Loading...
HomeMy WebLinkAboutResolution - 2011-R0322 - Contract - Talon LPE - Fire Station Repairs - 07_27_2011Resolution No. 2011-RO322 July 27, 2011 Item No. 5.14 RESOLUTION BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK: THAT the Mayor of the City of Lubbock is hereby authorized and directed to execute for and on behalf of the City of Lubbock, Contract No. 100350 for Fire Station Repair services, by and between the City of Lubbock and Talon/LPE, Amarillo, Texas, and related documents. Said Contract is attached hereto and incorporated in this resolution as if fully set forth herein and shall be included in the minutes of the City Council. Passed by the City Council on July 27, 2011 TOM MARTIN, MAYOR II ATTEST: 3�- RebAa Garza, City Secretary APPROVED AS TO CONTENT: Mark arwa , Assistant City Manager APPROVED AS TO FORM: Chad Weaver, Assistant City Attorney sj: ccdocs/RES.Contract-Talon-LPE July 8, 201 t c,oncrtics rro. 100350 Resolution No. 2011—RO322 Work Order Signature Document SUYBOARD EZ1QC Contract No.: Area 1.1- TAL ElNew Work Order Modify an Fxletfng Work Order Work Order Number, 010070.03 Work Order Date: - Work Order Title: City of Lubbock-- Fire Statlorr Repairs=TAL FInq stattorr #1 t Cwner Name: City of Lubbock Cont; r Name Talon"E Contact Westy Everett Contact Bridger Howard Phone: (806) 775-2275 Phone: (808) 87"15 — Work to be Padarmed 4,vork to ce performed as per the Final Detalled Scope of Work Attached and as per the terrr.3 and wnd dons of BuyBoard F_.ZIQC Contrad No Area I-t- TAL BriefMdt QM 00criptl0n. SCW: Fire Station Renovations, Time of performance See Schedule Section of flee Detr.Red Scope of Worrtr %fork 01-der Nu111her Location Amount of Contract 010674).03 fire station I 1 61,777.04 010670.04 Fire Station 12 2.128.18 1)191671).J:: iire>tatton 13 13,343.18 010670A)ft Fire Station la 28,228.38 170TAL 10.5,476.78 CV[ l t)F LVHIMC'K -� -- 4ffi,�r �mard. 1'uin'.�l:irtiii. �I.i_� or 1'rnject mana);cr '1 atnn LI'l�: .\licit: — '�16 tlehecea Ga a, Cite Store l >VYNttt;t 1 13 �.` r"f)\ E'I•'ti 3�:Si4�1!r at i'frva cpresentalt ii'c51cNEverett, Dire ctur of Facilities > i �rsisrant CUN .Xttnrner -- -�- Resolution No, 2011—RO322 A; Board® YaGwarahmp—chming Detailed Scope of Work To: Bridger Howard From: Wesly Everett Talon/LPE City of Lubbock 921 N Bivins Street 1625 13th St Amarillo, TX 79107 Lubbock, TX 79401 (806) 676-3815 (806) 775-2275 Date Printed: July 06, 2011 Work Order Number: 010670.03 Work Order Title: City of Lubbock - Fire Station Repairs_TAL Fire station #11 Brief Scope: SOW. Fire Station Renovations Station #11 71 Preliminary Revised FX I Final The following items detail the scope of work as discussed at the site. All requirements necessary to accomplish the items set forth below shall be considered part of this scope of work. SOW: Fire Station Renovations (Revised per Fire Department Notes "Fire Station Quote Revisions" Station #11 Clean HVAC Ductwork Remove and cover old HVAC grills in day room and repair wall Observation Deck; Ceiling Water Leak Install Weather Stripping on all Exterior Doors West Exterior Wall; Seal Around Water Valve Provide One Roll Off for Carpet and Tile Provide One Roll Off for Dorm Bathroom Renovations Replace (4) Heater Units in Bay area Repair/Replace Metal Edging on Sidewalk Replace (5) Overhead Door Motor operators (2) on South side and (3) on North West side Remove and install new toilet partitions in dorm bathroom Install shower faucets for three showers (American Standard T480-501) Install concrete board on (3) shower walls and ceilings Install pan, concrete, double drain, and tile on (3) shower floors Remove and install (3) commercial toilets Remove and install (2) commercial urinals Remove and install (4) lavatories and commercial faucets Remove and replace (9) bays of flourescent lights in Dorm Bath Remove lights over lavatories and replace (4) lights over lavatories with recessed can lights Install passage latchset on basement door Install stainless kick plate on basement door Install ceramic tile in kitchen 16"X16" Paint ceiling in dorm bathroom Remove carpet in Captain's bedroom and install carpet tile (Includes grinding floors) Remove cove base in Captain's bedroom and install cove base Observation Deck; Replace Carpet (Broadloom) (Includes grinding Floors) Dorm Bathroom Install 8X8 tile on shower walls, floors, and ceilings - (Does Not Include Possible Stud Damage, Which is Scope of Work Page 1 of 2 EZ10C - Buy Board 716/2011 Detailed Scope of Work Continues.. Work Order Number: 010670.03 Work Order Title: City of Lubbock - Fire Station Repairs_TAL Fire station #11 Unknown at This Time) Remove carpet in observation deck and install carpet tile Replace Dayroom Carpet (Includes grinding floors) Replace Basement Door Passage Lockset Only Remove all tile in dorm bathroom Install 8X8 file on bathroom walls (South wall in the toilet side of the bathroom will be tiled half way up and then tape, bed, textured, and painted on the upper half. All other walls will be tiled from the floor to the ceiling. Install 16X16 tile on bathroom floor Scope of Work Page 2 of 2 EZ1QC - Buy Board 7/6/2011 Contractor's Price Proposal Category - Summary Date: July 06, 2011 Re: IQC Master Contract #: Area 1-1- TAL Work Order #: 010670.G3 Owner PO #: Title: City of Lubbock - Fire Station Repairs TAL Fire station #11 Contractor: TalorYLPE Proposal Value: $81.777-04 Captains Bedroom $1,961.37 Dayroom; Remove and Cover Old A/C Vent $538.28 Heaters $9,308.20 Install Weather Striping at all Exterior Doors $721.60 Kitchen Floor $2,618.88 Observation Deck Replace Carpet $1,559.99 Observation Deck; Ceiling Water Leak $358.45 Repair Dorm Bathroom $12,105.04 Repair Dorm Shower Tile and Plumbing $14,119.21 Repair/Replace Metal Edge on Sidewalk $1,695.11 Replace Basement Door $376.30 Replace Dayroom Carpet $5,802.52 Replace Overhead Door Motors $9,685.25 Request Air Duct Cleaning $862.09 Seal Around Water Valve on West Door $164.75 Proposal Total $61,777,04 Contractor's Price Proposal - Summary Page 1 of 1 EZIQC - Buy Board 7/6/2011 Contractor's Price Proposal Category - Detail Date: July 06, 2011 Re: lQC Master Contract #: Work Order #: Owner PO #: Title: Contractor: Proposal Value; Area 1-1- TAL 010670.03 City of Lubbock - Fire Station Repairs_TAL Fire station #11 Talon/LPE $61, 777.04 Sect Item Modifer U OM Description Lino Total Labor Equip. Material (Excluded if marked with an X Captains Bedroom 1 09650 0033 LF 4" High 1/8" Vinyl Plastic Base, All Colors $197.03 Quantity Unit Price Factor Total Installation 74,00 x 1.75 x 1.2500 161.85 Demolition 74.00 x 0.38 x 1.2500 35,15 2 09MOD 0033 0189 For Quantities n 40 To 100, Add $10.08 Quantity Unit Price Factor Total Installation 62.00 x 0.13 x 1.2500 10,05 3 09680 0061 5Y 24 Ounce, Patterned, Nylon Carpet Tile $1,513.98 Quantity Unit Price Factor Total Installation 31.00 x 36.99 x 1.2500 1,433.36 Demolition 31.00 x 2.08 x 1.2500 80.60 4 09680 0078 SY Grinding Of Existing Concrete Floor Prior To Installation Of Carpet $240.30 Quantity Unit Price Factor Total Installation 44.50 x 4.32 x 1.2500 240.30 Subtotal for Captains Bedroom $1,961.37 Dayroom; Remove and Cover Old A/C Vent 5 09205 0005 SF 1-112", 25 Gauge. Hat Channel, Drywall Furring Channel, Installed On Walls $153.75 16" On Center Quantity Unit Price Factor Total Installation 60.00 x 1.52 x 1.2500 114,00 Demolition 60.00 x 0.53 x 1.2500 = 39.75 6 09250 0006 SF 518" Drywall, One Layer, One Face On Wood Or Metal Studs Or Furring $71.25 Quantity Unit Price Factor Total Installation 60.00 x 0.75 x 1.2500 - 5625 Demolition 60.00 x 0,20 x 1.2500 15.00 7 09MOD 0006 0045 For Quantities Up To 128, Add $20.25 Quantity Unit Price Factor Total Installation 60.00 x 0.27 x 1.2500 20.25 8 09250 0046 SF Tape, Spackle And Finish Drywall Walls Up To 10' Height $20.25 Quantity Unit Price Factor Total Installation 60.00 x 0.27 x 1.2500 - 2025 9 09MOD 0046 OD48 For Quantities Up To 128, Add $7.50 Quantity Unit Price Factor Total Installation 60.00 x 0.10 x 1,2500 - 7.50 10 09920 0062 SF Paint Interior Plaster/Drywall, 1 Coat Primer, Brush/Roller Work $18.75 Quantity Unit Price Factor Total Installation 60,00 x 0.25 x 1.2500 18.75 Contractor's Price Proposal - Detail Page 1 of 9 EZlQC - Buy Board 716=11 Contractor's Price Proposal - Detail Continues.. Work Order Number: 010670.03 Work Order Tide: City of Lubbock - Fire Station Repairs_TAL Fire station #11 sect item Modifer UOM Deseriiption Line Total Labor Equip. Material (Excluded if marked with an X Dayroom; Remove and Cover Old A/C Vent 11 09MOD 0062 0298 For Orange Peel Finish, Add $2.25 Quantity Unit Price Factor Total Installation 60,00 x 0.03 x 1.2500 225 12 09MOD 0062 0316 For Quantities Up To 100. Add $10.50 Quantity Unit Price Factor Total Installation 60.00 x 0.14 x 1.2500 - 10,50 13 09920 0064 SF Paint Interior PlasterlDrywall, 2 Coats Paint, Brush/Roller Work $38.25 Quantity Unit Price Factor Total Installation 80,00 x 0.51 x 1.2500 - 38.25 14 09MOD 0064 0298 For Orange Peel Finish, Add $5.25 Quantity Unit Price Factor Total Installation 60.00 x 0.07 x 1.2500 - 5.25 15 09MOD 0064 0316 For Quantities Up To 100, Add $21.75 Quantity Unit Price Factor Total Installation 60.00 x 0.29 x 1.2500 - 21.75 16 15867 0124 EA 20" x 20" Steel Security Grille $168.53 Quantity Unit Price Factor Total Installation 0.00 x 381.94 x 1_2500 - 0.00 Demolition 9.00 x 14.98 x 1.2500 168.53 Subtotal for Dayroom; Remove and Cover Old A1C Vent $638.28 Heaters 17 15700 0126 EA 202.5 MBH Output, 250 MBH Input, 3450 CFM Gas Fired Unit Heater Fan $9,308.20 Propelled, Horizontal, 115V Quantity Unit Price Factor Total Installation 4.00 x 1,760.97 x 1.2500 - 8,804.85 Demolition 4.00 x 100.67 x 1.2500 503.35 Subtotal for Heaters $9,308.20 Install Weather Striping at all Exterior Doors 16 OB364 0003 LF Weather Seal At Top Of Door $33.45 Quantity Unit Price Factor Total Installation 12.00 x 2.23 x 1.2500 - 33,45 19 08364 0004 LF Weather Strip At Door Bottom, Astragal Only $16.65 Quantity Unit Price Factor Total Installation 12.00 x 1.11 x 1,2500 16.65 20 08720 0177 LF 114" Vinyl Insert, 1-112" Width, 114" Height, Standard Jamb, Heavy Duty, Mill $671.50 Aluminum Retainer, Perimeter Gasketing Weather -Strip (Pemko 290AV) Quantity Unit Price Factor Total Installation 68.00 x 7.05 x 1.2500 - 599.25 Demolition 68.00 x 0,85 x 1.2500 72.25 Subtotal for Install Weather Striping at all Exterior Doors $721.60 Kitchen Floor Contractor's Prioe Proposal - Detail Page 2 of 9 EZIQC - Buy Board 7/6/2011 Contractor's Price Proposal - Detail Continues.. Work Order Number: 010670.03 Work Order Title: City of Lubbock - Fire Station Repairs_TAL Fire station #11 sect. Item Modifer UOM Description Line Total Labor Equip. Material (Excluded If marked with an X Kitchen Floor 21 09310 0003 SF Unmounted Floor Tile, 8"x8" And LargerNote: Indudes glazed porcelain, $1,947.00 unglazed porcelain and glazed ceramic tiles. Quantity Unit Price Factor Total Installation 240.00 x 6,49 x 1.2500 = 1,947.00 22 09MOD 0003 0068 For Quantities ? 50 To 250, Add $144.00 Quantity Unit Price Factor Total Installation 240.00 x 045 x 1.2500 144.00 23 09650 0024 SF Marbleized Pattern Vinyl Composition Tile 118" Thick $135.00 Quantity Unit Price Factor Total Installation 0.00 x 1.80 x 1.2500 0.00 Demolition 240.00 x 0,45 x 1.2500 = 135.00 24 09650 0033 LF 4" High 118" Vinyl Plastic Base, All Colors $292.88 Quantity Unit Price Factor Total Installation 110.00 x 1.75 x 1.2500 - 240.63 Demolition 1 %00 X 0.38 x 1.2500 = 52.25 Subtotal for Kitchen Floor $2,518.88 Observation Deck Replace Carpet 25 01510 0011 E4 Dumpster In/Out Fee $156.25 Quantity Unit Price Factor Total Installation 1.00 x 125.00 x 1.2500 _ 156.25 26 01510 0012 EA Dumpster Daily Fee $25.00 Quantity Unit Price Factor Total Installation 10.00 x 2.00 x 1.2500 = 25.00 27 09650 0033 LF 4" High 118" Vinyl Plastic Base, All Colors $335.48 Quantity Unit Price Factor Total Installation 126.00 x 1.75 x 1.2500 275.63 Demolition 128.00 x 0,38 x 1.2500 = 59.85 28 09680 0025 SY 24 Ounce, Medium Traffic, Nan-Pattemed, Nylon Broadloom Carpel $859.88 Quantity Unit Price Factor Total Installation 30.00 x 22.93 x 1.2500 859.88 29 09MOD 0025 0443 For Quantities a 15 To 33, Add $21.38 Quantity Unit Price Factor Total Installation 30.00 x 0.57 x 1.2500 21.3E 30 09680 0078 SY Grinding Of Existing Concrete Floor Prior To Installation Of Carpel $162.00 Quantity Unit Price Factor Total Installation 30,00 x 4.32 x 1.2500 - 162,00 Subtotal for Observation Deck Replace Carpet $1,559.99 Observation Deck; Ceiling Water Leak Contractor's Price Proposal - Detail Page 3 of 9 EZlQC - Buy Board 7/6/2011 Contractor's Price Proposal - Detail Continues.. Work Order Number: 010670.03 Work Order Title: City of Lubbock - Fire Station Repairs_TAL Fire station #11 Sect Item Modifer UOM Description Line Total Labor Equip. Material (Excluded if marked with an X Observation Deck; Ceiling Water Leak 31 01352 0027 HR Roofer, CompositeNote: Tasks in the CTC include appropriate costs to cover $232.20 labor. These tasks will be requested specifically by the owner for miscellaneous work not covered in the CTC. Quantity Unit Price Factor Total Installation 8.00 x 23.22 x 1.2500 232.20 2 men 4 hours, dean existing sealant in order for adhesion of new sealant 32 07510 0142 LF TremSEAL GP General Purpose Sealant $126.25 Quantity Unit Price Factor Total Installation 100.00 x 1.01 x 1.2500 = 126.25 Subtotal for Observation Deck; Ceiling Water Leak $358.45 Repair Dorm Bathroom 33 09920 0062 SF Paint Interior Plaster/Drywall, 1 Coat Primer, Brush/Roller Work $125.00 Quantity Unit Price Factor Total Installation 400.00 x 0.25 x 1.2500 - 125.00 34 09MOD 0062 0298 For Orange Peel Finish, Add $2.25 Quantity Unit Price Factor Total Installation 60A0 x 0.03 x 1.2500 2.25 35 09MOD 0062 0316 For Quantities Up To 100, Add $10.50 Quantity Unit Price Factor Total Installation 60.00 x 0.14 x 1.2500 10.50 36 09920 0064 SF Paint Interior Plaster[Drywall, 2 Coats Paint, Brush/Roller Work $255.00 Quantity Unit Price Factor Total Installation 400.00 x 0.51 x 1,2500 255.00 37 09MOD 0064 0298 For Orange Peel Finish, Add $5.25 Quantity Unit Price Factor Total Installation 60.00 x 0.07 x 1.2500 5.25 38 09MOD 0064 0316 For Quantities Up To 100, Add $21.75 Quantity Unit Price Factor Total Installation 60.00 x 0.29 x 1.2500 21.75 39 10160 0008 EA 36" x 60", Overhead Braced, Enamel Coated Steel, One Compartment Comer $2,076.23 Unit, Complete Toilet Partition Quantity Unit Price Factor Total Installation 3.00 x 506.77 x 1.2500 - 1,900.39 Demolition 3.00 X 46.89 X 1.2500 = 175.84 40 15451 0004 EA Flush Valve Type, Floor Outlet, Siphon Jet Water Closet, Floor Mounted, $1,218.23 Elongated, (American Standard 2305.100) Quantity Unit Price Factor Total Installation 3.00 x 293.88 x 1.2500 - 1,102.05 Demolition 3.00 x 30.98 x 1.26M = 116.10 41 15451 0019 EA Exposed Manual Water Closet Flush Valve (Sloan Regal-115) $1,068.31 Quantity Unit Price Factor Total Installation 5.00 x 160.78 x 1.2500 - 1,004.88 Demolition 5,00 x 10.15 x 1,2500 63.44 Contractor's Price Proposal - Detail Page 4 of 9 EZIQC - Buy Board 71612011 Contractor's Price Proposal - Detail Continues.. Work Order Number: 010670.03 Work Order Title: City of Lubbock - Fire Station Repairs_TAL Fire station #11 Sect Rem Modirer UOM Descrlpdon Line Total Labor Equip. Material (Excluded it marked with an X Repair Dorm Bathroom 42 15451 0038 EA Washdown, Wall Hung Vitreous China Urinal (American Standard $948,38 6501.010.020) Quantity Unit Price Factor Total Installation 2,00 x 347,48 x 1.2500 - 868.70 Demolition 2.00 x 31.57 x 1,2500 = 79.68 43 15451 0092 EA 20"x18" Vitreous China Wall Hung Lavatory (American Standard $1,562.30 0195.073,020) Quantity Unit Price Factor Total Installation 4.00 x 296.50 x 1.2500 = 1,482.50 Demolition 4.00 x 19.96 x 1.2500 = 99.80 44 15451 0217 EA Shower Head, Polished Chrome, Replacement $107.81 Quantity Unit Price Factor Total Installation 3.00 x 28.75 x 1.2500 107.81 45 15451 0300 EA Widespread Lavatory Faucet With Chrome Lever Handles, Delta $895.70 3543-LH P+H24 Quantity Unit Price Factor Total Installation 4,00 x 160.42 x 1,2500 842.10 Demolition 4.00 x 10.72 x 1.2500 a 53.60 46 15451 0315 EA Single Lever Handle, Chrome Shower Only, Pressure -Balance (American $559,61 Standard T480.501) Quantity Unit Price Factor Total Installation 3.00 x 136.31 x 1.2500 - 511.16 Demolition 3.00 x 12.92 x 1.2500 = 48.45 47 16120 0004 MLF #12 AWG Cable - Type THHN-THWN, 600 V Copper, Single Solid, Placed In $92.34 Conduit Quantity Unit Price Factor Total Installation 020 x 287.96 x L2500 71.99 Demolition 0.20 x 81,40 x 1.2500 a 20.35 48 16130 0095 EA #57243G Duplex Receptacle And Box, Ground, For #200,#500 Or #700 $103.30 Quantity Unit Price Factor Total Installation 4.00 x 20.66 x 1.2500 a 103.30 49 16131 0250 LF 112" EMT Conduit, Mounted Exposed On Flat Wall $69.00 Quantity Unit Price Factor Total Installation 30.00 x 1.50 x 1.2500 - 56.25 Demolition 30.00 x 0.34 x 1.2500 a 12.75 50 18131 0283 EA 1 /2 EMT Compression Coupling $10.58 Quantity Unit Price Factor Total Installation 3.00 x 2.08 x 1.2500 7.80 Demolition 3.00 x 0.74 x 1.2500 2.78 51 16131 0316 EA 1/2" EMT Box Connector, Compression $40.75 Quantity Unit Price Factor Total Installation 10.00 x 2.58 x 1.2500 = 32.25 Demolition 10,00 x 0.68 x 1,2600 8.50 52 16190 0003 EA 1/2", One Hole Steel Conduit Strap $9.75 Quantity Unit Price Factor Total Installation 6.00 x 1.30 x 1_2500 9.75 Contractor's Price Proposal - Detail Page 5 of 9 EZIQC - Buy Board 7/612011 Contractor's Price Proposal - Detail Continues.. Work Order Number: 010670.03 Work Order Title: City of Lubbock - Fire Station Repairs_TAL Fire station #11 sect. Item Modifer UOM Description Line Total Labor Equip. Material {Excluded If marked with an X Repair Dorm Bathroom 53 16501 0050 EA 9-26 Watt, 4-Pin Compact Fluorescent Lamp $87.00 Quantity Unit Price Factor Total Installation 4,00 x 17.40 x 1.2500 87.00 54 16510 0017 EA 2 T8 Lamps, 2' x 4', Surface Mounted, Wraparound Fluorescent Fixture $2.598.30 Quantity Unit Price Factor Total Installation 12.00 x 159.93 x 1.2500 - 2,398.95 Demolition 12,00 x 13.29 x 1.2500 9 199.35 55 16510 0203 EA Circular Clear Lens, Recessed Fixture Trim $191 A0 Quantity Unit Price Factor Total Installation 4.00 x 34.01 x 1,2500 170.05 Demolition 4.00 x 4.37 x 1.2500 21.85 56 16510 0395 LF For Each Additional LF Of Interior Lighting Wire Whip, AddNoW Wire whips $25.80 are included with interior lighting fixtures, where necessary, up to six feet in length. Use this task for additional required whip length. For example, if the fixture requires a 15' wire whip then use 9 LF of this task to reach required length. Quantity Unit Price Factor Total Installation 24.00 x 0.86 x 1.2500 - 25.80 Subtotal for Repair Dorm Bathroom $12,105.04 Repair Dorm Shower Tile and Plumbing 57 01510 0011 EA Dumpster In/Out Fee $312.50 Quantity Unit Price Factor Total Installation 2 DD x 125.00 x 1.2500 312.50 58 01510 0012 E4 Dumpster Daily Fee $12.50 Quantity Unit Price Factor Total Installation 5.00 x 2.00 x 1.2500 12.50 59 09305 0002 SF Thin -Set - Latex Portland Cement Mortar $500A0 Quantity Unit Price Factor Total Installation 417.00 x 0.65 x 1.2500 - 338.81 Demolition 417.00 x 0.31 x 1.2500 161,59 60 09305 0005 SF 1-114" Minimum Thickness Portland Cement Mortar Setting Bed Note: For $219.00 commercial floors. Includes 15# felt and wire reinforcement Quantity Unit Price Factor Total Installation 48.00 x 2.80 x 1.2500 168.00 Demolition 48.00 x 0.85 x 1.2500 51.00 61 09MOD 0005 0060 For Quantities Up To 50, Add $99.00 Quantity Unit Price Factor Total Installation 48.00 x 1.65 x 1.2500 - 99.00 62 09305 0009 SF 112" Cementitious Backer Units For Installation On Floors $1,162.39 Quantity Unit Price Factor Total Installation 417.00 x 1.98 x 1.2500 - 1,032.08 Demolition 417.00 x o.25 x 1.2500 130.31 63 09MOD 0009 0065 For Installation On Wall, Add $109.46 Quantity Unit Price Factor Total Installation 417.00 x 0.21 x 1.2500 109.46 Contractor's Price Proposal - Detail Page 6 of 9 EZIQC - Buy Board 7/6l2011 Contractor's Price Proposal - Detail Continues.. Work Order Number: 010670.03 Work Order Title: City of Lubbock - Fire Station Repairs_TAL Fire station #11 Sect Item Modifier UOM Description Line Total Labor Equip. Material lExcluded if marked with an X Repair Dorm Shower Tile and Plumbing 64 09310 0002 SF Mounted Floor Tile, Less Than WW"Note: Includes glazed porcelain, unglazed $235.58 porcelain and glazed ceramic tiles. Tiles mounted from back, side or front in 12N112", 12"x24", or similar sized sheets. Quantity Unit Price Factor Total Installation 27.00 x 6.02 x 1.2500 = 203.18 Demolition 27.00 x 0.96 x 1.2500 = 32.40 (3) 3x3 shower floors and ceilings 65 09MOD 0002 0068 For Quantities > 50 To 250, Add $12.83 Quantity Unit Price Factor Total Installation 27.00 x 0,38 x 1,2500 = 12.83 '(3) 3x3 shower floors and ceilings' 66 09310 0003 SF Unmounted Floor Tile, 8"x8" And LargerNote: Includes glazed porcelain, $3,540.00 unglazed porcelain and glazed ceramic tiles. Quantity Unit Price Factor Total Installation 400.00 x 6.49 x 1.2500 - 3.245.00 Demolition 400.00 x 0.59 X 1.2500 295.00 67 09310 0009 SF Mounted Wall Tile, Less than 8"xB"Note: Includes glazed porcelain, unglazed $6,604.08 porcelain and glazed ceramic 9les. Tiles mounted from back, side or front in 12"x12", 12"x24", or similar sized sheets. Quantity Unit Price Factor Total Installation 697.00 x 6,42 x 1.2500 = 5,59343 Demolition 697.00 x 1.16 x 1.2500 = 1,010.65 The South wall in the toilet side of the bathroom will be tiled half way up and then tape bed and texture and painted on the upper half. All other wells will be tied from the floor to the ceiling 66 09920 0064 SF Paint Interior Plaster/Drywall, 2 Coats Paint, BrushlRoller Work $151.73 Quantity Unit Price Factor Total Installation 238.00 x 0.51 x 11500 - 151.73 69 09MOD 0064 0298 For Orange Peel Finish, Add $28.70 Quantity Unit Price Factor Total Installation 328.00 x 0.07 x 1.2500 - 28,70 70 15421 0005 EA 6" Round Top Floor Drain With 4" Outlet, Bronze Top $948.64 Quantity Unit Price Factor Total Installation 3.00 x 209.16 x 1.2500 = 784,35 Demolition 3.00 x 43.81 x 1.2500 = 164,29 71 1545B 0017 SF 7 Oz Bituminous Membrane Shower Pan $182.40 Quantity Unit Price Factor Total Installation 48.00 x 3.04 x 1.2500 - 182.40 Subtotal for Repair Dorm Shower Tile and Plumbing $14,119.21 Repair/Replace Metal Edge on Sidewalk 72 01352 0033 HR Structural Steel WorkerNote: Tasks in the CTC include appropriate costs to $194.80 cover labor. These tasks will be requested specifically by the owner for miscellaneous work not covered in the CTC. Quantity Unit Price Factor Total Installation 4100 x 38.96 x 1,2500 W 194,80 Remove and instail new edge angle Contractors Price Proposal - Detail Page 7 of 9 EZIQC , Buy Board 7/6/2011 Contractor's Price Proposal - Detail Continues.. Work Order Number: 010670.03 Work Order Title: City of Lubbock - Fire Station Repairs_TAL Fire station ##11 Sect. Item Modifer UOM Deacriotion Line Total Labor Equip. Material (Excluded if marked with an X RepairfReplace Metal Edge on Sidewalk 73 02112 0282 IN 112" Diameter Drilling In Concrete Per Inch Of Depth $607.50 Quantity Unit Price Factor Total Installation 405.00 x 1.20 x 1.2500 607.50 Drilling into existing concrete in order to install angles 74 05410 0012 LF 2" x 2" x 116" Angle Iron $346.08 Quantity Unit Price Factor Total Installation 50,00 x 3.75 x 1.2500 - 234.38 Demolition 50.00 x 1.80 x 1,2500 = 112.50 75 05501 0184 EA 1 /4" Concrete Expansion Anchor $655.05 Quantity Unit Price Factor Total Installation 132.00 x 3.97 x 1.2500 - 655.05 To install angles in existing concrete, including tops and sides of angles at 12" on center 76 05MOD 0184 0046 For Quantities > 100, Deduct -$121.50 Quantity Unit Price Factor Total Installation 135.00 x -0.72 x 1.2500 - -121.50 To install angles in existing concrete, including tops and sides of angles at 12" on center' 77 09910 0364 SF Paint Miscellaneous Exposed Metal One Coat Alkyd Enamel $12.38 Quantity Unit Price Factor Total Installation 22.00 x 0.45 x 1.2500 12.38 Subtotal for Repair/Replace Metal Edge on Sidewalk $1,696.11 Replace Basement Door 78 08710 0083 EA 24" x 36", 0.050" Thick, Satin Aluminum Finish, Aluminum Kck Plate $80.84 Quantity Unit Price Factor Total Installation 1.00 x 64.67 x 1.2500 - 80.84 79 08710 2170 EA Passage/Closet F01 Mortise LatchsetNote: Both sides always unlocked. $295,46 Quantity Unit Price Factor Total Installation 100 x 227.85 x 1.2500 284.81 Demolition 1.00 x 0.52 x 1.2500 10.65 Subtotal for Replace Basement Door $376.30 Replace Dayroom Carpet 60 09650 0033 LF 4" High 118" Vinyl Plastic Base, All Colors $487.24 Quantity Unit Price Factor Total Installation 183.00 x 1.75 x 1.2500 - 400,31 Demolition 183.00 x 0.38 x 1.2500 = 66.93 81 o9660 0061 SY 24 Ounce, Patterned, Nylon Carpet Tile $4,786.08 Quantity Unit Price Factor Total Installation 9800 x 36.99 x 1.2500 4,531,28 Demolition 98.00 x 2,08 x 1.2500 254.80 82 09680 0078 SY Grinding Of Existing Concrete Floor Prior To Installation Of Carpet $529.20 Quantity Unit Price Factor Total Installation 98.00 x 4.32 x 1.2500 - 529.20 Subtotal for Replace Dayroom Carpet $5,802.52 Contractor's Price Proposal - Detail Page 8 of 9 EZ10C - Buy Board 7r6l2011 Contractor's Price Proposal - Detail Continues.. Work Order Number: 010670.03 Work Order Title: City of Lubbock - Fire Station Repairs_TAL Fire station #11 Sect Item Modlfer UOM Description Line Total Labor Equip. Material (Excluded If marked with an X Replace Overhead Door Motors 83 08332 0066 EA Add For Motor OperatorNots: includes motor, supports, push button operator, $9,665.25 stationary electronic eye, signal wiring from eye to motor and motor to operator. Quantity Unit Price Factor Total Installation 5.00 x 1,532.80 x 1.2500 - 9,580,00 Demolition 5.00 x 16.84 x 1.2500 = 105.25 16' LiRmaster Trolley 112 hp 220V 1 ph Continuous Duty Garage Door Openers and Two Remotes per Door Subtotal for Replace Overhead Door Motors $9,685.25 Request Air Duct Cleaning 84 15W 0095 EA Clean Grille/Diffuser/RegisterNote: Includes removal and reinstallation. $111.50 Quantity Unit Price Factor Total Installation 10.00 x 8.92 x 1.2500 - 111.50 85 15048 0096 EA Clean Air Handling Unit Fan $178.33 Quantity Unit Price Factor Total Installation 2,00 x 71.33 x 1.2500 - 178.33 86 15048 0097 F-A Clean Air Handling Unit Coil $267.48 Quantity Unit Price Factor Total Installation 2.00 x 106.99 x 1.2500 267.48 87 15048 009E EA Cleaning Of Ductwork Set-up Charge $304.78 Quantity Unit Price Factor Total Installation 1.00 x 243.82 x 1.2500 304.78 Subtotal for Request Air Duct Cleaning $862.09 Seal Around Water Valve on West Door 88 07920 0014 CLF 314" x 3/4" Joint, Silicone Sealant And Caulking $164.75 Quantity Unit Price Factor Total Installation 0.25 x 448.85 x 1.2500 = 140.27 Demolition 0.25 x 78.36 x 1.2500 = 24.49 Subtotal for Seal Around Water Valve on West Door $164.75 Proposal Total $61,777.04 This total represents the correct total for the proposal. Any discrepancy between line totals, sub -totals and the proposal total is due to rounding. Contractors Price Proposal - Detail Page 9 of 9 EZ1QC - Buy Board 7/612011 Resolution No. 2011—RO322 Board CQapenNrs Pwchselnp Detailed Scope of Work To: Bridger Howard From: Wesly Everett Talon/LPE City of Lubbock 921 N Bivins Street 1625 13th St Amarillo, TX 79107 Lubbock, TX 79401 (806)676-3815 (1306)775-2275 Date Printed: June 20, 2011 Work Order Number: 010670.04 Work Order Title: City of Lubbock - Fire Station Repairs—TAL Fire Station #12 Brief Scope: SOW: Fire Station Renovations Station #12 Preliminary ❑ Revised ❑X Final The following items detail the scope of work as discussed at the site. All requirements necessary to accomplish the items set forth below shall be considered part of this scope of work. Fire Station #12 Repair 2"X2" angle iron on the West side of the bay concrete Replace Carpet in Captain's Bedroom (Includes grinding floors) Overhead Door Weather Stripping Three South Overhead Doors Remove water fountain in bay and cover with metal Scope of Work Page 1 of 1 E21QC - Buy Board 612012011 Contractor's Price Proposal Category - Summary Date: June 20, 2011 Re: IOC Master Contract #: Area 1-1- TAL Work Order* at 0670.0a Owner PO #: Title: City of Lubbock - Fire Station Repairs TAL Fire Station #12 Contractor: Talon/LPE Proposal Value: $2,125.1 e Install Weather Stripping on Overhead Door $529.95 Repair/Replace Metal Edge on Sidewalk $655.88 Repair/Replace Metal Edging on Sidewalk $12.38 Replace Carpet in Lt. Bedroom $727.32 Water Fountain Demo/Cover $202.65 Proposal Total $2,128.18 Contractor's Price Proposal - Summary Page 1 of 1 EZIQC - Buy Board 6/20/2011 Contractor's Price Proposal Category - Detail Date: June 20, 2011 Re: IQC Master Contract #: Area 1-1- TAL Work Order #: 010670.04 Owner PO #: Title: City of Lubbock - Fire Station Repairs_TAL Fire Station #12 Contractor: Talon/LPE Proposal Value: $2.128.18 Sect Item Modifier UOM Description Line Total Labor Equip. Material (Excluded If marked with an X) Install Weather Stripping on Overhead Door 1 08330 0214 LF Top Of Door, Weather Strip Seal For Coiling Doors $108.90 Quantity Unit Price Factor Total Installation 36.00 x 1.91 x 1.2500 85.95 Demolition 36,00 x 0.51 x 1.2500 = 22.95 2 08330 0215 LF Bottom Of Door, Weather Strip Seal For Coiling Doors, Astragal Only $65.15 Quantity Unit Price Factor Total Installation 36.00 x 1.04 x 1,2500 46.80 Demolition 36.00 x 0.43 x 11500 = 19.35 3 08720 0150 LF 112" x 3/8". Silicone Triple Fin, Hospitality, Adhesive Backed Perimeter $354.90 Gasketing Weather -Strip (Pemko S773) Quantity Unit Price Factor Total Installation 78.00 x 2.79 x 1.2500 272.03 Demolition 78.00 x 0,05 x 1.2500 = 82.88 Subtotal for Install Weather Stripping on Overhead Door $529.95 RepairfReplace Metal Edge on Sidewalk 4 02112 0282 IN 112" Diameter Drilling In Concrete Per Inch Of Depth $198.00 Quantity Unit Price Factor Total Installation 132.00 x 1.20 x 1.2500 198.00 16" on center, anchored on vertical leg 5 05410 0012 LF 2" x 2" x 118" Angle Iron $457.88 Quantity Unit Price Factor Total Installation 66.00 x 3.75 x 1.2500 309.38 Demolition 66.00 x 1.80 x 1.2500 = 148.50 Subtotal for Repair/Replace Metal Edge on Sidewalk $655.88 RepairfReplace Metal Edging on Sidewalk 6 09910 0364 SF Paint Miscellaneous Exposed Metal One Coat Alkyd Enamel $12.38 Quantity Unit Price Factor Total Installation 22.00 x 0.45 x = 1.2500 12.38 Subtotal for RepairfReplace Metal Edging on Sidewalk $12.38 Replace Carpet in Lt. Bedroom 7 09650 0033 LF 4" High 118" Vinyl Plastic Base, All Colors $82.54 Quantity Unit Price Factor Total Installation 3100 x 175 x 12500 = 67.81 Demolition 31.00 x 0.38 x 1.2500 = 14.73 8 09650 0036 LF Vinyl Transition Strip, Brown Or Black $18.13 Quantity Unit Price Factor Total Installation 10.00 x 1.18 x 11500 14.75 Demolition 10,00 x 0.27 x 1,2500 3.38 Contractor's Price Proposal - Detail Page 1 of 2 EZlQC - Buy Board 6/20/2011 Contractor's Price Proposal - Detail Continues.. Work Order Number: 010670.04 Work Order Title: City of Lubbock - Fire Station Repairs_TAL Fire Station #12 sect Rom Modifer UOM Description Line Total Labor Equip. Material (Excluded if marked with an X) Replace Carpet in Lt. Bedroom 4 09MOD 0036 0189 For Quantities > 40 To 100, Add $7.00 Quantity Unit Price Factor Total Installation 70.00 x 0.06 x 1.2500 7.00 10 09680 0061 SY 24 Ounce, Patterned, Nylon Carpet Tile $554.85 Quantity Unit Price Factor Total Installation 1200 x 36.99 x 1.2500 554.85 11 09680 0078 SY Grinding Of Existing Concrete Floor Prior To Installation Of Carpet $64.80 Quantity Unit Price Factor Total Installation 12,00 x 4.32 x 1,2500 - 64.80 Subtotal for Replace Carpet in Lt. Bedroom $727.32 Water Fountain Demo/Cover 12 05735 0003 SF 0.026" Thick (24 Gauge) 304 Stainless Steel Sheet $202.65 Quantity Unit Price Factor Total Installation - 12.00 x 13.51 x 1.2500 � 202.65 Subtotal for Water Fountain Demo/Cover $202.65 Proposal Total This total represents the correct total for the proposal. Arty discrepancy between line totals, sub -totals and the proposal total is due to rounding. $2,128.18 Contractor's Price Proposal - Detail Page 2 of 2 EZ/QC - Buy Board 6/2012011 Resolution No. 2011—RO322 gBoard- "oovrstl" Purchasing Detailed Scope of Work To: Bridger Howard Talon/LPE 921 N Bivins Street From: Wesly Everett City of Lubbock 162513th St Amarillo, TX 79107 Lubbock, TX 79401 (806)676-3815 (806)775-2275 Date Printed: July 06, 2011 Work Order Number: 010670.05 Work Order Title: City of Lubbock - Fire Station Repairs_TAL Fire Station # 13 Brief Scope: SOW: Fire Station Renovations Station #13 Preliminary Revised L -- I Final The following items detail the scope of work as discussed at the site. All requirements necessary to accomplish the items set forth below shall be considered part of this scope of work. SOW: Fire Station Renovations (Revised per Fire Department Notes "Fire Station Quote Revisions" Fire Station #13 Weather Strip Three Exterior Doors Tear out 12'X20' section of concrete drive way Replace 12'X20' section of concrete drive way Clean out and caulk seal cracks in concrete drive way (366) Weather Strip Overhead Door Add Electric Eye for Overhead Door Tear out Lt. Shower and haul off Tear out tile in Lt's bathroom Replace shower faucet with Commercial Install cement board on walls and ceiling of Lfs shower Install shower pan, new drain, concrete, and tile on Lt.'s shower floor Install 8X8 ceramic the on walls of Lt.'s shower Install 8X8 ceramic tile on walls of Lt.'s bath Install 16X16 ceramic tile on Lt's bath floor Install new shower door Install bath accessories; toilet tissue holder, towel ring, towel bar Paint Lt.'s bath ceiling Scope of Work page 1 of 2 EZIQC - Buy Board 7/M011 Contractor's Price Proposal Category - Summary Date: July 06. 2011 Re: IQC Master Contract #: Work Order #: Owner PO #: Title: Contractor: Area 1-1- TAL 010670.05 City of Lubbock - Fire Station Repairs_TAL Fire Station # 13 Talon/LPE Proposal Value: $13,343.18 Add Electric Eye for Overhead Door and Safety Devices $681.69 Add Electronic Eye for Overhead Door and Safety Devices $72.60 Install Weather Striping at all Exterior Doors $452.33 Repair Officer Shower Tile and Plumbing $6,896.42 Replace Approach $5,240.14 Proposal Total $13,343.18 Contractor's Price Proposal - Summary Page 1 of 1 EZIQC - Buy Board 7/6/2011 Contractor's Price Proposal Category - Detail Date: July 06, 2011 Re: lQC Master Contract#: Area I-1- TAL Work Order #: 010670.05 Owner PO #: Title: City of Lubbock - Fire Station Repairs_TAL Fire Station # 13 Contractor: TalortlLPE Proposal Value: $13,343.18 Sect Item Modifier LIOM Description Line Total Labor Equip. Material (Excluded if marked with an X Add Electric Eye for Overhead Door and Safety Devices f 06330 0215 LF Bottom Of Door, Weather Strip Seal For Coiling Doors, Astragal Only $44.10 Quantity Unit Price Factor Total Installation 24.00 x 1.04 X 1.2500 31.20 Demolition 24.00 x OA3 x 1.2600 12.90 2 08331 020E EA Thru-Seam Type Photo Eye For High -Speed Rolling Doors $510.19 Quantity Unit Price Factor Total Installation 1.00 X 408.15 X 1.2500 510,19 3 08720 0150 LF 112" x 318", Silicone Triple Fin, Hospitality, Adhesive Backed Perimeter $127.40 Gasketing Weather -Strip (Pemko S773) Quantity Unit Price tractor Total Installation 20.00 X 2.79 X 1.2500 - 97.65 Demolition 26.00 x 0.85 X 1,2500 29.75 Subtotal for Add Electric Eye for Overhead Door and Safety Devices $681.69 Add Electronic Eye for Overhead Door and Safety Devices 4 08330 0214 LF Top Of Door, Weather Strip Seal For Coiling Doors $72.60 Quantity Unit Price Factor Total Installation 24.00 X 1.91 X 1,2500 57.30 Demolition 24,00 x 0.51 X 1.2500 15.30 Subtotal for Add Electronic Eye for Overhead Door and Safety $72.60 Devices Install Weather Striping at all Exterior Doors 5 08364 0003 LF Weather Seal At Top Of Door $25,09 Quantity Unit Price Factor Total Installation 9.00 X 2.23 x 1.2500 25.09 6 08364 0004 LF Weather Strip At Door Bottom, Astragal Only $12.49 Quantity Unit Price Factor Total Installation 9,00 X 1.11 X 1.2500 - 12.49 7 08720 0177 LF 114" Vinyl Insert, 1-11T Width, 114" Height, Standard Jamb, Heavy Duty, Mill $414.75 Aluminum Retainer, Perimeter Gasketing Weather -Strip (Pemko 290AV) Quantity Unit Price Factor Total Installation 42.00 X 7.05 X 1.2500 - 370.13 Demolition 42.00 x 0.85 X 1.2500 a 44,63 Subtotal for Install Weather Striping at all Exterior Doors $452.33 Repair Officer Shower Tile and Plumbing 8 01510 0010 EA Any Size Dumpster $62.50 Quantity Unit Price Factor Total Installation 100 X 50.00 X 1.2500 - 62.50 Contractor's Price Proposal - Detail Page 1 of 5 EZIQC - Buy Board 716/2011 Contractor's Price Proposal - Detail Continues.. Work Order Number: 010670.05 Work Order Title: City of Lubbock - Fire Station Repairs_TAL Fire Station # 13 Sect Item Modifier UOM Description Line Total Labor Equip. Material (Excluded If marked with an X Repair Officer Shower Tile and Plumbing 9 01510 0011 EA Dumpster In/Out Fee $156.25 Quantity Unit Price Factor Total Installation 1,00 x 125.00 x 1.2500 = 156.25 10 01510 0012 EA Dumpster Daily Fee $12.50 Quantity Unit Price Factor Total Installation 5.00 x 2.00 x 1.2500 = 12.50 11 09305 0002 SF Thin -Set - Latex Portland Cement Mortar $231.60 Quantity Unit Price Factor Total Installation 193.00 x 0.55 x 12500 - 156.81 Demolition 193.00 x 0.31 x 1.2500 74.79 12 09MOD 0002 0061 For Quantities > 50 To 250, Add $25.20 Quantity Unit Price Factor Total Installation 224.00 x 0.09 x 1.2500 = 25.20 13 09305 0005 SF 1-114" Minimum Thickness Portland Cement Mortar Setting BedNote: For $57.03 commercial floors. Includes 15# felt and wire reinforcement. Quantity Unit Price Factor Total Installation 12.50 x 2.80 x 11500 43.75 Dwnolitk)l 12.50 x 0.85 x 1.2500 c 13.28 14 09MOD 0005 0060 For Quantities Up To 50, Add $49.50 Quantity Unit Price Factor Total Installation 24.00 x 1.55 x 1.2500 49.50 15 09305 0009 SF 112" Cementitious Backer Units For Installation On Floors $537.99 Quantity Unit Price Factor Total Installation 193.00 x 1.98 x 1.2500 = 477.68 Demolition 193.00 x 0.26 x 1.2500 = 60.31 16 09MOD 0009 0061 For Quantities > 50 To 250, Add $58.80 Quantity Unit Price Factor Total Installation 224.00 x 0.21 x 1.2500 = 58,80 17 09310 0003 SF Unmounted Floor Tile, 8"x8" And LargerNote: Includes glazed porcelain, $265.50 unglazed porcelain and glazed ceramic tiles. Quantity Unit Price Factor Total Installation 30.00 x 6.49 x 1.2500 = 243.38 Demolition 30.00 x 0.59 x 1.2500 = 22.13 Lt bath floor 18 09310 0009 SF Mounted Wall Tile, Less then 8"xe"Note: Includes glazed porcelain, unglazed $1,951.85 porcelain and glazed ceramic bias. Tiles mounted from back, side or front in 12"x12", 12"x24", or similar sized sheets. Quantity Unit Price Factor Total Installation 206.00 x 6.42 x 1.2500 = 1,653.15 Demolition 206.00 x 1.16 x 1,2500 - 298.70 Lt. Shower 19 09MOD 0009 0074 For Quantities > 50 To 250, Add $115.00 Quantity Unit Price Factor Total Installation 200.00 x 0.46 x 1,2500 - 115.00 'Lt. Shower' Contractor's Price Proposal - Detail Page 2 of 5 EZIQC - Buy Board 7/6/2011 Contractor's Price Proposal - Detail Continues.. Work Order Humber: 010670.05 Work Order Title: City of Lubbock - Fire Station Repairs_TAL Fire Station # 13 sect Item Modifer UQM Description Line Total Labor Equip. Material {Excluded if marked with an X Repair Officer Shower Tile and Plumbing 20 09310 0009 SF Mounted Wall Tile, Less than 8"x8"Note: includes glazed porcelain, unglazed $1,876.05 porcelain and glazed ceramic tiles. Tiles mounted from back, side or front in 12"xl2", 12"x24", or similar sized sheets. Quantity Unit Price Factor Total Installation 198.00 x 5,42 x 1.2500 - 1,588,95 Demolition 190.00 x 1.16 x 1.2500 287.10 Lt. Bath 21 09310 0019 LF Glazed Porcelain, Unglazed Porcelain And Glazed Ceramic Cove Base Or Trim $434.18 Quantity Unit Price Factor Total Installation 42.00 x 7.44 x 1.2500 390,60 Demoltton 42.00 x 0.83 x 1.2500 = 43.58 22 09920 0160 SF Paint Interior Drywall/Plaster Ceiling, 2 Coats Paint, Brush/Roller Work $19.80 Quantity Unit Price Factor Total Installation 30,00 x 0.53 x 1.2500 19.88 23 10811 0013 EA 1a" Length, Surface Mounted, Chrome Plated Towel Bar $44.60 Quantity Unit Price Factor Total Installation 100 x 28.02 x 1.2500 35.03 Demolition 1.00 x 7,66 x 1.2500 9.56 24 10811 0015 EA Surface Mounted, Chrome Plated Towel Ring $41.09 Quantity Unit Price Factor Total Installation 1 00 x 25.21 x 1.2500 - 31.51 Demolition 1= x 7.86 x 12500 = 9.58 25 10811 0017 EA Single Roll, Surface Mounted, Chrome Plated Toilet Paper Holder $41.85 Quantity Unit Price Factor Total Installation 100 x 25.82 x 1.2500 - 32.28 Demolition 1.00 x 7.66 x 1.2500 s 9.58 26 15421 0003 EA 6" Round Top Floor Drain With 2" Outlet, Bronze Top $206.53 Quantity Unit Price Factor Total Installation 100 x 193.33 x 1.2500 = 241,86 Demolition 1.00 x 35.89 x 1.2500 = 44.86 27 15451 0315 EA Single Lever Handle, Chrome Shower Only, Pressure -Balance (American $186.54 Standard T460.501) Quantity Unit Price Factor Total Installation 100 x 136.31 x 1.2500 - 170-39 Demolition 1.00 x 12.92 x 1.2500 = 16.15 28 15457 0078 EA 24" Porcelain Enamel Steel Shower Frame With Tempered Glass Door $394.48 Quantity Unit Price Factor Total Installation 100 x 30&66 x 1,2500 - 383.33 Demolition 1.00 x 6.92 x 1.2500 11.15 29 15455 0017 SF 7 Oz Bituminous Membrane Shower Pan $4T50 Quantity Unit Price Factor Total Installation 12,50 x 3.04 x 1.2500 47.50 Subtotal for Repair Officer Shower Tile and Plumbing $6,896.42 Replace Approach Contractor's Price Proposal - Detail Page 3 of 5 EZ1QC - Buy Board 7/6/2011 Contractor's Price Proposal - Detail Continues.. Work Order Number: 010670.05 Work Order Title: City of Lubbock - Fire Station Repairs TAL Fire Station # 13 Sect Item Modifer UOM Description Line Total Labor Equip. Material (Excluded if marked with an X Replace Approach 30 02112 0029 SY Break -Up And Remove > 6" To 9" Thick Concrete With Wire Mesh $613.50 Quantity Unit Price Factor Total Installation 2700 x 18,18 x 1.2500 - 613.58 31 02112 0282 IN 1/2" Diameter Drilling In Concrete Per Inch Of Depth $247.50 Quantity Unit Price Factor Total Installation 165.00 x 1.20 x 1.2500 - 247.50 In order to install dowels in existing concrete for Approach 32 02119 0011 CYM Hauling >5 To 10 Miles $20.00 Quantity Unit Price Factor Total Installation 25.00 x 0.64 x 1.2500 - 20.00 33 02205 0007 CY Spreading, Shaping, and Rough Grading Imported or Stockpiled Material for $13.63 Bulk Excavation by Machine Quantity Unit Price Factor Total Installation 5.00 x 2.18 x 1.2500 - 13.63 34 02210 0022 CY Compaction Of Fill Or Subbase For Building Foundations and Other Structures $62.00 by Hand Quantity Unit Price Factor Total Installation 5.00 x 9.92 x 1.2500 - 62.00 35 02213 0003 CY Sand, Washed $75.86 Quantity Unit Price Factor Total Installation 3.00 x 20.23 x 1.2500 75.86 36 03110 0010 LF >6" To 12" High Slab Edge and Block -put Wood Formwork $244.80 Quantity Unit Price Factor Total Installation 64.00 x 3.06 x 1.2500 244.80 37 03MOD 0010 0004 For Quantities < 250, Add $43.20 Quantity Unit Price Factor Total Installation 64.00 x 0.54 x 1,2500 - 43.20 38 03210 0006 TON Grade 60 Reinforcing Steel, Footings And Slabs, #346 $632.64 Quantity Unit Price Factor Total Installation 0.32 x 1,581.60 x 1,2500 - 832,64 39 03210 0025 Fes, Straight Dowels, 1/2" Diameter x 24" Long (13 mm Diameter x 61 cm Long), $97.63 Deformed Quantity Unit Price Factor Total Installation 55,00 x 1.42 x 1.2500 97,63 40 03311 0027 CY >6", By Direct Chute, Place 3000 PSI Concrete Slab On Grade $673.65 Quantity Unit Pdoe Factor Total Installation 6,00 x 89.82 x 1.2500 - 673,65 41 03MOD 0027 0037 For 4000 PSI (280 Kg/Cm2) Concrete, Add $52.88 Quantity Unit Price Factor Total Installation 6.00 x 7.05 x 1.2500 - 52.88 42 03350 0006 SF Concrete Floor Finishes, Steel Trowel $135.00 Quantity Unit Price Factor Total Installation 240.00 x 0.45 x 1,2500 - 135.00 Contractor's Price Proposal - Detail Page 4 of 5 EZiQC - Buy Board 7/6/2011 Contractor's Price Proposal - Detail Continues.. Work Order Number: 010670.05 Work Order Title: City of Lubbock - Fire Station Repairs_TAL Fire Station # 13 Sect. Hem Modifier UOM Description Line Total Labor Equip. Material (Excluded if marked with an X Replace Approach 43 07920 0060 CLF 314" x V Joint, Polyurethane Sealant And Caulking $2,327.77 Quantity Unit Price Factor Total Installatlon 3.36 x 469.06 x 1.2500 = 1.970.05 Demolition 3.36 x 65,17 x 1.2500 = 357.71 Subtotal for Replace Approach $6,240.14 Proposal Total $13,343.18 This total represents the correct total for the proposal. Any discrepancy between line totals, sub -totals and the proposal total is due to rounding. Contractor's Price Proposal - Detail Page 5 of 5 EZ10C - Buy Board 71612011 Board - Cooperative Purchasing Detailed Scope of Work To: Bridger Howard Talon/LPE 921 N Bivins Street Amarillo, TX 79107 (806) 676-3815 Date Printed: Work Order Number: Work Order Title: Brief Scope: June 21, 2011 010670.06 Resolution No. 2011—RO322 lkjo< From: Wesly Everett City of Lubbock 1625 13th St Lubbock, TX 79401 (806) 775-2275 City of Lubbock - Fire Station Repairs_TAL Fire Station #14 SOW: Fire Station Renovations Station #14 ❑ Preliminary ❑ Revised EilFinal The following items detail the scope of work as discussed at the site. All requirements necessary to accomplish the items set forth below shall be considered part of this scope of work. Fire Station #14 Remove VC Tile in Dayroom/Bathroom/Office Install 16"X16" ceramic tile in the day room, bathroom and office Replace Metal angle iron on bay concrete edge Paint Interior Walls in Dorm and Dayroom, use two coats of paint Paint office desk cabinets, prep, prime, paint two coats of oil base enamel paint Replace Overhead Door, with 3" commercial tracks and operator Weather Stripping on All Exterior Doors Repair Crack in Outside Patio Wall Tear down and haul off old wood fence on North side of property line and South to patio area Install schedule 40 metal post in concrete, cedar rails, rail hardware, #1 cedar gothic pickets, use existing gates and hardware, install new pickets on existing gates. NOTE: All ceramic tile to be 16"X16" Scope of Work Page 1 of 2 EZ1QC - Buy Board 6121,12011 Contractor's Price Proposal Category - Summary Date: June 21, 2011 Re: IQC Master Contract #: Area 1-1- TAL Work Order #: 010670.06 Owner PO * Title: City of Lubbock - Fire Station Repairs_TAL Fire Station #14 Contractor: Talon/LPE Proposal Value: $28,228.38 Install Weather Striping at all Exterior Doors $603.10 Office Cabinets Need Refinishing $592.90 Repaint Interior Walls; Dorm and Day Room $1,744.20 Repair Crack in Outside patio Wall $359.25 Repair/Replace Metal Edge on Sidewalk $457.88 Repair/Replace Metal Edging on Sidewalk $12.38 Replace Backyard Fence $6,249.87 Replace Floor Tile in DayroomlBathroomlOffice $8,400.14 Replace Metal Edging Along Sidewalk in Bay $194.80 Replace Overhead Door $9,613.86 Proposal Total $28,228.38 Contractor's Price Proposal - Summary Page 1 of 1 EZlQC - Buy Board 6/21/2011 Contractor's Price Proposal Category - Detail Date: June 21, 2011 Re: IQC Master Contract #: Area 1-1- TAL Work Order #: 010670.06 Owner PO #: Title: City of Lubbock - Fire Station Repairs_TAL Fire Station #14 Contractor: TalonlLPE Proposal Value: $28,228.38 Sect Item Modifier UOM Description Line Total Labor Equip. Material (Excluded If marked with an X) Install Weather Striping at all Exterior Doors 1 08364 0003 LF Weather Seal At Top Of Door $33.45 Quantity Unit Price Factor Total Installation 1200 X 2.23 X 1.2500 33.45 2 08364 0004 LF Weather Strip At Door Bottom, Astragal Only $16.65 Quantity Unit Price Factor Total Installation 12.00 x 1.11 x 1.2500 16.65 3 08720 0177 LF 114"Vinyl Insert, 1-1/2" Width, 1/4" Height, Standard Jamb, Heavy Duty, Mill $553.00 Aluminum Retainer, Perimeter Gasketing Weather -Strip (Pemko 290AV) Quantity Unit Price Factor Total Installation 56.00 x 7,05 x 1.2500 493,50 Demolition 56.00 x 0.85 x 1.2500 = 59.50 Subtotal for Install Weather Striping at all Exterior Doors $60310 Office Cabinets Need Refinishing 4 09920 0308 SF Paint Interior Cabinets And Casework, One Coat Prime, Two Coats Paint, $592,90 Enamel Primer, Alkyd Or Latex Paint Quantity Unit Price Factor Total Installation 464.00 X 0.98 x 1,2500 592.90 Subtotal for Office Cabinets Need Refinishing $692.90 Repaint Interior Walls; Dorm and Day Room 5 09920 0064 SF Paint Interior Plaster/Drywall, 2 Coats Paint, Brush[Roller Work $1,744.20 Quantity Unit Price Factor Total Installation 2,736.00 x 0.51 x 1.2500 1,744.20 Subtotal for Repaint Interior Walls; Dorm and Day Room $1,744.20 Repair Crack in Outside Patio Wall 6 04910 0003 SF Cut And Repoint Brick, Soft, Loose Or Crumbling Mortar, Running Bond $359,25 Quantity Unit Price Factor Total Installation 60.00 x 4.79 x 1.2500 359.25 Approximately 60 SF of wail to be repainted Subtotal for Repair Crack in Outside Patio Wall $359.25 Repair/Replace Metal Edge on Sidewalk 7 05410 0012 LF 2" x Z' x If8" Angle Iron $457.88 Quantity Unit Price Factor Total Installation 66,00 x 3.75 x 1.2500 ' 309.38 Demolition 66.00 x 1.80 x 1.2500 = 148.50 Subtotal for Repair/Replace Metal Edge on Sidewalk $457.88 Contractors Price Proposal - Detail Page 1 of 3 EZIQC - Buy Board 6/21/2011 Contractor's Price Proposal - Detail Continues.. Work Order Number: 010670.06 Work Order Title: City of Lubbock - Fire Station Repairs_TAL Fire Station 414 sect Item Modifer UOM Description Line Total Labor Equip. Material (Excluded if marked with an X) RepairlReplace Metal Edging on Sidewalk B 09910 0364 SF Paint Miscellaneous Exposed Metal One Coat Alkyd Enamel $12.38 Quantity Unit Price Factor Total Installation 2200 x 0.45 x 1,2500 12.38 Subtotal for Repair/Replace Metal Edging on Sidewalk $12.38 Replace Backyard Fence 9 02112 0090 CIF Demo Concrete Building Foundations Without Reinforcing $12.94 Quantity Unit Price Factor Total Installation 3.00 x 3.45 x 1.2500 12.94 10 02119 0011 CYM Hauling >5 To 10 Miles $16.80 Quantity Unit Price Factor Total Installation 21.00 x 0.64 x 1.2500 15.80 11 02711 0090 LF 3" (7.6 cm) Outside Diameter Galvanized Steel Post, 7' Tc 10' In Length $2,336.88 Quantity Unit Price Factor Total X X Installation 270.00 x 6.93 x 1.2500 2,338.80 12 02713 0018 LF Board Fence, 3 - 2" x 4" Rails, 6' High 1" x 4" # 1 G rade Cedar $4, 023.00 Quantity Unit Price Factor Total Installation 270.00 x 11.07 x 1.2500 3,736.13 Demolition 270.00 x 0.85 x 1.2500 = 286,88 13 02MOD 0018 0788 For Screwing Of Boards Instead Of Nails, Add $226.13 Quantity Unit Price Factor Total Installation 270.00 x 0.67 x 1.2500 226.13 14 10425 0076 LF 4" x 4" Pressure Treated Wood Sign Posts -$367.88 Quantity Unit Price Factor Total X X Installation-270.00 x 1.09 x 1.2500 -367.88 Subtotal for Replace Backyard Fence $6,249.87 Replace Floor Tile in Dayroom/Bathroom/Office 15 09310 0003 SF Unmounted Floor Tile, 8"W' And LargerNGte: Includes glazed porcelain, $7,382.38 unglazed porcelain and glazed ceramic tiles. Quantity Unit Price Factor Total Installation 910.00 x 6.49 x 1.2500 7,382.38 16 09650 0024 SF Marbleized Pattern Vinyl Composition Tile 118" Thick $511.88 Quantity Unit Price Factor Total Installation 0.00 x 1.80 x 1.2500 0.00 Demolition 910.00 x 0.45 x 1,2500 = 511.88 17 09650 0033 LF 4" High 1/8" Vinyl Plastic Base, All Colors $505.68 Quantity Unit Price Factor Total Installation 190.00 x 1.75 x 1.2500 415,53 Demolition 190.00 x 0.38 x 1.2500 = 90.25 Subtotal for Replace Floor Tile in DayroomlBathroomlOffice $8,400.14 Replace Metal Edging Along Sidewalk in Bay Contractor's Price Proposal - Detail Page 2 of 3 EZIQC - Buy Board 6/21/2011 Contractor's Price Proposal - Detail Continues.. Work Order Number: 010670.06 Work Order Title: City of Lubbock - Fire Station Repairs_TAL Fire Station #14 Sect. Item Modifier UOM Description Line Total Labor Equip. Material (Excluded If marked with an X) Replace Metal Edging Along Sidewalk in Bay 18 01352 0033 HR Structural Steel WorkerNote: Tasks in the CTC include appropriate costs to $194.80 cover labor. These tasks will be requested specifically by the owner for miscellaneous work not covered in the CTC. Quantity Unit Price Factor Total Installation 4.00 x 38.96 x 1,2500 194.80 Subtotal for Replace Metal Edging Along Sidewalk in Bay $194.80 Replace Overhead Door 19 08362 0086 EA 24' x 14', Insulated, 24 Gauge Galvanized Steel Sectional Door, Manual Lift $7,187.06 Quantity Unit Price Factor Total Installation 100 x 5,033.52 x 1.2500 6.291.90 Demoiition 1.00 x 715A 3 x 1.2500 = 095.16 20 08364 0007 EA Operator, Electric, Chain LiftNote: Includes motor, supports, push button $1.349.50 operator, stationary electronic eye, signal wiring from eye to motor and motor to operator. Quantity Unit Price Factor Total Installation - 1.00 x 1,079.60 x 1.2500 - 1,349.50 21 08364 0009 SF Up To 2 SF Per Window 118" DSS GlazingNotw Additional cost for factory $531.30 supplied Quantity Unit Price Factor Total Installation 24.00 x 17.71 x 1.2500 - 531.30 22 08364 0020 SF 100,000 Cycle Spring In Lieu Of 10.000 Cycle For Sectional DoorNote: $546.00 Additional cost for factory supplied/installed spring. Per SF of Door. Quantity Unit Price Factor Total Installation 336.00 x 1.30 x 1.2500 546.00 Subtotal for Replace Overhead Door $9,613.86 Proposal Total $28,228.38 This total represents the correct total for the proposal. Any discrepancy between line totals, sub -totals and the proposal total is due to rounding. Contractor's Price Proposal - Detail Page 3 of 3 EZIQC - Buy Board 612112011