HomeMy WebLinkAboutResolution - 2011-R0323 - Contract - Minnix Commercial Partners LTD - Silent Wings Renovation Services - 07_27_2011Resolution No. 2011—RO323 July 27, 2011 Item No. 5.15 RESOLUTION BE IT RESOLVED BY THE CITY COUNCIL OF THE, CITY OF LUBBOCK: THAT the Mayor of the City of Lubbock is hereby authorized and directed to execute for and on behalf of the City of Lubbock, Contract No. 100351 for Silent Wings Renovation services, by and between the City of Lubbock and Minnix Commercial Partners, LTD, Lubbock, Texas, and related documents. Said Contract is attached hereto and incorporated in this resolution as if fully set forth herein and shall be included in the minutes of the City Council. Passed by the City Council on July 27, 2011 TOM MARTIN, MAYOR ATTEST: Q,�.o —5��4 — Reb1cca Garza, City Secretary APPROVED AS TO CONTENT: Marklk'ParwolWd, Assistant City Manager APPROVED AS TO FORM: Chad Weaver, Assistant City Attorney sj:ecdocs/RES.Contract 100351-Minnix Commercial Partners, LTD July 8, 2011 Contract No. 100351 Resolution No. 2011—RO323 Work Order Signature Document BUYBOARD EZIQC Contract No.: Area I -1 MCP - Option 1 ❑ New Work Order Modify an Existing Work Order Work Order Number. 011088.02 Work Order Data: Work order Tina: City of Lubbock - Silent Wings Curtin Wall Wet Seal Owner Name: City of Lubbock Contractor Name: Minnix Commercial Partners, LTD Contact Wesly Everett Contact: Keenan Davis Phone: iaM1775-2275 Phone: (806) 798-7335 Work to be Performed Work to be performed as per the Final Detailed Scope of Work Attached and as per the terms and conditions of 13uyBoard EZIQC Contract No Area I -1 MCP - Option 1. Brief Work Order Description: Silent Vvfngs Curtin Wall Wet Seal Time of Performance See Schedule Section of fire Defiled Scope of Work Work Order Number Location 011088.01 011088.02 011088.03 CITY OF LUBBOCK Tom Martin, Mayor Attest: Rebecca Ga za, City Secretary Amount of Contract Silent Wings — Wet Seal 56,926.16 Silent Wings — Curtain Wall Wet Seal 81,125.83 Silent Wings — Rotunda Wet Seal 68,555.85 APPROVED AS CONTENT: Mark earwo �,Assista 60t�yNlana�ger TOTAL 206,607.84 Ke an Davis, Project Manager Minnix Commercial Partners, LTD Owner'& Representative (� -Ir- ) CN* x3i Wesley Everett, Director of Facilities APP�-�77't FORM: --A-, ?AJ Assistant City Attorney Contractor's Price Proposal CSI - Summary Date: July 05, 2011 Re: IQC Master Contract* Work Order #: Owner PO #: Title: Contractor: Area I - 1 MCP - Option 1 011088.01 City of Lubbock - Silent Wings Wet Seal Minnix Commercial Partners, LTD Proposal Value: $56,926,16 01 - General Requirements $23,260.46 07 - Thermal & Moisture Protection $33,665.70 Proposal Total $56,926.16 Contractors Price Proposal - Summary Page 1 of 1 EZlQC - Buy Board 715r2011 Contractor's Price Proposal CSI - Detail Date: July 05, 2011 Re: IQC Master Contract # Area I - 1 MCP - Option 1 work Order #: 011088,01 (honer PO #: Title: City of Lubbock - Silent Wings Wet Seal Contractor: Minnix Commercial Partners, LTD Proposal Value: $56,926.16 Sect Kom Modifer UOM Description Line Total Labor Equip. Material {Excluded if marked with an Xi 01 - General Rt ulrements f 01520 0005 MO ADA Portable Toilets, Chemical $262.50 Quantity Unit Price Factor Totai Installation 2.00 x 104.99 x 1.2501 y 262.50 2 01540 0005 CCF Scaffolding With Bracing Accessories - Area Based On 3' Wide x 7' Long $3,004.99 Sections (CCF 1 Month) Quantity Unit Price Factor Total Installation 140.00 17x .17 x 1.2501 = 3.004.99 To be used on south and north sides of tower which are inaccessible with lift. Also to be used for soffit and rotunda in other phase. 3 01 MOD 0005 0023 For Quantities > 50 To 150, Add $301.02 Quantity Unit Price Factor Total Installation 140.00 x 1.72 x 1.2501 301.02 4 01540 0008 CCF Scaffolding Erection And Dismantling - Height 21' To 40' per CCF Of S3.262.28 Scaffolding And Accessories. Cost Includes Both Erection And Dismantling Of Scaffolding Quantity Unit Price Factor Total Installation 140.00 x 18.64 x 1.2501 3,282.26 To be used on south and north sides of tower which are inaccessible with lift Also to be used for soffit and rotunda in other phasn. 5 01590 0036 MO 125' Engine Powered, Articulating (UplOvef) Boom Manlift $16,054.66 Quantity Unit Price Factor Total Installation 1.00 x 12.842.70 x 1.2501 16,054.66 To be used on west and east sides of bower. Area is inaccessible with lift on north and south skies. 8 01590 1138 EA Equipment Delivery, Pickup, Mobilization And Demobl nation Using A Tractor $375.03 Trailer With Up To 53' BedNote: For equipment such as bulldozers, motor scrapers, hydraulic excavators, gradalls, road graders, loader-backhoes, heavy duty construction loaders, tractors, pavers, ropers, bridge finishers, straight mast construction forklifts, telescoping boom rough terrrain construction rorklffts, telescoping and articulating loom man&fls with a 40' boom lengths, eta Quantity Unit Price Factor Total Installation 1.00 x 300.00 x 1,2501 375.03 Subtotal for 01 - General Requirements $23,260.46 07 - Thermal & Moisture Protection 7 07510 0157 SQ Wall Tito Primer, Latex Primer For Wall Tito Coating $6,401.713 Quantity Unit Pr1ce Factor Total Installation 150.00 x 3414 x 12601 3 6,401.76 8 07910 0052 LF 1- (25 mm) Polyethylene Or Potyurethane Backer Rod $2,812.73 Quantity Unit Price Factor Total Installation 3,000.00 x 0.75 x 12501 — 2,812.73 Contractor's Price Proposal - Detail Page 1 of 2 EZ/QC - Bury Board 7/512011 Contractor's Price Proposal - Detail Continues.. Work Order Number: 011088.01 Work Order Title: City of Lubbock - Silent Wings Wet Seal sect Item Modifer UOM Description Line Tots' Mor Equip. Material (Excluded If marked witfi an Xi 07 - Thermal & Moisture Protection 9 07920 0075 CLF 314" x 1" Joint, Flexible Polyurethane Security Sealant And Caulking $24,451.21 Quantity Unit Price Factor Total Installation 30.00 x 566,81 x 1.2501 = 21,257.08 Demolition 30.00 x 85.17 x 1.2501 = 3,194.13 Subtotal for 07 - Thermal & Moisture Protection $33,665.70 Proposal Total $56,926.16 This total represents the correct total for the proposal. Any discrepancy between line totals, sub -totals and the proposal total is due to rounding. Contractor's Price Proposal - Detail Page 2 of 2 EZ1QC - Buy Board 715/2011 Contractor`s Price Proposal CSI - Summary Date: .luly 05, 2011 Re: ICC Master Contract #: Area I - 1 MCP - Option 1 Work Order # 011088,02 Owner PO #: 1 itle: City of Lubbock - Silent Wings Curtin Wail Wet Seal Contractor: Minnix Commercial Partners, LTD Proposal Value: $81,125.83 01 - General Requirements $46,687.58 07 - Thermal & Moisture Protection Proposal Total The Percentage of NPP on this Proposal: 54.04°/k $34,438.25 $81,125.83 Contractor's Price Proposal - Summary Page i of 1 EZIQC - Buy Board 715/2011 Contractor's Price Proposal CSI - Detail Date: July 05, 2011 Re: IQC Master Contract #: Area I - 1 MCP - Option 1 Work Order #: 011088.02 Owner PO #: Title: City of Lubbock - Silent Wings Curtin Wall Wet Seal Contractor: Minnix Commercial Partners, LTD Proposal Value: $81,125.83 Sect Item Modifer UOM Description Line Total W Labor Equip. Material (Excluded If marked with an Xi 2 01590 0054 NO 30' Eiectiic, Scissor Platform Lift 32,662.86 Quantity Unit Price Factor Total Installation 2.00 x 1,065.08 x 1.2501 2,662.86 3 01590 1137 EA Equipment Delivery, Pickup, Mobiization And Demobilizatlon Using A Rollback $187.52 Flatbed TnlckNote: For equipment such as trenchers, skid -steer Loaders (bobcats), industrial warehouse fortdifts, sweepers, scissor platform Lifts, telescoping and articulating boom manift with up to 40' boom lengths, etc. Quantity Unit Price Factor Total Installation 1.00 x 150.00 x 1.2501 18752 Subtotal for 01 - General Requirements $46,687.58 07 - Thermal & Moisture Protection 4 07920 0059 CLP 314" x 3/4" Joint, Polyurethane Sealant And Caulking $34,438.25 Quantity Unit Price Factor Total Installation 60.00 x 380.78 x 1.2501 28.560.78 Demolition 60.00 x 78.38 x 1.2501 = 5,877.47 Subtotal for 07 -Thermal dr Moisture Protection $34,438.25 Proposal Total $81,125.83 This total represents the correct total for the proposal. Any discrepancy between line totals, sub -totals and the proposal total Is due to rounding. The Percentage of NPP on this Proposal: 54.04% Contractor's Prins Proposal - Detai Page 1 of 1 EZIQC - Buy Board 7/5/2011 Contractor's Price Proposal CSI - Summary Date: July 05, 2011 Re: IQC Master Contract #: Area I - 1 MCP - Option 1 Work Order #: of 1068.02 Owner PO #: Title: City of Lubbock - Silent Wings Curtin Wall Wet Seal Contractor: Minnix Commercial Partners, LTD Proposal Value: $81,125.83 01 - General Requirements $46,687.56 07 - Thermal & Moisture Protection Proposal Total The Percentage of NPP on this Proposal: 54.04% $34,438.25 $81,125.83 Contractors Price Proposal - Summary Page 1 of 1 EZIQC - Buy Board 7/5/2011 Contractor's Price Proposal CSI - Summary Date: July 05, 2011 Re; IQC Master Contract* Area I - 1 MCP - Option 1 Work Order # 011088.03 Owner PO #: Title: City of Lubbock - Silent Wings Rotunda Wet Seal Contractor: Minnbr Commercial Partners, LTD Proposal Value: $68,555.85 02 - Site Work $8,585.75 04 - Masonry $28,689.79 07 - Thermal & Moisture Protection $29,328.90 15 - Mechanical $1,951.41 Proposal Total $68,555.85 Contractors Price Proposal - Summary Page 1 of 1 EZJQC - Buy Board 715/2011 Contractor's Price Proposal CSI - Detail Date, July 05, 2011 Re; IQC Master Contract* Area I - 1 MCP - Option 1 Work Order #: 011088.03 Owner PO #: Title: City of Lubbock - Silent Wings Rotunda Wet Seal Contractor: Minnix Commercial Partners, LTD Proposal Value: $68.555.85 Sect Item Modifier UOM Description Line Total Labor Equip. Material (Excluded If marked with an X) 02 - site Work 1 02210 0010 CY Excayadon For Building Foundations And Other Structures By Hand in Loose $5,773.02 Rock Quantity Unit Price Factor Total Installation 85.00 x 54.33 x 1.2501 = 5.773,02 2 02210 0019 CY Backtilling Around Building Foundations And Other Structures By Hand $1,696.64 Quantity Unit Price Factor Total Installation 90.00 x 15.08 x 1.2501 1.598.84 3 02210 0022 CY Compaction Of Fill Or Subbase For Building Foundations and Other Structures $1,116.09 by Hand Quantity Unit Price Factor Total Installation 90.00 x 9.92 x 1.2501 1.116.09 Subtotal for 02 - Site Work $8,585.75 04 - Masonry 4 04910 0011 LF Cut And Caulk Masonry, Silicone Caulks $22,051.76 Quantity Unit Price Factor Total Installation 4,500.00 x 3.92 x 1.2501 = 22,051.78 5 04MOD 0011 0077 For 314' (19 mm) Deep Cut, Add $8,838.03 Quantity Unit Price Factor Total Installation 4,500.00 x 1.18 x 12501 - 6,638.03 Subtotal for 04 - Masonry $28,689.79 07 - Thermal & Moisture Protection 8 07131 0006 CSF 1116- Butyl Elastomeric Waterproofing Wth Nylon $5,585.57 Quantity Unit Price Factor Total Installation 65.00 x 60.47 x 1.2501 4,913.58 Demolition 65.00 x 8.21 x 1.2501 671.99 7 07MOD 0008 0014 For Joint Taping, Add $400.59 Quantity Unit Price Factor Total Installation 05.00 x 4.93 x 1,2501 400.59 a 07510 0157 SQ Wall rite Primer, Latex Primer For Well rite Coating $7,041.94 Quantity Unit Price Factor Total Installation 165.00 x 34.14 x 1.2501 7,041.94 9 07920 0075 CLF 3/4" x 1" Joint Flexible Polyurethane Security Sealant And Caulking $18,300.80 Quantity Unit Price Factor Total Installation 20.00 x 566.81 x 1.2501 14,171.30 Demolition 20.00 x 85.17 x 1.250t = 2,129.42 Subtotal for 07 - Thermal & Moisture Protection $29,328.90 15 - Mechanical Contractors Price Proposal - Detad Page 1 of 2 EZlQC - Buy Board 715/2011 Contractor's Price Proposal - Detail Continues.. Work Order Number. 011088.03 Work Order Title: City of Lubbock - Silent Wings Rotunda Wet Seal Sect Item Modifer UOM Description Line Total Labor Equip. Material (Excluded If marked with an X) 15 - Mechanical 10 15064 0183 LF 0- (21 cm) ABS-PVC oVW Pipe Schedule 40 Pipe AssemblyNote: Includes all $1,951.41 fittings, couplings and hangers. Fittings are assumed every 10'. Not fur use where detail is available - Quantity Unit Price Factor r0tal Installation 50.00 x 31.22 x 1.2501 1,951.41 Subtotal for 15 - Mechanical $1,951.41 Proposal Total 5681558AS This total represents the correct total for the proposal. Any discrepancy between line totals, sub -totals and the proposal total is due to rounding, Contractor's Prica Proposal - Detail Page 2 of 2 EDQC - Buy Board 7/5/2011