HomeMy WebLinkAboutResolution - 2004-R0417 - Amendment To Contract For Engineering Services - Hugo Reed And Associates - 08_26_2004Resolution No. 2004-RO417 August 26, 2004 Item No. 46 RESOLUTION BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK: THAT the Mayor of the City of Lubbock BE and is hereby authorized and directed to execute for and on behalf of the City of Lubbock, an Amendment No.I to the Contract between the City of Lubbock and Hugo Reed and Associates, Inc. for engineering services. Said Amendment No. 1 is attached hereto and incorporated in this Resolution as if fully set forth herein and shall be included in the minutes of the Council. Passed by the City Council this 26th ATTEST: Rebecca Garza, City Secretary APPROVED AS TO CONTENT: City Engineer APPROVED AS TO FORM: M. Knight, Asgi-stant City Attorney gs:/ccdocs/Contract Amend #1-Hugo Reed. res Aug. 11, 2004 day of August , 2004. 4� / MC GAL, MAYOR Resolution No. 2004-RO417 August 26, 2004 Item No. 46 AMENDMENT NO. 1 to CONTRACT FOR ENGINEERING SERVICES for DESIGN and BID: GLENNA GOODACRE BOULEVARD PROJECT in OVERTON PARK, LUBBOCK THE STATE OF TEXAS § THE COUNTY OF LUBBOCK § THIS AMENDMENT NO. 1 to THE CONTRACT FOR ENGINEERING SERVICES for DESIGN and BID: GLENNA GOODACRE BOULEVARD PROJECT in OVERTON PARK, LUBBOCK, said contract dated December 11, 2003, is made by and between the City of Lubbock, Texas, hereinafter called the OWNER, and Hugo Reed and Associates, Inc., hereinafter called HRA. NOW, THEREFORE, in consideration of the mutual covenants and agreements herein contained, the OWNER and HRA do mutually agree as follows. ARTICLE 1. CONTRACT PERIOD The effective date of the original contract was December 1], 2003. This AMENDMENT NO. 1 will extend the Contract Period to include the additional design phase services as generally outlined herein. Unless subsequent Amendments to this Contract are executed, the Contract Period will extend to December 30, 2004, unless the additional services authorized by this amendment are completed in their entirety before said date. ARTICLE 2. SCOPE OF SERVICES This AMENDMENT NO. 1 is being made at the request of the OWNER for the purpose of amending the Original Scope of Services to include those general professional services detailed in Attachment A hereto, "Additional Project Scope and Services." ARTICLE 3. COMPENSATION The general tasking proposed to perform the additional services authorized by this Amendment is described in Attachment A. The "Basis for Payment" for services performed under this Amendment is indicated in Attachment B hereto. This Amendment No. I will result in a net increase of $ 165,915 to the maximum amount payable under this contract. ARTICLE 4. OTHER No other changes to the original contract are requested or granted as a result of this Amendment. All other provisions of the original contract will remain in full force and effect. This Amendment shall become a part of and be incorporated into the original contract upon its full execution by both OWNER and HRA. Amendment No. 1 to Contract for Engineering Services for Design and Bid: Glenna Goodacre Boulevard Project Page 1 ARTICLE 5. SIGNATORY WARRANTY The undersigned signatory for Hugo Reed and Associates, Inc. hereby represents and warrants that he is an officer of the organization for which he has executed this contract and that he has full and complete authority to enter into this contract on behalf of his firm. The undersigned signatory for the OWNER hereby represents and warrants that he/she has full and complete authority to enter into this contract on behalf of this organization. IN WITNESS WHEREOF, the parties hereto have caused this Amendment No. 1 to the original contract to be executed, but this Amendment No. 1 to the original contract shall not be valid until signed by a duly authorized representative of each party. HUGO REED AND ASSOCIATES, INC. Stevan M. Coleman, P.E. Executive V.P. Operations APPROVED AS TO CONTENT: Larry Hertel, P.E. City Engineer Attest: -Q, Rebecca Garza City Secretary APPROVED AS TO FORM: ohn M. Knight Assistant City Attorney Amendment No. I to Contract for Engineering Services for Design and Bid: Glenna Goodacre Boulevard Project Page 2 Mailing Addresses: For the purpose of this agreement, the following addresses shall be used to mail all required notices, reports, claims and correspondence: For: Hugo Reed and Associates, Inc. For: City of Lubbock 1601 Avenue N 1625 13`h Street Lubbock, TX 79401 Lubbock, Texas 79401 Attn: Mr. Bernard J. Gradel, Jr., President Attn: Mr. Larry Hertel, P. E. Amendment No. 1 to Contract for Engineering Services for Design and Bid: Glenna Goodacre Boulevard Project Page 3 ATTACHMENT A to AMENDMENT No. 1 to AGREEMENT for ENGINEERING SERVICES, Resolution No. 2004-RO417 August 26, 2004 Item No. 46 ADDITIONAL PROJECT SCOPE and SERVICES OWNER: City of Lubbock, Texas PROJECT: Amendment No. 1 for Engineering Services for Design and Bid: Glenna Goodacre Boulevard Project in Overton Park, Lubbock The scope of services for this Amendment is as follows: BASIC SERVICES A. DESIGN SERVICES The Amendment Basic Design Services are outlined in detail in Exhibit A-1, Worksheet AIB, according to the tasking and man-hours indicated therein. Following is a summary of the major categories for the Basic Design Services to be performed: a. Municipal Paving and Drainage Construction Documents 61h Street, full -width curb -to -curb, from point of tie-in with paving east of rotary planned for the intersection of 0 Street and Avenue X, to point of tie-in east of Avenue V; Avenue V, full -width curb -to -curb, from tie-in north of gth Street to the tie-in on the south side of Marsha Sharp Freeway at south end -of -radius, including tie-ins at intersections of 5th Street and all intervening alleys b. Amenities Construction Documents Parkway amenities for the north side of 0 Street and the west side of Avenue V adjacent to Tract 8, Overton Park ("Dinerstein III"), including hardscape, softscape and public lighting; Public lighting for the amenities project limits specified in the original Basic Services agreement 2. The design deliverables will include one design package of plans, specifications, and estimates each for the Documents specified in Items I.A. La. and I.A. Lb. above. The packages will be bid separately. 3. Each design package deliverable will consist of one set of reproducible mylar original plans, one hard -copy set of the noted specification sections, a bid form, and a final opinion of probable cost. 4. HRA will provide one hard -copy and one electronic copy of all pertinent design data including plans, specifications, opinion of probable cost, and Amendment No. t to Contract for Engineering Services for Design and Bid: Glenna Goodacre Boulevard Project Page 4 supporting data, computer models, and other calculations and information utilized in the development of the design package. B. SUPPLEMENTAL SERVICES ]. HRA will provide all surveying services as outlined in Exhibit A-1, Worksheet A1S, for the purposes of establishing the necessary control and acquiring the necessary field data for the performance of the Amendment Basic Design Services. 2. HRA will provide one hard -copy of all survey notes and records, and one electronic copy of all survey data so formatted. Amendment No. l to Contract for Engineering Services for Design and Bid: Glenna Goodacre Boulevard Project Page 5 Resolution No. 2004-RO417 August 26, 2004 Item No. 46 ATTACHMENT B to AMENDMENT No. 1 to AGREEMENT FOR ENGINEERING SERVICES BASIS for PAYMENT OWNER: City of Lubbock, Texas PROJECT: Amendment No. 1 for Engineering Services for Design and Bid: Glenna Goodacre Boulevard Project in Overton Park, Lubbock For Services rendered under this Contract, OWNER agrees to pay HRA as follows: A. GENERAL 1. HRA will be paid according to the personnel classifications and hourly rate schedules shown in Table C-1 in the original agreement, based on actual services performed on the project by classification and hours. Services performed by the subcontractor will be billed at cost. Reimbursable expenses will be paid at cost plus 15% for both HRA and the subcontractor. 2. Monthly payments will be made to HRA based on the uncontested amount of each monthly statement prepared and submitted by HRA. Each monthly statement will be itemized to show the amount of work actually performed by each personnel classification and with associated reimbursable expenses for both HRA and the subcontractor. Statements will be submitted in a format acceptable to OWNER. 3. Anticipated delivery date of the project Amendment design deliverables is on or about December 30, 2004, based on having an executed contract Amendment and N.T.P. no later than September 1, 2004. Should the N.T.P. on the Project not be received by the anticipated date, OWNER agrees that it will be necessary to reconsider the anticipated delivery date and, if necessary, to modify same by amendment to this contract if so agreed upon by both the OWNER and HRA. B. BASIC AND SUPPLEMENTAL SERVICES The maximum compensation to be billed OWNER by HRA for performance of the Amendment Basic and Supplemental Services and Reimbursables is as follows: Basic Supplemental Basic Basic Services Surveying Services Reimbursable Expenses Hugo Reed and $ 79,975 $ 21,400 $ 6,555 Associates, Inc. Parkhill, Smith and $ 54,661 N.A. $ 3,324 Cooper, Inc. Amendment No. l to Contract for Engineering Services for Design and Bid: Glenna Goodacre Boulevard Project Page 6 AMENDMENT TOTAL BASIC AND SUPPLEMENTAL $ 165,915 SERVICES NOT TO EXCEED: Amendment No. 1 to Contract for Engineering Services for Design and Bid: Glenna Goodacre Boulevard Project Page 7 Resolution No. 2004-R0417 August 26, 2004 Item No. 46 EXHIBIT A-1 AMENDMENT TASKING and MAN-HOURS for BASIC SERVICES, BASIC SUPPLEMENTAL SURVEYING SERVICES, and BASIC REIMBURSABLES, including SUBCONTRACTOR Amendment No. l to Contract for Engineering Services for Design and Bid: Glenna Goodacre Boulevard Project Page 8 Resolution No. 2004-RO417 August 26, 2004 Item No. 46 AMENDMENT No. 1 to CITY OF LUBBOCK, TEXAS Glenna Goodacre Boulevard Project and Associated Work 11-Aug-04 BASIC SERVICES and SUPPLEMENTAL SERVICES CONTRACT PROPOSAL SUMMARY AMENDMENT No. 1 BASIC SERVICES COMPENSATION $ 134,636 HRA Subtotal (Engineering Services) $ 79,975 PSC Subtotal (Architectural and Engineering Services) $ 54,661 AMENDMENT No. 1 SUPPLEMENTAL SERVICES COMPENSATION, SURVEYING SERVICES $ 21,400 AMENDMENT No. 1 BASIC SERVICES REIMBURSABLE EXPENSES, TOTAL, With 1.15 Multiplier $ 9,879 HRA Subtotal (Basic Services Reimbursables, No Multiplier) $ 5,700 PSC Subtotal (Basic Services Reimbursables, No Multiplier) $ 2,890 AMENDMENT No. 1 BASIC SERVICES, SUPPLEMENTAL SERVICES, AND REIMBURSABLES, TOTAL COMPENSATION $ 165,915 Page SUM-1 AMENDMENT No. 1 to Agreement for Professional Services for GLENNA GOODACRE BOULEVARD PROJECT and Associated Work 11•Aug-04 6th Street from East Side of Intersection with Avenue X through Intersection with Avenue V, and Avenue V from North Side of Glenna Goodacre Boulevard to South End of Radius at Marsha Sharp Freeway Amendment No. 1 BASIC SERVICES Worksheet Al B HRA PSC 1.1 Site visit, note field conditions 1 1 1 1 1 3 2 $ 277 $ 133 HRA PSC 1.2 Coordinate with surveyors for field survey data needed for design 1 1 4 2 8 0 $ 613 $ - HRA PSC 1.3 Review field survey data, establish approximate project demo and tie-in limits 2 2 2 4 1 8 1 15 1 5 $ 1.025 $ 364 HRA PSC 1.4 Develop project base maps, distribute for utilities mark-ups; distribute to PSC for plan development 4 3 8 1 40 53 3 $ 3,423 $ 255 HRA PSC 1.5 Receive, review, incorporate utilities mark-ups; meet with stakeholders regarding utilities locations; coordination with LP&L /PSC Electrical Eng 2 4 4 8 4 8 2 16 30 18 $ 2,136 $ 1,422 HRA PSC 1.6 Assemble known prior drainage analysis work 1 1 2 0 $ 167 $ - HRA PSC 1.7 Define R-O-W parcels needed; define potential off- site drainage easements needed, if any 2 4 1 1 8 0 $ 605 $ - HRA PSC 1.8 Review field survey data and HRA information on drainage, grades, curb cuts, location of curb, ROW 1 1 2 8 1 4 0 14 $ - $ 946 HRA PSC 1.9 Meet with TxDOT, receive available data on Marsha Sharp Freeway; Coordinate tie-in elevations and geometry at Avenue V 1 1 2 1 1 6 0 $ 476 $ - HRA PSC 1.10 Coordinate base maps provided by HRA 2 1 4 2 4 2 7 8 $ 479 $ 558 HRA PSC 1,11 Coordinate with HRA on street design, misc. planimetric and alignment details, etc., throughout 1 1 2 2 4 4 2 9 6 $ 708 $ 442 Page AlB-1 11•Aug-04 6th Street from East Side of Intersection with Avenue X through Intersection with Avenue V, and Avenue V from North Side of Glenna Goodacre Boulevard to South End of Radius at Marsha Sharp Freeway Amendment No.1 BASIC SERVICES Worksheet A1B Firm Classification Prin. or Proj. I Sr. Prof. Architect Land, Prof. I E.I.T. Engr. CADD Clerical Line I Line Officer Mgr. En r. Arch. En r. Tech. Tech. Hrs, I Extension HRA Rates $110.00 $110.00 $95.00 $85.00 $72.00 $67.00 $60.00 $37.00 by by PSC Tasking$114.00 $85.00 $85.00 $68.00 $96.00 $76.00 $65.00 $58.00 $51.00 Firm Firm HRA TASK 1 SUBTOTAL $ 9,909 PSC TASK 1 SUBTOTAL $ 4,120 TASK 1 SUBTOTAL $ 14,029 PROJECT CUMULATIVE TOTAL $ 14,029 2.1 Confirm street planimetrics and x-sections for all HRA project streets 1 4 8 8 21 $ 1,546 $ 272 PSC 4 4 2.2 Confirm on -street accessible parking requirements HRA for project streets as a result of Parking Study findings 1 2 3 $ 239 1 $ 351 PSC 1 1 1 2 1 2 1 5 2.3 Confirm and refine any necessary revisions to planimetrics and x-sections for all project streets as a HRA result of required on -street accessible parking 1 2 8 11 $ 719 $ 467 PSC 1 2 2 2 7 2.4 Refine street planimetrics to accommodate physical tie-ins at project limits; confirm demo limtis and tie-in HRA limits 1 6 8 15 $ 1,007 PSC 0 $ - 2.5 Develop street grading designs and prepare and HRA refine surface drainage analysis 2 32 72 12 118 $ 9,164 PSC 0 $ - 2.6 Check and refine street grading designs based on drainage hydraulics and tie-in constraints; revise all as- HRA necessary 1 4 12 12 29 $ 2,074 PSC 0 $ - 2.7 Analyze potential need or desirability of storm sewers to accommodate local drainage requirements HRA (RESERVED) 0 $ PSC 0 $ 2.8 Develop and prepare plans/profiles for storm sewers HRA if determined necessary for this project (RESERVED) 0 $ PSC 0 $ 2.9 Develop and prepare demo plan sheets HRA 4 12 40 56 $ 3,644 PSC 0 $ - Page Al B-2 11-Aug-04 6th Street from East Side of Intersection with Avenue X through Intersection with Avenue V, and Avenue V from North Side of Glenna Goodacre Boulevard to South End of Radius at Marsha Sharp Freeway Amendment No. 1 BASIC SERVICES Worksheet Al B Firm Classification Prin. or Officer Prof. Mgr. Sr. Prof. En r. Architect Land. Arch. Prof. En r. E.I.T. Engr. Tech. CADD Tech. Clerical Line Hrs. by Firm Line Extension by Firm HRA PSC Rates Tasking $110.00 $114.00 $110.00 $85.00 $95.00 $85.00 $68.00 $85.00 $96.00 $72.00 $76.00 $67,00 $65.00 $60.00 $58.00 $37.00 $51,00 HRA PSC 2.10 Develop and prepare street plan/profile sheets 12 16 136 164 0 $ 10,452 $ HRA PSC 2.11 Develop and prepare construction plans and details for concrete paving elements 4 I I 8 1 16 28 0 $ 1,916 $ - HRA PSC 2,12 Develop and prepare miscellaneous construction detail sheets, general notes, cover sheet 2 4 I 16 28 50 1 0 $ 3,432 $ HRA PSC 2.13 Develop and prepare advance construction warning layouts and traffic control plan 8 20 24 52 0 $ 3,640 $ - HRA PSC 2.14 Develop and prepare notes and details for traffic control plan 4 12 16 32 0 $ 2,204 $ - HRA PSC 2.15 Develop and prepare permanent striping plan and details; coordinate with City of Lubbock Traffic Engineering (permanent traffic signage assumed by others and not a part of this construction contract) 2 4 8 14 0 $ 958 $ - HRA PSC 2.16 Develop and prepare drainage area map and storm routing map 1 4 16 24 45 0 $ 3,082 $ - HRA PSC 2.17 Develop and prepare SWP3 2 12 12 26 0 $ 1,774 $ - HRA PSC 2.18 Develop and prepare specifications as necessary for SWP3, supplementary paving specifications, etc. 4 1 12 4 20 0 $ 1,392 $ - HRA PSC 2.19 Develop and prepare quantity take -offs and Opinion of Probable Cost 2 12 28 24 10 66 $ 4,816 $ - HRA PSC 2.20 Project management through pre -construction meeting, 4 months 48 2 8 56 2 $ 6,040 $ 228 Page A1B-3 11-Aug-04 6th Street from East Side of Intersection with Avenue X through Intersection with Avenue V, and Avenue V from North Side of Glenna Goodacre Boulevard to South End of Radius at Marsha Sharp Freeway Amendment No. 1 BASIC SERVICES Worksheet Al Firm Classification Prin. or Proj. Sr. Prof. Architect Land, Prof. E.I.T. Engr. CADD Clerical Line Line Officer Mgr. Engr. Arch. En r. Tech. Tech. Hrs. by Extension by HRA Rates $110.00 $110.00 $95.00 $85.00 $72.00 $67.00 $60.00 $37.00 PSC Tasking $114.00 $85.00 $85.00 $68.00 $96.00 $76.00 $65.00 $58.00 $51,00 Firm Firm HRA TASK 2 SUBTOTAL - - $ 58,099 PSC TASK 2 SUBTOTAL $ 1,318 TASK 2 SUBTOTAL $ 59,417 PROJECT CUMULATIVE TOTAL $ 73,446 HRA PSC 3.1 Develop 1 concept for Dinerstein III curb to property line 2 4 1 10 1 24 2 40 $ 167 $ 2,640 HRA PSC 3.2 Develop lighting plan layout and coordinate with LPLIPSC ElectENG - vehicular and pedestrian recommended locations 2 6 1 8 0 17 $ $ 1,107 HRA PSC 3.3 Coordinate with HRA on drainage issues and solutions 1 4 1 4 2 8 $ 167 $ 504 HRA PSC 3.4 Prepare preliminary Opinion of Probable Cost 1 4 1 1 1 0 1 4 1 9 $ 72 $ 618 HRA PSC 3.5 Project management 1 8 1 8 $ 110 I $ 912 HRA TASK 3 SUBTOTAL $ 516 PSC TASK 3 SUBTOTAL $ 5,781 TASK 3 SUBTOTAL $ 6,297 PROJECT CUMULATIVE TOTAL $ 79,743 Page A1B-4 11-Aug-04 6th Street from East Side of Intersection with Avenue X through Intersection with Avenue V, and Avenue V from North Side of Glenna Goodacre Boulevard to South End of Radius at Marsha Sharp Freeway Amendment No.1 BASIC SERVICES Worksheet A1B Firm Classification Prin. or Proj. Sr. Prof. Architect Land. Prof. E.I.T. Engr. CAD" Clerical Line Line Officer I Mgr. En r. Arch. En r. Tech. Tech, Hrs. Extension HRA Rates $110.0$95-00$110 $85.00 $72.00 $67.00 $60.00 $37.00 1 by by Tasking$114.00 00 $85.00 $85,00 $68.00 $96.00 1 $76.00 $65.00 $58.00 $51.00 Firm FirmPSC M..,.:tY ::y . 3,�-..• 'V. F- 4 - 0 1 i�. ,4M'1ii%. F: ...:y.A. .. b-# Td Cie A-'ACC11--Ad Cl/C/'AOAICAlT'AMA,^ k 4:�-ra!t,--rt t:flAnfilIAGGITlR �CTGCCT AIIIC�1/7.'ICI.`'�^Al1AGAAIC�ITC � _. 74.1 HRA PSC Refine 1 concept for Dinerstein III curb to property line 1 2 8 20 0 30 $ - $ 1,874 HRA PSC 4.2 Develop and prepare irrigation plans/details 2 1 4 12 0 18 $ - $ 1,138 HRA PSC 4.5 Develop and prepare plan sheets by block for Dinerstein III curb to property line 1 1 2 8 16 0 27 $ - $ 1,756 HRA PSC 4.6 Develop and prepare details and section plan sheets for crosswalks and bike crossings 1 1 4 1 16 2 21 $ 167 $ 1,285 HRA PSC 4.7 Develop and prepare details and sections plan sheets for Dinerstein 111 2 4 8 0 14 $ - $ 906 HRA PSC 4.9 Develop and prepare details and sections for street signage graphics and finials 4 f8 0 12 $ - $ 736 HRA PSC 4.10 Develop and prepare Specifications - draft and final 1 1 2 2 8 2 0 14 $ - $ 986 HRA PSC 4.11 CIA - QC review - includes coordination of grading and drainage design impacts with HRA 1 1 1 2 2 4 1 2 1 1 1 4 5 1 10 $ 444 1 $ 674 Page A1B-5 11-Aug-04 6th Street from East Side of Intersection with Avenue X through Intersection with Avenue V, and Avenue V from North Side of Glenna Goodacre Boulevard to South End of Radius at Marsha Sharp Freeway Amendment No. 1 BASIC SERVICES Worksheet Al B Firm Classification Prin. or Proj. Sr. Prof. Architect Land. Prof. E.I.T. Engr. CADD Clerical Line Line Officer Mgr. En r. Arch. En r. Tech. Tech. Hrs. by Extension by HRA Rates $110.00 $110.00 $95.00 $85.00 $72,00 $67.00 $60.00 $37.00 PSC Tasking $114.00 $85.00 $85.00 $68.00 $96.00 $76.00 $65.00 $58.00 $51,00 Firm Firm 4.12 Develop and prepare Final Opinion of Probable HRA Cost 0 $ - $ 1,326 PSC 1 1 4 6 1 8 19 4.13 Project management HRA 1 1 $ 110 $ 1,140 PSC 10 10 HRA TASK 4 SUBTOTAL PSC TASK 4 SUBTOTAL TASK 4 SUBTOTAL PROJECT CUMULATIVE TOTAL $ 721 $ 11,821 $ 12,542 $ 92,285 HRA PSC 5.1 QC/QA and preparation of deliverables: preliminary design submittal; plans, specifications, estimates 1 1 2 4 2 4 1 9 6 $ 684 $ 415 HRA PSC 5.2 QCIQA and preparation of pre -final design submittal; plans, specifications, estimates, bid form 2 1 4 2 4 1 4 4 2 1 14 10 $ 1,128 $ 694 HRA PSC 5.3 QC/QA and preparation of final design package submittal; plans, specifications, estimates, bid form 2 1 4 8 8 4 4 1 1 19 14 $ 1,453 $ 912 HRA PSC 5.4 Submit plans to TDLR for accessibility compliance review; receive review comments, incorporate changes as necessary 1 4 4 4 8 2 17 6 $ $ HRA PSC 5.5 Reserved 0 0 t1258 $ $ HRA TASK 5 SUBTOTAL PSC TASK 5 SUBTOTAL TASK 5 SUBTOTAL PROJECT CUMULATIVE TOTAL 4,523 2,477 7,000 $ 99,285 Page A18-6 11-Aug-04 6th Street from East Side of Intersection with Avenue X through Intersection with Avenue V, and Avenue V from North Side of Glenna Goodacre Boulevard to South End of Radius at Marsha Sharp Freeway Amendment No. 1 BASIC SERVICES Worksheet A1B Firm Classification Prin, or Proj. Sr. Prof. Architect Land. Prof. E.I.T. Engr. CADD Clerical Line Line Officer I Mgr. I En r. Arch. I Engr, I I Tech.. I Tech. I I Hrs. by Extension by HRA Rates $11$95-00 $72. $67.00 $60.00 $37,00 PSC 95.00$76.0 0 $65.00 $58.00 $51.00 Firm Firm MR 'lyyyyt� ,. <. 3,.. 7h` k' 3h '„n ..: P 'ra -5:, ty s.sw t, .1,i f �. 4 / .,.u'k .ki• ,G ,ry�, - ,.��r TASK 6 :MEETlNG,S r n�r: e<` r 6.1 Project kick-off meeting with COL plus maximum of HRA 1 submittal review comment meetings 4 4 4 12 $ 1,108 PSC 2 4 4 10 $ 840 6.2 Internal HRA and PSC meetings to coordinate base maps, drainage locations, grades, crosswalks, etc. - 2 HRA meetings assumed 2 8 8 18 $ 1,556 $ 1,224 PSC I I I g 1 8 16 6.3 Additional coordination meetings with COL project HRA management; 1 meeting assumed 2 2 4 $ 410 PSC 2 2 $ 136 HRA TASK 6 SUBTOTAL PSC TASK 6 SUBTOTAL TASK 6 SUBTOTAL PROJECT CUMULATIVE TOTAL 3,074 2,200 $ 5,274 $ 104,559 Page Al B-7 11-Aug-04 6th Street from East Side of Intersection with Avenue X through Intersection with Avenue V, and Avenue V from North Side of Glenna Goodacre Boulevard to South End of Radius at Marsha Sharp Freeway Amendment No. 1 BASIC SERVICES Worksheet A1B Firm Classification Prin. or Proj. Sr. Prof. Architect Land. Prof. E.I.T. Engr. CADD Clerical Line Line Officer I Mgr. En r. I Arch. En r. Tech. Tech. Hrs. by Extension by HRA Rates $110.00 $110.00 $95.00 $85.00 $72.00 $67.00 $60.00 $37.00 PSC Tasking $114.00 1 $85.00 $85.00 1 $68.00 $96.00 1 $76.00 $65.00 $58.00 $51.00 Firm Firm -." n r,; w .. ,Wi ...G M .5a : ti i,.As.:, > y.. �,M.•.., .,, ^ .n r .,e r. .r`4✓i.,. 4, ��_ a9: ...a,&.. y: 1 S`n. .4'?�., .y a„ :,x� ,-...„ :«•_ :c•tx. a: i`3a}•4.: y,,�. »;2s.. �a'.2. .'� 4" .. .,,;.. .^s, >: .. • ',t:A. k� f.... .., �*,�. k�^'4:g5.vf' :� "�t` s "'ASK 7 BID AND PRE�CON.9TRt1anim.P AP Y- d HRA PSC 7.1 Prepare for and attend pre -bid conference; address pre -bid questions 4 4 4 4 12 4 $ 1,108 $ 340 HRA PSC 7.2 Prepare bid addendum; 1 addendum 1 1 2 4 4 1 2 1 11 4 $ 852 $ 286 HRA PSC 7.3 Attend bid opening 3 3 3 3 $ 285 $ 255 HRA PSC 7.4 Bid evaluation assistance 2 1 1 2 4 1 1 1 1 4 1 10 3 $ 888 $ 284 HRA PSC 7.5 2nd Bid Package front end - assemble, 1 1 2 2 0 5 $ - $ 391 HRA TASK 7 SUBTOTAL $ 3,133 PSC TASK 7 SUBTOTAL $ 1,556 TASK 7 SUBTOTAL $ 4,689 Page A 1 B-8 11-Aug-04 6th Street from East Side of Intersection with Avenue X through Intersection with Avenue V, and Avenue V from North Side of Glenna Goodacre Boulevard to South End of Radius at Marsha Sharp Freeway Amendment No. 1 BASIC SERVICES Worksheet Al B HRA PSC 8.1 Entrance Feature accent lighting design 4 8 0 12 $ - $ 1,064 HRA PSC 1 8.2 Rotary lighting design 4 1 1 8 0 12 $ - 1 $ 1,064 HRA PSC 8.3 Pedestrian area lighting design 12 20 0 32 $ - $ 2,888 HRA PSC 8.4 Roadway lighting design 10 24 0 34 $ - 1 $ 2,964 HRA PSC 8.5 Lighting calculations 8 12 0 20 $ - $ 1,824 HRA PSC 8.6 Coordination with existing material 2 8 0 10 $ - $ 836 HRA PSC 8.7 Electrical service entrance design 8 16 0 24 $ - $ 2,128 HRA PSC 8.8 Voltage drop calculations 2 8 0 10 $ - $ 836 HRA PSC 8.9 Coordination/Review meetings 10 5 0 15 $ HRA PSC 8.10 Coordination with utilities 4 12 0 16 $ $ 1,368 HRA PSC 8.11 Develop specifications 6 24 8 0 38 $ - $ 2.916 HKA IASKd61JUIUTAL PSC TASK 8 SUBTOTAL TASK 8 SUBTOTAL $ 19,408 $ 19,408 Page Al B-9 11-Aug-04 6th Street from East Side of Intersection with Avenue X through Intersection with Avenue V, and Avenue V from North Side of Glenna Goodacre Boulevard to South End of Radius at Marsha Sharp Freeway Amendment No. 1 BASIC SERVICES Worksheet Al B HRA PSC 9.1 Pedestrian area lighting design 4 8 0 12 $ $ 1,064 HRA PSC 9.2 Roadway lighting design 4 1 1 12 0 16 $ - 1 $ 1,368 HRA PSC 9.3 Lighting calculations 2 6 0 8 $ - $ 684 HRA PSC 9.4 Electrical service entrance design 2 4 0 6 $ $ 532 HRA PSC 9.5 Voltage drop calculations 2 4 0 6 $ - 1 $ 532 HRA PSC 9.6 Coordination with Willies 4 4 0 8 $ - $ 760 HRA PSC 9.7 Develop specifications 2 8 4 0 14 $ - $ 1,040 HRA TASK 9 SUBTOTAL $ - PSC TASK 9 SUBTOTAL $ 5,980 TASK 9 SUBTOTAL $ 51980 HRA PROJECT SUBTOTAL, BASIC SERVICES $ 79,975 PSC PROJECT SUBTOTAL, BASIC SERVICES $ 54,661 PROJECT CUMULATIVE TOTAL, BASIC SERVICES $ 134,636 Page AlB-10 11-Aug-04 6th Street from East Side of Intersection with Avenue X through Intersection with Avenue V, and Avenue V from North Side of Glenna Goodacre Boulevard to South End of Radius at Marsha Sharp Freeway Amendment No. 1 BASIC SERVICES Worksheet All Firm Classification Prin, or Pro]. Sr. Prof. Architect Land. Prof, E.I.T. Engr. CADD Clerical Line Line Officer Mgr Engr. Arch. Engr. Tech. Tech, Hrs, Extension HRA Rates $110.00 $110.00 $95.00 $85.00 $72.00 $67.00 $60.00 $37.00 by by PSC Tasking$114.00 $85.00 $85.00 $68.00 $96.00 $76.00 $65.00 $58.00 $51.00 Firm Firm HRA Hours by Personnel Classification PSC Hours by Personnel Classification 87 178 28 60 0 25 137 344 470 7 1090 150 5 414 Page A1B-11 AMENDMENT No. 1 for Design Services for GLENNA GOODACRE BOULEVARD and Associated Work 11-Aug-04 Supplemental Services Compensation Worksheet SURVEYING SERVICES Worksheet A1S I Task I Description 1 Quantity I Unit I I Unit Cost 1 1 Line Total I S-1 Establish project horizontal and vertical control 1 Days @ $ 880 per Day $ 880 S-2 Locate/establish existing rights -of -way 2 Days @ $ 880 per Day $ 1,760 3-3 R-O-W parcel surveys 6 Each @ $ 1,000 Each $ 6,000 S4 Locate existing surface improvements in project corridor 3 Days @ $ 880 per Day $ 2,640 S-5 Topography: cross -sections in 6th Street and in Avenue V 2 Days @ $ 880 per Day $ 1,760 S-6 Topography: cross -sections, intersecting streets, alleys, and drainage features 2 Days @ $ 880 per Day $ 1,760 S-7 Research, office calculations, and record -keeping; Party Chief 12 Hours @ $ 55 per Hour $ 660 S-8 Supervision, data processing, review, calculations, and record -keeping; Sr. RPLS 16 Hours @ $ 95 per Hour $ 1,520 S-9 Surveying CAD 32 Hours @ $ 60 per Hour $ 1,920 5-10 GPS or Robotic Survey Equipment 10 1 Days @ $ 250 per Day $ 2,500 SUPPLEMENTAL SERVICES, SURVEYING, TOTAL $ 21,400 Page Al S-1 AMENDMENT No. 1 to Agreement for Professional Services for 11-Aug-04 Basic Services Reimbursable Expenses Worksheet REIMBURSABLE EXPENSES Worksheet AIR I Firm I Reimbursable Expense Description I Quantity I Unit I I Unit Cost I 1 Line Total I HRA Fax 50 Pages @ $ 1 per Page $ 50 PSC 50 Pages @ $ 1 per Page $ 50 HRA Blueline prints, 24" x 36"; check sets; utilities mark-up sets; COL review sets: misc. 200 Sheets @ $ 2.50 per Sheet $ 500 prints for field sheets and consultant PSC 100 Sheets @ $ 2.50 per Sheet $ 250 HRA Mylar plotter media for final drawing deliverables 1 Roll @ $ 300 per Roll $ 300 PSC 1 Roll @ $ 300 per Roll $ 300 HRA Engineering & Architectural CADD charges 470 Hours @ $ 8 per Hour $ 3,760 PSC 150 Hours @ $ 8 per Hour $ 1,200 HRA Reproduction for Bid Sets - To be done by the City of Lubbock N.A. Sheets @ N.A. per Sheet PSC N.A. Sheets @ N.A. per Sheet HRA 'TDLR Review Fee, Review Filing Fee, Inspection Fee, and Inspection Filing Fee 1 Fee Set @ $ 1,090 per Fee Set $ 1,090 PSC 1 Fee Set @ $ 1,090 per Fee Set $ 1,090 HRA Basic Services Reimbursable Expenses, Subtotal PSC Basic Services Reimbursable Expenses, Subtotal Basic Services Reimbursable Expenses, Total, w/o Multiplier BASIC SERVICES REIMBURSABLE EXPENSES, TOTAL, With 1.15 Multiplier $ 5,700 $ 2,890 $ 8,590 $ 9,879 Estimate only, based on estimated construction value and one review. Any additional fees shall be reimbursed to the consultant at actual costs incurred. Page AIR-1