Loading...
HomeMy WebLinkAboutResolution - 2011-R0321 - Contract - Minnix Commercial Partners - Fire Station Renovations - 07_27_2011Resolution No. 2011—RO321 July 27, 2011 Item No. 5.13 RESOLUTION BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK: THAT the Mayor of the City of Lubbock is hereby authorized and directed to execute for and on behalf of the City of Lubbock, Contract No. 10260 for fire station renovations, by and between the City of Lubbock and Minnix Commercial Partners, and related documents. Said Contract is attached hereto and incorporated in this resolution as if fully set forth herein and shall be included in the minutes of the City Council. Passed by the City Council on July 27, 2011 TOM MARTIN, MAYOR ATTEST: Rebe •a Garza, City Secretary APPROVED AS TO CONTENT: Markearv4od, Assistant City Manager APPROVED AS T0 FORM: ad Weaver, Assistant City Attorney vw:cedocs/RES.Contract-Minnix Commercial Partners June 29, 2011 Contract No. 10260 WorK Order Signature Document BUYBOARD E2JQC Contract No.: Area 1-1- MCP New Work Order ❑ Modify an Existing Work Order Work Order Title: City of Lubbock - Fire Station Repairs Owner Name: City of Lubbock Contact Wesly Everett Phone: (806) 775-2275 Resolution No. 2011—RO321 Contractor Name: Minnix Commercial Partners, LTD Contact Red Borg Phone: (8W) 773-1221 Work to be Performed Work to be performed as per the Final Detailed Scope of Work Attached and as per the terms and conditions of Buy Board FZIOC Contract No Area 1-1- MCP. Brief Work Order QewAptlon: City of Lubbock Fire Station Facility Repairs Time of Performance See Schedule Section of dwDetalled Scope of Worn Work Order Number 11083.00 10669.00 10669.01 10669.02 10669.03 10669.04 10669.05 10669.06 10669.07 10669.08 CITY OF LUBBOCK ow-w-�- Tod Martin, Mayor Location Administration Building Fire Station 1 Fire Station 3 Fire Station 4 Fire Station 5 Fire Station 6 Fire Station 7 Fire Station 9 Fire Station 10 Fire Station 15 Attest: i� —%--- Rebecca Gar , City Secretary APPROVED AS CONTENT: Mark earwo , Assistant City Manager Amount of Contract 41,087.46 30,077.40 39,249.99 134,683.67 76,271.29 12,611.60 24,550.23 66,610.59 26,673.94 26,098.88 TOTAL 477,915.05 r' n Davis, Project Manager Minnix Commercial Partners, LTD Owner's Representative tx,f� GNewy, Wesley Ever tt, Dlrcctirr of Facilities APP,I(OYED ASrTO�ORM: Assistant City Attorney Contract No. 10260 Work Order Signature Document BUYBOARD EZIQC Contract No.: Area I - 1 MCP - Option 1 F—x] New Work Order ❑ Modify an Existing Work Order Work Order Number: 011083.00 Work Order Date: Work Order Title: City of Lubbock - Fire Administration Building Owner Name: City of Lubbock Contractor Name: Minnix Commercial Partners, LTD Contact: Brad Reed Contact: Keenan Davis Phone: 806 790-7301 Phone: (806) 798-7335 Work to be Performed Work to be performed as per the Final Detailed Scope of Work Attached and as per the terms and conditions of BuyBoard EZIQC Contract No Area I - 1 MCP - Option 1. Brief Work Order Description: Remove old carpet Prep floors Level concrete floor in east hall Install new carpet Remove VC tile in copy room Install 16" x 16" ceramic file in copy room Install cove base through out Match paint color and paint walls Paint all metal doorjambs through out Remove all office signs that have FMO on them float and match texture Use fiber glass tape and patch all cracks and holes in the walls Repair laminate on cabinets in copy room Remove flooring in north exterior hail and install ceramic tile back to storage area Patch in framing and sheetrock in storage where vent hood was removed Install hardwood raised panel doors (2) on Fire Chiefs book case Remove and save two way window and glass in interrogation offices Frame in and sheetrock, tape bed and match texture after window is removed Remove and save quite signs in hall Repair roof leak at water heater vent Install two switches at wall in west hall by doors to operate hall lights Trade out Fire Chiefs door with interrogation door and lock Time of Performance See Schedule Section of the Detailed Scope of Work Liquidated Damages Will apply: Will not apply: Work Order Firm Fixed Price: $41,087.46 Owner Purchase Order Number: Work Order Signature Document Page f of 2 E71QC - Buy Board 612412011 Contract No. 10260 Contractor's Price Proposal Category - Summary Date: June 24, 2011 Re: IQC Master Contract #: Work Order #: Owner PO #: Title: Contractor: Proposal Value: Area I - i MCP - option 1 011083.00 City of Lubbock - Fire Administration Building Minnix Commercial Partners, LTD $41,067.46 Demo $51.15 Doors $280.83 Electrical $292.47 Flooring $27,832.99 Millwork $547.84 Painting $11,949.17 Roofing $133.01 Proposal Total $41,087.46 The Percentage of NPP on this Proposal: 38.87% Contractor's Price Proposal - Summary Page 1 of t EZ1QC - Buy Board 6/24/2011 Contract No. 10260 Contractor's Price Proposal Category - Detail Date: June 24, 2011 Re: I0C Master Contract #: Area I -1 MCP - Option 1 Work Order #: ai 1083.00 Owner PO #: Title: City of Lubbock - Fire Administration Building Contractor: Minnix Commercial Partners, LTD Proposal Value: $41,007.46 Sect Item Modifer UOM Description Line Total Labor Equip. Material (Excluded If marked with an X) Demo 1 08520 0124 FA >20 To 30 SF, 4" Frame Depth, HC 65, Fixed Aluminum Window (Traco $51.15 TR•9500' Quantity Unit Price Factor Total Installation 0.00 x 370.35 x 1.2501 - 0.00 Demolition 1.00 x 40.92 x 1.2501 - 51.15 Subtotal for Demo $51.15 Doors 2 08210 0215 FA Remove And Reinstall Wood Door $9126 Quantity Unit Price Factor Total Installation 2.00 x 37.30 x 1.2501 ' 93.26 3 08710 2311 FA Remove And Reinstall Door Lockset, Mortise $102.31 Quantity Unit Price Factor Total Installation 2.00 x 40.92 x 1.2501 = 102,31 4 08710 2318 EA Remove And Reinstall Surface Mounted Door Closer Or Holder $85.28 Quantity Unit Price Factor Total Installation 2.00 x 34.10 x 1.2501 85.26 Subtotals for Doors $280.83 Electrical 5 16125 0031 CLF 34' RGS With 4 #10 THHN/THINN Wire AssemblyNote_ includes conduit, $202.30 terminations, straps, wire as indicated. Not far use where detail is available. Quantity Unit Price Factor Total Installation 0.35 x 462.37 x 1.2501 202.30 6 16134 0014 FA 4" Square Steel Box With Cover, 1-112" Deep, Flush Mount $4.86 Quantity Unit Price Factor Total Installation 0.00 x 16.86 x 11.2501 0.00 Demolition 1.00 x 3.89 x 1,2501 - 4.86 7 16140 0122 EA 1 Gang, 20 A, 120/277 V, SPST, Switch Assembly Note: Includes box, switch and $85.31 cover plate Quantity Unit Price Factor Total Installation 2.00 x 34.12 x 1.2501 z 85.31 Subtotal for Electrical $292.47 Contractor's Pnce Proposal - Detail Page 1 of 4 EZJQC - Buy Board 6/2412011 Contract No. 10260 Contractor's Price Proposal - Detail Continues.. Work Order Number: 011083.00 Work Order Tide: City of Lubbock - Fire Administration Building Sect Item Modlfer UQM Description Una Total Labor Equip, Material (Excluded if marked with an X) Flooring 9 03540 0005 SF 3/4" Thick Self Leveling Underiayment For Concrete Floors Including Surface s1_512.12 Preparation Quantity Unit Price Factor Total Installation 315.00 x 3.84 x 1.2501 1,512.12 10 09310 0003 SF Unmounted Floor Tile, 8"x8" And LargerNote: Includes glazed porcelain, unglazed $2,555.64 porcelain and glazed ceramic tiles. Quantity Unit Price Factor Total Installation 315.00 x 6.49 x 1.2501 2,555.84 11 09650 0025 SF Travertine Pattern Vinyl Composition Tile 118" Thick $183.14 Quantity Unit Price Factor Total Installation 0.00 x 1.93 x 1.2501 J 0,00 Demolition 290.00 x 0.45 x 1.2501 = 163.14 12 09650 0036 LF Vinyl Transition Strip, Brown Or Black $W-58 Quantity Unit Price Factor Total Installation 25.00 x 118 x 12501 36.88 13 09650 0040 SF Remove Glue From Concrete FtoorNote: For removal of glue from VCT orcorpst =1,923.ti0 placement. Not to be used In conjunction with demolition tasks associated with floor file insteltation. Quantity Unit Price Factor Total Installation 4,050.00 x 0.38 x 1.2501 - 1,923.90 14 09650 0049 LF 4" High 1/8" Rubber Base, Group 2 Ail (Except WhPoa) S3,378.W Quantity Unit Price Factor Total Installation 1,388.00 x 1.50 x 1.2501 2,598.96 Demoli iwt 1,386.00 X 0.45 x 1.2501 - 779.89 15 09680 0039 SY 32 Ounce, Medium Traffic, Patterned, Nylon Broadloom Carpet $1.354.80 Quantity Unit Price Factor Total Installation 0.00 28x .38 x 1.2501 ' 0.00 Demolition 425.00 X 2.55 x 1.2501 - 1,354.110 16 09680 0078 SY Grinding Of Existing Concrete Floor Prior To tnstaltatlon Of Carpet $409.02 Quantity Unit Price Factor Total Installation 35.00 x 4.32 x 1.2501 - 189.02 17 09680 0079 SY Chemical Prepare Existing Concrete Floor prior To Installation Of Carpet $1,248.85 Quantity Unit Price Factor Total Installation 450.00 x 2.22 x 1.2501 ' 1,248.85 Subtotal for Flooring $27,832.99 Millwork 19 06420 0045 SF 1116" Plastic Laminate, Includes Cutting To Fit $47.80 Quantity Unit Price Factor Total Installation 8.00 x 4.78 x 1.2501 47,80 Subtotal for Millwork $547.84 Painting Contractor's Price Proposal - Detail Page 2 of 4 EZFQC - Buy Board 612412011 Contract No. 10260 Contractor's Price Proposal - Detail Continues.. Work Order Number: 011083.00 Work Order Title: City of Lubbock - Fire Administration Building Sect Item Modifer UOM Description Line Total Labor Equip, Material (Excluded If marked with an X) Painting 20 07920 0017 CLF 114" x 114" Joint, Acrylic/Latex Sealant And Caulking $1,393.60 Quantity Unit Price Factor Total Installation 8.88 x 125.61 x 1.2501 1.393.60 21 09110 0010 SF 3-518" Metal Stud Channel, 16" On Center, 20 Gauge, With Tracks And Runners $40.32 Quantity Unit Price Factor Total Installation 25.00 x 1.29 x 1.2501 40.32 22 09250 0006 SF 518" Drywall, One Layer, One Face On Wood Or Metal Studs Or Fuming $14.06 Quantity Unit Price Factor Total Installation 15.00 x 0.75 x 1.25011 14,06 23 09MOD 0006 0056 For Horizontal Ceiling Applications > 8' Height, Add $3.94 Quantity Unit Price Factor Total Installation 15.00 x 0.21 x 1.2501 3.94 24 09250 0046 SF Tape, Spackle And Finish Drywall Walls Up To 10' Height $79.32 Quantity Unit Price Factor Total Installation 235,00 x 0.27 x 1,2501 79.32 For holes in all areas except for demoliton such as window and unit being moved. 25 09250 0051 SF Tape, Spackle And Finish Drywall Ceilings Up To 10' Height $8.19 Quantity Unit Price Factor Total Installation 1500 x 0.33 x 1.2501 6,19 26 09MOD 0051 0048 For Quantities Up To 128, Add $2.25 Quantity Unit Price Factor Total Installation 15,00 x 0.12 x 1,2501 2.25 27 09250 0067 SF Textured Finish On Existing Drywall CellingNote: For non spray applied textures. $5.63 Quantity Unit Price Factor Total Installation 15.00 x 0.30 x 1.2501 5,63 28 09250 0069 SF Spray Applied Knockdown Or Skip Trowel Finish On Existing Drywall Wall $55.82 Quantity Unit Price Factor Total Installation 235.00 x 0.19 x 1.2501 55.82 29 09920 0059 SF Paint Interior PlasteriDrywall, 1 Coat Paint, Brush $7,506.60 Quantity Unit Price Factor Total Installation 18,765 00 x 0.32 x 1,2501 7.506.60 30 09920 0248 LF Paint Interior Metal Frame And Trim, 2 Coats Paint, BrushlRoller Work $1,752.95 Quantity Unit Price Factor Total Installation 1,775.0o x 0.79 x 1.2501 1,752.95 31 09MOD 0248 0326 For Oil Based Paint, Add $80.76 Quantity Unit Price Factor Total Installation 1,775,00 x 0.04 x 1.2501 88.78 32 09920 0268 EA Paint Interior Door, Both Faces, 2 Coats Paint, Brush/Roller Work $148.89 Quantity Unit Price Factor Total Installation 2.00 x 59.55 x = 1,2501 148.89 Chiefs new closet doors. 33 09MOD 0268 0326 For Oil Based Paint, Add $10.90 Quantity Unit Price Factor Total Installation 200 x 4.36 x 1.2501 10,90 Contractols Price Proposal - Detail Page 3 of 4 EZFQC - Buy Board 6/24/2011 Contract No. 10260 Contractor's Price Proposal - Detail Continues.. Work Order Number: 011083.00 Work Order Title: City of Lubbock - Fire Administration Building Sect. Item Modifer UOM Description Line Total Labor Equip. Material (Excluded if marked wtth an x) Painting 34 09945 0016 SF Cut And Patch Hole In Drywall To Match Existing, ? 2 To 4 SFNote: Per location $17.36 Quantity Unit Price Factor Total Installation 3.00 x 4.63 x 1.2501 17.36 35 09945 0016 SF Cut And Patch Hole In Drywall To Match Existing, > 2 To 4 SFNotw Per location $11.58 Quantity Unit Price Factor Total Installation 2.00 x 4.63 x 1.2501 11.58 36 09945 0022 SF Hand Scraping And Sanding Of Metal $510.35 Quantity Unit Price Factor Total Installation 1.775.00 x 0.23 x 1.2501 510.35 37 09945 0063 SF Cut And Patch Hole To Match Existing, s 10 SF To 50 SF $300.85 Quantity Unit Price Factor Total Installation 50.00 x 4.81 x 1.2501 300.65 Subtotal for Painting $11,949.17 Roofing 38 07590 0002 SF Roof Repair, Built -Up Roofing, Up To 10 SF $133.01 Quantity Unit Price Factor Total Installation 10.00 x 10.64 x 1.2501 — 133.01 Subtotal for Roofing $133.01 Proposal Total This total represents the correct total for the proposal. Any discrepancy between line totals, sub -totals and the proposal total is due to rounding. The Percentage of NPP on this Proposal: 38.87% $41,087.46 Contractor's Price Proposal - Detail Page 4 of 4 EZJQC - Buy Board 6124/2011 Contract No. 10260 Resolution No. 2011—RO321 Board® • r-w IfIQC Detailed Scope of Work To: Rad Borg Minnix Commercial Partners, LTD PO Box 64895 Lubbock, TX 79464 (806) 773-1221 Date Printed: June 24, 2011 From: Wesly Everett City of Lubbock 1625 13th St Lubbock, TX 79401 (806)775-2275 Work Order Number: 010669.00 Work Order Title: City of Lubbock - Fire Station RepairsMCP FS#1 Brief Scope: City of Lubbock Fire Station 1 Facility Repairs Prelkninary Revised Elrhol The following items detail the scope of work as discussed at the site. All requirements necessary to accomplish the items set forth below shall be considered part of this scope of work. The following repairs/work will be performed: 1. Exterior wall damage repair 2. Door stop on wail outside of bedroom area 3. Floor the in front of kitchen sink on second floor to be replaced 4. Upstairs dorm restroom - NE corner, repair caulk and file 5. Apparatus Bay - replace concrete around trench drain 6. Apparatus Bay - remove non -working EWC and cover with Stainless steel panel Scope of Work Page 1 of 1 FZlQC - Buy Board 6/24/2011 Contract No.10260 Contractor's Price Proposal Category - Detail Date: June 24, 2011 Re: IOC Master Contract #: Area 1-1- MCP Work Order #: 010689.00 Owner PO #: Title: City of Lubbock - Fire Station Repairs_MCP FS#1 Contractor: Minnlx Commercial Partners, LTD Proposal Value: $30,077.40 seat. lit" Modller UOM Description Line Total _ Labor Squip. Material {Excluded if marked with an XI App 1 05735 0007 SF 0.0625" Thick (16 gauge) 304 Stainless Steel Sheet $229.97 Quantity Unit Price Factor Total Installation a.00 x 23.64 x 1.2160 - 229.97 To cover hole from demoed water cooler. Subtotal for App $229.97 Asbestos 2 13281 0139 EA < 10 CIF Asbestos Contaminated Debris Coilection And Disposal $350.58 Quantity Unit Price Factor Total Installation 1.00 x 280.29 x 11160 - 350.56 3 13281 0202 HR Bulk Sampling Or Air Monitoring $1,072.10 Quantity Unit Price Factor Total Installation 2800 x 33.91 x 1.2160 1,072.10 Air monitoring for 26 hours for Kitchen (852 SF) _ $1072.10 4 13289 0007 EA T Zipper Door For Plastic Sheeting $27.58 Quantity Unit Price Factor Total Installation 1.00 x 22,Sa x 1.2160 y 27.58 5 13289 0012 EA Type C Supplied Air System $488. t0 Quantity Unit Price Factor Total Installation 100 x 401.40 x 1,2160 ' 48a.10 6 13289 0016 SF Clean Asbestos Surface 501 To 1000 SF $176.13 Quantity Unit Price Factor Total Installation 852.00 x 0.17 x 1,2160 a 176,13 Cleaning asbestos surfaces for Kitchen only (852 SF) - $178.13 Subtotal for Asbestos $2,114.47 Captain's Bathroom 7 08710 0509 FA Satin Aluminum Finish, Aluminum Hinge Pin Door Stop (Ives 70) $9.70 Quantity Unit Price Factor Total Installation 1.00 x 7.98 x 1,2160 9.70 Door stop 8 09110 0021 SF 3-5W Metal Stud Channel, 16" On Center, 18 Gauge, Wdh Tracks And Runners $186.49 Quantity Unit Price Factor Total Installation 54.00 x 2.19 x 1.2160 143.80 Demolition 54.00 x 0.65 x 1.2160 - 42.68 Repair wall 9 09MOD 0021 0013 For quantities Up To 200, Add $37.43 Quantity Unit Price Factor Total Installation 54.00 x 0.57 x 1.2160 37.43 Contractors Price Proposal - Detail Page 1 of 4 E71QC - Buy Board 6/24/2011 Contract No. 10260 Contractor's Price Proposal - Detail Continues.. Work Order Number: 010669.00 Work Order Title: City of Lubbock - Fire Station Repairs_MCP_f=S#1 Sect Item Modthr UOM Description Line ToW Labor Equip. Material (Excluded If marked with an X) Captain's Bathroom 10 09250 0013 SF 518" Fire Rated Drywall, One Layer, One Face On Wood Or Metal Studs Or $71.57 Furring Quantity Unit Price Factor Total Installation 54.00 x 0.89 x 1.2160 58.44 Demolition 54.00 x 0.20 x 1.2160 13.13 11 09MOD 0013 0045 For Quantities Up To 128, Add $20.36 Quantity Unit Price Factor Total Installation 54.00 x 0.31 x 12160 - 20.36 Subtotal for Captain's Bathroom $325.55 Concrete 12 02112 0032 SY Break -Up And Remove ;- 6" To 9" Thick Concrete With Reinforcing Rod. $1,167.42 Quantity Unit Price Factor Tatal Installation 45.50 21x .10 x 1.2160 ' 1,167.42 Replace drainage grate. 13 02112 0138 LF Saw Cut Rod Reinforced Concrete Slab Up To 4" (10 cm) Depth $428.83 Quantity Unit Price Factor Total Installation 154.00 x 2.29 x 1.2160 x 428.83 14 02MOD 0138 0067 For Each Additional Pass (Depth To 3"), Add s155.43 Quantity Unit Price Factor Total Installation 154.00 x 0.83 x 1.2160 155,43 15 03110 0006 SF Grade Beams Or Ducibank Foundation Wood Formwork $808.98 Quantity Unit Price Factor Total Installatlon 216.00 x 3.08 x 1.2160 ' 808.98 16 031MOD 0006 0001 For Quantities r 1000, Add $144.46 Quantity Unit Price Factor Total Installation 216.00 x 0.55 x 1.2160 , 144.46 17 03210 0002 TON Grade 40 Reinforcing Steel, Footings And Slabs, #3-n $919.00 Quantity Unit Price Factor Total Installation 0.50 x 1.511.52 x 1.2160 a 9%00 18 03311 0026 CY Up To 6", By Direct Chula, Place 3000 PSI Concrete Slab On Grade $897,89 Quantity Unit Price Factor Total Installation 8.00 x 92.30 x 1.2180 897,89 19 03MOD 0026 0037 For 4000 PSI (200 KglCm2) Concrete, Add $68.56 Quantity Unit Price Factor Total Installation 8.00 x 7.05 x 1.2180 m 68.58 20 03MOD 0026 0046 For Quantities Up To 20. Add $40.08 Quantity Unit Price Factor Total Installation 0.00 x 4,12 x 1.2180 a 40.08 21 03350 0004 SF Concrete Floor Finishes, Broom $163.72 Quantity Unit Price Factor Total installation 408.00 x 0.33 x 1.2160 ' 163,72 Finish Contractor's Price Proposal - Detail Page 2 of 4 EZIQC - Buy Board 6/24/2011 Contract No. 10260 Contractor's Price Proposal - Detail Continues.. Work Order Number: 010669.00 Work Order Title: City of Lubbock - Fire Station Repairs_MCP_FS#1 Sect Item Modifier UOM Description Line Total Labor Equip. Material (Excluded If marked with an X) Concrete 22 05530 0007 SF 1"x 1/4" Steel, Welded Grating $2,708.86 Quantity Unit Price Factor Total Installation 136.00 x 16.38 x 1.2160 2,708.86 Drainage grate Subtotal for Concrete $7,503.25 Exterior 23 01590 0063 WK 30' Electric, Scissor Platform Lift $619.09 Quantity Installation 100 x For Stucco Unit Price 509,12 x Factor 1.2160 Total 619.09 24 03360 0010 SF 2" Thick Marblecrete And Finish $7,760.27 Quantity Unit Price Factor Total Installation 340.00 x 18.77 x 1,2160 - -1,760.27 The thickness is 112", therefore the square footage was cut down by 4 from the original square footage. 25 09220 0003 SF Three Coat Troweled Stucco, ScratchlBrownlFinl$hNole: Excludes lath and felt $1,300.15 Interior or exterior, one side. Quantity Unit Price Factor Total Installation 0.00 x 2.78 x 1.2160 = 0.00 Demolition 1,320.00 x 0,81 x 1,2160 = 1,300.15 Demo of stucco Subtotal for Exterior $9,679.51 Flooring 28 09310 0003 SF Unmounted Floor Tile, 8"x8" And LargerNote: Includes glazed porcelain, unglazed $6,723.85 porcelain and glazed ceramic tiles. Quantity Unit Price Factor Total Installation 852.00 x 6.49 x 1,2160 6.723.85 Kitehen (852 SF) = $6723,85 27 09650 0049 LF 4" High 1/8" Rubber 9ase, Group 2 All (Except White) $621.66 Quantity Unit Price Factor Total Installation 220.00 x 1.50 x 1,2160 401.28 Demolition 220.00 x 0.45 x 1.2160 = 120.38 Kitchen Base (220 LF) = $401.28 Demo existing base (220 LF) = $120.38 Total=$521.68 28 13281 0064 SF 501 To 2500 SF Floor Tile Or Linoleum, Single Layer Or First Of Multiple Layers $1,906.30 Quantity Unit Price Factor Total Installation 852.00 x 1.84 x 1.2160 1.908.30 Kitchen abatement (852 SF) = $1906.30 29 13281 0082 SF $01 To 2500 SF Mastic, Applies To Bottom Layer Only, If Multiple Layers $383,33 Quantity Unit Price Factor Total Installation 852.00 x 0.37 x 12160 - 383.33 Kitchen abatement mastic (852 SF) = $383,33 Subtotal for Flooring $9,535.14 Contractor's Price Proposal - Detail Page 3 of 4 EZlQC - Buy Board 6124/2011 Contract No. 10260 Contractor's Price Proposal - Detail Continues.. Work Order Number_ 010669.00 Work Order Title: City of Lubbock - Fire Station Repairs_MCP_FS#1 Sect Item Modifier UOM Description Line Total Labor Equip. Material (Excluded if marked with an X) General 30 01510 0011 FA Dumpster In/Out Fee $608,00 Quantity Unit Price Factor Total Installation 4.00 x 125.00 x 1.2160 - 608.00 For demoed concrete, flooring and general repairs. 31 15454 0017 EA Stainless Steel Fully -Recessed Water Cooler With Bubbler, 8 GPH (Halsey -Taylor $81.51 RCBA-Q) Quantity Unit Price Factor Total Installation 0.00 x 2,285.10 x 1.2160 _ 0•04 Demolition 1.00 x 67.03 x 1.2160 = 81.51 This is to disconnect and cap off the plumbing at the water cooler and remove. Subtotai for General $689.51 Proposal Total $30,077.40 This total represents the correct total for the proposal. Any discrepancy between line totals, sub -totals and the proposal total is due to rounding. Contractor's Price Proposal - Detail Page 4 of 4 a ZJQC - Buy Board 6/24/2011 Contract No. 10260 Contractor's Price Proposal Category _ Summary Date: June 24, 2011 Re: IQC Master Contract #: Work Order #: Owner PO #' Title: Contractor: Proposal Value: Area [-1- MCP 01G669.00 City of Lubbock . Fire Station Repairs_MCP_FSfk1 Minnix Commercial Partners, LTD $30,077.40 App $229.97 Asbestos $2,114.47 Captain's Bathroom $325.55 Concrete $7,503.25 Exterior $9,B79.51 Flooring $9,535.14 General $689.51 Proposal Total $30,077.40 Contractor's Price Proposal - Summary Page 1 of 1 EZIQC Buy Board 6124/2011 Contract No. 10260 Resolution No. 2011—RO321 MBoard- -0--tiva P—h—kw fA I �Q7C Detailed Scope of Work To: Rad Borg From: Wesly Everett Minnix Commercial Partners, LTD City of Lubbock PO Box 64895 1625 13th St Lubbock, TX 79464 Lubbock, TX 79401 (806)773-1221 (806)775-2275 Date Printed: June 24, 2011 Work Order Number: 010669.01 Work Order Title: City of Lubbock - Fire Station Repairs_MCP_FS#3 Brief Scope: ❑ Preliminary Revised al Final The following items detail the scope of work as discussed at the site. All requirements necessary to accomplish the items set forth below shall be considered part of this scope of work. The following workirepairs will be performed: 1. Replace fence on north and east sides 2. Caulk along exterior of building on north and west sides 3. Replace Overhead door weather stripping 4. Replace Kitchen countertop laminate 5. Install gas bumer/oven combo (Owner supplied) 6. Clean ductwork 7. Replace ceramic tile and water valve in Captain's shower 8. Replace tile in front entry (NO ASBESTOS ABATEMENT FIGURED) 9. Replace flooring in basement with rubber tiles 10. Replace flooring in Dormitory 11. Repair ceramic the in restroom (caulk) Scope of Work - Page 1 of 1 EZ1QC - Buy Board 6/24/2011 Contract No. 10260 Contractor's Price Proposal Category - Summary Date: June 24, 2011 Re: IQC Master Contract #: Work Order #: Owner PO #: Title: Contractor: Proposal Value: Area 1-1- MCP 010669.01 City of Lubbock - Fire Station Repairs —MCP FS#3 Minnix Commercial Partners, LTD $39,249.99 Captain Shower $3,522.84 Exterior $7,437.74 Flooring $19,681.18 General $608.00 HVAC $2,255.12 Interior $260.23 Kitchen $4,983.17 Overhead Doors $501.71 Proposal Total $39,249.99 Contractor's Price Proposal - Summary Page 1 of 1 EZIQC - Buy Board 6/24/2011 Contract No. 10260 Contractor's Price Proposal Category - Detail Date: June 24, 2011 Re: IQC Master Contract # Area 1-1- MCP Work Order #: 010669, 01 Owner PO #: We: City of Lubbock - Fire Station Repairs MCP_FS#3 Contractor. Minnix Commercial Partners, LTD Proposal Value: $39,249.99 Sect Item ModNler UOM Description Una Teal Labor Equlp. Material ('Excluded If marked with an X) Captain Shower 1 03640 0009 SF 1- 314" Thick Setf Leveling Underlayment For Concrete Floors Including Surface $328.90 Preparation Quantity Unit Price Factor Total Installation 28.00 x 9.66 x 1.2160 328.90 Bathroom floor prep 2 09305 0009 SF 112" Camentitious Backer Units For Installation On Floors $347.10 Quantity Unit Price Factor Total Installation 128.00 x 1.98 x 1.2180 - 308.18 Demolition 128.00 x 0.25 x 1.2160 = 38.91 Bathroom wall sheathing 3 09MOD 0009 0061 For Quantities } 50 To 250, Add $32.69 Quantity Unit Price Factor Total Installation 128.00 x 0.21 x 1.2160 32.69 4 09MOO 0009 0065 For Installation On Wall, Add $32.69 Quantity Unit Price Factor Total Installation 128.00 x 0.21 x 1.2160 32.69 5 09310 0002 SF Mounted Floor Tile, Less Than 8"x8"Nots: Includes glazed porcelain, unglazed $237.66 porcelain and glazed ceramic tiles. Tiles mounted from back, side or front in 12"x12", 12'x24", or similar sized sheets. Quantity Unit Price Factor Total Installation 28.00 x 6.02 x 1.2160 m 204.97 Demolition 28.00 x D.96 x 1.2160 - 32.69 a 09MOD 0002 0067 For Quantities Up To 50, Add $75.08 Quantity Unit Price Factor Total Installation 21.00 x 2.94 x 1,2160 - 75.08 7 09310 0010 SF Unmounted Wall Tile, 8"x8" And LargerNots: Includes glazed porcelain, unglazed $1,209.39 porcelain and glazed ceramic tiles. Quantity Unit Price Factor Total Installation 126.00 x 7.03 x 1.2160 = 1,094.21 Demolition 128.00 x 0.74 x 1.2160 = 115.18 Bathroom Wall tile 8 09310 0019 LF Glazed Porcelain, Unglazed Porcelain And Glazed Ceramic Cove Base Or Trim $863.72 Quantity Unit Price Factor Total Installation 66.00 x 7.44 x 1.2100 a 507.10 Demolition Woo x 0.83 x 11.2180 - 66.01 9 15457 0011 EA Wall Mounted Shower Valve And Slide Bar, Single Lever Concealed Mixer, $492.10 Symmons 0 96-300-B30-V-X Quantity Unit Price Factor Total Installation 1.00 x 385.33 x 1.2160 3 468,56 Demolition 1.00 x 19.36 x 1.2160 a 23.64 Contractor's Price Proposal - Detail Page 1 of 4 ELQC - Buy Board 6/24/2011 Contract No. 10260 Contractor's Price Proposal - Detail Continues.. Work Order Number: 010669.01 Work Order Title: City of Lubbock Fire Station Repairs_MCP_FS#3 Sect Item Modifer UOM Description Line Total Labor Equip, Material (Excluded if marked with an X) Captain Shower 10 15458 0017 SF 7 Oz Bituminous Membrane Shower Pan $103.51 Quantity Unit Price Factor Total Installation 28,00 x 3.04 x 1.2160 - 103.51 Bathroom Shower pan Subtotal for Captain Shower $3,522.84 Exterior 11 02713 0018 LF Board Fence, 3 - 2" x 4" Rails, 6' High 1" x 4" # 1 Grade Cedar $5,739.91 Quantity Unit Price Factor Total Installation 396.00 x 11,07 x 1.2160 5,330,60 Demolition 396.00 x 0.85 x 1,2160 = 409.31 Fence 12 02MOD 0018 0788 For Screwing Of Boards instead Of Nails, Add $322.63 Quantity Unit Price Factor Total Installation 396.00 x 0.67 x 1.2160 _ 322.63 13 02713 0068 EA >5' To 8' High x T Wide, #1 Cedar Board Gate, 3 - Z" x 4" Rails With 1" x 4" $265.27 Board, Including Post And Hardware Quantity Unit Price Factor Total Installation 1.00 x 218.15 x 1.2160 285.27 Fence 14 07920 0065 CLF 318" x 318" Joint, Flexible Polyurethane Security Sealant And Caulking $1,109.93 Quantity Unit Price Factor Total Installation 4.80 x 190.16 x 1.2180 1,109.93 Sidewalk caulking at basement Subtotal for Exterior $7,437.74 Flooring 15 09310 0003 SF Unmounted Floor Tile, 8"x8" And LargerNote: Includes glazed porcelain, unglazed $13,400.34 porcelain and glazed ceramic tiles. Quantity Unit Price Factor Total Installation 1,698.00 x 6.49 x 1.2160 _ 13,400.34 Ceramic tile as requested. 16 09620 0032 SF 9/16" Interlocking Rubber Athletic Flooringhote: Black with hidden or exposed $3,604.22 locks. Pawling HL series. Quantity Unit Price Factor Total Installation 300.00 x 9.88 x 1.2160 J 3,604.22 WiII be Johnsonite Triumph as requested. 17 09MOD 0032 0159 For Colors, Add $437.76 Quantity Unit Price Factor Total Installation 300.00 x 1.20 x 1.2160 437.76 18 09650 0025 SF Travertine Pattern Vinyl Composition Tile 118" Thick $929.15 Quantity Unit Price Factor Total Installation 0.00 x 1.93 x 1.2160 z 0.00 Demolition 1.696.00 x 0.45 x 1.2160 = 929.15 Contractor's Price Proposal - Detail Page 2 of 4 EZlQC - Buy Board 6/24/2011 Contract No.10260 Contractor's Price Proposal - Detail Continues.. Work Order Number: 010669.01 Work Order Title: City of Lubbock - Fire Station Repairs MCP F5#3 sect Item Modlfer IIOM Descrip"Hon Una Total Labor Equlp. Material (Excluded If marked wM an 1Q Flooring 19 09MOD 0025 0190 For Quantities:-- 1000 To 3000, Deduct -$61.94 Quantity Unit Price Factor Total Installation 1,698.00 x -om x 1.2160 -61.94 20 09650 0047 LF 4" High 116" Rubber Base, Group 1 Black, Russet And Umber S1,371.65 Quantity Unit Price Factor Total Installation 600.00 x 1.43 x 1.216o = 1,043.33 Demolition 600.00 x 0.45 x 1,2160 = 328.32 Subtotal for Flooring $19,681.18 General 21 01510 0011 EA Dumpater Irk/Out Fee $608.00 Quantity Unit Price Factor Total Installation 4.00 125x .00 x 1.2160 608.00 Subtotal for General $6woo HVAC 22 01740 0018 EA Clean Commercial HVAC Unit $106.69 Quantity Unit Price Factor Total Installation 2.00 x 43.87 x 1.2160 106.69 29 01740 0033 LF Clean ductwork $1.996.82 Quantity Unit Price Factor Total Installation 2,935.00 x 0.58 x 1.2160 - 1,998.62 24 01740 0034 EA Clean Ductwork Vent Opening $149.61 Quantity Unit Price Factor Total Installation 44.00 x 2.80 x 1.2160 149,81 Subtotal for HVAC $2,255.12 Interior 25 09920 0042 SF Paint Interior Concrete Masonry Units, 2 Coate Paint, Brush Work $204.29 Quantity Unit Price Factor Tatar Installation 200.00 x 0.84 x 1.2160 204.29 Paint 26 09MOD 0042 0317 For Quantities a 100 To 250, Add $55.94 Quantity Unit Price Factor Total Installation 200.00 x 0.23 x 11180 _ 55.94 Subtotal for Interior $260.23 Kitchen 27 01915 0058 EA Kitchen Faucet, Kohler K 15111-P, Polished Chrome $142.20 Quantity Unit Price Factor Total Installation 1.00 x 100.76 x 1,2160 = 122.55 Demolition 1.00 x 16.16 x 1.2160 19.65 Contractor's Price Proposal - Dated Page 3 of 4 E71QC - Buy Board 6/24l2011 Contract No. 10260 Contractor's Price Proposal - Detail Continues.. Work Order Number: 010669.01 Work Order Title; City of Lubbock - Fire Station Repairs_MCP_FS#3 Sect Item Modifer UOM Description Line Total Labor Equip. Material (Excluded if marked with an X) Kitchen 28 06415 0005 LF Plastic Laminated Counter Top Custom Made With BacksplashNote: Up to 26" $3,642.16 deep Quantity Unit Price Factor Total Installation 96.00 X 26.08 x 1.2100 - 3,044.47 Demolition 96.00 x 5.12 x 1.2160 = 597.69 29 11420 0003 EA Bake Oven - Double Deck $188.16 Quantity Unit Price Factor Total X Installation 1.00 x 102.63 x 1.2160 - 124.80 X Demolition 1.00 x 52.11 x 1.2160 = 63.37 Labor only Oven not included in bid. 30 11420 0024 EA Steel Finish Fry Top $125.20 Quantity Unit Price Factor Total X Installation 1.00 x 63.86 x 1.2160 _ 77.65 X Demolition 1,00 x 39.10 x 1.2160 = 47.55 Labor only Fry top not included in bid. 31 15451 0156 EA 33"x21"x7-1l2" Stainless Steel Kitchen Sink, Double Bowl, 20 Gauge (Elkay $885.45 PSR3321) Quantity Unit Price Factor Total Installation 100 x 696.30 x 1.2160 846.70 Demolition 1.00 x 31.87 x 1.2160 = 38.75 Subtotal for Kitchen $4,983.17 Overhead Doors 32 01590 0049 DAY 20' Electric, Scissor Platform Lift $135.21 Quantity Unit Price Factor Total Installation 1.00 x 111.19 x 1.2160 = 135,21 Weatherstripping 33 08330 0214 LF Top Of Door, Weather Strip Seal For Coiling Doors $08.22 Quantity Unit Price Factor Total Installation 0.00 x 1.91 x 1.2160 0.00 Demolition 110.00 x 0.51 x 1.2160 = 68.22 Demo of Weatherstripping 34 08364 0003 LF Weather Seal At Top Of Door $298.28 Quantity Unit Price Factor Total Installation 110,00 X 2.23 x 1,2160 = 298.28 Subtotal for Overhead Doors $501.71 Proposal Total $39,249.99 This total represents the correct total for the proposal. Any discrepancy between line totals, sub -totals and the proposal total is due to rounding. Contractor's Price Proposal - Detail Page 4 of 4 ELQC - Buy Board 6/24/2011 Contract No. 10260 Resolution No, 2011—RO321 ,A:YBoard" Detailed Scope of Work To: Rad Borg Minnix Commercial Partners, LTD PO Box 64895 Lubbock, TX 79464 (806) 773-1221 Date Printed: June 24, 2011 From: Wesly Everett City of Lubbock 1625 13th St Lubbock, TX 79401 (806)T75-2275 Work Order Number: 010669.02 Work Order Title: City of Lubbock - Fire Station Repairs_MCP_FS#4 Brief Scope: Fire Station 94 Repairs Preliminary ❑ Revised ❑X Final The following items detail the scope of work as discussed at the site. All requirements necessary to accomplish the items set forth below shall be considered part of this scope of work. The following work/repairs will be performed: 1. Replace all concrete approach as discussed in walk through. 2. Replace metal light pole base plates 3. Replace overhead door weather stripping 4. Repair overhead door straps 5. Replace sweep on west exterior door 6. Replace kitchen flooring 7. Replace entry foyer fooing 8. Clean ductwork 9. Replace 2-5 Ton HVAC Units 10. Replace Flooring in dormitory 11. Replace flooring in Dayroom 12. Striping of Parking area after new concrete is poured; 10 new concrete bumpers and 12 relocated. Scope of Work Page 1 of 1 EZlQC - Buy Board 6124/2011 Contract No. 10260 Contractor's Price Proposal Category - Summary Date: June 24, 2011 Re: IQC Master Contract* Area 1-1- MCP Work Order #: 010669.02 Owner PO *: Title: City of Lubbock - Fire Station Repairs -MCP FS#4 Contractor: Minnix Commercial Partners, LTD Proposal Value: $134,683.67 Concrete $91,197.08 Doors $38.16 Flooring $22,448.09 General $407.12 HVAC $19,560.35 Overhead Doors $1,032.87 Proposal Total $134,683.67 The Percentage of NPP on this Proposal: 1.26% Contractor's Price Proposal - Summary Page 1 of 1 E7JQC - Buy Board 612412011 Contract No. 10260 Contractor's Price Proposal Category - Detail Date: June 24, 2011 Re: IQC Master Contract #: Area 1-1- MCP Work Order #: 010669.02 Owner PO #: Title: City of Lubbock - Fire Station Repaifa_MCP_FS#4 Contractor: Minnix Commercial Partners, LTD Proposal Value: $134.683.67 sect Item Modtfer UOM Description Line Total Labor Equip. Material (Excluded If marked with an XI Concrete 1 02112 0032 SY Break -Up And Remove > 6" To 9" Thick Concrete 4Wh Reinforcing Rod. $32,794.77 Quantity Unit Price Factor Total Installation 1277.78 x 21.10 x 1.2160 32,784.77 Demo 2 02MOD 0032 0051 For Quantities > 10oo To 2500, Deduct -$5,904.37 Quantity Unit Price Factor Total Installation 1,277.78 x -3.80 x 1.2160 - -5,904.37 3 02112 0136 LF Saw Cut Concrete Slab Or Paving Up To 4" (10 cm) Depth $882.69 Quantity Unit Price Factor Total Installation 610.00 x 1.19 x 1.2160 862.69 For control joint cutting 4 02MOD 0136 0068 For Quantities > 250, Deduct -$74.18 Quantity Unit Price Factor Total Installation 610.00 x -0.10 x 1.2160 -74.18 5 02119 0011 CYM Hauling >5 To 10 Miles $2,241.33 Quantity Unit Price Factor Total Installation 2,880.00 x 0.64 x 1.2160 2,241.33 Demo B 02201 0003 EA Equipment Delivery, Pickup, Mobilization And Demobilization Using A Tractor $729.60 Trailer With Up To 53' BedNote: For equipment such as bulldozers, motor scrapers, hydraulic excavators, gradalls, road graders, loader-backhoes, heavy duty construction loaders, tractors, pavers, rollers, bridge finishers, straight mast construction forklifts, telescoping boom rough terrain construction forklifts, telescoping and articulating boom manlifts with > 40' boom lengths, etc. Quantity Unit Price Factor Total Installation 200 x 300.00 x 1.2160 729.60 Front End Loaders and Dirt Moving Equipment 7 02210 0021 CY Compaction Of Fill Or Subbase For Building Foundations and Other Structures by $183.01 Vibratory Plato, Air Tamper, Etcetera Quantity Unit Price Factor Total Installation 50.00 x 3.01 x 1,2160 183.01 8 o2MOD 0021 0095 For Quantities > 20 To 50 (> 15 To 38 M3), Add $137.41 Quantity Unit Price Factor Total Installation 50.00 x 2.26 x 1.2160 J 137.41 9 02618 0147 LF Single 4" (10 cm) Wide Solid Line, Painted Pavement Striping for Parking Areas $235.66 Quantity Unit Price Factor Total Installation 380.00 x 0.51 x 1.2160 235.66 10 02618 0164 EA Handicap Symbol For Standard Parking Stalls, Painted Pavement Marking For $28.19 Parking AreasNote: Approximate overall dimensions: 2-2/3' width x 3' height White or blue symbol. Excludes striping. Quantity Unit Price Factor Total Installation 2.00 x 11.59 x 1.2160 28.19 Contractor's Price Proposal - Detail Page 1 of 4 EZ1QC - Buy Board 6124/2011 Contract No. 10260 Contractor's Price Proposal - Detail Continues.. Work Order Number: 010669.02 Work Order Title: City of Lubbock - Fire Station Repairs_MCP_FS#4 Sect Item Modlfer UOM Description Line Total Labor Equip. Material (Excluded If marked with an Xj Concrete 11 02725 0014 EA 8" x 13" x 6' Precast Concrete Wheel Stop $641.20 Quantity Unit Price Factor Total Installation 10.00 x 47.42 x 1.2160 = 576.63 Demolition 10.00 x 5.31 x 1.2160 = 64.57 New wheel stops to replace damaged. 12 02725 a024 EA Remove And Relocate Precast Concrete Wheel Stop $123.74 Quantity Unit Price Factor Total Installation 12.00 x 8.48 x 1.2160 = 123.74 Good Condtion Wheel stops that will be relocated 13 03110 0010 LF >6" To 12" High Slab Edge and Block -Out Wood Formwork $2,697.70 Quantity Unit Price Factor Total Installation 725.00 x 3.06 x 1.2160 = 2,697.70 14 03150 0003 LF 112" x 1" Plain Asphalt Expansion Joint, Poured $758.18 Quantity Unit Price Factor Total Installation 430.00 x 1.45 x 1,2160 = 758.18 15 03210 0002 TON Grade 40 Reinforcing Steel„ Footings And Slabs, t13-" $15,623.07 Quantity Unit Price Factor Total Installation 8.50 x 1.511.52 x 1.2160 = 15.623.07 16 03303 0004 SF Concrete Sealer $1,538.24 Quantity Unit Price Factor Total Installation 11,500.00 x 0.11 x 1.2160 = 1.538.24 11 03311 0028 CY Up To V, By Concrete Pump, Place 3000 PSI Concrete Slab On GradeExcludes $33,643,41 pumping equipment, Quantity Unit Price Factor Total Installation 284.00 x 97.42 x 1.2160 = 33.643.41 18 03MOD a028 0037 For 4000 PSI (280 KgICm2) Concrete, Add $2.638,43 Quantity Unit Price Factor Total Installation 284.00 x 7.64 x 1.2160 2 2,638.43 19 03MOD 0028 0049 For Quantities> 200 To 400, Deduct -$1,346.84 Quantity Unit Price Factor Total Installation 284.00 x -3.90 x 1.2160 = .1,346,84 20 03350 0004 SF Concrete Floor Finishes, Broom $4,614,72 Quantity Unit Price Factor Total Installation 11,500.00 x 0.33 x 1,2160 4,614.72 21 03MOD 0004 0059 For Quantities > 7500 SF. Deduct -$978 88 Quantity Unit Price Factor Total Installation 11,500.00 x -0.07 x 1.2160 -978.88 Subtotal for Concrete $91,197.08 Doors 22 08720 0104 LF 7116" Brush Insert, 90 Degree, Aluminum Retainer Door Sweeps With Rain Drip $38,16 (Pemko 345ANB) Quantity Unit Price Factor Total Installation 3.00 x 8 76 x 1.2160 = 31.96 Demolition 3.00 x 1.70 x 1.2160 = 6.20 Contractor's Price Proposal - Detail Page 2 of 4 FZlQC - Buy Board 6/24/2011 Contract No. 10260 Contractor's Price Proposal - Detail Continues.. Work Order dumber, 010669.02 Work Order Title: City of Lubbock - Fire Station Repairs MCP_FS#4 Sect KM Modl/er UOIIII Description Line Total Labor Equip. Material (Excluded if marked with an X) Subtotal for Doors $38.16 24 09310 0003 SF Unmounted Floor Tile, 8"W And LargerNote: Includes glazed porcelain, unglazed $18,048.64 porcelain and glazed ceramic files. Quantity Unit Price Factor Total Installation 2,287.00 x 8.49 x 1.2160 ' 18,048,64 Ceramic as requested. 25 09650 0025 9F Travertine Pattem Vinyl Composition Tile 1/8" Thick $1,251.45 Quantity Unit Price Factor Total Installation 0.00 x 1.93 x 1.2160 a 0.00 Demolition 2,287.00 x 0.45 x 1.2160 = 1,251.45 26 09MOD 0025 0190 For Quantities > 1000 To 3000, Deduct -$a3.43 Quantity Unit Price Factor Total Installation 2,287.00 x -0.03 x 1.2160 - -63.43 27 09650 0047 LF 4" High IV Rubber Base, Group 1 Black, Russet And Umber $1.435.66 Quantity Unit Price Factor Total Installation 628.00 x 1.43 x 1.2160 z 1,092.02 Demolition 628.00 x 0.45 x 1.2160 - 343.64 28 09680 0024 SY 22 Ounce, Medium Traffic, Non -Patterned, Nylon Broadloom Carpet $98.99 Quantity Unit Price Factor Total I nstallation 0.00 x 22.93 x 1.2160 = 0.00 Demolition 33.50 x 2.43 x 1.2160 - ',99 Subtotal for Flooring $22,448.09 General 29 01510 0011 EA Dumpster In/Out Fee $152.00 Quantity Unit Price Factor Total Installation 100 x 125.00 x 1.2160 = 152.00 For demoed flooring and general repairs. 30 16450 0022 EA Concealed Bass Assembly For Capper Lightning Protection Terminal $255,12 Quantity Unit Price Factor Total Installation 2.00 x 79.95 x 1.2160 - 194.44 Demolition 2.00 x 24.95 x 1.2160 = 60.88 New Light Pale base covers Subtotal for General $407.12 HVAC 31 01740 0033 LF Clean Ductwork $1,498.11 Quantity Unit Price Factor Total Installation 2,200.00 x 0.56 x 1.2160 - 1,498.11 32 01740 0034 EA Clean Ductwork Vent Opening $115.76 Quantity Unit Price Factor Total Installation 34.00 x 2.80 x 1.2160 = 115.76 ContracWrs Price Proposal - Detail page 3 of 4 EZiQC - Buy Board 6/2412011 Contract No. 10260 Contractor's Price Proposal - Detail Continues.. Work Order Number: 010669.02 Work Order Title: City of Lubbock - Fire Station Repairs_MCP_FS#4 sect. Item Modifier UOM Description line Total Labor Equip, Material (Excluded If marked with an X) HVAC 33 15770 0037 EA 5 Ton Coaling, 100 MBH Gas Heating Self Contained Package Rooftop Unit $16,676,52 Quantity Unit Price Factor Total Installation 2.00 x 6,746.17 x 1.2160 16,406.69 Demolition 2.00 x 110.95 x 1.2160 = 269.83 New Units as requested 34 15MOD 0037 0610 For Equipment Base Roof Curb, Add $1.243.99 Quantity Unit Price Factor Total Installation 2.00 x 511.51 x 1.2160 2 1,243.99 35 15028 0004 EA 32.1/2" To 41" Long, 6" High Adjustable Galvanized Steel Roof Curb $25,97 Quantity Unit Price Factor Total Installation 0.00 x 280.56 x 1.2160 2 0.00 Demolition 2,00 x 10.65 x 1.2160 = 25.97 Demo of existing root transition curbs Subtotal for HVAC $19,560.35 Overhead Doors 36 08330 0214 LF Top Of Door, Weather Strip Seal For Coiling Doors $192.25 Quantity Unit Price Factor Total Installation 0.00 x 1.91 x 1.2160 - 0.00 Demolition 310.00 x 0.51 x 1.2160 = 192.25 Demo of Weatherstripping 37 08364 0003 LF Weather Seal At Top Of Door $840,62 Quantity Unit Price Factor Total Installation 310.00 x 2.23 = x 1.2160 640.62 Subtotal for Overhead Doors $1,032.87 Proposal Total $134,683.67 This total represents the correct total for the proposal. Any discrepancy between line totals, sub -totals and the proposal total is due to rounding. The Percentage of NPP on this Proposal: 1.26% Contractor's Price Proposal - Detail Page 4 of 4 EZIQC - Buy Board 6r2412011 Contract No. 10260 • Board Detailed Scope of Work To: Rad Borg Minnix Commercial Partners, LTD PO Box 64895 Lubbock, TX 79464 (806) 773-1221 Date Printed: June 24, 2011 Resolution No. 2011—RO321 1 0 4 From: Wesly Everett City of Lubbock 1625 13th St Lubbock,TX 79401 (806)775-2275 Work Order Number: 010669.03 Work Order Title: City of Lubbock - Fire Station Repairs_MCP_FS#5 Brief Scope: Preliminary ❑ Revised ❑X Final The following items detail the scope of work as discussed at the site. All requirements necessary to accomplish the items set forth below shall be considered part of this scope of work. The following work/repairs will be performed: 1. Replace concrete approach as discussed in walk through (excludes turning radius and concrete up close to bay that was still in good shape) Price also includes 24' X 19"-5" section outside gate (some of this area was damaged by outside contractor and can be substituted for another damaged section per conversation with Sid Beach.) 2. Replace weather seals on Overhead Doors 3. Replace weather stripping on Overhead Doors 4. Replace restroom flooring 5. Clean ductwork 6. New Striping of parking lines after new concrete is poured; Replace 5 wheel stops and relocate 10. 7, Install Hose dryer (owner provided/delivered/existing demoed and haul off) Scope of Work Page 1 of 1 EZlQC - Buy Board 6/24/2011 Contract No. 10260 Contractor's Price Proposal Category - Summary Data: June 24, 2011 Re: iQC Master Contract #: Area I-1- MCP Work Order #: 010669.03 Owner PO #: Title: City of Lubbock - Fire Statlon Repairs_MCP_FS#5 Contractor: Minnix Commercial Partners, LTD Proposal Value: $76,271.29 Concrete $71,830.07 Flooring $1,732.55 General $486.40 HVAC $1,720.56 Overhead Doors $501.71 Proposal Total $75,271.29 The Percentage of NPP on this Proposal: 0.44% Contractor's Price Proposal - Summary Page 1 of 1 EZJQC - Buy Board 6124/2011 Contract No.10260 Contractor's Price Proposal Category - Detail Date: June 24, 2011 Re: IoC Master Contract #: Area 1-1- MCP Work Order il: 010669.03 Owner PO #: Title: City of Lubbock - Fire Station Repalrs_MCP_FS05 Contractor: MlnnixCommercial Partners, LTD Proposal Value: $76,271.29 sect Item Modifer UOM Description Lone Total Labor Equip. Material (Excluded if marked with an X) Concrete 1 02112 0032 SY Break -Up And Remove > 6" To 9' Thick Concrete With Reinforcing Rod. $23,220.13 Quantity Unit Price Factor Total Installation 905.00 x 21.10 x 1.2160 a 23,220.13 Demo 2 02MOD 0032 0050 For Quantities > 500 To 1000, Deduct -g2,322.01 Quantity Unit Price Factor Total Installation 905.D0 x -111 x 1,2150 -2,322.01 3 02112 0136 LF Saw Cut Concrete Slab Or Paving Up To 4" (10 cm) Depth $882.69 Quantity Unit Price Factor Total Installation 610.00 x 1.19 x 1.2160 _ 882.69 For control joint cutting 4 02MOO 0138 0068 For Quantities > 250, Deduct -$74.18 Quantity Unit Price Factor Total Installation 610,00 x -0.10 x 1.2160 -7C18 5 02119 0011 CYM Hauling >5 To 10 Miles $1,981.16 Quantity Unit Price Factor Total Installation 2,620.00 x 0.64 x 1.2160 1,961.18 Demo 6 02201 0003 EA Equipment Delivery, Pickup, Mobilization And Demobilization Using A Tractor $1,459.20 Trailer V1rdh Up To 53' BedNots: For equipment such as bulldozers, motor scrapers, hydraulic excavabors, gradalls, road graders, loader-backhoss, heavy duty construction loaders, tractors, pavers, rollers, bridge finishers, straight mast construction forklifts, telescoping boom rough terrrain construction forklifts, telescoping and articulating boom manlifts with > 40' boom lengths, eta Quantity Unit Price Factor Total Installation 4.00 x 300.00 x 1.2160 1,459.20 Front End Loaders and Dirt Moving Equipment. 7 02210 0021 CY Compaction Of Fill Or Subbase For Building Foundations and Other Structures by $183.01 Vibratory Plate, Alr Tamper, Etcetera Quantity Unit Price Factor Total Installation 50.00 x 3,01 x 1.2160 183.01 8 02MOD 0021 0095 For Quantities > 20 To 50 (> 15 To 36 M3), Add $137.41 Quantity Unit Price Factor Total Installation 50.00 x 2.26 x 1,2160 137.41 9 0261E 0147 LF Single 4' (10 cm) Wide Solid Line, Painted Pavement Striping for Parking Areas 3223.28 Quantity Unit Price Factor Total Installation 360.00 x 0.51 x 1.2160 223.26 10 02618 0164 EA Handicap Symbol For Standard Parking Stalls, Pointed Pavement Marking For $28.19 Parking AroasNote: Approximate overall dimensions: 2-2l3' width x 3` height. White or blue symbol. Excludes striping. Quantity Unit Price Factor Total Installation 2.00 x 11.59 x 1.2160 28.19 Contractor'a Price Proposal - Detail Page 1 of 4 EVOC - Buy Board 6i2412011 Contract No. 10260 Contractor's Price Proposal - Detail Continues.. Work Order Number: 010669.03 Work Order Title: City of Lubbock - Fire Station Repairs -MCP FS#5 Sect Item Modifer UOM Description Line Total Labor Equip. Material (Excluded if marked with an X) Concrete 11 02725 0014 EA 8" x 13" x 6' Precast Concrete Wheel Stop $320.60 Quantity Unit Price Factor Total Installation 5.00 x 47.42 x 1.2160 - 288.31 Demolition 5.00 x 5.31 x 1.2160 = 32.28 Now Wheel stops to replace damaged. 12 02725 0024 EA Remove And Relocate Precast Concrete Wheel Stop $103.12 Quantity Unit Price Factor Total Installation 10,00 x 0.40 x 1.2160 = 103.12 Relocate existing non -damaged wheel stops 13 03110 0010 LF >6" To 12" High Slab Edge and Block -Out Wood Formwork $1,918.29 Quantity Unit Price Factor Total Installation 515.00 x 3.06 x 1,2160 2 1,91629 14 03150 0003 LF 1/2" x 1" Plain Asphalt Expansion Joint. Poured $758.18 Quantity Unit Price Factor Total Installation 430.00 x 1.45 x 1.2160 758.18 15 03210 0002 TON Grade 40 Reinforcing Steel, Footings And Slabs, 93-#e $14,620.27 Quantity Unit Price Factor Total Installation 7.90 x 1,511.52 x 1.2160 14,520.21 16 03303 0004 SF Concrete Sealer $1,089.48 Quantity Unit Price Factor Total Installation 8,145.00 x 0.11 x 1.2160 1,089.48 17 03311 002E CY Up To 6", By Concrete Pump, Place 3000 PSI Concrete Slab On GradeExdudes $23,929.47 pumping equipment. Quantity Unit Price Factor Total Installation 202.00 x 97.42 x 1.2160 23,929.47 18 03MOD 0028 0037 For 4000 PSI (280 Kg/Cm2) Concrete, Add $1,076.63 Quantity Unit Price Factor Total Installation 202.00 x 7.64 x 1.2160 r 1,876.63 19 03MOD 0028 0049 For Quantities > 200 To 400, Deduct -$957.96 Quantity Unit Price Factor Total Installation 202.00 x -3.90 x 1.2160 z -957.96 20 03350 0004 SF Concrete Floor Finishes, Broom $3,268.43 Quantity Unit Price Factor Total Installation 8,145.00 x 0.33 x 1.2160 = 3,268.43 21 03MOD 0004 0059 For Quantities > 7500 SF, Deduct -$693.30 Quantity Unit Price Factor Total Installation 8,145.00 x -0.07 x 1.2160 -693.30 Subtotal for Concrete $71,830.07 Flooring 22 09310 0003 SF Unmounted Floor Tile, 8"x8" And LargerNote: Includes glazed porcelain, unglazed $1,420.53 porcelain and glazed ceramic tiles. Quantity Unit Price Factor Total Installation 180.00 x 6.49 x 1,2160 y 1,420.53 Contractor's Price Proposal - Detail Page 2 of 4 EZiQC - Buy Board 612412011 Contract No. 10260 Contractor's Price Proposal - Detail Continues.. Work Order Number: 010669.03 Work Order Title: City of Lubbock - Fire Station Repairs -MCP FS#5 Seel, Item Modifer UOM Description Line Total Labor Equip. Material (Excluded If marked with an Xi Flooring 23 09MOD 0003 0068 For Quantities P- 50 To 250, Add $105.08 Quantity Unit Prim Factor Total Installation 180.00 0x .48 x 1.t80 ' 105.06 2 24 09650 0025 SF Travertine Pattern Vinyl Composition Tile 1!8" Thick $98.50 Quantity Unit Price Factor Total Installation 0.00 x 193 x 12160 ' 0.00 Demolition 180.00 x 0.45 x 12160 a 98.50 25 09650 0047 LF 4" High 118" Rubber Base, Group 1 Black, Russet And Umber $91.44 Quantity Unit Price Factor Total Installation 40.00 x 1.43 x 1.2160 69.56 Demolition 40,00 x 0.45 x 1.2180 a 21.89 26 09MOD 0047 0194 For Quantities > 20 To 40, Add $17.02 Quantity Unit Price Factor Total Installation 40.00 x 0,35 x 1,2160 ' 17.02 Subtotal for Flooring $1,732.55 General 27 01510 0011 FAA Dumpstar In/Out Fee $152.00 Quantity Unit Price Factor Total Installation 1.00 x 125.00 x 1.2160 152.00 For demoed flooring and general repairs. Subtotal for General $486.40 HVAC 29 01740 0018 EA Clean Commercial HVAC Unit $108.89 Quantity Unit Price Factor Total Installation 2.00 x 43.87 x 1.2160 ' 100.69 30 01740 0033 LF Clean Ductwork 41,488.11 Quantity Unit Price Factor Total Installation 2,200.00 x 0.56 x 1,2180 a 1,498.11 31 01740 0034 EA Clean Ductwork Vent Opening $115.76 Quantity Unit Price Factor Total Installation 34.00 x 2.60 x 1.2160 115.78 Subtotal for HVAC $1,720.66 Overhead Doors 32 01590 0049 DAY 20' Electric, Scissor Platform Lift $135.21 Quantity Unit Price Factor Total Installation 1.00 x 111.19 x 1.2180 135.21 Weatherstripping Contractor's Price Proposal - Detail ' Page 3 of 4 FLQC - Buy Board 6124/2011 Contract No. 10260 Contractor's Price Proposal - Detail Continues.. Work Order Number: 010669.03 Work Order Title: City of Lubbock - Fire Station Repairs_MCP_FS#5 Sect Item Modifer UOM Description Una Total Labor Equip. Material {Excluded if marked with an X) Overhead Doors 33 08330 0214 LF Top Of Door, Weather Strip Seal For Coiling Doors $68 22 Quantity Unit Price Factor Total Installation 0.00 x1.91 x 11160 = 0.00 Demolition 110,00 x 0.51 x 1.2160 = 68.22 Demo of Weatherstripping 34 08354 0003 LF Weather Seal At Top Of Door $298.28 Quantity Unit Price Factor Total Installaton 110.00 x 2.23 x 1.2160 298.28 Subtotal for Overhead Doors $601.71 Proposal Total $76,271.29 This total represents the correct total for the proposal. Any discrepancy between line totals, sub -totals and the proposal total is due to rounding. The Percentage of NPP on this Proposal- 01"% Contractor's Price Proposal - Detail Page 4 of 4 EZ1QC - Buy Board 6/24/2011 Contract No. 10260 Resolution No. 2011-RO321 Board Cnupara 1" 1%M11Mh* �IQ C Detailed Scope of Work To: Rad Borg From: Wesly Everett Minnix Commercial Partners, LTD City of Lubbock PO Box 64895 1625 13th St Lubbock, TX 79464 Lubbock, TX 79401 (806)773-1221 (806)775-2275 Date Printed: June 24, 2011 Work Order Number: 010669.04 Work Order Title: City of Lubbock - Fire Station Repairs_MCP_FS#6 Brief Scope: Fire Statino #6 Repairs 71 Preliminary ❑ Revised O Final The following items detail the scope of work as discussed at the site. All requirements necessary to accomplish the items set forth below shall be considered part of this scope of work. The following work/repairs will be performed: 1. Replace concrete at 32' X 13' damaged section as discussed onsite. 2. Replace weather stripping on Overhead Doors 3. Replace kitchen cabinet hinges and pulls 4. Clean air ducts and vents 5. Replace carpet edging in Dayroom 6. Install Hose Dryer (Providedldelivered by owner/owner demo and haul off old) Scope of Work Page 1 of t FZlQC - Buy Board 6/24/2011 Contract No. 10260 Contractor's Price Proposal Category - Summary Date: June 24, 2011 Pe: ICC Master Contract*: Worts Order #: Owner PO #: Title: Contractor: Proposal Value: Area 1-1- MCP 010669.04 City of Lubbock- Fire Station Repairs_MCP_FS#6 Minnix Commercial Parmers, LTD $12,611.60 Concrete $6,982.25 Doors $3,700.52 Flooring $38.96 General $942.40 HVAC $1,580.97 Overhead Doors $366.50 Proposal Total $12,611.60 The Percentage of NPP on this Proposal: 166% Contractor's Price Proposal- Summary Page 1 of 1 EZlQC - Buy Board 6/24/2011 Contract No. 10260 Contractor's Price Proposal Category - Detail Date: Jude 24, 2011 Re: IQC Master Contract #: Area 1-1- MCP Work Order S: 010669.04 Owner PO #: Title: City of Lubbock - Fire Station Repairs MCP_FS#6 Contractor: Minnix Commercial Partners, LTD Proposal Value: $12,611,50 SecL Item MoMw WM Description one Total Labor Equip. Material (Excluded If marked with an )Q concfe}le 1 02112 0032 SY Break -Up And Remove> 6" To 9" Thick Concrete Wth Reinforcing Rod. $1,205.91 Quantity Unit Price Factor Total Installation 47.OD 21,10 x x 1.2160 ' 1,205.91 Demo 2 02112 0136 LF Saw Cut Concrete Slab Or Paving Up To 4" (10 cm) Depth $178.54 Quantity Unit Price Factor Total Installation 122.00 x 1.19 x 1.2160 0 178,54 For control joint cutting 3 02MOD 0136 0067 For Each Additional Pass (Depth To 3"), Add $121.65 Quantity Unit Price Factor Total Installation 244.00 x 0.41 x 1.2180 a 121.65 4 02119 0011 CYM Hauling >5 To 10 Miles $140,08 Quantity Unit Price Factor Total Installation 180.00 x 0.64 x 1.2160 3 140.08 Demo 5 02201 D003 EA Equipment Delivery, Pickup, Mablization And Demobllzation Using A Tractor $729.60 Trailer With Up To 53' BedNote: For equipmert such as bulldozers, motor scrapers, hydraulic excavators, gradalts, road graders, loader-backhoes, heavy duty construction loaders, tractors, pavers, rollenr, bridge finishers, straight mast construction forklifts, telescoping boom rough terrrain construction forklifts, telescoping and articulating boom manlifts with > 40' boom lengths, etc. Quantity Unit Price Factor Total Installation 2.00 x 300.00 x 1.2160 - 729.60 Front end loaders and dirt moving equipment B 02210 0022 CY Compaction Of Fll Or Subbase For Building Foundations and Other Structures by $96.50 Hand Quantity Unit Price Factor Total Installation 8.00 x 9.92 x 1.2160 96.50 Compaction done by hand because a Is such a stoop area. 7 03150 0003 LF 112" x 1" Plain Asphaft Expansion Joint, Poured $215.11 Quantity Unit Price Factor Total Installation 122.00 x 1.45 x 1.2160 - 215.11 8 03210 0002 TON Grade 40 Reinforcing Steel, Footings And Slabs, #348 $1,562.31 Quantity Unit Price Factor Total Installation 0.85 x 1,511.52 x 1.2160 1.562.31 9 03303 0004 SF Concrete Sealer $56.18 Quantity Unit Price Factor Total Installation 420.00 x 0.11 x 1.2160 58.18 10 03311 0026 CY Up To V, By Direct Chute, Place 3000 PSI Concrete Slab On Grade $1,348.84 Quantity Unit Price Factor Total Installation 12.00 x 92.30 x 1.2160 1,346.84 r Contractoes Price Proposal - Detail Page 1 of 3 EZ 0C - Buy Board 6/24/2011 Contract No. 10260 Contractor's Price Proposal - Detail Continues.. Work Order Number: 010669.04 Work Order Title: City of Lubbock - Fire Station Repairs_MCP_FS#6 sect. Item Modifier LION Description Line Total Labor Equip. Material (Excluded if marked with an %) Concrete 11 03MOD 0028 0037 For 4000 PSI (280 Kg/Cm2) Concrete, Add $102.87 Quantity Unit Price Factor Total Installation 12 0o x 7.05 x 1.2160 102.87 12 03MOD 0026 0046 For Quantities Up To 20, Add $60.12 Quantity Unit Price Factor Total Installation 1200 x 412 x 12160 = 60.12 13 03350 0004 SF Concrete Floor Finishes, Broom $160.54 Quantity Unit Price Factor Total Installation 420.00 x 0.33 x 12160 = 168.54 Subtotal for Concrete $5,982.25 Doors 14 01906 0084 E4 Replace Knob/Pull $935.06 Quantity Unit Price Factor Total Installation 72.00 x 10.58 x 1.2160 935.06 15 08710 0004 PR 3-1/2" x 3.112" Standard Duty, Full Mortise, Plain Bearing, Brass/Bronze, Satin $2,765.48 Chrome Finish Hinge Quantity Unit Price Factor Total Installation 53.00 x 40.52 x 1.2160 2,611.43 Demolition 53.00 x 2.39 x 1.2150 = 154.03 Subtotal for Doors $3,700.52 Flooring 18 09650 0036 LF Vinyl Transition Strip, Brown Or Black $31.74 Quantity Unit Price Factor Total Installation 18,00 x 1.18 x 1.2160 25.83 Demolition 18.00 x 0.27 x 1.2160 = 5.91 17 09MOD 0038 0187 For Quantities Up To 20, Add $7.22 Quantity Unit Price Factor Total Installation 10.00 x 0.33 x 1.2160 - 7.22 Subtotal for Flooring $38.96 General 18 01510 0011 E4 Dumpster In/Out Fee $605M Quantity Unit Price Factor Total Installation 4.00 x 125.00 x 1.2160 608.00 For demoed flooring and general repairs. Owner to deliver new to site. Subtotal for General $942.40 Contractors Price Proposal - Detail Page 2 or 3 EZ1QC - Buy Board 5/24/2011 Contract No. 10260 Contractor's Price Proposal - Detail Continues.. Work Order Number: 010669.04 Work Order Title: City of Lubbock - Fire Station Repairs_MCP_FS#6 sect Item Modlfer UOM Description Una Total Labor Equip. Material (Excluded if marked with an XI HVAC 20 01740 0018 EA Clean Commercial HVAC Unit $106.69 Quantity Unit Price Factor Total Installation 2.00 x 43,87 x 1.2160 - 106.69 21 01740 0033 LF Clean Ductwork $1,361.92 Quantity Unit Price Factor Total Installation 2,000.00 x 0.56 x 1.2160 - 1,361.92 22 01740 0034 EA Clean Ductwork Vent Opening $112.36 Quantity Unit Price Factor Total Installation 33,00 x 2.80 x 1.2160 - 112.36 Subtotal for HVAC $1,580.97 Overhead Doors 23 08330 0214 LF Top Of Door, Weather Strip Seal For Coiling Doors $68.22 Quantity Unit Price Factor Total Installation 0.00 x 1.91 x 1,2160 0.00 Demolition 110.00 x 0.51 x 1.2160 = 68.22 Demo of Weatherstripping 24 08364 0003 LF Weather Seal At Top Of Door $298.28 Quantity Unit Price Factor Total Installation 110.00 x 2.23 x 1.2160 298.28 Subtotal for Overhead Doors $306.50 Proposal Total $12,611.60 This total represents the correct total for the proposal. Any discrepancy between line totals, sub -totals and the proposal total is due to rounding. The Percentage of NPP on this Proposal: 2.65% Contractors Price Proposal - Detail Page 3 of 3 EZiQC - Buy Board 6/24/2011 Contract No. 10260 Resolution No. 2011-RO321 VBoard-- couromffreDetailed Scope of Work To: Rad Borg From: Wesly Everett Minnix Commercial Partners, LTD City of Lubbock PO Box 64895 1625 13th St Lubbock, TX 79464 Lubbock, TX 79401 (806)773-1221 (806)775-2275 Date Printed: June 24, 2011 Work Order Number: 010669.05 Work Order Title: City of Lubbock - Fire Station Repairs_MCP—FS#7 Brief Scope: Fire Station #7 Repairs Preliminary I I Revised ❑X Final The following items detail the scope of work as discussed at the site. All requirements necessary to accomplish the items set forth below shall be considered part of this scope of work. The following work)repairs will be performed: 1. Replace weather stripping on Overhead Doors 2. Replace gas cooktop in new countertop 3. Floor replacement in Lt.'s office 4. Floor replacement in Dormitory 5. Floor replacement in Dayroom (carpet) 6. Replace closer at ext. closet door. 7. Replace existing handles and hinges in Kitchen cabinetry. Scope of Work Page 1 of 1 EZfQC - Buy Board 6/24/2011 Contract No. 10260 Contractor's Price Proposal Category - Summary Date: June 24, 2011 Re: IQC Master Contract #: Area 1-1- MCP Work Order #: 010669.05 Owner PO #: Title: City of Lubbock- Fire Station Repairs_MCP_FS#7 Contractor: Minnix Commercial Partners, LTD Proposal Value: $24.550.23 Flooring $14,969.39 General $517.47 Kitchen $8,572.84 Overhead Doors $490.53 Proposal Total $24,550.23 The Percentage of NPP on this Proposal: 12.35% Contractors Prtce Proposal - Summary Page 1 of 1 EZIQC - Buy Board 6/24/2011 Contract No. 10260 Contractor's Price Proposal Category - Detail (Date: June 24, 2011 Re: IQC Master Contract* Area 1-1- MCP Work Order # 010669.05 Owner PO *: Title: City of Lubbock - Fire Station Repair4_MCP_FS#7 Contractor: Minna Commercial Partners, LTD Proposal Value: $24,550.23 Sect. Item Modifier UOM Description Lino Total Labor Equip. Material (Excluded if marked with an X) 2 09310 0003 SF Unmounted Floor Tile, "" And LargerNobw. Includes glazed porcelain, unglazed $11.009.12 porcelain and glazed ceramic tiles. Quantity Unit Price Factor Total Installation 1,395.00 x 6.49 x 12160 - 11.009.12 Ceramic as specified. 3 09650 0025 SF Travertine Patten Vinyl Composition Tile 1/8" Thick $763.34 Quantity Unit Price Factor Total Installation 0.00 x 1.93 x 1.2160 = 0.00 Demolition 1.395.00 x 0.45 x 1.2160 ■ 763.34 4 09MOD 0025 0190 For Quantities n 1000 To 3000, Deduct -$50.89 Quantity Unit Price Factor Total Installation 1,395.00 x -0.03 x 1.2160 -50.89 5 09650 0047 LF 4- Hlgh 118" Rubber Base, Group 1 Black, Russet And Umber $1,371.86 Quantity Unit Price Factor Total Installation 600.00 x 1,43 x 1.2160 1,043.33 Demotition 600.00 x 0.45 x 1.2160 = 326.32 6 09680 0024 SY 22 Ounce, Medium Traffic, Non-Pattemod, Nylon Broadloom Carpet $103.42 Quantity Unit Priors Factor Total Installation 0.00 x 22.93 x 1.2160 = 0.00 Demolition 35.00 x 2.43 x 1.2180 = 103.42 Subtotal for Flooring $14,969.39 General 7 01510 0011 EA Dumpstnr In/Out Fee $152.00 Quantity Unft Price Factor Total Installation 1.00 x 126.00 x 1.2160 152.00 8 01510 0012 EA Dumpster Daily Fee $72.96 Quantity Unit Price Factor Total Installation 30.00 x 2.00 x 1.2160 = 72,98 9 08710 2155 EA Surface Mounted High Security Door Closer- LCN 4510 Series $275.73 Quantity Unit Price Factor Total Installation 1.00 x 216.86 x 1.2160 4 263,70 Demolition 1.00 x 9.89 x 1.2160 = 12.03 Fact, Closet Door, not enough room inside above door for new calling door. 10 08MOD 2155 0428 EA For Hold Open Ann, Add $16.78 Quantity Unit Price Factor Total Installation 1.00 x 13.80 x 1.2180 3 16.79 Contractor's Price Proposal - Detail Page 1 of 2 EZ1QC - Buy Board 6/24/2011 Contract No. 10260 Contractor's Price Proposal - Detail Continues.. Work Order Number: 010669.05 Work Order Title: City of Lubbock - Fire Station Repairs_MCP_FS#7 sea tbm Nlodifer UOM Description Line Total Labor Equip. Material (Excluded if marked with an X) Subtotal for General $517.47 Kitchen 12 01906 0084 EA Replace Knob/Pull $922.07 Quantity Unit Price Factor Total Installation 71.00 x 10.68 x 1,2160 = 922.07 13 06416 0005 LF Plastic Laminated Counter Top Custom Made With BacksplashNote: Up to 26" $249.04 deep Quantity Unit Price Factor Total Installation 0.00 x 28.08 x 1.2160 0,00 Dam0111110n 40.00 x 5.12 X 1.2160 = 249.04 14 06416 0011 SF 112' Solid Polyester (Corlan) CountertopNote: Quantity based on area of counter, $3,235.65 backsplash and apron. Includes drilling hoies for fixtures and 1-117 drop edge with I Ir radius edges (when apron not used). Quantity Unit Price Factor Total installation 110.00 x 24.19 x 1.2160 3,235.65 15 06MOD 0011 0077 EA For Each Sink, Range Or Vanity Cutout, Add $36.48 Quantity Unit Price Factor Total Installation 2.00 x 15.00 x 1.2160 36.48 i8 08710 0004 PR 3-1/2" x 3-112" Standard Duty, Full Mortise, Plain Bearing, BrasslBronze, Satin $2,869.82 Chrome Finish Hinge Quantity Unft Price Factor Total Installation 55.00 x 40.52 x 1.2160 2,709.98 Demolition 55.00 x 2.39 x 1.2160 A 159.84 Subtotal for Kitchen $8,572.84 Overhead Doors 17 08330 0214 LF Top Of Door, Weather Strip Seal For Coiling Doors $192.25 Quantity Unit Price Factor Total Installation 0.00 x 1.91 x 1.2160 0.00 Demolition 310.00 x 0,51 x 1.2160 192.26 Demo of Weatherstripping 18 08364 0003 LF Weather Seal At Top Of Door $298.28 Quantity Unit Price Factor Total Installation 110.00 x 2.23 x 1.2100 = 298.28 Subtotal for Overhead Doors $490.53 Proposal Total $24,650.23 This total represents the correct total for the proposal. Any discrepancy between Tins totals, sub -totals and the proposal total is due to rounding. The Percentage of NPP on this Proposal: 12.35% Contractors Price Proposal - Detail Page 2 of 2 EZfQC - Buy Board 6124/2011 Contract No. 10260 Contractor's Price Proposal Category - Summary Date: June 24, 2011 Re: IQC Master Contract #: Work Order #: Owner PO #: Title: Contractor: Proposal Value: Area 1-1- MCP 010669.06 City of Lubbock - Fire Station Repairs MCP_FS#9 Minnix Commercial Partners, LTD $66,610.59 Asbestos $1,912.80 Bathroom $23,948.98 Concrete $11,114.77 Exterior $17,741.24 General $608.00 Interior $850.71 Kitchen $9,744.91 office $789.18 Proposal Total $66,610.59 Contractor's Price Proposal - Summary Page 1 of 1 EZIQC - Buy Board 6/24/2011 Contract No. 10260 Contractor's Price Proposal Category - Detail Date: June 24, 2011 Re: IQC Master Contract* Area 1-1- MCP Work Order #: a 10669.06 Owner PO #: Tltte: City of Lubbock - Fire Station Repairs_MCP_FS#9 Contractor; Minnix Commerdal Partners, LTD Proposal Value: $66,610.59 Sect. Item Modifier IJOM Oncriptlort Line Todd Labor Equip. Material (Excluded if marked with an XI Asbestos 1 13281 0063 SF 10 To 500 SF Floor Tile Or Linoleum, Single Layer Or First Of Multiple Layen $358.72 Quantity Unit Price Factor Total Installation 100.00 x 2.95 x 1,2160 - 358.72 2 13281 0139 EA c 10 CF Asbestos Contaminated Debris Collection And Disposal $350.58 Quantity Unit Price Factor Total Installation 100 x 288.29 x 1,2160 ' 350.56 3 13281 0202 HR Bulk Sampling Or Air Monitoring $659,75 Quantity Unit Price Factor Total Installation 16.00 x 33.91 x 1.2160 ' 659.75 4 13289 0007 EA T Zipper Door For Plastic Sheeting $27.58 Quantity Unit Price Factor Total Installation 1.00 x 22.68 x 1.2160 ' 27.58 5 13289 0012 EA Type C Supplied Air System $ 488.10 Quantity Unit Price Factor Total Installation 1.00 x 401A0 x 1.2160 , 488.10 6 13289 0015 SF Clean Asbestos Surface 101 To 500 SF $28,09 Quantity Unit Price Factor Total Installation 110.00 x 0,21 x 1.2160 20.09 Subtotal for Asbestos $1,912.80 Bathroom 7 03540 0004 SF 11T Thick Self Leveling Undertayment For Concrete Floors Including Surface $834.27 Preparation Quantity Unit Price Factor Total Installation 256.00 x 2.68 x 1.2180 834,27 Floor prep a 06415 0002 EA Field Cutout For Sinks And Lavatories $103.57 Quantity Unit Price Factor Total Installation 3.00 x 28.39 x 1.2160 103.57 9 06415 0005 LF Plastic Laminated Counter Top Custom Made With BacksplashNote: Up to 26- $807.03 deep Quantity Unit Price Factor Total Installation 16.00 x 26.08 x 1.2180 3 507.41 Demolition 16.00 x 5.12 x 12160 = 90.61 10 09305 0009 SF 112" Cementitious Backer Units For Installation On Floats $2,101.55 Quantity Unit Price Factor Total Installation 775.00 x 1.98 x 1.2160 - 1,865.95 Demolition 775.00 x 0.25 x 1.2160 235.60 Contractor's Price Proposal - Detail Page 1 of 6 EZIQC - Buy Board 612412011 Contract No. 10260 Contractor's Price Proposal - Detail Continues.. Work Order Number: 010669.06 Work Order Title: City of Lubbock - Fire Station Repairs_MCP_FS#9 Sect Itam Modifer UOM Description Line Total Labor Equip. Material (Excluded If marked with an X) Bathroom 11 0910100 0009 0085 For Installation On Wall, Add $197.90 Quantity Unit Price Factor Total Installation 775.00 x 021 x 1.2160 - 197.90 12 09310 0003 SF Unmounted Floor Tile, 6"x8" And LargerNots: Includes glazed porcelain, unglazed $2.203.98 porcelain and glazed ceramic ties. Quantity Unit Price Factor Total Installation 258.00 x 6.49 x 1.2180 2.020.31 Demolition 256.00 x. 0.59 x 1.2160 183.66 13 09310 0010 SF Unmounted Wall Tile, 8"x8" And LargerNots: Includes glazed porcelain, unglazed $7,322.45 porcelain and glazed ceramic files. Quantity Unit Price Factor Total Installation 775.00 x 7.03 x 1.2160 a 6.626.01 Demolition 775.00 x 0.74 x 1.2160 a 897.38 _ 14 09310 0019 LF Glazed Porcelain, Unglazed Porcelain And Glazed Ceramic Cove Base Or Trim $824.62 Quantity Unit Price Factor Total Installation 62.00 x 7.44 x 1.2160 - 741.86 Derrrotibon 02.00 x 0.83 x 1.2160 - 82.76 15 10160 0098 EA 36" x e0", Overhead Braced, Stainless Steel, One Compartment Comer Unit $3,038.78 Complete Toilet Partition Quantity Unit Price Factor Total Installation 2.00 x 1,20261 x 1.2160 - 2,924.75 Demolition 2.00 x 48.69 x 1.2160 - 114.04 15 10160 oils EA 24" x 58" x 1", Wall Hung And Post Supported, Stainless Steel, Urinal Screen $743.77 Quantity Unit Price Factor Total Installation 1.00 x 587.80 x 12150 3 714.76 Demolition 1,00 x 23.85 x 1.2460 - 29.00 17 10160 0120 EA 24" x 58" x 1", Stainless Steel, Toilet Partition Door $800,27 Quantity Unit Price Factor Total Installation 2.00 x 322.24 x 1.2160 783.69 Demolition 2.00 x 6.82 x 1.2160 18.59 18 10160 0156 FA Up To 4" x 82" x 1-114', Stainless Steel, Toilet Partition Pilaster $359.19 Quantity Unit Price Factor Total Installation 2.00 x 142.62 x 1.2160 347.34 Demolition 2.00 x 5.12 x 1.2180 12.45 is 10160 015s EA 6" x 82" x 1-1/4", Stainless Steel, Toilet Partition Pilaster $208.75 Quantity Unit Price Factor Total Installation 100 x 164.85 x 1.2160 a 200.46 Demolition 1.00 x 6.82 x 1.2160 - 8.29 20 10160 0160 FA I x 82" x 1-1/4", Stainless Steel, Toilet Partition Pilaster $308.40 Quantity Unit Price Factor Total Installation 1.00 x 245A0 x 1.2180 = 298.04 Demolition 1.00 x 8.62 x 1.2160 . 10.36 21 10810 0280 EA Remove And Reinstall Bathroom Accessory $77.70 Quantity Unit Price Factor Total Installation 6.00 x 10.65 x 1.2160 77.70 We are replacing the file so the accessories must be removed and replaced in order to replace the tile. Contractor's Price Proposal - Detail Page 2 of 6 EZJQC - Buy Board 6/24/2011 Contract No. 10260 Contractor's Price Proposal - Detail Continues.. Work Order Number: 010669.06 Work Order Title: City of Lubbock - Fire Station Repairs_MCP_FS#9 Seat. Item Modfer UOM Cescripdon Line Total Labor Equip. Material (Excluded If marked with an X) Bathroom 22 15451 0100 EA 27x19" Enameled Cast Iron Countertop Lavatory (Kohler K-29294) $1,479.34 Quantity Unit Price Factor Total Installation 3.00 x 379.46 x 1.2160 ' 1,384.27 Demoiition 3.00 x 26.06 x 11160 = 95.07 23 16451 0212 FA 319" To 1W Compression Shut-off Valve Replacement With 15" Polybutylene $50.51 Supply Tube Quantity Unit Price Factor Total Installation 3.00 x 22.07 x 1.2160 80.51 24 15451 0213 EA Chrome Supply Lines To Sink/Lavatory Replacement, Pair se8.87 Quantity Unit Price Factor Total Installation 6.00 x 12.18 x 1.2180 a8.67 25 15451 0214 EA Single Bawl Sink/Lavatory Drain Line Replacement 358.18 Quantity Unit Price Factor Total Installation 3.00 x 15.40 x 12160 = 56.18 26 15461 0215 EA Double Bowl Sink/Lavatory Drain Line Replacement $30.63 Quantity Unit Price Factor Total Installation 1.00 x 25.19 x 1.2160 = 30A3 27 15451 0266 EA Remove And Reinstall Floor Mount Water Closet With Flush Valve $2136.18 Quantity Unit Price Factor Total Installation 2.00 x 109.45 x 1.2160 ' 266.18 28 15451 0269 EA Remove And Reinstall Wall Hung Urinal Wlth Flush Valve $177.71 Quantity Unit Price Factor Total Installation 100 x 140.14 x 1.2180 ' 177.71 29 15451 0306 EA Easy -Push Metering 4" Centerset Faucet (Speakman $4141-LD) s927.10 Quantity Unit Price Factor Total Installation 3.00 x 243.42 x 1.21eo , 888.00 Dernoildan 3.00 x 10.72 x 1.2160 = 39.11 30 15457 0011 to Wall Mounted Shower Valve And Slide Bar, Single Lever Concealed Mixer; $422.10 Symmone * 96-300-B30-V-X Quantity Unit Price Factor Total Installation 1.00 x 385.33 x 1.2160 = 468.56 DemoOtion 1.00 x 19.38 x 1.2150 - 23.64 3i 1we 0017 SF 7 Oz Bituminous Membrane Shower Pan $517.53 Quantity Unit Price Factor Total Installation 140.00 x 3.04 x 1.2160 = 51T53 Subtotal for Bathroom $23,848.98 Concrete 32 02112 0021 SY Break -Up And Remove >3" To 6" Thick Bituminous Pavement $2,172A1 Quantity Unit Price Factor Total Installation 236.00 x 7.57 x 1.2160 v 2,172.41 33 02112 0033 SY Break -Up And Remove ?9" To 14" Thick Concrete With Reinforcing Rod. $1,138.61 Quantity Unit Price Factor Total Installation 34.00 x 27.54 x 1.2160 1,138.61 Contractors Price Proposal - Detail , Page 3 of 6 EVOC - Buy Board 612412011 Contract No. 10260 Contractor's Price Proposal - Detail Continues.. Work Order Number: 010669.06 Work Order title: City of Lubbock - Fire Station Repairs_MCP_FS#9 Sect. Item Modlif r WM Description LIM TOW Labor Equip. Material (Excluded if marked with an X) Concrete 34 02112 0037 SF Break -Up And Remove 1' To 3' Thick Bituminous Pavement By Hand $102.14 Quantity Unit Price Factor Total Installation 75.00 x 1.12 x 1.2160 102.14 35 03110 0009 LF Up To 6' High Slab Edge and Block -Out Wood Formwork $585.43 Quantity Unit Price Factor Total Installation 236.00 x 2.04 x 1.2160 - 585.43 36 03MOD 0009 0004 For Quantities < 250. Add $106.16 Quantity Unit Price Factor Total Installation 236.00 x 0.37 x 1.2160 = 108.18 37 03210 0002 TON Grade 40 Reinforcing Steel, Footings And Slabs, #346 $919.00 Quantity Unit Price Factor Total Installation 0.50 x 1,511.52 x 1.2160 = 919.00 38 03220 0002 SF 6 x 6 x #10, 21#1CSF, Welded W{re Reinforcement In Slabs, (W 1.4 x W 1.4) $689,47 Quantity Unit Price Factor Total Installation 1,575.00 x 0.36 x 1.2160 689.47 39 03311 0026 CY Up To 8', By Direct Chute, Place 3000 PSI Concrete Slab On Grade $3,703.81 Quantity Unit Price Factor Total Installation 33.00 x 92.30 x 1.2160 ' 3,703.61 40 03MOD 0028 0037 For 4000 PSI (280 KglCm2) Concrete, Add $282.90 Quantity Unit Price Factor Total Installation 33.00 x 7.05 x 1.2180 282.90 41 03MOD 0026 0047 For Quantities > 20 To 50, Add $62.20 Quantity Unit Price Factor Total Installation 33.00 x 1.55 x 1.2160 62.20 42 03350 0006 SF Concrete Floor Finishes, Steel Trowel $971.28 Quantity Unit Price Factor Total Installation 1,775.00 x 0.45 x 1.2160 = 971.28 We are pouring back more than we we taking out to control perking at rear of building. 43 03530 0008 SF Concrete Topping, 3' Thick Hard Trowel (76 mm) Integral Topping 1:1:2 Mix $381,34 Quantity Unit Price Factor Total Installation 160.00 x 198 x 12160 - 381.34 Subtotal for Concrete $11,114.77 Exterior 44 13122 0114 LF Pre -Engineered Standard Type Gutter, Painted $4,697.16 Quantity Unit Price Factor Total Installation 444.00 x 8,70 x 1,2160 - 4,897.16 45 13122 0148 LF 2' Standard Eave Overhang Without Soffit $13,044.08 Quantity Unit Prig Factor Total Installation 44400 x 24.16 x 1,2160 13,044.06 Subtotal for Exterior $17,741.24 General ' Contractor's Price Proposal - Detail Page 4 of 6 Ez10C - Buy Board W2412011 Contract No. 10260 Contractor's Price Proposal - Detail Continues.. Work Order Number: 010669.06 Work Order Title: City of Lubbock - Fire Station Repairs -MCP FS#9 Sect. Item Modifer UOIM Description UnaTotd Labor Equip. Material (Excluded H marked with an Xi General 46 01510 0011 EA ❑umpster IrdOut Fee $608.00 Quantity Unit Price Factor Total Installation 4.00 x 125.00 x 1.2160 608.00 Subtotal for General $608.00 Interior 47 12210 0005 SF Horizontal, 1" Aluminum Slats $650.71 Quantity Unit Price Factor Total Installation 120.00 x 5.41 x 1,2180 - 789.43 Demolition 120.00 x 0,42 x 1.2160 = 61.29 Window Blinds Subtotal for Interior $850.71 Kitchen 46 01906 0084 Ell Replace Knob/Pull $441.55 Quantity Unit Price Factor Total Installation 34.D0 x 10.68 x 1.2180 441.55 Replace all kitchen knobs 49 06410 0034 LF a30%3(- Wde, 34-1tr High x 24" Deep Built -In -Place 2-Drawer/2-Door $375.96 Cabinet, Note: Prefinlshed with solid hardwood race frames, hardwood door frames and drawer fronts. Hardwood veneer on raised door panels. Excludes top. Quantity Unit Price Factor Total Installation 2.00 x 133.10 x 1.2160 = 323.70 Demolition 2.00 x 21.41) x 1.2160 = 62.26 50 06410 0091 LF 30-38" Wide, 36" High x 13" Deep Built In Place Double Door Wall Cabinet,Nota: $269.92 Prefiniahed with solid hardwood face frames, hardwood door frames. Hardwood veneer on raised door panels. Quantity Unit Price Factor Total Installation 2.00 x 105.23 x 1.2160 255.92 Demolition 2.00 x 13.98 x 1.2160 34.00 51 06410 0101 EA Double Oven CabinetNate: Prefinished with solid hardwood face frames, hardwood $264.58 door frames. Quantity Unit Price Factor Total Installation 1.00 x 217.58 x 1.2160 264.Sa 52 06420 0045 SF 1/16" Plastic Laminate, Includes Cutting To Fit $871.14 Quantity Unit Price Factor Total Installation 120.00 x 4.78 x 1.2160 697.50 Demolition 120.00 x 1.19 x 1.218o * 173.64 53 08710 0004 PR 3-112" x 3-11r Standard Duty, Full Mortise, Plain Bearing, Brass/Bronze, Satin $1,252.29 Chrome Finish Hinge Quantity Unit Price Facia Tatar Installation 24.00 x 40.52 x 1.2180 - 1,182.54 Demolition 24.00 x 2.39 x 1.2160 = 69.75 Replace all hinges 54 09920 0308 SF Paint Interior Cabinets And Casework, One Coat Prime, Two Costs Paint, Enamel $518.38 Primer, Alkyd Or Latex Paint Quantity Unit Price Factor Total Installation 435.00 x 0.98 x 1.2160 518.38 Painted shelves inside cabinets. Contractor's Price Proposal - Detail Page 5 of 6 EZJQC - Buy Board 6/2412011 Contract No. 10260 Contractor's Price Proposal - Detail Continues.. Work Order Number: 010669.06 Work Order Title: City of Lubbock - Fire Station Repairs_MCP—FS#9 Sect Item Modifer UOM Description Line Total Labor Equip. Material (Excluded if marked with an X) Kitchen 55 09930 0020 SF One Coat Stain With Brush And Wipe Cabinet $240.04 Quantity Unit Price Factor Total Installation 420.00 x 0,47 x 1.2160 = 240.04 Exterior of cabinets stained 56 09930 0021 SF One Coat Shellac, Varnish Or Polyurethane Cabinet $245.15 Quantity Unit Price Factor Total Installation 420.00 x 0.48 x 1,2160 245.15 Exterior of cabinets stained. 57 09945 0038 SF Chemical Clean, Brush And Wash Wood Surfaces $384,68 Quantity Unit Price Factor Total Installation 855,00 x 0.37 x 1.2160 = 384.68 Stripping cabinets 58 09945 0042 SF Sanding Wood Paneling, Boards, Doors, Etcetera $280.71 Quantity Unit Price Factor Total Installation 855.00 x 0.27 x 1,2160 = 280.71 59 11420 0003 EA Bake Oven - Double Deck S4,580.51 Quantity Unit Price Factor Total Installation 1.00 x 3,714.76 x 1.2160 ' 4.517.15 Demolition 1.00 x 52.11 x 1.2160 = 63.37 KltchertAid Model# KEBS208SSS Subtotal for Kitchen $9,744.91 Office 60 09310 0003 SF Unmounted Floor Tile, 8"x8" And LargerNote: Includes glazed porcelain, unglazed $789.18 porcelain and glazed ceramic tiles. Quantity Unit Price Factor Total Installation 100.00 x 6.49 x 1.2160 789.18 Subtotal for Office $789.10 Proposal Total $66,610.59 This total represents the correct total for the proposal. Any discrepancy between line totals, sub -totals and the proposal total is due to rounding. Contractor's Price Proposal - Detail Page 6 of 6 EZJQC - Buy Board 6124/2011 Contract No. 10260 Resolution No. 2011—RO321 4:gBoard" j Detailed Scope of Work To: Rad Borg From: Wesly Everett Minnix Commercial Partners, LTD City of Lubbock PO Box 64895 1625 13th St Lubbock, TX 79464 Lubbock, TX 79401 (806)773-1221 (806)775-2275 Date Printed: June 24, 2011 Work Order Number: 010669.07 Work Order Titre: Co of Lubbock - Fire Station Repairs_MCP_FS#10 Brief Scope: Fire Station #10 Repairs F] Preliminary Revised ❑X Final The following items detail the scope of work as discussed at the site. All requirements necessary to accomplish the items set forth below shall be considered part of this scope of work. The following work/repairs will be performed: 1. Replace existing air conditioner unit 2. Repair mortar in brick on exterior 3. Replace counter tops with laminate up the back wall in kitchen and office countertops 4. Replace cooktop, double oven, and modify cabinet to fit larger oven. 5, Replace pulls on kitchen cabinets. 6. Replace kitchen sinklfaucettsupply lines/drain line/stops. 7. Re -Stain exterior of kitchen cabinets and paint interior shelving as requested. Scope of Work Page t of 1 EZ1QC - Buy Board W24/2011 Contract No. 10260 Contractor's Price Proposal Category - Summary Date: June 24, 2011 Re: 1QC Master Contract #: Area 1-1- MCP Work Order #: 010669.07 Owner PO #: Title: City of Lubbock - Fire Station Repairs_MCP_FS#10 Contractor: Minnix Commercial Partners, LTD Proposal Value. $26,673.94 General $3,429.73 HVAC $8,960.26 Kitchen $14,283.95 Proposal Total $26,673.94 The Percentage of NPP on this Proposal: 3.01% Contractors Price Proposal - Summary Page 1 of 1 EZlQC - Buy Board 612412011 Contract No. 10260 Contractor's Price Proposal Category - Detail Date: June 24, 2011 Re: IQC Master Contract #: Area 1-1- MCP Work Order #: 010669.07 Owner PO #: Title: City of Lubbock - Fire Station Repairs_MCP_FS#10 Contractor: Minix Commercial Partners, LTD Proposal Value: $26,673.94 Sect Item Modifer UDM Description Line Total Labor Equip. Material (Excluded If marked with an X) General 1 01510 0011 EA Dumpster In/Out Fee $152.00 Quantity Unit Price Factor Total Installation 1,00 x 125,00 x 1.2160 = 152.00 2 04910 0002 SF Cut And Repaint Brick, Hard In -Tact Mortar, Running Bond $3,381.70 Quantity Unit Price Factor Total Installation 450.00 x 6.18 x 1.2160 3,381.70 Mortar Repair 3 04MOD 0002 0074 For Quantities > 250 To 1000 (> 23.2 m2 To 93 m2), Deduct -$103.97 Quantity Unit Price Factor Total Installation 450.00 x -0.19 x 1.2160 103,97 Subtotal for General $3,429.73 HVAC 4 15770 0037 EA 5 Ton Cooling, 100 MBH Gas Heating Self Contained Package Rooftop Unit $8,338.26 Quantity Unit Price Factor Total Installation 100 x 6.746,17 x 1.2160 8,203.34 Demolition 1.00 x 110.95 x 1.2160 = 134.92 5 15MOD 0037 0610 For Equipment 16ase Roof Curb, Add $622.00 Quantity Unit Price Factor Total Installation 1.00 x 511.51 x 1.2160 - 622.00 Subtotal for HVAC $8,960.26 Kitchen 7 01906 0084 EA Replace Knob/Pull $363.63 Quantity Unit Price Factor Total Installation 28.00 x 10.68 x 1.2160 363.63 8 06410 0034 LF >30"-36" Wide, 34-1/2" High x 24" Deep Built -In -Place 2-Drawer/2-Door $375.96 Cabinst,Nots: Prefinished with solid hardwood face frames, hardwood doorframes and drawer fronts. Hardwood veneer on raised door panels. Excludes top. Quantity Unit Price Factor Total Installation 200 x 133,10 x 1.2160 = 323.70 Demolition 2.00 x 21.49 x 1.2160 = 52.26 Contractor's Price Proposal - Detail Page 1 of 3 EZIQC - Buy Board 6/24/2011 Contract No, 10260 Contractor's Price Proposal - Detail Continues.. Work Order Number: 010669.07 Work Order Title: City of Lubbock - Fire Station Repairs_MCP_FS#10 sect ttem modlfer UOM Descripdoe Una ToW Labor Equlp. Material )Excluded if marked with an X) Kitchen 9 06410 0091 LF 30-36" Wde, 36" High x 13" Deep Built In Place Double Door Wall Cabinst,Note: $289.92 Prefinished with solid hardwood face frames, hardwood door frames, Hardwood veneer an raised door panels. Quantity Unit Price Factor TOW installation 2,00 x 105.23 x 1.2160 = 255.92 Demolition 2.00 x 13.98 x 12160 34.00 10 06410 0101 EA Double Oven CabinstNote: Prefinished with solid hardwood face frames, hardwood $283.22 door frames. Quantity Unit Price Factor Total Installation 1.00 x 217.58 x 1.2160 = 264.58 Demolition 1.00 x 15.33 x 1.2160 = 18.64 11 06415 0002 EA Field Cutout For Sinks And Lavatories $89.04 Quantity Unit Price Factor Total Installation 2.00 x 28.39 x 1.2180 69.04 12 06415 0005 LF Plastic Laminated Counter Tap Custom Made With BacksplashNote: Up to 26" $3,642.16 deep Quantity Unit Price Factor Total Installation 98.00 x 26.08 x 1.2180 3,044.47 Derratlon 98.00 x 5.12 x 1.2160 - 597.69 13 06420 0045 SF 1116" Plastc Laminate, Includes Cutting To Fit $907.44 Quantity Unit Price Factor Total Installation 125.00 x 4.78 x 1,2100 = 726.56 Demolition 125.00 x 1.19 x 1,2160 - 180.88 For laminate an back wail per request 14 09920 0308 SF Paint Interior Cabinets And Casework, One Coat Prime, Two Costs Paint Enamel $446.88 Primer, Alkyd Or Latex Paint Quantity Unit Price Factor Total Installation 375.00 x 0.98 x 1,2160 446.80 15 09930 0020 SF One Coat Stain With Brush And Wpe Cabinet $214,32 Quantity Unit Price Factor Total Installation 375.00 x 0.47 x 1.2160 214.32 18 09930 0021 SF One Coat Shellac, Varnish Or Polyurethane Cabinet $218.88 Quantity Unit Price Factor Total Installation 375.00 x 0.40 x 1.2160 : 210.80 17 09945 0038 SF Chemical Clean, Brush And Wash Wood Surfaces $337.44 Quantity Unit Price Factor Total Installation 750.00 x 0.37 x 1.2160 a 337.44 18 09945 0042 SF Sanding Woad Paneling, Boards, Doom, Etcetera $246.24 Quantity Unit Price Factor Total Installation 750.00 x 0.27 x 1.2160 246.24 19 11420 0003 EA Bake Oven - Double Dock $4.580.51 Quantity Unit Price Factor Total Installation 100 x 3,714.76 x 1.2180 - 4.517.15 Demolition 1.00 x 52.11 x 1.2160 = 63.37 Model KEBS206SSS Contractor's Price Proposal - Detail Page 2 of 3 EZlQC - Buy Board 6/24/2011 Contract No. 10260 Contractor's Price Proposal - Detail Continues.. Work Order Number: 010669.07 Work Order Title: City of Lubbock - Fire Station Repairs_MCP_FS#10 sect, Item Modifer UOM Description Line Total Labor Equip. Material (Excluded If marked with an X) Kitchen 20 15451 0182 EA 33"x22"x8" Stainless Steel Kitchen Sink, Double Bowl, 18 Gauge (Elkay LR3322) $1,196.88 Quantity Unit Price Factor Total Installation 1.00 x 952.41 x 1.2160 � 1,158.13 Demolition 1.00 x 31.87 x 1.2160 = 38.75 21 15451 0212 EA 318" To 1/2" Compression Shut -of Valve Replacement With 15" Polybutytene $53.67 Supply Tube Quantity Unit Price Factor Total Installation 2.00 x 22.07 x 1.2160 53.67 22 15451 0215 EA Double Bowl Sink/Lavatory Drain Line Replacement $30.63 Quantity Unit Price Factor Total Installation 100 x 25.19 x 1.2160 30.63 23 15451 0216 EA Braided Stainless Steel, Compression x FIP, Supply Linea To Sink/Lavalory $13,55 Replacement Quantity Unit Price Factor Total Installation 100 x 11.14 x 1.2160 13.55 24 15451 0282 EA Top Cast Kitchen Faucet With Spray, Single Handle, Stainless Steel Finish, Delta $209.80 Brilliance 440 -SSWF Quantity Unit Price Factor Total Installation 1.00 x 157.64 x 1,2160 = 191.69 Demolition 1.00 x 14.89 x 1.2160 = 16.11 Subtotal for Kitchen $14,283.95 Proposal Total $26,673.94 This total represents the correct total for the proposal. Any discrepancy between line totals, sub -totals and the proposal total is due to rounding. The Percentage of NPP on this Proposal: 3.01% Contractors Price Proposal - Detail Page 3 of 3 EZIQC - Buy Board 6/2412011 Contract No. 10260 Resolution No, 2011-RO321 Board Cacptnd.� Pwcllas/q too Detailed Scope of Work To: Rad Borg From: Wesly Everett Minnix Commercial Partners, LTD City of Lubbock PO Box 64895 1625 13th St Lubbock, TX 79464 Lubbock, TX 79401 (806) 773-1221 (806) 775-2275 Date Printed: June 24, 2011 Work Order Number: 010669,08 Work Order Title: City of Lubbock - Fire Station Repairs_MCP_FS#15 Brief Scope: Fire Station #15 Repairs Preliminary Revised Fx1 Flnal The following items detail the scope of work as discussed at the site. All requirements necessary to accomplish the items set forth below shall be considered part of this scope of work. The following repairs/work will be performed: 1. Caulk cracks in CMU block in Apparatus Bay 2. Replace hinges kitchen cabinets 3. Regrout ceramic tile in women's shower 4. Replace Hot Water Healer 5. Replace Dormroom flooring 6. Replace Dayroom Carpet 7. Replace flooring in Exercise Room 8. Replace closer on NW back exterior door. Scope of Work Page t of 1 EZlQC - Buy Board 6/24/2011 Contract No. 10260 Contractor's Price Proposal Category - Summary Date: June 24, 2011 Re: IQC Master Contract* Area I-1- MCP Work Order #: 010889.08 Owner PO #: Title: City of Lubbock - Fire Station Repa1rs_MCP_FS#15 Contractor: Minnix Commercial Partners, LTC) Proposal Value: $26,098.88 Concrete $780.76 Doors $945.40 Flooring $18,561.79 General $4,720.21 Interior $1,190.70 Proposal Total $20,098.88 The Percentage of NPP on this Proposal: 24.00% Contractor's Price Proposal - Summary Page 1 of 1 EZIQC - Buy Board 6/2412011 Contract No. 10260 Contractor's Price Proposal Category - Detail Date: .lure 24. 2011 Re: IQC Master Contract* Area 1-1- MCP Work Order #: 010669.08 Owner PO # Title: City of Lubbock - Fire Station Repairs MCP_FS#1S Contractor: Minnbc Commercial Partners, LTD Proposal Value: $26,098.88 Suet. Itsrrr Modlfer WM Description Line Total Labor Equip. Material (Excluded If marked with an 7) Concrete 1 07920 0005 CLF 3/8" x 318" Joint, Silicone Sealant And Caulk" $780.78 Quantity Unit Price Factor Total Installation 3.40 x 188.85 x 12160 780.75 Subtotal for Concrete $780.78 Doors 2 08710 2155 EA Surface Mounted High Security Door Closer- LCN 4510 Series $275.73 Quantity Unit Price Factor Total Installation 1.00 x 216.86 x 1.2160 - 253.70 Demolition 1.00 x 9.89 x 1.2160 - 12.03 Replace doeer on NW back exterior. 3 08710 2299 EA Hinges, Concealed, Steel, Full Or Half Overlay, Self Closing $589.67 Quantity Unit Price Factor Total Installation 24.00 x 16A1 x 1.2160 = 470.15 Demolition 24.00 x 3.41 x 1.2160 = 99.52 Subtotal for Doors $ 5.40 5 09310 0003 SF Unmounted Floor Tf1e, 8"x8" And Larger Note: Includes glazed porcelain. unglazed $11.009.12 porcelain and glazed ceramic tiles. Quantity Unit Price Factor Total Installation 1,395.00 x 6.49 x 1,2160 - 11,009.12 6 09MOD 0003 0069 For Quantifies a 1000, Deduct -$407.12 Quantity Unit Prrce Factor TOW Installation 1,305.00 x -0.24 x 1.2160 -407.12 7 09620 0032 SF 9116" Interlocking Rubber Athletic FloortngNote: Black with hidden or exposed $3,480.06 locks. Pawling HL series. Quantity Unit Price Factor Total Installation 288 00 x 9.88 x 1.2160 3,480.08 8 09MOD 0032 0159 For Colors, Add $420.25 Quantity Unit Price Factor Total Installation 288.00 x 1,20 x 12160 420.25 9 09850 0025 SF Travertine Pattern Vinyl Composition Tole 118" Thick $703.34 Quantity Unit Price Factor Total Installation 0.00 x 1,93 x 1.2160 0.00 Demolition 1,395.00 x 0.45 x 1,21150 783.34 Contractor's Price Proposal - Detail r Page 1 of 3 EZlQC - Buy Board 8124/2011 Contract No. 10260 Contractor's Price Proposal - Detail Continues.. Work Order Number: 010669.08 Work Order Title: City of Lubbock - Fire Station Repairs_MCP_FS#15 sect. l4m Modifier Uort Doncriptlon tine TOW Labor Equip. Material (Excluded If marked with an X) Flooring 10 09MOD 0025 0190 For Quantities > 1000 To 3000, Deduct 4w-89 Quantity Unit Price Factor Total Installation 1,395.00 x -0.03 x 1,2160 -50,89 11 09650 0045 SF 7132" Thick Rubber TIIeNota Smooth, raised disc or other patterned surf-- $106.013 Quantity Unit Price Factor Total Installation 0.00 x 9.46 x 1.2100 0.00 Demolition 288.00 x 0.30 x 1.2160 = 105.06 12 09650 0047 LF 4" High 118" Rubber Base, Group 1 Black, Russet And Umber $1.371.65 Quantity Unit Price Factor Total Installation 600.00 x 1.43 x 1.2160 = 1,043.33 Demolition 600.00 x 0.45 x 1.2160 = 328.32 13 09680 0024 SY 22 dunce, Medium Traffic, Nun -Patterned, Nylon Broadloom Carpet $103.54 Quantity Unit Price Factor Total Installation 0.00 x 22.93 x 1.2160 = 0.00 Demoiition 65.50 x 2.43 x 1,2160 - 193.54 Subtotal for Flooring $18,561.79 General 15 01510 0011 EA Dumpster InfOut Fee $152.00 Quantity Unit Price Factor Total Installation 100 x 125.00 x 12160 - 162.00 Subtotal for General $4,720.21 Interior 16 09310 0014 SF Regrout Wall Tile Including Removal Of Loose Grout $548.32 Quantity Unit Price Factor Total Installation 144.00 x 3.12 x 1.2160 - 546.32 17 09920 0044 SF Paint Interior Concrete Masonry Units, t Coat Filler, Brush/RoterVWrk $296.34 Quantity Unit Price Factor Total Installation 736.00 x 0.33 x 1.2160 ' 295.34 Paint i8 09920 0045 SF Paint Interior Concrete Masonry Units, 1 Coat Paint, BruaftlRoller Work A-340.04 Quantity Unit Price Factor Total Installation 736.00 x 0.39 x 1.2160 349.04 Point Subtotal for Interior $1,190.70 Contractors Price Proposal - Detail • Page 2 of 3 EZ1QC - Buy Board 6/24/2011 Contract No. 10260 Contractor's Price Proposal - Detail Continues.. Work Order Number: 010669.08 Work Order Title: City of Lubbock - Fire Station Repairs_MCP_FS#15 Proposal Total This total represents the correct total for the proposal. Any discrepancy between Nine totals, sub -totals and the proposal total is due to rounding. The Percentage of NPP on this Proposal: 24.00% $ 26,098.88 Contractor's Price Proposal - Detail Page 3 of 3 EZlQC - Buy Board 6/24/2011