HomeMy WebLinkAboutResolution - 2011-R0503 - Contract - Talon LPE - Demolition Of Structures - 11_16_2011Resolution No. 2011-RO503
November 16, 2011
Item No. 5.10
RESOLUTION
BE 1T RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK:
THAT the Mayor of the City of Lubbock is hereby authorized and directed to
execute for and on behalf of the City of Lubbock, Contract No. 12-10471-JOC for
demolition of the structures located at 9802, 10204 and 10202 Milwaukee Avenue, by
and between the City of Lubbock and Talon/LPE, and related documents. Said Contract
is attached hereto and incorporated in this resolution as if fully set forth herein and shall
be included in the minutes of the City Council.
Passed by the City Council on November 16, 2011
TOM MARTIN, MAYOR
ATTEST:
Rebe a Garza, City Seere
APPROVED r.S TO CONTENT:
— M" /&�/
Marsha Reed, P.E., Chief Ope ations Officer
APPROVED AS TO FORM:
Chad Weaver, Assistant City Attorney
vw:ccdocs/RES.Contract-Talon
October 18, 2011
Resolution No. 2011—RO503
Contract No. 10471
Work Order Signature Document
BUYBOARD EQIQC Contract No.: Area I — 1 MCP — Option 1
New Work Order Modify and Existing Work Order
Work Order Number: 011362.00 Work Order Date: 10/20/2011
Work Order Title: City of Lubbock — Demo of 3 Residential Homes
Owner Name: City of Lubbock Contractor Name: Talon/LPE
Contact: John Castillo Contact: Bridger Howard
Phone: (806) 790-3078 Phone: (806) 676-3815
Work to be Performed
Work to be performed as per the Final Detailed Scope of Work Attached and as per the terms and conditions of
BuyBoard EZIQC Contract No Area I —1 TAL — Option 1.
Brief Work Order Description:
To demolish 3 residential homes
Time of Performance See Schedule Section of the Detailed Scope of Work
Work Order Number
(111362.00
CITY OF LUBBOCK
Location
9802, 10202 and 10204 Milwaukee
Ave.
Toni —Martin, Mayor
Attest: Q S
Rebecca Garza, "ty Secretary
APPROVE1) AS CONTE NT:
Marsha Reccl, I'.E., Chief Opera ions Officer
Amount of Contract
53,958.84
B u r Howard Project Manager
Taton/LPE
Owner's Representative
Wesley' Everett, Director of Facilities
APPAtOWD A.�TO FORM:
Assistant City Attorney
VZroard-
Detailed Scope of Work
To: Bridger Howard
Talon/LPE
921 N Bivins Street
Amarillo, TX 79107
(806) 676-3815
Date Printed: October 20, 2011
From: John Castillo
City of Lubbock
1625 13th St
Lubbock, TX 79401
No Data Input
Work Order Number: 011362.00
Work Order Title: City of Lubbock - Demo of 3 Residential Homes
Brief Scope: To demolish 3 residential properties and leave a clean and level lot. All three
properties are within a city block.
❑ Preliminary 7 Revised 7 Final
The following items detail the scope of work as discussed at the site. All requirements necessary to accomplish the
items set forth below shall be considered part of this scope of work.
9802 Milwaukee
Demolition of House and Porches (From 3' to North, 20' to West, 20' to South and East to Street)
Remove Septic Tank and Backfill to 90% compaction
Clearing and grubbing of light vegetation, no large tree removeal or root removal are included in this proposal.
Import backfill to provide a clear and level lot (excluding large trees)
10202 Milwaukee
Demolition of House
Remove debris from lot
Remove Septic Tank and Backfill to 90% density
Import Backfill to provide a clear and level lot (excluding large trees)
10204 Milwaukee
Demolition of House
Demolition of Outbuildings
Remove Septic tank and baWil to 90% compaction density
Remove Storm Sheller and Backfill to 90% density
Plug and Cap Water Well
Remove all Fences
Remove all light vegetation (not including large trees and roots)
Scope of work Page 1 of 2
EZIQC - Buy Board 10/2012011
Contractor's Price Proposal CSI - Summary
Date: October 20, 2011
Re: IQC Master Contract #:
Wortc Order #:
Owner PO #;
Title:
Contractor:
Area 1-1 TAL - Option 1
011362, 00
City of Lubbock - Demo of 3 Residential Homes
TalorVLPE
Proposal Value: $53,968.84
01 - General Requirements $594.76
02 - Site Work $52,894.64
03 - Concrete
$469.44
Proposal Total $53,968.84
Contractors Price Proposal - Summary Page 1 of 1
EZJQC - Buy Board 1OV201201 t
Contractor's Price Proposal CSI - Detail
Date: October 20, 2011
Re: 10C Master Contract #:
Work Order #:
Owner PO #:
Title:
Contractor;
Proposal Value:
Area 1-1 TAL - Option 1
011362.00
City of Lubbock - Demo of 3 Residential Homes
TalonlLPE
$53,958.84
Sect Item Modifer UQM Description Line Total
Labor Equip. Material (Excluded if marked with an X)
01 - General Requirements
1 01431
0011
Fact Proctor Compaction 4" Standard Maid ASTM 0698
$198.25
Quantity Unit Price
Factor
Total
Installation
1.00 x 154.39 x
-
1.2841 J
198.25
Septic Tank
2 01431
0011
EA Proctor Compaction 4" Standard Mold ASTM D690
$198.25
Quantity Unit Price
Factor
Total
Installation
1.00 x 154.38 x
=
1.2841
198.25
Septic Tank
3 01431
0011
EA Proctor Compaction 4" Standard Mold ASTM D698
$198.25
Quantity Unit Price
Factor
Total
Installation 1.00 x 154.39 x
12541 =
198.25
Septic Tank
Subtotal for 01 - General Requirements
$594.76
02 - Site Work
4 02102
0003
ACR Clear And Grub Light Trees To 6' (15 cm) Diameter, Cut And Chip, Include
$967.88
Grub And Removal Of Stump
Quantity Unit Price
Factor
Total
Installation
0.25 x 3,014.97 x
=
1.2841
867.88
5
02102
0003
ACR Clear And Grub Light Trees To 8' (15 cm) Diameter, Cut And Chip, Include
$1.935.76
Grub And Removal Of Stump
Quantity Unit Price
Factor
Total
Installation 0.50 X 3,014.97 x
1.2841 =
1,935.76
6
02102
0003
ACR Clear And Grub LightTrees To 6' (15 cm) Diameter, Cut And
Chip, Include
$967.88
Grub And Removal Of Stump
Quantity Unit Price
Factor
Total
Installation
0.25 x 3,014.97 x
1.2841
987.98
7
02102
0016
CY Machine Loading Of Cleared And Grubbed Material
$218.81
Quantity Unit Price
Factor
Total
Installation 40.00 x 4.26 x
1.2841
218,51
8
02102
0016
CY Machine Loading Of Cleared And Grubbed Material
$218.81
Quantity Unit Price
Factor
Total
Installation 40,00 x 4.25 x
11841 -
218.81
9
02102
0016
CY Machine Loading Of Cleared And Grubbed Material
$218.81
Quantity Unit Price
Factor
Total
Installation 4
X z
40.00 .28
1,2841
218.81
10
02111
0018
CCF Demo Wood Frame Building By Machine Remove Building
$1,700.57
Quantity Unit Price
Factor
Total
Installation
96.00 x 13.88 x
=
1.2841
1,708.57
Outbuilding #2
Contractoes Price Proposal - Detail Page 1 of 4
EZJQC - Buy Board 10/20/2011
Contractor's Price Proposal - Detail Continues.,
Work Order Number: 011362.00
Work Order Tide: City of Lubbock - Demo of 3 Residential Homes
SecL
Item
Modifer UdM Description
Line Total
Labor Equip.
Material
(Excluded if marked with an X)
02 - Site Work
11 02111
0010
CCF Demo Wood Frame Building By Machine Remove Building
$5,125.72
Quantity Unit Price
Factor
Total
Installation 288.00 x 13.88 x
1.2841
5,125.72
12 02111
0018
CCF Demo Wood Frame Building By Machine Remove Building
$1,388.21
Quantity Unit Price
Factor
Total
Installation 78.00 x 13.8e x
1.2841
1,388.21
outbuilding #1
13
02111
0018
CCF Demo Wood Frame Building By Machine Remove Building
$1.139.05
Quantity Unit Price
Factor
Total
Installation 64.00 x 13.88 x
1.2841 '
1,139.05
14
02111
0018
CCF Demo Wood Frame Building By Machine Remove Building
$5,524.05
Quantity Unit Price
Factor
Total
Installation 318.00 x 13.88 x
1.2841 '
5,624.05
Main House
15
02112
0031
SY Break -Up And Remove > 3' To ti Thick Concrete With Reinforcing Rod.
$3,515.35
Quantity Unit Price
Factor
Total
Installation 232.00 x 11.80 x
1.2841 '
3,515.35
16
02112
0033
SY Break -Up And Remove >r To 14" Thick Concrete With Reinforcing Rod.
$565.83
Quantity Unit Price
Factor
Total
Installation 16.00 x 27.54 x
1.2641 '
565,83
17
02112
0091
CF Demo Reinforced Concrete Building Foundation
$9,485.13
Quantity Unit Price
Factor
Total
Installation 1,894.00 x 3.90 x
1.2841 -
9,485.13
18
02112
0091
CF Demo Reinforced Concrete Building Foundation
$1,752.80
Quantity Unit Price
Factor
Total
Installation 350.00 x 3.90 x
1.2841 '
1,752.80
Under Garage
19
02119
0013
CYM Hauling >15 To 20 Miles
$3,761.08
Quantity Unit Price
Factor
Total
Installation 6,102.00 x 0.48 x
1.2841
3,761.08
From Site to Matthews Recycling Center on Regis 17 miles
20
02119
0013
CYM Hauling >15 To 20 Miles
$1,121.1-1
Quantity Unit Price
Factor
Total
Installation 1,819.00 x 0.48 x
1.2641 -
1,121.17
From Site to Matthews Recycling Center on Regis 17 miles
21
02119
0013
CYM Hauling >15 To 20 Miles
$5,506.32
Quantity Unit Price
Fedor
Total
Installation 8,933.50 x 0.48 x
1.2841
5,50e.32
From Site to Matthews Recycling Center on Regis 17 miles
22
02205
0007
CY Spreading, Shaping, and Rough Grading Imported or Stockpiled Material for
$50.39
Bulk Excavation by Machine
Quantity Unit Price
Factor
Total
Installation 13.00 x 2.18 x
1.2841
50.39
Contractor's Price Proposal - Detail
Page 2 of 4
E71QC - Buy Board
1012012011
Contractor's Price Proposal - Detail Continues..
Work Order Number: 011362.00
Work order Title: City of Lubbock - Demo of 3 Residential Homes
sect
Item
Modlfer UOM Description
Line Total
Labor
Equip.
Material
(Excluded If marked with an X)
02 - Site Work
23
02205
0007
CY Spreading, Shaping, and Rough Grading Imported or Stockpiled Material for
$236.54
Bulk Excavation by Machine
Quantity Unit Price Factor
Total
Installation =
84.50 x 2.18 x 1.2841
239.54
24
02210
0018
CY Backfllling Around Building Foundations And Other Structures By Hydraulic
$55.70
Excavator, Badfioe, Loader
Quantity Unit Price Factor
Total
Installation =
18.00 x 2.41 x 1.2841
55.70
25
02210
0018
CY Back011ing Around Building Foundations And Other Structures By Hydraulic
$261.50
Excavator, Backhoe, Loader
Quantity Unit Price Factor
Total
Installation x x a
84.50 2.41 1.2841
261.50
26
02213
0004
CY Native Sail/Dirt - Common
$1.439,88
Quantity Unit Price Factor
Total
Installation 84.50 x 13,27 x 1.2841 m
1,439.88
27
02213
0004
CY NativeSofUDirt - Common
$306.72
Quantity
Unit Price
Factor
Total
Installation 18.00 x
13.27
x
1.2841 '
306,72
28
02213
0004
CY Native SdVDirt- Common
$1,499.52
Quantity
Unit Price
Factor
Total
Installation 88.00 x
13.27
x
1.2841
1,499.52
Septic Tank
29
02213
0004
CY Native Sail/Dirt - Common
$1,499.52
Quantity
Unit Price
Factor
Total
Installation 88.00 x
13.27
x
1.2841 '
1,499.52
Septic Tank
30
02213
0004
CY Native SoiVDIrt - Common
$1,499.52
Quantity
Unit Price
Factor
Total
Installation 88.00 x
13.27
x
1.2841 '
1,499.52
Septle Tank
31
02540
0004
EA 1,000 Gallon Precast Septic Tank
$274.71
Quantity
Unit Price
Fedor
Total
Installation
0.00 x
1,781.83
x
=
1.2841
0.00
Demolition 1.00 x
213.93
x
1.2841 =
274.71
32
02540
0004
EA 1,000 Gallon Precast Septic Tank
$274.71
Quantity
Unit Price
Factor
Total
Installation
0.00 x
1,781.83
x
=
1.2841
0.00
Demolition 1.00 x
213.93
x
1,2841 -
274.71
33
02540
0004
EA 1,000 Gallon Precast Septic Tank
$274.71
Quantity
Unit Price
Fedor
Total
Installation 0.00 x
1,761.63
x
1.2841
0.00
Demolition 1.00 x
213.93
x
1.2841 =
274.71
Subtotal for 02 - Site Work
$52.894.64
03 - Concrete
Contractor's Price Proposal - Detail Page 3 of 4
EZ/QC - Buy Board 1012012011
Contractor's Price Proposal - Detail Continues..
Work Order Number: 011362.00
Work Order Title: City of Lubbock - Demo of 3 Residential Homes
Sect Item Modifer UOM Description Line Total
Labor Equip. Material (Excluded If marked with an XI
03 - Concrete
34 03640 0003 CF Pressure Injected Cementitious Grout $489.44
Quantity Unit Price Factor Totai
Installation 27.00 x 13.54 x 1,28941 a 469,44
Subtotal for 03 - Concrete
$469.44
Proposal Total $63,958.84
This total represents the correct total for the proposal. Any discrepancy between line totals,
sub -totals and the proposal total is due to rounding.
Contractor's Price Proposal -Mail Page 4 of 4
EZIQC - Buy Board 10/20/2011