinion of the Company is unsafe
and not suitable for this purpose
PUBLIC UTILITY COMMISSION OF TEXAS ( PRESIDENT AND CEO,
SOUTHWESTERN PUBLIC SERVICE COMPANY
G] G
Section No. IV
Sheet No. IV-150
Xcel Energy- Revision No. 1
$0010WElr6RN ►URlt6 ltRtlltE
Page 2 of 3
ELECTRIC TARIFF
RESTRICTED OUTDOOR LIGHTING SERVICE
RATE: The charge per lamp per month shall be in accordance with the following rates:
Lumen Lamp Size Lamp Tyne Wood Pole Underground Ornamental Pole
8,150 MV -- — $11.36
9,500 HPS $6.85 9 $9.31 $13.18
22,000 HPS $7.78 $10.41
The foregoing rates include the furnishing by the Company of the electric energy necessary to
operate the street lighting system, the replacement of lamps, and the normal maintenance of
fixtures, wires, transformers and all other component parts of the street lighting system, as
such replacements and maintenance become necessary. In the event maintenance and/or lamp
and the glassware replacements become excessive due to vandalism or similar causes, the
Company will notify the City and the City will exert whatever means are at its disposal in the
form of law enforcement agencies or other protective measures to eliminate destruction of street
lighting equipment. If such vandalism persists, the Company reserves the right to remove street
lights.
If any street light is permanently removed from service at the City's request, the City will pay to
the Company, at the time of removal from service of such light, the original cost of the
equipment taken out of service, less depreciation of four percent per year. If any street light is
removed from service temporarily (at least two months) at the City's request, the monthly rate for
such light during such temporary disconnection will be the base charge per lamp as stated above.
Fuel cost recovery will not be charged or credited on any temporarily disconnected street light.
The Company will install, own, operate and maintain the street lighting system. If, for any
reason, the Company is unable to continue service of particular equipment, such equipment, at
the option of the City, will be removed or replaced by the Company with currently available
equipment, and the City will pay the appropriate rate for new equipment.
Street light burning time will be from approximately one-half hour after sunset to approximately
one-half hour before sunrise.
TERMS OF PAYMENT: Net in 16 days after mailing date; 5 percent added to bill after 16 days. If
service is billed on a residential bill, the late payment charge will not be imposed. If the
sixteenth day falls on a holiday or weekend, the due date will be the next work day.
PUBLIC UTILITY COMMISSION OF TEXAS I PRESIDENT AND CEO,
SOUTHWESTERN PUBLIC SERVICE COMPANY
/I
Section No. IV
Sheet No. IV-150
Xcel Energy Revision No. 1
S�UTHWEfTERN ►UL•lIC �ERYItE
Page 3of3
ELECTRIC TARIFF
RESTRICTED OUTDOOR LIGHTING SERVICE
DETERMINATION OF ENERGY USE:
8,150 lumen,
175 watt,
21,500 lumen,
400 watt,
9,500 lumen,
100 watt,
22,000 lumen,
200 watt,
34,000 lumen,
400 watt,
110,000 lumen,
1,000 watt,
25,500 lumen,
250 watt,
50,000 lumen,
400 watt,
MV lamp uses 68 kWh per month
MV lamp uses 151 kWh per month
HPS lamp uses 39 kWh per month
BPS lamp uses 75 kWh per month
metal halide lamp uses 136 kWh per month
metal halide lamp uses 359 kWh per month
BPS lamp uses 97 kWh per month
BPS lamp uses 159 kWh per month
FUEL COST RECOVERY: The charge per kilowatt-hour of the above rate shall be increased by the
applicable fuel cost factor per kilowatt-hour as provided in PUCT Sheet IV-69. However,
Outdoor Lighting Service provided by Company which is electrically connected to a circuit
previously metered by Company for other electric service shall not have the above rate increased
by the applicable fluel cost recovery factor.
CHARACTER OF SERVICE: A-C; 60 hertz; single phase; 120 or 240 volts.
LINE EXTENSIONS: The Company will make line extensions in accordance with its standard line
extension policy.
FRANCHISE FEE: All current and future franchise fees not included in base rates shall be separately
assessed in the municipality where the excess franchise fee is authorized. Bills computed under
the above rate will be increased by the additional franchise fees imposed by the appropriate
municipality or taxing authority in which jurisdiction the customer's consuming facility resides,
when applicable. The franchise fee will appear on the bill as a separate item.
RULES REGULATIONS AND CONDITIONS OF SERVICE: Service supplied under this schedule
is subject to the terms and conditions set forth in the Company's Rules, Regulations, and
Conditions of Service on file with The Public Utility Commission of Texas.
PUBLIC UTILITY COMMISSION OF TEXAS PRESIDENT AND CEO,
SOUTHWESTERN PUBLIC SERVICE COMPANY
1 A/C)
xceCnerg '" Section IV
C Sheet No. IV-152
sour"WES111H ►utile SEAYICt Revision No. 1
Page 1 of 1
ELECTRIC TARIFF
STATE UNIVERSITY DISCOUNT RATE RIDER
APPLICABLE: To any facility of any four-year state university, upper -level institution,
Texas State Technical College, or college. This rate discount is offered in order to
comply with the Public Utility Regulatory Act of 2005 (PURA) Section 36.351. This
rate is available only as a rate discount to State supported institutions in conjunction
with a customer's applicable standard rate schedule currently in effect.
TERRITORY: Texas service territory.
MONTHLY BASE RATE DISCOUNT: A discount of 20% will be applied to the base
portion, exclusive of the fixed fuel factor, of the customer's applicable tariffed rate for
electric service.
TERMS AND CONDITIONS: The Company's Rules and Regulations apply to service
under this schedule.
PUBLIC UTILITY COMMISSION OF TEXAS
PRESIDENT AND CEO,
SOUTHWESTERN PUBLIC SERVICE COMPANY
/ A
Section No. IV
XcelEneW Sheet No. IV-170
Revision No. 1
SOuthwistERN Puslic SIMCE
Page 1 of 2
ELECTRIC TARIFF
Fuel Cost Surcharge Rider
Application of Fuel Cost Surcharge Factors are as follows:
Applicable to all rate schedules under the Fuel Cost Recovery Factor Tariff (Sheet IV-69). For
fifteen consecutive months beginning with the February 2006 billing month, the fuel cost surcharge
factors will be billed fo all applicable customers except for the transmission voltage level customers,
through the application of a Fuel Surcharge Factor. The fuel cost surcharge is billed to transmission
voltage level customers on the basis of their actual historical kWh usage recorded monthly during
the period beginning January 2004 through September 2005. As approved by the Public Utility
Commission of Texas in Docket No. 31978, the total amount of the fuel cost surcharge for all
applicable customer classes consists of $76,892,526.20 and related interest of $1,854,666.31
calculated through April 2007, calculated at the rate of 1.17 percent per annum in 2004, 1.26 percent
per annum in 2005 and 3.06 percent per annum in 2006 and 2007, in accordance with Commission
Substantive Rule 25.236(e)(1).
Method of Calculation
(a) For all applicable Texas retail customers, except for transmission voltage level customers:
The monthly fuel cost surcharge is calculated by the application of a Fuel Surcharge Factor,
determined in accordance with the following formula:
Fuel Surcharge Factor (FSF) = ((F + I) / K), where:
F= Total fuel cost underrecovery for the cumulative period of January 2004 through
September 2005;
I= Interest on the remaining principal balance at the end of the each month;
K= The estimated kWh for the rate class for the surcharge period.
FSF= Surcharge amount for each rate class is determined by dividing the total amount of
the surcharge attributable to each respective rate class, inclusive of interest through April
2007, by projected kWh sales for each respective rate class during the surcharge period, and
is as follows: The FSF is calculated to the nearest 0.0001 cent and is multiplied by the
customer's kWh usage in the billing month. The monthly fuel cost surcharge to each
customer is determined to the nearest whole cent.
PUBLIC UTILITY COMMISSION OF TEXAS I PRESIDENT AND CEO,
SOUTHWESTERN PUBLIC SERVICE COMPANY
/ 0Z
XCeffinergysm
SOUTNWE$tERN PUBLIC SERVICE
Section No. IV
Sheet No. N-170
Revision No. 1
Page 2 of 2
ELECTRIC TARIFF
42 .. 9
0,00521
ResidontiAl Service
Secondary General Scirvic
Primary Gene1 Service
8.395,254-07
0.005261
Strcet and Area Lighting
4ZLI31.15
0,005104
Subtotal
51 036 4 .19
(b) For all transmission voltage level customers (Large General Service — Transmission), the monthly fuel
cost surcharge amounts are determined on the basis of each customer's actual historical kWh usage
recorded monthly during the period that the underrecovery accumulated. The total amount of the
surcharge for each of these customers is spread over the fifteen month recovery period (February 2006
through April 2007) and are as follows including interest as previously described. The monthly fuel
cost surcharge to each customer is determined to. the nearest whole cent.
Backbone Tr mission
14.393.191.70
959.546.12
Sub -Transmission
$ 2.483.620.47
$ 165,574.70
Interruptible Backbone Trans
$ 2.092,959,60
606,197.30
Interruptible Sub Trans1341,172,55
$ 116.078.17
Subtotal
27,710,944.32
1,84 .3 6.29
Total of All Classes
$ 78,747,192.51
(c) Any difference between amounts actually surcharged and the amounts of surcharge specified herein
will be maintained in the under or over recovery balance pursuant to Subst. Rule 25.236 (e) on a per
rate class basis.
PUBLIC UTILITY COMMISSION OF TEXAS PRESIDENT AND CEO,
SOUTHWESTERN PUBLIC SERVICE COMPANY
!n 2
Xcel Energr
SOUTHWESTERN PURUC SERVICE
ELECTRIC TARIFF
Fuel Cost Surcharge Rider
Application of Fuel Cost Surcharge Factors are as follows:
Section No. IV
Sheet No. IV-171
Revision No. 1
Page 1 of 2
Applicable to all rate schedules under the Fuel Cost Recovery Factor Tariff (Sheet IV-69). For
twelve consecutive months beginning with the October 2006 billing month, the fuel cost surcharge
factors will be billed to all applicable customers except for the transmission voltage level
customers, through the application of a Fuel Surcharge Factor. The fuel cost surcharge is billed to
transmission voltage level customers on the basis of their actual historical kWh usage recorded
monthly during the period that the underrecovery accumulated. As approved by the Public Utility
Commission of Texas in Docket No. 32685, the total amount of the fuel cost surcharge for all
applicable customer classes consists of $41,780,354.16 and related interest of $1,761,897.40
calculated through September 2007, calculated at the rate of 1.26 percent per annum in 2005, 3.06
percent per annum in 2006, and 3.06 percent per annum in 2007, in accordance with Commission
Substantive Rule 25.236(e)(1).
Method of Calculation
(a) For all applicable Texas retail customers, except for transmission voltage level customers:
The monthly fuel cost surcharge is calculated by the application of a Fuel Surcharge Factor,
determined in accordance with the following formula:
Fuel Surcharge Factor (FSF) = ((F + I) / K), where:
F= Total fuel cost underrecovery for the cumulative period of October 2005 through
March 2006;
I= Interest on the remaining principal balance at the end of the each month;
K= The estimated kWh for the rate class for the surcharge period.
FSF= Surcharge amount for each rate class is detemvned by dividing the total amount of
the surcharge attributable to each respective rate class, inclusive of interest through
September 2007, by projected kWh sales for each respective rate class during the surcharge
period, and is as follows: The FSF is calculated to the nearest 0.0001 cent and is multiplied
by the customer's kWh usage in the billing month. The monthly fuel cost surcharge to each
customer is determined to the nearest whole cent.
'11-i ���
PUBLIC UTILITY COMMISSION OF TEXAS PRESIDENT AND CEO,SOUTHWESTERN PUBLIC SERVICE COMPANY
It)4(
Section No. W
Sheet No. IV-171
Xcel Energy'" Revision No. 1
SOUTHWESTERN PUBLIC 311VICE
ELECTRIC TARIFF
Page 2 of 2
Residential Service
7
0.003092
Secondary General Service
S 14,645,123.07
0.003577
Primary General Service
S 4,890,242.18
0.003733
Street and Area Li tin
.898.12
0,003704
ubtotal
27,576,662.93
(b) For all transmission voltage level customers (Large General Service — Transmission), the monthly
fuel cost surcharge amounts are determined on the basis of each customer's actual historical kWh
usage recorded monthly during the period that the underrecovery accumulated_ The total amount of
the surcharge for each of these customers is spread over the twelve month recovery period (October
2006 through September 2007) and are as follows including interest as previously described. The
monthly fuel cost surcharge to each customer is determined to the nearest whole cent.
tM
IMMIMMIMMYTTIM.M.
Backbone Transmission
6 80 .081.34
573,340.11
Sub -Transmission
2 213 081. 8
184 423.5
Interru tib e Backbone Trans
5.742.356.10
478 529.67
Interruptible Sub Trans
$ 1 130. 69.21
$ 94,172.43
Subtotal
15. 65 88 3
1,330,465.71
Total of All Classes
1 $ 43 542251 56
(c) Any difference between amounts actually surcharged and the amounts of surcharge specified herein
will be maintained in the under or over recovery balance pursuant to Subst. Rule 25.236 (e) on a per
rate class basis.
I
PUBLIC UTILITY COMMISSION OF TEXAS I PRESIDENT AND CEO,
SOUTHWESTERN PUBLIC SERVICE COMPANY
nC
Section No. IV
Sheet No. IV-172
XeelEner ��
Original
SOUfNWflfE1N /UIIIC $11VIGE
Pagel of 2
ELECTRIC TARIFF
SMALL GENERAL SERVICE
APPLICABLE: To commercial customers for electric service used at secondary voltage and used for
commercial purposes when all service is supplied at one point of delivery, and measured through
one meter, where facilities of adequate capacity and suitable voltage are adjacent to the premises
to be served, not to exceed 10 kW of demand in any month. Single phase motors not to exceed
10 horsepower, individual capacity, may be served under this rate.
TERRITORY: Texas service territory.
RATE: Service Availability Charge: $11.00 per month.
Energy Charge: 4.2500 per kWh for all kWh used per month during each summer month
3.3501E per kWh for all kWh used per month during each winter month.
WINTER MONTHS: The billing months of October through May.
SUMMER MONTHS: The billing months of June through September.
FUEL COST RECOVERY AND ADJUSTMENTS: The charge per kilowatt hour of the above rate
shall be increased by the applicable fuel cost recovery factor per kilowatt hour as provided in
DUCT Sheet IV-69. This rate schedule is subject to other applicable rate adjustments as in effect
from time to time in this tariff.
AVERAGE MONTHLY PAYMENT: Upon request, any commercial customer may be billed monthly
based on a levelized payment plan. A customer's monthly payment amount is calculated by
obtaining the most recent twelve months of actual consumption and dividing that amount by
twelve, and applying the Company's current rates to the average kWh consumption. The account
will be trued -up every twelve months. The true -up amount will be equal to the difference
between the total of the prior twelve months' levelized payments and the actual billings for the
corresponding most recent twelve month period.
CHARACTER OF SERVICE: A-C; 60 hertz; single phase 120/240 volts; or where available
secondary, three phase 240 volts.
LINE EXTENSIONS: The Company will make line extensions in accordance with its standard line
extension policy.
PUBLIC UTILITY COMMISSION OF TEXAS
PRESIDENT AND CEO,
SOUTHWESTERN PUBLIC SERVICE COMPANY
106
Section No. IV
���� rrn �� Sheet No. IV-172
Original
S011iHIVESfE1111 /lllll6 SERVICE
Page 2 of 2
ELECTRIC TARIFF
TERMS OF PAYMENT: Net in 16 days after mailing date; 5 percent added to bill after sixteen days. If
the sixteenth day falls on a holiday or weekend, the due date will be the next work day.
FRANCHISE FEE: All current and future franchise fees not included in base rates shall be separately
assessed in the municipality where the excess franchise fee is authorized. Bills computed under
the above rate will be increased by the additional franchise fees imposed by the appropriate
municipality or taxing authority in which jurisdiction the customer's consuming facility resides,
when applicable. The franchise fee will appear on the bill as a separate item.
RULES, REGULATIONS AND CONDITIONS OF SERVICE: Service supplied under this schedule
is subject to the terms and conditions set forth in the Company's Rules, Regulations and
Conditions of Service on file with The Public Utility Commission of Texas.
PUBLIC UTILITY COMMISSION OF TEXAS
PRESIDENT AND CEO,
SOUTHWESTERN PUBLIC SERVICE COMPANY
/n7
Section No. IV
XcelEnergr Sheet No. IV-173
f Original
soutHWISHAN 1111tIc $tIvIct
Pagel of 2
ELECTRIC TARIFF
PRIMARY GENERAL SERVICE
APPLICABLE: To all commercial and industrial electric service supplied at primary voltage and at
one point of delivery measured through one meter, where facilities of adequate capacity and
suitable voltage and are adjacent to the premises to be served.
Not applicable to temporary, breakdown, standby, supplementary, resale or shared service.
TERRITORY: Texas service territory.
RATE: Service Availability Charge: $114.79 per month
Energy Charge: 0.2960 per kWh for all kWh used during the month
Demand Charge:
$8.44 per kW of demand used per month during each summer month
$6.58 per kW of demand used per month during each winter month
WINTER MONTHS: The billing months of October through May.
SUMMER MONTHS: The billing months of June through September.
OPTIONAL SERVICE: Customers receiving service under this rate may elect to receive interruptible
service under the Interruptible Credit Option.
DETERMINATION OF DEMAND: The kW determined from Company's demand meter for the
30-minute period of customers greatest kW use during the month. In the absence of a demand
meter the Company will bill the customer's demand using the monthly kilowatt-hours and an
average load factor of 69.71 percent.
POWER FACTOR: Applicable to customers on this rate schedule with a peak demand of 200 kW or
greater. Customer, at all times, will maintain at Company's point of delivery a power factor of
not less than 90% lagging.
In the event a low voltage condition due to lagging power factor exists in a degree sufficient to
impair the Company's service, customer will install suitable capacitor or other equipment
necessary to raise the over-all power factor at the point of delivery to a satisfactory value. Where
such power factor correction equipment is used, customer will install and maintain a relay, switch,
or other regulating equipment for purpose of disconnecting or controlling the power factor
correction equipment in order to prevent excessive voltage variations on Company's lines.
PUBLIC UTILITY COMMISSION OF TEXAS I PRESIDENT AND CEO,
SOUTHWESTERN PUBLIC SERVICE COMPANY
/19k
Xceffinergr
SOUiHWISTIAH Fultic SEIYICt
ELECTRIC TARIFF
Section No. IV
Sheet No. IV-173
Original
Page 2 of 2
LOSS ADJUSTMENT: The meter readings used for billing shall be increased to include all
transformation losses when metering is installed on the secondary side of less than 69 kV of
any voltage transformation made on the customer's side of the point of service.
FUEL COST RECOVERY AND ADJUSTMENTS: The charge per kilowatt hour of the above rate
shall be increased by the applicable fuel cost recovery factor per kilowatt hour as provided in
PUCT Sheet IV-69. This rate schedule is subject to other applicable rate adjustments as in
effect from time to time in this tariff.
CHARACTER OF SERVICE: A-C 60 hertz, single or three phase at Company's available primary
voltage.
LINE EXTENSIONS: All cost of equipment, supplies, and labor related to the installation of
facilities necessary to make service available shall be paid by the customer in advance. No
transformation will be made by the Company at the point of service.
TERMS OF PAYMENT: Net in 16 days after mailing date; 5 percent added to bill after 16 days. If
the sixteenth day falls on a holiday or weekend, the due date will be the next work day.
FRANCHISE FEE: All current and future franchise fees not included in base rates shall be separately
assessed in the municipality where the excess franchise fee is authorized. Bills computed under
the above rate will be increased by the additional franchise fees imposed by the appropriate
municipality or taxing authority in which jurisdiction the customer's consuming facility resides,
when applicable. The franchise fee will appear on the bill as a separate item.
RULES, REGULATIONS AND CONDITIONS OF SERVICE: Service supplied under this schedule
is subject to the terms and conditions set forth in the Company's Rules, Regulations, and
Conditions of Service on file with The Public Utility Commission of Texas and the following
conditions:
1. For those customers receiving primary distribution voltage and who desire to elect
secondary distribution voltage, they may do so subject to the terms and conditions of
Primary/Secondary Conversions.
PUBLIC UTILITY COMMISSION OF TEXAS I PRESIDENT AND CEO,
SOUTHWESTERN PUBLIC SERVICE COMPANY
Section No. IV
Sheet No. IV-174
Xceffinergys-
Original
soutNWEltEAN /UILIC SERVICE
Page 1 of 2
ELECTRIC TARIFF
SMALL MUNICIPAL AND SCHOOL SERVICE
APPLICABLE: To municipal facilities and public and private schools for electric service used
at secondary voltage and used for municipal and school purposes when all service is
supplied at one point of delivery, and measured through one meter, where facilities of
adequate capacity and suitable voltage are adjacent to the premises to be served, not to
exceed 10 kW of demand in any month. Single phase motors not to exceed 10
horsepower, individual capacity, may be served under this rate.
TERRITORY: Texas service territory.
RATE: Service Availability Charge: $0.00 per month.
Energy Charge:
3.8800 per kWh for all kWh used per month during each summer month
3.1930 per kWh -for all kWh used per month during each winter month.
WINTER MONTHS: The billing months of October through May.
SUMMER MONTHS: The billing months of June through September.
FUEL COST RECOVERY AND ADJUSTMENTS: The charge per kilowatt hour of the
above rate shall be increased by the applicable fuel cost recovery factor per kilowatt hour
as provided in PUCT Sheet IV-69. This rate schedule is subject to other applicable rate
adjustments as in effect from time to time in this tariff.
CHARACTER OF SERVICE: A-C; 60 hertz; single or three phase, at one available standard
voltage.
LINE EXTENSIONS: The Company will make line extensions in accordance with its standard
line extension policy.
PUBLIC UTILITY COMMISSION OF TEXAS I PRESIDENT AND CEO,
SOUTHWESTERN PUBLIC SERVICE COMPANY
Section No. IV
Xcer Energl Sheet No. IV-174
SOVtNW11rIlN ?011ie StIVItI Original
Page 2 of 2
ELECTRIC TARIFF
TERMS OF PAYMENT: Net in 16 days after mailing date: 5 percent added to bill after sixteen
days. If the sixteenth day falls on a holiday or weekend, the due date will be the next
work day.
FRANCHISE FEE: All current and future franchise fees not included in base rates shall be
separately assessed in the municipality where the excess franchise fee is authorized. Bills
computed under the above rate will be increased by the additional franchise fees imposed
by the appropriate municipality or taxing authority in which jurisdiction the customer's
consuming facility resides, when applicable. The franchise fee will appear on the bill as a
separate item.
RULES, REGULATIONS, AND CONDITIONS OF SERVICE: Service supplied under this
schedule is subject to the terms and conditions set forth in the Company's Rules and
Regulations on file with The Public Utility Commission of Texas.
I Q-
PUBLIC UTILITY COMMISSION OF TEXAS I PRESIDENT AND CEO,
SOUTHWESTERN PUBLIC SERVICE COMPANY
iII
Section No. IV
Sheet No. IV-175
ja XcelEnergyw Original
SOMWEStE1N PUItIC SERVICE
Pagel of 2
ELECTRIC TARIFF
LARGE MUNICIPAL SERVICE
APPLICABLE: To all municipal facilities supplied electric service at secondary voltage and
at one point of delivery, and measured through one meter, where facilities of adequate
capacity and suitable voltage are adjacent to the premises to be served, in excess of
IOkW of demand in any month.
Not applicable to temporary, breakdown, standby, supplementary, resale or shared
service, or to service for which a specific rate schedule is provided.
TERRITORY: Texas service territory.
RATE: Service Availability Charge: $15.00 per month
Energy Charge: 0.35 1¢ per kWh for all kWh used during the month
Demand Charge: $6.79 per kW of demand used per month during each summer month
$5.59 per kW of demand used per month during each winter month
WINTER MONTHS: The billing months of October through May.
SUMMER MONTIIS: The billing months of June through September.
DEMAND: The Company will furnish at its expense the necessary metering equipment to
measure the customer's kW demand for the 30-minute period of greatest use during the
month. In the absence of a demand meter the Company will bill the customer's
demand using the monthly kilowatt-hours and an average load factor of 41.30 percent.
POWER FACTOR: Applicable to customers on this rate schedule with a peak demand of 200
kW or greater. Customer, at all times, will maintain at Company's point of delivery a
power factor of not less than 90% lagging.
In the event a low voltage condition due to lagging power factor exists in a degree
sufficient to impair the Company's service, customer will install suitable capacitor or
other equipment necessary to raise the over-all power factor at the point of delivery to a
satisfactory value. Where such power factor correction equipment is used, customer will
install and maintain a relay, switch, or other regulating equipment for purpose of
disconnecting or controlling the power factor correction equipment in order to prevent
excessive voltage variations on Company's lines.
PUBLIC UTILITY COMMISSION OF TEXAS
PRESIDENT AND CEO,
SOUTHWESTERN PUBLIC SERVICE COMPANY
/19
Section No. IV
Sheet No. IV-175
XcelEnergym
Original
S00101MIN ►Ultit SHViCE
Page 2 of 2
ELECTRIC TARIFF
FUEL COST RECOVERY AND ADJUSTMENTS: The charge per kilowatt hour of the
above rate shall be increased by the applicable fuel cost recovery factor per kilowatt
hour as provided in PUCT Sheet IV-69. This rate schedule is subject to other
applicable rate adjustments as in effect from time to time in this tariff.
CHARACTER OF SERVICE: A-C; 60 hertz; single or three phase, at one available
standard voltage.
LINE EXTENSIONS: The Company will make line extensions in accordance with its
standard line extension policy.
TERMS OF PAYMENT: Net in 16 days after mailing date; 5 percent added to bill after 16
days. If the sixteenth day falls on a holiday or weekend, the due date will be the next
work day.
FRANCHISE FEE: All current and future franchise fees not included in base rates shall be
separately assessed in the municipality where the excess franchise fee is authorized.
Bills computed under the above rate will be increased by the additional franchise fees
imposed by the appropriate municipality or taxing authority in which jurisdiction the
customer's consuming facility resides, when applicable. The franchise fee will appear
on the bill as a separate item.
RULES, REGULATIONS AND CONDITIONS OF SERVICE: Service supplied under
this schedule is subject to the terms and conditions set forth in the Company's Rules,
Regulations and Conditions of Service on file with The Public Utility Commission of
Texas and the following conditions:
1. For those customers receiving secondary service distribution voltage who desire
to elect primary distribution voltage, they may do so subject to the terms and conditions
of Primary/Secondary Conversions.
PUBLIC UTILITY COMMISSION OF TEXAS
PRESIDENT AND CEO,
SOUTHWESTERN PUBLIC SERVICE COMPANY
/I )
Section No. IV
Xce-kner � Sheet No. IVOrig17al
SOUTHWESTERN /UttIC SERVICE Page 1 of 8
ELECTRIC TARIFF
INTERRUPTIBLE CREDIT OPTION
APPLICABILITY
Applicable as an interruptible service option to customers who receive electric service
under the Company's Large General Service rate Schedules. Not applicable to customers
who receive electric service under the Company's Standby Service rate Schedules.
Effective: January 1, 2008
AVAILABILITY
Optional service under this rate schedule is available to customers that have entered
into a written, signed and dated Interruptible Agreement that specifies the Contract Firm
Demand, as well as the. customer specific data necessary for the Company to calculate the
customer's Monthly Credit as set forth below.
To qualify under this schedule, a customer must have a Contract Interruptible Load of
500 kilowatts or greater, as defined below. Also, customer must achieve an Interruptible
Demand of at least 500 kilowatts during each of the four, summer peak season months of
June, July, August and September of the prior year.
Customers receiving service under the less than ten-minute notice provision of this
schedule must provide the Company with physical control of their interruptible load.
Customers receiving service under this schedule shall be billed on a calendar month
basis, such that the first day of each month shall be the beginning and the last day of each
month shall be the end of the monthly billing period.
CONTRACT INTERRUPTIBLE LOAD
The Contract Interruptible Load for each calendar year shall be equal to the median of
the customer's maximum daily 15 minute integrated kW demands occurring between the
hours of 12:00 noon and 8:00 p.m. Monday through Friday, excluding federal holidays,
during the period June 1 through September 30 of the prior year. The Company shall
calculate the Contract Interruptible Load before January 1 of each year. If the Company
determines that the Contract Interruptible Load is less than 500 kilowatts, then the
Interruptible Agreement shall terminate at the end of the then current contact term.
1_1� 5�2_
PRESIDENT AND CEO,
PUBLIC UTILITY COMMISSION OF TEXAS SOUTHWESTERN PUBLIC SERVICE COMPANY
Section No. IV
XceIaeU Sheet No, IV177
l � Original
SOUTHWESTERN PUNIC SERVICE Page 2 of 8
ELECTRIC TARIFF
CONTRACT INTERRUPTIBLE LOAD (coot.)
In extraordinary circumstances, a customer that has entered into an Interruptible
Agreement may seek a ruling from the Commission that its Contract Interruptible Load
should be calculated using load data from the year one year prior to the year normally used to
calculate the Contract Interruptible Load under the tariff. In order to obtain such ruling, the
customer must show that, due to extraordinary circumstances, the load data that would
normally be used to calculate its Contract Interruptible Load under the tariff is less
representative of what the customer's load is likely to be in the following year than its load
data from the year one year prior to the period normally used.
CONTRACT FIRM DEMAND
The Contract Firm Demand is that portion of the customer's total load that is not
subject to interruptions by Company, as specified in the Interruptible Agreement.
INTERRUPTIBLE DEMAND
The Interruptible Demand, determined by meter measurement, shall be the maximum
thirty (30) minute integrated kilowatt demand used during the month, less the Contract Firm
Demand, if any, but not less than zero. Interruptible Demand is measured between the hours
of 12:00 noon to 8:00 p.m. Monday through Friday, excluding federal holidays.
DEFINITIONS
Number of Interruptible Hours (Ha). The number of hours in the year that each
customer elects as interruptible as set forth in the Interruptible Agreement. The
options for Ha are 40 hours, 80 hours, 160 hours, and 200 hours.
Capacity Availability (Ca). A percentage based on the Number of Interruptible Hours
(Ha) set forth in the Interruptible Agreement, The Ca applicable to each Ha option is
as follows:
Interruption Hours
Ha Ca
40 hours 27%
80 hours 46%
160 hours 71 %
200 hours 79%
PUBLIC UTILITY COMMISSION OF TEXAS SOUTHWESTERN PRESIDENT AND CEO, PUBLIC SERVICE COMPANY
Section No. IV
Xy���( !Get Sheet No. IVrv177
g1
Original
$OUTOWISTIAN PUe11c $11VICI Page 3of8
ELECTRIC TARIFF
DEFINITIONS (cont.)
Notice Factor (Nf). A percentage based on the amount of advance notice that each
customer elects to receive prior to interruption, as set forth in the Interruptible
Agreement. The Nf is as follows:
Advance Notice Nf
Less than 10 minutes 139%
One hour 100%
Eight hours 13%
Participation Cap (PC). The desired level of participation in kilowatts. This figure is
updated annually. The participation factor:
Advance Notice PC
Less than 10 minutes Zero kilowatts
One hour No current limit
Eight hours No current limit
System Loss Factors (Slfl. The System Loss Factors are as follows:
Delivery Level Slf
Secondary Distribution Voltage 1.089962
Primary Distribution Voltage 1.072454
Transmission Voltage 1.000000
These loss factors will change upon the approval of the next loss study filed by SPS.
Avoided Energy Cost (Av). The Avoided Energy Cost shall be updated semi-
annually at the time the Company updates its Fuel Cost Factor ("FCF") to reflect
prices in the FCF.
I
PUBLIC UTILITY COMMISSION OF TEXAS PRESIDENT AND CEO,
SOUTHWESTERN PUBLIC SERVICE COMPANY
116
Section No. IV
Sheet No. IV-177
XcelEnergyw Original
SOUTHWIST101 PUILIC SINVICf
Page 4of8
ELECTRIC TARIFF
MONTHLY CREDIT
The Monthly Credit shall be calculated by multiplying the Monthly Credit Rate
(MCR) by the lesser of the customer's Contract Interruptible Load or the actual Interruptible
Demand during the billing month.
The MCR shall be capped at the customer's seasonal production capacity cost.
The MCR shall be revised effective January 1 each year, and shall remain in effect for
the calendar year. The MCR shall vary by season. The summer season shall be June 1
through September 30, and the winter season shall be October 1 through May 31. The MCR
shall be calculated separately for each customer using the following equation:
Summer Monthly Credit, per kW -month:
MCR = [($5.41 * Ca * Nf) + ($0.00259 * Ha)] * Slf * 118%
Winter Monthly Credit, per kW -month:
MCR = [($5.41 * Ca * Nf) + ($0.00259 * Ha)] * Slf * 91%
SERVICE PERIOD
All contracts for service under this schedule shall be for an initial two-year term, with
automatic one-year renewal terms. A customer must provide the Company written six
months notice to cancel service under this schedule.
Any time during the first year of service under this schedule a customer may opt to
cancel its contract by returning all monthly credits paid by the Company up until the date of
cancellation. No additional payment will be assessed.
EARLY TERMINATION PENALTY
Any customer who cancels service without complying with the Service Period
requirements under this schedule shall be required to pay the Company, as a penalty, an
amount equal to the product of one hundred and ten percent (I10%) times the customer's
Contract Interruptible Load times the customer's MCR for each of the remaining months of
the unexpired contract term.
In addition, the customer shall reimburse the Company for the direct cost incurred by
the Company for equipment (including its installation cost, less salvage value) to measure the
customer's Interruptible Demand and to interrupt the customer.
PUBLIC UTILITY COMMISSION OF TEXAS I PRESIDENT AND CEO,
SOUTHWESTERN PUBLIC SERVICE COMPANY
Section No. IV
Sheet No. IV-177
}lam
XcelEnet Original
SOUTNWESIERH PUIIIC SERVICE Page5of8
ELECTRIC TARIFF
OBLIGATION TO INTERRUPT
When the Company asks the customer to interrupt its available Interruptible Load, the
customer must reduce its load to the level of customer's Contract Firm Demand.
ECONOMIC INTERRUPTIONS
The Company reserves the right to call an Economic Interruption for one or more
customers once per day when the Company believes, in its sole discretion, that calling an
interruption will lower its overall system costs compared to what the overall system cost
would be in the absence of the interruption. The duration of any Economic Interruption shall
not be less than four hours. Customers under the less than 10-minute and 1-hour notice
provisions will have at least 1-hour notice of an Economic Interruption. Customer under the
8-hour notice provision will have 8-hours notice of an Economic Interruption.
BUY THROUGH — ECONOMIC INTERRUPTIONS
Customers will have 15 minutes after being notified of an economic interruption to
elect to buy -through all or a portion of their available interruptible load. Such notice shall
advise customers of the Company's best estimate of the buy -through price. The buy -through
price shall be the actual cost of buy -through energy incurred by the Company. The actual
cost shall be calculated by taking the weighted average cost, as determined by the
Company's Cost Calculator or its successor, plus 3 mils per kWh, for the block of electricity
used to serve the customer(s) who elected to buy -through.
For purposes of this calculation, the Company shall assume that the block of
electricity used is the highest cost block of electricity consumed in each buy -through hour.
Once the Company has called an Economic Interruption, the Company agrees to provide
interruptible customers, by electronic mail delivered to the address as specified in the
Interruptible Agreement, with the estimated buy -through price for each hour of the four-hour
interruption period. Customers who elect to buy -through the Economic Interruption must
continue to buy -through all hours of the interruption period unless the Company notifies
Customers of an updated buy -through price for any hour of the interruption that exceeds the
original estimated buy -through price for the hour in question, whereupon any customer that
elected initially to buy -through the Economic Interruption will have 15 minutes after being
notified of the updated estimated price to advise the Company that such customer desires to
be interrupted at the start of the next hour. Once a customer chooses to interrupt, the
customer will be interrupted for the remainder of the interruption period as determined by the
Company. The minimum duration of any Economic Interruption under this Paragraph shall
be four hours from the time that the Company designated when it first called for the
Economic Interruption.
PUBLIC UTILITY COMMISSION OF TEXAS SOUTHWESTERN PRESIDENT AND CEO, PUBLIC SERVICE COMPANY
11F
Section No. IV
� Sheet No.IV-1 7
XcefEne?l ' W Original
SOUTHWISTUN PUILIc $11VICI Page 6 of 8
ELECTRIC TARIFF
If the Company chooses to extend an Economic Interruption from the original
notification, all ICO Customers affected by Economic Interruption will be notified and given
the opportunity to buy -through or interrupt for the duration of the Economic Interruption
extension period. Economic Interruption extensions may be less than 4 hours in duration.
Customers may provide advance election to buy -though up to a specified price. Such
election shall be made no later than the last business day prior to the first day of the month to
which the election will apply and shall be delivered to the customer's service representative
by electronic mail as provided in the customer's Interruptible Agreement. Any customer
with a standing buy -though order shall have the option, within, the 15 minute notice period,
to advise the Company that it desires to be interrupted. Further, in the event that the buy -
though price exceeds the customer -specified price, the customer may nevertheless elect to
buy -though the interruption by providing the Company with the required notice within 15
minutes.
FAILURE TO INTERRUPT - ECONOMIC INTERRUPTIONS
In the event that any customer fails to interrupt during an Economic Interruption, the
customer will be deemed by the Company to have failed to interrupt for all demand that the
customer was obligated to interrupt but did not interrupt. The failure -to -interrupt charge shall
be equal to the highest incremental price for power during the Economic Interruption plus 3
mills, as determined by the Company after the fact, including market costs, unit start-up cost,
spinning reserve costs and reserve penalty cost, if any. The charge will only apply to the
portion of the load the customer fails to interrupt.
CAPACITY INTERRUPTIONS
The Company reserves the right to call a Capacity Interruption for one or more
customers at any time when the Company believes, in its sole discretion, that generation or
transmission capacity is not sufficiently available to serve its firm load obligations other than
obligations to make intra-day energy sales. The duration of any Capacity Interruption shall
not be less than four hours.
CONTINGENCY INTERRUPTION
The Company reserves the right to call a Contingency Interruption for one or more
customers receiving service under the less than I0-minute notice provision at any time when
the Company believes, in its sole discretion, that interruption is necessary for the Company to
be able to meet its disturbance control standard (DCS) criteria. The duration of any
Contingency Interruption shall not be less than four hours.
1_1� <. ;_-p-
I
PRESIDENT AND CEO,
PUBLIC UTILITY COMMISSION OF TEXAS SOUTHWESTERN PUBLIC SERVICE COMPANY
Section No. IV
X� ,�-rl El�er Sheet No. IVg1177
yw Original
soutmwEstERN RUIIIC $11VICE
Page 7 of 8
ELECTRIC TARIFF
INDUSTRIAL & COMMERICIAL INTERRUPTIBLE CREDIT
SCHEDULE ICO
FAILURE TO INTERRUPT - CAPACITY & CONTINGENCY INTERRUPTIONS
In the event the customer fails to interrupt during a capacity or contingency
interruption, the customer shall pay the Company fifty percent (50%) percent of the
customer's expected annual credit for all demand that the customer was obligated to interrupt
but did not interrupt. The penalty will apply only to the portion of the load that the customer
fails to interrupt. After the customer fails to interrupt twice, the Company shall have the
option to cancel the Interruptible Agreement. If the contract is cancelled, the customer shall
not be eligible for service under this rate schedule for a minimum of one year.
If a Customer violates a capacity or contingency interruption while using Company -
owned equipment to effect said interruption, the Customer shall not be penalized unless
evidence of tampering or bypassing the direct load control of the company is in evidence. If
tampering or bypassing the direct load control of the Company is evident, the Company may
remove the Customer from the less than 10-minute notice option and place the Customer on
the one -hour notice option rate for a minimum one-year period. The customers' credits shall
be adjusted accordingly. In addition, the Customer shall pay 50% of the annual credit times
the amount of load that the Customer failed to remove as a penalty.
PHONE LINE REQUIREMENTS
All ICO Customers will be required to install a dedicated analog phone line to the
meter location. Less than 10-minute notice option Customers must also provide a dedicated
analog phone line with the `distinctive ring' feature. Phone line and distinctive ring feature
must be installed and working before the customer may join the rate.
Customers shall be notified by email when their phone line used to communicate
interruptions to the Company's Remote Terminal Unit is not working. Customers must
repair the phone line within 2 weeks of notification. If the Customer does not repair the
phone line within 2 weeks of notification by the Company, the customer shall be moved to
the one -hour notice option until the phone line is repaired and tested. The customer's credits
shall be adjusted accordingly. In the event that the Company issues a capacity or contingency
interruption during a time in which the Customer's phone line is not working, all applicable
penalties shall apply if the customer fails to comply with the interruption.
PUBLIC UTILITY COMMISSION OF TEXAS PRESIDENT AND CEO,
SOUTHWESTERN PUBLIC SERVICE COMPANY
A -
Section No. IV
�/ Sheet No. IV-177
Xceffineg � Original
SOUINWFStERN IUIIIC SEIVICE Page 8 of 8
ELECTRIC TARIFF
INTERRUPTIBLE CREDIT OPTION
SCHEDULE ICO
PHYSICAL CONTROL
For those customers who select the less than 10-minute notice ICO option, the
Company must have remote and automatic control over the customer's entire interruptible
load. All less than 10-minute notice option customers must pay for the cost of a remote
terminal unit that will receive the interruption and restore signals via phone line, and lock the
customer's load out during a capacity or contingency interruption. The remote terminal unit
shall be designed, purchased, installed and tested by the Company at the Customer's expense.
A $1000 non-refundable deposit is required to perform the engineering and design work need
to determine the costs associated with providing the Company physical control over the
Customer's load. A minimum of 6 months is required to design, order, install and test the
required equipment to give the Company complete and physical control over the customer's
load. During a capacity or contingency interruption, the Company shall lock out the
customer's load to prevent the customer from terminating the interruption before release.
Customers who select the less than 10-minute notice option shall submit to equipment testing
at least once per year. Before joining the rate the customer must complete a verification test
to prove their load will drop off in less than 10 minutes notice and must also demonstrate that
their load is physically locked out by the Company's remote terminal unit to prevent their
interruptible load from restoring before restore signal is received.
LIMITATION OF LIABILITY
Customers who elect to take service under the ICO program shall agree to indemnify
and save harmless the Company from all claims or losses of any sort due to death or injury to
person or property resulting from interruption of electric service under the ICO program or
from the operation of the interruption signal and switching equipment.
PRESIDENT AND CEO,
PUBLIC UTILITY COMMISSION OF TEXAS SOUTHWESTERN PUBLIC SERVICE COMPANY
Section No. IV
Sheet No. IV-178
Xceffinegri Original
$09THWISTIRN PUIIic SMICI Page 1 of
ELECTRIC TARIFF
AGREEMENT WITH:
*GOLDEN SPREAD ELECTRIC COOPERATIVE, INC.
FOR SERVICES TO:
Rate
FERC
Number
Schedule
Bailey County Electric Cooperative, Inc.
970
86
Deaf Smith Electric Cooperative, Inc.
953
88
Greenbelt Electric Cooperative, Inc.
955
90
Lamb County Electric Cooperative, Inc.
956
91
Lighthouse Electric Cooperative, Inc.
958
92
Big Country Electric Cooperative, Inc.
960
105
North Plains Electric Cooperative, Inc.
962
99
Rita Blanca Electric Cooperative, Inc.
963
98
South Plains Electric Cooperative, Inc.
971
96
Swisher Electric Cooperative, Inc.
966
97
Tri-County Electric Cooperative, Inc.
967
100
*10 years notice of termination required prior to December 31, 2004
AVAILABILITY: Available in the territory in which Company operates, to partial requirements
Wholesale Customers for resale and distribution. Service under this rate schedule is subject
to the terms and conditions specified in the contract for electric service in effect between the
parties as of the effective date of this rate schedule.
CHARACTER OF SERVICE: Service under this rate schedule shall be firm, and shall be 3 phase,
60 hertz electric energy at the available standard transmission voltage, 69 kV or above.
**MONTHLY RATE:
Customer Charge: $69,703 per customer/month and
Demand Charge: $4.99 per kW per month of firm power commitment
Energy Charge: $41.30 per MWh.
** Interim rates subject to refund pursuant to FERC Docket No. ER06-274-000.
PUBLIC UTILITY COMMISSION OF TEXAS I PRESIDENT AND CEO,
SOUTHWESTERN PUBLIC SERVICE COMPANY
122
Section No. IV
Sheet No. IV-178
Xceffinergr
I
Original
SOUTHWIS111H PUltit sitylet Page 2 of
ELECTRIC TARIFF
MEASUREMENT OF DEMAND: The measured kW demand on transmission delivery points shall
be the maximum thirty (30) minute period of Customer use during the month at each such
delivery point. The measured kW demand on distribution delivery points (service voltage
below 69 kV) shall equal 1.074 times the maximum thirty (30) minute period of use during
the month at each such delivery point.
DETERMINATION OF BILLING DEMAND: The billing demand for each Customer shall be the
sum of the non -coincident measured demands from all delivery points established in the
preceding eleven (11) months.
DETERMINATION OF ENERGY FOR DISTRIBUTION POINTS OF DELIVERY: The kWh
use for billing purposes for all distribution system points of delivery (service voltage below
69 kV) shall equal 1.032 times the measured kWh delivery at each such delivery point.
FUEL COST ADJUSTMENT: The above energy charges will be increased per kWh of sales equal
to the estimated fuel cost per kWh of sales in the current month and adjusted for the
preceding two months' estimate error. The energy charge adjustment shall be calculated in
compliance. with the formula and conditions set forth in the Wholesale Fuel Cost and
Economic Purchased Power Adjustment Clause, PUCT Sheet No. IV-135.
TAX ADJUSTMENT: Billings under this schedule may be increased by an amount equal to the sum
of the taxes payable under federal, state and local sales tax acts, and of all additional taxes,
fees or charges, (exclusive of ad valorem, state and federal income taxes) payable by the
utility and levied or assessed by any governmental authority on the public utility services
rendered, or on the right or privilege of rendering the service, or on any object or event
incidental to the rendition of service as the result of any new or amended laws after July I,
2006.
MINIMUM BILL: The customer charge and the demand charge for the month. Nothing contained
herein shall be construed as affecting in any way the right of the party fiunishing service
under this rate schedule to unilaterally make application to the Federal Energy Regulatory
Commission for a change in rates under Section 205 of the Federal Power Act and pursuant
to the Commission's Rules and Regulations promulgated thereunder.
I
PRESIDENT AND CEO,
PUBLIC UTILITY COMMISSION OF TEXAS SOU I WESTERN PUBLIC SERVICE COMPANY
!I2
Section No. IV
XCel Energy- Sheet No. IV-1 779
Original
SOUfNWBSrERN ►UMC SERYICt
Page 1 of 3
ELECTRIC TARIFF
PRIMARY QUALIFYING FACILITY STANDBY SERVICE
APPLICABLE: Under contract for electric service to a Qualifying Facility ("QF") provided at a
primary voltage for which the Company's service is used as standby backup or
maintenance service supplied at one point of delivery.
RATE: Service Availability Charge: $223.00 per month
Transmission & Distribution Standby Capacity Fee: $3.27 / kW-Mo
Gen Standby Capacity Reservation Fee — Summer: $0.71 / kW-Mo
Gen Standby Capacity Reservation Fee — Winter: $0.45 / kW-Mo
Energy Charge: 0.2960 per kWh for all kWh used during the month
BACKUP SERVICE: Backup Service is capacity and energy supplied by Company to replace
the Customer's generation during an unscheduled outage. The level of Backup Demand
shall be nominated annually in writing at least 30 days before the beginning of the
calendar year. If Customer receives Replacement Power for 100 or more hours in a
month where a scheduled outage was not planned in accordance with the Maintenance
Service section below, then all power and energy delivered through the Customer Meter
shall be billed in accordance with the standard applicable rate schedule. Also, the
Standby Demand charge will not be assessed in that month.
MAINTENANCE SERVICE: Maintenance Service is capacity and energy supplied by
Company to replace the Customer's self -generation during scheduled outages of the
Customer's generation. Scheduled outages shall be set at a time mutually agreeable by
Customer and Company, but exclusive of the months of June, July, and August of every
year. The scheduled outage shall be scheduled within only two billing months per
calendar year. Scheduled outages shall be agreed to in writing at least 30 days prior to the
beginning of the month in which the scheduled outage is planned to take place. However,
the Supplemental Demand established in a scheduled outage period shall not be used to
determine future minimum Supplemental Demands.
SUPPLEMENTAL SERVICE: Supplemental Service is capacity and energy supplied by the
utility and used by the Customer in addition to the Customer's self -generation in order to
meet the Customer's total load requirement and shall be billed in accordance with the
standard applicable rate schedule.
PRESIDENT AND CEO,
PUBLIC UTILITY COMMISSION OF TEXAS SOUTHWESTERN PUBLIC SERVICE COMPANY
Section No. IV
Xcel Energy Sheet No. I - nal
SauTitwisrERN rMIC SEEVICE
Page 2 of 3
ELECTRIC TARIFF
DEFINITION OF CUSTOMER METER DEMAND: The Customer Meter Demand shall
be the kW determined from Company's demand meter at the Customer Meter for the 30-
minute period of greatest use during the month.
DEFINITION OF MINIMUM GENERATION DEMAND: The Minimum Generation
Demand shall be the kW determined at the QF Generation Meter for the 30-minute period
of least total generation during the month.
DEFINITION OF REPLACEMENT POWER: The Replacement Power shall be equal to
the minimum of (a) the Customer Meter Demand, (b) the Standby Demand, or (c) the
remainder of the QF Generation Capability minus the Minimum Generation Demand.
The Generation Capability shall be set forth in the contract.
DEFINITION OF REPLACEMENT ENERGY: The Replacement Energy shall be equal to
the energy metered at the Customer Meter, but not more than the outage hours in a month
times the Generation Capability.
DEFINITION OF SUPPLEMENTAL DEMAND: The Supplemental Demand shall be
equal to the Customer Meter Demand minus the Replacement Power, but not less than the
minimum demand set forth in the applicable tariff. If, the Customer Meter Demand minus
the Replacement Power is at a level below the applicable minimum demand level, the
billing standby demand shall be reduced in only that month by the amount of demand
below the applicable minimum demand level. If a Customer Charge is collected for
Supplemental Service, a separate Standby Customer Charge shall not be billed.
MINIMUM CIIARGE: The minimum charges in a month shall be the sum of the Standby
Customer Charge and the Standby Demand Charge.
FUEL COST RECOVERY: The charge per kilowatt-hour of the above rate shall be
increased by the applicable fuel cost recovery per kilowatt-hour as provided in PUCT
Sheet No. IV-69.
TERMS OF PAYMENT: Net in 16 days after mailing date; 5 percent added to bill after 16
days. If the sixteenth day falls on a holiday or weekend, the due date will be the next
work day.
CHARACTER OF SERVICE: Alternating current; 60 hertz; at approximately the contract
voltage.
PRESIDENT AND CEO,
PUBLIC UTILITY COMMISSION OF TEXAS SOUTHWESTERN PUBLIC SERVICE COMPANY
Section No. W
Xcel Energy- Sheet No.179
Original
sourewtsrEAN Public sEtvicc
Page 3 of 3
ELECTRIC TARIFF
FRANCHISE FEE: All current and future franchise fees not included in base rates shall be
separately assessed in the municipality where the excess franchise fee is authorized. Bills
computed under the above rate will be increased by the additional franchise fees imposed
by the appropriate municipality or taxing authority in which jurisdiction the customer's
consuming facility resides, when applicable. The franchise fee will appear on the bill as a
separate item.
PUBLIC UTILITY COMMISSION OF TEXAS
PRESIDENT AND CEO,
SOUTHWESTERN PUBLIC SERVICE COMPANY
126
Section IV
Xcet Energy- Sheet No.. In -180
SOUTMWES1E11N IU011C SERVICE
ginal
Page I of 3
ELECTRIC TARIFF
SECONDARY QUALIFYING FACILITY STANDBY SERVICE
APPLICABLE: Under contract for electric service to a Qualifying Facility ("QF") provided at
secondary voltage for which the Company's service is used as standby backup or
maintenance service supplied at one point of delivery.
RATE: Service Availability Charge: $126.00 per month
Transmission & Distribution Standby Capacity Fee: $4.04 / kW-Mo
Gen Standby Capacity Reservation Fee — Summer: $0.72 / kW-Mo
Gen Standby Capacity Reservation Fee — Winter: $0.46 / kW-Mo
Energy Charge: 0.300 cents per kWh
BACKUP SERVICE: Backup Service is capacity and energy supplied by Company to replace
the Customer's generation during an unscheduled outage. The level of Backup Demand
shall be nominated annually in writing at least 30 days before the beginning of the
calendar year. If Customer receives Replacement Power for 100 or more hours in a
month where a scheduled outage was not planned in accordance with the Maintenance
Service section below, then all power and energy delivered through the Customer Meter
shall be billed in accordance with the standard applicable rate schedule. Also, the
Standby Demand charge will not be assessed in that month.
MAINTENANCE SERVICE: Maintenance Service is capacity and energy supplied by
Company to replace the Customer's self -generation during scheduled outages of the
Customer's generation. Scheduled outages shall be set at a time mutually agreeable by
Customer and Company, but exclusive of the months of June, July, and August of every
year. The scheduled outage shall be scheduled within only two billing months per
calendar year. Scheduled outages shall be agreed to in writing at least 30 days prior to the
beginning of the month in which the scheduled outage is planned to take place. However,
the Supplemental Demand established in a scheduled outage period shall not be used to
determine future minimum Supplemental Demands.
PUBLIC UTILITY COMMISSION OF TEXAS PRESIDENT AND CEO,
SOUTHWESTERN PUBLIC SERVICE COMPANY
Section IV
Xcel Energr Sheet No. n -18a
SOUFHWESEERN IU0116 6E1VICE
Page 2 of 3
ELECTRIC TARIFF
SUPPLEMENTAL SERVICE: Supplemental Service is capacity and energy supplied by the
utility and used by the Customer in addition to the Customer's self -generation in order to
meet the Customer's total load requirement and shall be billed in accordance with the
standard applicable rate schedule.
DEFINITION OF CUSTOMER METER DEMAND: The Customer Meter Demand shall
be the kW determined from Company's demand meter at the Customer Meter for the 30-
minute period of greatest use during the month.
DEFINITION OF MINIMUM GENERATION DEMAND: The Minimum Generation
Demand shall be the kW determined at the QF Generation Meter for the 30-minute period
of least total generation during the month.
DEFINITION OF REPLACEMENT POWER: The Replacement Power shall be equal to
the minimum of (a) the Customer Meter Demand, (b) the Standby Demand, or (c) the
remainder of the QF Generation Capability minus the Minimum Generation Demand.
The Generation Capability shall be set forth in the contract.
DEFINITION OF REPLACEMENT ENERGY: The Replacement Energy shall be equal to
the energy metered at the Customer Meter, but not more than the outage hours in a month
times the Generation Capability.
DEFINITION OF SUPPLEMENTAL DEMAND: The Supplemental Demand shall be
equal to the Customer Meter Demand minus the Replacement Power, but not less than the
minimum demand set forth in the applicable tariff. If the Customer Meter Demand minus
the Replacement Power is at a level below the applicable minimum demand level, the
billing standby demand shall be reduced in only that month by the amount of demand
below the applicable minimum demand level. If a Customer Charge is collected for
Supplemental Service, a separate Standby Customer Charge shall not be billed.
MINIMUM CHARGE: The minimum charges in a month shall be the sum of the Standby
Customer Charge and the Standby Demand Charge.
I
PUBLIC UTILITY COMMISSION OF TEXAS PRESIDENT AND CEO,
SOUTHWESTERN PUBLIC SERVICE COMPANY
128
Section IV
XcelEnergy- Sheet No. IV-180
sourxwesrERn ►u8tfc $111FICE Original
Page 3 of 3
ELECTRIC TARIFF
FUEL COST RECOVERY: The charge per kilowatt-hour of the above rate shall be increased
by the applicable fuel cost recovery per kilowatt-hour as provided in PUCT Sheet No.
IV-69.
TERMS OF PAYMENT: Net in 16 days after mailing date; 5 percent added to bill after 16
days. If the sixteenth day falls on a holiday or weekend, the due date will be the next
work day.
CHARACTER OF SERVICE: Alternating current; 60 hertz; at approximately the contract
. voltage.
FRANCHISE FEE: All current and future franchise fees not included in base rates shall be
separately assessed in the municipality where the excess franchise fee is authorized. Bills
computed under the above rate will be increased by the additional franchise fees imposed
by the appropriate municipality or taxing authority in which jurisdiction the customer's
consuming facility resides, when applicable. The franchise fee will appear on the bill as a
separate item.
PUBLIC UTILITY COMMISSION OF TEXAS PRESIDENT AND CEO,
I SOUTHWESTERN PUBLIC SERVICE COMPANY
Section No. IV
Xcel Ene�ry Sheet No. IV-181
' 7y� Original
SOUtNWESMN P0011C SElVICE
Page l of 3
ELECTRIC TARIFF
TRANSMISSION QUALIFYING FACILITY STANDBY SERVICE
APPLICABLE: Under contract for electric service to a Qualifying Facility ("QF") provided at a
transmission voltage for which the Company's service is used as standby backup or
maintenance service supplied at one point of delivery.
RATE: Service Availability Billing Charge: $66.00 per month
Service Availability Charge Per Meter Per Month:
Voltage Level: 230 kV 115 kV 69kV Primary
$3,200.00 $2,620.00 $2,430.00 $150.00
Transmission & Distribution Standby Capacity Fee: $1.16 / kW-Mo
Gen Standby Capacity Reservation Fee — Summer: $0.66 / kW-Mo
Gen Standby Capacity Reservation Fee — Winter $0.42 / kW-Mo
Energy Charge: 0.280¢ per kWh for all kWh used during the month
BACKUP SERVICE: Backup Service is capacity and energy supplied by Company to replace
the Customer's generation during an unscheduled outage. The level of Backup Demand
shall be nominated annually in writing at least 30 days before the beginning of the
calendar year. If Customer receives Replacement Power for 100 or more hours in a
month where a scheduled outage was not planned in accordance with the Maintenance
Service section below, then all power and energy delivered through the Customer Meter
shall be billed in accordance with the standard applicable rate schedule, but the demand
ratchet for future months under the standard applicable rate schedule shall not apply.
Also, the Standby Demand charge will not be assessed in that month.
MAINTENANCE SERVICE: Maintenance Service is capacity and energy supplied by
Company to replace the Customer's self -generation during scheduled outages of the
Customer's generation. Scheduled outages shall be set at a time mutually agreeable by
Customer and Company, but exclusive of the months of June, July, and August of every
year. The scheduled outage shall be scheduled within only two billing months per
calendar year. Scheduled outages shall be agreed to in writing at least 30 days prior to the
beginning of the month in which the scheduled outage is planned to take place. However,
the Supplemental Demand established in a scheduled outage period shall not be used to
determine future minimum Supplemental Demands.
PUBLIC UTILITY COMMISSION OF TEXAS PRESIDENT AND CEO,
SOUTHWESTERN PUBLIC SERVICE COMPANY
/30
Section No. IV
Xeel Energy'" Sheet No.. IV- n8a
SOUTHWESTikM A0111C SEMCE
Page 2 of 3
ELECTRIC TARIFF
SUPPLEMENTAL SERVICE: Supplemental Service is capacity and energy supplied by the
utility and used by the Customer in addition to the Customer's self -generation in order to
meet the Customer's total load requirement and shall be billed in accordance with the
standard applicable rate schedule.
DEFINITION OF CUSTOMER METER DEMAND: The Customer Meter Demand shall
be the kW determined from Company's demand meter at the Customer Meter for the 30-
minute period of greatest use during the month.
DEFINITION OF MINIMUM GENERATION DEMAND: The Minimum Generation
Demand shall be the kW determined at the QF Generation Meter for the 30-minute period
of least total generation during the month.
DEFINITION OF REPLACEMENT POWER: The Replacement Power shall be equal to
the minimum of (a) the Customer Meter Demand, (b) the Standby Demand, or (c) the
remainder of the QF Generation Capability minus the Minimum Generation Demand.
The Generation Capability shall be set forth in the contract.
DEFINITION OF REPLACEMENT ENERGY: The Replacement Energy shall be equal to
the energy metered at the Customer Meter, but not more than the outage hours in a month
times the Generation Capability.
DEFINITION OF SUPPLEMENTAL DEMAND: The Supplemental Demand shall be
equal to the Customer Meter Demand minus the Replacement Power, but not less than the
minimum demand set forth in the applicable tariff. If the Customer Meter Demand minus
the Replacement Power is at a level below the applicable minimum demand level, the
billing standby demand shall be reduced in only that month by the amount of demand
below the applicable minimum demand level. If a Customer Charge is collected for
Supplemental Service, a separate Standby Customer Charge shall not be billed.
MINIMUM CHARGE: The minimum charges in a month shall be the sum of the Standby
Customer Charge and the Standby Demand Charge.
FUEL COST RECOVERY: The charge per kilowatt-hour of the above rate shall be
increased by the applicable fuel cost recovery per kilowatt-hour as provided in PUCT
Sheet No. W-69.
PUBLIC UTILITY COMMISSION OF TEXAS I
PRESIDENT AND CEO,
SOUTHWESTERN PUBLIC SERVICE COMPANY
Section No. IV
' Xce1 Energy' Sheet No.. IV- 181
Original
SODTMWESFEsl! rustic SERVICE
Page 3 of 3
ELECTRIC TARIFF
TERMS OF PAYMENT: Net in 16 days after mailing date; 5 percent added to bill after 16
days. If the sixteenth day falls on a holiday or weekend, the due date will be the next
work day.
CHARACTER OF SERVICE: Alternating current; 60 hertz; at approximately the contract
voltage.
FRANCHISE FEE: All current and future franchise fees not included in base rates shall be
separately assessed in the municipality where the excess franchise fee is authorized. Bills
computed under the above rate will be increased by the additional franchise fees imposed
by the appropriate municipality or taxing authority in which jurisdiction the customer's
consuming facility resides, when applicable. The franchise fee will appear on the bill as a
separate item.
PUBLIC UTILITY COMMISSION OF TEXAS I PRESIDENT AND CEO,
SOUTHWESTERN PUBLIC SERVICE COMPANY
132
Section No. IV
Sheet No. IV-182
Xcel Energy Original
SOUINWESIEAN /ull(c SEIVICE
Pagel of 2
ELECTRIC TARIFF
LARGE SCHOOL SERVICE
APPLICABLE: To all public and private schools supplied electric service at secondary voltage and at
one point of delivery, and measured through one meter, where facilities of adequate capacity and
suitable voltage are adjacent to the premises to be served, in excess of IOkW of demand in any
month.
Not applicable to temporary, breakdown, standby, supplementary, resale or shared service, or to
service for which a specific rate schedule is provided.
TERRITORY: Texas service territory.
RATE: Service Availability Charge: $15.00 per month
Energy Charge: 0.4170 per kWh for all kWh used during the month
Demand Charge:
$7.69 per kW of demand used per month during each summer month
$6.33 per kW of demand used per month during each winter month
WINTER MONTHS: The billing months of October through May.
SUMMER MONTHS: The billing months of June through September.
DEMAND: The Company will furnish at its expense the necessary metering equipment to measure the
customer's kW demand for the 30-minute period of greatest use during the month. In the
absence of a demand meter the Company will bill the customer's demand using the monthly
kilowatt-hours and an average load factor of 41.30 percent.
POWER FACTOR: Applicable to customers on this rate schedule with a peak demand of 200 kW or
greater. Customer, at all times, will maintain at Company's point of delivery a power factor of not less
than 90% lagging.
In the event a low voltage condition due to lagging power factor exists in a degree sufficient to impair
the Company's service, customer will install suitable capacitor or other equipment necessary to raise
the over-all power factor at the point of delivery to a satisfactory value. Where such power factor
correction equipment is used, customer will install and maintain a relay, switch, or other regulating
equipment for purpose of disconnecting or controlling the power factor correction equipment in order to
prevent excessive voltage variations on Company's lines.
PRESIDENT AND CEO,
SOUTHWES
PUBLIC UTILITY COMMISSION OF TEXAS TERN PUBLIC SERVICE COMPANY
Section No. IV
Sheet No. IV-182
XcelEnetW Original
sourNWISrstN IullfC SHVICI Page 2 of 2
ELECTRIC TARIFF
FUEL COST RECOVERY AND ADJUSTMENTS: The charge per kilowatt hour of the above rate
shall be increased by the applicable fuel cost recovery factor per kilowatt hour as provided in
PUCT Sheet IV-69. This rate schedule is subject to other applicable rate adjustments as in effect
from time to time in this tariff.
CHARACTER OF SERVICE: A-C; 60 hertz; single or three phase, at one available standard voltage.
LINE EXTENSIONS: The Company will make line extensions in accordance with its standard line
extension policy.
TERMS OF PAYMENT: Net in 16 days after mailing date; 5 percent added to bill after 16 days. If the
sixteenth day falls on a holiday or weekend, the due date will be the next work day.
FRANCHISE FEE: All current and future franchise fees not included in base rates shall be separately
assessed in the municipality where the excess franchise fee is authorized. Bills computed under
the above rate will be increased by the additional franchise fees imposed by the appropriate
municipality or taxing authority in which jurisdiction the customer's consuming facility resides,
when applicable. The franchise fee will appear on the bill as a separate item.
RULES, REGULATIONS AND CONDITIONS OF SERVICE: Service supplied under this schedule
is subject to the terms and conditions set forth in the Company's Rules, Regulations and
Conditions of Service on file with The Public Utility Commission of Texas and the following
conditions:
1. For those customers receiving secondary service distribution voltage who desire to elect
primary distribution voltage, they may do so subject to the terms and conditions of
Primary/Secondary Conversions.
I
PUBLIC UTILITY COMMISSION OF TEXAS PRESIDENT AND CEO,
SOUTHWESTERN PUBLIC SERVICE COMPANY
/3�
Section No. IV
Sheet No. IV83
Xce1�ne
r Original
SOUIHWESiEIiN gr
$11VICE
Page I of 5
ELECTRIC TARIFF
TRANSMISSION QUALIFYING FACILITY
NON -FIRM STANDBY SERVICE
AVAILABILITY: This Schedule is available under contract to customers having a total demand
normally served by Customer's generation of at least 1,000 kW during June, July, August,
and September and whose facilities are equipped with appropriate telemetering and control
equipment to permit Customer to comply with, or Company to implement curtailment
requests. Service under this rate is available when taken in conjunction with service under
the applicable large general service rate schedules and riders or with finn standby service
under the Transmission Qualifying Facility Standby Service rate schedule.
APPLICABLE: Under contract for electric service to a Qualifying Facility ("QF") provided at a
transmission voltage for which the Company's service is used as non -firm standby backup
or non -firm maintenance service supplied at one point of delivery.
(��
Service Availability Billing Charge: $69.00 per month
Service Availability Charge Per Meter Per Month: The following charges apply if non -firm standby
service is provided on a stand-alone basis.
Metering Voltage Level: _230 kV 1_15 kV 69kV Primary
$3,350.00 $2,740.00 $2,540.00 $160.00
Delivery Charges
Transmission System Standby Capacity Fee: $1.21 per 4CP kW
Distribution System Standby Capacity Fee: $0.30 per kW of Nominated Standby Capacity
Usage Rates
Demand Charge: There will be no additional demand charge for use of Standby
Service except for Non -Compliant use as defined herein. In this case, Standby Service
Demand Charges shall be as defined in the Non -Compliance Payment paragraph of
this tariff.
PRESIDENT AND CEO,
PUBLIC UTILITY COMMISSION OF TEXAS SOUTHWESTERN PUBLIC SERVICE COMPANY
Section No. IV
Sheet No. IV-183
xcelaefw Original
soutBWEVIRN Ptllllt SERVICE Page 2 of 5
ELECTRIC TARIFF
Energy Charge: All Standby Replacement Energy provide by the Company during
non -interrupt periods shall be billed at the Hourly Clearing Price of the applicable regional
wholesale energy market. In addition, an Energy Margin of five percent (5%) of the Hourly
Clearing Price, but not less than $0.0028 per kWh, shall be added to the charge for all
Standby Replacement Energy provided by the Company.
BACKUP SERVICE: Backup Service is capacity and energy supplied by Company to replace the
Customer's generation during an unscheduled outage. The maximum required level of
Backup Demand (the "Standby Capacity") shall be nominated annually in writing at least 30
days before the beginning of the calendar year.
MAINTENANCE SERVICE: Maintenance Service is capacity and energy supplied by Company to
replace the Customer's self -generation during scheduled outages of the Customer's
generation. Scheduled outages shall be set at a time mutually agreeable by Customer and
Company, but exclusive of the months of June, July, and August of every year. The
scheduled outage(s) shall be scheduled within only two billing months per calendar year.
Scheduled outages shall be agreed to in writing at least 30 days prior to the beginning of the
month in which the scheduled outage is planned to take place.
SUPPLEMENTAL GENERATION SERVICE: Supplemental Generation Service is capacity and
energy supplied by the Company and used by the Customer in place of the Customer's self -
generation whenever the Customer's self -generation is not operating at the full level of the
nominated Standby Capacity. This Supplemental Generation Service usage shall be billed
Standby Replacement Demand and Standby Replacement Energy as described below.
SUPPLEMENTAL LOAD SERVICE: Supplemental Load Service is capacity and energy supplied by
the Company and used by the Customer for load requirements above the nominated Standby
Capacity for the Customer's self -generation in order to meet the Customer's total load
requirement. This Supplemental Load Service usage shall be billed in accordance with the
standard applicable rate schedule.
DEFINITION OF CUSTOMER METER DEMAND: The Customer Meter Demand shall be the
demand in kW determined from Company's demand meter at the Customer Meter for the 30
minute period of greatest use during the month.
PUBLIC UTILITY COMMISSION OF TEXAS SOUTHWESTERN PRESIDENT AND CEO, PUBLIC SERVICE COMPANY
/36
Section No. IV
Sheet No. IV-183
Xceff'nergr Original
��••%% SOutHWISUIN Iultic SElvlti
Page 3 of 5
ELECTRIC TARIFF
DEFINITION OF 4CP DEMAND: The 4CP Demand applicable under the Delivery Charges shall be
the average of the Standby Replacement Demand at the time of the Company's system peak
demand for the months of June, July, August and September of the previous calendar year.
Retail Non -Firm Standby Customers without previous history on which to determine their
4CP Demand will be billed based on an estimate of the 4CP Demand.
DEFINITION OF MINIMUM GENERATION PRODUCTION: The Minimum Generation
Production shall be the generation output in kW determined at the QF Generation Meter for
the 30-minute period of least total generation output during the month.
DEFINITION OF STANDBY REPLACEMENT DEMAND: The Standby Replacement Demand
shall be equal to the minimum of (a) the Customer Meter Demand, (b) the Standby Capacity
(Backup Demand), or (c) the result of the nominated Standby Capacity minus the Minimum
Generation Production.
DEFINITION OF STANDBY REPLACEMENT ENERGY: The Standby Replacement Energy shall
be equal to the energy metered at the Customer Meter less the energy supplied to the
customer's Supplemental Load Service, but not more than the outage hours in a month times
the nominated Standby Capacity.
DEFINITION OF SUPPLEMENTAL LOAD DEMAND: The Supplemental Load Demand shall be
equal to the Customer Meter Demand minus the Standby Replacement Demand, but not less
than the minimum demand set forth in the applicable tariff.
MINIMUM CHARGE: The minimum charges in a month shall be the sum of the Service Availability
Billing Charge, Service Availability Charge Per Meter if applicable, and the Delivery Charges.
POWER FACTOR ADJUSTMENT: Customer shall furnish, install and maintain, at his own expense,
any and all corrective apparatus necessary to maintain a power factor of not less than 90%
lagging on installations of any nature whatsoever.
TERMS OF PAYMENT: Net in 16 days after mailing date; 5 percent added to bill after 16 days. If
the sixteenth day falls on a holiday or weekend, the due date will be the next work day.
1 PRESIDENT AND CEO,
PUBLIC UTILITY COMMISSION OF TEXAS SOUTHWESTERN PUBLIC SERVICE COMPANY
Section No. IV
X��ll�n� Sheet No. IV183
r Original
$00tHWESTIAN PUILIC $11VIC[ Page 4 of 5
ELECTRIC TARIFF
CHARACTER OF SERVICE: Alternating current; 60 hertz; at approximately the contract voltage.
FRANCHISE FEE: All current and future franchise fees not included in base rates shall be separately
assessed in the municipality where the excess franchise fee is authorized. Bills computed
under the above rate will be increased by the additional franchise fees imposed by the
appropriate municipality or taxing authority in which jurisdiction the customer's consuming
facility resides, when applicable. The franchise fee will appear on the bill as a separate item.
GENERAL CONDITIONS: Customer understands that failure to interrupt this Non -Firm Standby
Service when requested threatens the reliability of service to other customers. Company will
attempt to provide as much prior notice as possible prior to interruptions. Interruptions may
be made at any time, in the judgment of Company, when demands for electricity exceeds or
are expected to be likely to exceed the Company's available electric supply for whatever
reasons including, but not limited to, breakdown of generating units, transmission equipment
or other critical facilities; short or long-term shortages of fuel or generation, transmission, and
other facilities; and requirement or orders of governmental agencies.
CONDITIONS OF SERVICE: Customer is required to install, own, operate and maintain
necessary monitoring devices and interruption -control equipment including protective
devices, on Customer's side of the point of delivery, as reasonably specified by Company.
In addition, Company shall install interruption -control equipment on Company's side of
point of delivery as reasonably determined necessary by Company to interrupt the
interruptible load. All interruption -control equipment shall be under the exclusive control
of Company, and the installation and maintenance of such facilities shall be at the
expense of Customer. Interruption -control equipment consists of but is not limited to,
under -frequency relays, switchgear, remote control and communications equipment
including a communications path, timers, trip counters, and/or other devices as specified
by Company. Remote control and communications equipment includes equipment
necessary to provide instantaneous load information to Company's designated system
operating centers. Operation of the equipment will remain under the control of Company and
Company reserves the right to inspect and test all interruption -control equipment and may
review Customers' maintenance records. Customer will make commercially reasonable
efforts to notify Company of timing and the anticipated duration of planned outages.
' I
PUBLIC UTILITY COMMISSION OF TEXAS PRESIDENT AND CEO,
SOUTHWESTERN PUBLIC SERVICE COMPANY
/3s
Section No. IV
XA����e � Sheet No. IV183
c e Original
Sout"WISTERN ►unlit stivitt Page 5 of 5
ELECTRIC TARIFF
NON-COMPLIANCE PAYMENT: Customer understands that to receive service under this rider
when the Company requests a reduction of any part or all of the customer's Standby load, the
customer must comply with such request within the specified time period. If, at any time, the
customer fails in whole or in part to maintain the requested load reduction, the customer shall
pay the following charges:
During interrupt periods called under the Company's Interruptible Rate Rider, customer
shall pay the Company's specifically identifiable additional cost for capacity and 150%
the Hourly Clearing Price of the applicable regional wholesale energy market for energy
for any Standby Replacement Demand and Energy used by the customer plus any charges
or penalties imposed by any governing entity that result from Customer's non-
compliance. In the absence of specifically identifiable additional capacity cost, customer
shall pay 150% of the firm demand charge in accordance with the Transmission
Qualifying Facility Standby Service rate schedule for the amount of demand not
interrupted during the billing month.
2. In the event of a second occurrence of non-compliance in any twelve month period, the
customer shall pay the same charges as just described except that the demand charge shall
be an amount equal to the normal firm demand charge in accordance with the
Transmission Qualifying Facility Standby Service rate schedule for the amount of
demand not interrupted during the billing month, multiplied by a factor of twelve. In
addition, a second occurrence of non-compliance during a Capacity Control interrupt
period in any twelve month period shall result in the customer being removed from the
Non -Firm Standby Service tariff and customer shall not be eligible to return to this tariff
for one year.
I
PRESIDENT AND CEO,
PUBLIC UTILITY COMMISSION OF TEXAS SOUTHWESTERN PUBLIC SERVICE COMPANY
'6,J
Xcel Energy-
SOU/NWES/ERN PUIIIC SERVICE
ELECTRIC TARIFF
SOUTHWESTERN PUBLIC SERVICE COMPANY
An Xcel Energy Company
TEXAS
CITIES AND TOWNS
RULES AND REGULATIONS
PUBLIC UTILITY COMMISSION OF TEXAS
ELECTRIC
PRESIDENT AND CEO,
SOUTHWESTERN PUBLIC SERVICE COMPANY
l�
xceEnergr
soutHwEIitlN P0111C 311VICI
ELECTRIC TARIFF
RULES, REGULATIONS AND CONDITIONS OF SERVICE
TABLE OF RULES
Rule No. Sheet No. Revision No. Title
Section No. V
Sheet No. V-2
Revision No. 2
Page 1 of l
1.
V-2
2
General Statement of Purpose
2.
V-3
2
Definitions
3.
V-4
2
Application for Service
4.
V-5
2
Supplying of Service
5.
V-6
1
Character of Service
6.
V-7
1
Continuity of Service
7.
V-8
5
Refusal, Discontinuance and Suspension of Service
8.
V-9
1
Use of Service
9.
V-10
1
Right -of -Way
10.
V-11
1
Access to Premises
11.
V-12
2
Change of Premises of Customer
12.
V-13
1
Temporary Service
13.
V-14
1
Customer's Installation
14.
V-15
2
Transformer Vaults
15.
V-16
2
Company's Installations
16.
V-17
10
Extension to Customers
17.
V-18
2
Metering
18.
V-19
3
Billing
19.
V-20
3
Application of Rate Schedules
20.
V-21
6
Deposits
21.
V-22
2
Application of Rules and Regulations --Conflicts
22.
V-23
1
Unauthorized Communication Devices
23.
V-25
2
Load Control Equipment for Customers
24.
V-27
1
Customer Complaints
25.
V-29
1
Retail Electric Switchover
26.
V-30
Original
Residential Billing of Vacant Rental Property
PRESIDENT AND CEO,
SOUTHWESTERN PUBLIC SERVICE COMPANY
PUBLIC UTILITY COMMISSION OF TEXAS
Xceffinergr
sourHWISIUa /ullic sttvtct
Section No. V
Sheet No. V-2
Revision No. 2
ELECTRIC TARIFF Page 1 of 1
RULES, REGULATIONS AND CONDITIONS OF SERVICE
1. GENERAL STATEMENT OF PURPOSE
These Rules and Regulations are designed to govern the supplying and taking of
electric service in such a manner as will secure to each Customer the greatest
practicable latitude in the enjoyment of service consistent with good service and
safety to himself and other Customers.
These Rules and Regulations, subject to revision from time to time, supercede and
annul all regulations by whatever term designated which may previously have
governed the supplying and taking of the Company's electric service.
This tariff, including all Rules and Regulations and all applicable rate schedules, is on
file in the Company's Amarillo and Austin offices, and copies are obtainable by any
Customer without charge upon request, or on the Company's website,
www.xcelenergy.com.
PUBLIC UTILITY COMMISSION OF
PRESIDENT AND CEO,
SOUTHWESTERN PUBLIC SERVICE COMPANY
/4Z-
xceEnergr
SOUfNWESTINN fulttt; SEAVItE
Section No. V
Sheet No. V-3
Revision No. 2
ELECTRIC TARIFF Page 1 of 2
RULES, REGULATIONS AND CONDITIONS OF SERVICE
2. DEFINITIONS
The following expressions, when used in these Rules and Regulations, in Rate
Schedules and in Service Agreements, shall, unless otherwise indicated, have the
meanings given below:
Applicant: Any individual, partnership, association, firm, public or private
corporation or governmental agency who applies for service for the first time or
reapplies at a new or existing location after discontinuance of service.
Billing Month: An interval of approximately thirty days between successive
meter reading dates, except when the calendar month is specified.
Commission: The Public Utility Commission of Texas.
Company: Southwestern Public Service Company ("SPS").
Customer: Any individual, partnership, association, firm, public or private
corporation or governmental agency receiving electric service from the Company.
Customer's Installation: All wires, cut-outs, switches, appliances and apparatus
of every kind and nature used in connection with or forming a part of any
installation for utilizing electricity for any purpose ordinarily located on the
Customer's side of Point of Delivery, whether such installation is owned outright
by Customer or used by Customer under lease or otherwise.
Electric Service: The maintenance by the Company of an established voltage
and frequency at the Point of Delivery to the Customer constitutes the supplying
of electric service, irrespective of whether or not any electric power and energy is
actually used by the Customer.
Extension: Any branch from, or continuation of, Company's existing facilities to
the Point of Delivery to Customer, including increases in capacity of any existing
facilities, or the changing of any line to meet the Customer's requirements, and
including all transformers, service connections and meters.
PRESIDENT AND CEO,
SOUTHWESTERN PUBLIC SERVICE COMPANY
PUBLIC UTILITY COMMISSION OF TEXAS
Section No. V
Xceffiner - Sheet No. V-3
71 Revision No. 2
$091NWESTrIN rustic SEEYICE
ELECTRIC TARIFF Page 2 of 2
RULES, REGULATIONS AND CONDITIONS OF SERVICE
DEFINITIONS
Meter: Any metering equipment, including auxiliary devices, if any, constituting
the complete installation required to measure the power and energy supplied to
any Customer at a single point of delivery.
Notice: Unless otherwise specified, a written notification delivered personally or
mailed by one party to the other at such other party's last known address.
Point of Delivery: The end of Company's service connection, or the point where
Company's wires are joined to Customer's wires or apparatus, unless otherwise
specified in Service Agreement.
Premises: Piece of land or real estate, including buildings and other
appurtenances thereon.
Service Agreement: Written agreement or contract between Company and
Customer pursuant to which service is supplied and taken in the manner
established for the applicable class of service.
Service Connection: Wires from the Company's distribution system to the
Customer's service entrance.
Special Contract: A written agreement or contract between Company and
Customer to establish a rate and/or condition of electric service that due to size or
load characteristics or both, differs From those established for general classes of
service.
Rate Schedule: Schedule of charges for electric service containing the schedule
number, class of service, applicability, territory, rate, minimum charge, and
conditions under which service is to be furnished, as approved by the
Commission.
Temporary Service: Service to any electrical installation for a period of less
than five years shall be considered temporary. Examples may include well
drilling loads, construction power loads, carnivals, street decorations for
celebrations and other similar loads of short duration.
PRESIDENT AND CEO,
SOUTHWESTERN PUBLIC SERVICE COMPANY
PUBLIC UTILITY COMMISSION OF TEXAS
/0
/0
XCOIEnergy19
SOUthwistIAN ►UStIC SERVICE
Section No. V
Sheet No. V4
Revision No. 2
ELECTRIC TARIFF Page 1 of 1
RULES, REGULATIONS AND CONDITIONS OF SERVICE
3. APPLICATION FOR SERVICE
Any applicant for service may be required to sign:
(a) The Company's standard deposit form,
(b) A Service Agreement, or
(c) A Special Contract.
PRESIDENT AND CEO,
SOUTHWESTERN PUBLIC SERVICE COMPANY
PUBLIC UTILITY COMMISSION OF TEXAS
' xce Energr
$0UTHWIMIN Fult1C $11VICI
Section No. V
Sheet No. V-5
Revision No. 2
ELECTRIC TARIFF Page 1 of 2
RULES, REGULATIONS AND CONDITIONS OF SERVICE
4. SUPPLYING OF SERVICE
Service shall be supplied only under and pursuant to these Rules and Regulations
and any modifications or additions thereto lawfully made, and such applicable
Rate Schedules as may from time to time be lawfully fixed. Service shall be
supplied under a given Rate Schedule only at such points of delivery located
adjacent to facilities of Company which, in the Company's opinion, are adequate
and suitable, as to capacity and voltage, for the service desired. Otherwise, a
Service Agreement or a Special Contract may be required.
The Company shall not be required to supply service until a reasonable time after
the application is approved and after any necessary permits have been obtained.
However, if, due to circumstances beyond the control of the Company, service
cannot be furnished within a reasonable length of time, Customer shall be advised
promptly regarding the delay.
(1) Applications for new electric service not involving line extensions or construction
of new facilities shall be filled within seven working days after the applicant has
met the credit requirements as provided for in §25.24 of the Commission's
Substantive Rules (relating to Credit Requirements and Deposits) and complied
with all applicable state and municipal regulations.
(2) An electric utility may require a residential applicant for service to satisfactorily
establish credit in accordance with §25.24 of the Commission's Substantive Rules
(relating to Credit Requirements and Deposits), but such establishment of credit
shall not relieve the Customer from complying with rules for prompt payment of
bills.
(3) Requests for new residential service requiring construction, such as line
extensions, shall be completed within 90 days or within a time period agreed to by
the Customer and the Company if the applicant has met the credit requirements as
provided for in §25.24 of the Commission's Substantive Rules; and made
satisfactory payment arrangements for construction charges; and has complied
with all applicable state and municipal regulations. For this section, facility
placement which requires a permit for a road or railroad crossing will be
considered a line extension.
PRESIDENT AND CEO,
PUBLIC UTILITY COMMISSION OF TEXAS I SOU`17HWESTERN PUBLIC SERVICE COMPANY
4
' XcetEne►X
souVIVIS )f ►ublie sely1cf
ELECTRIC TARIFF
RULES, REGULATIONS AND CONDITIONS OF SERVICE
4. SUPPLYING OF SERVICE
Section No. V
Sheet No. V-5
Revision No. 2
Page 2of2
(4) If facilities must be constructed, then the Company shall contact the Customer
within 10 working days of receipt of the application, and give the Customer an
estimated completion date and an estimated cost for all charges to be incurred by
the Customer.
(5) Unless the delay is beyond the reasonable control of the Company, a delay of
more than 90 days shall constitute failure to serve, unless the Customer and
electric utility have agreed to a longer term.
PRESIDENT AND CEO,
SOUTHWESTERN PUBLIC SERVICE COMPANY
PUBLIC UTILITY COMMISSION OF TEXAS
Xce Energy
sourNW11r1RH 1UIlIC $11VIC1
Section No. V
Sheet No. V-6
Revision No. l
ELECTRIC TARIFF Page 1 of l
RULES, REGULATIONS AND CONDITIONS OF SERVICE
5. CHARACTER OF SERVICE
Electric service furnished shall be of the character known as 60 hertz
alternating current. Voltage supplied and the choice of single or three-phase
service shall be by mutual agreement between the Customer and the
Company.
The standard nominal voltages to be supplied are:
120/240 Volts single-phase
120 Volts single-phase
480 Volts single-phase
120/208 Volts three-phase
120/240 Volts three-phase
277/480 Volts three-phase
480 Volts three-phase
2400 Volts three-phase
2400/4160 Volts three-phase
6930/12,000 Volts three-phase
7200/12,470 Volts three-phase
7620/13,200 Volts three-phase
13,200/22,860 Volts three-phase
34,500 Volts three-phase
19,900/34,500 Volts three-phase
PRESIDENT AND CEO,
SOUTHWESTERN PUBLIC SERVICE COMPANY
.. PUBLIC UTILITY COMMISSION OF TEXAS
0
Xce1Energr
SOMWESNIN FV11IC MVICE
Section No. V
Sheet No. V-7
Revision No. 1
ELECTRIC TARIFF Page 1 of 1
RULES, REGULATIONS AND CONDITIONS OF SERVICE
6. CONTINUITY OF SERVICE
Company will use reasonable diligence to supply steady and continuous service.
Company will be liable to Customer for any damages occasioned by irregularities
or interruptions only when such damages are the result of negligence on the part of
the Company.
The Company shall not be liable to the Customer nor shall the Customer be liable to
the Company by reason of failure of the Company to deliver or the Customer to
receive electrical energy as the result of fire, strike, riot, explosion, flood, accident,
breakdown, acts of God, the public enemy, or other conditions beyond the control
of the party affected; it being the intention of each party to relieve the other of the
obligation to supply or to receive energy when, as a result of any of the above
mentioned causes, either party may be unable to delivery or use, in whole or in part,
electrical energy to be delivered or received.
PRESIDENT AND CEO,
SOUTHWESTERN PUBLIC SERVICE COMPANY
PUBLIC UTILITY COMMISSION OF TEXAS
Section No. V
Sheet No. V-8
Xce� Energ' Revision No. 5
sonrewrsrrle futile srRrrct
Page 1 of 5
ELECTRIC TARIFF
RULES, REGULATIONS AND CONDITIONS OF SERVICE
7. REFUSAL, DISCONTINUANCE AND SUSPENSION OF SERVICE
(a) Disconnection with notice. Electric utility service may be disconnected after proper
notice for any of these reasons:
(1) failure to pay a bill for electric utility service or make deferred payment
arrangements by the date of disconnection;
(2) failure to comply with the terms of a deferred payment agreement;
(3) violation of the Company's rules on using service in a manner which interferes
with the service of others or the operation of nonstandard equipment, if a
reasonable attempt has been made to notify the Customer and the Customer is
provided with a reasonable opportunity to remedy the situation;
(4) failure to pay a deposit as required by §25.24 of the Commission's Substantive
Rules (relating to Credit Requirements and Deposits); or
(5) failure of the guarantor to pay the amount guaranteed, when the Company has a
written agreement, signed by the guarantor, that allows for disconnection of the
guarantor's service.
(b) Disconnection without prior notice. Electric utility service may be disconnected
without prior notice for any of the following reasons:
(1) where a known dangerous condition exists for as long as the condition exists.
Where reasonable, given the nature of the hazardous condition, the Company
shall post a notice of disconnection and the reason for the disconnection at the
place of common entry or upon the front door of each affected residential unit as
soon as possible after service has been disconnected;
(2) where service is connected without authority by a person who has not made
application for service;
(3) where service was reconnected without authority after termination for
nonpayment; or
(4) where there has been tampering with the Company's equipment or evidence of
theft of service.
(c) Disconnection prohibited. Electric utility service may not be disconnected for any of
the following reasons:
(1) delinquency in payment for electric utility service by a previous occupant of the
premises;
PRESIDENT AND CEO,
PUBLIC UTILITY COMMISSION OF TEXAS SOUTHWESTERN PUBLIC SERVICE COMPANY
l 50
XceffnerW
SOUNWSSI M F98ti6 IFIVICt
ELECTRIC TARIFF
Section No. V
Sheet No. V-8
Revision No. 5
Page 2 of 5
RULES, REGULATIONS AND CONDITIONS OF SERVICE
7. REFUSAL, DISCONTINUANCE AND SUSPENSION OF SERVICE
(2) failure to pay for merchandise, or charges for non -electric utility service;
(3) failure to pay for a different type or class of electric utility service unless charges
for such service were included on that account's bill at the time service was
initiated;
(4) failure to pay charges arising from an underbilling, except theft of service, more
than six months prior to the current billing;
(5) failure to pay disputed charges, except for the required average billing payment,
until a determination as to the accuracy of the charges has been made by the
Company or the Commission and the Customer has been notified of this
determination;
(6) failure to pay charges arising from an underbilling due to any faulty metering,
unless the meter has been tampered with or unless such underbilling charges are
due under §25.126 of the Commission's Substantive Rules (relating to Meter
Tampering); or
(7) failure to pay an estimated bill other than a bill rendered pursuant to an approved
meter -reading plan, unless the Company is unable to read the meter due to
circumstances beyond its control.
(d) Disconnection on holidays or weekends. Unless a dangerous condition exists or the
Customer requests disconnection, service shall not be disconnected on holidays or
weekends, or the day immediately preceding a holiday or weekend, unless the Company
personnel are available on those days to take payments and reconnect service.
(e) Disconnection due to electric utility abandonment. The Company may not abandon a
Customer or a certified service area without written notice to its Customers and all
similar neighboring utilities, and approval from the Commission.
(f) Disconnection of ill and disabled. The Company may not disconnect service at a
permanent, individually metered dwelling unit of a delinquent Customer when that
Customer establishes that disconnection of service will cause some person residing at that
residence to become seriously ill or more seriously ill.
PUBLIC UTILITY COMMISSION OF TEXAS
Xceffinergr
$00THW11THN PV1116 SEIVICt
ELECTRIC TARIFF
Section No. V
Sheet No. V-8
Revision No. 5
Page 3 of S
RULES, REGULATIONS AND CONDITIONS OF SERVICE
7. REFUSAL, DISCONTINUANCE AND SUSPENSION OF SERVICE
(1) Each time a Customer seeks to avoid disconnection of service under this
subsection, the Customer must accomplish all of the following by the stated date
of disconnection:
(A)have the person's attending physician (for purposes of this subsection, the
term "physician" shall mean any public health official, including medical
doctors, doctors of osteopathy, nurse practitioners, registered nurses, and any
other similar public health official) call or contact the Company by the stated
date of disconnection;
(B) have the person's attending physician submit a written statement to the
Company; and
(C) enter into a deferred payment plan.
(2) The prohibition against service termination provided by this subsection shall last
63 days from the issuance of the Company's bill or a shorter period agreed upon
by the Company and the Customer or physician.
(g) Disconnection of energy assistance clients. The Company may not terminate service to
a delinquent residential Customer for a billing period in which the Company receives a
pledge, letter of intent, purchase order, or other notification that the energy assistance
provider is forwarding sufficient payment to continue service.
(h) Disconnection during extreme weather. The Company cannot disconnect a Customer
anywhere in its Texas service territory on a day when:
(1) the previous days highest temperature did not exceed 32 degrees Fahrenheit, and
the temperature is predicted to remain at or below that level for the next 24 hours,
according to the nearest National Weather Service (NWS) reports; or
(2) the NWS issues a heat advisory for any county in the Company's Texas service
territory, or when such advisory has been issued on any one of the preceding two
calendar days.
PUBLIC UTILITY COMMISSION OF TEXAS
/s2
Xceffinep�ry{/'" Section No. V
yl Sheet No. V-8
sour"WISiERN Cultic SERVICE Revision No. 5
ELECTRIC TARIFF Page 4 of 5
RULES, REGULATIONS AND CONDITIONS OF SERVICE
7. REFUSAL, DISCONTINUANCE AND SUSPENSION OF SERVICE
(i) Disconnection of master -metered apartments. When a bill for electric utility services
is delinquent for a master -metered apartment complex:
(1) The Company shall send a notice to the Customer as required in subsection 0) of
this section. At the time such notice is issued, the Company shall also inform the
Customer that notice of possible disconnection will be provided to the tenants of
the apartment complex in six days if payment is not made before that time.
(2) At least six days after providing notice to the Customer and at least four days
before disconnecting, the Company shall post a minimum of five notices in
conspicuous areas in the corridors or other public places of the apartment
complex. Language in the notice shall be in large type and shall read: "Notice to
residents of (name and address of apartment complex): the Company service to
this apartment complex is scheduled for disconnection on (date), because (reason
for disconnection)."
0) Disconnection notices. Any disconnection notice issued by the Company to a Customer
must:
(1) not be issued before the first day after the bill is due, to enable the Company to
determine whether the payment was received by the due date. Payment of the
delinquent bill at the Company's authorized payment agency is considered
payment to the Company.
(2) be a separate mailing or hand delivered with a stated date of disconnection with
the words "disconnection notice" or similar language prominently displayed.
(3) have a disconnection date that is not a holiday or weekend day, not less than ten
days after the notice is issued.
(4) be in English and in Spanish.
(5) include a statement notifying the Customer that if they need assistance paying
their bill by the due date, or are ill and unable to pay their bill, they may be able to
make some alternate payment arrangement, establish deferred payment plan, or
possibly secure payment assistance. The notice shall also advise the Customer to
contact the Company for more information.
PRESIDENT AND CEO,
SOUTHWESTERN PUBLIC SERVICE COMPANY
PUBLIC UTILITY COMMISSION OF TEXAS
Section No. V
Sheet No. V-8
' XceIEnergAV Revision No. 5
SOUiHWIMIN 1Ulllt SEIVICI
ELECTRIC TARIFF Page 5 of 5
RULES, REGULATIONS AND CONDITIONS OF SERVICE
7. REFUSAL, DISCONTINUANCE AND SUSPENSION OF SERVICE
(k) Suspension of Service for Repairs and Changes: When necessary to make repairs to or
changes in the Company's plant, generating equipment, transmission or distribution
system, or other property, the Company may suspend service for such periods as may be
reasonably necessary, and in such manner as not to inconvenience the Customer
unnecessarily. The Company shall be liable to the Customer for any damages occasioned
by such suspension only when the damages are the result of negligence on the part of the
Company. The Company will endeavor to give reasonable notice to the Customer of the
Company's intention to suspend service.
PUBLIC UTILITY COMMISSION OF TEXAS
PRESIDENT AND CEO,
SOUTHWESTERN PUBLIC SERVICE COMPANY
J 6V
Section No. V
aXcel Energy Sheet No. V-9
`1 J Revision No. 1
SOVINWFStEIN P910C SUVICI
ELECTRIC TARIFF Page 1 of 1
RULES, REGULATIONS AND CONDITIONS OF SERVICE
8. USE OF SERVICE
Service shall be supplied directly to Customer through the Company's meter and is to
be used by the Customer only for the purposes specified in and in accordance with the
provisions of the applicable Rate Schedule or Service Agreement, these Rules and
Regulations and the Rules and Regulations of the Commission. Service shall be for
Customer's use only and under no circumstances may the Customer or Customer's
agent or any other individual, association or corporation install meters for the purpose
of remetering or reselling or otherwise disposing of service supplied Customer to
lessees, tenants or others, except in accordance with a Rate Schedule or Service
Agreement which authorizes such use of the service. In no case may Customer,
except with the written consent of the city, owner or entity having jurisdiction, extend
or connect his installation to lines across or under a street, alley, lane, court or avenue
other public or private space in order to obtain service for adjacent property through
one meter even though such adjacent property be owned by the Customer.
PRESIDENT AND CEO,
SOUTHWESTERN PUBLIC SERVICE COMPANY
PUBLIC UTILITY COMMISSION OF TEXAS
Section No. V
XcelEnergy- Sheet No. V-10
���✓// SOU1HWtltIAN IUftit SttYitt Revision No. 1
ELECTRIC TARIFF Page l of l
RULES, REGULATIONS AND CONDITIONS OF SERVICE
9. RIGHT OF WAY
The Customer shall provide, at no expense to the Company, valid easements and
rights -of -way, as required by the Company, to cover the distribution system.
The Company will use reasonable diligence in protecting the property owner when
providing or maintaining overhead or underground service connections. The
Company shall have the right to clear its service connection or any such interfering
tree, shrub or other obstruction; except when the property owner objects to such
clearance, the Company may change or relocate the service connection to meet its
requirements, and the full cost of the change or relocation will be borne by the
Customer or property owner.
PRESIDENT AND CEO,
PUBLIC UTILITY COMMISSION OF TEXAS SOUTHWESTERN PUBLIC SERVICE COMPANY
56
Xceffinergym
s00tHWIS111H ruu►c sfivicr
Section No. V
Sheet No. V-i l
Revision No. 1
ELECTRIC TARIFF Page 1 of 1
RULES, REGULATIONS AND CONTITIONS OF SERVICE
to. ACCESS TO PREMISES
Company's authorized agents shall have access at all reasonable hours to
premises of Customer, for the purpose of inspecting wiring and apparatus,
removing or replacing Company's property, reading of meters and all other
purposes incident to supplying of service.
PRESIDENT AND CEO,
SOUTHWESTERN PUBLIC SERVICE COMPANY
PUBLIC UTILITY COMMISSION OF TEXAS
XceffinergySN
SOUINWISIU N PURIC stly1tr
ELECTRIC TARIFF
Section No. V
Sheet No. V-12
Revision No. 2
Page 1 of I
RULES, REGULATIONS AND CONDITIONS OF SERVICE
11. CHANGE OF PREMISES OF CUSTOMER
When Customer plans to vacate the premises at which he is receiving service, he
shall notify the Company prior to moving from the premises. Customer shall be
responsible for all service supplied to the original premises until such notice has
been received and the Company has had not more than three working days to
discontinue service.
PRESIDENT AND CEO,
SOUTHWESTERN PUBLIC SERVICE COMPANY
PUBLIC UTILITY COMMISSION OF TEXAS
12.
XcelEnerW
foutHW11111H 10111C SERVICE
ELECTRIC TARIFF
Section No. V
Sheet No. V-13
Revision No. 1
Page 1 of l
RULES, REGULATIONS AND CONDITIONS OF SERVICE
TEMPORARY SERVICE
Temporary Service will be furnished under the Company's established rules,
regulations and rates for the type of service required; provided, the Customer may
be required to pay, in addition to the cost of service rendered under the applicable
rate, all the associated cost of installing, connecting and removing the facilities
required to provide such service, in excess of any salvage realized.
PRESIDENT AND CEO,
SOUTHWESTERN PUBLIC SERVICE COMPANY
PUBLIC UTILITY COMMISSION OF TEXAS
' XcelEner
109 W1fi11N lulllt $11VIt1
ELECTRIC TARIFF
Section No. V
Sheet No. V-14
Revision No. 1
Page 1 of 2
RULES, REGULATIONS AND CONDITIONS OF SERVICE
13. CUSTOMER'S INSTALLATION
Customer's Responsibility: The Customer shall assume all responsibility on
the Customer's side of Point of Delivery for service supplied or taken, as well
as for the electrical installation, appliances and apparatus used in connection
therewith, except for injury or damage to persons or property occasioned by
negligence on the part of the Company.
Customer's Facilities: Customer's facilities shall comply with specifications
at least equal to those prescribed by the National Electric Safety Code of the
United Stated Bureau of Standards, any other legally applicable codes, and the
rules of the Company. The Customer shall operate said facilities and other
electrical equipment in such a manner as not to interfere with the service of
the Company to other Customers.
The Service Entrance shall be so located that one set of attachments will
provide the necessary support for the Service Connection.
The Customer's service terminals are to be located at a point readily
accessible to Company's service lines, such point to be determined by
Company.
When construction or remodeling of a building preclude the use of the
Company's standard service attachment, Customer shall install a suitable
attachment for the overhead service wires to the building. The location of
such attachment shall be determined by the Company, and at the cost of the
Customer.
The Company shall be responsible for any and all damages to persons or
property resulting from insecure or weak or inadequate attachments on or to
Customer's property only when such damages are the result of negligence on
the part of the Company.
Power Factor: Customer shall furnish, install and maintain, at his own
expense, any and all corrective apparatus necessary to maintain a power factor
of not less than 90% lagging on installations of any nature whatsoever.
PRESIDENT AND CEO,
SOUTHWESTERN PUBLIC SERVICE COMPANY
PUBLIC UTILITY COMMISSION OF TEXAS
` XcelEnergr
100fo ESTIAN ►olile $11VICI
ELECTRIC TARIFF
Section No. V
Sheet No. V-14
Revision No. 1
Page 2 of 2
RULES, REGULATIONS AND CONDITIONS OF SERVICE
13. CUSTOMER'S INSTALLATION
Changes in Customer's Installation: The Company's service connections,
transformers, meters and other facilities used in supplying service to Customer
have a definite limited capacity. Customer shall give notice to Company, and
obtain Company's consent, before making any material changes or increases
in Customer's installation. After receipt of such notice Company will, as
promptly as practicable, give its approval to the proposed change or increase,
or will advise Customer upon what conditions service can be supplied for
such change or increase.
In the event of damage to Company's facilities resulting from Customer's
negligence in reporting changes or increases in Customer's installation,
Customer shall be liable to Company for all expenses incurred in repairing
such damages and restoring service.
Inspection by Company: Company retains the right, but does not assume the
duty, to inspect Customer's installation at any time, and from time to time,
and to refuse to commence or to continue service whenever it considers such
installation to be defective, hazardous or for any other reason not in good
operating condition.
The Company reserves die right to check the Customer's connected load and
service requirements from time to time and to apply the proper rate schedule
and basis of billing to conform to the findings of such investigations of
connected load and service requirements.
1 PRESIDENT AND CEO,
PUBLIC UTILITY COMMISSION OF TEXAS SOUTHWESTERN PUBLIC SERVICE COMPANY
Xccl EnerWw
$01F [STEAK ►UIU6 $IRVICE
ELECTRIC TARIFF
Section No. V
Sheet No. V-15
Revision No. 2
Page 1 of 1
RULES, REGULATIONS AND CONDITIONS OF SERVICE
14. TRANSFORMER VAULTS
Transformer vaults should not be used for new service. When a transformer vault
is installed for service to a Customer, all details and expenses thereto shall be
borne solely by the Customer. A Service Agreement or a Special Contract shall be
established to define ownership and liability.
PUBLIC UTILITY COMMISSION OF TEXAS
PRESIDENT AND CEO,
SOUTHWESTERN PUBLIC SERVICE COMPANY
162-
Xcel Energy
sourewISUIR iuilic $11VICI
ELECTRIC TARIFF
Section No. V
Sheet No. V-16
Revision No. 2
Page 1 of 1
RULES, REGULATIONS AND CONDITIONS OF SERVICE
15. COMPANY'S INSTALLATION
Installation and Maintenance. Company will install and maintain its line
and equipment on its side of Point of Delivery, but shall not install or maintain
any equipment or lines on Customer's side of Point of Delivery, excepting
meters and meter enclosures.
Service Connection to Customer
Overhead: Employees of the Company shall install an overhead
service connection from the Company's lines to a point of attachment
on Customer's building; connect to the Customer's service entrance
and install the meter, all at the expense of the Company.
Underground: Employees of the Company shall install an
underground service connection from the Company's lines to a point
of delivery in accordance with the provisions of the Company's
standards.
Protection by Customer: Customer or property owner will exercise due care
for the protection of Company property.
PUBLIC UTILITY COMMISSION OF TEXAS
PRESIDENT AND CEO,
SOUTHWESTERN PUBLIC SERVICE COMPANY
// "7
16.
Xcet Energ►r
SOUTHWESTERN'Ulttt SEAYICI
Section No. V
Sheet No. V-17
Revision No. 10
Page 1 of 3
RULES, REGULATIONS AND CONDITIONS OF SERVICE
EXTENSION TO CUSTOMERS
General Policy:
If a line Extension is required by other than a large industrial or commercial
Customer or if facilities are not available, the Company will inform the Customer
within 10 working days of receipt of the application, and will give the Customer an
estimated completion date.
Following assessment of necessary line work, the Company will explain to the
Customer any construction cost options such as sharing of construction costs between
the Company and the Customer, or sharing of costs between the Customer and other
Applicants.
The Company will make an Extension to provide service to a new Customer when the
revenue to be derived from such Extension will provide a suitable return. Extensions
requiring an excessive expenditure in relation to revenues shall be made only when
the Customer makes a nonrefundable contribution as an aid to construction. Such
nonrefundable contribution will reduce the Company's net Extension expenditure to a
value which will provide a suitable return from expected revenues, thereby
preventing undue hardship on the other Customers of the Company. Construction
shall not commence until the contribution is paid. in full.
Requested alterations or relocations of Company facilities without a contribution in
aid to construction impose an unfair burden on other Customers. The Customer
making such request shall make a nonrefundable contribution as an aid to
construction for the full cost of the alterations or relocations except where prohibited
by law, franchise or the authority having jurisdiction.
The cost of a line Extension is based on an estimate of the cost of material for the
specific line Extension. The cost includes the cost of material, labor, necessary
transportation and equipment and appropriate overheads applied in a uniform manner
throughout the Company's Texas service territory.
The Customer shall have the option of performing all ditching and backfilling
required for the installation of all underground wires and cables, in accordance with
Company specifications. If the Customer is unable or unwilling to do ditching and
backfilling, the Company shall do it at the expense of the Customer.
PRESIDENT AND CEO,
PUBLIC UTILITY COMMISSION OF TEXAS SOUTHWESTERN PUBLIC SERVICE COMPANY
164
Xce[Energryw
soutmirFRN /usuc stivicF
ELECTRIC TARIFF
Section No. V
Sheet No. V-17
Revision No. 10
Page 2 of 3
RULES, REGULATIONS AND CONDITIONS OF SERVICE
16. EXTENSION TO CUSTOMERS
Expected annual revenue, which excludes fuel and purchased power cost, is to be
estimated by applying current rates to the Customer's estimated load data. Average -
use data may be used to calculate annual revenue when appropriate, for example, if
the Customer's load is highly weather sensitive.
A suitable return, as used in this rule, is provided when an economic analysis results
in a return on the investment in plant and equipment related to the line Extension
equal to or greater than the allowed return granted in the Company's most recent rate
case. Such economic analysis will incorporate estimated annual revenue, operating
and maintenance expenses, line Extension cost, other costs as appropriate, and
expected duration of service to the new Customer.
Extensions to Customers will be made in compliance with the Company's distribution
standards. Each Extension shall be considered upon its individual merits and will be
governed where applicable, by the following Extension policy statements and
exhibits:
A Except for service to Customers specifically addressed in paragraphs B.,
C., and D. below, the Company will make an Extension at its cost to
Customers who qualify for service under its applicable tariffs, when the
cost of the Extension does not exceed 3.0 times the expected annual
revenue to be derived from such Extension, excluding any fuel and
purchased power cost revenue. The Customer shall pay to the Company a
nonrefundable contribution as an aid to construction, all costs of such
Extension which exceed 3.0 times the expected annual revenue figure
described in the preceding sentence.
B Irrigation: The Company will make an overhead Extension to Customers
who qualify for secondary general service. The Customer shall pay to the
Company a nonrefundable contribution as an aid to construction, all costs
of such Extension. An irrigation Extension shall be used in instances
where Customer uses Company's service for purpose of pumping water to
irrigate a tract of land on a permanent basis and plans to raise a crop
(cotton, feed, wheat, vegetables, grass, etc.). If Customer is planning to
pump water for domestic use, the irrigation Extension may not apply.
PRESIDENT AND CEO,
SOUTHWESTERN PUBLIC SERVICE COMPANY
PUBLIC UTILITY COMMISSION OF TEXAS
Section No. V
Xcel Energyn Sheet No. V-17
/ Revision No. 10
SOUTHWESTERN POILIC SERVICE
Page 3 of 3
ELECTRIC TARIFF
RULES, REGULATIONS AND CONDITIONS OF SERVICE
16. EXTENSION TO CUSTOMERS
C. Primary and Secondary General Service: Due to the complexities and
substantial costs often involved in this type of service Extension, each request
for service will be evaluated on its individual costs and benefits. The
Company will extend its facilities to serve Customers qualifying for service
under its Primary and Secondary General Service Tariff based upon the
following guidelines.
For Extensions costing more than $100,000, the Company will make the
Extension at its cost if the expected annual revenue from the service
provides a suitable return. Extensions requiring an excessive
expenditure in relation to revenue shall be made only when the
Customer makes a nonrefundable contribution as an aid to construction,
thereby lowering the Company's investment in the service to an amount
on which suitable return can be realized from the expected annual
revenue.
2. A Service Agreement or Special Contract may be required by the
Company to be executed prior to extending service. The contract term
shall contain a minimum contract period with an automatic renewable
provision from year to year thereafter.
D. Extension policies defining other specific service conditions are included in
the following exhibits:
Underground Distribution Extension— Exhibit "A"
2. Suburban Development Extension — Exhibit "B".
Any request for an Extension that cannot be agreeably resolved between the
Company and the Customer shall be referred to the regulatory body having
jurisdiction.
PUBLIC UTILITY COMMISSION OF TEXAS
PRESIDENT AND CEO,
SOUTHWESTERN PUBLIC SERVICE COMPANY
1�6
Section No. V
Sheet No. V-17
Xce energy- Revision No. 10
SOUINWESTERN PUIUC SERVICE
Page A-1 of A-2
ELECTRIC TARIFF
Extension Policy
TITLE: Underground Distribution Extension.
PURPOSE: To establish a policy under which the Company can extend its electric
facilities for the above titled service. The Company's tariffs covering electricity
consumption are all based on service being supplied by normal overhead facilities.
Requirements imposed on the owner or developer, herein called owner, under this policy
are designed so that the Company may provide underground service when requested by
the owner without causing undue hardship on other Customers of the Company. Undue
hardship is placed on other Customers of the Company when the Company's cost of
making the requested extension is such that the revenues to be derived from the extension
will not provide a suitable return as described in the Company's Rules, Regulations and
Conditions of Service -Extensions to Customers.
POLICY DEFINITION: The Company will provide a distribution system placed
underground utilizing pad mounted type transformers and enclosures. The distribution
system may provide single or three phase, three or four wire service at a nominal 120/240
Volts, 120/208 Volts or 277/480 Volts at a Point of Delivery acceptable to the Company.
Metering will be provided and installed by the Company.
STREET LIGHTING: The Company will provide street lighting requested by a
municipal authority having jurisdiction within the specified area being developed under
this policy, provided that the type of lighting requested is compatible with the distribution
system and the municipal authority agrees to the monthly service charges specified on the
applicable tariffs. The Company's rates for street lighting are differentiated as wood pole
overhead, wood pole underground, steel pole overhead and steel pole underground.
When the municipal authority authorizes a street light at the overhead service rate, the
owner shall pay to the Company, a nonrefundable contribution as an aid to construction,
and the Company will provide service to the street light. When the authorization
specifies a street light at a wood pole rate, the Company will install a standard steel pole
at the request of the owner, provided the owner pays to the Company, a nonrefundable
contribution as an aid to construction.
PUBLIC UTILITY COMMISSION OF TEXAS
PRESIDENT AND CEO,
SOUTHWESTERN PUBLIC SERVICE COMPANY
/1e
XcelEnetW
SOUTHWRSTERM ►USttC SERVICE
ELECTRIC TARIFF
EXHIBIT A
Extension Policy
Section No. V
Sheet No. V-17
Revision No. 10
Page A-2 of A-2
REQUIREMENTS FOR OWNER: The owner shall provide, at no expense to the Company,
the following:
A. Survey and Plats: Certified plats identifying property corners that have been
located on the ground by a qualified surveyor in a Company approved format.
B. Easements and Rights -of -Way: Valid easements and rights -of -way, as required
by the Company, to cover the distribution system.
C. Ditching and Backfilling: All ditching and backfilling required for the
installation of all underground wires and cables, in accordance with Company
specifications.
D. Compliance with Company Standards: All aspects of interconnection shall
comply with Company standards, electrical codes and the rules of the jurisdiction
having authority.
E. Contribution as an Aid to Construction: A nonrefundable contribution as an
aid to construction for all cost incurred by the Company. The cost to the
Company includes the cost of material, labor, necessary transportation and
equipment and appropriate overheads applied in a uniform manner.
F. Overhead to Underground Conversion: The Company will agree to place
existing or future feeder circuits and distribution lines underground only when the
cost is borne by the owner or others. Costs associated with such underground
feeder circuits and distribution lines shall be determined by the Company.
PRESIDENT AND CEO,
SOUTHWESTERN PUBLIC SERVICE COMPANY
PUBLIC UTILITY COMMISSION OF TEXAS
Section No. V
Sheet No. V-17
Revision No. 10
SOUTHWISTINN ►Unit SERVItt
Page B-1 of B-2
ELECTRIC TARIFF
EXHIBIT B
Extension Policy
TITLE: Suburban Development Extension.
PURPOSE: The purpose of this Extension policy is to establish a means by which the Company
can provide requested extensions of electric distribution facilities into a specific residential
development area for service to future Company Customers within that area without causing an
undue hardship on other Company Customers. Undue hardship is placed on other Customers
when the Company's cost of making a requested extension is such that the revenue to be derived
from the extension will not provide a suitable return to the Company.
AVAILABILITY: Extension of electric distribution facilities is available to any developer
engaged in subdividing a contiguous parcel of land, located within the Company's Texas service
area, into specified lots or tracts intended for sale or lease and utilization as lots for residential
occupancy. However, the development must be under the control of a responsible developer who
shall comply with the terms and conditions of this policy.
STATEMENT OF POLICY:
The Company will extend a primary voltage line to serve the development, including a
secondary voltage line as needed by developer ("Extension").
2. Developer will provide a non-refundable contribution as an aid to construction in the
amount of the Company's estimated total cost of the Extension.
3. The Company may make other extensions, alterations, or additions to the Extension for
service to Customers outside of the development.
Q. Upon the request of any owner of a lot within the development, the Company will extend
service from the Extension to the Point of Delivery in accordance with the Company's
Rules, Regulations and Conditions of Service.
5. The subdivided parcel of land shall be defined by a recorded plat, a copy of which shall
be provided to the Company in Company approved format.
6. The developer shall provide at no expense to the Company, valid easements and rights -of
way as required by the Company covering all the Company's facilities.
PRESIDENT AND CEO,
SOUTHWESTERN PUBLIC SERVICE COMPANY
PUBLIC UTILITY COMMISSION OF TEXAS
Xceffinergysm
$00tHwIltIRM PU/tfc ltlyict
ELECTRIC TARIFF
EXHIBIT B
Extension Policy
Section No. V
Sheet No. V-17
Revision No. 10
Page B-2 of B-2
STREET LIGHTING: The Company will provide at its cost street lighting requested by a municipal
authority having jurisdiction within the specified area being developed under this policy, provided that
the type of lighting requested is compatible with the distribution system and the municipal authority
agrees to the monthly service charges specified on the applicable tariffs. The Company's rates for
street lighting are differentiated as wood pole overhead, wood pole underground, steel pole overhead
and steel pole underground. When the municipal authority authorizes a street light at the overhead
service rate, the owner shall pay to the Company, a nonrefundable contribution as an aid to
construction, and the Company will provide service to the street light. When the authorization
specifies a street light at a wood pole rate, the Company will install a standard steel pole at the request
of the owner, provided the owner pays to the Company, a nonrefundable contribution as an aid to
construction.
PUBLIC UTILITY COMMISSION OF TEXAS
PRESIDENT AND CEO,
SOUTHWESTERN PUBLIC SERVICE COMPANY
1 /o
Section No. V
1►ce nerg /'� Sheet No. V-18
��11 Revision No. 2
soutHWIS111H lultic 31Ivict
Page 1 of 2
ELECTRIC TARIFF
RULES, REGULATIONS AND CONDITIONS OF SERVICE
17. METERING
(a) Use of meter. All electricity consumed or demanded by an electric Customer shall
be charged for by meter measurements, except where otherwise provided for by the
applicable rate schedule or contract.
(b) Installation. Unless otherwise authorized by the Commission, the Company shall
provide and install and shall continue to own and maintain all meters necessary for
the measurement of electric energy to its Customers.
(c) Standard type. All meters shall be of a standard type which meets industry
standards. Special meters used for investigation or experimental purposes are not
required to conform to these standards.
(d) Location of meters.
(1) Meters and service switches in conjunction with the meter shall be installed
in accordance with the latest revision of American National Standards
Institute (ANSI), Incorporated, Standard C12 (American National Code for
Electricity Metering), or other standards as may be prescribed by die
Commission, and will be readily accessible for reading, testing, and
inspection, where such activities will cause minimum interference and
inconvenience to the Customer.
(2) Customer shall provide, without cost to the Company, at a suitable and
easily accessible location:
(A) sufficient and proper space for installation of meters and other
apparatus of the Company;
(13) meter board;
PRESIDENT AND CEO
SOUTHWESTERN PUBLIC SERVICE COMPANY
PUBLIC UTILITY COMMISSION OF TEXAS
Xcel energy"
lOUTMwEMIN /USLIC SERVICE
ELECTRIC TARIFF
Section No. V
Sheet No. V-1 S
Revision No. 2
Page 2 of 2
RULES, REGULATIONS AND CONDITIONS OF SERVICE
17. METERING
(C) meter loop;
(D) safety service switches when required; and
(E) an adequate anchor for service drops.
(3) All meters installed after the effective date of these rules shall be located as
set forth in this section, provided that, where installations are made to
replace meters removed from service, this section shall not operate to
require any change in meter locations which were established prior to the
effective date of these rules, unless the Company finds that the old location
is no longer suitable or proper, or the Customer desires that the location be
changed.
(4) Where the meter location on the Customer's premises is changed at the
request of the Customer, or due to alterations on the Customer's premises,
the Customer shall provide and have installed at his expense, all wiring and
equipment necessary for relocating the meter.
(d) Accuracy requirements.
(1) No meter that violates the test calibration limits as set by the American
National Standards Institute, Incorporated, shall be placed in service or left
in service. Whenever on installation, periodic, or other tests, a meter is
found to violate these limits, it shall be adjusted.
(2) Meters shall be adjusted as closely as practicable to the condition of zero
error.
PRESIDENT AND CEO,
SOUTHWESTERN PUBLIC SERVICE COMPANY
PUBLIC UTILITY COMMISSION OF TEXAS
112
Section No. V
Xceffinergr Sheet No. V-19
Revision No. 3
rournwEsrriN futile srtvret
Page 1 of 8
ELECTRIC TARIFF
RULES, REGULATIONS AND CONDITIONS OF SERVICE
18. BILLING
(a) Frequency of bills. The Company shall issue bills monthly, unless otherwise authorized
by the Commission, or unless service is provided for a period less than one month. Bills
shall be issued as promptly as possible after reading meters.
(b) Billing information. The Company shall provide free to the Customer a breakdown of
charges at the time the service is initially installed or modified and upon request by the
Customer as well as the applicable rate schedule.
(c) Bill content. Each Customer's bill shall include all the following information:
(1) if the meter is read by the Company, the date and reading of the meter at the beginning
and at the end of the billing period;
(2) the due date of the bill, as specified in §25.28 of the Commission's Substantive Rules
(relating to Bill Payment and Adjustments);
(3) the number and kind of units metered;
(4) the applicable rate schedule and title or code should be provided upon request by the
Customer;
(5) the total amount due after addition of any penalty for nonpayment within a designated
period. The terms "gross bill" and "net bill" or other similar terms implying the
granting of a discount for prompt payment shall be used only when an actual discount
for prompt payment is granted. The terms shall not be used when a penalty is added
for nonpayment within a designated period;
(6) the word "Estimated" prominently displayed to identify an estimated bill;
(7) any conversions from meter reading units to billing units, or any other calculations to
determine billing units from recording or other devices, or any other factors used in
determining the bill; and
PRESIDENT AND CEO,
SOUTHWESTERN PUBLIC SERVICE COMPANY
PUBLIC UTILITY COMMISSION OF TEXAS
tj Xceffnergr
SOUThWISHIN pultIC $11VICI
ELECTRIC TARIFF
Section No. V
Sheet No. V-19
Revision No. 2
Page 2 of 8
RULES, REGULATIONS AND CONDITIONS OF SERVICE
18. BILLING
(8) any amount owed under a written guarantee contract provided the guarantor was
previously notified in writing by the Company as required by §25.24 of the
Commission's Substantive Rules (relating to Credit Requirements and Deposits).
(d) Estimated bills.
(1) The Company may submit estimated bills for good cause provided that an actual
meter reading is taken no less than every third month. In months where the meter
reader is unable to gain access to the premises to read the meter on regular meter
reading trips, or in months when meters are not read, the Company must provide the
Customer with a postcard and request the Customer to read the meter and return the
card to the Company. If the postcard is not received by the Company in time for
billing, the Company may estimate the meter reading and issue a bill.
(2) If the Company has a program in which Customers read their own meters and report
their usage monthly and no meter reading is submitted by a Customer the Company
may estimate the Customer's usage and issue a bill. However, the Company must
read the meter if the Customer does not submit readings for three consecutive months
so that a corrected bill may be issued.
Bill Payment and Adjustments
(a) Bill due date. The bill provided to the Customer shall include the payment due date
which shall not be less than 16 days after issuance. The issuance date is the postmark
date on the envelope or the issuance date on the bill if there is no postmark on the
envelope. A payment for electric utility service is delinquent if not received by the
Company or at the Company's authorized payment agency by the close of business on
the due date. If the sixteenth day falls on a holiday or weekend, then the due date shall be
the next work day after the sixteenth day.
PUBLIC UTILITY COMMISSION OF TEXAS
PRESIDENT AND CEO,
SOUTHWESTERN PUBLIC SERVICE COMPANY
I /T
Section No. V
i C Sheet No. V-19
( Xcel Gnus- Revision No. 3
~,1 $001HWESUIN PUtUC SERVICE
Page 3 of 8
ELECTRIC TARIFF
RULES, REGULATIONS AND CONDITIONS OF SERVICE
18. BILLING
(b) Penalty on delinquent bills for retail service. A one-time penalty not to exceed 5.0%
may be charged on a delinquent commercial or industrial bill. The 5.0% penalty on
delinquent bills may not be applied to any balance to which the penalty has already been
applied. Any service the Company provides to the state of Texas shall not be assessed a
fee, penalty, interest, or other charge to the state for delinquent payment of a bill.
(c) Overbilling. If charges are found to be higher than authorized in the Company's tariffs,
then the Customer's bill shall be corrected.
(1) The correction shall be made for the entire period of the overbilling.
(2) If the Company corrects the overbilling within three billing cycles of the error, it need
not pay interest on the amount of the correction.
(2) If the Company does not correct the overcharge within three billing cycles of the
error, it shall pay interest on the amount of the overcharge at the rate set by the
Commission each year.
(A) The interest rate shall be based on an average of prime commercial paper rates
for the previous 12 months.
(B) Interest on overcharges that are not adjusted by the Company within three
billing cycles of the bill in error shall accrue from the date of payment or from
the date of the bill in error.
(C) All interest shall be compounded monthly based on the annual rate.
(D) Interest shall not apply to leveling plans or estimated billings.
-01
PRESIDENT AND CEO,
SOUTHWESTERN PUBLIC SERVICE COMPANY
PUBLIC UTILITY COMMISSION OF TEXAS
Section No. V
Xce«nergr Sheet No. V-19
yl Revision No. 3
sout"Wittlak vu►uc stsvict
Page 4of8
ELECTRIC TARIFF
RULES, REGULATIONS AND CONDITIONS OF SERVICE
18. BILLING
(d) UnderbWing. If charges are found to be lower than authorized by the Company's tariffs,
or if the Company failed to bill the Customer for service, then the Customer's bill may be
corrected.
(1) The Company may backbill the Customer for the amount that was underbilled. The
backbilling shall not collect charges that extend more than six months from the date
the error was discovered unless the underbilling is a result of theft of service by the
Customer.
(2) The Company may disconnect service if the Customer fails to pay underbilled
charges.
(3) If the underbilling is $50 or more, the Company shall offer the Customer a deferred
payment plan option for the same length of time as that of the underbilling. A
deferred payment plan need not be offered to a Customer whose underpayment is due
to theft of service.
(4) The Company shall not charge interest on underbilled amounts unless such amounts
are found to be the result of theft of service (meter tampering, bypass, or diversion)
by the Customer, as defined in §25.126 of the Commission's Substantive Rules.
Interest on underbilled amounts shall be compounded monthly at the annual rate and
shall accrue from the day the Customer is found to have first stolen (tampered,
bypassed or diverted) the service.
PRESIDENT AND CEO,
SOUTHWESTERN PUBLIC SERVICE COMPANY
PUBLIC UTILITY COMMISSION OF TEXAS
174
Xcelfnergr
SOUTNWFS11IN POlttt SEIvict
ELECTRIC TARIFF
Section No. V
Sheet No. V-19
Revision No. 2
Page 5of8
RULES, REGULATIONS AND CONDITIONS OF SERVICE
18. BILLING
(e) Disputed bills.
(1) If there is a dispute between a Customer and the Company about a bill for service, the
Company shall investigate and report the results to the Customer. If the dispute is not
resolved, the Company shall inform the Customer of the complaint procedures of the
Commission pursuant to §25.30 of the Commission's Substantive Rules (relating to
Complaints).
(2) A Customer's service shall not be disconnected for nonpayment of the disputed
portion of the bill until the dispute is completely resolved by the Company.
(3) If the Customer files a complaint with the Commission, a Customer's service shall not
be disconnected for nonpayment of the disputed portion of the bill before the
Commission completes its informal complaint resolution process and informs the
Customer of its determination.
(4) The Customer is obligated to pay any billings not disputed.
(f) Payment arrangements. A payment arrangement is any agreement between the
Company and a Customer that allows a Customer to pay the outstanding bill after its due
date but before the due date of the next bill. If the Company issued a disconnection
notice before the payment arrangement was made, that disconnection should be
suspended until after the due date for the payment arrangement. If a Customer does not
fulfill the terms of the payment arrangements, the Company may disconnect service after
the later of the due date for the payment arrangement or the disconnection date indicated
in the disconnection notice, pursuant to §25.29 of the Commission's Substantive Rules
without issuing an additional disconnection notice.
PRESIDENT AND CEO,
SOUTHWESTERN PUBLIC SERVICE COMPANY
PUBLIC UTILITY COMMISSION OF TEXAS
Section No. V
Xcelfnergyp Sheet No. V-19
r 1 Revision No. 3
SOUIHWFSTF11 ►Ulilt StIVICS
Page 6 of 8
ELECTRIC TARIFF
RULES, REGULATIONS AND CONDITIONS OF SERVICE
18. BILLING
(g) Deferred payment plans. A deferred payment plan is any written arrangement between
the Company and a Customer that allows a Customer to pay an outstanding bill in
installments that extend beyond the due date of the next bill. A deferred payment plan
may be established in person or by telephone, and all deferred payment plans shall be put
in writing.
(1) The Company shall offer a deferred payment plan to any residential Customer,
including a guarantor of any residential Customer, who has expressed an inability to
pay all of the bill, if that Customer has not been issued more than two disconnection
notices during the preceding 12 months.
(2) Every deferred payment plan shall provide that the delinquent amount may be paid in
equal installments lasting at least three billing cycles.
(3) When a Customer has received service from the Company for less than three months,
the Company is not required to offer a deferred payment plan if the Customer lacks:
(A) sufficient credit; or
(B) a satisfactory history of payment for service from a previous utility.
PUBLIC UTILITY COMMISSION OF TEXAS
PRESIDENT AND CEO,
SOUTHWESTERN PUBLIC SERVICE COMPANY
l79
Section No. V
kelEner v, Sheet No. V-19
Revision No. 3
IQUyNWEltIIN Itlltlt $11vieE
Page 7 of 8
ELECTRIC TARIFF
RULES, REGULATIONS AND CONDITIONS OF SERVICE
18. BILLING
(4) Every deferred payment plan offered by the Company:
(A) shall state, immediately preceding the space provided for the Customer's signature
and in boldface type -no smaller than 14 point size, the following: "If you are not
satisfied with this contract, or if agreement was made by telephone and you feel
this contract does not reflect your understanding of that agreement, contact the
Company immediately and do not sign this contract. If you do not contact the
Company, or if you sign this agreement, you may give up your right to dispute the
amount due under the agreement except for the Company's failure or refusal to
comply with the terms of this agreement." In addition, where the Customer and
the Company's representative or agent meet in person, the Company's
representative shall read the preceding statement to the Customer. The Company
shall provide information to the Customer in English and Spanish as necessary to
make the preceding boldface language'understandable to the Customer;
(B) may include a 5.0% penalty for late payment but shall not include a finance
charge;
(C) shall state the length of time covered by the plan;
(D) shall state the total amount to be paid under the plan;
(E) shall state the specific amount of each installment;
(F) shall allow the Company to disconnect service if the Customer does not fulfill the
terms of the deferred payment plan, and shall state the terms for disconnection;
(G) shall not refuse a Customer participation in such a program on the basis of race,
color, sex, nationality, religion, or marital status;
(H) shall be signed by the Customer and a copy of the signed plan must be provided to
the Customer. If the agreement is made over the telephone, then the Company
shall send a copy of the plan to the Customer for signature; and
(I) shall allow either the Customer or the Company to initiate a renegotiation of the
deferred payment plan if the Customer's economic or financial circumstances
change substantially during the time of the deferred payment plan.
PRESIDENT AND CEO,
SOUTHWESTERN PUBLIC SERVICE COMPANY
PUBLIC UTILITY COMMISSION OF TEXAS
Section No. V
* Xce[Energr Sheet No. V-19
Revision No. 3
EOUrHWlfiElN IU111 lft SlIV(CE
Page 8 of 8
ELECTRIC TARIFF
RULES, REGULATIONS AND CONDITIONS OF SERVICE
18. BILLING
(5) The Company may disconnect a Customer who does not meet the terms of a deferred
payment plan. However, the Company may not disconnect service until a
disconnection notice has been issued to the Customer indicating that the Customer
has not met the terms of the plan. The notice and disconnection shall conform with
the disconnection rules in §25.29 of the Commission's Substantive Rules. The
Company may renegotiate the deferred payment plan agreement prior to
disconnection. If the Customer did not sign the deferred payment plan, and is not
otherwise fulfilling the terms of the plan, and the Customer was previously provided a
disconnection notice for the outstanding amount, no additional disconnection notice
shall be required.
PUBLIC UTILITY COMMISSION OF TEXAS
PRESIDENT AND CEO,
SOUTHWESTERN PUBLIC SERVICE COMPANY
/6V
19.
XcelEnerr
100towlittim /URIC 111vict
ELECTRIC TARIFF
Section No. V
Sheet No. V-20
Revision No. 3
Page 1 of 2
RULES, REGULATIONS AND CONDITIONS OF SERVICE
APPLICATION OF RATE SCHEDULES
Rates and Optional Rates: The rates to be charged by and paid to the Company
for electric service will be the rates in effect and filed with legally constituted
regulatory bodies. A complete schedule of all rates legally in effect will be kept
at all times at the Company's Amarillo and Austin offices where they will be
available for public inspection upon request.
All changes duly made in the Company's rates or terms and conditions of service
under which the Customer is served shall apply to the Customer on and after the
date such changes become effective, existing contracts or Service Agreements
notwithstanding.
The Customer shall not be eligible to receive service under any particular rate
unless and until any necessary wiring provisions that are required to conform to
metering requirements of the rate have been made, except that Company may,
under unusual circumstances waive this requirement.
All necessary wiring changes shall be at the expense of the Customer.
Franchise Fees: All current and future franchise fees not included in base rates
shall be separately assessed in the municipality where the excess franchise fee is
authorized. Bills computed under the above rate will be increased by the
additional franchise fees imposed by the appropriate municipality or taxing
authority in which jurisdiction the customer's consuming facility resides, when
applicable. The franchise fee will appear on the bill as a separate item.
PRESIDENT AND CEO,
SOUTHWESTERN PUBLIC SERVICE
PUBLIC UTILITY COMMISSION OF TEXAS
Mf
' Xce Enengr
8001HWESrEIN ruiuc srtrICI
ELECTRIC TARIFF
Section No. V
Sheet No. V-20
Revision No. 3
Page 2 of 2
RULES, REGULATIONS AND CONDITIONS OF SERVICE
Residential and Commercial Service: Homes in which space is occasionally
used for the conduct of business by a person residing therein may be served under
the standard residential rate. When a portion of the dwelling is regularly used for
business purposes, the electric energy used in that portion shall be separately
metered and billed on an applicable commercial rate, otherwise, the entire
premises will be classified as either residential or commercial, depending on the
Customer's major use of service. Service rendered through one meter to
recognized rooming houses will be considered commercial service, except where
four rooms or less are rented to the public, then the residential rate will apply.
PRESIDENT AND CEO,
PUBLIC UTILITY COMMISSION OF TEXAS SOUTHWESTERN PUBLIC SERVICE COMPANY
/QZ
Section No. V
Xceffin&W Sheet No. V-21
,s Revision No. 6
30ut"WrITINN tultt6 dEtYltE
Page 1 of 6
ELECTRIC TARIFF
RULES, REGULATIONS AND CONDITIONS OF SERVICE
20. DEPOSITS
(a) Credit requirements for permanent residential applicants.
(1) The Company may require a residential applicant for service to establish and
maintain satisfactory credit as a condition of providing service.
(A) Establishment of.credit shall not relieve any Customer from complying with
the Company's requirements for prompt payment of bills.
(B) The credit worthiness of spouses established during shared service in the 12
months prior to their divorce will be equally applied to both spouses for 12
months immediately after their divorce.
(2) A residential applicant can demonstrate satisfactory credit using any one of the
criteria listed in subparagraphs (A) through (C) of this paragraph.
(A)The residential applicant:
(i) has been a Customer of any electric utility for the same kind of
service within the last two years;
(ii) is not delinquent in payment of any such electric utility service
account;
(iii) during the last 12 consecutive months of service was not late in
paying a bill more than once;
(iv) did not have service disconnected for nonpayment; and
(v) is encouraged to obtain a letter of credit history from the applicant's
previous electric utility.
(B) The residential applicant demonstrates a satisfactory credit rating by
appropriate means, including, but not limited to, the production of:
(i) generally acceptable credit cards;
(ii) letters of credit reference;
(iii) the names of credit references which may be quickly and
inexpensively contacted by the Company; or
(iv) ownership of substantial equity that is easily liquidated.
PUBLIC UTILITY COMMISSION OF TEXAS
PRESIDENT AND CEO,
SOUTHWESTERN PUBLIC SERVICE COMPANY
/S 3
Section No. V
Xce Energy, Sheet No. V-21
/ Revision No. 6
$00THWESIEIN /U/llt SEIVICE
Page 2 of 6
ELECTRIC TARIFF
RULES, REGULATIONS AND CONDITIONS OF SERVICE
20. DEPOSITS
(C)The residential applicant is 65 years _of age or older and does not have an
outstanding account balance incurred within the last two years with the
Company or another electric utility for the same type of utility service.
(3) If satisfactory credit cannot be demonstrated by the residential applicant using
these criteria, the applicant may be required to pay a deposit pursuant to
subsection (c) of this section.
(b) Credit requirements for non-residential applicants. For non-residential service, if an
applicant's credit has not been demonstrated satisfactorily to the Company, the applicant
may be required to pay a deposit.
(c) Initial deposits.
(1) A residential applicant or Customer who is required to pay an initial deposit may
provide the Company with a written letter of guarantee pursuant to subsection (j)
of this section, instead of paying a cash deposit.
(2) An initial deposit may not be required from an existing Customer unless the
Customer was late paying a bill more than once during the last 12 months of
service or had service disconnected for nonpayment. The Customer may be
required to pay this initial deposit within ten days after issuance of a written
termination notice that requests such deposit. Instead of an initial deposit, the
Customer may pay the total amount due on the current bill by the due date of the
bill, provided the Customer has not exercised this option in the previous 12
months.
0
PUBLIC UTILITY COMMISSION OF TEXAS
PRESIDENT AND CEO,
SOUTHWESTERN PUBLIC SERVICE COMPANY
/OT
Section No. V
Xcel Enww Sheet No. V-21
,/ RevisionNo. 6
SOUtHWlfttlN ►ullit lttYitt
Page 3 of 6
ELECTRIC TARIFF
RULES, REGULATIONS AND CONDITIONS OF SERVICE
20. DEPOSITS
(d) Additional deposits.
(1) An additional deposit may be required if.
(A)the average of the Customer's actual billings for the last 12 months are at least
twice the amount of the original estimated annual billings; and
(B) a disconnection notice has been issued for the account within the previous 12
months.
The Company may require that an additional deposit be paid within ten days after the Company
has issued a written disconnection notice and requested the additional deposit.
(2) Instead of an additional deposit, the Customer may pay the total amount due on
the current bill by the due date of the bill, provided the Customer has not
exercised this option in the previous 12 months.
(3) The Company may disconnect service if the additional deposit is not paid within
ten days of the request, provided a written disconnection notice has been issued to
the Customer. A disconnection notice may be issued concurrently with either the
written request for the additional deposit or current usage payment.
(e) Deposits for temporary or seasonal service and for weekend residences. The
Company may require a deposit sufficient to reasonably protect it against the assumed
risk for temporary or seasonal service or weekend residences, as long as the policy is
applied in a uniform and nondiscriminatory manner. These deposits shall be returned
according to guidelines set out in subsection (k) of this section.
(f) Amount of deposit. The total of all deposits shall not exceed an amount equivalent to
one -sixth of the estimated annual billing.
PUBLIC UTILITY COMMISSION OF TEXAS
PRESIDENT AND CEO,
SOUTHWESTERN PUBLIC SERVICE COMPANY
I85
Section No. V
Xceffinp pr Sheet No. V-21
/ ``� �1 Revision No. 6
sourewrtrilm rustic 3E1rtct
Page 4of6
ELECTRIC TARIFF
RULES, REGULATIONS AND CONDITIONS OF SERVICE
20. DEPOSITS
(g) Interest on deposits. The Company shall pay interest on deposits at an annual rate at
least equal to that set by the Commission on December 1 of the preceding year, pursuant
to Texas Utilities Code §183.003 (Vernon 1998) (relating to Rate of Interest). If a
deposit is refunded within 30 days of the date of deposit, no interest payment is required.
If the Company keeps the deposit more than 30 days, payment of interest shall be made
retroactive to the date of deposit.
(1) Payment of the interest to the Customer shall be made annually, if requested by
the Customer, or at the time the deposit is returned or credited to the Customer's
account.
(2) The deposit shall cease to draw interest on the date it is returned or credited to the
Customer's account.
(h) Notification to Customers. When a deposit is required, the Company shall provide the
applicant or Customer written information about deposits by providing the "Your Rights
as a Customer" brochure, which contains the relevant information.
(i) Records of deposits.
(1) The Company shall keep records to show:
(A) the name and address of each depositor;
(B) the amount and date of the deposit; and
(C) each transaction concerning the deposit.
(2) The Company shall issue a receipt of deposit to each applicant paying a deposit
and shall provide means for a depositor to establish a claim if the receipt is lost.
(3) A record of each unclaimed deposit must be maintained for at least four years.
(4) The Company shall make a reasonable effort to return unclaimed deposits.
PRESIDENT AND CEO,
SOUTHWESTERN PUBLIC SERVICE COMPANY
PUBLIC UTILITY COMMISSION OF TEXAS
96
u)
Section No. V
XcelEnergr Sheet No. V-21
,r Revision No. 6
soutNWEftfIN 10111C SERVICE
Page 5 of 6
ELECTRIC TARIFF
RULES, REGULATIONS AND CONDITIONS OF SERVICE
20. DEPOSITS
Guarantees of residential Customer accounts.
(1) A guarantee agreement between the Company and a guarantor must be in writing
and shall be for no more than the amount of deposit the Company would require
on the applicant's account pursuant to subsection (f) of this section. The amount
of the guarantee shall be clearly indicated in the signed agreement.
(2) The guarantee shall be voided and returned to the guarantor according to the
provisions of subsection (k) of this section.
(3) Upon default by a residential Customer, the guarantor of that Customer's account
shall be responsible for the unpaid balance of the account only up to the amount
agreed to in the written agreement.
(4) The Company shall provide written notification to the guarantor of the Customer's
default, the amount owed by the guarantor, and the due date for the amount owed.
(A)The Company shall allow the guarantor 16 days from the date of notification
to pay the amount owed on the defaulted account. If the sixteenth day falls on
a holiday or weekend, the due date shall be the next workday.
(B)The Company may transfer the amount owed on the defaulted account to the
guarantor's own service bill provided the guaranteed amount owed is
identified separately on the bill as required by §25.25(c)(10) of the
Commission's Substantive Rules (relating to the Issuance and Format of
Bills).
(5) The Company may disconnect service to the guarantor for nonpayment of the
guaranteed amount only if the disconnection was included in the terms of the
written agreement, and only after proper notice as described by paragraph (4) of
this subsection, and §25.29(b)(5) of the Commission's Substantive Rules (relating
to Disconnection of Service).
PRESIDENT AND CEO,
SOUTHWESTERN PUBLIC SERVICE COMPANY
PUBLIC UTILITY COMMISSION OF TEXAS
Section No. V
@) X effinerV Sheet No. V-21
yl Revision No. 6
SOUTOW1111IN Publlt SEIYICE
Page 6 of 6
ELECTRIC TARIFF
RULES, REGULATIONS AND CONDITIONS OF SERVICE
20. DEPOSITS
(k) Refunding deposits and voiding letters of guarantee.
(1) If service is not connected, or is disconnected, the Company shall promptly void
and return to the guarantor all letters of guarantee on the account or provide
written documentation that the contract has been voided, or refund the Customer's
deposit plus accrued interest on the balance, if any, in excess of the unpaid bills
for service furnished. A transfer of service from one premise to another within
the Texas service area of the Company is not a disconnection, and no additional
deposit may be required.
(2) When the Customer has paid bills for service for 12 consecutive residential
billings or for 24 consecutive non-residential billings without having service
disconnected for nonpayment of a bill and without having more than two
occasions in which a bill was delinquent, and when the Customer is not
delinquent in the payment of the current bills, the Company shall promptly refund
the deposit plus accrued interest to the Customer, or void and return the guarantee
or provide written documentation that the contract has been voided. If the
Customer does not ineet these refund criteria, the deposit and interest or the letter
of guarantee may be retained.
(1) Re-establishment of credit. Every applicant who previously has been a Customer of the
Company and whose service has been disconnected for nonpayment of bills or theft of
service (meter tampering or bypassing of meter) shall be required, before service is
reconnected, to pay all amounts due the Company or execute a deferred payment
agreement, if offered, and reestablish credit. The Company must prove the amount of
utility service received but not paid for and the reasonableness of any charges for the
unpaid service, and any other charges required to be paid as a condition of service
restoration.
cl— 4:52�- /_ Q_
PRESIDENT AND CEO,
SOUTHWESTERN PUBLIC SERVICE COMPANY
PUBLIC UTILITY COMMISSION OF TEXAS
00
Section No. V
Xcel En r Sheet No. V-22
"� yl Revision No. 2
S00tHwist11N 1UI114 114V161
Page 1 of 1
ELECTRIC TARIFF
RULES, REGULATIONS AND CONDITIONS OF SERVICE
21. APPLICATION OF RULES AND REGULATIONS -CONFLICTS:
Application of Rules and Regulations: All Service Agreements at present in
effect or that may be effective in the future are made expressly subject to these
Rules and Regulations and any modifications hereof that may be lawfully made.
Conflicts: In case of conflict between any provision of a Rate Schedule, a
Service Agreement, these Rules and Regulations, or the rules and regulations of a
legally constituted regulatory body, the provision of the rules and regulations of
the regulatory body takes precedence, followed by the provision of the Rate
Schedule, the provisions of these Rules and Regulations, and in turn the provision
of the Service Agreement.
PRESIDENT AND CEO,
SOUTHWESTERN PUBLIC SERVICE COMPANY
PUBLIC UTILITY COMMISSION OF TEXAS
leg
Section No. V
Xcel Energy Sheet No. V-23
Revision No. I
SOUtHWIiIIIN lUllit SUVICI
Page I of 1
ELECTRIC TARIFF
RULES, REGULATIONS AND CONDITIONS OF SERVICE
22. UNAUTHORIZED COMMUNICATION DEVICES
Customer -owned communication devices shall not be connected directly or by
inductive coupling to meter, service entrance, secondary or other Company -
owned facilities in any manner.
Devices connected to Customer's facilities which transmit signals beyond
secondary distribution lines of Company are prohibited. Under no circumstances
shall Company's distribution lines or transmission lines be used for transmitting
signals from Customer -owned devices. If it is found that unauthorized devices
are being used, Company may immediately discontinue service to Customer until
the use of such unauthorized devices is discontinued.
Company shall not be liable for damage or interference caused by Customer
owned coirununication devices.
PUBLIC UTILITY COMMISSION OF TEXAS
PRESIDENT AND CEO,
SOUTHWESTERN PUBLIC SERVICE COMPANY
Mo
Section No. V
XceIEnergyIN Sheet No. V-25
j Revision No. 2
SGurowlittim Mtlt SEIYItt
Page 1 of 2
ELECTRIC TARIFF
RULES, REGULATIONS AND CONDITIONS OF SERVICE
23. LOAD CONTROL EQUIPMENT FOR CUSTOMERS
Eligibility: The Customer's load must be of such magnitude or character that
electronic recording metering is installed or could be installed under current
Company policy. Demand pulse equipment only is authorized to be installed
when the Customer demand is greater than 1000 kW unless Customer agrees to
pay for all necessary data and time pulse equipment plus installation costs.
Regardless of demand, any necessary metering changes will be at Customer's
expense.
A "Data Sheet for Pulse Demand Control Equipment" (Exhibit A), shall be
initiated by the division industrial or commercial sales representative who
contacts the Customer. No firm commitment shall be made with the Customer
until the data sheet has been reviewed by all departments indicated on the form.
Pulse service shall not be offered to Customers metered with self-contained
meters.
Specifications: Data pulses and time pulses shall be furnished as agreed upon in
the Electric Demand Signal Agreement (Exhibit "B"). If the Customer's
equipment cannot accept the data pulse rate or the time pulse rate or the time
pulse duration provided, the Customer shall be responsible for installing any
equipment necessary to change it. Both data pulses and time pulses shall consist
of contact closures only.
If it becomes necessary for the Company to change the pulse rate of the revenue
metering equipment, the Customer shall be responsible for accepting the new
pulse rate. The Company shall not provide operating voltage to the Customer's
equipment. This will be furnished by the Customer in accordance with Article VI
of the Electric Demand Signal Agreement.
To protect the Company's equipment, all pulse circuits provided for the
Customer's use shall be fused. Maximum fuse size shall be determined by the
Company. Slow -blow fuses shall not be used. The Company shall not be
responsible for pulse interruptions due to blown fuses. The fuses shall be located
so that, by mutual consent, the Customer may have access to them when
necessary.
PUBLIC UTILITY COMMISSION OF TEXAS
PRESIDENT AND CEO,
SOUTHWESTERN PUBLIC SERVICE COMPANY
/9i
'� xce nergy�
SOutNW1sf11N Public 811YIc1
ELECTRIC TARIFF
Section No. V
Sheet No. V-25
Revision No. 2
Page 2 of 2
RULES, REGULATIONS AND CONDITIONS OF SERVICE
23. LOAD CONTROL EQUIPMENT FOR CUSTOMERS
Cost: The initial cost to the Customer (Article I of the Electric Demand Signal
Agreement) shall be determined by the Company's meter department. This cost
shall include material labor, transportation, miscellaneous expenses (meals,
lodging, etc.), and all applicable overheads for their installation necessary to
provide the required signals. In certain cases, the Customer may be charged for
totalizing and/or recording equipment.
Compensation shall be made to the Company, in advance or under such credit
terms acceptable to the Company, prior to the ordering of metering equipment.
The Customer will compensate the Company for operation and maintenance
expenses in accordance with Articles IV and V of the Electric Demand Signal
Agreement. Expenses involved include, but are not limited to, material, labor,
transportation, miscellaneous (meals, lodging, etc.), and all applicable overheads.
If the Customer's load or service changes to the extent that the metering
installation must be changed, any additional costs necessary to continue the load
or time contact closures will result in an additional charge to the Customer.
PUBLIC UTILITY COMMISSION OF TEXAS
PRESIDENT AND CEO,
SOUTHWESTERN PUBLIC SERVICE COMPANY
192
SOUTHWESTERN PUBLIC SERVICE COMPANY
DATA SHEET FOR PULSE DEMAND CONTROL EQUIPMENT
Division,
Date
Customer
Address
Previous Peak Demand KW
Pulse Per KW =
Time Pulse Supplied: Yes No
Maximum Contact Capacity:
Customer Equipment Supplied By
Date Required
Other Information
Sales Representative
Meter Supervisor
Account Number
No. Wires
VA
Date Expected
Date
Date
Signed: Date
Manager, Sales —Managed Accounts
Signed: Date
Supervisor, Gas & Elecfic Metering
EXHIBIT A
Page 1 of 1
Date
No. Wires
District
/4�
�O XcelEnergy-
EXHIBIT B
Page 1 of 3
Request Date 20
Customer Name ("Customer"), Account N
Service Address
Mailing Address
Customer Contact
(Where is work to be performed?)
City, State,
City, State,
Phone Number ( )
ELECTRIC PULSE AGREEMENT
The parties ("Parties") to this Electric Pulse Agreement ("Agreement") are Southwestern Public Service
Company; a New Mexico corporation authorized to transact business in Texas, Oklahoma, and Kansas.
("SPS") and ("Customer") listed above.
Section 1. Agreement. Company will supply contact closures for time and/or energy pulses from Company's
meter located on Customer's premises. In order to supply said pulses it shall be necessary for Company to
install the necessary isolation relays with associated wiring contacts. Company will provide said contact
closures when, as, and if possible, from said isolation relay, as required by Customer at a cost shown in
Exhibit A, payable upon execution hereof, subject to the following conditions.
a. Customer shall be responsible for the installation and maintenance of all wiring and
Equipment on Customer's side of said isolation relay. Customer will run Customer's signal
circuit and conduit into Company's junction box; said junction box to be located adjacent to
Company's billing meter. Company will make the electrical connection in its junction box.
b. Customer agrees that.Cornpany is not obligated to alter or adjust any meter reading based
on the equipment which Customer installs to receive the special metering pulses provided for
herein. The Company in no way guarantees that Customer's equipment will operate satisfactory
nor the pulses the Customer receives will match exactly with the billing data.
C. Under no circumstances shall Customer modify, or interrupt the operation of Company's
relay and associated wiring.
d. The possible failure or malfunction of Company's equipment and subsequent loss of
pulse signal to the Customer's equipment shall in no way abrogate the validity of the Company's
meters in establishing the energy and demand record for billing purposes or relieve Customer of
obligations to pay such billed energy or demand charges.
�9¢
EXHIBIT B
Page 2 of 3
e. Company reserves the right to interrupt the pulse circuit at any time without notice to
Customer to perform routine or special tests or maintenance on Company billing metering
f. Equipment, and in so doing assumes no responsibility for affecting the operation of
Customer's equipment. Company will make a good faith effort to notify Customer prior to any
interruption of the pulse circuit.
g. All equipment on the Company's side of the Customer terminals of the isolation relay is
and shall remain in the sole property of Company.
h. Customer shall provide and maintain equipment capable of receiving any contact closure
values and pulse rates that it may become necessary for Company to use in its billing metering
system.
i. Customer agrees to fully protect, defend, and indemnify Company, hold harmless from
and against any and all claims, liability and damage including damage to Customer's equipment
and premises, in any way arising, directly or indirectly out of installation and use of said relay
equipment.
j. This Agreement in no way alters or changes any contract for electric services heretofore
signed by Customer and Company nor does it modify or amend the Service Rules or other
ordinances under which the Company operates.
k. This Agreement shall be binding upon the legal representatives, successor and assigns of
the parties hereto, but no assignment by Customer shall be binding on Company unless accepted
in writing by Company.
1. The pulse generating equipment installed by Company hereunder shall be designed for
monitoring the operation of Customer's equipment. Company does not warrant nor guarantee the
efficiency or adequacy of said equipment for Customer purpose. Company will cooperate with
Customer to the extent of assuring that no malfunction exists in Company's equipment. Work of
this nature will be billed to Customer, unless actual trouble is found within Company's
equipment.
Section 2. Term. The term ( "Term") of this Agreement shall begin on the earlier of (i) the date on which
Customer first receives pulse metering information under this Agreement or (ii) the
meter reading date, and shall continue for a period of 18 months. Upon the expiration of the
Term, this Agreement shall be automatically extended from year to year (Extended Tenn) unless terminated
pursuant to Section 3 ("Termination').
Section 3. Termination. Either Party may terminate this Agreement at the end of the Term or at any time
during the Extended Term, by delivering to other Party written notice thirty (30) days prior to the intended
date of termination.
pal.el
EXHIBIT B
Page 3 of 3
Section 4. Modification. This Agreement may be modified to comply with all published rules of service of
SPS (or rules, regulations, or orders of any regulatory body having jurisdiction) as they may be changed from
time to time.
Section 5. Rights to Discontinue Service. SPS reserves the right at any time to discontinue service to
Customer in accordance with the rules and regulations of SPS as approved by the regulatory body having
jurisdiction.
Section 6. Additional Terms. Additional terms and conditions applicable to this Agreement are:
Section 7. Partial Invalidity. If any term, provision, covenant, or condition of this Agreement is held by a
court of competent jurisdiction to be invalid, void, or unenforceable, the remainder of the provisions shall
remain in full force and effect and shall in no way be affected, impaired, or invalidated.
Section 8. Entire Agreement. This Agreement contains the entire agreement of the Parties with respect to
the matters covered by this Agreement. No other agreement, statement, or promise made by either Party, or
to any employee, officer, or agent of either Party, which is not contained in this Agreement, shall be binding
or valid.
Section 9. Captions. The captions preceding the text of each Section of this Agreement are included only for
convenience of reference and shall be disregarded in the construction of this Agreement.
SIGNED THIS day of ,
SOUTHWESTERN PUBLIC SERVICE COMPANY CUSTOMER
By: By:
Its Its
J 96
Section No. V
Sheet No. V-27
Revision No. ]
�7711
SOU1HWtSiEAN IUilit lEAYlCE Page 1 of I
ELECTRIC TARIFF
RULES, REGULATIONS AND CONDITIONS OF SERVICE
24. CUSTOMER COMPLAINTS
Customers may complain to the Company by letter, or by telephone. When the
Company receives a complaint, it will investigate the matter and tell the Customer
the results of the investigation within 21 days.
If the Customer is not satisfied with the results of the investigation, the Company
will provide the Customer information concerning the Commission's complaint
process, together with the address and telephone numbers of the Commission's
Consumer Affairs Division.
PUBLIC UTILITY COMMISSION OF TEXAS
PRESIDENT AND CEO,
SOUTHWESTERN PUBLIC SERVICE COMPANY
/9y
XcelEnergr
soul"WEItIIN Punic SEIVICE
ELECTRIC TARIFF
Section No. V
Sheet No. V-29
Revision No. I
Page 1 of I
RULES, REGULATIONS AND CONDITIONS OF SERVICE
25. RETAIL ELECTRIC SWITCHOVERS
A request to switch service to a consuming facility to another utility that has the
right to serve the facility shall be handled pursuant to Public Utility Commission
of Texas Substantive Rule §25.27, a copy of which will be provided upon request.
Base Charge: $140
Base Charge Adder: $10
PRESIDENT AND CEO,
SOUTHWESTERN PUBLIC SERVICE COMPANY
PUBLIC UTILITY COMMISSION OF TEXAS I
� 9S
Section No. V
Xce �nergym Sheet
rin No. V-30
SourHWISTIAN rueuc SENVICE Page I of
ELECTRIC TARIFF
RULES, REGULATIONS AND CONDITIONS OF SERVICE
26. RESIDENTIAL BILLING OF VACANT RENTAL PROPERTY
All landlords and property managers responsible for residential rental units shall
sign both a residential billing of vacant rental property agreement and select either
the Automatic Turn On ("ATO") option or the Lock On Disconnect ("LOD")
option. If a landlord/property manager declines to sign both a residential billing of
vacant rental property agreement and select the ATO option, their accounts will be
defaulted to the LOD option. The landlord/property manager may change their
selection by written notice to the Company at any time. The residential billing of
vacant rental property agreement may be canceled for only the affected buildings
if a landlord/ property manager's account becomes delinquent.
AUTOMATIC TURN ON OPTION (ATO)
If the landlord/property manager selects the ATO option, the company shall bill
the landlord/property manager for electric service in unoccupied rental unit(s)
during periods of tenant vacancies. Electric service for vacant rental unit(s) will
remain in the landlord/property manager's name until 1) a new tenant becomes the
Customer of record 2) the landlord/property manager (as agent for the tenant)
applies for service, or 3) the landlord/property manager submits a request to cancel
the ATO option in its entirety. If the ATO option is in effect, billings shall be the
responsibility of the landlord/property manager if a new tenant occupies the rental
unit but fails to apply for service.
LOCK ON DISCONNECT OPTION (LOD)
If the landlord/property manager selects the LOD option, service in rental unit(s)
will be disconnected when the Company is notified that the tenant has vacated the
property. Service in rental unit(s) will be reconnected when there is a new service
request. Reconnection fees will apply. Landlord will be assessed the after hours
connection charges if the meter is reconnected to prep the rental unit after hours
prior to the new tenant moving in. Landlord will be responsible for payment of all
the Company services until the new tenant assumes service in their name.
PUBLIC UTILITY COMMISSION OF TEXAS
PRESIDENT AND CEO,
SOUTHWESTERN PUBLIC SERVICE COMPANY
l ��
Section No. V
XcelEnergyw Sheet
gi No. V-30
$0UTHWISTIRN rU1tIC SINVICF
Page 2of2
ELECTRIC TARIFF
RULES, REGULATIONS AND CONDITIONS OF SERVICE
29. RESIDENTIAL BILLING OF VACANT RENTAL PROPERTY
START/STOP SERVICE NOTIFICATION
Tenant has the right to start or stop service in rental unit(s) by notifying the
Company. Alternatively, the tenant may start or stop service in rental unit(s) by
completing a "residential tenant authorization form for tenant or landlord to start
service" and/or a "residential tenant authorization form for tenant or landlord to
stop service" which authorizes the landlord/property manager to start or stop rental
unit(s) service in tenant's name. Under the terms of this form, the tenant is the
user of the service in rental unit(s) and is responsible for payment of all the
Company services from the service start date through the service stop date, which
are selected and communicated by the tenant to the landlord/property manager.
As stated in the residential tenant authorization form for tenant or landlord to start
service and residential tenant authorization form for tenant or landlord to stop
service, if the tenant fails to notify the Company or the landlord/property manager
of the service stop date, they will be responsible for all the Company charges. If
the tenant completes either form, the landlord/property manager is to fax the form
to the Company within one business day. if discrepancies arise pertaining to when
the tenant actually left, either the landlord and/or tenant may be required to submit
an affidavit attesting to proof of user of service in rental unit(s). Other acceptable
documents such as signed and dated tenant move -out documentation may be
requested from the landlord and/or tenant.
RENTAL PROPERTY OWNERSHIP CHANGES
Changes to either the ATO option or. LOD option due to sale or transfer of
ownership of facilities must be communicated to the Company in writing within
three business days to avoid possible late payment charges or other billing issues.
The user of the energy is the person responsible for the payment of the energy bill.
Non -energy usage issues are between the tenant and the landlord/property
Manager.
PRESIDENT AND CEO,
SOUTHWESTERN PUBLIC SERVICE COMPANY
PUBLIC UTILITY COMMISSION OF TEXAS
El
Exhibit C — Depreciation Rates
SOAR Docket No. 473-06-2536, PUC Docket No. 32766
Unanimous Stipulation
GAWord\2005\056000417H9.doc Page 201
Southwestern Public Service Company
Exhibit C
Schedule of Stipulated Depreciation Rates
Page 1 of 7
Staff Proposed
FERC Account and Description Remaining
Average
Dispersion
Net
Annual
Life
Life
Curve
Salvage %
Rate %
Source
310 Land and Water Rights
Land Rights NM
20.37
N/A
N/A
0
1.499
Appendix A to Direct Testimony of Nara V. Srinivasa
Land Rights TX
28.55
N/A
N/A
0
1.872
Appendix A to Direct Testimony of Nara V. Srinivasa
Water Rights TX
28.84
N/A
N/A
0
2.528
Appendix A to Direct Testimony of Nara V. Srinivasa
311 Structures and Improvements
Celanese Unit 2
9.25
N/A
N/A
-5
3.353
Appendix A to Direct Testimony of Nara V. Srinivasa
Cunningham Unit 1
6.27
N/A
N/A
-5
0.000
Appendix A to Direct Testimony of Nara V. Srinivasa
Cunningham Unit 2
17.79
N/A
N/A
-5
1.492
Appendix A to Direct Testimony of Nara V. Srinivasa
Cunningham Common
18.74
N/A
N/A
-5
3.553
Appendix A to Direct Testimony of Nara V. Srinivasa
Harrington Unit 1
23.16
N/A
N/A
-5
1 A07
Appendix A to Direct Testimony of Nara V. Srinivasa
Harrington Unit 2
24.98
N/A
N/A
-5
1.658
Appendix A to Direct Testimony of Nara V. Srinivasa
Harrington Unit 3
26.53
N/A
N/A
-5
1.495
Appendix A to Direct Testimony of Nara V. Srinivasa
Harrington Common
27.45
N/A
N/A
-5
2.729
Appendix A to Direct Testimony of Nara V. Srinivasa
Jones Unit 1
18.26
N/A
N/A
-5
2.576
Appendix A to Direct Testimony of Nara V. Srinivasa
Jones Unit 2
18.16
N/A
N/A
-5
2.368
Appendix A to Direct Testimony of Nara V. Srinivasa
Jones Common
18.80
N/A
N/A
-5
4.056
Appendix A to Direct Testimony of Nara V. Srinivasa
Maddox
22.39
N/A
N/A
-5
1.390
Appendix A to Direct Testimony of Nara V. Srinivasa
Moore County
5.36
N/A
N/A
-5
11.850
Appendix A to Direct Testimony of Nara V. Srinivasa
Nichols Unit 1
6.30
N/A
NIA
-5
1.011
Appendix A to Direct Testimony of Nara V. Srinivasa
Nichols Unit 2
8.18
N/A
N/A
-5
1.603
Appendix A to Direct Testimony of Nara V. Srinivasa
Nichols Unit 3
21.90
N/A
N/A
-5
1.828
Appendix A to Direct Testimony of Nara V. Srinivasa
Nichols Common
23.22
N/A
N/A
-5
3.159
Appendix A to Direct Testimony of Nara V. Srinivasa
Plant X Unit 1
6.22
N/A
N/A
-5
0.000
Appendix A to Direct Testimony of Nara V. Srinivasa
Plant X Unit 2
6.23
N/A
N/A
-5
0.000
Appendix A to Direct Testimony of Nara V. Srinivasa
Plant X Unit 3
13.28
NIA
N/A
-5
0.813
Appendix A to Direct Testimony of Nara V. Srinivasa
Plant X Unit 4
19.21
N/A
N/A
-5
1.135
Appendix A to Direct Testimony of Nara V. Srinivasa
Plant X Common
17.79
N/A
N/A
-5
3.605
Appendix A to Direct Testimony of Nara V. Srinivasa
Tolk Unit 1
28.42
N/A
N/A
-5
1.681
Appendix A to Direct Testimony of Nara V. Srinivasa
Tolk Unit 2
30.88
N/A
N/A
-5
1.565
Appendix A to Direct Testimony of Nara V. Srinivasa
Tolk Common
32.15
N/A
N/A
-5
2.976
Appendix A to Direct Testimony of Nara V. Srinivasa
312 Boiler Plant Equipment
Cunningham Unit 1
6.30
N/A
N/A
-5
0.000
Appendix A to Direct Testimony of Nara V. Srinivasa
Cunningham Unit 2
17.89
N/A
N/A
-5
1.162
Appendix A to Direct Testimony of Nara V. Srinivasa
N
Cunningham Common
18.75
N/A
N/A
-5
3.098
Appendix A to Direct Testimony of Nara V. Srinivasa
0
N
Southwestern Public Service Company
Schedule of Stipulated Depreciation Rates
Exhibit C
Page 2 of 7
Staff Proposed
FERC Account and Description
Remaining
Average
Dispersion
Net
Annual
Life
Life
Curve
Salvage %
Rate %
Source
Harrington Unit 1
23.50
N/A
N/A
-5
1.931
Appendix A to Direct Testimony of Nara V. Srinivasa
Harrington Unit 2
23.55
NIA
NIA
-5
2.041
Appendix A to Direct Testimony of Nara V. Srinivasa
Harrington Unit 3
25.19
N/A
N/A
-5
1.808
Appendix A to Direct Testimony of Nara V. Srinivasa
Harrington Common
27.49
NIA
N/A
-5
3.024
Appendix A to Direct Testimony of Nara V. Srinivasa
Jones Unit 1
18.21
N/A
N/A
-5
2.071
Appendix A to Direct Testimony of Nara V. Srinivasa
Jones Unit 2
18.23
N/A
N/A
-5
1.957
Appendix A to Direct Testimony of Nara V. Srinivasa
Jones Common
18.74
N/A
N/A
-5
3.266
Appendix A to Direct Testimony of Nara V. Srinivasa
Maddox
22.49
N/A
N/A
-5
1 A21
Appendix A to Direct Testimony of Nara V. Srinivasa
Moore County
5.41
N/A
N/A
-5
8.936
Appendix A to Direct Testimony of Nara V. Srinivasa
Nichols Unit 1
6.39
N/A
N/A
-5
5.587
Appendix A to Direct Testimony of Nara V. Srinivasa
Nichols Unit 2
8.29
N/A
NIA
-5
5.939
Appendix A to Direct Testimony of Nara V. Srinivasa
Nichols Unit 3
22.45
N/A
N/A
-5
2.007
Appendix A to Direct Testimony of Nara V. Srinivasa
Nichols Common
23.26
NIA
N/A
-5
3.035
Appendix A to Direct Testimony of Nara V. Srinivasa
Plant X Unit 1
6.34
N/A
N/A
-5
4.840
Appendix A to Direct Testimony of Nara V. Srinivasa
Plant X Unit 2
6.37
N/A
N/A
-5
4.910
Appendix A to Direct Testimony of Nara V. Srinivasa
Plant X Unit 3
13.63
N/A
N/A
-5
3.216
Appendix A to Direct Testimony of Nara V. Srinivasa
Plant X Unit 4
19.98
N/A
N/A
-5
2.941
Appendix A to Direct Testimony of Nara V. Srinivasa
Plant X Common
20.56
N/A
N/A
-5
3.439
Appendix A to Direct Testimony of Nara V. Srinivasa
Tolk Unit 1
28.35
N/A
N/A
-5
1.360
Appendix A to Direct Testimony of Nara V. Srinivasa
Tolk Unit 2
31.00
N/A
N/A
-5
1.627
Appendix A to Direct Testimony of Nara V. Srinivasa
Tolk Common
31.31
N/A
N/A
-5
2.175
Appendix A to Direct Testimony of Nara V. Srinivasa
314 Turbogenerators
Celanese Unit 2
9.24
N/A
N/A
-5
2.683
Appendix A to Direct Testimony of Nara V. Srinivasa
Cunningham Unit 1
6.30
N/A
N/A
-5
0.000
Appendix A to Direct Testimony of Nara V. Srinivasa
Cunningham Unit 2
18.08
NIA
NIA
-5
2.092
Appendix A to Direct Testimony of Nara V. Srinivasa
Cunningham Common
18.56
N/A
N/A
-5
2.276
Appendix A to Direct Testimony of Nara V. Srinivasa
Harrington Unit 1
23.50
N/A
N/A
-5
1.988
Appendix A to Direct Testimony of Nara V. Srinivasa
Harrington Unit 2
25.15
N/A
N/A
-5
1.815
Appendix A to Direct Testimony of Nara V. Srinivasa
Harrington Unit 3
26.96
NIA
N/A
-5
1.961
Appendix A to Direct Testimony of Nara V. Srinivasa
Harrington Common
27.41
NlA
N/A
-5
2.472
Appendix A to Direct Testimony of Nara V. Srinivasa
Jones Unit 1
18.09
N/A
N/A
-5
1.487
Appendix A to Direct Testimony of Nara V. Srinivasa
Jones Unit 2
18.24
N/A
N/A
-5
1.771
Appendix A to Direct Testimony of Nara V. Srinivasa
Jones Common
18.74
N/A
N/A
-5
3.201
Appendix A to Direct Testimony of Nara V. Srinivasa
Maddox
22.32
N/A
N/A
-5
1.534
Appendix A to Direct Testimony of Nara V. Srinivasa
Moore County
5.35
NIA
N/A
-5
10.908
Appendix A to Direct Testimony of Nara V. Srinivasa
Southwestern Public Service Company
Schedule of Stipulated Depreciation Rates
Exhibit C
Page 3 of 7
Staff Proposed
FERC Account and Description
Remaining
Average
Dispersion
Net
Annual
Life
Life
Curve
Salvage %
Rate %
Source
Nichols Unit 1
5.36
N/A
N/A
-5
0.000
Appendix A to Direct Testimony of Nara V. Srinivasa
Nichols Unit 2
8.20
N/A
N/A
-5
0.940
Appendix A to Direct Testimony of Nara V. Srinivasa
Nichols Unit 3
22.38
N/A
N/A
-5
2.030
Appendix A to Direct Testimony of Nara V. Srinivasa
Nichols Common
23.14
N/A
N/A
-5
2.662
Appendix A to Direct Testimony of Nara V. Srinivasa
Plant X Unit 1
6.30
N/A
N/A
-5
0.000
Appendix A to Direct Testimony of Nara V. Srinivasa
Plant X Unit 2
6.32
N/A
N/A
-5
0.490
Appendix A to Direct Testimony of Nara V. Srinivasa .
Plant X Unit 3
13.51
N/A
N/A
-5
0.950
Appendix A to Direct Testimony of Nara V. Srinivasa
Plant X Unit 4
19.74
NIA
N/A
-5
1.957
Appendix A to Direct Testimony of Nara V. Srinivasa
Plant X Common
20.17
N/A
N/A
-5
1.922
Appendix A to Direct Testimony of Nara V. Srinivasa
Tolk Unit 1
28.42
N/A
N/A
-5
1.503
Appendix A to Direct Testimony of Nara V. Srinivasa
Tolk Unit 2
30.95
N/A
N/A
-5
1.593
Appendix A to Direct Testimony of Nara V. Srinivasa
Tolk Common
32.21
N/A
N/A
-5
2.868
Appendix A to Direct Testimony of Nara V. Srinivasa
315 Accessory Electric Equipment
Celanese Unit 2
9.25
N/A
N/A
-5
3.223
Appendix A to Direct Testimony of Nara V. Srinivasa
Cunningham Unit 1
6.26
N/A
N/A
-5
0.000
Appendix A to Direct Testimony of Nara V. Srinivasa
Cunningham Unit 2
17.72
N/A
N/A
-5
0.829
Appendix A to Direct Testimony of Nara V. Srinivasa
Cunningham Common
18.55
N/A
N/A
=5
2.316
Appendix A to Direct Testimony of Nara V. Srinivasa
Harrington Unit 1
23.36
N/A
N/A
-5
1.797
Appendix A to Direct Testimony of Nara V. Srinivasa
Harrington Unit 2
25.08
N/A
N/A
-5
1.823
Appendix A to Direct Testimony of Nara V. Srinivasa
Harrington Unit 3
26.62
N/A
N/A
-5
1.528
Appendix A to Direct Testimony of Nara V. Srinivasa
Harrington Common
27.59
N/A
N/A
-5
2.930
Appendix A to Direct Testimony of Nara V. Srinivasa
Jones Unit 1
18.17
N/A
N/A
-5
1.726
Appendix A to Direct Testimony of Nara V. Srinivasa
Jones Unit 2
18.12
N/A
N/A
-5
1.160
Appendix A to Direct Testimony of Nara V. Srinivasa
Jones Common
18.77
N/A
N/A
-5
3.902
Appendix A to Direct Testimony of Nara V. Srinivasa
Maddox
22.54
N/A
N/A
-5
1.518
Appendix A to Direct Testimony of Nara V. Srinivasa
Moore County
5.31
N/A
N/A
-5
8.314
Appendix A to Direct Testimony of Nara V. Srinivasa
Nichols Unit 1
6.33
N/A
N/A
-5
0.000
Appendix A to Direct Testimony of Nara V. Srinivasa
Nichols Unit 2
8.18
N/A
N/A
-5
0.000
Appendix A to Direct Testimony of Nara V. Srinivasa
Nichols Unit 3
21.77
N/A
N/A
-5
1.009
Appendix A to Direct Testimony of Nara V. Srinivasa
Nichols Common
22.73
N/A
N/A
-5
1.848
Appendix A to Direct Testimony of Nara V. Srinivasa
Plant X Unit 1
6.23
N/A
N/A
-5
0.000
Appendix A to Direct Testimony of Nara V. Srinivasa
Plant X Unit 2
6.23
N/A
N/A
-5
0.000
Appendix A to Direct Testimony of Nara V. Srinivasa
Plant X Unit 3
13.63
N/A
N/A
-5
0.577
Appendix A to Direct Testimony of Nara V. Srinivasa
Plant X Unit 4
19.72
N/A
N/A
-5
0.669
Appendix A to Direct Testimony of Nara V. Srinivasa
Plant X Common
20.75
N/A
N/A
-5
4.274
Appendix A to Direct Testimony of Nara V. Srinivasa
J
Exhibit C
Southwestern Public Service Company
Page 4 of 7
Schedule of Stipulated Depreciation Rates
Staff Proposed
FERC Account and Description Remaining
Average
Dispersion
Net
Annual
Life
Life
Curve
Salvage %
Rate %
Source
Tolk Unit 1
28.34
N/A
N/A
-5
1.426
Appendix A to Direct Testimony of Nara V. Srinivasa
Tolk Unit 2
30.86
N/A
N/A
-5
1.532
Appendix A to Direct Testimony of Nara V. Srinivasa
316 Miscellaneous Power Plant Equipment
Celanese Unit 2
9.28
N/A
N/A
-5
5.563
Appendix A to Direct Testimony of Nara V. Srinivasa
Cunningham Unit 2
18.87
NIA
N/A
-5
4.284
Appendix A to Direct Testimony of Nara V. Srinivasa
Cunningham Common
18.51
N/A
N/A
-5
2.019
Appendix A to Direct Testimony of Nara V. Srinivasa
Harrington Unit 1
23.51
NIA
N/A
-5
2.560
Appendix A to Direct Testimony of Nara V. Srinivasa
Harrington Unit 2
24.87
N/A
N/A
-5
1.148
Appendix A to Direct Testimony of Nara V. Srinivasa
Harrington Unit 3
26.61
N/A
N/A
-5
1.771
Appendix A to Direct Testimony of Nara V. Srinivasa
Harrington Common
27.39
N/A
N/A
-5
2.543
Appendix A to Direct Testimony of Nara V. Srinivasa
Jones Unit 1
17.91
N/A
N/A
-5
0.957
Appendix A•to Direct Testimony of Nara V. Srinivasa
Jones Unit 2
18.11
N/A
N/A
-5
1.026
Appendix A to Direct Testimony of Nara V. Srinivasa
Jones Common
18.67
N/A
N/A
-5
2.645
Appendix A to Direct Testimony of Nara V. Srinivasa
Maddox
23.09
NIA
NIA
-5
2.569
Appendix A to Direct Testimony of Nara V. Srinivasa
Moore County
5.44
N/A
N/A
-5
13.059
Appendix A to Direct Testimony of Nara V. Srinivasa
Nichols Unit 1
6.33
NIA
NIA
-5
0.000
Appendix A to Direct Testimony of Nara V. Srinivasa
Nichols Unit 2
8.14
N/A
N/A
-5
0.000
Appendix A to Direct Testimony of Nara V. Srinivasa
Nichols Unit 3
22.37
NIA
NIA
-5
1.907
Appendix A to Direct Testimony of Nara V. Srinivasa
Nichols Common
23.16
N/A
N/A
-5
2.847
Appendix A to Direct Testimony of Nara V. Srinivasa
Plant X Unit 2
6.43
N/A
N/A
-5
6.046
Appendix A to Direct Testimony of Nara V. Srinivasa
Plant X Unit 3
14.12
N/A
N/A
-5
4.222
Appendix A to Direct Testimony of Nara V. Srinivasa
Plant X Unit 4
20.69
NIA
N/A
-5
4.008
Appendix A to Direct Testimony of Nara V. Srinivasa
Plant X Common
20.08
N/A
N/A
-5
2.579
Appendix A to Direct Testimony of Nara V. Srinivasa
Tolk Unit 1
28.49
N/A
N/A
-5
1.657
Appendix A to Direct Testimony of Nara V. Srinivasa
Tolk Unit 2
30.89
NIA
N/A
-5
1.448
Appendix A to Direct Testimony of Nara V. Srinivasa
Tolk Common
31.21
N/A
N/A
-5
2.071
Appendix A to Direct Testimony of Nara V. Srinivasa
340 Land and Water Rights
Land Rights TX - Riverview 6.00 NIA N/A 0 14.133 Appendix A to Direct Testimony of Nara V. Srinivasa
341 Structures and Improvements
Carlsbad
20.00
N/A
N/A
0
1.181
Appendix A to Direct Testimony of Nara V. Srinivasa
Cunningham
35.00
NIA
N/A
0
2.365
Appendix A to Direct Testimony of Nara V. Srinivasa
Maddox
15.00
N/A
N/A
0
4.460
Appendix A to Direct Testimony of Nara V. Srinivasa
Riverview
6.00
N/A
N/A
0
12.518
Appendix A to Direct Testimony of Nara V. Srinivasa
',J
Southwestern Public Service Company
Exhibit C
Schedule of Stipulated Depreciation Rates
Page 5 of 7
Staff Proposed
FERC Account and Description Remaining
Average
Dispersion
Net
Annual
Life
Life
Curve
Salvage %
Rate %
Source
Tucumcari 4.00
N/A
N/A
0
0.000
Appendix A to Direct Testimony of Nara V. Srinivasa
342 Fuel Holders and Accessory Equipment
Cunningham 35.00
N/A
N/A
0
2.192
Appendix A to Direct Testimony of Nara V. Srinivasa
Maddox 15.00
N/A
N/A
0
0.951
Appendix A to Direct Testimony of Nara V. Srinivasa
Riverview 6.00
N/A
N/A
0
12.400
Appendix A to Direct Testimony of Nara V. Srinivasa
Tucumcari 4.00
N/A
N/A
0
0.000
Appendix A to Direct Testimony of Nara V. Srinivasa
343 Prime Movers
Carlsbad
20.00
N/A
N/A
0
2.578
Appendix A to Direct Testimony of Nara V. Srinivasa
Cunningham
35.00
N/A
N/A
0
2.211
Appendix A to Direct Testimony of Nara V. Srinivasa
Riverview
6.00
N/A
N/A
0
11.920
Appendix A to Direct Testimony of Nara V. Srinivasa
Tucumcari
4.00
N/A
N/A
0
0.000
Appendix A to Direct Testimony of Nara V. Srinivasa
344 Generators
Carlsbad
20.00
N/A
N/A
0
0.000
Appendices A & C to Direct Testimony of Nara V. Srinivasa
Celanese Unit 1
10.00
N/A
N/A
0
0.821
Appendix A to Direct Testimony of Nara V. Srinivasa
Cunningham
35.00
N/A
N/A
0
2.375
Appendix A to Direct Testimony of Nara V. Srinivasa
Maddox
15.00
N/A
N/A
0
0.284
Appendix A to Direct Testimony of Nara V. Srinivasa
Riverview
6.00
N/A
N/A
0
12.387
Appendix A to Direct Testimony of Nara V. Srinivasa
Tucumcari
4.00
N/A
N/A
0
0.000
Appendix A to Direct Testimony of Nara V. Srinivasa
345 Accessory Electric Equipment
Carlsbad
20.00
N/A
N/A
0
0.596
Appendix A to Direct Testimony of Nara V. Srinivasa
Celanese Unit 1
10.00
N/A
N/A
0
0.958
Appendix A to Direct Testimony of Nara V. Srinivasa
Cunningham
35.00
N/A
N/A
0
2.259
Appendix A to Direct Testimony of Nara V. Srinivasa
Maddox
15.00
N/A
N/A
0
1.574
Appendix A to Direct Testimony of Nara V. Srinivasa
Riverview
6.00
N/A
N/A
0
12.404
Appendix A to Direct Testimony of Nara V. Srinivasa
Tucumcari
4.00
N/A
N/A
0
0.000
Appendices A & C to Direct Testimony of Nara V. Srinivasa
346 Miscellaneous Power Plant Equipment
Carlsbad
20.00
N/A
N/A
0
1.765
Appendix A to Direct Testimony of Nara V. Srinivasa
Cunningham
35.00
N/A
N/A
0
2.418
Appendix A to Direct Testimony of Nara V. Srinivasa
Maddox
15.00
N/A
N/A
0
5.436
Appendix A to Direct Testimony of Nara V. Srinivasa
Riverview
6.00
N/A
N/A
0
14.078
Appendix A to Direct Testimony of Nara V. Srinivasa
Tucumcari
4.00
N/A
N/A
0
0.000
Appendices A & C to Direct Testimony of Nara V. Srinivasa
J
Southwestern Public Service Company Exhibit C
Schedule of Stipulated Depreciation Rates Page 6 of 7
Staff Proposed
FERC Account and Description Remaining Average Dispersion Net Annual
Life Life Curve Salvage % Rate % Source
350-358Transmission
3502 Land Rights
57.12
70
R4
0
1.260
Appendix A&B to Direct Testimony of Nara V. Srinivasa
352
Structures and Improvements
39.71
55
R4
-20
2.210
Appendix A&B to Direct Testimony of Nara V. Srinivasa
353
Station Equipment
38.80
55
R4
5
1.610
Appendix A&B to Direct Testimony of Nara V. Srinivasa
354
Towers and Fixtures
62.38
75
R3
0
1.320
Appendix A&B to Direct Testimony of Nara V. Srinivasa
355
Poles and Fixtures
29.64
40
R5
-20
2.990
Appendix A&B to Direct Testimony of Nara V. Srinivasa
356
Overhead Conductors and Devices
32.27
42
R2.5
-4
2.350
Appendix A&B to Direct Testimony of Nara V. Srinivasa
357
Underground Conduit
40.90
75
R3
0
0.970
Appendix A&B to Direct Testimony of Nara V. Srinivasa
358
Underground Conductor and Devices
18.61
45
R3
0
1.320
Appendix A&B to Direct Testimony of Nara V. Srinivasa
360-373 Distribution
3602
Land Rights
42.91
60
R4
0
1.420
Appendix A&B to Direct Testimony of Nara V. Srinivasa
361
Structures and Improvements
39.59
52
R2
-4
2.050
Appendix A&B to Direct Testimony of Nara V. Srinivasa
362
Station Equipment
37.72
52
R2
-4
1.970
Appendix A&B to Direct Testimony of Nara V. Srinivasa
364
Poles, Towers, and Fixtures
26.95
40
S 1
-20
3.110
Appendix A&B to Direct Testimony of Nara V. Srinivasa
365
Overhead Conductors and Devices
28.17
40
S1
-15
3.010
Appendix A&B to Direct Testimony of Nara V. Srinivasa
366
Underground Conduit
27.34
40
R4
5
2.580
Appendix A&B to Direct Testimony of Nara V. Srinivasa
367
Underground Conductor and Devices
30.79
41
R2.5
0
2.460
Appendix A&B to Direct Testimony of Nara V. Srinivasa
368
Line Transformers
31.10
45
R1.5
0
1.970
Appendix A&B to Direct Testimony of Nara V. Srinivasa
369
Services
30.22
42
R2
-40
3.190
Appendix A&B to Direct Testimony of Nara V. Srinivasa
370
Meters
22.86
38
R5
0
2.670
Appendix A&B to Direct Testimony of Nara V. Srinivasa
371
Installation on Customer Premises
8.85
18
R2
-14
5.050
Appendix A&B to Direct Testimony of Nara V. Srinivasa
373
Street Lighting and Signal Systems
22.79
38
R3
5
2.590
Appendix A&B to Direct Testimony of Nara V. Srinivasa
389-398 General
389
Land and Land Rights
38.55
50
R4
0
1.470
Appendix A&B to Direct Testimony of Nara V. Srinivasa
390
Structures and Improvements
30.93
45
R2
2
1.480
Appendix A&B to Direct Testimony of Nara V. Srinivasa
391
Office Furniture and Equipment
15.86
25
1-1.5
2
3.800
Appendix A&B to Direct Testimony of Nara V. Srinivasa
391
Computer Equipment
1.32
5
R2
N/A
20.000
Appendices A,B & C to Direct Testimony of Nara V. Srinivasa
392
Transportation Equipment
5.64
11
L3
20
9.450
Appendix A&B to Direct Testimony of Nara V. Srinivasa
393
Stores Equipment
27.49
45
R2.5
0
2.090
Appendix A&B to Direct Testimony of Nara V. Srinivasa
394
Tool, Shop, and Garage Equipment
27.62
35
S0.5
0
2.720
Appendix A&B to Direct Testimony of Nara V. Srinivasa
395
Laboratory Equipment
16.33
25
R1
0
4.600
Appendix A&B to Direct Testimony of Nara V. Srinivasa
396
Power Operated Equipment
9.80
18
L2
15
7.350
Appendix A&B to Direct Testimony of Nara V. Srinivasa
397
Communication Equipment
13.12
23
R4
0
5.100
Appendix A&B to Direct Testimony of Nara V. Srinivasa
Southwestern Public Service Company
Exhibit C
Schedule of Stipulated Depreciation Rates
Page 7 of 7
Staff Proposed
PERC Account and Description Remaining
Average
Dispersion
Net
Annual
Life
Life
Curve
Salvage %
Rate %
Source
398 Miscellaneous Equipment 20.00
24
L0.5
0
4.140
Appendix A&B to Direct Testimony of Nara V. Srinivasa
303 Intangible
Software - 3 Year N/A
3
N/A
N/A
33.333
Appendix C to Direct Testimony of Nara V. Srinivasa
Software - 5 Year N/A
5
N/A
N/A
20.000
Appendix C to Direct Testimony of Nara V. Srinivasa
Software - 10 Year N/A
10
N/A
N/A
10.000
Appendix C to Direct Testimony of Nara V. Srinivasa
Exhibit D — Service Quality Commitments
SOAR Docket No. 473-06-2536; PUC Docket No. 32766
Unanimous Stipulation
G:\Word\2005\0560004\7H9.doc Page 209
Exhibit D
PUCT Docket No. 32766
Quality of Service Commitments
Field Service Performance
Request for Service - SPS shall initiate service to each Qualified Applicant for service within
its certificated area in accordance with the Commission's regulations (SUBST. R. 25.22) and
the SPS's Rule Tariff No. 4. To be considered a "Qualified Applicant," the customer must
satisfy SPS's credit requirements, have met and satisfied all local, state, or company required
standards and inspections for the service, and be ready to take service. Applications for
service not requiring a line extension should be completed within seven working days.
Residential service requiring a line extension should be completed in 90 days after the
customer is considered a Qualified Applicant i.e., the customer must satisfy SPS's credit
requirements, have met and satisfied all local, state, or company required standards and
inspections for the service, and be ready to take service). If completion is delayed beyond 90
days after the customer is considered a Qualified Applicant, a report shall be made to the
Cominission listing the name, location, and cause for the delay. SPS will also conduct
regional Builder / Developer conferences to improve relationships, communicate processes
and solicit suggestions for improvements.
Street Light Outage Repair — SPS shall institute the Street Light Outage Repair requirements
contained on the Municipal and State Street Lighting Service rate schedule, Sheet No. IV-91.
Expanded Field Personnel, Engineering, and Community Service Staffing — SPS shall
increase its Utilities Group personnel in the SPS Texas and New Mexico service area by 20
employees by the end of 2007 and 45 additional employees (65 total) by the end of 2008,
including: (a) apprentice or journeyman linemen and metermen; (b) designers, engineers,
account managers and area engineers; (c) substation electricians and relay technicians; and
(d) local supervisors and Community Service Representatives.
Increased Utilities Group Spending — SPS shall increase its capital and operations &
maintenance spending in the SPS Texas and New Mexico service area by $5 million in 2007
and by $5 million in 2008, relative to current budgets for these two years.
Annual Customer Service Reporting
In addition to the Service Quality Report submitted to the Commission each year pursuant to
SUBST. R. 25.82, SPS shall report annually to the Commission, SPS's customer service
statistics for the prior year. SPS shall report by February 14 of each year on the prior
calendar year: (a) number of customer complaints received for Texas retail operations; (b)
call center performance; (c) Texas retail field personnel request for service performance; (d)
billing error rates; (e) meter reading performance; and (f) SPS employment levels for field
personnel.
a/o
Exhibit E — Fuel Factor Formulae
SOAADocket No. 473-06-2536, PUCDocket No. 32766
Unanimous Stipulation
GAWord\2005\0560004\7H9.doc Page 211
Semi -Annual Adiustment Formula
May through October Fuel Cost Factor expressed in $ per MWh
= 27.121 + (3.750 (G — 5.265))
Where:
27.121 = Average Texas Retail fuel cost factor in dollars per MWh covering May through
October, calculated using the formula approved in Docket No. 27751;
3.750 = Based on PROSYM analysis, SPS estimates that for every one dollar ($1.00) per
MMBtu change in the price of natural gas would result in a change in reconcilable
fuel expense equal to $3.750 per MWh:
G = The average of the NYMEX forward pricing curve for the last 20 trading days of the
prompt month prior to the month in which the fuel factor adjustment will be filed in
the future. The NYMEX forward pricing curve will cover the six-month period
beginning with the month the semi-annual adjustment is to take effect;
5.265 = This factor was calculated based on the average of the NYMEX forward pricing
curve for the last 20 prompt month trading days of March 2003. The NYMEX
forward pricing curve covered a six-month period beginning in May and ending in
October. This time period was used in the development of the $27.121 per MWh
fiiel cost factor.
ONCE THE VOLTAGE LEVEL $/KWH FUEL FACTORS HAVE BEEN
CALCULATED THEY WILL BE ADJUSTED BY SUBTRACTING THE
APPROPRIATE VOLTAGE LEVEL BRIF DEFINED BELOW.
BRIF = Base Rate Items Factor. Factor to adjust for fuel items moved to base (i.e. certain
TUCO coal costs and PNM Inter. Demand fees) as a result of Docket No. 32766.
BRIF
Voltage Level
TUCOIPNM Intrp
Demand Fee Adj.
Seconds Fuel Factor No. 3
$
0.001207
Prima Fuel Factor No. 5
$
0.001190
Sub -Transmission Fuel Factor No. 7
$
0.001139
Backbone Transmission Fuel Factor No. 9
$
0.001133
A IA
Semi -Annual Adiustment Formula
November through April Fuel Cost Factor expressed in $ per MWh
= 23.097 + (2.880 (G — 5.375))
Where:
23.097 = Average Texas Retail fuel cost factor in dollars per MWh covering November
through April, calculated using the formula approved in Docket No. 27751;
2.880 = Based on PROSYM analysis, SPS estimates that for every one dollar ($1.00) per
MMBtu change in the price of natural gas would result in a change in reconcilable
fuel expense equal to $2.880 per MWh:
G = The average of the NYMEX forward pricing curve for the last 20 trading days of the
prompt month prior to the month in which the fuel factor adjustment will be filed in
the future. The NYMEX forward pricing curve will cover the six-month period
beginning with the month the semi-annual adjustment is to take effect;
5.375 = This factor was calculated based on the average of the NYMEX forward pricing
curve for the last 20 prompt month trading days of March 2003. The NYMEX
forward pricing curve covered a six-month period beginning in November and
ending in April. This time period was used in the development of the $23,097 per
MWh fuel cost factor.
ONCE THE VOLTAGE LEVEL $/KWH FUEL FACTORS HAVE BEEN
CALCULATED THEY WILL BE ADJUSTED BY SUBTRACTING THE
APPROPRIATE VOLTAGE LEVEL BRIF DEFINED BELOW.
BRIF = Base Rate Items Factor. Factor to adjust for fuel items moved to base (i.e. certain
TUCO coal costs and PNM Inter. Demand fees) as a result of Docket No. 32766.
BRIF
Voltage Level
TUCO/PNM Intrp
Demand Fee Ad'.
Seconds Fuel Factor No. 3
$
0.001207
Prima Fuel Factor No. 5
$
0.001190
Sub -Transmission Fuel Factor No. 7
$
0.001139
Backbone Transmission Fuel Factor No. 9
$
0.001133
.213
Certificate of Service
I certify that on the 27 h day of March 2007, a true and correct copy of the foregoing
instrument was served on all parties of record by hand delivery, Federal Express, certified mail,
or facsimile transmission.
SOAR Docket No. 473-06-2536; PUC Docket No. 32766
Unanimous Stipulation
GAWord\2005\0560004\7H9.doc Page 214
Resolution No. 2008-R0158
April 24, 2008
Itan No. 5.21
RESOLUTION
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK:
THAT the City Council of the City of Lubbock hereby authorizes and directs the
Mayor of the City of Lubbock to execute a unit price construction Contract by and
between the City of Lubbock and Utility Contractors of America, Ltd., of Wolfforth,
Texas, for pavement repair and compaction at 98`h Street and Quaker Avenue per RFP
#08-707-DD, which Contract and any associated documents, are attached hereto and
made a part of this Resolution for all intents and purposes.
Passed by the City Council this 24th day of
oe
DAVID A. MILLER, MAYOR
ATTEST:
Reber a Garza, City Secretary
APPROVED AS ONTE T:
Thomas L. Adams
Deputy City Manager/Water Utilities Director
APPROVED AS TO-YORM:
Vandi
DDres/UCA-98&QuakerPavingRepair08ConRes
April 9, 2008
11:
No Text
CITY OF LUBBOCK
SPECIFICATIONS FOR
PAVEMENT REPAIR AND COMPACTION
AT
98TH STREET & QUAKER AVENUE
RFP #08-707-DD
Contract # 8381
Plans & Specifications may be obtained from
THE REPRODUCTION COMPANY
httom://pr.thereproductioncompan.
Phone: (806) 763-7770
"A City of Planned Progress "
CITY OF LUBBOCK
Lubbock, Texas
RFP# 08-707-DD. Addendum # 1
City of Lubbock
PUBLIC WORKS CONTRACTING OFFICE
SUITE 204, MUNICIPAL BUILDING
1625 13T" STREET
LUBBOCK, TEXAS 79401
PH:(806)775-2168 FAX:(806)775-2164
http://purchasing.ci.lubbock.tx.us
DATE ISSUED:
CLOSE DATE:
ADDENDUM # I
RFP # 08-707-DD
PAVEMENT REPAIR AND COMPACTION
AT
98T" STREET AND QUAKER AVENUE
March 25, 2008
April 3, 2009 @ 1:00 P.M.
The following items take precedence over specifications for the above named Request for Proposals
(RFP). Where any item called for in the RFP documents is supplemented here, the original requirements,
not affected by this addendum, shall remain in effect.
Offeror's attention is invited to the following clarifications provided by the Engineer:
Additional information showing approximate locations of buried water meter lines and
buried irrigation sprinker lines and heads. The drawing also shows a designated
staging area a few feet east of the project area where United Super Market prefers
staging of equipment and materials. Drawing can be obtained from The
Reproduction Company, 2102 Avenue Q, Lubbock, Texas 79405, or on-line at
http://pr.thereproductioncompany.com/. You can reach them by phone at 806-763-
7770
All requests for additional information or clarification must be submitted in writing and directed to:
Darlene Doss, Buyer, City of Lubbock, P.O. Box 2000, Lubbock, Texas 79457
Questions may be faxed to (806)775-2164 or Email to , do> :: r zt
THANK YOU,
CITY OF LUBBOCK
t3J'4
Darlene Doss
Buyer
It is the intent and purpose of the City of Lubbock that this request permits competitive bids. It shall be
the otferor's responsibility to advise the Citv of Lubbock Buyer if anv laneuaee, reouirements. etc.. or
any combinations thereof, inadvertently restricts or limits the requirements stated in this RFP to a single
source. Such notification must be submitted in writing and must be received by the Buyer no later than
five (5) business days prior to the bid close date. A review of such notifications will be made.
RFP# 08-707-DDad I
RFP# 08-707-DD, Addendum # 2
City of Lubbock
PUBLIC WORKS CONTRACTING OFFICE
SUITE 204, MUNICIPAL BUILDING
1625 13T" STREET
LUBBOCK, TEXAS 79401
PH:(806)775-2168 FAX:(806)775-2164
http:,I/purchasing.ci.lubbock.tx.us
DATE ISSUED:
OLD CLOSE DATE:
NEW CLOSE DATE:
ADDENDUM #2
RFP # 08-707-DD
PAVEMENT REPAIR AND COMPACTION
AT
9eH STREET AND QUAKER AVENUE
March 25, 2008
April 3, 2009 @ 1:00 P.M.
April 3, 2008 n 1:00 PM
The following items take precedence over specifications for the above named Request for Proposals
(RFP). Where any item called for in the RFP documents is supplemented here, the original requirements,
not affected by this addendum, shall remain in effect.
1. This addendum is published only to correct a typing error on Addendum # I. The due date remains,
from initial publication, as April 3, 2008 at 1:00 P.M., CST.
All requests for additional information or clarification must be submitted in writing and directed to:
Darlene Doss, Buyer, City of Lubbock, P.O. Box 2000, Lubbock, Texas 79457
Questions may be faxed to (806)775-2164 or Email to Ir io ;;;, r ul k of'K, t".
rx"
THANK YOU,
CITY OF LUBBOCK
A Darlene Doss
Buyer
It is the intent and purpose of the City of Lubbock that this request permits competitive proposals. It shall
be the offeror's responsibility to advise the Citv of Lubbock Buver if anv language, requirements, etc., or
any combinations thereof, inadvertently restricts or limits the requirements stated in this RFP to a single
source. Such notification must be submitted in writing and must be received by the Buyer no later than
five (5) business days prior to the proposal close date. A review of such notifications will be made.
RFP# 08-707-DDad2
CITY OF LUBBOCK
SPECIFICATIONS FOR
PAVEMENT REPAIR AND COMPACTION
AT
98'" STREET & QUAKER AVENUE
RFP #08-707-DD
Contract # 8381
Plans & Specifications may be obtained from
THE REPRODUCTION COMPANY
http://pr.thereproductioncoi-npany.com/
Phone: (806) 763-7770
"A City of Planned Progress "
CITY OF LUBBOCK
Lubbock, Texas
Page Intentionally Left Blank
CITY OF LUBBOCK
REQUEST FOR PROPOSALS
FOR
TITLE:
PAVEMENT REPAIR AND COMPACTION AT 98"' STREET & QUAKER AVENUE
ADDRESS: LUBBOCK, TEXAS
RFP NUMBER: 08-707-DD
PROJECT NUMBER: 91081.9242.30000
CONTRACT PREPARED BY: PUBLIC WORKS CONTRACTING OFFICE
Paue Intentionally Left Blank
i
City of Lubbock, TX
,r Public Works Contracting Office
Contractor Checklist for
RFP # 08-707-DD
Before sub 'tting your proposal, please ensure you have completed and included the following:
1. Carefully read and understand the plans and specifications and properly complete the
PROPOSAL SUBMITTAL form. Proposal Submittal form MUST be completed in blue or
black ink or by typewriter. Signatures must be original, in blue or black ink, and by hand.
Amounts shall be written in both words and numerals and in the event of a discrepancy the
amounts written in words shall govern. Include corporate seal and Secretary's signature. Identify
addenda received (if any). Include firm's FEDERAL TAX ID number or Owner's SOCIAL
SECURITY number. Carefully read the BASIS OF PROPOSALS and SELECTION CRITERIA
in paragraph 32 of the General Instructions to Offeror's. Ensure ALL criteria are addressed in
/ your submittal.
2. / Include PROPOSAL BOND or CASHIER'S OR CERTIFIED CHECK as your proposal surety.
Failure to provide a proposal surety WILL result in automatic rejection of yourproposal.
3. i Clearly mark the proposal number, title, due date and time and your company name and address
on the outside of the envelope or container.
4. Ensure your proposal is RECEIVED by the City of Lubbock Public Works Contracting Office
prior to the deadline. Late proposals will not be accepted.
5. Complete and submit the "Contractor's Statement of Qualifications".
6. Complete and sign the CITY OF LUBBOCK INSURANCE REQUIREMENT AFFIDAVIT.
This must include the signature of the agent or broker. Contractor's signature must be original.
7. Complete and sign the SAFETY RECORD QUESTIONNAIRE. All "YES" responses must be
explained in detail and submitted with the questionnaire.
8. Complete and sign the SUSPENSION AND DEBARMENT CERTIFICATION. Include firm's
FEDERAL TAX ID number or Owner's SOCIAL SECURITY number.
9. f- Complete and submit the List of Sub -Contractors.
FAILURE TO PROVIDE ANY OF THE ABOVE MAY RESULT IN YOUR PROPOSAL BEING
DEEMED NON -RESPONSIVE AND, THEREFORE, NOT FURTHER EVALUATED. PLEASE
INCLUDE THIS COMPLETED PAGE AS THE FIRST PAGE OF YOUR PROPOSAL SUBMITTAL.
(Type or Print Company Name)
INDEX
1. NOTICE TO OFFERORS
2. GENERAL INSTRUCTIONS TO OFFERORS
3. TEXAS LOCAL GOVERNMENT CODE § 271.116
4. PROPOSAL SUBMITTAL — (must be submitted by published due date & time)
4-1. UNIT PRICE PROPOSAL SUBMITTAL FORM
4-2. PROPOSAL BOND WITH POWER OF ATTORNEY OR CERTIFIED/CASHIER'S CHECK
4-3. CONTRACTOR'S STATEMENT OF QUALIFICATIONS
4-4. CITY OF LUBBOCK INSURANCE REQUIREMENT AFFIDAVIT
4-5. SAFETY RECORD QUESTIONNAIRE
4-6. SUSPENSION AND DEBARMENT CERTIFICATION
4-7. LIST OF SUBCONTRACTORS
5. PAYMENT BOND
6. PERFORMANCE BOND
7. CERTIFICATE OF INSURANCE
8. CONTRACT
9. GENERAL CONDITIONS OF THE AGREEMENT
10. CURRENT WAGE DETERMINATIONS
11. SPECIFICATIONS
Page Intentionally Left Blank
NOTICE TO OFFERORS
Page Intentionally Left Blank
NOTICE TO OFFERORS
RFP #08-707-DD
Sealed proposals addressed to Darlene Doss, Buyer, City of Lubbock, Texas, will be received in the
office of the Public Works Contracting Office, Municipal Building, 1625 13th Street, Room 204, Lubbock,
Texas, 79401, until 1:00 P.M. on April 3, 2008, or as changed by the issuance of formal addenda to all
planholders, to furnish all labor and materials and perform all work for the construction of the following
described project:
"PAVEMENT REPAIR AND COMPACTION AT 98TH STREET & QUAKER AVENUE"
After the expiration of the time and date above first written, said sealed proposals will be opened in the
office of the Public Works Contracting Office and publicly read aloud. It is the sole responsibility of the offeror
to ensure that his proposal is actually in the Public Works Contracting Office for the City of Lubbock, before
the expiration of the date above first written.
Proposals are due at 1:00 P.M. on April 3, 2008 and the City of Lubbock City Council will consider the
proposals on April 24, 2008 at the Municipal Building, 1625 13th Street, Lubbock, Texas, or as soon thereafter
as may be reasonably convenient, subject to the right to reject any or all proposals and waive any formalities.
The successful offeror will be required to furnish a performance bond in accordance with Chapter 2253,
Government Code, in the amount of 100% of the total contract price in the event that said contract price exceeds
$100,000 and the successful offeror will be required to furnish a payment bond in accordance with Chapter
2253, Government Code, in the amount of 100% of the total contract price in the event that said contract price
exceeds $25,000. Said statutory bonds should be issued by a company carrying a current Best Rating of "A"
or better.
Offerors are required, whether or not a payment or performance bond is required, to submit a cashier's or
certified check issued by a bank satisfactory to the City of Lubbock, or a proposal bond from a reliable surety
company, payable without recourse to the order of the City of Lubbock in an amount not less than 5% of the
total amount of the proposal submitted as a guarantee that offeror will enter into a contract and execute all
necessary bonds (if required) within ten (10) business days after notice of award of the contract to him.
FAILURE OF THE OFFEROR TO INCLUDE PROPOSAL SECURITY WITH THE PROPOSAL
SUBMITTAL SHALL CONSTITUTE A NONRESPONSIVE PROPOSAL AND RESULT IN
DISQUALIFICATION OF THE PROPOSAL SUBMITTAL.
It shall be each offeror's sole responsibility to inspect the site of the work and to inform himself
regarding all local conditions under which the work is to be done. It shall be understood and agreed that all such
- factors have been thoroughly investigated and considered in the preparation of the proposal submitted. There
will be a non -mandatory pre -proposal conference on March 25, 2008 at 9:00 A.M., in the Municipal
Building, Room TCLO1, 1625 13th Street, Lubbock, Texas Offerors may view the plans and specifications
without charge at The Reproduction Company, 2102 Avenue Q, Lubbock, Texas 79405 or at
http://'pr.theret)roductioncompanY com/ . ONE SET OF PLANS AND SPECIFICATIONS MAY BE
OBTAINED, AT THE CITY'S EXPENSE, FROM THE REPRODUCTION COMPANY WITH A $100
REFUNDABLE DEPOSIT, Phone: (806) 763-7770. Deposit Checks shall be made payable to The City of
Lubbock, and will be refunded if documents are returned in good condition within Sixty (60) days of the
opening of Proposals. Additional sets of plans and specifications may be obtained at the offeror's expense.
Attention of each offeror is particularly called to the schedule of general prevailing rate of per diem
wages included in the contract documents on file in the office of the Public Works Contracting Office of the
City of Lubbock, which document is specifically referred to in this notice to offerors. Each offerors attention is
further directed to provision of Article 5159a, Vernon's Ann. Civil St., and the requirements contained therein
concerning the above wage scale and payment by the contractor of the prevailing rates of wages as heretofore
established by owner in said wage scale.
The City of Lubbock hereby notifies all offerors that in regard to any contract entered into pursuant to
this advertisement, minority and women business enterprises will be afforded equal opportunities to submit
proposals in response to this invitation and will not be discriminated against on the grounds of race, color, sex,
disability, or national origin in consideration for an award.
The City of Lubbock does not discriminate against persons with disabilities. City of Lubbock pre -
proposal meetings and proposal openings are available to all persons regardless of disability. If you require
special assistance, please contact the Public Works Contracting Office at (806) 775-2168 or write to Post Office
Box 2000, Lubbock, Texas 79457 at least 48 hours in advance of the meeting.
CITY OF LUBBOCK
DARLENE DOSS
BUYER
2
GENERAL INSTRUCTIONS TO OFFERORS
3
No Text
GENERAL INSTRUCTIONS TO OFFERORS
PROPOSAL DELIVERY TIME & DATE
1.1 The City of Lubbock is seeking written and sealed competitive proposals to furnish PAVEMENT
REPAIR AND COMPACTION AT 98TH STREET & QUAKER AVENUE per the attached
specifications and contract documents. Sealed proposals will be received no later than 1:00 P.M., April 3,
2008 at the office listed below. Any proposal received after the date and hour specified will be rejected
and returned unopened to the offeror. Each proposal and supporting documentation must be in a sealed
envelope or container plainly labeled in the lower left-hand corner: "RFP # 08-707-DD, PAVEMENT
REPAIR AND COMPACTION AT 98TH STREET & QUAKER AVENUE" and the
proposal opening date and time. Offerors must also include their company name and address on the
outside of the envelope or container. Proposals must be addressed to:
Darlene Doss, Buyer
City of Lubbock
1625 13th Street, Room 204
Lubbock, Texas 79401
1.2 Offerors are responsible for making certain proposals are delivered to the Public Works Contracting
Office. Mailing of a proposal does not ensure that it will be delivered on time or delivered at all. If
proposer does not hand deliver proposal, we suggest that he/she use some sort of delivery service that
provides a receipt.
1.3 Proposals will be accepted in person, by United States Mail, by United Parcel Service, or by private
courier service. No proposals will be accepted by oral communication, telephone, electronic mail,
telegraphic transmission, or telefacsimile transmission. THE CITY WILL NOT ACCEPT FAX
PROPOSALS.
1.4 The City of Lubbock reserves the right to postpone the date and time for opening proposals through an
addendum.
2 PRE -PROPOSAL MEETING
2.1 For the purpose of familiarizing offerors with the requirements, answering questions, and issuing addenda
as needed for the clarification of the Request for Proposals (RFP) documents, a non-mandatoryy pre -
proposal meeting will be held at 9:00 A.M., March 25, 2008 in the Municipal Building, Room TCL01,
1625 131h Street, Lubbock, Texas. All persons attending the meeting will be asked to identify
themselves and the prospective proposer they represent.
2.2 It is the proposer's responsibility to attend the pre -proposal meeting though the meeting is not mandatory.
The City will not be responsible for providing information discussed at the pre -proposal meeting to
offerors who do not attend the pre -proposal meeting.
3 ADDENDA & MODIFICATIONS
3.1 Any changes, additions, or clarifications to the RFP are made by ADDENDA information available over
the Internet at http://www.RFPdepot.com. We strongly suggest that you check for any addenda a
minimum of forty-eight hours in advance of the response deadline. BUSINESSES WITHOUT
INTERNET ACCESS may use computers available at most public libraries.
3.2 Any proposer in doubt as to the true meaning of any part of the specifications or other documents may
request an interpretation thereof from the Public Works Contracting Office. At the request of the
proposer, or in the event the Public Works Contracting Office deems the interpretation to be substantive,
the interpretation will be made by written addendum issued by the Public Works Contracting
Office. Such addenda issued by the Public Works Contracting Office will be available over the
Internet at http:/,www.RFPdepot.com and will become part of the proposal package having the
same binding effect as provisions of the original RFP. NO VERBAL EXPLANATIONS OR
INTERPRETATIONS WILL BE BINDING. In order to have a request for interpretation
considered, the request must be submitted in writing and must be received by the City of
Lubbock Public Works Contracting Office no later than five (5) days before the proposal closing
date.
3.3 . All addenda, amendments, and interpretations of this solicitation shall be in writing. The City of
Lubbock shall not be legally bound by any amendment or interpretation that is not in writing.
Only information supplied by the City of Lubbock Public Works Contracting Office in writing or
in this RFP should be used in preparing proposal responses. All contacts that a proposer may
have had before or after receipt of this RFP with any individuals, employees, or representatives
of the City and any information that may have been read in any news media or seen or heard in
any communication facility regarding this proposal should be disregarded in preparing responses.
3.4 The City does not assume responsibility for the receipt of any addendum sent to offerors.
4 EXAMINATION OF DOCUMENTS AND REQUIREMENTS
4.1 Each proposer shall carefully examine all RFP documents and thoroughly familiarize itself with
all requirements before submitting a proposal to ensure that their proposal meets the intent of
these specifications.
4.2 Before submitting a proposal, each proposer shall be responsible for making all investigations
and examinations that are necessary to ascertain conditions and requirements affecting the
requirements of this Request for Proposals. Failure to make such investigations and
examinations shall not relieve the proposer from obligation to comply, in every detail, with all
provisions and requirements of the Request for Proposals.
4.3 Notices of any discrepancies or omissions in these plans, specifications, or contract
documents, shall be given to the Public Works Contracting Officer and a clarification
obtained before the proposals are received, and if no such notice is received by the Public
Works Contracting Officer prior to the opening of proposals, then it shall be deemed that
the proposer fully understands the work to be included and has provided sufficient sums in
its proposal to complete the work in accordance with these plans and specifications. If
proposer does not notify the Public Works Contracting Officer before offering of any
discrepancies or omissions, then it shall be deemed for all purposes that the plans and
specifications are sufficient and adequate for completion of the project. It is further agreed
that any request for clarification must be submitted no later than five (5) calendar days
prior to the opening of proposals.
PROPOSAL PREPARATION COSTS
5.1 Issuance of this RFP does not commit the City of Lubbock, in any way, to pay any costs incurred
in the preparation and submission of a proposal.
5.2 The issuance of this RFP does not obligate the City of Lubbock to enter into contract for any
services or equipment.
5.3 All costs related to the preparation and submission of a proposal shall be paid by the proposer.
6 TRADE SECRETS CONFIDENTIAL INFORMATION AND THE TEXAS PUBLIC
INFORMATION ACT
6.1 If you consider any portion of your proposal to be privileged or confidential by statute or judicial
decision, including trade secrets and commercial or financial information, clearly identify those
portions.
6.2 The City of Lubbock will honor your notations of trade secrets and confidential information and
decline to release such information initially, but please note that the final determination of
whether a particular portion of your proposal is in fact a trade secret or commercial or financial
information that may be withheld from public inspection will be made by the Texas Attorney
General or a court of competent jurisdiction. In the event a public information request is
received for a portion of your proposal that you have marked as being confidential information,
you will be notified of such request and you will be required to justify your legal position in
writing to the Texas Attorney General pursuant to Section 552.305 of the Government Code. In
the event that it is determined by opinion or order of the Texas Attorney General or a court of
competent jurisdiction that such information is in fact not privileged and confidential under
Section 552.110 of the Government Code and Section 252.049 of the Local Government Code,
then such information will be made available to the requester.
6.3 Marking your entire proposal CONFIDENTIAL/PROPRIETARY is not in conformance with the
Texas Open Records Act.
7 LICENSES PERMITS TAXES
The price or prices for the work shall include full compensation for all taxes, permits, etc. that the
offeror is or may be required to pay.
8 UTILIZATION OF LOCAL BUSINESS RESOURCES
Prospective offerors are strongly encouraged to explore and implement methods for the utilization of
local resources, and to outline in their proposal submittal how they would utilize local resources.
9 CONFLICT OF INTEREST
9.1 The offeror shall not offer or accept gifts or anything of value nor enter into any business
arrangement with any employee, official or agent of the City of Lubbock.
9.2 By signing and executing this proposal, the offeror certifies and represents to the City the offeror has
not offered, conferred or agreed to confer any pecuniary benefit or other thing of value for the
receipt of special treatment, advantage, information, recipient's decision, opinion, recommendation,
vote or any other exercise of discretion concerning this proposal.
10 CONTRACT DOCUMENTS
10.1 All work covered by the contract shall be done in accordance with contract documents described
in the General Conditions.
10.2 All offeror's shall be thoroughly familiar with all of the requirements set forth on the contract
documents for the construction of this project and shall be responsible for the satisfactory
completion of all work contemplated by said contract documents.
11 PLANS FOR USE BY OFFERORS
It is the intent of the City of Lubbock that all parties with an interest in submitting a proposal on the
project covered by the contract documents be given a reasonable opportunity to examine the documents
and prepare a proposal without charge or forfeiture of deposit. The contract documents may be
examined without charge as noted in the Notice to Offerors.
12 OFFEROR INQUIRIES AND CLARIFICATION OF REQUIREMENTS
12.1 It is the intent and purpose of the City of Lubbock that this request permits competitive
proposals. It shall be the offerors responsibility to advise the Public Works Contracting Office if
anv lanuuaue. reauirements. etc.. or anv combinations thereof. inadvertently restricts or limits the
requirements stated in this RFP to a single source. Such notification must be submitted in
writing and must be received by the City of Public Works Contracting Office no later than five
(5) calendar days before the proposal closing date. A review of such notifications will be made.
7
12.2 NO OFFEROR SHALL REQUEST ANY INFORMATION VERBALLY. ALL
REQUESTS FOR ADDITIONAL INFORMATION OR CLARIFICATION
CONCERNING THIS REQUEST FOR PROPOSALS (RFP) MUST BE SUBMITTED IN
WRITING NO LATER THAN FIVE (5) CALENDAR DAYS PRIOR TO THE
PROPOSAL CLOSING DATE AND ADDRESSED TO:
Darlene Doss, Buyer
City of Lubbock
Public Works Contracting Office
1625 13 th Street, Room 204
Lubbock, Texas 79401
Fax: 806-775-2164 or 806-767-2275
Email: ddossL�)mylubbock.us
RFPDepot: http://www.RFPdepot.com
13 TIME AND ORDER FOR COMPLETION
13.1 The construction covered by the contract documents shall be substantially completed within
SEVENTY (70) CALENDAR DAYS from the date specified in the Notice to Proceed issued by
the City of Lubbock to the successful offeror.
13.2 The Contractor will be permitted to prosecute the work in the order of his own choosing,
provided, however, the City reserves the right to require the Contractor to submit a progress
schedule of the work contemplated by the contract documents. In the event the City requires a
progress schedule to be submitted, and it is determined by the City that the progress of the work
is not in accordance with the progress schedule so submitted, the City may direct the Contractor
to take such action as the City deems necessary to ensure completion of the project within the
time specified.
14 PAYMENT
f
All payments due to Contractor shall be made in accordance with the provisions of the General
Conditions of the contract documents.
t
15 AFFIDAVITS OF BILLS PAID
The City of Lubbock reserves the right, prior to final acceptance of this project to require the Contractor
to execute an affidavit that all bills for labor, materials and incidentals incurred in the construction of the
improvements contemplated by the contract documents have been paid in full and that there are no
claims pending, of which the Contractor has been notified.
16 MATERIALS AND WORKMANSHIP
The intent of these contract documents is that only materials and workmanship of the best quality and
grade will be furnished. The fact that the specifications may fail to be sufficiently complete in some
detail will not relieve the Contractor of full responsibility for providing materials of high quality and for
protecting them adequately until incorporated into the project. The presence or absence of a
representative of the City on the site will not relieve the Contractor of full responsibility of complying
with this provision. The specifications for materials and methods set forth in the contract documents
provide minimum standards of quality, which the Owner believes necessary to procure a satisfactory
project.
8
17 GUARANTEES
17.1 All equipment and materials incorporated in the project and all construction shall be guaranteed
against defective materials and workmanship. Prior to final acceptance, the Contractor shall
furnish to the Owner, a written general guarantee which shall provide that the Contractor shall
remedy any defects in the work, and pay for any and all damages of any nature whatsoever
resulting in such defects, when such defects appear within ONE year from date of final
acceptance of the work as a result of defective materials or workmanship, at no cost to the Owner
(City of Lubbock).
17.2 Notwithstanding any provisions contained in the contractual agreement, the Contractor
represents and warrants fault -free performance and fault -free result in the processing date and
date -related data (including, but not limited to calculating, comparing and sequencing) of all
hardware, software and firmware products delivered and services provided under this Contract,
individually or in combination, as the case may be from the effective date of this Contract. Also,
the Contractor warrants calculations will be recognized and accommodated and will not, in any
way, result in hardware, software or firmware failure. The City of Lubbock, at its sole option,
may require the Contractor, at any time, to demonstrate the procedures it intends to follow in
order to comply with all the obligations contained herein.
17.3 The obligations contained herein apply to products and services provided by the Contractor, its
sub -contractor or any third party involved in the creation or development of the products and
services to be delivered to the City of Lubbock under this Contract. Failure to comply with any
of the obligations contained herein, may result in the City of Lubbock availing itself of any of its
rights under the law and under this Contract including, but not limited to, its right pertaining to
termination or default.
17.4 The warranties contained herein are separate and discrete from any other warranties specified in
this Contract, and are not subject to any disclaimer of warranty, implied or expressed, or
limitation to the Contractor's liability which may be specified in this Contract, its appendices, its
schedules, its annexes or any document incorporated in this Contract by reference.
18 PLANS FOR THE CONTRACTOR
The contractor will, upon written request, be furnished up to ten sets of plans and specifications and
related contract documents for use during construction. Plans and specifications for use during
construction will only be furnished directly to the Contractor. The Contractor shall then distribute
copies of plans and specifications to suppliers, subcontractors or others, as required for proper
prosecution of the work contemplated by the Contractor.
19 PROTECTION OF THE WORK
_. The Contractor shall be responsible for the care, preservation, conservation, and protection of all
materials, supplies, machinery, equipment, tools, apparatus, accessories, facilities, and all means of
construction, and any and all parts of the work whether the Contractor has been paid, partially paid, or
not paid for such work, until the date the City issues its certificate of completion to Contractor. The City
reserves the right, after the proposals have been opened and before the contract has been awarded, to
require of a proposer the following information:
(a) The experience record of the offeror showing completed jobs of a similar nature to the one
covered by the intended contract and all work in progress with bond amounts and percentage
completed.
(b) A sworn statement of the current financial condition of the offeror.
(c) Equipment schedule.
9
i_
i
20 TEXAS STATE SALES TAX
20.1 This contract is issued by an organization which qualifies for exemption provisions pursuant to
provisions of Article 20.04 of the Texas Limited Sales, Excise and Use Tax Act.
20.2 The Contractor must obtain a limited sales, excise and use tax permit which shall enable him to -
buy the materials to be incorporated into the work without paying the tax at the time of purchase. i
21 PROTECTION OF SUBSURFACE LINES AND STRUCTURES
It shall be the Contractor's responsibility to prosecute the work contemplated by the contract documents
in such a way as to exercise due care to locate and prevent damage to all underground pipelines, utility
lines, conduits or other underground structures which might or could be damaged by Contractor during
the construction of the project contemplated by these contract documents. The City of Lubbock agrees
that it will furnish Contractor the location of all such underground lines and utilities of which it has
knowledge. However, such fact shall not relieve the Contractor of his responsibilities aforementioned.
All such underground lines or structures cut or damaged by Contractor during the prosecution of the
work contemplated by this contract shall be repaired immediately by Contractor to the satisfaction of the
City of Lubbock, Texas, at Contractor's expense.
22 BARRICADES AND SAFETY MEASURES
The contractor shall, at his own expense, furnish and erect such barricades, fences, lights and danger
signals, and shall take such other precautionary measures for the protection of persons, property and the
work as may be necessary. The Contractor will be held responsible for all damage to the work due to
failure of barricades, signs, and lights to protect it, and when damage is incurred, the damaged portion
shall be immediately removed and replaced by Contractor at his own cost and expense. The Contractor's
responsibility for maintenance of barricades, signs, and lights shall not cease until the date of issuance to
Contractor of City's certificate of acceptance of the project.
23 EXPLOSIVES
23.1 The use of explosives will not be permitted unless written permission to do so is obtained by the
Contractor from the City. In all cases where written permission is obtained for the use of
explosives, the Contractor shall assume full responsibility for all damage, which may occur as a
direct or indirect result of the blasting. In addition, in all cases where explosives are authorized
to be used, the Contractor shall use utmost care so as not to endanger life or property and the
Contractor shall further use only such methods as are currently utilized by persons, firms, or
corporations engaged in similar type of construction activity.
23.2 Explosive materials shall not be stored or kept at the construction site by the Contractor.
23.3 In all cases where explosives are to be used during the construction of the project contemplated
by this contract, it shall be the duty of the Contractor to notify each utility company having
structures (above or below the ground) in proximity to the site of the work of Contractor's
intention to use explosives, and such notice shall be given sufficiently in advance to enable the
companies to take such steps as they may deem necessary to protect their property from injury.
Such notice, however, shall not relieve the Contractor of responsibility for any damage resulting
from his blasting operations.
24 CONTRACTOR'S REPRESENTATIVE
The successful offeror shall be required to have a responsible local representative available at all times
while the work is in progress under this contract. The successful offeror shall be required to furnish the
name, address and telephone number where such local representative may be reached during the time
that the work contemplated by this contract is in progress.
10
25 INSURANCE
25.1 The Contractor shall not commence work under this contract until he has obtained all insurance
as required in the General Conditions of the contract documents, from an underwriter authorized
to do business in the State of Texas and satisfactory to the City. Proof of coverage shall be
furnished to the City and written notice of cancellation or any material change will be provided
-- ten (10) days in advance of cancellation or change. All policies shall contain an agreement on
the part of the insurer waiving the right to subrogation. The Contractor shall procure and carry at
his sole cost and expense through the life of this contract, insurance protection as hereinafter
specified. Coverage in excess of that specified herein also shall be acceptable. Such insurance
shall be carried with an insurance company authorized to transact business in the State of Texas
and shall cover all operations in connection with this contract, whether performed by the
Contractor or a subcontractor, or separate policies shall be provided covering the operation of
each subcontractor. A certificate of insurance specifying each and all coverages shall be
submitted before contract execution.
25.2 PROOF OF COVERAGE SHALL BE FURNISHED TO THE CITY OF LUBBOCK IN
THE FORM OF A CERTIFICATE OF INSURANCE. THE INSURANCE
CERTIFICATES FURNISHED SHALL NAME THE CITY OF LUBBOCK AS A
PRIMARY ADDITIONAL INSURED AND PROVIDE A WAIVER OF SUBROGATION
IN FAVOR OF THE CITY OF LUBBOCK AS REQUIRED BELOW, OR IN THE
ALTERNATIVE, SHALL BE ACCOMPANIED BY A STATEMENT FROM THE
CONTRACTOR TO THE EFFECT THAT NO WORK ON THIS PARTICULAR
PROJECT SHALL BE SUBCONTRACTED. IT SHALL BE THE CONTRACTOR'S
RESPONSIBILITY TO PROVIDE TO THE OWNER ALL PROOF OF COVERAGE
INSURANCE DOCUMENTS INCLUDING WORKERS COMPENSATION COVERAGE
FOR EACH SUBCONTRACTOR.
26 LABOR AND WORKING HOURS
26.1 Attention of each offeror is particularly called to the schedule of general prevailing rate of per
diem wages included in these contract documents. The wage rate that must be paid on this
project shall not be less than specified in the schedule of general prevailing rates of per diem
wages as above mentioned. The offeror's attention is further directed to the requirements of
Article 5159a, Vernon's Annotated Civil Statutes providing for the payment of the wage
schedules above mentioned and the offeror's obligations thereunder. The inclusion of the
schedule of general prevailing rate of per diem wages in these contract documents does not
release the Contractor from compliance with any wage law that may be applicable. Construction
work under this contract requiring an inspector will not be performed on weekends or holidays
unless the following conditions exist:
26.1.1 The project being constructed is essential to the City of Lubbock's ability to provide the
necessary service to its citizens.
26.1.2 Delays in construction are due to factors outside the control of the Contractor. The
Contractor is approaching the penalty provisions of the contract and Contractor can show
he has made a diligent effort to complete the contract within the allotted time.
26.2 Before construction work requiring an inspector is to be performed on weekends or holidays, the
Contractor must notify the Owner's Representative not less than three full working days prior to
the weekend or holiday he desires to do work and obtain written permission from the Owner's
Representative to do such work. The final decision on whether to allow construction work
requiring an inspector on weekends or holidays will be made by the Owner's Representative.
11
27
29
26.3 In any event, if a condition should occur or arise at the site of this project or from the work being
done under this contract which is hazardous or dangerous to property or life, the Contractor shall
immediately commence work, regardless of the day of the week or the time of day, to correct or
alleviate such condition so that it is no longer dangerous to property or life.
PAYMENT OF EMPLOYEES AND FILING OF PAYROLLS
The contractor and each of his subcontractors shall pay each of his employees engaged in work on the
project under this contract in full (less mandatory legal deductions) in cash, or by check readily cashable
without discount, not less often than once each week. The Contractor and each of his subcontractors
engaged at the site of the work shall not later than the seventh day following the payment of wages, file
with the Owner's Representative, or Engineer, a certified, sworn, legible copy of such payroll. This shall
contain the name of each employee, his classification, the number of hours worked on each clay, rate of
pay, and net pay. The affidavit shall state that the copy is a true and correct copy of such payroll, that no
rebates or deductions (except as shown) have been made, or will in the future be made from the wages
paid as shown thereon. The Contractor must classify employees according to one of the classifications
set forth in the schedule of general prevailing rate of per diem wages, which schedule is included in the
contract documents. The Contractor shall forfeit as a penalty to the City of Lubbock on whose behalf
this contract is made, ten dollars for each laborer, workman, or mechanic employed for each calendar
day, or portion thereof, such laborer, workman or mechanic is paid less than the wages assigned to his
particular classification as set forth in the schedule of general prevailing rate of per diem wages included
in these contract documents.
PROVISIONS CONCERNING ESCALATION CLAUSES
Proposals submitted containing any conditions which provide for changes in the stated proposal price
due to increases or decreases in the cost of materials, labor or other items required for the project will be
rejected and returned to the proposer without being considered.
PREPARATION FOR PROPOSAL
29.1 The offeror shall submit his proposal on forms furnished by the City. All blank spaces in the
form shall be correctly filled in and the proposer shall state the price both in words and numerals,
for which he intends to do the work contemplated or furnish the materials required. Such prices
shall be written in ink, distinctly and legibly, or typewritten. In case of discrepancy between the
price written in words and the price written in figures, the price written in words shall govern.
29.2 If the proposal is submitted by an individual, his name must be signed by him or his duly i
authorized agent. If a proposal is submitted by a firm, association, or partnership, the name and
address of each member must be given and the proposal signed by a member of the firm,
association or partnership, or person duly authorized. If the proposal is submitted by a company
or corporation, the company or corporate name and business address must be given, and the
proposal signed by an official or duly authorized agent. Powers of attorney authorizing agents or
others to sign proposals must be properly certified and must be in writing and submitted with the
proposal. The proposal shall be executed in ink. j
29.3 Each proposal shall be enclosed in a sealed envelope, addressed as specified in the Notice to
Offerors, and endorsed on the outside of the envelope in the following manner:
28.3.1 Offeror's name
28.3.2 Proposal for (description of the project).
29.4 Proposal submittals may be withdrawn and resubmitted at any time before the time set for
opening of the proposals, but no proposal may be withdrawn or altered thereafter.
12
29.5 Pursuant to Texas Local Government Code 252.043(g), a competitive sealed proposal that
has been opened may not be changed for the purpose of correcting an error in the proposal
price. THEREFORE, ANY CORRECTIONS TO THE PROPOSAL PRICE MUST BE
MADE ON THE PROPOSAL SUBMITTAL FORM PRIOR TO PROPOSAL OPENING.
30 BOUND COPY OF CONTRACT DOCUMENTS
Offeror understands and agrees that the contract to be executed by proposer shall be bound and include
the following:
(a) Notice to Offerors.
(b) General Instructions to Offerors.
(c) Proposer's Submittal.
(d) Statutory Bond (if required).
(e) Contract Agreement.
(f) General Conditions.
(g) Special Conditions (if any).
(h) Specifications.
(i) Insurance Certificates for Contractor and all Sub -Contractors.
(j) All other documents made available to offeror for his inspection in accordance with the Notice to
Offerors.
If Plans and Specifications are too bulky or cumbersome to be physically bound, they are to be
considered incorporated by reference into the aforementioned contract documents.
31 QUALIFICATIONS OF OFFERORS
The offeror may be required before the award of any contract to show to the complete satisfaction of the
City of Lubbock that it has the necessary facilities, ability, and financial resources to provide the service
specified therein in a satisfactory manner. The offeror may also be required to give a past history and
references in order to satisfy the City of Lubbock about the offeror's qualifications. The City of
Lubbock may make reasonable investigations deemed necessary and proper to determine the ability of
the proposer to perform the work, and the offeror shall furnish to the City of Lubbock all information for
this purpose that may be requested. The offeror's proposal may be deemed not to meet specifications or
the proposal may be rejected if the evidence submitted by, or investigation of, the offeror fails to satisfy
the City of Lubbock that the proposer is properly qualified to carry out the obligations of the contract
and to complete the work described therein. Evaluation of the offeror's qualifications shall include but
not be limited to:
(a) The ability, capacity, skill, and financial resources to perform the work or provide the service
required.
(b) The ability of the offeror to perform the work or provide the service promptly or within the time
specified, without delay or interference.
(c) The character, integrity, reputation, judgment, experience, and efficiency of the offeror.
(d) The quality of performance of previous contracts or services.
(e) The safety record of the Contractor and proposed Sub -Contractors
Before contract award, the recommended contractor for this project may be required to show that he has
experience with similar projects that require the Contractor to plan his work efforts and equipment needs
13
with City of Lubbock specifications in mind. Demonstration of experience shall include a complete list
of ALL similar municipal and similar non -municipal current and completed projects for the past three
(3) years for review. This list shall include the names of supervisors and type of equipment used to
perform work on these projects. In addition, the Contractor may be required to provide the name(s) of
supervisor(s) that will be used to perfonn work on this project in compliance with City of Lubbock
specifications herein.
32 BASIS OF PROPOSALS AND SELECTION CRITERIA
The City of Lubbock will use the Competitive Sealed Proposals procurement method as authorized by
the Texas Legislature and further defined by Texas Local Government Code Section 271.116. The
selection criteria used to evaluate each proposal will include the following:
32.1 60% Price. l
32.2 20% Contractor qualifications. Complete and submit the "Contractor's Statement of
Qualifications". City shall have an opportunity to interview the job superintendent at a time to be
named after receipt of proposals. '
32.3 5% Safety Record Questionnaire.
32.4 15% Construction time.
The estimated budget for the construction phase of this project is $120, 000.00
Proposals shall be made using the enclosed Proposal Form.
33 SELECTION
33.1 Selection shall be based on the responsible offeror whose proposal is determined to be the most
advantageous to the City of Lubbock considering the relative importance of evaluation factors included in
this RFP.
33.2 NO INDIVIDUAL OF ANY USING DEPARTMENT HAS THE AUTHORITY TO LEGALLY
AND/OR FINANCIALLY COMMIT THE CITY TO ANY CONTRACT, AGREEMENT OR
PURCHASE ORDER FOR GOODS OR SERVICES, UNLESS SPECIFICALLY SANCTIONED BY
THE REQUIREMENTS OF THIS REQUEST FOR PROPOSAL.
33.3 The City shall select the offeror that offers the best value for the City based on the published selection
criteria and on its ranking evaluation. The City shall first attempt to negotiate a contract with the selected
offeror. The City and its engineer or architect may discuss with the selected offeror options for a scope or
time modification and any price change associated with the modification. If the City is unable to negotiate
a contract with the selected offeror, the City shall, formally and in writing, end negotiations with that
offeror and proceed to the next offeror in the order of the selection ranking until a contract is reached or
all proposals are rejected.
33.4 In determining best value for the City, the City is not restricted to considering price alone, but may
consider any other factor stated in the selection criteria.
33.5 A proposal will be subject to being considered irregular and may be rejected if it shows
omissions, alterations of form, conditional alternate proposals, additions or alternates in lieu
of the items specified, if the unit prices are obviously unbalanced (either in excess of or below
reasonably expected values), or irregularities of any kind. "
14
34. ANTI -LOBBYING PROVISION
34.1 DURING THE PERIOD BETWEEN THE BID CLOSE DATE AND THE CONTRACT
AWARD, OFFEROR'S, INCLUDING THEIR AGENTS AND REPRESENTATIVES, SHALL
NOT DIRECTLY DISCUSS OR PROMOTE THEIR PROPOSAL WITH ANY MEMBER OF
THE LUBBOCK CITY COUNCIL OR CITY STAFF EXCEPT IN THE COURSE OF CITY -
SPONSORED INQUIRIES, BRIEFINGS, INTERVIEWS, OR PRESENTATIONS, UNLESS
REQUESTED BY THE CITY.
34.2 This provision is not meant to preclude offeror from discussing other matters with City Council
members or City staff. This policy is intended to create a level playing field for all potential
offeror, assure that contract decisions are made in public, and to protect the integrity of the
proposal process. Violation of this provision may result in rejection of the offeror's proposal.
15
TEXAS LOCAL GOVERNMENT CODE � 271.116
SELECTING CONTRACTOR FOR CONSTRUCTION SERVICES
THROUGH COMPETITIVE SEALED PROPOSALS
271.116.
SELECTING CONTRACTOR FOR CONSTRUCTION SERVICES
THROUGH COMPETITIVE SEALED PROPOSALS.
(a) In selecting a contractor through competitive sealed proposals for construction, rehabilitation, alteration,
or repair services for a facility or for construction of a project to which Section 252.043(d-1) applies, a
governmental entity shall follow the procedures prescribed by this section.
(b) The governmental entity shall select or designate an engineer or architect to prepare construction
documents for the project. The selected or designated engineer or architect has full responsibility for complying
with Chapter 1001 or 1051, Occupations Code, as applicable. If the engineer or architect is not a full-time
employee of the governmental entity, the governmental entity shall select the engineer or architect on the basis
of demonstrated competence and qualifications as provided by Section 2254.004, Government Code.
(c) The governmental entity shall provide or contract for, independently of the contractor, the inspection
services, the testing of construction materials engineering, and the verification testing services necessary for
acceptance of the facility or project by the governmental entity. The governmental entity shall select those
services for which it contracts in accordance with Section 2254.004, Government Code, and shall identify them
in the request for proposals.
(d) The governmental entity shall prepare a request for competitive sealed proposals that includes
construction documents, selection criteria, estimated budget, project scope, schedule, and other information that
contractors may require to respond to the request. The governmental entity shall state in the request for
proposals the selection criteria that will be used in selecting the successful offeror.
(e) The governmental entity shall receive, publicly open, and read aloud the names of the offerors and, if
any are required to be stated, all prices stated in each proposal. Not later than the 45th day after the date of
opening the proposals, the governmental entity shall evaluate and rank each proposal submitted in relation to
the published selection criteria.
(f) The governmental entity shall select the offeror that offers the best value for the governmental entity
based on the published selection criteria and on its ranking evaluation. The governmental entity shall first
attempt to negotiate a contract with the selected offeror. The governmental entity and its engineer or architect
may discuss with the selected offeror options for a scope or time modification and any price change associated
with the modification. If the governmental entity is unable to negotiate a contract with the selected offeror, the
governmental entity shall, formally and in writing, end negotiations with that offeror and proceed to the next
offeror in the order of the selection ranking until a contract is reached or all proposals are rejected.
(g) In determining best value for the governmental entity, the governmental entity is not restricted to
considering price alone, but may consider any other factor stated in the selection criteria.
PROPOSAL SUBMITTAL
Pate Intentionally Left Blank
PROPOSAL SIJBMITTAL
UNIT PRICE PROPOSAL CONTRACT
4
,t.
DATE: Y/3V
PROJE NUMBER: #08-707-DD - Pavement Repair and Compaction at 98th Street & Quaker Avenue
Proposal of G,�� ire (hereinafter called Offeror)
To the Honorable Mayor and City Council City of Lubbock, Texas (hereinafter called Owner)
Ladies and Gentlemen:
The Offeror, in compliance with your Request for Proposals for the construction of a Pavement Repair and Compaction
at 98th Street & Quaker Avenue having carefully examined the plans, specifications, instructions to offerors, notice to
offerors and all other related contract documents and the site of the intended work, and being familiar with all of the
conditions surrounding the construction of the intended project including the availability of materials and labor, hereby
- intends to furnish all labor, materials, and supplies; and to construct the project in accordance with the plans,
I specifications and contract_ documents, within the time set forth therein and at the price stated below. The price to cover
all expenses incurred in performing the work required under the contract documents.
Estimated
Item Quantity
No. & Unit Description of Item Total Amount
1. 190 SY Sawcut and remove existing HMAC paving surface and caliche base material and legally
dispose of materials off -site, including all cutting, hauling, and disposal, complete, per
square yard of paving surface area removed:
TOTAL ITEM # l : T W6,s atoll zsw Cats $ t0" /SY( 1,400 °' )
(knit Price Amounts shall be shown in both words and numerals. In case of discrepancy, the amount shown in words shall govern.)
2. 180 LF Sawcut and remove existing concrete curb and gutter material and legally dispose of materials off -
site, including all cutting, hauling, and disposal, complete, per linear foot of curb and gutter
removed:
TOTAL ITEM #2: 'en b.L,.t 'WA zw, Carts $ 1000. /LF( 11,800)
(Unit Price Amounts shall be shown in both words and numerals. In case oi'discrepancy, the amount shown in words shall govcm.)
3. 1,080 SF Remove, salvage and replace existing sod, including all necessary work to salvage, water and replace
sod to final repaired grade, complete, per square foot of sod salvaged and replaced:
TOTAL ITEM #3: T. D.&,, ate( awo c.,,k $ 10. /SF( ►a,800 " )
(Unit Price Amounts shall be shown in both words and numerals. In case of discrepancy, the amount shown in words shall govern.)
1,
Offeror's Initials
Estimated
Item Quantity
No. & Unit Description of Item Total Amount
4. 1 LS Remove one (1) existing live tree within landscape subsidence area, maintain, and then replant after
all improvements are complete, per lump sum:
TOTAL ITEM #4: Qotoo a" hero ew+ $1M °O /LS( 1,000.« )
(Unit Price Amounts shall be shown in both words and numerals. In case of discrepancy, the amount shown in words shall govern.)
1 LS Repair existing landscape irrigation system where necessary between back -of -curb in parking lot
and sidewalk adjacent to 98th Street as a result of repair of trench subsidence, including all piping,
wiring, irrigation heads, fittings, controls, and other accessories, complete and in place, per lump
sum:
TOTAL ITEM #5:11610uiawd Fla 6ANJ 0416rs and hero Cettts $ ZSJo °0 /LS( -&,Soo." )
(Unit Price Amounts shall he shown in both words and numerals. In case ol'discrepancy, the amount shown in words shall govern.)
190 SY HMAC paving surfacing on caliche base, per original Project Specifications, including a
minimum 2-inch compacted HMAC surface course and minimum 8-inch compacted caliche
base, furnished and installed, complete and in place, per square yard:
TOTAL ITEM #6: 00- QwW lkfb,, bA rs nJ ?.. Ca40 $ Bp_e0 /SY( *'106,00 }
(Unit Price Amounts shall be shown in both words and numerals. In case of discrepancy, the amount shown in words shall govern.)
7. 180 LF 24-inch concrete curb and gutter, per the original Project Specifications, furnished and installed, ;
complete and in place, per linear foot:
TOTAL ITEM #7: R% 0-41"s .4 FWb Coots $ 50.00 /LF( `)I 000 " )
(Unit Price Amounts shall be shown in both words and numerals. In case of discrepancy, the amount shown in words shall govern.)
170 LF Pavement striping per original Project Specifications, to delineate parking stalls on new HMAC
surfacing, furnished and installed, complete and in place, per linear foot:
TOTAL ITEM #8: Avg Mnrt aacl &ro Cyi. $ S °O /LF( MO." }
(Unit Price Amounts shall be shown in both words and numerals. In case of discrepancy, the amount shown in words shall govern.)
OPTION #1
0-1. 600 CY Excavate trench subsidence area and remove all suspect trench backfill material and dispose of
off -site, replace with flowable fill to within 18-inches of subgrade, provide topsoil in top 18-
inched of landscape area, including all utilities coordination, excavation, trench protection, hauling
and materials, complete and in place, per cubic yard of flowable fill:
V0
TOTAL ITEM #0-1: 11,"-Tw. D-16K "A uro his $ JIM 55zo0'e )
(Unit Price Amounts shall he shown in both words and numerals. In case of discrepancy, the amount shown in words shall govern.)
J�l Offeror's Initials
s Estimated
Item Quantity
' No. & Unit Description of Item Total Amount
OPTION #2
0-2. 600 CY Excavate trench subsidence area and remove all suspect trench backfill material, replace in 6-inch
lifts and compact to 95% Standard Proctor Density to within 18-inches of subgrade, provide
topsoil in top 18-inches of landscape area, including all utilities coordination, excavation, trench
protection, hauling and materials, furnished and installed, complete and in place, per cubic yard of
compacted fill:
TOTAL ITEM #0-2: Sixty - Fvc pailar" cw� Lit 9 " $ (PSos /CY( 30i.o0ty °° )
(Unit Price Amounts shall be shown in both words and numerals. In case of discrepancy, the amount shown in words shall govern.)
OPTION #3
0-3.1 350 CY Excavate portion of trench subsidence area, remove suspect trench backfill material and
dispose of oft -site, including all utilities coordination, excavation, trench protection, hauling
and materials, per cubic yard:
TOTAL ITEM #0-3.1
(Unit Price Amounts
• -'/ Q •7L/1 OO
be shown in both words and numerals. In case of discrepancy, the amount shown in words shall govem.)
0-3.2 350 CY Place flowable fill within 5 fcet of finished grade, including all utilities coordination, trench
protection, hauling, and materials, complete and in place, per cubic yard of flowable fill:
TOTAL ITEM #0-3.2: '0--trh,-4-d►swbo16tPS arAJ Lve Csrct+ $l- /CYO 23.450 ~ )
(Unit Price Amounts shall be shown in both words and numerals. In case of discrepancy, the amount shown in words shall govem.)
0-3.3 250 CY Excavate portion of trench subsidence area, remove suspect trench backfill material, replace
backfill in 6-inch lifts and compact to 95% Standard Proctor Density to within 18-inches of
finished grade, provide topsoil in top 18-inches of landscape area, including all utilities
coordination, excavation, trench protection, hauling, and materials, furnished and installed,
complete and in place, per cubic yard of materials:
K
TOTAL ITEM 40-3.3: Stx , ty - Fswe. D.Ilan � � Co.+4s $ /CY( I� ZS0.O0 )
(Unit Price Amounts shall be shown in both words and numerals. In case of discrepancy. the amount shown in words shall govem.)
TOTAL PROPOSAL WITH OPTION #1
MATERIALS:_] jCb,- l" theisi Nugi $ 31.500.°O
LABOR: �tvwts li t u k aw iiwnW (Vi.r•ltiwtwt $ 10.1410,00
TOTAL PROPOSAL
ITEM # I - #8 & #o-1 %. &A,4 4wm Tt�a.,.,A ,%mA g G.% Dotw,
(Unit Price .Amounts shall be shown in both words and numerals. In case of disc pancy, the amount shown in words shall govern.)
�9
Offeror's Initials
Paim Intentionally Left Blank
CITY OF LUBBOCK
CONTRACTOR'S STATEMENT OF QUALIFICATIONS
{ RFP # 08-707-DD
PAVEMENT REPAIR AND COMPACTION AT 98TH STREET & QUAKER AVENUE
Candidates must complete each of the following items in order to be considered.
_s I . FIRM NAME:
2. BUSINESS ADDRESS:.9:
3. TELEPHONE, WITH AREA CODE:���='
FAX, WITH AREA CODE:
E MAIL ADDRESS:
INTERNET URL ADDRESS:
i
4. TYPE OF ORGANIZATION: (CHECK ONE)
a. SOLE PROPRIETORSHIP ( )
b. PARTNERSHIP (-
c. CORPORATION ( )
d. JOINT VENTURE ( )
5. PRINCIPALS (P) AND ASSOCIATES (A):
(WRITE "P" OR "A" FOR EACH)
a.
b
d.
'1
e.�.7,,,
f.
DEGREE OR
P/A CERTIFICATE INSTITUTION
1
CITY OF LUBBOCK
CONTRACTOR'S STATEMENT OF QUALIFICATIONS CONTINUED
6. LIST 5 MAJOR PROJECTS WITHIN THE PAST THREE YEARS THAT ILLUSTRATE YOUR
EXPERIENCE WITH PROJECTS SIMILAR TO THE CITY'S.
PROJECT OWNER YEAR COST
a. An lYli: � �y CJ� .}� �✓ � %?: �/,�,. y�
q '} r 11
b. LjE "%��1 L fig }1 F l.t � `%l P /%d/ LJG? , 'ld I �J
C. TJZ711
d.
e.
7. REFERENCES:
(INCLUDE AT LEAST THREE REFERENCES FROM THREE PROJECTS SIMILAR TO THE ONE FOR
WHICH YOU ARE COMPETING)
NAME RELATIONSHIP PHONE NUMBER
Title:C
Firm Name: 0-6/1 /14 t-."�
Tel #:i''��
Address:
City �'�,l LKIZLI State: Zip:
PA
CITY OF LUBBOCK
INSURANCE REQUIREMENT AFFIDAVIT
To Be Completed by Offeror and Agent
Must be submitted when Proposals are due.
1, the undersigned Offeror, certify that the insurance requirements contained in this proposal document have been
reviewed by me with the below identified Insurance Ageiit/Broker. If I am awarded this contract by the City of Lubbock,
I will be able to, within ten (10) business days after being notified of such award by the City of Lubbock, furnish a valid
insurance certificate to the City meeting all of the requirements defined in this proposal.
Contra or ( ignature) CoAGactor (Print)47
, y
CONTRACTOR'S FIRM NAME:
(Prinor Type)
CONTRACTOR'S FIRM ADDRESS:
Name of Agent/Broker:
Agent / Broker (Signature)
Address of Agent/Broker:
City/State/Zip: ®, -
Agent/Broker Telephone Number:
Dater L r�
NOTE TO CONTRACTOR
If the time requirement specified above is not met, the City has the right to reject this proposal and award the
contract to another contractor. If rou have any questions concerning these requirements, please contact the Buyer
for the City of Lubbock at (806) 775-2168.
PROPOSAL #08-707-DD - Pavement Repair and Compaction at 98th Street & Quaker Avenue
Paze Intentionally Left Mink
4
SAFETY RECORD QUESTIONNAIRE
The City of Lubbock City Council desires to avail itself of the benefits of Section 252.0435 of the Local Government
Code, and consider the safety records of potential contractors prior to awarding proposals on City contracts. Pursuant to
Section 252.0435 of the Local Government Code, City of Lubbock has adopted the following written definition and
criteria for accurately determining the safety record of a proposer prior to awarding proposals on City contracts.
The definition and criteria for determining the safety record of a proposer for this consideration shall be:
The Citv of Lubbock shall consider the safety record of the offerors in determining the responsibility thereof. The City may
consider any incidence involving worker safety or safety of the citizens of the City of Lubbock, be it related or caused by
environmental, mechanical, operational, supervision or any other cause or factor. Specifically, the City may consider, among
other things:
a. Complaints to, or final orders entered by, the Occupational Safety and Health Review Commission (OSHRC),
against the proposer for violations of OSHA regulations within the past three (3) years.
b. Citations (as defined below) from an Environmental Protection Agency (as defined below) for violations within
the past five (5) years. Environmental Protection Agencies include, but are not necessarily limited to, the U.S.
Army Corps of Engineers (USACOE), the U.S. Fish and Wildlife Service (USFWS), the Environmental
Protection Agency (EPA), the Texas Commission on Environmental Quality (TCEQ), the Texas Natural Resource
Conservation Commission (TNRCC) (predecessor to the TCEQ), the Texas Department of State Health Services
(DSHS), the Texas Parks and Wildlife Department (TPWD), the Structural Pest Control Board (SPCB), agencies
of local governments responsible for enforcing environmental protection or worker safety related laws or
regulations, and similar regulatory agencies of other states of the United States. Citations include notices of
violation, notices of enforcement, suspension/revocations of state or federal licenses or registrations, fines
assessed, pending criminal complaints, indictments, or convictions, administrative orders, draft orders, final
orders, and judicial final judgments.
C. Convictions of a criminal offense within the past ten (10) years, which resulted in bodily harm or death.
d. Any other safety related matter deemed by the City Council to be material in determining the responsibility of the
offeror and his or her ability to perform the services or goods required by the proposal documents in a safe
environment, both for the workers and other employees of offeror and the citizens of the City of Lubbock.
3 In order to obtain proper information from offerors so that City of Lubbock may consider the safety records of potential
contractors prior to awarding proposals on City contracts, City of Lubbock requires that offerors answer the following
three (3) questions and submit them with their proposals:
QUESTION ONE
Has the offeror, or the firm, corporation, partnership, or institution represented by the offeror, or anyone acting for such
firm, corporation, partnership or institution, received citations for violations of OSHA within the past three (3) years?
YES / NO
If the offeror has indicated YES for question number one above, the offeror must provide to City of Lubbock, with its
proposal submission, the following information with respect to each such citation:
Date of offense, location of establishment inspected, category of offense, final disposition of offense, if any, and penalty
assessed.
a
415lo5 i S� LA-i- Onift+�pro�eat $eariaus Clos'd ' 4i,50o p0 `mokt =2� Offe�rorJs Initials
SIl2�OS' �e� tiw�+K �rtuN•� �lo�c•f � VNiouS � �.�o1gu.� � �;irJOD.ao _.
uw� a1 walkway )
QUESTION TWO i
Has the offeror, or the firm, corporation, partnership, or institution represented by the offeror, or anyone acting for such
firm, corporation, partnership or institution, received citations for violations of environmental protection laws or
regulations, of any kind or type, within the past five years? Citations include notice of violation, notice of enforcement,
suspension/revocations of state or federal licenses, or registrations, fines assessed, pending criminal complaints,
indictments, or convictions, administrative orders, draft orders, final orders, and judicial final judgments.
YES NO
If the offeror has indicated YES for question number two above, the offeror must provide to City of Lubbock, with its ¢
proposal submission, the following information with respect to each such conviction:
Date of offense or occurrence, location where offense occurred, type of offense, final disposition of offense, if any, and
penalty assessed.
QUESTION THREE
Has the offeror, or the firm, corporation, partnership, or institution represented by offeror, or anyone acting for such firm,
corporation, partnership, or institution, ever been convicted, within the past ten (10) years, of a criminal offense which
resulted in serious bodily injury or death?
YES NO
If the offeror has indicated YES for question number three above, the offeror must provide to City of Lubbock, with its
proposal submission, the following information with respect to each such conviction:
Date of offense, location where offense occurred, type of offense, final disposition of offense, in any, and penalty
assessed.
ACKNOWLEDGEMENT
THE STATE OF TEXAS
COUNTY OF LUBBOCK
I certify that I have made no willful misrepresentations in this Questionnaire nor have I withheld information in my
statements and answers to questions. I am aware that the information given by me in this questionnaire will be
investigated, with my full permission, and that any misrepresentations or omissions may cause my proposal to be rejected.
Sign e
1.
Title
1
SUSPENSION AND DEBARMENT CERTIFICATION
Federal Law (A-102 Common Rule and OMB Circular A-110) prohibits non -Federal entities from contracting with or
making sub -awards under covered transactions to parties that are suspended or debarred or whose principals are
suspended or debarred. Covered transactions include procurement contracts for goods or services equal to or in excess of
$25,000 and all non -procurement transactions (e.g., sub -awards to sub -recipients).
- Contractors receiving individual awards of $25,000 or more and all sub -recipients must certify that their organization and
j its principals are not suspended or debarred by a Federal agency.
Before an award of $25,000 or more can be made to your firm, you must certify that your organization and its principals
are not suspended or debarred by a Federal agency.
I, the undersigned agent for the firm named below, certify that neither this firm nor its principals are suspended or
debarred by a Federal agency.
COMPANY NAME: Z /,,/ <
FEDERAL TAX ID or SOCIAL SEC RITJt'- No.
Signature of Company Official:
Printed name of company official s' ing above:
Date Signed: �
g ,G .�' /'
,
Page Intentionally Left Blank
LIST OF SUBCONTRACTORS
1.
Company Name and City
' _+1
nY Dirt at `�] W-n, LW6ftk, 75K
Minority Owned
Yes No
L
2.
Tom; s TY« P�ouc — `,u1obW.k . 1 x
❑
3.
1. 6-44 Labs . T., . TXXL
4.
❑
5.
❑ ❑
6.
❑ �i
7.
8.
❑ a
9.
C ❑
10.
11.
❑ ❑
❑ ❑
12.
❑
13.
❑ ❑
14.
❑ ❑
15.
❑ ❑
16.
❑ ❑
THIS FORM SHALL BE COMPLETED AND RETURNED ALONG WITH YOUR PROPOSAL
IF NO SUBCONTRACTORS WILL BE USED INDICATE SO
PROPOSAL #08-707-DD - Pavement Repair and Compaction at 98th Street & Quaker Avenue
9
Paee Intentionally Left Blank
PAYMENT BOND
Page Intentionally Left Blank
BOND NO. 6550725
STATUTORY PAYMENT BOND PURSUANT TO SECTION 2253.021(a)
OF THE TEXAS GOVERNMENT CODE
(CONTRACTS MORE THAN $25,000)
UTILITY CONTRACTORS
KNOW ALL MEN BY THESE PRESENTS, that OF AMERICA, LTD. (hereinafter called the Principal(s),
as Principal(s), and SAFECO INSURANCE COMPANY OF AMERICA
(hereinafter called the Surety( �ur�s�I 6bk&a� and unto the City of Lubbock (hereinafter called the
Obligee), in the amount of FIFTY AND NO 100-----------------Dollars ($91,550.00 ) lawful money of the
United States for the payment whereof, the said Principal and Surety bind themselves, and their heirs, administrators,
executors, successors and assigns, jointly and severally, firmly by these presents.
WHEREAS, the Principal has entered into a certain written contract with the Obligee, dated the 24TH day of
APRIL ,2008,to PROPOSAL #08-707-DD - PAVEMENT REPAIR AND COMPACTION AT 98TH
STREET & QUAKER AVENUE
and said Principal under the law is required before commencing the work provided for in said contract to execute a bond
in the amount of said contract which contract is hereby referred to and made a part hereof as fully and to the same extent
as if copied at length herein.
NOW, THEREFORE, THE CONDITION OF THIS OBLIGATION IS SUCH, that if the said Principal shall pay
all claimants supplying labor and material to him or a subcontractor in the prosecution of the work provided for in said
contract, then, this obligation shall be void; otherwise to remain in full force and effect; .
PROVIDED, HOWEVER, that this bond is executed pursuant to the provisions of Section 2253.021(a) of the
Texas Government Code, and all liabilities on this bond shall be determined in accordance with the provisions of said
Article to the same extent as if it were copied at length herein.
IN WITNESS WHEREOF, the said Principal (s) and Surety (s) have signed and sealed this instrument this
1ST day of MAY 2008.
SAFECO INSURANCE COMPANY
Surety OF AMERICA
*By
(Title) A HILL
ATTORNEY -IN -FACT
UTILITY CONTRACTORS OF AMERICA,
(Company Name) LTD .
By: &Y`rs /`aS
(Printed a )
(Signature)
Kr
(Title)
The undersigned surety company represents that it is duly qualified to do business in Texas, and hereby
designates HOWARD COWAN an agent resident in Lubbock County to whom any requisite notices may be delivered
and on whom service of process may be had in matters arising out of such suretyship.
SAFECO INSURANCE COMPANY OF
Surety AMERICA
* By:
(Title)A HILL
ATTORNEY —IN —FACT
Approved as to form:
City of Lubbock
By:
y Attorn y
* Note: If signed by an officer of the Surety Company there must be on file a certified extract from the by-laws showing
that this person has authority to sign such obligation. If signed by an Attorney in Fact, we must have copy of power of
attorney for our files.
2
SAFECO"
State of Texas Surety Bond Claim Notice
In accordance with Section 2253.021(f) of the Texas Government Code and
Section 53.202(6) of the Texas Property Code, any notice of claim to the named
surety under this bond(s) should be sent to:
SAFECO Surety
Adams Building
4634 154th PL NE
Redmond, WA 98052
Mailing Address:
SAFECO Surety
PO Box 34526
Seattle, WA 98124
Phone: (425) 376-6535
Fax: (425) 376-6533
www.SAFECO.com
S A F E C O- POWER
► OF ATTORNEY
KNOW ALL BY THESE PRESENTS:
SAFECO INSURANCE COMPANY OF AMERICA
GENERAL INSURANCE COMPANY OF AMERICA
HOME OFFICE: SAFECO PLAZA
SEATTLE, WASHINGTON 98185
No. 11561
That SAFECO INSURANCE COMPANY OF AMERICA and GENERAL INSURANCE COMPANY OF AMERICA, each a Washington corporation, does each hereby
appoint
sssss*sssssssssssss*sssssssssssss*s*ssssssssssssssssssst*HOWARD COWAN; MARLA HILL; Lubbock, Texas*'*sssssssssssss*sssssssssssss*##+++++*#sssss+ssss*
its true and lawful attomey(s)-in-fact, with full authority to execute on its behalf fidelity and surety bonds or undertakings and other documents of a similar character
issued in the course of its business, and to bind the respective company thereby.
IN WITNESS WHEREOF, SAFECO INSURANCE COMPANY OF AMERICA and GENERAL INSURANCE COMPANY OF AMERICA have each executed and
attested these presents
this 2nd
R.A. PIERSON, SECRETARY
CERTIFICATE
day of March
k), 4944&464
W. RANDALL STODDARD, PRESIDENT
Extract from the By -Laws of SAFECO INSURANCE COMPANY OF AMERICA
and of GENERAL INSURANCE COMPANY OF AMERICA:
2000
"Article V, Section 13. - FIDELITY AND SURETY BONDS ... the President, any Vice President, the Secretary, and any Assistant Vice President appointed for that
purpose by the officer in charge of surety operations, shall each have authority to appoint individuals as attomeys-in-fact or under other appropriate titles with authority to
execute on behalf of the company fidelity and surety bonds and other documents of similar character issued by the company in the course of its business... On any
instrument making or evidencing such appointment, the signatures may be affixed by facsimile. On any instrument conferring such authority or on any bond or
undertaking of the company, the seal, or a facsimile thereof, may be impressed or affixed or in any other manner reproduced; provided, however, that the seal shall not
be necessary to the validity of any such instrument or undertaking."
Extract from a Resolution of the Board of Directors of SAFECO INSURANCE COMPANY OF AMERICA
and of GENERAL INSURANCE COMPANY OF AMERICA adopted July 28, 1970.
"On any certificate executed by the Secretary or an assistant secretary of the Company setting out,
(i) The provisions of Article V, Section 13 of the By -Laws, and
(ii) A copy of the power-of-attomey appointment, executed pursuant thereto, and
(iii) Certifying that said power-of-attomey appointment is in full force and effect,
the signature of the certifying officer may be by facsimile, and the seal of the Company may be a facsimile thereof."
1, R.A. Pierson, Secretary of SAFECO INSURANCE COMPANY OF AMERICA and of GENERAL INSURANCE COMPANY OF AMERICA, do hereby certify that the
foregoing extracts of the By -Laws and of a Resolution of the Board of Directors of these corporations, and of a Power of Attorney issued pursuant thereto, are true and
correct, and that both the By -Laws, the Resolution and the Power of Attorney are still in full force and effect.
IN WITNESS WHEREOF, I have hereunto set my hand and affixed the facsimile seal of said corporation
this 1ST
CORPORATE
SEAL a y SEAL
s
srlF Of WAS
day of MAY
R.A. PIERSON, SECRETARY
2008
S-09741SAEF 7198 ® Registered trademark of SAFECO Corporation.
3000 PDF
CERTIFICATE OF INSURANCE
Page Intentionally Left Blank
ACORD CERTIFICATE OF LIABILITY INSURANCE
4/28i2o 8
PRODUCER (972) 772-7220 FAX: (972) 771-4695
K S Insurance en
Agency
2255 Ridge Road, Ste 333
P O Box 277
Rockwall TX 75087
THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION
ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE
HOLDER. THIS CERTIFICATE DOES NOT AMEND, EXTEND OR
ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW.
INSURERS AFFORDING COVERAGE
NAIC #
INSURED
Utility Contractors of America, Inc., DBA:
Utility Contractors of America, Ltd
927 Hwy. 62
Wolfforth TX 79382
INSURER A: Continental Casualty Co.
INSURERB:Valley Forge Insurance Co
INSURERC:U. S. Fire Ins. Co.
INSURER D: Nat ' l Fire Ins. Co. of
Hartford
INSURER E: Travelers Insurance Co.
OWH640
OVERAGES
THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY
REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN,
THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES.
AGGREGATE LIMITS SHOWWMAY HAVE BEEN REDUCED BY PAID CLAIMS.
INSR
ADD'L INSRD
TYPE OF INSURANCE
POLICY NUMBER
POLICY
A EYMM/DD THE
IWDD T10N
PDATE EXPIRATION
LIMITS
A
GENERAL LIABILITY
X COMMERCIAL GENERAL LIABILITY
�
CLAIMS MADE FXIOCCUR
4
C2090553748
9/5/2007
9/5/2008
EACH OCCURRENCE
$ 1,000,000
IMAGETORENT Dn
_-
$ 100,000
MEDEXP(Anvoneoerso n
$ 5,000
PERSONAL & ADV INRY
$ 1,000,000
GENERAL AGGREGATE
$ 2,000,000
GEN'L AGGREGATE LIMIT APPLIES PER:
POLICY X JECOT LOC
PRODUCTS - COMP/OP AGG
$ 2,000,000
B
AUTOMOBILE
LIABILITY
ANY AUTO
ALL OWNED AUTOS
SCHEDULED AUTOS
HIREDAUTOS
NON -OWNED AUTOS
C2090553751
9/5/2007
9/5/2008
COMBINED SINGLE LIMIT
(Ea accident)
$ 1,000,000
X
BODILY INJURY
(Per person)
$
X
BODILY INJURY
(Per accident)
$
X
PROPERTY DAMAGE
(Per accident)
$
GARAGE LIABILITY
ANY AUTO
AUTO ONLY - EA ACCIDENT
$
OTHER THAN EA A
AUTO ONLY: AGG
$
$
C
EXCESSIUMBRELLA LIABILITY
X1 OCCUR CLAIMS MADE
DEDUCTIBLE
HX RETENTION 0
553-090364-1
9/5/2007
9/5/2008
EACH OCCURRENCE
$ 2,000,000
AGGREGATE
_
$ 2,000,000
$
$
D
WORKERS COMPENSATION AND
EMPLOYERS' LIABILITY
ANY PROPRIETOR/PARTNER/EXECUTIVE
OFFICER/MEMBER EXCLUDED?
If yes, describe under
SPECIAL PROVISIONS below
WC2090553765
9/5/2007
9/5/2008
WCYTATU- OTH-
LIMIT z
DRr
E.L. EACH ACCIDENT
$ 1,000,000
E.L. DISEASE - EA EMPLOYE
$ 1,000,000
E.L. DISEASE - POLICY LIMIT
$ 1,000,000
E
E
E
OTHER Equipment Floater
Installation Floater
Rented/Leased Eq.
QT6605376s228
QT6605376B228
IQT6605376B228
9/5/2007
9/5/2007
9/5/2007
9/5/2008
9/5/2008
1 9/5/2008
$4,126,140 w/$1000 Deductible
$300,000 w/$1000 Deductible
1$200,000 Max.Limit
DESCRIPTION OF OPERATIONS!LOCATIONS/VEHICLES/EXCLUSIONS ADDED BY ENDORSEMENT/SPECIAL PROVISIONS
Certificate Holder, its officers, agents and employees should be known as Additional insured with a Waiver of
Subrogation in favor of the City of Lubbock when required by written contract. RE: Pavement Repair & Compaction @
98th Street & Quaker Ave. RFP #08-707-DD.
*Except 10 days notice for non-payment of premium.
CERTIFICATE HOLDER _
(806)745-7577
City of Lubbock
1625 13th Street
Lubbock, TX 79457
ACORD 25 (2001108)
SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE
EXPIRATION DATE THEREOF, THE ISSUING INSURER WILL ENDEAVOR TO MAIL
30 DAYS WRITTEN NOTICE TO THE CERTIFICATE HOLDER NAMED TO THE LEFT, BUT
FAILURE TO DO SO SHALL IMPOSE NO OBLIGATION OR LIABILITY OF ANY KIND UPON THE
INSURER,ITS AGENTS OR REPRESENTATIVES.
AUTHORIZED REPRESENTATIVE
2 Daiker-1/CHERYL
OACORD CORPORATION 1988
P.— 1 of 7
CONTRACTORCHECKLIST
A CONTRACTOR SHALL:
(1) provide coverage for its employees providing services on a project, for the duration of the project based
on proper reporting of classification codes and payroll amounts and filling of any coverage agreements;
(2) provide a certificate of coverage showing workers' compensation coverage to the governmental entity
prior to beginning work on the project;
(3) provide the governmental entity, prior to the end of the coverage period, a new certificate of coverage
showing extension of coverage, if the coverage period shown on the contractor's current certificate of
coverage ends during the duration of the project;
(4) obtain from each person providing services on a project, and provide to the governmental entity:
(A) a certificate of coverage, prior to that person beginning work on the project, so the governmental
entity will have on file certificates of coverage showing coverage for all persons providing
services on the project; and
(B) no later than seven days after receipt by the contractor, a new certificate of coverage showing
extension of coverage, if the coverage period shown on the current certificate of coverage ends
during the duration of the project;
(5) retain all required certificates of coverage on file for the duration of the project and for one year
thereafter;
(6) notify the govermnental entity in writing by certified mail or personal delivery, within ten (10) days after
the contractor knew or should have known, of any change that materially affects the provision of
coverage of any person providing services on the project;
(7) post a notice on each project site informing all persons providing services on the project that they are
required to be covered, and stating how a person may verify current coverage and report failure to provide
coverage. This notice does not satisfy other posting requirements imposed by the Act or other
commission rules. This notice must be printed in at least 19-point normal type, and shall be in both
English and Spanish and any other language common to the worker population. The text for the notices
shall be the following text provided by the commission on the sample notice, without any additional
words or changes:
PROOF OF COVERAGE SHALL BE FURNISHED TO THE CITY OF LUBBOCK IN THE FORM OF A
CERTIFICATE OF INSURANCE. THE INSURANCE CERTIFICATES FURNISHED SHALL NAME THE
CITY OF LUBBOCK AS A PRIMARY ADDITIONAL INSURED AND PROVIDE A WAIVER OF
SUBROGATION IN FAVOR OF THE CITY OF LUBBOCK, OR IN THE ALTERNATIVE, SHALL BE
ACCOMPANIED BY A STATEMENT FROM THE CONTRACTOR TO THE EFFECT THAT NO WORK ON
THIS PARTICULAR PROJECT SHALL BE SUBCONTRACTED. IT SHALL BE THE CONTRACTOR'S
RESPONSIBILITY TO PROVIDE TO THE OWNER ALL PROOF OF COVERAGE INSURANCE
DOCUMENTS INCLUDING WORKERS COMPENSATION COVERAGE FOR EACHSUBCONTRACTOR.
3
r
i
REQUIRED WORKERS' COMPENSATION COVERAGE
"The law requires that each person working on this site or providing services related to this construction project must (see
reverse) be covered by workers' compensation insurance. This includes persons providing, hauling, or delivering
equipment and materials, or providing labor or transportation or other service related to the project, regardless of the
identity of their employer or status as an employee."
"Call the Texas Workers' Compensation Commission at 512-305-7238 to receive information on the legal
requirement for coverage, to verify whether your employer has provided the required coverage, or to
report an employer's failure to provide coverage." and
(8) contractually require each person with whom it contracts to provide services on a project, to: l
(A) provide coverage based on proper reporting of classification codes and payroll amounts and
tiling of any coverage agreements for all of its employees providing services on the project, for
the duration of the project;
(B) provide a certificate of coverage to the contractor prior to that person beginning work on the
project;
(C) include in all contracts to provide services on the project the language in subsection (e) (3) of this
rule;
(D) provide the contractor, prior to the end of the coverage period, a new certificate of coverage
showing extension of coverage, if the coverage period shown on the current certificate of
coverage ends during the duration of the project;
(E) obtain from each other person with whom it contracts, and provide to the contractor:
(i) a certificate of coverage, prior to the other person beginning work on the project; and
(ii) prior to the end of the coverage period, a new certificate of coverage showing extension of the
coverage period, if the coverage period shown on the current certificate of coverage ends during
the duration of the project;
(F) retain all required certificates of coverage on file for the duration of the project and for one year =-
thereafter;
(G) notify the governmental entity in writing by certified mail or personal delivery, within (ten) 10
days after the person knew or should have known, of any change that materially affects the
provision of coverage of any person providing services on the project; and
(H) contractually require each other person with whom it contracts, to perform as required by
paragraphs (A) - (H), with the certificate of coverage to be provided to the person for whom they
are providing services.
4
CONTRACT
PaEe Intentionally Left Blank
CONTRACT #8381
STATE OF TEXAS
COUNTY OF LUBBOCK
THIS AGREEMENT, made and entered into this 241h day of April 2008 by and between the City of Lubbock,
County of Lubbock, State of Texas, acting by and through the Mayor, City of Lubbock, thereunto authorized to do so,
hereinafter referred to as OWNER, and UTILITY CONTRACTORS OF AMERICA LTD. of the City of
WOLFFORTH, County of LUBBOCK and the State of TEXAS hereinafter termed CONTRACTOR.
WITNESSETH: That for and in consideration of the payments and agreements hereinafter mentioned, to be made and
performed by the OWNER and under the conditions expressed in the bond bearing even date herewith (if any) the
CONTRACTOR hereby agrees with OWNER to commence and complete the construction of certain improvements
described as follows:
PROPOSAL #08-707-DD - Pavement Repair and Compaction at 98th Street & Quaker Avenue - $91,550
and all extra work in connection therewith, under the terms as stated in the contract documents and at his (or their) own
proper cost and expense to furnish all materials, supplies, machinery, equipment, tools, superintendence, labor, insurance
and other accessories and services necessary to complete the said construction in accordance with the contract documents
as defined in the General Condition of Agreement. UTILITY CONTRACTORS OF AMERICA LTD. 'S proposal
dated APRIL 3, 2008 is incorporated into and made a part of this agreement.
The CONTRACTOR hereby agrees to commence work within ten days after the date written notice to do so shall have
been given to him and to substantially complete same within the time specified in the contract documents.
The OWNER agrees to pay the CONTRACTOR in current funds for the performance of the contract in accordance
with the proposal submitted therefore, subject to additions and deductions, as provided in the contract documents and to
make payment on account thereof as provided therein.
IN WITNESS WHEREOF, the parties to these presents have executed this agreement in Lubbock, Lubbock County,
Texas in the year and day first above written.
CONTRACTOR:
COMPLETE ADDRESS:
Company W1 N CP,+r&�a 4 /�.•1�F , tt�.
Address `1-11 4""J . 61-
City, State, Zip INaA4" TK -1 J91-
ATTEST:
Corporate Secretary
CITY OF LUBB TEXAS (O R):
MAYOR
!t'
ATTEST:
ity S retary
VED AS O FORM:
T
V -V
ity tto e
GENERAL CONDITIONS OF THE AGREEMENT
Page Intentionally Left Blank
GENERAL CONDITIONS OF THE AGREEMENT
I. OWNER
Whenever the word Owner, or First Party, are used in this contract, it shall be understood as referring to the City
of Lubbock, Texas.
2. CONTRACTOR
Whenever the word Contractor, or Second Party, is used, it shall be understood to mean the person, persons, co-
partnership or corporation, to wit UTILITY CONTRACTORS OF AMERICA LTD, who has agreed to
perform the work embraced in this contract, or their legal representative.
OWNER'S REPRESENTATIVE
Whenever the word Owner's Representative or representative is used in this contract, it shall be understood as
referring to, City of Lubbock, or its representative WOOD FRANKLIN, P.E., CHIEF ENGINEER FOR
WATER UTILITIES, so designated who will inspect constructions; or to such other representatives,
supervisors, architects, engineers, or inspectors as may be authorized by said Owner to act in any particular under
this agreement. Engineers, supervisors or inspectors will act for the Owner under the direction of Owner's
Representative, but shall not directly supervise the Contractor or persons acting on behalf of the Contractor.
4. CONTRACT DOCUMENTS
The contract's documents shall consist of the Notice to Offerors, General Instructions to Offerors, Proposal,
Signed Agreement, Statutory Bonds (if required), General Conditions of the Agreement, Special Conditions of the
Agreement (if any), Specifications, Plans, Insurance Certificates, and all other documents made available to
Offeror for inspection in accordance with the Notice to Offerors. The above described materials are sometimes
referred to herein as the "contract" or "contract documents".
5. INTERPRETATION OF PHRASES
Whenever the words "Directed," "Permitted," "Designated," "Required," "Considered Necessary," "Prescribed,"
or words of like import are used, it shall be understood that the direction, requirement, pennission, order,
designation or prescription of the Owner's Representative is intended; and similarly, the words "Approved,"
"Acceptable," "Satisfactory," or words of like import shall mean approved by or acceptable or satisfactory to the
Owner's Representative.
6. SUBCONTRACTOR
The term Subcontractor, as employed herein, includes only those having a direct contract with the Contractor for
performance of work on the project contemplated by these contract documents. Owner shall have no
responsibility to any Subcontractor employed by Contractor for performance of work on the project contemplated
by these contract documents, but said Subcontractors will look exclusively to Contractor for any payments due
Subcontractor. The City reserves the right to approve or disapprove the selection of any subcontractor(s).
7. WRITTEN NOTICE
Written notice shall be deemed to have been duly served if delivered in person to the individual or to a member of
the firm or to an officer of the corporation for whom it is intended, or if delivered at or sent certified mail to the
last business address known to the party who gives the notice.
CONTRACTOR'S RESPONSIBILITIES
Unless otherwise stipulated, the Contractor shall provide and pay for all materials, supplies, machinery,
equipment, tools, superintendence, labor, insurance, and all water, light, power, fuel, transportation and all other
facilities necessary for the execution and completion of the work covered by the contract documents. Unless
otherwise specified, all materials shall be new and both workmanship and materials shall be of a good quality.
The Contractor shall, if required, furnish satisfactory evidence as to the kind and quality of materials. Materials
or work described in words which so applied have well known, technical or trade meaning shall be held to refer
such recognized standards.
All work shall be done and all materials furnished in strict conformity with the contract documents.
9. SUBSTANTIALLY COMPLETED
The terns "Substantially Completed" is meant that the structure or project contemplated by the contract documents
has been made suitable for use or occupancy or the facility is in a condition to serve its intended purpose, but still
may require minor miscellaneous work and adjustment.
10. LAYOUT
Except as specifically provided herein, the Contractor shall be responsible for laying out all work and shall
accomplish this work in a manner acceptable to the Owner's Representative. The Owner's Representative will
check the Contractor's layout of all major structures and any other layout work done by the Contractor at
Contractor's request, but this check does not relieve the Contractor of the responsibility of correctly locating all
work in accordance with the Plans and Specifications.
11. KEEPING OF PLANS AND SPECIFICATIONS ACCESSIBLE
The Contractor shall be furnished copies of all Plans and Specifications without expense to Contractor and
Contractor shall keep one copy of same consistently accessible on the job site.
12. RIGHT OF ENTRY
The Owner's Representative may make periodic visits to the site to observe the progress or quality of the executed
work and to determine, in general, if the work is proceeding in accordance with the contract documents. Owner's
Representative will not be required to make exhaustive or continuous onsite inspections to check the quality or
quantity of the work, nor will Owner's Representative be responsible for the construction means, methods,
techniques, sequences or procedures, or the safety precautions incident thereto. Notwithstanding the Owner's
Representative's rights of entry hereunder, the Owner's Representative will not be responsible for the Contractor's
failure to perform the work in accordance with the Contract Documents.
13. LINES AND GRADES
All lines and grades shall be furnished by the Owner's Representative whenever Owner's Representative deems
said lines and grades are necessary for the commencement of the work contemplated by these contract documents
or the completion of the work contemplated by these contract documents. Whenever necessary, Contractor shall
suspend its work in order to permit Owner's Representative to comply with this requirement, but such suspension
will be as brief as practical and Contractor shall be allowed no extra compensation therefore. The Contractor
shall give the Owner's Representative ample notice of the time and place where lines and grades will be needed.
All stakes, marks, etc., shall be carefully preserved by the Contractor, and in case of careless destruction or
removal by Contractor, its Subcontractors, or its employees, such stakes, marks, etc., shall be replaced by the
Owner's Representative at Contractor's expense.
14. OWNER'S REPRESENTATIVE'S AUTHORITY AND DUTY
Unless otherwise specified, it is mutually agreed between the parties to this Agreement that the Owner's
Representative has the authority to review all work included herein. The Owner's Representative has the
authority to stop the work whenever such stoppage may be necessary to ensure the proper execution of the
contract. The Owner's Representative shall, in all cases, determine the amounts and quantities of the several kinds
of work which are to be paid for under the contract documents, and shall determine all questions in relation to said
work and the construction thereof, and shall, in all cases, decide every question which may arise relative to the
execution of this contract on the part of said Contractor. The decision of the Owner's Representative shall be
conclusive in the absence of written objection to same delivered to Owner's Representative within fifteen (15)
calendar days of any decision or direction by Owner's Representative. In the absence of timely written objection
by Contractor, as provided herein, any and all objection or objections shall be deemed waived.
15. SUPERINTENDENCE AND INSPECTION
It is agreed by the Contractor that the Owner's Representative shall be and is hereby authorized to appoint from
time to time such subordinate engineers, supervisors, or inspectors as the said Owner's Representative may deem
proper to inspect the materials furnished and the work done under this Agreement, and to see that said material is
furnished and said work is done in accordance with the specifications therefore. The Contractor shall furnish all
reasonable aid and assistance required by the subordinate engineers, supervisors or inspectors for the proper
inspection and examination of the work. The Contractor shall regard and obey the directions and instructions of
any subordinate engineers, supervisors or inspectors so appointed, when such directions and instructions are
consistent with the obligations of this Agreement and accompanying plans and specifications provided, however,
should the Contractor object to any orders by any subordinate engineer, supervisor or inspector, the Contractor
may within fifteen (15) calendar days make written appeal to the Owner's Representative for its decision. In the
absence of timely written objection by Contractor, as provided herein, any and all objection or objections shall be
deemed waived.
16. CONTRACTOR'S DUTY AND SUPERINTENDENCE
The Contractor shall give personal attention to the faithful prosecution and completion of this contract and shall
keep on the work, during its progress, a competent superintendent and any necessary assistants, all satisfactory to
Owner's Representative. The superintendent shall represent the Contractor in its absence and all directions given
to superintendent shall be binding as if given to the Contractor. It is expressly agreed that adequate supervision
by competent and reasonable representatives of the Contractor is essential to the proper performance of the work
and lack of such supervision shall be grounds for suspending operations of the Contractor.
The work, from its commencement to completion, shall be under the exclusive charge and control of the
Contractor and all risk in connection therewith shall be borne by the Contractor.
The Owner or Owner's Representatives shall not be responsible for the acts or omissions of the Contractor, or any
subcontractors, or any of Contractor's agents or employees, or any other persons performing any of the work.
17. CONTRACTOR'S UNDERSTANDING
It is understood and agreed that the Contractor has, by careful examination, satisfied itself as to the nature and
location of the work, the confirmation of the ground, the character, quality and quantity of materials to be
encountered, the character of equipment and facilities needed preliminary to and during the prosecution of the
work, and the general and local conditions, and all other matters which in any way affect the work under the
contract documents. No oral agreement or conversation with any officer, agent, or employee of the Owner, or
Owner's Representative either before or after the execution of this contract, shall affect or modify any of the
terms or obligations herein contained. Subject to the rights of Owner as set forth in Paragraph 23 hereof, all
18
19.
20.
21.
modifications and/or amendments to the contract documents, shall be in writing, and executed by Owner's
Representative and Contractor.
Unless otherwise specified herein, all loss, expense or damage to Contractor arising out of the nature of the work
to be done, or from the action of the elements, or from any unforeseen circumstance and the prosecution of the
work, shall be sustained and borne by the Contractor at its own cost and expense.
CHARACTER OF WORKERS
The Contractor agrees to employ only orderly and competent workers, skillful in the performance in the type of
work required under this contract, to do the work; and agrees that whenever the Owner's Representative shall
inform Contractor in writing that any man or men on the work, are, in Owner's Representative's sole opinion,
incompetent, unfaithful, disorderly, or otherwise unacceptable to Owner or Owner's Representative, such man or
men shall be discharged from the work and shall not again be employed on the work without the Owner's
Representative's written consent.
CONSTRUCTION PLANT
The Contractor shall provide all labor, tools, equipment, machinery and materials necessary in the prosecution
and completion of this contract where it is not otherwise specifically provided that Owner shall furnish same, and
it is also understood that Owner shall not be held responsible for the care, preservation, conservation, or
protection of any materials, tools, equipment or machinery or any part of the work until it is finally completed and
accepted.
The building of structures for the housing of men or equipment will be pennitted only at such places as the
Owner's Representative shall consent or direct, and the sanitary conditions of the grounds in or about such
structure shall at all times be maintained in a manner satisfactory to the Owner's Representative.
SANITATION
Necessary sanitary conveniences for the use of laborers on the work site, properly secluded from public -
observation, shall be constructed and maintained by the Contractor in such manner and at such points as shall be
approved by the Owner's Representative and their use shall be strictly enforced.
OBSERVATION AND TESTING
The Owner or Owner's Representative shall have the right at all times to observe and test the work. Contractor
shall make necessary arrangements and provide proper facilities and access for such observation and testing at any
location wherever such work is in preparation or progress. Contractor shall ascertain the scope of any ob::.;rvation
that may be contemplated by Owner or Owner's Representative and shall give ample notice as to the time each
part of the work will be ready for such observation. Owner or Owner's Representative may reject any such work
found to be defective or not in accordance with the contract documents, regardless of the stage of its completion
or the time or place of discovery of such errors and regardless of whether Owner's Representative has previously ;
accepted the work through oversight or otherwise. If any such work should be covered without approval or i
consent of the Owner, it must, if requested by Owner or Owner's Representative, be uncovered for examination at
Contractor's expense. In the event that any part of the work is being fabricated or manufactured at a location
where it is not convenient for Owner or Owner's Representative to make observations of such work or require x
testing of said work, then in such event Owner or Owner's Representative may require Contractor to furnish
Owner or Owner's Representative certificates of inspection, testing or approval made by persons competent to
perform such tasks at the location where that part of the work is being manufactured or fabricated. All sucL tests
will be in accordance with the methods prescribed by the American Society for Testing and Materials or such
other applicable organization as may be required by law or the contract documents.
4
If any such work which is required to be inspected, tested, or approved is covered up without written approval or
consent of the Owner or Owner's Representative, it must, if requested by the Owner or Owner's Representative, be
uncovered for observation and testing at the Contractor's expense. The cost of all such inspections, tests and
approvals shall be borne by the Contractor unless otherwise provided herein. Any work which fails to meet the
requirements of any such tests, inspections or approvals, and any work which meets the requirements of any such
tests or approvals but does not meet the requirements of the contract documents shall be considered defective, and
shall be corrected at the Contractor's expense.
Neither observations by the Owner or Owner's Representative, nor inspections, tests, or approvals made by
Owner, Owner's Representative, or other persons authorized under the contract documents to make such
inspections, tests, or approvals shall relieve the Contractor from its obligation to perforn the work in accordance
with the requirements of the contract documents.
22. DEFECTS AND THEIR REMEDIES
It is expressly agreed that if the work or any part thereof, or any material brought on the site of the work for use in
the work or selected for the same, shall be deemed by the Owner or Owner's Representative as unsuitable or not in
conformity with plans, specifications and/or contract documents, the Contractor shall, after receipt of written
notice thereof from the Owner's Representative, forthwith remove such material and rebuild or otherwise remedy
such work so that it shall be in full accordance with the contract documents. It is further agreed that any remedial
action contemplated as hereinabove set forth shall be at Contractor's expense.
23. CHANGES AND ALTERATIONS
The Contractor further agrees that the Owner may make such changes and alterations as the Owner may see fit, in
the line, grade, form dimensions, plans or materials for the work herein contemplated, or any part thereof, either
before or after the beginning of the construction, without affecting the validity of this contract and the
accompanying bond.
If such changes or alterations diminish the quantity of the work to be done, they shall not constitute the basis for a
- claim for damages, or anticipated profits on the work that may be dispensed with. If they increase the amount of
work, and the increased work can fairly be classified under the specifications, such increase shall be paid
according to the quantity actually done and at the unit price established for such work under this contract;
otherwise such additional work shall be paid for as provided under Extra Work. In case the Owner shall make
such changes or alterations as shall make useless any work already done or material already furnished or used in
said work, then the Owner shall recompense the Contractor for any material or labor so used, and for actual
expenses incurred in preparation for the work as originally planned.
24. EXTRA WORK
The term "extra work" as used in this contract shall be understood to mean and include all work that may be
required by the Owner or Owner's Representative to be done by the Contractor to accomplish any change,
alteration or addition to the work as shown on the plans and specifications or contract documents and not covered
by Contractor's proposal, except as provided under Changes and Alterations herein.
It is agreed that the Contractor shall perform all cxtra work under the direction of the Owner's Representative
when presented with a written work order signed by the Owner's Representative; subject, however, to the right of
the Contractor to require written confirmation of such extra work order by the Owner. It is also agreed that the
compensation to be paid to the Contractor for performing said extra work shall be determined by the following
methods:
Method (A) - By agreed unit prices; or
Method (B) - By agreed lump sum; or
Method (C) - If neither Method (A) or Method (B) be agreed upon before the extra work is j
commenced, then the Contractor shall be paid the lesser of the following: (1) actual field
cost of the extra work, plus fifteen (15%) percent; or (2) the amount that would have been
charged by a reasonable and prudent Contractor as a reasonable and necessary cost for
performance of the extra work.
In the event said extra work be perfonned and paid for under Method (C)(1), then the provisions of this paragraph
shall apply and the "actual field cost" is hereby defined to include the cost of all workmen, such as foremen,
timekeepers, mechanics and laborers, materials, supplies, teams, trucks, rentals on machinery and equipment, for
the time actually employed or used on such extra work, plus actual transportation charges necessarily incurred,
together with all expenses incurred directly on account of such extra work, including Social Security, Old Age
Benefits, Maintenance Bonds, Public Liability and Property Damage and Workers' Compensation and all other
insurances as may be required by law or ordinances or directed by the Owner or Owner's Representative, or by
them agreed to. Owner's Representative may direct the form in which accounts of the actual field cost shall be
kept and records of these accounts shall be made available to the Owner's Representative. The Owner's
Representative may also specify in writing, before the work comunences, the method of doing the work and the
type and kind of machinery and equipment to be used; otherwise, these matters shall be determined by the
Contractor. Unless otherwise agreed upon, the prices for the use of machinery and equipment shall be determined
by using 100%, unless otherwise specified, of the latest Schedule of Equipment and Ownership Expenses adopted
by the Associated General Contractors of America. Where practical, the terms and prices for the use of
machinery and equipment shall be incorporated in the written extra work order. The fifteen percent (15%) of the
actual field cost to be paid to Contractor shall cover and compensate Contractor for its profit, overhead, general
superintendence and field office expense, and all other elements of cost and expense not embraced within the
actual field cost as herein defined, save that where the Contractor's Camp or Field Office must be maintained
primarily on account of such Extra Work, then the cost to maintain and operate the same shall be included in the
"actual field cost."
No claim for extra work of any kind will be allowed unless ordered in writing by Owner's Representative. In case
any orders or instructions appear to the Contractor to involve extra work for which Contractor should receive
compensation or an adjustment in the construction time, Contractor shall prior to commencement of such extra
work, make written request to the Owner's Representative for a written order authorizing such extra work.Should
a difference of opinion arise as to what does or does not constitute extra work or as to the payment therefore, and
the Owner's Representative insists upon its performance, the Contractor shall proceed with the work after making
written request for written order and shall keep adequate and accurate account of the actual field cost thereof, as
provided under Method (C) (1). If Contractor does not notify Owner's Representative before the commencement
of any extra work, any claim for payment due to alleged extra work shall be deemed waived.
25. DISCREPANCIES AND OMISSIONS
It is further agreed that it is the intent of the contract documents that all work described in the proposal, the
specifications, plans and other contract documents, is to be done for the prices quoted by the Contractor and that
such price shall include all appurtenances necessary to complete the work in accordance with the intent of these
contract documents as interpreted by Owner's Representative. Notices of any discrepancies or omissions in
these plans, specifications, or contract documents, shall be given to the Owners' Representative and a
clarification obtained before the proposals are received, and if no such notice is received by the Owner's
Representative prior to the opening of proposals, then it shall be deemed that the Contractor fully
understands the work to be included and has provided sufficient sums in its proposal to complete the work
in accordance with these plans and specifications. If Contractor does not notify Owner's Representative
before offering of any discrepancies or omissions, then it shall be deemed for all purposes that the plans
and specifications are sufficient and adequate for completion of the project. It is further agreed that any
request for clarification must be submitted no later than five (5) calendar days prior to the opening of
proposals.
26. RIGHT OF OWNER TO MODIFY METHODS AND EQUIPMENT
If at any time the methods or equipment used by the Contractor are found to be inadequate to secure the quality of
work with the rate of progress required under this contract, the Owner or Owner's Representative may order the
Contractor in writing to increase their safety or improve their character and efficiency and the Contractor shall
comply with such order.
If, at any time, the working force of the Contractor is inadequate for securing the progress herein specified, the
Contractor shall, if so ordered in writing, increase its force or equipment, or both, to such an extent as to give
reasonable assurance of compliance with the schedule of progress.
27. PROTECTION AGAINST ACCIDENT TO EMPLOYEES AND THE PUBLIC AND GENERAL INDEMNITY
The Contractor shall take out and procure a policy or policies of Workers' Compensation Insurance with an
- insurance company licensed to transact business in the State of Texas, which policy shall comply with the
Workers' Compensation laws of the State of Texas. The Contractor shall at all times exercise reasonable
precaution for the safety of employees and others on or near the work and shall comply with all applicable
provisions of federal, state and municipal laws and building and construction codes. All machinery and
equipment and other physical hazards shall be guarded in accordance with the "Manual of Accident Prevention in
Construction" of Associated General Contractors of America, except where incompatible with federal, state or
municipal laws or regulations. The Contractor, its sureties and insurance carriers shall defend, indemnify and
hold harmless the Owner and all of its officers, agents and employees against any all losses, costs, damages,
expenses, liabilities, claims and/or causes of action, whether known or unknown, fixed, actual, accrued or
contingent, liquidated or unliquidated, including, but not limited to, attorneys' fees and expenses, in connection
with, incident to, related to, or arising out of, the Contractor's or any subcontractor's, agent's or employee's, in
any manner whatsoever, omission, execution and/or supervision of this contract, and the project which is the
subject matter of this contract.
The safety precautions- taken shall be the sole responsibility of the Contractor, in its sole discretion as an
Independent Contractor; inclusion of this paragraph in the Agreement, as well as any notice which may be given
by the Owners or the Owner's Representative concerning omissions under this paragraph as the work progresses,
are intended as reminders to the Contractor of its duty and shall not be construed as any assumption of duty to
supervise safety precautions by either the Contractor or any of its subcontractors.
28. CONTRACTOR'S INSURANCE
The Contractor shall not commence work under this contract until he has obtained all insurance as required in the
General Conditions of the contract documents, from an underwriter authorized to do business in the State of
Texas and satisfactory to the City. Proof of coverage shall be furnished to the City and written notice of
cancellation or any material change will be provided ten (10) calendar days in advance of cancellation or change.
All policies of insurance, required herein, including policies of insurance required to be provided by Contractor
and its subcontractors, shall contain a waiver of any and all of the insurer's or payor's, in the event of self-
insurance, rights to subrogation that any such insurer or payor, in the event of self-insurance, may acquire by
- virtue of payment of any loss under such insurance or self-insurance. All certificates of insurance submitted to
the City in conformity with the provisions hereof shall establish such waiver.
The Contractor shall procure and carry at its sole cost and expense through the life of this contract, insurance
protection as hereinafter specified. Coverage in excess of that specified herein also shall be acceptable. Such
insurance shall be carried with an insurance company authorized to transact business in the State of Texas and
shall cover all operations in connection with this contract, whether performed by the Contractor or a
subcontractor, or separate policies shall be provided covering the operation of each subcontractor. A certificate of
insurance specifying each and all coverages shall be submitted prior to contract execution.
PROOF OF COVERAGE SHALL BE FURNISHED TO THE CITY OF LUBBOCK IN THE FORM OF
A CERTIFICATE OF INSURANCE ALONG WITH A COPY OF THE ADDITIONAL INSURED
ENDORSEMENT. THE INSURANCE CERTIFICATES FURNISHED SHALL NAME THE CITY OF
LUBBOCK AS A PRIMARY ADDITIONAL INSURED AND PROVIDE A WAIVER OF
SUBROGATION IN FAVOR OF THE CITY OF LUBBOCK AS REQUIRED BELOW, OR IN THE
ALTERNATIVE, SHALL BE ACCOMPANIED BY A STATEMENT FROM THE CONTRACTOR TO
THE EFFECT THAT NO WORK ON THIS PARTICULAR PROJECT SHALL BE SUBCONTRACTED.
IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO PROVIDE TO THE OWNER ALL
PROOF OF COVERAGE INSURANCE DOCUMENTS INCLUDING WORKERS COMPENSATION
COVERAGE FOR EACH SUBCONTRACTOR.
A. Commercial General Liability Insurance (Primary Additional Insured and Waiver of Subrogation
required)
The contractor shall have Comprehensive General Liability Insurance with limits of $1,000,000
Combined Single Limit in the aggregate and per occurrence to include:
Products & Completed Operations Hazard
Contractual Liability
Personal Injury & Advertising Injury
With Heavy Equipment Endorsement
B. Owner's and Contractor's Protective Liability Insurance - NOT REQUIRED
C. Comprehensive Automobile Liability Insurance (Waiver of Subrogation Required)
The Contractor shall have Comprehensive Automobile Liability Insurance with limits of not less than;
Bodily Injury/Property Damage, $500,000 Combined Single Limit, to include all owned
and non -owned cars including: Employers Non -ownership Liability Hired and Non -owned Vehicles.
F. Worker's Compensation and Employers Liability Insurance (Waiver of Subrogation required)
Worker's Compensation Insurance covering all employees whether employed by the Contractor or any
Subcontractor on the job with Employers Liability of at least $500,000
Definitions:
Certificate of coverage ("certificate") - A copy of a certificate of insurance, a certificate of
authority to self -insure issued by the commission, or a coverage agreement (TWCC-81, TWCC-
82, TWCC-83, or TWCC-84), showing statutory workers' compensation insurance coverage for
the person's or entity's employees providing services on a project, for the duration of the project.
Duration of the project - includes the time from the beginning of the work on the project until the
Contractor's/person's work on the project has been completed and accepted by the governmental
entity.
Persons providing services on the project ("subcontractor" in Section 406.096, Texas Labor
Code) - includes all persons or entities performing all or part of the services the Contractor has
undertaken to perform on the project, regardless of whether that person contracted directly with
the Contractor and regardless of whether that person has employees. This includes, without
limitation, independent contractors, subcontractors, leasing companies, motor carriers, owner -
operators, employees of any such entity, or employees of any entity which furnishes persons to
provide services on the project. "Services" include, without limitation, providing, hauling, or
delivering equipment or materials, or providing labor, transportation, or other service related to a
project. "Services" does not include activities unrelated to the project, such as food/beverage
vendors, office supply deliveries, and delivery of portable toilets.
The Contractor shall provide coverage, based on proper reporting of classification codes and
payroll amounts and filing of any coverage agreements, which meets the statutory requirements
of Texas Labor Code, Section 401.011(44) for all employees of the contractor providing services
on the project, for the duration of the project.
The Contractor must provide a certificate of coverage to the governmental entity prior to being
awarded the contract.
4. If the coverage period shown on the Contractor's current certificate of coverage ends during the
duration of the project, the Contractor must, prior to the end of the coverage period, file a new
certificate of coverage with the governmental entity showing that coverage has been extended.
The Contractor shall obtain from each person providing services on the project, and provide to the
governmental entity:
(a) a certificate of coverage, prior to that person beginning work on the project, so the
governmental entity will have on file certificates of coverage showing coverage for all
persons providing services on the project; and
(b) no later than seven days after receipt by the Contractor, a new certificate of coverage
showing extension of coverage, if the coverage period shown on the current certificate of
coverage ends during the duration of the project.
The Contractor shall retain all required certificates of coverage for the duration of the project and
for one year thereafter.
7. The Contractor shall notify the governmental entity in writing by certified mail or personal
delivery, within 10 days after the Contractor knew or should have known, of any change that
materially affects the provision of coverage of any person providing services on the project.
The Contractor shall post on each project site a notice, in the text, form and manner prescribed by
the Texas Workers' Compensation Commission, infonning all persons providing services on the
project that they are required to be covered, and stating how a person may verify coverage and
report lack of coverage.
The Contractor shall contractually require each person with whom it contracts to provide services
on the project, to:
(a) provide coverage, based on proper reporting of classification codes and payroll amounts
and filing of any coverage agreements, which meets the statutory requirements of Texas
Labor Code, Section 401.011(44) for all of its employees providing services on the
project, for the duration of the project;
(b) provide to the Contractor, prior to that person beginning work on the project, a certificate
of coverage showing that coverage is being provided for all employees of the person
providing services on the project, for the duration of the project;
G
(c) provide the Contractor, prior to the end of the coverage period, a new certificate of
coverage showing extension of coverage, if the coverage period shown on the current
certificate of coverage ends during the duration of the project;
(d) obtain from each other person with whom it contracts, and provide to the Contractor:
(1) a certificate of coverage, prior to the other person beginning work on the project;
and 1
(2) a new certificate of coverage showing extension of coverage, prior to the end of
the coverage period, if the coverage period shown on the current certificate of
coverage ends during the duration of the project;
(e) retain all required certificates of coverage on file for the duration of the project and for
one year thereafter;
(f) notify the governmental entity in writing by certified mail or personal delivery, within 10
days after the person knew or should have known, of any change that materially affects
the provision of coverage of any person providing services on the project; and
(g) contractually require each person with whom it contracts fo perform as required by
paragraphs (a) - (g), with the certificates of coverage to be provided to the person for
whom they are providing services.
10. By signing this contract or providing or causing to be provided a certificate of coverage, the
Contractor is representing to the governmental entity that all employees of the Contractor who �-
will provide services on the project will be covered by worker's compensation coverage for the
duration of the project, that the coverage will be based on proper reporting of classification codes
and payroll amounts, and that all coverage agreements will be filed with"the appropriate insurance
carrier or, in the case of a self -insured, with the commission's Division of Self -Insurance
Regulation. Providing false or misleading information may subject the Contractor to
administrative penalties, criminal penalties, civil penalties, or other civil actions.
11. The Contractor's failure to comply with any of these provisions is a breach of contract by the
Contractor which entitles the governmental entity to declare the contract void if the Contractor
does not remedy the breach within ten days after receipt of notice of breach from the
governmental entity.
Proof of Coverage
Before work on this contract is commenced, each Contractor and subcontractor shall submit to the Owner
for approval five Certificates of Insurance covering each insurance policy carried and offered as evidence
of compliance with the above insurance requirements, signed by an authorized representative of the
insurance company setting forth:
(1) The name and address of the insured.
(2) The location of the operations to which the insurance applies.
(3) The name of the policy and type or types of insurance in force thereunder on the date borne by
such certificate.
(4) The expiration date of the policy and the limit or limits of liability thereunder on the date borne
by such certificate.
V
(5) A provision that the policy may be canceled only by mailing written notice to the named insured
at the address shown in the proposal specifications.
(6) A provision that written notice shall be given to the City ten days prior to any change in or
cancellation of the policies shown on the certificate.
(7) The certificate or certificates shall be on the form (or identical copies thereof) contained in the job
specifications. No substitute of nor amendment thereto will be acceptable.
(8) If policy limits are paid, new policy must be secured for new coverage to complete project.
(9) A Contractor shall:
(a) provide coverage for its employees providing services on a project, for the duration of the
project based on proper reporting of classification codes and payroll amounts and filling
of any coverage agreements;
(b) provide a certificate of coverage showing workers' compensation coverage to the
governmental entity prior to beginning work on the project;
(c) provide the governmental entity, prior to the end of the coverage period, a new certificate
of coverage showing extension of coverage, if the coverage period shown on the
Contractor's current certificate of coverage ends during the duration of the project;
(d) obtain from each person providing services on a project, and provide to the governmental
entity:
(i) a certificate of coverage, prior to that person beginning work on the project, so
the governmental entity will have on file certificates of coverage showing
coverage for all persons providing services on the project; and
(ii) no later than seven days after receipt by the Contractor; a new certificate of
coverage showing extension of coverage, if the coverage period shown on the
current certificate of coverage ends during the duration of the project;
(e) retain all required certificates of coverage on file for the duration of the project and for
one year thereafter;
(f) notify the governmental entity in writing by certified mail or personal delivery, within 10
days after the Contractor knew or should have known, of any change that materially
affects the provision of coverage of any person providing services on the project;
(g) post a notice on each project site informing all persons providing services on the project
that they are required to be covered, and stating how a person may verify current
coverage and report failure to provide coverage. This notice does not satisfy other
posting requirements imposed by the Texas Worker's Compensation Act or other
commission rules. This notice must be printed with a title in at least 30-point bold type
and text in at least 19-point normal type, and shall be in both English and Spanish and
any other language common to the worker population. The text for the notices shall be
the following text provided by the commission on the sample notice, without any
additional words or changes:
REQUIRED WORKERS' COMPENSATION COVERAGE
"The law requires that each person working on this site or providing services related to
this construction project must be covered by workers' compensation insurance. This
includes persons providing, hauling, or delivering equipment or materials, or providing
labor or transportation or otherservice related to the project, regardless of the identity
of their employer or status as an employee. "
11
(h)
"Call the Texas Workers' Compensation Commission at 800-372-7713 or 512-804-
4000 (wNtw.tdi.state.tr.us) to receive information of the legal requirements for
coverage, to verify whether your employer has provided the required coverage, or to
report an employer's failure to provide coverage; " and
contractually require each person with whom it contracts to provide. services on a project,
to:
(i) provide coverage based on proper reporting of classification codes and payroll
amounts and filing of any coverage agreements for all of its employees providing
services on the project, for the duration of the project;
(ii) provide a certificate of coverage to the Contractor prior to that person beginning
work on the project;
(iii) include in all contracts to provide services on the project the following language:
"By signing this contract or providing or causing to be
provided a certificate of coverage, the person signing this
contract is representing to the governmental entity that all
employees of the person signing this contract who will
provide services on the project will be covered by workers'
compensation coverage for the duration of the project, that
the coverage will be based on proper reprinting of
classification codes and payroll amounts, and that all
coverage agreements will be filed with the appropriate
insurance carrier or, in the case of a self -insured, with the
commission's Division of Self -Insurance Regulation.
Providing false or misleading information may subject the
Contractor to administrative penalties, criminal penalties,.
civil penalties, or other civil actions.";
(iv) provide the Contractor, prior to the end of the coverage period, a new certificate
of coverage showing extension of coverage, if the coverage period shown on the
current certificate of coverage ends during the duration of the project;
(v) obtain from each other person with whom it contracts, and provide to the `
Contractor:
(1) a certificate of coverage, prior to the other person beginning work on the
project; and (_
(2) prior to the end of the coverage period, a new certificate of coverage
showing extension of the coverage period, if the coverage period shown j
on the current certificate of coverage ends during the duration of the 1
project;
(vi) retain all required certificates of coverage on file for the duration of the project
and for one year thereafter;
(vii) notify the governmental entity in writing by certified mail or personal delivery,
within 10 days after the person knew or should have known, of any change that
materially affects the provision of coverage of any person providing services on
the project; and
(viii) contractually require each other person with whom it contracts, to perform as
required by paragraphs (i)-(viii), with the certificate of coverage to be provided
to the person for whom they are providing services.
12
29. DISABLED EMPLOYEES
Contractors having more than fifteen (15) employees agree to comply with the Americans with Disabilities Act of
1990, and agree not to discriminate against a qualified individual with a disability because of the disability of such
individual in regard to job application procedures, the hiring, advancement, or discharge of employees, employee
compensation, job training, and other terms, conditions, and privileges of employment.
30. PROTECTION AGAINST CLAIMS OF SUBCONTRACTORS LABORERS MATERIALMEN AND
FURNISHERS OF MACHINERY, EQUIPMENT AND SUPPLIES
Without limiting, in any way, manner or form, the indemnity provided by Contractor in paragraph 27 hereof, the
Contractor agrees that it will indemnify and save the Owner and all of its officers, agents and employees,
harmless against any and all claims, liabilities, losses, damages, expenses and causes of action arising out of, in
any way, manner or form, the demands of subcontractors, laborers, workmen, mechanics, material men and
furnishers of machinery and parts thereof, equipment, power tools, and supplies, incurred in the performance of
this contract and the project which is the subject matter of this contract. When Owner so desires, the Contractor
shall furnish satisfactory evidence that all obligations of the nature hereinabove designated have been paid,
discharged or waived.
31. PROTECTION AGAINST ROYALTIES OR PATENT INVENTION
The Contractor shall pay all royalties and license fees, and shall provide for the use of any design, device, material
or process covered by letters patent or copyright by suitable legal agreement with the Patentee or owner thereof.
Without limiting, in any way, manner or form, the indemnity provided by Contractor in paragraph 27 hereof, the
Contractor shall defend all suits or claims for infringement of any patent or copyrights and shall indemnify and
save the Owner, and all of its officers, agents and employees harmless from any loss on account thereof, except
that Owner shall defend all such suits and claims and shall be responsible for all such loss when a particular
design, device, material or process or the product of a particular manufacturer or manufacturers is specified or
required in these contract documents by Owner; provided, however, if choice of alternate design, device, material
or process is allowed to the Contractor, then Contractor shall indemnify and save Owner, and all of its officers,
-. agents and employees harmless from any loss on account thereof. Notwithstanding anything herein to the
contrary, if the material or process specified or required by Owner and/or this contract is an infringement, the
Contractor shall be responsible for such loss unless it gives written notice of such infringement to the Owner's
Representative prior to offering.
32. LAWS AND ORDINANCES
The Contractor shall at all times observe and comply with all federal, state and local laws, ordinances and
regulations, which in any manner affect the contract or the work, and without limiting, in any way, manner or
form, the indemnity provided by Contractor in paragraph 27 hereof, Contractor shall indemnify and save harmless
the Owner, and all of its officers, agents, and employees against any claims arising from the violation of any such
laws, ordinances, and regulations, whether by the Contractor, its employees, or subcontractors. If the Contractor
observes that the plans and specifications are at variance therewith, he shall notify the Owner's Representative in
writing prior to proposing and any necessary changes shall be adjusted as provided in the contract for changes in
the work. In the absence of timely written notification to Owner's Representative of such variance or variances
within said time, any objection and/or assertion that the plans and specifications are at variance with any federal,
state or local laws, ordinances or regulations shall be deemed waived. If the Contractor, its employees or
subcontractors perform any work contrary to such laws, ordinances, rules and regulations, and without such notice
to the Owner's Representative, Contractor shall bear all costs arising there from.
The Owner is a municipal corporation of the State of Texas and the law from which it derives its powers, insofar
as the same regulates the objects for which, or the manner in which, or the conditions under which the Owner may
13
enter into contracts, shall be controlling, and shall be considered as part of this contract to the same effect as
though embodied herein.
33. SUBCONTRACTING
The Contractor agrees that it will retain personal control and will give its personal attention to the fulfillment of
this contract. The Contractor further agrees that subletting of any portion or feature of the work, or materials
required in the performance of this contract, shall not relieve the Contractor from its full obligations to the Owner,
as provided by the contract documents.
34. TIME FOR SUBSTANTIAL COMPLETION AND LIQUIDATED DAMAGES
It is hereby understood and mutually agreed by and between the Contractor and the Owner, that the date of
beginning and time for completion as specified in the contract documents, of work to be done hereunder are
essential conditions of this contract; and it is further mutually understood and agreed that the work embraced in
this contract shall be connnenced as provided in the contract documents.
If the Contractor should neglect, fail, or refuse to substantially complete the work within the time herein specified,
then the Contractor does hereby agree as part of the consideration for the awarding of this contract, the Owner
may withhold permanently from Contractor's total compensation, the sum of $1,000 (ONE THOUSAND) PER
DAY, not as a penalty, but as liquidated damages for the breach of the contract as herein set forth for each and
every working day that the Contractor shall be in default after the time stipulated for substantially completing the
work.
It is expressly understood and agreed, by and between Contractor and the Owner, that the time for the substantial
completion of the work described herein is reasonable time for the completion of the same, taking into
consideration the average climatic range and conditions and usual industrial conditions prevailing in this locality.
The amount is fixed and agreed upon by and between the Contractor and the Owner because the actual damages
the Owner would, sustain in such event would be difficult and/or impossible to estimate, however, the amount
agreed upon herein is a reasonable forecast of the amount necessary to render just compensation to Owner, and is
expressly agreed to be not disproportionate to actual damages as measured at time of breach.
IT IS FURTHER AGREED AND UNDERSTOOD BETWEEN THE CONTRACTOR AND OWNER THAT
TIME IS OF THE ESSENCE OF THIS CONTRACT.
35. TIME AND ORDER OF COMPLETION
It is the meaning and intent of this contract, unless otherwise herein specifically provided, that the Contractor
shall be allowed to prosecute its work at such time and sessions, in such order of precedence, and in such manner
as shall be most conductive to economy of construction; provided, however, that the order and time of prosecution
shall be such that the work shall be substantially completed as a whole and in part, in accordance with this
contract, the plans and specifications, and within the time of completion designated in the proposal; provided,
also, that when the Owner is having other work done, either by contract or by its own force, the Owner's
Representative may direct the time and manner of constructing work done under this contract so that conflicts will
be avoided and the construction of the various works being clone for the Owner shall be harmonized.
The Contractor shall submit, at such times as may reasonably be requested by the Owner's Representative,
schedules which shall show the order in which the Contractor intends to carry on the work, with dates at which
the Contractor will start the several parts of the work and estimated dates of completion of the several parts.
14
36. TIME OF PERFORMANCE
The Contractor agrees that it has submitted its proposal in full recognition of the time required for the completion
of this project, taking into consideration the average climatic range and industrial conditions prevailing in this
locality, and has considered the liquidated damage provisions of paragraph 34 hereinabove set forth and expressly.
agrees that it shall not be entitled to, nor will it request, an extension of time on thus contract, except when its
work has been delayed by an act or neglect of the Owner, Owner's Representative, employees of the Owner or
other contractors employed by the Owner, or by changes ordered in the work, or by strike, walkouts, acts of God
or the public enemy, fire or flood. Any request for extension shall be in writing with the written request for same
setting forth all justifications, in detail, for the request, and submitted to Owner's Representative within twenty
(20) calendar days of the occurrence of the event causing said delay. A failure by Owner's Representative to
affirmatively grant the extension no later than twenty (20) calendar days of written submission by Contractor shall
be deemed a denial, and final. Further, in the absence of timely written notification of such delay and request for
extension, as provided herein, any request for extension by Contractor shall be deemed waived.
37. HINDRANCE AND DELAYS
In executing the contract, the Contractor agrees that in undertaking to complete the work within the time herein
fixed, Contractor has taken into consideration and made allowances for all hindrances and delays incident to such
work, whether growing out of delays due to unusual and unanticipated circumstances, difficulties or delays in
securing material or workmen, or any other cause or occurrence. No charge shall be made by the Contractor for
hindrance or delays from any cause during the progress of any part of the work embraced -in this contract except
where the work is stopped by order of the Owner or Owner's Representative for the Owner's convenience, in
which event, such expense as in the sole judgment of the Owner's Representative that is caused by such stoppage
shall be paid by Owner to Contractor.
38. QUANTITIES AND MEASUREMENTS
No extra or customary measurements of any kind will be allowed, but the actual measured or computed length,
area, solid contents, number and weight oily shall be considered, unless otherwise specifically provided. In the
- event this contract is let on a unit price basis, then Owner and Contractor agree that this contract, including the
specifications; plans and other contract documents are intended to show clearly all work to be done and material
to be furnished hereunder. Where the estimated quantities are shown, and only when same are expressly stated to
be estimates, for the various classes of work to be done and material to be furnished under this contract, they are
approximate and are to be used only as a basis for estimating the probable cost of the work and for comparing
their proposals offered for the work. In the event the amount of work to be done and materials to be furnished are
expressly stated to be estimated, and only when same are expressly stated to be estimated, it is understood and
agreed that the actual amount of work to be done and the materials to be furnished under this contract may differ
somewhat from these estimates, and that where the basis for payment under this contract is the unit price method,
payment shall be for the actual amount of work done and materials furnished on the project.
39. PROTECTION OF ADJOINING PROPERTY
- The Contractor shall take proper means to protect the adjacent or adjoining property or properties in any way
encountered, which may be injured or seriously affected by any process of construction to be undertaken under
this agreement, from any damage or injury by reason of said process of construction; and Contractor shall be
i_. liable for any and all claims for such damage on account of his failure to fully protect all adjacent property.
Without limiting, in any way, manner and form, the indemnity provided by Contractor in paragraph 27 hereof, the
Contractor agrees to indemnify, save and hold harmless the Owner, and any of its officers, agents and employees,
against any and all claims or damages due to any injury to any adjacent or adjoining property, related to, arising
from or growing out of the performance of this contract.
15
i
40. PRICE FOR WORK
In consideration of the furnishing of all necessary labor, equipment and material and the completion of all work
by the Contractor, and on the delivery of all materials embraced in this contract in full conformity with the
specifications and stipulations herein contained, the Owner agrees to pay the Contractor the price set forth in the
proposal attached hereto, which has been made a part of this contract, and the Contractor hereby agrees to receive
such price in full for furnishing all materials and all labor required for the aforesaid work, also, for all expenses
incurred by Contractor and for well and truly performing the same and the whole thereof in the manner and
according to this agreement, the attached specifications, plans, contract documents and requirements of Owner's
Representative.
41. PAYMENTS
No payments made or certificates given shall be considered as conclusive evidence of the performance of the
contract, either wholly or in part, nor shall any certificate or payment be considered as acceptance of defective
work. Contractor shall at any time requested during the progress of the work furnish the Owner or Owner's
Representative with a verifying certificate showing the Contractor's total outstanding indebtedness in connection
with the work. Before final payment is made, Contractor shall satisfy Owner, by affidavit or otherwise, that there
are no outstanding liens against Owner's premises by reason of any work under the contract. Acceptance by
Contractor of final payment of the contract price shall constitute a waiver of all claims against Owner, Owner's
agents and employees, which have not theretofore been timely filed as provided in this contract.
42. PARTIAL PAYMENTS
On or before the tenth day of each month, the Contractor shall submit to Owner's Representative an application
for partial payment or, if the Contractor does not submit such application, the Owner's -Representative shall
determine the amount to be partially paid. Owner's Representative shall review said application for partial
payment if submitted, and the progress of the work made by the Contractor and if found to be in order, shall
prepare a certificate for partial payment showing as- completely as practical the total value of the work dono by the
Contractor. up to and including the last day of the preceding month. The determination of the partial payment by
the Owner's Representative shall be in accordance with Paragraph 14 hereof.
The Owner shall then pay the Contractor on or before the fifteenth day of the current month the total amount of
the Owner's Representative's Certificate of Partial Payment, less 5% of the amount thereof, which 5% shall be
retained until final payment, and further, less all previous payments and all further sums that may be retained by
Owner under the terms of the contract documents.
Any partial payment made hereunder shall not constitute a waiver by the Owner of any and all other rights to
enforce the express tenns of the contract documents, and all remedies provided therein, as to any and all work -
performed, to be performed • and/or materials delivered hereunder, including, but limited to, work to which said
partial payment is attributable.
43. SUBSTANTIAL COMPLETION
Contractor shall give Owner's Representative written notice of substantial completion. Within thirty-one (31)
working days after the Contractor has given the Owner's Representative written notice that the work has been
substantially completed, the Owner's Representative and/or the Owner shall inspect the work and within said time,
if the work be found to be substantially completed in accordance with the contract documents, the Owner's
Representative shall issue to the Owner and Contractor a certificate of substantial completion. Notwithstanding
the issuance of a certificate of substantial completion, Contractor shall proceed with diligence to finally complete
the work within the time provided in this contract.
16
44. FINAL COMPLETION AND PAYMENT
The Contractor shall give written notice to Owner's Representative of final completion. Upon written notice of
final completion, the Owner's Representative shall proceed to make final measurement to determine whether final
completion has occurred. If the Owner's Representative determines final completion has occurred, Owner's
Representative shall so certify to the Owner. Upon certification by Owner's Representative of final completion,
Owner shall pay to the Contractor on or before the 31 st working day after the date of certification of final
completion, the balance due Contractor under the terms of this agreement. Neither the certification of final
completion nor the final payment, nor any provisions in the contract documents shall relieve the Contractor of the
obligation for fulfillment of any warranty which may be required in the contract documents and/or any warranty
or warranties implied by law or otherwise.
._ 45. CORRECTION OF WORK
Contractor shall promptly remove from Owner's premises all materials condemned by the Owner's Representative
on account of failure to conform to the contract documents, whether actually incorporated in the work or not, and
Contractor shall at its own expense promptly replace such condemned materials with other materials confonning
to the requirements of the contract documents. Contractor shall also bear the expense of restoring all work of
other contractors damaged by any such removal or replacement. If Contractor does not remove and replace any
such condemned work within a reasonable time after a written notice by the Owner or the Owner's
Representative, Owner may remove and replace it at Contractor's expense.
Neither the final payment, nor certification of final completion or substantial completion, nor any provision in the
contract documents shall relieve the Contractor of responsibility for faulty materials or workmanship, and
Contractor shall remedy any defects due thereto and pay for any damage to other work resulting therefrom, which
shall appear within a period of one (1) year from the date of certification of final completion by Owner's
Representative.
46. PAYMENT WITHHELD
The Owner or Owner's Representative may, on account of subsequently discovered evidence, withhold or nullify
the whole or part of any certification to such extent as may be necessary to protect itself from loss on account of -
(a) Defective work not remedied and/or work not performed.
(b) Claims filed or reasonable evidence indicating possible filing of claims.
(c) Damage to another contractor.
When the above grounds are removed, or the Contractor provides a surety bond satisfactory to the Owner, in the
amount withheld, payment shall be made for amounts withheld because of them.
47. CLAIM OR DISPUTE
It is further agreed by both parties hereto that all questions of dispute or adjustment presented by the Contractor
LA shall be in writing and filed with the Owner's Representative within fifteen (15) calendar days after the Owner's
Representative has given any direction, order or instruction to which the Contractor desires to take exception.
Timely written notice of dispute as provided in this contract of any decision by Owner's Representative or Owner
shall be a condition precedent to the bringing and/or assertion of any action or claim by Contractor of any right
under this Contract. If the matters set forth in the notice of dispute are not granted or otherwise responded to by
Owner's Representative within fifteen (15) calendar days of receipt of notice of dispute by Owner's
Representative, said objections shall be deemed denied. Any decision by the Owner's Representative, or deemed
denial by the Owner's Representative, shall be final and conclusive in the absence of fraud. It is further agreed
F. that the acceptance by the Contractor of the final payment shall be a bar to any and all claims of the Contractor,
I'
�1
17
and constitute a waiver of the right to assert any claim against Owner, Owner's agents and employees and
Owner's Representative, by Contractor.
48. NON-COMPLIANCE AND/OR ABANDONMENT BY CONTRACTOR
In case the Contractor should (1) abandon and fail or refuse to resume work within fifteen (15) calendar days alter
written notification from the Owner or the Owner's Representative, or (2) if the Contractor fails to comply with
the written orders of the Owner's Representative, when such orders are consistent with this contract, then the
Surety on the bond shall be notified in writing and directed to complete the work and a copy of said notice shall
be delivered to the Contractor. In the event a bond is not required by law, or otherwise obtained by the
Contractor, no further notice of such non-compliance to Contractor shall be required.
After receiving said notice of abandonment or non-compliance , the Contractor shall not remove from the work
any machinery, equipment, tools, materials or supplies then on the job, but the same, together with any materials
and equipment under the contract for work, may be held for use on the work by the Owner or the Surety of the
Contractor, or another contractor, in completion of the work; and the Contractor shall not receive any rental or
credit therefore (except when used in connection with Extra Work, where credit shall be allowed as provided for
under paragraph 24 of this contract); it being understood that the use of such equipment and materials will
ultimately reduce the cost to complete the work and be reflected in the final settlement.
In the event the Contractor, or Surety, whichever is applicable, should fail to commence compliance with the
notice hereinbefore provided within ten (10) calendar days after service of such notice, and/or shall fail to proceed
with diligence to complete the project as contemplated and in compliance with all terms and provisions of the
contract documents, then the Owner may exercise any and all remedies available to it pursuant to law, contract,
equity or otherwise, including, but not limited to, providing for completion of the work in either of the following
elective manners:
(a) The Owner may employ such force of men and use of machinery, equipment, tools, materials and
supplies as said Owner may deem necessary to complete the work and charge the expense of such labor,
machinery, equipment, tools, materials and supplies to said Contractor, and the expense so charged shall
be deducted and paid by the Owner out of such moneys as maybe due, or that may thereafter at any time
become due to the Contractor under and by virtue of this Agreement. In case such expense is less than
the sum which would have been payable under this contract, if the same had been completed by the
Contractor, then said Contractor shall receive the difference. In case such expense is greater than the sum
which would have been payable under this contract, if the same had been completed by said Contractor,
then the Contractor and/or its Surety shall pay the amount of such excess to the Owner; or
(b) The Owner, under sealed proposals, after notice published as required by law, at least twice in a
newspaper having a general circulation in the County of location of the work, may let the contract for the
completion of the work under substantially the same terms and conditions which are provided in this
contract. In case of any increase in cost to the Owner under the new contract as compared to what would
have been the cost under this contract, such increase shall be charged to the Contractor and the Surety
shall be and remain bound therefore. Should the cost to complete any such new contract prove to be less
than that which would have been the cost to complete the work under this contract, the Contractor or his
Surety shall be credited therewith.
In the event the Owner's Representative elects to complete the work, as described above, when the work shall have been finally completed, the Contractor and his Surety shall be so notified and certification of completion as
provided in paragraph 44 hereinbbove set forth, shall be issued. A complete itemized statement of the contract
accounts, certified to by Owner's Representative as being correct shall then be prepared and delivered to
Contractor and his Surety, if applicable, whereon the Contractor or his Surety, or the Owner as the case may be,
shall pay the balance due as reflected by said statement within 30 days after the date of certification of
completion.
18
In the event the statement of accounts shows that the cost to complete the work is less than that which would have
been the cost to the Owner had the work been completed by the Contractor under the terms of this contract, or
when the Contractor and/or his Surety, if applicable, shall pay the balance shown to be due by them to the Owner,
then all machinery, equipment, tools, materials or supplies left on the site of the work shall be turned over to the
Contractor and/or his Surety, if applicable. Should the cost to complete the work exceed the contract price, and
the Contractor and/or his Surety, if applicable, fail to pay the amount due the Owner within the time designated
hereinabove, and there remains any machinery, equipment, tools, materials or supplies on the site of the work,
notice thereof, together with an itemized list of such equipment and materials shall be mailed to the Contractor
and his Surety, if applicable, at the respective addresses designated in this contract; provided, however, that actual
written notice given in any manner will satisfy this condition. After mailing, or other giving of such notice, such
property shall be held at the risk of the Contractor and his Surety, if applicable, subject only to the duty of the
Owner to exercise ordinary care to protect such property. After fifteen (15) calendar days from the date of said
notice the Owner may sell such machinery, equipment, tools, materials or supplies and apply the net sum derived
from such sale to the credit of the Contractor and his Surety, if applicable. Such sale may be made at either public
or private sale, with or without notice, as the Owner may elect. The Owner shall release any machinery,
equipment, tools, materials, or supplies that remain on the jobsite and belong to persons other than the Contractor
or his Surety, if applicable, to their proper owners.
The remedies provided to Owner by law, equity, contract, or otherwise, shall be cumulative, to the extent
permitted by law. It is expressly agreed and understood that the exercise by Owner of the remedies provided in
this paragraph shall not constitute an election of remedies on the part of Owner, and Owner, irrespective of its
exercise of remedies hereunder, shall be entitled to exercise concurrently or otherwise, any and all other remedies
available to it, by law, equity, contract or otherwise, including but not limited to, liquidated damages, as provided
in paragraph 34, hereinabove set forth.
49. LIMITATION ON CONTRACTOR'S REMEDY
The remedies of Contractor hereunder shall be limited to, and Owner shall be liable only for, work actually
performed by Contractor and/or its subcontractors as set forth in the contract documents, and Owner shall not be
liable for any consequential, punitive or indirect loss or damage that Contractor may suffer in connection with the
project which is the subject matter of this contract.
50. BONDS
The Contractor is required to furnish a performance bond in accordance with Chapter 2253, Government Code, in
the amount of 100% of the total contract price in the event that said contract price exceeds $100,000 and the
Contractor is required to furnish a payment bond in accordance with Chapter 2253, Government Code, in the
amount of 100% of the total contract price in the event that said contract price exceeds $25,000. All bonds shall
be submitted on forms supplied by the Owner, and executed by an approved Surety Company authorized to do
business in the State of Texas. It is further agreed that this contract shall not be in effect until such bonds are so
furnished.
51. SPECIAL CONDITIONS
In the event special conditions are contained herein as part of the contract documents and said special conditions
conflict with any of the general conditions contained in this contract, then in such event the special conditions
shall control.
52. LOSS OR EXPENSE DUE TO UNUSUAL OR UNANTICIPATED CIRCUMSTANCES
Unless otherwise specified herein, all loss, expense or damage to the Contractor arising out of the nature of the
work to be done, or from the action of the elements, or from any unforeseen circumstance or from unusual
19
obstructions or difficulties, naturally occurring, man made or otherwise, which may be encountered in the
prosecution of the work, shall be sustained and borne by the Contractor at his own cost and expense.
53. INDEPENDENT CONTRACTOR
Contractor is, and shall remain, an independent contractor with full, complete and exclusive power and authority
to direct, supervise, and control its own employees and to determine the method of the performance of the work
covered hereby. The fact that the Owner or Owner's Representative shall have the right to observe Contractor's
work during Contractor's performance and to carry out the other prerogatives which are expressly reserved to and
vested in the Owner or Owner's Representative hereunder, is not intended to and shall not at any time change or
effect the status of the Contractor as an independent contractor with respect to either the Owner or Owner's
Representative or to the Contractor's own employees or to any other person, firm, or corporation.
54. CLEANING UP
The Contractor shall at all times keep the premises free from accumulation of debris caused by the work, and at
the completion of the work Contractor shall remove all such debris and also its tools, scaffolding, and surplus
materials and shall leave the work room clean or its equivalent. The work shall be left in good order and
condition. In case of dispute Owner may remove the debris and charge the cost to the Contractor.
55. HAZARDOUS SUBSTANCES AND ASBESTOS
Hazardous Substances (herein so called), as defined in the Comprehensive Environmental Response,
Compensation, and Liability Act (42 U.S.C.S. §9601(14)) and the regulations promulgated thereunder, as same
may be amended from time to time, hydrocarbons or other petroleum products or byproducts and/or asbestos, in
any form, shall not (i) be utilized, in any way, manner or form, in the construction of, or incorporation into, the
Project; or (ii) be brought upon, placed, or located, by any party, on the Project site, or any other property of the
City, without the written consent of the Owner's Representative. If Contractor believes that the utilization of a
Iazardous Substance, hydrocarbons or other petroleum products or byproducts and/or asbestos is necessary in the
construction of the Project, or that it is necessary to place and/or otherwise locate upon the site of the Project or
other property of the City, a Hazardous Substance, hydrocarbons or other petroleum products or byproducts
and/or asbestos, Contractor shall notify the Owner's Representative, and request consent therefrom, at least
twenty (20) days prior to such action. Owner's Representative may grant or deny the request of Contractor and
provide whatever requirements such consent, if granted, is conditioned upon, in its sole and absolute discretion. If
the request of Contractor is not granted, or otherwise not responded to, by Owner's Representative within five (5)
days of the receipt of said request, said request shall be deemed to be denied.
In the event Owner's Representative shall consent to the request of Contractor, Contractor shall be responsible for
ensuring that all personnel involved in the Project are (i) trained for the level of expertise required for proper
performance of the actions contemplated by this Contract and, in particular, in all aspects of handling, storage,
disposal and exposure of Hazardous Substances, hydrocarbons or other petroleum products or byproducts and/or
asbestos; and (ii) are provided and utilize all protective equipment, including without limitation, personal
protective gear, necessary to provide protection from exposure to Hazardous Substances, hydrocarbons or other
petroleum products or byproducts and/or asbestos.
56. NONAPPROPRIATION
All funds for payment by the City under this contract are subject to the availability of an annual appropriation for
this purpose by the City. In the event of non -appropriation of funds by the City Council of the City of Lubbock
for the goods or services provided under the contract, the City will terminate the contract, without termination
charge or other liability, on the last day of the then -current fiscal year or when the appropriation made for the
then -current year for the goods or services covered by this contract is spent, whichever event occurs first. If at
any time funds are not appropriated for the continuance of this contract, cancellation shall be accepted by the
20
57.
Seller on thirty (30) days prior written notice, but failure to give such notice shall be of no effect and the City
shall not be obligated under this contract beyond the date of termination.
THE CITY RIGHT TO AUDIT
At any time during the term of this Contract and for a period of four (4) years thereafter the City or a duly
authorized audit representative of the City, or the State of Texas, at its expense and at reasonable times, reserves
the right to audit Contractor's records and books relevant to all services provided under this Contract. In the event
such an audit by the City reveals any errors/overpayments by the City, Contractor shall refund the City the full
amount of such overpayments within thirty (30) days of such audit findings, or the City, at its option, reserves the
right to deduct such amounts owing the City from any payments due Contractor.
2t
Page Intentionally Left Blank
CURRENT WAGE DETERMINATIONS
Pap_e Intentionally Left Blank
RE: RESOLUTION NO.2002-R0483, NOVEMBER 14, 2002
Craft
Acoustical Ceiling Installer
Air Conditioner Installer
Air Conditioner Installer -Helper
Asbestos Worker
Asbestos Supervisor
Bricklayer
Bricklayer -Helper
Carpenter
Carpenter -Helper
Cement Finisher
Drywall Hanger
Electrician
Electrician -Helper
Equipment Operator -Heavy
Equipment Operator -Light
Fire Sprinkler Fitter -Journey
Fire Sprinkler Fitter -Apprentice
Floor Installer
Glazier
Insulator-Piping/Boiler
Insulator -Helper
Iron Worker
Laborer -General
Mortar Mixer
Painter
Plumber
Plumber -Helper
Roofer
Roofer -Helper
Sheet Metal Worker
Sheet Metal Worker -Helper
Welder -Certified
EXHIBIT A
City of Lubbock
Building Construction Trades
Prevailing Rates
Hourly Rate
11.50
12.00
7.50
9.00
12.50
12.50
7.00
11.00
7.00
9.00
11.00
15.00
8.00
10.00
9.00
18.00
10.00
9.50
10.50
10.50
7.00
11.00
6.00
6.00
9.50
12.50
7.00
9.00
7.00
10.00
7.00
11.00
1
EXHIBIT B
Paving and Highway Construction
Prevailing Wage Rates
Craft Hourly Rate
Asphalt Heaterman
9.00
Asphalt Shoveler
7.50
Concrete Finisher
9.00
Concrete Finisher -Helper
7.50
Electrical Repairer -Equipment
12.50
Flagger
6.50
Form Setter
8.00
Form Setter -Helper
6.50
Laborer -General
6.00
Laborer -Utility
6.75
Mechanic
9.00
Mechanic -Helper
7.00
Power Equipment Operators
Asphalt Paving Machine
9.00
Bulldozer
9.00
Concrete Paving Machine
9.00
Front End Loader
9.00
Heavy Equipment Operator
9.00
Light Equipment Operator
8.00
Motor Grader Operator
10.25
Roller
7.00
Scraper
7.50
Tractor -Trailer
8.50
Truck Driver -Heavy
8.00
Truck Driver -Light
7.00
2
EXHIBIT C
Prevailing Wage Rates
Overtime Rate
The rate for overtime (in excess of forty hours per week) shall be as required by the Fair Labor Standards Act.
EXHIBIT D
Prevailing Wage Rates
Legal Holiday Rate
The rate for legal holidays shall be as required by the Fair Labor Standards Act.
3
Page Intentionally Left Blank
SPECIFICATIONS
Pavement Repair and Compaction
98t" & Quaker Avenue
TECHNICAL SPECIFICATIONS
FEBRUARY 2008
TABLE OF CONTENTS
Pavement Repair and Compaction - 981h & Quaker Avenue
DIVISION I --GENERAL, REQUIREMENTS
Sec.
Description Pages
01010
Summary of Work....................................................................3
01019
Contract Considerations..............................................................1
01039
Coordination of Meetings...........................................................3
01140
Work Restrictions....................................................................3
01322
Photographic Documentation......................................................2
01356
Storm Water Pollution Prevention Plan..,.,,,..,_„
01400
(duality Requirements................................................................3
01555
Barricades, Signs, and Trattic handling..........................................1
01576
Waste Material Disposal............................................................2
01700
Contract Closeout.. .. . ................................................................ 2
DIVISIONS 2 "TIiROUGH
16 (NOT USED)
Pavement Repair & Compaction February 2008
98rh Street & Quaker Avenue - 91081
SEcTiON 01010
SUMMARY OF WORK
PART t -- GENERAL
1.1 SUMMARY
A. The OWNER is the City of Lubbock
B. The Owner's representative is:
a. L. Wood Franklin, P.E.
Chief Water Utilities Engineer
City of Lubbock
(806) 745 -- 2343
C. Section includes:
a. Project description
b. Permits and licenses
c. Access to site
d. Contractor's us of the premises
e. Coordination requirements
f. Coordination drawings
g. Preconstruction meeting
h. Warranty
1.2 PROJE:CI' DESCRIPTION
A. Description: This is a unit price contract (unless shown differently on bidding
tab) that consists of removing and replacing subsided Hot Mix Asphaltic
Concrete (HMAC) pavement, caliche base, curbing, trench backfill, sod, and
soil. The project is located at United Super Market parking lot on the south side
of 98'h Street near Quaker Avenue.
F
a. Sawcut and remove existing HMAC paving surface and caliche base material
and legally dispose of materials off -site, including all cutting, hauling and
disposal as shown on the project drawing.
b. Sawcut and remove existing concrete curb and gutter materials and legally
dispose of materials off -site, including all cutting, hauling, and disposal as
shown on the project drawing. 3
c. Remove, salvage and replace existing sod, including all necessary work to {
salvage, irrigate and replace sod to final repaired grade as shown on the
drawing. 1
d. Temporarily remove one ( l) existing live tree within the landscaped area that
has subsided. Maintain the tree in healthy condition and then replant per 4
accepted technique to assure continued health after construction
improvements are completed, just prior to re -sodding.
e. Repair existing landscape irrigation system where necessary between back of
curb in parking lot and sidewalk adjacent to 981" Street as a result of trench
subsidence and any damage during construction. Work shall include all
piping, wiring, irrigation heads, fittings, controls, and other accessories to
provide a properly working system within the larger system.
Pavement Repair & Compaction 01010-1 February 2008
98°i Street & Quaker Avenue - 91081
f. Provide new HMAC paving surfacing on caliche base, per original Project
Specifications, including a minimum 2-inch compacted HMAC surface
course and a minimum 8-inch compacted caliche base as shown in the
project drawing.
g. Provide new concrete curb and gutter, per the original Project Specifications
as shown on the project drawing.
h. Provide new pavement striping per original Project Specifications on new
HMAC.
i. Provide trench repair using one of three options as shown on project drawing.
1.3 DEFINITIONS
A. Remove: To excavate and legally dispose of existing materials as incidcated.
B. Replace: To put products in place in the work ready for the intended use,
including unloading, unpacking, handling, storing, assembling, installing,
erecting, placing, applying, anchoring, working, finishing, curing, protecting,
cleaning, and similar operations.
C. Provide: To furnish and install products.
D. Indicated: Shown, noted, scheduled, specified, or drawn, somewhere in the
contract documents.
ls. Engineer: Hugo Reed & Associates
F. Owner: City of Lubbock
G. Original Project Specifications: Drawings and Specifications used to construct
the United Super Market at 981h Street and Quaker Avenue.
1.4 REGULATORY REQUIREMENTS
A. Submit copies of all permits, licenses, and similar permissions obtained, and
receipts for Fees paid, to the owner directly.
1.5 ACCESS TO THE SITE AND USE OF THE PREMISES
A. The space available to the Contractor for the performance of the work, either
exclusively or in conjunction with others performing other construction as part of
the project, is restricted to the area shown on the site plan of the contract
drawings unless the Contractor makes arrangements to use additional space with
the Owner. An additional staging area will be made available if required.
B. Signs: Provide signs adequate to direct traffic if impedence of traffic on 98`'
street is necessary.
C. Barricades: Provide barricades to keep people and traffic from construction area.
1.6 PROJECT IDENTIFICATION
A. A project sign is not required.
1.? PROJECT SCHEDULE
A. The Work summarized above shall be completed within sixty (60) calendar days
from the date of the Notice to Proceed. There will be a $1,000 per day liquidated
damages for cacti day that exceeds the sixty (60) day limit.
Pavement Repair & Compaction
W" Street & Quaker Avenue - 91091
01010-2 February 2008
1.8 SUBSTANTIAI, COMPLETION VERSUS FINAL COMPLETION
A. Punch List will be created during walk through at substantial completion. The
contractor must complete all punch list items within 10 work days as measured
from the date the contractor receives the punchlist. Liquidated damages of' $1,000
per day will apply if any punch list item or items remain uncorrected and
approved by the engineer.
PART 2—PRODUCTS
Not used
PART 3 —
EXECUTION
3.1 SECURITY
PROCEDURES
A.
Limit access to the site to persons involved in the work.
B.
Provide storage for materials for which the owner has made payments and which
are stored on site.
C.
Secure completed work as required to prevent loss.
D.
Secure the site by means of fencing, security guards, or other means to prevent
damage, theft, safety hazards, or other problems on the site. The use of security
personnel shall be cleared with the Owner.
E.
See the Supplementary Conditions,
3.2 COORDINATION
A.
Coordinate work with Contacts and Public Utility Contacts listed on the
drawings. if necessary, inform each party involved, in writing, of procedures
required for coordination; include requirements for giving notice, submitting
reports, and attending meetings.
a. Inform the Owner when coordination of his work is required. !
B.
See other requirements in other portions of the contract documents.
3.3 WARRANTY
A.
Contractor shall warrant 100 percent of the project for two (2) years after the date
of final acceptance of the work.
B.
On the eleventh month from the date of final acceptance, an Owner's
representative will schedule an annual inspection with the presence of the
Contractor to inspect for defects and assessment of the work performed. Any
work that is considered defective by the Owner's representative will be repaired. r
I
C.
The Contractor shall remedy any defects in workmanship, and pay for any and all
damages of any nature whatsoever resulting in detects at no cost to the Owner. i
END OF SECTION s
Pavement Repair & Compaction 01010-3 F'ebmary 2008
98'h Street & Quaker Avenue - 91081
SECTION 01019
CONTRACT CONSIDERATIONS
PART 1 — GENERAL
1.1 SECTION INCLUDES
A. Schedule of Values
B. Application for Payment
1.2 SCHEDULE OF VALUES
A. Submit a printed schedule on Engineer approved Contractor's form or electronic
media printout.
B. Submit Schedule of Values in duplicate within five (5) days after receiving the
bid tabulation.
C. Revise schedule to list approved Change Orders, with each Application for
Payment.
1.3 APPLICATIONS FOR PAYMENT
A. Submit two (2) copies of each application on Engineer approved Contractor's
form or electronic media printout.
B. Content and Format: Utilize Schedule of Values for listing items in Application
for Payment.
C. Pavment Period: Single payment at end of project.
D. Submit the following along with the application for final payment:
a. The documentation for the completed project.
b. Signed affidavit from a Notary Public that all claims on this job have been
settled and that all bills owed by tite Contractor for the project including
materials and labor have been paid.
c. Contractor warranties for this job shall be signed and sealed by a Notary
Public.
PART 2 — PRODUCTS
Not used
PART 3 —EXECUTION
Not used
LEND OF SECTION
Pavement Repair & Compaction 01019-1 Febnaarv2008
98"' Street & Quaker Ave - 91081
SECTION 01.039
COORDINATION AND MEETINGS
PART I -- GENERAL
1.1 RE LATE'D DOCUMENTS
A. Drawings: General Instructions to Bidders, General Conditions of the
Agreement, Special Provisions and Division I — General Requirements apply to
Work of this Section.
1.2 SECTION INCLUDES
A. Coordination
B. Field engineering
C. Preconstruction meeting
D. Progress meetings
E. Preinstallation meetings
F. Cutting and patching
1.3 COORDINATION
A. Coordinate scheduling, submittals, and Work of the various Sections of the
Project Manual to assure efficient and orderly sequence of installation of
interdependent construction elements, with provisions for accommodating items
installed later.
13. Coordinate completion and cleanup of Work of separate Sections in preparation
for Substantial -Completion,
C. After Owner occupancy of premises, coordinate access to site for correction of
defective Work and Work not in accordance with Contract Documents, to
minimize disruption of Owner's activities.
1.4 FIELD ENGINEERING
A. Locate and protect any survey control and reference points.
LS PRECONSTRUCTION MEETING
A. The Owner will schedule a meeting after a Notice to Proceed.
B. Procedures and processing of field decisions, submittals, and substitutions,
applications for payments, proposal request, Change Orders and Contract
closeout procedures.
C. Agenda:
a. Use of premises by Owner and Contractor.
b. Distribution of executed Contract Documents.
c. Submission of list of Subcontractors, list of products and progress schedule.
Pavement Repair & Compaction 01039-1 February 2008
98'" Street &. Quaker Avenue - 91081
d. Designation of personnel representing the parties in Contract and the
Engineer.
e. Owner's requirements.
f. Construction facilities, if any, and controls provided by Owner.
g. Survey and layout.
h. Security and housekeeping procedures.
i. Schedule.
j. Procedures for testing soil compaction and concrete strength.
k. Procedures for maintaining record documents.
D. Record minutes and distribute copies within five (5) days after meeting to
participants and those affected by decisions made.
1.6 PROGRESS MEETINGS
Not used.
PART 2 — PRODUCTS
Not used
PART 3 — EXECUTION
3.1 EXAMINATION
A. Verify that existing site conditions and substrate surfaces are acceptable for
subsequent Work. Beginning new Work means acceptance of existing
conditions.
B. Examine and verify specific conditions described in individual specification
sections.
C. Verify that utility services are available, if needed, of the correct characteristics, '
and in the correct location.
3.2 PREPARATION
A. Clean substrate surfaces prior to applying next material or substance.
B. Seal cracks or openings of substrate prior to applying next material or substance.
C. Apply any manufacturer required or recommended substrate primer, sealer, or
conditioner prior to applying any new material or substance in contact or bond.
3.3 CUTTING AND PATCHING
A. FInploy skilled and experienced installer to perfortu cutting, and patching. Ali
pavement and curb cuts shall be saw cuts.
B. Execute cutting, fitting, and patching, including excavation and fill, to complete
Work, and to
a. Fit the several parts together, to integrate with other Work
b. Uncover Work to install or correct ill-timed Work
c. Remove and replace defective and non -conforming Work
Pavement Repair & Compaction —� --01039-2 " -^ � February" 2009
981h Street & Quaker Avenue - 91081. p
d. Remove samples of installed Work for testing
C. Execute work by methods which will avoid damage to other Work, and provide
surfaces to receive patching and finishing.
D. Cut rigid materials using tnasonry saw or core drill.
E. Restore Work with new products in accordance with requirements of Contract
Documents.
F. Fit Work tight to pipes, sleeves, ducts, conduit, and other penetrations through
surfaces.
G. Refinish surfaces to match adjacent finishes.
11. Identify any hazardous condition exposed during the Work to the Engineer for
decision or remedy.
END OF SECTION
Pavement Repair & Compaction 01039-3 Febmary 2008
98'4 Street & Quaker Avenue - 91081
SECTION 01140
WORK RESTRICTIONS
PART I -- GENERAL,
1.1 SECTION INCLUDES
A.
Use or premises
B.
Special scheduling requirements
C.
Working period
D.
Utility cutovers and interruptions
E.
Noise restrictions
F.
Occupancy requirements
1.2 RELATED DOCUMENTS
A. Drawings and general provisions of the Contract, including General Conditions
and other Division I Specification Sections, apply to this Section.
1.3 USE OF PREMISES
A. Use of site: Limit use of premises to work in areas indicated. Do not disturb
portions of site beyond areas in which the Work is indicated.
a. Limits: Confine construction operations such that blocking of traffic on 98'h
street is not required. Confine to area no greater than 40 feet south of the
curb to he removed. Coordinate barricading with Owner who will coordinate
with United Super Market. Do not coordinate directly With United Super
Market.
b. Driveways and Entrances: Keep driveways and entrances serving premises
north and south of the construction area clear and available to employees,
general public and emergency vehicles at all times. Do not use these areas
for parking or storage of materials.
1.4 SPECIAL SCHEDULING REQUIREMENTS
A. [-lave materials, equipment, and personnel required to perform the work at the
site prior to the commencement of the Work.
B. Permission to interrupt any utility service shall be requested in writing a
minimum of fourteen (14) calendar days prior to the desired date of interruption.
1.5 WORKING PEIRIOD
A. Working hours: Regular working hours shall be within a thirteen (13) hour
period between 7:00 a.m. and 8:00 p.m., Monday through Friday. Work on
Saturdays and Sundays must be authorized by the Owner as noted in paragraph
1.5.13. The Owner reserves the right, at the Owner's discretion, to disallow work
Pavement Repair & Compaction 01140-1 February 2008
98'' Street & Quaker Avenue - 91081
when it interferes with holiday times and traffic. No work shall be performed on
the following holiday periods or days:
a. New Year's Day
b. Good Friday Holiday
c. Memorial Day Holiday
d. Independence Day Holiday
e. Labor Day Holiday
f. 'Thanksgiving Day Holiday plus the day before and the three clays following
"Thanksgiving Day.
g. Christmas Week. If Christmas Day falls on Saturday, this will be defined as
the week leading to Christmas Day. If Christmas Day falls on Sunday, this
will be defined as the week following Christmas Day plus the Friday and
Saturday prior to Christmas Day.
B. Work outside Regular Flours: No work shall be done outside of Regular
Working flours.
1.6 NOISE RESTRICTIONS
A. 75 dI3 limit at face of nearest structure during normal daylight hours.
B. 65 dB limit at face of nearest structure during evening and nighttime hours in or
near residential areas and for 24-hour working conditions that have received
Owner approval. Evening and nighttime hours shall be defined as 6:00 p.m. to
7:00 a.m.
C. The Contractor shall keep on -site a hand portable sound measurement device for
both the Owner's and the Contractor's use for measuring noise levels.
1.7 ADVANCE NOTICE
A. Owner shall be notified 5 days in advance of starting work.
1.8 WATER FOR CONSTRUCTION
A. Obtaining water for construction is the Contractor's sole responsibility.
B. Water is available from the potable water system of the City of Lubbock for
construction purposes. The Contractor is responsible for all charges and
arrangements for water consumption from the potable water system. The
Contractor shall make such arrangements directly with the City of Lubbock
Water Utilities Department. The City will not furnish potable water free of
charge for the construction work. The Contractor is responsible for any required
metering and hauling.
C. Water from park area lakes shall not be used for construction.
D. This section does not preclude the Contractor from seeking other water sources
for use in construction. Such water resources shall meet the purity requirements
for the intended use. Such arrangements for water from other sources are the
responsibility of the Contractor.
PART 2 — PRODUCTS
Not used
Pavement Repair he Compaction 01 140-2 February 2009
98'" Street & Quaker Avenue - 91081
I
PART 3 — EXECUTION
3.1 WORK AREA LIMITS
Not used.
END OF SECTION
Pavement Repair & Compaction 01140-3 Pehruary 2008
98"' Street & Quaker Avenue - 91081
SECTION 01322
PHOTOGRAPHIC DOCUMENTATION
PART 1— GENERAL
1.1 SECTION INCLUDES
A. This section includes administrative and procedural requirements for the
following:
a. Preconstruction photographs
b. Periodic construction photographs
B. Related Sections include the following:
a. Division 1 Section "Submittal Procedures" for submitting construction
photographs.
1.2 RELATED DOCUMENT'S
A. Drawings and general provisions of the Contract, including General and
Supplementary Conditions and other Division l Specification Sections, apply to
this Section.
1.3 SUBMITTALS.
A. Submit three (3) complete sets of preconstruction photographs to the Engineer.
The Owner and the Engineer will retain all three (3) sets.
a. Identification: On back of each print provide an applied label or rubber-
stamped impression with the following information:
i. Name of Project
ii. Name and address of photographer
iii. 'dame of Engineer
iv. Name of Contractor
v. Date photograph was taken
vi. Description of vantage point, indicating location, direction (by
compass point), and elevation or story of construction.
b. Digital Images: Submit a complete set of digital image electronic files with
each submittal of prints. Identify electronic media with date photographs
were taken. Submit images that have the same aspect ratio as the sensor,
uncropped.
13. Summary of Photos required:
a. Pre -construction,
b. Excavated trench before back tilling is started for each section if done in
sections,
c. '(Tench, after till in of tlowable fill but before each successive 6" lift of fill
for each section if done in sections
d. Finished compacted sub -grade prior to caliche base for each section
e. Finished compacted grade before paving or curb placement
f Finish photos at end of the project but prior to acceptance. Finish photo shall
include the landscape area with working sprinkers; restored and marked
Pavement Repair & Compaction 01322-1 February 2008
98`h Street & Quaker Avenue - 91081
pavement and curbing. Photos of finish work shall be fi•om a minimum of
three vantage points.
PART 2 — PRODUCTS
Not used
PART 3 — EXECUTION
3.1 PHOTOGRAPHS, GENERAL
A. Field Office Prints: Not Used
3.2 CONSTRUCTION PHOTOGRAPHS
A. As specified in 1.3 of this section.
END OF SECTION
Pavement Repair & Compaction 01322-2 February 2008
98'h Street & Quaker Avenue - 91081
SECTION 01356
STORM WATER POLLUTION PREVENTION :MEASURES
PART I — GENERAL
1.1 GENERAL
A. The Contractor shall implement, maintain, and update the Storm Water Pollution
Prevention measures specified in the Storm Water Pollution Prevention Plan
(SWP3) in a manner, which will meet the requirements of the Texas Pollution
Discharge Elimination System (TPDES) General Permit No.TXR150000. 'The
Contractor shall be responsible for any fines or penalties assessed by the
appropriate regulatory agency for failure to make required inspections, failure to
properly document those inspections, failure to adequately implement and adjust
the storm water pollution prevention measures specified in the SWP3 to
adequately control pollutants, and/or any other fines or penalties assess by TCEQ
or the EPA for failure to comply with any part of the permit requirements. The
Contractor shall submit a Notice of Intent and a Notice of Termination
independently of the Owner.
B. Fines levcled against the Owner by the TCF.Q or the EPA for the Contractor's
failure to comply with and maintain the SWP3 shall be paid by the Contractor.
PART 2 —PRODUCTS
Not Used
PART 3 —EXECUTION
3.1 STORM WATER POLLUTION PREVENTION PLAN
A. Storm Water Pollution Prevention Plan will be provided by the Contractor as
required. Contractor must keep a copy of the SWP3 on site at all times.
END OF SECTION
I'aventent Repair & Compaction 01356-1 February 2008
98'h Street & Quaker Avenue - 91081
SECTION 01400
QUALITY REQUIREMENTS
PART 1 —GENERAL
1.1 SUMMARY
A. This Section includes administrative and procedural requirements for quality
assurance and quality control.
B. Testing and inspecting services are required to verify compliance with
requirements specified or indicated. These services do not relieve the Contractor
of responsibility for compliance with the Contract Document requirements.
a. Specific quality control requirements for individual construction activities
are specified in the sections that specify those activities. Requirements in
those Sections may also cover production of standard products.
b. Specified tests, inspections, and related actions do no limit the Contractor's
quality control procedures that facilitate compliance with the Contract
Document requirements.
1.2 RELATF,D DOCUMENTS
A. Drawings and general provisions of the Contract, including General Conditions
and other Division I specification Sections, apply to this section.
1.3 DE-FINITIONS
A. Quality Assurance Services: Activities, actions, and procedures performed
before and during execution of the Work to guard against defects and
deficiencies and ensure that proposed construction complied with requirements.
B. Quality Control Services: Test, inspections, procedures, and related actions
during and after execution of the Work to evaluate that completed construction
complies with requirements.
1.4 SUBMITTALS
A. Qualification Data: For individuals employed by the Contractor who will
perform testing as required by the drawings, submit at least fourteen (1 4) days
prior to being used on the project the capabilities and experience of such
individuals and the types of tests that the individual will perform. For outside
testing agency employed by the Contractor, submit at least fourteen (14) days
prior to being used on the project the name, address, and manager of such testing
agency and the types of tests that the agency will perform. Such testing agcncy
shall be acceptable to the Owner prior to being used on the project.
B. Reports: Prepare and submit written reports within fourteen (14) days following
the date of the test that include the following:
a. Date of issue
b. Project title and number.
Pavement Repair & Compaction �^ W400-1 T February 2008T
980' Street & Quaker Avenue - 91081
c. Name, address, and telephone number of testing agency. If the individual is
employed by the Contractor, use Contractor's name, address, and telephone
number.
d. Dates and locations of samples and test
e. Names of individuals making tests
f. Description of the work and test method
g. Identification of material, product, and specification Section.
h. Complete test or inspection data
i. Test results and interpretation of test results
j. Ambient conditions at time of sample taking and testing.
k. Comments and opinion on whether tested Work complied with the Contract
Document requirements and the applicable specification Section,
I. Name and signature of individual performing the test if employee of the
Contractor, or name and signature of testing agency responsible person.
m. For failing tests, recommendations on retesting unless specification Sections
provide procedure for retesting.
C. Test Agency Qualifications: An agency with the experience and capability to
conduct testing indicated, as documented by ASTM E 548, and that has the
capability and experience in the types of tests to be performed.
D. "resting Agency Responsibilities: Sub►nit certified written report of each test and
similar Quality Assurance service to the Contractor. Interpret tests and state in
each report whether tested work complies with or deviates from the Contract
Document requirements.
1.5 QUALITY CONTROL
A. Contractor Responsibilities: Provide quality control services required in the
various specification Sections.
a. Where third party testing is engaged by the Contractor, notify testing agency
sufficiently in advance of the time and date when work that requires testing
will be performed.
b. 'resting requested by the Contractor and not required by the Contract
Documents are the Contractor's responsibility.
B. Retesting: Regardless of whether original tests were the Contractor's
responsibility, provide quality control services, including retesting, for
construction that revised or replaced work that failed to comply with
requirements established by the Contract Documents.
C. 'Testing Agency Responsibilities: Cooperate with the Engineer and Contractor in
performance of duties. Provide qualified personnel and necessary equipment to
perform required tests and inspections.
a. Notify the Engineer or Contractor promptly of irregularities or deficiencies
observed in the work during performance of its services.
b. Interpret tests and inspections and state in each report whether tested and
inspected work complies with or deviates from the requirements.
c. Submit a certified written report, in it iplicate. of each test, inspection, and
similar quality control service through the Contactor.
d. Do not release, revoke, alter, or increase requirements of the Contract
Documents or approve or accept and portion of the Work.
e. Do not perform any duties of the Contractor,
D. Associated Services: Cooperate with agencies performing required tests,
inspections, and similar quality control services, and provide reasonable auxiliary
Pavement Repair & Compaction 01400-2 Pebruary 2008
98`h Street & Quaker Avenue - 91081
services as requested. Notify agency sufficiently in advance or operations to
permit assignment of personnel. Provide the following:
a Access to the Work.
b. Incidental labor and facilities necessary to facilitate tests and inspections.
c. Adequate quantities of representative samples of materials that require
testing and inspecting. Assist agency in obtaining samples.
d. Facilities for storage and field curing of test samples.
e. Additional associated services required of the Contractor for testing access
are listed in the specification Sections.
f. Delivery of samples to testing agencies.
g. Preliminary design mix proposed for use for material mires that require
control by testing agency.
h. Security and protection for samples and for testing and inspecting equipment
at Project site.
E. Coordination: Coordinate sequence of activities to accommodate required
quality assurance and quality control services with a minimum of delay and to
avoid necessity of removing and replacing construction to accommodate testing
and inspecting.
a. Schedule times for tests, inspections, obtaining samples, and similar
activities.
PART 2 — PRODUCTS
Not used
PART 3 — EXECUTION
3.1 REPAIR AND PROTECTION
A. General: On completion of testing, inspecting, sample taking, and.similar
services, repair damaged construction, and restore substrates and finishes.
a. Provide materials and comply with installation requirements specified on
drawings. Restore patched areas and extend restoration into adjoining areas
in a manner that eliminates evidence of patching.
B. Protect construction exposed by or for quality control service activities.
C. Repair and protection are the Contractor's responsibility, regardless of the
assignment of responsibility for quality control services.
END OF SECTION
Pavement Repair & Compaction 01,100-3 February 2008
98"' Street & Quaker Avenue - 91081 } ,_,
SECTION 01555
BARRICADES, SIGNS, AND TRAFFIC HANDLING
PART 1 —GENERAL
1.1 DESCRIPTION
A. This item shall govern for providing, installing, moving, replacing, maintaining,
cleaning, and removing upon completion of work, all barricades, portable
barriers, signs, portable changeable message signs, cones, lights, and other such
type devices and of handling traffic as indicated on the plans or as directed by the
Engineer or Owner.
PART 2 — PRODUCTS
A. Construction Methods
a. All barricades, signs, and other types of devices listed above shall conform to
details shown on the plans or those indicated in the latest version of the
Texas Manual on Uniform "Traffic Control Devices (TM[JTCD). All traffic
control devices shall be crashworthy according to the guidelines set forth in
the National Cooperative Highway Research Program (NCHRP) Report 350.
PART 3 — EXECUTION
3.1 GENERAL
A. The Contractor shall propose his own 'traffic Control Plan (TCP) as -necessary
for phased construction. If the plan is approved in writing by the Engineer or
Owner, it may be used. Prior to beginning work, the Contractor shall designate,
in writing, a competent person who will be responsible and available on this
project site or in the immediate area to insure compliance with the TCP.
3.2 MAINTENANCE
A. All retroreflective traffic control devices such as barricades, vertical panels,
signs, etc., shall be maintained by cleaning, replacing, or a combination thereof
such that during darkness and rain the retroreflective characteristics shall equal or
exceed the retroreflective characteristics of traffic industry standard reflective
panels.
END OF SECTION
Pavetnent Repair & Compaction 01555-1 Pebruary 2009
98°i Street & Quaker Avenue - 91081
SECTION 01576
WASTE MATERIAL DISPOSAL
PART 1 — GENERAL
11 SECTION INCLUDES
A. Disposal of waste material and salvageable material.
1.2 RELATED SECTIONS
A. Section 02221 — Removing Existing Pavements.
B, Section 02317 — Excavation and Backfill for Utilities.
1.3 SUBMITTALS
A. Obtain and submit disposal permits for proposed disposal sites if required by
local ordinances.
B. Submit a copy of written permission from property owner, along with a
description of property, prior to disposal of excess material adjacent to the
Project. Submit a written and signed release from property owner upon
completion of disposal work. Both written permission and signed release shall
include hold -harmless clauses naming the City of Lubbock, Texas as the entitles
to be held harmless in any subsequent legal proceeding. Both property
permissions and signed releases shall be attested to by it notary public.
PART 2 — PRODUCTS
Not used
PART 3 — EXECUTION
3.1 SALVAGEABLE MATERIAL
A. Asphalt Pavement and Asphalt Stabilized Base: Conform to requirements of
Section 02221 — Removing Existing Pavements.
3.2 EXCESS MA['ERIAL
A. Vegetation, rubble, broken concrete, debris, asphaltic concrete pavement, excess
soil, and other materials not designated for salvage, shall become the property of
the Contractor and shall be removed from the job site and legally disposed of at a
proper facility such as the West 'rexas Region Disposal Facility (WTRDF).
a. Excess material may be disposed at the WI'RDF. There will be a tipping fee
of $28.50 per ton for construction debris and for excess uncontaminated soil.
For a complete list of fees associated with the W`rRDF, please go to the
City's website at IidAyastc_ei;{tthbuck.tx, �s;_disposal/disf;es.htm.
"there will also be a fee of $15.00 per load for every truck that is not covered
Pavement Repair & Compaction 01576-1 February 2008
9W" Street & Quaker Avenue - 91081
properly when coming to the landfill. All tipping fees shall be considered to
be included in the Contractor's bid prices.
B. Excess soil may be deposited on private property adjacent to the Project if
approved by the Owner and when written permission is obtained from the
property owner. See Paragraph 1.3.0 above.
C. Waste materials shall be removed from the site on a daily basis, such that the site
is maintained in a neat and orderly condition.
END OF SECTION
Pavement Repair & Compaction 01576-2 February 2008
93'h Street & Quaker Avenue - 91081
SECTION 01.700
i
CONTRACT CLOSEOUT
PART l — GENERAL
1.1 RELATED DOCUMENT'S
A. Drawings, General Instructions to Bidders, General Conditions of the Agreement, Special
Provisions and Division I —General Requirements apply to Work ofthis Section.
1.2 SECTION INCLUDES
A. Closeout procedures
B. Final cleaning
C. Project record documents
D. Operations and maintenance data
1.3 CLOSEOUT PROCEDURES
A. Submit final Application for Payment identitying total adjusted Contract Sum, previous
payments, and sum remaining due.
1.4 FINAL CLEANING
A. Execute final cleaning prior to final inspection.
B. Clean site; sweep paved areas, rake clean landscaped surfaces.
C. Remove waste and surplus materials, rubbish, and construction facilities from the site.
D. Repair, patch, and touch-up marred surfaces to match adjacent finishes.
1.5 PROJECT RECORD DOCUMENTS
A. Maintain on site, one set of the following record documents; record actual revisions to the
Work
a. Contract Drawings
b. Specifications
c. Addenda
d. Change Orders and other Modifications to the Contract
e. Reviewed shop drawings, product data, and samples.
B. Store Record Documents separate from documents used for construction.
C. Record information concurrent with construction progress.
D. Specifications: Legibly mark and record at each Product section description of actual
Products installed, including the following:
a. Changes made by Addenda and Modifications.
E. Record Documents: Legibly mark each item to record actual construction including:
a. 'Measured horizontal and vertical locations of underground utilities and
appurtenances referenced to permanent surface improvements.
b. Field changes of dimension and detail.
e. Details not on original Contract Drawings.
d. Changes made by Addenda and Modifications.
F. Submit two (2) copies to the Engineer with claim for final Application for Payment.
G. Use forms below for certification of Substantial Completion.
Pavement Repair & Compaction 01700-1
98'h Street & Quaker Avenue - 91081
February 2008
Certificate of Substantial Completion
Project: Towner: Owner's Contract No.:
Contract: Pate or Contract:
Contractor. (Engineer's Project No.:
This [tentative] [deffnitivej Certificate of Substantial Completion applies to:
All Work under the Contract Documents: The following specified portions:
Date of Substantial Completion
The Work to which this Certificate applies has been inspected by authorized representatives of Owner, Contractor and Engineer,
and found to be substantially complete. The Date of Substantial Completion of the Project or portion thereof designated above is
hereby declared and is also the date of commencement of applicable warranties required by the Contract Documents, except as
stated below.
A [tentative] [revised tentative] [definitive] list of items to be completed or corrected, is attached hereto. This list may not be all-
inclusive, and the failure to include any items on such list does not alter the responsibility of the Contractor to complete all Work in
accordance with the Contract Documents.
The responsibilities between OWNER and CONTRACTOR for security, operation, safety, maintenance, heat, utilities,
Insurance and warranties shall be as provided in the Contract Documents except as amended as follows:
Amended Responsibilities Not Amended
Owners Amended Responsibilities:
Contractors Amended Responsibilities:
The following documents are attached to and made part of this Certificate:
This Certificate does not constitute an acceptance of Work not in accordance with the Contract Documents nor is it a release of
Contractor's obligation to complete the Work in accordance with the Contract Documents.
Executed by Engineer pate
Accepted by Contractor .. Date
Accepted by Owner Date
Pavement Repair & Compaction J ~-01700-2February 2008— -�---
98rh Street & Quaker Avenue - 91081
CERTIFICATE OF SUBSTANTIAL COMPLETION
Project _
Location
Project or Specified Part Shall Include
File No.
Spec. No
Date of Substantial Completion Contract
The Work performed under this Contract has been inspected by authorized
representatives of the Owner, Contractor, and Consultant, and the Project (or specified
part of the Project, as indicated above) is hereby declared to be substantially completed
on the above date.
DEFINITION OF SUBSTANTIAL COMPLETION
The stage in construction when a project can be utilized for the purpose for
which it was intended. At substantial completion, minor items and items
that seasonally restricted need not be completed, but the items that affect
operational integrity and function of the facility must be capable of
continuous use.
A tentative list of items to be completed or corrected is appended hereto. This list may
not be exhaustive, and the failure to include an item on it does not alter the responsibility
of the Contractor to complete all the Work in accordance with the Contract Documents,
BY
CONSUL; CANT AUTHORIZED REPRESENTATIVE DATE
The Contractor accepts the above Certificate of Substantial Completion and agrees to
complete and correct the items on the tentative list within the time indicated.
BY
CONTRACTOR AUTHORIZED REPRESENTATIVE DATE
The Owner accepts the Project or specified area of the Project as Substantially Complete
and will assume full possession of the Project or specified area of the Project at
(time), on _ (date). The responsibility for utilities, security, and
insurance under the Contract Documents shall be as set forth under "Remarks" below.
BY
OWNER AUTHORIZED REPRESE NTATIVF. DA'1'1s
REMARKS: (Attach additional sheet, if necessary)
Pavement Repair & Compaction 01700-3 February 2008
98"' Street & Quaker Avenue - 91081
PART 2 — PRODUCTS
Not used
PART 3 — EXECUTION
Not used
END OF SECTION
Pavement Repair & Compaction 01700-4 February 2008
98'� Street & Quaker Avenue - 91081